Loading...
HomeMy WebLinkAboutContract 60442-PM1CSC No. 60442-PM1 FORTWORTH PROJECT MANUAL FOR THE CONSTRUCTION OF WATER AND SANITARY SEWER IMPROVEMENTS TO SERVE INTERMODAL PARKWAY IPRC Record No. IPRC23-0102 City Project No. 104996 FID No. 30114-0200431-104996-EO7685 File No. NIA X File No. X-27872 Mattie Parker David Cooke Mayor City Manager Christopher P. Harder, P.E. Director, Water Department Lauren Prieur, P.E. Director, Transportation and Public Works Department Prepared for The City of Fort Worth February 2024 PREPARED BY PELOTON LAND SOLUTIONS 9800 HILLWOOD PARKWAY, SUITE 250 FORT WORTH, TEXAS 76177 817-562-3350 TBPE Firm No. 12207 2 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 8 SECTION 00 00 10 TABLE OF CONTENTS DEVELOPER AWARDED PROJECTS Division 00 - General Conditions 1001113 lnvita4ionte Bidders 1002113 1004100 BidFe 00 42 43 Proposal Form Unit Price 00 45 12 Prequalification Statement 00 45 13 Bidder Preatua!447teatiet,k-pPliealien 00 45 26 Contractor Compliance with Workers' Compensation Law 00 52 43 Agreement nn 00 62 13 I Performance Bond 00 62 14 I Payment Bond 00 62 19 Maintenance Bond 00 72 go general Genditiens 00-00 I c , .,r., ,.,, 0073 10 I Standard City Conditions of the Construction Contract for Developer Awarded Projects Division 01- General Requirements 01 1100 Summary of Work 01 2500 Substitution Procedures I 01 31 19 Preconstruction Meeting Pmieel 01� 01 32 33 I h4eeth i�g Preconstruction Video 01 33 00 Submittals 01 35 13 Special Project Procedures 01 45 23 Testing and Inspection Services 01 50 00 Temporary Facilities and Controls 01 55 26 Street Use Permit and Modifications to Traffic Control 01 57 13 Storm Water Pollution Prevention Plan 01 60 00 1 Product Requirements 01 6600 I Product Storage and Handling Requirements 01 70 00 Mobilization and Remobilization 01 71 23 Construction Staking 01 74 23 Cleaning 01 77 19 Closeout Requirements 01 78 23 Operation and Maintenance Data 01 78 39 I Project Record Documents Last Revised nztn� nt�o 04A2 014 j 05/22/2019 1 nn fn�r02,9014 nn fnmrro2l�cvi4 1 09/01/2015 OY099020 I 04/02/2014 no/no 1r�9 06/16/2016 7I 01/31/2012 1 01/31/2012 01/31/2012 1111f15/air I name 01/10/2013 Last Revised 12/20/2012 08/30/2013 08/30/2013 1 08/30/2013 1 08/30/2013 1 08/30/2013 I 03/20/2020 07/01/2011 07/01/2011 07/01/2011 03/20/2020 7 04/07/2014 04/07/2014 04/07/2014 I 04/07/2014 04/07/2014 04/07/2014 04/07/2014 CITY OF FORT WORTH Wtr & Sivr Improvements to serve Gnernrodal PlnvJ, 5TANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 8 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents NONE Division 02 - Existing; Conditions 024113 D��iv�issionn 03 - Concrete 03 30 0 Cast In Amp, Ga er-ete nLSM� n L.- AR.-4n.' IF T-...-eh Re rVtl sFRt�a-,P21TaGlta-! [or[Ic,• • •.v,.atP Division 26 - Electrical 26-03-00 wnanv �xa Werk Rescitafor z[ee 260533 RaceA,a .; i i 11314:; fa L`leet :• .l Syst, < , ^L� l l..dergFOURd n,...t,. d 11:CIrrirye !4 cL,.a. iefl1 Sy4tems Division 31 - Earthwork 312323 I Boffevf 3124 00 _ €nakaak4nents M 2500 Erosion and Sediment Cafftrel 1 31 36 00 Gabiens 1313:7 0e R+rimp Division 32 - Exterior Improvements 3201 17 ice.• nt Asohith Pv. iv/; R%Inc r 32 i i 29 119� Liquid T..._ e 1 Sail Stabilize 13212 16 Arplvlr rc. irn 321273 Asphalt Paving r•-..,d, a....l.MRS 13213 28 Cetic+ete S+dc�wllrc, @rivr:: a� x d D....: _r Free 1 3213 73 Cenerete PaN,ifigjoilitSealaills 32 i4 i Wick r 32 16 13 GeneFete r l and r and Valley 6uReF 132 31-1-3 IChain Fenees and gates Date Modified CITY OF FORT WORTH Wh' & Slvr Lnprovements to serve Intermcdal Pkwy 5TANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS one Wife FeRees and gates 32 M 29 Wood Fenees and Gates 32 92-i3 aJamr=�rmzn* > c,slid Hddoaq 3293 43 T-Feeg and Division 33 - Utilities 33 03 i pyrur pt1wiug arrist+rtk SewerSlstetlts 133 0410 ,1 ra :: a.. _ ! l e;:, "�I GePresou Ciu*V Too# Ctatiens 39 04 12 >, 4agnesi , -Anode Gatti die n.,..mimi.,.., off..., 33 04 a Tempox ryWater Semiees 3 01 40 it - = 1 n ffe TeStitig rWyftl 33 0439 Cleeaing a"Se eF Maims 33051.0 UtilityT r•.._ h,.,l.. e t .,,1 B..l,ml . 2 Water hiae r o 33-05 13 I Frame, Govef aaol r[rmb I"�c �7a5t-kat 33 05 P Adjusting Alaaheles, inlets, Valve Begimes, and Other gtfueliare 33 0520 .hw-gxParinA 3303 21 THMA LiAlr P1rto 33 0522 Steel Gas"Ig pipe 33 0623 #tt:0. Tiamiling 330524 insi.lm�ca.patiaHrr.f r'il.:'I Y. PIRF In gasi . . Tunnel r : .,.nl.4e 330526 n4xk " Laeat 33 05y0 1 rr-x' l l,'l:,ie: 133 14 10 I guet:le lromPipe 93mod, I Ductile a c�,-=-iHii'igs .. uF 3311 13 '' 33 14 14 Bur4ed steel Pipe and Fittings 33 12-10 .x,er 1 irlLic 9 itneh 33 !224 AMPAIA RubbeF Seatsl, LIIIlarfy v21.,ys- 33Q 23 C-oxl2eetia, Ic G-.i..yi.14 urr.y ley 93 4230 I Gambit mi. VY: All MV. f A-,C.,-rtancq fe.. rotablp rate=rSystems 331240 I FiFe It rc l lydr t +9 33125e 33 1260 I Sties w-i p kal z f N'V rT Acsetrr64y Page 3 of 8 1 I CITY OF FORT WORTH Wir & Swr Improvements to serve Inferntodal Ahvy 5TANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 8 P�z:afir zed Pipe for Gmlity 980ilaFNI Sewers 33 � ..teH i'tlork .. Intrrt n_......:.. Ezritary Over Pipe lsv 3 3� P4)e . 33� Sa%iitafy Ce...e.. Slip L4ftifW, 33 9123 Serilz:y Evww.. Piro HpJargement 3331�A Ft3ttiiiffi A ✓ v I'V fol. ee.,:te.. Se.. e. Mains 333 39910 Gast in Plfiee r Ma"llslas r p 39 z8 I n r M t. 1 7l 333940 Ulaste ...te. A,..,ess rl,.....l.e.. PA/AG� 33� I L"._ 1 . _eFs for 0::::te y Sewer S!Fuet_Fes 33 4110 DeifAm'eed r,.ne.ete et:::%L Ew.,sr Pioey=cciiveii3 I � I ne : �i 33 a6-ee I d, i+>i� 33 4601 Slotted Stema Drains 33 4602 I TPeneh Drains 1 Manholes ..d T.. tie., D ..e.. 00 �n �1 t1 -- 33-19-20 curb .. ..I..Iete L. 13349 48 61. mmn DrWlrrxoi llmdslulls and t,r:......II . I I Division 34 - Transportation 3A� 1 TfaPfie Sigook 3A Al 1lnn1 :Pa . A N. A C-Antfolef Cabinet 9TTTp» . 3�4 41 10v02 tFEaelmul [r2Atran,2,SpedrtfeUvtion 34 41 1003 mtae-kmeHt G S aft%,,Hre SpeeifietAim 94 41 11 Toui7z.a7,, Trri�_ EIg+W 3 A� 134 41 15 3A� I Pede (Finn AybF:d CL..,..I 13441 �34-tAlrz2nornA1✓GMIi::HPeS _ 3A n1 owl rweway LED Read. ay r.....imiF,.. I34 Al 3n n3 oe..:,t.,..ti.,t r cry a �-,�-�;� I �m,�-,�_ I.zr/&,'rri 4A::'_144atr�-s 341190 IAlmnimum Sigtis 3A� T«e+�rGenl _ CITY OF FORT WORTH Wn' & Svr Improvements to score Grlermodal Plnvp STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 5 of 8 Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: bttp://fortworthtexas.eov/tpw/contractors/ Division 02 - Existing Conditions Last Revised 0241 13 Selective Site Demolition 12/20/2012 02 12991201P 02 41 15 I Paving Removal 02/02/2016 Division 03 - Concrete 03 30 00 Cast -In -Place Concrete 12/20/2012 0334 13 Controlled Low Strength Material (CLSM) 12120/2012 03-34-1 6 renef eie nase Maier:` Ia.. T..8,...I, n ,.. a if , o ro.� n�2 03-90..00 I AA di fi _.._.._ to L'.__'•.... Con .ete ct,., el ,oro�^rr^�^012 Division 26 - Electrical 1 Is., fie- El,,e6,i...,1 , ,, n 2605 1012y-OSAA Svm�1�n IlluhIl:���a= I%71XJl: X:i Q90/20i2 26-05 49 Unds: ffi-7iEIlA k%u .. - I .. n___. _ la_.• rl„_.. .l System oo/9420W 2605 0 .. into 69016 Division 31- Earthwork 31 1000 Site Clearing 12/20/2012 1 01 to-a+28P014 3i 23 23 BOV170M 01no o�3 3124 00 Emb&t nt5 01n 31 2500 Erosion and Sediment Control 12/20/2012 j M36 00 Gabiens 12404012 31300 Rit3fan ,2/,z W2912 I Division 32 - Exterior Improvements I ZOO p . , Asphalt �v yr �N I 32 0i 1R Temperatj• A::►ha.!1 Px i e tr „1 32 01-29 Couefete Paviiig Fes, , 4049' o „tom 1 i 4,w2gQ012I 3O2 titt ,Y6 Asphalt ON411 tOgolaola 1 321273 kviob)k Pn-iir.g c_, ek Sealant 1=042912 _I 32 ig la P...,..-._te P...,.in - 12� Q/04 32 4320 CaneFete e•, n PFk,eways❑ . r Ffee Ramps I 06/8wolg 323-73 Nrfillb %e1HE-Sealants ,oto, &2Q!2 32 1�6 13, ('afwvPie l' h wtid I` aHE1 Valley I uNe I 1� CITY OF FORT WORTH Wtr & Swr Improvements to seine GVermodal PkwJ` 5TANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 32 1725 Cimi91FIN1 IN w4gates Weed Feases and Ga4es 32-M is �q Al at) 3292 0 Cast in PIRee Genevete Retaiiiitig A:'all: I Hydro -Mulching, Seeding, and Sodding I T+eesanAtbs 32 92 13 3293 43 Division 33 - Utilities _ 3301 30 Sewer and Manhole Testing 33 01 31 Closed Circuit Television (CCTV) Insnection Q,,..,ping n.65;i.,.se,vvz.vZ-System S 3303 10 3304 10 33 04 11 By s Of join! Bon'AwA vi t U.8-tF:_ .1� �d Isgial. on Gei:Fesien Control Test Stations A , O. .te... die D -a 39 04Y122 33 04 40 4agnesium tiode eii Cleaning and Acceptance Testing of Water Mains n 33 04 50 3305 10 GleaHing .:roe.. ey ai+is Utility Trench Excavation, Embedment, and Backfill 33 05 12 Water Line Lowering 3305 13 Frame, Cover and Grade Rings — Cast Iron Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to 3305 14 Grade 1 33 05 16 I Concrete Water Vaults 330520 Aw.;z-Br.:"a.; 1 340521 330922 23 T+Mfiel binerplate I Steel l Ca;;Hg Pipe I H Tkau !illg 33 05 33-0324 ud e li:;:1:1I.tII.✓[. of Carrier Pipe iii Casilig at -Tunnel 33 05 26 Utility Markers/Locators 33 05 30 Location of Existing Utilities 33 1105 Bolts, Nuts, and Gaskets 33 11 10 Ductile Iron Pipe 33 11 11 Ductile Iron Fittings 33 11 12 Polyvinyl Chloride (PVC) Pressure Pine 133 ii 0 33 11 C Wessore n•. Par IALFaped S(eel 9 liiidet4:ype n d Steel Ape alid C1/17. gs AAl 1 ine 1, 33 12-10 31� 33 1220 saplispq iffieh to 2 _ 1 e 1A/,ref Mete Resilient Seated Gate Valve 33 Q 21 33 1225 Connection to Existing Water Mains 33 1230 33 ,� 33 1250 I3z Combination Air Valve Assemblies for Potable Water Systems F-.e l ute Page 6 of 8 , 1 /nn /on1 10/o-rcQ040 2 1 9 /orc-rrvrcnv 11 - ,.2�QW2012 I 061QS12019 I I7/ I I 12/20/2012 17/'lt Q QL20/�nl2 12/20/2012 03/03/2016 I 4W-201 I 12,qW2011I 10 n^r/nmlr01/2011 02/06/2013 lggg oI2 I 12/12/2016 12/20/2012 01/22/2016 nlroa�o 12/20/2012 12/20/2012 Q 1 12,E I 10P1�rr 1 n<n3 12/20/2012 12/20/2012 12/20/2012 I 12/20/2012 1 I 12/20/2012 11/16/2018 I 12/20/2012 10/� WN 02/06/2013 12/20/2012 n 1 /03 /z01 n ,onn/on1� L n</13 CITY OF FORT WORTH Wn• & Avr hnprovements to serve lnfermodal Pbwy 5TANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 333i A n' ,rvnu\ I Fibe ,lass Re,:,li.eed n• ge .v:?f Saiiitaily Seweri ZOO 33 31 20 I High tl .,, . P I ..A I (14PPC) Noe f c I Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 331 133 Aipe 31-22 133 Ecs%/.i: f E::;•.ar-stip Wainr I M 23 133 3150 Sanita . Sewer Pi Enlargemeni I Sanitary Sewer Service Connections and Service Line 1 33-31-7-0 Combi11Am Ai: `:-?M: C .. SaiiiFaFy Sewer Feme Maifis 1 3339 10 Cast -in -Place Concrete Manholes 1 33 39 20 I Precast Concrete Manholes f33 39 30 :I.,,.��..,,n,.nRanneles 33 39 60 I334111 133 41 12 eeegs _.._ _. I Epoxy Liners for Sanitary Sewer Structures c: c.ei . r C:,i4,rrR IHig4i ejis;.ity Polyethylene /L DPE) Pipe f, o r A..:. e,l4e.e 33 4609 33 46 01 1 33 4602 &RP9�e Sul rage T ✓cb�slwr. 33� 1334920 Gast ].. Pittee Mafi1. t' c2im-...nd BF 33 49 40 hilets Division 34 - Transportation 1 34 41 1 Tra ffie ci..n:!N 34 41, 1ment ` 1 34 n�-r'41 1002 I v tt,..L:::e::;-9 C,:.....alle-: sp ci ffr.an 1 34 n� 1 10.03 I Atteehment E £etTwaresryeeiAeatieh I344111 I T7rry.anrr/T: rl ^ 34-0415 1 keei.rr.Aft1.xnN/::hQ1��rii 3441 20 R.oacl�1,,y ilhlrrir. /:z/ A �rrlrl;es l on 4�120402 Fi-ee. . LED Roadway I 34 4120.03 Residential LED Rai r 6 tiAlifiRiFeS 134 41-39 A!-.::r1..zY//S.g;is 1 344139siogle Made Fiber Opfie Cable 3471 13 Traffic Control Page 7 of 8 J,;' n,� i 1 2n , in I ]on�z 06/19/2013 , o,oazrzv gas oi2 04/26/2013 , a,z 12/20/2012 12/20/2012 4242042041 , 2A2W2Qi2 12/20/20I2 074919011 , a P,=voogo4z ,,,1 ,ON name , „�4z 07,n,�T , n J,�. 0,�5 1 , a nzz/18Qcai-s. 1 92r2012 1 04/2042 1 wa24013 I ,amp i 11 1 , a,omz40/2012 n6n..o `, 043 n6noo1169015 1 „ I 4 2A0A 1 aan<�91 i 11/22/2013 1 CITY OF FORT WORTH WL• & $vr 1), provemems to serve Grteromdal Pbv), 5TANDARD CONSTRICTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 8 of 8 Appendix NV T ..f�!!lfSREiri➢1!f GR-01 60 00 Product Requirements END OF SECTION CITY OF FORT WORTH Wir & Srvr Improvements to serve Intermoda! Plnvp STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised March 20, 2020 04243 DAP- BID PROPOSAL Page I of I UNIT PRICE BID SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Interfnodal Parkway Project Item Information Bidder's Application Bidlist Item Description Specification Specification Unit of Hid Quantlly No No. Measure WATER IMPROVEME14TS 1 3311.0551 16" DIP Water 3311 10, �1 sS3 1?� LF 85 2 3311.0541 16" DIP Water Pipe with 30" Steel Encasement ''99 d3�11121� LF 20 3 3311.0547 16" Water Pipe, CLSM Backfill 3312 LF 20 4 13312.3106 16" Cut -in Gate Valve w/ Vault I 33 12 20 EA I 1 1 5 13312.3006 16" Gate Valve w/ Vault I 33 12 20 EA 1 2 I 1 6 10241.1106 16" Pressure Plug 1 0241 14 EA 1 1 I 1 7 13305.0109 Trench Safety 1 33 05 10 I LF 1 125 I 1 8 �3311.0001 Ductile Iron Water Fittings w! Restraint 1 3311 11 1 TON 1 1.55 1 9 I3312.0106 Connection to Existing 16" Water Main 1 33 12 25 EA 1 1 Removal and Replacement of Asphalt pavement for Utility Line 11I 1 10 19999.a0004 I 00 00 OOJ SY ( 948 1 I 11 Traffic Control 1 3471 13 1 MO 1 1 1 1 12 I3471.0001 9999/0005 Concrete Blocking, Type B 1 00 00 00 1 CY 1 3 1 1 13 19999.0006 Removal and Selvage of Concrete Paver for Utility Line Installation I 00 00 00 1 Sy l 78 1 TOTAL WATER IMPROVEMENTS Engineers Estimate Unit Price $270.00 $940.00 $320.001 $38,500.001 $32,500.001 $2,500.001 10.00 $12,5 0.001 -. $28,500.001 $95.001 $6.500.001 $1,000.001 $210.001 1 13301.0002 Post -CCTV Inspection 33 01 31 I LF 372 $8.00 ",i Iv, 2 13331.4208 12" Sewer Pipe 33 31 12, I LF 20 $300.00 n7iro 3 13331.4116 8" Sewer Pipe, CSS Backfill 3a3 391 1y2p, 1 LF 50 1 $260.00 7? 1U, q I3? I LF I 322 I $200.00I 3331.4115 8" Sewer P�'e 33 31 12 5 13301.0101 Manhole Vacuum Testing - - 1 33 01 30J EA 1 2 'I $500.001 6 13305.0109 Trench Safety 1 33 05 10 1 -LF 1 372 $8.001 7 I3339.1001 4' Manhole W/ Hydraulic Slide 31 1 33 39 201 EA 1 2 I $12,500.001 8 3339.1003 4' Extra Depth Manhole 1 33 39 10, 1 33 39 20 VF 1 W 1 $300.001 9 3339.0001 Epoxy Manhole Liner 1 33 39 60 I VF J 19 1 $600.00I _ TOTAL SEWER IMPROVEMENTS Bid Summary WATER IMPROVEMENT$ I SEWERIMPROVEMENTS Total ConsOve[ion Bid This Bid is submitted by the entity named below: BIDDER; CONATSER CONSTRUCTION TX, L.P. 5327 WIC.HITA ST. FORT WORTH, TX 76119 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. BY: BROCK I GGINS TITLE: PRF., DENT DATE: 9/26/2023 60 worldng days after the date when the END OF SECTION Hid Value $22,950.00 $18,800.00� $6.400.00 $38,500.00 $65,000.001 $2.500.001 $1 250.001 $19,375.061 $28,500.001 $90,060.001 $6.500.001 $3,000.001 $16,380.00 $319,215.00 $2.976.001 $6.000.001 $13,000.001 $64.400.001 $1000.001 $A76.001 $25,000.001 $6,100.001 11.400.001 $ 1,852.001 $319,215.001 $1311/ 852.001 $457,067.001 CITY OF FORT WORTH STANDARn CONSTRUCTION SPECIFICATION DOCUMENTS- DLVELOPM AWARDED PROJECTS 2 Version May 22.2019 hftm,odolfl, y Bid Pm osol.xla 0045 12 DAP PREQUALIFICKnON STATEMENT Page 1 of 1 SECTION 00 4512 DAP — PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Maior Work Type" box provide the complete maior work tvoe and actual description as provided by the Water Department for water and sewer and TPW for paving. Major Work Type Water Transmission, Development, 24-inches and smaller Sewer Collection System, Development, 8-inches and smaller Sanitary Sewer Manhole/Structure Interior Lining — Warren or Chesterton Coating Contractor/Subcontractor Company Name Prequalification Expiration Date (1o(-at9CrCcnsm.lc h ar) TX. L_ . a 4/ 30/ Zy C)onnfsCr Cornstc"cticn rx, L_ P. 4/3o/2-q Currently, only below three are qualified per Water Department approved contractor list. Use one of below: 2y- Ace —Warren 2. BCAC — Warren 3. Madero — Warren The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: ConatS"er'CansiruC_0 By: c�-rx, �A -Emoc tt cyl r � Company (Please Print) Signature: Address Title: EfyT V\10V v-),'fX `1( i i n �r�51 d-er)f- City/State/Zip (Please Print) Date: END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION PREQUAUFICATION STATEMENT- DEVELOPER AWARDED PROJECTS Wtr & Swr Improvements lntermodol pkwy Form version September 1, 2015 City Project No. 104996 0045 26-1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 2 1 SECTION 00 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it 4 provides worker's compensation insurance coverage for all of its employees employed on City 5 Project No. 104996. Contractor further certifies that, pursuant to Texas Labor Code, Section 6 406.096(b), as amended, It will provide to City its subcontractor's certificates of compliance with 7 worker's compensation coverage. 9 9 CONTRACTOR: 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 (`�rrlrSFrCc�nStruC cis tic By: RI-Dr-F-t b_.Igyjr S Company (Please Print) Signature: Address FoyV w0vi'kl.T.Y, "1LOI A Title: PI eSiC1E'Xli City/State/Zip (Please Print) THE STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, on this day personally appeared known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as the act and deed of i M :i ( I I It for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this .) anuc49 .20 yrf 7b11%S Nolery67033rTavas 6r686MyCon Ewm ' Novambar$0, 2D26 I (> day of Notary Public In and for the State of Texas CITY OF FORT WORTH Wtr& Sur Improvements Intermodal Pkvvy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Protect No, 104996 Revised April 2, 2014 004526-2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 2 of 2 END OF SECTION CITY OF FORT WORTH Wtr& Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 104996 Revised April 2, 2014 00 52 43 - 1 Developer Awarded Project Agreement Page i of 6 1 SECTION 00 52 43 2 AGREEMENT 3 4 THIS AGREEMENT, authorized on 211 jay is made by and between the Developer, 5 Hillwood Alliance Services LLC authorized to do business in Texas ("Developer") , and 6 Conatser Construction TX, LP , authorized to do 7 business in Texas, acting by and through its duly authorized representative, ("Contractor"). 8 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree 9 as follows: 10 Article 1. WORK 11 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 12 Project identified herein. 13 Article 2. PROJECT 14 The project for which the Work under the Contract Documents may be the whole or only a part 15 is generally described as follows: 16 lntermodal Parkwav 17 104996 18 Article 3. CONTRACT TIME 19 3.1 Time is of the essence. 20 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 21 Documents are of the essence to this Contract. 22 3.2 Final Acceptance. 23 The Work will be complete for Final Acceptance within r !C) ) working days the date 24 when the Contract Time commences to run as provided in Paragraph 12.04 of the 25 Standard City Conditions of the Construction Contract for Developer Awarded Projects. 26 3.3 Liquidated damages 27 Contractor recognizes that time is of the essence of this Agreement and that Developer 28 will suffer financial loss If the Work is not completed within the times specified in 29 Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 14 of 30 the Standard City Conditions of the Construction Contract for Developer Awarded CITY OF FORT WORTH Wtr & Swr Improvements lntermodul Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Cfty Project No. 104996 Revised June 16, 2016 005243-2 Developer Awarded Project Agreement Page 2 of 6 31 Projects. The Contractor also recognizes the delays, expense and difficulties involved in 32 proving in a legal proceeding the actual loss suffered by the Developer if the Work Is not 33 completed on time. Accordingly, instead of requiring any such proof , Contractor agrees 34 that as liquidated damages for delay (but not as a penalty), Contractor shall pay 35 Developer NIA Dollars ($ N/A ) 36 for each day that expires after the time specified in Paragraph 3.2 for Final Acceptance 37 until the City issues the Final Letter of Acceptance. 38 Article 4. CONTRACT PRICE 39 Developer agrees to pay Contractor for performance of the Work in accordance with the 40 Contract Documents an amount in current funds of 41 Dollars ($ 14` J ) , OIfJ i 0C) ). 42 Article 5.CONTRACT DOCUMENTS 43 5.1 CONTENTS: 44 A. The Contract Documents which comprise the entire agreement between Developer 45 and Contractor concerning the Work consist of the following: 46 1. This Agreement. 47 2. Attachments to this Agreement: 48 a. Bid Form (As provided by Developer) 49 1) Proposal Form (DAP Version) 50 2) Prequalification Statement 51 3) State and Federal documents (project specific) 52 b. Insurance ACORD Form(s) 53 C. Payment Bond (DAP Version) 54 d. Performance Bond (DAP Version) 55 e. Maintenance Bond (DAP Version) 56 f. Power of Attorney for the Bonds 57 g. Worker's Compensation Affidavit 58 h. MBE and/orSBE Commitment Form (If required) 59 3. Standard City General Conditions of the Construction Contract for Developer 60 Awarded Projects. CITY OF FORT WORTH Wtr& Swr Improvements Intermodol Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No, 104995 Revised June 16, 2016 00 52 43 - 3 Developer Awarded Project Agreement Page 3 of 6 61 4. Supplementary Conditions. 62 5. Specifications specifically made a part of the Contract Documents by attachment 63 or, if not attached, as incorporated by reference and described in the Table of 64 Contents of the Project's Contract Documents. 65 6. Drawings. 66 7. Addenda. 67 68 69 70 71 72 73 74 75 76 8. Documentation submitted by Contractor prior to Notice of Award. 9. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. CITY OF FORT WORTH Wtr & Swr Improvements tntermodol Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised June 16, 2026 005243-4 Developer Awarded Project Agreement Page 4 of 6 77 Article 6. INDEMNIFICATION 78 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 79 expense, the city, its officers, servants and employees, from and against any and all 80 claims arising out of, or alleged to arise out of, the work and services to be performed by 81 the contractor, its officers, agents, employees, subcontractors, licenses or invitees under 82 this contract. This indemnification Provision is specifically intended to operate and be 83 effective even if it is alleged or Proven that all or some of the damages being sought 84 were caused, in whole or in part, by any act, omission or negligence of the city. This 85 indemnity provision is intended to include, without limitation, indemnity for costs, 86 expenses and legal fees incurred by the city in defending against such claims and causes 87 of actions. 88 89 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 90 the city, its officers, servants and employees, from and against any and all loss, damage 91 or destruction of property of the city, arising out of, or alleged to arise out of, the work 92 and services to be performed by the contractor, its officers, agents, employees, 93 subcontractors, licensees or invitees under this contract. This indemnification provision 94 is specifically intended to operate and be effective even if it is alleged or proven that all 95 or some of the damages being sought were caused, in whole or in Dart, by any act, 96 omission or negligence of the city. 97 98 Article 7. MISCELLANEOUS 99 7.1 Terms. 100 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of 101 the Construction Contract for Developer Awarded Projects. 102 7.2 Assignment of Contract. 103 This Agreement, including all of the Contract Documents may not be assigned by the 104 Contractor without the advanced express written consent of the Developer. 105 7.3 Successors and Assigns. 106 Developer and Contractor each binds itself, its partners, successors, assigns and legal 107 representatives to the other party hereto, in respect to all covenants, agreements and 108 obligations contained in the Contract Documents. CITY OF FORT WORTH Wtr & Swr Improvements Intermodol ➢kwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised June 16, 2016 DD5243-5 Developer Awarded Project Agreement Page 5 of 6 109 7.4 Severability, 110 Any provision or part of the Contract Documents held to be unconstitutional, void or 111 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 112 remaining provisions shall continue to be valid and binding upon DEVELOPER and 113 CONTRACTOR. 114 7.5 Governing Law and Venue. 115 This Agreement, including all of the Contract Documents is performable In the State of 116 Texas, Venue shall be Tarrant County, Texas, or the United States District Court for the 117 Northern District of Texas, Fort Worth Division. 118 119 7.6 Authority to Sign. 120 Contractor shall attach evidence of authority to sign Agreement, if other than duly 121 authorized signatory of the Contractor. 122 123 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple 124 counterparts. 125 126 This Agreement is effective as of the last date signed by the Parties ("Effective Date"). 127 Contractor: Developer: C�7(1Qt5( t�C c7Rctri lc HCv 1TX,U� %� �� •rood ��l;arcp -rW'r es LLG By: By: �� J (S g ature) (Signature) CITY OF FORT WORTH Wtr & SWr Improvements Intermodol Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised June 16, 2016 128 Brock- HU a i nt (Printed ame) Title: Pr-ef5+ Cient Company Name: C:CM+SCr O nGTR .(Czi o4`1 Tx , L • P. Address: 53a'1 VN C."Q sr. City/State/Zip: �r/t 1nl r�/th TX -7O i q 71712H Date 005243.6 Developer Awarded Project Agreement Page 6 of 6 (Printed Name) Title: Sern.'cql W C4 PceS,'de,4 Company name: Address: Sel�`GQS y PLC CY goo ILl, dwuvc/ Pkwy• Sv, ke ?D City/State/Zip: (014 6-,,Jc r-h-, . -it 7617 % Date 7 CITY OF FORT WORTH Wtr& Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised June 16, 2016 <►� Bond No. 0256222 00 6213 • 1 PERFORMANCE BOND Page i of 4 1 SECTION 00 62 13 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we, Conatser Construction TX, L.P. known as 9 "Principal' herein and Berkley Insurance Company a corporate 10 surety(sureties, if more than one) duly authorized to do business in the State of Texas, known as 11 "Surety' herein (whether one or more), are held and firmly bound unto the Developer, 12 (Hillwood Alliance Services, LLC ), authorized to do business in Texas ("Developer") 13 and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum of, Four Hunded 14 Fifty One Thousand, Sixty Seven and N01100-------- Dollars ($ 451,067.00 ), 15 lawful money of the United States, to be paid In Fort Worth, Tarrant County, Texas for the 16 payment of which sum well and truly to be made jointly unto the Developer and the City as dual 17 obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly 18 and severally, firmly by these presents. 19 WHEREAS, Developer and City have entered Into an Agreement for the construction of 20 community facilities in the City of Fort Worth by and through a Community Facilities Agreement, 21 CFA Number CFA23-0092; and 22 WHEREAS, the Principal has entered into a certain written contract with the Developer awarded 23 the" day of n, 20 2' which Contract is hereby referred to and made a 24 part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor 25 and other accessories defined by law, in the prosecution of the Work, including any Change 26 Orders, as provided for in said Contract designated as lntermodal parkway. 27 NOW, THEREFORE, the condition of this obligation is such that if the said Principal shall 28 faithfully perform It obligations under the Contract and shall in all respects duly and faithfully 29 perform the Work, including Change Orders, under the Contract, according to the plans, CITY of FART wuRTii Wtr& Swr improvements Intermodal pkwy STANDARD CRY CONDITIONS -DEVELOPER AWARDED PROJECTS CRY ProJeCt No. 104998 RGY1100 January 31, 2012 00 62 13 • 2 PERFORMANCE BOND Page 2 of 4 1 specifications, and contract documents therein referred to, and as well during any period of 2 extension of the Contract that may be granted on the part of the Developer and/or City, then 3 this obligation shall be and become null and void, otherwise to remain in full force and effect. 4 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 5 Tarrant County, Texas arthe United States District Court for the Northern District of Texas, Fort 6 Worth Division. 7 This bond is made and executed in compliance with the provisions of Chapter 2253 of 8 the Texas Government Code, as amended, and all liabilities an this bond shall be determined in 9 accordance with the provisions of said statue. 10 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this 11 Instrument by duly authorized agents and officers on this the 14A day of telJr✓a l 12 .20 Z`i , 13 14 15 16 17 18 19 20 _ 21 22 ATTEST: 23 24 25 26 (Principal) Secretary 27 CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 31, 2012 PRINCIPAL: Conatser Construction M L.P. BY, A" O v Signature Brock Huggins, President Name and Title Wtr & SWrImprovements Intermodol pkwy City Project No. 104996 1 2 3 4 5 6 7 8 Witness as to Principal 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Witness as to Surety 31 CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 31, 2012 00 6213.3 PERFORMANCE BOND Page 3 of 4 Address; 5327 Wichita St. Fort Worth, TX 76119 SURETY Berkley Insurance Company Signature Robbi Morales, Attorney -in -fact Name and Title Address: 5005 LBJ Freeway, Suite 1500 Dallas, TX 75244 Telephone Number: 214/989-0000 WIr& Swr Improvements lntermodol pkwy City Project No. 104996 006213-4 PERFORMANCE BOND Page 4 of 4 4 "Note: if signed by an officer of the Surety Company, there must be on file a certified extract 5 from the by-laws showing that this person has authority to sign such obligation. if 6 Surety's physical address is different from its mailing address, both must be provided, g The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH Wtr & Swr Improvements Intermodo7 Pkwy STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS City Project No. 204996 Revised January 32, 2012 Bond No. 0256222 006214.1 PAYMENT BOND Page 1 of 3 1 SECTION 00 6214 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 a That we, _ _ Conatser Construction TR, L.P. known as 9 "Principal" herein, and Berkley Insurance Company a 10 corporate surety ( or sureties if more than one), duly authorized to do business In the State of 11 Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the 12 Developer, (_HiUwood Alliance Services, LLC _), authorized to do business in 13 Texas "(Developer"), and the City of Fort Worth, a Texas municipal corporation ("City"), in the 14 penal sum of Pour HundredFifty One Thousand, Sixty Seven and No/100--•- Dollars 15 ($451,067.00 ), lawful money of the United States, to be paid in Fort Worth, 16 Tarrant County, Texas, for the payment of which sum well and truly be made jointly unto the 17 Developer and the City as dual obligees, we bind ourselves, our heirs, executors, administrators, 18 successors and assigns, jointly and severally, firmly by these presents: 19 WHEREAS, Developer and City have entered into an Agreement for the construction of 20 community facilities In the City of Fort Worth, by and through a Community Facilities 21 Agreement, CFA Number CFA23-0092; and 22 WHEREAS, Principal has entered into a certain written Contract with Developer, 23 awarded the T*' day of Ytbrva!) , 20 2-1 , which Contract is hereby 24 referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all 25 materials, equipment, labor and other accessories as defined by law, in the prosecution of the 26 Work as provided for in said Contract and designated as lntermodal Parkway. 27 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if Principal shall 28 pay all monies owing to any (and all) payment bond beneficiary (as defined in Chapter 22S3 of CITY OF FORT WORTH Me& Swr Improvement, Intem,odor Pkwy STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS CIry Project No. 104996 Revised January 31, 2012 005214-2 PAYMENT BOND Page 2 of 3 1 the Texas Government Code, as amended) in the prosecution of the Work under the Contract, 2 then this obligation shall be and become null and void; otherwise to remain in full force and 3 effect. 4 This bond is made and executed in compliance with the provisions of Chapter 2253 of 5 the Texas Government Code, as amended, and all liabilities on this bond shall be determined in 6 accordance with the provisions of said statute- 7 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED this 8 instrument by duly authorized agents and officers on this the 74" day of ID PRINCIPAL: Conatser Construction TX, L.P ATTEST' BY: Signature (Principal) Secretary Witness as to Principal CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised Ja nuary 31, 2012 Brock Huggins, President Name and Title Address: 5327 Wichita St. Fort Worth, TX 76119 SURETY: Berldev Insurance Company Wtr & Swr Improvements Intermodol Pkwy City Project No. 104996 ATTEST: (Surety) Secretary Witness as to Surety 1 006214-3 PAYMENTSOND Page 3 of 3 5ignature Robbi Morales, Attorney -in -fact Name and Title Address: 5005 LBJ Freeway, Suite 1500 Dallas, TX 75244 Telephone Number: 21 989-0000 2 Note: If signed by an officer of the Surety, there must be on file a certified extract from the 3 bylaws showing that this person has authority to sign such obligation. If Surety's physical 4 address Is different from its mailing address, both must be provided. 5 6 The date of the bond shall not be prior to the date the Contract is awarded. 7 END OF SECTION U CITY OF FORT WORTH Wtr & Swrrmprovements Intermodol Pkwy STANDARD CITY CONDITIONS— DEVELOPER AWARDED PROJECTS City Project No. 104996 ROvlied January 31, 2012 /Bond No. 0256222 006219-1 MAINTENANCE BOND Page 1 of 4 1 SECTION 00 6219 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OFTARRANT § 7 That we Conatser Construction TX, L.P. known as 8 "Principal" herein and Berkley=Insurance Company a corporate surety 9 (sureties, if more than one) duly authorized to do business in the State of Texas, known as 10 "Surety" herein (whether one or more), are held and firmly bound unto the Developer, 11 Hillwood Alliance Services, LLC , authorized to do business in Texas ("Developer") 12 and the City of Fort Worth, a Texas municipal corporation ("City"), in the sum 13 of Four HundredFifty One Thousand, Sixty Seven and N01100Dollars($ 451067.00 J, 14 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment 15 of which sum well and truly be made Jointly unto the Developer and the City as dual obligees 16 and their successors, we bind ourselves, our heirs, executors, administrators, successors and 17 assigns, Jointly and severally, firmly by these presents. 18 19 WHEREAS, Developer and City have entered into an Agreement for the construction of 20 community facilities in the Clty of Fort Worth by and through a Community Facilities Agreement, 21 CFA Number CFA23-0092; and 22 WHEREAS, the Principal has entered into a certain written contract with the Developer 23 awarded the l day of Te{v eq 20_1!J, which Contract is 24 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish 25 all materials, equipment labor and other accessories as defined by law, In the prosecution of the 26 Work, including any Work resulting from a duly authorized Change Order (collectively herein, the 27 "Work") as provided for in said Contract and designated as Intermodal Parkway; and M. My OF FORT WORTH Wtr & Swr Improvements lAfermodol Pkwy STANDARD CITY CONDITIONS— DEVELOPER AWARDED PROJECTS City Project No, x04996 Revised January 31, 2012 0O 6219.2 MAINTENANCE BOND Page 2 of 4 1 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 2 accordance with the plans, specifications and Contract Documents that the Work is and will 3 remain free from defects in materials or workmanship for and during the period of two (2) years 4 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and F 6 WHEREAS, Principal binds itself to repair or reconstruct the Work In whole or in part upon 7 receiving notice from the Developer and/or City of the need thereof at any time within the 8 Maintenance Period. 0 10 NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy 11 any defective Work, for which timely notice was provided by Developer or City, to a completion 12 satisfactory to the City, then this obligation shall become null and void; otherwise to remain in 13 full force and effect_ 14 15 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely 16 noticed defective Work, it is agreed that the Developer or City may cause any and all such 17 defective Work to be repaired and/or reconstructed with all associated costs thereof being 18 borne by the Principal and the Surety under this Maintenance Bond; and 19 20 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 21 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 22 Worth Division; and 23 24 PROVIDED FURTHER, that this obligation shall be continuous in nature and successive 25 recoveries may be had hereon for successive breaches. 26 CITY Or PORT WORTH Wtr& Swr Improvements Intermodol Pkwy STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROTECTS City Project No. 104096 Revised )aouary 31, 2012 006219-3 MAINTENANCE BOND Page 3 of 4 1 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the 7"1"day of IaIrvr. 7- 3 2044 . 4 5 6 7 8 9 10 11 12 13 14 15 ATTEST 16 17 _ 18_ — — 19 (Principal) Secretary 20 21 22 23 24 25 26 27 28 Witness as to Principal 29 CITY OF FORT WORTH STANDARD CITY CONDITIONS --DEVELOPER AWARDED PROJECTS Revised January 31, 2012 PRINCIPAL. Conatser Construction TX, L.P. PA -- Signature Brock Huggins, President Name and Title Address: 5327 Wichita St. Fort Worth, TX 76119 Wtr & Swr Improvements Intermodal pkwy city Project No. 304996 1 2 3 4 S 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 ff SURETY: 006219-4 MAINTENANCE BOND Page 4 of 4 Berkley Insurance Company BY: Signature Robb! Morales, Attorney -In -fact ATTEST: Name and Title Address: (Surety) Secretary 5005 LBj Freeway, Suite 1500_ Dallas, TX 75244 Aitne5s Surety Telephone Number: 214/989-0000 *Note: If signed by an officer of the Surety Company, there most be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS Revised January 31, 2012 Wtr& Ewr improvements Intermodol Pkwy City Project No, 104996 No. BI-7280k POWEP, OF ATTORNEY BERKLEY INSURANCE COMPANY WILMINGTON., DELAWARE NOTICE: The warning, found elsewhere in this Power of Attorney, affects the -validity thereoff. Please review Carefully. KNOW ALL MEN BY THESE PRESENTS. that BERKLEY INSURANCE COMPANY (the '�Company% a corporation duly Cd organized and.existing under the laws of the State of.Delawar.c, having its principal office in Greenwich, CT, has made, constituted ca and appointed, and does by these presents make, constitute and appoint Ricardo J. Reyniq Don E Cornell; Bophhde Hunter, Robbi Morales; .dolly A. Westbrook; 7Yna McEwan; Joshua Sounders; Tank Peaanek; or J40kddq Peppers of Aph Risk Services Soalltwes4- Inc. of DaUds, 7X its true and lawful Attorney -in -Fact, to sign its name as Surety o* as delineated below and, to execute, seal, acknowledge and deriver any and all bonds 'and undertakings, with the exception of Financial Guaranty -8 Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S. Dollars, (U.S.S50,000,000.00), to the. same, extent as if such bonds had been duly executed and -acknowledged by the -regularly. elected officers of the Company at its prinripai office ice in their own proper -persons. M This Power of Attomqy shall be construed and enforced in accordance with, and governed by, the laws- of the State of Delaware, $2 without giving effect to the brifi0flDles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following r- resolution ',w . . idly adopted at. a meeting of the he Board ofDirectors of the. Company held on lanuary.25,2010: o 9 were duly validly 5 RESOLVED, 'that, with respect to the Surety business written by Berkley Surety, the Chairmkd of the Board, Chief#: Executive Officer, President or any Vice President of the Company,. in conjunctioa with the Secretary or any AWstant 0 y Secretary are hereby authorized to execute powers of attorney authorizing and qualiPling the attorney -in -fact named therein t to execute bonds; undertakings,. TwogAizances, or other suretyship obligittid.ps on behalf of the Company, and to affix the d corporate seal of the Company to powers of Attorney executed pursuant hereto; and S6 officers may remove any such 0 attorney -in -fact and• revoke any power of attorney previously granted, and further RESOLVED, that such. power of attorney limits the acts ofthosenamed therein to the boftd.s, tindditakWgs, repogaizances, or other suretyship obligations spocific4th y namo therein, and they have no authority to bind the Company except in the manner and to the extent therein stated; aW further RESOLVED, that such power of attorney reVok-es all previous powers issued on behalf of the attorney-fti-fact named-, and ,0 bb further RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any 0 power of attorney or certification thereof authorizing the execution and delivery of any bond, undetWcing, recognizance, or other suretyship obligation of the Company-, and such signatgre'and seal when so used, shall have the.same forte and effect as - 'though manually affixed. The Company may continue to use for the p.uk.p.- acsindle signature of any .94as herein. t#tW the f person .or persons who shall have been such officer or officers of the Company, -notwithstanding the fact that they may have Cn ceased to be such at the time when such instruments shall be issued. its 0 IN WITNESS VAMREOF, the Company W caused -tJacse presents..ftbc .sued and attested by its appropriate officers Gird i herwrito affixed It is L� o corporate seal j1JILY Of 0 co Attest Berk) Thmiance (A'nipapy o (sea[) By President & Secretary -,e Executive Vice I d addent 0 Z .0 � WARN-ING: THIS-'POW-)RR--MVAL-ED.--lltt4OT PitTEID ON ULVE Yi SECURITY. TAPER. w STATE 6'F-00NNr-%; JLix-'tj:i -0 0 ss: COUNTY OF-PABUftLb 0 .g y Sworn to before.mr, &.14otat 1 N ib licr in the State -oiCorinecticut. this Wdap of Hc,,-, a0aQ- by lra S. Lodennu -:rite to the R-m-cuitive "Senior Nwe J) and Jefficy M. Haftw'wha Am sivern to Vice Pred5dpn�Ser;retary, and L'nfor i0s.President, raspWtvoly, of Deddey Insmneo.Comp"y- MABIAZTRON6WEN MCdMNOSIGN DiMFIER taly-publitj Stale oi'Connacfiaut o AMLA=4 0 CER-TWICATE Z L the undetsign4. Assistadt*ObPbr, Y INSURANCE, CONT- ANY. DO.HE-FMY--CER-T-1FYft pfB)ERKIE foregairig is a true, correct *and,cqm plete-copy of the .6d*Q.Pd-4er-o Aftornw that said Tower dfAttorney ha3.net bewrt revoked. -or rescinded Q and that the authorityofthe'AAqTnqy.4j� .. Fact-:safflor.lh th�xn, whoecut&d ih& bond or undartalting to wbicli. this Power of . Attomey is fhtl lbrd&and., ef6tet as of this date. Given under anyhandai2d seal -of ft CovparLy, this day of (Seal) IMPORTANT NOTICE To obtain information or make a complaint: You may call Berkley Surety Group, LLC and its affiliates by telephone for information or to make a complaint: BERKLEY SURETY GROUP, LLC Please send all notices of claim on this bond to: Berkley Surety Group, LLC (866) 768-3534 412 Mount Kemble Avenue, Suite 31ON Morristown, NJ 07960 Attn: Surety Claims Department You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: htt,1:1/www.tdi.state.tx.us E-mail: ConsumerProtectionCa"tdi.state.tx.us PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact your agent or Berkley Surety Group, LLC first. if the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR BOND: This notice is for information only and does not become a part or condition of the attached document and is given to comply with Texas Legal and regulatory requirements. STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS TABLE OF CONTENTS Page Article 1 — Definitions and Terminology..........................................................................................................1 1.01 Defined Terms...............................................................................................................................1 1.02 Terminology..................................................................................................................................5 Article2 — Preliminary Matters......................................................................................................................... 6 2.01 Before Starting Construction........................................................................................................6 2.02 Preconstruction Conference..........................................................................................................6 2.03 Public Meeting.............................................................................................................................. 6 Article 3 — Contract Documents and Amending............................................................................................... 6 3.01 Reference Standards..................................................................................................................... 6 3.02 Amending and Supplementing Contract Documents.................................................................. 6 Article 4 — Bonds and Insurance....................................................................................................................... 7 4.01 Licensed Sureties and Insurers..................................................................................................... 7 4.02 Performance, Payment, and Maintenance Bonds........................................................................ 7 4.03 Certificates of Insurance............................................................................................................... 7 4.04 Contractor's Insurance..................................................................................................................9 4.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................12 Article 5 — Contractor's Responsibilities........................................................................................................12 5.01 Supervision and Superintendent.................................................................................................12 5.02 Labor; Working Hours................................................................................................................13 5.03 Services, Materials, and Equipment...........................................................................................13 5.04 Project Schedule..........................................................................................................................14 5.05 Substitutes and "Or-Equals".......................................................................................................14 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors).....................................16 5.07 Concerning Subcontractors, Suppliers, and Others...................................................................16 5.08 Wage Rates..................................................................................................................................18 5.09 Patent Fees and Royalties...........................................................................................................19 5.10 Laws and Regulations.................................................................................................................19 5.11 Use of Site and Other Areas .......................................................................................................19 5.12 Record Documents......................................................................................................................20 5.13 Safety and Protection..................................................................................................................21 5.14 Safety Representative................................................................................................................. 21 5.15 Hazard Communication Programs............................................................................................. 22 5.16 Submittals....................................................................................................................................22 5.17 Contractor's General Warranty and Guarantee..........................................................................23 CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 5.18 Indemnification........................................................................................................................... 24 5.19 Delegation of Professional Design Services.............................................................................. 24 5.20 Right to Audit: ............................................................................................................................ 25 5.21 Nondiscrimination.......................................................................................................................25 Article 6 - Other Work at the Site...................................................................................................................26 6.01 Related Work at Site...................................................................................................................26 Article7 - City's Responsibilities............................................................................................................... 26 7.01 Inspections, Tests, and Approvals.............................................................................................. 26 7.02 Limitations on City's Responsibilities....................................................................................... 26 7.03 Compliance with Safety Program...............................................................................................27 Article 8 - City's Observation Status During Construction .......................................... 8.01 City's Project Representative.....................................................................................................27 8.02 Authorized Variations in Work..................................................................................................27 8.03 Rejecting Defective Work..........................................................................................................27 8.04 Determinations for Work Performed.......................................................................................... 28 Article9 - Changes in the Work.....................................................................................................................28 9.01 Authorized Changes in the Work............................................................................................... 28 9.02 Notification to Surety..................................................................................................................28 Article 10 - Change of Contract Price; Change of Contract Time................................................................28 10.01 Change of Contract Price............................................................................................................28 10.02 Change of Contract Time............................................................................................................28 10.03 Delays..........................................................................................................................................28 Article 11 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work......................29 11.01 Notice of Defects........................................................................................................................ 29 11.02 Access to Work........................................................................................................................... 29 11.03 Tests and Inspections..................................................................................................................29 11.04 Uncovering Work....................................................................................................................... 30 11.05 City May Stop the Work.............................................................. 11.06 Correction or Removal of Defective Work................................................................................ 30 11.07 Correction Period........................................................................................................................ 30 11.08 City May Correct Defective Work............................................................................................. 31 Article12 - Completion.................................................................................................................................. 32 12.01 Contractor's Warranty of Title................................................................................................... 32 12.02 Partial Utilization........................................................................................................................ 32 12.03 Final Inspection...........................................................................................................................32 12.04 Final Acceptance.........................................................................................................................33 Article13 - Suspension of Work....................................................................................................................33 13.01 City May Suspend Work............................................................................................................ 33 Article14 - Miscellaneous.............................................................................................................................. 34 14.01 Giving Notice..............................................................................................................................34 CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 14.02 Computation of Times .................................... 14.03 Cumulative Remedies ..................................... 14.04 Survival of Obligations ................................... 14.05 Headings........................................................... CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 ....................................................................... 34 ....................................................................... 34 ....................................................................... 35 ...................................................................... 35 Wtr & Swr Improvements, Intermodal Parkway City Project No. 104996 0073 10- 1 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page] of 35 ARTICLE 1— DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Agreement - The written instrument which is evidence of the agreement between Developer and Contractor covering the Work 2. Asbestos —Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 3. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 4. Buzzsaw — City's on-line, electronic document management and collaboration system. 5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. 6. City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by, its governing body through its City Manager, his designee, or agents authorized pursuant to its duly authorized charter on his behalf. 7. Community Facilities Agreement (CFA) A Contract between the Developer and the City for the Construction of one or more following public facilities within the City public right-of- way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs. A CFA may include private facilities within the right-of-way dedicated as private right-of- way or easement on a recorded plat. 8. Contract —The entire and integrated written document incorporating the Contract Documents between the Developer, Contractor, and/or City concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 9. Contract Documents —Those items that make up the contract and which must include the Agreement, and it's attachments such as standard construction specifications, standard City Conditions, other general conditions of the Developer, including: a. An Agreement CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10-2 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 2 of 35 b. Attachments to the Agreement i. Bid Form ii. Vendor Compliance with State Law Non -Resident Bidder iii. Prequalification Statement C. Current Prevailing Wage Rates Table (if required by City) d. Insurance Accord Form e. Payment Bond f. Performance Bond g. Maintenance Bond h. Power of Attorney for Bonds i. Workers Compensation Affidavit j. MWBE Commitment Form( If required by City) k. General Conditions 1. Supplementary Conditions in. The Standard City Conditions n. Specifications specifically made part of the Contract Documents by attachment, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents o. Drawings P. Documentation submitted by contractor prior to Notice of Award. q. The following which may be delivered or issued after the effective date if the Agreement and, if issued become an incorporated part of the Contract Documents i. Notice to Proceed ii. Field Orders iii. Change Orders iv. Letters of Final Acceptance r. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 10. Contractor —The individual or entity with whom Developer has entered into the Agreement. 11. Day or day — A day, unless otherwise defined, shall mean a Calendar Day. 12. Developer — An individual or entity that desires to make certain improvements within the City of Fort Worth 13. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 14. Engineer —The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the Developer. 15. Final Acceptance — The written notice given by the City to the Developer and/or Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 3 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 3 of 35 16. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 17. General Requirements —A part of the Contract Documents between the Developer and a Contractor. 18. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 19. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 20. Milestone —A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 21. Non -Participating Change Order —A document, which is prepared for and reviewed by the City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 22. Participating Change Order —A document, which is prepared for and approved by the City, which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 23. Plans — See definition of Drawings. 24. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 25. Project —The Work to be performed under the Contract Documents. 26. Project Representative —The authorized representative of the City who will be assigned to the Site. 27. Public Meeting — An announced meeting conducted by the Developer to facilitate public participation and to assist the public in gaining an informed view of the Project. 28. Regular Working Hours — Hours beginning at 7:00 a.m. and ending at 6: 00 p. m., Monday thru Friday (excluding legal holidays). 29. Samples Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 4 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 4 of 35 30. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 31. Site —Lands or areas indicated in the Contract Documents as being furnished by City or Developer upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City or Developer which are designated for the use of Contractor. 32. Specifications —That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made apart of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 33. Standard City Conditions — That part of the Contract Documents setting forth requirements of the City. 34. Subcontractor —An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of apart of the Work at the Site. 35. Submittals All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 36. Superintendent — The representative of the Contractor who is available at all times and able to receive instructions from the City and/or Developer and to act for the Contractor. 37. Supplementary Conditions —That part of the Contract Documents which amends or supplements the General Conditions. 38. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 40. Weekend Working Hours — Hours beginning at 9: 00 a. m. and ending at S: 00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 5 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 5 of 35 41. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result ofperforming or providing all labor, services, and documentation necessary to produce such construction including any Participating Change Order, Non -Participating Change Order, or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 42. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or - legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p. m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.B through D are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. C. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 00 73 10- 6 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 6 of 35 ARTICLE 2 — PRELIMINARY MATTERS 2.01 Before Starting Construction Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting the Work. New schedules will be submitted to City when Participating Change Orders or Non - Participating Change Orders occur. 2.02 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.03 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. ARTICLE 3 — CONTRACT DOCUMENTS AND AMENDING 3.01 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.02 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Participating Change Order or a Non -Participating Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 7 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 7 of 35 1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or 2. City's written interpretation or clarification. ARTICLE 4 — BONDS AND INSURANCE 4.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverage so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided Section 4.04. 4.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 4.01 and 4.02.C. 4.03 Certificates of Insurance Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee identified in these Standard City Conditions certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. 0073 10- 8 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 8 of 35 1. The certificate of insurance shall document the City, an as "Additional Insured" on all CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 liability policies. 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in these Standard City Conditions. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 9. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10-9 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 9 of 35 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 11. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 12. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 13. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 4.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. 3. The limits of liability for the insurance shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations a. Statutory limits b. Employer's liability CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10-10 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 10 of 35 1) $100,000 each accident/occurrence 2) $100,000 Disease - each employee 3) $500,000 Disease - policy limit B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. 1. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project 2. Contractor's Liability Insurance under this Section which shall be on a per project basis covering the Contractor with minimum limits of: a. $1,000,000 each occurrence b. $2,000,000 aggregate limit The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. 4. The Commercial General Liability Insurance policies shall provide ' X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. 1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in an amount not less than the following amounts: a. Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. CITY OF FORT WORTH Wtr & Swr Irnprovements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 11 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page I I of 35 1) $1, 000, 000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: 2) $250,000 Bodily Injury per person 3) $500,000 Bodily Injury per accident / 4) $100,000 Property Damage D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the following requirements: 1. The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks owned and operated by: _ NONE 2. The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. 3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: a. General Aggregate: NONE b. Each Occurrence:: NONE 4. With respect to the above outlined insurance requirements, the following shall govern: a. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at -grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. b. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights -of - CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 12 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 12 of 35 way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. If, in addition to a grade separation or an at -grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at -grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. d. If no grade separation is involved but other work is proposed on a railroad company's right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. 5. No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. 6. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 4.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the Developer and City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the Developer or City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the Developer or City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 5 — CONTRACTOR'S RESPONSIBILITIES 5.01 Supervision and Superintendent A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 13 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 13 of 35 Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 5.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 5.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 14 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 14 of 35 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 5.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and the General Requirements) proposed adjustments in the Project Schedule. 2. Proposed adjustments in the Project Schedule that will -change the Contract Time shall be submitted in accordance with the requirements of Article 9. Adjustments in Contract Time for projects with City participation shall be made by participating change orders. 5.05 Substitutes and "Or -Equals" A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or -Equal " Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if a. City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 15 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 15 of 35 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 5.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 0125 00 and: 1) shall certify that the proposed substitute item will: i. perform adequately the functions and achieve the results called for by the general design; ii. be similar in substance to that specified; Ili. be suited to the same use as that specified; and 2) will state: i. the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; ii. whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; iii. whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: i. all variations of the proposed substitute item from that specified; ii. available engineering, sales, maintenance, repair, and replacement services; and CITY OF FORT WORTH Wtr & Swr Improvements, Intertnodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 00 73 10- 16 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 16 of 35 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 5.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.B. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Participating Change Order. 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors) A. The Contractor and any subcontractors are required to be prequalified for the work types requiring pre -qualification 5.07 Concerning Subcontractors, Suppliers, and Others A. Minority and Women Owned Business Enterprise Compliance: CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 17 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 17 of 35 ❑ Required for this Contract. (Check this box if there is any City Participation) Ix Not Required for this Contract. It is City policy to ensure the full and equitable participation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent of the City's MWBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MWBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. C. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 18 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 18 of 35 Documents, Contractor shall provide City contract numbers and reference numbers to the Subcontractors and/or Suppliers. 5.08 Wage Rates ❑ Required for this Contract. IX I Not Required for this Contract. A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 1 lth day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (1) the name and CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 19 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 19 of 35 occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 5.09 Patent Fees and Royalties A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and otherprofessionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 5.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.01. 5.11 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 20 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 20 of 35 other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and shall be entitled to recover its cost in doing so. The City may withhold Final Acceptance until clean-up is complete and cost arc recovered. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 5.12 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 21 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 21 of 35 Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 5.13 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 5.14 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 22 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 22 of 35 5.15 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 5.16 Submittals A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal will be identified as required by City. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 5.16.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 5.16.C. B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 23 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 23 of 35 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 5.17 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: l . observations by City; 2. recommendation or payment by City or Developer of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 24 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 24 of 35 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 4.02.B. The City will give notice of observed defects with reasonable promptness. 5.18 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART. BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE. EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 5.19 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 25 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 25 of 35 C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 5.16.C. 5.20 Right to Audit: A. The City reserves the right to audit all projects utilizing City funds B. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The. City shall give Subcontractor reasonable advance notice of intended audits. D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 5.21 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title V1, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 26 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 26 of 35 ARTICLE 6 — OTHER WORK AT THE SITE 6.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. .ARTICLE 7 — CITY'S RESPONSIBILITIES 7.01 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 11.03. 7.02 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13. CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 27 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 27 of 35 7.03 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 5.13. ARTICLE 8 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 8.01 City's Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City's representative during construction are set forth in the Contract Documents. A. City's Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Representative's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents. 8.02 Authorized Variations in Work City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City Developer, and also on Contractor, who shall perform the Work involved promptly. 8.03 Rejecting Defective Work City will have authority to reject Work which City's Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or completed. CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 28 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 28 of 35 8.04 Determinationsfor Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). ARTICLE 9 — CHANGES IN THE WORK 9.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Participating Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a project with City participation, a Field Order may be issued by the City. 9.02 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. ARTICLE 10 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 10.01 Change of Contract Price A. The Contract Price may only be changed by a Participating Change Order for projects with City participation. 10.02 Change of Contract Time A. The Contract Time may only be changed by a Participating Change Order for projects with City participation. 10.03 Delays A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 29 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 29 of 35 ARTICLE 11— TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 11.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 11.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 11.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations approved by City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 30 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 30 of 35 3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Developer/Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance until the Testing Lab is Paid E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. 11.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. 11.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 11.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 11.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 31 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 31 of 35 Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 11.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor and Developer should such additional warranty coverage be required. Contractor's obligations under this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 11.08 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 32 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 32 of 35 stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor- shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 11.09. ARTICLE 12 — COMPLETION 12.01 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment will pass to City no later than the time of Final Acceptance and shall be free and clear of all Liens. 12.02 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 12.03 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 33 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 33 of 35 within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 12.04 Final Acceptance A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction of the following: 1. All documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; 2. consent of the surety, if any, to Final Acceptance; 3. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and 4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. 5. after all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. ARTICLE 13 — SUSPENSION OF WORK 13.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will stop contract time on City participation projects. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 34 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 34 of 35 available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. ARTICLE 14 — MISCELLANEOUS 14.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 14.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 14.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 0073 10- 35 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 35 of 35 14.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 14.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH Wtr & Swr Improvements, Intermodal Parkway STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised: January 10, 2013 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 01 11 00 SUMMARY OF WORK 011100-1 DAP SUMMARY OF WORK Pagel of 3 5 A. Section Includes: 6 1. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 11 2. Division 1 - General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 A. Work Covered by Contract Documents 19 1. Work is to include furnishing all labor, materials, and equipment, and performing 20 all Work necessary for this construction project as detailed in the Drawings and 21 Specifications. 22 B. Subsidiary Work 23 1. Any and all Work specifically governed by documentary requirements for the 24 project, such as conditions imposed by the Drawings or Contract Documents in 25 which no specific item for bid has been provided for in the Proposal and the item is 26 not a typical unit bid item included on the standard bid item list, then the item shall 27 be considered as a subsidiary item of Work, the cost of which shall be included in 28 the price bid in the Proposal for various bid items. 29 C. Use of Premises 30 1. Coordinate uses of premises under direction of the City. 31 2. Assume full responsibility for protection and safekeeping of materials and 32 equipment stored on the Site. 33 3. Use and occupy only portions of the public streets and alleys, or other public places 34 or other rights -of -way as provided for in the ordinances of the City, as shown in the 35 Contract Documents, or as may be specifically authorized in writing by the City. 36 a. A reasonable amount of tools, materials, and equipment for construction 37 purposes may be stored in such space, but no more than is necessary to avoid 38 delay in the construction operations. CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects City Project No. 104996 Revised December 20, 2012 011100-2 DAP SUMMARY OF WORK Page 2 of 3 1 b. Excavated and waste materials shall be stored in such a way as not to interfere 2 with the use of spaces that may be designated to be left free and unobstructed 3 and so as not to inconvenience occupants of adjacent property. 4 c. If the street is occupied by railroad tracks, the Work shall be carried on in such 5 manner as not to interfere with the operation of the railroad. 6 1) All Work shall be in accordance with railroad requirements set forth in 7 Division 0 as well as the railroad permit. 8 D. Work within Easements 9 1. Do not enter upon private property for any purpose without having previously 10 obtained permission from the owner of such property. 11 2. Do not store equipment or material on private property unless and until the 12 specified approval of the property owner has been secured in writing by the 13 Contractor and a copy furnished to the City. 14 3. Unless specifically provided otherwise, clear all rights -of -way or easements of 15 obstructions which must be removed to make possible proper prosecution of the 16 Work as a part of the project construction operations. 17 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, 18 lawns, fences, culverts, curbing, and all other types of structures or improvements, 19 to all water, sewer, and gas lines, to all conduits, overhead pole lines, or 20 appurtenances thereof, including the construction of temporary fences and to all 21 other public or private property adjacent to the Work. 22 5. Notify the proper representatives of the owners or occupants of the public or private 23 lands of interest in lands which might be affected by the Work. 24 a. Such notice shall be made at least 48 hours in advance of the beginning of the 25 Work. 26 b. Notices shall be applicable to both public and private utility companies and any 27 corporation, company, individual, or other, either as owners or occupants, 28 whose land or interest in land might be affected by the Work. 29 c. Be responsible for all damage or injury to property of any character resulting 30 from any act, omission, neglect, or misconduct in the manner or method or 31 execution of the Work, or at any time due to defective work, material, or 32 equipment. 33 6. Fence 34 a. Restore all fences encountered and removed during construction of the Project 35 to the original or a better than original condition. 36 b. Erect temporary fencing in place of the fencing removed whenever the Work is 37 not in progress and when the site is vacated overnight, and/or at all times to 38 provide site security. 39 c. The cost for all fence work within easements, including removal, temporary 40 closures and replacement, shall be subsidiary to the various items bid in the 41 project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects City Project No. 104996 Revised December 20, 2012 011100-3 DAP SUMMARY OF WORK Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 12 13 END OF SECTION 1 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects City Project No. 104996 Revised December 20, 2012 01 25 00 - 1 DAP SUBSTITUTION PROCEDURES Page l of 4 1 SECTION 0125 00 2 SUBSTITUTION PROCEDURES 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedure for requesting the approval of substitution of a product that is not 7 equivalent to a product which is specified by descriptive or performance criteria or 8 defined by reference to 1 or more of the following: 9 a. Name of manufacturer 10 b. Name of vendor 11 c. Trade name 12 d. Catalog number 13 2. Substitutions are not "or -equals". 14 B. Deviations from this City of Fort Worth Standard Specification 15 1. None. 16 C. Related Specification Sections include, but are not necessarily limited to: 17 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 18 2. Division 1 — General Requirements 19 1.2 PRICE AND PAYMENT PROCEDURES 20 A. Measurement and Payment 21 1. Work associated with this Item is considered subsidiary to the various items bid. No 22 separate payment will be allowed for this Item. 23 1.3 REFERENCES [NOT USED] 24 1.4 ADMINISTRATIVE REQUIREMENTS 25 A. Request for Substitution - General 26 1. Within 30 days after award of Contract (unless noted otherwise), the City will 27 consider formal requests from Contractor for substitution of products in place of 28 those specified. 29 2. Certain types of equipment and kinds of material are described in Specifications by 30 means of references to names of manufacturers and vendors, trade names, or catalog 31 numbers. 32 a. When this method of specifying is used, it is not intended to exclude from 33 consideration other products bearing other manufacturer's or vendor's names, 34 trade names, or catalog numbers, provided said products are "or -equals," as 35 determined by City. 36 3. Other types of equipment and kinds of material may be acceptable substitutions 37 under the following conditions: 38 a. Or -equals are unavailable due to strike, discontinued production of products 39 meeting specified requirements, or other factors beyond control of Contractor; 40 or, CITY OF FORT WORTH Wtr & Swr Improvements Internzodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 00Project No. 104996 Revised August 30, 2013 012500-2 DAP SUBSTITUTION PROCEDURES Page 2 of 4 1 b. Contractor proposes a cost and/or time reduction incentive to the City. 2 1.5 SUBMITTALS 3 A. See Request for Substitution Form (attached) 4 B. Procedure for Requesting Substitution 5 1. Substitution shall be considered only: 6 a. After award of Contract 7 b. Under the conditions stated herein 8 2. Submit 3 copies of each written request for substitution, including: 9 a. Documentation 10 1) Complete data substantiating compliance of proposed substitution with 11 Contract Documents 12 2) Data relating to changes in construction schedule, when a reduction is 13 proposed 14 3) Data relating to changes in cost 15 b. For products 16 1) Product identification 17 a) Manufacturer's name 18 b) Telephone number and representative contact name 19 c) Specification Section or Drawing reference of originally specified 20 product, including discrete name or tag number assigned to original 21 product in the Contract Documents 22 2) Manufacturer's literature clearly marked to show compliance of proposed 23 product with Contract Documents 24 3) Itemized comparison of original and proposed product addressing product 25 characteristics including, but not necessarily limited to: 26 a) Size 27 b) Composition or materials of construction 28 c) Weight 29 d) Electrical or mechanical requirements 30 4) Product experience 31 a) Location of past projects utilizing product 32 b) Name and telephone number of persons associated with referenced 33 projects knowledgeable concerning proposed product 34 c) Available field data and reports associated with proposed product 35 5) Samples 36 a) Provide at request of City. 37 b) Samples become the property of the City. 38 c. For construction methods: 39 1) Detailed description of proposed method 40 2) Illustration drawings 41 C. Approval or Rejection 42 1. Written approval or rejection of substitution given by the City 43 2. City reserves the right to require proposed product to comply with color and pattern 44 of specified product if necessary to secure design intent. 45 3. In the event the substitution is approved, if a reduction in cost or time results, it will 46 be documented by Change Order. CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised August 30, 2013 012500-3 DAP SUBSTITUTION PROCEDURES Page 3 of 4 1 4. Substitution will be rejected if.- 2 a. Submittal is not through the Contractor with his stamp of approval 3 b. Request is not made in accordance with this Specification Section 4 c. In the Developer's opinion, acceptance will require substantial revision of the 5 original design 6 d. In the City's or Developer's opinion, substitution will not perform adequately 7 the function consistent with the design intent 8 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 9 1.7 CLOSEOUT SUBMITTALS [NOT USED] 10 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 11 1.9 QUALITY ASSURANCE 12 A. In making request for substitution or in using an approved product, the Contractor 13 represents that the Contractor: 14 1. Has investigated proposed product, and has determined that it is adequate or 15 superior in all respects to that specified, and that it will perform function for which it 16 is intended 17 2. Will provide same guarantee for substitute item as for product specified 18 3. Will coordinate installation of accepted substitution into Work, to include building 19 modifications if necessary, making such changes as may be required for Work to be 20 complete in all respects 21 4. Waives all claims for additional costs related to substitution which subsequently 22 arise 23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 PART 2 - PRODUCTS [NOT USED] 27 PART 3 - EXECUTION [NOT USED] 28 WE 30 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Wtr & Swr Imprownients Internaodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised August 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 01 25 00 - 4 DAP SUBSTITUTION PROCEDURES Page 4 of 4 EXHIBIT A REQUEST FOR SUBSTITUTION FORM: TO: PROJECT: DATE: We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature as noted Recommended — Recommended Firm — Not recommended _Received late Address By Date Date Remarks Telephone For Use by City: Approved City Date Rejected CITY OF FORT WORTH Wtr & Swr Improvements Interntodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised August 30, 2013 1 2 3 PART 1- GENERAL 4 1.1 SUMMARY SECTION 013119 PRECONSTRUCTION MEETING 01 31 19 - 1 DAP Preconstruction Meeting Page 1 of 3 5 A. Section Includes: 6 1. Provisions for the preconstruction meeting to be held prior to the start of Work to 7 clarify construction contract administration procedures 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. No construction schedule required unless requested by the City. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1— General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. No 16 separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 A. Coordination 1. Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the delivery of the distribution package to the City. The meeting will be scheduled and administered by the City. 1. The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 2. Attendance shall include: a. Developer and Consultant b. Contractor's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request CITY OF FORT WORTH Wtr & Swr Improvements Intermoda/ Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised April 7, 2014 0131 19 - 2 DAP Preconstruction Meeting Page 2 of 3 1 e. Other City representatives 2 f. Others as appropriate 3 3. Preliminary Agenda may include: 4 a. Introduction of Project Personnel 5 b. General Description of Project 6 c. Status of right-of-way, utility clearances, easements or other pertinent permits 7 d. Contractor's work plan and schedule 8 e. Contract Time 9 f. Notice to Proceed 10 g. Construction Staking 11 h. Progress Payments 12 i. Extra Work and Change Order Procedures 13 j. Field Orders 14 k. Disposal Site Letter for Waste Material 15 1. Insurance Renewals 16 m. Payroll Certification 17 n. Material Certifications and Quality Control Testing 18 o. Public Safety and Convenience 19 p. Documentation of Pre -Construction Conditions 20 q. Weekend Work Notification 21 r. Legal Holidays 22 s. Trench Safety Plans 23 t. Confined Space Entry Standards 24 u. Coordination with the City's representative for operations of existing water 25 systems 26 v. Storm Water Pollution Prevention Plan 27 w. Coordination with other Contractors 28 x. Early Warning System 29 y. Contractor Evaluation 30 z. Special Conditions applicable to the project 31 aa. Damages Claims 32 bb. Submittal Procedures 33 cc. Substitution Procedures 34 dd. Correspondence Routing 35 ee. Record Drawings 36 ff. Temporary construction facilities 37 gg. MBE/SBE procedures 38 hh. Final Acceptance 39 ii. Final Payment 40 J. Questions or Comments CITY OF FORT WORTH Wtr & Swr Improvements lntermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised April 7, 2014 0131 19 - 3 DAP Preconstruction Meeting Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 L7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 END OF SECTION 12 13 14 + Revision Log I DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Wtr & Swr Improvements lntermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised April 7, 2014 013233-1 DAP PRECONSTRUCTION VIDEO Pagel of 2 SECTION 0132 33 PRECONSTRUCTION VIDEO PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative and procedural requirements for: a. Preconstruction Videos B. Deviations from this City of Fort Worth Standard Specification 1. Though not mandatory, it is highly recommended on infill developer projects. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Preconstruction Video 1. Produce a preconstruction video of the site/alignment, including all areas in the vicinity of and to be affected by construction. a. Provide digital copy of video upon request by the City. 2. Retain a copy of the preconstruction video until the end of the maintenance surety period. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104996 Revised August 30, 2013 PART 3 - EXECUTION [NOT USED] 013233-2 DAP PRECONSTRUCTION VIDEO Page 2 of 2 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104996 Revised August 30, 2013 01 33 00- 1 DAP Submittals Page] of 8 1 SECTION 0133 00 2 DAP SUBMITTALS 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General methods and requirements of submissions applicable to the following 7 Work -related submittals: 8 a. Shop Drawings 9 b. Product Data (including Standard Product List submittals) 10 c. Samples 11 d. Mock Ups 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1— General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Coordination 24 1. Notify the City in writing, at the time of submittal, of any deviations in the 25 submittals from the requirements of the Contract Documents. 26 2. Coordination of Submittal Times 27 a. Prepare, prioritize and transmit each submittal sufficiently in advance of 28 performing the related Work or other applicable activities, or within the time 29 specified in the individual Work Sections, of the Specifications. 30 b. Contractor is responsible such that the installation will not be delayed by 31 processing times including, but not limited to: 32 a) Disapproval and resubmittal (if required) 33 b) Coordination with other submittals 34 c) Testing 35 d) Purchasing 36 e) Fabrication 37 f) Delivery 38 Similar sequenced activities 39 c. No extension of time will be authorized because of the Contractor's failure to 40 transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH Wtr & Swr Improvements Intermodol Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised April 7, 2014 01 33 00- 2 DAP Submittals Page 2 of 8 1 d. Make submittals promptly in accordance with approved schedule, and in 2 such sequence as to cause no delay in the Work or in the work of any other 3 contractor. 4 A. Submittal Numbering 5 1. When submitting shop drawings or samples, utilize a 9-character submittal 6 cross-reference identification numbering system in the following manner: 7 a. Use the first 6 digits of the applicable Specification Section Number. 8 b. For the next 2 digits number use numbers 01-99 to sequentially number 9 each initial separate item or drawing submitted under each specific Section 10 number. 11 c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. 12 A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical 13 submittal number would be as follows: 14 15 03 30 00-08-B 16 17 1) 03 30 00 is the Specification Section for Concrete 18 2) 08 is the eighth initial submittal under this Specification Section 19 3) B is the third submission (second resubmission) of that particular shop 20 drawing 21 B. Contractor Certification 22 1. Review shop drawings, product data and samples, including those by 23 subcontractors, prior to submission to determine and verify the following: 24 a. Field measurements 25 b. Field construction criteria 26 c. Catalog numbers and similar data 27 d. Conformance with the Contract Documents 28 2. Provide each shop drawing, sample and product data submitted by the 29 Contractor with a Certification Statement affixed including: 30 a. The Contractor's Company name 31 b. Signature of submittal reviewer 32 c. Certification Statement 33 1) `By this submittal, I hereby represent that I have determined and 34 verified field measurements, field construction criteria, materials, 35 dimensions, catalog numbers and similar data and I have checked and 36 coordinated each item with other applicable approved shop drawings." 37 C. Submittal Format 38 1. Fold shop drawings larger than 8 'h inches x 11 inches to 8 %2 inches x 11 inches. 39 2. Bind shop drawings and product data sheets together. 40 3. Order 41 a. Cover Sheet 42 1) Description of Packet 43 2) Contractor Certification 44 b. List of items / Table of Contents 45 c. Product Data /Shop Drawings/Samples /Calculations CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised April 7, 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 01 33 00- 3 DAP Submittals Page 3 of 8 D. Submittal Content 1. The date of submission and the dates of any previous submissions 2. The Project title and number 3. Contractor identification 4. The names of: a. Contractor b. Supplier c. Manufacturer 5. Identification of the product, with the Specification Section number, page and paragraph(s) 6. Field dimensions, clearly identified as such 7. Relation to adjacent or critical features of the Work or materials 8. Applicable standards, such as ASTM or Federal Specification numbers 9. Identification by highlighting of deviations from Contract Documents 10. Identification by highlighting of revisions on resubmittals 11. An 8-inch x 3-inch blank space for Contractor and City stamps E. Shop Drawings 1. As specified in individual Work Sections includes, but is not necessarily limited to: a. Custom -prepared data such as fabrication and erection/installation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates f. Special wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable to the Work 2. Details a. Relation of the various parts to the main members and lines of the structure b. Where correct fabrication of the Work depends upon field measurements Provide such measurements and note on the drawings prior to submitting for approval. F. Product Data 1. For submittals of product data for products included on the City's Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City's Standard Product List, submittal data may include, but is not necessarily limited to: a. Standard prepared data for manufactured products (sometimes referred to as catalog data) CITY OF FORT WORTH Wtr & Swr Improvements lntermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised April 7, 2014 01 33 00- 4 DAP Submittals Page 4 of 8 1 1) Such as the manufacturer's product specification and installation 2 instructions 3 2) Availability of colors and patterns 4 3) Manufacturer's printed statements of compliances and applicability 5 4) Roughing -in diagrams and templates 6 5) Catalog cuts 7 6) Product photographs 8 7) Standard wiring diagrams 9 8) Printed performance curves and operational -range diagrams 10 9) Production or quality control inspection and test reports and certifications 11 10) Mill reports 12 11) Product operating and maintenance instructions and recommended 13 spare -parts listing and printed product warranties 14 12) As applicable to the Work 15 H. Samples 16 1. As specified in individual Sections, include, but are not necessarily limited to: 17 a. Physical examples of the Work such as: 18 1) Sections of manufactured or fabricated Work 19 2) Small cuts or containers of materials 20 3) Complete units of repetitively used products color/texture/pattern swatches 21 and range sets 22 4) Specimens for coordination of visual effect 23 5) Graphic symbols and units of Work to be used by the City for independent 24 inspection and testing, as applicable to the Work 25 I. Do not start Work requiring a shop drawing, sample or product data nor any material to 26 be fabricated or installed prior to the approval or qualified approval of such item. 27 1. Fabrication performed, materials purchased or on -site construction accomplished 28 which does not conform to approved shop drawings and data is at the Contractor's 29 risk. 30 2. The City will not be liable for any expense or delay due to corrections or remedies 31 required to accomplish conformity. 32 3. Complete project Work, materials, fabrication, and installations in conformance 33 with approved shop drawings, applicable samples, and product data. 34 J. Submittal Distribution 35 1. Electronic Distribution 36 a. Confirm development of Project directory for electronic submittals to be 37 uploaded to City's Buzzsaw site, or another external FTP site approved by the 38 City. 39 b. Shop Drawings 40 1) Upload submittal to designated project directory and notify appropriate 41 City representatives via email of submittal posting. 42 2) Hard Copies 43 a) 3 copies for all submittals 44 b) If Contractor requires more than 1 hard copy of Shop Drawings 45 returned, Contractor shall submit more than the number of copies listed 46 above. 47 c. Product Data CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised April 7, 2014 01 33 00- 5 DAP Submittals Page 5 of 8 1 1) Upload submittal to designated project directory and notify appropriate 2 City representatives via email of submittal posting. 3 2) Hard Copies 4 a) 3 copies for all submittals 5 d. Samples 6 1) Distributed to the Project Representative 7 2. Hard Copy Distribution (if required in lieu of electronic distribution) 8 9 10 a. Shop Drawings 11 1) Distributed to the City 12 2) Copies 13 a. 8 copies for mechanical submittals 14 b. 7 copies for all other submittals 15 c. If Contractor requires more than 3 copies of Shop Drawings 16 returned, Contractor shall submit more than the number of copies 17 listed above. 18 b. Product Data 19 1) Distributed to the City 20 2) 'Copies 21 a) 4 copies 22 c. Samples 23 1) Distributed to the Project Representative 24 2) Copies 25 a) Submit the number stated in the respective Specification Sections. 26 3. Distribute reproductions of approved shop drawings and copies of approved 27 product data and samples, where required, to the job site file and elsewhere as 28 directed by the City. 29 a. Provide number of copies as directed by the City but not exceeding the 30 number previously specified. 31 K. Submittal Review 32 1. The review of shop drawings, data and samples will be for general conformance 33 with the design concept and Contract Documents. This is not to be construed as: 34 a. Permitting any departure from the Contract requirements 35 b. Relieving the Contractor of responsibility for any errors, including details, 36 dimensions, and materials 37 c. Approving departures from details furnished by the City, except as otherwise 38 provided herein 39 2. The review and approval of shop drawings, samples or product data by the City 40 does not relieve the Contractor from his/her responsibility with regard to the 41 fulfillment of the terms of the Contract. 42 a. All risks of error and omission are assumed by the Contractor, and the City will 43 have no responsibility therefore. 44 3. The Contractor remains responsible for details and accuracy, for coordinating the 45 Work with all other associated work and trades, for selecting fabrication processes, 46 for techniques of assembly and for performing Work in a safe manner. CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised April 7, 2014 01 33 00- 6 DAP Submittals Page 6 of 8 1 4. If the shop drawings, data or samples as submitted describe variations and show a 2 departure from the Contract requirements which City finds to be in the interest of 3 the City and to be so minor as not to involve a change in Contract Price or time for 4 performance, the City may return the reviewed drawings without noting an 5 exception. 6 5. Submittals will be returned to the Contractor under 1 of the following codes: 7 a. Code 1 8 1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or 9 comments on the submittal. 10 a. When returned under this code the Contractor may release the 11 equipment and/or material for manufacture. 12 b. Code 2 13 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of 14 the notations and comments IS NOT required by the Contractor. 15 a. The Contractor may release the equipment or material for manufacture; 16 however, all notations and comments must be incorporated into the 17 final product. 18 c. Code 3 19 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is 20 assigned when notations and comments are extensive enough to require a 21 resubmittal of the package. 22 a) The Contractor may release the equipment or material for manufacture; 23 however, all notations and comments must be incorporated into the 24 final product. 25 b) This resubmittal is to address all comments, omissions and 26 non -conforming items that were noted. 27 c) Resubmittal is to be received by the City within 15 Calendar Days of 28 the date of the City's transmittal requiring the resubmittal. 29 d. Code 4 30 1) "NOT APPROVED" is assigned when the submittal does not meet the 31 intent of the Contract Documents. 32 a) The Contractor must resubmit the entire package revised to bring the 33 submittal into conformance. 34 b) It may be necessary to resubmit using a different manufacturer/vendor 35 to meet the Contract Documents. 36 6. Resubmittals 37 a. Handled in the same manner as first submittals 38 1) Corrections other than requested by the City 39 2) Marked with revision triangle or other similar method 40 a) At Contractor's risk if not marked 41 b. Submittals for each item will be reviewed no more than twice at the City's 42 expense. 43 1) All subsequent reviews will be performed at times convenient to the City 44 and at the Contractor's expense, based on the City's or City 45 Representative's then prevailing rates. 46 2) Provide Contractor reimbursement to the City within 30 Calendar Days for 47 all such fees invoiced by the City. CITY OF FORT WORTH Wtr & Swr Improvements Intermoda/ Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised April 7, 2014 01 33 00- 7 DAP Submittals Page 7 of 8 1 c. The need for more than 1 resubmission or any other delay in obtaining City's 2 review of submittals, will not entitle the Contractor to an extension of Contract 3 Time. 4 7. Partial Submittals 5 a. City reserves the right to not review submittals deemed partial, at the City's 6 discretion. 7 b. Submittals deemed by the City to be not complete will be returned to the 8 Contractor, and will be considered "Not Approved" until resubmitted. 9 c. The City may at its option provide a list or mark the submittal directing the 10 Contractor to the areas that are incomplete. 11 8. If the Contractor considers any correction indicated on the shop drawings to 12 constitute a change to the Contract Documents, then written notice must be 13 provided thereof to the Developer at least 7 Calendar Days prior to release for 14 manufacture. 15 9. When the shop drawings have been completed to the satisfaction of the City, the 16 Contractor may carry out the construction in accordance therewith and no further 17 changes therein except upon written instructions from the City. 18 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days 19 following receipt of submittal by the City. 20 L. Mock ups 21 1. Mock Up units as specified in individual Sections, include, but are not necessarily 22 limited to, complete units of the standard of acceptance for that type of Work to be 23 used on the Project. Remove at the completion of the Work or when directed. 24 M. Qualifications 25 If specifically required in other Sections of these Specifications, submit a P.E. 26 Certification for each item required. 27 N. Request for Information (RFI) 28 1. Contractor Request for additional information 29 a. Clarification or interpretation of the contract documents 30 b. When the Contractor believes there is a conflict between Contract Documents 31 c. When the Contractor believes there is a conflict between the Drawings and 32 Specifications 33 1) Identify the conflict and request clarification 34 2. Sufficient information shall be attached to permit a written response without further 35 information. 36 37 38 39 40 1.5 SUBMITTALS [NOT USED] 41 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 42 1.7 CLOSEOUT SUBMITTALS [NOT USED] 43 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] CITY OF FORT WORTH Wtr & Swr Improvementslntermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised April 7, 2014 01 33 00- 8 DAP Submittals Page 8 of 8 1 1.9 QUALITY ASSURANCE [NOT USED] 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 3 1.11 FIELD [SITE] CONDITIONS [NOT USED] 4 1.12 WARRANTY [NOT USED] 5 6 7 8 9 PART 2 — PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 END OF SECTION 12 13 Revision Log DATE NAME SUMMARY OF CHANGE II 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days f CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised April 7, 2014 01 35 13- 1 DAP SPECIAL PROJECT PROCEDURES Page 1 of 7 1 SECTION 01 3513 2 SPECIAL PROJECT PROCEDURES 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedures for special project circumstances that includes, but is not limited to: 7 a. Coordination with the Texas Department of Transportation 8 b. Work near High Voltage Lines 9 c. Confined Space Entry Program 10 d. Air Pollution Watch Days 11 e. Use of Explosives, Drop Weight, Etc. 12 f. Water Department Notification 13 g. Public Notification Prior to Beginning Construction 14 h. Coordination with United States Army Corps of Engineers 15 i. Coordination within Railroad permits areas 16 j. Dust Control 17 k. Employee Parking 18 B. Deviations from this City of Fort Worth Standard Specification 19 1. None. 20 C. Related Specification Sections include, but are not necessarily limited to: 21 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 22 2. Division 1 — General Requirements 23 3. Section 33 12 25 — Connection to Existing Water Mains 24 25 1.2 REFERENCES 26 A. Reference Standards 27 1. Reference standards cited in this Specification refer to the current reference 28 standard published at the time of the latest revision date logged at the end of this 29 Specification, unless a date is specifically cited. 30 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 31 High Voltage Overhead Lines. 32 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction 33 Specification 34 1.3 ADMINISTRATIVE REQUIREMENTS 35 A. Coordination with the Texas Department of Transportation 36 1. When work in the right-of-way which is under the jurisdiction of the Texas 37 Department of Transportation (TxDOT): 38 a. Notify the Texas Department of Transportation prior to commencing any work 39 therein in accordance with the provisions of the permit CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwv STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104996 Revised August, 30, 2013 0135 13-2 DAP SPECIAL PROJECT PROCEDURES Page 2 of 7 1 b. All work performed in the TxDOT right-of-way shall be performed in 2 compliance with and subject to approval from the Texas Department of 3 Transportation 4 B. Work near High Voltage Lines 5 1. Regulatory Requirements 6 a. All Work near High Voltage Lines (more than 600 volts measured between 7 conductors or between a conductor and the ground) shall be in accordance with 8 Health and Safety Code, Title 9, Subtitle A, Chapter 752. 9 2. Warning sign 10 a. Provide sign of sufficient size meeting all OSHA requirements. 11 3. Equipment operating within 10 feet of high voltage lines will require the following 12 safety features 13 a. Insulating cage -type of guard about the boom or arm 14 b. Insulator links on the lift hook connections for back hoes or dippers 15 c. Equipment must meet the safety requirements as set forth by OSHA and the 16 safety requirements of the owner of the high voltage lines 17 4. Work within 6 feet of high voltage electric lines 18 a. Notification shall be given to: 19 1) The power company (example: ONCOR) 20 a) Maintain an accurate log of all such calls to Power Company and 21 record action taken in each case. 22 b. Coordination with Power Company 23 1) After notification coordinate with the power company to: 24 a) Erect temporary mechanical barriers, de -energize the lines, or raise or 25 lower the lines 26 c. No personnel may work within 6 feet of a high voltage line before the above 27 requirements have been met. 28 C. Confined Space Entry Program 29 1. Provide and follow approved Confined Space Entry Program in accordance with 30 OSHA requirements. 31 2. Confined Spaces include: 32 a. Manholes 33 b. All other confined spaces in accordance with OSHA's Permit Required for 34 Confined Spaces 35 D. Use of Explosives, Drop Weight, Etc. 36 1. When Contract Documents permit on the project the following will apply: 37 a. Public Notification 38 1) Submit notice to City and proof of adequate insurance coverage, 24 hours 39 prior to commencing. 40 2) Minimum 24 hour public notification in accordance with Section 0131 13 41 E. Water Department Coordination 42 1. During the construction of this project, it will be necessary to deactivate, for a 43 period of time, existing lines. The Contractor shall be required to coordinate with 44 the Water Department to determine the best times for deactivating and activating 45 those lines. CITY OF FORT WORTH Wtr & Swr Improvements Interrnodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104996 Revised August, 30, 2013 0135 13 -3 DAP SPECIAL PROJECT PROCEDURES Page 3 of 7 1 2. Coordinate any event that will require connecting to or the operation of an existing 2 City water line system with the City's representative. 3 a. Coordination shall be in accordance with Section 33 12 25. 4 b. If needed, obtain a hydrant water meter from the Water Department for use 5 during the life of named project. 6 c. In the event that a water valve on an existing live system be turned off and on 7 to accommodate the construction of the project is required, coordinate this 8 activity through the appropriate City representative. 9 1) Do not operate water line valves of existing water system. 10 a) Failure to comply will render the Contractor in violation of Texas Penal 11 Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor 12 will be prosecuted to the full extent of the law. 13 b) In addition, the Contractor will assume all liabilities and 14 responsibilities as a result of these actions. 15 F. Public Notification Prior to Beginning Construction 16 1. Prior to beginning construction on any block in the project, on a block by block 17 basis, prepare and deliver a notice or flyer of the pending construction to the front 18 door of each residence or business that will be impacted by construction. The notice 19 shall be prepared as follows: 20 a. Post notice or flyer 7 days prior to beginning any construction activity on each 21 block in the project area. 22 1) Prepare flyer on the Contractor's letterhead and include the following 23 information: 24 a) Name of Project 25 b) City Project No (CPN) 26 c) Scope of Project (i.e. type of construction activity) 27 d) Actual construction duration within the block 28 e) Name of the contractor's foreman and phone number 29 f) Name of the City's inspector and phone number 30 g) City's after-hours phone number 31 2) A sample of the `pre -construction notification' flyer is attached as Exhibit 32 A. 33 3) Submit schedule showing the construction start and finish time for each 34 block of the project to the inspector. 35 4) Deliver flyer to the City Inspector for review prior to distribution. 36 b. No construction will be allowed to begin on any block until the flyer is 37 delivered to all residents of the block. 38 G. Public Notification of Temporary Water Service Interruption during Construction 39 1. In the event it becomes necessary to temporarily shut down water service to 40 residents or businesses during construction, prepare and deliver a notice or flyer of 41 the pending interruption to the front door of each affected resident. 42 2. Prepared notice as follows: 43 a. The notification or flyer shall be posted 24 hours prior to the temporary 44 interruption. 45 b. Prepare flyer on the contractor's letterhead and include the following 46 information: 47 1) Name of the project 48 2) City Project Number CITY OF FORT WORTH Wtr & SwrImprovementsIntennodal Pkm, STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104996 Revised August, 30, 2013 0135 13 - 4 DAP SPECIAL PROJECT PROCEDURES Page 4 of 7 1 3) Date of the interruption of service 2 4) Period the interruption will take place 3 5) Name of the contractor's foreman and phone number 4 6) Name of the City's inspector and phone number 5 c. A sample of the temporary water service interruption notification is attached as 6 Exhibit B. 7 d. Deliver a copy of the temporary interruption notification to the City inspector 8 for review prior to being distributed. 9 e. No interruption of water service can occur until the flyer has been delivered to 10 all affected residents and businesses. 11 f. Electronic versions of the sample flyers can be obtained from the Project 12 Construction Inspector. 13 H. Coordination with United States Army Corps of Engineers (USAGE) 14 1. At locations in the Project where construction activities occur in areas where 15 USACE permits are required, meet all requirements set forth in each designated 16 permit. 17 I. Coordination within Railroad Permit Areas 18 1. At locations in the project where construction activities occur in areas where 19 railroad permits are required, meet all requirements set forth in each designated 20 railroad permit. This includes, but is not limited to, provisions for: 21 a. Flagmen 22 b. Inspectors 23 c. Safety training 24 d. Additional insurance 25 e. Insurance certificates 26 f. Other employees required to protect the right-of-way and property of the 27 Railroad Company from damage arising out of and/or from the construction of 28 the project. Proper utility clearance procedures shall be used in accordance 29 with the permit guidelines. 30 2. Obtain any supplemental information needed to comply with the railroad's 31 requirements. 32 J. Dust Control 33 1. Use acceptable measures to control dust at the Site. 34 a. If water is used to control dust, capture and properly dispose of waste water. 35 b. If wet saw cutting is performed, capture and properly dispose of slurry. 36 K. Employee Parking 37 1. Provide parking for employees at locations approved by the City. CITY OF FORT WORTH Wtr & Swr Improvements Intennodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104996 Revised August, 30, 2013 0135 13 -5 DAP SPECIAL PROJECT PROCEDURES Page 5 of 7 1 1.4 SUBMITTALS [NOT USED] 2 1.5 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.6 CLOSEOUT SUBMITTALS [NOT USED] 4 1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.8 QUALITY ASSURANCE [NOT USED] 6 1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.10 FIELD [SITE] CONDITIONS [NOT USED] 8 1.11 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 12 13 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1.3.13— Added requirement of compliance with Health and Safety Code, Title 8/31/2012 i.). Johnson Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. CITY OF FORT WORTH Wtr & Swr Improvements Intennodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104996 Revised August, 30, 2013 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 01 35 13 - 6 DAP SPECIAL PROJECT PROCEDURES Page 6 of 7 EXHIBIT A (To be printed on Contractor's Letterhead) Date: CPN No.: Project Name: Mapsco Location: Limits of Construction: THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> OR Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkm STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104996 Revised August, 30, 2013 1 K 01 35 13 -7 DAP SPECIAL PROJECT PROCEDURES Page 7 of 7 EXHIBIT B FORTWORTH DOB NO. IFX= ftojeat Name. NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, ,CONTRACTOR 3 - - --- -- 4 CITY OF FORT WORTH Wir & Swr Improi,ements Intermodal Pkwp STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Cite Project No.104996 Revised August, 30, 2013 01 45 23 TESTING AND INSPECTION SERVICES Pagel of 2 SECTION 0145 23 TESTING AND INSPECTION SERVICES PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Testing and inspection services procedures and coordination B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a. Contractor is responsible for performing, coordinating, and payment of all Quality Control testing. b. City is responsible for performing and payment for first set of Quality Assurance testing. 1) If the first Quality Assurance test performed by the City fails, the Contractor is responsible for payment of subsequent Quality Assurance testing until a passing test occurs. a) Final acceptance will not be issued by City until all required payments for testing by Contractor have been paid in full. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Testing 1. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be performed by the City, notify City, sufficiently in advance, when testing is needed. b. When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3. Distribution of Testing Reports a. Electronic Distribution 1) Confirm development of Project directory for electronic submittals to be uploaded to the City's document management system, or another external FTP site approved by the City. CITY OF FORT WORTH Wtr & swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 104996 Revised March 9, 2020 01 4523 TESTING AND INSPECTION SERVICES Page 2 of 2) Upload test reports to designated project directory and notify appropriate City representatives via email of submittal posting. 3) Hard Copies a) 1 copy for all submittals submitted to the Project Representative b. Hard Copy Distribution (if required in lieu of electronic distribution) 1) Tests performed by City a) Distribute 1 hard copy to the Contractor 2) Tests performed by the Contractor a) Distribute 3 hard copies to City's Project Representative 4. Provide City's Project Representative with trip tickets for each delivered load of Concrete or Lime material including the following information: a. Name of pit b. Date of delivery c. Material delivered B. Inspection 1. Inspection or lack of inspection does not relieve the Contractor from obligation to perform work in accordance with the Contract Documents. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] DATE NAME END OF SECTION Revision Log SUMMARY OF CHANGE 3/9/2020 D.V. Magana through the City's document management system. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 9, 2020 Wtr & swr Improvements Intermodal Pkwy City Project No. 104996 014523-1 DAP Testing and Inspection Services Page 1 of 2 1 SECTION 0145 23 2 TESTING AND INSPECTION SERVICES 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Testing and inspection services procedures and coordination 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 — General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 a. Contractor is responsible for performing, coordinating, and payment of all 17 Quality Control testing. 18 b. City is responsible for performing and payment for first set of Quality 19 Assurance testing. 20 1) If the first Quality Assurance test performed by the City fails, the 21 Contractor is responsible for payment of subsequent Quality Assurance 22 testing until a passing test occurs. 23 a) Final acceptance will not be issued by City until all required payments 24 for testing by Contractor have been paid in full. 25 1.3 REFERENCES [NOT USED] 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Testing 28 1. Complete testing in accordance with the Contract Documents. 29 2. Coordination 30 a. When testing is required to be performed by the City, notify City, sufficiently 31 in advance, when testing is needed. 32 b. When testing is required to be completed by the Contractor, notify City, 33 sufficiently in advance, that testing will be performed. 34 3. Distribution of Testing Reports 35 a. Electronic Distribution 36 1) Confirm development of Project directory for electronic submittals to be 37 uploaded to City's Buzzsaw site, or another form of distribution approved 38 by the City. 39 40 CITY OF FORT WORTH Wtr & Swr Improvements Interniodal Pkwv STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS Cite Project No. 104996 Revised April 7, 2014 01 45 23 - 2 DAP Testing and Inspection Services Page 2 of 2 1 1) Upload test reports to designated project directory and notify appropriate 2 City representatives via email of submittal posting. 3 2) Hard Copies 4 a) 1 copy for all submittals submitted to the Project Representative 5 b. Hard Copy Distribution (if required in lieu of electronic distribution) 6 1) Tests performed by City 7 a) Distribute 1 hard copy to the Contractor 8 2) Tests performed by the Contractor 9 a) Distribute 3 hard copies to City's Project Representative 10 4. Provide City's Project Representative with trip tickets for each delivered 11 load of Concrete or Lime material including the following information: 12 a. Name of pit 13 b. Date of delivery 14 c. Material delivered 15 B. Inspection 16 1. Inspection or lack of inspection does not relieve the Contractor from obligation to 17 perform work in accordance with the Contract Documents. 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS (NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 27 28 29 30 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] DATE NAME END OF SECTION Revision Log SUMMARY OF CHANGE CITY OF FORT WORTH Wir & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised April 7, 2014 O1 50 00- 1 DAP Temporary Facilities and Controls Pagel 44 1 SECTION 0150 00 2 TEMPORARY FACILITIES AND CONTROLS 3 PART 1-GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provide temporary facilities and controls needed for the Work including, but not 7 necessarily limited to: 8 a. Temporary utilities 9 b. Sanitary facilities 10 c. Storage Sheds and Buildings 11 d. Dust control 12 e. Temporary fencing of the construction site 13 B. Deviations from this City of Fort Worth Standard Specification 14 1. None. 15 C. Related Specification Sections include, but are not necessarily limited to: 16 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 17 2. Division 1 — General Requirements 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A. Measurement and Payment 20 1. Work associated with this Item is considered subsidiary to the various Items bid. 21 No separate payment will be allowed for this Item. 22 1.3 REFERENCES [NOT USED] 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Temporary Utilities 25 1. Obtaining Temporary Service 26 a. Make arrangements with utility service companies for temporary services. 27 b. Abide by rules and regulations of utility service companies or authorities 28 having jurisdiction. 29 c. Be responsible for utility service costs until Work is approved for Final 30 Acceptance. 31 1) Included are fuel, power, light, heat and other utility services necessary for 32 execution, completion, testing and initial operation of Work. 33 2. Water 34 a. Contractor to provide water required for and in connection with Work to be 35 performed and for specified tests of piping, equipment, devices or other use as 36 required for the completion of the Work. 37 b. Provide and maintain adequate supply of potable water for domestic 38 consumption by Contractor personnel and City's Project Representatives. 39 c. Coordination 40 1) Contact City 1 week before water for construction is desired 41 CfTY OF FORT WORTH CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project Aro. 104996 Revised April 7, 2014 01 50 00- 2 DAP Temporary Facilities and Controls Page 2 of 4 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED 2 PROJECTS City Project No. 104631 Revised August 30, 2013 3 d. Contractor Payment for Construction Water 4 1) Obtain construction water meter from City for payment as billed by City's 5 established rates. 6 3. Electricity and Lighting 7 a. Provide and pay for electric powered service as required for Work, including 8 testing of Work. 9 Provide power for lighting, operation of equipment, or other use. 10 b. Electric power service includes temporary power service or generator to 11 maintain operations during scheduled shutdown. 12 4. Telephone 13 a. Provide emergency telephone service at Site for use by Contractor personnel 14 and others performing work or furnishing services at Site. 15 5. Temporary Heat and Ventilation 16 a. Provide temporary heat as necessary for protection or completion of Work. 17 b. Provide temporary heat and ventilation to assure safe working conditions. 18 B. Sanitary Facilities 19 1. Provide and maintain sanitary facilities for persons on Site. 20 a. Comply with regulations of State and local departments of health. 21 2. Enforce use of sanitary facilities by construction personnel at job site. 22 a. Enclose and anchor sanitary facilities. 23 b. No discharge will be allowed from these facilities. 24 c. Collect and store sewage and waste so as not to cause nuisance or health 25 problem. 26 d. Haul sewage and waste off -site at no less than weekly intervals and properly 27 dispose in accordance with applicable regulation. 28 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 29 4. Remove facilities at completion of Project 30 C. Storage Sheds and Buildings 31 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor 32 above ground level for materials and equipment susceptible to weather damage. 33 2. Storage of materials not susceptible to weather damage may be on blocks off 34 ground. 35 3. Store materials in a neat and orderly manner. 36 a. Place materials and equipment to permit easy access for identification, 37 inspection and inventory. 38 4. Equip building with lockable doors and lighting, and provide electrical service for 39 equipment space heaters and heating or ventilation as necessary to provide storage 40 environments acceptable to specified manufacturers. 41 5. Fill and grade site for temporary structures to provide drainage away from 42 temporary and existing buildings. 43 6. Remove building from site prior to Final Acceptance. 44 D. Temporary Fencing CITY OF FORT WORTH Wtr & Swr Improvements Interrnodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No . 104996 Revised April 7, 2014 01 50 00- 3 DAP Temporary Facilities and Controls Page 3 of 4 1 1. Provide and maintain for the duration or construction when required in contract 2 documents 3 E. Dust Control 4 1. Contractor is responsible for maintaining dust control through the duration of the 5 project. 6 a. Contractor remains on -call at all times 7 b. Must respond in a timely manner 8 F. Temporary Protection of Construction 9 1. Contractor or subcontractors are responsible for protecting Work from damage due 10 to weather. 11 1.5 SUBMITTALS [NOT USED] 12 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 13 1.7 CLOSEOUT SUBMITTALS [NOT USED] 14 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 15 1.9 QUALITY ASSURANCE [NOT USED] 16 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 17 1.11 FIELD [SITE] CONDITIONS [NOT USED] 18 1.12 WARRANTY [NOT USED] 19 PART 2 - PRODUCTS [NOT USED] 20 PART 3 - EXECUTION [NOT USED] 21 3.1 INSTALLERS [NOT USED] 22 3.2 EXAMINATION [NOT USED] 23 3.3 PREPARATION [NOT USED] 24 3.4 INSTALLATION 25 A. Temporary Facilities 26 1. Maintain all temporary facilities for duration of construction activities as needed. 27 3.5 [REPAIR] / [RESTORATION] 28 3.6 RE -INSTALLATION 29 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 30 3.8 SYSTEM STARTUP [NOT USED] 31 3.9 ADJUSTING [NOT USED] 32 3.10 CLEANING [NOT USED] 33 3.11 CLOSEOUT ACTIVITIES 34 A. Temporary Facilities 35 CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised April 7, 2014 01 50 00- 4 DAP Temporary Facilities and Controls Page 4 of 4 1 2 3 1. Remove all temporary facilities and restore area after completion of the Work, 4 to a condition equal to or better than prior to start of Work. 5 3.12 PROTECTION [NOT USED] 6 3.13 MAINTENANCE [NOT USED] 7 3.14 ATTACHMENTS [NOT USED] lul END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Wtr & Swr Improvements Interrnodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS 00Project No . 104996 Revised April 7, 2014 01 55 26- 1 DAP Street Use Permit and Modifications to Traffic Control Page] of 3 I SECTION 0155 26 2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL 3 PART 1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Administrative procedures for: 7 a. Street Use Permit 8 b. Modification of approved traffic control 9 c. Removal of Street Signs 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include, but are not necessarily limited to: 13 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1 — General Requirements 15 3. Section 34 71 13 — Traffic Control 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES 21 A. Reference Standards 22 1. Reference standards cited in this specification refer to the current reference standard 23 published at the time of the latest revision date logged at the end of this 24 specification, unless a date is specifically cited. 25 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 28 29 30 31 32 33 34 35 36 37 38 39 A. Traffic Control 1. General a. When traffic control plans are included in the Drawings, provide Traffic Control in accordance with Drawings and Section 34 71 13. b. When traffic control plans are not included in the Drawings, prepare traffic control plans in accordance with Section 34 71 13 and submit to City for review. 1) Allow minimum 10 working days for review of proposed Traffic Control. B. Street Use Permit 1. Prior to installation of Traffic Control, a City Street Use Permit is required. a. To obtain Street Use Permit, submit Traffic Control Plans to City Transportation and Public Works Department. CITY OF FORT WORTH Wtr & Swr Improvements Interniodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECT City Project No.104996 Revised April 7, 2014 01 55 26- 2 DAP Street Use Permit and Modifications to Traffic Control Page 2 of 3 1 2 3 1) Allow a minimum of 5 working days for permit review. 4 2) Contractor's responsibility to coordinate review of Traffic Control plans for 5 Street Use Permit, such that construction is not delayed. 6 C. Modification to Approved Traffic Control 7 1. Prior to installation traffic control: 8 a. Submit revised traffic control plans to City Department Transportation and 9 Public Works Department. 10 1) Revise Traffic Control plans in accordance with Section 34 71 13. 11 2) Allow minimum 5 working days for review of revised Traffic Control. 12 3) It is the Contractor's responsibility to coordinate review of Traffic Control 13 plans for Street Use Permit, such that construction is not delayed. 14 D. Removal of Street Sign 15 1. If it is determined that a street sign must be removed for construction, then contact 16 City Transportation and Public Works Department, Signs and Markings Division to 17 remove the sign. 18 E. Temporary Signage 19 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting 20 requirements of the latest edition of the Texas Manual on Uniform Traffic Control 21 Devices (MUTCD). 22 2. Install temporary sign before the removal of permanent sign. 23 3. When construction is complete, to the extent that the permanent sign can be 24 reinstalled, contact the City Transportation and Public Works Department, Signs 25 and Markings Division, to reinstall the permanent sign. 26 F. Traffic Control Standards 27 1. Traffic Control Standards can be found on the City's Buzzsaw website. 28 1.5 SUBMITTALS [NOT USED] 29 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 30 1.7 CLOSEOUT SUBMITTALS [NOT USED] 31 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 32 1.9 QUALITY ASSURANCE [NOT USED] 33 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 34 1.11 FIELD [SITE] CONDITIONS [NOT USED] 35 1.12 WARRANTY [NOT USED] 36 PART 2 - PRODUCTS [NOT USED] 37 PART 3 - EXECUTION [NOT USED] 38 END OF SECTION CITY OF FORT WORTH Wtr & Swr Improvements Luermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECT City Project No. 104996 Revised April 7, 2014 01 55 26- 3 DAP Street Use Permit and Modifications to Traffic Control Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECT City Project No. 104996 Revised April 7, 2014 01 57 13 -1 DAP STORM WATER POLLUTION PREVENTION Page 1 of 3 I SECTION 0157 13 2 STORM WATER POLLUTION PREVENTION 3 PARTI- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Procedures for Storm Water Pollution Prevention Plans 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the I 1 Contract 12 2. Division 1 — General Requirements 13 3. Section 3125 00 — Erosion and Sediment Control 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Construction Activities resulting in less than 1 acre of disturbance 17 a. Work associated with this Item is considered subsidiary to the various Items 18 bid. No separate payment will be allowed for this Item. 19 2. Construction Activities resulting in greater than 1 acre of disturbance 20 a. Measurement and Payment shall be in accordance with Section 3125 00. 21 1.3 REFERENCES 22 A. Abbreviations and Acronyms 23 1. Notice of Intent: NOI 24 2. Notice of Termination: NOT 25 3. Storm Water Pollution Prevention Plan: SWPPP 26 4. Texas Commission on Environmental Quality: TCEQ 27 5. Notice of Change: NOC 28 A. Reference Standards 29 1. Reference standards cited in this Specification refer to the current reference 30 standard published at the time of the latest revision date logged at the end of this 31 Specification, unless a date is specifically cited. 32 2. Integrated Storm Management (iSWM) Technical Manual for Construction 33 Controls 34 1.4 ADMINISTRATIVE REQUIREMENTS 35 A. General 36 1. Contractor is responsible for resolution and payment of any fines issued associated 37 with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised July 1, 2011 01 57 13 - 2 DAP STORM WATER POLLUTION PREVENTION Page 2 of 3 1 B. Construction Activities resulting in: 2 1. Less than 1 acre of disturbance 3 a. Provide erosion and sediment control in accordance with Section 3125 00 and 4 Drawings. 5 2. 1 to less than 5 acres of disturbance 6 a. Texas Pollutant Discharge Elimination System (TPDES) General Construction 7 Permit is required 8 b. Complete SWPPP in accordance with TCEQ requirements 9 1) TCEQ Small Construction Site Notice Required under general permit 10 TXR150000 11 a) Sign and post at job site 12 b) Prior to Preconstruction Meeting, send 1 copy to City Department of 13 Transportation and Public Works, Environmental Division, (817) 392- 14 6088. 15 2) Provide erosion and sediment control in accordance with: 16 a) Section 3125 00 17 b) The Drawings 18 c) TXR150000 General Permit 19 d) SWPPP 20 e) TCEQ requirements 21 3. 5 acres or more of Disturbance 22 a. Texas Pollutant Discharge Elimination System (TPDES) General Construction 23 Permit is required 24 b. Complete SWPPP in accordance with TCEQ requirements 25 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee 26 a) Sign and post at job site 27 b) Send copy to City Department of Transportation and Public Works, 28 Environmental Division, (817) 392-6088. 29 2) TCEQ Notice of Change required if making changes or updates to NOI 30 3) Provide erosion and sediment control in accordance with: 31 a) Section 3125 00 32 b) The Drawings 33 c) TXR150000 General Permit 34 d) SWPPP 35 e) TCEQ requirements 36 4) Once the project has been completed and all the closeout requirements of 37 TCEQ have been met a TCEQ Notice of Termination can be submitted. 38 a) Send copy to City Department of Transportation and Public Works, 39 Environmental Division, (817) 392-6088. 40 1.5 SUBMITTALS 41 A. SWPPP 42 1. Submit in accordance with Section 0133 00, except as stated herein. 43 a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City 44 as follows: 45 1) 1 copy to the City Project Manager 46 a) City Project Manager will forward to the City Department of 47 Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH Wtr & Swr Improvements Interntodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised July 1, 2011 01 57 13 -3 DAP STORM WATER POLLUTION PREVENTION Page 3 of 3 1 B. Modified SWPPP 2 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City 3 in accordance with Section 0133 00. 4 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 5 1.7 CLOSEOUT SUBMITTALS [NOT USED] 6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 7 1.9 QUALITY ASSURANCE [NOT USED] 8 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 9 1.11 FIELD [SITE] CONDITIONS [NOT USED] 10 1.12 WARRANTY [NOT USED] 11 PART 2 - PRODUCTS [NOT USED] 12 PART 3 - EXECUTION [NOT USED] 13 14 15 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised July 1, 2011 01 60 00 SECTION 0160 00 PRODUCT REQUIREMENTS PART 1- GENERAL 1.1 SUMMARY DAP PRODUCT REQUIREMENTS Page I of 2 A. Section Includes: 1. References for Product Requirements and City Standard Products List B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A list of City approved products for use is available through the City's website at: httus://apps.fortworthtexas.eov/ProiectResources/ and following the directory path: 02 - Construction Documents\Standard Products List A. Only products specifically included on City's Standard Product List in these Contract Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the City. B. Any specific product requirements in the Contract Documents supersede similar products included on the City's Standard Product List. 1. The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City's Standard Product List. C. Although a specific product is included on City's Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that manufacturer's standard product. D. See Section 0133 00 for submittal requirements of Product Data included on City's Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised March 20, 2020 01 60 00 DAP PRODUCT REQUIREMENTS Page 2 of 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE +I 10/12/12 D. Johnson Modified Location of City's Standard Product List I 4/7/2014 M.Domenech evised for DAP application (,111�.Cmov ei renc �o r uzzsaw�afto n iou mat zne city approved prouucts iisl is 03/20/2020 D.V. Magana ccessip6�e t�irougli the city weUslte CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised March 20, 2020 01 66 00- 1 DAP PROJECT RECORD DOCUMENTS Page 1 of 4 1 SECTION 0166 00 2 PRODUCT STORAGE AND HANDLING REQUIREMENTS 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Scheduling of product delivery 7 2. Packaging of products for delivery 8 3. Protection of products against damage from: 9 a. Handling 10 b. Exposure to elements or harsh environments 11 B. Deviations from this City of Fort Worth Standard Specification 12 1. None. 13 C. Related Specification Sections include, but are not necessarily limited to: 14 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 15 2. Division 1 — General Requirements 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES [NOT USED] 21 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 22 1.5 SUBMITTALS [NOT USED] 23 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 24 1.7 CLOSEOUT SUBMITTALS [NOT USED] 25 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 26 1.9 QUALITY ASSURANCE [NOT USED] 27 1.10 DELIVERY AND HANDLING 28 A. Delivery Requirements 29 1. Schedule delivery of products or equipment as required to allow timely installation 30 and to avoid prolonged storage. 31 2. Provide appropriate personnel and equipment to receive deliveries. 32 3. Delivery trucks will not be permitted to wait extended periods of time on the Site 33 for personnel or equipment to receive the delivery. 34 35 36 CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwp STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised April 7, 2014 01 66 00- 2 DAP PROJECT RECORD DOCUMENTS Page 2 of 4 1 4. Deliver products or equipment in manufacturer's original unbroken cartons or other 2 containers designed and constructed to protect the contents from physical or 3 environmental damage. 4 5. Clearly and fully mark and identify as to manufacturer, item and installation 5 location. 6 6. Provide manufacturer's instructions for storage and handling. 7 B. Handling Requirements 8 1. Handle products or equipment in accordance with these Contract Documents and 9 manufacturer's recommendations and instructions. 10 C. Storage Requirements 11 1. Store materials in accordance with manufacturer's recommendations and 12 requirements of these Specifications. 13 2. Make necessary provisions for safe storage of materials and equipment. 14 a. Place loose soil materials and materials to be incorporated into Work to prevent 15 damage to any part of Work or existing facilities and to maintain free access at 16 all times to all parts of Work and to utility service company installations in 17 vicinity of Work. 18 3. Keep materials and equipment neatly and compactly stored in locations that will 19 cause minimum inconvenience to other contractors, public travel, adjoining owners, 20 tenants and occupants. 21 a. Arrange storage to provide easy access for inspection. 22 4. Restrict storage to areas available on construction site for storage of material and 23 equipment as shown on Drawings, or approved by City's Project Representative. 24 5. Provide off -site storage and protection when on -site storage is not adequate. 25 a. Provide addresses of and access to off -site storage locations for inspection by 26 City's Project Representative. 27 6. Do not use lawns, grass plots or other private property for storage purposes without 28 written permission of owner or other person in possession or control of premises. 29 7. Store in manufacturers' unopened containers. 30 8. Neatly, safely and compactly stack materials delivered and stored along line of 31 Work to avoid inconvenience and damage to property owners and general public 32 and maintain at least 3 feet from fire hydrant. 33 9. Keep public and private driveways and street crossings open. 34 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to 35 satisfaction of City's Project Representative. 36 a. Total length which materials may be distributed along route of construction at 37 one time is 1,000 linear feet, unless otherwise approved in writing by City's 38 Project Representative. CITY OF FORT WORTH Wtr & Swr Improvements Internzodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS 00; Project No, 104996 Revised April 7, 2014 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 01 66 00- 3 DAP PROJECT RECORD DOCUMENTS Page 3 of 4 PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD lox] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non -Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH Wtr^ & Swr Irnproventents Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City PrwjectNo. 104996 Revised April 7, 2014 01 66 00- 4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised April 7, 2014 01 70 00 - 1 MOBILIZATION AND REMOBILIZATION Page 1 of 4 1 SECTION 0170 00 2 MOBILIZATION AND REMOBILIZATION 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 1. Mobilization and Demobilization a. Mobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies to the Site 2) Establishment of necessary general facilities for the Contractor's operation at the Site 3) Premiums paid for performance and payment bonds 4) Transportation of Contractor's personnel, equipment, and operating supplies to another location within the designated Site 5) Relocation of necessary general facilities for the Contractor's operation from 1 location to another location on the Site. b. Demobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies away from the Site including disassembly 2) Site Clean-up 3) Removal of all buildings and/or other facilities assembled at the Site for this Contract c. Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. 2. Remobilization a. Remobilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: 1) Demobilization a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b) Site Clean-up as designated in the Contract Documents 2) Remobilization a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site necessary to resume the Work. b) Establishment of necessary general facilities for the Contractor's operation at the Site necessary to resume the Work. 3) No Payments will be made for: a) Mobilization and Demobilization from one location to another on the Site in the normal progress of performing the Work. b) Stand-by or idle time c) Lost profits 3. Mobilizations and Demobilization for Miscellaneous Projects CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised November 22, 2016 Wtr & Swr Improvements Intermodal Pkwj, City Project No. 104996 01 70 00 - 2 MOBILIZATION AND REMOBILIZATION Page 2 of 4 1 a. Mobilization and Demobilization 2 1) Mobilization shall consist of the activities and cost on a Work Order basis 3 necessary for: 4 a) Transportation of Contractor's personnel, equipment, and operating 5 supplies to the Site for the issued Work Order. 6 b) Establishment of necessary general facilities for the Contractor's 7 operation at the Site for the issued Work Order 8 2) Demobilization shall consist of the activities and cost necessary for: 9 a) Transportation of Contractor's personnel, equipment, and operating 10 supplies from the Site including disassembly for each issued Work 11 Order 12 b) Site Clean-up for each issued Work Order 13 c) Removal of all buildings or other facilities assembled at the Site for 14 each Work Oder 15 b. Mobilization and Demobilization do not include activities for specific items of 16 work for which payment is provided elsewhere in the contract. 17 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects 18 a. A Mobilization for Miscellaneous Projects when directed by the City and the 19 mobilization occurs within 24 hours of the issuance of the Work Order. 20 B. Deviations from this City of Fort Worth Standard Specification 21 1. None. 22 C. Related Specification Sections include, but are not necessarily limited to: 23 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 24 2. Division 1— General Requirements 25 1.2 PRICE AND PAYMENT PROCEDURES 26 A. Measurement and Payment [Consult City Department/Division for direction on if 27 Mobilization pay item to be included or the item should be subsidiary. Include the 28 appropriate Section 1.2 A. 1.] 29 1. Mobilization and Demobilization 30 a. Measure 31 1) This Item is considered subsidiary to the various Items bid. 32 b. Payment 33 1) The work performed and materials furnished in accordance with this Item 34 are subsidiary to the various Items bid and no other compensation will be 35 allowed. 36 2. Remobilization for suspension of Work as specifically required in the Contract 37 Documents 38 a. Measurement 39 1) Measurement for this Item shall be per each remobilization performed. 40 b. Payment 41 1) The work performed and materials furnished in accordance with this Item 42 and measured as provided under "Measurement" will be paid for at the unit 43 price per each "Specified Remobilization" in accordance with Contract 44 Documents. 45 c. The price shall include: 46 1) Demobilization as described in Section 1.1.A.2.a.1) CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwv STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 104996 Revised November 22, 2016 017000-3 MOBILIZATION AND REMOBILIZATION Page 3 of 4 1 2) Remobilization as described in Section 1.1.A.2.a.2) 2 d. No payments will be made for standby, idle time, or lost profits associated this 3 Item. 4 3. Remobilization for suspension of Work as required by City 5 a. Measurement and Payment 6 1) This shall be submitted as a Contract Claim in accordance with Article 10 7 of Section 00 72 00. 8 2) No payments will be made for standby, idle time, or lost profits associated 9 with this Item. 10 4. Mobilizations and Demobilizations for Miscellaneous Projects 11 a. Measurement 12 1) Measurement for this Item shall be for each Mobilization and 13 Demobilization required by the Contract Documents 14 b. Payment 15 1) The Work performed and materials furnished in accordance with this Item 16 and measured as provided under "Measurement" will be paid for at the unit 17 price per each "Work Order Mobilization" in accordance with Contract 18 Documents. Demobilization shall be considered subsidiary to mobilization 19 and shall not be paid for separately. 20 c. The price shall include: 21 1) Mobilization as described in Section 1.1.A.3.a.1) 22 2) Demobilization as described in Section 1.1.A.3.a.2) 23 d. No payments will be made for standby, idle time, or lost profits associated this 24 Item. 25 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects 26 a. Measurement 27 1) Measurement for this Item shall be for each Mobilization and 28 Demobilization required by the Contract Documents 29 b. Payment 30 1) The Work performed and materials furnished in accordance with this Item 31 and measured as provided under "Measurement" will be paid for at the unit 32 price per each "Work Order Emergency Mobilization" in accordance with 33 Contract Documents. Demobilization shall be considered subsidiary to 34 mobilization and shall not be paid for separately. 35 c. The price shall include 36 1) Mobilization as described in Section 1.1.A.4.a) 37 2) Demobilization as described in Section 1.1.A.3.a.2) 38 d. No payments will be made for standby, idle time, or lost profits associated this 39 Item. 40 1.3 REFERENCES [NOT USED] 41 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 42 1.5 SUBMITTALS [NOT USED] 43 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 44 1.7 CLOSEOUT SUBMITTALS [NOT USED] 45 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 104996 Revised November 22, 2016 01 70 00 - 4 MOBILIZATION AND REMOBILIZATION Page 4 of 4 1 1.9 QUALITY ASSURANCE [NOT USED] 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 3 1.11 FIELD [SITE] CONDITIONS [NOT USED] 4 1.12 WARRANTY [NOT USED] 5 6 7 8 0 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION i Revision Log DATE NAME SUMMARY OF CHANGE 11/22/16 Michael Owen 1.2 Price and Payment Procedures - Revised specification, including blue text, to make specification flexible for either subsidiary or paid bid item for Mobilization. I CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised November 22, 2016 City Project No. 104996 017123-1 CONSTRUCTION STAKING AND SURVEY Page] of 8 1 SECTION 017123 2 CONSTRUCTION STAKING AND SURVEY 3 PART 1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Requirements for construction staking and construction survey 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. See Changes (Highlighted in Yellow). 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 — General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 A. Measurement and Payment 1. Construction Staking a. Measurement 1) Measurement for this Item shall be by lump sum. b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the lump sum price bid for "Construction Staking". 2) Payment for "Construction Staking" shall be made in partial payments prorated by work completed compared to total work included in the lump sum item. c. The price bid shall include, but not be limited to the following: 1) Verification of control data provided by Developer's Project Representative. 2) Placement, maintenance and replacement of required stakes and markings in the field. 3) Preparation and submittal of construction staking documentation in the form of "cut sheets" using the City's standard template. 2. Construction Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 3. As -Built Survey a. Measurement 1) Measurement for this Item shall be by lump sum. b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the lump sum price bid for "As -Built Survey". CITY OF FORT WORTH Wtr & Swr Improvements Intemiodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised February 14, 2018 017123-2 CONSTRUCTION STAKING AND SURVEY Page 2 of 8 1 2) Payment for "As -Built Survey" shall be made in partial payments prorated 2 by work completed compared to total work included in the lump sum item. 3 c. The price bid shall include, but not be limited to the following: 4 1) Field measurements and survey shots to identify location of completed 5 facilities. 6 2) Documentation and submittal of as -built survey data onto contractor redline 7 plans and digital survey files. 8 9 1.3 REFERENCES 10 A. Definitions 11 1. Construction Survev - The survey measurements made prior to or while 12 construction is in progress to control elevation, horizontal position, dimensions and 13 configuration of structures/improvements included in the Project Drawings. 14 2. As -built Survev —The measurements made after the construction of the 15 improvement features are complete to provide position coordinates for the features 16 of a project. 17 3. Construction Stakine — The placement of stakes and markings to provide offsets 18 and elevations to cut and fill in order to locate on the ground the designed 19 structures/improvements included in the Project Drawings. Construction staking 20 shall include staking easements and/or right of way if indicated on the plans. 21 4. Survev "Field Checks" — Measurements made after construction staking is 22 completed and before construction work begins to ensure that structures marked on 23 the ground are accurately located per Project Drawings. 24 B. Technical References 25 1. City of Fort Worth — Construction Staking Standards (available on City's Buzzsaw 26 website) — 0171 23.16.01— Attachment A Survey Staking Standards 27 2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files (available 28 on City's Buzzsaw website). 29 3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision 30 4. Texas Society of Professional Land Surveyors (TSPS), Manual of Practice for Land 31 Surveying in the State of Texas, Category 5 32 33 1.4 ADMINISTRATIVE REQUIREMENTS 34 A. The Contractor's selection of a surveyor must comply with Texas Government 35 Code 2254 (qualifications based selection) for this project. 36 1.5 SUBMITTALS 37 A. Submittals, if required, shall be in accordance with Section 0133 00. 38 B. All submittals shall be received and reviewed by the City prior to delivery of work. 39 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS 40 A. Field Quality Control Submittals 41 1. Documentation verifying accuracy of field engineering work, including coordinate 42 conversions if plans do not indicate grid or ground coordinates. CITY OF FORT WORTH Wtr & Swr bnprovements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised February 14, 2018 017123-3 CONSTRUCTION STAKING AND SURVEY Page 3 of 8 1 2. Submit "Cut -Sheets" conforming to the standard template provided by the City 2 (refer to 01 71 23.16.01 — Attachment A — Survey Staking Standards). 3 1.7 CLOSEOUT SUBMITTALS 4 B. As -built Redline Drawing Submittal 5 1. Submit As -Built Survey Redline Drawings documenting the locations/elevations of 6 constructed improvements signed and sealed by Registered Professional Land 7 Surveyor (RPLS) responsible for the work (refer to 01 71 23.16.01 — Attachment A 8 — Survey Staking Standards) . 9 2. Contractor shall submit the proposed as -built and completed redline drawing 10 submittal one (1) week prior to scheduling the project final inspection for City 11 review and comment. Revisions, if necessary, shall be made to the as -built redline 12 drawings and resubmitted to the City prior to scheduling the construction final 13 inspection. 14 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 15 1.9 QUALITY ASSURANCE 16 A. Construction Staking 17 1. Construction staking will be performed by the Contractor. 18 2. Coordination 19 a. Contact City and Developer's Project Representative at least one week in 20 advance notifying the City of when Construction Staking is scheduled. 21 b. It is the Contractor's responsibility to coordinate staking such that 22 construction activities are not delayed or negatively impacted. 23 3. General 24 a. Contractor is responsible for preserving and maintaining stakes. If 25 Developer's Project Representative is required to re -stake for any reason, the 26 Contractor will be responsible for costs to perform staking. If in the opinion of 27 the City, a sufficient number of stakes or markings have been lost, destroyed 28 disturbed or omitted that the contracted Work cannot take place then the 29 Contractor will be required to stake or re -stake the deficient areas. 30 B. Construction Survey 31 1. Construction Survey will be performed by the Contractor. 32 2. Coordination 33 a. Contractor to verify that horizontal and vertical control data established in the 34 design survey and required for construction survey is available and in place. 35 3. General 36 a. Construction survey will be performed in order to construct the work shown 37 on the Construction Drawings and specified in the Contract Documents. 38 b. For construction methods other than open cut, the Contractor shall perform 39 construction survey and verify control data including, but not limited to, the 40 following: 41 1) Verification that established benchmarks and control are accurate. 42 2) Use of Benchmarks to furnish and maintain all reference lines and grades 43 for tunneling. 44 3) Use of line and grades to establish the location of the pipe. CITY OF FORT WORTH Wtr & Swr I nprovements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised February 14, 2018 01 71 23 - 4 CONSTRUCTION STAKING AND SURVEY Page 4 of 8 1 4) Submit to the City copies of field notes used to establish all lines and 2 grades, if requested, and allow the City to check guidance system setup prior 3 to beginning each tunneling drive. 4 5) Provide access for the City, if requested, to verify the guidance system and 5 the line and grade of the carrier pipe. 6 6) The Contractor remains fully responsible for the accuracy of the work and 7 correction of it, as required. 8 7) Monitor line and grade continuously during construction. 9 8) Record deviation with respect to design line and grade once at each pipe 10 joint and submit daily records to the City. 11 9) If the installation does not meet the specified tolerances (as outlined in 12 Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct 13 the installation in accordance with the Contract Documents. 14 C. As -Built Survey 15 1. Required As -Built Survey will be performed by the Contractor. 16 2. Coordination 17 a. Contractor is to coordinate with City to confirm which features require as- 18 built surveying. 19 b. It is the Contractor's responsibility to coordinate the as -built survey and 20 required measurements for items that are to be buried such that construction 21 activities are not delayed or negatively impacted. 22 c. For sewer mains and water mains 12" and under in diameter, it is acceptable 23 to physically measure depth and mark the location during the progress of 24 construction and take as -built survey after the facility has been buried. The 25 Contractor is responsible for the quality control needed to ensure accuracy. 26 3. General 27 a. The Contractor shall provide as -built survey including the elevation and 28 location (and provide written documentation to the City) of construction 29 features during the progress of the construction including the following: 30 1) Water Lines 31 a) Top of pipe elevations and coordinates for waterlines at the following 32 locations: 33 (1) Minimum every 250 linear feet, including 34 (2) Horizontal and vertical points of inflection, curvature, 35 etc. 36 (3) Fire line tee 37 (4) Plugs, stub -outs, dead-end lines 38 (5) Casing pipe (each end) and all buried fittings 39 2) Sanitary Sewer 40 a) Top of pipe elevations and coordinates for force mains and siphon 41 sanitary sewer lines (non -gravity facilities) at the following locations: 42 (1) Minimum every 250 linear feet and any buried fittings 43 (2) Horizontal and vertical points of inflection, curvature, 44 etc. 45 3) Stormwater — Not Applicable 46 b. The Contractor shall provide as -built survey including the elevation and 47 location (and provide written documentation to the City) of construction 48 features after the construction is completed including the following: 49 1) Manholes CITY OF FORT WORTH Wtr & Swr Improvements Intemiodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised February 14, 2018 01 71 23 - 5 CONSTRUCTION STAKING AND SURVEY Page 5 of 8 1 a) Rim and flowline elevations and coordinates for each manhole 2 2) Water Lines 3 a) Cathodic protection test stations 4 b) Sampling stations 5 c) Meter boxes/vaults (All sizes) 6 d) Fire hydrants 7 e) Valves (gate, butterfly, etc.) 8 f) Air Release valves (Manhole rim and vent pipe) 9 g) Blow off valves (Manhole rim and valve lid) 10 h) Pressure plane valves 11 i) Underground Vaults i2 (1) Rim and flowline elevations and coordinates for each 13 Underground Vault. 14 3) Sanitary Sewer 15 a) Cleanouts 16 (1) Rim and flowline elevations and coordinates for each 17 b) Manholes and Junction Structures 18 (1) Rim and flowline elevations and coordinates for each 19 manhole and junction structure. 20 4) Stormwater — Not Applicable 21 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 22 1.11 FIELD [SITE] CONDITIONS [NOT USED] 23 1.12 WARRANTY 24 PART 2 - PRODUCTS 25 A. A construction survey will produce, but will not be limited to: 26 1. Recovery of relevant control points, points of curvature and points of intersection. 27 2. Establish temporary horizontal and vertical control elevations (benchmarks) 28 sufficiently permanent and located in a manner to be used throughout construction. 29 3. The location of planned facilities, easements and improvements. 30 a. Establishing final line and grade stakes for piers, floors, grade beams, parking 31 areas, utilities, streets, highways, tunnels, and other construction. 32 b. A record of revisions or corrections noted in an orderly manner for reference. 33 c. A drawing, when required by the client, indicating the horizontal and vertical 34 location of facilities, easements and improvements, as built. 35 4. Cut sheets shall be provided to the City inspector and Survey Superintendent for all 36 construction staking projects. These cut sheets shall be on the standard city template 37 which can be obtained from the Survey Superintendent (817-392-7925). 38 5. Digital survey files in the following formats shall be acceptable: 39 a. AutoCAD (.dwg) 40 b. ESRI Shapefile (.shp) 41 c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use 42 standard templates, if available) 43 6. Survey files shall include vertical and horizontal data tied to original project 44 control and benchmarks, and shall include feature descriptions CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised February 14, 2018 017123-6 CONSTRUCTION STAKING AND SURVEY Page 6 of 8 1 PART 3 - EXECUTION 2 3.1 INSTALLERS 3 A. Tolerances: 4 1. The staked location of any improvement or facility should be as accurate as 5 practical and necessary. The degree of precision required is dependent on many 6 factors all of which must remain judgmental. The tolerances listed hereafter are 7 based on generalities and, under certain circumstances, shall yield to specific 8 requirements. The surveyor shall assess any situation by review of the overall plans 9 and through consultation with responsible parties as to the need for specific 10 tolerances. 11 a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical 12 tolerance. Horizontal alignment for earthwork and rough cut should not exceed 13 1.0 ft. tolerance. 14 b. Horizontal alignment on a structure shall be within .0.1 ft tolerance. 15 c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and 16 walkways shall be located within the confines of the site boundaries and, 17 occasionally, along a boundary or any other restrictive line. Away from any 18 restrictive line, these facilities should be staked with an accuracy producing no 19 more than 0.05ft. tolerance from their specified locations. 20 d. Underground and overhead utilities, such as sewers, gas, water, telephone and 21 electric lines, shall be located horizontally within their prescribed areas or 22 easements. Within assigned areas, these utilities should be staked with an 23 accuracy producing no more than 0.1 ft tolerance from a specified location. 24 e. The accuracy required for the vertical location of utilities varies widely. Many 25 underground utilities require only a minimum cover and a tolerance of 0.1 ft. 26 should be maintained. Underground and overhead utilities on planned profile, 27 but not depending on gravity flow for performance, should not exceed 0.1 ft. 28 tolerance. 29 B. Surveying instruments shall be kept in close adjustment according to manufacturer's 30 specifications or in compliance to standards. The City reserves the right to request a 31 calibration report at any time and recommends regular maintenance schedule be 32 performed by a certified technician every 6 months. 33 1. Field measurements of angles and distances shall be done in such fashion as to 34 satisfy the closures and tolerances expressed in Part 3.1.A. 35 2. Vertical locations shall be established from a pre -established benchmark and 36 checked by closing to a different bench mark on the same datum. 37 3. Construction survey field work shall correspond to the client's plans. Irregularities 38 or conflicts found shall be reported promptly to the City. 39 4. Revisions, corrections and other pertinent data shall be logged for future reference. 40 41 3.2 EXAMINATION [NOT USED] CITY OF FORT WORTH Wtr & Swr hnprovements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised February 14, 2018 017123-7 CONSTRUCTION STAKING AND SURVEY Page 7 of 8 1 3.3 PREPARATION [NOT USED] 2 3.4 APPLICATION 3 3.5 REPAIR / RESTORATION 4 A. If the Contractor's work damages or destroys one or more of the control 5 monuments/points set by the Developer's Project Representative, the monuments shall be 6 adequately referenced for expedient restoration. 7 1. Notify City or Developer's Project Representative if any control data needs to be 8 restored or replaced due to damage caused during construction operations. 9 a. Contractor shall perform replacements and/or restorations. 10 b. The City or Developer's Project Representative may require at any time a 11 survey "Field Check" of any monument or benchmarks that are set be verified 12 by the Developer's Project Representative before further associated work can 13 move forward. 14 3.6 RE -INSTALLATION [NOT USED] 15 3.7 FIELD [OR] SITE QUALITY CONTROL 16 A. It is the Contractor's responsibility to maintain all stakes and control data placed by the 17 Developer's Project Representative in accordance with this Specification. This includes 18 easements and right of way, if noted on the plans. 19 B. Do not change or relocate stakes or control data without approval from the City. 20 3.8 SYSTEM STARTUP 21 A. Survey Checks 22 1. The City reserves the right to perform a Survey Check at any time deemed 23 necessary. 24 2. Checks by City personnel or 3rd party contracted surveyor are not intended to 25 relieve the contractor of his/her responsibility for accuracy. 26 27 3.9 ADJUSTING [NOT USED] 28 3.10 CLEANING [NOT USED] 29 3.11 CLOSEOUT ACTIVITIES [NOT USED] 30 3.12 PROTECTION [NOT USED] 31 3.13 MAINTENANCE [NOT USED] 32 3.14 ATTACHMENTS [NOT USED] 33 34 35 CITY OF FORT WORTH Wtr & Swr hnprovements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised February 14, 2018 2 017123-8 CONSTRUCTION STAKING AND SURVEY Page 8 of 8 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson Added instruction and modified measurement & payment under 1.2; added 8/31/2017 M. Owen definitions and references under 1.3; modified 1.6; added 1.7 closeout submittal requirements; modified 1.9 Quality Assurance; added PART 2 — PRODUCTS ; Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup. Removed "blue text"; revised measurement and payment sections for Construction Staking and As -Built Survey; added reference to selection compliance with TGC 2/14/2018 M Owen 2254; revised action and Closeout submittal requirements; added acceptable depth measurement criteria; revised list of items requiring as -built survey "during" and "after" construction; and revised acceptable digital survey file format CITY OF FORT WORTH Wtr & Swr Lnproveinents Inter iodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised February 14, 2018 01 74 23 -1 DAP CLEANING Page 1 of 4 1 SECTION 0174 23 2 CLEANING 3 PART 1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Intermediate and final cleaning for Work not including special cleaning of closed 7 systems specified elsewhere 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 — General Requirements 13 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Work associated with this Item is considered subsidiary to the various Items bid. 17 No separate payment will be allowed for this Item. 18 1.3 REFERENCES [NOT USED] 19 1.4 ADMINISTRATIVE REQUIREMENTS 20 A. Scheduling 21 1. Schedule cleaning operations so that dust and other contaminants disturbed by 22 cleaning process will not fall on newly painted surfaces. 23 2. Schedule final cleaning upon completion of Work and immediately prior to final 24 inspection. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALSlINFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE [NOT USED] 30 1.10 STORAGE, AND HANDLING 31 A. Storage and Handling Requirements 32 1. Store cleaning products and cleaning wastes in containers specifically designed for 33 those materials. CITY OF FORT WORTH Wir & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised April 7, 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 01 74 23 - 2 DAP CLEANING Page 2 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2-PRODUCTS 2.1 OWNER -FURNISHED [oR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site. 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH Wtr & Swr Improvements Internvodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised April 7, 2014 01 74 23 - 3 DAP CLEANING Page 3 of 4 1 6. Handle materials in a controlled manner with as few handlings as possible. 2 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with 3 this project. 4 8. Remove all signs of temporary construction and activities incidental to construction 5 of required permanent Work. 6 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to 7 have the cleaning completed at the expense of the Contractor. 8 10. Do not burn on -site. 9 B. Intermediate Cleaning during Construction 10 1. Keep Work areas clean so as not to hinder health, safety or convenience of 11 personnel in existing facility operations. 12 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 13 3. Confine construction debris daily in strategically located container(s): 14 a. Cover to prevent blowing by wind 15 b. Store debris away from construction or operational activities 16 c. Haul from site at a minimum of once per week 17 4. Vacuum clean interior areas when ready to receive finish painting. 18 a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 19 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which 20 may become airborne or transported by flowing water during the storm. 21 C. Exterior (Site or Right of Way) Final Cleaning 22 1. Remove trash and debris containers from site. 23 a. Re -seed areas disturbed by location of trash and debris containers in accordance 24 with Section 32 92 13. 25 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object 26 that may hinder or disrupt the flow of traffic along the roadway. 27 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, 28 junction boxes and inlets. 29 4. If no longer required for maintenance of erosion facilities, and upon approval by 30 City, remove erosion control from site. 31 Clean signs, lights, signals, etc. 32 3.11 CLOSEOUT ACTIVITIES [NOT USED] 33 3.12 PROTECTION [NOT USED] 34 3.13 MAINTENANCE [NOT USED] 35 3.14 ATTACHMENTS [NOT USED] 36 37 38 39 40 CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS Cio) Project No. 104996 Revised April 7, 2014 K DATE NAME 4/7/2014 M.Domenech I 1 I END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP application 01 74 23 - 4 DAP CLEANING Page 4 of 4 CITY OF FORT WORTH Wu- & Swr Improvements Intermodal Pkwv STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised April 7, 2014 1 2 3 PART 1- GENERAL 4 1.1 SUMMARY SECTION 01 7719 CLOSEOUT REQUIREMENTS 017719-1 DAP CLOSEOUT REQUIREMENTS Page 1 of 3 5 A. Section Includes: 6 1. The procedure for closing out a contract 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 1. Division 1— General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 A. Guarantees, Bonds and Affidavits 19 1. No application for final payment will be accepted until all guarantees, bonds, 20 certificates, licenses and affidavits required for Work or equipment as specified are 21 satisfactorily filed with the City. 22 B. Release of Liens or Claims 23 1. No application for final payment will be accepted until satisfactory evidence of 24 release of liens has been submitted to the City. 25 1.5 SUBMITTALS 26 A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwv STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 10494 Revised April 7, 2014 01 77 19 - 2 DAP CLOSEOUT REQUIREMENTS Page 2 of 3 1 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 PAT 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 CLOSEOUT PROCEDURE 9 A. Prior to requesting Final Inspection, submit: 10 1. Project Record Documents in accordance with Section 0178 39 11 2. Operation and Maintenance Data, if required, in accordance with Section 0178 23 12 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 13 01 74 23. 14 C. Final Inspection 15 1. After final cleaning, provide notice to the City Project Representative that the Work 16 is completed. 17 a. The City will make an initial Final Inspection with the Contractor present. 18 b. Upon completion of this inspection, the City will notify the Contractor, in 19 writing within 10 business days, of any particulars in which this inspection 20 reveals that the Work is defective or incomplete. 21 2. Upon receiving written notice from the City, immediately undertake the Work 22 required to remedy deficiencies and complete the Work to the satisfaction of the 23 City. 24 3. Upon completion of Work associated with the items listed in the City's written 25 notice, inform the City, that the required Work has been completed. Upon receipt 26 of this notice, the City, in the presence of the Contractor, will make a subsequent 27 Final Inspection of the project. 28 4. Provide all special accessories required to place each item of equipment in full 29 operation. These special accessory items include, but are not limited to: 30 a. Specified spare parts 31 b. Adequate oil and grease as required for the first lubrication of the equipment 32 c. Initial fill up of all chemical tanks and fuel tanks 33 d. Light bulbs 34 e. Fuses 35 f. Vault keys 36 g. Handwheels 37 h. Other expendable items as required for initial start-up and operation of all 38 equipment 39 D. Notice of Project Completion 40 CITY OF FORT WORTH Wtr & Swr Improvements Intennodal Pkm STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised April 7, 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 ►: 29 01 77 19 - 3 DAP CLOSEOUT REQUIREMENTS Page 3 of 3 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) f. Contractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP application CITY OF FORT WORTH Wtr & Swr Improvements Intennodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised April 7, 2014 01 78 39 -1 DAP PROJECT RECORD DOCUMENTS Page I of 4 1 SECTION 0178 39 2 PROJECT RECORD DOCUMENTS 3 PART 1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Work associated with the documenting the project and recording changes to project 7 documents, including: 8 a. Record Drawings 9 b. Water Meter Service Reports 10 c. Sanitary Sewer Service Reports 11 d. Large Water Meter Reports 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1 — General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 23 1.5 SUBMITTALS 24 A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to 25 City's Project Representative. 26 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE 30 A. Accuracy of Records 31 1. Thoroughly coordinate changes within the Record Documents, making adequate 32 and proper entries on each page of Specifications and each sheet of Drawings and 33 other Documents where such entry is required to show the change properly. 34 2. Accuracy of records shall be such that future search for items shown in the Contract 35 Documents may rely reasonably on information obtained from the approved Project 36 Record Documents. CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised April 7, 2014 01 78 39 - 2 DAP PROJECT RECORD DOCUMENTS Page 2 of 4 1 3. To facilitate accuracy of records, make entries within 24 hours after receipt of 2 information that the change has occurred. 3 4. Provide factual information regarding all aspects of the Work, both concealed and 4 visible, to enable future modification of the Work to proceed without lengthy and 5 expensive site measurement, investigation and examination. 6 1.10 STORAGE AND HANDLING 7 A. Storage and Handling Requirements 8 1. Maintain the job set of Record Documents completely protected from deterioration 9 and from loss and damage until completion of the Work and transfer of all recorded 10 data to the final Project Record Documents. 11 2. In the event of loss of recorded data, use means necessary to again secure the data 12 to the City's approval. 13 a. In such case, provide replacements to the standards originally required by the 14 Contract Documents. 15 1.11 FIELD [SITE] CONDITIONS [NOT USED] 16 1.12 WARRANTY [NOT USED] 17 PART 2 - PRODUCTS 18 2.1 OWNER -FURNISHED [oR] OWNER -SUPPLIED PRODUCTS [NOT USED] 19 2.2 RECORD DOCUMENTS 20 A. Job set 21 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no 22 charge to the Contractor, 1 complete set of all Documents comprising the Contract. 23 B. Final Record Documents 24 1. At a time nearing the completion of the Work and prior to Final Inspection, provide 25 the City 1 complete set of all Final Record Drawings in the Contract. 26 2.3 ACCESSORIES [NOT USED] 27 2.4 SOURCE QUALITY CONTROL [NOT USED] 28 PART 3 - EXECUTION 29 3.1 INSTALLERS [NOT USED] 30 3.2 EXAMINATION [NOT USED] 31 3.3 PREPARATION [NOT USED] 32 3.4 MAINTENANCE DOCUMENTS 33 A. Maintenance of Job Set 34 1. Immediately upon receipt of the job set, identify each of the Documents with the 35 title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 00, Project No. 104996 Revised April 7, 2014 017839-3 DAP PROJECT RECORD DOCUMENTS Page 3 of 4 1 2. Preservation 2 a. Considering the Contract completion time, the probable number of occasions 3 upon which the job set must be taken out for new entries and for examination, 4 and the conditions under which these activities will be performed, devise a 5 suitable method for protecting the job set. 6 b. Do not use the job set for any purpose except entry of new data and for review 7 by the City, until start of transfer of data to final Project Record Documents. 8 c. Maintain the job set at the site of work. 9 3. Coordination with Construction Survey 10 a. At a minimum clearly mark any deviations from Contract Documents 11 associated with installation of the infrastructure. 12 4. Making entries on Drawings 13 a. Record any deviations from Contract Documents. 14 b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the 15 change by graphic line and note as required. 16 c. Date all entries. 17 d. Call attention to the entry by a "cloud" drawn around the area or areas affected. 18 e. In the event of overlapping changes, use different colors for the overlapping 19 changes. 20 5. Conversion of schematic layouts 21 a. In some cases on the Drawings, arrangements of conduits, circuits, piping, 22 ducts, and similar items, are shown schematically and are not intended to 23 portray precise physical layout. 24 1) Final physical arrangement is determined by the Contractor, subject to the 25 City's approval. 26 2) However, design of future modifications of the facility may require 27 accurate information as to the final physical layout of items which are 28 shown only schematically on the Drawings. 29 b. Show on the job set of Record Drawings, by dimension accurate to within 1 30 inch, the centerline of each run of items. 31 1) Final physical arrangement is determined by the Contractor, subject to the 32 City's approval. 33 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in 34 ceiling plenum", "exposed", and the like). 35 3) Make all identification sufficiently descriptive that it may be related 36 reliably to the Specifications. 37 c. The City may waive the requirements for conversion of schematic layouts 38 where, in the City's judgment, conversion serves no useful purpose. However, 39 do not rely upon waivers being issued except as specifically issued in writing 40 by the City. 41 B. Final Project Record Documents 42 1. Transfer of data to Drawings 43 a. Carefully transfer change data shown on the job set of Record Drawings to the 44 corresponding final documents, coordinating the changes as required. 45 b. Clearly indicate at each affected detail and other Drawing a full description of 46 changes made during construction, and the actual location of items. 47 c. Call attention to each entry by drawing a "cloud" around the area or areas 48 affected. CITY OF FORT WORTH Wtr & Swr Improvements Intermodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised April 7, 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 01 78 39 - 4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] DATE NAME i� 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP Application CITY OF FORT WORTH Wtr & Swr Improvements Intennodal Pkwy STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104996 Revised April 7, 2014 CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 IApprovall Spec No. IClasssification Manufacturer Model No. National Spec Size Water & Sewer - Manholes & Bases/Components 33-39-10 (Rev 2/3/16) I 07/23/97 33 05 13 Urethane Hydrophilic Waterstop Asahi Kogyo K.K. Adeka Ultra -Seal P-201 ASTM 132240/13412/13792 I 04/26/00 33 05 13 Offset Joint for 4' Diam. MH Hanson Concrete Products Drawing No. 35-0048-001 I 04/26/00 33 05 13 Profile Gasket for 4' Diam. MH. Press -Seal Gasket Corp. 250-4G Gasket ASTM C-443/C-361 SS MH I 1126199 33 05 13 HOPE Manhole Adjustment Rings Ladtech, Inc HDPE Adjustment Ring Traffic and Non -traffic area I 5/13105 33 05 13 Manhole External Wrap Canusa - CPS WrapidSeal Manhole Encapsulation System I Water & Sewer - Manholes & Bases/Fiberglass 33-39-13 (1/8/13) I I 1/26/99 33 39 13 Fiberglass Manhole Fluid Containment, Inc. Flowthe ASTM 3753 Non -traffic area I 08/30/06 I 33 39 13 Fiberglass Manhole L.F. Manufacturing Non -traffic area I Water & Sewer - Manholes & Bases/Frames & Covers/Rectangular 33-05-13 (Rev 2/3/16) I33 05 13 IManhole Frames and Covers I Westem Iron Works, Bass & Hays Foundry 1001 24"x40" WD Water & Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13 (Rev 2/3/16) " 3305 13 Manhole Frames and Covers Westem Iron Works, Bass & Hays Foundry 30024 24" Dia. * 3305 13 Manhole Frames and Covers McKinley It. Works Inc. A 24 AM 24" Dia. I 08/24/18 33 05 13 Manhole Frames and Covers Neenah Foundry R-1272 ASTM A48 & AASHTO M306 24" Dia. I 08/24/18 33 05 13 Manhole Frames and Covers Neenah Foundry NF 1274 ASTM A48 & AASHTO M306 30" Dia. I33 05 13 Manhole Frames and Covers Sigma Corporation MH-144N I33 05 13 Manhole Frames and Covers Sigma Corporation MH-143N I33 05 13 Manhole Frames and Covers Pont-A-Moreson GTS-STD 24" the. I33 05 13 Manhole Frames and Covers Neenah Casting 24" the. I 10/31/06 33 05 13 Manhole Frames and Covers (Hinged) Powerseal Hinged Ductile Iron Manhole ASTM A536 24" Dia. I 7/25/03 3305 13 Manhole Frames and Covers Saint-Gobain Pipelines (Pamrex/rexus) RE32-R8FS 30" Dia. I 01/31/06 3305 13 30" Dia. MH Ring and Cover East Jordan Iron Works V1432-2 and V1483 Designs AASFITO M306-04 30" Dia. I 11/02/10 3305 13 30" Dia. MH Ring and Cover Sigma Corporation MH165IFWN & MH16502 30" Dia I 07/19/1 t 3305 13 30" Dia. MH Ring and Cover Star Pipe Products NIH32FTWSS-DC 30" Dia I 08/10/11 3305 13 30" Dia. MH Ring and Cover Accucast 220700 Heavy Duty with Gasket Ring 30" Dia 30" ERGO XL Assembly 10/14/13 3305 13 30" Dia. MH Ring and Cover (Hinged & Lockable) East Jordan Iron Works with Cam Lock/MPIC/T-Gasket ASSFITO MI 05 & ASTM A536 30" Dia I 06/01/17 3405 13 30" Dia. MH Rine and Cover (Lockable) CI SIP Industries 2280 (32") ASTM A 48 30" Dia. CAP-ONE-30-FTW, Composite, w/ Lock 09/16/19 33 05 13 30" Dia. MH Ring and Cover Composite Access Products, L.P. w/o Hing 30" Dia. 10/07/21 34 O 13 30" Dia. MH Ring and Cover Trumbull Manufacturing 32"(30") Frame and Cover 30" Dia. Water & Sewer - Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight 33-05-13 (Rev 2/3/16) * 33 05 13 Manhole Frames and Covers Pont-A-Mousson Pamtight 24" Dia. * 33 05 13 Manhole Frames and Covers Neenah Casting 24" Dia. * 3305 13 Manhole Frames and Covers Western Iron Works,Bass & Hays Foundry 300-24P 24" Dia. * 3305 13 Manhole Frames and Covers McKinley Iron Works Inc. WPA24AM 24" Dia. 03/08/00 3305 13 Manhole Frames and Covers Accucast RC-2100 ASTM A 48 24" Dia. 04/20/01 3305 13 Manhole Frames and Covers (SIP)Serampore Industries Private Ltd. 300-24-23.75 Ring and Cover ASTM A 48 24" Dia. Water & Sewer - Manholes & Bases/Precast Concrete Tev 1/8/13) * 33 39 10 Manhole, Precast Concrete Hydro Condurt Corp SPL Item -1 ASTM C 478 48" * 33 39 10 Manhole, Precast Concrete Wall Concrete Pipe Co. Inc. ASTM C-443 48" 12/0S/23 33 39 10 IManhole, Precast Concrete The Tumer Company 72" I.D. Manhole w/ 32" Cone ASTM C 478 72" OS/08/18 33 39 10 Manhole, Precast Concrete The Turner Company 48", 60" I.D. Manhole w/ 32" Cone ASTM C 478 48", 60" I 10/27/06 33 39 10 Manhole, Precast Concrete Oldeastle Precast Inc. 48" I.D. Manhole w/ 24" Cone ASTM C 478 48" Diam w 24" Ring I I 06/09/10 33 39 10 Manhole, Precast (Reinforced Polymer)Concrete US Composite Pipe Reinforced Polymer Concrete ASTM C-76 48" to 72" I I 09/06/19 33 3920 Manhole, Precast Concrete Forterra Pipe and Precast 60" & 72" I.D. Manhole w/32" Cone ASTM C-76 60" & 72" I I 10/07/21 32 39 20 Manhole, Precast Concrete Forterra Pipe and Precast 48" I.D. Manhole w/32" Cone ASTM C-77 48" I I 10/07/21 33 3920 Manhole, Precast (Reinforced Polymer) Concrete Armon-k 48" & 60" I.D. Manhole w/32" Cone 48" & 60" I I 10/07/21 33 3920 Manhole, Precast (Hybrid) Polymer & PVC Predl Systems 48" & 60" I.D. Manhole w/32" Cone 48" & 60" Non Traffic Areas I ASTM C-478; ASTM C-923; -1/07/23 33 3920 Manhole, Precast Concrete AmeriTex Pipe and Products, LLC 48" & 60" I.D. Manhole w/32" Cone ASTM C-443 I 03/07/23 33 3920 Manhole, Precast (Reinforced Polymer) Concrete P3 Polymers, RockHardscp 48" & 60" I.D. Manhole w/32" Cone I I 04/28/07 Manhole, Precast (Reinforced Polymer) Concrete Amiteeh USA Meyer Polycrete Pipe I I I I Sewer -(WAC) Wastewater Access Chamber 33 39 40 I I Water & Sewer - Manholes & Bases/Rehab Svstems/Cementitious IE1-14 Manhole Rehab Systems Ouadex I 04/23/01 E1-14 Manhole Rehab Systems Standard Cement Materials, Inc. Relmer MSP E1-14 Manhole Rehab Systems AP/M Permaform I 4/20/01 E1-14 Manhole Rehab System Strong Company Strong Seal MS2A Rehab System I 5/12/03 E1-14 Manhole Rehab System (Liner) Triplex Lining System MH repair product to stop infiltration ASTM D5813 I08/30/06 I General Concrete Repair FlexKrete Technologies Vinyl Polyester Reparr Product Misc. Use I * From Original Standard Products List 1 FORT WORTH® CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST (Approval Spec No. IClasssification I Manufacturer Water & Sewer - Manholes & Bases/Rehab Svstems/NonCementitious 05/20/96 E1-14 Manhole Rehab Systems Spravrog, 12/14/01 Coating for Corrosion protection(Exterior) ERTECH 01/31/06 Coatings for Corrosion Protection Chesterton 8/28/2006 Coatings for Corrosion Protection Warren Environmental 33 01 16, 33 39 10, 03/19/18 33 39 20 Coating for Corrosion protection(Exterior) Sherwin Williams Water & Sewer - Manhole Inserts - Field Onerations Use Only (Rev 2/3/16) * 33 05 13 Manhole Insert Knutson Enterprises * 3305 13 Manhole Insert South Western Packaging * 33 05 13 Manhole Insert Nofiow-Inflow 09/23/96 3305 13 Manhole Insert Southwestem Packing & Seals, Inc. 09/23/96 3305 13 Manhole Insert Southwestern Packing & Seals, Inc. Water & Sewer - Pine Casine Spacers 33-05-24 (07/01/13) 11/04/02 Steel Band Casing Spacers Advanced Products and Systems, Inc. 02/02/93 Stainless Steel Casing Spacer Advanced Products and Systems, Inc. 04/22/87 Casing Spacers Cascade Waterworks Manufacturing 09/14/10 Stainless Steel Casing Spacer Pipeline Seal and Insulator 09/14/10 Coated Steel Casin Spacers Pipeline Seal and Insulator 05/10/11 Stainless Steel Casing Spacer Powerseal 03/19/18 Casing Spacers BWM 03/19/18 Casing Spacers BWM 03/29/22 3305 13 Casing Spacers CCI Pipeline Systems Water & Sewer - PiDes/Ductile Iron 33-11-10(1/8/13) Model No. National Spec Spray Wall Polyurethane Coating ASTM D639/D790 Series 20230 and 2100 (Asphatic Emulsion) Arc 791, S1BB, Sl, S2 Acid Resistance Test S-301 and M-301 RR&C Dampproofing Non-Fibered Spray Grade (Asphatic Emulsion) Made to Order - Plastic ASTM D 1248 Made to Order - Plastic ASTM D 1248 Made to Order - Plastic ASTM D 1248 Lifesaver - Stainless Steel TetherLok- Stainless Steel Carbon Steel Spacers, Model SI Stainless Steel Spacer, Model SSI Casing Spacers Stainless Steel Casing Spacer Coated Steel Casin Spacers 4810 Powerchock SS-12 Casing Spacer(Stainless Steel) FB-12 Casing Spacer (Coated Carbon Steel) for Non_rressme Pipe and Grouted Casing CSC12, CSS12 * 33 11 10 Ductile Iron Pipe Griffin Pipe Products, Co. Super Bell-Tite Ductile Iron Pressure Pipe, AW WA C150, C151 08/24/18 33 11 10 Ductile It. Pipe American Ductile Iron Pipe Co. American Futile Pipe (Bell Spigot) AW WA C150, C151 08/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co. American Flex Ring (Restrained Joint) AW WA C150, C151 * 33 11 10 Ductile Iron Pipe U.S. Pipe and Foundry Co. AW WA C150, C151 * 33 11 10 Ductile Iron Pipe McWane Cast Iron Pipe Co. AW WA C150, C151 Water & Sewer - Utility Line Marker (08/24/2018) Sewer - Coatin¢s/Enoxv 33-39-60 (01/08/13) 02/25/02 Epoxy Lining System Sauereisen, Inc SewerGard 21ORS LA County #210-1.33 12/14/01 Epoxy Lining System Enech Technical Coatings Ertech 2030 and 2100 Series 04/14/05 Interior Ductile Iron Pipe Coating Induron Protean 401 ASTM B-117 01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1BB, Sl, S2 Acid Resistance Test 8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer - Coatin¢s/Polvurethane Updated:12/29/2023 Size Structures Only Sewer Applications Sealer Applications For Exterior Coating of Concrete Structures Only For 24" dia. For 24" dia. For 24" dia. For 24" dia. For 24" dia Up to 48" Up to 48" Up to 48" 3" fl m 24" 4" thm 30" 4" thm 30" Ductile Iron Pipe Only Sewer Applications Sealer Applications Sewer - Combination Air Valves 05/25/18 33-31-70 Air Release Valve A.R.I. USA, Inc. D025LTP02(Composite Body) 2" Sewer - Pines/Concrete * E:- Conc. Pipe, Reinforced Wall Concrete Pipe Co. Inc. ASTM C 76 * E I-04 Conc. Pipe, Reinforced Hydro Conduit Corporation Class III T&G, SPL Item #77 ASTM C 76 * E I-04 Conc. Pipe, Reinforced Hanson Concrete Products - - - -, - ASTM C 76 * E I-04 Conc. Pipe, Reinforced Concrete Pipe & Products Co. Inc. ASTM C 76 Sewer - Pine Enlarement Svstem (Method)33-31-23 (01/18/13) PIM System PIM Corporation Polyethylene PIM CorP.. Piscata WaY, N.J. Approved Previously McConnell Systems McLat Construction Polyethylene Houston, Texas Approved Previously TRS Systems Trenchless Replacement System Polyethylene Calgary, Canada Approved Previously * From Original Standard Products List 2 FORT WORTH® CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 (Approval Spec No. )Classsification Manufacturer Model No. National Spec Size Sewer- PiDe/Fiber0ass Reinforced/33-31-13(1/8/13) 7/21/97 33 31 13 Cent. Cast Fiberglass (FRP) Hobas Pipe USA, Inc. Helios Pipe (Non -Pressure) ASTM D3262/D3754 03/22/10 33 31 13 Fiberglass Pipe (FRP) Ameron Bondstrand RPMP Pipe ASTM D3262/D3754 04/09/21 3331 13 Glass -Fiber Reinforced Polymer Pipe (FRP) Thompson Pipe Group Thompson Pipe (Flowtite) ASTM D3262/D3754 03/07/23 3331 13 Fiberglass Pipe (FRP) Future Pipe Industries Fiberstrong FRP ASTM D3262, ASTM D3681, ASTM D4161, AW WA M45 Sewer - PiDe/Polvmer PIDe 4/14/05 Polymer Modified Concrete Pioe Anech USA MPolwrete Pipe ASTM C33, A276, -17 8" to 102", Class V 06/09/10 EI-9 Reinforced Polvmer Concrete Pipe UmS Composite Pipe Reinforcedeyer Polymer Concrete Pioe ASTM C-76 Sewer - PiDes/HDPE 33-31-23(1/8/13) * High -density polyethylene pipe Phillips Driswpipe, Inc. Ovticore Ductile Polyethylene Pipe ASTM D 1248 8" * High -density polyethylene pipe Plexco Inc. ASTM D 1248 8" * High -density polyethylene pipe Polly Pipe, Inc. ASTMD 1248 8" High -density Polyethylene pipe CSR Hydro Conduit/Pioeline Systems McConnell Pipe Enlargement ASTM D 1248 Sewer - PiDes/PVC (Pressure Sewer) 33-11-12 (4/1/13) 12/02/11 33-11-13 DR -Id PVC Pressure Pipe Pipelife Jetstream PVC Pressure Pipe AW WA C900 4" thru 12" 10/22/14 33-11-12 DR-14 PVC Pressure Pipe Royal Building Products Royal Seal PVC Pressure Pipe AW WA C900 4" thru 12" Sewer - PiDes/PVC* 33-31-20 (7/1/13), * 33-31-20 PVC Sewer Pioe 1-M Manufacturing Co., Inc. (JM Eagle) SDR-26 (PS115) ASTM D 3034 4" - 15" 12/23/97* 33-31-20 PVC Sewer Pioe Diamond Plastics Corporation SDR-26 (PS115) ASTM D 3034 4" thin 15" * 33-31-20 PVC Sewer Pioe Lamson Vylm Pipe SDR-26 (PSI 15) ASTM D 3034 4" thm 15" 12/05/23 33-31-20 PVC Sewer Pie Vin (tech PVC Pie SDR-26 PS115 ASTM D3034 4" thm 15" 12/05/23 33-31-20 PVC Sewer Pie Vin ltech PVC Pie Grovi Sewer PS 115 ASTM F 679 18" * 33-31-20 PVC Sewer PiJje J-M Manufacmrinv�Co, Inc (JM Eagle) PS 115 ASTM F 679 18" - 28" 05/06/05 33-31-20 PVC Solid Wall Pipe Diamond Plashes Corporation PS 115 ASTM F-679 18" to 48" 04/27/06 33-31-20 PVC Sewer Fittings Harco SDR-26 (PS 115) Gasket Finings ASTM D-3034, D-1784, etc 4" - 15" * 33-31-20 PVC Sewer Fittings Plastic Trends, Ine.(Westlak) Gasketed PVC Sewer Main Fittings ASTM D 3034 1 3/19/2018 33 3120 PVC Sewer Pipe Pipelife Jet Stream SDR 26 (PS 115) ASTM F679 18"- 24" 1 3/19/2018 33 3120 PVC Sewer PTe Pipelife Jet Stream SDR 26 ASTM D3034 4"- 11" 1 3/29/2019 33 3120 Gasketed Fittings (PVC) GPK Products, Inc. SDR 26 ASTM D3034 4"- 15" 1 10/21/2020 33 3120 PVC Sewer Pipe NAPCO(Westlake) SDR 26 ASTM D3034 4" - 15" 1 10/22/2020 33 3120 PVC Sewer Pipe Sanderson Pipe Corp. SDR 26 ASTM D3034 4"- 15" 1 10/21/2020 333120 PVC Sewer Pipe NAPCO(Westlake) SDR 26 PS 115 ASTM F-679 18"-36" Sewer - PiDes/Rehab/CIPP 33-31-12 (01/18/131 * Cured in Place Pioe In in— Texark, Inc ASTM F 1216 05/03/99 Cured in Place Pioe National Envirotech Group National Liner, (SPL) Item #27 ASF-1216/D-5813 05/29/96 Cured in Place Pipe Remolds Inc/Inliner Technol" (Inliner USA) Inlmer Technology ASTM F 1216 Sewer - Piues/Rehab/Fold & Form * Fold and Form Pipe Cullum Pipe Systems, hic. 11/03/98 Fold and Form Pipe Insimform Technologies, Inc. Insituform "NuPine" ASTM F-1504 Fold and Form Pipe American Pipe & Plastics, Inc. Demo. Purpose Only 12/04/00 Fold and Form Pipe Ultralner Ultraliner PVC Alloy Pipelmer ASTM F-1504, 1871, 1867 06/09/03 Fold and Form Pipe Miller Pipeline Com. EX Method ASTM F-1504, F-1947 UP to 18" diameter Sewer - PiDeS/ODen PCoelle Laree Diameter 09/26/91 E100-2 PVC Sewer Pipe, Ribbed Lamson Vylon Pipe Carlon Vylon H.C. Closed Profile Pipe, ASTM F 679 18" to 48" 09/26/91 E100-2 PVC Sewer Pipe, Ribbed Extrusion Technologies, Inc. Ultra -Rib Open Profile Sewer Pipe ASTM F 679 18" to 48" E100-2 PVC Sewer Pipe, Ribbed Up -or ETI Company 11/10/10 (E100-2) Polypropylene (PP) Sewer Pipe, Double Wall Advanced Drainage Systems (ADS) SaniTite UP Double Wall (Corrugated) ASTM F 2736 24"-30" 11/10/10 (E100-2) Polypropylene (PP) Sewer Pipe, Triple Wall Advanced Drainage Systems (ADS) SaniTite HP Triple Wall Pipe ASTM F 2764 30" to 60" * From Original Standard Products List 3 CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 (Approval Spec No. IClasssification Manufacturer Model No. National Spec Size Water - Aoour-enances 33-12-10 (07/01/13) 01/18/18 33-12-10 Double Strap Saddle Romac 202NS Nylon Coated AWWA C800 1"-2" SVC, up to 24" Pipe 08/28/02 Double Strap Saddle Smith Blau 4317 Nylon Coated Double Strap Saddle 07/23/12 33-12-10 Double Strap Service Saddle Mueller Company DR2S Double (SS) Strap DI Saddle AWWA C800 1"-2" SVC, up to 24" Pipe 03/07/23 33-12-10 Double Strap Service Saddle Powerseal 3450AS, Incl. Corp. Stop, ON Strap, Stainless NSF ANSI 372 1"-2" SVC, up to 24" Pipe 10/27/87 Curb Stops -Ball Meter Valves McDonald 6100M,6100MT & 61 OMT 3/4" and 1" 10/27/87 Curb Stops -Ball Meter Valves McDonald 4603B, 4604B, 6100M, 6100TM and 6101M 1'/:" and 2" FB600-7NL, FB1600-7-NL, FV23-777-W-NL, 1/25/2018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. -2-7-L AWWA C800 2" FB600-6-NL, FB1600-6-NL, FV23-666-W- 1111018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. NL, L22-66NL AWWA C800 - ^' FB600-4-NL, FB1600-4-NL, B11-444-WR- 1111.1. 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. NL, B22444-WR-NL, L28-44NL AWWA C800 I " 13-25000N, B-24277N-3, B-20200N-3, H- AWWA C800, ANSF 61, 1/25/2018 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15000N, , H-1552N, H142276N ANSI/NSF 372 _ B-25000N, B-20200N-3, B-24277N-3,H- AWWA C800, ANSF 61, 1111.1. 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15000N, H-14276N, H-15525N ANSI/NSF 372 1-1/3" B-25000N, B-20200N-3,H-15000N, H- AWWA C800, ANSF 61, 1111.1. 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15530N ANSI/NSF 372 V 01/26/00 Coated Tapping Saddle with Double SS Straps 1CM Industries, Inc. #406 Double Band SS Saddle 1"-2" Taps on up to 12" 0/5/21/12 33-12-25 Tapping Sleeve (Coated Steel) 1CM Industries, Inc. 412 Tapping Sleeve ESS AWWA C-223 Up to 30" w/12" Out 03/29/22 33-12-25 Tapping Sleeve (Coated or Stainless Steel) 1CM Industries, Inc. 415 Tapping Sleeve AWWA C-223 Concrete Pipe Only 05/10/11 Tapping Sleeve (Stainless Steel) Powerseal 3490AS (Flange) & 3490MJ 4"-8" and 16" 02/29/12 33-12-25 Tapping Sleeve (Coated Steel) Romac FTS 420 AWWA C-223 up to 42" w/24" Out 02/29/12 33-12-25 Tapping Sleeve (Stainless Steel) Romac SST Stainless Steel AWWA C-223 Up to 24" w/12" Out 02/29/12 33-12-25 Tapping Sleeve (Stainless Steel) Romac SST III Stainless Steel AWWA C-223 Up to 30" w/12" Out 05/10/11 Joint Repair Clamp Powerseal 3232 Bell Joint Repair Clamp 4" to 30" Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW37C-12-1EPAF FTW Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW39C-12-1EPAF FTW 08/30/06 Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW65C-14-1EPAF FTW Class "A" Concrete Meter Box Bass & Hays CMB37-B12 1118 LID-9 Concrete Meter Box Bass & Hays CMB-18-Dual 1416 LID-9 Concrete Meter Box Bass & Hays CMB65-B65 1527 LID-9 Water - Bolts. Nuts. and Gaskets 33-11-05 (01/08/13). Water - Combination Air Release 33-31-70 (01/08/13) * E1-11 Air Release Valve GA Industries, Inc. Empire Air and Vacuum Valve, Model 935 ASTM A 126 Class B, ASTM A 1" & 2" * E1-11 [rarbombination inationAir Release Valve Multiplex Manufacturing Co. Crispin Air and Vacuum Valves, Model No. 11" 1" & 2" E1-11 ombination Air Release Valve Valve and Primer Corp. APCO 4143C, #145C and #147C 1", 2" & 3" Water - Dry Barrel Fire Hvdrants 33-1240 (01/15/14) 10/01/87 E-1-12 Dry Barrel Fire Hydrant American -Darling Valve Drawing Nos. 90-18608, 94-18560 AWWA C-502 03/31/88 E-1-12 Dry Barrel Fire Hydrant American Darling Valve Shop Drawing No. 94-18791 AWWA C-502 09/30/87 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Shop Drawing No. D-19895 AWWA C-502 01/12/93 E-1-12 Dry Barrel Fire Hydrant American AVK Company Model 2700 AWWA C-502 08/24/88 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Drawings D20435, D20436, B20506 AWWA C-502 E-1-12 Dry Barrel Fire Hydrant ITT Kennedy Valve Shop Drawing No. D-80783FW AWWA C-502 0.1.7 E-1-12 Dry Barrel Fire Hydrant M&H Valve Company Shop Drawing No. 13476 AWWA C-502 Shop Drawings No. 6461 l0/14/87 E-1-12 Dry Barrel Fire Hydrant Mueller Company A-423 Centurion AWWA C-502 Shop Drawing FH-12 01/15/88 E1-12 Dry Barrel Fire Hydrant Mueller Company A-423 Super Centurion 200 AWWA C-502 10/09/87 E-1-12 Dry Barrel Fire Hydrant U.S. Pipe & Foundry Shop Drawing No. 960250 AWWA C-502 09/16/87 E-1-12 Dry Barrel Fire Hydrant American Flow Control (AFC) Waterous Pacer WB67 AWWA C-502 08/12/16 33-12-40 Dry Barrel Fire Hydrant EJ (East Jordan Iron Works) WaterMaster 5CD250 Water - Meters 02/05/93 E101-5 Detector Check Meter Ames Company Model 1000 Detector Check Valve AW WA C550 4" - 10" 08/05/04 Magnetic Drive Vertical Turbine Hersey Magnetic Drive Vertical AWWA C701, Class 1 3/4" - 6" * From Original Standard Products List 4 CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 IApprovall Spec No. IClasssification Manufacturer Model No. National Spec Size Water - Pines/PVC (Pressure Water) 33-31-70 (01/08/13) AWWA C900, AW WA C605, 12/05/23 33-I1-12 PVC Pressure Pie Vin loch PVC Pipe DR14 ASTM D1784 V-16" AWWA C900, AWWA C605, 12/OS/23 33-11-12 PVC Pressure Pipe Vinyltech PVC Pipe DR18 ASTM D1784 16"-18" 3/19/2018 33 11 12 PVC Pressure Pipe Pipelife Jet Stream DR14 AWWA C900 4"-12" 1 3/19/2018 3311 12 PVC Pressure Pipe Pipelife Jet Stream DR18 AWWA C900 16"-24" 1 5/25/2018 33 11 12 PVC Pressure Pipe Diamond Plastics Comoration DR 14 AWWA C900 4"-12" 5/25/2018 33 11 12 PVC Pressure Pipe Diamond Plastics Corporation DR 18 AWWA C900 16"-24" AWWA C900-16 UL 1285 12/6/2018 3311 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/b/a JM Eagle DR 14 ANSI/NSF 61 4"-28" FM 1612 12/6/2018 33 11 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/b/a JM Eagle DR 18 " ° 16"-24" 9/6/2019 33 11 12 PVC Pressure Pipe Underground Solutions Inc. DR14 Fusible PVC AWWA C900 4" - 8" 9/6/2019 33 11 12 PVC Pressure Pipe NAPCO(Westlake) DR18 AWWA C900 16"-24" 9/6/2019 33 11 12 PVC Pressure Pipe NAPCO(Westlake) DR14 AWWA C900 4%12" 9/6/2019 33 11 12 PVC Pressure Pipe Sanderson Pipe Corp. DR14 AWWA C900 4%12" Water - PlDes/Valves & Fittings/Ductile Iron Fittings 33-11-11 (01/08/13) 07/23/92 EI-07 Ductile Iron Fittings Star Pipe Products, Inc. Mechanical Joint Fittings AW WA C153 & C110 * E1-07 Ductile Iron Fittings Griffin Pipe Products, Co. Mechanical Joint Fittin, @ AWWA C 110 * E1-07 Ductile Iron Fittings McWane/Tyler Pipe/ Union Utilities Division Mechanical Joint Finings, SSB lass 350 AWWA C 153, C 110, C III 08/11/98 E1-07 Ductile Iron Fittings Sigma, Co. Mechanical Joint Finings, SSB Class 351 AWWA C 153, C 110, C 112 02/26/14 E1-07 MJ Fittings Accucast Class 350 C-153 MJ Finings AWWA C153 4"-12" 05/14/98 E1-07 Ductile Iron Joint Restraints Ford Meter Box Co./Uni-Flange Uni-Flange Series 1400 AW WA C111/C153 4" to 36" 05/14/98 E1-24 PVC Joint Restraints Ford Meter Box Co./Um-Flange Uni-Flange Series 1500 Circle -Lock AW WA C111/C153 4" to 24" 11/09/04 E1-07 Ductile Iron Joint Restraints One Bolt, Inc. One Bolt Restrained Joint Fitting AWWA C111/C116/C153 4" to 12" 02/29/12 33-11-11 Ductile Iron Pipe Mechanical Joint Restraint EBAA Iron, Inc. Megalug Series 1100 (for DI Pipe) AWWA C111/C116/C153 4" to 42" 02/29/12 33-11-11 PVC Pipe Mechanical Joint Restraint EBAA Iron, Inc. Megalug Series 2000 (for PVC Pipe) AWWA C111/C116/C153 4" to 24" 08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLC4 - SLC10 AW WA C111/C153 4" to 10" 03/06/19 33-11-11 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLCS4 - SLCS12 AW WA C111/C153 4" to 12" 08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLCE AW WA C111/C153 12" to 24" 08/10/98 E1-07 MJ Fittings(DIP) Sigma, Co. Sigma One-Lok SLDE AWWA C153 4" - 24" 10/12/10 E1-24 Interim Restrained Joint Svstem S & B Techncial Products Bulldog System ( Diamond Lok 21 & JM ASTM F-1624 4" to 12" 08/16/06 E1-07 Mechanical Joint Fittings SIP Industries(Serampore) Mechanical Joint Fittings AWWA C153 4" to 24" 11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. PVC Stargnp Series 4000 ASTM A536 AW WA CI I I 11/07/16 33-11-I1 Mechanical Joint Retainer Glands Star Pipe Products, Inc. DIP Stargrip Series 3000 ASTM A536 AW WA CI I I EZ Grip Joint Restraint (EZD) Black For DIP 03/19/18 33-11-I1 Mechanical Joint Retaner Glands SIP Industries(Serampore) ASTM A536 AW WA CI I I 3"-48" EZ Grip Joint Restraint (EZD) Red for C900 03/19/18 33-11-I1 Mechanical Joint Retainer Glands SIP Industries(Serampore) DR14 PVC Pipe ASTM A536 AW WA CI I I 4"-12" EZ Grip Joint Restraint (EZD) Red for C900 03/19/18 33-11-I1 Mechanical Joint Retainer Glands SIP Industries(Serampore) DR18 PVC Pipe ASTM A536 AW WA CI I I 16"-24" Water - Pines/Valves & Fittings/Resilient Seated Gate Valve* 33-12-20 (05/13/15) Resilient Wedged Gate Valve w/no Gears American Flow Control Series 2500 Drawing # 94-20247 16" 12/13/02 Resilient Wedge Gate Valve American Flow Control Series 2530 and Series 2536 AWWA C515 30" and 36" 08/31/99 Resilient Wedge Gate Valve American Flow Control Series 2520 & 2524 (SD 94-20255) AWWA C515 20" and 24" 05/18/99 Resilient Wedge Gate Valve American Flow Control Series 2516 (SD 94-20247) AWWA C515 16" 10/24/00 E1-26 Resilient Wedge Gate Valve American Plow Control Series 2500 (Ductile Iron) AWWA C515 4" to 12" 08/05/04 Resilient Wedge Gate Valve American Flow Control 42" and 48" AFC 2500 AWWA C515 42" and 48" 05/23/91 E1-26 Resilient Wedge Gate Valve American AVK Company American AVK Resilient Seaded GV AWWA C509 4" to 12" 01/24/02 E1-26 Resilient Wedge Gate Valve American AVK Company 20" and smaller * E1-26 Resilient Seated Gate Valve Kennedy 4" - 12" * E1-26 Resilient Seated Gate Valve M&H 4" - 12" * E1-26 Resilient Seated Gate Valve Mueller Co. 4" - 12" 11/08/99 Resilient Wedge Gate Valve Mueller Co. Series A2361 (SD 6647) AWWA C515 16" 01/23/03 Resilient Wedge Gate Valve Mueller Co. Series A2360 for 18"-24" (SD 6709) AWWA C515 24" and smaller 05/13/05 Resilient Wedge Gate Valve Mueller Co. Mueller 30" & 36", C-515 AWWA C515 30" and 36" 01/31/06 Resilient Wedge Gate Valve Mueller Co. Mueller 42" & 48", C-515 AWWA C515 42" and 48" 01/28/88 E1-26 Resilient Wedge Gate Valve Clow Valve Co. AWWA C509 4" - 12" 10/04/94 Resilient Wedge Gate Valve Clow Valve Co. 16" RS GV (SD D-20995) AWWA C515 16" 11/08/99 EI-26 Resilient Wedge Gate Valve Clow Valve Co. Clow RW Valve (SD D-21652) AWWA C515 24" and smaller 11/29/04 Resilient Wedge Gate Valve Clow Valve Co. Clow 30" & 36" C-515 AWWA C515 30" and 36" (Note 3) 11/30/12 ReaihentW Gate Valve eGate Clow Valve Co. Clow Valve Model 2638 AWWA C515 24" to 48" ote 3) 05/08/91 E1-26 Resilient Seat Valve Stockham Valves & Finings AWWA C 509, ANSI 420 - stem, 4" - * E1-26 Resilient Seated Gate Valve U.S. Pipe and Foundry Co. Met,,, a1250, requirements SPL #74 3" to 16" 10/26/16 33-12-20 Resilient Seated Gate Valve EJ (East Jordan Iron Works) IIIFlowMester Gate Valve & Boxes 08/24/18 Mateo Gate Valve Matco-Norca 225 MR AWWA/ANSI C115/An21.15 4" to 16" * From Original Standard Products List 5 FORT WORTH® CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 (Approval Spec No. [Classsification Manufacturer Water - PiDes alves & Fittings/Rubber Seated Batter Valve 33-12-21 (07/10/14) Model No. National Spec Size * y E1-30 Rubber Seated Butterfly Valve Hei ry Pratt Co. AW WA C-504 24" * E1-30 Rubber Seated Butterfly Valve Mueller Co. AW WA C-504 24"and smaller 1/11/99 E1-30 Rubber Seated Butterfly Valve Dezurik Valves Co. AW WA C-504 24" and larger 06/12/03 E1-30 Valmatic American Butterfly Valve Valmanc Valve and Manufacturing Com. Valmatic American Butterfly Valve. AW WA C-504 Up to 84" diameter 04/06/07 E1-30 Rubber Seated Butterfly Valve M&H Valve M&H Style 4500 & 1450 AW WA C-504 24" to 48" 03/19/18 33 1221 Rubber Seated Butterfly Valve G. A. Industries (Golden Anderson) AW WA C504 Butterfly Valve AW WA C-504 30"-54" Water - Polvethvlene Encasement 33-11-10 (01/08/13) 05/12/05 E1-13 Polyethylene Encasment Fl—ol Packaging Fulton Entemrises AW WA C105 8 mil LLD 05/12/05 E1-13 Polyethylene Encasment Mountain States Plastics (MSP) and AEP Ind. Standard Hardware AW WA C105 8 mil LLD 05/12/05 E1-13 Polyethylene Encasment AEP Industries Bullstrong by Cowtown Bolt & Gasket AW WA C105 8 mil LLD 09/06/19 33-11-11 Polyethylene Encasment Northtown Products Inc. PE Encasement for DIP AW WA C105 8 mil LLD Water - SamDlinE Station 03/07/23 33 12 50 l Water Sampling Station Eclipse Number 88 , 12-inch Depth of Bury As shown in spec. 33 12 50 Water - Automatic Flusher HG6-A-IN-2-BRN-LPRR(Portable) 1.110 Automated Flushing System Mueller Hydroguard HG2-A-IN--2-PVC-018-LPLG(Perinanent) 04/09/21 Automated Flushing System Kupferle Foundry Company Eclipse #9800we 04/09/21 Automated Flushing System Kupferle Foundry Company Eclipse #9700 (Portable) The Fort Worth Water Department's Standard Products List has been developed to minimize the submittal review of products which meet the Fort Worth Water Department's Standard Specifications during utility construction projects. When Technical Specifications for specific products, are included as part of the Construction Contract Documents, the regmrements of the Technical Specification w 11 override the Fort Worth Water Department's Standard Specifications and the Fort Worth Water Department's Standard Products List and approval of the specific products will be based on the requirements of the Technical Specification whether or not the specific product meets the Fort Worth Water Department's Standard Specifications or is on the Fort Worth Water Yellow Highlight indicates recent changes * From Original Standard Products List