Loading...
HomeMy WebLinkAboutContract 61065CSCO NO. 61065 TRANSPORTATION IMPACT FEE CREDIT AGREEMENT THIS TRANSPORTATION IMPACT FEE CREDIT AGREEMENT (the "Agreement") is made and entered into effective as of the Effective Date (as defined below), by and among THE CITY OF FORT WORTH, TEXAS (the "City"), a Texas home rule municipal corporation, and Rainbow Ridge, LLC (Impression Homes), a Texas limited liability company authorized to do business in Texas (the "Owner") (the City and the Owner a "Party", and collectively, the "Parties"). RECITALS WHEREAS, the Owner is the owner of approximately 13.658 acres in Tarrant County, Texas, as described by metes and bounds in Exhibit "A" (the "Property") located within the corporate boundaries of the City. A map of the Property showing its location is attached hereto as Exhibit "B"; and WHEREAS, the Owner desires to proceed with development of the Property as described or illustrated on the Development Plan, attached hereto as Exhibit "C" which identifies the on -site and/or off -site transportation facilities necessary for serving full development of the Property; and WHEREAS, the City has adopted a Transportation Impact Fee program pursuant to Texas Local Government Code Chapter 395, codified in City Code Chapter 30, Article VIII, et seq., as amended, under which transportation impact fees are imposed on new development for impacts to the City's transportation facilities as a result of said development; and WHEREAS, transportation impact fees are collected and must be spent by the City on impact fee eligible transportation facilities identified within the City's adopted Transportation Improvements Plan ("TIP"), as amended, within the service area(s) in which the new development is located; and WHEREAS, the Transportation Impact Fee Program provides for credits against impact fees for dedication of right-of-way and/or construction of transportation improvements identified as impact fee eligible on the adopted TIP; and WHEREAS, the Property is located within service area Y; and WHEREAS, the City has determined the maximum transportation impact fees to be assessed against new development within service area Y to be $2,588 per service unit (vehicle -miles of demand); and WHEREAS, certain transportation facilities depicted on Exhibit "D" are identified as impact fee eligible within the City's adopted TIP and therefore eligible for impact fee credit; and WHEREAS, Owner has agreed to dedicate the right-of-way and/or constructed the transportation improvements shown on Exhibit "D" for which credits against transportation impact fees shall be granted; and OFFICIAL RECORD Transportation Impact Fee Credit Agreement - CA-23-013 CITY SECRETARY Page 1 of 17 Rainbow Ridge FT. WORTH, Tx 03/01/2024 WHEREAS, the Owner has received preliminary plat approval for Rainbow Ridge Addition, PP-02-011, on February 24, 2021; and WHEREAS, the Owner has received final plat approval for Rainbow Ridge, FP-22-107, on November 17, 2022; and WHEREAS, the Owner has dedicated 66,647 square feet of right-of-way for McCart Avenue with FP-22-107, recorded as Instrument D222271691, on November 17, 2022; and WHEREAS, the Owner has received approval for construction plans JPRC20-0168) on 7/15/2021, and executed a Community Facilities Agreement (CFA21-0014) on February 28, 2022, and obtained final acceptance by the City for Rainbow Ridge, City Project 103145 on 8/14/2023. NOW, THEREFORE, for and in consideration of the mutual agreements, covenants, and conditions contained herein, and other good and valuable consideration, the City and the Owner hereby covenant and agree as follows: 1. Recitals. The recitals contained in this Agreement are true and correct as of the Effective Date and form the basis upon which the Parties negotiated and entered into this Agreement. 2. Transportation Improvements. Owner agrees to dedicate the rights -of -way for and/or construct the system facilities identified in Exhibit "D". For any transportation improvement which has been previously dedicated or constructed by Owner on the Property and accepted by the City prior to execution of this Agreement, the improvement shall be identified as completed on Exhibit "D» 3. Credits. The Parties agree that the estimated value of the credits for each transportation improvement, expressed in current dollars, shall be as set forth in Exhibit "E". The value of credits associated with the improvements first shall be reduced by the Schedule 2 impact fee associated with any lot for which a building permit has previously been issued, and the net value of credits shown on Exhibit "E" shall be considered as exact. 4. Phasing. The Parties acknowledge that, where it is anticipated that the project will be developed in phases, the anticipated construction of improvements by phase shall be as depicted in Exhibit "D". which is attached hereto and incorporated herein by reference. 5. Allocation of Credits by Phase. The general allocation of credits to each phase of the development shall be as shown on Exhibit "F". which is attached hereto and incorporated herein by reference. The Parties agree that the credits identified in this Agreement shall not be deemed to have been created until the system facility for which credit is to be granted has been dedicated and accepted (in the case of right-of-way) or constructed through an executed Community Facilities Agreement and final acceptance by the City has been obtained. The Parties further agree that, prior to the application of a credit against transportation impact fees otherwise due for any unit of development; the following events shall take place: (a) The number of credits resulting from such improvement has been valued; and Transportation Impact Fee Credit Agreement - CA-23-013 Page 2 of 17 Rainbow Ridge 03/01/2024 (b) Concurrent with final plat approval, a credit allocation shall be provided by the developer for the phase of development to which the credit is to be applied, which allocation may either assign the credit, expressed in dollars, to each finally platted lot or may create a credit -pool to be utilized by that phase of development. Term and Effective Date. The term of this Agreement shall be ten (10) years from its Effective Date. 7. Assignment. Owner shall have the right to assign this Agreement to any person or entity ("Owner's Assignee") with the written consent of the City, provided: (a) the assignment is in writing executed by the Owner and its assignee; and (b) the assignment incorporates this Agreement by reference and binds the Owner's Assignee to perform (to the extent of the obligations assigned) in accordance with this Agreement. Each Owner's Assignee shall become a Party to this Agreement upon the execution of such assignment. In no event may this Agreement be construed to authorize assignment of any credits attributable to a system facility to be dedicated or constructed hereunder for use outside the boundaries of the Property. 8. Amendment. This Agreement shall not be modified or amended except as follows: (a) Any amendment or modification to this Agreement or any Exhibit or schedule hereto shall be in writing and signed by the Parties. (b) Any revision, amendment, or modification to this Agreement, the Development Plan, or any Exhibit or schedule thereto, shall become effective on the date executed by the Parties or, as applicable, upon the date of approval by the City Council or designated city official. 9. Exhibits. The exhibits attached to this Agreement are incorporated as part of this Agreement for all purposes as if set forth in full in the body of this Agreement. (Remainder of Page Intentionally Left Blank) Transportation Impact Fee Credit Agreement - CA-23-013 Page 3 of 17 Rainbow Ridge 03/01/2024 IN WITNESS WHEREOF, the undersigned parties have executed this Agreement to be effective as of the date subscribed by the City's Assistant City Manager. CITY OF FORT WORTH, TEXAS , Dana Burghdoff; (Mar 20241 CST) Dana Burghdoff Assistant City Manager Date: Mar 7, 2024 Recommended By: Oalton ffamell Dalton Harrell (Mar 5, 202411:18 CST) DJ Harrell Director, Development Services Approved as to Form and Legality: ig� Douglas Black (Mar 5, 202416:33 CST) Douglas Black Assistant City Attorney M&C: None required Form 1295: None required ATTEST: Jannette Goodall City Secretary 4,d44�pn�� oo m F oo I. ��e o=° p°o*� daQ� nE� p54gp Transportation Impact Fee Credit Agreement - CA-23-013 Rainbow Ridge OWNER Rainbow Ridge, LLC (Impression Homes) a Texas Limited Liability Company Steve Garza (Marl, 202413:06 CST) Steve Garza CFO City Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Tanya Boyd (Mar 1, 262411:02 CST) Tanya M. Boyce Planning Manager Development Services Department OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 4 of 17 03/01/2024 EXHIBIT LIST "A" Description of the Property "B" Map of Property "C" Development Plan "D" Eligible Transportation Improvements "E" Credits Against Transportation Impact Fees "F" Allocation of Credits Transportation Impact Fee Credit Agreement - CA-23-013 Page 5 of 17 Rainbow Ridge 03/01/2024 EXHIBIT A Description of Property: FP-22-107 BEING a tract of land situated in the John H. Duncan Survey, Abstract No. 398, the Jose A Gill Survey, Abstract No. 568, City of Fort Worth, Tarrant County, Texas and being a part of those certain tracts of land described by deeds to Rainbow Ridge, LLC, recorded in County Clerk's Document Numbers D219156460 & D220265574, Deed Records, Tarrant County, Texas, said tract of land being more particularly described by metes and bounds as follows: BEGINNING at a 5/8" iron rod with yellow cap stamped "DUNAWAY ASSOC." for corner (hereinafter called 5/8" YCIR) set in south end of the terminus and westerly right-of-way line of McCart Avenue (a 65' of 130' width public right-of-way), as shown on plat for Rainbow Ridge Addition, an Addition to the City of Fort Worth, according to the plat recorded in Cabinet A, Slide 9451, Plat Records, Tarrant County, Texas and the most northerly northwest corner of said Rainbow Ridge tract, recorded in said County Clerk's Document Number D219156460; THENCE South 60°57'50" East, a passing distance of 65.00 feet to point for the southwest corner of Lot 1, Block 3 of said Rainbow Ridge Addition and continuing for a total distance of 336.54 feet to a 5/8" YCIR set for the southwest corner of Lot 6, Block 3 of said Rainbow Ridge Addition; THENCE South 29°02'10" West, a passing distance of 270.00 feet to a point for the northwest corner of Lot 9, Block 9, Rainbow Ridge Addition, an Addition to the City of Fort Worth, according to the plat recorded in County Clerk's Document Number D222087504, Plat Records, Tarrant County, Texas and continuing with a westerly line of said Rainbow Ridge Addition for a total distance of 772.02 feet to a 5/8" YCIR found for the southwest corner of Lot 38, Block 9 of said Rainbow Ridge Addition; THENCE South 60°57'50" East, with the south line of said Lot 38, Block 9, Rainbow Ridge Addition, a distance of 119.99 feet to a 5/8" YCIR found in the south right-of-way line of Bermuda Court (a 50' width public right-of-way), as shown on the plat for said Rainbow Ridge Addition and the beginning of a non -tangent curve to the left having a central angle of 190° 13'33", a radius of 51.00 feet, a chord bearing and distance of North 75°35'51" East - 101.59 feet and the center bears North 80°42'40" East, a distance of 51.00 feet; THENCE with south right-of-way line of said Bermuda Court and with said non -tangent curve to the left in a northeasterly direction, an arc length of 169.32 feet to a 5/8" YCIR found for the southwest corner of Lot 41, Block 9 of said Rainbow Ridge Addition; THENCE North 89°39'04" East, with the south line of said Lot 41, Block 9, Rainbow Ridge Addition, a distance of 123.40 feet to a 5/8" YCIR found for the southeast corner of said Lot 41, Block 9, Rainbow Ridge Addition; THENCE North 00°20'56" West, with the east line of said Lot 41, Block 9, Rainbow Ridge Addition, a distance of 38.26 feet to a 5/8" YCIR found for the northeast corner of Lot 41, Block 9 of said Rainbow Ridge Addition; THENCE North 89°39'04" East, with the south line of Block 9 of said Rainbow Ridge Addition, a distance of 655.62 feet to a 5/8" YCIR found for the southeast corner of Lot 56, Block 9 of said Rainbow Ridge Addition; THENCE North 00°20'56" West, with the east line of said Lot 56, Block 9, Rainbow Ridge Addition, a distance of 110.00 feet to a 5/8" YCIR found for the northeast corner of said Lot 56, Block 9, Rainbow Ridge Addition Transportation Impact Fee Credit Agreement - CA-23-013 Page 6 of 17 Rainbow Ridge 03/01/2024 and in the south right-of-way line of Tahiti Lane (a 50' width public right-of-way), as shown on plat of said Rainbow Ridge Addition; THENCE North 89°39'04" East, with the south right-of-way line of said Tahiti Lane, a distance of 300.00 feet to an X-cut in concrete found for the north end of a corner clip; THENCE South 45°20'56" East, departing the south right-of-way line of said Tahiti Lane, with said corner clip, a distance of 14.14 feet to a 5/8" YCIR found in the west right-of-way line of St. Martin Road (a 50' width public right-of-way), as shown on plat of said Rainbow Ridge Addition; THENCE South 00°20'56" East, with the west right-of-way line of said St. Martin Road, a distance of 215.00 feet to a 5/8" YCIR found in the end terminus of said St. Martin Road; THENCE North 89°39'04" East, with the south end terminus of said St, Martin Road, a distance of 50.00 feet to a 5/8" YCIR found in the east right-of-way line of said St. Martin Road; THENCE North 00°20'56" West, with the east right-of-way line of said St. Martin Road, a distance of 222.72 feet to an X-cut found in concrete for the southwest corner of Lot 17, Block 10 of said Rainbow Ridge Addition; THENCE North 89°39'04" East, departing said east right-of-way line of said St. Martin Road, with south line of said Block 10, Rainbow Ridge Addition, a distance of 220.00 feet to a 5/8" YCIR found for the southeast corner of Lot 8, Block 10 of said Rainbow Ridge Addition and in the west right-of-way line of Martinique Lane (a 50' width public right-of-way), as shown on plat of said Rainbow Ridge Addition; THENCE South 00°20'56" East, with the west right-of-way line of said Martinique Lane, a distance of 22.72 feet to a 5/8" YCIR found in the south end terminus of said Martinique Lane; THENCE South 89°39'04" West, departing the west right-of-way line of said Martinique Lane, and with the south end terminus of said Martinique Lane, a distance of 50.00 feet to a 5/8" YCIR found in the east right-of- way line of said Martinique Lane; THENCE North 00°20'56" West, with the east right-of-way line of said Martinique Lane, a distance of 10.00 feet to a 5/8" YCIR found for the south end of a corner clip; THENCE North 44°39'04" East, departing the east right-of-way line of said Martinique Lane, with said corner clip, a distance of 14.14 feet to a 5/8" YCIR found in the south right-of-way line of Montego Bay Lane (a 50' width public right-of-way), as shown on plat of said Rainbow Ridge; THENCE North 89°39'04" East, departing said corner clip and with the south right-of-way line of said Montego Bay Lane, a distance of 345.00 feet to a 5/8" YCIR found for the northwest corner of Lot 34, Block 17 of said Rainbow Ridge Addition; THENCE South 00°20'56" East, departing said Montego Bay Lane and with the west line of said Lot 34, Block 17, Rainbow Ridge Addition, a distance of 110.00 feet to a 5/8" YCIR found for the southwest corner of said Lot 34, Block 17, Rainbow Ridge Addition; THENCE North 89°39'04" East, with the south line of Block 17 of said Rainbow Ridge Addition, a distance of Transportation Impact Fee Credit Agreement - CA-23-013 Page 7 of 17 Rainbow Ridge 03/01/2024 768.94 feet to a 5/8" YCIR found for the southeast corner of Lot 21, Block 17 of said Rainbow Ridge Addition and in the west line of Lot 1, Block 1, J.A. Hargrave Elementary School Addition, an Addition to the City of Fort Worth, according to the plat recorded in Cabinet A, Slide 8569, Plat Records, Tarrant County, Texas; THENCE South 01'49'19" West, with the west line of said Lot 1, Block 1, j.A. Hargrave Elementary School Addition, a passing distance of 108.86 feet to the southwest corner of said Lot 1, Block 1, J.A. Hargrave Elementary School Addition and continuing for a total distance of 116.85 feet to a 5/8" YCIR set; THENCE South 00°20'56" East, a distance of 23.23 feet to a point in the approximate centerline of North Crowley -Cleburne Road (County Road 1075); THENCE South 89°39'04" West, with the approximate centerline of said North Crowley -Cleburne Road, a distance of 3,148.21 feet to an 1" iron rod found for the southwest corner of said Rainbow Ridge tract, recorded in County Clerk's Document Number D219156460; THENCE North 01°00'37" West, departing the approximate centerline of said North Crowley -Cleburne Road, with a west line of said Rainbow Ridge tract, a distance of 85.35 feet to a mag nail with shiner stamped "DUNAWAY ASSOC." set; THENCE North 29°02'10" East, with the westerly line of said Rainbow Ridge tract, a distance of 1,025.36 feet to the POINT OF BEGINNING and containing a calculated area of 817,887 square feet or 18.776 acres of land. Transportation Impact Fee Credit Agreement - CA-23-013 Page 8 of 17 Rainbow Ridge 03/01/2024 �PROJECT TI SITE EXHIBIT B Map of Property I � -1 � I � � � I � I VICINITY MAP EXHIBIT C Development Plan Transportation Impact Fee Credit Agreement - CA-23-013 Rainbow Ridge Page 9 of 17 03/01/2024 FP-22-107 as add,..... a a bk I Tipa ""' � .,,� � I! a� � a.e� >t.w � � u.. a... a.as an° am �p �, -%R�lS4�YF . . . . - ,W -— - 3 I --- ---- ---- -- ---- -- .---- - � i T�N� P LO f Transportation Impact Fee Credit Agreement - CA-23-013 Page 10 of 17 Rainbow Ridge 03/01/2024 EXHIBIT D Transportation Improvements v 4 Eligible Improvements Crowley Cleburne EXHIBIT D Rainbow Ridge 'Eligible for Credit Against WI Transportation Impact Fees Right -of -Way �yeFNp Qu Dedication & Construstion FORT WORTH C. R SAINT v°1NCE ! 2 (CLEBURNE Limits ROW Dedication (FP-22-107) fvkCart Construciton (CPN 103145) Transportation Impact Fee Credit Agreement - CA-23-013 Page 11 of 17 Rainbow Ridge 03/01/2024 EXHIBIT E Credits Against Transportation Impact Fees Rainbow Ridge Transportation Impact Fee Credit Overview Value of ROW Dedication Instrument # Final Plat # Eligible Arterial D222271691 FP-22-107 McCart Ave TOTAL ROW TRANSPORTATION IMPACT FEE CREDIT Value of Community Facilities Agreement Construction City Secretary # CFA/CPN # Eligible Arterial(s) 57186 CFA21-0014 Rainbow Ridge CPN 103145 TOTAL COMMUNITY FACILITIES AGREEMENT CREDIT Value $247,754.58 $247,754.58 Value $2,482,724.58 $21482,724.58 TOTAL TRANSPORTATION IMPACT FEE CREDIT $2,730,479.16 I Transportation Impact Fee Credit Applied to Date Building Permits 13 Value $77,549.42 TOTAL TRANSPORTATION IMPACT FEE CREDIT APPLIED TO DATE $77,549.42 NET TRANSPORTATION IMPACT FEE CREDIT REMAINING $2,652,929.74 Transportation Impact Fee Credit Agreement - CA-23-013 Rainbow Ridge Page 12 of 17 03/01/2024 Right -of -Way Valuation for McPherson Blvd Valuation Method 1 - Percentage of TIP Project Cost Eligible Arterial McCart Ave 2022 Transportation Improvements Plan Project Number Y-51 Estimated Construction Costs from 2022 Transportation $5,306,000 Improvements Plan Value of Total Project Right -of -Way (20% of Construction Cost) $1,061,200 Total Project Length (LF) 2,840 Arterial Cross -Section Width (LF) 110 Additional ROW needed for Roundabout (SF) 0 Total Project Right -of -Way (SF) 312,400 Right -of -Way Value Per Square Foot $3.40 Valuation Method 2 - Percentage of Construction Project Cost Eligible Arterial McCart Ave City Project Number 103145 Final Construction Costs from Notice of Completion (Green Sheet) $1,238,773 Value of Total Project Right -of -Way (20% of Construction Cost) $247,755 Total Project Length (LF) 65 Arterial Cross -Section Width (LF) 1,077 Additional ROW needed for Roundabout (SF) 0 Total Project Right -of -Way (SF) 66,647 Right -of -Way Value Per Square Foot $3.72 Valuation Method 3 - TAD appraised value TAD Value as of 08/9/2023 McCart Ave TAD Account 7527217 Total Area (SF) 45,612 Appraised Value $52,250.00 Value per Square Foot $1.15 Right -of -Way Dedication McCart Ave Recording Instrument Number D219156460 Final Plat Number FP-22-107 Recording Date 11/17/2022 Total area of ROW dedicated (SF) 66,647 Value per SF $3.72 ROW Credit Available $247,754.58 Transportation Impact Fee Credit Agreement - CA-23-013 Page 13 of 17 Rainbow Ridge 03/01/2024 Paving Item No. Description Unit Eligible Quantity Completed Quantity Unit Price Credit Available 1 BARRIER FREE RAMP, TYPE P-1 EA 4 4 $2,285.00 $ 9,140.00 2 4" CONC SIDEWALK SF 7851 7851 $6.25 $ 49,068.75 3 6" CONC PVMT SY 4147 4147 $42.00 $ 174,174.00 4 8" CONC PVMT SY 10357 10357 $68.15 $ 705,829.55 5 6" LIME TREATMENT SY 4433 4433 $3.50 $ 15,515.50 6 8" LIME TREATMENT SY 11025 11025 $3.75 $ 41,343.75 7 HYDDRATED LIME @ 30 LB/SY TN 67 67 $187.06 $ 12,533.02 8 HYDRATED LIME # 36 LB/SY TN 199 199 $187.06 $ 37,224.94 9 FURNISH/INSTALL ALUM SIGN GROUD EA 3 3 $464.71 $ 1,394.13 MOUNT CITY 10 TRAFFIC CONTROL MO 3 3 $15,053.00 $ 45,159.00 11 BLOCK SOD PLACEMENT SY 652 652 $0.60 $ 391.20 12 SWPPP 1 ACRE LS 1 1 $300.00 $ 300.00 13 REMOVE ASPHALT PVMT SY 8643 8643 $10.00 $ 86,430.00 14 REMOVE CONCRETE PVMT SY 183 183 $32.00 $ 5,856.00 15 END ROAD BARRICADE (TXDOT) EA 1 1 $1,500.00 $ 1,500.00 16 24" SLD PVMT MARKING HAE (W) LF 28 28 $16.76 $ 469.28 17 TOPSOIL CY 31 31 $54.12 $ 1,677.72 18 6" CRUSHED STONE BASE SY 922 922 $20.00 $ 18,440.00 19 2" ASPHALT PVMT TYPE D SY 870 870 $22.00 $ 19,140.00 20 TRUF REINFORCED MAT SY 426 426 $6.20 $ 2,641.20 21 4" SLD PVMT MARKING HAS (Y) LF 7432 7432 $1.31 $ 9,735.92 22 8" SLD PVMT MARKING HAS (Y) LF 34 34 $2.71 $ 92.14 23 REFL RAISED MARKER TY II -A -A EA 140 140 $5.12 $ 716.80 Paving Subtotal $ 1,238,772.90 Storm Drain Item Eligible Completed No. Description Unit Quantity Quantity Unit Price Credit Available 1 4X3 BOX CULVERT LF 1532 1532 $270.00 $ 413,640.00 2 36" RCP CLASS III LF 175 175 $151.00 $ 26,425.00 3 24" RCP CLASS III LF 819 819 $106.00 $ 86,814.00 4 21" RCP CLASS III LF 221 221 $68.00 $ 15,028.00 5 REMOVE 24" STORM LINE LF 39 39 $17.00 $ 663.00 6 4' STORM JUNCTION BOX EA 3 3 $5,100.00 $ 15,300.00 7 4' MANHOLE RISER EA 1 1 $2,000.00 $ 2,000.00 8 15' CURB INLET EA 4 4 $5,300.00 $ 21,200.00 9 10' CURB INLET EA 4 4 $4,100.00 $ 16,400.00 10 6' DROP INLET EA 1 1 $6,500.00 $ 6,500.00 11 5' DROP INLET EA 1 1 $5,700.00 $ 5,700.00 12 TRENCH SAFETY LF 2747 2747 $0.50 $ 1,373.50 13 6' STROM JUNCTION BOX EA 4 4 $6,000.00 $ 24,000.00 14 CONCRETE COLLAR EA 2 2 $400.00 $ 800.00 15 TRAFFIC CONTROL MO 1 1 $81,200.00 $ 81,200.00 16 WIDE ASPHALT PVMT REPAIR, LF 100 100 $88.00 $ 8,800.00 Storm Drain Subtotal $ 725,843.50 Transportation Impact Fee Credit Agreement - CA-23-013 Page 14 of 17 Rainbow Ridge 03/01/2024 Street Light Improvements Item No. Description Unit Quantity Eligible Quantity Unit Price Credit Available 1 2" CONDT PVC SCH 80 (T) LF 2015 2015 $13.83 $ 27,867.45 2 NO 6 INSULATED ELEC CONDR LF 6045 6045 $2.14 $ 12,936.30 3 FURNISH/INSTALL LED LIGHTING FIXTURE EA 19 19 $294.00 $ 5,586.00 (70 WATT ATBO COBRA HEAD) 4 RDWY ILLUM FOUNDATION TY 1,2, AND 4 EA 19 19 $1,367.00 $ 25,973.00 5 FURNISH/INSTALL RDWAY ILLUM TY 11 EA 19 19 $1,682.00 $ 31,958.00 POLE Street Lights Subtotal $ 104,320.75 1 Paving Subtotal $ 1,238,772.90 Storm Drain Subtotal $ 725,843.50 Street Lights Subtotal $ 104,320.75 CONSTRUCTION SUBTOTAL $ 2,068,937.15 Other Eligible Items Engineering, Surveying and Material Testing 20% of Paving & Storm Drain $ 413,787.43 Value of Community Facilities Agreement Construction $ 2,482,724.58 Transportation Impact Fee Credit Agreement - CA-23-013 Page 15 of 17 Rainbow Ridge 03/01/2024 Transportation Impact Fee Credit Applied to Date Number of Permits Street Now 9340 MARTINIQUE LN PB23-15094 3436 N CROWLEY CLEBURNE RD PB23-15106 3432 N CROWLEY CLEBURNE RD PB23-15117 3440 N CROWLEY CLEBURNE RD PB23-15118 3448 N CROWLEY CLEBURNE RD PB23-15119 3456 N CROWLEY CLEBURNE RD PB23-15286 3452 N CROWLEY CLEBURNE RD PB23-15289 3444 N CROWLEY CLEBURNE RD PB23-15293 3473 MONTEGO BAY LN PB23-15586 3457 MONTEGO BAY LN PB23-15556 3461 MONTEGO BAY LN PB23-15585 3612 TAHITI LN PB23-16605 Permit No. 3465 MONTEGO BAY LN PB23-16604 Transportation Impact Fee Credit Applied to Date Transportation Impact Fee Credit Agreement - CA-23-013 Page 16 of 17 Rainbow Ridge 03/01/2024 13 Collection Rate $5,965.34 $5,965.34 $5,965.34 $5,965.34 $5,965.34 $5,965.34 $5,965.34 $5,965.34 $5,965.34 $5,965.34 $5,965.34 $5,965.34 $5,965.34 $77,549.42 EXHIBIT F Allocation of Credits Credit shall be allocated on a first -come, first -served basis to building permits within the Final Plat FP-22-107 �a a. �m i a i m i a. .wr �.a as uenn FP•22.107 84 add--, N B 61, Transportation Impact Fee Credit Agreement - CA-23-013 Page 17 of 17 Rainbow Ridge 03/01/2024