HomeMy WebLinkAboutContract 57939-CO2F_ OAT W_ O RT H City of Fort Worth ! t Change Order Request CSC No. 57939-CO2 ProjectName] Clear Fork Lift Station I CitySec No.: 1 57939 Project No.(s):I 56020 / 0600430 / 001680 DOE No. I N/A I CityProj. No.: I 100996 Project Description: Lift Station wetwell piping and appurtenances; Three 10,500 gpm submersible sewage pumps; An electrical building and electrical and controls improvements, 750 kW standby generator, yard piping, vaults and site work, etc. Contractors Eagle Contracting, LLC I Change Order # I 2 Date: I 3/8/2024 City Project Mgr.I Liam Conlon City Inspector: I Ronnie Cardenas Phone Number] 817-392-6824 � Phone Number: I 682-234-2767 1 Dept. Water Sewer Totals Contract Time (Calender days) Original Contract Amount $12,969,865.00 $12,969,865.00 480 Extras to Date $0.00 $0.00 0 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $12,969,865.00 $12,969,865.00 480 Amount of Proposed Change Order $42,335.55 $42,335.55 174 Revised Contract Amount $13,012,200.55 $13,012,200.55 6541 Original Funds Available for Change Orders $259,397.00 $259,397.00 Remaining Funds Available for this CO $259,397.00 $259,397.00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.33% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 259/6) $16,212,331.25 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No. 2 provides for the following: Cast in place beam support for various openings that were inadvertently omitted at the time the project was advertised for bid. Modifications to the inlet piping for the lift station to avoid conflict with a previously unknown 48-in water main including raising the bottoms of the two inlet structures and protecting the encountered water main. Operational Interface Terminal for Clear Fork PI-Cl as requested by the city. Additional railroad flagmen compensation for increased flagmen observation cost by railroad staff for the additional work performed Staff concurs with the contractors request for an additional 174 calendar days on the project for the delay in receiving the generator along with the switchboard and power being supplied to the site. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name I Contractor Name I gontrac r¢ignature� I Date Eagle Contracting, LLC Andrew Howard idsper .,Director (Water Dept) Christaoher Na 4' l x . �,. a , ion Assistant City Attorne gi:wa�l�+m.�-o�acon M&C Number I N/A Dale Project Manager Date Y haul � ,3! g Icy-. date Construction upeerviis�o date Mar 15, 2024 1� r�% Date �9sistant City Manager!I= Date Mar 20, 2024 Mar20, 2024 Council Action (If Required) M&C Date Approved N/A Fc3 H-r W_ ORTH City of Fort Worth ! t Change Order Additions Project Name Clear Fork Lift Station City Sec No.: 1 57939 Project No.(s): 56020 / 0600430 / 001680 DOE No.1 N/A City Proj. No.: 1 100996 Project I Lift Station wetwell piping and appurtenances; Three 10,500 gpm submersible sewage pumps; An electrical building Description and electrical and controls improvements, 750 kW standby generator, yard piping, vaults and site work, etc. Contractor Eagle Contracting, LLC I Change Order:1 2 Date: 1 3/8/2024 City Project Mgr. Liam Conlon City Inspector I Ronnie Cardenas ADDITIONS I I tM UESCRIP I IUN DEPT Q Unit Unit Cost Total 13 EPDXY MANHOLE LINER Sewer 10.50 VF $476.00 $4,996.38 17 6' EXTRA DEPTH MANHOLE Sewer 4.80 VF $870.00 $4,173.83 25 18-INCH DIAMETER DRILLED SHAFTS Sewer 10.00 VF $80.00 $800.26 26 18-INCH DIAMETER CASING FOR DRILLED SHAFTS Sewer 24.01 VF $10.00 $240.05 40 CMR 03 - RAILROAD FLAGMEN ALLOWANCE Sewer 1.00 LS $60,555.00 $60,555.00 45 PCM 04 - METER VAULT STRUCTURAL REVISIONS Sewer 1.00 LS $4,759.47 $4,759.47 46 PCM 05 - INLET PIPING REVISIONS Sewer 1.00 LS $209,510.00 $209,510.00 47 CMR 02 - ADDITION OF OPERATIONAL INTERFACE TERMINAL Sewer 1.00 LS $16,810.56 $16,810.56 (Water (Sewer �$301,845.55 Page 1 of 1 (Additions Sub Total I$301,845.55 FORT' WORTH City of Fort Worth Change Order Deletions Project Name Clear Fork Lift Station City Sec No.: 57939 Project No.(s): I 56020 / 0600430 / 001680 DOE No. I N/A City Proj. No.: 100996 Project Description Lift Station wetwell piping and appurtenances; Three 10,500 gpm submersible sewage pumps; An electrical building and electrical and controls improvements, 750 kW standby generator, yard piping, vaults and site work, Contractor Eagle Contracting, LLC I Change Order: [-2—] Date I 3/8/2024 City Project Mgr. Liam Conlon City Inspector: I Ronnie Cardenas DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 7 30" SEWER CARRIER PIPE Sewer 73.00 LF $1,500.00 $109,500.00 8 48" CASING/TUNNEL LINER PLATE BY OTHER THAN OPEN CU Sewer 73.00 LF $1,370.00 $100,010.00 41 9999.0016 - CONTINGENCY Sewer 0.50 LS $100,000.00 $50,000.00 (Water Sewer $259,510.00 Page 1 of 1 IDeletions Sub Total $259,510.00 MMBE Breakdown for this Change Order MWBE Sub I Type of Service Amount for this CO Same as original Contract Miscellaneous $38,017.46 Co # Previous Change Orders DATE Total I Total I $38,017.46 AMOUNT $0.00 1 Page 1 of 1 PCM 04 - METER VAULT STRUCTURAL REVISIONS Clear Fork Lift Station Eagle Change Proposal No. 5 Date: June 22, 2023 Work Description: Additional Beams at Meter Vault Owner: City of Ft. Worth Water Department 200 Texas St. Ft. Worth, Texas 76102 TOTALS: Overhead & Profit - 5% Subcontracted Work Overhead & Profit - 15% Self Performed Work Subtotal Eagle Insurance 1.8% Bond @ 1% Subtotal Total Amount This Cost Proposal Time Extension Required Engineer: Kimley Horn 801 Cherry St., Suite 1300 Fort Worth, Texas 76102 K l � EAGLE CONTr2ACT1`JC: Contractor: Eagle Contracting 5700 Park Vista Circle Ft Worth, Texas 76244 Labor Material GC Material Equipment Subcontractor $ 3,235.16 $ 800.00 $ - I $ - I $ - 1 $4,035.16 0 Days Days Required to Complete Work 0 Days $0.00 $605.27 $4,640.43 $72.63 $46.40 $4,759.47 $4,759.47 PCM 04 - METER VAULT STRUCTURAL REVISIONS ILABOR RT HRS OT HRS UNIT RT RATE OT RATE TOTAL Project Manag�er 6 0 MH $88.00 $88.00 $ Superintendent 0 0 MH $88.00 $88.00 $ Craft Supl 12 0 MH $55.00 $82.50 $ 660.00 Foreman 0 0 MH $45.00 $67.50 $ - Carpenter 16 0 MH $32.00 $48.00 $ 512.00 Carpenter Helper 32 0 MH $28.60 $42.90 $ 915.20 Laborer 0 0 MH $23.00 $34.50 $ - Pipe Layer/Fitter 0 0 MH $32.00 $48.00 $ Pipe Layer/Fitter Helper 0 0 MH $26.40 $39.60 $ Operator - Crane 0 0 MH $39.60 $59.40 $ Operator 0 6 MH $30.25 $40.50 $ - Field Engineer 0 0 MH $60.50 $90.75 $ Rodman 0 0 MH $28.60 $42.90 $ - Subtotal $ 2,087.20 Labor Burden @ 55% $ 1,147.96 Total Labor $ 3,235.16 NON -TAXED MATERIAL QTY UNIT UNIT PRICE TOTAL 6 LS $0.00 $ Form Work 1 LS $800.00 $ 800.00 0 LS $0.00 $ - 0 LS $0.00 $ 0 LS $0.00 $ I $ (Subtotal - Non -Taxed Material $ 800.00 ITAXED MATERIAL QTY UNIT UNIT PRICE TOTAL 0 $0.06 $ - 0 $0.00 $ 0 $0.00 $ 0 $0.00 $ Subtotal - Taxed Material + (8.25% Tax) $ GENERAL CONDITION MATERIAL QTY UNIT UNIT PRICE TOTAL Jobsile Trailer $25.50/Dayy 0 LS $ $ Jobsile Phone/Internet $13.65/Day 0 LS $ $ Jobsile Electric $12.50/Day 0 LS $ $ Jobsile Water $7.20/Day 0 LS $ - $ Small Tools 7 % Labor 0 LS $ 226.46 $ General Cleaning $13.35/Day 0 LS $ - $ Dumpster $23.3 /Day 0 LS $ - $ - Temporar�,Toilets $29.00/Day 0 LS $ $ Safely Egwpment $21.00/Day 0 LS $ $ Pickup Trucks $45.00/Day 0 LS $ $ Lab Testing 0 LS $ $ (Subtotal - G C Material + (8.25 % Tax) $ - ITotal Material $ 800.00 EQUIPMENT QTY UNIT RATE TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 I $0.00 Subtotal - Equipment $0.00 IFuel, Oil & Grease (45 % of Equipment) $ - ITax @ 8.25 % $ - ITotal Equipment $0.00 ISUBCONTRACTOR QTY UNIT UNIT PRICE TOTAL 0 LS $8,490.00 $ - 0 LS $0.00 $ 0 LS $0.00 $ 6 LS $0.00 $ Total $ PCM 05 - INLET PIPING REVISIONS Clear Fork Lift Station Eagle PCM No. 5 - 30" Inlet Pipe Modifications February 2, 2024 Work Description: 30" Inlet Pipe Revisions Owner: City of Ft. Worth Water Department 200 Texas St. Ft. Worth, Texas 76102 TOTALS: Overhead & Profit - 5% Subcontracted Work Overhead & Profit - 15% Self Performed Work Subtotal Eagle Insurance 1.8% Bond (d1% Subtotal Total Amount This Cost Proposal Time Extension Required Engineer: Kimley Horn 801 Cherry St., Suite 1300 Fort Worth, Texas 76102 EAGLE CONTRACTING, L.P. Contractor: Eagle Contracting 5700 Park Vista Circle Ft Worth, Texas 76244 Labor Material GC Material Equipment Subcontractor $ 78,492.00 1 $ 56,998.25 1 $ - 1 $ 74,019.76 1 $ (209,510.00)1 $0.00 0 Days $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Days Required to Complete Work 0 Days - Pricing for alternate location of 6" waterline not included within PCM, Kimley Horn to issue PCM for newly selected location. - Payment for additional time required within UPRR ROW accounted for in (BI # 40) previous pay applications. - Upon approval of change proposal, Bid Item # 7 & 8 will be billed to 100% complete as Eagle Contracting has already absorbed this cost for transitioning to open cut method for installation of 30" SS Pipe. There will be no deduction or additional cost related to relocation of the 6" waterline and hydrant. $0.00 go] ►A[@19'M10LNa =1aIaLei :A*T&,Ri]0&1 ILABOR RT HRS OT HRS UNIT RT RATE OT RATE TOTAL Protect Manz��er 0 0 MH $88.00 $88.00 $ - Superintendenl 0 0 MH $88.OD $88.00 $ Craft Supt 152 D MH $55.00 $82.50 $ 8,360.00 Foreman 0 0 MH $45.00 $67.50 $ - Carpenler D 0 MH $32.00 $48.00 $ Carpenter Helper 0 0 MH $28.60 $42.90 $ - Laborer 432 0 MH $23.00 $34.50 $ 9,936.00 P�e Layer/Fitter 370 0 MH $32.00 $48.00 $ 11,840.00 Pipe Layer/Fitter Helper 135 0 MH $26.40 $39.60 $ 3,564.00 Operator - Crane 0 0 MH $39.60 $59.40 $ - operator 300 0 MH $30.25 $40.50 $ 9,075.00 Field Engineer 130 0 MH $60.50 $90.75 $ 7,865.00 Rodman 0 0 MH $28.60 $42.90 $ - ISublotal $ 50,640.00 ILabor Burden @ 55% 1 $ 27,852.00 ITotal Labor $ 78,492.00 NON -TAXED MATERIAL QTY UNIT UNIT PRICE TOTAL Material Cost of Open Cut 1 LS $56,998.25 $ 56,998.25 0 LS $0.00 $ - 0 LS $0.00 $ - 0 LS $0,00 $ - 0 LS $0.00 $ I $ ISubtotal - Non -Taxed Material $ 56,998.25 ITAXED MATERIAL QTY UNIT UNIT PRICE TOTAL 1 0 $0.00 $ - I 0 $0.00 $ 1 0 $0.00 $ 1 0 $0.00 $ Subtotal - Taxed Material + (8.25% Tax) $ GENERAL CONDITION MATERIAL QTY UNIT UNIT PRICE TOTAL Jobsile Trailer $25.50/Dayy 0 LS $ - $ - Jobsile Phone/Internet $13.65/Day 0 LS $ - $ - Jobsite Electric $12.50/Day 0 LS $ $ Jobsite Water $7.20/Day D LS $ $ Small Tools 7% Labor D LS $ $ General Cleaning $13.35/Day D LS $ $ Dumpster $23.33/Day 0 LS $ - $ - Temporary Toilets $29.O0/Day 0 LS $ - $ - Safety Equipment $21.00/Day 0 LS $ $ Pickup Trucks $45.00/Day 0 LS $ $ Lab Yesling 0 LS $ $ Subtotal - G C Material + (8.25 % Tax) $ - Total Material $ 56,998.25 EQUIPMENT QTY UNIT RATE TOTAL Material Cost of Open Cut 1 LS $48,300.00 $48,300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ISublotal - Equipment $48.300.00 1Fuel, Oil & Grease (45 % of Equipment) $ 21,735.00 ITax @ 8.25 % $ 3,984.75 ITotal Equipment $74,019.75 ISUBCONTRACTOR QTY UNIT UNIT PRICE TOTAL Sundance Construction (81 # 7 & 8) 1 LS ($209,510.OD) $ (209,510.00) LS $0.00 $ 0 LS $0.00 $ - 0 LS $0.00 $ - Total $ (209,610.00) CMR 02 - ADDITION OF OIT Clear Fork Lift Station -- Eagle Change Proposal No. 2�; Date: January 11, 2024 EAGLE CONTRACTING Work Description: Addition of Operational Interface Terminal to the PLC Owner: Engineer: Contractor: City of Ft. Worth Water Department Kimley Horn Eagle Contracting 200 Texas St. 801 Cherry St., Suite 1300 5700 Park Vista Circle Ft. Worth, Texas 76102 Fort Worth, Texas 76102 Ft Worth, Texas 76244 Labor Material GC Material Equipment Subcontractor TOTALS: I $ I $ I $ I $ - I $ 15,586.98 I $15,586.98 Overhead & Profit - 5% Subcontracted Work $779.35 Overhead & Profit - 15% Self Performed Work $0.00 Subtotal $16,366.33 Eagle Insurance 1.8% $280.57 Bond @ 1% $163.66 Subtotal $16,810.56 Total Amount This Cost Proposal $16,810.56 Time Extension Required 0 Days Days Required to Complete Work 0 Days EAGLE CONTRACTING CMR 03 - RAILROAD FLAGMEN ALLOWANCE January 18,2024 Mr. Liam Conlon Fort Worth Water Department 200 Texas Street Fort Worth, Texas 76102 RE: Project No. 26920 Clear Fork Lift Station Railroad Flagmen Allowance Dear Mr. Conlon: 5700 Parl<Vista Circle Fort Worth, TX 76244 (817) 379-1897 eag Iecontracting.com Due to unforeseen field conditions while performing construction activities on Union Pacific Railroad's easement Eagle Contracting is submitting this formal letter requesting additional days and associated cost. As documented in PCM-005 Eagle Contracting encountered an unknown obstruction that delayed our construction efforts by 12 days (07/12/2023- 07/25/2023) while laying the 30" SS Line. Also, while progressing on Rail Pro's easement Eagle Contracting has experienced 11 days with no production due to weather conditions beyond our control. There were also unexpected issues that impacted and extended our completion dates, including the necessity to produce an engineered temporary pipe support design prior to hand digging under the 48" SS line and revised shoring plan on Inlet Structure 272, each were requested by UPRR. The discovery and eventual damage to Sprint's fiber optic line created a circumstance that lead to lost time. Eagle was tasked with managing repairs and eliminating any potential hazardous environment prior to engaging in additional construction activities. The introduction of each change in conditions resulted in extensive review periods and coordination by UPPR and Rail Pros prior to the acceptance of our recommended solution. Currently we are anticipating 21 days to complete work on Rail Pros easement including placing the asphalt, installing existing fence, demolition of the 48" SS line within Inlet Structure . We plan to repair the 48" potable water line within the requested 21 days as soon as we receive notice from the City of Fort Worth that the main line is depressurized. As such and allowed by Project Specifications 00_72_00 General Conditions, Article 12.03.A as it relates specifically for delays beyond the control of the contractor, Eagle Contracting is asking that 33 days and $60,555.00 be added to the Railroad Flagmen and Construction Observation allowance. Which would be a variance to specification Special INNOVATIVE BUILDS IN THE WATER AND WASTEWATER INDUSTRY �= EAGLE `.,�r'' CONTRACTING Project Procedures 01_35_13-2. Please let us know what other information you require to make this Chang CMR 03 - RAILROAD FLAGMEN ALLOWANCE 5700 Pari<Vista Circle -r, ADDITIONAL CONTRACT TIME �ortwortt,,Tx76244 EAGLE' 817) 379-1897 t .,.yu CONTRACTING eaglecontracting.com February 05,2024 Mr. Liam Conlon Fort Worth Water Department 200 Texas Street Fort Worth, Texas 76102 RE: Project No. 26920 Clear Fork Lift Station Additional Days to Contract Dear Mr. Conlon: Let this letter serve as a request for time extension for substantial and final completion dates for the above referenced project. As discussed in numerous progress meetings ongoing. lack of communication issues on ONCOR's part regarding the contract and equipment delivery appears to cause a delay to the project's substantial and final completion dates. Due to not having power all equipment start up will have to be pushed out as shown on the January 2024 schedule update. Eagle continues to pursue completion of our remaining work as rapidly as reasonable possible under the circumstances, however, these delays are beyond our control. Per the Schedule we presented activity No. A4130 Furnish Transformer- ONCOR is on our critical path of the project, currently it is anticipated that power and the transformer will arrive in the first weeks of April. Installation will take place immediately and completed the same day. Start up and testing of all equipment will follow, and punch list items will be completed after. We received notice to proceed on September 6th,2022 and the original contract duration was 480 days. As of today, we have a substantial completion date of November 15th,2023 and Final completion Date of December 30th,2023. As allowed by project specifications 00_72_00 INNOVATIVE BUILDS IN THE WATER AND WASTEWATER INDUSTRY ;r EAGLE ADDITIONAL CONTRACT TIME CONTRACTING General Conditions, Article 12.3.A as it relates specifically for delays beyond the control of the contractor Eagle Contracting is asking that 174 calendar days to be added to the contract. This gives us a new substantial completion date of May 07,2024 and Final completion date of June 21,2024. Please take into consideration that the substantial and final completion dates provided above are merely an estimated guess due to not having a set date for power and equipment delivery provided by ONCOR and may be subject to change. Apon approval on the additional contract days Eagle contracting may request to suspend contract time if/when we are required to demobilize which will result in Eagle contracting to put in a request for additional compensation for remobilization. Contract Compliance ManaLer By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. 0, ` 61' i�� Signature Liam Conlon Name of Employee Project Manager Title ATTEST: Jannette Goodall City Secretary b4440pq� FOR Pp�pV'�8 00* po ° J-6 .l10 o ° ° °° d� n4 TEXA`�a°p �URR444 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX