Loading...
HomeMy WebLinkAboutContract 61063-PM1CSC No. 61063-PM1 FoRTWORTH PROJECT MANUAL FOR THE CONSTRUCTION OF The Business Park at Trinity IPRC Record No. 22-0249 City Project No.104654 FID No. 30114-0200431-104654-EO7685 File No. W 2907 X File No. 27664 Mattie Parker David Cooke Mayor City Manager Christopher P. Harder, P.E. Director, Water Department Lauren Prieur, P.E. Director, Transportation and Public Works Department Prepared for The City of Fort Worth Winkelmann and Associates, Inc. 6750 Hillcrest Plaza Dr, Suite 215 Dallas, TX 75230 Phone: 972-490-7090 Texas Engineers Firm Registration Number: 89 !!WAM R MMrKEL I M ............................... :.��.9 20378a NO OFFICIAL RECORD %%%'%8'0"L`�� CITY SECRETARY 031..//212024 FT. WORTH, TX THE SEAL APPEARING ON THIS DOCUMENT WAS AUTHORIZED BY WILLIAM R. WINKELMANN, P.E. # 110378 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 5 SECTION 00 00 10 TABLE OF CONTENTS DEVELOPER AWARDED PROJECTS Division 00 - General Conditions nn�3 inyiia4ion to -Bidde s nn�3 Last Revised 03 i 0 i 004100 00 42 43 nn� ins4uetions t Bidders Bid Fe Proposal Form Unit Price Bid Ben 03 0 nn/n T 05/22/2019 nn /nT 0045 it Biddef:s Pfequ l;f;,.cAiea's Prequalification Statement A..pi;e tie U,-o.,u l;fie nn /nvTr02/2014 09/01/2015 0045 12 0045 13 00 45 26 Bidder- do Contractor Compliance with Workers' Compensation Law .;t 03/0on 04/02/2014 nQ i 004540 00 52 43 Mine y Business Enterprise Goal Agreement a 06/16/2016 00 61 25 Certificate of Insurance 07/01/2011 00 62 13 Performance Bond 01/31/2012 00 62 14 Payment Bond 01/31/2012 00 62 19 00 72 00 Maintenance Bond GeneralConditions 01/31/2012 i ii ii T 007300 0073 10 Suppleme tafy r,.. difi ns Standard City Conditions of the Construction Contract for Developer 07/nm�li 01/10/2013 Awarded Projects Division 01- General Requirements Last Revised 01 1100 Summary of Work 12/20/2012 01 25 00 Substitution Procedures 08/30/2013 01 31 19 Preconstruction Meeting 08/30/2013 01 32 33 Preconstruction Video 08/30/2013 01 33 00 Submittals 08/30/2013 01 35 13 Special Project Procedures 08/30/2013 01 45 23 Testing and Inspection Services 03/20/2020 01 50 00 Temporary Facilities and Controls 07/01/2011 01 5526 Street Use Permit and Modifications to Traffic Control 07/01/2011 01 57 13 Storm Water Pollution Prevention Plan 07/01/2011 01 60 00 Product Requirements 03/20/2020 01 66 00 Product Storage and Handling Requirements 04/07/2014 01 70 00 Mobilization and Remobilization 04/07/2014 01 71 23 Construction Staking (DAP MOD) Subsidiary 02/14/2018 01 74 23 Cleaning 04/07/2014 01 77 19 Closeout Requirements 04/07/2014 01 78 23 Operation and Maintenance Data 04/07/2014 01 78 39 Project Record Documents 04/07/2014 CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 5 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents NONE Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: htti):Hfortworthtexas.2ov/ti)w/contractors/ or htti)s:Happs.fortworthtexas.sov/Proi ectResources/ or htti)s://www.dot.state.tx.us/insdtdot/orLchart/cmd/cserve/standard/brid2e-e.htm TxDOT Specs Last Revised 104 Removing Concrete 02/2020 465 Junction Boxes, Manholes, & Inlets 02/2020 466 Headwall and Wingwalls 02/2020 Last Revised Division 02 - Existing Conditions 0241 13 Selective Site Demolition 12/20/2012 0241 14 Utility Removal/Abandonment 12/20/2012 0241 15 Paving Removal 02/02/2016 Division 03 - Concrete 03 30 00 Cast -In -Place Concrete 12/20/2012 03-34-13 G..,..t of l e,l Tow Strength A i ate -ia (rr SW 1 2 /7zzr� QO 12 03 34 16 Concrete Base Material for Trench Repair 12/20/2012 03 80 00 ra,.di fi ,. tefis t Existing r ae f@o o ft.ruiW1.-es 12/ 0,9012 Diiviision26 - Electrical 260500 -Comman `x7erk Results f ,- Eleet..iea 26� 710m elifie n f ,. L'leet..iea Systems 1 1 /7�vi4 12/zzr20420iz 'lib 05 43 T Tade -g-..,,...1 Duets Raee.: for- Eleetfieal Systems 07 /llmTv 1QO14 02/o Q and ays 26 05 50 CO1R3rAtwizions Mule; Dtiet r,.n"t. Division 31- :arthwork 31 1000 Site Clearing 12/20/2012 3123 16 Unclassified Excavation 01/28/2013 31 23 23 Borrow 01/28/2013 31 24 00 Embankments 01/28/2013 31 25 00 Erosion and Sediment Control ,�-1 12/20/2012 1 /7zzr� 3 ✓6 00 GabionS 31 37 00 Riprap 2 QO 12 12/20/2012 Division 32 - Exterior Improvements 3201 �T � vim.. t ?iv 3201 19 Telmer-ary Aor).a1t Ilr. __ 12 /'�lz 32 1123 Fle*ible Base retffses 12/�12 CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 5 3q 11 qg 27�3 3l 11 3"Z Time T-r-ea4ed Base !''o Cement Treated Base r., Liquid Tfea4ed coil fteal"ili ff 12/�12 12/7zz�-� QO12 n4/o 1�t5 32 1216 4Gr';'lalt I\-mfig 12/20QO12 32 1273 �� n s,.hak Pa-y ftg O 1 c�:1[ S .,��1a11 � � 12/2L2n1'f� 0, 32 13 13 Concrete Paving 12/20/2012 32 1320 Concrete Sidewalks, Driveways and Barrier Free Ramps 06/05/2018 32 1373 Concrete Paving Joint Sealants 12/20/2012 32 14-16 Dtiok Urrt Alr ing 12 /�1i 32 16 13 Concrete Curb and Gutters and Valley Gutters 10/05/2016 32 1723 32 5 3231 3 Pavement Markings ram,, t, Address Pain n Chain >;enees and Gates 11/22/2013 1 11 1 /n�13 12/7 z 3232 13 Cast i Dlaee r.,,� e-ete D„ .t�inirr� �'�a-1}s 0 ov6/05/2018a 3291 19 Topsoil Placement and Finishing of Parkways 12/20/2012 32 92 13 Hydro -Mulching, Seeding, and Sodding 12/20/2012 32 93-43 Tfees and f1.-xubG 12/�1-2 Division 33 - Utilities 33 01 30 Sewer and Manhole Testing r; t Telesis;,.,, 12/20/2012 /n 33 0131 ZZ�o Close -eu (CCT37) Tripe fie r TeipA Boading a*d Qeetfieal lsela4ie 03 6 17/7rc�-z Q012- 22� 33 04-30 33 04 40 AiT.,..nos;,,m Anode G.,tl,. die D,-eteeti..,,, S„sto,.,., Temperar-y Wa4er- Sef,4e Cleaning and Acceptance Testing of Water Mains 12/zz�-20QO12 07/n�n 02/06/2013 33 04-50 C)aarning 9f Sowef: TiT.,i 12/7 z 3305 10 Utility Trench Excavation, Embedment, and Backfill 12/12/2016 3305 12 33 nc 1 3 --�-z� 3305 Div Wa,ar Lime >g > r n-a�rr Per��le�ii3gS Ga�t�I�I Ffame, Cover- and Grade Rings Composite Adjusting hiretS, Valve Other- tikE�2st9 12/��2 01 /22/2n16 �� n1 /�6 1 2/z � ZZ nc 14 �r vxes�,and -v Gf-ade 22� 33�T 330520 3�1 33 05 22 Z'2�3 r,.,-e-CotoWater- Vaults !',fie -Coto Coliafs TL'erirl�1 T �1X e Stool Cass g Npe T,,,,.,v4ng 12/'fez 12/�0iQ012 11 /�12- 11 /�� 12/7r�-zvrzviz 12/'lrtr20,Q012 ZZ�4 33 05 26 Hand lost.,lla4io-, (`af-;o,--Pipe i !-'..sing Tunnel 1 Plate 06/lvvr19,Q013 12/20/2012 of of f Utility Markers/Locators 33 05 30 Location of Existing Utilities 12/20/2012 33 1105 Bolts, Nuts, and Gaskets Tl,,.,t;le T,-E) 12/20/2012 12/'fez 33�-11-10 33 11 11 Pipee Ductile Iron Fittings 12/20/2012 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 11/16/2018 CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 5 ', 1 2 i� 1 � �Z e Pipe Baf: IALF .l Stool !''ylif „le,. Type �fle�ete�fes^�, 12/'fez ppe 11 11 Burie Stool Pipe and Fittings 12/20QO12 33 1210 22� Water Services 1-inch to 2-inch I 02/14/2017 1 71 /7 33 1220 a fge Al tef Metefs Resilient Seated Gate Valve AIa7AL Se.,te, [7 z 12/20/2012 33 12 21 33 1225 Rubber- BtWe,-fl., Connection to Existing Water Mains 12/'fez 02/06/2013 33 12304aein— ies for- Potable W.,to. Syste 12/�12 33 1240 Fire Hydrants O1/03/2014 33 1250 33 12 600 Wa40F ca.Wla Stations Standar-d Blow off Valve Assembly bly 12/20,9012 06/19,9013 3331 2 33 31 3 Ci ffe,l ;n Ul.,ee Pipe (CIDDI Fiberglass n ein f ,-ee,l Pipe for- r,-., it; ,- 9L\Aitarj-Sewtf:s 12/7 z 11 /�12 33 31 3 33 2o 14}gli DDlrWY 1Dl-,etl,Y,leae (HDP r4 -Piro fo '-wita -Sewer- Polk.,;,-. C lef:i (PVC4!`_,-.,.,;tom, 5.,*ta-„ Sewer- Pipe 12/20,9012 06n -3 e �} PolyvinylChloride ClosedProfile!` -ay t„ 5.,n tafy Sewer- 1 '1 /'zzrz-vizviz (PVC) Pipe 14 41 2 T 5 a-m to fy S e. , ar E'Iirr� liming m 1 � /20,Q0 2 �� ZZ�3 3 2�o 5a-n tmy Sewer- Pipe Emlay/j 4 Sa-n t., Sewer- Se,.,,;,.e Cefmeet; rs Se,.,,;ee r ; e Q/'frL 20,90i2 nn /gin 22� 3339 10 y and CO Cast i Ul.,ee C ner-ete Manholes 12/�12 12/�12 33 39 30 ZZ�o Ribz r� r_ y\Yanheles n eeess !`I,.,mbe,- n 12/'fez 1 71 /7 22� Write,:,.,tef (NV C;4 L'..o*y Line e f C.(rlritary Sewe,- St.-,,.,t,,,-o., z 12/7zzrz QO12 3341 10 22� Reinforced Concrete Storm Sewer Pipe/Culverts St..i: rl,-.,i 07/01/2011 12/'fez 3,.-2 ��1l�1 11? HighDensity Polyethylene (HDPE) Pipe f f Re''yiaf ,-ee.l P4yetL,lene (ERPE) P*e 11 /1 s 171 /7� 33 46 0 33 4601 SttVdr-ainage Slotted S 3rm Dmins 20QO12 n� /no 1�11 33 4602 33 49 10 Tf,-,Mk D"�kp.'a Cast i Dl.,ee Manholes .,a.1 r,,,-,etio Boxes 07/n�1 goi i Q/'fez 33 4920 33 49 40 Curb and D-ap h lets Storm Drainage Headwalls and Wingwalls 12/'fez 07/01/2011 Division 34 34�o 3 ^ ^�01 - Transportation T-.,ff:e Sigg .1ss At4aehment A Centre 1ler-C-abinet Attaehmel}t B Centferlervpeeification 1n/Tvr12,QO15 12 / 1�15 02QO12 3 n n�02 3n n�03 3A�T 34 41 15 Attaehmel}t G Se€twafe aped£eatien Tempof:., -„ Tr- ff a Signals Removing T -.,ff e Signals Reetangul RaNll F�azAN� B eaeo OLQW2 1 1 /22,Q013 1 2 /ram 20,Q012 1 1 /�13 34 41 16 Pede`U t6am Il` bFW-&gn-al 1 1 /�13 34-4-�e bl; �� nl»�p�tion �n es � 12/20,Q 3 n n�0T r Aftc6�1. �D ngadw r�, �axli-xwras 06 c ,90 c� 2n n�02 >~ .ee,: ay LED ne.,dw ,, iihvNitairas 06/10 e�I�5 3n n�o3 r r Re�idorftial �T'�a3- �,:�il��><as 06/15/ O c vvrr✓rcvr� CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 3441 30 Alums&-s F/.gns 3471 13 Traffic Control Appendix Page 5 of 5 114242013. 02 io�6 11 /22/2013 GE-4.91 Nw� I ulity ,.vim GC-4.02 Subsurface and Physical Conditions GC-6.06.D amy).�=—_-2 GG-F.07 Wage-Rxa GG-6 1� Uv.-m is andUtilities GG 6.24 Naff &0"Mw/at,.an GR-01 60 00 Product Requirements END OF SECTION CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised March 20, 2020 00 42 43 DAP - BID PROPOSAL Page I of5 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Unit of Bid Unit Price Bid Value No. Section No. Measure Quantity UNIT I: WATER IK )ROVEMENTS 1 3311.0161 6" PVC Water Pipe 31 11 12 LF 25 $44.34 $1,108.501 2 3312.0001 Fire Hydrant 33 12 40 EA 3 $6,603.61 $19,810.831 3 3312.2003 1"Water Service 331210 EA 1 $3,140.00 $3,140.001 4 0241.1510 Salvage Fire Hydrant 0241 14 EA 2 $1,633.34 $3,266.681 5 3312.0117 Connection to Existing 4"-12" Water Main 33 12 25 EA 4 $1,275.26 $5,101.041 6 3312.2203 2" Water Service 3312 10 EA 1 $3,628.14 $3,628.141 7 3311.0001 Ductile Iron Water Fittings w/ Restraint 3311 11 TON 0.65 $10,761.00 $6,994.651 8 3312.3002 6" Gate Valve 33 12 20 EA 4 $2,911.00 $11,644.001 9 3312.3105 12" Cut -in Gate Valve 33 12 20 EA 3 $7,028.00 $21,084.001 10 0241.1118 4"-12" Pressure Plug 0241 14 EA 4 $89.55 $358.201 11 3305.0109 Trench Safety 3305 10 LF 40 $1.75 $70.001 I 12 I I 13 I I 14 I I 15 I I 16 I I 17 I I 18 I I 19 I I 20 I I 21 I I 22 I I 23 I I 24 I I 25 I I 26 I I 27 I I 28 I I 29 I I 30 I I 31 I I 32 I I 33 I I 34 I I 35 I I 36 I I 37 I I 38 I I 39 I I 40 I I 41 I I 42 I I 43 I TOTAL UNIT I: WATER IMPROVEMENTS $76,206.041 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 00 42 43 Bid Proposal DAP 77302.00.xlsx 00 42 43 DAP - BID PROPOSAL Page 2 of 5 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Unit of Bid Unit Price Bid Value No. Section No. Measure Quantity UNIT II: SANITARY SEWER IMPROVEM, JUTS 1 0241.2102 6" Sewer Abandonment Plug 0241 14 EA 1 $75.00 $75.001 3 0241.5001 Abandon Manhole 0241 14 EA 1 $5,025.00 $5,025.001 4 0241.2001 Sanitary Line Groutinq 0241 14 CY 0.6 $750.00 $450.001 6 3301.0101 Manhole Vacuum Testinq 3301 30 EA 1 $300.00 $300.001 17 I I 8 I 19 I 10 11 I 12 I I 13 I I 14 I I 15 I I 16 I I 17 I I 18 I I 19 I I 20 I I 21 I I 22 I I 23 I I 24 I I 25 I I 26 I I 27 I I 28 I I 29 I I 30 I I 31 I I 32 I I 33 I I 34 I I 35 I I 36 I I 37 I I 38 I I 39 I I 40 I I 41 I I 42 I I 43 I TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS $5,850.001 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 00 42 43 Bid Proposal DAP 77302.00.xlsx UNIT PRICE BID Bidlist Item No. 1 2 3 4 5 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 00 42 43 DAP - BID PROPOSAL Page 3 of 5 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Bidder's Application Project Item Information Description Specification I Unit of I Bid Section No. Measure Quantity UNIT III: PAVING IMPROVEMENTS 0241.0100 Remove Sidewalk 0241 13 SF 447 0241.1000 Remove Conc Pvmt 0241 15 SY 40 0241.1300 Remove Conc Curb&Gutter 0241 15 LF 300 3211.0502 8" Lime Treatment 3211 29 SY 118 3212.0304 4" Asphalt Pvmt Hot Mix Type D SY (Underlayment) 3212 16 118 3213.0103 8" Conc Pvmt 3213 13 SY 118 3213.0506 Barrier Free Ramp, Type P-1 32 13 20 EA 2 3213.0404 9" Concrete Driveway 32 13 20 SF 655 3217.4303 Remove 8" Pvmt Markinq 32 17 23 LF 137 3217.4307 Remove Raised Marker 32 17 23 EA 7 3217.0101 6" SLID Pvmt Markinq HAS (W) 32 17 23 LF 267 3217.0401 18" SLD Pvmt Markinq HAE (W) 32 17 23 LF 64 3217.1002 Lane Leqend Arrow 32 17 23 EA 2 3217.1004 Lane Leqend OnlV 32 17 23 EA 1 3217.2104 REFL Raised Marker TY II-C-R 32 17 23 EA 12 3291.0100 Topsoil 3291 19 CY 20 3292.0100 Block Sod Placement 3292 13 SY 115 3471.0001 Traffic Control 3471 13 MO 1 3211.0400 Hydrated Lime 3211 29 TN 2.13 TOTAL UNIT III: PAVING IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 Bidder's Proposal Unit Price I Bid Value $5.10 $2,279.70 $62.00 $2,480.00 $5.00 $1,500.00 $46.00 $5,428.00 $26.00 $3,068.00 $75.00 $8,850.00 $2,000.00 $4,000.00 $16.00 $10,480.00 $10.00 $1,370.00 $20.00 $140.00 $3.50 $934.50 $10.00 $640.00 $240.00 $480.00 $260.00 $260.00 $7.00 $84.00 $85.00 $1,700.00 $8.00 $920.00 $6,500.00 $6,500.00 $450.00 $958.50 $52,072.70 00 42 43 Bid Proposal DAP 77302.00.xlsx UNIT PRICE BID Bidlist Item No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information Description 3341.0602 60" RCP, Class III 3341.0103 18" RCP, Class III JCTBOX(COMPL)(PJB)(8FTX8FT) REMOVING CONC (HEADWALL) HEADWALL (CH - PW - 0) (DIA= 60 IN) 3305.0109 Trench Safety 3305.0203 Imported Embedment/Backfill, CLSM 3137.0101 Concrete Riprap Specification Section No. UNIT IV: STORM 3341 10 3341 10 0465 6012 0104 6031 0466 6105 3305 10 3305 10 31 3700 00 42 43 DAP - BID PROPOSAL Page 4 of 5 Bidder's Application Bidder's Proposal Unit of I Bid Unit Price Measure Quantity LF 321 $426.06 LF 5 $76.26 EA 1 $26,195.00 SY 1 $3,154.00 EA 1 $17,047.00 LF 321 $1.50 CY 19 $500.00 SY 213 $64.00 TOTAL UNIT IV: STORM IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 Bid Value $136,765.26 1 $381.30 1 $26,195.00 1 $3,154.00 1 $17,047.00 1 $481.50 1 $9,500.00 1 $13,632.00 1 $207,156.061 00 42 43 Bid Proposal DAP 77302.00.xlsx UNIT PRICE BID SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information 00 42 43 DAP - BID PROPOSAL Page 5 of 5 Bidder's Application Bidlist Item Description Specification I Unit of I Bid No. Section No. Measure Quantity Bid Summary UNIT I: WATER IMPROVEMENTS UNIT ll: SANITARY SEWER IMPROVEMENTS UNIT III: PAVING IMPROVEMENTS UNIT IV: STORM IMPROVEMENTS This Bid is submitted by the entity named below: BIDDER: Reliable Paving Inc 1903 N Peyco Dr Arlington, TX 76001 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. Total Construction Bid BY: Reliable Paving Inc &ara 6'arrarr TITLE: President of Construction DATE: 11.01.2023 END OF SECTION Bidder's Proposal Unit Price I Bid Value $76,206.04 $5,850.00 $52,072.70 $207,156.06 $341,284.80 160 working days after the date when the CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 00 42 43_Bid Proposal DAP 77302.00.xlsx DO 45 12 DAP PREQUALIFICATION STATEMENT Page 1 of 1 SECTION 00 45 12 DAP — PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Maior Work Type" box provide the complete major work type and actual description as provided by the Water Department fbr water and sewer and TPW for paving. Major Work Type Water New Development — Water Distribution, Development, 8" diameter & Smaller Sewer Collection System, Development, 8" Diameter & Smaller Stonn Improvements — Not Required Concrete Paving — Hand Pour — Not Required Contractor/Subcontractor Company Name Trophy Construction Services, LLC Prequalification Expiration Date 04.30.2024 The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: RELIABLE PAVING, INC. 1903 PEYCO DR. N. ARLINGTON, TX 76001 BY: Charles M. Long G-41 A g - SI nature) TITLE: Owner DATE: 12.01.2023 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT— DEVELOPER AWARDED PROIECTS 00 45 12 Prequalification Statement 2015 DAP Form Version September 1, 2015 00 45 26 - 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No.104654. Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: Reliable Paving, Inc. Company 1903 Pevco Drive North Address Arlington. TX 76001 City/State/Zip THE STATE OF TEXAS § COUNTY OF TARRANT § By: CA a ,v-lM /►-) L (7-plff (Please Print) V Signature: w Title: Q w)1 v- (Please Print) BEFTE MEj the and signed authority, on this day personally appeared Cvt A , `h z� known to me to be the person whose name is subscribed to the foregoing in e�t, and ackn edged to me thaQ_q she executed the same as the act and deed of �L/r4(r� y Adt .� c for the purposes and consideration therein expressed and in the capacity therelAtated. GIVEN MY HAND AND SEAL OF OFFICE this day of 20Z,3 WILLIAM PADMORE, JR. My Notary ID # 11730754 Expires September 7, 2027 Notary Pu in and for the State of Texas END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised April 2, 2014 The Business Park at Trinity City Project No. 104654 005243-1 Developer Awarded Project Agreement Page 1 of 4 1 SECTION 00 52 43 2 AGREEMENT 3 4 THIS AGREEMENT, authorized on 12.07.2023 is made by and between the Developer, The 5 Business Park at Trinitv. LLC. authorized to do business in Texas ("Developer") , and Reliable 6 Paviniz, Inc. , authorized to do business in Texas, acting by and through its duly authorized 7 representative, ("Contractor"). 8 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree 9 as follows: 10 Article 1. WORK 11 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 12 Project identified herein. 13 Article 2. PROJECT 14 The project for which the Work under the Contract Documents may be the whole or only a part 15 is generally described as follows: 16 The Business Park at Trinitv 17 City Proiect No. 104654 18 Article 3. CONTRACT TIME 19 3.1 Time is of the essence. 20 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 21 Documents are of the essence to this Contract. 22 3.2 Final Acceptance. 23 The Work will be complete for Final Acceptance within 160 working days after the date 24 when the Contract Time commences to run as provided in Paragraph 12.04 of the 25 Standard City Conditions of the Construction Contract for Developer Awarded Projects. 26 3.3 Liquidated damages 27 Contractor recognizes that time is of the essence of this Agreement and that Developer 28 will suffer financial loss if the Work is not completed within the times specified in 29 Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 30 of the Standard City Conditions of the Construction Contract for Developer Awarded 31 Projects. The Contractor also recognizes the delays, expense and difficulties involved in 32 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not 33 completed on time. Accordingly, instead of requiring any such proof , Contractor agrees 34 that as liquidated damages for delay (but not as a penalty), Contractor shall pay 35 Developer Two Hundred Fiftv Dollars ($250.00) for each day that expires after the time 36 specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of 37 Acceptance. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised June 16, 2016 005243-2 Developer Awarded Project Agreement Page 2 of 4 38 Article 4. CONTRACT PRICE 39 Developer agrees to pay Contractor for performance of the Work in accordance with the 40 Contract Documents an amount in current funds of Three Hundred Fortv-One Thousand Two 41 Hundred Eighty -Four Dollars and Eighty Cents ($ 341,284.80). 42 Article 5. CONTRACT DOCUMENTS 43 5.1 CONTENTS: 44 A. The Contract Documents which comprise the entire agreement between Developer 45 and Contractor concerning the Work consist of the following: 46 1. This Agreement. 47 2. Attachments to this Agreement: 48 a. Bid Form (As provided by Developer) 49 1) Proposal Form (DAP Version) 50 2) Prequalification Statement 51 3) State and Federal documents (project specific) 52 b. Insurance ACORD Form(s) 53 c. Payment Bond (DAP Version) 54 d. Performance Bond (DAP Version) 55 e. Maintenance Bond (DAP Version) 56 f. Power of Attorney for the Bonds 57 g. Worker's Compensation Affidavit 58 h. MBE and/or SBE Commitment Form (If required) 59 3. Standard City General Conditions of the Construction Contract for Developer 60 Awarded Projects. 61 4. Supplementary Conditions. 62 5. Specifications specifically made a part of the Contract Documents by attachment 63 or, if not attached, as incorporated by reference and described in the Table of 64 Contents of the Project's Contract Documents. 65 6. Drawings. 66 7. Addenda. 67 8. Documentation submitted by Contractor prior to Notice of Award. 68 9. The following which may be delivered or issued after the Effective Date of the 69 Agreement and, if issued, become an incorporated part of the Contract 70 Documents: 71 a. Notice to Proceed. 72 b. Field Orders. 73 c. Change Orders. 74 d. Letter of Final Acceptance. 75 CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised June 16, 2016 005243-3 Developer Awarded Project Agreement Page 3 of 4 76 Article 6. INDEMNIFICATION 77 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 78 expense, the city, its officers, servants and employees, from and against any and all 79 claims arising out of, or alleged to arise out of, the work and services to be performed by 80 the contractor, its officers, agents, employees, subcontractors, licenses or invitees under 81 this contract. This indemnification provision is specifically intended to operate and be 82 effective even if it is alleged or proven that all or some of the damages being sought 83 were caused, in whole or in part, by anv act, omission or negligence of the city. This 84 indemnity provision is intended to include, without limitation, indemnity for costs, 85 expenses and legal fees incurred by the city in defending against such claims and causes 86 of actions. 87 88 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 89 the city, its officers, servants and employees, from and against any and all loss, damage 90 or destruction of property of the city, arising out of, or alleged to arise out of, the work 91 and services to be performed by the contractor, its officers, agents, employees, 92 subcontractors, licensees or invitees under this contract. This indemnification provision 93 is specifically intended to operate and be effective even if it is alleged or proven that all 94 or some of the damages being sought were caused, in whole or in part, by anv act, 95 omission or negligence of the city. 96 97 Article 7. MISCELLANEOUS 98 7.1 Terms. 99 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of 100 the Construction Contract for Developer Awarded Projects. 101 7.2 Assignment of Contract. 102 This Agreement, including all of the Contract Documents may not be assigned by the 103 Contractor without the advanced express written consent of the Developer. 104 7.3 Successors and Assigns. 105 Developer and Contractor each binds itself, its partners, successors, assigns and legal 106 representatives to the other party hereto, in respect to all covenants, agreements and 107 obligations contained in the Contract Documents. 108 7.4 Severability. 109 Any provision or part of the Contract Documents held to be unconstitutional, void or 110 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 111 remaining provisions shall continue to be valid and binding upon DEVELOPER and 112 CONTRACTOR. 113 7.5 Governing Law and Venue. 114 This Agreement, including all of the Contract Documents is performable in the State of Texas. 115 Venue shall be Tarrant County, Texas, or the United States District Court for the Northern 116 District of Texas, Fort Worth Division. 117 CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised June 16, 2016 OD5243-4 Developer Awarded Project Agreement Page 4of4 118 7.6 Authority to Sign. 119 Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized 120 signatory of the Contractor. 121 122 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple 123 counterparts. 124 125 This Agreement is effective as of the last date signed by the Parties ("Effective Date"). Contractor: Developer: RELIABLE PAVING, INC. THE BUSINESS PARK AT TRINITY, LLC By: By (Signa (Signature)' Charles M. Long (Printed Name) Title: Owner Company Name: Reliable Paving, Inc Address: 1903 Peyco Dr. N. Farooq Waziali (Printed Name) Title: Manager Company name: The Business Park at Trinity, LLC Address: 2667 Northhaven Road City/State/Zip: Arlington, TX 76001 City/State/Zip: Dallas, TX 75229 09/22/2023 Date Date 11 126 CITY OF FORT WORTH The Business Park or TfInify STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Proj,-Ct AID. 104654 Revised June 16, 2416 CNAChanges - Notice of Cancellation or Material Restriction Endorsement This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART EMPLOYEE BENEFITS LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART OWNERS AND CONTRACTORS PROTECTIVE LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART STOP GAP LIABILITY COVERAGE PART TECHNOLOGY ERRORS AND OMISSIONS LIABILITY COVERAGE PART SPECIAL PROTECTIVE AND HIGHWAY LIABILITY POLICY — NEW YORK DEPARTMENT OF TRANSPORTATION SCHEDULE Number of days notice (other than for nonpayment of premium): Number of days notice for nonpayment of premium: Name of person or organization to whom notice will be sent: Address: PER SCHEDULE ON FILE TX 76001 030 N/A PER SCHEDULE ON FILE If no entry appears above, the number of days notice for nonpayment of premium will be 10 days. It is understood and agreed that in the event of cancellation or any material restrictions in coverage during the policy period, the Insurer also agrees to mail prior written notice of cancellation or material restriction to the person or organization listed in the above Schedule. Such notice will be sent prior to such cancellation in the manner prescribed in the above Schedule. All other terms and conditions of the Policy remain unchanged. This endorsement, which forms a part of and is for attachment to the Policy issued by the designated Insurers, takes effect on the effective date of said Policy at the hour stated in said Policy, unless another effective date is shown below, and expires concurrently with said Policy. CNA74702XX (1-15) Page 1 of 1 Policy No: 7039382018 Endorsement No: Effective Date: 07/02/2023 Insured Name: RELIABLE PAVING INC Copyright CNA All Rights Reserved. Blanket Additional Insured - Owners, Lessees or Cw NA Contractors -with Products -Completed Operations Coverage Endorsement This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART It is understood and agreed as follows: I. WHO IS AN INSURED is amended to include as an Insured any person or organization whom you are required by written contract to add as an additional insured on this coverage part, but only with respect to liability for bodily injury, property damage or personal and advertising injury caused in whole or in part by your acts or omissions, or the acts or omissions of those acting on your behalf: A. in the performance of your ongoing operations subject to such written contract; or B. in the performance of your work subject to such written contract, but only with respect to bodily injury or property damage included in the products -completed operations hazard, and only if: 1. the written contract requires you to provide the additional insured such coverage; and 2. this coverage part provides such coverage. II. But if the written contract requires: A. additional insured coverage under the 11-85 edition, 10-93 edition, or 10-01 edition of CG2010, or under the 10-01 edition of CG2037; or B. additional insured coverage with "arising out of language; or C. additional insured coverage to the greatest extent permissible by law; then paragraph I. above is deleted in its entirety and replaced by the following: WHO IS AN INSURED is amended to include as an Insured any person or organization whom you are required by written contract to add as an additional insured on this coverage part, but only with respect to liability for bodily injury, property damage or personal and advertising injury arising out of your work that is subject to such written contract. III. Subject always to the terms and conditions of this policy, including the limits of insurance, the Insurer will not provide such additional insured with: A. coverage broader than required by the written contract; or B. a higher limit of insurance than required by the written contract. IV. The insurance granted by this endorsement to the additional insured does not apply to bodily injury, property damage, or personal and advertising injury arising out of: A. the rendering of, or the failure to render, any professional architectural, engineering, or surveying services, including: 1. the preparing, approving, or failing to prepare or approve maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; and 2. supervisory, inspection, architectural or engineering activities; or B. any premises or work for which the additional insured is specifically listed as an additional insured on another endorsement attached to this coverage part. V. Under COMMERCIAL GENERAL LIABILITY CONDITIONS, the Condition entitled Other Insurance is amended to add the following, which supersedes any provision to the contrary in this Condition or elsewhere in this coverage part: Primary and Noncontributory Insurance CNA75079XX (10-16) Policy No: 7039382018 Page 1 of 2 Endorsement No: 07/02/2023 Continental Casualty Company Effective Date: Insured Name: RELIABLE PAVING, INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. Blanket Additional Insured - Owners, Lessees or Cw NA Contractors -with Products -Completed Operations Coverage Endorsement With respect to other insurance available to the additional insured under which the additional insured is a named insured, this insurance is primary to and will not seek contribution from such other insurance, provided that a written contract requires the insurance provided by this policy to be: 1. primary and non-contributing with other insurance available to the additional insured; or 2. primary and to not seek contribution from any other insurance available to the additional insured. But except as specified above, this insurance will be excess of all other insurance available to the additional insured. VI. Solely with respect to the insurance granted by this endorsement, the section entitled COMMERCIAL GENERAL LIABILITY CONDITIONS is amended as follows: The Condition entitled Duties In The Event of Occurrence, Offense, Claim or Suit is amended with the addition of the following: Any additional insured pursuant to this endorsement will as soon as practicable: 1. give the Insurer written notice of any claim, or any occurrence or offense which may result in a claim; 2. send the Insurer copies of all legal papers received, and otherwise cooperate with the Insurer in the investigation, defense, or settlement of the claim; and 3. make available any other insurance, and tender the defense and indemnity of any claim to any other insurer or self -insurer, whose policy or program applies to a loss that the Insurer covers under this coverage part. However, if the written contract requires this insurance to be primary and non-contributory, this paragraph 3. does not apply to insurance on which the additional insured is a named insured. The Insurer has no duty to defend or indemnify an additional insured under this endorsement until the Insurer receives written notice of a claim from the additional insured. VII. Solely with respect to the insurance granted by this endorsement, the section entitled DEFINITIONS is amended to add the following definition: Written contract means a written contract or written agreement that requires you to make a person or organization an additional insured on this coverage part, provided the contract or agreement: A. is currently in effect or becomes effective during the term of this policy; and B. was executed prior to: 1. the bodily injury or property damage; or 2. the offense that caused the personal and advertising injury; for which the additional insured seeks coverage. Any coverage granted by this endorsement shall apply solely to the extent permissible by law. All other terms and conditions of the Policy remain unchanged. This endorsement, which forms a part of and is for attachment to the Policy issued by the designated Insurers, takes effect on the effective date of said Policy at the hour stated in said Policy, unless another effective date is shown below, and expires concurrently with said Policy. CNA75079XX (10-16) Page 2 of 2 Continental Casualty Company Insured Name: RELIABLE PAVING, INC. Copyright CNA All Rights Reserved. Policy No: 7039382018 Endorsement No: 07/02/2023 Effective Date: Includes copyrighted material of Insurance Services Office, Inc., with its permission. Contractors' General Liability Extension Endorsement It is understood and agreed that this endorsement amends the COMMERCIAL GENERAL LIABILITY COVERAGE PART as follows. If any other endorsement attached to this policy amends any provision also amended by this endorsement, then that other endorsement controls with respect to such provision, and the changes made by this endorsement with respect to such provision do not apply. TABLE OF CONTENTS 1. Additional Insureds 2. Additional Insured - Primary And Non -Contributory To Additional Insured's Insurance 3. Bodily Injury— Expanded Definition 4. Broad Knowledge of Occurrence/ Notice of Occurrence 5. Broad Named Insured 6. Broadened Liability Coverage For Damage To Your Product And Your Work 7. Contractual Liability - Railroads 8. Electronic Data Liability 9. Estates, Legal Representatives and Spouses 10. Expected Or Intended Injury— Exception for Reasonable Force 11. General Aggregate Limits of Insurance — Per Project 12. In Rem Actions 13. Incidental Health Care Malpractice Coverage 14. Joint Ventures/Partnership/Limited Liability Companies 15. Legal Liability — Damage To Premises / Alienated Premises / Property In The Named Insured's Care, Custody or Control 16. Liquor Liability 17. Medical Payments 18. Non -owned Aircraft Coverage 19. Non -owned Watercraft 20. Personal And Advertising Injury — Discrimination or Humiliation 21. Personal And Advertising Injury - Contractual Liability 22. Property Damage - Elevators 23. Supplementary Payments 24. Unintentional Failure To Disclose Hazards 25. Waiver of Subrogation — Blanket 26. Wrap -Up Extension: OCIP CCIP, or Consolidated (Wrap -Up) Insurance Programs CNA74705XX (1-15) Page Policy No: 7039382018 Endorsement No: Effective Date: 07/02/2023 Insured Name: RELIABLE PAVING, INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA Contractors' General Liability Extension Endorsement 1. ADDITIONAL INSUREDS a. WHO IS AN INSURED is amended to include as an Insured any person or organization described in paragraphs A. through H. below whom a Named Insured is required to add as an additional insured on this Coverage Part under a written contract or written agreement, provided such contract or agreement: (1) is currently in effect or becomes effective during the term of this Coverage Part; and (2) was executed prior to: (a) the bodily injury or property damage; or (b) the offense that caused the personal and advertising injury, for which such additional insured seeks coverage. b. However, subject always to the terms and conditions of this policy, including the limits of insurance, the Insurer will not provide such additional insured with: (1) a higher limit of insurance than required by such contract or agreement; or (2) coverage broader than required by such contract or agreement, and in no event broader than that described by the applicable paragraph A. through H. below. Any coverage granted by this endorsement shall apply only to the extent permissible by law. A. Controlling Interest Any person or organization with a controlling interest in a Named Insured, but only with respect to such person or organization's liability for bodily injury, property damage or personal and advertising injury arising out of: 1. such person or organization's financial control of a Named Insured; or 2. premises such person or organization owns, maintains or controls while a Named Insured leases or occupies such premises; provided that the coverage granted by this paragraph does not apply to structural alterations, new construction or demolition operations performed by, on behalf of, or for such additional insured. B. Co-owner of Insured Premises A co-owner of a premises co -owned by a Named Insured and covered under this insurance but only with respect to such co -owner's liability for bodily injury, property damage or personal and advertising injury as co-owner of such premises. C. Lessor of Equipment Any person or organization from whom a Named Insured leases equipment, but only with respect to liability for bodily injury, property damage or personal and advertising injury caused, in whole or in part, by the Named Insured's maintenance, operation or use of such equipment, provided that the occurrence giving rise to such bodily injury, property damage or the offense giving rise to such personal and advertising injury takes place prior to the termination of such lease. D. Lessor of Land Any person or organization from whom a Named Insured leases land but only with respect to liability for bodily injury, property damage or personal and advertising injury arising out of the ownership, maintenance or use of such land, provided that the occurrence giving rise to such bodily injury, property damage or the offense giving rise to such personal and advertising injury takes place prior to the termination of such lease. The coverage granted by this paragraph does not apply to structural alterations, new construction or demolition operations performed by, on behalf of, or for such additional insured. E. Lessor of Premises An owner or lessor of premises leased to the Named Insured, or such owner or lessor's real estate manager, but only with respect to liability for bodily injury, property damage or personal and advertising injury arising out CNA74705XX (1-15) Page Policy No: 7039382018 Endorsement No: Effective Date: 07/02/2023 Insured Name: RELIABLE PAVING, INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA Contractors' General Liability Extension Endorsement of the ownership, maintenance or use of such part of the premises leased to the Named Insured, and provided that the occurrence giving rise to such bodily injury or property damage, or the offense giving rise to such personal and advertising injury, takes place prior to the termination of such lease. The coverage granted by this paragraph does not apply to structural alterations, new construction or demolition operations performed by, on behalf of, or for such additional insured. F. Mortgagee, Assignee or Receiver A mortgagee, assignee or receiver of premises but only with respect to such mortgagee, assignee or receiver's liability for bodily injury, property damage or personal and advertising injury arising out of the Named Insured's ownership, maintenance, or use of a premises by a Named Insured. The coverage granted by this paragraph does not apply to structural alterations, new construction or demolition operations performed by, on behalf of, or for such additional insured. G. State or Governmental Agency or Subdivision or Political Subdivisions — Permits A state or governmental agency or subdivision or political subdivision that has issued a permit or authorization but only with respect to such state or governmental agency or subdivision or political subdivision's liability for bodily injury, property damage or personal and advertising injury arising out of: 1. the following hazards in connection with premises a Named Insured owns, rents, or controls and to which this insurance applies: a. the existence, maintenance, repair, construction, erection, or removal of advertising signs, awnings, canopies, cellar entrances, coal holes, driveways, manholes, marquees, hoistaway openings, sidewalk vaults, street banners, or decorations and similar exposures; or b. the construction, erection, or removal of elevators; or c. the ownership, maintenance or use of any elevators covered by this insurance; or 2. the permitted or authorized operations performed by a Named Insured or on a Named Insured's behalf. The coverage granted by this paragraph does not apply to: a. Bodily injury, property damage or personal and advertising injury arising out of operations performed for the state or governmental agency or subdivision or political subdivision; or b. Bodily injury or property damage included within the products -completed operations hazard. With respect to this provision's requirement that additional insured status must be requested under a written contract or agreement, the Insurer will treat as a written contract any governmental permit that requires the Named Insured to add the governmental entity as an additional insured. H. Trade Show Event Lessor 1. With respect to a Named Insured's participation in a trade show event as an exhibitor, presenter or displayer, any person or organization whom the Named Insured is required to include as an additional insured, but only with respect to such person or organization's liability for bodily injury, property damage or personal and advertising injury caused by: a. the Named Insured's acts or omissions; or b. the acts or omissions of those acting on the Named Insured's behalf, in the performance of the Named Insured's ongoing operations at the trade show event premises during the trade show event. 2. The coverage granted by this paragraph does not apply to bodily injury or property damage included within the products -completed operations hazard. 2. ADDITIONAL INSURED -PRIMARY AND NON-CONTRIBUTORY TO ADDITIONAL INSURED'S INSURANCE The Other Insurance Condition in the COMMERCIAL GENERAL LIABILITY CONDITIONS Section is amended to add the following paragraph: CNA74705XX (1-15) Policy No: 7039382018 Page Endorsement No: Effective Date: 07/02/2023 Insured Name: RELIABLE PAVING, INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA Contractors' General Liability Extension Endorsement If the Named Insured has agreed in writing in a contract or agreement that this insurance is primary and non- contributory relative to an additional insured's own insurance, then this insurance is primary, and the Insurer will not seek contribution from that other insurance. For the purpose of this Provision 2., the additional insured's own insurance means insurance on which the additional insured is a named insured. Otherwise, and notwithstanding anything to the contrary elsewhere in this Condition, the insurance provided to such person or organization is excess of any other insurance available to such person or organization. 3. BODILY INJURY— EXPANDED DEFINITION Under DEFINITIONS, the definition of bodily injury is deleted and replaced by the following: Bodily injury means physical injury, sickness or disease sustained by a person, including death, humiliation, shock, mental anguish or mental injury sustained by that person at any time which results as a consequence of the physical injury, sickness or disease. 4. BROAD KNOWLEDGE OF OCCURRENCE/ NOTICE OF OCCURRENCE Under CONDITIONS, the condition entitled Duties in The Event of Occurrence, Offense, Claim or Suit is amended to add the following provisions: A. BROAD KNOWLEDGE OF OCCURRENCE The Named Insured must give the Insurer or the Insurer's authorized representative notice of an occurrence, offense or claim only when the occurrence, offense or claim is known to a natural person Named Insured, to a partner, executive officer, manager or member of a Named Insured, or an employee designated by any of the above to give such notice. B. NOTICE OF OCCURRENCE The Named Insured's rights under this Coverage Part will not be prejudiced if the Named Insured fails to give the Insurer notice of an occurrence, offense or claim and that failure is solely due to the Named Insured's reasonable belief that the bodily injury or property damage is not covered under this Coverage Part. However, the Named Insured shall give written notice of such occurrence, offense or claim to the Insurer as soon as the Named Insured is aware that this insurance may apply to such occurrence, offense or claim. 5. BROAD NAMED INSURED WHO IS AN INSURED is amended to delete its Paragraph 3. in its entirety and replace it with the following: 3. Pursuant to the limitations described in Paragraph 4. below, any organization in which a Named Insured has management control: a. on the effective date of this Coverage Part; or b. by reason of a Named Insured creating or acquiring the organization during the policy period, qualifies as a Named Insured, provided that there is no other similar liability insurance, whether primary, contributory, excess, contingent or otherwise, which provides coverage to such organization, or which would have provided coverage but for the exhaustion of its limit, and without regard to whether its coverage is broader or narrower than that provided by this insurance. But this BROAD NAMED INSURED provision does not apply to: (a) any partnership, limited liability company or joint venture; or (b) any organization for which coverage is excluded by another endorsement attached to this Coverage Part. For the purpose of this provision, management control means: A. owning interests representing more than 50% of the voting, appointment or designation power for the selection of a majority of the Board of Directors of a corporation; or B. having the right, pursuant to a written trust agreement, to protect, control the use of, encumber or transfer or sell property held by a trust. CNA74705XX (1-15) Page Policy No: 7039382018 Endorsement No: Effective Date: 07/02/2023 Insured Name:RELIABLE PAVING, INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA Contractors' General Liability Extension Endorsement 4. With respect to organizations which qualify as Named Insureds by virtue of Paragraph 3. above, this insurance does not apply to: a. bodily injury or property damage that first occurred prior to the date of management control, or that first occurs after management control ceases; nor b. personal or advertising injury caused by an offense that first occurred prior to the date of management control or that first occurs after management control ceases. 5. The insurance provided by this Coverage Part applies to Named Insureds when trading under their own names or under such other trading names or doing -business -as names (dba) as any Named Insured should choose to employ. 6. BROADENED LIABILITY COVERAGE FOR DAMAGE TO YOUR PRODUCT AND YOUR WORK A. Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended to delete exclusions k. and I. and replace them with the following: This insurance does not apply to: k. Damage to Your Product Property damage to your product arising out of it, or any part of it except when caused by or resulting from: (1) fire; (2) smoke; (3) collapse; or (4) explosion. I. Damage to Your Work Property damage to your work arising out of it, or any part of it and included in the products -completed operations hazard. This exclusion does not apply: (1) If the damaged work, or the work out of which the damage arises, was performed on the Named Insured's behalf by a subcontractor; or (2) If the cause of loss to the damaged work arises as a result of: (a) fire; (b) smoke; (c) collapse; or (d) explosion. B. The following paragraph is added to LIMITS OF INSURANCE: Subject to 5. above, $100,000 is the most the Insurer will pay under Coverage A for the sum of damages arising out of any one occurrence because of property damage to your product and your work that is caused by fire, smoke, collapse or explosion and is included within the product -completed operations hazard. This sublimit does not apply to property damage to your work if the damaged work, or the work out of which the damage arises, was performed on the Named Insured's behalf by a subcontractor. C. This Broadened Liability Coverage For Damage To Your Product And Your Work Provision does not apply if an endorsement of the same name is attached to this policy. 7. CONTRACTUAL LIABILITY — RAILROADS With respect to operations performed within 50 feet of railroad property, the definition of insured contract is replaced by the following: CNA74705XX (1-15) Page Policy No: 7039382018 Endorsement No: Effective Date: 07/02/2023 Insured Name: RELIABLE PAVING, INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA Contractors' General Liability Extension Endorsement Insured Contract means: a. A contract for a lease of premises. However, that portion of the contract for a lease of premises that indemnifies any person or organization for damage by fire to premises while rented to a Named Insured or temporarily occupied by a Named Insured with permission of the owner is not an insured contract; b. A sidetrack agreement; c. Any easement or license agreement; d. An obligation, as required by ordinance, to indemnify a municipality, except in connection with work for a municipality; e. An elevator maintenance agreement; f. That part of any other contract or agreement pertaining to the Named Insured's business (including an indemnification of a municipality in connection with work performed for a municipality) under which the Named Insured assumes the tort liability of another party to pay for bodily injury or property damage to a third person or organization. Tort liability means a liability that would be imposed by law in the absence of any contract or agreement. Paragraph f. does not include that part of any contract or agreement: (1) That indemnifies an architect, engineer or surveyor for injury or damage arising out of: (a) Preparing, approving or failing to prepare or approve maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or (b) Giving directions or instructions, or failing to give them, if that is the primary cause of the injury or damage; (2) Under which the Insured, if an architect, engineer or surveyor, assumes liability for an injury or damage arising out of the insured's rendering or failure to render professional services, including those listed in (1) above and supervisory, inspection, architectural or engineering activities. 8. ELECTRONIC DATA LIABILITY A. Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended to delete exclusion p. Electronic Data and replace it with the following: This insurance does not apply to: p. Access Or Disclosure Of Confidential Or Personal Information And Data -related Liability Damages arising out of: (1) any access to or disclosure of any person's or organization's confidential or personal information, including patents, trade secrets, processing methods, customer lists, financial information, credit card information, health information or any other type of nonpublic information; or (2) the loss of, loss of use of, damage to, corruption of, inability to access, or inability to manipulate electronic data that does not result from physical injury to tangible property. However, unless Paragraph (1) above applies, this exclusion does not apply to damages because of bodily injury. This exclusion applies even if damages are claimed for notification costs, credit monitoring expenses, forensic expenses, public relation expenses or any other loss, cost or expense incurred by the Named Insured or others arising out of that which is described in Paragraph (1) or (2) above. B. The following paragraph is added to LIMITS OF INSURANCE: Subject to 5. above, $100,000 is the most the Insurer will pay under Coverage A for all damages arising out of any one occurrence because of property damage that results from physical injury to tangible property and arises out of electronic data. C. The following definition is added to DEFINITIONS: CNA74705XX (1-15) Policy No: 7039382018 Page Endorsement No: Effective Date: 07/02/2023 Insured Name: RELIABLE PAVING, INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA Contractors' General Liability Extension Endorsement Electronic data means information, facts or programs stored as or on, created or used on, or transmitted to or from computer software (including systems and applications software), hard or floppy disks, CD-ROMS, tapes, drives, cells, data processing devices or any other media which are used with electronically controlled equipment. D. For the purpose of the coverage provided by this ELECTRONIC DATA LIABILITY Provision, the definition of property damage in DEFINITIONS is replaced by the following: Property damage means: a. Physical injury to tangible property, including all resulting loss of use of that property. All such loss of use shall be deemed to occur at the time of the physical injury that caused it; b. Loss of use of tangible property that is not physically injured. All such loss of use shall be deemed to occur at the time of the occurrence that caused it; or c. Loss of, loss of use of, damage to, corruption of, inability to access, or inability to properly manipulate electronic data, resulting from physical injury to tangible property. All such loss of electronic data shall be deemed to occur at the time of the occurrence that caused it. For the purposes of this insurance, electronic data is not tangible property. E. If Electronic Data Liability is provided at a higher limit by another endorsement attached to this policy, then the $100,000 limit provided by this ELECTRONIC DATA LIABILITY Provision is part of, and not in addition to, that higher limit. 9. ESTATES, LEGAL REPRESENTATIVES, AND SPOUSES The estates, heirs, legal representatives and spouses of any natural person Insured shall also be insured under this policy; provided, however, coverage is afforded to such estates, heirs, legal representatives, and spouses only for claims arising solely out of their capacity or status as such and, in the case of a spouse, where such claim seeks damages from marital community property, jointly held property or property transferred from such natural person Insured to such spouse. No coverage is provided for any act, error or omission of an estate, heir, legal representative, or spouse outside the scope of such person's capacity or status as such, provided however that the spouse of a natural person Named Insured and the spouses of members or partners of joint venture or partnership Named Insureds are Insureds with respect to such spouses' acts, errors or omissions in the conduct of the Named Insured's business. 10. EXPECTED OR INTENDED INJURY — EXCEPTION FOR REASONABLE FORCE Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended to delete the exclusion entitled Expected or Intended Injury and replace it with the following: This insurance does not apply to: Expected or Intended Injury Bodily injury or property damage expected or intended from the standpoint of the Insured. This exclusion does not apply to bodily injury or property damage resulting from the use of reasonable force to protect persons or property. 11. GENERAL AGGREGATE LIMITS OF INSURANCE - PER PROJECT A. For each construction project away from premises the Named Insured owns or rents, a separate Construction Project General Aggregate Limit, equal to the amount of the General Aggregate Limit shown in the Declarations, is the most the Insurer will pay for the sum of: 1. All damages under Coverage A, except damages because of bodily injury or property damage included in the products -completed operations hazard; and 2. All medical expenses under Coverage C, that arise from occurrences or accidents which can be attributed solely to ongoing operations at that construction project. Such payments shall not reduce the General Aggregate Limit shown in the Declarations, nor the Construction Project General Aggregate Limit of any other construction project. CNA74705XX (1-15) Page Policy No: 7039382018 Endorsement No: Effective Date: 07/02/2023 Insured Name: RELIABLE PAVING, INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA Contractors' General Liability Extension Endorsement B. All: 1. Damages under Coverage B, regardless of the number of locations or construction projects involved; 2. Damages under Coverage A, caused by occurrences which cannot be attributed solely to ongoing operations at a single construction project, except damages because of bodily injury or property damage included in the products -completed operations hazard; and 3. Medical expenses under Coverage C caused by accidents which cannot be attributed solely to ongoing operations at a single construction project, will reduce the General Aggregate Limit shown in the Declarations. C. The limits shown in the Declarations for Each Occurrence, for Damage To Premises Rented To You and for Medical Expense continue to apply, but will be subject to either the Construction Project General Aggregate Limit or the General Aggregate Limit shown in the Declarations, depending on whether the occurrence can be attributed solely to ongoing operations at a particular construction project. D. When coverage for liability arising out of the products -completed operations hazard is provided, any payments for damages because of bodily injury or property damage included in the products -completed operations hazard will reduce the Products -Completed Operations Aggregate Limit shown in the Declarations, regardless of the number of projects involved. E. If a single construction project away from premises owned by or rented to the Insured has been abandoned and then restarted, or if the authorized contracting parties deviate from plans, blueprints, designs, specifications or timetables, the project will still be deemed to be the same construction project. F. The provisions of LIMITS OF INSURANCE not otherwise modified by this endorsement shall continue to apply as stipulated. 12. IN REM ACTIONS A quasi in rem action against any vessel owned or operated by or for the Named Insured, or chartered by or for the Named Insured, will be treated in the same manner as though the action were in personam against the Named Insured. 13. INCIDENTAL HEALTH CARE MALPRACTICE COVERAGE Solely with respect to bodily injury that arises out of a health care incident: A. Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Insuring Agreement is amended to replace Paragraphs 1.b.(1) and 1.b.(2) with the following: b. This insurance applies to bodily injury provided that the professional health care services are incidental to the Named Insured's primary business purpose, and only if: (1) such bodily injury is caused by an occurrence that takes place in the coverage territory. (2) the bodily injury first occurs during the policy period. All bodily injury arising from an occurrence will be deemed to have occurred at the time of the first act, error, or omission that is part of the occurrence; and B. Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended to: i. add the following to the Employers Liability exclusion: This exclusion applies only if the bodily injury arising from a health care incident is covered by other liability insurance available to the Insured (or which would have been available but for exhaustion of its limits). ii. delete the exclusion entitled Contractual Liability and replace it with the following: This insurance does not apply to: Contractual Liability CNA74705XX (1-15) Policy No: 7039382018 Page Endorsement No: Effective Date: 07/02/2023 Insured Name: RELIABLE PAVING, INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA Contractors' General Liability Extension Endorsement the Insured's actual or alleged liability under any oral or written contract or agreement, including but not limited to express warranties or guarantees. iii. add the following additional exclusions: This insurance does not apply to: Discrimination any actual or alleged discrimination, humiliation or harassment, including but not limited to claims based on an individual's race, creed, color, age, gender, national origin, religion, disability, marital status or sexual orientation. Dishonesty or Crime Any actual or alleged dishonest, criminal or malicious act, error or omission. Medicare/Medicaid Fraud any actual or alleged violation of law with respect to Medicare, Medicaid, Tricare or any similar federal, state or local governmental program. Services Excluded by Endorsement Any health care incident for which coverage is excluded by endorsement. C. DEFINITIONS is amended to: i. add the following definitions: Health care incident means an act, error or omission by the Named Insured's employees or volunteer workers in the rendering of: a. professional health care services on behalf of the Named Insured or b. Good Samaritan services rendered in an emergency and for which no payment is demanded or received. Professional health care services means any health care services or the related furnishing of food, beverages, medical supplies or appliances by the following providers in their capacity as such but solely to the extent they are duly licensed as required: a. Physician; b. Nurse; c. Nurse practitioner; d. Emergency medical technician; e. Paramedic; f. Dentist; g. Physical therapist; h. Psychologist; L Speech therapist; j. Other allied health professional; or Professional health care services does not include any services rendered in connection with human clinical trials or product testing. ii. delete the definition of occurrence and replace it with the following: Occurrence means a health care incident. All acts, errors or omissions that are logically connected by any common fact, circumstance, situation, transaction, event, advice or decision will be considered to constitute a single occurrence; CNA74705XX (1-15) Page Policy No: 7039382018 Endorsement No: Effective Date: 07/02/2023 Insured Name: RELIABLE PAVING, INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA Contractors' General Liability Extension Endorsement iii. amend the definition of Insured to: a. add the following: • the Named Insured's employees are Insureds with respect to: (1) bodily injury to a co -employee while in the course of the co -employee's employment by the Named Insured or while performing duties related to the conduct of the Named Insured's business; and (2) bodily injury to a volunteer worker while performing duties related to the conduct of the Named Insured's business; when such bodily injury arises out of a health care incident. • the Named Insured's volunteer workers are Insureds with respect to: (1) bodily injury to a co -volunteer worker while performing duties related to the conduct of the Named Insured's business; and (2) bodily injury to an employee while in the course of the employee's employment by the Named Insured or while performing duties related to the conduct of the Named Insured's business; when such bodily injury arises out of a health care incident. b. delete Subparagraphs (a), (b), (c) and (d) of Paragraph 2.a.(1) of WHO IS AN INSURED. D. The Other Insurance condition is amended to delete Paragraph b.(1) in its entirety and replace it with the following: Other Insurance b. Excess Insurance (1) To the extent this insurance applies, it is excess over any other insurance, self insurance or risk transfer instrument, whether primary, excess, contingent or on any other basis, except for insurance purchased specifically by the Named Insured to be excess of this coverage. 14. JOINT VENTURES / PARTNERSHIP / LIMITED LIABILITY COMPANIES WHO IS AN INSURED is amended to delete its last paragraph and replace it with the following: No person or organization is an Insured with respect to the conduct of any current or past partnership, joint venture or limited liability company that is not shown as a Named Insured in the Declarations, except that if the Named Insured was a joint venturer, partner, or member of a limited liability company and such joint venture, partnership or limited liability company terminated prior to or during the policy period, such Named Insured is an Insured with respect to its interest in such joint venture, partnership or limited liability company but only to the extent that: a. any offense giving rise to personal and advertising injury occurred prior to such termination date, and the personal and advertising injury arising out of such offense first occurred after such termination date; b. the bodily injury or property damage first occurred after such termination date; and c. there is no other valid and collectible insurance purchased specifically to insure the partnership, joint venture or limited liability company; and If the joint venture, partnership or limited liability company is or was insured under a consolidated (wrap-up) insurance program, then such insurance will always be considered valid and collectible for the purpose of paragraph c. above. But this provision will not serve to exclude bodily injury, property damage or personal and advertising injury that would otherwise be covered under the Contractors General Liability Extension Endorsement provision entitled WRAP-UP EXTENSION: OCIP, CCIP, OR CONSOLIDATED (WRAP-UP) INSURANCE PROGRAMS. Please see that provision for the definition of consolidated (wrap-up) insurance program. 15. LEGAL LIABILITY — DAMAGE TO PREMISES / ALIENATED PREMISES / PROPERTY IN THE NAMED INSURED'S CARE, CUSTODY OR CONTROL CNA74705XX (1-15) Page Policy No: 7039382018 Endorsement No: Effective Date: 07/02/2023 Insured Name: RELIABLE PAVING, INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA Contractors' General Liability Extension Endorsement A. Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended to delete exclusion j. Damage to Property in its entirety and replace it with the following: This insurance does not apply to: j. Damage to Property Property damage to: (1) Property the Named Insured owns, rents, or occupies, including any costs or expenses incurred by you, or any other person, organization or entity, for repair, replacement, enhancement, restoration or maintenance of such property for any reason, including prevention of injury to a person or damage to another's property; (2) Premises the Named Insured sells, gives away or abandons, if the property damage arises out of any part of those premises; (3) Property loaned to the Named Insured; (4) Personal property in the care, custody or control of the Insured; (5) That particular part of real property on which the Named Insured or any contractors or subcontractors working directly or indirectly on the Named Insured's behalf are performing operations, if the property damage arises out of those operations; or (6) That particular part of any property that must be restored, repaired or replaced because your work was incorrectly performed on it. Paragraphs (1), (3) and (4) of this exclusion do not apply to property damage (other than damage by fire) to premises rented to the Named Insured or temporarily occupied by the Named Insured with the permission of the owner, nor to the contents of premises rented to the Named Insured for a period of 7 or fewer consecutive days. A separate limit of insurance applies to Damage To Premises Rented To You as described in LIMITS OF INSURANCE. Paragraph (2) of this exclusion does not apply if the premises are your work. Paragraphs (3), (4), (5) and (6) of this exclusion do not apply to liability assumed under a sidetrack agreement. Paragraph (6) of this exclusion does not apply to property damage included in the products -completed operations hazard. Paragraphs (3) and (4) of this exclusion do not apply to property damage to: L tools, or equipment the Named Insured borrows from others, nor ii. other personal property of others in the Named Insured's care, custody or control while being used in the Named Insured's operations away from any Named Insured's premises. However, the coverage granted by this exception to Paragraphs (3) and (4) does not apply to: a. property at a job site awaiting or during such property's installation, fabrication, or erection; b. property that is mobile equipment leased by an Insured; c. property that is an auto, aircraft or watercraft; d. property in transit; or e. any portion of property damage for which the Insured has available other valid and collectible insurance, or would have such insurance but for exhaustion of its limits, or but for application of one of its exclusions. A separate limit of insurance and deductible apply to such property of others. See LIMITS OF INSURANCE as amended below. CNA74705XX (1-15) Page Policy No: 7039382018 Endorsement No: Effective Date: 07/02/2023 Insured Name: RELIABLE PAVING, INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA Contractors' General Liability Extension Endorsement B. Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended to delete its last paragraph and replace it with the following: Exclusions c. through n. do not apply to damage by fire to premises while rented to a Named Insured or temporarily occupied by a Named Insured with permission of the owner, nor to damage to the contents of premises rented to a Named Insured for a period of 7 or fewer consecutive days. A separate limit of insurance applies to this coverage as described in LIMITS OF INSURANCE. C. The following paragraph is added to LIMITS OF INSURANCE: Subject to 5. above, $25,000 is the most the Insurer will pay under Coverage A for damages arising out of any one occurrence because of the sum of all property damage to borrowed tools or equipment, and to other personal property of others in the Named Insured's care, custody or control, while being used in the Named Insured's operations away from any Named Insured's premises. The Insurer's obligation to pay such property damage does not apply until the amount of such property damage exceeds $1,000. The Insurer has the right but not the duty to pay any portion of this $1,000 in order to effect settlement. If the Insurer exercises that right, the Named Insured will promptly reimburse the Insurer for any such amount. D. Paragraph 6., Damage To Premises Rented To You Limit, of LIMITS OF INSURANCE is deleted and replaced by the following: 6. Subject to Paragraph 5. above, (the Each Occurrence Limit), the Damage To Premises Rented To You Limit is the most the Insurer will pay under Coverage A for damages because of property damage to any one premises while rented to the Named Insured or temporarily occupied by the Named Insured with the permission of the owner, including contents of such premises rented to the Named Insured for a period of 7 or fewer consecutive days. The Damage To Premises Rented To You Limit is the greater of: a. $500,000; or b. The Damage To Premises Rented To You Limit shown in the Declarations. E. Paragraph 4.b.(1)(a)(ii) of the Other Insurance Condition is deleted and replaced by the following: (ii) That is property insurance for premises rented to the Named Insured, for premises temporarily occupied by the Named Insured with the permission of the owner; or for personal property of others in the Named Insured's care, custody or control; 16. LIQUOR LIABILITY Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended to delete the exclusion entitled Liquor Liability. This LIQUOR LIABILITY provision does not apply to any person or organization who otherwise qualifies as an additional insured on this Coverage Part. 17. MEDICAL PAYMENTS A. LIMITS OF INSURANCE is amended to delete Paragraph 7. (the Medical Expense Limit) and replace it with the following: 7. Subject to Paragraph 5. above (the Each Occurrence Limit), the Medical Expense Limit is the most the Insurer will pay under Coverage C — Medical Payments for all medical expenses because of bodily injury sustained by any one person. The Medical Expense Limit is the greater of: (1) $15,000 unless a different amount is shown here: $<insert ($) amount>; or (2) the amount shown in the Declarations for Medical Expense Limit. B. Under COVERAGES, the Insuring Agreement of Coverage C — Medical Payments is amended to replace Paragraph 1.a.(3)(b) with the following: (b) The expenses are incurred and reported to the Insurer within three years of the date of the accident; and CNA74705XX (1-15) Page Policy No: 7039382018 Endorsement No: Effective Date: 07/02/2023 Insured Name: RELIABLE PAVING, INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA Contractors' General Liability Extension Endorsement 18. NON -OWNED AIRCRAFT Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended as follows: The exclusion entitled Aircraft, Auto or Watercraft is amended to add the following: This exclusion does not apply to an aircraft not owned by any Named Insured, provided that: 1. the pilot in command holds a currently effective certificate issued by the duly constituted authority of the United States of America or Canada, designating that person as a commercial or airline transport pilot; 2. the aircraft is rented with a trained, paid crew to the Named Insured; and 3. the aircraft is not being used to carry persons or property for a charge. 19. NON -OWNED WATERCRAFT Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended to delete subparagraph (2) of the exclusion entitled Aircraft, Auto or Watercraft, and replace it with the following. This exclusion does not apply to: (2) a watercraft that is not owned by any Named Insured, provided the watercraft is: (a) less than 75 feet long; and (b) not being used to carry persons or property for a charge. 20. PERSONAL AND ADVERTISING INJURY —DISCRIMINATION OR HUMILIATION A. Under DEFINITIONS, the definition of personal and advertising injury is amended to add the following tort: • Discrimination or humiliation that results in injury to the feelings or reputation of a natural person. B. Under COVERAGES, Coverage B — Personal and Advertising Injury Liability, the paragraph entitled Exclusions is amended to: 1. delete the Exclusion entitled Knowing Violation Of Rights Of Another and replace it with the following: This insurance does not apply to: Knowing Violation of Rights of Another Personal and advertising injury caused by or at the direction of the Insured with the knowledge that the act would violate the rights of another and would inflict personal and advertising injury. This exclusion shall not apply to discrimination or humiliation that results in injury to the feelings or reputation of a natural person, but only if such discrimination or humiliation is not done intentionally by or at the direction of: (a) the Named Insured; or (b) any executive officer, director, stockholder, partner, member or manager (if the Named Insured is a limited liability company) of the Named Insured. 2. add the following exclusions: This insurance does not apply to: Employment Related Discrimination Discrimination or humiliation directly or indirectly related to the employment, prospective employment, past employment or termination of employment of any person by any Insured. Premises Related Discrimination discrimination or humiliation arising out of the sale, rental, lease or sub -lease or prospective sale, rental, lease or sub -lease of any room, dwelling or premises by or at the direction of any Insured. CNA74705XX (1-15) Page Policy No: 7038382018 Endorsement No: Effective Date: 07/02/2023 Insured Name: RELIABLE PAVING, INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA Contractors' General Liability Extension Endorsement Notwithstanding the above, there is no coverage for fines or penalties levied or imposed by a governmental entity because of discrimination. The coverage provided by this PERSONAL AND ADVERTISING INJURY —DISCRIMINATION OR HUMILIATION Provision does not apply to any person or organization whose status as an Insured derives solely from • Provision 1. ADDITIONAL INSURED of this endorsement; or • attachment of an additional insured endorsement to this Coverage Part. This PERSONAL AND ADVERTISING INJURY —DISCRIMINATION OR HUMILIATION Provision does not apply to any person or organization who otherwise qualifies as an additional insured on this Coverage Part. 21. PERSONAL AND ADVERTISING INJURY - CONTRACTUAL LIABILITY A. Under COVERAGES, Coverage B —Personal and Advertising Injury Liability, the paragraph entitled Exclusions is amended to delete the exclusion entitled Contractual Liability. B. Solely for the purpose of the coverage provided by this PERSONAL AND ADVERTISING INJURY - CONTRACTUAL LIABILITY provision, the following changes are made to the section entitled SUPPLEMENTARY PAYMENTS — COVERAGES A AND B: 1. Paragraph 2.d. is replaced by the following: d. The allegations in the suit and the information the Insurer knows about the offense alleged in such suit are such that no conflict appears to exist between the interests of the Insured and the interests of the indemnitee; 2. The first unnumbered paragraph beneath Paragraph 2.f.(2)(b) is deleted and replaced by the following: So long as the above conditions are met, attorneys fees incurred by the Insurer in the defense of that indemnitee, necessary litigation expenses incurred by the Insurer, and necessary litigation expenses incurred by the indemnitee at the Insurer's request will be paid as defense costs. Such payments will not be deemed to be damages for personal and advertising injury and will not reduce the limits of insurance. C. This PERSONAL AND ADVERTISING INJURY - CONTRACTUAL LIABILITY Provision does not apply if Coverage B —Personal and Advertising Injury Liability is excluded by another endorsement attached to this Coverage Part. This PERSONAL AND ADVERTISING INJURY - CONTRACTUAL LIABILITY Provision does not apply to any person or organization who otherwise qualifies as an additional insured on this Coverage Part. 22. PROPERTY DAMAGE —ELEVATORS A. Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended such that the Damage to Your Product Exclusion and subparagraphs (3), (4) and (6) of the Damage to Property Exclusion do not apply to property damage that results from the use of elevators. B. Solely for the purpose of the coverage provided by this PROPERTY DAMAGE — ELEVATORS Provision, the Other Insurance conditions is amended to add the following paragraph: This insurance is excess over any of the other insurance, whether primary, excess, contingent or on any other basis that is Property insurance covering property of others damaged from the use of elevators. 23. SUPPLEMENTARY PAYMENTS The section entitled SUPPLEMENTARY PAYMENTS — COVERAGES A AND B is amended as follows: A. Paragraph 1.b. is amended to delete the $250 limit shown for the cost of bail bonds and replace it with a $5,000. limit; and B. Paragraph 1.d. is amended to delete the limit of $250 shown for daily loss of earnings and replace it with a $1,000. limit. CNA74705XX (1-15) Page Policy No: 7039382018 Endorsement No: Effective Date: 07/02/2023 Insured Name: RELIABLE PAVING, INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA Contractors' General Liability Extension Endorsement 24. UNINTENTIONAL FAILURE TO DISCLOSE HAZARDS If the Named Insured unintentionally fails to disclose all existing hazards at the inception date of the Named Insured's Coverage Part, the Insurer will not deny coverage under this Coverage Part because of such failure. 25. WAIVER OF SUBROGATION - BLANKET Under CONDITIONS, the condition entitled Transfer Of Rights Of Recovery Against Others To Us is amended to add the following: The Insurer waives any right of recovery the Insurer may have against any person or organization because of payments the Insurer makes for injury or damage arising out of: 1. the Named Insured's ongoing operations; or 2. your work included in the products -completed operations hazard. However, this waiver applies only when the Named Insured has agreed in writing to waive such rights of recovery in a written contract or written agreement, and only if such contract or agreement: 1. is in effect or becomes effective during the term of this Coverage Part; and 2. was executed prior to the bodily injury, property damage or personal and advertising injury giving rise to the claim. 26. WRAP-UP EXTENSION: OCIP, CCIP, OR CONSOLIDATED (WRAP-UP) INSURANCE PROGRAMS Note: The following provision does not apply to any public construction project in the state of Oklahoma, nor to any construction project in the state of Alaska, that is not permitted to be insured under a consolidated (wrap-up) insurance program by applicable state statute or regulation. If the endorsement EXCLUSION — CONSTRUCTION WRAP-UP is attached to this policy, or another exclusionary endorsement pertaining to Owner Controlled Insurance Programs (O.C.I.P.) or Contractor Controlled Insurance Programs (C.C.I.P.) is attached, then the following changes apply: A. The following wording is added to the above -referenced endorsement: With respect to a consolidated (wrap-up) insurance program project in which the Named Insured is or was involved, this exclusion does not apply to those sums the Named Insured become legally obligated to pay as damages because of: Bodily injury, property damage, or personal or advertising injury that occurs during the Named Insured's ongoing operations at the project, or during such operations of anyone acting on the Named Insured's behalf; nor 2. Bodily injury or property damage included within the products -completed operations hazard that arises out of those portions of the project that are not residential structures. B. Condition 4. Other Insurance is amended to add the following subparagraph 4.b.(1)(c): This insurance is excess over: (c) Any of the other insurance whether primary, excess, contingent or any other basis that is insurance available to the Named Insured as a result of the Named Insured being a participant in a consolidated (wrap-up) insurance program, but only as respects the Named Insured's involvement in that consolidated (wrap-up) insurance program. C. DEFINITIONS is amended to add the following definitions: Consolidated (wrap-up) insurance program means a construction, erection or demolition project for which the prime contractor/project manager or owner of the construction project has secured general liability insurance covering some or all of the contractors or subcontractors involved in the project, such as an Owner Controlled Insurance Program (O.C.I.P.) or Contractor Controlled Insurance Program (C.C.I.P.). Residential structure means any structure where 30% or more of the square foot area is used or is intended to be used for human residency, including but not limited to: CNA74705XX (1-15) Page Policy No: 7039382018 Endorsement No: Effective Date: 07/02/2023 Insured Name: RELIABLE PAVING, INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA Contractors' General Liability Extension Endorsement 1. single or multifamily housing, apartments, condominiums, townhouses, co-operatives or planned unit developments; and 2. the common areas and structures appurtenant to the structures in paragraph 1. (including pools, hot tubs, detached garages, guest houses or any similar structures). However, when there is no individual ownership of units, residential structure does not include military housing, college/university housing or dormitories, long term care facilities, hotels or motels. Residential structure also does not include hospitals or prisons. This WRAP-UP EXTENSION: OCIP, CCIP, OR CONSOLIDATED (WRAP-UP) INSURANCE PROGRAMS Provision does not apply to any person or organization who otherwise qualifies as an additional insured on this Coverage Part. All other terms and conditions of the Policy remain unchanged. This endorsement, which forms a part of and is for attachment to the Policy issued by the designated Insurers, takes effect on the effective date of said Policy at the hour stated in said Policy, unless another effective date is shown below, and expires concurrently with said Policy. CNA74705XX (1-15) Page Policy No: 7039382018 Endorsement No: Effective Date: 07/02/2023 Insured Name: RELIABLE PAVING, INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA Contractors' General Liability Extension Endorsement CNA74705XX (1-15) Policy No: 7039382018 Page Endorsement No: Effective Date: 07/02/2023 Insured Name: RELIABLE PAVING, INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. 1 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. This endorsement modifies insurance provided underthe following: BUSINESS AUTO COVERAGE FORM I. LIABILITY COVERAGE A. Who Is An Insured The following is added to Section II, Paragraph A.1., Who Is An Insured: 1. a. Any incorporated entity of which the Named Insured owns a majority of the voting stock on the date of inception of this Coverage Form; provided that, b. The insurance afforded by this provision A.1. does not apply to any such entity that is an insured under any other liability "policy" providing auto coverage. 2. Any organization you newly acquire or form, other than a limited liability company, partnership or joint venture, and over which you maintain majority ownership interest. The insurance afforded by this provision A.2.: a. Is effective on the acquisition or formation date, and is afforded only until the end of the policy period of this Coverage Form, or the next anniversary of its inception date, whichever is earlier. b. Does not apply to: (1) Bodily injury or property damage caused by an accident that occurred before you acquired or formed the organization; or (2) Any such organization that is an insured under any other liability "policy" providing auto coverage. 3. Any person or organization that you are required by a written contract to name as an additional insured is an insured but only with respect to their legal liability for acts or omissions of a person, who qualifies as an insured under SECTION II — WHO IS AN INSURED and for whom Liability Coverage is afforded under this policy. If required by written contract, this insurance will be primary and non-contributory to insurance on which the additional insured is a Named Insured. 4. An employee of yours is an insured while operating an auto hired or rented under a contract or agreement in that employee's name, with your permission, while performing duties related to the conduct of your business. "Policy", as used in this provision A. Who Is An Insured, includes those policies that were in force on the inception date of this Coverage Form but: 1. Which are no longer in force; or 2. Whose limits have been exhausted. B. Bail Bonds and Loss of Earnings Section II, Paragraphs A.2. (2) and A.2. (4) are revised as follows: 1. In a.(2), the limit for the cost of bail bonds is changed from $2,000 to $5,000; and 2. In a.(4), the limit for the loss of earnings is changed from $250 to $500 a day. Form No: CNA63359XX (04-2012) Policy No: BUA 7039381998 Endorsement Effective Date: Endorsement Expiration Date: Policy Effective Date: 07/02/2023 Endorsement No:; Page: Policy Page: Underwriting Company: The Continental Insurance Company, 151 N Franklin St, Chicago, IL 60606 © Copyright CNA All Rights Reserved. Includes copyrighted material of the Insurance Services Office, Inc., used with its permission. C. Fellow Employee Section II, Paragraph B.5 does not apply. Such coverage as is afforded by this provision C. is excess over any other collectible insurance. II. PHYSICAL DAMAGE COVERAGE A. Glass Breakage — Hitting A Bird Or Animal — Failing Objects Or Missiles The following is added to Section III, Paragraph A.3.: With respect to any covered auto, any deductible shown in the Declarations will not apply to glass breakage if such glass is repaired, in a manner acceptable to us, rather than replaced. B. Transportation Expenses Section III, Paragraph A.4.a. is revised, with respect to transportation expense incurred by you, to provide: a. $60 per day, in lieu of $20; subject to b. $1,800 maximum, in lieu of $600. C. Loss of Use Expenses Section III, Paragraph A.4.b. is revised, with respect to loss of use expenses incurred by you, to provide: a. $1,000 maximum, in lieu of $600. D. Hired "Autos" The following is added to Section III. Paragraph A.: 1. Hired "Autos" If Physical Damage coverage is provided under this policy, and such coverage does not extend to Hired Autos, then Physical Damage coverage is extended to: a. Any covered auto you lease, hire, rent or borrow without a driver; and b. Any covered auto hired or rented by your employee without a driver, under a contract in that individual employee's name, with your permission, while performing duties related to the conduct of your business. c. The most we will pay for any one accident or loss is the actual cash value, cost of repair, cost of replacement or $75,000, whichever is less, minus a $500 deductible for each covered auto. No deductible applies to loss caused by fire or lightning. d. The physical damage coverage as is provided by this provision is equal to the physical damage coverage(s) provided on your owned autos. e. Such physical damage coverage for hired autos will: (1) Include loss of use, provided it is the consequence of an accident for which the Named Insured is legally liable, and as a result of which a monetary loss is sustained by the leasing or rental concern. (2) Such coverage as is provided by this provision will be subject to a limit of $750 per accident. E. Airbag Coverage The following is added to Section III, Paragraph B.3.: The accidental discharge of an airbag shall not be considered mechanical breakdown. Form No: CNA63359XX (04-2012) Policy No: BUA 7039381998 Endorsement Effective Date: Endorsement Expiration Date: Policy Effective Date: 07/02/2023 Endorsement No: ; Page: Policy Page: Underwriting Company: The Continental Insurance Company, 151 N Franklin St, Chicago, IL 60606 © Copyright CNA All Rights Reserved. Includes copyrighted material of the Insurance Services Office, Inc., used with its permission. F. Electronic Equipment Section III, Paragraphs B.4.c and B.4.d. are deleted and replaced by the following: c. Physical Damage Coverage on a covered auto also applies to loss to any permanently installed electronic equipment including its antennas and other accessories d. A $100 per occurrence deductible applies to the coverage provided by this provision. G. Diminution In Value The following is added to Section III, Paragraph B.6.: Subject to the following, the diminution in value exclusion does not apply to: a. Any covered auto of the private passenger type you lease, hire, rent or borrow, without a driver for a period of 30 days or less, while performing duties related to the conduct of your business; and b. Any covered auto of the private passenger type hired or rented by your employee without a driver for a period of 30 days or less, under a contract in that individual employee's name, with your permission, while performing duties related to the conduct of your business. c. Such coverage as is provided by this provision is limited to a diminution in value loss arising directly out of accidental damage and not as a result of the failure to make repairs; faulty or incomplete maintenance or repairs; or the installation of substandard parts. d. The most we will pay for loss to a covered auto in any one accident is the lesser of: (1) $5,000; or (2) 20% of the auto's actual cash value (ACV). III. Drive Other Car Coverage — Executive Officers The following is added to Sections II and III: 1. Any auto you don't own, hire or borrow is a covered auto for Liability Coverage while being used by, and for Physical Damage Coverage while in the care, custody or control of, any of your "executive officers", except: a. An auto owned by that "executive officer" or a member of that person's household; or b. An auto used by that "executive officer" while working in a business of selling, servicing, repairing or parking autos. Such Liability and/or Physical Damage Coverage as is afforded by this provision. (1) Equal to the greatest of those coverages afforded any covered auto; and (2) Excess over any other collectible insurance. 2. For purposes of this provision, "executive officer" means a person holding any of the officer positions created by your charter, constitution, by-laws or any other similar governing document, and, while a resident of the same household, includes that person's spouse. Such "executive officers" are insureds while using a covered auto described in this provision. IV. BUSINESS AUTO CONDITIONS A. Duties In The Event Of Accident, Claim, Suit Or Loss The following is added to Section IV, Paragraph A.2.a.: Form No: CNA63359XX (04-2012) Policy No: BUA 7039381998 Endorsement Effective Date: Endorsement Expiration Date: Policy Effective Date: 07/02/2023 Endorsement No: ; Page: Policy Page: Underwriting Company: The Continental Insurance Company, 151 N Franklin St, Chicago, IL 60606 © Copyright CNA All Rights Reserved. Includes copyrighted material of the Insurance Services Office, Inc., used with its permission. (4) Your employees may know of an accident or loss. This will not mean that you have such knowledge, unless such accident or loss is known to you or if you are not an individual, to any of your executive officers or partners or your insurance manager. The following is added to Section IV, Paragraph A.2.b.: (6) Your employees may know of documents received concerning a claim or suit. This will not mean that you have such knowledge, unless receipt of such documents is known to you or if you are not an individual, to any of your executive officers or partners or your insurance manager. B. Transfer Of Rights Of Recovery Against Others To Us The following is added to Section IV, Paragraph A.S. Transfer Of Rights Of Recovery Against Others To Us: We waive any right of recovery we may have, because of payments we make for injury or damage, against any person or organization for whom or which you are required by written contract or agreement to obtain this waiver from us. This injury or damage must arise out of your activities under a contract with that person or organization. You must agree to that requirement prior to an accident or loss. C. Concealment, Misrepresentation or Fraud The following is added to Section IV, Paragraph B.2.: Your failure to disclose all hazards existing on the date of inception of this Coverage Form shall not prejudice you with respect to the coverage afforded provided such failure or omission is not intentional. D. Other Insurance The following is added to Section IV, Paragraph B.S.: Regardless of the provisions of Paragraphs S.a. and S.d. above, the coverage provided by this policy shall be on a primary non-contributory basis. This provision is applicable only when required by a written contract. That written contract must have been entered into prior to Accident or Loss. E. Policy Period, Coverage Territory Section IV, Paragraph B. 7.(S).(a). is revised to provide: a. 45 days of coverage in lieu of 30 days. V. DEFINITIONS Section V. paragraph C. is deleted and replaced by the following: Bodily injury means bodily injury, sickness or disease sustained by a person, including mental anguish, mental injury or death resulting from any of these. Form No: CNA63359XX (04-2012) Policy No: BUA 7039381998 Endorsement Effective Date: Endorsement Expiration Date: Policy Effective Date: 07/02/2023 Endorsement No: ; Page: Policy Page: Underwriting Company: The Continental Insurance Company, 151 N Franklin St, Chicago, IL 60606 © Copyright CNA All Rights Reserved. Includes copyrighted material of the Insurance Services Office, Inc., used with its permission. CMA 1 It is understood and agreed that: Business Auto Policy Policy Endorsement If you have agreed under written contract to provide notice of cancellation to a party to whom the Agent of Record has issued a Certificate of Insurance, and if we cancel a policy term described on that Certificate of Insurance for any reason other than nonpayment of premium, then notice of cancellation will be provided to such Certificateholders at least 30 days in advance of the date cancellation is effective. If notice is mailed, then proof of mailing to the last known mailing address of the Certificateholder on file with the Agent of Record will be sufficient to prove notice. Any failure by us to notify such persons or organizations will not extend or invalidate such cancellation, or impose any liability or obligation upon us or the Agent of Record. All other terms and conditions of the policy remain unchanged This endorsement, which forms a part of and is for attachment to the policy issued by the designated Insurers, takes effect on the Policy Effective date of said policy at the hour stated in said policy, unless another effective date (the Endorsement Effective Date) is shown below, and expires concurrently with said policy. Form No: CNA68021XX (02-2013) Policy No: BUA 7039381998 Endorsement Effective Date: Endorsement Expiration Date: Policy Effective Date: 07/02/2023 Endorsement No: Page: Policy Page: Underwriting Company: The Continental Insurance Company, 151 N Franklin St, Chicago, IL 60606 © Copyright CNA All Rights Reserved. Business Auto Policy EndorsementCNA Policy HIRED ALITO PHYSICAL DAMAGE LIMIT FNDCIRSFMFNT It is understood and agreed that this endorsement amends the Business Auto Coverage Part Declarations by adding the following: The Hired Auto Physical Damage Limit of Insurance for Comprehensive and Collision Coverage is the: 1. Actual cash value; 2. Cost of repairs; or 3. amount of $100,000 whichever is less, minus the applicable deductible. All other terms and conditions of the policy remain unchanged This endorsement, which forms a part of and is for attachment to the policy issued by the designated Insurers, takes effect on the Policy Effective date of said policy at the hour stated in said policy, unless another effective date (the Endorsement Effective Date) is shown below, and expires concurrently with said policy. Form No: CNA89114XX (05-2017) Policy No: BUA 7039381998 Endorsement Effective Date: Endorsement Expiration Date: Policy Effective Date: 07/02/2023 Endorsement No: ; Page: Policy Page: Underwriting Company: The Continental Insurance Company, 151 N Franklin St, Chicago, IL 60606 © Copyright CNA All Rights Reserved. CMA 1 Business Auto Policy Policy Endorsement Form No: IL 00 21 09 08 Policy No: BUA 7039381998 Endorsement Effective Date: Endorsement Expiration Date: Policy Effective Date: 07/02/2023 Endorsement No: ; Page: Policy Page: Underwriting Company: The Continental Insurance Company, 151 N Franklin St, Chicago, IL 60606 © Copyright Insurance Services Office, Inc., 2007 CNA 1 It is understood and agreed that: If you have agreed under written contract to provide notice of cancellation to a party to whom the Agent of Record has issued a Certificate of Insurance, and if we cancel a policy term described on that Certificate of Insurance for any reason other than nonpayment of premium, then notice of cancellation will be provided to such Certificateholders at least 30 days in advance of the date cancellation is effective. If notice is mailed, then proof of mailing to the last known mailing address of the Certificateholder on file with the Agent of Record will be sufficient to prove notice. Any failure by us to notify such persons or organizations will not extend or invalidate such cancellation, or impose any liability or obligation upon us or the Agent of Record. All other terms and conditions of the policy remain unchanged. This endorsement, which forms a part of and is for attachment to the policy issued by the designated Insurers, takes effect on the Policy Effective date of said policy at the hour stated in said policy, unless another effective date (the Endorsement Effective Date) is shown below, and expires concurrently with said policy. Form No: CNA68021 XX (02-2013) Endorsement Effective Date: Endorsement No: ; Page: Underwriting Company: The Continental Insurance Company Policy No: BUA 7039381998 Policy Effective Date:07/02/2023 Policy Page: ° Copyright CNA All Rights Reserved. CNA 1 7 This endorsement applies only to the insurance provided by the policy because Texas is shown in Item 3.A. of the Information Page. In the event of cancelation or other material change of the policy, we will mail advance notice to the person or organization named in the Schedule. The number of days advance notice is shown in the Schedule. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. 1. Number of days advance notice: 2. Notice will be mailed to: PER SCHEDULE ON FILE 71854 Schedule 10 Cancellation for Non -Payment of Premium 30 Cancellation other than Non -Payment of Premium 30 Notice of Non -Renewal All other terms and conditions of the policy remain unchanged. This endorsement, which forms a part of and is for attachment to the policy issued by the designated Insurers, takes effect on the Policy Effective date of said policy at the hour stated in said policy, unless another effective date (the Endorsement Effective Date) is shown below, and expires concurrently with said policy unless another expiration date is shown below. Form No: WC 42 06 01 (01-1994) Endorsement Effective Date: Endorsement No: Page: Endorsement Expiration Date: Policy No: WC 7 39382021 Policy Effective Date: 07/02/2023 Policy Page: Underwriting Company: Valley Forge Insurance Company © Copyright 2014 National Council on Compensation Insurance, Inc. All Rights Reserved POLICY 7039382018 PARAMOUNT CNAEffective 07/02/2023 FORM I ED. DATE I FORM NAME CNA74844XX 04/15 Additional Coverage Limited Pollution Liability Coverage - Worksites Endorsement CNA75079XX 03/22 Blanket Additional Insured - Owners, Lessees or Contractors - with Products - Completed Operations Coverage Endorsement CNA75119XX 01/15 Deductible Applicable to Damages Endorsement CNA74843XX 01/15 Pollution Exclusion Amendatory Endorsement CNA74682XX 01/15 Subsidence Exclusion (CA, CO, NV) and Subsidence Residential Exclusion (All Other States) Endorsement CNA74687XX 01/15 Silica Exclusion Endorsement CNA74708XX 01/15 Fungi / Mold / Mildew / Yeast / Microbe Exclusion Endorsement CNA74761TX 01/15 Employment -Related Practices Exclusion Endorsement - Texas CNA74801XX 01/15 Contractors - Professional Liability Exclusion Endorsement CNA74862XX 01/15 Residential Construction Defect Products/Completed Operations Exclusion Endorsement CNA74863XX 01/15 Construction Wrap -Up Program Exclusion Endorsement CNA74892XX 01/15 Exterior Finish System Products/Completed Operations Property Damage Exclusion Endorsement CNA75089XX 01/15 Exclusion - Access or Disclosure of Confidential or Personal Information and Data -Related Liability - with Limited Bodily Injury Exception Endorsement CNA62646XX 01/15 Bridge Endorsement CNA74702XX 01/15 Changes - Notice of Cancellation or Material Restriction Endorsement CNA74726XX 01/15 Calculation of Premium Endorsement CNA74898TX 01/15 Experience Rating Modification Endorsement - Texas CNA74904TX 01/15 Duties Endorsement - Texas CNA74719XX 01/15 Asbestos Exclusion Endorsement CNA74727XX 01/15 Nuclear Energy Liability Exclusion Endorsement (Broad Form) CNA 1 7 This endorsement applies only to the insurance provided by the policy because Texas is shown in Item 3.A. of the Information Page. We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule, but this waiver applies only with respect to bodily injury arising out of the operations described in the Schedule where you are required by a written contract to obtain this waiver from us. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. The premium for this endorsement is shown in the Schedule. Schedule [ ] Specific Waiver Name of person or organization [ X ] Blanket Waiver Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver. 2. Operations: 3. Premium: The premium charge for this endorsement shall be Waiver of Subrogation Percent of Premium percent of the premium developed on payroll in connection with work performed for the above person(s) or organization(s) arising out of the operations described. 4. Advance Premium: Waiver of Subrogation Advance Premium All other terms and conditions of the policy remain unchanged. This endorsement, which forms a part of and is for attachment to the policy issued by the designated Insurers, takes effect on the Policy Effective date of said policy at the hour stated in said policy, unless another effective date (the Endorsement Effective Date) is shown below, and expires concurrently with said policy unless another expiration date is shown below. Form No: WC 42 03 04 B (06-2014) Policy No: WC 7 39382021 Endorsement Effective Date: Endorsement Expiration Date: Policy Effective Date: 07/02/2023 Endorsement No: [ ] ; Page: Policy Page: Underwriting Company: Valley Forge Insurance Company t-". YJ ; I1.' ,...ul C,,..—K - 1 ... I-- u. -, I. All f.SS h f —. —. CNA G-15028-A (Ed. 08/89) THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. LOSS PAYABLE PROVISIONS This endorsement modifies insurance provided under the following: COMMERCIAL INLAND MARINE COVERAGE FORM SCHEDULE Provisions Applicable Location Description Loss Payee Loss Lender's Contract (If Applicable) of Property (Name & Address) Payable Loss Payable Of Sale REFER TO INLAND MARINE LOSS PAYEE SCHEDULE A. When this endorsement is attached to your 2. For Covered Property in which both you and a Commercial Inland Marine Coverage Form the term Loss Payee have an insurable interest: Coverage Form in this endorsement is replaced by the a. We will pay for covered loss or damage to term Policy. each Loss Payee in their order of precedence, B. LOSS PAYABLE as interests may appear; The following is added under the Loss Conditions b. The Loss Payee has the right to receive loss section of the Commercial Inland Marine Conditions, payment even if the Loss Payee has started Paragraph E. — Loss Payment: foreclosure or similar action on the Covered For Covered Property in which both you and a Loss Property; Payee shown in the above Schedule have an c. If we deny your claim because of your acts or insurable interest, we will: because you have failed to comply with the 1. Adjust losses with you; and terms of the Coverage Form, the Loss Payee will still have the right to receive loss payment 2. Pay any claim for loss or damage jointly to you if the Loss Payee: and the Loss Payee, as interests may appear. (1) Pays any premium due under this Cover- C. LENDER'S LOSS PAYABLE age Form at our request if you have failed to do so; 1. The Loss Payee shown in the above Schedule is a creditor (including a mortgageholder or trustee) (2) Submits a signed, sworn proof of loss with whom you have entered a contract for the within 60 days after receiving notice from sale of Covered Property, whose interest in that us of your failure to do so; and Covered Property is established by such written (3) Has notified us of any change in owner - contracts as: ship, occupancy or substantial change in a. Bills of lading; risk known to the Loss Payee. b. Financing statements; All of the terms of this Coverage Form will then apply directly to the Loss Payee. c. Chattel mortgages. d. If we pay the Loss Payee for any loss or damage and deny payment to you because of G-15028-A (Ed. 08/89) Page 1 of 2 G-15028-A (Ed. 08/89) 3. your acts or because you have failed to comply with the terms of this Coverage Form: (1) The Loss Payee's rights will be transferred to us to the extent of the amount we pay; and (2) The Loss Payee's rights to recover the full amount of the Loss Payee's claim will not be impaired. At our option, we may pay to the Loss Payee the whole principle on the debt plus any accrued interest. In this event, you will pay your remaining debt to us. If we cancel this policy, we will give written notice to the Loss Payee at least: a. 10 days before the effective date of cancellation if we cancel for your non- payment of premium; or b. 30 days before the effective date of cancellation if we cancel for any other reason. 4. If we do not renew this policy, we will give written notice to the Loss Payee at least 10 days before the expiration date of this policy. D. CONTRACT OF SALE 1. The Loss Payee shown in the Schedule is a person or organization you have entered a contract with for the sale of Covered Property. 2. For Covered Property in which both you and the Loss Payee have an insurable interest we will: a. Adjust losses with you; and b. Pay any claim for loss or damage jointly to you and the Loss Payee, as interests may appear. 3. The following is added under the Loss Condition section of the Commercial Inland Marine Conditions, Paragraph F. — Other Insurance: For Covered Property that is the subject of a contract of sale, the word "you" includes the Loss Payee. G-15028-A Page 2 of 2 (Ed. 08/89) POLICY NUMBER INSURED NAME AND ADDRESS C 7039369334 RELIABLE PAVING, INC. 1903 PEYCO DR N ARLINGTON, TX 76001-6705 INLAND MARINE LOSS PAYEE SCHEDULE All loss payees as their interests may appear in the Covered Property. The following provisions apply in accordance with the insurable interest of the loss payee: Loss Payable, Lender's Loss Payable, or Contract of Sale. Description of Property: Any Covered Property in which a loss payee, creditor or lender holds an interest, including any person or organization you have entered a contract with for the sale of the Covered Propery. G-55232 (Ed. 01/97) INSURED Page 3 of 4 Bond No.1DO137606 006213-1 PERFORMANCE BOND Page 1 of 3 1 SECTION 00 62 13 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we, Reliable Pavine. Inc. known as 9 "Principal' herein and Merchants Bonding Companv (Mutual) a corporate 10 surety(sureties, if more than one) duly authorized to do business in the State of Texas, known as 11 "Surety" herein (whether one or more), are held and firmly bound unto the Developer, The 12 Business Park at Trinity, LLC, authorized to do business in Texas ("Developer") and the City of 13 Fort Worth, a Texas municipal corporation ("City"), in the penal sum of, Three Hundred Forty -One Thousand Two Hundred 14 Eightv-Four and 80/100 Dollars ($ 341,284.80 ), 15 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the 16 payment of which sum well and truly to be made jointly unto the Developer and the City as dual 17 obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly 18 and severally, firmly by these presents. 19 WHEREAS, Developer and City have entered into an Agreement for the construction of 20 community facilities in the City of Fort Worth by and through a Community Facilities Agreement, 21 CFA Number 23-0159;and 22 WHEREAS, the Principal has entered into a certain written contract with the Developer awarded 23 the 22nd day of September . 20 23, which Contract is hereby referred to and made a 24 part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor 25 and other accessories defined by law, in the prosecution of the Work, including any Change 26 Orders, as provided for in said Contract designated as The Business Park at Trinity. 27 NOW, THEREFORE, the condition of this obligation is such that if the said Principal shall 28 faithfully perform it obligations under the Contract and shall in all respects duly and faithfully 29 perform the Work, including Change Orders, under the Contract, according to the plans, 30 specifications, and contract documents therein referred to, and as well during any period of 31 extension of the Contract that may be granted on the part of the Developer and/or City, then 32 this obligation shall be and become null and void, otherwise to remain in full force and effect. CITY OF FORT WORTH The Business Park at Trinity STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised January 31, 2012 006213-2 PERFORMANCE BOND Page 2 of 3 1 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 2 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 3 Worth Division. 4 This bond is made and executed in compliance with the provisions of Chapter 2253 of 5 the Texas Government Code, as amended, and all liabilities on this bond shall be determined in 6 accordance with the provisions of said statue. 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 2$- -29 30 31 32 33 34 35 36 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrument by duly authorized agents and officers on this the 13th day of December , 20 23 . ATTEST: (Principal) Secrets Witness as to Principal CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 PRINCIPAL: Reliable Paving, Inc. BY: Signature -,ci-lex /Y? /o,, CSC✓►-» e L2 Name and itle Address: 1903 N Peyco Dr. Arlington, TX 76001 SURETY: Merchants Bonding Company (Mutual) BY:-'Rw6p�, Signature Mikaela Peppers, Attorney -in -Fact Name and Title Address: 6700 Westown Parkwav West Des Moines, IA 50266 The Business Park at Trinity City Project No. 104654 006213-3 PERFORMANCE BOND Page 3of3 2 Witness as to Surety Telephone Number: 800-678-8171 3 4 5 6 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 7 from the by-laws showing that this person has authority to sign such obligation. If 8 Surety's physical address is different from its mailing address, both must be provided. 9 10 The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH The Business Park at Trinity STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised January 31, 2012 Bond NO. 100137606 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 SECTION 00 62 14 PAYMENT BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § 006214-1 PAYMENT BOND Page 1 of 3 That we, Reliable Paviniz. Inc. , known as "Principal" herein, and Merchants Bonding Company (Mutual) , a corporate surety ( or sureties if more than one), duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, The Business Park at Trinity, authorized to do business in Texas "(Developer"), and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum Three Hundred Forty -One Thousand Two Hundred ofEighhly--four and 80/100 Dollars ($ 341,284.80 ), lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be made jointly unto the Developer and the City as dual obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents: WHEREAS, Developer and City have entered into an Agreement for the construction of community facilities in the City of Fort Worth, by and through a Community Facilities Agreement, CFA Number 23-0159;and WHEREAS, Principal has entered into a certain written Contract with Developer, awarded the 22nd day of September , 20 23 , which Contract is hereby referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, labor and other accessories as defined by law, in the prosecution of the Work as provided for in said Contract and designated as The Business Park at Trinity. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under the Contract, then this obligation shall be and become null and void; otherwise to remain in full force and effect. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 The Business Park at Trinity City Project No. 104654 1 2 3 4 5 6 7 8 006214-2 PAYMENT BOND Page 2 of 3 This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statute. IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the 13th day of December , 2023 . ATTEST: (Principal) Secre&y Witness as to Principal ATTEST: (Surety) Secretary Witness as to Surety CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 PRINCIPAL: Reliable Pavine. Inc. Signature Name and Title Address: 1903 N Pevco Dr. Arlineton, TX 76001 SURETY: Merchants Bondine Comoanv IMutuall BY: Signature Mikaela Peppers, Attorney -in -Fact Name and Title Address: 6700 Westown Parkway West Des Moines, IA 50266 Telephone Number: 800-678-8171 The Business Pork of Trinity City Project No.104654 006214-3 PAYMENT BOND Page 3 of 3 1 Note: If signed by an officer of the Surety, there must be on file a certified extract from the 2 bylaws showing that this person has authority to sign such obligation. If Surety's physical 3 address is different from its mailing address, both must be provided. 4 5 The date of the bond shall not be prior to the date the Contract is awarded. 6 END OF SECTION 7 CITY OF FORT WORTH The Business Park at Trinity STANDARD CITY CONDITIONS— DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised January 31, 2012 Bond No.100137606 1 2 3 4 5 6 7 r, 9 10 11 12 13 14 15 16 17 18 SECTION 00 62 19 MAINTENANCE BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § 006219-1 MAINTENANCE BOND Page 1 of 3 That we Reliable Paviniz. Inc. known as "Principal" herein and Merchants Bondine Comoanv (Mutual) , a corporate surety (sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, The Business Park at Trinity, authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), in the sum Three Hundred Forty -One Thousand Two of Huodred Eighty -Four and 80/100 Dollars ($ 341.284.80 ), lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment of which sum well and truly be made jointly unto the Developer and the City as dual obligees and their successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. 19 WHEREAS, Developer and City have entered into an Agreement for the construction of 20 community facilities in the City of Fort Worth by and through a Community Facilities Agreement, 21 CFA Number 23-0159; and 22 WHEREAS, the Principal has entered into a certain written contract with the Developer 23 awarded the 22nd day of September , 20 23 , which Contract is 24 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish 25 all materials, equipment labor and other accessories as defined by law, in the prosecution of the 26 Work, including any Work resulting from a duly authorized Change Order (collectively herein, 27 the "Work') as provided for in said Contract and designated as The Business Park of Trinity; and 28 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 29 accordance with the plans, specifications and Contract Documents that the Work is and will 30 remain free from defects in materials or workmanship for and during the period of two (2) years 31 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and CITY OF FORT WORTH The Business Park at Trinity STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised January 31, 2012 006219-2 MAINTENANCE BOND Page 2 of 3 1 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon 2 receiving notice from the Developer and/or City of the need thereof at any time within the 3 Maintenance Period. 4 NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy 5 any defective Work, for which timely notice was provided by Developer or City, to a completion 6 satisfactory to the City, then this obligation shall become null and void; otherwise to remain in 7 full force and effect. 8 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely 9 noticed defective Work, it is agreed that the Developer or City may cause any and all such 10 defective Work to be repaired and/or reconstructed with all associated costs thereof being 11 borne by the Principal and the Surety under this Maintenance Bond; and 12 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 13 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 14 Worth Division; and 15 PROVIDED FURTHER, that this obligation shall be continuous in nature and successive 16 recoveries may be had hereon for successive breaches. 17 18 19 20 21 22 23 24 25 26 CITY OF FORT WORTH The Business Park at Trinity STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised January 31, 2012 006219-3 MAINTENANCE BOND Page 3 of 3 1 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the 13th day of December 3 2023 . 4 PRINCIPAL: 5 Reliable Paving, Inc. 6 7 8 BY: 9 Signature 10 ATTEST: J 11 C_^ � je4 M L M �j C?GJY► Q%? 12 (Principal) Secretary Name and Title [] 13 14 Address: 1903 N Peyco Dr. 15 Arlington, TX 76001 16 17 18 Witness as to Principal 19 SURETY: 20- Merchants Bonding Company (Mutual) _�1 22 23 BY: 24 Signature 25 26 Mikaela Peppers, Attorney -in -Fact 27 ATTEST: Name and Title 28 -��. Sri,. Address: 6700 Westown Parkway 29 (Surety) Secretary West Des Moines, IA 50266 30 31�'` 32 Witness as to Surety Telephone Number: 800-678-8171 33 34 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 35 from the by-laws showing that this person has authority to sign such obligation. If 36 Surety's physical address is different from its mailing address, both must be provided. 37 38 The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH The Business Park at Trinity STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised January 31, 2012 MERCHANTS b� BONDING COMPANY POWER OF ATTORNEY Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., both being corporations of the State of Iowa, d/b/a Merchants National Indemnity Company (in California only) (herein collectively called the "Companies") do hereby make, constitute and appoint, individually, Don E Cornell; Josh Saunders; Kelly A Westbrook, Mikaela Peppers; Ricardo J Reyna; Robbi Morales; Sophinie Hunter; Tina McEwan; Tonle Petranek heir true and lawful Attomey(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. This Power -of -Attorney is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adopted by the Board of Directors of Merchants National Bonding, Inc., on October 16, 2015. "The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attomeys-in-Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, reoognizances, contracts of indemnity and other writings obligatory in the nature thereof." "The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed." In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the Attorney -in -Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Attomey-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner - Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 8th day of December 2022 "'��"'• MERCHANTS BONDING COMPANY (MUTUAL) •'•'p�f,ONgl �Q��G C��i,�•. MERCHANTS NATIONAL BONDING, INC. y pRPOgq e0•. •00,•DAPOgq. 9y d!b!a MERCHANTS NATIONAL INDEMNITY COMPANY .f ._ -o- o • j ' 2003 �; : y 1933 r: By • 0- • '•d�' •.. :r,��" •••��fy" \�a•• President STATE OFIOWA •.,, S�f ���.•' '•.����,.• COUNTY OF DALLAS ss. On this 8th day of December 2022 before me appeared Larry Taylor, to me personally known, who being by me duly sworn did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. PSiIR{ S lam tft F Cron Nariber 702737 imm AFOI 14,2024 �*n &J-U Notary Public (Expiration of notarys commission does not invalidate this instrument) I, William Warner, Jr., Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 13th day of December 2023 . !� *p pR •9p : mO�pR P 9 A� �• v' 2003 0y'- 1933 �: C Secretary •• POA 0018 (10/22) ••••""' MERCHANT` �s BONDING COMPANY,. MERCHANTS BONDING COMPANY (MUTUAL) P.O. BOX 14498, DES MOINES. IOWA50306-3498 PHONE: (800) 678-8171 FAX: (515) 243-3854 IMPORTANT NOTICE To obtain information or make a complaint: You may contact your insurance agent at the telephone number provided by your insurance agent You may call Merchants Bonding Company (Mutual) toll -free telephone number for information or to make a complaint at: 1-800-678-8171 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or Complaints at: 1-800-252-3439 You may write the Texas Department of Insurance at: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 490-1007 Web: www_tdi.texas.00v E-mail: ConsumerProtection@tdi.texas.gov PREMIUM AND CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. SUP 0032 TX (2115) STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS TABLE OF CONTENTS Article 1 — Definitions and Terminology.......... 1.01 Defined Terms ............................... 1.02 Terminology .................................. Article 2 — Preliminary Matters ....................... 2.01 Before Starting Construction...... 2.02 Preconstruction Conference........ 2.03 Public Meeting ............................ Page .............................................1 .............................................1 ............................................. 5 ....................................................... 6 ....................................................... 6 ....................................................... 6 ....................................................... 6 Article 3 — Contract Documents and Amending............................................................................................... 6 3.01 Reference Standards..................................................................................................................... 6 3.02 Amending and Supplementing Contract Documents.................................................................. 6 Article 4 — Bonds and Insurance....................................................................................................................... 7 4.01 Licensed Sureties and Insurers..................................................................................................... 7 4.02 Performance, Payment, and Maintenance Bonds........................................................................ 7 4.03 Certificates of Insurance............................................................................................................... 7 4.04 Contractor's Insurance.................................................................................................................. 9 4.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................12 Article 5 — Contractor's Responsibilities........................................................................................................12 5.01 Supervision and Superintendent.................................................................................................12 5.02 Labor; Working Hours................................................................................................................13 5.03 Services, Materials, and Equipment...........................................................................................13 5.04 Project Schedule..........................................................................................................................14 5.05 Substitutes and "Or-Equals".......................................................................................................14 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors).....................................16 5.07 Concerning Subcontractors, Suppliers, and Others...................................................................16 5.08 Wage Rates..................................................................................................................................18 5.09 Patent Fees and Royalties...........................................................................................................19 5.10 Laws and Regulations.................................................................................................................19 5.11 Use of Site and Other Areas.......................................................................................................19 5.12 Record Documents......................................................................................................................20 5.13 Safety and Protection.................................................................................................................. 21 5.14 Safety Representative.................................................................................................................21 5.15 Hazard Communication Programs.............................................................................................22 5.16 Submittals....................................................................................................................................22 5.17 Contractor's General Warranty and Guarantee..........................................................................23 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 5.18 Indemnification ............................................ 5.19 Delegation of Professional Design Services 5.20 Right to Audit: ............................................. 5.21 Nondiscrimination ........................................ Article 6 - Other Work at the Site....... 6.01 Related Work at Site ....... Article 7 - City's Responsibilities ............................................ 7.01 Inspections, Tests, and Approvals ....................... 7.02 Limitations on City's Responsibilities ................ 7.03 Compliance with Safety Program ........................ Article 8 - City's Observation Status During Construction....... 8.01 City's Project Representative ................................. 8.02 Authorized Variations in Work .............................. 8.03 Rejecting Defective Work ...................................... 8.04 Determinations for Work Performed ...................... Article 9 - Changes in the Work ...................... 9.01 Authorized Changes in the Work 9.02 Notification to Surety ................... Article 10 - Change of Contract Price; Change of Contract Time 10.01 Change of Contract Price ........................................... 10.02 Change of Contract Time ........................................... 10.03 Delays......................................................................... Article 11 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work ............ 11.01 Notice of Defects.............................................................................................................. 11.02 Access to Work................................................................................................................. 11.03 Tests and Inspections........................................................................................................ 11.04 Uncovering Work............................................................................................................. 11.05 City May Stop the Work................................................................................................... 11.06 Correction or Removal of Defective Work...................................................................... 11.07 Correction Period.............................................................................................................. 11.08 City May Correct Defective Work................................................................................... Article 12 - Completion ........................................... 12.01 Contractor's Warranty of Title ............ 12.02 Partial Utilization ................................. 12.03 Final Inspection .................................... 12.04 Final Acceptance .................................. Article 13 - Suspension of Work ..................................... 13.01 City May Suspend Work ............................. Article 14 - Miscellaneous ......................................... 14.01 Giving Notice ......................................... CITY OF FORT WORTH STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 24 24 25 25 26 26 26 26 26 27 a a ... 29 ... 29 ... 29 ... 29 ... 30 ... 30 ... 30 ... 30 ... 31 ................................. 32 ................................. 32 ................................. 32 ................................. 32 ................................. 33 ............................................................. 33 ............................................................. 33 34 34 14.02 Computation of Times................................................................................................................ 34 14.03 Cumulative Remedies................................................................................................................. 34 14.04 Survival of Obligations...............................................................................................................35 14.05 Headings......................................................................................................................................35 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 1 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 1 of 35 ARTICLE 1— DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Agreement - The written instrument which is evidence of the agreement between Developer and Contractor covering the Work 2. Asbestos —Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 3. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 4. Buzzsaw — City's on-line, electronic document management and collaboration system. 5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. 6. City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by, its governing body through its City Manager, his designee, or agents authorized pursuant to its duly authorized charter on his behalf. 7. Community Facilities Agreement (CFA) A Contract between the Developer and the City for the Construction of one or more following public facilities within the City public right-of- way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs. A CFA may include private facilities within the right-of-way dedicated as private right-of- way or easement on a recorded plat. 8. Contract —The entire and integrated written document incorporating the Contract Documents between the Developer, Contractor, and/or City concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 9. Contract Documents —Those items that make up the contract and which must include the Agreement, and it's attachments such as standard construction specifications, standard City Conditions, other general conditions of the Developer, including: a. An Agreement CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-2 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 2 of 35 b. Attachments to the Agreement i. Bid Form ii. Vendor Compliance with State Law Non -Resident Bidder iii. Prequalification Statement C. Current Prevailing Wage Rates Table (if required by City) d. Insurance Accord Form e. Payment Bond f. Performance Bond g. Maintenance Bond h. Power of Attorney for Bonds i. Workers Compensation Affidavit j. MWBE Commitment Form( If required by City) k. General Conditions 1. Supplementary Conditions in. The Standard City Conditions n. Specifications specifically made part of the Contract Documents by attachment, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents o. Drawings P. Documentation submitted by contractor prior to Notice of Award. q. The following which may be delivered or issued after the effective date if the Agreement and, if issued become an incorporated part of the Contract Documents i. Notice to Proceed ii. Field Orders iii. Change Orders iv. Letters of Final Acceptance r. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 10. Contractor —The individual or entity with whom Developer has entered into the Agreement. 11. Day or day —A day, unless otherwise defined, shall mean a Calendar Day. 12. Developer — An individual or entity that desires to make certain improvements within the City of Fort Worth 13. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 14. Engineer —The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the Developer. 15. Final Acceptance — The written notice given by the City to the Developer and/or Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 3 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 3 of 35 16. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 17. General Requirements —A part of the Contract Documents between the Developer and a Contractor. 18. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 19. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 20. Milestone —A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 21. Non -Participating Change Order —A document, which is prepared for and reviewed by the City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 22. Participating Change Order —A document, which is prepared for and approved by the City, which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 23. Plans — See definition of Drawings. 24. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 25. Project —The Work to be performed under the Contract Documents. 26. Project Representative —The authorized representative of the City who will be assigned to the Site. 27. Public Meeting — An announced meeting conducted by the Developer to facilitate public participation and to assist the public in gaining an informed view of the Project. 28. Regular Working Hours — Hours beginning at 7: 00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 29. Samples Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 4 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 4 of 35 30. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 31. Site —Lands or areas indicated in the Contract Documents as being furnished by City or Developer upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City or Developer which are designated for the use of Contractor. 32. Specifications —That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 33. Standard City Conditions — That part of the Contract Documents setting forth requirements of the City. 34. Subcontractor —An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of apart of the Work at the Site. 35. Submittals All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 36. Superintendent — The representative of the Contractor who is available at all times and able to receive instructions from the City and/or Developer and to act for the Contractor. 37. Supplementary Conditions —That part of the Contract Documents which amends or supplements the General Conditions. 38. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 40. Weekend Working Hours — Hours beginning at 9: 00 a. in. and ending at 5: 00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 5 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 5 of 35 41. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Participating Change Order, Non -Participating Change Order, or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 42. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p. m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.13 through D are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. C. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 6 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 6 of 35 ARTICLE 2 — PRELIMINARY MATTERS 2.01 Before Starting Construction Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting the Work. New schedules will be submitted to City when Participating Change Orders or Non - Participating Change Orders occur. 2.02 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.03 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. ARTICLE 3 — CONTRACT DOCUMENTS AND AMENDING 3.01 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.02 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Participating Change Order or a Non -Participating Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 7 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 7 of 35 1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or 2. City's written interpretation or clarification. ARTICLE 4 — BONDS AND INSURANCE 4.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverage so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided Section 4.04. 4.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 4.01 and 4.02.C. 4.03 Certificates of Insurance Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee identified in these Standard City Conditions certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 8 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 8 of 35 1. The certificate of insurance shall document the City, an as "Additional Insured" on all liability policies. 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in these Standard City Conditions. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 9. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-9 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 9 of 35 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 11. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 12. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either parry or the underwriter on any such policies. 13. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 4.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. 3. The limits of liability for the insurance shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations a. Statutory limits b. Employer's liability CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 10 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 10 of 35 1) $100,000 each accident/occurrence 2) $100,000 Disease - each employee 3) $500,000 Disease - policy limit B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. 1. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project 2. Contractor's Liability Insurance under this Section which shall be on a per project basis covering the Contractor with minimum limits of: a. $1,000,000 each occurrence b. $2,000,000 aggregate limit 3. The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. 4. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. 1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in an amount not less than the following amounts: a. Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 11 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 11 of 35 1) $1, 000, 000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: 2) $250,000 Bodily Injury per person 3) $500,000 Bodily Injury per accident / 4) $100,000 Property Damage D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the following requirements: 1. The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks owned and operated by: NONE Write the name of the railroad company. (If none, then write none) 2. The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. 3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: a. General Aggregate: NONE Enter limits provided by Railroad Company (If none, write none) b. Each Occurrence:: NONE Enter limits provided by Railroad Company (If none, write none) 4. With respect to the above outlined insurance requirements, the following shall govern: a. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at -grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. b. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights -of - CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 12 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 12 of 35 way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. c. If, in addition to a grade separation or an at -grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at -grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. d. If no grade separation is involved but other work is proposed on a railroad company's right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. 5. No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. 6. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 4.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the Developer and City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the Developer or City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the Developer or City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 5 — CONTRACTOR'S RESPONSIBILITIES 5.01 Supervision and Superintendent A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 13 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 13 of 35 Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 5.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 5.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 14 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 14 of 35 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 5.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and the General Requirements) proposed adjustments in the Project Schedule. 2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 9. Adjustments in Contract Time for projects with City participation shall be made by participating change orders. 5.05 Substitutes and "Or -Equals " A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or -Equal" Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 15 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 15 of 35 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 5.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 0125 00 and: 1) shall certify that the proposed substitute item will: i. perform adequately the functions and achieve the results called for by the general design; ii. be similar in substance to that specified; iii. be suited to the same use as that specified; and 2) will state: i. the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; ii. whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; iii. whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: i. all variations of the proposed substitute item from that specified; ii. available engineering, sales, maintenance, repair, and replacement services; and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 16 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 16 of 35 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 5.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.13. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Participating Change Order. 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors) A. The Contractor and any subcontractors are required to be prequalified for the work types requiring pre -qualification 5.07 Concerning Subcontractors, Suppliers, and Others A. Minority and Women Owned Business Enterprise Compliance: CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 17 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 17 of 35 ❑ Required for this Contract. (Check this box if there is any City Participation) Not Required for this Contract. It is City policy to ensure the full and equitable participation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent of the City's MWBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MWBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. C. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 18 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 18 of 35 Documents, Contractor shall provide City contract numbers and reference numbers to the Subcontractors and/or Suppliers. 5.08 Wage Rates ❑ Required for this Contract. IX Not Required for this Contract. A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the I Ith day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 19 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 19 of 35 occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 5.09 Patent Fees and Royalties A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 5.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.01. 5.11 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 20 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 20 of 35 other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and shall be entitled to recover its cost in doing so. The City may withhold Final Acceptance until clean-up is complete and cost are recovered. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 5.12 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 21 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 21 of 35 Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 5.13 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 5.14 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 22 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 22 of 35 5.15 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 5.16 Submittals A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal will be identified as required by City. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 5.16.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 5.16.C. B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 23 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 23 of 35 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 5.17 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City or Developer of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 24 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 24 of 35 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 4.02.13. The City will give notice of observed defects with reasonable promptness. 5.18 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 5.19 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 25 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 25 of 35 C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 5.16.C. 5.20 Right to Audit: A. The City reserves the right to audit all projects utilizing City funds B. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 5.21 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 26 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 26 of 35 ARTICLE 6 — OTHER WORK AT THE SITE 6.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. ARTICLE 7 — CITY'S RESPONSIBILITIES 7.01 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 11.03. 7.02 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 27 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 27 of 35 7.03 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 5.13. ARTICLE 8 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 8.01 City's Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City's representative during construction are set forth in the Contract Documents. A. City's Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Representative's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents. 8.02 Authorized Variations in Work City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City Developer, and also on Contractor, who shall perform the Work involved promptly. 8.03 Rejecting Defective Work City will have authority to reject Work which City's Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or completed. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 28 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 28 of 35 8.04 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). ARTICLE 9 — CHANGES IN THE WORK 9.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Participating Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a project with City participation, a Field Order may be issued by the City. 9.02 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. ARTICLE 10 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 10.01 Change of Contract Price A. The Contract Price may only be changed by a Participating Change Order for projects with City participation. 10.02 Change of Contract Time A. The Contract Time may only be changed by a Participating Change Order for projects with City participation. 10.03 Delays A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 29 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 29 of 35 ARTICLE 11— TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 11.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 11.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 11.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations approved by City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 30 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 30 of 35 3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the Testing Lab by Contractor. Developer/Contractor. City will forward all invoices for retests to 4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance until the Testing Lab is Paid E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. 11.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. 11.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 11.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 11.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 31 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 31 of 35 Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 11.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor and Developer should such additional warranty coverage be required. Contractor's obligations under this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 11.08 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 32 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 32 of 35 stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 11.09. ARTICLE 12 — COMPLETION 12.01 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment will pass to City no later than the time of Final Acceptance and shall be free and clear of all Liens. 12.02 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 12.03 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 33 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 33 of 35 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 12.04 Final Acceptance A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction of the following: 1. All documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; 2. consent of the surety, if any, to Final Acceptance; 3. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and 4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. 5. after all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. ARTICLE 13 — SUSPENSION OF WORK 13.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will stop contract time on City participation projects. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 34 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 34 of 35 available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. ARTICLE 14 — MISCELLANEOUS 14.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given i£ 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 14.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 14.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 35 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 35 of 35 14.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 14.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 01 11 00 SUMMARY OF WORK 011100-1 DAP SUMMARY OF WORK Page 1 of 3 5 A. Section Includes: 6 1. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 11 2. Division 1 - General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 A. Work Covered by Contract Documents 1. Work is to include furnishing all labor, materials, and equipment, and performing all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work 1. Any and all Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included on the standard bid item list, then the item shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. C. Use of Premises 1. Coordinate uses of premises under direction of the City. 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. 3. Use and occupy only portions of the public streets and alleys, or other public places or other rights -of -way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the City. a. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects City Project No. 104654 Revised December 20, 2012 01 11 00 - 2 DAP SUMMARY OF WORK Page 2 of 3 I b. Excavated and waste materials shall be stored in such a way as not to interfere 2 with the use of spaces that may be designated to be left free and unobstructed 3 and so as not to inconvenience occupants of adjacent property. 4 c. If the street is occupied by railroad tracks, the Work shall be carried on in such 5 manner as not to interfere with the operation of the railroad. 6 1) All Work shall be in accordance with railroad requirements set forth in 7 Division 0 as well as the railroad permit. 8 D. Work within Easements 9 1. Do not enter upon private property for any purpose without having previously 10 obtained permission from the owner of such property. 11 2. Do not store equipment or material on private property unless and until the 12 specified approval of the property owner has been secured in writing by the 13 Contractor and a copy furnished to the City. 14 3. Unless specifically provided otherwise, clear all rights -of -way or easements of 15 obstructions which must be removed to make possible proper prosecution of the 16 Work as a part of the project construction operations. 17 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, 18 lawns, fences, culverts, curbing, and all other types of structures or improvements, 19 to all water, sewer, and gas lines, to all conduits, overhead pole lines, or 20 appurtenances thereof, including the construction of temporary fences and to all 21 other public or private property adjacent to the Work. 22 5. Notify the proper representatives of the owners or occupants of the public or private 23 lands of interest in lands which might be affected by the Work. 24 a. Such notice shall be made at least 48 hours in advance of the beginning of the 25 Work. 26 b. Notices shall be applicable to both public and private utility companies and any 27 corporation, company, individual, or other, either as owners or occupants, 28 whose land or interest in land might be affected by the Work. 29 c. Be responsible for all damage or injury to property of any character resulting 30 from any act, omission, neglect, or misconduct in the manner or method or 31 execution of the Work, or at any time due to defective work, material, or 32 equipment. 33 6. Fence 34 a. Restore all fences encountered and removed during construction of the Project 35 to the original or a better than original condition. 36 b. Erect temporary fencing in place of the fencing removed whenever the Work is 37 not in progress and when the site is vacated overnight, and/or at all times to 38 provide site security. 39 c. The cost for all fence work within easements, including removal, temporary 40 closures and replacement, shall be subsidiary to the various items bid in the 41 project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects City Project No. 104654 Revised December 20, 2012 011100-3 DAP SUMMARY OF WORK Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] i 11QI ZI] Icy I[ON I IQ I 12 13 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects City Project No. 104654 Revised December 20, 2012 012500-1 DAP SUBSTITUTION PROCEDURES SECTION 0125 00 SUBSTITUTION PROCEDURES PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 4 The procedure for requesting the approval of substitution of a product that is not equivalent to a product which is specified by descriptive or performance criteria or defined by reference to 1 or more of the following: a. Name of manufacturer b. Name of vendor c. Trade name d. Catalog number 2. Substitutions are not "or -equals". B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Request for Substitution - General 1. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2. Certain types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or -equals," as determined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a. Or -equals are unavailable due to strike, discontinued production of products meeting specified requirements, or other factors beyond control of Contractor; or, CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised August 30, 2013 012500-2 DAP SUBSTITUTION PROCEDURES Page 2 of 4 b. Contractor proposes a cost and/or time reduction incentive to the City. 1.5 SUBMITTALS A. See Request for Substitution Form (attached) B. Procedure for Requesting Substitution 1. Substitution shall be considered only: a. After award of Contract b. Under the conditions stated herein 2. Submit 3 copies of each written request for substitution, including: a. Documentation 1) Complete data substantiating compliance of proposed substitution with Contract Documents 2) Data relating to changes in construction schedule, when a reduction is proposed 3) Data relating to changes in cost b. For products 1) Product identification a) Manufacturer's name b) Telephone number and representative contact name c) Specification Section or Drawing reference of originally specified product, including discrete name or tag number assigned to original product in the Contract Documents 2) Manufacturer's literature clearly marked to show compliance of proposed product with Contract Documents 3) Itemized comparison of original and proposed product addressing product characteristics including, but not necessarily limited to: a) Size b) Composition or materials of construction c) Weight d) Electrical or mechanical requirements 4) Product experience a) Location of past projects utilizing product b) Name and telephone number of persons associated with referenced projects knowledgeable concerning proposed product c) Available field data and reports associated with proposed product 5) Samples a) Provide at request of City. b) Samples become the property of the City. c. For construction methods: 1) Detailed description of proposed method 2) Illustration drawings C. Approval or Rejection 1. Written approval or rejection of substitution given by the City 2. City reserves the right to require proposed product to comply with color and pattern of specified product if necessary to secure design intent. 3. In the event the substitution is approved, if a reduction in cost or time results, it will be documented by Change Order. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised August 30, 2013 012500-3 DAP SUBSTITUTION PROCEDURES Page 3 of 4 4. Substitution will be rejected if: a. Submittal is not through the Contractor with his stamp of approval b. Request is not made in accordance with this Specification Section c. In the Developer's opinion, acceptance will require substantial revision of the original design d. In the City's or Developer's opinion, substitution will not perform adequately the function consistent with the design intent 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. In making request for substitution or in using an approved product, the Contractor represents that the Contractor: 1. Has investigated proposed product, and has determined that it is adequate or superior in all respects to that specified, and that it will perform function for which it is intended 2. Will provide same guarantee for substitute item as for product specified 3. Will coordinate installation of accepted substitution into Work, to include building modifications if necessary, making such changes as may be required for Work to be complete in all respects 4. Waives all claims for additional costs related to substitution which subsequently arise 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] MNO1Z171M01011130 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised August 30, 2013 012500-4 DAP SUBSTITUTION PROCEDURES Page 4 of 4 EXHIBIT A REQUEST FOR SUBSTITUTION FORM: TO: PROJECT: DATE: We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature Recommended as noted Firm Not recommended Address By Date Date Remarks Telephone For Use by City: Approved Rejected City Date Recommended Received late CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised August 30, 2013 013119-1 DAP PRECONSTRUCTION MEETING SECTION 0131 19 PRECONSTRUCTION MEETING PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 3 1. Provisions for the preconstruction meeting to be held prior to the start of Work to clarify construction contract administration procedures B. Deviations from this City of Fort Worth Standard Specification 1. No construction schedule required unless requested by the City. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the delivery of the distribution package to the City. a. The meeting will be scheduled and administered by the City. 2. The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3. Attendance shall include: a. Developer and Consultant b. Contractor's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised August 30, 2013 013119-2 DAP PRECONSTRUCTION MEETING Page 2 of 3 e. Other City representatives f. Others as appropriate 4. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals In. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre -Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. MBE/SBE procedures hh. Final Acceptance ii. Final Payment J. Questions or Comments CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised August 30, 2013 013119-3 DAP PRECONSTRUCTION MEETING Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised August 30, 2013 013233-1 DAP PRECONSTRUCTION VIDEO Page 1 of 2 SECTION 0132 33 PRECONSTRUCTION VIDEO PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative and procedural requirements for: a. Preconstruction Videos B. Deviations from this City of Fort Worth Standard Specification 1. Though not mandatory, it is highly recommended on infill developer projects. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Preconstruction Video 1. Produce a preconstruction video of the site/alignment, including all areas in the vicinity of and to be affected by construction. a. Provide digital copy of video upon request by the City. 2. Retain a copy of the preconstruction video until the end of the maintenance surety period. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised August 30, 2013 01 32 33 - 2 DAP PRECONSTRUCTION VIDEO Page 2 of 2 PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised August 30, 2013 SECTION 0133 00 DAP SUBMITTALS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 013300-1 DAP SUBMITTALS Page 1 of 8 General methods and requirements of submissions applicable to the following Work -related submittals: a. Shop Drawings b. Product Data (including Standard Product List submittals) c. Samples d. Mock Ups B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication f) Delivery g) Similar sequenced activities c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised August 30, 2013 013300-2 DAP SUBMITTALS Page 2 of 8 d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 03 30 00-08-B 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents 2. Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) `By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8 '/2 inches x 11 inches to 8 '/2 inches x 11 inches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised August 30, 2013 013300-3 DAP SUBMITTALS Page 3 of 8 2. The Project title and number 3. Contractor identification 4. The names of: a. Contractor b. Supplier c. Manufacturer 5. Identification of the product, with the Specification Section number, page and paragraph(s) 6. Field dimensions, clearly identified as such 7. Relation to adjacent or critical features of the Work or materials 8. Applicable standards, such as ASTM or Federal Specification numbers 9. Identification by highlighting of deviations from Contract Documents 10. Identification by highlighting of revisions on resubmittals 11. An 8-inch x 3-inch blank space for Contractor and City stamps F. Shop Drawings 1. As specified in individual Work Sections includes, but is not necessarily limited to: a. Custom -prepared data such as fabrication and erection/installation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates £ Special wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable to the Work 2. Details a. Relation of the various parts to the main members and lines of the structure b. Where correct fabrication of the Work depends upon field measurements 1) Provide such measurements and note on the drawings prior to submitting for approval. G. Product Data 1. For submittals of product data for products included on the City's Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City's Standard Product List, submittal data may include, but is not necessarily limited to: a. Standard prepared data for manufactured products (sometimes referred to as catalog data) 1) Such as the manufacturer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of compliances and applicability 4) Roughing -in diagrams and templates 5) Catalog cuts 6) Product photographs CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised August 30, 2013 013300-4 DAP SUBMITTALS Page 4 of 8 7) Standard wiring diagrams 8) Printed performance curves and operational -range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare -parts listing and printed product warranties 12) As applicable to the Work H. Samples As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: 1) Sections of manufactured or fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work I. Do not start Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1. Fabrication performed, materials purchased or on -site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals d. Samples 1) Distributed to the Project Representative 2. Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised August 30, 2013 013300-5 DAP SUBMITTALS Page 5 of 8 a. Shop Drawings 1) Distributed to the City 2) Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. 3. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review 1. The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. b. Code 2 CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised August 30, 2013 013300-6 DAP SUBMITTALS Page 6 of 8 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non -conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked b. Submittals for each item will be reviewed no more than twice at the City's expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the Developer at least 7 Calendar Days prior to release for manufacture. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised August 30, 2013 013300-7 DAP SUBMITTALS Page 7 of 8 9. When the shop drawings have been completed to the satisfaction of the City, the Contractor may carry out the construction in accordance therewith and no further changes therein except upon written instructions from the City. 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days following receipt of submittal by the City. L. Mock ups 1. Mock Up units as specified in individual Sections, include, but are not necessarily limited to, complete units of the standard of acceptance for that type of Work to be used on the Project. Remove at the completion of the Work or when directed. M. Qualifications 1. If specifically required in other Sections of these Specifications, submit a P.E. Certification for each item required. N. Request for Information (RFI) 1. Contractor Request for additional information a. Clarification or interpretation of the contract documents b. When the Contractor believes there is a conflict between Contract Documents c. When the Contractor believes there is a conflict between the Drawings and Specifications 1) Identify the conflict and request clarification 2. Sufficient information shall be attached to permit a written response without further information. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised August 30, 2013 013300-8 DAP SUBMITTALS Page 8 of 8 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised August 30, 2013 1 2 3 PART1- GENERAL 4 1.1 SUMMARY 0135 13 -1 DAP SPECIAL PROJECT PROCEDURES Page 1 of 7 SECTION 0135 13 SPECIAL PROJECT PROCEDURES 5 A. Section Includes: 6 1. The procedures for special project circumstances that includes, but is not limited to: 7 a. Coordination with the Texas Department of Transportation 8 b. Work near High Voltage Lines 9 c. Confined Space Entry Program 10 d. Air Pollution Watch Days 11 e. Use of Explosives, Drop Weight, Etc. 12 f. Water Department Notification 13 g. Public Notification Prior to Beginning Construction 14 h. Coordination with United States Army Corps of Engineers 15 i. Coordination within Railroad permits areas 16 j. Dust Control 17 k. Employee Parking 18 19 20 B. Deviations from this City of Fort Worth Standard Specification 21 1. None. 22 C. Related Specification Sections include, but are not necessarily limited to: 23 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 24 2. Division 1 — General Requirements 25 3. Section 33 12 25 — Connection to Existing Water Mains 26 27 1.2 REFERENCES 28 A. Reference Standards 29 1. Reference standards cited in this Specification refer to the current reference 30 standard published at the time of the latest revision date logged at the end of this 31 Specification, unless a date is specifically cited. 32 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 33 High Voltage Overhead Lines. 34 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction 35 Specification 36 1.3 ADMINISTRATIVE REQUIREMENTS 37 A. Coordination with the Texas Department of Transportation 38 1. When work in the right-of-way which is under the jurisdiction of the Texas 39 Department of Transportation (TxDOT): CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised August, 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 0135 13 -2 DAP SPECIAL PROJECT PROCEDURES Page 2 of 7 a. Notify the Texas Department of Transportation prior to commencing any work therein in accordance with the provisions of the permit b. All work performed in the TxDOT right-of-way shall be performed in compliance with and subject to approval from the Texas Department of Transportation B. Work near High Voltage Lines 1. Regulatory Requirements a. All Work near High Voltage Lines (more than 600 volts measured between conductors or between a conductor and the ground) shall be in accordance with Health and Safety Code, Title 9, Subtitle A, Chapter 752. 2. Warning sign a. Provide sign of sufficient size meeting all OSHA requirements. 3. Equipment operating within 10 feet of high voltage lines will require the following safety features a. Insulating cage -type of guard about the boom or arm b. Insulator links on the lift hook connections for back hoes or dippers c. Equipment must meet the safety requirements as set forth by OSHA and the safety requirements of the owner of the high voltage lines 4. Work within 6 feet of high voltage electric lines a. Notification shall be given to: 1) The power company (example: ONCOR) a) Maintain an accurate log of all such calls to power company and record action taken in each case. b. Coordination with power company 1) After notification coordinate with the power company to: a) Erect temporary mechanical barriers, de -energize the lines, or raise or lower the lines c. No personnel may work within 6 feet of a high voltage line before the above requirements have been met. C. Confined Space Entry Program 1. Provide and follow approved Confined Space Entry Program in accordance with OSHA requirements. 2. Confined Spaces include: a. Manholes b. All other confined spaces in accordance with OSHA's Permit Required for Confined Spaces D. Use of Explosives, Drop Weight, Etc. 1. When Contract Documents permit on the project the following will apply: a. Public Notification 1) Submit notice to City and proof of adequate insurance coverage, 24 hours prior to commencing. 2) Minimum 24 hour public notification in accordance with Section 0131 13 E. Water Department Coordination CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised August, 30, 2013 0135 13 -3 DAP SPECIAL PROJECT PROCEDURES Page 3 of 7 1 1. During the construction of this project, it will be necessary to deactivate, for a 2 period of time, existing lines. The Contractor shall be required to coordinate with 3 the Water Department to determine the best times for deactivating and activating 4 those lines. 5 2. Coordinate any event that will require connecting to or the operation of an existing 6 City water line system with the City's representative. 7 a. Coordination shall be in accordance with Section 33 12 25. 8 b. If needed, obtain a hydrant water meter from the Water Department for use 9 during the life of named project. 10 c. In the event that a water valve on an existing live system be turned off and on 11 to accommodate the construction of the project is required, coordinate this 12 activity through the appropriate City representative. 13 1) Do not operate water line valves of existing water system. 14 a) Failure to comply will render the Contractor in violation of Texas Penal 15 Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor 16 will be prosecuted to the full extent of the law. 17 b) In addition, the Contractor will assume all liabilities and 18 responsibilities as a result of these actions. 19 F. Public Notification Prior to Beginning Construction 20 1. Prior to beginning construction on any block in the project, on a block by block 21 basis, prepare and deliver a notice or flyer of the pending construction to the front 22 door of each residence or business that will be impacted by construction. The notice 23 shall be prepared as follows: 24 a. Post notice or flyer 7 days prior to beginning any construction activity on each 25 block in the project area. 26 1) Prepare flyer on the Contractor's letterhead and include the following 27 information: 28 a) Name of Project 29 b) City Project No (CPN) 30 c) Scope of Project (i.e. type of construction activity) 31 d) Actual construction duration within the block 32 e) Name of the contractor's foreman and phone number 33 f) Name of the City's inspector and phone number 34 g) City's after-hours phone number 35 2) A sample of the `pre -construction notification' flyer is attached as Exhibit 36 A. 37 3) Submit schedule showing the construction start and finish time for each 38 block of the project to the inspector. 39 4) Deliver flyer to the City Inspector for review prior to distribution. 40 b. No construction will be allowed to begin on any block until the flyer is 41 delivered to all residents of the block. 42 G. Public Notification of Temporary Water Service Interruption during Construction 43 1. In the event it becomes necessary to temporarily shut down water service to 44 residents or businesses during construction, prepare and deliver a notice or flyer of 45 the pending interruption to the front door of each affected resident. 46 2. Prepared notice as follows: 47 a. The notification or flyer shall be posted 24 hours prior to the temporary 48 interruption. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised August, 30, 2013 0135 13 -4 DAP SPECIAL PROJECT PROCEDURES Page 4 of 7 1 b. Prepare flyer on the contractor's letterhead and include the following 2 information: 3 1) Name of the project 4 2) City Project Number 5 3) Date of the interruption of service 6 4) Period the interruption will take place 7 5) Name of the contractor's foreman and phone number 8 6) Name of the City's inspector and phone number 9 c. A sample of the temporary water service interruption notification is attached as 10 Exhibit B. 11 d. Deliver a copy of the temporary interruption notification to the City inspector 12 for review prior to being distributed. 13 e. No interruption of water service can occur until the flyer has been delivered to 14 all affected residents and businesses. 15 f. Electronic versions of the sample flyers can be obtained from the Project 16 Construction Inspector. 17 H. Coordination with United States Army Corps of Engineers (USAGE) 18 1. At locations in the Project where construction activities occur in areas where 19 USAGE permits are required, meet all requirements set forth in each designated 20 permit. 21 I. Coordination within Railroad Permit Areas 22 1. At locations in the project where construction activities occur in areas where 23 railroad permits are required, meet all requirements set forth in each designated 24 railroad permit. This includes, but is not limited to, provisions for: 25 a. Flagmen 26 b. Inspectors 27 c. Safety training 28 d. Additional insurance 29 e. Insurance certificates 30 f. Other employees required to protect the right-of-way and property of the 31 Railroad Company from damage arising out of and/or from the construction of 32 the project. Proper utility clearance procedures shall be used in accordance 33 with the permit guidelines. 34 2. Obtain any supplemental information needed to comply with the railroad's 35 requirements. 36 J. Dust Control 37 1. Use acceptable measures to control dust at the Site. 38 a. If water is used to control dust, capture and properly dispose of waste water. 39 b. If wet saw cutting is performed, capture and properly dispose of slurry. 40 K. Employee Parking 41 1. Provide parking for employees at locations approved by the City. 42 L. (Goo, -din do w th. I Tcf&li gentfal Texas Gati ei of rn,NCTGnrn Clean 43 the xcj re4} 44 1. Comply with equipaxAnt, operational, r-epet4iag and enf ,.,.oment 4 45 forth in N ' CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised August, 30, 2013 0135 13 -5 DAP SPECIAL PROJECT PROCEDURES Page 5 of 7 1 1.4 SUBMITTALS [NOT USED] 2 1.5 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 3 1.6 CLOSEOUT SUBMITTALS [NOT USED] 4 1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.8 QUALITY ASSURANCE [NOT USED] 6 1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.10 FIELD [SITE] CONDITIONS [NOT USED] 8 1.11 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 12 DATE NAME 8/31/2012 D. Johnson 13 III\I 1X17 W3I[t] I IQ I Revision Log SUMMARY OF CHANGE 1.3.13 — Added requirement of compliance with Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised August, 30, 2013 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 01 35 13 -6 DAP SPECIAL PROJECT PROCEDURES Page 6 of 7 EXHIBIT A (To be printed on Contractor's Letterhead) Date: CPN No.: Project Name: Mapsco Location: Limits of Construction: THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> OR Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised August, 30, 2013 1 2 3 4 Date: EXHIBIT B FORT WORTH DOE NO. xxxx Project Name: 0135 13 -7 DAP SPECIAL PROJECT PROCEDURES Page 7 of 7 NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) lei MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, CONTRACTOR CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised August, 30, 2013 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 1 of 2 SECTION 0145 23 TESTING AND INSPECTION SERVICES PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Testing and inspection services procedures and coordination B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a. Contractor is responsible for performing, coordinating, and payment of all Quality Control testing. b. City is responsible for performing and payment for first set of Quality Assurance testing. 1) If the first Quality Assurance test performed by the City fails, the Contractor is responsible for payment of subsequent Quality Assurance testing until a passing test occurs. a) Final acceptance will not be issued by City until all required payments for testing by Contractor have been paid in full. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Testing 1. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be performed by the City, notify City, sufficiently in advance, when testing is needed. b. When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3. Distribution of Testing Reports a. Electronic Distribution 1) Confirm development of Project directory for electronic submittals to be uploaded to the City's document management system, or another form of distribution approved by the City. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised March 20, 2020 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 2 of 2 2) Upload test reports to designated project directory and notify appropriate City representatives via email of submittal posting. 3) Hard Copies a) 1 copy for all submittals submitted to the Project Representative b. Hard Copy Distribution (if required in lieu of electronic distribution) 1) Tests performed by City a) Distribute 1 hard copy to the Contractor 2) Tests performed by the Contractor a) Distribute 3 hard copies to City's Project Representative 4. Provide City's Project Representative with trip tickets for each delivered load of Concrete or Lime material including the following information: a. Name of pit b. Date of delivery c. Material delivered B. Inspection 1. Inspection or lack of inspection does not relieve the Contractor from obligation to perform work in accordance with the Contract Documents. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 03/20/2020 D.V. Magaiia Removed reference to Buzzsaw and noted that electronic submittals be uploaded through the City's document management system. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised March 20, 2020 015000-1 DAP TEMPORARY FACILITIES AND CONTROLS Page 1 of 4 SECTION 0150 00 TEMPORARY FACILITIES AND CONTROLS PART1- GENERAL 1.1 SUMMARY A. Section Includes: Provide temporary facilities and controls needed for the Work including, but not necessarily limited to: a. Temporary utilities b. Sanitary facilities c. Storage Sheds and Buildings d. Dust control e. Temporary fencing of the construction site B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Temporary Utilities 1. Obtaining Temporary Service a. Make arrangements with utility service companies for temporary services. b. Abide by rules and regulations of utility service companies or authorities having jurisdiction. c. Be responsible for utility service costs until Work is approved for Final Acceptance. 1) Included are fuel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as required for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic consumption by Contractor personnel and City's Project Representatives. c. Coordination 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised JULY 1, 2011 01 50 00 - 2 DAP TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 d. Contractor Payment for Construction Water 1) Obtain construction water meter from City for payment as billed by City's established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as required for Work, including testing of Work. 1) Provide power for lighting, operation of equipment, or other use. b. Electric power service includes temporary power service or generator to maintain operations during scheduled shutdown. 4. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and others performing work or furnishing services at Site. 5. Temporary Heat and Ventilation a. Provide temporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe working conditions. B. Sanitary Facilities 1. Provide and maintain sanitary facilities for persons on Site. a. Comply with regulations of State and local departments of health. 2. Enforce use of sanitary facilities by construction personnel at job site. a. Enclose and anchor sanitary facilities. b. No discharge will be allowed from these facilities. c. Collect and store sewage and waste so as not to cause nuisance or health problem. d. Haul sewage and waste off -site at no less than weekly intervals and properly dispose in accordance with applicable regulation. 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 4. Remove facilities at completion of Project C. Storage Sheds and Buildings 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off ground. 3. Store materials in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventory. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Final Acceptance. D. Temporary Fencing Provide and maintain for the duration or construction when required in contract documents E. Dust Control CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised JULY 1, 2011 015000-3 DAP TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1. Contractor is responsible for maintaining dust control through the duration of the project. a. Contractor remains on -call at all times b. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Temporary Facilities 1. Maintain all temporary facilities for duration of construction activities as needed. 3.5 [REPAIR] / [RESTORATION] 3.6 RE -INSTALLATION 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES A. Temporary Facilities CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised JULY 1, 2011 01 50 00 - 4 DAP TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1. Remove all temporary facilities and restore area after completion of the Work, to a condition equal to or better than prior to start of Work. 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised JULY 1, 2011 01 55 26 - 1 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 1 of 3 SECTION 0155 26 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative procedures for: a. Street Use Permit b. Modification of approved traffic control c. Removal of Street Signs B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 34 71 13 — Traffic Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this specification refer to the current reference standard published at the time of the latest revision date logged at the end of this specification, unless a date is specifically cited. 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 1.4 ADMINISTRATIVE REQUIREMENTS A. Traffic Control 1. General a. When traffic control plans are included in the Drawings, provide Traffic Control in accordance with Drawings and Section 34 71 13. b. When traffic control plans are not included in the Drawings, prepare traffic control plans in accordance with Section 34 71 13 and submit to City for review. 1) Allow minimum 10 working days for review of proposed Traffic Control. B. Street Use Permit 1. Prior to installation of Traffic Control, a City Street Use Permit is required. a. To obtain Street Use Permit, submit Traffic Control Plans to City Transportation and Public Works Department. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised July 1, 2011 01 55 26 - 2 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 1) Allow a minimum of 5 working days for permit review. 2) Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. C. Modification to Approved Traffic Control Prior to installation traffic control: a. Submit revised traffic control plans to City Department Transportation and Public Works Department. 1) Revise Traffic Control plans in accordance with Section 34 71 13. 2) Allow minimum 5 working days for review of revised Traffic Control. 3) It is the Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. D. Removal of Street Sign 1. If it is determined that a street sign must be removed for construction, then contact City Transportation and Public Works Department, Signs and Markings Division to remove the sign. E. Temporary Signage 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting requirements of the latest edition of the Texas Manual on Uniform Traffic Control Devices (MUTCD). 2. Install temporary sign before the removal of permanent sign. 3. When construction is complete, to the extent that the permanent sign can be reinstalled, contact the City Transportation and Public Works Department, Signs and Markings Division, to reinstall the permanent sign. F. Traffic Control Standards 1. Traffic Control Standards can be found on the City's Buzzsaw website. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised July 1, 2011 01 55 26 - 3 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised July 1, 2011 015713-1 DAP STORM WATER POLLUTION PREVENTION Page 1 of 3 SECTION 0157 13 STORM WATER POLLUTION PREVENTION PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for Storm Water Pollution Prevention Plans B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 3125 00 — Erosion and Sediment Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Activities resulting in less than 1 acre of disturbance a. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 2. Construction Activities resulting in greater than 1 acre of disturbance a. Measurement and Payment shall be in accordance with Section 3125 00. In=45»1W3:7WcopDk" A. Abbreviations and Acronyms 1. Notice of Intent: NOI 2. Notice of Termination: NOT 3. Storm Water Pollution Prevention Plan: SWPPP 4. Texas Commission on Environmental Quality: TCEQ 5. Notice of Change: NOC A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Integrated Storm Management (iSWM) Technical Manual for Construction Controls 1.4 ADMINISTRATIVE REQUIREMENTS A. General 1. Contractor is responsible for resolution and payment of any fines issued associated with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised July 1, 2011 01 57 13-2 DAP STORM WATER POLLUTION PREVENTION Page 2 of 3 B. Construction Activities resulting in: 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 3125 00 and Drawings. 2. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) TCEQ Notice of Change required if making changes or updates to N01 3) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 1.5 SUBMITTALS A. SWPPP Submit in accordance with Section 0133 00, except as stated herein. a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City as follows: 1) 1 copy to the City Project Manager a) City Project Manager will forward to the City Department of Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised July 1, 2011 01 57 13 -3 DAP STORM WATER POLLUTION PREVENTION Page 3 of 3 B. Modified SWPPP 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City in accordance with Section 0133 00. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised July 1, 2011 SECTION 0160 00 PRODUCT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 01 60 00 DAP PRODUCT REQUIREMENTS Page 1 of 2 1. References for Product Requirements and City Standard Products List B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A list of City approved products for use is available through the City's website at: https://apes.fortworthtexas.2ov/ProiectResources/ and following the directory path: 02 - Construction Documents\Standard Products List A. Only products specifically included on City's Standard Product List in these Contract Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the City. B. Any specific product requirements in the Contract Documents supersede similar products included on the City's Standard Product List. 1. The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City's Standard Product List. C. Although a specific product is included on City's Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that manufacturer's standard product. D. See Section 0133 00 for submittal requirements of Product Data included on City's Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised March 20, 2020 01 60 00 DAP PRODUCT REQUIREMENTS Page 2 of 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] DATE NAME END OF SECTION Revision Log SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City's Standard Product List 4/7/2014 M.Domenech Revised for DAP application 03/20/2020 D.V. Magaiia Removed reference to Buzzsaw and noted that the City approved products list is accessible through the City's website. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised March 20, 2020 016600-1 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 1 of 4 SECTION 0166 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A. Delivery Requirements 1. Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised April 7, 2014 016600-2 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 4. Deliver products or equipment in manufacturer's original unbroken cartons or other containers designed and constructed to protect the contents from physical or environmental damage. 5. Clearly and fully mark and identify as to manufacturer, item and installation location. 6. Provide manufacturer's instructions for storage and handling. B. Handling Requirements 1. Handle products or equipment in accordance with these Contract Documents and manufacturer's recommendations and instructions. C. Storage Requirements 1. Store materials in accordance with manufacturer's recommendations and requirements of these Specifications. 2. Make necessary provisions for safe storage of materials and equipment. a. Place loose soil materials and materials to be incorporated into Work to prevent damage to any part of Work or existing facilities and to maintain free access at all times to all parts of Work and to utility service company installations in vicinity of Work. 3. Keep materials and equipment neatly and compactly stored in locations that will cause minimum inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. a. Arrange storage to provide easy access for inspection. 4. Restrict storage to areas available on construction site for storage of material and equipment as shown on Drawings, or approved by City's Project Representative. 5. Provide off -site storage and protection when on -site storage is not adequate. a. Provide addresses of and access to off -site storage locations for inspection by City's Project Representative. 6. Do not use lawns, grass plots or other private property for storage purposes without written permission of owner or other person in possession or control of premises. 7. Store in manufacturers' unopened containers. 8. Neatly, safely and compactly stack materials delivered and stored along line of Work to avoid inconvenience and damage to property owners and general public and maintain at least 3 feet from fire hydrant. 9. Keep public and private driveways and street crossings open. 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to satisfaction of City's Project Representative. a. Total length which materials may be distributed along route of construction at one time is 1,000 linear feet, unless otherwise approved in writing by City's Project Representative. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised April 7, 2014 016600-3 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non -Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised April 7, 2014 016600-4 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised April 7, 2014 017000-1 DAP MOBILIZATION AND REMOBILIZATION Page 1 of 4 SECTION 0170 00 MOBILIZATION AND REMOBILIZATION PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Mobilization and Demobilization a. Mobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies to the Site 2) Establishment of necessary general facilities for the Contractor's operation at the Site 3) Premiums paid for performance and payment bonds 4) Transportation of Contractor's personnel, equipment, and operating supplies to another location within the designated Site 5) Relocation of necessary general facilities for the Contractor's operation from 1 location to another location on the Site. b. Demobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies away from the Site including disassembly 2) Site Clean-up 3) Removal of all buildings and/or other facilities assembled at the Site for this Contract c. Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. 2. Remobilization a. Remobilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: 1) Demobilization a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b) Site Clean-up as designated in the Contract Documents 2) Remobilization a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site necessary to resume the Work. b) Establishment of necessary general facilities for the Contractor's operation at the Site necessary to resume the Work. 3) No Payments will be made for: a) Mobilization and Demobilization from one location to another on the Site in the normal progress of performing the Work. b) Stand-by or idle time c) Lost profits 3. Mobilizations and Demobilization for Miscellaneous Projects a. Mobilization and Demobilization CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised April 7, 2014 01 70 00 - 2 DAP MOBILIZATION AND REMOBILIZATION Page 2 of 4 1) Mobilization shall consist of the activities and cost on a Work Order basis necessary for: a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site for the issued Work Order. b) Establishment of necessary general facilities for the Contractor's operation at the Site for the issued Work Order 2) Demobilization shall consist of the activities and cost necessary for: a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly for each issued Work Order b) Site Clean-up for each issued Work Order c) Removal of all buildings or other facilities assembled at the Site for each Work Oder b. Mobilization and Demobilization do not include activities for specific items of work for which payment is provided elsewhere in the contract. 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects a. A Mobilization for Miscellaneous Projects when directed by the City and the mobilization occurs within 24 hours of the issuance of the Work Order. B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements LW4101M Lei W.1011WMIKIIIoleo 89:111001Diu.11*1 A. Measurement and Payment 1. Mobilization and Demobilization a. Measure 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 2. Remobilization for suspension of Work as specifically required in the Contract Documents a. Measurement 1) Measurement for this Item shall be per each remobilization performed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Specified Remobilization" in accordance with Contract Documents. c. The price shall include: 1) Demobilization as described in Section 1.1.A.2.a.1) 2) Remobilization as described in Section 1.1.A.2.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised April 7, 2014 017000-3 DAP MOBILIZATION AND REMOBILIZATION Page 3 of 4 Remobilization for suspension of Work as required by City a. Measurement and Payment 1) This shall be submitted as a Contract Claim in accordance with Article 10 of Section 00 72 00. 2) No payments will be made for standby, idle time, or lost profits associated with this Item. 4. Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The Work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Work Order Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include: 1) Mobilization as described in Section 1.1.A.3.a.1) 2) Demobilization as described in Section 1.I.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. Emergency Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The Work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Work Order Emergency Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include 1) Mobilization as described in Section 1.1.A.4.a) 2) Demobilization as described in Section 1.I.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised April 7, 2014 01 70 00 - 4 DAP MOBILIZATION AND REMOBILIZATION 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP application Page 4 of 4 CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised April 7, 2014 1 2 3 PART1- GENERAL 4 1.1 SUMMARY 5 6 7 8 9 10 11 12 1.2 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 017123-1 CONSTRUCTION STAKING AND SURVEY Page 1 of 8 SECTION 01 71 23 CONSTRUCTION STAKING AND SURVEY A. Section Includes: 1. Requirements for construction staking and construction survey B. Deviations from this City of Fort Worth Standard Specification 1. See Changes (Highlighted in Yellow). C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Staking a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 2. Construction Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 3. As -Built Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised February 14, 2018 01 71 23 - 2 CONSTRUCTION STAKING AND SURVEY Page 2 of 8 �I%=;701y01;7Die cyOky 2 A. Definitions 3 1. Construction Survev - The survey measurements made prior to or while 4 construction is in progress to control elevation, horizontal position, dimensions and 5 configuration of structures/improvements included in the Project Drawings. 6 2. As -built Survev —The measurements made after the construction of the 7 improvement features are complete to provide position coordinates for the features 8 of a project. 9 3. Construction Staking — The placement of stakes and markings to provide offsets 10 and elevations to cut and fill in order to locate on the ground the designed 11 structures/improvements included in the Project Drawings. Construction staking 12 shall include staking easements and/or right of way if indicated on the plans. 13 4. Survev "Field Checks" — Measurements made after construction staking is 14 completed and before construction work begins to ensure that structures marked on 15 the ground are accurately located per Project Drawings. 16 B. Technical References 17 1. City of Fort Worth — Construction Staking Standards (available on City's Buzzsaw 18 website) — 01 71 23.16.01— Attachment A Survey Staking Standards 19 2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files (available 20 on City's Buzzsaw website). 21 3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision 22 4. Texas Society of Professional Land Surveyors (TSPS), Manual of Practice for Land 23 Surveying in the State of Texas, Category 5 24 25 1.4 ADMINISTRATIVE REQUIREMENTS 26 A. The Contractor's selection of a surveyor must comply with Texas Government 27 Code 2254 (qualifications based selection) for this project. 28 1.5 SUBMITTALS 29 A. Submittals, if required, shall be in accordance with Section 0133 00. 30 B. All submittals shall be received and reviewed by the City prior to delivery of work. 31 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 32 A. Field Quality Control Submittals 33 1. Documentation verifying accuracy of field engineering work, including coordinate 34 conversions if plans do not indicate grid or ground coordinates. 35 2. Submit "Cut -Sheets" conforming to the standard template provided by the City 36 (refer to 01 71 23.16.01 — Attachment A — Survey Staking Standards). 37 38 1.7 CLOSEOUT SUBMITTALS 39 B. As -built Redline Drawing Submittal CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised February 14, 2018 017123-3 CONSTRUCTION STAKING AND SURVEY Page 3 of 8 1 1. Submit As -Built Survey Redline Drawings documenting the locations/elevations of 2 constructed improvements signed and sealed by Registered Professional Land 3 Surveyor (RPLS) responsible for the work (refer to 01 71 23.16.01 — Attachment A 4 — Survey Staking Standards) . 5 2. Contractor shall submit the proposed as -built and completed redline drawing 6 submittal one (1) week prior to scheduling the project final inspection for City 7 review and comment. Revisions, if necessary, shall be made to the as -built redline 8 drawings and resubmitted to the City prior to scheduling the construction final 9 inspection. 10 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 11 1.9 QUALITY ASSURANCE 12 A. Construction Staking 13 1. Construction staking will be performed by the Contractor. 14 2. Coordination 15 a. Contact City and Developer's Project Representative at least one week in 16 advance notifying the City of when Construction Staking is scheduled. 17 b. It is the Contractor's responsibility to coordinate staking such that 18 construction activities are not delayed or negatively impacted. 19 3. General 20 a. Contractor is responsible for preserving and maintaining stakes. If City 21 surveyors or Developer's Project Representative are required to re -stake for 22 any reason, the Contractor will be responsible for costs to perform staking. If 23 in the opinion of the City, a sufficient number of stakes or markings have been 24 lost, destroyed disturbed or omitted that the contracted Work cannot take place 25 then the Contractor will be required to stake or re -stake the deficient areas. 26 B. Construction Survey 27 1. Construction Survey will be performed by the Contractor. 28 2. Coordination 29 a. Contractor to verify that horizontal and vertical control data established in the 30 design survey and required for construction survey is available and in place. 31 3. General 32 a. Construction survey will be performed in order to construct the work shown 33 on the Construction Drawings and specified in the Contract Documents. 34 b. For construction methods other than open cut, the Contractor shall perform 35 construction survey and verify control data including, but not limited to, the 36 following: 37 1) Verification that established benchmarks and control are accurate. 38 2) Use of Benchmarks to furnish and maintain all reference lines and grades 39 for tunneling. 40 3) Use of line and grades to establish the location of the pipe. 41 4) Submit to the City copies of field notes used to establish all lines and 42 grades, if requested, and allow the City to check guidance system setup prior 43 to beginning each tunneling drive. 44 5) Provide access for the City, if requested, to verify the guidance system and 45 the line and grade of the carrier pipe. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised February 14, 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 01 71 23 - 4 CONSTRUCTION STAKING AND SURVEY Page 4 of 8 6) The Contractor remains fully responsible for the accuracy of the work and correction of it, as required. 7) Monitor line and grade continuously during construction. 8) Record deviation with respect to design line and grade once at each pipe joint and submit daily records to the City. 9) If the installation does not meet the specified tolerances (as outlined in Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct the installation in accordance with the Contract Documents. C. As -Built Survey 1. Required As -Built Survey will be performed by the Contractor. 2. Coordination a. Contractor is to coordinate with City to confirm which features require as - built surveying. b. It is the Contractor's responsibility to coordinate the as -built survey and required measurements for items that are to be buried such that construction activities are not delayed or negatively impacted. c. For sewer mains and water mains 12" and under in diameter, it is acceptable to physically measure depth and mark the location during the progress of construction and take as -built survey after the facility has been buried. The Contractor is responsible for the quality control needed to ensure accuracy. 3. General a. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features during the progress of the construction including the following: 1) Water Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Minimum every 250 linear feet, including (2) Horizontal and vertical points of inflection, curvature, etc. (3) Fire line tee (4) Plugs, stub -outs, dead-end lines (5) Casing pipe (each end) and all buried fittings 2) Sanitary Sewer a) Top of pipe elevations and coordinates for force mains and siphon sanitary sewer lines (non -gravity facilities) at the following locations: (1) Minimum every 250 linear feet and any buried fittings (2) Horizontal and vertical points of inflection, curvature, etc. 3) Stormwater — Not Applicable b. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features after the construction is completed including the following: 1) Manholes a) Rim and flowline elevations and coordinates for each manhole 2) Water Lines a) Cathodic protection test stations b) Sampling stations c) Meter boxes/vaults (All sizes) CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised February 14, 2018 017123-5 CONSTRUCTION STAKING AND SURVEY Page 5 of 8 1 d) Fire hydrants 2 e) Valves (gate, butterfly, etc.) 3 f) Air Release valves (Manhole rim and vent pipe) 4 g) Blow off valves (Manhole rim and valve lid) 5 h) Pressure plane valves 6 i) Underground Vaults 7 (1) Rim and flowline elevations and coordinates for each 8 Underground Vault. 9 3) Sanitary Sewer 10 a) Cleanouts 11 (1) Rim and flowline elevations and coordinates for each 12 b) Manholes and Junction Structures 13 (1) Rim and flowline elevations and coordinates for each 14 manhole and junction structure. 15 4) Stormwater — Not Applicable 16 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 17 1.11 FIELD [SITE] CONDITIONS [NOT USED] 18 1.12 WARRANTY ITS7\4'RNP1 94',1I311141V 20 A. A construction survey will produce, but will not be limited to: 21 1. Recovery of relevant control points, points of curvature and points of intersection. 22 2. Establish temporary horizontal and vertical control elevations (benchmarks) 23 sufficiently permanent and located in a manner to be used throughout construction. 24 3. The location of planned facilities, easements and improvements. 25 a. Establishing final line and grade stakes for piers, floors, grade beams, parking 26 areas, utilities, streets, highways, tunnels, and other construction. 27 b. A record of revisions or corrections noted in an orderly manner for reference. 28 c. A drawing, when required by the client, indicating the horizontal and vertical 29 location of facilities, easements and improvements, as built. 30 4. Cut sheets shall be provided to the City inspector and Survey Superintendent for all 31 construction staking projects. These cut sheets shall be on the standard city template 32 which can be obtained from the Survey Superintendent (817-392-7925). 33 5. Digital survey files in the following formats shall be acceptable: 34 a. AutoCAD (.dwg) 35 b. ESRI Shapefile (.shp) 36 c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use 37 standard templates, if available) 38 6. Survey files shall include vertical and horizontal data tied to original project 39 control and benchmarks, and shall include feature descriptions 40 PART 3 - EXECUTION 41 3.1 INSTALLERS CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised February 14, 2018 017123-6 CONSTRUCTION STAKING AND SURVEY Page 6 of 8 1 A. Tolerances: 2 1. The staked location of any improvement or facility should be as accurate as 3 practical and necessary. The degree of precision required is dependent on many 4 factors all of which must remain judgmental. The tolerances listed hereafter are 5 based on generalities and, under certain circumstances, shall yield to specific 6 requirements. The surveyor shall assess any situation by review of the overall plans 7 and through consultation with responsible parties as to the need for specific 8 tolerances. 9 a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical 10 tolerance. Horizontal alignment for earthwork and rough cut should not exceed 11 1.0 ft. tolerance. 12 b. Horizontal alignment on a structure shall be within .0.1 ft tolerance. 13 c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and 14 walkways shall be located within the confines of the site boundaries and, 15 occasionally, along a boundary or any other restrictive line. Away from any 16 restrictive line, these facilities should be staked with an accuracy producing no 17 more than 0.05ft. tolerance from their specified locations. 18 d. Underground and overhead utilities, such as sewers, gas, water, telephone and 19 electric lines, shall be located horizontally within their prescribed areas or 20 easements. Within assigned areas, these utilities should be staked with an 21 accuracy producing no more than 0.1 ft tolerance from a specified location. 22 e. The accuracy required for the vertical location of utilities varies widely. Many 23 underground utilities require only a minimum cover and a tolerance of 0.1 ft. 24 should be maintained. Underground and overhead utilities on planned profile, 25 but not depending on gravity flow for performance, should not exceed 0.1 ft. 26 tolerance. 27 B. Surveying instruments shall be kept in close adjustment according to manufacturer's 28 specifications or in compliance to standards. The City reserves the right to request a 29 calibration report at any time and recommends regular maintenance schedule be 30 performed by a certified technician every 6 months. 31 1. Field measurements of angles and distances shall be done in such fashion as to 32 satisfy the closures and tolerances expressed in Part 3.1.A. 33 2. Vertical locations shall be established from a pre -established benchmark and 34 checked by closing to a different bench mark on the same datum. 35 3. Construction survey field work shall correspond to the client's plans. Irregularities 36 or conflicts found shall be reported promptly to the City. 37 4. Revisions, corrections and other pertinent data shall be logged for future reference. 38 39 3.2 EXAMINATION [NOT USED] 40 3.3 PREPARATION [NOT USED] 41 3.4 APPLICATION 42 3.5 REPAIR / RESTORATION 43 A. If the Contractor's work damages or destroys one or more of the control 44 monuments/points set by the City or Developer's Project Representative, the monuments 45 shall be adequately referenced for expedient restoration. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised February 14, 2018 017123-7 CONSTRUCTION STAKING AND SURVEY Page 7 of 8 1 1. Notify City or Developer's Project Representative if any control data needs to be 2 restored or replaced due to damage caused during construction operations. 3 a. Contractor shall perform replacements and/or restorations. 4 b. The City or Developer's Project Representative may require at anytime a 5 survey "Field Check" of any monument or benchmarks that are set be verified 6 by the City surveyors or Developer's Project Representative before further 7 associated work can move forward. 8 3.6 RE -INSTALLATION [NOT USED] 9 3.7 FIELD [oR] SITE QUALITY CONTROL 10 A. It is the Contractor's responsibility to maintain all stakes and control data placed by the 11 City or Developer's Project Representative in accordance with this Specification. This 12 includes easements and right of way, if noted on the plans. 13 B. Do not change or relocate stakes or control data without approval from the City. 14 3.8 SYSTEM STARTUP 15 A. Survey Checks 16 1. The City reserves the right to perform a Survey Check at any time deemed 17 necessary. 18 2. Checks by City personnel or 3' party contracted surveyor are not intended to 19 relieve the contractor of his/her responsibility for accuracy. 20 21 3.9 ADJUSTING [NOT USED] 22 3.10 CLEANING [NOT USED] 23 3.11 CLOSEOUT ACTIVITIES [NOT USED] 24 3.12 PROTECTION [NOT USED] 25 3.13 MAINTENANCE [NOT USED] 26 3.14 ATTACHMENTS [NOT USED] 27 END OF SECTION 28 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson Added instruction and modified measurement & payment under 1.2; added 8/31/2017 M. Owen definitions and references under 1.3; modified 1.6; added 1.7 closeout submittal requirements; modified 1.9 Quality Assurance; added PART 2 — PRODUCTS ; Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup. Removed "blue text"; revised measurement and payment sections for Construction 2/14/2018 M Owen Staking and As -Built Survey; added reference to selection compliance with TGC 2254; revised action and Closeout submittal requirements; added acceptable depth CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised February 14, 2018 017123-8 CONSTRUCTION STAKING AND SURVEY Page 8 of 8 measurement criteria; revised list of items requiring as -built survey "during" and "after" construction; and revised acceptable digital survey file format CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No. 104654 Revised February 14, 2018 SECTION 0174 23 CLEANING PART1- GENERAL 1.1 SUMMARY 017423-1 DAP CLEANING Page 1 of 4 A. Section Includes: 1. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fall on newly painted surfaces. 2. Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised April 7, 2014 01 74 23 - 2 DAP CLEANING Page 2 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site. 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised April 7, 2014 01 74 23 - 3 DAP CLEANING Page 3 of 4 6. Handle materials in a controlled manner with as few handlings as possible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. 8. Remove all signs of temporary construction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do not burn on -site. B. Intermediate Cleaning during Construction 1. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 3. Confine construction debris daily in strategically located container(s): a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haul from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transported by flowing water during the storm. C. Exterior (Site or Right of Way) Final Cleaning 1. Remove trash and debris containers from site. a. Re -seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised April 7, 2014 DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP application 01 74 23 - 4 DAP CLEANING Page 4 of 4 CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised April 7, 2014 SECTION 0177 19 CLOSEOUT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY 017719-1 DAP CLOSEOUT REQUIREMENTS Page 1 of 3 A. Section Includes: 1. The procedure for closing out a contract B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Guarantees, Bonds and Affidavits 1. No application for final payment will be accepted until all guarantees, bonds, certificates, licenses and affidavits required for Work or equipment as specified are satisfactorily filed with the City. B. Release of Liens or Claims 1. No application for final payment will be accepted until satisfactory evidence of release of liens has been submitted to the City. 1.5 SUBMITTALS A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised April 7, 2014 017719-2 DAP CLOSEOUT REQUIREMENTS Page 2 of 3 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 CLOSEOUT PROCEDURE A. Prior to requesting Final Inspection, submit: 1. Project Record Documents in accordance with Section 0178 39 2. Operation and Maintenance Data, if required, in accordance with Section 0178 23 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 01 74 23. C. Final Inspection 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b. Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective or incomplete. 2. Upon receiving written notice from the City, immediately undertake the Work required to remedy deficiencies and complete the Work to the satisfaction of the City. 3. Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. 4. Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified spare parts b. Adequate oil and grease as required for the first lubrication of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses f. Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of all equipment D. Notice of Project Completion CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised April 7, 2014 017719-3 DAP CLOSEOUT REQUIREMENTS Page 3 of 3 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) f. Contractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP application CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised April 7, 2014 017823-1 DAP OPERATION AND MAINTENANCE DATA Page 1 of 5 SECTION 0178 23 OPERATION AND MAINTENANCE DATA PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Product data and related information appropriate for City's maintenance and operation of products furnished under Contract 2. Such products may include, but are not limited to: a. Traffic Controllers b. Irrigation Controllers (to be operated by the City) c. Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Schedule 1. Submit manuals in final form to the City within 30 calendar days of product shipment to the project site. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 0133 00. All submittals shall be approved by the City prior to delivery. 11rim10 010457uIE%111100IL1111:3ul10II: M A. Submittal Form 1. Prepare data in form of an instructional manual for use by City personnel. 2. Format a. Size: 8 '/2 inches x 11 inches b. Paper 1) 40 pound minimum, white, for typed pages 2) Holes reinforced with plastic, cloth or metal c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised April 7, 2014 01 78 23 - 2 DAP OPERATION AND MAINTENANCE DATA Page 2 of 5 d. Drawings 1) Provide reinforced punched binder tab, bind in with text 2) Reduce larger drawings and fold to size of text pages. e. Provide fly -leaf for each separate product, or each piece of operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. f. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subject matter covered in the manual 3. Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupings. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify each product by product name and other identifying symbols as set forth in Contract Documents. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable information 3. Drawings a. Supplement product data with drawings as necessary to clearly illustrate: 1) Relations of component parts of equipment and systems 2) Control and flow diagrams b. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. c. Do not use Project Record Drawings as maintenance drawings. 4. Written text, as required to supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures. b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised April 7, 2014 01 78 23 - 3 DAP OPERATION AND MAINTENANCE DATA Page 3 of 5 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel giving: 1) Proper procedures in event of failure 2) Instances which might affect validity of warranties or bonds C. Manual for Materials and Finishes 1. Submit 5 copies of complete manual in final form. 2. Content, for architectural products, applied materials and finishes: a. Manufacturer's data, giving full information on products 1) Catalog number, size, composition 2) Color and texture designations 3) Information required for reordering special manufactured products b. Instructions for care and maintenance 1) Manufacturer's recommendation for types of cleaning agents and methods 2) Cautions against cleaning agents and methods which are detrimental to product 3) Recommended schedule for cleaning and maintenance Content, for moisture protection and weather exposure products: a. Manufacturer's data, giving full information on products 1) Applicable standards 2) Chemical composition 3) Details of installation b. Instructions for inspection, maintenance and repair D. Manual for Equipment and Systems 1. Submit 5 copies of complete manual in final form. 2. Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts 1) Function, normal operating characteristics and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Operating procedures 1) Start-up, break-in, routine and normal operating instructions 2) Regulation, control, stopping, shut -down and emergency instructions 3) Summer and winter operating instructions 4) Special operating instructions c. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Alignment, adjusting and checking d. Servicing and lubrication schedule 1) List of lubricants required e. Manufacturer's printed operating and maintenance instructions f. Description of sequence of operation by control manufacturer 1) Predicted life of parts subject to wear 2) Items recommended to be stocked as spare parts g. As installed control diagrams by controls manufacturer h. Each contractor's coordination drawings 1) As installed color coded piping diagrams CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised April 7, 2014 01 78 23 - 4 DAP OPERATION AND MAINTENANCE DATA Page 4 of 5 i. Charts of valve tag numbers, with location and function of each valve j. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage k. Other data as required under pertinent Sections of Specifications 3. Content, for each electric and electronic system, as appropriate: a. Description of system and component parts 1) Function, normal operating characteristics, and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards 1) Electrical service 2) Controls 3) Communications c. As installed color coded wiring diagrams d. Operating procedures 1) Routine and normal operating instructions 2) Sequences required 3) Special operating instructions e. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking £ Manufacturer's printed operating and maintenance instructions g. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage h. Other data as required under pertinent Sections of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Provide operation and maintenance data by personnel with the following criteria: 1. Trained and experienced in maintenance and operation of described products 2. Skilled as technical writer to the extent required to communicate essential data 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised April 7, 2014 01 78 23 - 5 DAP OPERATION AND MAINTENANCE DATA Page 5 of 5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] DATE NAME 8/31/2012 D.Johnson 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE 1.5.A.1 — title of section removed Revised for DAP Application CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised April 7, 2014 017839-1 DAP PROJECT RECORD DOCUMENTS Page 1 of 4 SECTION 0178 39 PROJECT RECORD DOCUMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Work associated with the documenting the project and recording changes to project documents, including: a. Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to City's Project Representative. 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Accuracy of Records 1. Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. 2. Accuracy of records shall be such that future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised April 7, 2014 017839-2 DAP PROJECT RECORD DOCUMENTS Page 2 of 4 3. To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 4. Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modification of the Work to proceed without lengthy and expensive site measurement, investigation and examination. 1.10 STORAGE AND HANDLING A. Storage and Handling Requirements 1. Maintain the job set of Record Documents completely protected from deterioration and from loss and damage until completion of the Work and transfer of all recorded data to the final Project Record Documents. 2. In the event of loss of recorded data, use means necessary to again secure the data to the City's approval. a. In such case, provide replacements to the standards originally required by the Contract Documents. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2- PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED] 2.2 RECORD DOCUMENTS A. Job set 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no charge to the Contractor, 1 complete set of all Documents comprising the Contract. B. Final Record Documents 1. At a time nearing the completion of the Work and prior to Final Inspection, provide the City 1 complete set of all Final Record Drawings in the Contract. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set 1. Immediately upon receipt of the job set, identify each of the Documents with the title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised April 7, 2014 017839-3 DAP PROJECT RECORD DOCUMENTS Page 3 of 4 2. Preservation a. Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. b. Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. c. Maintain the job set at the site of work. 3. Coordination with Construction Survey a. At a minimum clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4. Making entries on Drawings a. Record any deviations from Contract Documents. b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c. Date all entries. d. Call attention to the entry by a "cloud" drawn around the area or areas affected. e. In the event of overlapping changes, use different colors for the overlapping changes. 5. Conversion of schematic layouts a. In some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b. Show on the job set of Record Drawings, by dimension accurate to within 1 inch, the centerline of each run of items. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in ceiling plenum", "exposed", and the like). 3) Make all identification sufficiently descriptive that it may be related reliably to the Specifications. c. The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. B. Final Project Record Documents Transfer of data to Drawings a. Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. b. Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. c. Call attention to each entry by drawing a "cloud" around the area or areas affected. CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised April 7, 2014 017839-4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP Application CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project No.104654 Revised April 7, 2014 APPENDIX 6E=4 91 r1vailaLilily :,ems GC-4.02 Subsurface and Physical Conditions — Refer to Geotech Report Project No. DE22-041, Dated March 31, 2022 prepared by Alliance Geotechnical Group GC 4.06 u.,z.,,.dous hny-,.n,v.epA l Condition M Site .tl,rr.�J0 Corny)ilasn-32 T�[11ii11R��i8ii GR-01 60 00 Product Requirements CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 104654 Revised July 1, 2011 GC-4.02 Subsurface and Physical Conditions THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH The Business Park at Trinity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 104654 Revised July 1, 2011 GEOTECHNICAL INVESTIGATION PROPOSED TRINITY CROSSING ADDITION FORT WORTH, TEXAS AGG REPORT: DE22-041 MARCH 31, 2022 PREPARED FOR: COCKRELL HILL PARTNERS, INC. PRESENTED BY: RLUAnce GGEOTECFifIICRL CiiWP Geotechnical Engineering — Construction Services — Construction Materials Engineering Testing 3228 Halifax Street - Dallas, TX 75247 Ph. 972.444.8889 FX. 972.444.8893 f'ILLIPfi'fCE GEOTECHNIC19L GROUP March 31, 2022 Mr. Farooq Wazirali General Partner Cockrell Hill Partners, Inc. 12977 Trinity Blvd., Suite 105 Euless, Texas 76040 Re: Geotechnical Investigation Proposed Trinity Crossing Addition Fort Worth, Texas AGG Report: DE22-041 Mr. Wazirali, • GEOTECHNICAL ENGINEERING CONSTRUCTION MATERIALS ENGINEERING AND TESTING CONSTRUCTION INSPECTION Please find enclosed our report summarizing the results of the geotechnical investigation that was performed at the above referenced project. We trust that the recommendations derived from this investigation will provide you with the information necessary to complete your proposed project successfully. For your future geotechnical investigations and construction materials testing and related quality control requirements, it is recommended that the work be performed by Alliance Geotechnical Group, Inc. in order to maintain continuity of engineering, inspection and testing services for the project under the direction of the Geotechnical Project Engineer. We thank you for the opportunity to provide you with our professional services. If we can be of further assistance, please do not hesitate to contact us. Sincerely, ALLIANCE GEOTECHNICAL GROUP, INC. Fran 4Enn ing, P.E. Projeer �EpTECHkt = SF�..OF T.t ��G' ' -4 1� •r ;t ICG +i .........1�............'.;t AICHAEL DAINE ROLANDY .......... ........ 96043 i Mich I D. Rolan , P.E Vice President Dallas • Ft. Worth • Frisco • Dayton • Longview MEMBER 3228 Halifax Street • Dallas, Texas 75247 AM r Tel: 972-444.8889 • Fax: 972-444-8893 • www.aggengr.com "07-Tir R+a TABLE OF CONTENTS PAGE 1.0 INTRODUCTION --------------------------------------------------------------------------------------1 1.1 PROJECT DESCRIPTION--------------------------------------------------------- 1 1.2 PURPOSE AND SCOPE----------------------------------------------------------- 2 2.0 FIELD INVESTIGATION ----------------------------------------------------------------------------- 2 3.0 LABORATORY TESTING --------------------------------------------------------------------------- 3 4.0 SITE AND SUBSURFACE CONDITIONS------------------------------------------------------- 3 4.1 GENERAL SITE CONDITIONS --------------------------------------------------- 3 4.2 SITE GEOLOGY---------------------------------------------------------------------- 3 4.3 SUBSURFACE CONDITIONS---------------------------------------------------- 4 4.4 GROUNDWATER CONDITIONS ------------------------------------------------ 4 5.0 ANALYSES AND RECOMMENDATIONS------------------------------------------------------4 5.1 SOIL MOVEMENT------------------------------------------------------------------- 4 5.2 EXISTING FILL SOILS & MUCKY POND BOTTOM ------------------------ 5 5.3 LOOSE NON -PLASTIC SOILS --------------------------------------------------- 6 6.0 SHALLOW FOOTING FOUNDATION SYSTEMS --------------------------------------------- 6 6.1 SHALLOW FOOTING CONSTRUCTION -------------------------------------- 8 6.2 FLOOR SLAB -------------------------------------------------------------------------- 9 6.3 ARCHITECTURAL AND STRUCTURAL DETAILING --------------------- 10 6.4 FLAT WORK AND PIPING CONSIDERATIONS ---------------------------10 7.0 PAVEMENT RECOMMENDATIONS----------------------------------------------------------- 10 7.1 NON -PLASTIC SOILS-------------------------------------------------------------11 7.2 EXISTING FILL SOILS-------------------------------------------------------------11 7.3 S U B G RA D E PREPARATION ---------------------------------------------------- 12 7.4 FLEX BASE---------------------------------------------------------------------------12 7.5 RECOMPACTED PAVEMENT SUBGRADE--------------------------------- 13 7.6 DRIVE APPROACHES------------------------------------------------------------14 7.7 PAVEMENT SECTIONS-----------------------------------------------------------14 7.8 PAVEMENT CONSIDERATIONS ----------------------------------------------- 16 8.0 EARTHWORK GUIDELINES--------------------------------------------------------------------- 17 8.1 SITE GRADING AND DRAINAGE ----------------------------------------------17 8.2 UTILITY TRENCH EXCAVATION----------------------------------------------18 8.3 PROOFROLLING AND SUBGRADE PREPARATION--------------------18 8.4 GENERAL FILL PLACEMENT IN PAVEMENT AND LANDSCAPING AREAS------------------------------------------------------------------------------------------18 8.5 ON -SITE CLAY FILL PLACEMENT IN BUILDING AREAS--------------18 8.6 SELECT FILL PLACEMENT IN BUILDING AREAS-----------------------20 9.0 TREE EFFECTS------------------------------------------------------------------------------------ 20 10.0 DETENTION POND CONSTRUCTION REQUIREMENTS------------------------------- 20 11.0 FIELD SUPERVISION AND DENSITY TESTING ------------------------------------------- 21 12.0 LIMITATIONS ---------------------------------------------------------------------------------------- 22 ALLIANCE GEOTECHNICAL GROUP, INC. DE22-041 FIGURES FIGURE PLANOF BORINGS------------------------------------------------------------------------------------------1 LOGS OF BORINGS--------------------------------------------------------------------------------- 2 t h ru 11 LEGEND - KEY TO LOG TERMS & SYMBOLS------------------------------------------------------- 12 SWELL TEST RESULTS----------------------------------------------------------------------------------- 13 APPENDIX APPENDIX MEASURES TO MINIMIZE DEEP SEATED SWELL ALLIANCE GEOTECHNICAL GROUP, INC. DE22-041 GEOTECHNICAL INVESTIGATION PROPOSED TRINITY CROSSING ADDITION FORT WORTH, TEXAS 1.0 INTRODUCTION 1.1 PROJECT DESCRIPTION The project consists of a new development to be constructed within the southwest quadrant of the intersection of Trinity Blvd. and Highway 157 in Fort Worth, Texas. A total of 4 new buildings are planned for construction. We understand that the buildings will be lightly loaded and will have accompanying parking lots and paving areas. The description of each of the proposed buildings along with anticipated cuts and fills required to achieve final pad grades are provided below based upon grading information provided by the client. • Office / warehouse building will have a plan area of 20,000 sf and a FFE of 530.0 feet. Fills ranging from 1.5 to 10.5 feet will be required to achieve final pad grades. • Building A will have a plan area of 18,400 sf and a FFE of 529.0 feet. Minor cuts and fills (on the order of 1 foot) will be required to achieve final pad grades. • Building B will have a plan area of 24,200 sf and a FFE of 529.0 feet. Fills ranging from 0 to 3.5 feet will be required to achieve final pad grades. • Building C will have a plan area of 20,000 sf and a FFE of 527.0 feet. Fills ranging from 2.5 to 5 feet will be required to achieve final pad grades. The site was heavily wooded but has recently been cleared of trees within the proposed new development area. There is an existing pond present within the southwest portion of the proposed office / warehouse building that will need to be backfilled during the earthwork operations. Two detention ponds will be constructed on this site. One of the detention ponds will be located on the south side of the middle portion of the site and the other detention pond will be located along the eastern edge of the property. We understand that these detention ponds need to be designed to catch excess rain runoff but are not required to hold water. Both of the detention ponds will be about 7 feet deep and will be constructed mostly by cutting and excavating. The embankments are anticipated to have 3H:1V slopes. ALLIANCE GEOTECHNICAL GROUP, INC. DE22-041 PAGE 1 1.2 PURPOSE AND SCOPE The purposes of this geotechnical investigation were to: 1) explore the subsurface conditions at the site, 2) evaluate the pertinent engineering properties of the subsurface materials, 3) provide foundation recommendations for the proposed new buildings, 4) provide concrete pavement section recommendations, and 5) provide comments and recommendations for site grading and drainage. This report was prepared in general accordance with AGG Proposal P22-0123E dated January 18, 2022. 2.0 FIELD INVESTIGATION The field investigation consisted of drilling a total of ten (10) test borings (Borings B-1 thru B-10). Two (2) of the test borings (Borings B-1 and B-2) were drilled in the vicinity of the proposed office / warehouse building. Two (2) test borings (Borings B-3 and B-4) were drilled in the vicinity of proposed Building A. Two (2) test borings (Borings B-5 and B-7) were drilled in the vicinity of proposed Building B. Two (2) test borings (Borings B-9 and B- 10) were drilled in the vicinity of proposed Building C. Two (2) test borings (Borings B-6 and B-8) were drilled in the vicinity of the proposed retention ponds. The test borings were advanced to depths of 30 feet below the existing ground surface. A truck mounted auger drill rig was used to advance the borings and to obtain samples for laboratory evaluation. The borings were located at the approximate locations shown on the Plan of Borings (Figure 1). The approximate elevations shown on the boring logs were estimated from a grading plan provided by the client. Undisturbed samples of cohesive soils were obtained at intermittent intervals with standard, thin -walled, seamless tube samplers. These samples were extruded in the field, logged, sealed, and packaged to protect them from disturbance and maintain their in -situ moisture content during transport to our laboratory. The relative density of the soils encountered within the test borings was evaluated by performing a Standard Penetration Test (SPT) in conjunction with split spoon sampling. The SPT's involves driving a standard 2-inch diameter sampler a total of 18 inches or until 50 blows for 6 inches or less occurs. The blow counts and driving distances for each 6-inch or 50 blow increment are recorded. The first 6-inch drive is for seating purposes. The results of the SPT's are recorded at the respective testing depths on the logs. ALLIANCE GEOTECHNICAL GROUP, INC. DE22-041 PAGE 2 The results of the boring program are presented on the Logs of Borings, Figures 2 thru 11. A key to the descriptive terms and symbols used on the logs is presented on Figure 12. 3.0 LABORATORY TESTING Laboratory tests were performed on representative samples of the soil to aid in classification of the soil materials. These tests included Atterberg limits tests, percent passing #200 sieve, moisture content tests, and unit weight determinations. Hand penetrometer tests were performed on the clay soil samples to provide indications of the swell potential and the foundation bearing properties of the subsurface strata. Unconfined compression strength tests were performed on selected soil samples in order to determine the foundation bearing properties. To provide additional information about the swell characteristics of these soils at their in - situ moisture conditions, absorption swell tests were performed on selected samples of the clayey soils. The results of our testing program are presented on the Logs of Borings (Figures 2 through 11) and on the Swell Test Summary (Figure 13). 4.0 SITE AND SUBSURFACE CONDITIONS 4.1 GENERAL SITE CONDITIONS The project consists of a new development to be constructed within the southwest quadrant of the intersection of Trinity Blvd. and Highway 157 in Fort Worth, Texas. The project site is vacant and undeveloped. The site was heavily wooded but has recently been cleared. There is an existing pond present on the southwest portion of the site. See Plan of Borings (Figure 1) for site configuration, location and aerial view. The aerial view was taken prior to the existing trees being remove. 4.2 SITE GEOLOGY As shown on the Dallas Sheet of the Geologic Atlas of Texas, the site is located in an area where Fluviatile Terrace deposits are overlying the Woodbine Formation. Fluviatile Terrace deposits are Quaternary Age deposits consisting of gravel, sand, silt and clay. The Woodbine Formation typically consists of shale, sandstone, and cemented sand interbedded with clay seams. Soils derived from the formation are typically moderately to highly active clays exhibiting moderate to high shrink/swell potential with variations in moisture content. Hard rock boulders can also be present at shallow depths. ALLIANCE GEOTECHNICAL GROUP, INC. DE22-041 PAGE 3 4.3 SUBSURFACE CONDITIONS Subsurface conditions encountered in the borings, including descriptions of the various strata, their depths, and thicknesses, are presented on the Logs of Borings. Note that the depths shown on the logs of borings refer to the depth from the existing grade or ground surface present at the time of the investigation. Boundaries between the various soil types are approximate. 4.4 GROUNDWATER CONDITIONS The borings were advanced using continuous flight auger methods. Advancement of the borings using these methods allows for observation of the initial zones of seepage. Groundwater was not encountered within the test borings during the drilling operations. Shallow groundwater should be anticipated in all areas during and after wet weather periods. It is not possible to accurately predict the magnitude of subsurface water fluctuations that might occur based upon short-term observations. The subsurface water conditions are subject to change with variations in climatic conditions and are functions of subsurface soil conditions and rainfall. 5.0 ANALYSES AND RECOMMENDATIONS 5.1 SOIL MOVEMENT The subsurface exploration revealed the presence of extremely dry moderately expansive sandy clay, very sandy clay and clayey sand over deep extremely dry highly expansive clay. Potential soil swell movement calculations were performed using swell test results, pocket penetrometer readings, and moisture content tests to estimate the swell potential of the soil. The potential soil swell movements are separated into "active zone" swell and "deep seated" swell. The assumed "active zone" swell values are upward soil movements that could occur due to seasonal moisture changes and soil swelling within a typical 10 foot deep active zone. The potential "active zone" soil swell movements based upon current grades and current very dry moisture conditions are estimated to range from about 4 to 6 inches. The site soils are currently in a very dry condition due to the previous tree root moisture absorption (soil desiccation). ALLIANCE GEOTECHNICAL GROUP, INC. DE22-041 PAGE 4 In addition to the "active zone" soil swell, the potential for additional "deep-seated" swell exists at this site. The additional deep-seated swell potential is on the order of 1 to 2 inches. The deep-seated swell values are additional upward soil movements that could occur due to moisture changes and soil swelling below a typical 10 foot deep "active -zone". Deep-seated swell could occur due to groundwater fluctuations or free water sources such as ponding water conditions, percolation of water in landscaped areas, leaking sprinkler lines and/or leaking utility lines that are not detected and repaired in an expedient manner and from water ponding within the proposed adjacent retention pond. The magnitude of deep-seated swell that will actually occur will depend upon the depths of water percolation that occurs over the serviceable life of the new structures. Deep swelling would be dampened out to some degree by deep moisture conditioned fill soils. Note: Measures to minimize additional deep-seated swell associated with free water sources are provided in the Appendix to this report. 5.2 EXISTING FILL SOILS & MUCKY POND BOTTOM Existing fill soils were encountered within Boring B-1. The existing fill soils consist of soft very sandy clay soils and extend to a depth of 5 feet below the existing ground surface at this test boring location. Based upon results of this test boring, the existing fill soils were placed in an uncontrolled manner without engineering supervision and without moisture / compaction verification of each fill lift. Excessive settlements should be anticipated for slabs, pavements, retaining walls and flatwork placed over existing uncontrolled fill soils unless these fill soils are over -excavated and replaced in thin compacted lifts. In addition to uncontrolled fill soils being present in the vicinity of Boring B-1, an existing pond is also present. This pond is located within the southwest portion of the office / warehouse building and will need to be backfilled during the earthwork operations to constructed the subject building pad. It is imperative that after water is pumped out of the pond, and prior to backfilling the pond, that all mud and muck present be removed. After the mud and muck has been removed, the area should be proofrolled in accordance with Section 7.6 of this report. ALLIANCE GEOTECHNICAL GROUP, INC. DE22-041 PAGE 5 5.3 LOOSE NON -PLASTIC SOILS The upper subsurface soils encountered at half of the test boring locations consisted of non -plastic silty sands and sandy silts. These non -plastic soils generally extended to depths of 1.5 to 2 feet below the existing ground surface where encountered. However, four (4) feet of these non -plastic soils were encountered at Boring B-2. These non -plastic soils are currently loose and these materials are extremely difficult to compact and difficult to maintain compaction. In addition, these soils will be subject to pumping after rain events. Therefore, AGG recommends that these non -plastic soils be removed and not used within building areas, pavement areas, etc. These non -plastic soils should only be placed within landscaping areas. 6.0 SHALLOW FOOTING FOUNDATION SYSTEMS Consideration could be given to supporting the proposed structures on shallow footing foundation systems. Site preparation work would be required in order to reduce the potential "active zone" soil swell movements to one inch. There would still be the potential for additional deep seated soil swell (see Section 5.1 of this report). We recommend that the following site preparation work be performed within the proposed building pad areas. For the office / warehouse building Borings B-1 and B-2 location), excavate to a depth of 10 feet below final pad grade. For the other buildings (Building A, B and C), excavate to a depth of 8.5 feet below the existing, ground surface. Excavations should extend 5 feet beyond the edges of the perimeter footings. We recommend that Alliance Geotechnical Group review the excavation plans for compliance with this report prior to construction bidding. Note 1: During excavation, stockpile the low PI clayey sand meeting the requirements for select fill separately from the higher PI sandy clay soils and from the non -plastic (PI less than 4) silty sand and sandy silt. Note 2: The base of cut should be observed by an AGG Geotechnical Engineer to verify that all existing fill soils and/or soft / loose soils have been removed. Any existing fill and/or soft / loose soils present at base of cut should be over -excavated under the direction of AGG. Note 3: The base of cut for the office / warehouse building should be proofrolled to verify that all soft soils, mud and muck have been removed. Proofrolling should be performed in accordance with Section 7.8 of this report. 2. The upper 8 inches at the base of cut for each building pad should be scarified and compacted to a minimum of 98 percent of ASTM Standard D 698 between optimum and +3 percentage points of the soil's optimum moisture content. ALLIANCE GEOTECHNICAL GROUP, INC. DE22-041 PAGE 6 3. Fill to within 2 feet of final pad grade with on -site sandy clay, very sandy clay and clayey sand having a PI between 4 and 28. Clay and sandy clay soils having a PI in excess of 29 and non -plastic silty sands / sandy silts having a PI of less than 4 should not be used as fill beneath the buildings. Compact in 8 inch loose lifts as specified below. For very sandy clay and clayey sand Compact at -2% to +2% of with PI between 4 and 18: optimum to a minimum of 96% of ASTM D 698. For sandy clay with PI between 19 and 28: Compact at +1 % to +4% above optimum to a minimum of 95% of ASTM D 698. Note 4: The "targeted" compaction moisture contents are subject to the following QA /QC verifications by AGG. Hand Penetrometer: 3.0 to 4.5 tsf (very sandy clay and clayey sand) 3.0 to 4.0 tsf (sandy clay PI of 19 to 28) Soil Swell: 1 % under select fill surcharge. Note 5: For fill placed below 10 feet of final pad grade, these deeper fills should be compacted to a minimum of 98% of ASTM D698 at -2% to +2% of optimum moisture content. 4. The upper 2 feet of fill should consist of low PI select fill. The material used as select fill should be a clayey sand (uniform consistency free of clay clods) with a liquid limit less than 35 and having a plasticity index between 6 and 15. The fill should be spread in loose lifts, less than 8 inches thick, and uniformly compacted to a minimum of 98 percent of ASTM Standard D 698 between -2% and +2% of the soil's optimum moisture content. Note 6: It should be noted that on -site clayey sand meeting the above requirements can be used as select fill. However, it will be important that a soil management plan be implemented in order to stockpile and save the on -site soils meeting the requirements for select fill during the excavation operations. Otherwise, if insufficient amounts of site soils meeting select fill requirements remain to cap the upper 24 inches of the building pads, then select fill will have to be hauled in from an off -site source. 5. The upper 24 inches of fill in unpaved areas near the buildings should consist of compacted on -site clay or sandy clay having a PI of at least 20 to minimize water infiltration into the select fill (compact in 8 inch lifts to a minimum of 95% of ASTM D 698) at optimum to +3% of optimum moisture. ALLIANCE GEOTECHNICAL GROUP, INC. DE22-041 PAGE 7 NOTE 7: A moist soil condition should be maintained with proper irrigation adjacent to the building after construction of the foundation. Otherwise, additional settlement due to ground shrinkage would occur. Positive drainage with no ponding must be maintained during and after construction. All work should be performed in accordance with the Earthwork Guidelines (Section 8.0) of this report. 6.1 SHALLOW FOOTING CONSTRUCTION Continuous wall footings should be at least 18 inches wide and may be designed for an allowable soil bearing capacity of 1,500 psf. Column footings should be at least 3 feet square and designed for an allowable soil bearing capacity of 2,000 psf. All footings should be founded at depths of at least 1.5 feet below final pad grade. These footings should be subject to maximum settlements of less than one inch. Differential movements could also be on the order of one inch. See Section 9.0 regarding effects of trees near slabs and shallow foundations. We recommend that DCP testing be performed by an Alliance Geotechnical Group Engineer after excavation of the footings has been performed in order to verify adequate bearing capacity. We recommend that a horizontal moisture barrier be used in unpaved areas adjacent to the buildings (20 mil poly with UV protection attached to foundation with mastic adhesive, extending at least 7 feet from building and covered with a minimum of 12 inches of compacted on -site soil (compacted in 6 inch lifts to a minimum of 95% of ASTM D 698 at optimum to +3% above optimum). All footings should be constructed using neat vertical cuts without forming the footing base. Forming of footing stem walls may be used. We recommend that the footing excavations be observed by an Alliance Geotechnical Engineer prior to concrete placement to verify that the footings will be founded at the proper depths, verify proper bearing materials, verify neat vertical cuts, and to verify the footings are properly cleaned prior to concrete placement. Shallow footing foundations at this site will be subject to differential movement caused by post -construction settlement and soil swell heave. If the above site preparation work is performed, the footings would be subjected to one (1) inch of "active zone" soil swell movements. In addition, the shallow footing foundation system could also be subjected to ALLIANCE GEOTECHNICAL GROUP, INC. DE22-041 PAGE 8 additional deep seated soil swell movements on the order of 1 to 2 inches. See Section 5.1 of this report for deep seated soil swell movements potential and see the Appendix for measures to minimize deep seated soil swell movements. Some deep seated soil swell could probably be accommodated if details are used to accommodate differential movement. Actual deep seated swell movements should be dampened out to some degree by the presence of moisture conditioned fill soils above the deeper clay swelling soil. Deep seated soil swell generally affects a broad surface area and generally does not cause isolated or abrupt differential movements of shallow foundations. Deep seated soil movements on structures supported by shallow foundations are usually manifest into more of a general lifting or tilting than in abrupt differential movements. Closely spaced vertical crack control joints (10 to 15 foot spacings) should be used along the full height of all walls to control cracking associated with differential foundation movements (if applicable). See Section 5.1 of this report. The foundation plan and the utility plan should be cross-checked to verify that no utility line excavation extends beneath the bearing influence of any footing (approximated by 2:1 slope extending downward from edge of footings). Trench cuts extending beneath the footings (or within their bearing influence) should be avoided, if possible. Otherwise, the trench backfill should consist of lean concrete or compacted low PI select fill within the bearing influence of the footing. 6.2 FLOOR SLAB Slab -on -grade floor systems may be used in conjunction with shallow footing foundation systems. Site preparation work specified above should be performed in order to reduce the potential upward "active zone" soil movements to on the order of one inch. A polyethylene moisture barrier is recommended below slab -on -grade floor slabs where floor coverings or painted floor surfaces will be applied with products which are sensitive to moisture or if products stored on the building floors are sensitive to moisture. Procedures for installation of vapor barriers are recommended in ACI 302. ALLIANCE GEOTECHNICAL GROUP, INC. DE22-041 PAGE 9 6.3 ARCHITECTURAL AND STRUCTURAL DETAILING It should be recognized that differential movements of floor slabs and/or shallow footings due to settlements and/or shrink/swell soil movements of over one -quarter inch can cause cracking of interior sheetrock walls, ceilings, floor slabs, floor coverings, and masonry walls. In order to minimize cracking and the associated maintenance costs to repair cracks, we recommend the following. 1. Use resilient floor and wall coverings that can accommodate differential movement without cracking. 2. Provide closely spaced joints within interior and exterior walls to control cracking and reduce irregular crack patterns and maintenance (especially over doors and windows). 3. Coordinate with General Contractor and all subcontractors regarding the need for appropriate jointing in all interior and exterior walls to reduce future cracking and maintenance after occupancy. 4. The Owner should be advised that future maintenance will likely be required over the life of the facility. 5. A landscape architect and arborist should be contacted for recommendations for root barriers and irrigated tree wells within 35 feet of the buildings. The ground beneath the un-pruned drip lines of trees should not be paved unless an arborist is consulted regarding the installation of root barriers and irrigated tree wells. 6.4 FLAT WORK AND PIPING CONSIDERATIONS Provisions should be made for post -construction differential upward movement of adjacent flat work and piping. Site grading plans should include provisions for the effects of soil movements on access and entry slabs and adjacent sidewalks. Utility line details and fixtures should consider the potential for differential movement beneath any piping. 7.0 PAVEMENT RECOMMENDATIONS We understand that new automobile parking and concrete drives will be constructed on the project site. We assume that only occasional heavy to medium truck traffic will be present on the drive areas and that automobile traffic only will be used in the parking pavements. The following recommendations are based upon these assumed conditions. ALLIANCE GEOTECHNICAL GROUP, INC. DE22-041 PAGE 10 Note: Differential upward slab movements are likely at this site based upon existing dry soil moisture conditions. The potential for differential upward slab movements should be anticipated during design of the grading plan. Excavation and moisture conditioning could be performed within pavement areas to reduce the potential for differential pavement movements if desired. See Section 5.1 of this report. Recommendations for excavation and moisture conditioning beneath the pavements could be provided by AGG based on tolerances for pavement movement determined by the owner and Civil Engineer. 7.1 NON -PLASTIC SOILS The upper subsurface soils encountered at half of the test boring locations consisted of non -plastic silty sands and sandy silts. These non -plastic soils generally extended to depths of 1.5 to 2 feet below the existing ground surface where encountered. However, four (4) feet of these non -plastic soils were encountered at Boring B-2. These non -plastic soils are currently loose and these materials are extremely difficult to compact and difficult to maintain compaction. In addition, these soils will be subject to pumping after rain events. Therefore, AGG recommends that these non -plastic soils be removed and not be used within the pavement areas. If the non -plastic soils are left in place, a smooth wheeled vibratory roller will be required to compact the non -plastic silty sands. The surface of each compacted fill lift should be watered after compaction is achieved to maintain a moist compact condition until the next lift is placed. The non -plastic soils will be susceptible to loosening upon drying and pumping after a rain event. The non -plastic soils should be spread in loose lifts, less than 8 inches thick, and uniformly compacted to a minimum of 95 percent of ASTM Standard D 698 between —2% and +2% of the soil's optimum moisture content. It is imperative that each lift of fill be protected from drying and/or loosening. Every lift of fill should only be placed on a moist adequately compacted subgrade. Flex base must be placed directly on a moist adequately compacted subgrade and/or cement stabilization should be performed on a moist adequately compacted subgrade. 7.2 EXISTING FILL SOILS Existing fill soils were encountered within Boring B-1. The existing fill soils consist of soft very sandy clay soils and extend to a depth of 5 feet below the existing ground surface at this test boring location. Based upon results of this test boring, the existing fill soils were placed in an uncontrolled manner without engineering supervision and without moisture / compaction verification of each fill lift. Excessive settlements should be anticipated for ALLIANCE GEOTECHNICAL GROUP, INC. DE22-041 PAGE 11 pavements placed over existing uncontrolled fill soils unless these fill soils are over - excavated and replaced in thin compacted lifts. In order to provide adequate pavement support where existing fill soils are present within pavement areas, we recommend that the existing fill soils be tested for compaction. If compaction levels are less than 95% of ASTM D698, excavation of the existing fill soils will need to be performed to provide the minimum pavement support required for design and to minimize settlements. 7.3 SUBGRADE PREPARATION Surficial soils along the proposed new pavements are anticipated to consist of low PI clayey sands. Cement stabilization is used to improve the support value of sandy soils. A minimum of six (6) inches of cement stabilized materials could be used over a proofrolled and compacted subgrade. A mix design could be performed to determine the optimum amount of cement to achieve the required compressive strength for design (150 psi in 7 days). If a mix design is not performed, we recommend a minimum of 8% cement for this project (45 pounds per square yard per 6-inch depth). A paddle agitated truck should be used to allow the cement slurry to be applied uniformly. An acceptable gradation for pulverization (prior to cement treatment) would be 100% passing the 1-3/4" sieve, 85% passing the 3/4" sieve, and 60% passing the No. 4 sieve prior to spreading cement. Cement treatment, final mixing, shaping and compaction must be achieved within 2 hours. The cement stabilization should be performed in accordance with TxDOT Item 275 and Tex-120-E (including curing requirements). The base should be compacted at -2% to +2% of optimum to a minimum of 95% of ASTM D1557 (modified Proctor). Mixing, shaping and compaction must be achieved within 2 hours after adding cement. We recommend that stabilization extend 2 feet beyond exposed pavement edges in order to reduce the effects of shrinkage during extended dry periods. Note: Final gradation and fine grading must be completed prior to final compaction per TxDOT Item 275. The concrete should be placed directly on top of hard undisturbed cement stabilized soil that has been continuously moisture cured. 7.4 FLEX BASE In lieu of cement stabilization, eight (8) inches of crushed "Chico" stone and/or recycled crushed concrete flex base should be used. The flex base should be compacted at ALLIANCE GEOTECHNICAL GROUP, INC. DE22-041 PAGE 12 optimum to +2% above optimum to a minimum of 95% of Modified Proctor density (ASTM D1557). The base materials should comply with TxDOT Item 247, Type D, Grades 1 or 2. Prior to placing the flex base, the subgrade should be proofrolled in accordance with Section 7.8 of this report. The upper 8 inches should be compacted at -2% and +2% of optimum moisture to a minimum of 98% of Standard Proctor density (ASTM D 698) just prior to flex base placement. Only on -site soil (comparable to the underlying subgrade soil) should be used for fine grading the pavement areas. After fine grading, the subgrade should be watered if needed and re -compacted in order to re -achieve the moisture and density levels discussed above and provide a tight non -yielding subgrade. Non -plastic soils should be specifically prohibited beneath pavement areas during final grading, since these more porous soils can allow water inflow, resulting in heave and strength loss of subgrade soils. It should be specified that only clayey soils will be allowed for fine grading. After fine grading each area in preparation for paving, the subgrade surface should be lightly moistened, as needed, and recompacted to obtain a tight non - yielding subgrade. The subgrade moisture content and density must be maintained until paving is completed. The subgrade should be watered just prior to paving to assure concrete placement over a moist subgrade. Note: If a rain event occurs prior to placement of flex base, the subgrade should be aerated and re -tested prior to paving. Due to the presence of expansive clay soils, post construction upward pavement movements should be anticipated. Inspection during construction is particularly important to insure proper construction procedures are followed. 7.5 RECOMPACTED PAVEMENT SUBGRADE In lieu of performing cement -stabilization and/or placing crushed stone flex base, thickened concrete sections could be used over a compacted subgrade. The upper eight (8) inches of subgrade soil should consist of clavev soils and should be compacted at -2% to +2% above optimum moisture to a minimum of 98% of Standard Proctor density (ASTM D698). Where non -plastic soils (PI less than 4) are present at pavement subgrade, these non -plastic ALLIANCE GEOTECHNICAL GROUP, INC. DE22-041 PAGE 13 sands should be removed and replaced with clayey soils. The subgrade should be proof - rolled prior to subgrade compaction. Proofrolling and removal and replacement of soft materials should be performed in accordance with Section 7.8 of this report. Only on -site clayey soil should be used for fine grading the pavement areas. After fine grading, the subgrade should be watered if needed and re -compacted in order to re - achieve the moisture and density levels discussed above and provide a tight non -yielding subgrade. Sand should not be allowed for use in fine grading the pavement areas as discussed previously. The subgrade moisture content and density must be maintained until paving is completed. The subgrade should be watered just prior to paving to assure concrete placement over a moist subgrade. Non -plastic sand should be specifically prohibited beneath pavement areas during final grading, since these more porous soils can allow water inflow, resulting in heave and strength loss of subgrade soils. It should be specified that only clayey soils will be allowed for fine grading. After fine grading each area in preparation for paving, the subgrade surface should be lightly moistened, as needed, and recompacted to obtain a tight non - yielding subgrade. Note: If a rain event occurs prior to paving, the subgrade should be aerated and re- tested prior to paving. 7.6 DRIVE APPROACHES Water should not be allowed to pond in drive approaches prior to paving. Density tests should be performed on the subgrade soils in each drive approach prior to fine grading in preparation for paving to verify compliance with project specifications. 7.7 PAVEMENT SECTIONS Tables 1 and 2 present the recommended pavement sections for this project: ALLIANCE GEOTECHNICAL GROUP, INC. DE22-041 PAGE 14 TABLE 1. LIGHT DUTY PAVEMENT SECTION AUTOMOBILE TRAFFIC ONLY (Automobile Parking Stalls) PCC SECTION 5 inches Portland Cement Concrete 8 inches Scarified and Compacted Subgrade (Section 7.5)* * Although not required by designed, cement -stabilization and/or placement of flex base could be performed to improve performance and reduce maintenance. TABLE 2. MODERATE DUTY PAVEMENT SECTIONS MODERATE DUTY PAVEMENT (Moderate Heavy Truck Use) ** PCC SECTION 6 inches Portland Cement Concrete 6 inches Cement -Stabilized Subgrade (Section 7.3) Or 6 inches Portland Cement Concrete 8 inches Flex Base (Section 7.4) Or 7 inches Portland Cement Concrete 8 inches Scarified and Compacted Subgrade (Section 7.5) ** For 35 truck repetitions per week (20-year design life). The concrete should have a minimum 28 day compressive strength of 3,600 psi within automobile only pavement and 4,000 psi within truck drive areas. Concrete quality will be important in order to produce the desired flexural strength and long term durability. We recommend that the concrete have 5% entrained air plus or minus 1 %. The concrete should be placed at a slump of 4 inches plus or minus 1 inch for hand pours and a slump of 2 inches plus or minus 1 inch for machine finish pours. Proper joint placement and design is critical to pavement performance. Load transfer at all longitudinal joints and maintenance of watertight joints should be accomplished by use of ALLIANCE GEOTECHNICAL GROUP, INC. DE22-041 PAGE 15 tie bars. Control joints should be sawed as soon as possible after placing concrete and before shrinkage cracks occur. All joints including sawed joints should be properly cleaned and sealed as soon as possible to avoid infiltration of water. Our previous experience indicates that joint spacing on 12 to 15 foot centers have generally performed satisfactorily. It is our recommendation that the concrete pavement be reinforced with a minimum of No. 3 bars placed on chairs on approximately 18-inch centers in each direction. We recommend that the perimeter of the pavements have a stiffening curb section to prevent possible distress due to heavy wheel loads near the edge of the pavements and to provide channelized drainage. 7.8 PAVEMENT CONSIDERATIONS It is recommended that provisions be made in the contract to provide for proofrolling in areas where the subgrade will support new pavements. It is also recommended that an item be included for removal and replacement of soft materials, which are identified by this procedure. Proofrolling can generally be accomplished using a heavy (25 ton or greater total weight) pneumatic tired roller making several passes over the areas. Where soft or compressible zones are encountered, these areas should be removed to a firm subgrade. Wet or very moist surficial materials may need to be undercut and either dried or replaced with proper compaction or replaced with a material which can be properly compacted. Any resulting void areas should be backfilled to finished subgrade in 6 inch compacted lifts compacted to a minimum of 95 percent of maximum dry density as determined by ASTM D 698 at -2% to +2%. The upper 8 inches of subgrade soil within pavement areas should be compacted at - 2% to +2% of optimum moisture to a minimum of 98% of Standard Proctor density (ASTM D 698). Achieving the required field density is dependent upon the adequate pulverization of the clay fill materials, the magnitude of compaction energy and the maintenance of field moisture near optimum. All joints and pavements should be inspected at regular intervals to ensure proper performance and to prevent crack propagation. The soils at the site are active and differential heave within the pavement areas should be anticipated and considered during design of the final grading plan. See Section 5.1. The service life of paving may be reduced due to water infiltration into subgrade soils through ALLIANCE GEOTECHNICAL GROUP, INC. DE22-041 PAGE 16 heave induced cracks in the paving section. This will result in softening and loss of strength of the subgrade soils. A regular maintenance program to seal paving cracks will help prolong the service life of the paving. The life of the pavement can be increased with proper drainage. Areas should be graded to prevent ponding adjacent to curbs or pavement edges. Backfill materials, which could hold water behind the curb, should not be permitted. Compacted clay soils should be used as fill behind the curbs. Flat pavement grades should be avoided. 8.0 EARTHWORK GUIDELINES 8.1 SITE GRADING AND DRAINAGE All grading should provide positive drainage away from the proposed structures and should prevent water from collecting or discharging near the foundations. Water must not be permitted to pond adjacent to the structure during or after construction. Otherwise, differential soil swell movements, and resulting differential foundation movements could exceed the estimates contained within this report. Leave outs should not be allowed to collect and hold water. These leave outs should be pumped out as needed. Surface drainage gradients should be designed to divert surface water away from the building and edges of pavements. Surface drainage gradients of sidewalks, pavements, and landscaping, within 20 feet of the building should be constructed with maximum slopes allowed by local codes and maintained after occupancy (5% minimum in landscaping areas and 2% minimum for flatwork subject to ADA requirements). If flatter grades are used, a permanent horizontal moisture barrier should be used for a distance of 15 feet from the building (20 mil poly sheeting with UV protection attached to the building and covered with 16 inches of on -site compacted clay (compacted in 8 inch lifts at or above optimum to a minimum of 95% of ASTM D698). Provisions should be made for large post -construction differential upward movement of adjacent flat work. Site grading plans should include provisions for the effects of soil swell movements on access and entry slabs, adjacent sidewalks, and all pavements. See Section 5.1 of this report. The roofs should be provided with gutters and downspouts to prevent the discharge of rainwater directly onto the ground adjacent to the building foundation. Downspouts should ALLIANCE GEOTECHNICAL GROUP, INC. DE22-041 PAGE 17 discharge directly onto well -drained areas at least 5 feet from the building. Roof downspouts and surface drain outlets should discharge into erosion —resistant areas. Water permitted to pond in planters, open areas, or areas with unsealed joints next to the structure can result in excessive slab or pavement movements as indicated in this report. Exterior sidewalks and pavements will be subject to large post construction movement as indicated in this report. These potential movements should be considered during preparation of the grading plan. Flat grades should be avoided. Where concrete pavement is used, joints should also be sealed routinely to prevent the infiltration of water. Since post construction movement of pavement and flat work will occur, joints particularly around the building should be periodically inspected and resealed where necessary. 8.2 UTILITY TRENCH EXCAVATION Trench excavation for utilities should be sloped or braced in the interest of safety. Attention is drawn to OSHA Safety and Health Standards (29 CFR 1926/1910), Subpart P, regarding trench excavations greater than 5 feet in depth. 8.3 PROOFROLLING AND SUBGRADE PREPARATION Proofrolling should be performed at base of cuts prior to filling. Proofrolling should be performed in accordance with Section 7.8 of this report. 8.4 GENERAL FILL PLACEMENT IN PAVEMENT AND LANDSCAPING AREAS The on -site surficial clays may be used for general grading and filling. The fill materials should be free of surficial vegetation or debris. The fill soils should be spread in loose lifts, less than 8 inches thick and uniformly compacted to a minimum of 95% of ASTM D 698 (Standard Proctor) between -2% and +2% above optimum moisture. The upper 8 inches within pavement areas should be compacted to a minimum of 98% of ASTM D698. The city ordinance should be followed where applicable. 8.5 ON -SITE CLAY FILL PLACEMENT IN BUILDING AREAS On -site clay soils may be used as fill in building areas. All fill should be placed and compacted in maximum 8-inch lifts. Prior to fill placement, the subgrade should be scarified and compacted to a depth of 8 inches. See Section 6.0 of this report. ALLIANCE GEOTECHNICAL GROUP, INC. DE22-041 PAGE 18 Each layer shall be leveled with approved equipment. After spreading, each layer shall be thoroughly manipulated by plowing, discing, or other approved methods of the full depth of the layer being placed to insure uniform density and moisture distribution for proper compaction. The moisture content at the time of compaction shall be within the range specified in this report. If the material is too dry, it shall be moistened by watering before and during manipulation, to properly condition the material for compaction. If the material is too wet, the compaction operation shall be delayed until the moisture content has been reduced to within satisfactory compaction range. Because of time of completion limitations, thoroughly processing of the on -site clay soils will be required during manipulation if the moisture content is below optimum at the time of placement. Each fill lift should be processed until the soil mixture is free of large clods to allow uniform moisture distribution and uniform compaction within the entire fill lift. This is particularly important if highly plastic clay soils are to be used as fill in the building pads. The amount of processing and reworking required to achieve uniform moisture conditions can be reduced by pre -wetting the onsite soils prior to placement. As a quality control measure, pocket penetrometer (P.P.) tests shall be performed with each field density test during construction as further verification that proper moisture conditioning is being achieved within the clay fill soils. Proper moisture condition should be indicated with hand penetrometer readings with the following ranges. Hand Penetrometer: 3.0 to 4.5 tsf (very sandy clay and clayey sand) 3.0 to 4.0 tsf (sandy clay PI of 19 to 28) Similarly, P.P. tests should be performed on each Proctor Compaction Point in the laboratory for correlation and verification of the desired P.P. range with respect to Proctor moisture, density and swell (with verification that volumetric swell is less than 1 % at the targeted moisture content). Prior to construction, it should be confirmed that the "targeted moisture contents" recommended in this report will result in an average volumetric swell of less than 1 %. This swell testing should be performed in conjunction with all proctor compaction testing. If the targeted moisture contents result in an average swell of over 1 % or in a P.P. value outside the range indicated above, AGG should be contacted to ALLIANCE GEOTECHNICAL GROUP, INC. DE22-041 PAGE 19 determine if the intent of the geotechnical design is being achieved with respect to required swell reduction and bearing capacity. 8.6 SELECT FILL PLACEMENT IN BUILDING AREAS The material used as select fill should be a very sandy clay to clayey sand (uniform consistency free of clay clods) with a liquid limit of less than 35 and a plasticity index between 6 and 15. The select fill should be spread in loose lifts, less than 8 inches thick, and uniformly compacted to a minimum of 98 percent of ASTM Standard D 698 between - 2% and +2% above the soil's optimum moisture content. The upper 24 inches of fill in unpaved areas near the building should consist of compacted on —site clay or sandy clay having a PI of at least 20 to minimize water infiltration into the select fill (compacted in 8 inch lifts at optimum to +3% to minimum of 95% of ASTM D698). 9.0 TREE EFFECTS It should be recognized that concrete slabs (floor slabs, shallow foundations, sidewalks, and pavements) will be subject to long term settlement due to ground shrinkage caused by moisture absorption of tree root systems. To minimize long term settlements, trees and deep rooted shrubs should not be planted within 35 feet of the building and critical flatwork areas sensitive to movement in order to minimize settlements caused by ground shrinkage associated with moisture absorption of the tree root systems. Also, the area beneath the un-pruned mature tree drip lines and to limits of at least 10 feet beyond the drip line should not be paved. The area beneath the drip line should be landscaped and irrigated. Otherwise, an arborist should be contacted regarding the installation, effectiveness, and use of root barriers and irrigated tree wells to minimize future slab -on -grade shallow foundation and flatwork settlements due to ground shrinkage caused by tree root absorption. If an arborist is consulted and root barriers and irrigated tree wells are installed, trees should still be at least 25 feet from the foundation. 10.0 DETENTION POND CONSTRUCTION REQUIREMENTS Two detention ponds will be constructed as well on this site. One of the detention ponds will be located on the south side of the middle portion of the site and the other detention pond will be located along the eastern edge of the property. We understand that these detention ponds need to be designed to catch excess rain runoff but are not required to hold water. Both of the detention ponds will be about 7 feet deep and will be constructed mostly by cutting and excavating. The embankments are anticipated to have 3H:1 V slopes. ALLIANCE GEOTECHNICAL GROUP, INC. DE22-041 PAGE 20 Where filling is required, the embankments should be constructed of the native very sandy clay and clayey sands having a PI between 4 and 19. Non -plastic soils (PI less than 4) and clayey soils having a PI of 20 or greater should not be used for embankment filling. According to Table 7.1 of TxDOT's Geotechnical Manual, the PI of the embankment soils must be less than 20 for a 3H:1 V slope in order to achieve a factor of safety of 1.3 against slope stability failure. The fill should be spread in horizontal benched lifts, less than 8 inches thick, and uniformly compacted to a minimum of 98 percent of ASTM D698 between -2% and +2% percentage points above the soils optimum moisture content. Compaction must be achieved along the existing benched excavation interface / pond embankment. Compacted fill should be placed beyond final lines and grades to allow the slope to be trimmed of loose soil during final grading. In this manner, compacted fill will be exposed along the final embankment slopes rather than loose non -compacted fill. Compaction along sloped grades should not be allowed. 11.0 FIELD SUPERVISION AND DENSITY TESTING Field density and moisture content determinations should be made on each lift of fill with a minimum of 3 tests per lift in the building pad areas, (minimum 1 per 2,500 sf), 1 test per lift per 5,000 sf in other fill areas, and 1 test per lift per 100 to 150 linear feet of utility trench backfill. Supervision by the field technician and the project engineer is required. Some adjustments in the test frequencies may be required based upon the general fill types and soil conditions at the time of fill placement. Many problems can be avoided or solved in the field if proper inspection and testing services are provided. It is recommended that all footing excavations, proofrolling, site and subgrade preparation, subgrade stabilization and pavement construction be monitored by a qualified engineering technician. Density tests should be performed to verify compaction and moisture content of any earthwork. Inspection should be performed prior to and during concrete placement operations. Alliance Geotechnical Group employs a group of experienced, well -trained technicians for inspection and construction materials testing who would be pleased to assist you on this project. ALLIANCE GEOTECHNICAL GROUP, INC. DE22-041 PAGE 21 12.0 LIMITATIONS The professional services, which have been performed, the findings obtained, and the recommendations prepared were accomplished in accordance with currently accepted geotechnical engineering principles and practices. The possibility always exists that the subsurface conditions at the site may vary somewhat from those encountered in the test borings. The number and spacing of test borings were chosen in such a manner as to decrease the possibility of undiscovered abnormalities, while considering the nature of loading, size, and cost of the project. If there are any unusual conditions differing significantly from those described herein, Alliance Geotechnical Group, Inc. should be notified to review the effects on the performance of the recommended foundation system. The recommendations given in this report were prepared exclusively for the use of client and their consultants. The information supplied herein is applicable only for the design of the previously described development to be constructed at locations indicated at this site and should not be used for any other structure, locations, or for any other purpose. We will retain the samples acquired for this project for a period of 30 days subsequent to the submittal date printed on the report. After this period, the samples will be discarded unless otherwise notified by the owner in writing. ALLIANCE GEOTECHNICAL GROUP, INC. DE22-041 PAGE 22 FIGURES ALLIANCE GEOTECHNICAL GROUP DE22-041 Ze..Y y.. E - '-y. k ��' �r •�e� r .JOA a{V? -t B-7 J B-4 B-8 B-3 B-6 .� ,.. _ LOG OF BORING B-1 Project: Trinity Crossing Addition, Ft. Worth, TX Project No.: DE22-041 Date: 3/3/2022 Elev.:=527.0' Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: was: Depth to caving when checked: was: ELEVATION/ I SOIL SYMBOLS DEPTH SAMPLER SYMBOLS DESCRIPTION % % % % -% DID RIPEN UNsf Strain (feet) & FIELD TEST DATA % % % % % pcf tsf ksf �4//6;; Soft reddish brown and tan very sandv CLAY, w/ gravel 3/6° (FILL) O 1 /6" 1/s" - 5 1/6„ 1/6 2/6 " Brown and tan sandv CLAY, w/ sand seams and iron stains Reddish brown and gray sandy CLAY, w/ iron stains - 10 12 31 16 15 60 0.25 --- — 0.5 17 119 0.75 1.4 8.1 1.0 4.0 15 4.0 Reddish brown and tan clavev SAND to sandv CLAY, 4.5+ w/ iron stains 11 4.5+ -15 ` 19/6" 21/6" 19/6 - 20 Gray and tan sandv CLAY, w/ iron stains /6" 8/6" 25 11/6" 3/6" Tan and gray clavev SAND MA7/6 5/6° - 30 " Boring terminated at 30 feet - 35 Notes: 14 4.5+ 4.5+ FIGURE:2 Alliance Geotechnical Group, Inc. LOG OF BORING B-2 Project: Trinity Crossing Addition, Ft. Worth, TX Project No.: DE22-041 Date: 3/3/2022 Elev.:=528.5' Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: was: Depth to caving when checked: was: ELEVATION/ I SOIL SYMBOLS DEPTH SAMPLER SYMBOLS DESCRIPTION % % % % -% DID RIPEN UNsf Strain (feet) & FIELD TEST DATA % % % % % pcf tsf ksf -s 6;6;; Reddish brown and brown sandv SILT, w/ trace gravel 14 65 6/6" and sand seams 9/6" 14/6 19/6" ,5/s" Reddish brown and brown sandv CLAY, w/ sand seams - 5 / 19/6° and trace gravel 12 41 15 26 60 4.5+ 28/6" 12/6" 16/6" 9/6" 9/6" 15/6" - 10 � 19/6" 13/s„ Brown and tan sandy CLAY, w/ sand seams /6" - 15 21 21/6" ` 1/6" 18/6" 20 / 23/6" Gray and tan sandv CLAY, w/ sand seams ` 1/6" 15/6" 25 / 17/6" Gray and tan CLAY, jointed, w/ trace sand and iron /stains 9/6" 12/6" - 30 16/6" Boring terminated at 30 feet - 35 Notes: m 10 4.5+ 4.5+ 4.5+ 4.5+ 4.5+ 4.5+ FIGURE:3 Alliance Geotechnical Group, Inc. LOG OF BORING B-3 Project: Trinity Crossing Addition, Ft. Worth, TX Date: 3/3/2022 Elev.:=529.0' Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: was: Depth to caving when checked: was: ELEVATION/ I SOIL SYMBOLS DEPTH SAMPLER SYMBOLS DESCRIPTION (feet) & FIELD TEST DATA Brown and reddish brown sandv CLAY, w/ gravel and �6/6" iron stains ` /6 9" / /6" 12/6" 5 7/6" 10/6" 12/6" Reddish brown and tan sandv CLAY, w/ trace gravel and sand seams 10 Project No.: DE22-041 MC LL PL PI -200 DID RIPEN UNCON Strain % % % % % PCf tsf ksf % 4.5+ 15 35 15 20 4.5+ 4.5+ 11 4.5+ 15 39 14 25 73 116 4.5+ 4.5+ 4.5+ - ----------------------------------- Brown and tan sandy CLAY, w/ sand seams and iron //.. stains f 9/6" 11 4.5+ 16/6" 15 ms 24/6" ` 12/6 4.5+ 19/6" 20 24/6" - ----------------------------------- 11/6„ Gray and tan CLAY, jointed, w/ iron stains 4.5+ 12/6" - 25 / 15/6" Gray and tan sandv CLAY, w/ iron stains 4.0 4.0 30 Boring terminated at 30 feet - 35 Notes: FIGURER Alliance Geotechnical Group, Inc. LOG OF BORING B-4 Project: Trinity Crossing Addition, Ft. Worth, TX Project No.: DE22-041 Date: 3/3/2022 Elev.:=530.0' Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: was: Depth to caving when checked: was: ELEVATION/ I SOIL SYMBOLS DEPTH SAMPLER SYMBOLS DESCRIPTION % % % % -% DID RIPEN UNsf Strain (feet) & FIELD TEST DATA % % % % % pcf tsf ksf -0 sis° Brown sandv CLAY 11 4.z 6/6" 4.5+ a/6" Reddish brown sandv_ CLAY 16 40 14 26 ss a.s+ 7/6" 4.5++ 7/6" - 5 3/6" 3.7 4/6" 4.0 5/6" 3/6„ Reddish brown sandv_ CLAY, w/ iron stains 5/6" 3.5 8/6" 6/6" 3.7 8/6" 4.0 - 10 9/6" 6/6" 13 3.2 - 15 9/6" 0 ;00 11/ 11/6" 4.5+ 20 14/6" 6/6" Light gray slightly sandv CLAY, w/ iron stains 8/6" 15 4.5+ 25 10/6" Light gray sandv CLAY, w/ iron stains /s ` 8/6' 4.5+ 14/6" 30 15/6" Boring terminated at 30 feet - 35 Notes: FIGURE:5 Alliance Geotechnical Group, Inc. LOG OF BORING B-5 Project: Trinity Crossing Addition, Ft. Worth, TX Project No.: DE22-041 Date: 3/3/2022 Elev.:=528.5' Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: was: Depth to caving when checked: was: ELEVATION/ I SOIL SYMBOLS DEPTH SAMPLER SYMBOLS DESCRIPTION % % % % -% DID RIPEN UNsf Strain (feet) & FIELD TEST DATA % % % % % pcf tsf ksf 3;6;; Brown clavev SAND, w/ clay seams and iron stains 5/6" - ----------------------------------- 8/6„ Reddish brown and tan very sandv CLAY, w/ iron stains 12 34 14 20 124 4.5++ 10/6° and trace gravel 10/6" 5 9/6' 4.5++ 16/6" 20/6" 9/6„ Reddish brown and tan very sandv CLAY to clavev 4.5++ 11/6" SAND, w/ trace gravel 13/6" 9/6" 9 31 14 17 126 4.5++ 11 /6" - 10 13/6" 9/6„ Reddish brown and tan sandv CLAY, w/ trace gravel 10 4.5+ 16 /6° and sand seams 20 15 20/6" 10/6" Brown and gray CLAY, jointed, w/ sand 14 4.5+ 18/6" -20 19/6" - ----------------------------------- Tan and gray CLAY, jointed, w/ iron stains _ 8/6" 4.5+ 13/6" -25 17/6" Gray and tan sandv CLAY, w/ sand seams 4.5 rr 4.5+ 30 Boring terminated at 30 feet - 35 Notes: FIGURE:6 Alliance Geotechnical Group, Inc. , LOG OF BORING B-6 Project: Trinity Crossing Addition, Ft. Worth, TX Project No.: DE22-041 Date: 3/17/2022 Elev.:=526.0' Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: was: Depth to caving when checked: was: ELEVATION/ I SOIL SYMBOLS DEPTH SAMPLER SYMBOLS DESCRIPTION % % % % -% DID RIPEN UNsf Strain (feet) & FIELD TEST DATA % % % % % pcf tsf ksf -0 4/6„ Brown silty SAND 11 45 a/6" 5/6" Reddish brown sandy CLAY, w/ iron stains and nodules 3/6" 3.5 5/s" 3.0 7/6" 14 -5 4.5+ / 4.15 36 15 21 3.0.0 4.2 / 4.0 10 / 4.5 2.5 14 116 3.0 2.4 7.1 15 I $/6„ Brown and tan CLAY, jointed, w/ sand seams and iron 4.5++ 13/6" stains -20 19/6" Tan sandy CLAY, w/ iron stains 12 4.5++ - 2s I 4.5++ vv ve ve �9/6„ Reddish brown SAND, w/ clay layers - 30 9/6" Boring terminated at 30 feet - 35 Notes: FIGURE:7 Alliance Geotechnical Group, Inc. , LOG OF BORING B-7 Project: Trinity Crossing Addition, Ft. Worth, TX Project No.: DE22-041 Date: 3/16/2022 Elev.:=526.0' Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: was: Depth to caving when checked: was: ELEVATION/ I SOIL SYMBOLS DEPTH SAMPLER SYMBOLS DESCRIPTION % % % % -% DID RIPEN UNsf Strain (feet) & FIELD TEST DATA % % % % % pcf tsf ksf -0 4/6" — Reddish brown siltv sand 5/6° Reddish brown sandv CLAY 11 2.75 6/6" ,o/s" Reddish brown sandy CLAY, w/ sand seams and gravel 15/6° fragments 4.5++ Z 18/6" 11 /6" 13 4.5++ 5 14/6" 14/6" _ 11 /s" 16/6" 20/6" Gray and tan sandv CLAY, w/ iron stains 8/6" 14/6" 10 / 16/6" Brown and tan sandy CLAY, w/ sand seams and iron 9/6" stains / 16/6" 15 /` 25/6" 9/6„ Brown and tan CLAY, jointed, fissured, w/ sand 16/6" - 20 22/6" 13 ---4.5++-------- 4.5++ 12 40 15 25 70 126 4.5++ 14 120 4.5++ - ----------------------------------- Gray and tan CLAY, jointed, fissured, w/ sand and silt seams, calcareous nodules and iron stains 9/6" 15/6" 4.5++ - 25 17/6" 9/6„ Brown and tan medium -coarse SAND 116 1 /6" - 30 v..: 16/6" Boring terminated at 30 feet - 35 Notes: FIGURE:8 Alliance Geotechnical Group, Inc. , LOG OF BORING B-8 Project: Trinity Crossing Addition, Ft. Worth, TX Date: 3/16/2022 Elev.:=525.0' Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: was: Depth to caving when checked: was: ELEVATION/ I SOIL SYMBOLS DEPTH SAMPLER SYMBOLS DESCRIPTION (feet) & FIELD TEST DATA — 0 3/6„ 4/6" Brown siltv SAND 4/6" Reddish brown sandv CLAY, w/ gravel fragments —5 Gray, tan and reddish brown very sandv CLAY to clavev SAND, w/ iron stains 10 : � ®r: 15 ms Brown and gray CLAY, jointed, w/ iron stains 9/6" 12/6" — 20 /01 15/6" Gray and tan sandv CLAY 06/64/6 9" 25 / /6" 5//6„ Brown and tan medium SAND 6/6„ 30 8/6" Boring terminated at 30 feet — 35 Project No.: DE22-041 MC LL PL PI -200 DID RIPEN UNCON Strain % % % % % PCf tsf ksf % 16 3.5 14 3.0 3.5 ----------------------------------- 4.5+ 15 32 14 18 3.75 16 4.5+ 4.5++ 4.5 Notes: FIGURE:9 Alliance Geotechnical Group, Inc. , LOG OF BORING B-9 Project: Trinity Crossing Addition, Ft. Worth, TX Date: 3/15/2022 Elev.:=522.5' Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: was: Depth to caving when checked: was: ELEVATION/ I SOIL SYMBOLS DEPTH SAMPLER SYMBOLS DESCRIPTION (feet) & FIELD TEST DATA -0 3/6„ Reddish brown silty SAND 2/6" 3/6" Project No.: DE22-041 MC LL PL PI -200 DID RIPEN UNCON Strain % % % % % PCf tsf ksf % 11 - ----------------------------------- Reddish brown sandy CLAY 3.5 17 4.5 - ---------------------------------- ,z/s" Reddish brown and tan sandv CLAY, w/ iron stains and 4.5++ -5 16/6° nodules 4.5++ - / 2o/s° 13/6" 16/6" 1::12 /6" 17/6" - 10 � 22/6" 12/6" Reddish brown and tan sandv CLAY 17/6" - 15 28/s" : � 0 r : 8/6" 20 � 11/6" 18/s" ev ; �5/6„ Brown SAND, w/ clay layers and gravel 7/6" 25 7/6" - $/6„ Gray and tan silty CLAY 15/6" 30 22/s" Boring terminated at 30 feet - 35 Notes: 4.5++ 13 31 14 17 75 4.5++ 4.5++ 4.5++ 10 4.5++ 4.5++ 17 4.5++ 4.5++ 3.7 4.5 FIGURE:10 Alliance Geotechnical Group, Inc. LOG OF BORING B-10 Project: Trinity Crossing Addition, Ft. Worth, TX Project No.: DE22-041 Date: 3/16/2022 Elev.:=523.0' Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: was: Depth to caving when checked: was: ELEVATION/ I SOIL SYMBOLS DEPTH SAMPLER SYMBOLS DESCRIPTION % % % % -% DID RIPEN UNsf Strain (feet) & FIELD TEST DATA % % % % % pcf tsf ksf s/s" Reddish brown sandy_ CLAY, w/ organics 6/6" 12 4.5++ 10/6" - ----------------------------------- IIE 11/6„ Reddish brown sandy_ CLAY 4.5++ 16/6" 4.5++ 28/6" - 5 10/6" 4.5++ 15/6" 11 43 15 28 4.5++ 1/6" 12/6" 4.5++ 18/6" 4.5++ 24/6" " 7/6„ Brown and tan sandy CLAY, w/ iron stains 12 4.5++ 14/64.5++ - 10 .:�O 17/6" ,s/s" Brown and reddish brown sandv CLAY 9 4.5++ 2/6" 4.5++ 15 / 29/6" Gray and tan CLAY, jointed, w/ iron stains _ 9/6" 4.5++ 14/6" 4.5++ - 20 26/6" Reddish brown SAND, w/ gravel 3/6" 10 X 4/6" - 25 4/6 6/6" Gray and tan CLAY, jointed, w/ iron stains 2.75 10/6° 3.7 —30 15/6" Boring terminated at 30 feet - 35 Notes: FIGURE:11 Alliance Geotechnical Group, Inc. Symbol Description Strata svmbols CLAY, sandy SAND, clayey SILT, sandy CLAY V / SAND, silty SAND CLAY, silty Soil Samplers Standard Penetration Test Thin Wall Shelby Tube Notes KEY TO LOG TERMS & SYMBOLS Symbol Description UAuger 1. Exploratory borings were drilled on dates indicated using truck mounted drilling equipment. 2. Water level observations are noted on boring logs. 3. Results of tests conducted on samples recovered are reported on the boring logs. Abbreviations used are: DD = natural dry density (pcf) LL = liquid limit (o) MC = natural moisture content (o) PL = plastic limit (o) Uncon.= unconfined compression (tsf) PI = plasticity index P.Pen.= hand penetrometer (tsf) -200 = percent passing #200 4. Rock Cores REC = (Recovery) sum of core sample recovered divided by length of run, expressed as percentage. RQD = (Rock Quality Designation) sum of core sample recovery 4" or greater in length divided by the run, expressed as percentage. FIGURE:12 Alliance Geotechnical Group, Inc. SWELL TEST RESULTS ATTERBERG IN -SITU FINAL VERTICAL BORING DEPTH UNIT LIMITS MOISTURE MOISTURE LOAD SWELL NO. (FEET) WEIGHT LL PL PI CONTENT CONTENT (PSF) % B-3 7-8 116.0 39 14 25 14.5 16.1 938 1.0 3-4 123.9 34 14 20 12.2 13.8 438 1.5* B-5 9-10 126.2 31 14 17 8.6 11.6 1188 0.9* 14-15 125.9 40 15 25 11.7 12.5 1813 0.4* B-7 19-20 119.6 - - - 14.4 17.1 2438 3.5* B-10 5-6 125.5 43 15 28 11.1 15.0 688 4.3* *Sample was remolded using Modified compaction effort prior to performing swell test. PROCEDURE: 1. The subject sample is placed in a confined ring. Then, the design load (including overburden) is applied to the sample. 2. The confined ring with the sample is then submerged with free water with surfactant and allowed to swell completely. 3. Once the swell movement stabilized, the design load was removed and the sample was retrieved for final moisture content determination. Project No: ALLIAIiCE GEOTECFinICAL DE22-041 SWELL TEST RESULTS G GROUP TRINITY CROSSING ADDITION FIGURE DALLAS, TEXAS 13 APPENDIX MEASURES TO MINIMIZE DEEP SEATED SWELL ALLIANCE GEOTECHNICAL GROUP DE22-041 MEASURES TO MINIMIZE DEEP SEATED SWELL In order to reduce the risk of excessive upward ground movements caused by soil swelling associated with free water sources, the following measures should be taken during design and construction: • The use of superior contractors and utility line materials accompanied with Quality Control inspection and testing of all utility line installations including automatic sprinkler systems installed after construction. • Sprinkler lines should not be installed near the structure. Instead, the system should be designed so that the lines themselves are as far away from the structure as possible. Sprinkler heads should be used with a capacity to direct water toward the structure from distances of several feet. • Utility under -drains with impervious barriers along the trench bottom may be used as an additional safeguard to minimize post -construction upward movement caused by water percolation into the deeper clay soils. • Elevated landscape beds over impervious lining should be used in lieu of recessed beds to prevent ponding water conditions near the structure. • Positive drainage should be provided. Surface drainage gradients within 20 feet of the building should be constructed with maximum slopes allowed by local codes. • Roof gutters should be used to direct roof runoff away from the structure in the most direct manner. Downspouts should not be allowed to discharge into landscaped areas located near the building. Downspout extensions should be used to facilitate drainage from the structure. • Rapid repair of any utility leak including water lines, sewer lines, sprinkler line, sprinkler heads. • Trees and deep rooted shrubs should not be planted within 40 feet of the building to minimize settlements caused by ground shrinkage associated with moisture absorption of the tree root systems. Also, the area beneath the un-pruned mature tree drip lines and to limits of at least 10 feet beyond the drip line should not be paved. The area beneath the drip line should be landscaped and irrigated. Otherwise, an arborist should be contacted regarding the installation, effectiveness, and use of root barriers and irrigated tree wells to minimize future slab -on -grade foundation and flatwork settlements due to ground shrinkage caused by tree root absorption. If the risk of large deep-seated swell is not acceptable for these structures, and/or if the costs associated with the required deep excavation and moisture conditioning are cost prohibitive, the foundation systems should consist of straight shaft piers that are socketed into the bearing stratum in conjunction with structurally supported floor slabs over void spaces. It should be noted that deeper test borings would be required in order to penetrate and determine straight shaft values for the bearing stratum (which was not encountered within the 30 feet deep test borings). ALLIANCE GEOTECHNICAL GROUP E22-041 GR-01 60 00 Product Requirements THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH The Business Park at Trintity STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 104654 Revised July 1, 2011 104 Item 104 Removing Concrete 2. 3. 4. DESCRIPTION Break, remove, and salvage or dispose of existing hydraulic cement concrete. CONSTRUCTION Texas Ikpartmenf of Transportation Remove existing hydraulic cement concrete from locations shown on the plans. Avoid damaging concrete that will remain in place. Saw -cut and remove the existing concrete to neat lines. Replace any concrete damaged by the Contractor at no expense to the Department. Accept ownership and properly dispose of broken concrete in accordance with federal, state, and local regulations unless otherwise shown on the plans. MEASUREMENT Removing concrete pavement, floors, porches, patios, riprap, medians, foundations, sidewalks, driveways, and other appurtenances will be measured by the square yard (regardless of thickness) or by the cubic yard of calculated volume, in its original position. Removing curb, curb and gutter, and concrete traffic barrier will be measured by the foot in its original position. The removal of monolithic concrete curb or dowelled concrete curb will be included in the concrete pavement measurement. Removing retaining walls will be measured by the square yard along the front face from the top of the wall to the top of the footing. This is a plans quantity measurement Item. The quantity to be paid is the quantity shown in the proposal, unless modified by Article 9.2., "Plans Quantity Measurement." Additional measurements or calculations will be made if adjustments of quantities are required. PAYMENT The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price bid for "Removing Concrete" of the type specified. This price is full compensation for breaking the concrete; loading, hauling, and salvaging or disposing of the material; and equipment, labor, tools, and incidentals. Removing retaining wall footings will not be paid for directly but will be considered subsidiary to this Item. 73 465 Item 465® Junction Boxes, Manholes, and Inlets Texas De of Trapartnsportmentation 1. DESCRIPTION Construct junction boxes, manholes, and inlets, complete in place or to the stage detailed, including furnishing and installing frames, grates, rings, and covers. 2. MATERIALS Furnish materials in accordance with the following: ■ Item 420, "Concrete Substructures," ■ Item 421, "Hydraulic Cement Concrete," ■ Item 440, 'Reinforcement for Concrete," and ■ Item 471, "Frames, Grates, Rings, and Covers." Cast -in -place junction boxes, manholes, inlets, risers, and appurtenances are acceptable unless otherwise shown. Alternate designs for cast -in -place items must be acceptable to the Engineer and must conform to functional dimensions and design loading. Alternate designs must be designed and sealed by a licensed professional engineer. 2.1. Concrete. Furnish Class H concrete as referenced in Item 421 "Hydraulic Cement Concrete," except that Mix Design Options 1-8 will be allowed for formed precast junction boxes, manholes, and inlets. Furnish concrete per DMS-7310, `Reinforced Concrete Pipe and Machine -Made Precast Concrete Box Culvert Fabrication and Plant Qualification," for machine -made precast junctions boxes, manholes, and inlets. Furnish Class C concrete for cast -in -place manholes and inlets unless otherwise shown on the plans. 2.2. Mortar. Furnish mortar conforming to DMS-4675, "Cementitious Grouts and Mortars for Miscellaneous Applications." 2.3. Timber. Provide sound timber that is a minimum of 3 in. nominal thickness and reasonably free of knots and warps for temporary covers when used with Stage I construction (see Article 465.3., "Construction"). 2.4. Other Materials. Use commercial -type hardware as approved. 3. CONSTRUCTION Construct all types of junction boxes, manholes, and inlets either complete or in 2 stages, described as Stage I and Stage 11. Construct the Stage I portion of junction boxes, manholes, and inlets as shown on the plans or as specified in this Item. Furnish and install a temporary cover as approved. Furnish and install the storm drain pipe and a temporary plug for the exposed end of the storm drain pipe from the storm drain to a point below the top of curb indicated on the plans for Stage I construction of cast iron or steel inlet units. Construct Stage II after the pavement structure is substantially complete unless otherwise approved. Construct the remaining wall height and top of junction box, manhole, or inlet for Stage 11, and furnish and install any frames, grates, rings and covers, curb beams, or collecting basins required. 659 465 Item 465® Junction Boxes, Manholes, and Inlets Texas De of Trapartnsportmentation 1. DESCRIPTION Construct junction boxes, manholes, and inlets, complete in place or to the stage detailed, including furnishing and installing frames, grates, rings, and covers. 2. MATERIALS Furnish materials in accordance with the following: ■ Item 420, "Concrete Substructures," ■ Item 421, "Hydraulic Cement Concrete," ■ Item 440, 'Reinforcement for Concrete," and ■ Item 471, "Frames, Grates, Rings, and Covers." Cast -in -place junction boxes, manholes, inlets, risers, and appurtenances are acceptable unless otherwise shown. Alternate designs for cast -in -place items must be acceptable to the Engineer and must conform to functional dimensions and design loading. Alternate designs must be designed and sealed by a licensed professional engineer. 2.1. Concrete. Furnish Class H concrete as referenced in Item 421 "Hydraulic Cement Concrete," except that Mix Design Options 1-8 will be allowed for formed precast junction boxes, manholes, and inlets. Furnish concrete per DMS-7310, `Reinforced Concrete Pipe and Machine -Made Precast Concrete Box Culvert Fabrication and Plant Qualification," for machine -made precast junctions boxes, manholes, and inlets. Furnish Class C concrete for cast -in -place manholes and inlets unless otherwise shown on the plans. 2.2. Mortar. Furnish mortar conforming to DMS-4675, "Cementitious Grouts and Mortars for Miscellaneous Applications." 2.3. Timber. Provide sound timber that is a minimum of 3 in. nominal thickness and reasonably free of knots and warps for temporary covers when used with Stage I construction (see Article 465.3., "Construction"). 2.4. Other Materials. Use commercial -type hardware as approved. 3. CONSTRUCTION Construct all types of junction boxes, manholes, and inlets either complete or in 2 stages, described as Stage I and Stage 11. Construct the Stage I portion of junction boxes, manholes, and inlets as shown on the plans or as specified in this Item. Furnish and install a temporary cover as approved. Furnish and install the storm drain pipe and a temporary plug for the exposed end of the storm drain pipe from the storm drain to a point below the top of curb indicated on the plans for Stage I construction of cast iron or steel inlet units. Construct Stage II after the pavement structure is substantially complete unless otherwise approved. Construct the remaining wall height and top of junction box, manhole, or inlet for Stage 11, and furnish and install any frames, grates, rings and covers, curb beams, or collecting basins required. 659 465 Construct cast -in -place junction boxes, manholes, and inlets in accordance with Item 420, "Concrete Substructures." Forms will be required for all concrete walls. Outside wall forms for cast -in -place concrete may be omitted with approval if the surrounding material can be trimmed to a smooth vertical face. 3.1. Precast Junction Boxes, Manholes, and Inlets. Construct formed precast junction boxes, manholes, and inlets in accordance with Item 420, "Concrete Substructures," except as otherwise noted in this Item. Construct machine -made precast junction boxes, manholes, and inlets in accordance with ASTM C478 except as otherwise noted in this Item. Mix and place concrete for machine -made junction boxes, manholes, and inlets per the requirements of DMS-7310, "Reinforced Concrete Pipe and Machine -Made Precast Concrete Box Culvert Fabrication and Plant Qualification." Conform to the product permissible variations and rejection criteria stated in ASTM C478 for machine -made precast junction boxes, manholes, and inlets. Cure all precast units in accordance with Item 424, "Precast Concrete Structural Members (Fabrication)." Multi -project fabrication plants as defined in Item 424 "Precast Concrete Structural Members (Fabrication)," that produce manholes and inlets will be approved by the Construction Division in accordance with DMS-7340, "Qualification Procedure for Multi -Project Fabrication Plants of Precast Concrete Junction Boxes, Manholes and Inlets." The Department's MPL has a list of approved multi -project plants. 3.1.1. Lifting Holes. Provide no more than 4 lifting holes in each section for precast units. Lifting holes may be cast, cut into fresh concrete after form removal, or drilled. Provide lifting holes large enough for adequate lifting devices based on the size and weight of the section. The maximum hole diameter is 3 in. at the inside surface of the wall and 4 in. at the outside surface. Cut no more than 5 in. in any direction of reinforcement per layer for lifting holes. Repair spalled areas around lifting holes. 3.1.2. Marking. Clearly mark each precast junction box, manhole, and inlet unit with the following information: ■ name or trademark of fabricator and plant location; ■ product designation; ■ ASTM designation (if applicable); ■ date of manufacture; ■ designated fabricator's approval stamp; and ■ designation "SR" for product meeting sulfate -resistant concrete plan requirements (when applicable). 3.1.3. Storage and Shipment. Store precast units on a level surface. Do not ship units until design strength requirements have been met. 3.2. Excavation, Shaping, Bedding, and Backfill. Excavate, shape, bed, and backfill in accordance with Item 400, "Excavation and Backfill for Structures." Immediate backfilling is permitted for all junction box, manhole, and inlet structures where joints consist of rubber boots, rubber gaskets, or bulk or preformed joint sealant. Take precautions in placing and compacting the backfill to avoid any movement of junction boxes, manholes, and inlets. Remove and replace junction boxes, manholes, and inlets damaged by the Contractor at no expense to the Department. 3.3. Junction Boxes, Manholes, and Inlets for Precast Concrete Pipe Storm Drains. Construct junction boxes, manholes, and inlets for precast concrete pipe storm drains before completion of storm drain lines into or through the junction box, manhole, or inlet. Neatly cut all storm drains at the inside face of the walls of the junction box, manhole, or inlet. 3.4. Junction Boxes, Manholes, and Inlets for Box Storm Drains. Place bases or risers of junction boxes, manholes, and inlets for box storm drains before or in conjunction with placement of the storm drain. Backfill the junction box, manhole, or inlet and storm drain as a whole. 3.5. Inverts. Shape and route floor inverts passing out or through the junction box, manhole, or inlet as shown on the plans. Shape by adding and shaping mortar or concrete after the base is placed or by placing the required additional material with the base. 660 465 3.6. Finishing Complete Junction Boxes, Manholes, and Inlets. Complete junction boxes, manholes, and inlets in accordance with the plans. Backfill to original ground elevation in accordance with Item 400, "Excavation and Backfill for Structures." 3.7. Finishing Stage I Construction. Complete Stage I construction by constructing the walls to the elevations shown on the plans and backfilling to required elevations in accordance with Item 400, "Excavation and Backfill for Structures." 3.8. Stage II Construction. Construct subgrade and base course or concrete pavement construction over Stage I junction box, manhole, or inlet construction unless otherwise approved. Excavate to expose the top of Stage I construction and complete the junction box, manhole or inlet in accordance with the plans and these Specifications, including backfill and cleaning of all debris from the bottom of the junction box, manhole, or inlet. 3.9. Inlet Units. Install cast iron or steel inlet units in conjunction with the construction of concrete curb and gutter. Set the inlet units securely in position before placing concrete for curb and gutter. Form openings for the inlets and recesses in curb and gutter as shown on the plans. Place and thoroughly consolidate concrete for curb and gutter adjacent to inlets and around the inlet castings and formed openings and recesses without displacing the inlet units. 4. MEASUREMENT All junction boxes, manholes, and inlets satisfactorily completed in accordance with the plans and specifications will be measured by each junction box, manhole, or inlet, complete, or by each junction box, manhole, or inlet completed to the stage of construction required by the plans. 5. PAYMENT The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for as follows: 5.1. Complete Manholes. Payment for complete manholes will be made at the unit price bid for "Manhole (Complete)" of the type specified. 5.2. Complete Inlets. Payment for inlets will be made at the unit price bid for "Inlet (Complete)," of the type specified. 5.3. Complete Junction Boxes. Payment for junction boxes will be made at the unit price bid for "Junction Box (Complete)" of the type specified. 5.4. Manholes Stage I. Payment for Manholes, Stage I, will be made at the unit price bid for each "Manhole (Stage 1)" of the type specified. 5.5. Manholes Stage II. Payment for Manholes, Stage 11, will be made at the unit price bid for each "Manhole (Stage 11)" of the type specified. 5.6. Inlets Stage I. Payment for Inlets, Stage I, will be made at the unit price bid for each "Inlet (Stage 1)" of the type specified. 5.7. Inlets Stage II. Payment for Inlets, Stage 11, will be made at the unit price bid for each "Inlet (Stage 11)" of the type specified. 5.8. Junction Boxes Stage I. Payment for Junction Boxes, Stage 1, will be made at the unit price bid for each "Junction Box (Stage 1)" of the type specified. 661 465 5.9. Junction Boxes Stage II. Payment for Junction Boxes, Stage 11, will be made at the unit price bid for each "Junction Box (Stage ll)" of the type specified. This price is full compensation for concrete, reinforcing steel, mortar, frames, grates, rings and covers, excavation, and backfill and for all other materials, tools, equipment, labor, and incidentals. 662 466 Item 466 0 Headwalls and Wingwalls ,Texas Department of Transportation 1. DESCRIPTION Furnish, construct, and install concrete headwalls and wingwalls for drainage structures and underpasses. 2. MATERIALS 2.1. General. Furnish materials in accordance with the following. ■ Item 420, "Concrete Substructures," ■ Item 421, "Hydraulic Cement Concrete," and ■ Item 440, 'Reinforcement for Concrete." Use Class C concrete for cast -in -place and precast concrete units unless otherwise shown on the plans. Furnish cast -in -place or precast headwalls and wingwalls unless otherwise shown on the plans. 2.2. Fabrication. 2.2.1. General. Fabricate cast -in -place concrete units and precast units in accordance with Item 420 "Concrete Substructures." Use the following definitions for headwalls and wingwalls: ■ "Headwalls" refers to all walls, including wings, at the ends of single -barrel and multiple -barrel pipe culvert structures. ■ "Wingwalls" refers to all walls at the ends of single -barrel or multiple -barrel box culvert structures. 2.2.2. Lifting Holes. Provide no more than 4 lifting holes in each section for precast units. Lifting holes may be cast, cut into fresh concrete after form removal, or drilled. Provide lifting holes large enough for adequate lifting devices based on the size and weight of the section. The maximum hole diameter is 3 in. at the inside surface of the wall and 4 in. at the outside surface. Cut no more than 1 longitudinal wire or 2 circumferential wires per layer of reinforcing steel when locating lift holes. Repair spalled areas around lifting holes. 2.2.3. Marking. Clearly mark each precast unit before shipment from the casting or fabrication yard with the following: ■ the date of manufacture, ■ the name or trademark of the manufacturer, and ■ the type and size designation. 2.2.4. Storage and Shipment. Store precast units on a level surface. Do not place any loads on precast concrete units until design strength is reached. Do not ship units until design strength requirements have been met. 2.2.5. Causes for Rejection. Precast units may be rejected for not meeting any one of the specification requirements. Individual units may also be rejected for fractures or cracks passing through the wall or surface defects indicating honeycombed or open texture surfaces. Remove rejected units from the project, and replace them with acceptable units meeting the requirements of this Item. 2.2.6. Defects and Repairs. Occasional imperfections in manufacture or accidental damage sustained during handling may be repaired. The repaired units will be acceptable if they conform to the requirements of this Item and the repairs are sound, properly finished, and cured in conformance with pertinent specifications. 663 466 3. CONSTRUCTION 3.1. General. Remove portions of existing structures and drill, dowel, and grout in accordance with Item 420, "Concrete Substructures." 3.2. Excavation, Shaping, Bedding, and Backfill. Excavate, shape, bed, and backfill in accordance with Item 400, "Excavation and Backfill for Structures." Take special precautions in placing and compacting the backfill to avoid any movement or damage to the units. Bed precast units on foundations of firm and stable material accurately shaped to conform to the bases of the units. 3.3. Placement of Precast Units. Provide adequate means to lift and place the precast units. Fill lifting holes with mortar or concrete and cure. Precast concrete or mortar plugs may be used. 3.4. Connections. Make connections to new or existing structures in accordance with the details shown on the plans. Furnish jointing material in accordance with Item 464, `Reinforced Concrete Pipe," or as shown on the plans. Remove a length of the existing pipe from the headwall to the joint when removing existing headwalls as shown on the plans or as approved. Re -lay the removed pipe if approved, or furnish and lay a length of new pipe. 4. MEASUREMENT This is a plans quantity measurement item. The quantity to be paid is the quantity shown in the proposal unless modified by Article 9.2., "Plans Quantity Measurement." Additional measurements or calculations will be made if adjustments of quantities are required. 4.1. Headwalls. Headwalls will be measured by each end of a structure. 4.2. Wingwalls. Wingwalls will be measured by one of the following methods: 4.2.1. Square Foot. Wingwalls will be measured by the square foot of the front surface area of the wall of each type. The area will be measured from the top of the footing or apron to the top of the wall unless otherwise shown on the plans. If there is no footing or apron, then measurement is from the bottom of the wall. 4.2.2. Each. Wingwalls will be measured by each end of a structure. 5. PAYMENT The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the price bid for "Headwalls" of the type and pipe size (diameter or design) specified, "Wingwalls" of the type specified when measurement is by the square foot, or "Wingwalls" of the type and wall height specified when measurement is by each. For payment purposes, the wingwall height will be rounded to the nearest foot. All wingwalls and headwalls of the same type will be paid for equally when skew does not affect the type. This price is full compensation for constructing, furnishing, transporting, and installing the headwalls or wingwalls; connecting to existing structure; breaking back, removing and disposing of portions of the existing structure, and replacing portions of the existing structure as required to make connections; excavation and backfill; and concrete, reinforcing steel, corrugated metal pipe or reinforced concrete pipe, equipment, labor, tools, and incidentals. Apron concrete or riprap between or around the wingwalls of single- or multiple -barrel box culvert structures will be measured and paid for in accordance with Item 432, "Riprap." The removal and re-laying of existing pipe or the furnishing of new pipe to replace existing pipe will not be paid for directly but will be considered subsidiary to this Item. 664 FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 10/04/2023 Approval I Spec No. Concrete Ckissili'ation Nla—l-fin- Model No. National Spec 19/9/2022 03 30 00 Mix Design American Concrete Company 30CAF029 3000 psi Concrete for Sidewalks & ADA Ramps 19/9/2022 03 30 00 Mix Design American Concrete Company 01JAF382 1000 psi Concrete Base Material for Trench Repair 19/9/2022 03 30 00 Mix Design American Concrete Company 40CNF065 4000 psi Concrete for Manholes & Utility Structures 19/9/2022 03 30 00 Mix Design American Concrete Company 45CAF076 4500 psi Concrete for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Argos D10000001737 4500 psi Concrete for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Argos D 1000000 17914500 psi Concrete for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Argos D 1000000 1793 4500 psi Concrete for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Argos D 1000000 1103 4500 psi Concrete for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Argos D10000002107 4500 psi Concrete for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Argos D 1000000 1273 4500 psi Concrete for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Argos D10000001617 3600 psi Concrete for Machine Placed Paving 19/9/2022 03 30 00 Mix Design Argos D10000008381 4500 psi Concrete for HES Paving 19/9/2022 03 30 00 Mix Design Argos D10000009857 50 psi Flowable Fill - CLSM 19/9/2022 03 30 00 Mix Design Argos D10000001055 3000 psi Concrete for Inlets, Junction Boxes, Manholes, Channel Liners, Sidewalks, Driveways, Curb & Gutter 19/9/2022 03 30 00 Mix Design Argos D1000001043S 3000 psi Concrete for Sidewalks, Curbs 19/9/2022 03 30 00 Mix Design Argos D1000001565S 3000 psi Concrete for Curbs, Curb & Gutters, Sidewalks, Driveways, ADA Ramps 19/9/2022 03 30 00 Mix Design Argos D1000001615 3600 psi Concrete for Inlets, Boxes, Encasement, Blocking 19/9/2022 03 30 00 Mix Design Argos D10000001061 3600 psi Concrete for Inlets, Boxes, Encasement, Blocking 19/9/2022 03 30 00 Mix Design Argos D10000001083S 4000 psi Concrete for Valve Pads, Inlets, Structures, Headwalls, Thrust Blocking 19/9/2022 03 30 00 Mix Design Argos D 1000000 1083 4000 psi Concrete for Valve Pads, Inlets, Structures, Headwalls, Thrust Blocking 19/9/2022 03 30 00 Mix Design Argos D 1000000 1685 4000 psi Concrete for Valve Pads 19/9/2022 03 30 00 Mix Design Argos D10000005751 750 Psi Concrete Base for Trench Repair 19/9/2022 03 30 00 Mix Design Argos D 1000000 16814000 psi Concrete for Headwalls, Retaining Walls, Box Culverts, Valley Gutters 19/9/2022 03 30 00 Mix Design Big D Concrete 7SKGRT 3000 psi Concrete for Grouting 19/9/2022 03 30 00 Mix Design Big D Concrete 14500AE 4500 psi Concrete for High Early Strength Paving 1 5/2/2023 32 13 13 Mix Design Big D Concrete CM14520AE 4500 psi Concrete for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Big Town Concrete 452065-1 4500 psi hand placed paving 19/9/2022 03 30 00 Mix Design Big Town Concrete 450065-1 4500 psi hand placed paving 19/9/2022 03 30 00 Mix Design Bumco Texas 45U500BG 4500 psi Concrete Mix for Hand Placed Paving, Storm Structures 19/9/2022 03 30 00 Mix Design Bumco Texas 40U553BG 4000 psi Concrete Mix for Machine Placed Paving 19/9/2022 03 30 00 Mix Design Bumco Texas 55UI20AG 4000 psi Concrete Mix for High Early Strength Paving 19/9/2022 03 30 00 Mix Design Bumco Texas 30U100AG 3000 psi Concrete Mix for Pipe Collars, Inlets, Thrust Blocks, Sidewalks, ADA Ramps 19/9/2022 03 30 00 Mix Design Bumco Texas 30U101AG 3000 psi Concrete Mix for Flatwork I9/9/2022 03 30 00 Mix Design Bumco Texas 30U500BG 3000 psi Concrete Mix for Blocking, Encasement, Curb Inlets, Junction Boxes, Fire Hydrant Pads, Driveways, Curb & Gutters, Sidewalks, ADA Ramps 19/9/2022 03 30 00 Mix Design Bumco Texas 40U500BG 4000 psi Concrete Mix for Storm Drain Structures, Driveways, Screen Walls, Collars 19/9/2022 03 30 00 Mix Design Bumco Texas 36U500BG 3600 psi Concrete Mix for Lighting and Traffic Signal Foundations 19/9/2022 03 30 00 Mix Design Bumco Texas 08Y450BA 800 psi Concrete Mix for Base for Trench Repair 19/9/2022 03 30 00 Mix Design Bumco Texas 01 Y690BF 100 psi Concrete Mix for Flowable Fill 14/1/2023 03 34 16 Mix Design Bumco Texas 1OYH50BF 1000 psi Concrete Base Material for Trench Repair 19/9/2022 03 30 00 Mix Design Carder Concrete FWCC602021 4500 psi concrete for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Carder Concrete FWCC552091 3600 psi for Machine Placed Paving 19/9/2022 03 30 00 Mix Design Carder Concrete FWCC602091 3600 psi for Machine Placed Paving 19/9/2022 03 30 00 Mix Design Carder Concrete FWCC359101 Flowable Fill - CLSM 19/9/2022 03 30 00 Mix Design Carder Concrete FWFF237501 Flowable Fill - CLSM 19/9/2022 03 30 00 Mix Design Carder Concrete FWCC602001 4000 psi Concrete for Storm Drain Structures, Manholes, Headwalls, Retaining Walls, Valley Gutters, Drive Approaches 19/9/2022 03 30 00 Mix Design Carder Concrete FWCC502021 3500 psi concrete for Sidewalks, Driveways, Ramps, Curb & Gutter 19/9/2022 03 30 00 Mix Design Carder Concrete FWCC502001 3000 psi for Sidewalks, Driveways, Ramps, Curb & Gutter, Flatwork 19/9/2022 03 30 00 Mix Design Charley's Concrete 4142 3600 psi Concrete for Curb Inlets, Junction Boxes 19/9/2022 03 30 00 Mix Design Charley's Concrete 4518 4000 psi Concrete for Headwalls, Wingwalls 19/9/2022 03 30 00 Mix Design Charley's Concrete 5167 3600 psi Concrete Mix for Machine Placed Paving 19/9/2022 03 30 00 Mix Design Charley's Concrete 4609 4500 psi Concrete Mix for Hand Placed Paving, Manholes 19/9/2022 03 30 00 Mix Design Charley's Concrete 6103 4500 psi Concrete Mix for Hand Placed Paving, Manholes 19/9/2022 03 30 00 Mix Design Charley's Concrete 4502 3000 psi Concrete Mix for Sidewalks 19/9/2022 03 30 00 Mix Design Charley's Concrete 3759 3000 psi Concrete Mix for Sidewalks 19/9/2022 03 30 00 Mix Design Charley's Concrete 1502 150 psi Concrete for Flowable Fill-CLSM 19/9/2022 03 30 00 Mix Design Charley's Concrete 1518 150 Psi Concrete for Flowable Fill-CLSM 19/9/2022 03 30 00 Mix Design Charley's Concrete 5642 4000 psi Concrete for Storm Drain Structures 19/9/2022 03 30 00 Mix Design Charley's Concrete 6595 5000 psi Concrete Mix for High Early Strength Paving 19/9/2022 03 30 00 Mix Design Charley's Concrete 6589 4500 psi Concrete Mix for High Early Strength Paving 19/9/2022 03 30 00 Mix Design Chisholm Trail Redi Mix CI3020AE 3000 psi Concrete for Driveways, Curb & Gutter 19/9/2022 03 30 00 Mix Design City Concrete Company 11-350-FF 50-150 psi Concrete for Flowable Fill-CLSM FORT WORTH: CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT Approval Spec No. STANDARD PRODUCTS LIST AS OF 10/04/2023 Classification NI,mul-tur" Model No. National Spec 1 Concrete (Continued) 19/9/2022 03 30 00 Mix Design City Concrete Company 30HA25II 3000 psi Concrete for Rip -Rap 19/9/2022 03 30 00 Mix Design City Concrete Company 30HA20II 3000 psi Concrete Mix for Blocking, Sidewalks, Flatwork, Pads 19/9/2022 03 30 00 Mix Design City Concrete Company 45NG25II 3600 psi Concrete Mix for Drilled Shafts/Lighting and Traffic Signal Foundations 19/9/2022 03 30 00 Mix Design City Concrete Company 50QG25H 3600 psi Slurry Displaced Drilled Shaft 19/9/2022 03 30 00 Mix Design City Concrete Company 45NA20II 4500 psi Concrete Mix for Hand Placed Paving 19/9/2022 03 30 00 Mix Design City Concrete Company 36LA2011 3600 psi Concrete Mix for Machine Placed Paving 19/9/2022 03 30 00 Mix Design City Concrete Company 36JA001 J 3600 psi Concrete Mix for Machine Placed Paving 19/9/2022 03 30 00 Mix Design City Concrete Company 40LA2011 4000 psi Concrete Mix for Storm Drain Structures 1 11/16/2022 03 30 00 Mix Design City Concrete Company CLNG25I13600 psi Concrete for Drilled Shaft/Lighting and Traffic Signal Foundations 1 5/5/2023 03 30 00 Mix Design City Concrete Company CCNA25OAG 3600 psi Concrete for Drilled ShaftsLighting and Traffic Signal Foundations 15/5/2023 03 30 00 Mix Design City Concrete Company CSSQA25OAG 3,600 psi Concrete for Slurry Displacement Shafts, Underwater Shafts 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 250 3000 psi Concrete Mix for Sidewalks, Driveways, ADA Ramps 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 350 3000 psi Concrete Mix for Sidewalks, Driveways, ADA Ramps 19/9/2022 03 34 13 Mix Design Cow Town Redi Mix 9 70 psi Flowable Fill - CLSM 19/9/2022 03 34 13 Mix Design Cow Town Redi Mix 9-5-2 70 psi Flowable Fill - CLSM 19/9/2022 03 34 13 Mix Design Cow Town Redi Mix 220-8 50 psi Concrete Mix for Flowable Fill - CLSM 19/9/2022 03 34 13 Mix Design Cow Town Redi Mix 320-8 50 psi Concrete Mix for Flowable Fill - CLSM 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 230-8 750 psi Concrete Base Material for Trench Repair 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 330-58 750 psi Concrete Base Material for Trench Repair 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 353 3000 psi Concrete Mix for Sidewalks, ADA Ramps, Driveways, Curb & Gutter, Safety End Treatments, Non-TxDOT Retaining Walls 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 253-W 3000 psi Concrete Mix Sidewalks, ADA Ramps, Driveways, Curb & Gutter, Safety End Treatments, Non-TxDOT Retaining Walls 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 260 4000 psi Concrete Mix for Bridge Slabs, Box Culverts, Headwalls 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 260-1 3600 psi Concrete Mix for Headwalls 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 260-2 3600 psi Concrete Mix for Box Culverts, Headwalls 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 360 4000 psi Concrete Mix for Bridge Slabs, Box Culverts, Headwalls 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 360-1 3600 psi Concrete Mix for Box Culverts, Headwalls, Wingwalls 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 264-N 4500 psi Concrete Mix for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 366 4500 psi Concrete Mix for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 265 4500 psi Concrete Mix for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 365 4500 psi Concrete Mix for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 370-NC 4500 psi Concrete for HES Paving 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 370-lNC 5000 psi Concrete for HES Paving 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 375-NC 5000 psi Concrete for HES Paving 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 267 4200 psi Concrete Mix for Manholes and Drainage Structures 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 270 5000 psi Concrete Mix for Cast -in -Place Box Culverts 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 370 5000 psi Concrete Mix for Cast -in -Place Box Culverts 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 255-2 3000 psi Concrete Mix for Inlets, Thrust Blocking, Concrete Encasement 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 257 3600 psi Concrete mix for Valley Gutters 1 11/14/2022 32 13 13 Mix Design Cow Town Redi Mix 357-M 3600 psi Concrete Mix for Machine Placed Paving 19/9/2022 33 13 13 Mix Design Cow Town Redi Mix 257-M 3600 psi Concrete Mix for Machine Placed Paving 19/9/2022 34 13 13 Mix Design Cow Town Redi Mix 260-M 4000 psi Concrete Mix for Machine Placed Paving 19/9/2022 35 13 13 Mix Design Cow Town Redi Mix 360-M 4000 psi Concrete Mix for Machine Placed Paving 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 255-LP 3000 psi Concrete Mix for Curb & Gutter 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 355-LP 3000 psi Concrete Mix for Curb & Gutter 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 255 3500 psi Concrete Mix for Flatwork, Inlets, Thrust Blocking Concrete Encasement 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 355 3000 psi Concrete Mix for Inlets, Thrust Blocking, Concrete Encasement 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 365-STX 4000 psi Concrete for Bridge slabs, top slabs of direct traffic culverts, approach slabs 19/9/2022 03 30 00 Mix Design Cow Town Redi Mix 357 3600 psi Concrete Mix for Valley Gutters 16/21/2023 03 30 00 Mix Design Cow Town Redi Mix 360-DS 3600 psi Concrete for Drilled Shaft/Lighting and Traffic Signal Foundation 1 1/18/2023 03 30 00 Mix Design Cow Town Redi Mix 380-NC 4500 psi Concrete for HES Paving 19/9/2022 03 30 00 Mix Design GCH Concrete Services GCH4000 4000 psi Concrete for for Sidewalks, Ramps, Headwalls, Inlets, and Storm Drain Structures 19/9/2022 03 30 00 Mix Design GCH Concrete Services GCHVS 4000 psi Concrete for Machine Placed Paving 19/9/2022 03 30 00 Mix Design GCH Concrete Services GCH4500 4500 psi Concrete Hand Placed Paving 19/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates C47PV5E5 3000 psi Concrete for Sidewalks, ADA Ramps 19/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates 2MWR-70J23504 3000 psi Concrete for Sidewalks, ADA Ramps 19/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates 2MWR-147QW5D5 3000 psi Concrete Mix for Sidewalks, ADA Ramps 19/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates 2MWR-056PS5D5 4000 psi Concrete Machine Placed Paving 19/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates 2MWR-161UV5DM 4500 psi Concrete for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates 2MWR- I OMQS50N 4500 psi Concrete for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates 161PSSEM 4500 psi Concrete for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates C47PV5E5 3000 psi Concrete Mix for Sidewalks, ADA Ramps 14/7/2023 03 30 00 mix Design Ingram Concrete & Aggregates 1OLQS50N 3,600 psi Concrete for Drilled Shafts/Lighting and Traffic Signal Foundations 19/9/2022 03 30 00 Mix Design Ingram Concrete & Aggregates 161PS5EM 4500 psi Concrete Mix for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 1551 3000 psi Concrete Mix for Blocking FORT WORTH: CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 10/04/2023 Approval Spec No. Classification Manufacturer Model No. National Spec Concrete(Continued) 19/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 5177 3000 psi Concrete Mix for Sidewalks 19/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 1261 3000 psi Concrete Mix for Sidewalks 19/9/2022 4 30 00 Mix Design Holcim - SOR, Inc. 2125 4500 psi Concrete for HES Paving 19/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 1701 4000 psi Concrete Mix for Storm Drain Structures, Sanitary Sewer Manholes, Junction Box 19/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 5409 4000 psi Concrete Mix for Sidewalks, Inlets 19/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 5507 4500 psi Concrete Mix for Hand Placed Paving 1 12/15/2022 3 30 00 Mix Design Holcim - SOR, Inc. 3741 100 psi concrete for flowable flll/CSLM 19/9/2022 04 30 00 Mix Design Holcim - SOR, Inc. 5017 200 psi Concrete for Base Material for Trench Repair 19/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 9600 3600 psi Concrete for Drill Shafts/Lighting and Traffic Signal Foundations 19/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 1851 4500 psi Concrete for Storm Drain Structures, Hand Placed Paving 1 12/5/2022 4 30 00 Mix Design Holcim - SOR, Inc. 1822 3600 psi Concrete for Drilled Shafts/Lighting and Traffic Signal Foundations 19/9/2022 03 30 00 Mix Design Holcim - SOR, Inc. 1859 4000 psi Concrete for Drilled Shafts/Lighting and Traffic Signal Foundations 14/7/2023 03 30 00 Mix Design Liquid Stone C301D 3,000 psi Concrete for Sidewalks, Approaches, and Driveways. 14/27/2023 03 30 00 Mix Design Liquid Stone C361DNFA 3,600 psi Concrete for Retaining wall, driveway, junction box apron, approach 14/7/2023 03 30 00 Mix Design Liquid Stone C361DHR 3,600 psi Concrete for Drilled Shaft/Lighting and Traffic Signal Foundations 1 1/24/2023 03 30 00 Mix Design Liquid Stone C451DHR-A 4500psi Concrete for HES Paving 19/9/2022 03 30 00 Mix Design Martin Marietta R2132214 3,000 psi Concrete for Sidewalks & Ramps 19/9/2022 03 30 00 Mix Design Martin Marietta D9490SC 3,000 psi Concrete for Sidewalks & Ramps 19/9/2022 03 30 00 Mix Design Martin Marietta R2131214 3,000 psi Concrete for Sidewalks & Ramps 19/9/2022 03 30 00 Mix Design Martin Marietta R2131314 3,000 psi Concrete for Sidewalks & Ramps 19/9/2022 03 30 00 Mix Design Martin Marietta R2136014 3,000 psi Concrete for Sidewalks & Ramps 19/9/2022 03 30 00 Mix Design Martin Marietta R2136214 3,000 psi Concrete for Sidewalks & Ramps 19/9/2022 03 30 00 Mix Design Martin Marietta R2141224 4,000 psi Concrete for Sidewalks & Ramps 19/9/2022 03 30 00 Mix Design Martin Marietta R2141024 4,000 psi Concrete for Sidewalks & Ramps 19/9/2022 03 30 00 Mix Design Martin Marietta R2136224 3,600 psi Concrete for Curb Inlets 19/9/2022 03 30 00 Mix Design Martin Marietta R2141233 3,600 psi Concrete for Storm Structures, Inlets, Blocking & Encasement 19/9/2022 03 30 00 Mix Design Martin Marietta FLOW25A 50 psi Concrete for Flowable Fill/CLSM 19/9/2022 03 30 00 Mix Design Martin Marietta R2142233 3,600 psi Concrete for Manholes, Inlets & Headwalls 19/9/2022 03 30 00 Mix Design Martin Marietta R2146333 3,600 psi Concrete for Manholes, Inlets & Headwalls, Concrete Encasement 19/9/2022 03 30 00 Mix Design Martin Marietta R21412304,000 psi Concrete for Manholes, Inlets & Headwalls, Valve Pads 19/9/2022 03 30 00 Mix Design Martin Marietta R2146035 4,000 psi Concrete for Manholes, Inlets & Headwalls, Valve Pads 19/9/2022 03 30 00 Mix Design Martin Marietta R2146335 4,500 psi Concrete for Hand Placed Paving, Inlets, Storm Drain Structures 111/2/2022 32 13 13 Mix Design Martin Marietta Q214IN27 4,000 psi Concrete for Machine Placed paving 111/2/2022 32 13 13 Mix Design Martin Marietta Q214IK30 4,000 psi Concrete for Machine Placed Paving 111/2/2022 32 13 13 Mix Design Martin Marietta R2146N36 4,500 psi Concrete for Hand Placed Paving 1 11/15/2022 33 13 13 Mix Design Martin Marietta R2146K36 4,500 psi Concrete for Hand Placed Paving 1 11/15/2022 3413 13 Mix Design Martin Marietta R21461`36 4,500 psi Concrete for Hand Placed Paving 111/2/2022 32 13 13 Mix Design Martin Marietta R2146K36 4,500 psi Concrete for Hand Placed Paving 111/2/2022 32 13 13 Mix Design Martin Marietta R2146N35 / 6.11 sacks / 4,500 psi concrete for Hand Place Paving, Inlets, Manholes, Headwalls 111/2/2022 32 13 13 Mix Design Martin Marietta R2146K34 4,000 psi Concrete for Inlets, Manholes, Headwalls 111/2/2022 32 13 13 Mix Design Martin Marietta R2141N24 4,000 psi Concrete for Sidewalks and Ramps 111/2/2022 32 13 13 Mix Design Martin Marietta R2141K24 4,000 psi Concrete for Junction Boxes, Sidewalks and Ramps 19/9/2022 03 30 00 Mix Design Martin Marietta R2146038 4,500 psi Concrete for Inlets, Storm Drain Structures 19/9/2022 03 30 00 Mix Design Martin Marietta R2146036 4,500 psi Concrete for Hand Placed Paving, Inlets 19/9/2022 03 30 00 Mix Design Martin Marietta R2146042 4,500 psi Concrete for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Martin Marietta R2146242 4,500 psi Concrete for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Martin Marietta R2146236 4,500 psi Concrete for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Martin Marietta D9493SC 4,500 psi Concrete for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Martin Marietta R2147241 4,500 psi Concrete for Hand Placed Paving 14/l/2023 32 1320 Mix Design Martin Marietta R2136N14 / 5.00 sacks / 3,000 psi concrete for Sidewalks 14/l/2023 03 30 00 Mix Design Martin Marietta R2146P33 / 6.01 sacks / 4,000 psi concrete for Bridge Deck 14/l/2023 03 30 00 Mix Design Martin Marietta R2146033 4,000 psi Concrete for Riprap 14/7/2023 32 1320 Mix Design Martin Marietta R2136K14 3,000 psi concrete for sidewalks and ramps 14/7/2023 32 13 13 Mix Design Martin Marietta R2161K70 6,000 psi (3,000 psi (& 24lux) for HES Paving 14/l/2023 03 30 00 Mix Design Martin Marietta 310LBP 3,600 psi Concrete for Retaining Walls 1 5/22/2023 32 13 13 Mix Design Martin Marietta R2146K37/6.22 sack / 4,500 psi Concrete for Hand Placed Paving 14/l/2023 03 30 00 Mix Design Martin Marietta R2141030 4,000 psi Concrete for Riprap FORT WORTH: CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT Approval Spec No. STANDARD PRODUCTS LIST AS OF 10/04/2023 Classification Manufacturer Model No. National Spec 1 Concrete(Conthmed) 1 5/3/2023 03 30 00 Mix Design Martin Marietta M7842344 4,000 psi Concrete for Bridge Deck 16/1/2023 32 1320 Mix Design Martin Marietta R2136R20 3,000 psi Concrete for Sidewalks and Ramps 16/1/2023 32 13 20 Mix Design Martin Marietta R2136N20 3,000 psi Concrete for Sidewalks and Ramps 16/27/2023 03 30 00 Mix Design Martin Marietta U2146N41 / 6.44sacks / 3,600 psi Concrete for Drilled Shafts / Lighting and Traffic Signal Foundations 16/27/2023 03 30 00 Mix Design Martin Marietta U2146K45 / 6.65 sacks / 3,600 psi Concrete for Drilled Shafts / Lighting and Traftc Signal Foundations 1 8/4/2023 03 30 00 Mix Design Martin Marietta U2146R41 / 6.44 sacks / 4,500 psi Concrete for Drilled Piers/Light Pole bases. 1 8/4/2023 03 30 00 Mix Design Martin Marietta R2136R14 / 5.00 sacks / 3,500 psi Concrete for Sidewalks and Ramps 1 8/4/2023 32 1320 Mix Design Martin Marietta R2141R24 / 5.53 / 4,000 psi Concrete for Junction Box, Box Culvert, Sidewalks and Ramps. 1 8/4/2023 03 30 00 Mix Design Martin Marietta R2146R35 / 6.11 / 4,500 psi Concrete for Inlets, Manholes, and Headwalls 1 8/4/2023 32 13 13 Mix Design Martin Marietta R2146R36 / 6.17 / 4,500 psi Concrete for Hand Placed Paving 1 8/30/2023 03 30 00 Mix Design Martin Marietta R2141R30 / 5.85 SK / 4,000 psi Concrete for Box Culverts & Headwalls 1 8/4/2023 32 13 13 Mix Design Martin Marietta Q2141R27 / 5.69 sacks / 4,000 psi Concrete for Machine Placed Paving 19/9/2022 32 1320 Mix Design NCS Redi Mix NCS5020A 3000 psi Concrete Mix for Curb & Gutter, Driveways, Sidewalks 19/9/2022 03 30 00 Mix Design NBR Ready Mix TX C-YY 3000 psi Concrete Mix for Curb Inlets 19/9/2022 03 30 00 Mix Design NBR Ready Mix TX C-NY 3000 psi Concrete Mix for Curb Inlets 19/12/2023 03 30 00 Mix Design NBR Ready Mix CLS Pl-YY / 6.00 Sacks / 4,000 psi Concrete for Collars, Manholes, Box Culverts 1 10/4/2023 03 30 00 Mix Design NBR Ready Mix CLS A-YY / 5.00 Sacks / 3,000 psi Concrete for Sidewalks & Ramps, and Curb & Gutter 1 10/4/2023 03 30 00 Mix Design NBR Ready Mix CLS A -NY/ 5.00 Sacks / 3,000 psi Concrete for Sidewalks & Ramps, and Curb & Gutter 1 10/4/2023 32 13 13 Mix Design NBR Ready Mix TX C SF-YY / 5.50 Sacks / 3,600 psi Concrete for Machine Placed Paving 1 10/4/2023 32 13 13 Mix Design NBR Ready Mix TX C SF -NY 5.50 Sacks / 3,600 psi Concrete for Machine Placed Paving 1 10/4/2023 32 13 13 Mix Design NBR Ready Mix CLS P2-YY / 6.50 Sacks / 4,500 psi Concrete for Hand Placed Paving 1 10/4/2023 32 13 13 Mix Design NBR Ready Mix CLS P2-NY / 6.50 Sacks / 4,500 psi Concrte for Hand Placed Paving 1 10/4/2023 03 34 13 Mix Design NBR Ready Mix FTW FLOW FILL / 150 psi concrete for Flowable 17/10/2023 03 30 00 Mix Desing Osborn 30A50MR / 5 SK / 3,000 psi Concrete for Sidewalks 17/10/2023 32 13 13 Mix Design Osborn 45A60MR / 6 SK / 4,500 psi Concrete for Hand Placed Paving 1 1/24/2023 03 30 00 Mix Design Rapid Redi Mix RRM6320AHP 4500 psi Concrete for Hand Placed Paving 1 1/24/2023 03 30 00 Mix Design Rapid Redi Mix RRM5525A 3600 psi Concrete for Valley Gutters, Sidewalks, Approaches, ADA Ramps 11/18/2023 03 30 00 Mix Design Rapid Redi Mix RRM6020ASS 4000 psi Concrete for Strom Drain Structures 1 1/18/2023 03 30 00 Mix Design Rapid Redi Mix RRM5320A 3000 psi Concrete for Blocking 1 1/18/2023 03 30 00 Mix Design Rapid Redi Mix RRM5020A 3000 psi Concrete for Curb, Gutter, Driveways, Sidewalk, Ramps 19/9/2022 03 30 00 Mix Design Redi-Mix DCA2E554 3000 psi Concrete Mix for Rip Rap 19/9/2022 03 30 00 Mix Design Redi-Mix V0J11524 3000 psi Concrete Mix for Curb & Gutter 19/9/2022 03 34 13 Mix Design Redi-Mix FOCI 0021 215 psi Flowable Fill - CLSM 19/9/2022 03 30 00 Mix Design Redi-Mix 1OJ11524 3000 psi Concrete Mix for Driveways, Sidewalks, ADA Ramps 19/9/2022 03 30 00 Mix Design Redi-Mix 1OJ11504 3000 psi Concrete Mix for Sidewalks 19/9/2022 03 30 00 Mix Design Redi-Mix 1 OLI 1504 3,600 psi Concrete Mix for Sidewalks, Curb & Gutter 19/9/2022 03 30 00 Mix Design Redi-Mix 1OL11524 3600 psi Concrete Mix Manholes, Inlets, Junction Boxes, Headwalls 19/9/2022 03 30 00 Mix Design Redi-Mix 1RJ11524 3500 psi Concrete Mix for Thrust Blocks, Valve Pads 1 9/29/2022 03 30 00 Mix Design Redi-Mix 1 OL21524 4000 psi Concrete Mix for Manholes 19/9/2022 03 30 00 Mix Design Redi-Mix 15611524 4000 psi Concrete Mix for Cast -in -Place Storm Drain Structures 19/9/2022 03 30 00 Mix Design Redi-Mix 1OL115E4 3600 psi Concrete Mix for Bridge substructures 19/9/2022 03 30 00 Mix Design Redi-Mix 156115D4 4000 psi Bridge Slabs 19/9/2022 03 34 13 Mix Design Redi-Mix F35238VN 100 psi Flowable Fill - CLSM 19/9/2022 03 34 13 Mix Design Redi-Mix FOD138VM 100 psi Flowable Fill - CLSM 19/9/2022 03 34 13 Mix Design Redi-Mix 1OJ11554 3000 psi Concrete Mix for Rip -Rap 19/9/2022 03 30 00 Mix Design Redi-Mix POG138K9 1000 psi Concrete Mix for Trench Repair Base Material 19/9/2022 03 30 00 Mix Design Redi-Mix 1OK11524 3600 psi Concrete Mix for Encasement 19/9/2022 03 30 00 Mix Design Redi-Mix 1 ON11507 4500 psi (2600 psi @ 24 hrs.) Concrete Mix for HES Paving 19/9/2022 03 30 00 Mix Design Redi-Mix 1ON11504 5000 psi (3600 psi @ 2 days) Concrete Mix for HES Paving 19/9/2022 03 30 00 Mix Design Redi-Mix 50KI1524 3600 psi Concrete Mix for Machine Placed Paving 19/9/2022 03 30 00 Mix Design Redi-Mix 1 OM115D4 4500 psi Concrete Mix for Hand Placed Paving, Storm Drain Structures 19/9/2022 03 30 00 Mix Design Redi-Mix 1 OMI 1524 4500 psi Concrete Mix for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Redi-Mix 1OM11504 4500 psi Concrete Mix for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Redi-Mix 145CD5P4 4500 psi Concrete Mix for Hand Placed Paving, Storm Drain Structures 1 11/2/2022 03 30 00 Mix Design Redi-Mix 145P25P4 4500 psi Concrete for Storm Drain Structures 1 12/5/2022 03 30 00 Mix Design Redi-Mix 1 OK115C4 3500 psi Concrete for Thrust Blocks, Valve Pads 1 12/5/2022 03 30 00 Mix Design Redi-Mix 156115C4 4000 psi Concrete for CIP Storm Drain Structures 1 12/5/2022 03 30 00 Mix Design Redi-Mix 1OL115C4 3600 psi Concrete for Manhole, Inlet, Junction Box, Headwall 15/15/2023 03 30 00 Mix Design Redi-Mix 80LI15135 3600 psi Concrete for Drilled Shafts/Lighting and Traffic Signal Foundations 15/15/2023 03 30 00 Mix Design Redi-Mix 1ONI ISD6 Slurry Displacement Shafts, Underwater Drilled shafts 19/9/2022 03 34 13 Mix Design SRM Concrete 30000 3,000 psi Concrete for Sidewalks and Ramps, Curb & Gutter 19/9/2022 03 34 13 Mix Design SRM Concrete 40050 4,000 psi Concrete for Headwalls, Retaining Wall, Collars 19/9/2022 03 30 00 Mix Design SRM Concrete 35023 3,600 psi Concrete for Machine Placed Paving 19/9/2022 03 30 00 Mix Design SRM Concrete 40068 3,600 psi Concrete for Machine Placed Paving 19/9/2022 03 30 00 Mix Design SRM Concrete 45000 4,500 psi Concrete for Hand Placed Paving 19/9/2022 03 30 00 Mix Design SRM Concrete 45300 4,500 psi Concrete for Hand Placed Paving 19/9/2022 03 30 00 Mix Design SRM Concrete 40326 4,500 (3,00 @ 3-days) psi Concrete for HES Paving FORT WORTH: CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT Approval Spec No. STANDARD PRODUCTS LIST AS OF 10/04/2023 Classification Nl.riul-tur- Model No. National Spec 1 Concrete(Continued) 1 10/10/2022 03 30 00 Mix Design SRM Concrete 35000 3600 psi Concrete for Sewer Manholes 1 10/10/2022 03 30 00 Mix Design SRM Concrete 35300 3600 psi Concrete for Swere Manholes 19/9/2022 03 30 00 Mix Design SRM Concrete 35022 3,600 psi Concrete for Junction Box, Retaining Walls 19/9/2022 03 30 00 Mix Design SRM Concrete 30050 3,000 psi Concrete for Sidewalks, Ramps, Inlets, Junction Boxes, Thrust Blocks, Curb and Gutter, Driveways, Barrier Ramp 12/10/2023 03 30 00 Mix Design SRM Concrete 50310 5,000 psi Concrete for HES Paving 1 1/13/2023 32 13 13 Mix Design SRM Concrete 45023 4,500 psi Concrete for Hand Placed Paving 1 5/5/2023 03 30 00 Mix Design SRM Concrete D100008553CB 4,000 psi Concrete for Bdridge Approach Slab, Deck Slab 19/9/2022 03 30 00 Mix Design Tarrant Concrete FW60AHP 4500 psi Concrete Mix for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Tarrant Concrete FW6020AHP 4500 psi Concrete Mix for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Tarrant Concrete TCFW6020AHP 4500 psi Concrete Mix for Hand Placed Paving 19/9/2022 03 30 00 Mix Design Tarrant Concrete FW7520AMR 4500 (3000 psi @ 3-days) psi Concrete HES Paving 19/9/2022 03 30 00 Mix Design Tarrant Concrete FW6520AMR 4500 (3000 psi @ 3-days) psi HES Paving 19/9/2022 03 30 00 Mix Design Tarrant Concrete FW5520AMP 3600 psi Concrete for Machine Placed Paving 19/9/2022 03 30 00 Mix Design Tarrant Concrete FW5320A 3000 psi Concrete Mix for Blocking 19/9/2022 03 34 13 Mix Design Tarrant Concrete FWFF150CLSM 50-150 psi Flowable Fill - CLSM 19/9/2022 03 34 13 Mix Design Tarrant Concrete FWFF275 50-150 psi Flowable Fill - CLSM 19/9/2022 03 30 00 Mix Design Tarrant Concrete FW6020A2 4000 psi Concrete Mix for Storm Drain Structures 1 10/10/2022 03 30 00 Mix Design Tarrant Concrete TCFW6025A2 4000 psi Concrete for Manholes 1 10/10/2022 03 30 00 Mix Design Tarrant Concrete TCFW5020A 3000 psi Concrete for Sidewalks 19/9/2022 03 30 00 Mix Design Tarrant Concrete FW5025A 3000 psi Concrete Mix for Curb & Gutter, Driveways, Sidewalks, ADA Ramps 19/9/2022 03 30 00 Mix Design Titan Ready Mix 3020AE 3000 psi Concrete for Sidewalks 19/9/2022 03 30 00 Mix Design Tarrant Concrete CP5020A 3000 psi Concrete Mix for Curb and Gutter 19/9/2022 03 30 00 Mix Design Tarrant Concrete FW5525A2 3600 psi Concrete Mix for Sidewalks, Drive Approaches, ADA Ramp 19/9/2022 03 30 00 Mix Design Titan Ready Mix TRC4520 4500 psi Concrete for Hand Placed Paving 19/9/2022 03 30 00 Mix Design True Grit Redi Mix 0250.230 3000 psi Concrete Mix for Flatwork, Curb & Gutter, Driveways, Sidewalks, ADA Ramps 19/9/2022 03 30 00 Mix Design True Grit Redi Mix 270.230 5000 psi Concrete for Hand Placed Paving 19/9/2022 03 30 00 Mix Design True Grit Redi Mix 0250.2301 3000 psi Concret Mix for Curb & Gutter, Driveways, Sidewalks, ADA Ramps 19/9/2022 03 30 00 Mix Design True Grit Redi Mix 0260.2302 4000 psi Concrete Mix for Machine Placed Paving 19/9/2022 03 30 00 Mix Design True Grit Redi Mix 0255.2301 3600 psi Concrete Mix for Machine Placed Paving 19/9/2022 03 30 00 Mix Design True Grit Redi Mix 0260.2301 4500 psi Concrete Mix for Hand Placed Paving 19/9/2022 03 30 00 Mix Design True Grit Redi Mix 0265.2301 4500 psi Concrete Mix for Valley Gutters, Hand Placed Paving 19/9/2022 03 3000 Mix Design Wise Redi Mix 3678 3600 psi Concrete Mix for Lighting and Traffic Signal Foundations A9v ftalt Pavinv 19/9/2022 322 16 Mix Design Austin Asphalt FT5D137965 PG64-22 Type D Fine Surface 19/9/2022 32 1216 Mix Design Austin Asphalt DA513135965 PG64-22 Type D Fine Surface 19/9/2022 32 1216 Mix Design Austin Asphalt FT5B117965 PG64-22 Type B Fine Base 19/9/2022 32 1216 Mix Design Austin Asphalt FTIB139965 PG64-22 Type B Fine Base 19/9/2022 32 1216 Mix Design Austin Asphalt FT1B117.2 PG64-22 Type B Fine Base 19/9/2022 32 1216 Mix Design Reynolds Asphalt 1901D PG64-22 Type D Fine Surface 19/9/2022 32 1216 Mix Design Reynolds Asphalt 1112B PG64-22 Type B Fine Base 19/9/2022 32 1216 Mix Design Reynolds Asphalt 1612B PG64-22 Type B Fine Base 19/9/2022 32 1216 Mix Design Surmount Paving 341DV6422 PG64-22 Type D Fine Surface 1 11/26/2022 32 1216 Mix Design Surmount Paving 340DV6422 PG64-22 Type D Fine Surface 1 12/5/2022 33 1216 Mix Design Surmount Paving 3076B V6422 PG62-22 Type B Fine Base 19/9/2022 32 12 16 Mix Design Sunmount Paving 341-BRAP6422ERG PG64-22 Type B Fine Base 19/9/2022 32 1216 Mix Design TXBIT 37-211305-20 PG64-22 Type B Fine Base 19/9/2022 32 12 16 Mix Design TXBIT 44-211305-17 P664-22 Type B Fine Base 19/9/2022 32 1216 Mix Design TXBIT 211305 (1757) PG64-22 Type B Fine Base 19/9/2022 32 12 16 Mix Design TXBIT 222475 (1857) PG64-22 Type D Fine Surface 19/9/2022 32 1216 Mix Design TXBIT 29-222475-19 PG64-22 Type D Fine Surface 19/9/2022 32 1216 Mix Design TXBIT 1-222475-20 PG64-22 Type D Fine Surface 19/9/2022 32 1216 Mix Design TXBIT 64-224125-18 PG70-22 Type D Fine Surface 19/9/2022 32 1216 Mix Design TXBIT 12-222475-19 P664-22 Type D Fine Surface Detectable Warnin Surface 19/9/2022 32 13 20 D 1 - Pavers Pine Hall Brick (Winston Salem, NC) Tactile Pavers 19/9/2022 32 1320 DWS - Pavers Western Brick Co. (Houston, TX) Detectable Warning Pavers 19/9/2022 32 13 20 DWS - Composite Engineered Plastics, Inc. (Williamsville. Armor Tile 19/9/2022 32 13 20 DWS - Composite ADA Solutions (Wilmington, MA) Heritage Brick CIP Composite Paver 14/7/2023 32 13 20 DWS - Pavers ADA Solutions (Wilmington, MA) Detectable Warning Pavers FORT WORTH. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT Approval Spec No. STANDARD PRODUCTS LIST AS OF 10/04/2023 Classification Nla.ul-turv, Model No. National Spec Silicone Joint Sealant 19/9/2022 1113 Joint Sealant Dow 890SL - Cold Applied, Single Component, Silicone Joint Sealant ASTM D5893 19/9/2022 32 13 73 Joint Sealant Tremco 900SL - Cold Applied, Single Component, Silicone Joint Sealant ASTM D5893 19/9/2022 �12 32 1373 Joint Sealant Pecora 300SL - Cold Applied, Single Component, Silicone Joint Sealant ASTM D5893 19/9/2022 32 1373 Joint Sealant Crafco RoadSaver Silicone - Cold Applied, Single Component, Silicone Joint Sealant ASTM D5893 Utility Trench Embedment Sand 19/9/2022 33 05 10 Embedment Sand Silver Creek Materials Utility Embedment Sand ASTM C33 19/9/2022 33 05 10 Embedment Sand Crouch Materials Utility Embedment Sand ASTM C33 19/9/2022 33 05 10 Embedment Sand F and L Dirt Movers Utility Embedment Sand ASTM C33 19/9/2022 33 05 10 Embedment Sand F and L Dirt Movers Utility Embedment Sand ASTM C33 19/9/2022 33 05 10 Embedment Sand Tin Top Martin Marietta Utility Embedment Sand ASTM C33 Storm Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13 19/28/2018 33 05 13 Manhole Frames and Covers AccuCast (Govind Steel Company, LTD) MHRC #220605 (Size - **24" Dia.) ASTM A48 AASHTO M306 19/28/2018 33 05 13 Manhole Cover Neenah Foundry NF-1274-T91 (Size - 32" Dial ASTM A48 AASHTO M306 19/28/2018 33 05 13 Manhole Frames and Covers Neenah Foundry NF-1743-LM (Hinged) (Size - 32" Dial ASTM A48 AASHTO M306 19/28/2018 33 05 13 Manhole Frame Neenah Foundry NF-1930-30 (Size - 32.25" Dia.) ASTM A48 AASHTO M306 19/28/2018 33 05 13 Manhole Frames and Covers Neenah Foundry R-1743-HV (Size - 32" Dia.) ASTM A48 AASHTO M306 14/3/2019 33 05 13 Manhole Frames and Covers SIP Industries ++ 2279ST (Size - 24" Dial ASTM A48 AASHTO M306 14/3/2019 33 05 13 Manhole Frames and Covers SIP Industries ++ 2280ST (Size - 32" Dia.) ASTM A48 AASHTO M306 1 10/8/2020 33 05 13 Manhole Frames and Covers EJ ( Formally East Jordan Iron Works) EJ1033 Z2/A (Size - 32.25" Dia.) ASTM A536 AASHTO M306 **Note: AM new development and new installation manhole lids shall meet the minimum 30-inch opening requirement as specified in City Specification 33 0513. Any smaller opening sizes will only be allowed for existing manholes that require replacement frames anticovers. FORT WORTH: CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT Approval Spec No. STANDARD PRODUCTS LIST AS OF 10/04/2023 Classification NI,mul-turt, Model No. National Spec 1 Storm Sewer - Inlet & Structures 33-05-13 110/8/2020 33 49 20 Curb Inlets Forterrra FRT-I0x3-405-PRECAST** (Size - 10' X 3') ASTM C913 110/8/2020 33 49 20 Curb Inlets Forterrra FRT-I0x3-406-PRECAST** (Size - 10' X 31 ASTM C913 110/8/2020 33 49 20 Curb Inlets Forterrra FRT-I0x4.5-407-PRECAST** (Size - 10' X 4.5') ASTM C913 110/8/2020 33 49 20 Curb Inlets Forterrra FRT-I0x4.5-420-PRECAST** (Size - 10' X 4.5') ASTM C913 110/8/2020 33 3920 Manhole Forterrra FRT-4X4-409-PRECAST-TOP (Size - 4' X 4� ASTM C913 110/8/2020 33 3920 Manhole Forterrra FRT-4X4-409-PRECAST-BASE (Size - 4' X 4� ASTM C913 110/8/2020 33 3920 Manhole Forterrra FRT-SX5-410-PRECAST-TOP (Size - 5' X 5') ASTM C913 110/8/2020 33 3920 Manhole Forterrra FRT-5X5-410-PRECAST-BASE (Size - TX 5) ASTM C913 110/8/2020 33 3920 Manhole Forterrra FRT-6X6-411-PRECAST-TOP (Size - 6' X fl ASTM C913 110/8/2020 33 3920 Manhole Forterrra FRT-6X6-411-PRECAST-BASE (Size - 6' X 6� ASTM C913 13/19/2021 33 49 20 Curb Inlets Thompson Pipe Group TPG-lOX3-405-PRECAST INLET** (Size - 10' X 3) ASTM 615 13/19/2021 33 49 20 Curb Inlets Thompson Pipe Group TPG- 1 5X3-405-PRECAST INLET** (Size - 15' X 3') ASTM 615 13/19/2021 33 49 20 Curb Inlets Thompson Pipe Group TPG-20X3-405-PRECAST INLET** (Size - 20' X 7) ASTM 615 13/19/2021 33 3920 Manhole Thompson Pipe Group TPG-4X4-409-PRECAST TOP (Size - 4' X 4') ASTM 615 13/19/2021 33 3920 Manhole Thompson Pipe Group TPG-4X4-409-PRECAST BASE (Size - 4' X 4') ASTM 615 13/19/2021 33 3920 Manhole Thompson Pipe Group TPG-4X4-412-PRECAST 4-FT RISER (Size - 4' X 4') ASTM 615 13/19/2021 33 3920 Manhole Thompson Pipe Group TPG-5X5-410-PRECAST TOP (Size - 5' X 5') ASTM 615 13/19/2021 33 3920 Manhole Thompson Pipe Group TPG-5X5-410-PRECAST BASE (Size - 5' X T) ASTM 615 13/19/2021 33 3920 Manhole Thompson Pipe Group TPG-5X5-412-PRECAST 5-FT RISER (Size - 5' X 5') ASTM 615 13/19/2021 33 3920 Manhole Thompson Pipe Group TPG-6X6-41 1 -PRECAST TOP (Size - 6' X 6') ASTM 615 13/19/2021 33 3920 Manhole Thompson Pipe Group TPG-6X6-41 1 -PRECAST BASE (Size - 6' X 61 ASTM 615 13/19/2021 33 3920 Manhole Thompson Pipe Group TPG-6X6-412-PRECAST 6-FT RISER (Size - 6' X 6� ASTM 615 13/19/2021 33 3920 Manhole Thompson Pipe Group TPG-7X7-41 1 -PRECAST TOP (Size - TX 71 ASTM 615 13/19/2021 33 3920 Manhole Thompson Pipe Group TPG-7X7-41 1 -PRECAST BASE (Size - TX T) ASTM 615 13/19/2021 33 3920 Manhole Thompson Pipe Group TPG-7X7-412-PRECAST 4-FT RISER (Size - TX T) ASTM 615 13/19/2021 33 3920 Manhole Thompson Pipe Group TPG-8X8-41 1 -PRECAST TOP (Size - 8' X 8') ASTM 615 13/19/2021 33 3920 Manhole Thompson Pipe Group TPG-8X8-41 1 -PRECAST BASE (Size - 8' X 81 ASTM 615 13/19/2021 33 3920 Manhole Thompson Pipe Group TPG-8X8-412-PRECAST 5-FT RISER (Size - 8' X ASTM 615 13/19/2021 33 49 20 Drop Inlet Thompson Pipe Group TPG-4X4-408-PRECAST INLET (Size - 4' X 4) ASTM 615 13/19/2021 33 49 20 Drop Inlet Thompson Pipe Group TPG-5X5-408-PRECAST INLET (Size - 5' X 5') ASTM 615 13/19/2021 33 49 20 Drop Inlet Thompson Pipe Group TPG-6X6-408-PRECAST INLET (Size - 6' X 6) ASTM 615 18/28/2023 33 49 10 Manhole Oldcastle Precast 4' x 4' Stacked Manhole (Size - 4' X 4) ASTM C478 18/28/2023 33 49 10 Manhole Oldcastle Precast 5' x 8' Storm Junction Box (Size - 5' X 8') ASTM C478 18/28/2023 33 49 10 Manhole Oldcastle Precast 4' x 4' Storm Junction Box (Size - TX T) ASTM C478 18/28/2023 33 49 10 Manhole Oldcastle Precast 5' x 5' Storm Junction Box (Size - 5' X 5') ASTM C478 18/28/2023 33 49 10 Manhole Oldcastle Precast 6' x 6' Storm Junction Box (Size - 6' X 6') ASTM C478 18/28/2023 33 49 10 Manhole Oldcastle Precast 8' x 8' Storm Junction Box Base (Size - 8' X 81 ASTM C478 18/28/2023 33 49 10 Manhole Oldcastle Precast 5' x 8' Storm Junction Box Base (Size - 5' X 8� ASTM C478 18/28/2023 33 49 10 Manhole Rinker Materials Reinforced 48" Diameter Spread Footing Manhole (Size - TX 4') ASTM C433 18/28/2023 33 3920 Curb Inlet 10 'x 3' Riser Thompson Pipe Group Inlet Riser (Size - 3 FT) ASTM C913-16 18/28/2023 33 3920 Curb Inlet 15 'x 3' Riser Thompson Pipe Group Inlet Riser (Size - 3 FT) ASTM C913-16 18/28/2023 33 3920 Curb Inlet 20' x 3' Riser Thompson Pipe Group Inlet Riser (Size - 3 FT) ASTM C913-16 **Note: Pre -cast inlets are appoved for the stage I portion of the structure (basin) only. Stage II portion of the structure are required to be cast in place. No exceptions to this requirement shall be allowed. Storm Sewer - Pipes & Boxes 33-05-13 14/9/2021 33 41 13 Storm Drain Pipes Advanced Drainage Systems, Inc. (ADS) ADS III? Storm Polvpropvlene (PP) Pipe (Size - 12" - 60") ASTM F2881 & AASHTO M330 18/28/2023 3349 10 Storm Drain Pipes Rinker Materials Reinforced Concrete Pipe Tongue and Groove Joint Pipe (Size - 21" or larger) ASTM C76, C655 18/28/2023 33 49 10 Culvert Box Rinker Materials Reinforced Concrete Box Culvert (Sze - Various) ASTM C789, C850 FORT WORTH® CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03/07/2023 Note: All water or sewer pipe larger than 1S inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding maybe required for some pipes. Approval IModel INational Water & Sewer - Manholes & Bases/Components 33-39-10 (Rev 2/3/16) ` 07/23/97 33 05 13 Urethane Hydrophilic Waterstop Asahi Kogyo K.K. Adeka Ultra -Seal P-201 ASTM D2240/D412/1)792 04/26/00 33 05 13 Offset Joint for 4' Diam. MH Hanson Concrete Products Drawing No. 35-0048-001 04/26/00 33 05 13 Profile Gasket for 4' Diam. MIR. Press -Seal Gasket Corp. 250-4G Gasket ASTM C-443/C-361 SS MH 1126199 33 05 13 HOPE Manhole Adjustment Rings Ladtech, Inc HDPE Adjustment Ring Traffic and Non -traffic area 5/13/05 33 05 13 Manhole External Wrap Canusa - CPS WrapidSeal Manhole Encapsulation System er - Manholes & Bases/Fiberelass 33-39-13 (1/8/13 1/26/99 33 39 13 Fiberglass Manhole Fluid Containment, Inc. Flowti[e ASTM 3153 Non -traffic area 08/30/06 33 39 13 Fiberglass Manhole L.F. Manufacturing Non -traffic area 1 j Water & Sewer - Manholes & Bases/Frames & Covers/Rectammlar 33-05-13 (Rev 2/3/16) 1 * 33 05 13 (Manholc Frames and Covers Western Iron Works, Bass & Hays Foundry 1001 24"x40" WE) Water & Sewer - Manholes & Bases/Frames & Covers/Standard Boundl 33-05-13 (Rev 2/3/16) 3305 13 Manhole Frames and Covers Western Iron Works, Bass & Hays Foundry 30024 24" Dia. * 3305 13 Manhole Frames and Covers McKinley Iron Works Inc. A 24 AM 24" Dia. 1 08/24/18 3305 13 Manhole Frames and Covers Neenah Foundry R-1272 ASTM A48 & AASHTO M306 24" Dia. 1 08/24/18 3305 13 Manhole Frames and Covers Neenah Foundry R- 165-LM (Hinged) ASTM A48 & AASHTO M306 24" Dia. 1 08/24/18 3305 13 Manhole Frames and Covers Neenah Foundry NF 1274 ASTM A48 & AASHTO M306 30" Dia. 1 08/24/18 3305 13 Manhole Frames and Covers Neenah Foundry R-1743-LM (Hinged) ASTM A48 & AASHTO M306 30" dia. 1 33 05 13 Manhole Frames and Covers Sigma Corporation MH-144N 1 33 05 13 Manhole Frames and Covers Sigma Corporation MH-143N 1 33 05 13 Manhole Frames and Covers Pont-A-Mousson GTS-STD 24" dia. 1 33 05 13 Manhole Frames and Covers Neenah Casting 24" dia. 1 10/31/06 33 05 13 Manhole Frames and Covers (Hinged) Powerseal Hinged Ductile Iron Manhole ASTM A536 24" Dia. 1 7/25/03 3305 13 Manhole Frames and Covers Saint-Gobain Pipelines (Pamrex/rexus) RE32-R8FS 30" Dia. 1 01/31/06 3305 13 30" Dia. MH Ring and Cover East Jordan Iron Works V1432-2 and V1483 Designs AASFITO M306-04 30" Dia. 11/02/10 3305 13 30" Dia. MH Ring and Cover Sigma Corporation MH165IFWN & MH16502 30" Dia 1 07/19/1 t 3305 13 30" Dia. MH Ring and Cover Star Pipe Products NIH32FTWSS-DC 30" Dia 1 08/10/11 3305 13 30" Dia. MH Ring and Cover Accucast 220700 Heavy Duty with Gasket Ring 30" Dia 30" ERGO XL Assembly 10/14/13 3305 13 30" Dia. MH Ring and Cover, (Hinged & Lockable) East Jordan Iron Works with Cam Lock/MPIC/T-Gasket ASSEITO MI 05 & ASTM A536 30" Dia 06/01/17 3405 13 30" Dia. MH Ring and Cover (Hinged & Lockable) CI SIP Industries 2280 (32") ASTM A 48 30" Dia. CAP-ONE-30-FTW, Composite, w/ Lack .111111 33 OS 13 30" Dia. MH Ring and Cover Composite Access Products, L.P. w/o Hmg 30" Dia. 10/07/21 3405 13 30" Dia. MH Ring and Cover Trumbull Manufacturing 32"(30") Frame and Cover 30" Dia. Water &der - Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight 33-05-13 (Rev 2/3/1� 33 05 13 Manhole Frames and Covers Pont-A-Mousson Pamtight 24" Dia. * 3305 13 Manhole Frames and Covers Neenah Casting 24" Dia. * 3305 13 Manhole Frames and Covers Western Iron Works,Bass & Hays Foundry 300-24P 24" Dia. * 3305 13 Manhole Frames and Covers McKinley Iron Works Inc. WPA24AM 24" Dia. 03/08/00 3305 13 Manhole Frames and Covers Accucast RC-2100 ASTM A 48 24" Dia. 04/20/01 3305 13 Manhole Frames and Covers (SIP)Serampore Industries Private Ltd. 300-24-23.75 Ring and Cover ASTM A 48 24" Dia. �Wr - Manholes & Bases/Precast Concrete l2ev 33 39 10 Manhole, Precast Concrete 1/8/13 Hydro Conduit Corp SPL Item 449 ASTM C 478 41" * 33 39 10 Manhole, Precast Concrete Wall Concrete Pipe Co. hic. ASTM C-443 48" 09/23/96 33 39 10 Manhole, Precast Concrete Concrete Product Inc. 48" I.D. Manhole w/ 32" Cone ASTM C 478 48" w/32" cone 05/08/18 33 39 10 Manhole, Precast Concrete The Turner Company 48", 60" I.D. Manhole w/ 32" Cone ASTM C 478 48", 60" 10/27/06 33 39 10 Manhole, Precast Concrete Oldeastle Precast Inc. 48" I.D. Manhole w/ 24" Cone ASTM C 478 48" Diam w 24" Ring 1 06/09/10 33 39 10 Manhole, Precast (Reinforced Polymer)Conaete US Composite Pipe Reinforced Polymer Concrete ASTM C-76 48" to 72" 1 09/06/19 33 3920 Manhole, Precast Concrete Forterra Pipe and Precast 60" & 72" I.D. Manhole w/32" Cone ASTM C-76 60" & 72" 10/07/21 32 39 20 Manhole, Precast Concrete Forterra Pipe and Precast 48" I.D. Manhole w/32" Cone ASTM C-77 48" 10/07/21 33 3920 Manhole, Precast (Reinforced Polymer) Concrete Armorock 48" & 60" I.D. Manhole w/32" Cone 48" & 60" 10/07/21 33 3920 Manhole, Precast (Hybrid) Polymer & PVC Predl Systems 48" & 60" I.D. Manhole w/32" Cone 48" & 60" Non Traffic Areas ASTM C-478; ASTM C-923; 03/07/23 33 3920 Manhole, Precast Concrete AmeriTex Pi a and Products, LLC 48" & 10" I.D. Manhole w/32" Cone ASTM C-443 03/07/23 33 3920 IManhole, Precast (Reinforced Pol er) Concrete P3 Polymers, RockHards 48" & 60" I.D. Manhole w/32" Cone 04/28/07 IManholc, Precast (Reinforced Polymcr) Concrete Amitech USA Meyer Polycrete Pipe Eater & Sewer - Manholes & Bases/Rehab Svstems/Cementitlous EI-14 Manhole Rehab Systems Quadex 04/23/01 EI-14 Manhole Rehab Systems Standard Cement Materials, Inc. Relmer MSP E1-14 Manhole Rehab Systems AP/M Permaform 4120101 E I-14 Manhole Rehab System Strong Company Strong Seal MS2A Rehab System 5/12/03 EI-14 Manhole Rehab System (Liner) Triplex Lining System MH repair product to stop infiltration ASTM D5813 08/30/06 General Concrete Repair FlexKrete Technologies Vinyl Polyester Repair Product Mise. Use * From Original Standard Products List CITY OF FORT WORTH FORT WORTH® WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03/07/2023 Note: All water or sewer pipe larger than 1S inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding maybe required for some pipes. Approv pec No./ IManufacturer Model1. National Spec Water &Sewer - an o es Bases/Rehab Svstems/NonCementitiousI mmmmw`Moir 05/ 00/96 E1-14 Manhole Rehab Systems Sprayroa, Spray Wall Polyurethane Coating ASTM D639/D790 I 12/14/01 Coating for Corrosion protection(Exterior) ERTECH Series 20230 and 2100 (Asphatic Emulsion) Structures Only I01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1BB, Sl, S2 Acid Resistance Test Sewer Applications I8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications » v�33 nu�pP�ooung i�P�ayolloull- x `Structures 03/19/18 I 39 20� Coating for Corrosion orotection(Exterim) Sherwin Williams Grade (Asohatic Emulsion) Only I 33 05 13 Manhole Insert ME Knutson Enterprises Made to Order - Plastic ASTM D 1248 For 24" dia. I * 33 05 13 Manhole Insert South Western Packaging Made to Order - Plastic ASTM D 1248 For 24" dia. I I * 3305 13 Manhole Insert Noflow-Inflow Made to Order - Plastic ASTM D 1248 For 24" dia. I I 09/23/96 3305 13 Manhole Insert Scuthwestcon Packing & Seals, Inc. Lifesaver - Stainless Steel For 24" dia. I I 09/23/96 3305 13 Manhole Insert Southwestern Packing & Seals, Inc. TetherLok - Stainless Steel For 24" dia I I 711111.72 ara e�Sewer - Pine Casim SDacers 33-05-24 (07/01/13) I Steel Band Casing Spacers Advanced Products and Systems, Inc. Carbon Steel Spacers, Model SI IO2/02/93 Stainless Steel Casing Spacer Advanced Products and Systems, Inc. Stainless Steel Spacer, Model SSI I04/22/87 Casing Spacers Cascade Waterworks Manufacturing Casing Spacers I09/14/10 Stainless Steel Casing Spacer Pipeline Seal and Insulator Stainless Steel Casing Spacer Up to 48" I09/14/10 Coated Steel Casin Spacers Pipeline Seal and Insulator Coated Steel Casin Spacers Up to 48" I 05/10/11 Stainless Steel Casing Spacer Powerseal 4810 Powerchock Up to 48" 03/19/18 Casing Spacers BWM SS-12 Casing Spacer(Stainleas Steel) 03/19/18 Casing Spacers BWM FB-12 Casing Spacer (Coated Carbon Steel) for Non_pressure Pipe and Grouted Casing 03/29/22 33 05 13 Casing Spacers CCI Pipeline Systems CSC12, CSS12 PEW I Water & Sewer - Pines/Ductile Iron 33-11-10(1/8/13) i I * 33 11 10 Ductile Iron Pipe Griffin Pipe Products, Co. Super Bell-Tite Ductile Iron Pressure Pipe, AW WA C150, C151 3" thrn 24" OS/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co. American Fastite Pipe (Bell Spigot) AW WA C150, C151 4" thrn 30" 08/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co. American Flex Ring (Restrained Joint) AW WA C150, C151 4" thin 30" * 33 11 10 Ductile Iron Pipe U.S. Pipe and Foundry Co. AW WA C150, C151 * 33 11 10 Ductile Iron Pipe McWane Cast Iron Pipe Co. AW WA C150, C151 I Water & Sewer - Utility Line Marker (08/24/2018) I I ewer - Coatinss/EDD -39-60 (01/08/13) I INEK 02/25/02 Epoxy Lining System Sauereisen, Inc SewerGard 21 ORS LA County 9210-1.33 I 12/14/01 Epmv Lmmg System Ertech Technical Coatings Ertcch 2030 and 2100 Series I I 04/14/05 Interim Ductile Iron Pipe Coating Induron Protecto 401 ASTM B-117 Ductile Iron Pipe Only I I01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1HB, Sl, S2 Acid Resistance Test Sewer Applications I I8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications I I INNE Sewer - Coatings/Polvurethane I I Sewer - Combination Air Valves I I 05/25/18 I 33-31-70 Air Release Valve A.R.I. USA, Inc. D121LTP02(Compwite Body) 2" I I Sewer - Pines/Concrete I * EI-04 C. Pipe, Reinforced Wall Concrete Pipe Co. Inc. ASTM C 76 I E I-04 Conc. Pipe, Reinforced Hydro Condun Corporation Class III T&G, SPL Item #77 ASTM C 76 I I E I-04 Conc. Pipe, Reinforced Hanson Concrete Products SPL item 495 hirsaliele, 998 Pipe ASTM C 76 I IE I-04 Conc. Pipe, Reinforced Concrete Pipe & Products Co. Inc. ASTM C 76 I I Sewer - Pine Enlargment Svstem (Method)33-31-23 (01/18/13). I Svstem PIM Corporation Polyethylene PIM Corp., Piscata Way, N.J. Approved Previously �Plm McConnell Systems McLat Construction Polyethylene Houston, Texas Approved Previously I TRS Systems Trenchless Replacement System Polyethylene Calgary, Canada Approved Previously I I Sewer - PiDe/Fibere as_ss Reinforced/ 33-31-13(1/8/13) I Hobas Pipe USA, Inc. Holies Pipe (Non -Pressure) ASTM D3262/D3754 I 7/21 /97 33 31 13 Cent. Cast Fiberglass (FRP) I 03/22/10 333 13 Fiberglass It,. (FRP) Ameroa Bondstmod RPMP Pipe AST- D3262-3154 I 04/09/21 33 31 13 Glass -Fiber Reinforced Polviner Pipe FRP Thompson Pie Group Thompson Pipe Flowtite ASTM D32621D3754 03/07/23 3331 13 lFiber.lass Pine (FRP) Future Pine Industries Fiberstron¢ FRP ASTM D3212. ASTM D3681. ASTM D4161. AW WA M45 Sewer - PiDe/Polvmer Pine 4/14/OS Polvmer Modified Concrete Pioe Amrtech USA Meyer Polycrete Pioe ASTM C33, A276, F477 8" tp 1112", Class V I06/09/10 El-9 Reinforced Polymer Concrete Pipe US Composite Pipe Reinforced Polymer Concrete Pioe ASTM C-76 I I I /HDPE 33-31-23(1/8/13) * From Original Standard Products List CITY OF FORT WORTH FORT WORTH® WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03/07/2023 Note: All water or sewer pipe larder than 1S inch diameter shall be approved for use by the Water Department on a proiect specific basis. Special bedding maybe required for some I ' hdsity polyethylene pipe Phillips Driswpipe, Inc. Opticore Ductile Polyethylene Pipe ASTM D 1248 8" I * gh-density polyethylene pipe �'Ih�gh_d_maitv PI- Inc. ASTM D 1248 8" * gh-density polyethylene pipe Polly Pipe, Inc. ASTM D 1248 8" polyethylene pipe CSR Hydro CondmUPioelme Systems McConnell Pipe Enlargement ASTM D 1248 Sewer - PiDes/PVC (Pressure Sewer) 33-11-12 (4/1/13) 12/02/11 33-11-1� DR -Id PVC Pressure Pipe Prpelife Jetstream PVC PressurePipe AWWA C900 4"[tiro 12" 10/22/14 33-11-12 DR-14 PVC Pressure Pipe Royal Building Products Royal Seal PVC Pressure Pipe AW WA C900 4" thru 12" 33-31-20 PVC Sewer Poe 12/23/97* 33-31-20 PVC Sewer Pipe * 33-31-20 PVC Sewer Pipe 01/18/18 33-31-20 PVC Sewer Pipe 11/11/98 33-31-20 PVC Sewer Pipe * 33-31-20 PVC Sewer Pipe 09/11/12 33-31-20 PVC Sewer 05/06/05 33-31-20 , PVC Sohd Wall Pipe 04/27/06 33-31-20 PVC Sewer Fittings * 33-31-20 PVC Sewer Fittings 1 3/19/2018 33 3120 PVC Sewer Pipe 1 3/19/2018 33 3120 PVC Sewer Pre 1 3/29/2019 33 3120 Gasketed Fittings (PVC) 1 10/21/2020 33 3120 PVC Sewer Pipe 1 10/22/2020 33 3120 PVC Sewer Pipe 1 10/21/2020 33 3120 PVC Sewer Pipe P 33-31-12 1 * Cured in Place Pipe 05/03/99 Cured in Place Ape 05/29/96 Cured in Place Pipe Sewer - Pipes/Rehab/Fold & Form Fold and Form Pi 11/03/98 Fold and Form Pipe Fold and Form Pipe 12/04/00 Fold and Form Pipe 06/09/03 Fold and Form Pipe 1-M Manufacturing Co., Inc. (JM Eagle) Diamond Plastics Corporation Lamson Vylon Pipe Vinyltech PVC Pipe Diamond Plastics Corporation J-M Manufacturing Co, Inc. (JM Eagle) P,qq life Jet Stream Diamond Plastics Corporation Harco Plastic Trends, Inc.(Westlak ) Pipelife Jet Stream Pipelife Jet Stream GPK Products, Inc. NAPCO(Westlake) Sanderson Pipe Corp. NAPCO(Westlake) Insimfrrm Texark, Inc National Envirotech Group Remolds Inc/Inliner Technolgy (Inliner USA) Cullum Pipe Systems, Inc. Insimfirm Technologies, Inc. American Pipe & Plastics, Inc. Ultralmer Miller Pipeline Corp. Sewer - PiDes/ODen Prot -de Laree Diameter i 09/26/91 E100-2 PVC Sewer Pipe, Ribbed Lamson Vvlon Pipe 09/26/91 E100-2 PVC Sewer Pipe, Ribbed Extmsim Technologies, Inc. E100-2 PVC Sewer Pipe, Ribbed Up -or ETI Company 11/10/10 (E100-2) Polypropylene (PP) Sewer Pipe, Double Wall Advanced Drainage Systems (ADS) 11/10/10 (E100-2) Polypropylene (PP) Sewer Pipe, Triple Wall Advanced Drainage Systems (ADS) 05/16/11 Steel Reinforced Polyethylene Pipe ConTech Construction Products SDR-26 SDR-26 Gravity Sewer "S" Gravity Sewer Pipe SDR 26/35 PS 115/46 SDR-26 and SDR-35 SDR 26/35 PS 115/46 SDR-26 and SDR-35 Gasket Fittings Gasketed PVC Sewer Main Finings SDR 35 SDR 26 SDR 26 SDR 26 SDR 26 SDR 26/35 PS 115/46 National Liner, (SPL) Item #27 Inliner Technology Insim "NuPIpe" Ultralmer PVC Alloy Pipelmer EX Method Carlon Vylon H.C. Closed Profile Pipe, Ultra -Rib Open Profile Sewer Pipe SaniTite HP Double Wall (Corrugated) SamTne HP Triple Wall Pipe Durmaxx ASTM D 3034 ASTM D 3034 ASTM F 789 ASTM D3034 ASTM F 679 ASTM F 679 ASTM F-679 ASTM F-679 ASTM D-3034, D-1784, etc ASTM D 3034 ASTM F679 ASTM D3034 ASTM D3034/F-679 ASTM D3034 ASTM D3034 ASTM F-679 ASTM F 1216 ASTM F-1216/D-5813 ASTM F 1216 ASTM F-1504 ASTM F-1504, 1871, 1867 ASTM F-1504, F-1947 ASTM F 679 ASTM F 679 ASTM F 2736 ASTM F 2764 ASTM F 2562 4" - 15" 4" thru 15" 4" thru 15" 4" thru 15" 18" to 27" 18" - 28" 18" 18" to 48" 4" - 11" 18"- 24" 4"- 15" 4"- 15" 4" - 15" 4"- 15" 18"- 36" Demo. Purpose Only Up to 18" diameter 18" to 48" 18" to 48" 24"-30" 30" to 60" 24" to 72" * From Original Standard Products List CITY OF FORT WORTH FORT WORTH® WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03/07/2023 Note: All water or sewer pipe larger than 1S inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding maybe required for some pipes. Approval Spec I on 1W Manufacturer Model1. National Spec Water - Aoour�enancesgig -10 (07/Ol/13) Ol/18/18 33-12-10 Double Strap Saddle Romac 202NS Nylon Coated AWWA C800 1"-2"SVC, no 124"Pipe 08/28/02 Double Strap Saddle Smith Blair 4317 Nylon Coated Double Strap Saddle 07/23/12 33-12-10 Double StrapService Saddle Mueller Company U-S Double SS Strap DI Saddle AWWA C800 1"-2" SVC, u to 24" Pi e 03/07/23 33-12-10 Double StrapService Saddle Powerseal 3450AS, Inc. Corp. Stop, ON Strap, Stainless NSF ANSI 372 1"-2" SVC, u to 24 Pi e 10/27/87 Curb Stops -Ball Meter Valves McDonald 6100M,6100MT & 610MT 3/4" and 1" 10/27/87 Curb Stops -Ball Meter Valves McDonald 4603B, 4604B, 610UM, 6100TM and 6101M 1 h" and 2" FB600-7NL, FB1600-7-NL, FV23-777-W-NL, 1/25/2018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. L22-77NL AWWA C800 2" FB600-6-NL, FB1600-6-NL, FV23-666-W- 1111018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. NL, L22-66NL AWWA C800 1-1/2" FB600-4-NL, FB1600-4-NL, B11-444-WR- 1111018 33-12-1. Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. NL, B22444-WR-NL, L28-44NL AWWA C800 I " 13-25000N, B-24277N-3, B-20200N-3, H- AWWA C800, ANSF 61, 1/25/2018 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15000N, , H-1552N, H142276N ANSI/NSF 372 _ B-25000N, B-20200N-3, B-24277N-3,H- AWWA C800, ANSF 61, 1111.1. 33-12-1. Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15000N, H-14276N, H-15525N ANSI/NSF 372 1-1/2" 5/25/2018 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15530N ANSI/NSF 372 V, 01/26/00 Coated Tapping Saddle with Double SS Straps 1CM Industries, Inc. #406 Double Band SS Saddle 1"-2" Taps on up to 12" 0/5/21/12 33-12-25 Tapping Sleeve (Coated Steel) 1CM Industries, Inc. 412 Tapping Sleeve ESS AWWA C-223 Up to 30" w/12" Out 03/29/22 33-12-25 Tapping Sleeve (Coated or Stainless Steel) 1CM Industries, Inc. 415 Tapping Sleeve AWWA C-223 Concrete Pipe Only 05/10/11 Tapping Sleeve (Stainless Steel) Powerseal 3490AS (Flange) & 3490MJ 4"-1" and 16" 02/29/12 33-12-25 Tapping Sleeve (Coated Steel) Romac FTS 420 AWWA C-223 U p to 42" w/24" Out 02/29/12 33-12-25 Tapping Sleeve (Stainless Steel) Romac SST Stainless Steel AWWA C-223 Up to 24" w/12" Out 02/29/12 33-12-25 Tapping Sleeve (Stainless Steel) Romac SST III Stainless Steel AWWA C-223 Up to 30" w/12" Out 05/10/11 Joint Repair Clamp Powerseal 3232 Bell Joint Repair Clamp 4" to 30" Plastic Meter Box w/Composite Lid DFW Plastics lnc. DFW37C-12-lEPAFFTW Plastic Meter Box w/Composite Lid DFW Plastics lnc. DFW39C-12-lEPAFFTW 08/30/06 Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW65C-14-lEPAF FTW Class "A" Concrete Meter Box Bass & Hays CMB37-B12 1118 LID-9 Concrete Meter Box Bass & Hays CMB-18-Dual 1416 LID-9 Concrete Meter Box Bass & Hays CMB65-B65 1527 LID-9 r Water - Combination Air Release 33-31-70 (01/08/13) 1 E I -I I Au Release Valve GA Industries, Inc. Empve Air and Vacuum Valve, Model 935 ASTM A 126 Class B, ASTM A 1" &W21' * EI-11 [oribriation ombmation Ar Release Valve Multiplex Manufacturing Co. Crispin Air and Vacuum Valves, Model No. 1/2", 1" & 2" EI-11 ombination Air Release Valve Valve and Primer Corp. APCO #143C, #145C and #147C 1", 2" & 3" Water Barrel Fire Hvdrants 10/Ol/87 E-1-12 Dry Barrel Fire Hydrant American -Darting Valve Drawing Nos. 90-18608, 94-18560 AWWA C-502 03/31/88 E-1-12 Dry Barrel Fire Hydrant American Darling Valve Shop Drawing No. 94-18791 AWWA C-502 09/30/87 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Shop Drawing No. D-19895 AWWA C-502 01/12/93 E-1-12 Dry Barrel Fire Hydrant American AVK Company Model 2700 AWWA C-502 08/24/88 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Drawings D20435, D20436, B20506 AWWA C-502 E-1-12 Dry Barrel Fire Hydrant ITT Kennedy Valve Shop Drawing No. D-80783FW AWWA C-502 0.1.7 E-1-12 Dry Barrel Fire Hydrant M&H Valve Company Shop Drawing No. 13476 AWWA C-502 Shop Drawings No. 6461 t0/14/87 E-1-12 Dry Barrel Fire Hydrant Mueller Company A-423 Centurion AW WA C-502 01/15/88 E1-12 Dry Barrel Fire Hydrant Mueller Company A-423 Super Centurion 200 AWWA C-502 10/09/87 E-1-12 Dry Barrel Fire Hydrant U.S. Pipe & Foundry Shop Drawing No. 960250 AWWA C-502 09/16/87 E-1-12 Dry Barrel Fire Hydrant American Flow Control (AFC) Waterous Pacer WB67 AWWA C-502 08/12/16 33-12-40 Dry Barrel Fire Hydrant EI (East Jordan Iron Works) WaterMaster 5CD250 I 02/05/93 E101-5 Detector Check Meter Ames Company Model 1000 Detector Check Valve AWWA C550 4" - 10" 08/05/04 Magnetic Drive Vertical Turbine Hersey Magnetic Drive Vertical AWWA C701, Class 1 3/4" - 6" * From Original Standard Products List CITY OF FORT WORTH FORT WORTH® WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03/07/2023 Note: All water or sewer pipe larger than 1S inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding maybe required for some pipes. Approval IModel INational Water -Pines/PVC(Pressure Waterl33-31-70(01/08/13) -W MEL M` —AL I 01/18/18 33-11-12 PVC Pressure Pipe Vinyltech PVC Pipe DR14 ASTM D1784 V-12" I I 3/19/2018 33 11 12 PVC Pressure Pipe Pipelife Jet Stream DR14 AWWA C900 4"-12" I I 3/19/2018 33 11 12 PVC Pressure Pipe Pipelife Jet Stream DR18 AWWA C900 16"-24" I I 5/25/2018 33 11 12 PVC Pressure Pipe Diamond Plastics Corporation DR 14 AWWA C900 4"-12" I 5/25/2018 3311 12 PVC Pressure Pipe Diamond Plastics Corporation DR 18 AWWA C900 16"-24" AWWA C900-16 UL 1285 12/6/2018 3311 12 PVC Pressure Pipe J-M Manufacnrring Co., Inc d/b/a JM Eagle DR 14 ANSI/NSF 61 4"-28" FM 1612 12/6/2018 33 11 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/b/a JM Eagle DR 18 ° 16"-24" 9/6/2019 33 11 12 PVC Pressure Pipe Underground Solutions Inc. DR14 Fusible PVC AWWA C900 4" - 8" 9/6/2019 33 11 12 PVC Pressure Pipe NAPCO(Westlake) DR18 AWWA C900 16"-24" 9/6/2019 33 11 12 PVC Pressure Pipe NAPCO(Westlake) DR14 AWWA C900 4"-12" 9/6/2019 33 11 12 PVC Pressure Pipe Sanderson Pipe Corp. DR14 AWWA C900 4"- 12" I Water - Pines/Valves & Fittin¢s/Ductile Iron Fittines 33--11 (01/08/13) I 07/23/92 EI-07 Ductile Iron Fittings Star Pipe Products, Inc. Mechanical Joint Finings AW WA C153 & C110 I EI-07 Ductile Iron Fittings Griffin Pipe Products, Co. Mechanical Joint Fittiq @ AWWA C 110 I * E1-07 Ductile Iron Fittings McWane/Tyler Pipe/ Union Utilmes Division Mechanical Joint Finings, SSB lass 350 AWWA C 153, C 110, C 111 I 08/11/98 E1-07 Ductile Iron Fittings Sigma, Co. Mechanical Joint Finings, SSB Class 351 AWWA C 153, C 110, C 112 I 02/26/14 E1-07 MJ Fittings Accucast Class 350 C-153 MJ Fittings AW WA C153 4"-12" I 05/14/98 E1-07 Ductile Iron Joint Restraints Ford Meter Box Co./Uni-Flange Uni-Flange Series 1400 AW WA C111/C153 4" to 36" I 05/14/98 E1-24 PVC Joint Restraints Ford Meter Box Co./Uni-Flange Uni-Flange Series 1500 Circle -Lock AW WA C111/C153 4" to 24" I 11/09/04 E1-07 Ductile Iron Joint Restraints One Bolt, Inc. One Bolt Restrained Joint Fitting AWWA C111/C116/C153 4" to 12" I I 02/29/12 33-11-11 Ductile Iron Pipe Mechanical Joint Restraint EBAA Iron, Inc. Megalug Series 1100 (for DI Pipe) AWWA C111/C116/C153 4" to 42" I I 02/29/12 33-11-11 PVC Pipe Mechanical Joint Restraint EBAA Iron, hic. Megalug Series 2000 (for PVC Pipe) AWWA C111/C116/C153 4" to 24" I I 08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLC4 - SLC10 AW WA C111/C153 4" to 10" I I 03/06/19 33-11-11 Mechanical Joint Retainer GlandaFVC) Sigma, Co. Sigma One-Lok SLCS4 - SLCS12 AW WA C111/C153 4" to 12" I I 08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLCE AW WA C111/C153 12" to 24" I I 08/10/98 E1-07 MJ Fiffir IP) Sigma, Co. Sigma One-Lok SLDE AW WA C153 4" - 24" I I 10/12/10 E1-24 Interim Restrained Joint Svatem S & B Techncial Products Bulldog System ( Diamond Lok 21 & JM ASTM F-1624 4" to 12" I I 08/16/06 E1-07 Mechanical Joint Fittings SIP Ind-nies(Serampore) Mechanical Joint Fittings AW WA C153 4" to 24" I I 11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. PVC Stargrip Series 4000 ASTM A536 AW WA CI I I I I 11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. DIP Stmgrip Series 3000 ASTM A536 AW WA CI I I I EZ Grip Joint Restraint (EZD) Black For DIP 03/19/18 33-11-I1 Mechanical Joint Retainer Glands SIP Industries(Seramnore) ASTM A536 AW WA CI I I 3"-48" EZ Grip Joint Restraint (EZD) Red for C900 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Serampore) DRl4 PVC Ape ASTM A536 AW WA CI I I 4"-12" 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Sersmpore) �` vuP, V11i. nn, oa„ �,.t.�`VJ nGLL �V1 �J°✓ ASTM A536 AW WA CI11 16"-24" I Water - Pioes/Valves & Fittings/Resilient Seated Gate Valve* 33-12-20 (05/13/15). I Resilient Wedged Gate Valve w/no Gears American Flow Control Series 2500 Drawing # 94-20247 16" I 12/13/02 Resilient Wedge Gate Valve American Flow Control Series 2530 and Series 2536 AWWA C515 30" and 36" I I 08/31/99 Resilient Wedge Gate Valve American Flow Control Series 2520 & 2524 (SD 94-20255) AW WA C515 20" and 24" I I 05/18/99 Resilient Wedge Gate Valve American Flow Control Series 2516 (SD 94-20247) AWWA C515 16" I I 10/24/00 E1-26 Resilient Wedge Gate Valve American Flow Control Series 2500 (Ductile Iron) AWWA C515 4" to 12" I I 08/05/04 Resilient Wedge Gate Valve American Flow Control 42" and 48" AFC 2500 AWWA C515 42" and 48" I I 05/23/91 E1-26 Resilient Wedge Gate Valve American AVK Company American AVK Resilient Seeded GV AWWA C509 4" to 12" I I01/24/02 E1-26 Resilient Wedge Gate Valve American AVK Company 20" and smaller I I * E1-26 Resilient Seated Gate Valve Kennedy 4" - 12" I I E1-26 Resilient Seated Gate Valve M&H 4" - 12" I I * E1-26 Resilient Seated Gate Valve Mueller Co. 4" - 12" I I 11/08/99 Resilient Wedge Gate Valve Mueller Co. Series A2361 (SD 6647) AWWA C515 16" I I 01/23/03 Resilient Wedge Gate Valve Mueller Co. Series A2360 for 18"-24" (SD 6709) AWWA C515 24" and smaller I 05/13/05 Resilient Wedge Gate Valve Mueller Co. Mueller 30" & 36", C-515 AW WA C515 30" and 36" I 01/31/06 Resilient Wedge Gate Valve Mueller Co. Mueller 42" & 48", C-515 AW WA C515 42" and 48" I 01/28/88 EI-26 Resilient Wedge Gate Valve Clow Valve Co. AWWA C509 4" - 12" I 10/04/94 Resilient Wedge Gate Valve Clow Valve Co. 16" RS GV (SD D-20995) AW WA C515 16" I 11/08/99 EI-26 Resilient Wedge Gate Valve Clow Valve Co. Clow RW Valve (SD D-21652) AW WA C515 24" and smaller I 11/29/04 Resilient Wedge Gate Valve Clow Valve Co. Clow 30" & 36" C-515 AWWA C515 30" and 36" (Note 3) 11/30/12 Resilient We Crate Valve Clow Valve Co. Clow Valve Model 2638 AW WA C515 24" to 48" (Nora 3) 05/08/91 E1-26 Resilient Seat Gate Valve Stockham Valves & Fittings AWWA C 509, ANSI 420 - stem, 4" - 12" I E1-26 Resilient Seated Gate Valve U.S. Pipe and Foundry Co. Mcoesw1250, regwremerts SPL #74 3" to 16" 11/26/16 33-12-20 Resilient Seated Gate Valve EJ (East Jordan Iron Works) EJ Fluo Master Gat. Valve & Boxes 08/24/18 I Mateo Gate Valve Matco-Norca 225 MR AWWA/ANSI C115/An21.15 4" to 16" I * From Original Standard Products List FORT WORTH® Note: All water or CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST than 1S inch diameter shall be approved for use by the Water basis. for some Updated: 03/07/2023 I * E1-30 Rubber Seated Butterfly Valve Henry Pratt Co. AW WA C-504 24" I * E1-30 Rubber Seated ButterFly Valve Mueller Co. AW WA C-504 24"and smaller 1/11/99 E1-30 Rubber Seated Butterfly Valve De ik Valves Co. AW WA C-504 24" and larger 06/12/03 E1-30 Valmatm American Butterfly Valve Valmanc Valve and Manufacturing Cert. Valmatic American Butterfly Valve. AW WA C-504 Up to 84" diameter 04/06/07 E1-30 Rubber Seated ButterFly Valve M&H Valve M&H Style 4500 & 1450 AW WA C-504 24" to 48" 03/19/18 33 12 21 Rubber Seated Butterfly Valve G. A. Industries (Golden Anderson) AW WA C504 Butterfly Valve AW WA C-504 30"-54" Water�ne Encasement 33-11-10 (01/08/13) OS/12/OS EI-13 Polyethylene Encasment Flessol Packaging Fulton Enterprises AW WA C105 8 mil LLD 05/12/05 EI-13 Polyethylene Encasment Mountain States Plastics (MSP) and AEP Ind. Standard Hardware AW WA C105 8 mil LLD 05/12/05 E1-13 Polyethylene Encasment AEP Industries Bullstrong by Cowtown Bolt & Gasket AW WA C105 8 mil LLD 09/06/19 33-11-11 Polyethylene Encasment Northtown Products Inc. PE Encasement for DIP AW WA C105 8 mil LLD Water - Samnlint= Station 03/07/23 33 12 50 Water Sam lin Station I Eclipse Number 88 , 12-inch Depth of Bur As shown in spec. 33 12 50 0F.-L Water - Automatic Flusher Automated Flushing System Mueller Hydrogaud HG2-A-IN-2-PVC-018-LPLG(Permanent) 04/09/21 Automated Flushing System Kupf le Foundry Company Eclipse #9800wc 04/09/21 Automated Flushing System Kupf le Foundry Company Eclipse 99700 (Portable) * From Original Standard Products List