HomeMy WebLinkAboutContract 55480-A1CSC No. 55480-A1 AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 55480 WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 55480, (the CONTRACT) which was authorized by M&C 21-0218 on the 23rd day of March, 2021 in the amount of $262,380.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Trinity Boulevard 36-Inch Water Main Relocation, Phases 1 and 2; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $76,600.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $338,980.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Trinity Blvd. 36" Water Main Relocation, Ph. 1 & Ph. 2 Prof Services Agreement Amendment Template 102101 Revision Date: November 23, 2021 Page 1 of 2 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: APPROVAL RECOMMENDED: chi-i 'toyheY ff6 (el- ChristopherHard r(M a r 26, 202407,14 CDT, Christopher Harder, P. E. Director, Water Department Contract Compliance Manager: ENGINEER Kimlley-Horn Associates, Inc. W,� Join Atkins, P.E. Vice President DATE: 02/16/2024 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. for PreOti KC, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: Douglas Black (Mar29. 202410:04 CDT) Douglas W. Black Sr. Assistant City Attorney d4vvnn� - * FRR), ATTEST: q Pvo oo =d *� b C TEX A`�o4p nbUpao4� C Jannette Goodall City Secretary City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: November 23, 2021 Page 2 of 2 M&C: N/A Date: N/A Form 1295: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Trinity Blvd. 36" Water Main Relocation, Ph. 1 & Ph. 2 102101 Kimley>»Horn February 2, 2024 Ms. Preeti KC, P.E. Senior Project Manager City of Fort Worth Water Department 200 Texas Street Fort Worth, TX 76102 Re: City of Fort Worth — Trinity Blvd Ph1 & Ph2 — Amendment No. 1 Phase 2 Construction Phase Services KHA No. 061018386 City Project No. 103010 Dear Preeti: This letter is in reference to a contract between Kimley-Horn and Associates, Inc. (ENGINEER) and the City of Fort Worth (CITY) dated 03-29-2021 referred to herein as the "CONTRACT". This amendment is to provide construction phase services for the duration of the phase 2 construction phase portion of the project. ENGINEER will provide the services outlined as follows: TASK 10. PHASE 2 — DESIGN MANAGEMENT In accordance with the Contract, Engineer shall perform the following additional services for up to four (4) months: 10.1. Managing the Team • Lead, manage and direct design team activities • Ensure quality control is practiced in performance of the work • Communicate internally among team members • Task and allocate team resources 10.2. Communications and Reporting • Prepare invoices and submit monthly in the format requested by the CITY. • Coordinate with other agencies and entities as necessary for the design of the proposed infrastructure, and provide and obtain information needed to prepare the design • With respect to coordination with permitting authorities, ENGINEER shall communicate with permitting authorities such that their regulatory requirements are appropriately reflected in the designs. ENGINEER shall work with regulatory authorities to obtain approval of the designs, and make changes necessary to meet their requirements, as part of the design scope. Kimley>>> Horn Page 2 TASK 17. PHASE 2 — CONSTRUCTION PHASE SERVICES Engineer will provide the following additional services: 7.1 Construction Support • The ENGINEER shall attend the preconstruction conference. • After the pre -construction conference, the ENGINEER shall provide project exhibits and attend public meeting to help explain the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. • Prepare and distribute Meeting Notes. • On -site Observation • Make up to four (4) site visits at intervals as directed by CITY in order to observe the progress of the work. Such visits and observations by ENGINEER are not intended to be exhaustive or to extend to every aspect of Contractor's work in progress. Observations are to be limited to spot checking, selective measurement, and similar methods of general observation of the Work based on ENGINEER'S exercise of professional judgment. Based on information obtained during such visits and such observations, ENGINEER will evaluate whether Contractor's work is generally proceeding in accordance with the Contract Documents, and ENGINEER will keep CITY informed of the general progress of the Work. The purpose of ENGINEER'S site visits will be to enable ENGINEER to better carry out the duties and responsibilities specifically assigned in this Agreement to ENGINEER, and to provide CITY a greater degree of confidence that the completed Work will conform in general to the Contract Documents. ENGINEER shall not, during such visits or as a result of such observations of Contractor's work in progress, supervise, direct, or have control over Contractor's work, nor shall ENGINEER have authority over or responsibility for the means, methods, techniques, equipment choice and usage, sequences, schedules, or procedures of construction selected by Contractor, for safety precautions and programs incident to Contractor's work, nor for any failure of Contractor to comply with laws and regulations applicable to Contractor's furnishing and performing the Work. Accordingly, ENGINEER neither guarantees the performance of any Contractor nor assumes responsibility for any Contractor's failure to furnish and perform its work in accordance with the Contract Documents. • Progress Meetings Attend monthly progress meetings (up to 4) and visit the site for observation at that time. • Shop drawing, samples and other submittals Review Kimley»>Horn Page 3 • Review up to thirty (30) shop drawings, samples and other submittals submitted by the contractor for general conformance with the design concepts and general compliance with the requirements of the contract for construction. Such review, approvals or other action will not extend to means, methods, techniques, equipment choice and usage, sequences, schedules, or procedures of construction or to related safety precautions and programs and shall not relieve the Contractor from its responsibility for performance in accordance with the contract for construction, nor is such review a guarantee that the work covered by the shop drawings, samples and submittals is free of errors, inconsistencies or omissions. • Log all shop drawings, samples and other submittals. • Substitutions • Evaluate and determine the acceptability of up to five (5) substitute or "or -equal" materials proposed by Contractor in accordance with the Contract Documents, but subject to the provisions of applicable standards of the state or the CITY. • Request for information (RFI): Provide necessary interpretations and clarifications of contract documents, and make recommendations as to the acceptability of the work for up to four (4) RFI's. ENGINEER will respond to reasonable and appropriate Contractor requests for information and issue necessary clarifications and interpretations of the Contract Documents to CITY as appropriate to the orderly completion of Contractor's work. Any orders authorizing variations from the Contract Documents will be made by CITY. • Change Orders Provide support for Change Orders as requested by the CITY. Up to one (1) change order is assumed. Change Order support may include review and recommendations to the CITY for the execution of change orders. • Final PROJECT Walk Through • Attend the "Final" PROJECT Part walk through and assist with preparation of final punch list. Attend one (1) final site visit to determine if the completed Work of Contractor is generally in accordance with the Contract Documents. • ENGINEER shall not be responsible for the acts or omissions of any Contractor, or of any of their subcontractors, suppliers, or of any other individual or entity performing or furnishing the Work. ENGINEER shall not have the authority or responsibility to stop the work of any Contractor. Kimley>>> Horn Page 4 TASK 18. PHASE 2 — RECORD DRAWINGS Engineer will provide the following additional services: 8.1 Record Drawings • The ENGINEER shall prepare Record Drawings from information provided by the CITY depicting any changes made to the Final Drawings during construction. The following information shall be provided by the CITY: o As -Built Survey o Red -Line Markups from Contractor o Red -Line Markups from City Inspector o Copies of Approved Change Orders o Approved Substitutions • The ENGINEER shall modify the Final Drawings electronically and shall place a stamp on the plans indicating that they represent Record Drawings of the project as constructed. The stamp shall be signed and dated by the ENGINEER and shall be placed on each plan sheet, whether there are any revisions on the sheet or not. Each sheet shall clearly indicate all changes which apply to that sheet by clouding and numbering, or other suitable means. • The following disclaimer shall be included with the Record Drawing stamp: o These Record Drawings were prepared using information provided by others and represent the as constructed conditions to the extent that documented changes were provided for recording. The ENGINEER assumes no liability for undocumented changes and certifies only that the documented changes are accurately depicted on these drawings. • The ENGINEER shall submit a set of sealed Final Drawings, modified and stamped as Record Drawings, on mylar for record storage. The ENGINEER may keep copies of the information provided by the CITY for their files, but all original red -lined drawings shall be returned to the CITY with the mylars. ASSUMPTIONS • One copy of full size (22"x34") .pdf will be delivered to the CITY. DELIVERABLES A. PDF Record Drawings files will be uploaded to E-Builder. B. GIS shapefiles will be provided to the City in .shp format. C. Approved Pipe Shop Drawings. Kimley»>Horn Page 5 Compensation and Budget Modifications We recommend that the City increase the budget by $76,600 for these additional services. The following table summarizes our recommended budget revisions and revised contract amount: Description Original Amendment Total Contract No.1 Task 1. Phase 1 - Design Management $8,600 $6,700 $15,300 Task 2. Phase 1 - Conceptual Design $0 $0 $0 Task 3. Phase 1 - Preliminary Design $50,590 $0 $50,590 Task 4. Phase 1 - Final Design $39,680 $0 $39,680 Task 5. Phase 1 - Construction Contract Documents $6,400 $0 $6,400 Task 6. Phase 1 - Bid Phase Services $7,900 $0 $7,900 Task 7. Phase 1 - Construction Phase Services $36,150 $0 $36,150 Task 8. Phase 1 - Record Drawings $7,000 $0 $7,000 Task 9. Phase 1 - Survey and Subsurface Utility $10,510 $0 $10,510 Engineering Services Task 10. Phase 2 -Design Management $7,800 $0 $7,800 Task 11. Phase 2 - Conceptual Design $0 $0 $0 Task 12. Phase 2 - Preliminary Design $38,684 $0 $38,684 Task 13. Phase 2 - Final Design $29,900 $0 $29,900 Task 14. Phase 2 - Construction Contract $6,166 $0 $6,166 Documents Task 15. Phase 2 - Bid Phase Services $5,900 $0 $5,900 Task 16. Phase 2 - Survey and Subsurface Utility $7,100 $0 $7,100 Engineering Services Task 17. Phase 2 - Construction Phase Services $0 $60,400 $60,400 Task 18. Phase 2 - Record Drawings $0 $9,500 $9,500 Total $262,380 $76,600 $338,980 We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. 4JI.Atkins, P.E. Vice President J RA/jck Attachments: Level of Effort (LOE) Spreadsheet \\Kimley-horn\CN_FTW\FTW_Utilities\061018388-Trinity-Blvd-36-Inch-WL\PPP\POST_NTP\CCA-Amendment\Trinity Blvd WL Ph1 and 2_Am-1_Ltr.doc 2/2/2024 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Trinity Blvd Ph 2 & Ph 2 - 36-Inch Water Line Relocation City Project No. 102101 Labor (hours) Task Description Senior Task No. Professional Rate $370.00 Project Manager / Engineer $295.00 EIT $215.00 Total Labor Subconsultant Admin. Cost MWBE I Non-MWBE Markup $135.00 Travel/ Total Reproduction / Expense Task Sub Total Cost Fees /Permitting 10.0 Design Management (Ph2) 10 10 0 0 $6,700 $0 $0 $0 $0 $0 $6,700 Managing the Team 10 10 $6,700 $0 $6,700 $0 $0 $0 17.0 Construction Phase Services (Ph2) 311 100 801 0 $58,400 $0 $0 $0 $2,000 $2,000 $60,400 Construction Support Attend Preconstruction Conference 2 2 2 Attend Public Meeting 2 6 Construction Meetings (1/mo for 4 mo) 4 8 8 Shop Drawing Review (30) 8 40 40 Pipe 2 18 RFIs (4) 4 12 12 Change Orders (1) 4 8 4 Final Walkthrough 4 4 4 Punch List 1 4 2 Follow Up Walkthrough 2 2 2 $0 $2,000 $0 $0 $1,800 $0 $1,800 $1,900 $0 $1,900 $5,600 $2,000 $7,600 $23,400 $0 $23,400 $6,100 $0 $6,100 $7,600 $0 $7,600 $4,700 $0 $4,700 $3,500 $0 $3,500 $2,000 $0 $2,000 $1,800 $0 $1,800 $0 $0 $0 18.0 Record Drawings (Ph2) 5 10 22 0 $9,500 $0 $0 $0 $0 $0 $9,500 Record Drawings Revisions Deliverables 5 10 20 2 $0 $0 $0 $9,100 $0 $9,100 $400 $0 $400 $0 $0 $0 Subtotal 46 120 102 0 $74,600 $0 $0 $0 $2,000 $2,000 $76,600 Water Line Linear Footage 2,276 LF 100% Sanitary Sewer Linear Footage - LF 0% Total Fee: Survey/SUE Fee: Total Fee (-) Survey Fee Description 31 - Design 51 - Survey City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 $76,600 $0 $76,600 Water Sewer $76,600.00 $0.00 $0.00 $0.00 Project Summary Total Hours 268 Total Labor $74,600 Total Expense $2,000 M/WBE Sub $0 M/WBE Participation 0.0% Non-M/WBE Sub $0 Total Sub Markup $0 Total Direct Expenses $2,000 Grand Total $76,600.001 Page 1 of 1