Loading...
HomeMy WebLinkAboutContract 58093-FP1FORT WORTH. City Secretary -FP1 Contract No. 58093 Date Received 03/28/2024 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Walsh Ranch — Quail Valley — Planning Area 3 West Phase B City Project No.: 104054 Improvement Type(s): x❑ Paving Original Contract Price: ❑X Drainage ❑ Street Lights ❑ Traffic Signals Amount of Approved Change Order(s): Revised Contract Amount: Total Cost of Work Complete: Jacob D. Good (Mar 27, 202410:50 CDT) Contractor Manager Title Conatser Construction, TX, L.P. Company Name Jc Koonce(Ma r27, 202410:54CDT) Project Inspector Project Manager Red err i Ewen (Mar 78_ 7024 07:50 CDT) CFA Manager Lauren Pr,,,., (Mar 28, 2024 07:58 CDT) TPW Director Asst. City Manager $1,496,359.50 -$6,627.00 $1,489,732.50 $1,489,732.50 M a r 27, 2024 Date M a r 27, 2024 Date Mar 27, 2024 Date M a r 28, 2024 Date Mar 28, 2024 Date Apr 1, 2024 Date OFFICIAL RECORD CITY SECRETARY Page 1 of 2 FT. WORTH, TX Notice of Project Completion Project Name: Walsh Ranch — Quail Valley — Planning Area 3 West Phase B City Project No.: 104054 City's Attachments Final Pay Estimate ❑x Change Order(s): ❑x Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time 150 WD Work Start Date: 8/29/2023 Completed number of Soil Lab Test: 534 Completed number of Water Test: 19 Days Charged: 130 Work Complete Date: 3/4/2024 Page 2 of 2 FORT WO 1T H CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name WALSH RANCH - QUAIL VALLEY - PLANNING AREA 3 WEST PHASE B Contract Limits Project Type DRAINAGE & PAVING IMPROVEMENTS City Project Numbers 104054 DOE Number 4054 Estimate Number 1 Payment Number 1 For Period Ending 3/19/2024 WD City Secretary Contract Number Contract Time 15WD Contract Date 9/26/2022 Days Charged to Date 130 Project Manager NA Contract is 100.00 Complete Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH, TX 76119 Inspectors DEYON / KOONCE Monday, March 25, 2024 Page 1 of 5 City Project Numbers 104054 DOE Number 4054 Contract Name WALSH RANCH - QUAIL VALLEY - PLANNING AREA 3 WEST PHASE Estimate Number I Contract Limits Payment Number 1 Project Type DRAINAGE & PAVING IMPROVEMENTS For Period Ending 3/19/2024 Project Funding UNIT III: DRAINAGE IMPROVEMENTS Item Description of Items Estimated unit No. Quanity 1 21" RCP CLASS III 310 LF 2 24" RCP CLASS III 1301 LF 3 30" RCP CLASS 111 88 LF 4 36" RCP CLASS 111 717 LF 5 42" RCP CLASS III 92 LF 6 48" RCP CLASS III 201 LF 7 4' STORM JUNCTION BOX 8 EA 8 5' STORM JUNCTION BOX 3 EA 9 42" FLARED HEADWALL, 1 PIPE l EA 10 10' CURB INLET 2 EA 11 15' CURB INLET 10 EA 12 20' CURB INLET 2 EA 13 MEDIUM STONE RIPRAP, DRY 39 SY 14 TRENCH SAFETY 2709 LF 15 FACTORY STORM WYE CONNECTION 5 EA 16 POST -CCTV INSPECTION (CO #1) 0 LF Sub -Total of Previous Unit UNIT IV: PAVING IMPROVEMENTS Unit Cost Estimated Completed Completed Total Quanity Total $65.00 $20,150.00 310 $20,150.00 $75.00 $97,575.00 1301 $97,575.00 $90.00 $7,920.00 88 $7,920.00 $125.00 $89,625.00 717 $89,625.00 $155.00 $14,260.00 92 $14,260.00 $190.00 $38,190.00 201 $38,190.00 $6,500.00 $52,000.00 8 $52,000.00 $9,500.00 $28,500.00 3 $28,500.00 $6,000.00 $6,000.00 1 $6,000.00 $4,000.00 $8,000.00 2 $8,000.00 $5,400.00 $54,000.00 10 $54,000.00 $6,000.00 $12,000.00 2 $12,000.00 $105.00 $4,095.00 39 $4,095.00 $1.00 $2,709.00 2709 $2,709.00 $500.00 $2,500.00 5 $2,500.00 $3.00 $0.00 0 $0.00 $437,524.00 $437,524.00 Item Description of Items Estimated Unit No. Quanity -------------------- 1 6" CONC PVMT 18653 SY 2 6" LIME TREATMENT 19948 SY 3 HYDRATED LIME (6" PAVE @ 336 LBS/SY) 359.1 TN 4 5" CONC SIDEWALK 908 SF 5 BARRIER FREE RAMP TYPE R-1 16 EA 6 FURNISH/INSTALL WALSH RANCH STYLE 8 EA SIGN POST & FOUNDATION W/REGULATORY 7 FURNISH/INSTALL WALSH RANCH STYLE 1 EA SIGN POST & FOUNDATION W/NAME BLADES 8 4" CONDT PVC SCH 40 (T) 255 LF 9 MODIFIED T101 TRAFFIC RAILLING 100 LF Unit Cost Estimated Completed Completed Total Quanity Total ---------------- $44.50 "30,058.50 18653 $830,058.50 $3.50 $69,818.00 19948 $69,818.00 $210.00 $75,411.00 359.1 $75,411.00 $4.75 $4,313.00 908 $4,313.00 $1,900.00 $30,400.00 16 $30,400.00 $1,700.00 $13,600.00 8 $13,600.00 $1,300.00 $1,300.00 $32.00 $8,160.00 $160.00 $16,000.00 1 $1,300.00 255 $8,160.00 100 $16,000.00 Monday, March 25, 2024 Page 2 of 5 City Project Numbers 104054 DOE Number 4054 Contract Name WALSH RANCH - QUAIL VALLEY - PLANNING AREA 3 WEST PHASE Estimate Number I Contract Limits Payment Number 1 Project Type DRAINAGE & PAVING IMPROVEMENTS For Period Ending 3/19/2024 Project Funding 10 BLOCK SOD PLACEMENT 129 SY $8.00 $1,032.00 129 $1,032.00 11 TOPSOIL 22 CY $28.00 $616.00 22 $616.00 12 SIDEWALK DRAIN (CO #3) 1 EA $1,500.00 $1,500.00 1 $1,500.00 Sub -Total of Previous Unit $1,052,208.50 $1,052,208.50 -------------------------------------- Monday, March 25, 2024 Page 3 of 5 City Project Numbers 104054 DOE Number 4054 Contract Name WALSH RANCH - QUAIL VALLEY - PLANNING AREA 3 WEST PHASE Estimate Number I Contract Limits Payment Number 1 Project Type DRAINAGE & PAVING IMPROVEMENTS For Period Ending 3/19/2024 Project Funding Contract Information Summary Original Contract Amount $1,496,359.50 Change Orders Change Order Number 1 ($8,127.00) Change Order Number 3 $1,500.00 Total Contract Price $1,489,732.50 Total Cost of Work Completed $1,489,732.50 Less % Retained $0.00 Net Earned $1,489,732.50 Earned This Period $1,489,732.50 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $1,489,732.50 Monday, March 25, 2024 Page 4 of 5 City Project Numbers 104054 DOE Number 4054 Contract Name WALSH RANCH - QUAIL VALLEY - PLANNING AREA 3 WEST PHASE Estimate Number I Contract Limits Payment Number I Project Type DRAINAGE & PAVING IMPROVEMENTS For Period Ending 3/19/2024 Project Funding Project Manager NA Inspectors DEYON / KOONCE Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH, TX 76119 City Secretary Contract Number Contract Date 9/26/2022 Contract Time 150 WD Days Charged to Date 130 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $1,489,732.50 Less % Retained $0.00 Net Earned $1,489,732.50 Earned This Period $1,489,732.50 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $1,489,732.50 Monday, March 25, 2024 Page 5 of 5 Walsh Ranch - Quail Valley - PA3W - B DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: Walsh Ranch - Quail Valley - PA3W - B CHANGE CONTRACT: Water (A), Sewer (Al), Drainage 61), Paving (B) ORDER No: CFA #: 22-0068 CITY PARTICIPATION: No CITY PROJECT #: 104054 DOE #: N/A 1 FID #: 30114-0200431-104054-EO7685 FILE #: X-27310, W-2830 INSPECTOR: Jeremy Koonce PROJECT MANAGER: Sandip Adhikari Phone No: (832) 527-5406 Phone No: (817) 392-8424 1 WATER 2 SEWER Developer Cost City Cost Developer Cost City Cost (COST PARTICIPATION % 100.00% 100.00% IORIGINAL CONTRACT $ 522,435.00 $ 645,054.00 EXTRAS TO DATE CREDITS TO DATE CONTRACT TO DATE $ 522,435.00 $ 645,054.00 (AMOUNT OF PROP. CHANGE ORDER $ (97,870.00) REVISED CONTRACT AMOUNT $ 522,435.00 $ 547,184.00 TOTAL REVISED CONTRACT AMOUNT PER $522,435.00 $547,184.00 UNIT REVISED COST SHARE Dev. Cost: $2,557,851.50 TOTAL REVISED CONTRACT ICity Cost from Change Order: $0.00 CONTRACT UNIT 3 DRAINAGE Developer Cost City Cost 100.00% $ 445,651.00 - $ 445,651.00 $ (8,127.00) $ 437,524.00 $437,524.00 (City Cost: ' $2,557,851.50 4 PAVING 5 STREET LIGHTING Developer Cost City Cost Developer Cost City Cost 100.00% 100.00% $ 1,050,708.50 $ 0.00 $ 1,050,708.50 $ 0.00 $ 1,050,708.50 $ 0.00 $1,050,708.50 $0.00 REVIEWED By Sandip Adhikari at 3:59 pm, Aug 22, 2023 CONTRACT DAYS 120 120 120 Page 1 Walsh Ranch - Quail Valley - PA3W - B You are directed to make the following changes in the contract documents QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL PAY ITEM # I CITY BID ITEM It I I I I I Unit II: Sewer Improvements 1 3331.4115 -715 LF 8" Sewer Pipe $56.00 ($40,040.00)1 3 3339.1001 -5 EA 4' Manhole $4,400.00 ($22,000.00)1 5 3339.1003 -17 VF 4' Extra Depth Manhole $215.00 ($3,655.00)1 6 3339.0001 -16 VF Epoxy Manhole Liner $425.00 f$6,800.00)1 7 3331.3101 -23 EA 4" Sewer Service $850.00 ( 19,550.00)1 8 3305.0109 -715 LF Trench Safety $1.00 ($715.00)1 9 3301.0002 -715 LF Post -CCTV Inspection $4.00 ($2,860.00)1 10 3301.0101 -5 EA Manhole Vacuum Testing $150.00 ($750.00)1 11 9999.0001 -1 EA 8" Sewer Connection to Existing Plug $1,500.00 ($1,500.00)1 Unit II: Sewer Improvements $ (97,870.00)1 REVIEWED l By Sandip Adhikari at 3:59 pm, Aug 22, 2023 Page 2 Walsh Ranch - Quail Valley - PA3W - B You are directed to make the following changes in the contract documents: PAY ITEM # CITY BID ITEM # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL Unit III: Drainage Improvements 16 3301.0002 -2709 LF Post -CCTV Inspection $3.00 ($8,127.00� Unit III: Drainage Improvements $ (8,127.00 REVIEWED By Sandip Adhikari at 3:59 pm, Aug 22, 2023 Page 3 DocuSign Envelope ID: 15C4837A-248B-43A1-9EOF-CCE06F18C8CC Walsh Ranch - Quail Valley - PA3W - B REASONS FOR CHANGE ORDER 1 Sanitary Sewer was removed and placed into CPN103935, as this project flows into this system now and will be required for that project. 2 Storm Drain CCTV Removed at the direction of Victor Tornero. 4 5 7 NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100 % OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. RECOMMENDED: APPROVED: APPROVED: OOWSi nod by: �`Hullt-Zollars. Inc j By; r� - � DOG �g net hy; vcO VLV%,C,I,8y Quail VaP-Y�'[; f �,14lx DocuSi ned b : tru nn X., L.�. ConatseEZ51350600229CI`44A q' -- 79666E03C412442. 93g0BF B19299428.. ... Name: Jordan V. Madia. P.E. Name: Setn arpanter Name: Brock Huqqins Title: Project Manaqer Title: Vice President Title: President REVIEWED By Sandip Adhikari at 3:59 pm, Aug 22, 2023 9/28/2022 2:38:24 PM Page 4 DocuSign Envelope ID: D75B2D16-7093-4AA2-BB71-DCDC693A5E74 Walsh Ranch - Quail Valley - PA3W - B DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: Walsh Ranch - Quail Valley - PA3W - B CONTRACT: Water (A), Sewer (Al), Drainage (B1), Paving (B) CFA #: 22-0068 CITY PROJECT #: 104054 DOE #: N/A FID #: 30114-0200431-104054-ED7685 FILE #: X-27310, W-2830 INSPECTOR: Steven Wester PROJECT MANAGER: Sandip Adhikari 1 WATER Developer Cost City Cost COST PARTICIPATION % 100.00% ORIGINAL CONTRACT $ 522,435.00 EXTRAS TO DATE CREDITS TO DATE CONTRACT TO DATE $ 522,435.00 AMOUNT OF PROP. CHANGE ORDER $ 1,100.00 REVISED CONTRACT AMOUNT $ 523,535.00 TOTAL REVISED CONTRACT AMOUNT PER $523,535.00 UNIT REVISED COST SHARE Dev. Cost: TOTAL REVISED CONTRACT CITY PARTICIPATION: Phone No: (682) 287-3465 Phone No: (817) 392-8424 CONTRACT UNIT 2 SEWER 3 DRAINAGE leveloper Cost City Cost Developer Cost City Cost 100.00% 100.00% $ 645,054.00 $ 445,651.00 $ (97,870-00) $ (8,127.00) S 547,184.00 $ 437,524.00 $ 547,184.00 $ 437,524.00 $547,184.00 $437,524.00 $2,558,951.50 (City Cost: $2,558,951.50 jCIty Cost from Change Order: 1 $0.00 ►R CHANGE ORDER No: 2 4 PAVING Developer Cost City Cost 100.00% $ 1,050,708.50 $ 1,OSQ708.50 $ 1,050,708.50 $1,050,708.50 REVIEWED By Sandip Adhikari at 4:51 pm, Aug 22, 2023 5 STREET LIGHTING CONTRACT DAYS leveloper Cost City Cost 100.00 $ 0.00 120 $ 0.00 120 $ 0.00 120 $0.00 Page 1 DocuSign Envelope ID: D75B2D16-7093-4AA2-BB71-DCDC693A5E74 Walsh Ranch - Quail Valley - PA3W - B You are directed to make the following changes in the contract documents: PAY ITEM # I CITY BID ITEM # QUANTITY UNIT New 11 1 3312.2003 1 1 JEA 11" Irrigation Service ITEM DESCRIPTION Unit I: Water Improvements REVIEWED By Sandip Adhikari at 4:51 pm, Aug 22, 2023 UNIT PRICE TOTAL $1,100.00 $1,100.00 Unit I: Water Improvements $ 1,100.00 Page 2 DocuSign Envelope ID: D75B2D16-7093-4AA2-BB71-DCDC693A5E74 Walsh Ranch - Quail Valley - PA3W - B REASONS FOR CHANGE ORDER 1 Added Irrigation Meter to plan set. NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100 % OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. RECOMMENDED: gRVIP,T Y:U Name: io,98911 V%Irlia4PE. Title: Project Manaqer APPROVED: Quail Vall '4VIL"I3ll by: Y s. r, Na g*J 942B... Title: Senior Vice President APPROVED: Conatser ns nRR&.n,�Y Y. Name: 1��c�Q pgmsC F44 A... Title: President REVIEWED By Sandip Adhikari at 4:51 pm, Aug 22, 2023 Page 3 DocuSign Envelope ID: A20136DEB-051C-4155-8FBF-31FF8E97287D Walsh Ranch - Quail Valley - PA3W - B DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: Walsh Ranch - Quail Valley - PA3W - B CONTRACT: Water (A), Sewer (Al), Drainage (B1), Paving (B) CFA #: 22-0068 CITY PARTICIPATION: CITY PROJECT #: 104054 DOE #: N/A FID #: 30114-0200431-104054-ED7685 FILE #: X-27310, W-2830 INSPECTOR: Steven Wester PROJECT MANAGER: Sandip Adhikari 1 WATER Developer Cost City Cost COST PARTICIPATION % 100.00% ORIGINAL CONTRACT $ 522,435.00 EXTRAS TO DATE $ 1,100.00 CREDITS TO DATE CONTRACT TO DATE $ 523,535.00 AMOUNT OF PROP. CHANGE ORDER $ 3,800.00 REVISED CONTRACT AMOUNT $ 527,335.00 TOTAL REVISED CONTRACT AMOUNT PER $527,335.00 UNIT REVISED COST SHARE Dev. Cost: TOTAL REVISED CONTRACT Phone No: (682) 287-3465 Phone No: (817) 392-8424 2SEWER leveloper Cost City Cost 100.00% $ 645,054.00 $ (97,870-00) S 547,184.00 $ 547,184.00 $547,184.00 $2,564,251.50 jCIty Cost from Change Order: 1 $0.00 CONTRACT UNIT 3 DRAINAGE )eveloper Cost City Cost 100.00% $ 445,651.00 $ (8,127.00) $ 437,524.00 $ 437,524.00 $437,524.00 (City Cost: $2,564,251.50 ►R CHANGE ORDER No: 3 4 PAVING Developer Cost City Cost 100.00% $ 1,050,708.50 $ 1,050,708.50 $ 1,500.0" $ 1,052,208.50 $1,052,208.50 REVIEWED By Sandip Adhikari at 1:22 pm, Mar 07, 2024 5 STREET LIGHTING leveloper Cost City Cost 100.00% $ 0.00 $ 0.00 $ 0.00 $0.00 CONTRACT DAYS 120 120 120 Page 1 DocuSign Envelope ID: A20136DEB-051C-4155-8FBF-31FF8E97287D Walsh Ranch - Quail Valley - PA3W - B You are directed to make the following changes in the contract documents: PAY ITEM # I CITY BID ITEM # QUANTITY UNIT ate ve New 11 I 3312.2003 2 EA I18" Irrigation I Service ITEM DESCRIPTION Unit I: Water Improvements REVIEWED 1 l By Sandip Adhikari at 1:22 pm, Mar 07, 2024 J UNIT PRICE TOTAL $1,600.001 $1,600.00 $1,100.00 $2,200.00 Unit I: Water Improvements $ 3,800.00 Page 2 DocuSign Envelope ID: A20136DEB-051C-4155-8FBF-31FF8E97287D Walsh Ranch - Quail Valley - PA3W - B You are directed to make the following changes in the contract documents: PAY ITEM # I CITY BID ITEM # QUANTITY UNIT New 12 1 9999.0011 1 EA ISidewalk Drain ITEM DESCRIPTION Unit IV: Paving Improvements REVIEWED By Sandip Adhikari at 1:22 pm, Mar 07, 2024 UNIT PRICE TOTAL 1 $1,500.00 $1,500.00 Unit IV: Paving Improvements $ 1,500.00 Page 3 DocuSign Envelope ID: A20B6DEB-051 C-4155-8FBF-31 FF8E97287D Walsh Ranch - Quail Valley - PA3W - B REASONS FOR CHANGE ORDER 1 Plan Revision 3 - Added Irrigation Meter to plan set. 2 Plan Revision 3 - Added Sidewalk drain for open space. 3 Plan Revison 3 - Added Gate Valve. 4 5 6 7 NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100 % OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. RECOMMENDED: APPROVED: APPROVED: DpcuS- ned bV• FiuIt-To tars, Inc. Al.aV{ is b� y DocuSL eLLC Quail V le DevVi7c ly M&r ConatserConrDCCuS.- ed by: LPibV't� ow - 79666E03C412442... Name: Jordan V. Marlia, P.E. 9308FEB1929942B... Name: Seth Carpenter SD50600229CF44A... Name: Brock Huqqins Title: Project Manager Title: Senior Vice President Title: President REVIEWED 1 By Sandip Adhikari at 1:22 pm, Mar 07, 2024 J Page 4 FORTWORTH. M, TRANSPORTATION AND PUBLIC WORKS March 6, 2024 Conatser Construction TX, LP. 5327 Wichita Street Fort Worth, TX 76119 RE: Acceptance Letter Project Name: Walsh Ranch Quail Valley PAW3-B Project Type: Developer City Project No.: 104054 To Whom It May Concern: On March 6, 2024 a final inspection was made on the subject project. There were no punch list items identified at that time. The final inspection indicates that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on March 6, 2024, which is the date of the final inspection and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at (832)527-5406. Sincerely, OP14.11-1- Sandip Adhikari, Project Manager Cc: Jeremy Koonce, Inspector Edward Davila, Inspection Supervisor Gary Deyon, Senior Inspector Andrew Goodman, Program Manager Huitt-Zollars, Inc., Consultant Conatser Construction TX, LP., Contractor Quail Valley Devco VLO, LLC, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 08/20/19 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a Notary Public in the state and county aforesaid, on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc., general partner of Conatser Construction TX. LP. known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said: That all persons, firms, associations, corporations or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth, has been paid in full; and That there are no claims pending for personal injury and/or property damages; On Contract described as: WALSH PA3W-B WATER, SANITARY SEWER, PAVING, AND DRAINAGE IMPROVEMENTS CFA PRJ #: 22-0068 CITY PROJECT #: 104054 CITY OF FORT WORTH STATE OF TEXAS CONATSER CONSTRUCTION TX, LP -Agenle'd. t Brock Huggins Subscribed and sworn to before me this 271h day of February, 2024. Y Py KATHERINE ROSE Notary Public, State of Texas h IOp 133467933 Notary Public in Tarrant County, Texas My Commission Expires November 30, 2025 e CONSENT OF SURETY COMPANY TO FINAL PAYMENT Conforms with the American Institute of Architects, AIA Document G707 OWNER ❑ ARCHITECT ❑ CONTRACTOR ❑ SURETY ❑ OTHER PROJECT: (name, addreSS)Walsh Ranch -Quail Valley Planning Area 3 West Ph B Fort Worth, TX TO (Owner) Bond No 0247474 (QUAIL VALLEY DEVCO VLO, LLC AND THE CITY OF_-] ARCHITECT'S PROJECT NO: CFA22-0068 FORT WORTH CONTRACT FOR: 400 S. Record St., Suite 1200 IPRC22-0065 - Walsh Ranch -Quail Valley -'Planning Area 3 West - Phase B (PA3W-B) - Utilities and Paving Dallas TX 75202 CONTRACT DATE: CONTRACTOR: CONATSER CONSTRUCTION TX, L.P. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the there insert name and address of Surety Company) BERKLEY INSURANCE COMPANY 475 Steamboat Road Greenwich CT 06830 , SURETY COMPANY on bond of (here insert name and address of Contractor) CONATSER CONSTRUCTION TX, L.P. 5327 Wichita St. Fort Worth TX 76119-6035 ,CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that fmal payment to the Contractor shall not relieve the Surety Company of any of its obligations to (here insert name and address of Owner) QUAIL VALLEY DEVCO VLO, LLC AND THE CITY OF FORT WORTH 400 S. Record St., Suite 1200 Dallas TX 75202 , OWNER, as set forth in the said Surety Company's bond, IN WITNESS, WHEREOF, the Surety Company has hereunto set its hand this Attest: _mot (Seal): 26th day Of February, 2024 BERKLEY INSURANCE COMPANY Surety Company Signature of Authorized Representative Robbi Morales Title Attorney -in -Fact NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Current Edition ONE PAGE No. BI-7280k POWER OF ATTORNEY BERKLEY INSURANCE COMPANY WILMINGTON, DELAWARE NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof Please review carefully. KNOW ALL MEN BY THESE PRESENTS, that BERKLEY TSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Delaware, having its principal office in Greenwich, CT, has .made; constituted E and appointed, and does 'by these presents make, constitute and appoint: Ricardo J. Reyna; Don E ConteU; .Sophinie Hunter; Robbi Morales; .Kelly. A. Westbrook;. Thw .McErvan; Joshua Saunders, Tonie Petranek; or Mikaela Peppers of Aon Risk Services Sout/nvest, Inc. of Dallas, TX its true and lawful Attomey-in-Fact, to sign its name as surety only as delineated below and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty 'C Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S. Dollars (U.S.S50,000,000.00), to the. same extent as if such bonds had been duly executed and .acknowledged by the regularly elected officers .of the Company at its principal office in their own proper persons. c > This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware, without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following o resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January.25, 2010: o RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief C Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant o Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney -in -fact named therein it to execute bonds, undertakings,. recognizances, or other suretyship obligations on behalf of the Company, and to affix the o c corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such Q attorney -in -fact and revoke any power of attorney previously granted; and further RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances, or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the i manner and to the extent therein stated; and further RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney -in -fact named; and Cd O further RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any Y power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or 3 other suretyship obligation of the Company; and such signature and seal when so used shalt have the same force and effect as though .manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any U0 person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have ceased to be such at the time when such instruments shall be issued. 0 o IN WrI'1NESS WI-MIZEOF, the Company has caused these presents to -be signed and attested by its appropriate o C1-icers and its o corporate. seal hereunto affxed this ofMemu. ^ U Attest Berk Insurance Company w (Sea[) By �� By U,N Je . ' tfer Executive Vice President & Secretary :S i ice ; ident U O o WARNING: THIS:POWER.INVALED IF NOT PRINTED Oil BLUE "13ERi ZY" SECURITY PAPER. STATE OR CONNECTCCUT ) b o N o COUNTY OF FAIItFIELD } Sworn to before me, a Notary Public in the State -of Connecticut, this _L[t day of. Mc� �03a , `by Ira S. Lederman es and Jeffrey 14i. Rafter who are sruorn tome to _be the Executive Vice President Secretary, and Senior Mice President, res cctively; of Berkley lnsuranae Cam any nRo1ATicwRv-:00M i C COMEcrlaurcett ,�LMYGQAIMSMN EXPIRED o rt•t+lrao;zox4 otary Nblic State of Connecticut CIERT7FiCATE: Z ` I, the undersigned- Assistant :Secretary -of BER M.Iff INSURANCE COMPANY, DO HEREBY CERTfFY that the foregoing is a true, correct and complete copy of the ori&M Power of Attorney; that said Power o.f Attorney has not beearevoked or rescinded 3 and that the authority of the Atiornev iyt-Fact;set fords therein, rho executed .the bond or undert akin;. to which. this :Power of Attorney is attached. -is: in fullforce.and effect as of this date. 20 24 Liven undermyliand:ancisealoftlteCompany,this26th day of Februa (Seal) Vincent P. ForteV AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a Notary Public in the state and county aforesaid, on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc., general partner of Conatser Construction TX. LP. known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said: That all persons, firms, associations, corporations or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth, has been paid in full; and That there are no claims pending for personal injury and/or property damages; On Contract described as: WALSH PA3W-B WATER, SANITARY SEWER, PAVING, AND DRAINAGE IMPROVEMENTS CFA PRJ #: 22-0068 CITY PROJECT #: 104054 CITY OF FORT WORTH STATE OF TEXAS CONATSER CONSTRUCTION TX, LP -Agenle'd. t Brock Huggins Subscribed and sworn to before me this 271h day of February, 2024. Y Py KATHERINE ROSE Notary Public, State of Texas h IOp 133467933 Notary Public in Tarrant County, Texas My Commission Expires November 30, 2025 e CONSENT OF SURETY COMPANY TO FINAL PAYMENT Conforms with the American Institute of Architects, AIA Document G707 OWNER ❑ ARCHITECT ❑ CONTRACTOR ❑ SURETY ❑ OTHER PROJECT: (name, addreSS)Walsh Ranch -Quail Valley Planning Area 3 West Ph B Fort Worth, TX TO (Owner) Bond No 0247474 (QUAIL VALLEY DEVCO VLO, LLC AND THE CITY OF_-] ARCHITECT'S PROJECT NO: CFA22-0068 FORT WORTH CONTRACT FOR: 400 S. Record St., Suite 1200 IPRC22-0065 - Walsh Ranch -Quail Valley -'Planning Area 3 West - Phase B (PA3W-B) - Utilities and Paving Dallas TX 75202 CONTRACT DATE: CONTRACTOR: CONATSER CONSTRUCTION TX, L.P. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the there insert name and address of Surety Company) BERKLEY INSURANCE COMPANY 475 Steamboat Road Greenwich CT 06830 , SURETY COMPANY on bond of (here insert name and address of Contractor) CONATSER CONSTRUCTION TX, L.P. 5327 Wichita St. Fort Worth TX 76119-6035 ,CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that fmal payment to the Contractor shall not relieve the Surety Company of any of its obligations to (here insert name and address of Owner) QUAIL VALLEY DEVCO VLO, LLC AND THE CITY OF FORT WORTH 400 S. Record St., Suite 1200 Dallas TX 75202 , OWNER, as set forth in the said Surety Company's bond, IN WITNESS, WHEREOF, the Surety Company has hereunto set its hand this Attest: _mot (Seal): 26th day Of February, 2024 BERKLEY INSURANCE COMPANY Surety Company Signature of Authorized Representative Robbi Morales Title Attorney -in -Fact NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Current Edition ONE PAGE No. BI-7280k POWER OF ATTORNEY BERKLEY INSURANCE COMPANY WILMINGTON, DELAWARE NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof Please review carefully. KNOW ALL MEN BY THESE PRESENTS, that BERKLEY TSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Delaware, having its principal office in Greenwich, CT, has .made; constituted E and appointed, and does 'by these presents make, constitute and appoint: Ricardo J. Reyna; Don E ConteU; .Sophinie Hunter; Robbi Morales; .Kelly. A. Westbrook;. Thw .McErvan; Joshua Saunders, Tonie Petranek; or Mikaela Peppers of Aon Risk Services Sout/nvest, Inc. of Dallas, TX its true and lawful Attomey-in-Fact, to sign its name as surety only as delineated below and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty 'C Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S. Dollars (U.S.S50,000,000.00), to the. same extent as if such bonds had been duly executed and .acknowledged by the regularly elected officers .of the Company at its principal office in their own proper persons. c > This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware, without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following o resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January.25, 2010: o RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief C Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant o Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney -in -fact named therein it to execute bonds, undertakings,. recognizances, or other suretyship obligations on behalf of the Company, and to affix the o c corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such Q attorney -in -fact and revoke any power of attorney previously granted; and further RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances, or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the i manner and to the extent therein stated; and further RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney -in -fact named; and Cd O further RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any Y power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or 3 other suretyship obligation of the Company; and such signature and seal when so used shalt have the same force and effect as though .manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any U0 person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have ceased to be such at the time when such instruments shall be issued. 0 o IN WrI'1NESS WI-MIZEOF, the Company has caused these presents to -be signed and attested by its appropriate o C1-icers and its o corporate. seal hereunto affxed this ofMemu. ^ U Attest Berk Insurance Company w (Sea[) By �� By U,N Je . ' tfer Executive Vice President & Secretary :S i ice ; ident U O o WARNING: THIS:POWER.INVALED IF NOT PRINTED Oil BLUE "13ERi ZY" SECURITY PAPER. STATE OR CONNECTCCUT ) b o N o COUNTY OF FAIItFIELD } Sworn to before me, a Notary Public in the State -of Connecticut, this _L[t day of. Mc� �03a , `by Ira S. Lederman es and Jeffrey 14i. Rafter who are sruorn tome to _be the Executive Vice President Secretary, and Senior Mice President, res cctively; of Berkley lnsuranae Cam any nRo1ATicwRv-:00M i C COMEcrlaurcett ,�LMYGQAIMSMN EXPIRED o rt•t+lrao;zox4 otary Nblic State of Connecticut CIERT7FiCATE: Z ` I, the undersigned- Assistant :Secretary -of BER M.Iff INSURANCE COMPANY, DO HEREBY CERTfFY that the foregoing is a true, correct and complete copy of the ori&M Power of Attorney; that said Power o.f Attorney has not beearevoked or rescinded 3 and that the authority of the Atiornev iyt-Fact;set fords therein, rho executed .the bond or undert akin;. to which. this :Power of Attorney is attached. -is: in fullforce.and effect as of this date. 20 24 Liven undermyliand:ancisealoftlteCompany,this26th day of Februa (Seal) Vincent P. ForteV