HomeMy WebLinkAboutContract 58093-FP2FORT WORTH.
-FP2
City Secretary
Contract No. 58093
Date Received 03/28/2024
AT
NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Walsh Ranch — Quail Valley — Planning Area 3 West Phase
City Project No.: 104054
Improvement Type(s): Water ❑x Sewer ❑x
Original Contract Price: $1,167,489.00
Amount of Approved Change Order(s):-$92,970.00
Revised Contract Amount: $1,074,519.00
Total Cost of Work Complete: $1,074,519.00
Jacob D. Gatewood (Mar 27. 202410:51 CDT)
Contractor
Manager
Title
Conaster Construction TX, LP
Company Name
Je Koonce (Mar 27. 202410:54 CDT)
Project Inspector
Project Manager
Rebecca Owen (Mar 28, 202407:50 CDT)
CFA Manager
Lau ren Prieur (Mar 28, 2024 07:58 CDT)
TPW Director
Asst. City Manager
M a r 27, 2024
Date
Mar 27, 2024
Date
Mar 27, 2024
Date
M a r 28, 2024
Date
Mar 28, 2024
Date
Apr 1, 2024
Date
OFFICIAL RECORD Page 1 of 2
CITY SECRETARY
FT. WORTH, TX
Notice of Project Completion
Project Name: Walsh Ranch — Quail Valley — Planning Area 3 West Phase
City Project No.: 104054
City's Attachments
Final Pay Estimate ❑x
Change Order(s): ❑x Yes ❑ N/A
Pipe Report: x❑ Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time: 150 WD
Work Start Date: 8/29/2023
Completed number of Soil Lab Test: 534
Completed number of Water Test: 19
Days Charged: 130
Work Complete Date: 3/4/2024
Page 2 of 2
FORT WO 1T H
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name WALSH RANCH - QUAIL VALLEY - PLANNING AREA 3 WEST PHASE B
Contract Limits
Project Type WATER & SEWER
City Project Numbers 104054
DOE Number 4054
Estimate Number 1 Payment Number 1 For Period Ending 3/19/2024
WD
City Secretary Contract Number Contract Time 15WD
Contract Date 9/26/2022 Days Charged to Date 130
Project Manager NA Contract is 100.00 Complete
Contractor CONATSER CONSTRUCTION TxLP
5327 WICHITA ST
FORT WORTH, TX 76119
Inspectors DEYON / KOONCE
Monday, March 25, 2024 Page 1 of 5
City Project Numbers 104054 DOE Number 4054
Contract Name WALSH RANCH - QUAIL VALLEY - PLANNING AREA 3 WEST PHASE Estimate Number I
Contract Limits Payment Number 1
Project Type WATER & SEWER For Period Ending 3/19/2024
Project Funding
UNIT I: WATER IMPROVEMENTS
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1
8" DIP WATER
284 LF
$64.00
$18,176.00
284
$18,176.00
2
8" DIP WATER CLSM BACKFILL
264 LF
$74.00
$19,536.00
264
$19,536.00
3
8" PVC WATER PIPE
4805 LF
$52.00
Q49,860.00
4805
$249,860.00
4
FIRE HYDRANT
4 EA
$4,600.00
$18,400.00
4
$18,400.00
5
DUCTILE IRON WATER FITTINGS
3.09 TN
$9,000.00
$27,810.00
3.09
$27,810.00
W/RESTRAINT
6
CONNECTION TO EXISTING 4"-12" WATER
6 EA
$2,000.00
$12,000.00
6
$12,000.00
MAIN
7
1" WATER SERVICE
121 EA
$1,100.00
W3,100.00
121
$133,100.00
8
1" WATER SERVICE - TAP EXISTING MAIN
6 EA
$2,100.00
$12,600.00
6
$12,600.00
9
8" GATE VALVE (CO #3)
17 EA
$1,600.00
$27,200.00
17
$27,200.00
10
TRENCH SAFETY
5353 LF
$1.00
$5,353.00
5353
$5,353.00
11
--------------------------------------
1" IRRIGATION SERVICE (CO #2 & #3)
3 EA
$1,100.00
$3,300.00
3
$3,300.00
-------------
Sub-Total of Previous
Unit
$527,335.00
$527,335.00
UNIT
II: SANITARY SEWER IMPROVEMENTS
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
---------------------------------------
1
8" SEWER PIPE (CO #1)
2324 LF
$56.00
W0,144.00
2324
$130,144.00
2
8" SEWER PIPE, CSS BACKFILL
155 LF
$66.00
$10,230.00
155
$10,230.00
3
4' MANHOLE (CO #1)
11 EA
$4,400.00
$48,400.00
11
$48,400.00
4
4' DROP MANHOLE
I EA
$6,400.00
$6,400.00
1
$6,400.00
5
4' EXTRA DEPT MANHOLE (CO #1)
116 VF
$215.00
$24,940.00
116
$24,940.00
6
EPDXY MANHOLE (CO #1)
529 VF
$425.00
M4,825.00
529
$224,825.00
7
4" SEWER SERVICE (CO #1)
62 EA
$850.00
$52,700.00
62
$52,700.00
8
TRENCH SAFETY (CO #1)
2479 LF
$1.00
$2,479.00
2479
$2,479.00
9
POST -CCTV INSPECTON (CO #1)
2479 LF
$4.00
$9,916.00
2479
$9,916.00
10
MANHOLE VACUUM TESTING (CO 91)
11 EA
$150.00
$1,650.00
11
$1,650.00
11
8" SEWER CONNECTION TO EXISTING PLUG
3 EA
$1,500.00
$4,500.00
3
$4,500.00
(CO #1)
12
MANHOLE ADJUSTMENT MINOR
1 1 EA
$2,000.00
$22,000.00
11
$22,000.00
13
MANHOLE EPDXY REPAIR
9 EA
$1,000.00
$9,000.00
9
$9,000.00
Monday, March 25, 2024 Page 2 of 5
City Project Numbers 104054 DOE Number 4054
Contract Name WALSH RANCH - QUAIL VALLEY - PLANNING AREA 3 WEST PHASE Estimate Number I
Contract Limits Payment Number I
Project Type WATER & SEWER For Period Ending 3/19/2024
Project Funding
Sub -Total of Previous Unit $547,184.00 $547,184.00
Monday, March 25, 2024 Page 3 of 5
City Project Numbers 104054 DOE Number 4054
Contract Name WALSH RANCH - QUAIL VALLEY - PLANNING AREA 3 WEST PHASE Estimate Number I
Contract Limits Payment Number 1
Project Type WATER & SEWER For Period Ending 3/19/2024
Project Funding
Contract Information Summary
Original Contract Amount $1,167,489.00
Change Orders
Change Order Number 1 ($97,870.00)
Change Order Number 2 $1,100.00
Change Order Number 3 $3,800.00
Total Contract Price $1,074,519.00
Total Cost of Work Completed $1,074,519.00
Less % Retained $0.00
Net Earned $1,074,519.00
Earned This Period $1,074,519.00
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$1,074,519.00
Monday, March 25, 2024 Page 4 of 5
City Project Numbers 104054 DOE Number 4054
Contract Name WALSH RANCH - QUAIL VALLEY - PLANNING AREA 3 WEST PHASE Estimate Number I
Contract Limits Payment Number I
Project Type WATER & SEWER For Period Ending 3/19/2024
Project Funding
Project Manager NA
Inspectors DEYON / KOONCE
Contractor CONATSER CONSTRUCTION TxLP
5327 WICHITA ST
FORT WORTH, TX 76119
City Secretary Contract Number
Contract Date
9/26/2022
Contract Time
150 WD
Days Charged to Date
130 WD
Contract is .000000
Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $1,074,519.00
Less % Retained $0.00
Net Earned $1,074,519.00
Earned This Period $1,074,519.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$1,074,519.00
Monday, March 25, 2024 Page 5 of 5
Walsh Ranch - Quail Valley - PA3W - B
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
PROJECT NAME: Walsh Ranch - Quail Valley - PA3W - B CHANGE
CONTRACT: Water (A), Sewer (Al), Drainage 61), Paving (B) ORDER No:
CFA #: 22-0068 CITY PARTICIPATION: No
CITY PROJECT #: 104054
DOE #: N/A 1
FID #: 30114-0200431-104054-EO7685
FILE #: X-27310, W-2830
INSPECTOR: Jeremy Koonce
PROJECT MANAGER: Sandip Adhikari
Phone No: (832) 527-5406
Phone No: (817) 392-8424
1 WATER
2 SEWER
Developer Cost City Cost
Developer
Cost City Cost
(COST PARTICIPATION %
100.00%
100.00%
IORIGINAL CONTRACT
$ 522,435.00
$
645,054.00
EXTRAS TO DATE
CREDITS TO DATE
CONTRACT TO DATE
$ 522,435.00
$
645,054.00
(AMOUNT OF PROP. CHANGE ORDER
$
(97,870.00)
REVISED CONTRACT AMOUNT
$ 522,435.00
$
547,184.00
TOTAL REVISED CONTRACT AMOUNT PER
$522,435.00
$547,184.00
UNIT
REVISED COST SHARE
Dev. Cost:
$2,557,851.50
TOTAL REVISED CONTRACT
ICity Cost from Change Order:
$0.00
CONTRACT UNIT
3 DRAINAGE
Developer
Cost
City Cost
100.00%
$
445,651.00
-
$
445,651.00
$
(8,127.00)
$
437,524.00
$437,524.00
(City Cost: '
$2,557,851.50
4 PAVING 5 STREET LIGHTING
Developer Cost City Cost Developer Cost City Cost
100.00% 100.00%
$ 1,050,708.50 $ 0.00
$ 1,050,708.50 $ 0.00
$ 1,050,708.50 $ 0.00
$1,050,708.50 $0.00
REVIEWED
By Sandip Adhikari at 3:59 pm, Aug 22, 2023
CONTRACT
DAYS
120
120
120
Page 1
Walsh Ranch - Quail Valley - PA3W - B
You are directed to make the following changes in the contract documents
QUANTITY
UNIT
ITEM DESCRIPTION
UNIT PRICE
TOTAL
PAY ITEM #
I CITY BID ITEM It I
I
I
I I
Unit II: Sewer Improvements
1
3331.4115
-715
LF
8" Sewer Pipe
$56.00
($40,040.00)1
3
3339.1001
-5
EA
4' Manhole
$4,400.00
($22,000.00)1
5
3339.1003
-17
VF
4' Extra Depth Manhole
$215.00
($3,655.00)1
6
3339.0001
-16
VF
Epoxy Manhole Liner
$425.00
f$6,800.00)1
7
3331.3101
-23
EA
4" Sewer Service
$850.00
( 19,550.00)1
8
3305.0109
-715
LF
Trench Safety
$1.00
($715.00)1
9
3301.0002
-715
LF
Post -CCTV Inspection
$4.00
($2,860.00)1
10
3301.0101
-5
EA
Manhole Vacuum Testing
$150.00
($750.00)1
11
9999.0001
-1
EA
8" Sewer Connection to Existing Plug
$1,500.00
($1,500.00)1
Unit II: Sewer Improvements $ (97,870.00)1
REVIEWED
l By Sandip Adhikari at 3:59 pm, Aug 22, 2023
Page 2
Walsh Ranch - Quail Valley - PA3W - B
You are directed to make the following changes in the contract documents:
PAY ITEM # CITY BID ITEM # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL
Unit III: Drainage Improvements
16 3301.0002 -2709 LF Post -CCTV Inspection $3.00 ($8,127.00�
Unit III: Drainage Improvements $ (8,127.00
REVIEWED
By Sandip Adhikari at 3:59 pm, Aug 22, 2023
Page 3
DocuSign Envelope ID: 15C4837A-248B-43A1-9EOF-CCE06F18C8CC
Walsh Ranch - Quail Valley - PA3W - B
REASONS FOR CHANGE ORDER
1 Sanitary Sewer was removed and placed into CPN103935, as this project flows into this system now and will be required for that project.
2 Storm Drain CCTV Removed at the direction of Victor Tornero.
4
5
7
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100 % OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY
WILL BE SOUGHT BY THE DEVELOPER.
RECOMMENDED:
APPROVED:
APPROVED:
OOWSi nod by:
�`Hullt-Zollars. Inc j
By; r� - �
DOG �g net hy;
vcO VLV%,C,I,8y
Quail VaP-Y�'[; f �,14lx
DocuSi ned b :
tru nn X., L.�.
ConatseEZ51350600229CI`44A
q' --
79666E03C412442.
93g0BF B19299428..
...
Name: Jordan V. Madia. P.E.
Name: Setn arpanter
Name: Brock Huqqins
Title: Project Manaqer
Title: Vice President
Title: President
REVIEWED
By Sandip Adhikari at 3:59 pm, Aug 22, 2023
9/28/2022 2:38:24 PM Page 4
DocuSign Envelope ID: D75B2D16-7093-4AA2-BB71-DCDC693A5E74
Walsh Ranch - Quail Valley - PA3W - B
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
PROJECT NAME: Walsh Ranch - Quail Valley - PA3W - B
CONTRACT: Water (A), Sewer (Al), Drainage (B1), Paving (B)
CFA #: 22-0068
CITY PROJECT #: 104054
DOE #: N/A
FID #: 30114-0200431-104054-ED7685
FILE #: X-27310, W-2830
INSPECTOR: Steven Wester
PROJECT MANAGER: Sandip Adhikari
1 WATER
Developer
Cost
City Cost
COST PARTICIPATION %
100.00%
ORIGINAL CONTRACT
$
522,435.00
EXTRAS TO DATE
CREDITS TO DATE
CONTRACT TO DATE
$
522,435.00
AMOUNT OF PROP. CHANGE ORDER
$
1,100.00
REVISED CONTRACT AMOUNT
$
523,535.00
TOTAL REVISED CONTRACT AMOUNT PER
$523,535.00
UNIT
REVISED COST SHARE
Dev.
Cost:
TOTAL REVISED CONTRACT
CITY PARTICIPATION:
Phone No: (682) 287-3465
Phone No: (817) 392-8424
CONTRACT UNIT
2 SEWER
3 DRAINAGE
leveloper
Cost
City Cost
Developer
Cost
City Cost
100.00%
100.00%
$
645,054.00
$
445,651.00
$
(97,870-00)
$
(8,127.00)
S
547,184.00
$
437,524.00
$
547,184.00
$
437,524.00
$547,184.00
$437,524.00
$2,558,951.50
(City Cost:
$2,558,951.50
jCIty Cost from Change Order: 1 $0.00
►R
CHANGE
ORDER No:
2
4 PAVING
Developer Cost City Cost
100.00%
$ 1,050,708.50
$ 1,OSQ708.50
$ 1,050,708.50
$1,050,708.50
REVIEWED
By Sandip Adhikari at 4:51 pm, Aug 22, 2023
5 STREET LIGHTING CONTRACT
DAYS
leveloper Cost City Cost
100.00
$ 0.00 120
$ 0.00 120
$ 0.00 120
$0.00
Page 1
DocuSign Envelope ID: D75B2D16-7093-4AA2-BB71-DCDC693A5E74
Walsh Ranch - Quail Valley - PA3W - B
You are directed to make the following changes in the contract documents:
PAY ITEM # I CITY BID ITEM # QUANTITY UNIT
New 11 1 3312.2003 1 1 JEA 11" Irrigation Service
ITEM DESCRIPTION
Unit I: Water Improvements
REVIEWED
By Sandip Adhikari at 4:51 pm, Aug 22, 2023
UNIT PRICE TOTAL
$1,100.00 $1,100.00
Unit I: Water Improvements $ 1,100.00
Page 2
DocuSign Envelope ID: D75B2D16-7093-4AA2-BB71-DCDC693A5E74
Walsh Ranch - Quail Valley - PA3W - B
REASONS FOR CHANGE ORDER
1 Added Irrigation Meter to plan set.
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100 % OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
RECOMMENDED:
gRVIP,T
Y:U
Name: io,98911 V%Irlia4PE.
Title: Project Manaqer
APPROVED:
Quail Vall '4VIL"I3ll by:
Y s. r,
Na g*J 942B...
Title: Senior Vice President
APPROVED:
Conatser ns nRR&.n,�Y
Y.
Name: 1��c�Q pgmsC F44 A...
Title: President
REVIEWED
By Sandip Adhikari at 4:51 pm, Aug 22, 2023
Page 3
DocuSign Envelope ID: A20136DEB-051C-4155-8FBF-31FF8E97287D
Walsh Ranch - Quail Valley - PA3W - B
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
PROJECT NAME: Walsh Ranch - Quail Valley - PA3W - B
CONTRACT: Water (A), Sewer (Al), Drainage (B1), Paving (B)
CFA #: 22-0068 CITY PARTICIPATION:
CITY PROJECT #: 104054
DOE #: N/A
FID #: 30114-0200431-104054-ED7685
FILE #: X-27310, W-2830
INSPECTOR: Steven Wester
PROJECT MANAGER: Sandip Adhikari
1 WATER
Developer
Cost
City Cost
COST PARTICIPATION %
100.00%
ORIGINAL CONTRACT
$
522,435.00
EXTRAS TO DATE
$
1,100.00
CREDITS TO DATE
CONTRACT TO DATE
$
523,535.00
AMOUNT OF PROP. CHANGE ORDER
$
3,800.00
REVISED CONTRACT AMOUNT
$
527,335.00
TOTAL REVISED CONTRACT AMOUNT PER
$527,335.00
UNIT
REVISED COST SHARE
Dev.
Cost:
TOTAL REVISED CONTRACT
Phone No: (682) 287-3465
Phone No: (817) 392-8424
2SEWER
leveloper Cost City Cost
100.00%
$ 645,054.00
$ (97,870-00)
S 547,184.00
$ 547,184.00
$547,184.00
$2,564,251.50
jCIty Cost from Change Order: 1 $0.00
CONTRACT UNIT
3 DRAINAGE
)eveloper
Cost
City Cost
100.00%
$
445,651.00
$
(8,127.00)
$
437,524.00
$
437,524.00
$437,524.00
(City Cost:
$2,564,251.50
►R
CHANGE
ORDER No:
3
4 PAVING
Developer
Cost
City Cost
100.00%
$
1,050,708.50
$
1,050,708.50
$
1,500.0"
$
1,052,208.50
$1,052,208.50
REVIEWED
By Sandip Adhikari at 1:22 pm, Mar 07, 2024
5 STREET LIGHTING
leveloper Cost City Cost
100.00%
$ 0.00
$ 0.00
$ 0.00
$0.00
CONTRACT
DAYS
120
120
120
Page 1
DocuSign Envelope ID: A20136DEB-051C-4155-8FBF-31FF8E97287D
Walsh Ranch - Quail Valley - PA3W - B
You are directed to make the following changes in the contract documents:
PAY ITEM # I CITY BID ITEM # QUANTITY UNIT
ate
ve
New 11 I 3312.2003 2 EA I18" Irrigation I Service
ITEM DESCRIPTION
Unit I: Water Improvements
REVIEWED 1
l By Sandip Adhikari at 1:22 pm, Mar 07, 2024 J
UNIT PRICE
TOTAL
$1,600.001
$1,600.00
$1,100.00
$2,200.00
Unit I: Water Improvements
$
3,800.00
Page 2
DocuSign Envelope ID: A20136DEB-051C-4155-8FBF-31FF8E97287D
Walsh Ranch - Quail Valley - PA3W - B
You are directed to make the following changes in the contract documents:
PAY ITEM # I CITY BID ITEM # QUANTITY UNIT
New 12 1 9999.0011 1
EA ISidewalk Drain
ITEM DESCRIPTION
Unit IV: Paving Improvements
REVIEWED
By Sandip Adhikari at 1:22 pm, Mar 07, 2024
UNIT PRICE TOTAL
1 $1,500.00 $1,500.00
Unit IV: Paving Improvements $ 1,500.00
Page 3
DocuSign Envelope ID: A20B6DEB-051 C-4155-8FBF-31 FF8E97287D
Walsh Ranch - Quail Valley - PA3W - B
REASONS FOR CHANGE ORDER
1 Plan Revision 3 - Added Irrigation Meter to plan set.
2 Plan Revision 3 - Added Sidewalk drain for open space.
3 Plan Revison 3 - Added Gate Valve.
4
5
6
7
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100 % OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
RECOMMENDED:
APPROVED:
APPROVED:
DpcuS- ned bV•
FiuIt-To tars, Inc.
Al.aV{ is
b�
y DocuSL eLLC
Quail V le DevVi7c
ly M&r
ConatserConrDCCuS.- ed by:
LPibV't�
ow -
79666E03C412442...
Name: Jordan V. Marlia, P.E.
9308FEB1929942B...
Name: Seth Carpenter
SD50600229CF44A...
Name: Brock Huqqins
Title: Project Manager
Title: Senior Vice President
Title: President
REVIEWED 1
By Sandip Adhikari at 1:22 pm, Mar 07, 2024 J
Page 4
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Walsh Ranch Quail Valley PA3W-B
CITY PROJECT NUMBER: 104054
WATER
PIPE LAID SIZE TYPE OF PIPE LF
DIP 8" DIP 284
C-900 8" PVC 4805
FIRE HYDRANTS: 4 VALVES (16" OR LARGER) N/A
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Yes
NEW SERVICES: 1" Copper 128 EA.
I SEWER
PIPE LAID SIZE TYPE OF PIPE LF
SDR-26 8" PVC 2324
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Yes
NEW SERVICES: 4" PVC 62 EA.
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311
(817) 392 - 7941 • Fax: (817) 392 - 7845
FORTWORTH.
M,
TRANSPORTATION AND PUBLIC WORKS
March 6, 2024
Conatser Construction TX, LP.
5327 Wichita Street
Fort Worth, TX 76119
RE: Acceptance Letter
Project Name: Walsh Ranch Quail Valley PAW3-B
Project Type: Developer
City Project No.: 104054
To Whom It May Concern:
On March 6, 2024 a final inspection was made on the subject project. There were no punch list items
identified at that time. The final inspection indicates that the work meets the City of Fort Worth
specifications and is therefore accepted by the City. The warranty period will start on March 6, 2024,
which is the date of the final inspection and will extend of two (2) years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at
(832)527-5406.
Sandip Adhikari, Project Manager
Cc: Jeremy Koonce, Inspector
Edward Davila, Inspection Supervisor
Gary Deyon, Senior Inspector
Andrew Goodman, Program Manager
Huitt-Zollars, Inc., Consultant
Conatser Construction TX, LP., Contractor
Quail Valley Devco VLO, LLC, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 08/20/19
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a Notary Public in the state and county aforesaid,
on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc.,
general partner of Conatser Construction TX. LP. known to me to be a credible person, who
being by me duly sworn, upon his oath deposed and said:
That all persons, firms, associations, corporations or other organizations furnishing
labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth, has
been paid in full; and
That there are no claims pending for personal injury and/or property damages;
On Contract described as:
WALSH PA3W-B
WATER, SANITARY SEWER, PAVING,
AND DRAINAGE IMPROVEMENTS
CFA PRJ #: 22-0068
CITY PROJECT #: 104054
CITY OF FORT WORTH
STATE OF TEXAS
CONATSER CONSTRUCTION TX, LP
-Agenle'd.
t
Brock Huggins
Subscribed and sworn to before me this 271h day of February, 2024.
Y Py
KATHERINE ROSE
Notary Public, State of Texas
h IOp 133467933 Notary Public in Tarrant County, Texas
My Commission Expires
November 30, 2025
e
CONSENT OF
SURETY COMPANY
TO FINAL PAYMENT
Conforms with the American Institute of
Architects, AIA Document G707
OWNER
❑
ARCHITECT
❑
CONTRACTOR
❑
SURETY
❑
OTHER
PROJECT:
(name, addreSS)Walsh Ranch -Quail Valley Planning Area 3 West Ph B
Fort Worth, TX
TO (Owner)
Bond No 0247474
(QUAIL VALLEY DEVCO VLO, LLC AND THE CITY OF_-] ARCHITECT'S PROJECT NO: CFA22-0068
FORT WORTH CONTRACT FOR:
400 S. Record St., Suite 1200 IPRC22-0065 - Walsh Ranch -Quail Valley -'Planning Area 3 West -
Phase B (PA3W-B) - Utilities and Paving
Dallas TX 75202 CONTRACT DATE:
CONTRACTOR: CONATSER CONSTRUCTION TX, L.P.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
there insert name and address of Surety Company)
BERKLEY INSURANCE COMPANY
475 Steamboat Road
Greenwich CT 06830 , SURETY COMPANY
on bond of (here insert name and address of Contractor)
CONATSER CONSTRUCTION TX, L.P.
5327 Wichita St.
Fort Worth TX 76119-6035
,CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that fmal payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (here insert name and address of Owner)
QUAIL VALLEY DEVCO VLO, LLC AND THE CITY OF FORT WORTH
400 S. Record St., Suite 1200
Dallas TX 75202 , OWNER,
as set forth in the said Surety Company's bond,
IN WITNESS, WHEREOF,
the Surety Company has hereunto set its hand this
Attest: _mot
(Seal):
26th day Of February, 2024
BERKLEY INSURANCE COMPANY
Surety Company
Signature of Authorized Representative
Robbi Morales
Title
Attorney -in -Fact
NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS,
Current Edition
ONE PAGE
No. BI-7280k
POWER OF ATTORNEY
BERKLEY INSURANCE COMPANY
WILMINGTON, DELAWARE
NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof Please review carefully.
KNOW ALL MEN BY THESE PRESENTS, that BERKLEY TSURANCE COMPANY (the "Company"), a corporation duly
organized and existing under the laws of the State of Delaware, having its principal office in Greenwich, CT, has .made; constituted
E and appointed, and does 'by these presents make, constitute and appoint: Ricardo J. Reyna; Don E ConteU; .Sophinie Hunter;
Robbi Morales; .Kelly. A. Westbrook;. Thw .McErvan; Joshua Saunders, Tonie Petranek; or Mikaela Peppers of Aon Risk
Services Sout/nvest, Inc. of Dallas, TX its true and lawful Attomey-in-Fact, to sign its name as surety only as delineated below
and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty
'C Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S. Dollars (U.S.S50,000,000.00), to the.
same extent as if such bonds had been duly executed and .acknowledged by the regularly elected officers .of the Company at its
principal office in their own proper persons.
c > This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware,
without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following
o resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January.25, 2010:
o RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief
C Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant
o Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney -in -fact named therein
it to execute bonds, undertakings,. recognizances, or other suretyship obligations on behalf of the Company, and to affix the
o c corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such
Q attorney -in -fact and revoke any power of attorney previously granted; and further
RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances,
or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the
i manner and to the extent therein stated; and further
RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney -in -fact named; and
Cd
O further
RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any
Y power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or
3 other suretyship obligation of the Company; and such signature and seal when so used shalt have the same force and effect as
though .manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any
U0 person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have
ceased to be such at the time when such instruments shall be issued.
0 o IN WrI'1NESS WI-MIZEOF, the Company has caused these presents to -be signed and attested by its appropriate o C1-icers and its
o corporate. seal hereunto affxed this ofMemu.
^ U
Attest Berk Insurance Company
w (Sea[) By �� By U,N
Je . ' tfer
Executive Vice President & Secretary :S i ice ; ident
U O
o WARNING: THIS:POWER.INVALED IF NOT PRINTED Oil BLUE "13ERi ZY" SECURITY PAPER.
STATE OR CONNECTCCUT )
b o
N o COUNTY OF FAIItFIELD }
Sworn to before me, a Notary Public in the State -of Connecticut, this _L[t day of. Mc� �03a , `by Ira S. Lederman
es and Jeffrey 14i. Rafter who are sruorn tome to _be the Executive Vice President Secretary, and Senior Mice President,
res cctively; of Berkley lnsuranae Cam any nRo1ATicwRv-:00M i C
COMEcrlaurcett ,�LMYGQAIMSMN EXPIRED
o rt•t+lrao;zox4 otary Nblic State of Connecticut
CIERT7FiCATE:
Z ` I, the undersigned- Assistant :Secretary -of BER M.Iff INSURANCE COMPANY, DO HEREBY CERTfFY that the foregoing is a
true, correct and complete copy of the ori&M Power of Attorney; that said Power o.f Attorney has not beearevoked or rescinded
3 and that the authority of the Atiornev iyt-Fact;set fords therein, rho executed .the bond or undert akin;. to which. this :Power of
Attorney is attached. -is: in fullforce.and effect as of this date. 20 24
Liven undermyliand:ancisealoftlteCompany,this26th day of Februa
(Seal)
Vincent P. ForteV
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a Notary Public in the state and county aforesaid,
on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc.,
general partner of Conatser Construction TX. LP. known to me to be a credible person, who
being by me duly sworn, upon his oath deposed and said:
That all persons, firms, associations, corporations or other organizations furnishing
labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth, has
been paid in full; and
That there are no claims pending for personal injury and/or property damages;
On Contract described as:
WALSH PA3W-B
WATER, SANITARY SEWER, PAVING,
AND DRAINAGE IMPROVEMENTS
CFA PRJ #: 22-0068
CITY PROJECT #: 104054
CITY OF FORT WORTH
STATE OF TEXAS
CONATSER CONSTRUCTION TX, LP
-Agenle'd.
t
Brock Huggins
Subscribed and sworn to before me this 271h day of February, 2024.
Y Py
KATHERINE ROSE
Notary Public, State of Texas
h IOp 133467933 Notary Public in Tarrant County, Texas
My Commission Expires
November 30, 2025
e
CONSENT OF
SURETY COMPANY
TO FINAL PAYMENT
Conforms with the American Institute of
Architects, AIA Document G707
OWNER
❑
ARCHITECT
❑
CONTRACTOR
❑
SURETY
❑
OTHER
PROJECT:
(name, addreSS)Walsh Ranch -Quail Valley Planning Area 3 West Ph B
Fort Worth, TX
TO (Owner)
Bond No 0247474
(QUAIL VALLEY DEVCO VLO, LLC AND THE CITY OF_-] ARCHITECT'S PROJECT NO: CFA22-0068
FORT WORTH CONTRACT FOR:
400 S. Record St., Suite 1200 IPRC22-0065 - Walsh Ranch -Quail Valley -'Planning Area 3 West -
Phase B (PA3W-B) - Utilities and Paving
Dallas TX 75202 CONTRACT DATE:
CONTRACTOR: CONATSER CONSTRUCTION TX, L.P.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
there insert name and address of Surety Company)
BERKLEY INSURANCE COMPANY
475 Steamboat Road
Greenwich CT 06830 , SURETY COMPANY
on bond of (here insert name and address of Contractor)
CONATSER CONSTRUCTION TX, L.P.
5327 Wichita St.
Fort Worth TX 76119-6035
,CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that fmal payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (here insert name and address of Owner)
QUAIL VALLEY DEVCO VLO, LLC AND THE CITY OF FORT WORTH
400 S. Record St., Suite 1200
Dallas TX 75202 , OWNER,
as set forth in the said Surety Company's bond,
IN WITNESS, WHEREOF,
the Surety Company has hereunto set its hand this
Attest: _mot
(Seal):
26th day Of February, 2024
BERKLEY INSURANCE COMPANY
Surety Company
Signature of Authorized Representative
Robbi Morales
Title
Attorney -in -Fact
NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS,
Current Edition
ONE PAGE
No. BI-7280k
POWER OF ATTORNEY
BERKLEY INSURANCE COMPANY
WILMINGTON, DELAWARE
NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof Please review carefully.
KNOW ALL MEN BY THESE PRESENTS, that BERKLEY TSURANCE COMPANY (the "Company"), a corporation duly
organized and existing under the laws of the State of Delaware, having its principal office in Greenwich, CT, has .made; constituted
E and appointed, and does 'by these presents make, constitute and appoint: Ricardo J. Reyna; Don E ConteU; .Sophinie Hunter;
Robbi Morales; .Kelly. A. Westbrook;. Thw .McErvan; Joshua Saunders, Tonie Petranek; or Mikaela Peppers of Aon Risk
Services Sout/nvest, Inc. of Dallas, TX its true and lawful Attomey-in-Fact, to sign its name as surety only as delineated below
and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty
'C Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S. Dollars (U.S.S50,000,000.00), to the.
same extent as if such bonds had been duly executed and .acknowledged by the regularly elected officers .of the Company at its
principal office in their own proper persons.
c > This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware,
without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following
o resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January.25, 2010:
o RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief
C Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant
o Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney -in -fact named therein
it to execute bonds, undertakings,. recognizances, or other suretyship obligations on behalf of the Company, and to affix the
o c corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such
Q attorney -in -fact and revoke any power of attorney previously granted; and further
RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances,
or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the
i manner and to the extent therein stated; and further
RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney -in -fact named; and
Cd
O further
RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any
Y power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or
3 other suretyship obligation of the Company; and such signature and seal when so used shalt have the same force and effect as
though .manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any
U0 person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have
ceased to be such at the time when such instruments shall be issued.
0 o IN WrI'1NESS WI-MIZEOF, the Company has caused these presents to -be signed and attested by its appropriate o C1-icers and its
o corporate. seal hereunto affxed this ofMemu.
^ U
Attest Berk Insurance Company
w (Sea[) By �� By U,N
Je . ' tfer
Executive Vice President & Secretary :S i ice ; ident
U O
o WARNING: THIS:POWER.INVALED IF NOT PRINTED Oil BLUE "13ERi ZY" SECURITY PAPER.
STATE OR CONNECTCCUT )
b o
N o COUNTY OF FAIItFIELD }
Sworn to before me, a Notary Public in the State -of Connecticut, this _L[t day of. Mc� �03a , `by Ira S. Lederman
es and Jeffrey 14i. Rafter who are sruorn tome to _be the Executive Vice President Secretary, and Senior Mice President,
res cctively; of Berkley lnsuranae Cam any nRo1ATicwRv-:00M i C
COMEcrlaurcett ,�LMYGQAIMSMN EXPIRED
o rt•t+lrao;zox4 otary Nblic State of Connecticut
CIERT7FiCATE:
Z ` I, the undersigned- Assistant :Secretary -of BER M.Iff INSURANCE COMPANY, DO HEREBY CERTfFY that the foregoing is a
true, correct and complete copy of the ori&M Power of Attorney; that said Power o.f Attorney has not beearevoked or rescinded
3 and that the authority of the Atiornev iyt-Fact;set fords therein, rho executed .the bond or undert akin;. to which. this :Power of
Attorney is attached. -is: in fullforce.and effect as of this date. 20 24
Liven undermyliand:ancisealoftlteCompany,this26th day of Februa
(Seal)
Vincent P. ForteV