HomeMy WebLinkAboutContract 58871-CO2CSC No. 58871-CO2
Foxa"
Project Name I 2022 Bond Year 1 -Contract 4
City of Fort Worth
Change Order Request
I City Sec # I 58871
Client Project #(s)I 102930
Project Description Reconstruction of existing pavement with proposed water & sanitary sewer on Burton Avenue, Chickasaw Avenue, Crouch Avenue and Quails Lane.
Contractorl Stabile & Winn, Inc Change Order #1 2 1 Date
City Project Mgr.I Christian Cardona City Inspectorl
Dept
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
Unit 1: Water Unit 2: Sewer Unit 3: Paving
$2,018,239.50 $1,626,486.50 $3,867,989.00
$2,018,239.50
$1,626,486.50
$3,867,989.00
$0.00
$0.00
$0.00
$2,018,239.50
$1,626,486.50
$3,867,989.00
$100,912.00
$81,324.00
$193,399.00
$100,912.00
$81,324.00
$193,399.00
2/26/2024
Pedro Hernandez
Contract Time
Totals (CD
$7,512,715.00 90
$7,512,715.00 390
30
$7,512,715.00 420
$375,635.00
$375,635.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $9,390,893.75
JUSTIFICATION (REASONS) FOR CHANGE ORDE
IN ACCORDANCE WITH THIS CHANGE ORDER REQUEST, THE CONTRACTOR SHALL: Install hydraulic slides at the Quails Ln/Garrison Ave and Quails Ln/Burke Rd intersections to allow for the connection from
the new sewer line to the existing sewer main. Remove and replace existing 6" concrete sewer pipe at the Quails/Ganison pipe connection with 6" PVC pipe. Grout and abandon existing 10" sewer along Quails Lane.
Remove and replace concrete steps in order to fit ADA-cempliant ramps along Quails Lane. Based on comparison with similar projects, the City agrees that price for additional work is fair and reasonable.
Staff concurs with contractors request for additional days as followed:
3 days for the installation of hydraulic slides at the Quails Ave/Garrison Ave and Quails Ave/Burke Rd intersections to allow for the connection from the new sewer line to the existing sewer main
3 days for the removal and replacement of an existing 6" concrete sewer pipe at the Quails/Garrison pipe connection with 6" PVC pipe.
5 days for the installation of new 8" watedine through intersections of Quails Ln/Eastover Ave and Quails Ln/Garrison Ave (Utilized with existing bid items).
2 days of Grouting and abandoning the existing 10-inch sewer along Quails Lane.
10 days for the replacement of the west intersection of S Edgewood Ter/Burton Ave in order to meet ADA requirements for new ramps (Utilized with existing bid items).
2 days for price research and negotiation.
5 days for Atmos delays and exploratory excavation of old gas main along Quails Lane.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
ntractor's Compan Name ontractor Na Contract Signature Date
Stabile & Winn, Inc Jerry Henderson Feb 27, 2024
00001pection Supervisor
� 11--4
Date
Feb 27, 2024
Project and Contract Compliance Manager ill
-_ - %
Date
Mar 11, 2024
iro ram Manager
Date
Senior Capital Project Officer
Date
Mar11,2024
Mar18,2024
nt Director (Dept)
Date
Director, Contracting Department Dept
Date
/_w7 k
I Mar 20, 2024
Mar 20, 2024
ssistant City Attorney
Date
Assistant City Manager
Date
,.,
Mar 28, 2024
t �'_
Apr 1, 2024
ATTEST:
A ate..
Jannette Goodall, City Secretary
4.�4U4pQ��
Pvo �=4
Ppa* 000 000*�
as d
a rezp5aap
�bnaaaoo
Council Action if required
M&C Number I I M&C Date Approved
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth
Change Order Additions
Project Name 1 2022 Bond Year 1 - Contract 4
I City Sec # 1
58871 1
Client Project # 1 102930
1
Contractorl Stabile & Winn, Inc
IPMI Christian
Cardona I
Inspectorl Pedro Hernandez
Change Order Submittal #
Date 1 2126/2024
1
ADDITIONS
IIEM
UESUKIPIIUN
UEPI
Uty
Unit Unit Lost
total 1
36
3331.41U6 b" Pvl; Sewer Pipe
Unit 2: Sewer
4U.000UUUUU
LF $13b.0U
$b,4UU.UU1
39
0241.2013 Remove 8" Sewer Pipe
Unit 2: Sewer
20.00000000
LF $50.00
$1,000.001
40
0241.2001 Sanitary Line Grouting
Unit 2: Sewer
6.00000000
CY $900.00
$5,400.001
41
0241.2104 10" Abandonment Plug
Unit 2: Sewer
4.00000000
EA $750.00
$3,000.001
42
9999.0004 Connect Existing Sewer Main
Unit 2: Sewer
2.00000000
EA $550.00
$1,100.001
43
9999.0005 Add Hydraulic Slide
Unit 2: Sewer
2.00000000
EA $2,000.00
$4,000.001
44
9999.0006 Connect to Existing Manhole
Unit 2: Sewer
2.00000000
EA $2,150.00
$4,300.001
49
0241.0200 Remove Concrete Steps
Unit 3: Paving
50.00000000
SF $5.01J
$250.001
50
9999.0008 Install Concrete Steps
Unit 3: Paving
50.00000000
SF $20.00
$1,000.001
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
Unit I: Water
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
$0.001
Unit 2: Sewer
$24,200.001
Unit 3: Paving
$1,250.001
I
Sub Total Additions
I
$25,450.001
Change Order Additions Page 2 of 4
Fox_ rH City of Fort Worth
Change Order Deletions
Project Name 1 2022 Bond Year 1 - Contract 4 City Sec # 1 58871
Client Project # 1 102930 1
Contractorl Stabile 8 Winn, Inc IPMI Christian Cardona I Inspectorl Pedro Hernandez I
Change Order Submittal # 0 Date 1 2/26/2024 1
DELETIONS
IIFM UES(;HIF'I IUN UFF'I U unit Unit UOSt total 1
:31 9999.0002 SanitarySewer Gonstructlon Allowance Unit 2: Sewer U.' 42000UI) LS $11111,111111.111J $24,21111.11u 1
48 9999.0003 Paving Construction Allowance Unit 3: Paving 0.0125000U LS $100,000.0U $1,250.001
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Unit1:Water 0.001
Unit 2: Sewer $24,100.001
Unit 3: Paving $1,250.001
Sub Total Deletions $25,450.001
Change Order Deletions Page 3 of 4
MISBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE
Total $0.00
Previous Change Orders
CO # DATE I AMOUNT
8/17/2023 $0.00
Total I $0.00 1
FORT WORTH.:;
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: Change order #2 — 2022 Bond Year 1 — Contract 4
M&C: CPN: 102930 CSO: 58871 DOC#:
Date:
To:
Name
Department
Initials
Date Out
1.
Filogonio Munoz
TPW - signature
"IN
Feb 26, 2024
2.
Jerry Henderson
Stabile & Winn, Inc -
-.Z—H
Feb 27, 2024
signature
JH
3.
Pedro Hernandez
TPW - signature
m
Feb 27, 2024
4.
Dena Johnson
WD - signature
n DT
M a r 10, 2024
5.
Christian Cardona
TPW - signature
cc
Mar 11, 2024
6.
Gregory Robbins
TPW - signatures
Mar 11, 2024
7.
Mary Hanna
TPW - signatures'
Mar 18, 2024
8.
Patricia Wadsack
TPW - signature
p(,�/'
Mar 20, 2024
9.
Lauren Prieur
TPW - signature
?P
Mar 20, 2024
10.
Doug Black
Legal - signature
DB
Mar 28, 2024
11.
Jesica McEachern
CMO - signature
CO-
Apr 1, 2024
12.
Jannette Goodall
CSO - signatures
Apr 1, 2024
13.
TPW Contracts
DOCUMENTS FOR CITY MANAGER'S
SIGNATURE:
All documents received from any
and all City Departments requesting
City Manager's signature for approval MUST BE ROUTED
TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed
the routing slip,
David
will review and take the next steps.
NEEDS TO BE NOTARIZED: DYES ®No
RUSH: ®YES ❑No SAME DAY: DYES ❑No NEXT DAY: ❑YES ®No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts(&FortWorthTexas.aov at ext. 7233 for pick up when completed.
Thank you!