HomeMy WebLinkAboutContract 58628-CO6FORT' WORTH City of Fort Worth
= Change Order Request
CSC No. 58528-006
Project Name: Sanitary Sewer Rehabilitation Contract 98 1
City Sec No.: 1 58528
Project No.(s):1 56002-0600430-0700430-0200430-5740010 M&C: 1 22-0888 1
City Proj. No.: l CO2719
Project Description:)
Water, sanitary sewer, and paving Improvements in the Northside Neighborhood.
I�
I
IIIII
Contractor: Woody Contractors, Inc. Change Order #
6 Date: 3/26/2024
City Project Mgr.) Suzy Abbe City Inspector: Charles Hayes
Phone Numbed. 817-392-8209 � Phone Number: 682-213-0240
Dept. Water Sewer Paving
Totals
Contract Time
(Calender days)
Original Contract Amount $3,043,559.00 $3,253,980.00 $957,884.25
$7,255,423.25
550
Extras to Date $6,200.00 $8,431.00 $0.00
$14,631.00
Credits to Date $18,950.00
$18,950.00
Pending Change Orders (in M&C Process)
Contract Cost to Date $3,030,809.00
$3,262,411.00
$957,884.25
$7,251,104.25
550
JAmount of Proposed Chanqe Order $0.00
$0.05
$0.00
$0.05
030
Revised Contract Amount $3,030,809.00
$3,262,411.05
$957,884.25
$7,251,104.30
580
Original Funds Available for Change Orders $121,742.00
$130,159.00
$57,473.00
$309,374.00
Remaining Funds Available for this CO $134,492.00
$121,728.00
$57,473.00
$313,693.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
0.06%
MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
1$9,069,279.06
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Change Order No.6 provides for:
• Mechanical cleaning and cured in place pipe (CIPP) for the rehab of L-631 as a lower cost, less destructive alternative to open cut because
open cut would involve the reconstruction of two 10-foot by 5-foot box culverts.
• Point repair in 10" pipe at the intersection of NE 20th and Main Street including additional mobilization,
traffic control, CLSM embedment
and backfill, and brick repair due to field conditions that were encountered during construction.
• 10-inch Cl PP of an 10-inch line instead of a 12-inch line as encountered during construction.
• Replace and extend an existing handrail to separate a new access ramp from the landing in front business
at the intersection of N.
Commerce and NE 21st street and avoid a trip hazard.
30 days will be added to the contract time for the additional work to be performed.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
�htractor'`s toffi'an ' Na��
Ix Y
Woody Contractors, Inc.
Contractor Na
Troy Woody
` ' C ctor Si nature
9
%
Date
��-,?�j
'l
1naeCib
to
Project Ma pe
03/27/24,�.�
024
Dior (Water
ate
Construction Superviso
F
,,o,IT%
T.S. Mar29,2024
7�oy U(/U' Ile
024
Senior Assistant City A#tomey
Date
er
Apr 3, 2024
Apr 4, 2024
Council
M&C Number F—N/A
,
M&C Date Approved NIA
FORT WORTv3
City of Fort Worth
- = -
Change Order Additions
Project Name Sanitary Sewer Rehabilitation Contract 98
I
City Sec No.:
58528
Project No.(s): 56002-0600430-0700430-0200430-5740010
DOE No.1
22-088q
City Proj. No.:
CO2719
Project I Water, sanitary sewer, and paving Improvements in the Northside Neighborhood.
Description
Contractor Woody Contractors, Inc.
Change Order:6 Date:
1 3/26/2024
City Project Mgr. f Suzy Abbe
I City Inspector
Charles Hayes
ADDITIONS
1TtN1 uLbUKIFI wn
DEPT
Qty Unit
'Unit Cost I
Total
94 Mechanical Cleaning of L-631
Sewer
1.00 LS
$7,400.00
$7,400.00
95 CIPP 8"
Sewer
48.00 LF
$345.00
$16,560.00
96 Service reconnect CIPP
Sewer
1.00 EA
$600.00
$600.00
97 Brick Paving
Sewer
15.00 SY
$490.00
$7,350.00
98 Imported Embedment/Backfill CLSM
Sewer
25.00 CY
$250.00
$6,250.00
99 Mobilization
Sewer
1.00 LS
$8,000.00
$8,000.00
100 Point Repair with 10" SDR 26 Pressure Pipe
Sewer
12.00 LF
$289.00
$3,468.00
101 CIPP 101,
Sewer
457.00 LF
$129.00
$58,953.00
102 Additional Traffic Control
Sewer
1.00 EA
$5,500.00
$5,500.00
103 Replace and extend existing handrail
Sewer
1.00 EA
$1,772.00
$1,772.00
Water
Sewer
$115,853.00
Paving
Page 1 of 1
JAdditions
Sub Total
$115,853.00
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name Sanitary Sewer Rehabilitation Contract 98
City Sec No.:
I 58528
Project No.(s): 56002-0600430-0700430-0200430-5740010 DOE No. 1 22-08�
City Proj, No,:
I CO2719
Project Description
I Water, sanitary sewer, and paving Improvements in the Northside Neighborhood.
Contractor I Woody Contractors, Inc. 1
Change Order: F6 I
Date 3/26/2024
City Project Mgr. Suzy Abbe City Inspector: I Charles Hayes
DELETIONS
ITEM (DESCRIPTION DEPT Qty Unitnit;Cost
Total J
3 CIPP 12" Sewer 457.00 LF
$135.00
$61,695.00
30 8" C900 DR18 Green CSS Sewer 38.00 LF
$250.00
$9,500.00
32 8" C900 DR18 Green Carrier Pipe Sewer 10.00 LF
$250.00
$2,500.00
93 Construction Allowance Sewer 0.281053 LS
$150,000.00
$42,157.95
Water
Sewer $115,852.95
(Paving
Page 1 of 1 IDeletions Sub Total $115,852.95
MIWBE Breakdown For this Change Order
#.....d.,..., r i i... s
i ,, Type of`Service Fz'YAmounf'for this C0
Total
Previous Change Orders
AMO�., .,# --S ._#-., e. --,(a ;-.�.H wyA
Total �' `'
Page 1 of 1
WOODY CONTRACTORS 1Nr
Job: S.S. CONTRACT 98
Date March 20, 2024
S.S. M-B 20 TH STREET
Item Description
3 12" CIPP
90 TRAFFIC CONTROL
1 BRICK PAV,
2 IMPORT EMBED/ BACKFILL CLSM
3 MOB.
4 10" $131126 PRESSURE PIPE (POINT)
5 loll CIPP
ADD 30 CALENDAR DAYS
s;
WOOD
CONTRACTORS
650 TOWER RD
KENNEDALE,.TX 76060
PHONE- 817-488.47a7
FAX 817-483-2040
Quantity Unit price Total Brice
-457 LP $ 135.00 $ (61,695.00)
1 MTH $ 5,600.00 $ 6,600.00
15 SY
$
490.00
$
7,350.00
25 CY
$
250.00
$
6,250.00
1 LS
$
8,000.00
$
8,000.00
12 LF
$
289.00
$
3,468.00
467 LF
$
129.00
$
58.953.00
Total for Sheet
$
27,826.001
WOODY CONTRACTORS INC
Job: CONTRACT 98 CHANGE ORDER 9
Date March 6, 2024
L-631
WOODY
CONTRACTORS
650 TOWER RD
KENNEDALE,TX 76060
PHONE- 817-483-4787
FAX 817-483-2048
Item Description
Quantity
Unit Price
Total Price
1 Descaling 8" line segment
10 HR
$
740.00
$
7,400.00
2 CIPP 8"
48 LF
$
345.00
$
16,560.00
3 SERVICE RECONN CIPP
1 EA
$
600,00
$
600.00
4 8" C900 DR18 GREEN CSS
-38 LF
$
250.00
$
(9,500.00)
5 8" C900 DR18 GREEN CARRIER PIPE
-10 LF
$
250.00
$
(2,500.00)
1
Total for Sheet
$
12,560.00
4 HR minimum Total For Job $ 12,560.00
Price goes up or down depending on how many HRs
of work takes place
Estimated work hours is 6 - 8 but payment willl be based off of hours performed
WOODY
CONTRACTORS
WOODY CONTRACTORS INC.
650 TOWER RD
KENNEDALE, TX 76060
PHONE- 817-483-4787
FAX 817-483-2048
Job: CONTRACT 98
Date March 21, 2024
2021 NORTH COMMERCE STREET
Item Description Quantity Unit Price Total Price
1 REMOVE $ REPLACE HANDRAIL 1 LS $ 1,772.00 $ 1,772.00
Total for Sheet $
Total For Job $
1,772.001
1,772.00
3/25/2024
CPN CO2719
Sanitary Sewer Rehabilitation Contract 98
Change Reauest 6 Notes
Change Order No. 6 provides for a change in the rehab method for L-631, an additional point repair for
MB on 201h and Main Street, and a credit for 10" CIPP instead of 12" CIPP for a portion of MB on 20th
street.
• The planned open cut replacement L-631 with hand tunneling under a storm junction box is not
possible because the sewer main passes under two, parallel 10'x5' box culverts instead of the
junction structure, leaving insufficient space for tunneling underneath the both box culverts.
Options to complete the rehab of the line in this project are to open cut and rebuild the storm
drains or CIPP the line. Pipe bursting is not an option because of the sewer main is too close to
the box culverts. Rerouting the line would require delaying the rehab because additional
easements are needed to do the work. Lining the pipe will be the least invasive and most cost-
effective rehab option. However, the existing 8" line is heavily encrusted. Field operations
cleared most of the encrustation with a 7" saw. This change order provides for additional
mechanical cleaning to smooth the pipe profile and to restore the capacity of the line and
prepare the pipe for lining. The change order also includes the cost of CIPP lining and a credit
for the original pipe installation.
• The additional point repair for MB addresses a 6' section of pipe above a water line that has
settled and would result in a sag once the pipe is lined. The point repair will be at the center of
the intersection of 201h and Main Street. The price of the point repair includes mobilization,
additional traffic control, 12' of pressure pipe, CLSM embedment and backfill, and brick repair.
• Two sections of MB along 201h street were found to be 10" in diameter instead of 12" based on
record drawings. This change order reduces the price of approximately 457 feet of CIPP based
on the smaller liner size.
• The addition of an access ramp at the intersection of N. Commerce and NE 2111 St placed the
sloped portion of the ramp next to the landing in front a business. To prevent a trip hazard
between the landing and the ramp, the existing handrail at the stairs up to the business was
replaced and extended to separate the ramp and the landing. The business owner approved the
proposed modification.
30 days will be added to the contract time for the additional work to be performed.
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Suzanne Abbe
Name of Employee
Senior Engineer, Capital Project Delivery
Title
ATTEST:
off. � .
Jannette Goodall
City Secretary