Loading...
HomeMy WebLinkAboutContract 61230CSC No. 61230 CITY OF FORT WORTH, TEXAS STANDARD AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL SERVICES This AGREEMENT is between the City of Fort Worth, a Texas home -rule municipality ("CITY"), and Kimley-Horn and Associates, Inc., authorized to do business in Texas, ("ENGINEER"), for a PROJECT generally described as: Fort Worth Central City Water and Sanitary Sewer Relocations — Project No. 104484. Article I Scope of Services The Scope of Services is set forth in Attachment A. Negotiated changes to this Agreement, if any, are included in Attachment C. Article II Compensation The ENGINEER's compensation shall be in the amount up to $2,448,100.00 as set forth in Attachment B. Payment shall be considered full compensation for all labor (including all benefits, overhead and markups), materials, supplies, and equipment necessary to complete the Services. Engineer shall provide monthly invoices to City. The Engineer shall provide the City sufficient documentation, including but not limited to meeting the requirements set forth in Attachment D to this AGREEMENT, to reasonably substantiate the invoices. Payments for services rendered shall be made in accordance with the Texas Prompt Payment Act (Texas Government Code Ch. 2251). Acceptance by Engineer of said payment shall release City from all claims or liabilities under this Agreement for anything related to, performed, or furnished in connection with the Services for which payment is made, including any act or omission of City in connection with such Services. Article III Term Time is of the essence. Unless otherwise terminated pursuant to Article VI. D. herein, this Agreement shall be for a term beginning upon the effective date, as described below, and shall continue until the expiration of the funds or completion of the subject matter contemplated herein pursuant to the schedule, whichever occurs first. Unless specifically otherwise amended, the original term shall not exceed five years from the original effective date. City of Fort Worth, Texas FWCC Water & Sanitary Sewer Relocation Standard Agreement for Engineering Related Design Services CPN 104484 Revised Date: 12-08-2023 Page 1 of 15 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Article IV Obligations of the Engineer A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement, providing professional engineering consultation and advice and furnishing customary services incidental thereto. B. Standard of Care The ENGINEER shall perform its services: (1) with the professional skill and care ordinarily provided by competent engineers practicing under the same or similar circumstances and professional license; and (2) as expeditiously as is prudent considering the ordinary professional skill and care of a competent engineer. C. Designation of Engineer's Personnel (1) The ENGINEER and CITY shall agree upon the designation of the ENGINEER's "Project Manager" prior to starting work on contract. (2) ENGINEER shall inform CITY in writing of a proposed change to their designated project manager prior to making the change or immediately upon receiving notification that the designated project manager is separating employment with the ENGINEER. (3) ENGINEER shall provide resumes to the CITY of the proposed replacement project manager(s), who shall have similar qualifications and experience as the outgoing person, for review and approval. D. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurface investigations in connection with design and engineering work to be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. City of Fort Worth, Texas FWCC Water & Sanitary Sewer Relocation Standard Agreement for Engineering Related Design Services CPN 104484 Revised Date: 12-08-2023 Page 2 of 15 (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of the ENGINEER. E. Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible mylar sheets and electronic files in .pdf format, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. F. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on -site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the contract documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed in a manner indicating that the PROJECT, when completed, will be in accordance with the contract documents, nor shall anything in the contract documents or this AGREEMENT between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on -site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT. If the ENGINEER makes on -site observation(s) of a City of Fort Worth, Texas FWCC Water & Sanitary Sewer Relocation Standard Agreement for Engineering Related Design Services CPN 104484 Revised Date: 12-08-2023 Page 3 of 15 deviation from the contract documents, the ENGINEER shall inform the CITY. (3) When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the contract documents. G. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A. (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by third parties; quality, type, management, or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. H. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the contract documents; that the final work will be acceptable in all respects; that the ENGINEER has made an examination to ascertain how or for what purpose the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are no other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. City of Fort Worth, Texas FWCC Water & Sanitary Sewer Relocation Standard Agreement for Engineering Related Design Services CPN 104484 Revised Date: 12-08-2023 Page 4 of 15 Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. J. Business Equity Participation City has goals for the full and equitable participation of minority business and/or women business enterprises in City contracts greater than $100,000. In accordance with the City's Business Equity Ordinance No. 25165-10-2021 (as codified in Chapter 20, Article X of the City's Code of Ordinances, as amended, and any relevant policy or guidance documents), Engineer acknowledges the MBE and WBE goals established for this Agreement and its execution of this Agreement is Engineer's written commitment to meet the prescribed MBE and WBE participation goals. Any misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Engineer may result in the termination of this Agreement and debarment from participating in City contracts for a period of time of not less than three (3) years. K. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract. ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultant agreements hereunder a provision to the effect that the subconsultant agrees that the CITY shall, until the expiration of five (5) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subconsultant, involving transactions to the subcontract, and further, that the CITY shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with City of Fort Worth, Texas FWCC Water & Sanitary Sewer Relocation Standard Agreement for Engineering Related Design Services CPN 104484 Revised Date: 12-08-2023 Page 5 of 15 subsection (3) hereof. CITY shall give subconsultant reasonable advance notice of intended audits. (3) ENGINEER and subconsultant agree to reproduce such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of hard copies at the rate published in the Texas Administrative Code in effect as of the time copying is performed. L. INSURANCE Engineer shall not commence work under this Agreement until it has obtained all insurance required under Attachment F and City has approved such insurance. M. Independent Consultant The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. The doctrine of respondent superior shall not apply. N. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract. O. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the CITY may request the ENGINEER to assist in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. P. Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, City of Fort Worth, Texas FWCC Water & Sanitary Sewer Relocation Standard Agreement for Engineering Related Design Services CPN 104484 Revised Date: 12-08-2023 Page 6 of 15 at its own cost and expense. However, if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. Q. Schedule ENGINEER shall manage the PROJECT in accordance with the schedule developed per Attachment D to this AGREEMENT. Article V Obligations of the City A. City -Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B. Access to Facilities and Property The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER's performance of its services. The CITY will perform, at no cost to the ENGINEER, such tests of equipment, machinery, pipelines, and other components of the CITY's facilities as may be required in connection with the ENGINEER's services. The CITY will be responsible for all acts of the CITY's personnel. C. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights -of -way, and access necessary for the ENGINEER's services or PROJECT construction. D. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule prepared in accordance with Attachment D. City of Fort Worth, Texas FWCC Water & Sanitary Sewer Relocation Standard Agreement for Engineering Related Design Services CPN 104484 Revised Date: 12-08-2023 Page 7 of 15 E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors. F. Asbestos or Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY's facilities that may contain hazardous materials, including asbestos containing materials, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage, or disposition of such materials. In consideration of the associated risks that may give rise to claims by third parties or employees of City, City hereby releases ENGINEER from any damage or liability related to the presence of such materials. (2) The release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER's negligence or if ENGINEER brings such hazardous substance, contaminant or asbestos onto the project. G. Contractor Indemnification The CITY agrees to include in all construction contracts the provisions of Article IV.E. regarding the ENGINEER's Personnel at the construction site, and provisions providing for contractor indemnification of the CITY and the ENGINEER for contractor's negligence. H. Contractor Claims and Third -Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the CITY will be the beneficiary of any undertaking by the ENGINEER." (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third -party beneficiaries. City of Fort Worth, Texas FWCC Water & Sanitary Sewer Relocation Standard Agreement for Engineering Related Design Services CPN 104484 Revised Date: 12-08-2023 Page 8 of 15 (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third -party beneficiary rights under this Agreement. (4) Nothing contained in this Section H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. I. Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated between the parties. J. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article VI General Legal Provisions A. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. B. Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. City of Fort Worth, Texas FWCC Water & Sanitary Sewer Relocation Standard Agreement for Engineering Related Design Services CPN 104484 Revised Date: 12-08-2023 Page 9 of 15 C. Force Majeure CITY and ENGINEER shall exercise their best efforts to meet their respective duties and obligations as set forth in this Agreement, but shall not be held liable for any delay or omission in performance due to force majeure or other causes beyond their reasonable control, including, but not limited to: acts of the public enemy, fires, strikes, lockouts, natural disasters, epidemics/pandemics, wars, riots, material or labor restrictions by any governmental authority and/or any other similar causes. D. Termination (1) This AGREEMENT may be terminated a.) by the City for its convenience upon 30 days' written notice to ENGINEER. b.) by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and the nonperforming party does not commence correction of such nonperformance within 5 days' written notice or thereafter fails to diligently complete the correction. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Reasonable cost of reproduction or electronic storage of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; b.) The reasonable time requirements for the ENGINEER'S personnel to document the work underway at the time of the CITY'S termination for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all projected termination expenses. The CITY'S approval shall be obtained in writing prior to proceeding with termination services. E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECT's schedule, City of Fort Worth, Texas FWCC Water & Sanitary Sewer Relocation Standard Agreement for Engineering Related Design Services CPN 104484 Revised Date: 12-08-2023 Page 10 of 15 commitment and cost of the ENGINEER's personnel and subcontractors, and ENGINEER's compensation will be made. F. Indemnification The ENGINEER shall indemnify or hold harmless the CITY against liability for any damage committed by the ENGINEER or ENGINEER's agent, consultant under contract, or another entity over which the ENGINEER exercises control to the extent that the damage is caused by or resulting from an act of negligence, intentional tort, intellectual property infringement, or failure to pay a subcontractor or supplier. CITY is entitled to recover its reasonable attorney's fees in proportion to the ENGINEER's liability. G. Assignment ENGINEER shall not assign all or any part of this AGREEMENT without the prior written consent of CITY. H. Jurisdiction The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be Tarrant County, Texas. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause. J. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees from and against all City of Fort Worth, Texas FWCC Water & Sanitary Sewer Relocation Standard Agreement for Engineering Related Design Services CPN 104484 Revised Date: 12-08-2023 Page 11 of 15 claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. K. Contract Construction/No Waiver The parties acknowledge that each Party and, if it so chooses, its counsel, have reviewed and revised Agreement and that the normal rule of contract construction, to the effect that any ambiguities are to be resolved against the drafting party, must not be employed in the interpretation of Agreement or any amendments or exhibits hereto. The failure of CITY or ENGINEER to insist upon the performance of any term or provision of this Agreement or to exercise any right granted herein shall not constitute a waiver of CITY's or ENGINEER's respective right to insist upon appropriate performance or to assert any such right on any future occasion. L. Immigration Nationality Act ENGINEER shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (1-9). Upon request by CITY, ENGINEER shall provide CITY with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. ENGINEER shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any ENGINEER employee who is not legally eligible to perform such services. ENGINEER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY ENGINEER, ENGINEER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. CITY, upon written notice to ENGINEER, shall have the right to immediately terminate this Agreement for violations of this provision by ENGINEER. M. Prohibition On Contracts With Companies Boycotting Israel ENGINEER unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of the Texas Government Code, if ENGINEER has 10 or more full time -employees and the contract value is $100,000 or more, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" City of Fort Worth, Texas FWCC Water & Sanitary Sewer Relocation Standard Agreement for Engineering Related Design Services CPN 104484 Revised Date: 12-08-2023 Page 12 of 15 shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, ENGINEER certifies that ENGINEER'S signature provides written verification to the City that if Chapter 2271, Texas Government Code applies, ENGINEER: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. N. Prohibition on Boycotting Energy Companies ENGINEER acknowledges that in accordance with Chapter 2276 of the Texas Government Code, the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more, which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meaning ascribed to those terms by Chapter 2276 of the Texas Government Code. To the extent that Chapter 2276 of the Government Code is applicable to this Agreement, by signing this Agreement, ENGINEER certifies that ENGINEER's signature provides written verification to the CITY that ENGINEER: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. O. Prohibition on Discrimination Against Firearm and Ammunition Industries ENGINEER acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code, the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, ENGINEER certifies that ENGINEER's signature provides written verification to the CITY that ENGINEER: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or City of Fort Worth, Texas FWCC Water & Sanitary Sewer Relocation Standard Agreement for Engineering Related Design Services CPN 104484 Revised Date: 12-08-2023 Page 13 of 15 firearm trade association during the term of this Agreement. This AGREEMENT, including its attachments and schedules, constitutes the entire AGREEMENT, which supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. This AGREEMENT may be executed in one or more counterparts and each counterpart shall, for all purposes, be deemed an original, but all such counterparts shall together constitute but one and the same instrument. The following attachments and schedules are hereby made a part of this AGREEMENT: Attachment A - Scope of Services Attachment B - Compensation Attachment C - Amendments to Standard Agreement for Engineering Services Attachment D - Project Schedule Attachment E - Location Map Attachment F — Insurance Requirements City of Fort Worth, Texas FWCC Water & Sanitary Sewer Relocation Standard Agreement for Engineering Related Design Services CPN 104484 Revised Date: 12-08-2023 Page 14 of 15 Duly executed by each party's designated representative to be effective on the date subscribed by the City's designated Assistant City Manager. BY: CITY OF FORT WORTH 7� . Fernando Costa Assistant City Manager Date: Apr 5, 2024 4.p"oU4pq ATTEST: as FORr��a load 1, °ono o=d Jannette Goodall City Secretary°�1aEao5�pp APPROVAL RECOMMENDED: 6&6k G � HArAl- By. Christopher Harber (Apr 4, 2024 14:33 CDT) Christopher Harder, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY By: Douglas Black (Apr 4, 202423:47 CDT) Douglas W Black Sr. Assistant City Attorney Contract Compliance Manager: BY: ENGINEER Kimley-Horn and Associates, Inc. �.Zf, r E. John Atkins, P. E. Vice President Date: 3/29/2024 Form 1295 No.: 2023-1092745 M&C No.: 24-0256 M&C Date: March 26. 2024 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requireme 716 Liam Conlon Project Manager City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services Revised Date: 12-08-2023 Page 15 of 15 FWCC Water & Sanitary Sewer Relocation CPN 104484 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 ATTACHMENT "A" Scope for Enaineerina Design Related Services for Water and Sanitary Sewer Relocations DESIGN SERVICES FOR WATER AND SANITARY SEWER RELOCATIONS FOR THE FORT WORTH CENTRAL CITY PROJECT CITY PROJECT NO. 104484 General Scope of Services The scope set forth herein defines the work to be performed by the ENGINEER in conjunction with the PROJECT. Both the CITY and ENGINEER have attempted to define services to be performed and address the needs of the PROJECT through September of 2024. OBJECTIVE The objective of this PROJECT is to facilitate the relocation of the CITY's water and sanitary sewer facilities that are in conflict with the USACE Fort Worth Central City improvements, and to assist the CITY with the Panther Island Redevelopment Project. WORK TO BE PERFORMED Task 1. Design/Program Management Task 2. Conceptual Design Task 3. Preliminary Design Task 4. Final Design Task 5. Bid Phase Services Task 6. Construction Phase Services Task 7. ROW/Easement Services Task 8. Survey and Subsurface Utility Engineering Services Task 9. Permitting Task 10. Holly Analysis — None Task 11. Development Analysis Task 12. USACE Plan Reviews — None Task 13. Ham Branch Study — None Task 14. Panther Island Sanitary Sewer Master Plan — None Task 15. Additional Services — None Task 16. Panther Island Revisioning CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 1 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 TASK 1. DESIGN/PROGRAM MANAGEMENT Anticipated durations 12 months (July 2023 thru June 2024) 1.1 Kick -Off Meeting: Attend one (1) pre -design PROJECT kickoffs for Design PROJECT Parts with CITY staff to confirm and clarify scope and objectives. 1.2 Regular Period Meetings: Attend regular periodic meetings as required by CITY and Tarrant Regional Water District (TRWD). The number of meetings is only intended to be an approximation of the frequency and content of the meetings. A. Monthly CITY Progress Meetings: Conduct and document twelve (12) monthly PROJECT update meetings with the CITY PROJECT Manager B. Semi-monthly TRWD and CITY Coordination Meetings: Conduct twenty-four (24) semi- monthly PROJECT update meetings with CITY PROJECT Manager, Other CITY Consultants, and TRWD PROJECT partners. Prepare and distribute meeting notes and action items. C. Franchise Utility Progress Meetings: Attend fifteen (15) franchise utility PROJECT update meeting with CITY PROJECT Manager and TRWD PROJECT partners. D. TRWD CITY Program Manager's Progress Meetings: Attend approximately six (6) TRWD CITY Program Manager's progress meetings. E. Semi-monthly TRWD PROJECT Managers Review Meetings: Attend approximately six (6) semi-monthly TRWD PROJECT Managers review meetings. F. Quarterly USACE Coordination Meetings: Attend four (4) quarterly USACE PDT meetings for PROJECT coordination. 1.3 City Reporting: A. Progress Reports B. Monthly Schedule Update: Prepare twelve (12) monthly PROJECT schedule status updates to be provided to both CITY and TRWD. The schedules should reflect all of the CITY's PROJECT Parts associated with this contract, appropriately labeled to distinguish between FWCC and Non-FWCC PROJECT Parts. The design schedule will not be cost loaded with the ENGINEER's fees. C. M/WBE Reporting: Complete twelve (12) Monthly M/WBE Report Forms for both TRWD and the CITY. Submit M/WBE Change forms as necessary for any changes in M/WBE Status. D. Monthly Invoices and PROJECT Tracking by PROJECT Part: Prepare twelve (12) monthly invoices that meet the CITY and TRWD invoice format requirements. 1.4 TRWD Program Reporting: Facilitate coordination of PROJECT financial information and track status. A. PROJECT Cost Monthly Update: Prepare and update monthly a spreadsheet that tracks each PROJECT Part including projected Construction and Engineering Cost, changes to CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 2 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 the projected Construction and Engineering Cost, and actual Construction and Engineering Cost. B. Monthly CITY Actuals Reporting: Review the CITY's Water and Sanitary Sewer, Storm Drain, Franchise, Bridges and Local Street Modifications monthly Project Management Reports and prepare twelve (12) Actual vs. Budget Cost Summary Reports. C. Monthly Contracted and Reimbursable Tracking D. CIP Coordination: The quarterly coordination of the CITY's Five -Year CIP to verify how each PROJECT Part is included in each fiscal year budget. Cost shall be summed by fiscal year. E. Quarterly TRWD Schedule Review: Perform four (4) quarterly review of modifications to the TRWD schedule and report potential impacts to both TRWD and CITY. Coordinate with both TRWD and CITY as CITY and TRWD work to achieve a schedule that is mutually agreed upon by each party. F. TRWD PROJECT Change Form: Document PROJECT scope and cost changes and report to TRWD. 1.5 Coordination of other CITY Consultants: Facilitate action items/tasks for other CITY Consultants as a result of the TRWD PROJECT Managers meeting. Services may include delegation of tasks and conducting additional meetings associated with the directives of the PROJECT Managers meeting. 1.6 Deliverables A. Meeting Notes for Kickoff Meetings. B. Monthly M/WBE Reporting to both TRWD and CITY. C. Meeting Notes and action items from TRWD and CITY Monthly coordination meeting. D. TRWD Monthly schedule updates with schedule narrative describing any current or anticipated schedule changes. E. CITY Monthly schedule updates with schedule narrative describing any current or anticipated schedule changes. F. Monthly invoices. G. Monthly CITY Actual vs. Budget Cost Summary Report. H. Capital Tracking Spreadsheet (Quarterly). CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 3 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 TASK 2. CONCEPTUAL DESIGN (30 PERCENT) Water Relocations Name Size Range Length (LF) Part 24 University Drive 8" & 24" 7,820 Water Subtotal 7,820 LF Sewer Relocations Name Size Range Length (LF) Part 24 University Drive 12" & 66" 2,180 Sewer Subtotal 2,180 LF Total 10,000 LF The Conceptual Design shall be submitted to CITY per the approved Project Schedule. The purpose of the conceptual design is for the ENGINEER to ■ Study the project, ■ Identify and develop alternatives that enhance the system, ■ Present (through the defined deliverables) these alternatives to the CITY ■ Recommend the alternatives that successfully addresses the design problem, and ■ Obtain the CITY's endorsement of this concept. ENGINEER will develop the conceptual design of the infrastructure as follows. 2.1. Data Collection • In addition to data obtained from the CITY, ENGINEER will research proposed improvements in conjunction with any other planned future improvements that may influence the project. • The ENGINEER will also identify and seek to obtain data for existing conditions that may impact the project including but not limited to; utilities, agencies (TxDOT and railroads), City Master Plans, and property ownership as available from the Tax Assessor's office. CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 4 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 • The data collection efforts will also include conducting special coordination meetings with affected property owners and businesses as necessary to develop sewer re-routing plans. • The ENGINEER shall visit the project site and obtain the meter numbers and sizes on all existing meters to be replaced on the project and shall identify existing sample stations and fire line locations. 2.2. The Conceptual Design Package includes the following scope of services. • Graphic exhibits (aerial at a scale of 1" = 40') for re -alignment options. • Identification of potential access routes and easement requirements. • Fire line reconnections, if needed • Proposed phasing of any water work that is included in this project documented in both the project schedule and narrative form. • Documentation of key design decisions. • Estimates of probable construction cost. ASSUMPTIONS • Six (6) Geotechnical borings are expected for Part 24 University Drive TASK 3. PRELIMINARY DESIGN (60 PERCENT PLANS) Complete Preliminary Design based on information developed or obtained during Task 2 — Conceptual Design and Task 8 — Surveying Services. Name Part 24 University Drive Water Subtotal Name Part 24 University Drive Sewer Subtotal Total CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 5 OF 34 Water Relocations Size Range Length (LF) 8" & 24" 7,820 7,820 LF Sewer Relocations Size Range Length (LF) 12" & 66" 2,180 2,180 LF 10,000 LF ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 3.1 Preliminary Design Drawings: Preliminary Design Drawings will include the following Sheets: A. Cover Sheet B. Sheet Index and General Notes 1. CITY's General Notes as found on e-Builders. 2. PROJECT Part Specific Notes: Add notes, as required, to meet the specific needs of the PROJECT Part. C. Shutdown and Phasing Notes D. Control Points and Benchmarks in accordance with Task 8 — Survey Services E. Overall Location Map and Sheet Reference for Proposed Water and Sewer Lines F. Overall Existing Water and Sewer Line Map G. Overall Existing Water and Sewer Line Abandonment Plan H. Overall Proposed Easement Map I. Preliminary Water Plan and Profile Sheets: (11 Sheets) Water lines shall be designed in accordance with the CITY Design Standards for water lines, and in accordance with TCEQ requirements as depicted in Chapter 290 of the TAC. Plan and Profile Sheets shall include proposed: CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 6 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 1. Water lines: plan view only (water lines 8-inches and smaller) 2. Water lines: plan and profile (water lines 12-inches and larger) 3. Water line sizes 4. Water line grades for 12-inch and larger 5. Fire hydrants 6. Water service lines and meter boxes 7. Valves and valve vaults 8. Air release valves, vaults, and vents 9. Blow -off valves and blow -off valve manholes 10. Sample stations 11. Water services and sizes a. Make provisions to reconnect all water service lines which connect directly to any main being replaced. b. Locations where water services will require relocation across private property due to the location of the proposed water main relative to the existing water main c. The number and location of water services where relocation is significant and will require a detail as part of Task — 4 Final Design d. Temporary water service locations 12. Fire lines 13. Casing limits and size 14. Connection to existing Water lines 15. Isolation Valves 16. Major Connections: Locations where connection to existing main is significant and will require a detail as part of Task 4 — Final Design 17. Proposed limits of the utility trench and pavement removal and replacement J. Preliminary Sanitary Sewer Plan and Profile Sheets: (4 Sheets) Wastewater lines shall be designed in accordance with the CITY Design Standards for wastewater lines, and in accordance with TCEQ requirements as depicted in Chapter 217 of the TAC. Plan and Profile Sheets shall include proposed: CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 7 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 1. Sanitary sewer lines: plan and profile 2. Manholes and junction structures 3. Sewer line sizes 4. Sewer line grades 5. Sewer service lines and sizes a. Make provisions to reconnect all wastewater services lines which connect directly to any main being replaced, including replacement of existing service lines within City right-of-way or utility easement. When the existing alignment of a water and sanitary sewer main or lateral is changed, provisions will be made in the final plans and/or specifications by the ENGINEER to relocate all service lines which are connected to the existing main and connect said service lines to the relocated main. The following shall be applicable at all locations where it is necessary to relocate or reroute the existing private sanitary sewer service line due to the abandonment or realignment of the existing public sanitary sewer lateral or main: The CITY shall furnish the ENGINEER with a sample format of how the sewer service line reroute/relocation should be designed and submitted for construction. During design survey, if a rod can be inserted through the cleanout to the bottom of the service line, the ENGINEER will obtain the flow line elevation and design the service line prior to advertising the project for bid. If the service flow line information cannot be obtained during design survey, the ENGINEER shall delay the design of the sewer service line until after a Quality Level A Subsurface Utility Engineering (SUE investigation has been performed). The Level A SUE will be performed; (1) by the ENGINEER if included in the fee proposal; or (2) by the CITY prior to bidding if the CITY determines that it is needed for satisfactory completion of the design; or (3) by the Contractor after the project has been bid, by means of a bid item to that effect. In all options, the ENGINEER shall propose appropriate de -hole locations in the project and collect flow line elevation and other applicable information of the sewer service line. The ENGINEER shall use this information to provide the design for the sanitary sewer service line to be rerouted or relocated. c. Provide map showing location of new manhole construction at the end of existing sewer segments, 90 degree bends, or tee connections. Site survey or specific design plans for manhole construction is not included as part of the scope. The contract documents shall specify that it is the Contractor's responsibility to coordinate utility location, etc. manhole construction. d. The ENGINEER will prepare standard and special detail sheets for water line installation and sewer rehabilitation or replacement that are not already included in the D-section of the CITY's specifications. These may include connection details between various parts of the project, tunneling details, boring and jacking details, waterline relocations, details unique to the construction of the project, trenchless details, and special service lateral reconnections. CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 8 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 6. Connections to existing sewer lines 7. Identify structures that will require special details in Task 4 — Final Design 8. By-pass pumping locations 9. Casing limits and size 10. Proposed limits of the utility trench and pavement removal and replacement K. In general, PROJECT Part Plan and Profile Sheets shall include the following: 1. Existing conditions as identified in Task 8 — Survey Services 2. CITY standard border 3. CITY water and sewer Project number 4. North arrow 5. Graphic scale 6. Engineers Preliminary Seal 7. No less than Two (2) benchmarks per plan/profile sheet 8. General notes and sheet notes 3.2 Stakeholder Progress Update Meetings: Conduct stakeholder meetings during Preliminary Design when design of the proposed improvements directly affects the property owner's operations. 3.3 Geotechnical Investigations: Perform a geotechnical analysis of the boring site utilizing a qualified geotechnical laboratory to determine subsurface conditions. Provide recommendations regarding foundation design parameters. The geotechnical analysis will include the following: A. Subsurface exploration 1. Six (6) bores up to 25-ft deep B. Laboratory tests for classification purposes and strength characteristics. 1. Moisture content and soil identification 2. Percent passing #200 sieve 3. Liquid and plastic limit determinations 4. Unconfined compression tests on soil 5. Unconfined compression tests on rock 6. Unit weight determinations 7. Absorption pressure and/or one -point pressure swell tests C. The geotechnical report will present the results of the field and laboratory data as well as analyses and recommendations. The data contained in the geotechnical report will be made available to contractors during the bidding process for information purposes. The report will address: CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 9 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 1. General soil and ground water conditions 2. Comments on general soil and rock excavation 3. Earthwork and Trench recommendations 4. Lateral Earth Pressure for Blocking 5. Pavement Design recommendations, where required 3.4 Environmental Analysis A. Perform a Limited Phase II investigation in the following locations — none B. Samples will be tested to identify total petroleum hydrocarbons (TPH), volatile organic compounds (VOCs) and other chemicals of concern (COCs) and will be compared to the Texas Risk Reduction Program (TRAP) protective concentration levels. 3.5 By Other than Open Cut Installation A. Prepare trenchless alignments which include entry and exit locations, equipment layout, and other site constraints for the following trenchless crossings: 1. One (1) 24-inch water lines carrier pipe by 200-LF crossing of University Drive 2. One (1) 24-inch water lines carrier pipe by 200-LF crossing of SH-199 3. One (1) 8-inch water lines carrier pipe by 550-LF crossing of University Drive 4. One (1) 66-inch sewer carrier pipe by 250-LF crossing of University Drive 3.6 Special Structural Design: Develop Design (60 percent) calculations, drawings, specifications, for the following special structures: A. Zero (0) Siphon Structures with stop logs B. Zero (0) Siphon Drop Structures C. Two (2) Junction Structures D. Zero (0) Aerial Crossings E. Zero (0) Butterfly Valve Vaults F. Zero (0) Access Manhole G. Zero (0) Siphon Structure Modification 3.7 Constructability Review and Site Visit A. Prior to the preliminary design review meeting with the CITY, schedule and attend a PROJECT Part site visit with the CITY Project Manager and Construction personnel. Prepare meeting notes capturing the CITY's comments from the site visit. B. The PROJECT requires coordination with other Fort Worth Central City Projects. Review modifications to the other Fort Worth Central City Project submittals to verify there are no changes affecting the existing and/or proposed water and wastewater infrastructure. CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 10 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 3.8 Utility Clearance A. Coordinate with the CITY's Transportation and Public Works Department, Water Department, and other CITY departments, public utilities, private utilities and government agencies to determine the approximate location of above and underground utilities and other facilities that have an impact or influence on the PROJECT Part. Design CITY facilities to avoid or minimize conflicts with existing utilities, and where known and possible, consider potential future utilities in designs. B. Upload one (1) set of the approved preliminary construction plans to e-Builders for the CITY's Utility Coordinator to forward to all utility companies which have facilities within the limits of the PROJECT Part. 3.9 Opinion of Probable Construction Cost: (OPCC) A. Prepare an opinion of probable construction cost updated to reflect preliminary design. The OPCC should separate the cost based on CITY fund account numbers: water, sewer, storm water, and streets. Line item cost should be based on CITY standard bid items. 3.10 Deliverables A. Six (6) copies of the Preliminary Design Package will be delivered to CITY for each PROJECT Part. Four (4) copies will include full size (22" x 34") plan sheets and Two (2) copies will include half size (11" x 17") plan sheets. B. Zero (0) copies of the Preliminary Design Package will be delivered to TRWD/USACE for each PROJECT Part. Drawings will be full size (22" x 34") plan sheets. C. One (1) PDF Copy of the Preliminary Design Package uploaded to e-Builder for each PROJECT Part. D. One (1) Copy of the Opinion of Probable Construction Cost (OPCC) for each PROJECT Part 3.11 Preliminary Design Review Meeting A. Conduct five (5) review meetings with the CITY to review Preliminary Design and receive comments from the CITY. CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 11 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 TASK 4. FINAL DESIGN (90 PERCENT PLANS) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT PLANS) Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as follows: Water Relocations Name Size Range Length (LF) Part 13 Channel Segment D 16" 150 Water Subtotal 150 LF Sewer Relocations Name Size Range Length (LF) Part 13 Channel Segment D 24"-78" 4,320 Upper Clear Fork 60" 1,300 Sewer Subtotal 5,620 LF Total 5,770 LF 4.1 Preliminary Design Comments A. Incorporate comments from Task 3 — Preliminary Design from the CITY as well as Utility Clearance in the Final Design Documents. 4.2 Final Design (90 Percent Plans): Each plan sheet shall be sealed, dated, and signed by an Engineer licensed in State of Texas with appropriate Firm Registration Number. A. Cover Sheet B. Sheet Index and General Notes C. Shutdown and Phasing Notes D. Overall Existing Water and Sewer Line Map E. Overall Existing Water and Sewer Line Abandonment Plan F. Overall Location Map and Sheet Reference for Proposed Water Lines CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 12 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 G. Overall Location Map and Sheet Reference for Proposed Sewer Lines H. Overall Existing Water Line Abandonment Plan I. Overall Existing Sewer Line Abandonment Plan J. Control Points and Benchmarks in accordance with Task 8 — Survey Services K. Subsurface Utility Engineering Maps L. Water Plan and Profile Sheets: In addition to the information identified in Task 3 — Preliminary Design, the following information should be added to the Plan and Profile sheet to communicate the design. 1. Stationing for proposed water and sewer lines 2. Noting of Design Features — Plan a. Stationing of the feature b. Name of Feature c. X and Y NAD 83 coordinates d. Reference to appropriate CITY Standard Details, or PROJECT Part Specific Details 3. Noting of Design Features — Profile a. Stationing of the feature b. Name of the feature c. Elevation in the Profile (at 50' intervals) d. Provide top of pipe elevations for water lines e. Reference to Standard or PROJECT Part Specific Details 4. Pavement Restoration: Indicate the limits of pavement removal and replacement in accordance with CITY Pavement Replacement Policy. Limits should reflect all improvements which require pavement cuts including: a. Water lines b. Structures: vaults and others c. Service lines d. Abandonment of existing utilities e. Indicate the type of patch to be performed and reference the appropriate standard detail. 5. Backfill: Indicated the type and locations of the design trench backfill 6. Water Pipe Line Restraint: If the water line is designed to have restrained joints, calculate and indicate on the plan and profile sheets the designed sections that are to be restrained. (3 pipe types). CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 13 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 7. By Other than Open Cut Installation: Design tunnel/bore including casing/tunnel liner plate minimum thickness and inside diameter, shafts, allowable methods, control of ground water, and appropriate tolerances with the chosen method. Indicate the following on the plan and profile sheets: a. Casing or Tunnel Line Plate Thickness b. Jacking Shaft and Receiving Shaft Location 8. Water Services: Provide the following on the plan and profile sheets a. Water Service Table: Include the station of the service, the action to be taken on the service, meter box type, service size, meter size, and the meter number associated with each service b. Temporary Water Service: Indicate locations which will require temporary service M. Sewer Plan and Profile Sheets: In addition to the information identified in Task 3 — Preliminary Design, the following information should be added to the Plan and Profile sheet to communicate the design. 1. Stationing for proposed water and sewer lines 2. Noting of Design Features - Plan a. Stationing of the feature b. Name of Feature c. X and Y NAD 83 coordinates d. Reference to appropriate CITY Standard Details, or PROJECT Part Specific Details 3. Noting of Design Features — Profile a. Stationing of the feature b. Name of the feature c. Elevation in the Profile (at 50' intervals) d. Provide flow line elevations for sewer lines e. Reference to Standard or PROJECT Part Specific Details 4. Pavement Restoration a. Indicate the limits of pavement removal and replacement in accordance with CITY Pavement Replacement Policy. Limits should reflect all improvements which require pavement cuts including: b. Sanitary sewer lines c. Structures: manholes, vaults and others d. Service lines e. Abandonment of existing utilities CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 14 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 f. Indicate the type of patch to be performed and reference the appropriate standard detail. 5. Backfill: Indicated the type and locations of the design trench backfill 6. By Other than Open Cut Installation: Design tunnel/bore including casing/tunnel liner plate minimum thickness and inside diameter, shafts, allowable methods, control of ground water, and appropriate tolerances with the chosen method. Indicate the following on the plan and profile sheets: a. Casing or Tunnel Line Plate Thickness b. Jacking Shaft and Receiving Shaft Location N. Standard Details: Incorporate Standard Details into the construction plans as required by the PROJECT Part scope O. PROJECT Part Specific Details: Prepare PROJECT Part specific details 1. Connections to Existing Water Transmission Mains: [Zero (0) Detail] Prepare details where existing water transmission mains will be cut into to connect a new pipe line or where ductile iron and steel -based pipe lines will be tied together. 2. Butterfly Valve Vaults: [Zero (0) Details] Provide Butterfly vault structural design and details 3. Large Meter Vaults: [Zero (0) Details] Provide large water meter vault structural design and details 4. By -Pass Pumping: [Zero (0) Details] Provide size, and details for by-pass pumping 5. Manhole Junction Structures: [Five (5) Structures] Provide manhole junction structure structural design and details 6. Siphon Structures: [Two (2) Structures] Provide siphon structure structural design and details 7. 45' Bend Siphon Drop Structures: [Zero (0) Structures] Provide structural design and details 8. Access Structures: [Zero (0) Structure] Provide access structure structural design and details 9. Tunneling: [One (1) Location] Provide tunneling details 10. Storm Structure Modifications: [Zero (0) Structure] Provide structural design and details 11. Aerial Crossing: [One (1) Crossing] Provide aerial crossing structural design and details 12. Shoring Plan/Coffer Dam: [Zero (0) Location] Provide shoring details 13. Grading: [Zero (0) Location] Provide grading details P. Traffic Control Plans (TCP): CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 15 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 1. TCP: Prepare TCP [Eight (8) Sheet] based on the UMTCD and the CITY's Standard details. 2. CITY Standard Details: Incorporate CITY Standard detail sheets in the Construction plans as required. 3. PROJECT Part Specific Details: Prepare Specific Traffic Control Details as required by the PROJECT Part. Q. Cathodic Protection: 1. Final Design will include Cathodic Protection Design Plans as prepared by ENGINEER's Cathodic Protection subconsultant. R. Erosion Control Plans: [Four (4) Sheets] Provide erosion control plans in accordance with CITY and TCEQ requirements. 4.3 Final Design Project Manual: Prepare a Project manual in accordance with the CITY's standards as found on the CITY's e-Builders site. Prepare the following according to the requirements of the PROJECT Part [One (1) Project]. A. Division 00 1. Invitation to Bid: Modify/complete the Invitation to Bidders as required by the PROJECT Part. 2. Instructions to Bidders: Modify/complete the Instructions to Bidders as required by the PROJECT Part. 3. Bid Form: Prepare the PROJECT Part Bid Form using the standard CITY bid items as located on the CITY's e-Builders site. 4. Supplementary Conditions: Modify/complete supplemental conditions for the PROJECT Part including insurance requirements, construction time, and liquidated damages. B. Division 01 1. Modify/complete Division 01 requirements for inclusion in the Project manual and in accordance with the requirements of the PROJECT Part. C. Division 02-49 1. Modify/complete Division 02-49 requirements for inclusion in the Project manual and in accordance with the requirements of the PROJECT Part. D. Non -Standard Specifications 1. Prepare specifications for requirements which are not included in the CITY standard specifications for inclusion in the Project manual and in accordance with the requirements of the PROJECT Part. These may include, but are not limited to specifications for the following: a. Shafts b. Tunneling CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 16 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 c. Odor Control d. Shoring E. Appendix: Include the following with Project Manual Appendix: 1. Easements 2. Permits 3. Geotechnical Investigation 4. Paving Cores CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 17 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 4.4 Opinion of Probable Construction Cost (OPCC) A. Prepare an OPCC updated to reflect Final Design. The OPCC should separate the cost based on CITY fund account numbers: water, sewer, storm water, and streets. Line item cost should be based on CITY standard bid items. 4.5 Stakeholder Meetings: Conduct stakeholder meetings during Final Design when the proposed improvements directly affect the property owner's operations. 4.6 CITY Plan Review Submittals A. Pavement Removal and Replacement: Submit Plans to the CITY's TPW department for review of proposed pavement removal and replacement. B. Traffic Control Plans: Submit Plans to the CITY's TPW department for review of proposed traffic control measures. 4.7 Construction Plan Review Meetings A. Constructability Review: Conduct zero (0) review meeting(s) with CITY Project manager and the CITY Inspector to receive comments. B. Water Operational Review: Conduct one (1) review meeting(s) with Water Department Field Operation valve crews and with Water Production to review system shut down requirements. C. Wastewater Operational Review: Conduct one (1) review meeting(s) with Water Department Field Operation wastewater personnel to review impacts on the wastewater system and to review proposed by-pass pumping. D. TRWD Review: Conduct one (1) review meeting(s) with TRWD personnel to review impacts and coordination with the entire TRWD Project. E. USACE Review: Conduct one (1) review meeting(s) with USACE personnel to review impacts and coordination where USACE has jurisdiction or proposed construction. 4.8 Construction Documents: Based on the various meetings and reviews revise the final design plans and Project manual to produce the Final Construction Documents for Bidding. 4.9 Deliverables A. Six (6) copies of the 90% Design Package will be delivered to CITY for each PROJECT Part. Four (4) copies will include full size (22" x 34") plan sheets and two (2) copies will include half size (11" x 17") plan sheets. Project Manual B. Six (6) copies of the 90% Design Package will be delivered to TRWD/USACE for each PROJECT Part. Four (4) copies will include full size (22" x 34") plan sheets and two (2) copies will include half size (11" x 17") plan sheets. Project Manual C. One (1) PDF copy of the Final Design Package uploaded to e-Builders for each PROJECT Part. D. One (1) copy of the Opinion of Probable Construction Cost (OPCC) for each PROJECT Part E. One (1) mylar cover Sheet for Signatures by CITY for each PROJECT Part CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 18 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 F. Six (6) copies of the 100% Design Package will be delivered to CITY for each PROJECT Part. Four (4) copies will include full size (22" x 34") plan sheets and two (2) copies will include half size (11" x 17") plan sheets. G. Zero (0) copies of the 100% Design Package will be delivered to TRWD/USACE for each PROJECT Part. H. Electronic Version of 100% Construction Plans and Project Manual will be delivered as the As -bid set. Construction plans will be in DWF and PDF format and the Project Manual will be in PDF format for each PROJECT Part. TASK 5. BID PHASE SERVICES Name Bid Packages Part 13 Channel Segment D 1 Total 3 5.1 General A. Separate sets of Bidding Documents are planned for each PROJECT Part. B. Services below will be performed for each bid set. 5.2 Advertisement A. The CITY will publish the Invitation to Bidders in the local paper of record. 5.3 Issuing Bid Sets A. Make available at an agreed location sufficient copies of the Bidding Documents to distribute to potential bidders. B. Upload Bidding Documents to e-Builders for electronic distribution C. The ENGINEER may charge a non-refundable fee up to $100 per set of Bidding Documents. D. Issue Bidding Documents to four (4) Plan Rooms as determined by the CITY. E. Maintain a log of all plan holders. 5.4 Request for Information A. Receive requests for information from prospective bidders and maintain a log of bidder's significant questions. B. Provide technical interpretations of the Contract Documents. C. Send written clarifications to all plan holders. 5.5 Addenda CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 19 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 A. Issue Addenda as necessary when clarifications require a modification to the Contract Documents. 5.6 Pre -bid Meeting A. Conduct a pre -bid meeting for each PROJECT Part as indicated in the Table above. 5.7 Bid Opening A. Attend bid opening held at the CITY. 5.8 Recommendation of Award A. Obtain Bidder's proposals from the CITY. B. Review all bids for completeness and prepare a bid tabulation of all Bidder proposals. C. Evaluate the apparent low bidder and the two (2) subsequent low bidders. D. Verify the qualification and the acceptability of the low bidder. E. Prepare a letter to the CITY with a recommendation of award. 5.9 Conformance Documents A. Incorporate all addenda into the construction plans and the project manual. 5.10 Contract Execution A. Prepare three (3) copies of the conformed Construction Documents for each bid package to be executed by the CITY and the Contractor per bid package. 5.11 Deliverables A. Addenda and Clarifications B. Upload to e-Builders bidding documents (construction plans and project manuals). C. Six (6) sets of bidding documents (construction plans and project manuals) for each bid package D. Three (3) sets of conformed bidding documents for execution for each bid package E. One (1) Award Letter for each Bid Package F. One (1) Bid Tabulation for each Bid Package G. Six (6) full size (22"x34") Six (6) half size (11"x 17") of Conformed Plans and Specifications for Preconstruction Meeting for each Bid Package. CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 20 OF 34 TASK 6. CONSTRUCTION PHASE SERVICES Name Anticipated Construction Duration Part 14 Channel 17 Mo Segment C 6.1 Public Meeting ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 Months of Submittal Construction Construction Review: Services in This CITY/KHA Activity: Contract 17 Mo. KHA Weekly/Daily A. The CITY shall be responsible for establishing the location and mailing the invitation for the public meeting. B. Attend one (1) Public Meetings for each PROJECT Part. C. Prepare up to two (2) exhibits for each PROJECT Part for use in the public meeting. 6.2 Construction Support A. The ENGINEER will provide professional construction phase services to the CITY during construction of this project. The estimated construction period of the project is seventeen (17) months for the basis of establishing the ENGINEER's Fee. The construction phase services are as follows: 1. Pre -Construction Conference a. Prepare for and attend a pre -construction conference prior to commencement of Work at the Site 2. Visits to Site and Construction Observation — The ENGINEER will provide on -site construction observation services during the construction phase. The ENGINEER will make visits at intervals as directed by the CITY in order to observe the progress of the Work. Such visits and observations by the ENGINEER are not intended to be exhaustive or to extend to every aspect of Contractor's work in progress. Observations are to be limited to spot checking, selective measurement, and similar methods of general observation of the Work based on the ENGINEER's exercise of professional judgment. Based on information obtained during such visits and such observations, the ENGINEER will evaluate whether Contractor's work is generally proceeding in accordance with the Contract Documents, and the ENGINEER will keep the CITY informed of the general progress of the Work. 3. The purpose of the ENGINEER's site visits will be to enable the ENGINEER to better carry out the duties and responsibilities specifically assigned in this Agreement to the ENGINEER, and to provide the CITY a greater degree of confidence that the completed Work will conform in general to the Contract Documents. The ENGINEER shall not, during such visits or as a result of such observations of Contractor's work in progress, supervise, direct, or have control over Contractor's work, nor shall the ENGINEER have authority over or responsibility for the means, methods, CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 21 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 techniques, equipment choice and usage, sequences, schedules, or procedures of construction selected by Contractor, for safety precautions and programs incident to Contractor's work, nor for any failure of Contractor to comply with laws and regulations applicable to Contractor's furnishing and performing the Work. Accordingly, the ENGINEER neither guarantees the performance of any Contractor nor assumes responsibility for any Contractor's failure to furnish and perform its work in accordance with the Contract Documents. 4. Resident Project Representative. ENGINEER's role as Resident Project Representative will include furnishing a Resident Project Representative ("RPR") to assist ENGINEER in observing progress and quality of the work. a. The duties and responsibilities of the RPR are limited to those of ENGINEER in the Agreement with the CITY and in the Contract Documents, and are further limited and described as follows: b. General c. RPR is ENGINEER's agent at the Site, will act as directed by and under the supervision of ENGINEER, and will confer with ENGINEER regarding RPR's actions. It is assumed for the scope of this project that the RPR will perform an average of 3 site visits per week for construction observation. d. RPR's dealings in matters pertaining to a Contractor's work in progress shall in general be with ENGINEER and Contractor, keeping CITY advised as necessary e. RPR's dealings with subcontractors shall only be through or with the full knowledge and approval of Contractor f. RPR shall generally communicate with CITY with the knowledge of and under the direction of ENGINEER g. Schedules h. Review the progress schedule, schedule of Shop Drawing and submittals, and any other schedules prepared by Contractor and consult with the ENGINEER concerning acceptability i. Conferences and Meetings j. Attend meetings with Contractor, such as preconstruction conferences, progress meetings, job conferences and other project -related meetings, and prepare and circulate copies of minutes thereof k. Liaison I. Serve as ENGINEER's liaison with Contractor, working principally through Contractor's superintendent, and assist in providing information regarding the intent of the Contract Documents m. Assist ENGINEER in serving as CITY's liaison with Contractor when Contractor's operations affect CITY's on -site operations n. Assist in obtaining from CITY additional details or information, when required for proper execution of the Work CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 22 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 o. Interpretation of Contract Documents p. Report to ENGINEER when clarifications and interpretations of the Contract Documents are needed and transmit to Contractor clarifications and interpretations as issued by ENGINEER q. Shop Drawings and Submittals r. Maintain Shop Drawing and Submittal Record log s. Advise ENGINEER and Contractor of the commencement of any portion of the Work requiring a Shop Drawing or submittal for which RPR believes that the submittal has not been approved by ENGINEER t. Modifications u. Consider and evaluate Contractor's suggestions for modifications in Drawings or Specifications and report such suggestions, together with RPR's recommendations, to ENGINEER. Transmit to Contractor in writing decisions as issued by ENGINEER v. Review of Work and Rejection of Defective Work w. Conduct on -Site observations of Contractor's work in progress to assist ENGINEER in determining if the Work is in general proceeding in accordance with the Contract Documents x. Report to ENGINEER whenever RPR believes that any part of Contractor's work in progress will not produce a completed project that conforms generally to the Contract Documents or will imperil the integrity of the design concept of the completed Specific Project as a functioning whole as indicated in the Contract Documents, or has been damaged, or does not meet the requirements of any inspection, test or approval required to be made; and advise ENGINEER of that part of work in progress that RPR believes should be corrected or rejected or should be uncovered for observation, or requires special testing, inspection or approval y. Inspections, Tests, and System Start-ups z. Consult with ENGINEER in advance of scheduled major inspections, tests, and systems start-ups of important phases of the Work aa. Verify that tests, equipment, and systems start-ups and operating and maintenance training are conducted in the presence of appropriate CITY's personnel, and that Contractor maintains adequate records thereof bb. Observe, record, and report to ENGINEER appropriate details relative to the test procedures and systems start-ups cc. Accompany visiting inspectors representing public or other agencies having jurisdiction over a Specific Project, record the results of these inspections, and report to ENGINEER dd. Records CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 23 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 ee. Maintain at the Site orderly files for correspondence, reports of job conferences, reproductions of original Contract Documents including all Addenda, Change Orders, Field Orders, additional Drawings issued subsequent to the execution of the Contract, ENGINEER's clarifications and interpretations of the Contract Documents, progress reports, Shop Drawing and submittals received from and delivered to Contractor, and other Specific Project -related documents ff. Prepare a daily report or keep a diary or log book, recording Contractor's hours on the Site, weather conditions, data relative to questions of Change Orders, Field Orders, or changed conditions, Site visitors, daily activities, decisions, observations in general, and specific observations in more detail as in the case of observing test procedures; and send copies to ENGINEER gg. Record names, addresses, fax numbers, e-mail addresses, web site locations and telephone numbers of all Contractors, subcontractors, and major suppliers of materials and equipment hh. Maintain records for use in preparing project documentation ii. Upon completion of the Work, furnish original set of all RPR Specific Project documentation to ENGINEER jj. Reports kk. Furnish to ENGINEER periodic reports, as required, of progress of the Work and of Contractor's compliance with the progress schedule and schedule of Shop Drawing and submittals II. Draft and recommend to ENGINEER proposed Change Orders and Field Orders. Obtain backup material from Contractor mm. Furnish to ENGINEER and CITY copies of all inspection, test, and system startup reports nn. Immediately notify ENGINEER of the occurrence of any Site accidents, emergencies, acts of God endangering the Work, damage to property by fire or other causes, or the discovery of any Constituent of Concern oo. Payment Request — Not Included pp. Completion qq. Participate in a final inspection in the company of ENGINEER, CITY, and Contractor and prepare a final list of items to be completed and deficiencies to be remedied rr. Observe whether all items on the final list have been completed or corrected and make recommendations to ENGINEER concerning acceptance and issuance of the Notice of Acceptability of the Work ss. Resident Project Representative shall not: tt. Authorize any deviation from the Contract Documents or substitution of materials or equipment (including "or -equal" items) CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 24 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 uu. Exceed limitations of ENGINEER's authority as set forth in the Agreement or the Contract Documents vv. Undertake any of the responsibilities of a Contractor, subcontractors, suppliers, or a Contractor's superintendent ww. Advise on, issue directions relative to, or assume control over any aspect of the means, methods, techniques, sequences or procedures of the Contractor's work unless such advice or directions are specifically required by the Contract Documents xx. Advise on, issue directions regarding, or assume control over safety practices, precautions and programs in connection with the activities or operations of CITY or Contractor yy. Participate in specialized field or laboratory tests or inspections conducted off - site by others except as specifically authorized by ENGINEER zz. Accept Shop Drawings or submittals from anyone other than Contractor aaa. Authorize CITY to occupy a Specific Project in whole or in part bbb. Through such observations of Contractor's work in progress and field checks of materials and equipment by the RPR, ENGINEER shall endeavor to provide CITY a greater degree of confidence that the completed Work will conform in general to the Contract Documents. However, ENGINEER shall not, during such visits or as a result of such observations of Contractor's work in progress, supervise, direct, or have control over Contractor's work, nor shall ENGINEER have authority over or responsibility for the means, methods, techniques, equipment choice and usage, sequences, schedules, or procedures of construction selected by Contractor, for safety precautions and programs incident to Contractor's work, nor for any failure of Contractor to comply with laws and regulations applicable to Contractor's furnishing and performing the Work. Accordingly, ENGINEER neither guarantees the performance of any Contractor nor assumes responsibility for any Contractor's failure to furnish and perform its work in accordance with the Contract Documents. 5. Recommendations with Respect to Defective Work a. Provide recommendations to CITY that Contractor's work be disapproved and rejected while it is in progress if, on the basis of site visit evaluations, the ENGINEER believes such work will not produce a completed Project that conforms generally to Contract Documents or that it will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated in the Contract Documents. Notwithstanding the foregoing, the CITY reserves the right to disapprove or reject Contractor's work without a recommendation from the ENGINEER. 6. Clarifications and Interpretations a. Issue necessary clarifications and interpretations of the Contract Documents to CITY as appropriate to the orderly completion of Contractor's work. Such clarifications and interpretations will be consistent with the intent of the Contract CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 25 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 Documents. Any orders authorizing variations from the requirements of the Contract Documents will be made by CITY. 7. Change Orders a. Recommend change orders to CITY, as appropriate. b. Review and make recommendations related to Change Orders submitted or proposed by the Contractor. 8. Shop Drawings and Samples a. Review and approve or take other appropriate action in respect to Shop Drawings and Samples and other data which Contractor is required to submit, but only for conformance with the information given in the Contract Documents and compatibility with the design concept of the completed Project as a functioning whole as indicated in the Contract Documents. Such review and approvals or other action will not extend to means, methods, techniques, equipment choice and usage, sequences, schedules, or procedures of construction or to related safety precautions and programs. 9. Substitutes and `or -equal" a. Evaluate and determine the acceptability of substitute or "or -equal" materials and equipment proposed by Contractor in accordance with the Contract Documents, but subject to the provisions of applicable standards of state or local government entities. b. Provide recommendations to the CITY 10. Material Testing Coordination and Evaluation a. Maintain Report Log b. ENGINEER will maintain a log of test results as they are received. c. Coordination with Testing Lab and City d. ENGINEER will coordinate with Testing Lab regarding any discrepancies as well as timing of proposed testing. ENGINEER will notify CITY of failed tests. e. Review of Testing Reports f. ENGINEER will review materials testing reports as they are received to determine conformance with the Construction Contract Documents, and whether further clarification is required from the Testing Lab. g. Limitation of Responsibilities h. ENGINEER shall not be responsible for the acts or omissions of the City's testing lab. ENGINEER shall not have the authority or responsibility to direct the work of the City's testing lab 11. Disagreements between CITY and Contractor a. As necessary, the ENGINEER will, with reasonable promptness, render initial written decision on all claims of the CITY and Contractor relating to the CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 26 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 acceptability of Contractor's work or the interpretation of the requirements of the Contract Documents pertaining to the progress of the Contractor's work. In rendering such decisions, the ENGINEER will be fair and not show partiality to the CITY or Contractor and will not be liable in connection with any decision rendered in good faith in such capacity. The initial decision of the ENGINEER shall be required as a condition precedent to mediation or litigation of any claim arising prior to the date final payment is due to the Contractor, unless thirty (30) days have passed after a claim has been referred to the ENGINEER with no decision having been rendered. 12. Final Walkthrough and Punchlist Preparation a. Attend final walkthrough with Contractor and the CITY to determine if the completed work of Contractor is generally in accordance with the Contract Documents. b. Limitation of Responsibilities: The ENGINEER will not be responsible for the acts or omissions of any Contractor, or of any of their subcontractors, suppliers, or of any other individual entity performing or furnishing the work. The ENGINEER will not have the authority or responsibility to stop the work of any Contractor. c. Compile punch list from information gathered during final walkthrough with the CITY and Contractor. 13. Limitation of Responsibilities. ENGINEER shall not be responsible for the acts or omissions of any Contractor, or of any of their subcontractors, suppliers, or of any other individual or entity performing or furnishing the Work. ENGINEER shall not have the authority or responsibility to stop the work of any Contractor. 6.3 Record Drawings A. The ENGINEER shall prepare Record Drawings from information provided by the CITY depicting any changes made to the Final Drawings during construction B. The ENGINEER shall modify the Final Drawings electronically and shall place a stamp on the plans indicating that they represent Record Drawings of the project as constructed. The stamp shall be signed and dated by the ENGINEER and shall be placed on each plan sheet, whether there are any revisions on the sheet or not. Each sheet shall clearly indicate all changes which apply to that sheet by clouding and numbering, or other suitable means. C. The following disclaimer shall be included with the Record Drawing stamp: 1. These Record Drawings were prepared using information provided by others and represent the as constructed conditions to the extent that documented changes were provided for recording. The ENGINEER assumes no liability for undocumented changes and certifies only that the documented changes are accurately depicted on these drawings. D. The ENGINEER shall submit a set of sealed Final Drawings, modified and stamped as Record Drawings, on mylar for record storage. The ENGINEER may keep copies of the information provided by the CITY for their files, but all original red -lined drawings shall be returned to the CITY with the mylars. CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 27 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 E. PDF files shall be uploaded to the project's Record Drawings folder in e-Builders. 6.4 Assumptions A. One (1) construction contract will be awarded for each Project Part. B. ENGINEER will provide up to two (2) exhibits for one (1) virtual public meeting for each contract and prepare a listing of names and addresses of residents and businesses affected by the project. C. Ten (10) RFI's are assumed for each contract. D. Two (2) Change Orders are assumed for each contract. E. Thirty (30) Shop Drawings reviews are assumed for each contract. F. One (1) evaluation of substitutes is included for each contract. G. Twenty-eight (28) Site Observation Visits are assumed. H. One (1) PDF copy of full size (22"x34") record drawing plans will be delivered to the CITY for each construction contract. 6.5 Deliverables A. Public meeting exhibits B. Fifty-six (56) Progress Meeting Agendas and Notes C. Responses to Contractor's Requests for Information D. Review of Change Orders E. Review of shop drawings F. Record Drawings on PDF TASK 7. ROW/EASEMENT SERVICES ENGINEER will support and perform activities related to ROW and land as outlined below, per scoping direction and guidance from the CITY's Project Manager. 7.1 Right -of -Way Research A. The ENGINEER shall determine rights -of -way, easements needs for construction of the project. Required permanent easements will be identified based on available information and recommendations will be made for approval by the CITY. 7.2 Right-of-Way/Easement Preparation and Submittal. A. The ENGINEER shall prepare documents to be used to obtain right-of-way and permanent easements required to construct the improvements. B. The ENGINEER shall submit the right-of-way and/or easement documents to CITY PM for real property acquisition CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 28 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 C. The documentation shall be provided in conformance with the checklists and templates available on the CITY's e-Builders site. ASSUMPTIONS • Up to thirty (30) Easements (permanent or temporary construction easement) or right-of-way documents will be prepared. • CITY will provide Appraisals and Easement Acquisition services DELIVERABLES A. Easement exhibits and metes and bounds provided on CITY forms. B. Temporary Right of Entry Letters TASK 8. SURVEY ENGINEER will provide survey support as follows. 8.1 Design Survey A. ENGINEER will perform field surveys to collect horizontal and vertical elevations and other information needed by ENGINEER in design and preparation of plans for the project. Information gathered during the survey shall include topographic data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations, location of buried utilities, structures, trees 6-in and larger (measure caliper, identify overall canopy, and have qualified arborist identify species of trees), and other features relevant to the final plan sheets. Existing drainage at intersections will be verified by field surveys. Spot elevations will be shown on intersection layouts with cross slope to fit intersecting grade lines. B. The alignment centerline (or offset, as appropriate) will be staked in the field for areas of the alignment not adjacent to street right-of-way. C. The minimum survey information to be provided on the plans shall include the following: a. A Project Control Sheet, showing ALL Control Points, used or set while gathering data. Generally, on a scale of not less than 1:400: b. The following information about each Control Point; i. Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod) ii. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on CITY Datum only. iii. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 29 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 c. Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same coordinate system, as the Control. d. No less than two horizontal benchmarks, per line or location. e. Bearings given on all proposed centerlines, or baselines. f. Station equations relating utilities to paving, when appropriate. 8.2 Temporary Right of Entry Preparation and Submittal A. Temporary Right of Entry will be provided by the ENGINEER as described in Task 7. 8.3 Subsurface Utility Engineering (SUE): A. The SUE shall be performed in accordance with Cl/ASCE 38-02. B. Four different levels of SUE are identified. The following is a description of each level of SUE used on this project. a. Level D — Collect level D as part of this scope of services. b. Level C i. Field locate and obtain horizontal position of visible utility surface features for all of the utility systems described within Level D. c. Level B i. Indicate by marking with paint, the presence and approximate horizontal location of subsurface utilities using geophysical prospecting techniques, including electromagnetic, sonic, and acoustical techniques. ii. Approximately 4 days of direct buried utilities are identified for Level B location. d. Level A i. Location (Test Hole) Services: Locating the horizontal and vertical position of the utility by excavating a test hole using vacuum excavation techniques and equipment. In performing locating (test hole) services ENGINEER will: ii. Excavate two 2 test holes to expose the utility to be measured in such a manner that ensures the safety of the excavation and the integrity of the utility to be measured. Excavations will be performed using specially developed vacuum excavation equipment that is non-destructive to existing facilities. If contaminated soils are discovered during the excavation process, the ENGINEER will notify the CITY. Obtain X, Y and Z information at each test hole. ASSUMPTIONS Topographic survey will be extended 50-ft on either side of selected alignment. Topographic survey at intersection will include no more than 100 ft. in each direction. CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 30 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 • Level A Subsurface Utility Engineering will be performed for up to two (2) locations and 4 days of Level B Subsurface Utility Engineering. DELIVERABLES A. Copies of field survey data and notes signed and sealed by a licensed surveyor. B. Drawing of the project layout with dimensions and X, Y, and Z coordinate list., when applicable. C. SUE records and measurements will be uploaded to e-Builders. TASK 9. PERMITTING 9.1 TXDOT A. Prepare two (2) permits for utilities accommodation within TxDOT ROW in accordance with the TXDOT UAR. 9.2 Railroads A. Coordinate zero (0) railroad crossings. 9.3 Tarrant Regional Water District (TRWD) and U.S. Army Corp of Engineers (USACE) A. Prepare one (1) submittal to TRWD/USACE for each project consisting of the following: 1. Digital copies of each CITY PROJECT Part submittal (Conceptual, Preliminary, 90 percent and 100 percent Construction Plans) and provide to TRWD for review and comment. 2. Review and respond to one set of DR Checks comments for each submittal. 9.4 Park Land Conversion A. The ENGINEER will prepare and submit two (2) City of Fort Worth Park's Department Conversion Application including the following: 1. One (1) aerial exhibit indicating existing easements, tree save/removal areas, construction staging and storage areas, landscape areas, fences, signs, access points and all alternate alignment options. Proposed pipeline should be labeled with pipe size, linear footage of pipe, width of easement and boring/open cut locations. 2. One (1) CD including snapshot size color photographs of the existing conditions of the park property. 3. Explanation of use for any park road or property identifying duration and frequency of anticipated use as well as types of vehicles that will require access. Necessary signage plans and anticipated disruptions to traffic will also need to be submitted. 4. Proposed preservation, security, environmental protection and restoration plans for all staging and storage areas. CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 31 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 5. Letter of Request for Conversion 6. Letter of Permission to Survey 7. 8.5" x 11" Survey Exhibit for Park Board B. Legal Description, Copy of Deed and Copy of Plat/Abstract C. Stake proposed alignment, permanent boring locations and temporary workspaces for final approval. 9.5 United States Army Corps of Engineers (USACE) Permitting A. Cultural resource compliance (Section 106) — Part 13 Clear Fork Trinity River Crossing 1. Archeological Services a. Conduct a search of the Texas Archeological and Historic Sites Atlas, maintained by the THC and Texas Archeological Research Laboratory (TARL) to identify previously documented archeological sites, cemeteries, historical markers, properties and districts listed on the National Register of Historic Places (NRNP), and State Antiquities Landmarks (SALs). Results of the search will be integrated with soil information, topographic maps, aerial photographs, and other pertinent data into an Agency Coordination letter on behalf of the Tarrant Regional Water District and the City of Fort Worth. A recommendation of no additional archeological investigation or archeological monitoring during the bore pit excavation will be made at this level. b. Much of this area has been previously investigated and numerous impacts have occurred, including the straightening of the Trinity River at this location. However, if either the USACE or THC require the monitoring investigation, ENGINEER will follow the current guidelines as developed by the Council of Texas Archeologists and approved by the THC in April 2020. Archeological monitoring will only be conducted at the proposed bore pits to a depth of no more than 15 feet, as that level is well outside of cultural bearing strata as has been identified in previous archeological investigations in the same area. As the bore pits are being excavated, ENGINEER will watch for indication of archeological deposits, artifacts, or features that may occur within the bore pits. Photographs and detailed notes will be taken of each monitored bore pit, cultural aspects will be documented as observed. Should additional information be required a small sample of the aspect will be inspected more closely. c. A report of the findings will be prepared and submitted to the THC and USACE for review and concurrence. Final reports will be submitted once concurrence is received and submitted to THC. Survey shapefiles will be submitted to both THC and TARL for uploading to the Atlas in order to assist future researchers. TASK 10. HOLLY ANALYSIS There is no scope for the Holly Analysis included in this contract TASK 11. DEVELOPMENT ANALYSIS CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 32 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 11.1 Development Review Assistance A. Provide assistance for upcoming development projects in the Panther Island, Cultural District, and Downtown Areas. Based upon the recommended design criteria, the ENGINEER will assist the CITY to help determine what infrastructure improvements will be required associated with proposed developments. As an example, the ENGINEER will: 1. Review developer's water system analysis and input data into Holly water system model to analyze the impact of development to the existing water system, 2. Review developer's sanitary sewer analysis and input data into drainage basin to analyze the impact of development to the existing sanitary sewer system, 3. Prepare opinions of probable construction costs associated with the recommended infrastructure improvements, 4. Attend Community Facilities Agreement (CFA) or Pre -Development Conference meetings when requested, and 5. Review calculations associated with domestic and fire services for the proposed facilities. TASK 12. USACE FORT WORTH CENTRAL CITY CONSTRUCTION PROJECTS There is no scope for the USACE FWCC construction projects included in this contract. TASK 13. HAM BRANCH STUDY There is no scope for the Ham Branch Study included in this contract. TASK 14. PANTHER ISLAND SANITARY SEWER MASTER PLAN There is no scope for the Panther Island Sanitary Sewer Master Plan included in this contract. TASK 15. ADDITIONAL SERVICES There is no scope for the Additional Services included in this contract. TASK 16. PANTHER ISLAND REVISIONING 16.1 Panther Island Revisioning A. Provide assistance for the revisioning of Panther Island. The ENGINEER will: 1. Attend meetings with CITY, and other Panther Island Revisioning project partners. 2. Prepare documents associated with the Panther Island Revisioning as directed by the CITY. ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 33 OF 34 ATTACHEMENT A DESIGN SERVICES FOR FORT WORTH CENTRAL CITY PROJECT WATER AND SANTIARY SEWER RELOCATIONS CITY PROJECT NO. 104484 CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the Tasks above. However, ENGINEER can provide these services, if needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the PROJECT shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: A. Preparation of Permitting Documents and Coordination for Permits, not listed in Scope of Services. B. Negotiation of easements or property acquisition. C. Services related to development of the CITY's project financing and/or budget. D. Services related to disputes over pre -qualification, bid protests, bid rejection and rebidding of the contract for construction. E. Construction management and inspection services F. Performance of materials testing or specialty testing services. G. Services necessary due to the default of the Contractor. H. Services related to damages caused by fire, flood, earthquake or other acts of God. I. Services related to warranty claims, enforcement and inspection after final completion. J. Services to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. K. Performance of miscellaneous and supplemental services related to the PROJECT as requested by the CITY. CITY OF FORT WORTH, TEXAS ATTACHMENT A REVISION DATE: 08.22.14 PAGE 34 OF 34 EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) Design Services for Fort Worth Central City Water & Sanitary Sewer Relocations City Project No. 104484 Lump Sum Project Compensation A. The ENGINEER shall be compensated a total lump sum fee of $2,448,100.00 as summarized in Exhibit B-1 — Engineer Invoice and Section IV — Summary of Total Project Fees. The total lump sum fee shall be considered full compensation for the services described in Attachment A, including all labor materials, supplies, and equipment necessary to deliver the services. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment A. Partial payment shall be made to the ENGINEER monthly upon City's approval of an invoice prepared and submitted by the ENGINEER in the format and including content as presented in Exhibit B-1, Progress Reports as required in item 111. of this Attachment B, and Schedule as required in Attachment D to this Agreement. B. The estimated current physical percent complete as required on the invoice shall be calculated from the progress schedule as required in Attachment D to this Standard Agreement and according to the current version of the City of Fort Worth's Schedule Guidance Document. C. The cumulative sum of such monthly partial fee payments shall not exceed the total current project budget including all approved Amendments. D. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Water Department monthly progress reports and schedules in the format required by the City. ATTACHMENT B COMPENSATION IV. Summary of Total Project Fees Firm Primary Responsibility Prime Consultant Kimley-Horn and Design Management, Associates, Inc. Conceptual Design, Preliminary Design, Final Design, Bidding, and Construction Proposed MBE/SBE Sub -Consultants Gorrondona & Survey Associates, Inc. The Rios Group Subsurface Utility Engineering Jaster-Quintanilla, LLP Structural Engineering Geisler Partners Civil Engineering Consulting Engineers PIC Printing, LLC Printing Non-MBE/SBE Sub -Consultants CMJ, Inc. Geotechnical Investigation Riner Engineering, Inc. Geotechnical Investigation Bennett Trenchless Structural Engineering Engineers Black Mesa Cathodic Design Engineering & Consulting, PLLC Stantec Consulting Environmental Permitting Services Inc. V&A Consulting Odor Control Engineers, Inc. Project Number & Name CPN 104484 — Fort Worth Central City Water & Sanitary Sewer Relocations City MBE/SBE Goal = 10% City of Fort Worth, Texas Attachment B PMO Official Release Date: 8.09.2012 Page 3 of 4 TOTAL Fee Amount $1,752,288 71.6 $130,400 5.3 $10,000 0.4 $95,665 3.9 $180,330 7.4 $8,200 0.4 $17,800 0.7 $15,150 0.6 $155,147 6.3 $25,000 1.0 $33,120 1.4 $25,000 1.0 100% Total Fee MBE/SBE Fee MBE/SBE $2,448.100 $424.595 17.3% Consultant Committed Goal = 10% B-3 EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) Insert required invoice format following this page, including negotiated total budget and allocations of budgets across desired work types and work phases. City of Fort Worth, Texas Attachment B PMO Official Release Date: 8.09.2012 Page 4 of 4 C d Professional Services Invoice Project Manager: ILiam Conlon Project: Fort Worth Central City Water & Sanitary Sewer Relocations City Project #: 104484 1 City Sec Number: Company Name: IKimley-Horn and Associates, Inc. Supplier's PM: Carl DeZee Supplier Invoice #: Payment Request #: Service Date:From Service Date:To Invoice Date: Supplier Instructions: Summary Fill in green cells including Invoice Number, From and To Dates and the included worksheets When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. email: Carl.Dezee' imlev-horn.com Office AddreSS 801 Cherry St., Unit 11 Suite 1300, Fort Worth, TX 76102 Telephone: 817-339-2287 Fax: 817-335-5070 Remit Address P.O. Box 951640, Dallas, Texas 75395-1640 Agreement LTD Agreement Amendment Amount to Completed Percent ($) Invoiced Current Remaining Sheet FID and Work Type Description Amount Amount Date Amount Spent Previously Invoice Balance Work Type 1 Water $595,512.00 $595,512.00 $595,512.00 Work Type 2 Sewer $1,852,588.00 $1,852,588.00 $1,852,588.00 Work Type 3 Work Type 4 Work Type 5 Work Type 6 Totals This Invoice $2A48.100.00 $2.448.100.00 $2.448.100.00 Overall Percentage Spent: Professional Services Invoice Project Manager: Liam Conlon Project: Fort Worth Central City Water & Sanitary Sewer Relocations City Project #: 104484 Work Type Desc: lWater Supplier Instructions: FID: City Sec Number: Fill in green cells including Percent Complete and Invoiced Previously Ouanities Purchase Order: When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. Company Name: Kimley-Horn and Associates, Inc. Supplier's PM: Carl DeZee Supplier Invoice #: Payment Request #: Service Date:From Service Date:To Invoice Date: Pay Items 30 - Desiqn Description Totals This Unit email: Carl.Dezee@kimley-horn.com Office Address: 801 Cherry St., Unit 11 Suite 1300, Fort Worth, TX 76102 Telephone: 817-339-2287 Fax: 817-335-5070 Remit P.O. Box 951640, Dallas, Texas 75395-1640 Address: Agreement LTD Agreement Amendment Amendment Amount to Completed Amount Number Amount Date Amount $595,512.00 $595,512.00 $595,512.0o $595,512.00 Overall Percentage Spent: Percent ($) Invoiced I Current Spent Previously Invoice Remaining Balance $595,512.00 $595,512.00 Professional Services Invoice Project Manager: Liam Conlon Project: Fort Worth Central City Water & Sanitary Sewer Relocations City Project #: 104484 Work Type Desc: ISewer Supplier Instructions: FID: City Sec Number: Fill in green cells including Percent Complete and Invoiced Previously Quanities Purchase Order: When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. Company Name: Kimley-Horn and Associates, Inc. Supplier's PM: Carl Dezee Supplier Invoice #: Payment Request #: Service Date:From Service Date:To Invoice Date: Pay Items 30 - Desiqn Description Totals This Unit: email: Carl.Dezee@kimley-horn.com Office Address 801 CherrySt., Unit 11 Suite 1300, FortWorth, TX 76102 Telephone: 817-339-2287 Fax: 817-335-5070 Remit P.O. Box 951640, Dallas, Texas 75395-1640 Address: Agreement LTD Agreement Amendment Amendment Amount to Completed Amount Number Amount Date Amount $1,852,588.00 $1,852,588.00 $1,852,588.0o $1,852,588.0o Overall Percentage Spent: Percent ($) Invoiced Spent Previously Current Remaining Invoice Balance $1,852,588.00 $1,852,588.0o Task No. Task Description 1.0 IDesign Management Program Management Hart b Beach b4-Inch Water Line Hart 13 Bypass channel Segment U Fart 14 Bypass Channel Segment C Hart 24 University Fart 2b Clear cork Isolation Gate 2.0 konceptual Design (sd i ) Hrogram lvlanagement Fart b Beach 54-inch Water Line Fart 13 Bypass Channel Segment D Fart 14 Bypass Channel Segment G Hart 24 University Part 25 Clear Fork Isolation Gate 3.0 (Preliminary Uesign (eU%) Program Management Part 5 Beach 54-inch Water Line Part 13 Bypass Channel Segment D Part 14 Bypass channel Segment G Part 24 University Hart 2b clear Fork Isolation Gate 4.0 IFinal Uesign (9u%and 1uu%) Program lvlanagement Hart b Beach b4-inch Water Line Part 13 Bypass Channel Segment D Part 14 Bypass Channel Segment G Part 24 University Part 2b Clear Fork Isolation Gate 5.0 Bid Phase Services Program Management Part b Beach 54-inch Water Line Part 13 Bypass Channel Segment D City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FW WTR Official Release Date: 8.09.2012 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for FWCC Sum City Project No. 104484 Labor (hours) Principal Project Project EIT Technical Admin Total Labor Manager Engineer Support Cost Kate $370.00 $350.00 $295.00 $245.00 $150.00 $145.00- 1 01 3821 2501 1661 01 47 $255,506 0 382 250 166 0 47 $255,500 6 0 6 0 6 0 $0 0 0 0 0 0 0 $0 0 0 0 0 0 0 $0 0 0 0 0 0 0 $0 0 0 0 0 0 0 $0 I01 211 601 701 01 0 $42,500 0 0 0 0 0 0 $0 0 0 0 0 0 0 $6 0 0 0 0 0 0 $0 0 0 0 0 0 0 $0 0 21 60 70 0 0 $42,500 6 0 6 0 6 $0 I01 441 981 701 01 0 $62,200 0 0 0 0 0 0 $0 6 0 6 0 6 0 $0 0 0 0 0 0 0 $0 0 0 0 0 0 0 $6 0 44 98 70 0 0 $62,200 0 0 0 0 0 0 $0 I 41 1671 4281 5831 01 4 $331,406 0 0 0 0 0 0 $0 0 0 0 0 0 0 $0 4 167 428 586 6 $331,400 6 0 6 0 6 0 $0 0 0 0 0 0 0 $0 0 0 0 0 0 0 $6 0 37 63 16 0 10 $37,200 0 0 0 0 0 0 $0 0 0 0 0 0 0 $0 0 37 63 16 0 10 $37,200 Expense Subconsultant Travel / Total Task Sub MWBE Non-MWBE Markup Reproduction / Expense Cost Total Fees /Permitting $6,110 $0 $6901 $5,0001 $11,800 $267,30 $0 $0 $0 $5,00 $5,000 $260,50 $6 $0 $6 $o $0 $ $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $ $6,110 $0 $690 $0 $6,800 $6,80 $0 $0 $0 $0 $0 $ $81,0501 $01 $8,1501 $0 $89,200 $131,70 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $ $81,050 $0 $8,150 $0 $89,200 $131,70 $0 $0 $6 $o $0 $ $88,8001 $42,8001 $13,2001 $0 $144,800 $207,00 $0 $0 $0 $0 $0 $ $6 $0 $6 $o $0 $ $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $ $88,800 $42,800 $13,200 $0 $144,800 $207,00 $0 $0 $0 $0 $0 $ $70,1701 $104,8301 $17,4501 $0 $192,450 $523,85 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $ $70,176 $104,836 $17,456 $ $192,450 $523,85 $6 $0 $6 $o $0 $ $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $ $9,700 $10,100 $1,600 $0 $21,400 $58,60 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $ $9,700 $10,100 $1,600 $0 $21,400 $58,60 2/14/2024 Page 1 of 3 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for FWCC Sum City Project No. 104484 Labor (hours) Task Description Project Project Technical Total Labor Task No. Principal Manager Engineer EIT Admin Support Cost Mate $370.00 $350.00 $295.00 $245.00 $150.00 $145.00 Fart 14 Bypass Channel Segment C 0 0 0 0 0 0 $0 Part 24 University 0 0 0 0 0 0 $6 Fart 2b Clear Fork Isolation Gate 0 0 0 0 0 0 $0 6.0 (Construction Phase Services I 0 3611 9061 8791 8761 0 $741,000 Hrogram Management 0 0 0 0 0 0 $0 Fart b Beach b4-mch Water Line 0 0 0 0 0 0 $0 Hart 13 Bypass Channel Segment D 0 0 0 0 0 0 $0 Hart 14 Bypass Channel Segment G I 361 906 879 876 $741,000 Hart 24 University 6 0 6 0 6 0 $0 Hart 2b Clear Fork Isolation Gate 0 0 0 0 0 0 $0 7.0 IKUV1lrtasement Services I 0 171 341 611 01 0 $31,000 Hrogram Management 0 0 0 0 0 0 $0 Hart b Beach 54-inch Water Line 0 0 0 0 0 0 $6 Hart 13 Bypass Channel Segment D 0 6 12 30 0 0 $13,000 Hart 14 Bypass Channel Segment C 0 3 6 6 0 0 $4,300 Hart 24 University 0 8 16 25 0 0 $13,700 Hart 25 Clear Fork Isolation Gate 6 0 6 0 6 $0 8.0 Iburvey and but Services I 01 21 81 81 01 0 $5,200 Hrogram Management 0 0 0 0 0 0 $0 Hart 5 Beach 54-inch Water Line 6 0 6 0 6 0 $0 Hart 13 Bypass Channel Segment D 0 0 0 0 0 0 $0 Hart 14 Bypass Channel Segment C 0 0 0 0 0 0 $6 Hart 24 University 0 2 8 8 0 0 $5,200 Hart 2b Clear Fork Isolation Gate 0 0 0 0 0 0 $0 9.0 IHermittmg 1 0 371 111 1551 0 0 $84,100 Program Management 0 0 0 0 0 0 $0 Hart b Beach b4-mCh Water Line 0 0 0 0 0 0 $0 Hart 13 Bypass Channel Segment D 27 61 95 J 0 $53,300 Hart 14 Bypass Channel Segment G 0 0 6 0 $0 Hart 24 University 0 10 42 60 0 0 $30,800 Hart 2b Clear Fork Isolation Gate 0 0 0 0 0 0 $6 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FW WTR Official Release Date: 8.09.2012 Expense Subconsultant Travel / Total Task Sub Reproduction / Expense Total MWBE Non-MWBE Markup p Fees /Permitting Cost $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $ $23,5951 $80,3671 $10,1381 $6,650 $120,750 $861,75 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $ $23,595 $80,367 $10,136 $6,65 $120,750 $861,75 $6 $0 $6 $0 $0 $ $0 $0 $0 $0 $0 $ $58,6001 $01 $6,0001 $0 $64,600 $95,60 $0 $0 $0 $ $0 $ $0 $0 $0 $0 $ $ $25,300 $0 $2,550 $0 $27,850 $40,85 $4,500 $0 $450 $0 $4,950 $9,25 $28,800 $0 $3,000 $0 $31,800 $45,50 $6 $0 $6 $ $0 $ $71,8001 $01 $7,2001 $0 $79,000 $84,20 $0 $0 $0 $0 $0 $ $0 $0 $6 $0 $0 $ $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $ $ $71,800 $0 $7,200 $0 $79,000 $84,20 $0 $0 $0 $0 $0 $ $14,7701 $33,1201 $4,9101 $0 $52,800 $136,90 $0 $0 $0 $0 $0 $ $0 $0 $0 $0 $0 $ $5,000 $33,126 $3,880 $ $42,000 $95,30 $0 $0 $6 $0 $0 $ $9,770 $0 $1,030 $0 $10,800 $41,60 $0 $0 $0 $0 $ 1 $ 2/14/2024 Completed Percent Amount Complete t Page 2 of 3 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for FWCC Sum City Project No. 104484 Labor (hours) Expense Task Description Task No. Principal Kate $370.00 Project Manager $350.00 Project Engineer $295.00 EIT $245.00 Technical Support $150.00 Total Labor Subconsultant Admin Cost MWBE Non-MWBE Markup $145.00 Total Travel / Task Sub Expense Reproduction / Cost Total Fees /Permitting 11.0 Development Assistance 0 40 30 30 0 2 $30,500 $0 $0 $0 $700 $700 $31,200 Development Assistance 0 40 30 30 0 2 $30,500 $0 $0 $0 $700 $700 $31,200 16.0 an er s an evisiomng 0 60 50 50 0 3 $48,500 $0 $0 $0 $1,500 $1,500 $50,000 an er son evisioning 0 60 50 50 0 3 $48,500 $0 $0 $0 $1,500 $1,500 $50,000 u o a 4 1168 2038 2088 876 66 rl—,669,l 00,742-4,5951 $271,217 $69,3381 13,850 779,000 1 2,448,100 2/14/2024 Completed Percent Amount Complete Totals:1 $2,448,100 1 $0.001 0.00% Water Line Footage 7,9701 37% Sewer Line Footage 13,7751 63 % 21,745 100% (A) Total Fee $2,448,100 (B) Survey Fee $84,200 (C) Total Fee (-) survey Fee $2,363,900 Water Fee (34 % of C) ISewer Fee (66 % of C $529,836.00 $1,834,064.00 Project Summary PM $341,700 Total Hours 6,240 Part 5 $0 Description WP Water Sewer Total Labor $1,669,100 Part 13 $718,600 Design 30 $595,51eZ00 $1,852,588.00 Total Expense $779,000 Part 14 $871,000 Total $2,448, 00.00 MWBE Subconsultant $424,595 Part 24 $516,800 Non-MWBE Subconsultant $271,217 Part 25 $0 Water Sewer Total MWBE Participation 17.3% Sum $2,448,100 FWCC $407'945.00 $1,621,835.00 $2,029,780.00 1 Non-FWCC $187,567.00 $230,753.00 $418,320.00 M/WBE Goal 10% Total $595,512.00 $1,852,588.00 $2,448,100.00 Amendments No. 1 June 2024 - Parts 5 & 13 Construction and Design Management No. 2 October 2025 - Part 24 Construction, Part 25 Design, and Design Management No. 3 March 2027 - Part 25 Construction City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FW WTR Official Release Date: 8.09.2012 Page 3 of 3 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for FWCC Program Management City Project No. 104484 Labor(hours) Expense Task Description Task No. Principal htatE9 $370.00 Project Manager $350.00 Project Engineer $295.00 EIT $245.00 Technical Support $150.00 Total Labor Subconsultant Admin Cost MWBE Non-MWBE Markup $145.00 Travel / Total Task Sub Reproduction / Expense Total Cost Fees /Permitting 1.0 Design Management - 12 months 0 3821 250 1661 0 47 1.1 Kick-off Meetings (1 - Parts 24) 2 2 4 2 1.2 Regular Period Meetings 1.2.1 Monthly City Progress Meetings 36 18 18 1.2.2 Semi-monthly TRWD PDT Meetings 72 72 36 18 1.2.3 Monthly Franchise Utility Meetings 18 1.2.4 Monthly TRWD/City PM Progress Meetings 72 1.2.5 Quarterly USACE Coordination Meetings 9 5 1.3 City Reporting 1.3.1 Prepare Monthly Progress Reports 9 9 1.3.2 Monthly Schedule Update 9 1.3.3 M/WBE Reporting 9 18 1.3.4 Invoicing 1.4 TRWD Program Reporting 1.4.1 Project Cost Monthly Update 18 9 1.4.2 Monthly City Actuals 9 18 18 1.4.3 Monthly Contracted & Reimbursement Tracking g 18 18 Yearly TRWD Request for Reimbursement 20 24 24 1.4.4 Quarterly CIP Coordination 24 1.4.5 Quarterly TRWD Schedule Review 12 12 12 1.5 Coordination with other City Consultants 54 72 36 $255,500 $0 $01 $0 $5,000 $5,000 $260,500 $2,600 $2,000 $1,500 $1,500 $0 $2,600 $0 $2,000 $2,000 $22,400 $0 $22,400 $57,900 $0 $57,900 $6,300 $0 $6,300 $25,200 $0 $25,200 $4,700 $0 $4,700 $0 $1,500 $1,500 $4,500 $0 $4,500 $3,200 $0 $3,200 $5,800 $0 $5,800 $0 $0 $0 $0 $1,500 $1,500 $9,000 $0 $9,000 $12,900 $0 $12,900 $12,900 $0 $12,900 $20,000 $0 $20,000 $8,400 $0 $8,400 $10,700 $0 $10,700 $49,000 $0 $49,000 2.0 Conceptual Design 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 3.0 re immary esign 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 4.0 ma esign o an 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 5.0 i ase ervices 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 6.0 Construction Phase Services 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 1 $0 $0 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 2/14/2024 Page 1 of 2 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for FWCC Program Management City Project No. 104484 Labor (hours) Expense Task Description Task No. Principal rtatE9 $370.00 Project Manager $350.00 Project Engineer $295.00 Err $245.00 Technical Support $150.00 Total Labor Subconsultant Admin Cost MWBE Non-MWBE Markup $145.00 Travel / Total Task Sub Reproduction / Expense Total Cost Fees /Permitting 7.0ROW/Easement Services 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 8.0 7577-5-y-a-n= services 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 9.0 ermrthng 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 11.0 eve opment Assistance Development Assistance 0 40 30 30 0 2 $30,500 $0 $0 $0 $700 $700 $31,200 40 30 30 2 $30,500 $700 $700 $31,200 16.0 Panther Island Kevisioning Hantner Island Hevisioning 0 60 50 50 0 3 $48,500 $0 $0 $0 $1,500 $1,500 $50,000 60 50 50 3 $48,500 $1,5001 $1,5001 $50,000 Subtotall 0 482 330 246 0 52 $334,500 0 0 0 $7,2001 $7,2001 $341,700 Description Design Total City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 Water Line Footage 1001 5091, Sewer Line Footage 1001 50 % 2001 100 (A) Total Fee $341,700 (B) Survey Fee $0 (C) Total Fee (-) survey Fee $341,700 Water Fee (50 % of C) Sewer Fee (50 % of Cl $17C 1 $170,850.00 1 WP Water Sewer 30 $170,850.00 $170,850.00 $341,7 0.00 Water Sewer Total FWCC $130,250.00 $130,250.00 $260,500.00 Non-FWCC $40,600.00 $40,600.00 $81,200.00 Total $170,850.00 $170,850.00 $341,700.00 2/14/2024 Completed Percent Amount Complete Totals:1 $341,700 0.00 020 Project Summary Total Hours 1,110 Total Labor $334,500 Total Expense $7,200 MWBE Subconsultan j $0 Non-MWBE Subconsultan $0 MWBE Participation l 0.0% Page 2 of 2 Task No. Task Description Rate 1.0 Design Management 1.1 managing the ream 2.0 Conceptual Design (su%) 2.1 Data Uoilection 3.0 Preliminary Design (bu %) 3.1 Preliminary Design Drawings 4.0 anal Design (90% ana 1uu%) 4.1 Preliminary Design (60%) Comments 4.2 90 % Design Drawings 4.2.1 Cover 4.2.2 Sheet Index and General Notes 4.2.3 Shutdown & Phasing Notes 4.2.4 Control and Benchmarks 4.2.5 Bypass Pumping Plan 4.2.6 Overall Existing Map (W&SS) (2) 4.2.7 Abandonment (W & SS) (2) 4.2.8 Ex. And Prop Easement Layout (2) 4.2.9 Easement Vacations (1) 4.2.10 Prop Water Plan & Prof (1) Restraint Length (DI/Conc/Steel) 4.2.10 Prop SS Plan & Prof (12) 4.2.11 Standard Details 4.2.12 Project Spec. Details 4.2.12.1 Siphon Structure (4) 4.2.12.2 Junction Structure (5) 4.2.12.3 Aerial Crossing (1) 4.2.12.4 Bypass Pumping/Flow Diversion 4.2.12.5 Trenchless Water -Tight Shafts (4) 4.2.12.6 Tunneling 4.2.12.7 Odor Control 4.2.12.8 Geotechnical 4.2.13 Surface Repair (2) City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for FWCC Part 13 Bypass Channel Segment D Sanitary Sewer Relocations City Project No. 104484 Labor(hours) Expense Project Project Technical Total Labor Subconsultant Travel / TotalTask Sub Principal Manager Engineer EIT Support Admin Cost Reproduction / Expense Total MWBE Non-MWBE Markup Cost $370.00 $350.00 $295.00 $245.00 $150.00 $145.00 Fees / Permitting 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $ $0 $0 $ 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $ $0 $0 $ 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $ $0 $0 $ $0 $0 $ 4 167 428 583 0 4 $331,400 $70,170 $104,830 $17,450 $0 $192,450 $523,85 5 20 20 $12,600 $0 $12,60 1 1 2 2 4 8 1 1 3 2 4 2 4 2 4 1 2 1 8 12 1 4 12 60 96 4 12 4 16 12 5 20 5 5 20 5 10 15 20 10 10 10 10 10 10 10 10 10 2 4 2 1 10 30 $3,900 $300 $1,100 $1,600 $1,600 $1,600 $800 $5,700 $1,600 $45,500 $4,200 $0 $69,170 $6,930 $9,1 $M $M $12,c $M $8,c $8,c $10, $64,680 $6,470 $25,000 $2,500 $15,150 $1,550 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $76,100 $0 $0 $0 $0 $0 $71,150 $27,500 $16, 700 $0 $1,1 $1,6 $1,6 $1,6 $5, $1, $76,1 $9,1 $19,1 $10,7 2/14/2024 Page 1 of 4 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for FWCC Part 13 Bypass Channel Segment D Sanitary Sewer Relocations City Project No. 104484 Labor (hours) Expense Task No. Task Description Kate Project Principal Manager $370.00 $350.00 Project Engineer $295.00 EIT $245.00 Technical Support Admin $150.00 $145.00 Total Labor Cost Subconsultant Travel / MWBE Non-MWBE Markup Reproduction / Fees / Permitting TotalTask Expense Cost Sub Total 4.2.14 Traffic Control Plans (8) 4 8 32 96 $37,300 $0 $37,30' Traffic Control Details (15) 1 4 8 $3,500 $0 $3,50, 4.2.15 Trail Detour Plan (5) 5 20 30 $15,000 $0 $15,001 4.2.15 Tree Protection and Removal Plan (2) 1 4 12 $4,500 $0 $4,50, 4.2.15 Construction Access (2) 1 4 12 $4,500 $0 $4,501 4.2.16 Erosion Control and Details 1 10 16 $7,300 $0 $7,30, 4.2.17 90% Project Manual $0 $0 $1 4.2.17.1 Division 00 2 8 2 $3,600 $0 $3,60i 4.2.17.2 Division 01 2 8 2 $3,600 $0 $3,60 4.2.17.3 Divisions 20-49 6 8 2 $5,000 $0 $5,00 4.2.17.4 Non-Std. Specs 8 8 2 $5,700 $0 $5,70 4.2.17.5 Appendix 2 8 2 $3,600 $0 $3,60� 4.2.18 Quantities/OPCC 2 4 8 $3,900 $0 $3,90, 4.2.19 QA/QC and Revisions $0 $0 $1 4.2.20 Deliverables 2 4 8 2 $4,200 $500 $500 $4,70, 4.2.21 Public Meeting Prep/Exhibits 4 4 16 $6,500 $0 $6,50i 4.2.22 Review with City/Meeting Notes 4 4 6 $4,100 $0 $4,10i 4.2.23 Review with TRWD/Meeting Notes 2 2 4 $2,300 $0 $2,30' 4.2.24 Construction Plan Review (1) 4 4 8 $4,600 $0 $4,60, 4.2.25 Review 90% City Design Comments $0 $0 $1 4.3 100% Design Drawings 15 30 60 $28,800 $0 $28,80, 4.3.1 100% OPCC 2 4 8 $3,900 $0 $3,901 4.3.2 100% Project Manual 15 30 $14,100 $0 $14,10, 4.3.3 Deliverables 2 4 8 2 $4,200 $500 $500 $4,70 NEW- Pid Phase Services 0 37 63 16 01 0 $37,200 $9,700 $10,100 $1,600 $0 $21,400 $58,60 5.1 Bid Support $0 $0 $ 5.1.1 Upload Plans to BIM 360 2 $600 $0 $60, 5.1.2 Print Hardcopies (6) 2 $2,100 $600 $2,100 $2,701 5.1.3 Maintain Plan holders List 1 6 $1,200 $0 $1,20, 5.1.4 Answer/Respond to Bidding Questions 6 10 $5,500 $10,100 $1,600 $5,100 $17,200 $22,30, 5.1.5 Prequalificaitons 20 20 $12,900 $0 $12,90, 5.1.5 Issue Addenda 4 4 $2,600 $0 $2,60 5.1.6 Prepare for and Attend Pre -Bid Meeting 2 2 $1,300 $0 $1,30i 5.1.6.1 Tabulate bids and review 2 4 $1,200 $0 $1,20 5.1.7 Recommend/References 2 4 $1,900 $0 $1,90i City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 2/14/2024 Page 2 of 4 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for FWCC Part 13 Bypass Channel Segment D Sanitary Sewer Relocations City Project No. 104484 Labor(hours) Expense Task Description Project Project Technical Total Labor Subconsultant Task No. Principal Man- a En-i--- EIT c ��� � Admin 1- 2/14/2024 Travel / Total Task Sub Completed Percent Expense Reproduction / Total Amount Complete 5.1.8 5.2 Kate Precertification Requirements Final Design Drawings $370.00 " "u $350.00 2 1 "'y""` $295.00 6 10 $245.00 16 ....... $150.00 $145.00 -- $2,500 $7,300 MWBE $2,100 Non-MWBE Markup Fees / Permitting Cost $0 $2,100 $2,500 $9,400 6.0 Construction Phase Services 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 Not included in this Contract $0 $0 $0 $0 $0 $0 $0 $0 $0 7.0 ROW/Easement Services 0 6 12 30 0 0 $13,000 $25,300 $0 $2,550 $0 $27,850 $40,850 7.1 7.2 7.2.1 7.3 7.4 7.4.1 Research$0 KOW/casement Preparation/Submittal Permanent/ I emporary (22) 1 emporary Kight of Entry (See I ask 8.1) coordination with Heal Property Aerial Exhibits (U) 6 12 30 $25,300 $2,550 $0 $0 $0 $0 $0 $13,000 $27,850 $40,850 $0 $0 $0 $0 $0 $0 $0 $0 $0 8.0 Survey an Services 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 8.1 Design urvey $0 $0 $0 $0 9.0 Permitting 0 27 69 95 0 0 $53,300 $5,000 $33,120 $3,880 $0 $42,000 $95,300 9.1 9.1.2 9.1.3 9.2 9.2.1 9.2.2 9.3 9.4 TRWD/USACE Final90% Final100% Park Land Conversion Tree Survey Stake Easements 7xDOT Permit 1 exas Historical Commission 2 2 4 2 2 15 10 4 12 8 2 8 25 6 4 30 16 2 12 25 $0 $5,000 $33,120 $500 $3,380 $0 $0 $5,200 $0 $5,200 $2,900 $0 $2,900 $12,300 $0 $12,300 $7,000 $0 $7,000 $1,100 $5,500 $6,600 $6,000 $0 $6,000 $18,800 $36,500 $55,300 u ota 4 237 572 724 0 14 434,900 110,170 148,050 25,480 0 283,700 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 718,600 Totals: 718,600 1 $0.001 0.00% Page 3 of 4 EXHIBIT B-2 2/14/2024 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for FWCC Part 13 Bypass Channel Segment D Sanitary Sewer Relocations City Project No. 104484 Labor (hours) Expense Task Description Project Project Technical Total Labor Total Subconsultant Travel / Task Sub Completed Percent Task No. Principal Manager Engineer EIT Support Admin Cost Reproduction / Expense MWBE Non-MWBE Markup Cost Total Amount Complete Rate $370.00 $350.00 $295.00 $245.00 $150.00 $145.00 Fees /Permitting Non -Standard Design items Water Line Footage 150 3% Tunneling: $100,650 Sewer Line Footage 5,800 97 % Odor Control: $36,400 5,950 100% Subsurface Utility Excavation: $0 Structural (Aerial Crossing and Junction Structures) $121,400 (A) Total Fee $718,600 Traffic Control: $55,800 (B) Survey Fee $0 USACE, TxDOT, & THC Permiting: $95,300 (C) Total Fee (-) survey Fee $718,600 Standard Design $309,050 Water Fee (3% of C) Sewer Fee (97% of C $/LF: $51.9 $21,558.00 $697,042.00 Project Summary Total Hours 1,551 Description WP Water Sewer Total Labor $434,900 Design 30 $2t,558.00 $697,042.00 Total Expense $283,700 Total $718,6 0.00 MWBE Subconsultant $110,170 Non-MWBE Subconsultant $148,050 Water Sewer Total MWBE Participation 15.3% FWCC $15,677.00 $506,889.00 $522,566.00 Non-FWCC $5,881.00 $190,153.00 $196,034.00 Total $21,558.00 $697,042.00 $718,600.00 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 Page 4 of 4 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for FWCC Part 14 Bypass Channel Segment C Sanitary Sewer Relocations City Project No. 104484 Labor (hours) Expense Task No. Task Description Kate Principal $370.00 Project Manager $350.00 Project Engineer $295.00 EIT $245.00 Technical Support $150.00 Admin $145.00 Total Labor Cost Subconsultant MWBE Non-MWBE Markup Travel / Reproduction / Fees /Permitting Total Expense Cost Task Sub Total 1.0 1.1 Design Management (24 Months Design) Managing the I earn 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 2.0 2.1 oncep ua esign Data Collection 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 3.0 3.1 re immary esign Preliminary Design Drawings 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 4.0 4.1 Final Design o an o Final uesign Revisions 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 5.0 5.1 i ase ervices bid Support 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 6.0 6.1 6.2 ons ruc ion ase Services Construction Support Attend Preconstruction Conference Attend Public Meeting Prepare exhibits (2) Pre -Con Meeting On -Site Observations (1/2/1/mo @ 2hrs) Progress Meetings (1.5hr/mtg, 4mtg/mo) Shop Drawing Review (50) Review Materials Testing Reports RFls (10) Change Orders (1) Final Walkthrough Punch List Follow Up Walkthrough RPR Coordination Record Drawings Revisions Deliverables 01 3611 2 1 4 34 102 25 10 20 4 4 1 2 146 4 906 2 2 1 4 68 102 75 10 30 8 4 4 2 584 10 879 2 5 2 2 34 102 50 30 30 8 4 2 2 584 20 2 876 876 0 $741,000 $23,595 $80,367 $10,138 $6,650 $120,750 $861,750 $0 $2,500 $20,995 $80,367 $10,138 $6,650 $100 $0 $0 $1,800 $2,500 $4,300 $2,600 $0 $2,600 $1,200 $1,200 $3,100 $3,100 $40,300 $40,300 $90,800 $90,800 $43,200 $111,500 $154,700 $13,800 $0 $13,800 $23,200 $0 $23,200 $5,800 $0 $5,800 $3,600 $0 $3,600 $2,100 $0 $2,100 $1,800 $0 $1,800 $497,900 $6,650 $504,550 $0 $100 $100 $9,300 $0 $9,300 $500 $0 $500 $0 $0 $0 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 2/14/2024 Completed Percent Amount Complete Page 1 of 2 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for FWCC Part 14 Bypass Channel Segment C Sanitary Sewer Relocations City Project No. 104484 Labor (hours) Expense Task Description Task No. Principal Mate $370.00 Project Manager $350.00 Project Engineer $295.00 EIT $245.00 Technical Support $150.00 Total Labor Subconsultant Admin Cost MWBE Non-MWBE Markup $145.00 Total Travel / Task Sub Expense Reproduction / Cost Total Fees /Permitting 7.0 ROW Easement Services 0 3 6 6 0 0 $4,300 $4,500 $0 $450 $0 $4,950 $9,250 7.1 7.2 ROW Research$0 Easement Preparation Vacations 3 6 6 $4,500 $450 $0 $0 $4,300 $4,950 $9,250 8.0 Survey and SUE Services 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 9.0 ermrt m9 01 01 01 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 SO $0 u o a 0 364 912 885 876 0 745,300 28,095 80,367 10,588 6,650 125,700 871,000 Description Design Total City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 Water Line Footage 0 0% 00 Sewer Line Footage 5,795 1 5,795 100% (A) Total Fee $871,000 (B) Survey Fee $0 (C) Total Fee (-) survey Fee $871,000 Water Fee (0% of C) Fewer Fee (100% of C $0.00 1 $871,000.00 WP Water Sewer 30 $0.00 $871,000.00 $871, 00.00 Water Sewer Total FWCC $0.00 $871'000.00 $871,000.00 Non-FWCC $0.00 $0.00 $0.00 Total $0.00 $871,000.00 $871,000.00 2/14/2024 Completed Percent Amount Complete Totals: $871,0001 $0.001 0.00% Project Summary Total Hours 3,037 Total Labor $745,300 Total Expense $125,700 MWBE Subconsultanf $28,095 Non-MWBE Subconsultant $80,367 MWBE Participation 3.2% Page 2 of 2 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for FWCC Part 24 University Water and Sanitary Sewer Lines City Project No. 104484 Labor(hours) Expense Task No. Task Description Kate Principal $370.00 Project Manager $350.00 Project Engineer $295.00 EIT $245.00 Technical Support $150.00 Admin $145.00 Total Labor Cost Subconsultant MWBE Non-MWBE Markups Travel / Reproduction / Fees /Permitting Total Expense Cost Task Sub Total 1.0 Design Management 0 0 0 0 0 0 $0 $6,110 $0 $690 $0 $6,800 $6,800 1.1 1.2 Kick -Off MeetingKick- uesign Suhmittal Keview Meetings (s) 0 1,750 $4,360 250 $440 2,000 2,000 $0 $4,800 $4,800 2.0 Conceptual Design 0 21 60 70 0 0 $42,500 $81,0501 $0 $8,150 $0 $89,200 $131,700 2.1 2.2 2.2.1 2.2.2 2.2.3 2.2.4 2.2.5 2.2.6 2.2.7 2.2.8 2.2.9 2.2.10 2.2.11 2.2.12 2.2.13 Data Collection Conceptual Design Package Cover Sheet Index and General Notes Shutdown & Phasing Notes Control and Benchmarks Overall LOG & Prop Sht Ket (3) Overall Existing Map (W&SS) (4) Abandonment (vv&SS) (3) Prop Easement Layout (1) Easement vacations (u) Prop Water Plan & Prot (11) Prop SS Plan & Prot (4) OPCC Deliverables 10 2 8 1 30 4 1 2 1 20 15 2 3 4 2 40 4 $0 $80,850 $200 $8,150 $0 $0 $16,100 $89,000 $105,100 $0 $0 $0 $0 $0 $0 $2,400 $0 $2,400 $0 $0 $0 $1,100 $0 $1,100 $1,600 $0 $1,600 $800 $0 $800 $0 $0 $0 $0 $0 $0 $18,500 $0 $18,500 $0 $0 $0 $2,000 $0 $2,000 $0 $200 $200 3.0 Preliminary Design 01 441 981 701 01 0 $62,200 $88,800 $42,800 $13,200 $0 $144,800 $207,000 3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.1.6 3.1.7 3.1.8 3.1.9 3.1.10 3.1.10 3.1.10 3.1.11 Preliminary Design Drawings Cover Sheet Index and General Notes Shutdown & Phasing Notes Control and Benchmarks Overall LOG & Prop Sht Ref (W&SS) (3) Overall Existing Map (W&SS) (4) Abandonment (W&SS) (3) Prop Easement Layout (1) Easement Vacations (1) Prop Water Plan & Prof (11) Restraint Length (DI/Conc/Steel) Prop SS Plan & Prof (4) Standard Details 6 1 4 4 6 14 4 1 2 1 20 8 12 5 2 3 4 2 40 $7,500 $77,600 $7,800 $85,400 $92,900 $0 $0 $0 $0 $0 $0 $2,100 $0 $2,100 $0 $0 $0 $1,100 $0 $1,100 $1,600 $0 $1,600 $800 $0 $800 $0 $0 $0 $0 $0 $0 $17,100 $0 $17,100 $3,800 $0 $3,800 $5,700 $0 $5,700 $0 $0 $0 CRy of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 2/14/2024 Page 1 of 4 EXHIBIT B-2 2/14/2024 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for FWCC Part 24 University Water and Sanitary Sewer Lines City Project No. 104484 Labor (hours) Expense Task Description Project Project Technical Total Labor Subconsultant Travel/ TotalTask Sub Completed Percent Task No. Principal Manager Engineer EIT Support Admin Cost MWBE Non-MWBE Markup Reproduction / Expense Cost Total Amount Complete Kate $370.00 $350.00 $295.00 $245.00 $150.00 $145.00 Fees / Permitting 3.1.12 Project Spec. Details $0 $0 $0 3.1.13 Junction Structures Structure (3) 6 12 6 $7,200 $11,000 $1,100 $12,100 $19,300 3.1.14 Specifications 4 4 $2,600 $0 $2,600 3.1.15 QA/QC and Revisions $0 $0 $0 3.2 Geotechnical 2 4 2 $2,400 $17,800 $1,800 $19,600 $22,000 3.3 Tunneling $0 $0 $0 3.4 Cathodic Protection Study 2 4 4 $2,900 $25,000 $2,500 $27,500 $30,400 3.5 Constructability Review $0 $0 $0 3.6 Utility Clearance 1 2 2 $1,500 $0 $1,500 3.7 OPCC 1 2 $1,000 $0 $1,000 3.8 Deliverables 1 2 $1,000 $200 $200 $1,200 3.9 Review with City/Meeting Notes 4 4 $2,600 $0 $2,600 3.10 Review with I RVVD/Meeting Notes 2 2 $1,300 $0 $1,300 4.0 Final Design o an 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 Not included in this Contract $0 $0 $0 $0 $0 $0 $0 $0 $0 5.0 Bid Phase Services 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 Not included in this Contract $0 $0 $0 $0 $0 $0 $0 $0 $0 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FW WTR Official Release Date: 8.09.2012 Page 2 of 4 Task No. 6.0 7.0 7.1 7.2 7.2.1 7.2.2 7.2.3 7.3 7.4 7.4.1 8.0 8.1 8.2 8.3 9.0 9.1 9.1.1 9.1.1 9.1.2 9.1.3 9.2 9.2.1 9.2.2 9.3 Task Description Construction Phase Services Not included in this Contract RUW/tasement Services ROW Research ROW/Easement Preparation/Submittal Permanent (8) Temporary (5) Vacation (3) Temporary Right of Entry (See Task 8.1) Coordination with Real Property Aerial Exhibits (0) Survey and SUE services Design Survey Temporary Right of Entry Subsurtace Utility txcavatlon lPermrttmg TRW D/USACE Conceptual 30 Preliminary 60 Final 90 Final 100 Park Land Conversion Tree Survey Stake Easements I xUU I Hermit • Subtotall City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 EXHIBIT B-2 2/14/2024 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for FWCC Part 24 University Water and Sanitary Sewer Lines City Project No. 104484 Labor(hours) Expense Project Project Technical Total Labor Subconsultant Travel/ TotalTask Sub Completed Percent Principal Manager Engineer Err Support Admin Cost Reproduction / Expense Total Amount Complete MWBE Non-MWBE Markups Cost Rata $370.00 $350.00 $295.00 $245.00 $150.00 $145.00 Fees /Permitting 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 8 161 25 0 0 $13,700 $28,800 $0 $3,000 $0 $31,800 $45,500 $0 $0 $0 $0 $0 $0 4 8 12 $6,700 $14,400 $1,500 $15,900 $22,600 3 5 8 $4,500 $9,000 $900 $9,900 $14,400 1 3 5 $2,500 $5,400 $600 $6,000 $8,500 0 2 8 8 1 4 4 1 4 4 0 10 42 60 2 10 6 2 10 6 4 12 30 2 8 16 2 2 01 851 2241 2331 0 0 0� $71,800 $61,800 $10,000 $9,770 $4,770 $0 $7,200 $6,200 $1,000 $0 $1,030 $530 $12,300 $7,000 $1,100 $5,000 $500 $0 1 $1154,40111$286,3301 $42,8001$33,2701 $79,000 $84,200 $68,000 $70,600 $0 $0 $11,000 $13,600 $10,800 $41,600 $5,3001 $5,300 $12, $7, $6, 1 1 $362,401AI $516,800 1 Totals:l $516,8001 1 $0.001 0.00 r' Page 3 of 4 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for FWCC Part 24 University Water and Sanitary Sewer Lines City Project No. 104484 Labor (hours) Task No. Task Description Principal Project Project Err Technical Admin Total Labor Manager Engineer Support Cost Rate $370.00 $350.00 $295.00 $245.00 $150.00 $145.00 Water Line Footage 1 7,8201 78 % Sewer Line Footage 2,1801 22 % 10,000 100 (A) Total Fee $516,800 (B) Survey Fee $84,200 (C) Total Fee (-) survey Fee $432,600 Water Fee (78 % of C) ISewer Fee (22 % of C1 $337,428.00 $95,172.00 1 Description WP Water Sewer Design 30 $403,104.00 $113,696.00 Total $516, 00.00 Water Sewer Total FWCC $262'018.00 $113,696.00 $375,714.00 Non-FWCC $141,086.00 $0.00 $141,086.00 1 Total $403,104.00 $113,696.00 $516,800.00 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 Expense Subconsultant Travel / Total Task Sub MWBE Non-MWBE Markups Reproduction/ Expense Cost Total Fees / Permitting Non -Standard Design items Geotechnical: $22,000 Cathodic Protection Study: $30,400 Subsurface Utility Excavation: $13,600 Junction Structures: $19,300 Traffic Control: $0 USACE & TxDOT Permiting: $41,600 Standard Design $389,900 $/LF: $39.0 Project Summary Total Hours 542 Total Labor $154,400 Total Expense $362,400 MWBE Subconsultant $286,330 Non-MWBE Subconsultant $42,800 MWBE Participation 55.4% 2/14/2024 Completed Percent Amount Complete Page 4 of 4 EXHIBIT B-3 Engineer's Opinion of Probable Construction Cost Design Services for Fort Worth Central City Water and Sanitary Sewer Relocations City Project No. 104484 Kimley-Horn and Associates, Inc. Opinion of Probable Construction Cost E ent: City of Fort Worth Date: 2/14/2024 Project: Fort Worth Central City Water and Sanitary Sewer Relocations Prepared By: CTD A No.: 061018052 Checked By: CTD IlTitle: Summary �I Project Description Total Water Part 13 - Channel Segment D Water Line Relocation 150 LF $130,000 Part 24 - University Water Line Relocation 4,490 LF $3,600,000 University Cast Iron Water Line Replacement 3,710 LF $4,900,000 Water Total 8,350 LF $8,630,000 Sanitary Sewer Part 13 - Channel Segment D Sanitary Sewer Relocations 5,430 LF $32,830,000 Part 24 - University Sanitary Sewer Relocation 2,180 LF $4,600,000 Sanitary Sewer Total 7,610 LF $37,430,000 Project Total 15,960 $46,060,000 Basis for Cost Projection: 0 No Design ❑ Preliminary Design ❑ Final Design This total does not reflect engineering or technical services The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinions of probable costs. K:\FTW_Marketing\Fort_Worth\2022_FWCC\WKS\Exhibit B-3 OPCC Summary_2024-01-19-No-Part-5or14.xls Kimley-Horn and Associates, Inc. Opinion of Probable Construction Cost E ent: City of Fort Worth Date: 11/10/02023 Project: FWCC Part 13 - Channel Segment D Water & Sanitary Sewer Relocations Prepared By: LEV A No.: 061018052 Checked By: CTD Title: 60% Design Summary JProject Description Total Sanitary Sewer Sanitary Sewer Improvements 5,427 LF $32,830,000 Total Sanitary Sewer $32,830,000 Water Water Improvements 150 LF $130,000 Total Water $130,000 Project Total $32.960.000 FWCC Cost FWCC Sanitary Sewer Improvements 4,063 LF $26,210,000 Water Improvements 150 LF $130,000 Total FWCC $26,340,000 Non-FWCC Cost Non-FWCC Sanitary Sewer Improvements 1,364 LF $6,620,000 Total Non-FWCC $6,620,000 Project Total $32.960.000 Basis for Cost Projection: 0 Conceptual Design Ed Preliminary Design 0 Final Design This total does not reflect engineering or technical services. The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinions of probable costs. Kimley-Horn and Associates, Inc. Client: City of Fort Worth Project: FWCC Part 13 - Channel Segment D Water & Sanitary Sewer Relocations KHA No.: 061018052 (Title: Water Improvements Line No. I Description 1 3311.0556 16" DIP Water, Select Backfill (Restrained Joints) 2 3312.3006 16" Gate Valve w/Vault 3 3311.0001 Ductile Iron Water Fittings w/Restraint 4 0241.1016 Remove 16" Water Line 5 3312.0106 Connection to Existing 16" Water Main 6 3125.0101 SWPPP >_ 1 acre 7 0171.0101 Construction Staking 8 0171.0102 As -Built Survey 9 3305.0109 Trench Safety ❑ Conceptual Design 0 Preliminary Design ❑ Final Design This total does not reflect engineering or technical services. Opinion of Probable Construction Cost Date: 11 /10/02023 Prepared By: LEV Checked By: CTD Spec. No. Quantity Unit Unit Price II Cost r 33 11 10 150 LF $350.00 $52,500 33 1220 1 EA $20,000.00 $20,000 331111 1 TON $8,500.00 $8,500 0241 14 110 LF $50.00 $5,500 33 12 01 2 EA $2,000.00 $4,000 31 2500 1 LS $5,000.00 $5,000 01 71 23 1 LS $2,000.00 $2,000 01 71 23 1 LS $2,000.00 $2,000 33 05 10 150 LF $10.00 $1.500 Subtotal: $101,000 IiContinq. (%,+/-) 20 II $29.000 1 (Total II $130,00011 The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinions of probable costs. Kimley-Horn and Associates, Inc. E ent: City of Fort Worth Project: FWCC Part 13 - Channel Segment D Water & Sanitary Sewer Relocations A No.: 061018052 IITitle: Sanitary Sewer Improvements Opinion of Probable Construction Cost Date: 11110112023 Prepared By: LEV Checked By: CTD Line No. Description Spec. No. Quantity Unit Unit Price Cost 1 3331.4803 72" Fiberglass Sewer Pipe, Select Backfill 3331 13 101 LF $1,450.00 $146,450 2 3331.4724 66" Fiberglass Sewer Pipe, Deep Trench Backfill 3331 13 1,097 LF $1,550.00 $1,700,350 3 3305.3018 66" Sewer Carrier Pipe 33 05 24 188 LF $1,100.00 $206,800 4 3331.4710 60" Fiberglass Sewer Pipe, Select Backfill 3331 13 1,013 LF $1,350.00 $1,367,550 5 3331.4710 60" Fiberglass Sewer Pipe, Deep Trench Backfill 3331 13 315 LF $1,500.00 $472,500 6 3305.3017 60" Sewer Carrier Pipe 33 05 24 973 LF $950.00 $924,350 7 3331.4610 54" Fiberglass Sewer Pipe, Select Backfill 3331 13 270 LF $1,300.00 $351,000 8 3331.4609 54" Fiberglass Sewer Pipe, CSS Backfill 3331 13 835 LF $1,500.00 $1,252,500 9 3305.3016 54" Sewer Carrier Pipe 33 05 24 265 LF $900.00 $238,500 10 3331.4423 36" Fiberglass Sewer Pipe, Select Backfill 3331 13 80 LF $1,150.00 $92,000 11 3305.3013 36" Sewer Carrier Pipe 33 05 24 265 LF $800.00 $212,000 12 3331.4335 27" Fiberglass Sewer Pipe, Select Backfill 3331 13 25 LF $1,100.00 $27,500 13 9999.0003 84" Casing By Other Than Open Cut (Open -Shield 33 05 22 123 LF $3,800.00 $467,400 Pipejacking) 14 9999.0003 84" Casing By Other Than Open Cut (Henderson Bridge 33 05 22 188 LF $3,300.00 $620,400 Crossing) 15 3305.xxxx 78" Casing By Open Cut 33 05 22 550 LF $2,500.00 $1,375,000 16 9999.0000 78" Casing By Aerial Crossing 33 05 22 300 LF $2,000.00 $600,000 17 3305.1112 72" Casing By Other Than Open Cut (Open -Shield 33 05 22 265 LF $3,650.00 $967,250 Pipejacking) 18 3305.1109 54" Casing By Other Than Open Cut (Open -Shield 33 05 22 265 LF $3,200.00 $848,000 Pipejacking) 19 9999.0000 Aerial Crossing Supports 03 30 00 7 EA $100,000.00 $700,000 20 9999.0006 Shaft Excavation and Support - STA 28+55 33 05 41 1 LS $2,200,000.00 $2,200,000 (Secant Pile / Cutter Soil Mixed) 21 9999.0006 Shaft Excavation and Support - STA 31+50 33 05 41 1 LS $3,000,000.00 $3,000,000 (Secant Pile / Cutter Soil Mixed) 22 3339.0002 Epoxy Structure Liner 33 39 60 13,403 SF $40.00 $536,120 23 3339.0001 Epoxy Manhole Liner 291 VF $500.00 $145,500 24 9999.XXXX Odor Control 1 LS $100,000.00 $100,000 25 3339.1205 6' Type A Manhole 33 39 10, 33 39 20 14 EA $30,000.00 $420,000 26 3339.1203 6' Extra Depth Manhole 33 39 10, 33 39 20 207 VF $500.00 $103,500 27 3339.2101 8' Polymer Concrete Manhole 33 39 21 5 EA $220,000.00 $1,100,000 28 3339.2001 Sanitary Sewer Junction Structure A - STA 0+00 (Line A) 33 39 10, 33 39 20 1 LS $1,000,000.00 $1,000,000 29 3339.2001 Sanitary Sewer Junction Structure B - STA 13+26 (Line A) 33 39 10, 33 39 20 1 LS $600,000.00 $600,000 31 3339.2001 Sanitary Sewer Junction Structure C - STA 27+47 (Line A) 33 39 10, 33 39 20 1 LS $500,000.00 $500,000 32 3339.2001 Sanitary Sewer Siphon Structure D-1 - STA 28+21 (Line A) 33 39 10, 33 39 20 1 LS $600,000.00 $600,000 33 3339.2001 Sanitary Sewer Siphon Structure D-2 - STA 31+90 (Line A) 33 39 10, 33 39 20 1 LS $600,000.00 $600,000 33 39 10, 33 39 20 34 3339.2001 Sanitary Sewer Junction Structure E-1 - STA 1+17.90 (Line B) 1 LS $600,000.00 $600,000 35 33339.2001 Sanitary Sewer Junction Structure E-2 - STA 12+75.95 (Line 33 39 10, 33 39 20 1 LS $800,000.00 $800,000 36 9999.0006 Subway Stand Structure Removal N/A 1 LS $5,000.00 $5,000 37 9999.0007 Billboard Removal and Relocation N/A 1 LS $10,000.00 $10,000 38 0241.2001 Sanitary Line Grouting 0241 14 280 CY $300.00 $84,000 39 0241.2027 Remove 54" Sewer Line 0241 14 285 LF $250.00 $71,250 40 0241.2022 Remove 27" Sewer Line 0241 14 35 LF $200.00 $7,000 41 0241.2117 54" Sewer Abandonment Plug 0241 14 30 EA $2,000.00 $60,000 42 0241.2202 Remove Sanitary Sewer Manhole 0241 14 9 EA $6,000.00 $54,000 43 0241.2302 Remove Sanitary Sewer Junction Structure 0241 14 2 LS $30,000.00 $60,000 44 3110.0103 12"-18" Tree Removal 31 1000 2 EA $750.00 $1,500 45 3201.0113 6' Wide Asphalt Pvmt Repair, Residential 3201 17 1,464 LF $80.00 $117,120 46 3201.0201 Asphalt Pvmt Repair Beyond Defined Width, Residential 3201 17 3,617 SY $120.00 $433,987 47 3201.0127 10' Wide Asphalt Pvmt Repair, Arterial 3201 17 928 LF $100.00 $92,800 48 3201.0201 Asphalt Pvmt Repair Beyond Defined Width, Arterial 3201 17 1,532 SY $150.00 $229,800 49 3216.0101 6" Conc Curb and Gutter 32 16 13 800 LF $45.00 $36,000 50 3301.0001 Pre -CCTV Inspection 33 01 31 4,630 LF $12.00 $55,560 51 3301.0002 Post -CCTV Inspection 3301 31 5,430 LF $8.00 $43,440 52 3303.0001 Bypass Pumping 33 03 10 1 LS $500,000.00 $500,000 53 3301.0101 Manhole Vacuum Testing 3301 30 24 EA $500.00 $12,000 Kimley-Horn and Associates, Inc. E ent: City of Fort Worth Project: FWCC Part 13 - Channel Segment D Water & Sanitary Sewer Relocations A No.: 061018052 JlTitle: Sanitary Sewer Improvements Line No. Description 54 3305.0112 Concrete Collar 55 3305.0113 Trench Water Stops 56 9999.000X TRWD Trail Repair 57 3471.0001 Traffic Control 58 3471.0002 Portable Message Sign 59 0171.0101 Construction Staking 60 0171.0102 As -Built Survey 61 3305.0104 Ground Water Control 62 3305.0109 Trench Safety 63 3292.0400 Seeding, Hydromulch 64 9999.0011 Landscape Restoration 65 3125.0101 SWPPP >_ 1 acre ❑ Conceptual Design 0 Preliminary Design ❑ Final Design This total does not reflect engineering or technical services. Opinion of Probable Construction Cost Date: 11/10/020231 Prepared By: LEV Checked By: CTD Spec. No. Quantity Unit I Unit Price 1f Cost 33 05 17 17 EA $2,500.00 $42,500 33 05 15 3 EA $5,000.00 $15,000 321320 1,095 SF $25.00 $27,375 3471 13 4 MO $10,000.00 $40,000 347113 16 WK $1,000.00 $16,000 01 71 23 1 LS $20,000.00 $20,000 01 71 23 1 LS $20,000.00 $20,000 33 05 10 1 LS $300,000.00 $300,000 33 05 10 4,286 LF $10.00 $42,860 3292 13 12,173 SY $5.00 $60,863 N/A 1 LS $20,000.00 $20,000 31 2500 1 LS $5.000.00 $5.000 Subtotal: $27,357,724 Contina. (%,+/-) 20 II $5,472,276 JTotal II $32,830,000 The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinions of probable costs. Kimley-Horn and Associates, Inc. E ent: City of Fort Worth Project: FWCC Part 13 - Channel Segment D Water & Sanitary Sewer Relocations A No.: 061018052 IITitle: FWCC Sanitary Sewer Improvements Opinion of Probable Construction Cost Date: 11110112023 Prepared By: LEV Checked By: CTD Line No. Description Spec. No. Quantity Unit Unit Price Cost 1 3331.4803 72" Fiberglass Sewer Pipe, Select Backfill 3331 13 0 LF $1,450.00 $0 2 3331.4724 66" Fiberglass Sewer Pipe, Deep Trench Backfill 3331 13 0 LF $1,550.00 $0 3 3305.3018 66" Sewer Carrier Pipe 33 05 24 0 LF $1,100.00 $0 4 3331.4710 60" Fiberglass Sewer Pipe, Select Backfill 3331 13 224 LF $1,350.00 $302,400 5 3331.4710 60" Fiberglass Sewer Pipe, Deep Trench Backfill 3331 13 1,201 LF $1,500.00 $1,801,500 6 3305.3017 60" Sewer Carrier Pipe 33 05 24 1,038 LF $950.00 $986,100 7 3331.4610 54" Fiberglass Sewer Pipe, Select Backfill 3331 13 0 LF $1,300.00 $0 8 3331.4611 54" Fiberglass Sewer Pipe, Deep Trench Backfill 3331 13 0 LF $1,450.00 $0 9 3331.4609 54" Fiberglass Sewer Pipe, CSS Backfill 3331 13 0 LF $1,500.00 $0 10 3305.3016 54" Sewer Carrier Pipe 33 05 24 0 LF $900.00 $0 11 3331.4523 48" Fiberglass Sewer Pipe, Select Backfill 34 05 24 0 LF $1,250.00 $0 12 3331.4524 48" Fiberglass Sewer Pipe, Deep Trench Backfill 3331 13 0 LF $1,400.00 $0 13 3305.3015 48" Sewer Carrier Pipe 33 05 24 0 LF $850.00 $0 14 3331.4509 42" Fiberglass Sewer Pipe, CSS Backfill 3331 13 755 LF $1,400.00 $1,057,000 15 3331.4510 42" Fiberglass Sewer Pipe, Select Backfill 3331 13 235 LF $1,200.00 $282,000 16 3331.4528 42" Fiberglass Sewer Pipe, Deep Trench Backfill 3331 13 0 LF $1,350.00 $0 17 3305.3014 42" Sewer Carrier Pipe 3431 13 265 LF $825.00 $218,625 18 3331.4423 36" Fiberglass Sewer Pipe, Select Backfill 3331 13 80 LF $1,150.00 $92,000 19 3305.3013 36" Sewer Carrier Pipe 33 05 24 265 LF $800.00 $212,000 20 3331.4335 27" Fiberglass Sewer Pipe, Select Backfill 3331 13 0 LF $1,100.00 $0 21 9999.0003 84" Casing By Other Than Open Cut (Open -Shield 33 05 22 0 LF $3,800.00 $0 Pipejacking) 22 3305.xxxx 78" Casing By Open Cut 33 05 22 550 LF $2,500.00 $1,375,000 23 9999.0000 78" Casing By Aerial Crossing 33 05 22 300 LF $2,000.00 $600,000 24 9999.0003 72" Casing By Other Than Open Cut (Henderson Bridge 33 05 22 188 LF $3,150.00 $592,200 Crossing) 25 3305.1112 72" Casing By Other Than Open Cut (Open -Shield 33 05 22 0 LF $3,650.00 $0 Pipejacking) 26 3305.1110 60" Casing By Other Than Open Cut (Open -Shield 33 05 22 265 LF $3,350.00 $887,750 Pipejacking) 27 3305.1010 60" Casing By Open Cut 33 05 22 0 LF $1,500.00 $0 28 9999.0000 60" Casing By Aerial Crossing 33 05 22 0 LF $1,450.00 $0 29 3305.1109 54" Casing By Other Than Open Cut (Open -Shield 33 05 22 265 LF $3,200.00 $848,000 Pipejacking) 30 9999.0000 Aerial Crossing Supports 03 30 00 7 EA $100,000.00 $700,000 31 9999.0006 Shaft Excavation and Support - STA 13+65 33 05 41 0 LS $3,000,000.00 $0 (Secant Pile / Cutter Soil Mixed) 32 9999.0006 Shaft Excavation and Support - STA 18+08 33 05 41 0 LS $1,900,000.00 $0 (Secant Pile / Cutter Soil Mixed) 33 9999.0006 Shaft Excavation and Support - STA 28+55 33 05 41 1 LS $2,200,000.00 $2,200,000 (Secant Pile / Cutter Soil Mixed) 34 9999.0006 Shaft Excavation and Support - STA 31+50 33 05 41 1 LS $3,000,000.00 $3,000,000 (Secant Pile / Cutter Soil Mixed) 35 3339.0002 Epoxy Structure Liner 33 39 60 11,046 SF $40.00 $441,840 36 3339.0001 Epoxy Manhole Liner 277 VF $500.00 $138,500 37 9999.XXXX Odor Control 1 LS $75,000.00 $75,000 38 3339.1205 6' Type A Manhole 33 39 10, 33 39 20 8 EA $30,000.00 $240,000 39 3339.1203 6' Extra Depth Manhole 33 39 10, 33 39 20 128 VF $500.00 $64,000 40 3339.2101 8' Polymer Concrete Manhole 33 39 21 2 LS $220,000.00 $440,000 41 3339.2001 Sanitary Sewer Junction Structure A - STA 0+00 (Line A) 33 39 10, 33 39 20 1 LS $1,000,000.00 $1,000,000 42 3339.2001 Sanitary Sewer Siphon Structure B-1 - STA 13+26 (Line A) 33 39 10, 33 39 20 1 LS $600,000.00 $600,000 43 3339.2001 Sanitary Sewer Siphon Structure B-2 - STA 18+38 (Line A) 33 39 10, 33 39 20 0 LS $600,000.00 $0 44 3339.2001 Sanitary Sewer Junction Structure C - STA 27+47 (Line A) 33 39 10, 33 39 20 1 LS $500,000.00 $500,000 45 3339.2001 Sanitary Sewer Siphon Structure D-1 - STA 28+21 (Line A) 33 39 10, 33 39 20 1 LS $600,000.00 $600,000 46 3339.2001 Sanitary Sewer Siphon Structure D-2 - STA 31+90 (Line A) 33 39 10, 33 39 20 1 LS $600,000.00 $600,000 Kimley-Horn and Associates, Inc. E ent: City of Fort Worth Project: FWCC Part 13 - Channel Segment D Water & Sanitary Sewer Relocations A No.: 061018052 IITitle: I Line No. 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 FWCC Sanitary Sewer Improvements Description 3339.2001 Sanitary Sewer Junction Structure E-1 - STA 1+17.90 (Line B) 3339.2001 Sanitary Sewer Junction Structure E-2 - STA 12+75.95 (Line B) 9999.0006 Subway Stand Structure Removal 9999.0007 Billboard Removal and Relocation 0241.2001 Sanitary Line Grouting 0241.2027 Remove 54" Sewer Line 0241.2022 Remove 27" Sewer Line 0241.2117 54" Sewer Abandonment Plug 0241.2202 Remove Sanitary Sewer Manhole 0241.2302 Remove Sanitary Sewer Junction Structure 3110.0103 12"-18" Tree Removal 3201.0113 6' Wide Asphalt Pvmt Repair, Residential 3201.0201 Asphalt Pvmt Repair Beyond Defined Width, Residential 3201.0127 10' Wide Asphalt Pvmt Repair, Arterial 3201.0201 Asphalt Pvmt Repair Beyond Defined Width, Arterial 3216.0101 6" Conc Curb and Gutter 3301.0001 Pre -CCTV Inspection 3301.0002 Post -CCTV Inspection 3303.0001 Bypass Pumping 3301.0101 Manhole Vacuum Testing 3305.0112 Concrete Collar 3305.0113 Trench Water Stops 9999.000X TRWD Trail Repair 3471.0001 Traffic Control 3471.0002 Portable Message Sign 0171.0101 Construction Staking 0171.0102 As -Built Survey 3305.0104 Ground Water Control 3305.0109 Trench Safety 3292.0400 Seeding, Hydromulch 9999.0011 Landscape Restoration 3125.0101 SWPPP >_ 1 acre ❑ Conceptual Design 0 Preliminary Design ❑ Final Design This total does not reflect engineering or technical services. Opinion of Probable Construction Cost Date: 11 /10/02023 Prepared By: LEV Checked By: CTD r( Spec. No. Quantity Unit 33 39 10, 33 39 20 0 LS 33 39 10, 33 39 20 0 LS N/A N/A 0241 14 0241 14 0241 14 0241 14 0241 14 0241 14 31 1000 3201 17 3201 17 3201 17 3201 17 321613 33 01 31 3301 31 33 03 10 3301 30 33 05 17 33 05 15 32 13 20 3471 13 3471 13 01 71 23 01 71 23 33 05 10 33 05 10 32 92 13 N/A 31 25 00 1 1 0 285 0 16 4 0 2 1,434 3,283 903 1,498 800 4,230 4,066 1 14 10 3 845 4 16 1 1 1 3,045 5,383 1 1 Subtotal: Continq. (% (Total LS LS CY LF LF EA EA LS EA LF SY LF SY LF LF LF LS EA EA EA SF MO WK LS LS LS LF SY LS LS Unit Price Cost $600,000.00 $800,000.00 $5,000.00 $10,000.00 $300.00 $250.00 $200.00 $2,000.00 $6,000.00 $30,000.00 $750.00 $80.00 $120.00 $100.00 $150.00 $45.00 $12.00 $8.00 $350,000.00 $500.00 $2,500.00 $5,000.00 $25.00 $10,000.00 $1,000.00 $20,000.00 $20,000.00 $300,000.00 $10.00 $5.00 $20,000.00 $5.000.00 20 $0 $0 $5,000 $10,000 $0 $71,250 $0 $32,000 $24,000 $0 $1,500 $114,720 $393,907 $90,300 $224,700 $36,000 $50,760 $32,528 $350,000 $7,000 $25,000 $15,000 $21,125 $40,000 $16,000 $20,000 $20,000 $300,000 $30,450 $26,913 $20,000 $5.000 II $21,837,067 $4,372,933 II $26,210,000 The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinions of probable costs. EXHIBIT B-3 Engineer's Opinion of Probable Construction Cost Design Services for Fort Worth Central City Water and Sanitary Sewer Relocations City Project No. 104484 Kimley-Horn and Associates, Inc. Opinion of Probable Construction Cost E ent: City of Fort Worth Date: 11/9/2025 Project: University Drive - FWCC Part 24 Wtr & Swr and Cast Iron Water Line Replacement Prepared By: CTD A No.: 061018052 Checked By: CTD IlTitle: Summary Project Description Total FWCC Part 24 Water Line Relocations FWCC Part 24 Sanitary Sewer Relocations University Cast Iron Water Line Replacement Basis for Cost Projection: 21 No Design ❑ Preliminary Design ❑ Final Design This total does not reflect engineering or technical services 4,490 LF $3,600,000 2,180 LF $4,600,000 FWCC Total $8,200,000 3,710 LF $4,900,000 Project Total $13,100,000 The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinions of probable costs. K:\FTW_Marketing\Fort_Worth\2022_FWCC\WKS\Exhibit B-3 OPCC_University_FWCC-&-Cast-Iron-Replacement-2023-11-09.xls EXHIBIT B-3 Engineer's Opinion of Probable Construction Cost Design Services for Fort Worth Central City Water and Sanitary Sewer Relocations City Project No. 104484 Kimley-Horn and Associates, Inc. Opinion of Probable Construction Cost lient: City of Fort Worth Date: 11/9/2023 Project: E University Drive - FWCC Part 24 Wtr & Swr and Cast Iron Water Line Replacement Prepared By: CTD HA No.! 061018052 Checked By: CTD 11Title: FWCC Part 24 Water Line Relocations �I Line No. Description Quantity Unit Unit Price Cost 1 0241.0100 Remove Sidewalk 0241 13 40 SF $4.00 $160 2 0241.0401 Remove Concrete Drive 0241 13 1,200 SF $4.00 $4,800 3 0241.1012 Remove 6" Water Line 0241 14 30 LF $10.00 $300 4 0241.1013 Remove 8" Water Line 0241 14 1,849 LF $10.00 $18,490 5 0241.1018 Remove 20" Water Line 0241 14 2,240 LF $75.00 $168,000 6 0241.1001 Water Line Grouting 0241 14 193 CY $300.00 $57,900 7 0241.1300 Remove Conc Curb&Gutter 0241 15 30 LF $10.00 $300 8 0241.1302 Remove 6" Water Valve 0241 14 4 EA $750.00 $3,000 9 0241.1303 Remove 8" Water Valve 0241 14 2 EA $750.00 $1,500 10 0241.1353 Salvage 20" Water Valve 0241 14 2 EA $2,000.00 $4,000 11 0241.1510 Salvage Fire Hydrant 0241 14 1 EA $1,500.00 $1,500 12 0241.1514 Salvage 2" Water Meter 0241 14 3 EA $400.00 $1,200 13 3201.0121 4' Wide Asphalt Pvmt Repair, Arterial 3201 17 1,685 LF $75.00 $126,375 14 3201.0122 5' Wide Asphalt Pvmt Repair, Arterial 3201 17 2,230 LF $85.00 $189,550 15 3201.0203 Asphalt Pvmt Repair Beyond Defined Width, 3201 17 1,670 SY $150.00 $250,500 Industrial 16 3201.0616 Conc Pvmt Repair, Arterial/Industrial 3201 17 90 SY $150.00 $13,500 17 3292.0400 Seeding, Hydromulch 3201 17 2,660 SY $5.00 $13,300 18 3213.0301 4" Conc Sidewalk 3201 17 40 SF $20.00 $800 19 3213.0400 5" Concrete Driveway 32 13 20 1,200 SF $25.00 $30,000 20 3216.0101 6" Conc Curb and Gutter 32 16 13 30 LF $45.00 $1,350 21 3304.0002 Cathodic Protection 33 04 12 1 LS $50,000.00 $50,000 22 3305.0101 Fire Hydrant Stem Extension 33 05 14 5 EA $500.00 $2,500 23 3305.0103 Exploratory Excavation of Existing Utilities 33 05 30 2 EA $2,500.00 $5,000 24 3305.0109 Trench Safety 33 05 10 2,964 LF $10.00 $29,640 25 3305.1103 20" Casing By Other Than Open Cut 33 05 22 558 LF $700.00 $390,600 26 3305.1107 42" Casing By Other Than Open Cut 33 05 22 205 LF $800.00 $164,000 27 3305.2002 8" Water Carrier Pipe 33 05 24 558 LF $155.00 $86,490 28 3305.2007 24" Water Carrier Pipe 33 05 24 205 LF $250.00 $51,250 29 3311.0001 Ductile Iron Water Fittings w/ Restraint 3311 11 20 TON $8,500.00 $170,000 30 3311.0161 6" PVC Water Pipe 3311 12 20 LF $90.00 $1,800 31 3311.0242 8" Water Pipe, CSS Backfill 33 11 10, 33 11 12 1,447 LF $180.00 $260,460 32 3311.0251 8" DIP Water 3311 10 100 LF $190.00 $19,000 33 3311.0644 24" Water Pipe (Restrained Joints) 33 11 10, 33 11 12, 33 11 13, 33 11 14 2,160 LF $425.00 $918,000 34 3312.0001 Fire Hydrant 33 12 40 2 EA $4,000.00 $8,000 35 3312.2201 2" Water Service, Meter Reconnection 33 12 10 3 EA $2,000.00 $6,000 36 3312.2203 2" Water Service 331210 3 EA $1,500.00 $4,500 37 3312.3002 6" Gate Valve 33 12 20 2 EA $2,000.00 $4,000 38 3312.3003 8" Gate Valve 33 12 20 8 EA $2,500.00 $20,000 39 3312.3008 24" Gate Valve w/ Vault 33 12 20 3 EA $30,000.00 $90,000 40 3312.6002 6" Blow Off Valve 33 12 60 1 EA $15,000.00 $15,000 Subtotal: $3,182,,65 0 No Design Contincl. (%.+/-) 30 $962,035 ❑ Preliminary Total $3,190,000 ❑ Final Design Escalation 2022 to 2024 $410,000 Total Escalated $3,600,000 This total does not reflect engineering or technical services. The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinions of probable costs. K:\FNJ_Marketing\Fort_W orth\2022_FW CC\W KS\Exhibit B-3 OPCC_University_FW CC-&-Cast-Iron-Replacement-2023-11-09.xis EXHIBIT B-3 Engineer's Opinion of Probable Construction Cost Design Services for Fort Worth Central City Water and Sanitary Sewer Relocations City Project No. 104484 Kimley-Horn and Associates, Inc. Opinion of Probable Construction Cost ent: City of Fort Worth Date: 11/9/2023 Project: E University Drive - FWCC Part 24 Wtr & Swr and Cast Iron Water Line Replacement Prepared By: CTD A No. 061018052 Checked By: CTD 11Title: FWCC Part 24 Sanitary Sewer Relocations Line No. Description Quantity Unit Unit Price Cost 1 0241.2013 Remove 8" Sewer Line 0241 14 0 LF $5.00 $0 2 0241.2029 Remove 66" Sewer Line 0241 14 455 LF $420.00 $191,100 3 0241.2201 Remove 4' Sewer Manhole 0241 14 5 EA $2,000.00 $10,000 4 0241.2301 Remove Sewer Junction Structure 0241 14 1 LS $15,000.00 $15,000 5 0241.2001 Sanitary Line Grouting 0241 14 1,630 CY $225.00 $366,750 6 3201.0121 4' Wide Asphalt Pvmt Repair, Arterial 3201 17 1,000 LF $100.00 $100,000 7 Width, Industrial 3401 17 19110 SY $150.00 $166,500 8 3292.0400 Seeding, Hydromulch 32 92 13 1,710 SY $5.00 $8,550 9 3301.0001 Pre -CCTV Inspection 3301 31 3,575 LF $12.00 $42,900 10 3301.0002 Post -CCTV Inspection 3301 31 2,180 LF $8.00 $17,440 11 3301.0101 Manhole Vacuum Testing 3301 30 10 EA $500.00 $5,000 12 3303.0001 Bypass Pumping 33 03 10 1 LS $250,000.00 $250,000 13 3305.0103 Exploratory Excavation of Existing Utilities 33 05 30 4 EA $2,500.00 $10,000 14 3305.0109 Trench Safety 33 05 10 1,735 LF $10.00 $17,350 15 3305.0112 Concrete Collar 33 05 17 7 EA $500.00 $3,500 16 3305.1103 20" Casing By Other Than Open Cut 33 05 22 185 LF $700.00 $129,500 17 3305.3004 12" Sewer Carrier Pipe 33 05 24 185 LF $200.00 $37,000 18 3331.3102 4" 2-Way Cleanout 3331 50 3 EA $1,250.00 $3,750 19 3331.4208 12" Sewer Pipe 33 11 10, 33 31 12, 33 31 20 1,465 LF $220.00 $322,300 20 3331.4721 66" Fiberglass Sewer Pipe 3331 13 270 LF $1,550.00 $418,500 21 3305.3018 66" Sewer Carrier Pipe 33 05 24 260 LF $1,100.00 $286,000 22 3339.0001 Epoxy Manhole Liner 33 39 60 84 VF $500.00 $42,000 23 3339.0002 Epoxy Structure Liner 33 39 60 1,200 SF $40.00 $48,000 24 3339.1001 4' Manhole 33 39 10, 33 39 20 7 EA $7,500.00 $52,500 25 3339.1003 4' Extra Depth Manhole 33 39 10, 33 39 20 48 VF $1,000.00 $48,000 26 3339.2101 8' Polymer Concrete Manhole 33 39 21 1 LS $220,000.00 $220,000 27 3339.2001 Sanitary Sewer Junction Structure 33 39 10, 33 39 20 2 LS $245,000.00 $490,000 28 9999.0003 84" Casinq By Other Than Open Cut 33 05 22 260 LF $3,300.00 $858,000 Subtotal: $4,159,t40 0 No Design Contina. (%,+/-) 30 $1,248,222 ❑ Preliminary Total $4,160,a00 El Final Design Escalation 2023 to 2025 $440,000 Total Escalated $4,600,000 The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinions of probable costs. K:\FTW_Marketing\Fort_W orth\2022_FW CC\W KS\Exhibit B-3 OPCC_University_FW CC-&-Cast-Iron-Replacement-2023-11-09.xis EXHIBIT B-3 Engineer's Opinion of Probable Construction Cost Design Services for Fort Worth Central City Water and Sanitary Sewer Relocations City Project No. 104484 Kimley-Horn and Associates, Inc. Client: City of Fort Worth Project: University Drive - FWCC Part 24 Wtr & Swr and Cast Iron Water Line Replacement KHA No.:061018052 Jitle: University Cast Iron Water Line Replacement Line No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 Description 3305.1107 42" Casing By Other Than Open Cut 3305.1103 20" Casing By Other Than Open Cut 3305.2007 24" Water Carrier Pipe 3305.2002 8" Water Carrier Pipe 3311.0644 24" Water Pipe (Restrained Joints) 3311.0554 16" DIP Water (Restrained Joints) 3311.0444 12" Water Pipe (Restrained Joints) 3311.0242 8" Water Pipe, CSS Backfill 3311.0161 6" PVC Water Pipe 3305.0109 Trench Safety 3312.3008 24" Gate Valve w/ Vault 3312.3006 16" Gate Valve w/ Vault 3312.3005 12" Gate Valve 3312.3003 8" Gate Valve 3312.3002 6" Gate Valve 3312.0106 Connection to Existing 16" Water Main 3312.0108 Connection to Existing 24" Water Main 3312.0113 Connection to Existing 54" Water Main 3312.0117 Connection to Existing 4"-12" Water Main 3312.1004 4" Combination Air Valve Assembly for Water 3312.6002 6" Blow Off Valve 3305.0110 Utility Markers 3311.0001 Ductile Iron Water Fittings w/ Restraint 3312.0001 Fire Hydrant 3305.0101 Fire Hydrant Stem Extension 3304.0002 Cathodic Protection 0241.0100 Remove Sidewalk 0241.0401 Remove Concrete Drive 0241.1012 Remove 6" Water Line 0241.1013 Remove 8" Water Line 0241.1018 Remove 20" Water Line 0241.1001 Water Line Grouting 0241.1118 4"-12" Pressure Plug 0241.1218 4"-12" Water Abandonment Plug 0241.1208 20" Water Abandonment Plug 0241.1300 Remove Conc Curb&Gutter 0241.1302 Remove 6" Water Valve 0241.1303 Remove 8" Water Valve 0241.1353 Salvage 20" Water Valve 0241.1510 Salvage Fire Hydrant 0241.1514 Salvage 2" Water Meter 3201.0121 4' W ide Asphalt Pvmt Repair, Arterial 3201.0122 5' W ide Asphalt Pvmt Repair, Arterial 3201.0203 Asphalt Pvmt Repair Beyond Defined Width, Industrial 3201.0616 Conc Pvmt Repair, Arterial/Industrial 3292.0400 Seeding, Hydromulch 3213.0301 4" Conc Sidewalk 3213.0400 5" Concrete Driveway 3216.0101 6" Conc Curb and Gutter 3471.0001 Traffic Control 3471.0002 Portable Message Sign 9999.001 Contingency 0 No Design ❑ Preliminary ❑ Final Design This total does not reflect engineering or technical services. 33 05 22 33 05 22 33 05 24 33 05 24 33 11 10, 33 11 12, 33 11 13, 33 11 14 3311 10 33 11 10, 33 11 12 33 11 10, 33 11 12 3311 12 33 05 10 33 12 20 33 12 20 33 12 20 33 12 20 33 12 20 33 12 25 33 12 25 33 12 25 33 12 25 33 12 30 33 12 60 33 05 26 3311 11 33 12 40 33 05 14 33 04 12 0241 13 0241 13 0241 14 0241 14 0241 14 0241 14 0241 14 0241 14 0241 14 0241 15 0241 14 0241 14 0241 14 0241 14 0241 14 3201 17 3201 17 3201 17 Opinion of Probable Construction Cost Date: 111912023 Prepared By: CT DI Checked By: CTD Quantity Unit Unit Price Cost 200 LF $800.00 $160,000 0 LF $700.00 $0 200 LF $250.00 $50,000 0 LF $155.00 $0 2,500 LF $425.00 $1,062,500 100 LF $350.00 $35,000 100 LF $250.00 $25,000 810 LF $180.00 $145,800 120 LF $90.00 $10,800 3,510 LF $10.00 $35,100 6 EA $30,000.00 $180,000 2 EA $20,000.00 $40,000 1 EA $4,000.00 $4,000 3 EA $2,500.00 $7,500 6 EA $2,000.00 $12,000 2 EA $30,001.00 $60,002 1 EA $30,002.00 $30,002 1 EA $30,003.00 $30,003 10 EA $30,004.00 $300,040 1 EA $20,000.00 $20,000 0 EA $15,000.00 $0 1 LS $15,000.00 $15,000 27 TON $8,500.00 $229,500 6 EA $4,000.00 $24,000 0 EA $500.00 $0 1 LS $50,000.00 $50,000 0 SF $4.00 $0 0 SF $4.00 $0 0 LF $10.00 $0 0 LF $10.00 $0 0 LF $75.00 $0 0 CY $300.00 $0 0 EA $1,000.00 $0 0 EA $500.00 $0 0 EA $700.00 $0 0 LF $10.00 $0 5 EA $750.00 $3,750 4 EA $750.00 $3,000 3 EA $2,000.00 $6,000 6 EA $1,500.00 $9,000 0 EA $400.00 $0 0 LF $75.00 $0 0 LF $85.00 $0 0 SY $150.00 $0 3201 17 11,700 SY $150.00 $1,755,000 3201 17 0 SY $5.00 $0 3201 17 0 SF $20.00 $0 32 13 20 0 SF $25.00 $0 321613 100 LF $45.00 $4,500 3471 13 9 MO $5,000.00 $45,000 347113 30 WK $500.00 $15,000 00 72 00 1 LS $25,000.00 $25.000 _ Subtotal: $4,392,497 Contino.(%.+/-1 30 $1.325.222 Total - $4,400,000 Escalation 2022 to 2024 $500,000 Total Escalated $4,900,000 The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinions of probable costs. K\FTW_Marketing\For_Worth\2022_FWCC\WKS\Exhibit B-3OPCC_Univ miTy_FWCC-&-Cast-Iron-Replacement-2023-11-09.xls ATTACHMENT "C" CHANGES AND AMENDMENTS TO STANDARD AGREEMENT Design Services for FORT WORTH CENTRAL CITY WATER & SANITARY SEWER RELOCATIONS City Project No. 104484 NO CHANGES City of Fort Worth, Texas Attachment C PMO Release Date: 05.19.2010 Page I of I ATTACHMENT "D" PROJECT SCHEDULE Design Services for FORT WORTH CENTRAL CITY WATER & SANITARY SEWER RELOCATIONS City Project No. 104484 City of Fort Worth, Texas Attachment C PMO Release Date: 05.19.2010 Page I of I ATTACHMENT "E" LOCATION MAP Fort Worth Central City Water & Sanitary Sewer Relocations City Project No. 104484 •�y PROPOSED 66-INCH & 12-INCH SANITARY SEWER AND 12-INCH WATER LINE RELOCATION PROPOSED24-INCH WATER LINE RELOCATION PROPOSED 66154-INCH SANITARY SEWER USAGE CENTRAL CITY PROJECT SOUTH BYPASS CHANNEL MUM 4 ss PROPOSED 66;60-INCH SANITARY SEWER [1QT ,rAt ATTACHMENT "F" CERTIFICATE OF INSURANCE Design Services for FORT WORTH CENTRAL CITY WATER & SANITARY SEWER RELOCATIONS City Project No. 104484