HomeMy WebLinkAboutContract 55171-A3CSC No. 55171-A3 AMENDMENT No . 3 TO CITY SECRETARY CONTRACT No. 55171 WHEREAS, the City of Fort Worth (CITY) and Halff Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 55171, (the CONTRACT) which was authorized by M&C 20-0983 on the 15th day of December, 2020 in the amount of $530,314.00; and WHEREAS, the CONTRACT was subsequently revised by:Amendment Number 1 in the amount of $123,768.00 authorized by M&C # 21-0921 on November 30, 2021 and Amendment Number 2 in the amount of $42,003.00 administratively authorized November 29, 2023; and WHEREAS, the CONTRACT involves engineering services for the following project: Northside IV 24-Inch Water Transmission Main, CPN 102687; and WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $48,380.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $ 744,465.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Northside IV 24-Inch WTM Prof Services Agreement Amendment Template CPN: 102687 Revision Date: 12/08/2023 Page 1 of 2 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: Apr 5, 2024 ATTEST: Jannette Goodall City Secretary APPROVAL RECOMMENDED: ENGINEER Halff Associates, Inc. � r.- Dennis Haar, P.E. Public Works Team Leader ,dp4URn� A F F°RTo %od DATE: April 1, 2024 �o °000 o= vp od oo 00 0 *� a fl rEXA`-�a4p �bnaaaoo Christopher H rder (Apr 5, 2024 07:12 CDT) Chris Harder Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Suzanne Abbe, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: Douglas Black (Apr 5, 2024 16:43 CDT) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: 12/08/2023 Page 2 of 2 M&C No.#: M&C Date Form 1295 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX N/A N/A N/A Northside IV 24-Inch WTM CPN: 102687 Elio haLff March 8, 2024 34486.001 Ms. Suzy Abbe, PE Senior Engineer, Capital Projects Delivery - Facilities City of Fort Worth Water Department 200 Texas Street Fort Worth, Texas 76102 RE: Amendment No. 3 — Northside IV 24-inch Water Line City Project No. 102687 Dear Ms. Abbe: Halff Associates presents this Amendment No. 3 for additional services to City Project No. 102687. Amendment No. 3 includes the effort necessary to complete construction phase services for the referenced project. This amendment includes 20 additional submittal reviews, 10 additional RFI/CO reviews, and eight additional construction coordination meetings. This amendment also includes survey effort to support the condemnation effort for water easements 16, 17 and 18 on the Pete & Jo Bonds and JM Bonds properties. The Level of Effort spreadsheet for Amendment 3 is attached for reference. A summary of the proposed budget for this amendment is as follows: 6.0 Construction Phase Services $38,668 8.0 Survev 59,712 TOTAL PROPOSED AMENDMENT NO. 3 $48,380 Please review the enclosed information and do not hesitate to call me if you have any questions or require additional information regarding this proposal. 2601 Meacham Blvd., Suite 600, Fort Worth, TX 76137 1 halff.com Nifin MEN haLff Following is project fee summary: Original Contract $530,314 Amendment No. 1 $123,768 Amendment No. 2 $42,003 Amendment No. 3 548,380 REVISED CONTRACT AMOUNT $744,465 Sincerely, HALFF ASSOCIATES, INC. Leah M. Hodge, PE Sr. Project Manager 2601 Meacham Blvd., Suite 600, Fort Worth, TX 76137 1 halff.com Task No. Task Description 1.0 Project Management 1.1 Man )(t the Team NI"USED 1.11 1.11 QA/QC 1.2 Communications and R ortigy 1.21 Pre -Design Coordinaiko Meeting [monthly, bi-monthly, monthly] Project 1.21 Update Meetings 1.21 Design Submittal Review Meetings 1.21 Prepare Baseline Schedule Prepare Monthly Progress Reports with 1.21 Schedule 121 Pretgy/e Monthly MBE/SBE Reports 1.2 NO�I USED 2.0 Conceptual Design (30-Percent) 2.1 Data Collection 2.x NOT USED 2.2 Section 404 of CWA Assessment 2.3 Conceptual Design Package 2.3.1 Corro�sjPn prgtecWp evaluation 2.3.2 Concep ua as Memo 2.3.3 Construction Estima e 3.0 Preliminary Design (60 Percent) 3.1 Preliminaw Design Drawings 3.2 Geotechmcal Investigation 3.x NOT USED 3.3 Util Clearance 3.4 Tra 'c Control Plan 3.6 NOT USED 3.7 Construction Estimate 3.8 Not Used 4.0 Final Design (assume 12,400 LF) Final Draft (90%) Construction Plans and 4.1 Specifications City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8.09.2012 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Northside IV 24-inch Water Transmission Main Phase IB City Project No. 102687 Amendment No. 3 Project Director Project Manager Project Engineer Labor lhours) EIT urs Survey RPLS Survey Tech Administrative Labor Cost E� Subconsultant MWBE I Non-MWBE Anse Travel Reproduction Total Expense Cost Task Sub Total %Complete Budget Remaining $364 $274 $132 $133 $75 $249 $133 $83 0 01 01 0 $0 $0 $0 $0 $0 $0 $0 I I I I I I $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 0 0i 01 01 0 $0 $0 $0 $0 $0 $0 $0 I I 1 1 I $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 01 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 1 1 I I I I $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 rE� 0 0 0 0 0 $0 $0 $0 $0 $0 $0 1 $0 $0 1 $0 $0 1 of 5 Task No. Task Description 4.1.1 NOT USED 4.2 Final (100%) Plans and Specifications 4.3 NOT USED 4.4 Construction Estimates (90% and 100%) 5.0 Bid Phase 5.1 Bid Sypp9rt Seff (,ontract Documents and Maintain 5.11 Plan Holders List 5.11 Issue Addenda 5.11 Attend Pre -bid Conference 5.11 NOT USED 5.11 Tabulate Bids and Recommend Award 5.11 Issue Conformed Contract Documents 6.0 Construction Phase Services 6.1 Construction Sup�? 6.11 Attend Precons ruction Conference Northside Capacity/Reliabilty Mtgs 6.11 Assumes 8� 6.11 roject Site isits Submittal Review (Assumes 20 6.11 Additional) Request for Information/Change Order 6A Review�Assumes 10 Additional) 6.11 Final alk Through and Punch List 6.2 Record Drawings 7.0 ROW/Easement Services 7.1 Right -of -Way Research ROW/Easement Preparation and Submittal 7.2 (assume 15 perm and 15 temp easements) 7.3 Tem Dorar/ Riqht of Entry Submittal 8.0 Survey 8.1 Design Survey City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8.09.2012 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Northside IV 24-inch Water Transmission Main Phase IB City Project No. 102687 Amendment No. 3 Project Director Project Manager Project Engineer Labor hours EIT CADD Survey RPLS Survey Tech Administrative Total Labor Cost $0 6ppnse Subconsul[an[ Travel Reproduction MWBE Non-MWBE 1 1 Total Expense Cost SO Task Sub Total $0 $364 $274 $182 $133 $75 $249 $133 $83 1 I $0 $0 $0 So $0 $o $0 SO $0 0 0 0i 0 0 0 $0 $0 $0 $0 $0 $0 $0 I I I I $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 112 0 60 0 0 $38,668 $0 $0 $0 $0 $0 $38,668 I 121 1 201 60 801 1 $0 $0 $0 $3,288 $0 $3,288 $0 $13,460 $0 $0 $0 $13,460 $21,920 $0 $21,920 $0 $0 $0 $0 $0 $0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 51 0 0 0 10 44 0 $9,712 $0 $0 $0 $0 $0 $9,712 $0 $0 $0 % Complete 2 of Task No. Task Description Rate 8.2 Temporary Right of Entry Submittal 8.4 SUE SurmeRinesearch/Cp\nation Supaort \ 9.8.4 0 Pry ePgO 9.1 SWPP 9.2 Environmental Services 9.3 Floodplain Services 9.4 TxDOT 9.5 Railroad 9.6 TDLR 9.7 Unj� of port Worth Parks Uonverslon 10.0 F Tuitional Services 10.1 Additional Services, as directed by City Totals City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8.09.2012 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Northside IV 24-inch Water Transmission Main Phase IB City Project No. 102687 Amendment No. 3 Project Director Project Manager Project Engineer Labor (hours) EIT CADD Survey RPLS Survey Tech Administrative Total Labor Cost $0 6�pnse Subconsul[an[ Travel Reproduction MWBE Non-MWBE Total Expense Cost $0 Task Sub Total $0 Budget % Complete Remaining $364 $274 $182 $133 $75 $249 $133 $83 5 1 10 4 $0 $9,712 $0 $0 $0 $9,712 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 I I I I I $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 1171 01 601 01 1 10 $48,380 $0 $0 $0 $0 $0 $48,380 Project Summary Total Hours 177 Total labor $48,380 Total Expense $0 MBE/SBE Subconsultan J $0 Non-MBE/SBE Subconsultan( $0 10% Sub Markup $0 MBE/SBE Participation 0.0% Total Project Costl $48,380, 3 of