HomeMy WebLinkAboutContract 55171-A3CSC No. 55171-A3
AMENDMENT No . 3
TO CITY SECRETARY CONTRACT No. 55171
WHEREAS, the City of Fort Worth (CITY) and Halff Associates, Inc.,
(ENGINEER) made and entered into City Secretary Contract No. 55171, (the
CONTRACT) which was authorized by M&C 20-0983 on the 15th day of December,
2020 in the amount of $530,314.00; and
WHEREAS, the CONTRACT was subsequently revised by:Amendment Number 1
in the amount of $123,768.00 authorized by M&C # 21-0921 on November 30,
2021 and Amendment Number 2 in the amount of $42,003.00 administratively
authorized November 29, 2023; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Northside IV 24-Inch Water Transmission Main, CPN 102687; and
WHEREAS, it has become necessary to execute Amendment No. 3 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $48,380.00.
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $ 744,465.00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Northside IV 24-Inch WTM
Prof Services Agreement Amendment Template CPN: 102687
Revision Date: 12/08/2023
Page 1 of 2
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth
Fernando Costa
Assistant City Manager
DATE: Apr 5, 2024
ATTEST:
Jannette Goodall
City Secretary
APPROVAL RECOMMENDED:
ENGINEER
Halff Associates, Inc.
� r.-
Dennis Haar, P.E.
Public Works Team Leader
,dp4URn�
A F F°RTo
%od DATE:
April 1, 2024
�o
°000 o=
vp
od
oo 00 0 *�
a
fl rEXA`-�a4p
�bnaaaoo
Christopher H rder (Apr 5, 2024 07:12 CDT)
Chris Harder
Director, Water Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Suzanne Abbe, P.E.
Project Manager
APPROVED AS TO FORM AND LEGALITY:
Douglas Black (Apr 5, 2024 16:43 CDT)
Douglas W. Black
Sr. Assistant City Attorney
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: 12/08/2023
Page 2 of 2
M&C No.#:
M&C Date
Form 1295
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
N/A
N/A
N/A
Northside IV 24-Inch WTM
CPN: 102687
Elio haLff
March 8, 2024
34486.001
Ms. Suzy Abbe, PE
Senior Engineer, Capital Projects Delivery - Facilities
City of Fort Worth Water Department
200 Texas Street
Fort Worth, Texas 76102
RE: Amendment No. 3 — Northside IV 24-inch Water Line
City Project No. 102687
Dear Ms. Abbe:
Halff Associates presents this Amendment No. 3 for additional services to City Project No. 102687. Amendment
No. 3 includes the effort necessary to complete construction phase services for the referenced project. This
amendment includes 20 additional submittal reviews, 10 additional RFI/CO reviews, and eight additional
construction coordination meetings. This amendment also includes survey effort to support the condemnation
effort for water easements 16, 17 and 18 on the Pete & Jo Bonds and JM Bonds properties.
The Level of Effort spreadsheet for Amendment 3 is attached for reference.
A summary of the proposed budget for this amendment is as follows:
6.0 Construction Phase Services $38,668
8.0 Survev 59,712
TOTAL PROPOSED AMENDMENT NO. 3 $48,380
Please review the enclosed information and do not hesitate to call me if you have any questions or require
additional information regarding this proposal.
2601 Meacham Blvd., Suite 600, Fort Worth, TX 76137 1 halff.com
Nifin
MEN
haLff
Following is project fee summary:
Original Contract
$530,314
Amendment No. 1
$123,768
Amendment No. 2
$42,003
Amendment No. 3
548,380
REVISED CONTRACT AMOUNT
$744,465
Sincerely,
HALFF ASSOCIATES, INC.
Leah M. Hodge, PE
Sr. Project Manager
2601 Meacham Blvd., Suite 600, Fort Worth, TX 76137 1 halff.com
Task No. Task Description
1.0
Project Management
1.1
Man )(t the Team
NI"USED
1.11
1.11
QA/QC
1.2
Communications and R ortigy
1.21
Pre -Design Coordinaiko Meeting
[monthly, bi-monthly, monthly] Project
1.21
Update Meetings
1.21
Design Submittal Review Meetings
1.21
Prepare Baseline Schedule
Prepare Monthly Progress Reports with
1.21
Schedule
121
Pretgy/e Monthly MBE/SBE Reports
1.2
NO�I USED
2.0
Conceptual Design (30-Percent)
2.1
Data Collection
2.x
NOT USED
2.2
Section 404 of CWA Assessment
2.3
Conceptual Design Package
2.3.1
Corro�sjPn prgtecWp evaluation
2.3.2
Concep ua as Memo
2.3.3
Construction Estima e
3.0
Preliminary Design (60 Percent)
3.1
Preliminaw Design Drawings
3.2
Geotechmcal Investigation
3.x
NOT USED
3.3
Util Clearance
3.4
Tra 'c Control Plan
3.6
NOT USED
3.7
Construction Estimate
3.8
Not Used
4.0
Final Design (assume 12,400 LF)
Final Draft (90%) Construction Plans and
4.1
Specifications
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date: 8.09.2012
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
Northside IV 24-inch Water Transmission Main Phase IB
City Project No. 102687 Amendment No. 3
Project
Director
Project
Manager
Project
Engineer
Labor lhours)
EIT
urs
Survey
RPLS
Survey
Tech
Administrative
Labor
Cost
E�
Subconsultant
MWBE I Non-MWBE
Anse
Travel
Reproduction
Total Expense
Cost
Task Sub Total
%Complete
Budget
Remaining
$364
$274
$132
$133
$75
$249
$133
$83
0
01
01
0
$0
$0 $0
$0
$0
$0
$0
I
I
I
I
I
I
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
0
0
0i 01 01 0
$0
$0 $0 $0 $0
$0
$0
I
I
1
1
I
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
0
01
0 0 0 0
$0
$0 $0 $0 $0
$0
$0
1
1
I
I
I
I
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
rE�
0
0
0
0
0
$0
$0
$0
$0
$0
$0
1
$0
$0
1
$0
$0
1 of 5
Task No. Task Description
4.1.1
NOT USED
4.2
Final (100%) Plans and Specifications
4.3
NOT USED
4.4
Construction Estimates (90% and 100%)
5.0
Bid Phase
5.1
Bid Sypp9rt
Seff (,ontract Documents and Maintain
5.11
Plan Holders List
5.11
Issue Addenda
5.11
Attend Pre -bid Conference
5.11
NOT USED
5.11
Tabulate Bids and Recommend Award
5.11
Issue Conformed Contract Documents
6.0
Construction Phase Services
6.1
Construction Sup�?
6.11
Attend Precons ruction Conference
Northside Capacity/Reliabilty Mtgs
6.11
Assumes 8�
6.11
roject Site isits
Submittal Review (Assumes 20
6.11
Additional)
Request for Information/Change Order
6A
Review�Assumes 10 Additional)
6.11
Final alk Through and Punch List
6.2
Record Drawings
7.0
ROW/Easement Services
7.1
Right -of -Way Research
ROW/Easement Preparation and Submittal
7.2
(assume 15 perm and 15 temp easements)
7.3
Tem Dorar/ Riqht of Entry Submittal
8.0
Survey
8.1
Design Survey
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date: 8.09.2012
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
Northside IV 24-inch Water Transmission Main Phase IB
City Project No. 102687 Amendment No. 3
Project
Director
Project
Manager
Project
Engineer
Labor hours
EIT
CADD
Survey
RPLS
Survey
Tech
Administrative
Total Labor
Cost
$0
6ppnse
Subconsul[an[
Travel Reproduction
MWBE Non-MWBE
1
1
Total Expense
Cost
SO
Task Sub Total
$0
$364
$274
$182
$133
$75
$249
$133
$83
1
I
$0
$0
$0
So
$0
$o
$0
SO
$0
0
0
0i
0
0
0
$0
$0
$0 $0 $0
$0
$0
I
I
I
I
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
0
112
0 60 0 0
$38,668
$0 $0 $0 $0
$0
$38,668
I
121
1
201 60
801
1
$0
$0
$0
$3,288
$0
$3,288
$0
$13,460
$0
$0
$0
$13,460
$21,920
$0
$21,920
$0
$0
$0
$0
$0
$0
0
0
0
0
0
0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
0
51
0
0
0
10
44
0
$9,712
$0
$0
$0
$0
$0
$9,712
$0
$0
$0
% Complete
2 of
Task No.
Task Description
Rate
8.2
Temporary Right of Entry Submittal
8.4
SUE
SurmeRinesearch/Cp\nation Supaort
\
9.8.4
0
Pry
ePgO
9.1
SWPP
9.2
Environmental Services
9.3
Floodplain Services
9.4
TxDOT
9.5
Railroad
9.6
TDLR
9.7
Unj� of port Worth Parks Uonverslon
10.0
F Tuitional Services
10.1
Additional Services, as directed by City
Totals
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date: 8.09.2012
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
Northside IV 24-inch Water Transmission Main Phase IB
City Project No. 102687 Amendment No. 3
Project
Director
Project
Manager
Project
Engineer
Labor (hours)
EIT
CADD
Survey
RPLS
Survey
Tech
Administrative
Total Labor
Cost
$0
6�pnse
Subconsul[an[
Travel Reproduction
MWBE Non-MWBE
Total Expense
Cost
$0
Task Sub Total
$0
Budget
% Complete
Remaining
$364
$274
$182
$133
$75
$249
$133
$83
5
1
10
4
$0
$9,712
$0
$0
$0
$9,712
0
0
0
0
0
0
$0
$0
$0 $0 $0
$0
$0
I
I
I
I
I
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
0
1171
01
601
01
1
10
$48,380
$0
$0
$0
$0
$0
$48,380
Project Summary
Total Hours
177
Total labor
$48,380
Total Expense
$0
MBE/SBE Subconsultan J
$0
Non-MBE/SBE Subconsultan(
$0
10% Sub Markup
$0
MBE/SBE Participation
0.0%
Total Project Costl $48,380,
3 of