HomeMy WebLinkAboutContract 56416-A2AMENDMENT No . 2 CSC No. 56416-A2
TO CITY SECRETARY CONTRACT No. 56416
WHEREAS, the City of Fort Worth (CITY) and Shield Engineering Group,
PLLC., (ENGINEER) made and entered into City Secretary Contract No. 56416,
(the CONTRACT) which was authorized by M&C 21-0508 on the 22nd day of June,
2021 in the amount of $ 456,150.00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1
in the amount of $94,960.00 which was administratively authorized on June
20th, 2022; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Trinity River Vision- Central City Flood Control Drainage Projects,
CPN (103260, 103261, 103262, 103263, 103264, 103664, 103665, 103666,
103667); and
WHEREAS, it has become necessary to execute Amendment No. 2 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design and construction phase
services to be performed by Engineer totals $644,000.00. (See Attached
Funding Breakdown Sheet, Page -4-)
2.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $1,194,840.00.
City of Fort Worth, Texas Trinity River Vision -Central City Flood Control Drainage Projects
Prof Services Agreement Amendment Template 103260, 103261, 103262, 103263, 103264, 103664, 103665, 103666, 103667
Revision Date: 03/08/2024
Page 1 of 3
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth
CPOA�
Jesica McEachern
Assistant City Manager
DATE: Apr 5, 2024
ATTEST:
Jannette Goodall
City Secretary
,ovnvgq
apF FORrga�
p
-o
pvo g=A
as ° a
arl n a5oo
APPROVED AS TO FORM AND LEGALITY:
ft�
Douglas Black (Apr 4, 202423:49 CDT)
Douglas W. Black
Sr. Assistant City Attorney
Consultant
Shield Engineering Group, PLLC
Jean-' Marie Alekander (Mar 28, 2024 13:45 CDT)
Jean Marie Alexander
COO
DATE: M a r 28, 2024
M&C No.#:
M&C Date:
24-0245
3/26/2024
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Trinity River Vision -Central City Flood Control Drainage Projects
Prof Services Agreement Amendment Template 103260, 103261, 103262, 103263, 103264, 103664, 103665, 103666, 103667
Revision Date: 03/08/2024
Page 2 of 3
FUNDING BREAKDOWN SHEET
City Secretary No. 56416
Amendment No. 2
CF2 -
Project
CF1-
Fund
Dept ID
Account
Bond
Amount
ID
Activity
Reference
52002
0200431
5330500
103260
02880
9999
$92,689.84
52007
0200431
5330500
103260
02880
9999
$4,577.17
52008
0200431
5330500
103260
02880
9999
$41,232.99
52007
0200431
5330500
103261
02880
9999
$1,588.00
52002
0200431
5330500
103261
02880
9999
$5,397.00
52008
0200431
5330500
103261
02880
9999
$23,015.00
52007
0200431
5330500
103666
02880
9999
$138,500.00
52002
0200431
5330500
103263
02880
9999
$666.00
52007
0200431
5330500
103263
02880
9999
$29,334.00
52002
0200431
5330500
103264
02880
9999
$6,313.00
52007
0200431
5330500
103264
02880
9999
$3,842.76
52008
0200431
5330500
103264
02880
9999
$128,344.24
52002
0200431
5330500
103664
02880
9999
$69,250.00
52002
0200431
5330500
103665
02880
9999
$69,197.50
52007
0200431
5330500
103665
02880
9999
$52.50
52002
0200431
5330500
103667
02880
9999
$3,545.00
52007
0200431
5330500
103667
02880
9999
$6,118.32
52008
0200431
5330500
103667
02880
9999
$20,336.68
Total:
$$644,000.00
City of Fort Worth, Texas Trinity River Vision -Central City Flood Control Drainage Projects
Prof Services Agreement Amendment Template 103260, 103261, 103262, 103263, 103264, 103664, 103665, 103666, 103667
Revision Date: 03/08/2024
Page 3 of 3
3/27/24, 10:07 AM
M&C Review
CITY COUNCIL AGENDA
Create New From This M&C
DATE: 3/26/2024 REFERENCE **M&C 24-
NO.: 0245
LOG NAME:
CODE: C TYPE: CONSENT PUBLIC
HEARING:
Official site of the City of Fort Worth, Texas
FoRTWORTti
20SWM FWCC PROJECT
MANAGEMENT
CONSTRUCTION AM 2
NO
SUBJECT. (CD 2 and CD 9) Authorize Execution of Amendment No. 2 in the Amount of $644,000.00
to a Professional Services Agreement with Shield Engineering Group, PLLC for a Revised
Contract Amount of $1,194,840.00 for Stormwater Capital Project Management Services,
for the Fort Worth Central City Flood Control Drainage Projects
RECOMMENDATION:
It is recommended that the City Council authorize execution of Amendment No. 2 in the amount of
$644,000.00 to a professional services agreement with Shield Engineering Group, PLLC for a revised
contract amount of $1,194,840.00 for stormwater capital project management services for the Fort
Worth Central City Flood Control Drainage Projects.
DISCUSSION:
On June 22, 2021, Mayor and Council Communication 21-0508, a professional services agreement
with Shield Engineering Group, PLLC was authorized to provide capital project management services
for the Fort Worth Central City (FWCC) Flood Control Drainage projects. The construction of the north
and south bypass channels by the Corps of Engineers (Corps) for the FWCC Flood Control project will
displace existing City drainage infrastructure and require it to be relocated. The Transportation and
Public Works (TPW) Department Stormwater Program is advancing the funding for the drainage
relocation projects, and the funding for this contract is expected to be reimbursed directly from future
revenues from Tax Increment Finance (TIF) District 9.
The relocation projects are in various phases. This amendment, in the amount of $644,000.00, will
include capital project management services for the following FWCC Flood Control Drainage projects:
5th Street/Greenleaf Sump (City Project No. 103260) - construction
Bazaar Outfall (City Project No. 103261) - design
Main Street Outfall and 8th Street (City Project No. 103262/103666) - construction
University Drive (City Project No. 103263) - coordination
Viola (City Project No. 103264) - construction
Cemetery (City Project Number 103667) - design
Grand Ave Ph 2 Pt 2 (City Project Number 103664) - construction
Grand Ave Ph 2 Pt 3 (City Project Number 103665) - construction
The following table summarizes contract action and amendments:
(CONTRACT
CSC 56416
Amendment 1
Amendment 2
DATE
October 4, 2021
June 20, 2022
This amendment
REVISED
AMOUNT
AMOUNT
$456,150.00
$94,690.00
$644,000.00
$1,194,840.00
Funding for this contract is available in the Stormwater Capi al Projects, Stormwater Rev Bonds 2020
and Drainage Rev Bonds Series 2023 Funds for various Fort Worth Central City projects. Having
exhausted the share of the local program budget allocated to Stormwater infrastructure relocation,
apps.cfwnet.org/council_packet/mc_review.asp?ID=31952&counciIdate=3/26/2024 1 /2
3/27/24, 10:07 AM
M&C Review
costs for this contract will not be included in the annual reimbursement process between the City and
the Tarrant Regional Water District (TRWD). Rather, costs for this contract will be eligible for
reimbursement directly from future Trinity River Vision TIF revenue after prior commitments of the TIF
have been satisfied. Once reimbursement associated with this project is received, those funds will be
used to reimburse the Stormwater utility.
Business Equity: Awaiver of the goal for Business Equity subcontracting requirements was requested,
and approved by the DVIN, in accordance with the applicable Ordinance, because the purchase of
goods or services is from sources where subcontracting or supplier opportunities are negligible.
The projects are located in COUNCIL DISTRICT 2 and 9
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are available in the current capital budget, as previously
appropriated, in the Stormwater Capital Projects, Stormwater Rev Bonds 2020 and the Drainage Rev
Bonds Series 2023 Funds for FWCC 5th St Greenleaf Sump, FWCC Bazaar Outfall, FWCC New Main
St Outfall & 8, FWCC University, FWCC Viola, FWCC Cemetery Outfall & Houstn, FWCC Grand Ave
Ph2 Pt2 and FWCC Grand Ave Ph2 Pt3 projects to support the approval of the above
recommendation and execution of the agreement. Prior to any expenditure being incurred, the
Transportation & Public Works Department has the responsibility to validate the availability of funds.
TO
Fund Department Account Project Program Activity Budget Reference # I Amount
ID ID Year (Chartfield 2)
FROM
Fund Department Account Project
ID I ID
Submitted for Citv Manager's Office by_
Originating Department Head:
Additional Information Contact:
ATTACHMENTS
Program Activity Budget Reference #
Year (Chartfield 2)
Jesica McEachern (5804)
Lauren Prieur (6035)
Linda Young (2485)
20SWM FWCC PROJECT MANAGEMENT CONSTRUCTION AM 2 funds availabilitv.pdf (CFW Internal)
20SWM FWCC PROJECT MANAGEMENT FID TABLE.XLSX (CFW Internal)
20SWM FWCC PROJECT MANAGEMENT MAP.pdf (Public)
20SWM FWCC PROJECT MANAGEMENT SAM SEARCH.Ddf (CFW Internal)
Form 1295 Certificate 101166681.pdf (CFW Internal)
PM SERVICES WAIVER -SHIELD - TRVA APPROVED (002).pdf (CFW Internal)
Amount
apps.cfwnet.org/council_packet/mc_review.asp?ID=31952&counciIdate=3/26/2024 2/2
FORT WORTH;
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: Shield Contract Amendment No.2
M&C: 24-0245 CPN: 103260,103261,103262, CSO: 56416 DOC#:
103263,103264,103664,
103665, 103666,103667
Date:
To:
Name
Department
Initials
Date Out
1
Jean-Marie Alexander
TPW
Mar 28, 2024
jeanmarie.alexander@segpllc.com
-4-
JMA
2.
Linda Young
TPW
3.
Lauren Prieur
TPW
4.
Doug Black
Legal
oB DE
Apr 4, 2024
5.
Jesica McEachern
CMOQ,l-
Apr 5, 2024
6.
Jannette Goodall
CSO
Apr 7, 2024
7.
TPW—SW—Contracts
TPW—SW
8.
KC
Apr 8, 2024
9.
.dam
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
PURPOSE: This Amendment will add the Construction Manager line item and reallocate funds to
it.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return to: tpw sw contractsn.fortworthtexas.Liov Call 817-229-3283 with questions. Thank you!
SHIELD
ENGINEERING GROUP
February 12, 2024
Linda S. Young, PE, PMP
Program Manager, TPW Capital Delivery
City of Fort Worth
200 Texas Street
Fort Worth, TX 76102
RE: Trinity River Vision -Central City Flood Control Drainage Projects — Amendment 2
CSN 103260, 103261, 103262, 103263, 103264, 103664, 103665, 103666, 103667
Dear Ms. Young,
Shield Engineering Group, PLLC is pleased to submit the following services to amend the
contract shown above per the attached Level of Effort Spreadsheet. The new contract will be
amended in the amount of $644,000 for a revised contract amount of $1,194,840. Shield plans
to provide a Professional Engineer and EIT2 services.
Original contract
$456,150
Amendment 1
$94,690
Amendment 2
$644,000
Revised contract
$1,194,840
Additionally, the contract Attachment "A" will be replaced with the attached Revised Attachment
"A". Attachment "B", providing an updated rate schedule is also included.
Please see the attached Level of Effort spreadsheet which includes the assumptions and
estimations for the hourly efforts as well as the revised Attachments "A" & "B".
Please feel free to contact me with any questions or comments.
Sincerely,
Jean-Marie Alexander, P.E.
COO
Shield Engineering Group, PLLC
Attachments: Revised Attachments "A" & "B" and the LOE for FWCC amendment 2
1600 West 7th Street, Suite 200, Fort Worth, TX 76102 - 817.810.0696
info@segpllc.com - www.SHIELDENGINEERINGGROUP.com
TBPE FIRM #F-11039 - TBPLS FIRM #10193890