Loading...
HomeMy WebLinkAboutContract 51820-CO2DEVELOPER - AWARDED - PROJECT CHANGE ORDER IPROJECT NAME: I CONTRACT: ICFA# ICITY PROJECT # I DOE # I WATER PROJECT # ISEWER PROJECT # IFILE # INSPECTOR: PROJECT MANAGER American Airlines Headquarteers - Trinity Blvd, SBFR 360, American Blvd CHANGE Paving, Drainage, Street Lighting, Signals ORDER No: CS-51820 CITY PARTICIPATION: I YES 101314 N/A 2 N/A N/A K-2965 Aaron Ybarra Phone No: 682-213-0382 Debbie J. Wilhelm Phone No: 817-392-2481 PAVING (IMPACT FEE REVENUE) CITY COST ORIGINAL CONTRACT $ 128,154.00 $ EXTRAS TO DATE $ - $ CREDITS TO DATE $ - $ CONTRACT TO DATE $ 128,154.00 $ AMOUNT OF PROP. CHANGE ORDER $ - $ REVISED CONTRACT AMOUNT $ 128,154.00 $ TOTAL REVISED CONTRACT AMOUNT $ 128,154.00 PER UNIT DEVELOPER REVISED COST SHARE COST TOTAL REVISED CONTRACT CONTRACT UNIT CSC No. 51820-CO2 PAVING STORM DRAIN STREET LIGHTS, SIGNS, SIGNALS CONTRACT DAYS DEVELOPER CITY TXDOT DEVELOPER CITY TXDOT DEVELOPER CITY TXDOT COST COST COST COST COST COST COST COST COST $ $ $ 129,048.30 117 $ 388,454.30 $ 1,553,817.20 $ 24,864.00 $ 99,456.00 $ 516,193.20 $ $ $ 213,731.25 90 $ 144,405.55 $ $ 50,947.00 $ - $ - $ $ is - $ - $ $ - $ - $ - $ $ $ 342,779.55 207 $ 532,859.85 $ 1,553,817.20 $ 75,811.00 $ 99,456.00 $ 516,193.20 $ $ $ 46,801.90 180 $ 44,265.20 $ 100,707.60 $ 12,542.80 $ 24,491.20 $ 66,791.60 $ $ $ 389,581.45 387 $ 577,125.05 $ 1,654,524.80 $ 88,353.80 $ 123,947.20 1 $ 582,984.80 $2, 231, 649.85 $212,301.00 $972, 566.25 $0.00 CITY $1,183,214.30 $2,361,456.80 COST COSTTXDO $3,544,671.10 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 1 of 6 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENTS: PAY ITEM # CITY BID ITEM QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE CITY COST TXDOT COST TOTAL # COST PAVING (IMPACT FEE REVENUES) 100% 0% PAVING SUBTOTAL (IMPACT FEE REVENUES) $ $ $ PAVING (American Blvd / Transformation Way) 1 100% 0% _ 1 117 0241.0550 200 LF Remove Guardrail $ 11.00 $ 2,200.00 $ $ 2,200.00 120 3123.0101 160 CY Unclassified Excavation by Plan $ 17.00 $ 2,720.00 $ $ 2,720.00 121 3211.0400 -10.8 TN Hydrated Lime $ 214.00 $ (2,311.20) $ $ (2,311.20) 122 3211.0502 -720 SY 8" Lime Treatment $ 8.00 $ (5,760.00) $ $ (5,760.00) 125 3217.4301 -123 LF Remove 4" Pvmt Marking $ 1.00 $ (123.00) $ $ (123.00) 127 3292.0101 209 SY Surface Restoration Sodding $ 5.00 $ 1,045.00 $ $ 1,045.00 128 3305.0103 1 EA Exploratory Excavation of Existing Utilities $ 2,900.00 $ 2,900.00 $ $ 2,900.00 133 TX 540-6002 181 LF Metal Beam Guard Fence (Steel Post) $ 37.50 $ 6,787.50 $ $ 6,787.50 134 TX 540-6016 1 EA Downstream Terminal Anchor Section $ 1,700.00 $ 1,700.00 $ $ 1,700.00 135 TX 544-6002 1 EA Single Guard Terminal (MASH) SKT $ 3,750.00 $ 3,750.00 $ $ 3,750.00 136 TX432-6001 -3 CY Riprap (Conc)(4 In) $ 520.00 $ (1,560.00) $ $ (1,560.00) 178 3211.0113 720 SY Flexible Base, Type A, GR-1 or 2 $ 10.75 $ 7,740.00 $ $ 7,740.00 PAVING SUBTOTAL (American Blvd / Transformation Way)l $ 19,088.30 $ $ 19,088.30 STORM DRAIN (American Blvd / Transformation Way) I100% 0% 132 3349.8001 -1 EA Type 2 Inlet $ 17,100.00 $ (17,100.00) $ $ (17,100.00) 183 3349.XXXX I 1 I EA I10' 10' Type 2 Inlet (Special) $ 19,450.00 $ 19,450.00 $ $ 19,450.00 184 3305.0116 185 LF Concrete Encasement for 16" WL $ 22.00 $ 4,070.00 $ $ 4,070.00 STORM DRAIN SUBTOTAL (American Blvd / Transformation Way) $ 6,420.00 $ $ 6,420.00 LIGHTING, SIGNS, SIGNALS (American Blvd / Transformation Way) I 100% I 0% 138 2605.3014 -25 LF 2" CONDT RM (Riser) $ 47.50 $ (1,187.50) $ $ (1,187.50) 139 2605.3015 310 LF 2" CONDT PVC SCH 80 (T) $ 14.50 $ 4,495.00 $ $ 4,495.00 140 2605.3025 -160 LF 3" CONDT PVC SCH 80 (T) $ 18.00 $ (2,880.00) $ $ (2,880.00) 141 2605.3026 120 LF 3" CONDT PVC SCH 80 (B) $ 22.00 $ 2,640.00 $ $ 2,640.00 142 3217.001 -510 LF 4" SLD Pvmt Marking HAS (Y) $ 1.75 $ (892.50) $ $ (892.50) 143 3217.003 877 LF 4" BRK Pvmt Marking HAS (W) $ 1.00 $ 877.00 $ $ 877.00 144 3217.0201 45 LF 8" SLD Pvmt Marking HAS (W) $ 2.00 $ 90.00 $ $ 90.00 145 3217.0202 9 LF 8" SLD Pvmt Marking HAS (Y) $ 3.25 $ 29.25 $ $ 29.25 146 3217.0501 -46 LF 24" SLD Pvmt Marking HAE (W) $ 6.00 $ (276.00) $ $ (276.00) 149 3217.2102 -28 EA REFL Raised Marker TY I-C $ 5.00 $ (140.00) $ $ (140.00) 150 3217.2103 1 EA REFL Raised Marker TY II -A -A $ 9.00 $ 9.00 $ $ 9.00 156 3441.1217 -5 LF Install Hybrid Detection Cable $ 3.00 $ (15.00) $ $ (15.00) 158 3441.1224 -5 LF Furnish/Install Preemption Cable $ 1.25 $ (6.25) $ $ (6.25) 159 3441.1311 -55 LF 5/C 14 AWG Multi -Conductor Cable $ 2.00 $ (110.00) $ $ (110.00) 161 3441.1315 -5 LF 20/C 14 AWG Multi -Conductor Cable $ 5.00 $ (25.00) $ $ (25.00) 162 3441.1322 -5 LF 3/C 14 AWG Multi -Conductor Cable $ 1.00 $ (5.00) $ $ (5.00) 163 3441.1408 -220 LF NO 6 Insulated Elec Condr $ 1.50 $ (330.00) $ $ (330.00) 164 3441.1409 395 LF NO 8 Insulated Elec Condr $ 1.50 $ 592.50 $ $ 592.50 172 3441.XXXX 1 EA Light Pole Spread Footing (American / 136) $ 1,340.00 $ 1,340.00 $ $ 1,340.00 176 3441.4001 -2 EA Furnish/Install Alum Sign Mast Arm Mount $ 550.00 $ (1,100.00) $ $ (1,100.00) 177 3471.0001 2 MO Traffic Control (American / 136) $ 7,000.00 $ 14,000.00 $ $ 14,000.00 179 3471.XXXX 3 MO Temporary Stop Signs with Flags $ 297.00 $ 891.00 $ $ 891.00 180 2605.3016 255 LF 2" CONDT PVC SCH 80 (B) $ 20.00 $ 5,100.00 $ $ 5,100.00 181 3441.XXXX 1 EA FURNISH / INSTALL PTZ CAMERA (AMERICAN) $ 6,780.00 $ 6,780.00 $ $ 6,780.00 182 3441.XXXX 35 LF FURNISH / INSTALL PTZ CABLE (AMERICAN) $ 6.50 $ 227.50 $ $ 227.50 _ LIGHTING, SIGNS, SIGNALS SUBTOTAL (American Blvd / Transformation Way)l $ 30,104.00 1 $ $ 30,104.00 Page 2 of 6 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENTS: PAY ITEM # CITY BID ITEM QUANTITY UNIT I ITEM DESCRIPTION 2AVING (Trinity Boulevard) 2 241.0100 755 SF Remove Sidewalk 3 241.0300 3 EA Remove ADA Ramp 6 241.1000 70 SY Remove Conc Pvmt 17 3123.0101 1379.5 CY Unclassified Excavation by Plan 18 3124.0101 992 CY Embankment by Plan 20 3201.0302 261.94 SY 3" Extra Width Asphalt Pavement Repr 21 3211.0401 -84 TN Commercial Lime Slurry 22 3211.0502 -5241 SY 8" Lime Treatment 23 3213.0104 41.33 SY 9" Concrete Pavement 24 2313.0312 -2492 SF 5" Conc Sidewalk, Adjacent to Curb 25 2313.0321 -1080 SF Conc Sidewalk, Adjacent to Ret Wall 28 3213.0506 1 EA Barrier Free Ramp, Type P-1 29 3217.0003 -1964 LF 4" BRK Pvmt Marking HAS (W) 30 3217.0201 1013 LF 8" SLD Pvmt Marking HAS (W) 31 3217.0501 -564 LF 24" SLD Pvmt Marking HAE (W) 32 3217.1002 17 EA Lane Legend Arrow 33 3217.1004 4 EA Lane Legend Only 34 3217.2102 31 EA REFL Raised Marker TY I-C 35 3217.2104 53 EA REFL Raised Marker TY I I-C-R 36 3217.4301 -1894 LF Remove 4" Pvmt Marking 37 3217.4306 -47 LF Remove 24" Pvmt Marking 38 3217.4307 -38 EA Remove Raised Marker 39 3232.0100 557 SF Conc Ret Wall Adjacent to Sidewalk 41 3292.0100 1981 SY Block Sod Placement 42 3292.0400 6774 SY Seeding, Hydromulch 43 3305.0103 3 EA Exploratory Excavation of Existing Util 99 3471.0001 3 MO Traffic Control 100 3471.0002 -20 WK Portable Message Sign 101 360-6003 -279 SY Conc Pvmt (Cont Reinf CRCP 9") 102 360-6027 -450 LF Curb (Type 11) Type 103 400-6005 15 CY Cem Bkfl 104 403-6001 352 SF Temporary Spl Shoring 107 432-6046 40.33 CY Riprap (Mow Strip)(5 In) 109 450-6048 -3575 LF Rail (Handrail)(TY B) 187 3305.XXXX 20 EA Exploratory Excavations (Shallow) 191 3471-0001 5 MO Truck Detour 194 310-6001 279 SY Prime Coat 195 341-6008 279 SY HOT MIX ASPHALT TY B 20") 196 341-6021 279 SY HOT MIX ASPHALT TY C 2") 197 360-6008 1323 LF CURB & GUTTER (TXDOT TY II) 198 3211.0113 4962 SY 8" Flexible Base, Type A, GR-1 or 2 200 1 LS Tree Well Slope Protection 217 103 LF Remove Guardrail 219 TxDOT 644 1 LS Small Roadway Sign Assemblies 220 TxDOT 662 1 LS Work Zone Pavement Markings 221 TxDOT 423 1 LS Modification to Retaining Wall RWWB 106 222 TxDOT 423 1 LS Modification to Retaining Wall RWEB 105 223 3441.4003 1 EA FURNISH/INSTALL ALUM SIGN GND MNT CITY STD 224 TxDOT Pv Mk 31 EA REF PAV MRK TY I W)(YLD TRI)(100MIL) 225 450-6031 601 LF RAIL (TY C221)(HPC) - RAISE 6" 226 TxDOT 423 338 LF RWWB 106 - Epoxy Repair Gae 227 TxDOT 423 130 LF RWWB 108 - Concrete Repair Gap 228 TxDOT 423 133 LF RW - Repair - Monolithic Pour 229 1 EA Tunnel bore under Colored Stamped Concrete UNIT PRICE CITY COST TXDOT COST TOTAL COST 20% 80% $ 2.50 $ 377.50 $ 1,510.00 $ 1,887.50 $ 745.00 $ 447.00 $ 1,788.00 $ 2,235.00 $ 19.00 $ 266.00 $ 1,064.00 $ 1,330.00 $ 17.00 $ 4,690.30 $ 18,761.20 $ 23,451.50 $ 11.00 $ 2,182.40 $ 8,729.60 $ 10,912.00 $ 24.00 $ 1,257.31 $ 5,029.25 $ 6,286.56 $ 214.00 $ (3,595.20) $ (14,380.80) $ (17,976.00) $ 8.00 $ (8,385.60) $ (33,542.40) $ (41,928.00) $ 86.00 $ 710.88 $ 2,843.50 $ 3,554.38 $ 8.00 $ (3,987.20) $ (15,948.80) $ (19,936.00) $ 8.00 $ (1,728.00) $ (6,912.00) $ (8,640.00) $ 2,500.00 $ 500.00 $ 2,000.00 $ 2,500.00 $ 1.00 $ (392.80) $ (1,571.20) $ (1,964.00) $ 2.00 $ 405.20 $ 1,620.80 $ 2,026.00 $ 6.00 $ (676.80) $ (2,707.20) $ (3,384.00) $ 127.00 $ 431.80 $ 1,727.20 $ 2,159.00 $ 140.00 $ 112.00 $ 448.00 $ 560.00 $ 5.00 $ 31.00 $ 124.00 $ 155.00 $ 5.00 $ 53.00 $ 212.00 $ 265.00 $ 1.00 $ (378.80) $ (1,515.20) $ (1,894.00) $ 2.50 $ (23.50) $ (94.00) $ (117.50) $ 1.00 $ (7.60) $ (30.40) $ (38.00) $ 19.00 $ 2,116.60 $ 8,466.40 $ 10,583.00 $ 5.00 $ 1,981.00 $ 7,924.00 $ 9,905.00 $ 1.00 $ 1,354.80 $ 5,419.20 $ 6,774.00 $ 2,900.00 $ 1,740.00 $ 6,960.00 $ 8,700.00 $ 10,500.00 $ 6,300.00 $ 25,200.00 $ 31,500.00 $ 212.00 $ (848.00) $ (3,392.00) $ (4,240.00) $ 175.00 $ (9,765.00) $ (39,060.00) $ (48,825.00) $ 11.00 $ (990.00) $ (3,960.00) $ (4,950.00) $ 120.00 $ 360.00 $ 1,440.00 $ 1,800.00 $ 32.00 $ 2,252.80 $ 9,011.20 $ 11,264.00 $ 520.00 $ 4,194.32 $ 16,777.28 $ 20,971.60 $ 68.00 $ (48,620.00) $ (194,480.00) $ (243,100.00) $ 500.00 $ 2,000.00 $ 8,000.00 $ 10,000.00 $ 6,389.00 $ 6,389.00 $ 25,556.00 $ 31,945.00 $ 2.00 $ 111.60 $ 446.40 $ 558.00 $ 165.00 $ 9,207.00 $ 36,828.00 $ 46,035.00 $ 20.50 $ 1,143.90 $ 4,575.60 $ 5,719.50 $ 27.00 $ 7,144.20 $ 28,576.80 $ 35,721.00 $ 10.75 $ 10,668.30 $ 42,673.20 $ 53,341.50 $ 16,500.00 $ 3,300.00 $ 13,200.00 $ 16,500.00 $ 11.00 $ 226.60 $ 906.40 $ 1,133.00 $ 4,305.00 $ 861.00 $ 3,444.00 $ 4,305.00 $ 4,910.00 $ 982.00 $ 3,928.00 $ 4,910.00 $ 2,150.00 $ 430.00 $ 1,720.00 $ 2,150.00 $ 2,450.00 $ 490.00 $ 1,960.00 $ 2,450.00 $ 550.00 $ 110.00 $ 440.00 $ 550.00 $ 45.00 $ 279.00 $ 1,116.00 $ 1,395.00 $ 15.50 $ 1,863.10 $ 7,452.40 $ 9,315.50 $ 46.50 $ 3,143.40 $ 12,573.60 $ 15,717.00 $ 14.50 $ 377.00 $ 1,508.00 $ 1,885.00 $ 2.87 $ 76.34 $ 305.37 $ 381.71 $ 448.00 $ 89.60 $ 358.40 $ 448.00 Page 3 of 6 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENTS: PAY ITEM # CITY BID ITEM QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE CITY COST TXDOT COST TOTAL # COST 230 1 EA Re -Mobilization Fee - Staton Bros $ 4,000.00 $ 800.00 $ 3,200.00 $ 4,000.00 231 1 EA Re -Mobilization Fee - Oscar Orduno $ 3,000.00 $ 600.00 $ 2,400.00 $ 3,000.00 234 658-6004 59 EA F&I Delineators (D-SW SZ 2 FLX SRF) $ 79.50 $ 938.10 $ 3,752.40 $ 4,690.50 235 3441.41XX 2 EA Furnish & Install Sign Panel and Post $ 375.00 $ 150.00 $ 600.00 $ 750.00 236 1 LS Traffic Control - Striping $ 950.00 $ 190.00 $ 760.00 $ 950.00 237 2 EA Remobilization - Striping & Pavment Repair $ 1,600.00 $ 640.00 $ 2,560.00 $ 3,200.00 238 1200 LF Chain Link Fence (6) Steel $ 29.50 $ 7,080.00 $ 28,320.00 $ 35,400.00 239 1 LS C221 RAIL REPAIR - Remove & Replace $ 3,750.00 $ 750.00 $ 3,000.00 $ 3,750.00 240 10 LF Remove & Replace Handrail Section $ 295.00 $ 590.00 $ 2,360.00 $ 2,950.00 241 3 DAY Rail Repair Emergency Traffic Control $ 950.00 $ 570.00 $ 2,280.00 $ 2,850.00 242 3471.0001 1 LS Traffic Control (Conc Repair American/Trinity) $ 4,700.00 $ 940.00 $ 3,760.00 $ 4,700.00 243 3213.0104 70 SY 9" Conc Pvmt (HES) $ 120.65 $ 1,689.10 $ 6,756.40 $ 8,445.50 244 658-6004 60 LF Remove Delineators (D-SW SZ 2 FLX SFR) $ 15.50 $ 186.00 $ 744.00 $ 930.00 245 1 LS Plan REV7 - Traffic Control for Removal & triping $ 1,150.00 $ 230.00 $ 920.00 $ 1,150.00 246 1 LS PlanREV7 - Remobilization - Striping $ 1,600.00 $ 320.00 $ 1,280.00 $ 1,600.00 247 37.5 LF Plan REV8 - TxDOT 540-6001 MFGF $ 37.50 $ 281.25 $ 1,125.00 $ 1,406.25 248 1 EA Plan REV8 - TxDOT 540-6009 TRANS THRIE Beam $ 3,525.00 $ 705.00 $ 2,820.00 $ 3,525.00 249 1 EA Plan REV8 - TxDOT 544-6001 SKT MASH $ 3,750.00 $ 750.00 $ 3,000.00 $ 3,750.00 250 1 LS Plan REV8 - Remobilization Guardrail Crew $ 1,800.00 $ 360.00 $ 1,440.00 $ 1,800.00 251 1 WK Plan REV8 - Traffic Control for MBGF $ 10,500.00 $ 2,100.00 $ 8,400.00 $ 10,500.00 252 1 LS Plan REV8 - Remobilization Traffic Control Crew $ 1,050.00 $ 210.00 $ 840.00 $ 1,050.00 253 1 LS Plan REV8 - Site Clearing for MBGF $ 3,450.00 $ 690.00 $ 2,760.00 $ 3,450.00 254 190 CY Plan REV8 - Embankment for MBGF $ 11.00 $ 418.00 $ 1,672.00 $ 2,090.00 255 18 CY Plan REV8 - TxDOT 4" MOW STRIP $ 520.00 $ 1,872.00 $ 7,488.00 $ 9,360.00 256 1 EA Plan REV8 - Exploratory Utility Excavation for MBGF $ 2,900.00 $ 580.00 $ 2,320.00 $ 2,900.00 257 200 SY Plan REV8 - Block Sod Frontage Road $ 5.00 $ 200.00 $ 800.00 $ 1,000.00 258 1 LS Plan REV8 - Remobilization Landscape Crew (sod) $ 400.00 $ 80.00 $ 320.00 $ 400.00 PAVING SUBTOTAL (Trinity Blvd) $ 25,176.90 $ 100,707.60 $ 125,884.50 STORM DRAIN (Trinid Boulevard) 20% 80% 45 3341.0103 -14 LF 18" RCP, Class III $ 114.00 $ (319.20) $ (1,276.80) $ (1,596.00) 46 3341.0205 40 LF 24" RCP, Class III $ 208.00 $ 1,664.00 $ 6,656.00 $ 8,320.00 47 3341.0302 -23 LF 30" RCP, Class III $ 240.00 $ (1,104.00) $ (4,416.00) $ (5,520.00) 192 3341.0201 30 LF 21" RCP, Class III $ 175.00 $ 1,050.00 $ 4,200.00 $ 5,250.00 193 3341.0309 26 LF 36" RCP, Class III $ 270.00 $ 1,404.00 $ 5,616.00 $ 7,020.00 201 0171.0102 1 LS Construction Staking (New RCP & Headwall) $ 600.00 $ 120.00 $ 480.00 $ 600.00 202 3110.0101 1 LS Site Clearing (New Culvert Extension) $ 2,500.00 $ 500.00 $ 2,000.00 $ 2,500.00 203 0241.4002 1 EA Remove Existing Headwall $ 1,500.00 $ 300.00 $ 1,200.00 $ 1,500.00 204 3349.1003 1 EA Install 24" Flared Headwall, 1 Pipe $ 11,500.00 $ 2,300.00 $ 9,200.00 $ 11,500.00 205 TX432-6046 2 CY Rock Ri ra 6in $ 520.00 $ 208.00 $ 832.00 $ 1,040.00 STORM DRAIN SUBTOTAL (Trinity Boulevard)l $ 6,122.80 $ 24,491.201 $ 30,614.00 LIGHTING. SIGNS, SIGNALS (Trinity Boulevard) 20% 80% 9 2605.0111 1 EA Furnish/Install Elec Sery Pedestal $ 6,700.00 $ 1,340.00 $ 5,360.00 $ 6,700.00 10 2605.3013 20 LF 2" CONDT RM (T) $ 25.00 $ 100.00 $ 400.00 $ 500.00 11 2605.3015 476 LF 2" CONDT PVC SCH 80 (T) $ 14.50 $ 1,380.40 $ 5,521.60 $ 6,902.00 12 2605.3016 740 LF 2" CONDT PVC SCH 80 (B) $ 20.00 $ 2,960.00 $ 11,840.00 $ 14,800.00 13 3605.3025 -25 LF 3" CONDT PVC SCH 80 (T) $ 18.00 $ (90.00) $ (360.00) $ (450.00) 14 2605.3026 5 LF 3" CONDT PVC SCH 80 (B) $ 22.00 $ 22.00 $ 88.00 $ 110.00 15 2605.3033 20 LF 4" CONDT PVC SCH 80 (T) $ 30.00 $ 120.00 $ 480.00 $ 600.00 49 3441.1001 -2 EA 3-Sect Signal Head Assmbly $ 1,150.00 $ (460.00) $ (1,840.00) $ (2,300.00) 51 3441.1003 2 EA 5-Sect Signal Head Assmbly $ 1,500.00 $ 600.00 $ 2,400.00 $ 3,000.00 53 3441.1011 -6 EA Ped Signal Head Assmbly $ 900.00 $ (1,080.00) $ (4,320.00) $ (5,400.00) 54 3441.1021 -24 EA 2" Ped Push BTN Station W/ Sign $ 403.00 $ (1,934.40) $ (7,737.60) $ (9,672.00) 55 3441.1031 -6 EA Audible Pedestrian Pushbutton Station $ 1,520.00 $ (1,824.00) $ (7,296.00) $ (9,120.00) Page 4 of 6 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENTS: PAY CITY BID ITEM ITEM # QUANTITY 57 3441.1217 -190 LF 58 3441.1224 6 LF 60 3441.131 -271 LF 62 3441.1312 90 LF 63 3441.1315 -45 LF 64 3441.1322 -256 LF 65 3441.1402 1200 LF 66 3441.1408 1155 LF 67 3441.1409 270 LF 68 3441.1414 54 LF 69 3441.1501 1 EA 71 3441.1603 -5 EA 80 3441.1701 -6 EA UNIT 89 3441.3052 5 EA 90 3441.3302 -1 EA 91 3441.3342 -1 EA 92 3441.4001 10 EA 96 3441.XXXX 5 LF 98 3441.XXXX 1 EA 114 685-6005 1 EA 185 1 LS 186 1 EA 188 5 EA 189 5 EA 190 6 EA 199 3441.33XX 4 EA 206 1 EA 207 1 EA 208 20 LF 209 110 LF 210 90 LF 211 1760 LF 212 560 LF 213 1760 LF 214 24 HR 215 1 LS 216 1 LS 218 TxDOT 681 1 LS 232 2 EA 233 205 LF ITEM DESCRIPTION UNIT PRICE CITY COST TXDOT COST TOTAL COST Furnish/Install Hybrid Detection Cable $ 3.00 $ (114.00) $ (456.00) $ (570.00) Furnish/Install Preemption Cable $ 1.25 $ 1.50 $ 6.00 $ 7.50 4/C 14 AWG Multi -Conductor Cable $ 2.00 $ (108.40) $ (433.60) $ (542.00) 7/C 14 AWG Multi -Conductor Cable $ 2.00 $ 36.00 $ 144.00 $ 180.00 20/C 14 AWG Multi -Conductor Cable $ 5.00 $ (45.00) $ (180.00) $ (225.00) 3/C 14 AWG Multi -Conductor Cable $ 1.00 $ (51.20) $ (204.80) $ (256.00) NO 6 Duplex OH insulated Elec Condr $ 2.00 $ 480.00 $ 1,920.00 $ 2,400.00 NO 6 Insulated Elec Condr $ 1.50 $ 346.50 $ 1,386.00 $ 1,732.50 NO 8 Insulated Elec Condr $ 1.50 $ 81.00 $ 324.00 $ 405.00 NO 8 Bare Elec Condr $ 1.50 $ 16.20 $ 64.80 $ 81.00 Ground Box Type B $ 900.00 $ 180.00 $ 720.00 $ 900.00 Furnish/Install 10' - 14' Ped Pole Assmbly $ 1,150.00 $ (1,150.00) $ (4,600.00) $ (5,750.00) TY 1 Signal Foundation $ 1,200.00 $ (1,440.00) $ (5,760.00) $ (7,200.00) Furnish/Install LED Lighting Fixture (ATB2 cobra) (187 watt ATB2 Cobra Head) $ 850.00 $ 850.00 $ 3,400.00 $ 4,250.00 Rdwy Illum Foundation TY 3,5,6, and 8 $ 1,500.00 $ (300.00) $ (1,200.00) $ (1,500.00) Rdwy Illum TY 18 Pole $ 1,700.00 $ (340.00) $ (1,360.00) $ (1,700.00) Furnish/Install Alum Sign Mast Arm Mount $ 550.00 $ 1,100.00 $ 4,400.00 $ 5,500.00 Furnish/Install VIVDS Cable $ 3.00 $ 3.00 $ 12.00 $ 15.00 Remove and Salvage Illumination Fixture $ 120.00 $ 24.00 $ 96.00 $ 120.00 Relocate Rdsd Flsh BCN AM (Solar Pwrd) $ 5,000.00 $ 1,000.00 $ 4,000.00 $ 5,000.00 Traffic Control During Signal Switch $ 1,900.00 $ 380.00 $ 1,520.00 $ 1,900.00 Install Oncor Provided Pull Box $ 950.00 $ 190.00 $ 760.00 $ 950.00 Furnish & Install 35' Wood Light Pole $ 1,500.00 $ 1,500.00 $ 6,000.00 $ 7,500.00 Furnish & Install 8' Wood Light Pole Arm $ 800.00 $ 800.00 $ 3,200.00 $ 4,000.00 Electrical Connection (Wood Poles) $ 250.00 $ 300.00 $ 1,200.00 $ 1,500.00 Hydro -Vac Rdwy Illum Foundation TY 3,5,6, and 8 $ 2,750.00 $ 2,200.00 $ 8,800.00 $ 11,000.00 Furnish/Install 40' Class 2 Wood Pole $ 1,650.00 $ 330.00 $ 1,320.00 $ 1,650.00 ELC SRV TY D 120/240 060(NS) GS (N) SP (0)SERVICE $ 5,574.00 $ 1,114.80 $ 4,459.20 $ 5,574.00 Conduit (RM)(2") $ 47.50 $ 190.00 $ 760.00 $ 950.00 Condt (Pvc) (Sch 40) (3") $ 13.00 $ 286.00 $ 1,144.00 $ 1,430.00 Condt (Pvc) (Sch 40) (3") (Bore) $ 20.00 $ 360.00 $ 1,440.00 $ 1,800.00 Elec Condr (No. 4) Insulated $ 3.25 $ 1,144.00 $ 4,576.00 $ 5,720.00 Elec Condr (No. 4) Bare $ 3.25 $ 364.00 $ 1,456.00 $ 1,820.00 Remove Existing Cables $ 1.25 $ 440.00 $ 1,760.00 $ 2,200.00 Security for TxDOT Pull Box $ 135.00 $ 648.00 $ 2,592.00 $ 3,240.00 Re-Mobilzation (ITS Layout) $ 2,000.00 $ 400.00 $ 1,600.00 $ 2,000.00 Traffic Control (ITS Layout) $ 850.00 $ 170.00 $ 680.00 $ 850.00 Temporary Traffic Signals $ 5,995.00 $ 1,199.00 $ 4,796.00 $ 5,995.00 TRINITY- FURNISH/INSTALL PTZ CAMERA $ 6,780.00 $ 2,712.00 $ 10,848.00 $ 13,560.00 TRINITY- FURNISH/INSTALL PTZ CABLE $ 6.50 $ 266.50 $ 1,066.00 $ 1,332.50 LIGHTING, SIGNS, SIGNALS SUBTOTAL (Trinity Boulevard)) $ 16,697.90 1 $ 66,791.601 $ 83,489.501 TOTAL CHANGE ORDER 021 $ 103,609.90 I $ 191,990.40 I $ 295,600.30 [ SIGNATURES APPEAR ON THE FOLLOWING PAGE ] Page 5 of 6 REASONS FOR CHANGE ORDER: Changes correspond to multiple sheets in the REV1 through REV9 revised construction plans for Trinity Boulevard as prepared by Pacheco Koch and multiple sheets in the REV1 through REV4 revised construction plans for American Blvd / Transformation Way as prepared by Dunaway Associates. This change order requires 180 calendar days added to the contract. This change order corresponds with Contractor's Request PCO #2-21 and 23-28. The change order amounts for Trinity Boulevard infrastructure is eligible for 80% RTR Funding and 20% City Funding. The change order amounts for American Blvd / Transformation Way infrastructure is 100% City Funded. CITY AND TXDOT FUNDS INVOLVED IN THIS CONTRACT. REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. RECOMMENDED: APPROVED: APPROVED: APPROVAL RECOMMENDED: Consultant - Pacheco Koch Developer -American Airlines, Inc. Contractor - Reyes Group, Ltd CFW - Sponsoring Department a �W�eesstwwooyo�d/Company Chris Collison (Mar25,2024 17:43 CDT) Marcos Re s(Mar26,202418:29 MDT) Lauren Prieur(Mar27,202412:33 CDT) Brian O'Neill, PE, CFM Chris Collision rcos G. Reyes Lauren Prieur, PE Director, Public Infrastructure Director, Corporate Real Estate President Director, Transportation and Public Works Dept APPROVED: APPROVED AS TO FORM AND LEGALITY: RECOMMENDED: * Contract Compliance Manager (Project Manager) CFW - Assistant City Manager CFW - Assistant City Attorney CFW - Contract Compliance Manager By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, �� Dana Burghdoff 2024 CDT) Richard McCracken(Apr5,202407:28CDT) De66� C). uJe� including ensuring all performance and reporting (Apr o requirements. Dana Burghdoff, AICP Richard A. McKracken Debbie J. Willhelm, PE M&C Number: MC22-0735 Assistant City Manager Assistant City Attorney Project Manager M&C Date Appr:: 09/27/22 Form 1295: N/A ATTEST: CFW - City Secretary 1FOAT�� .4F� wN, o ago ��d Jannette S. Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 6 of 6 City of Fort Worth, Texas Mayor and Council Communication DATE: 09/27/22 M&C FILE NUMBER: M&C 22-0735 LOG NAME: 06AAECFA17-0192AMEND3 SUBJECT (CD 5) Authorize Execution of Amendment No. 3 to City Secretary Contract No. 51820, an Enhanced Community Facilities Agreement with American Airlines, Inc. for the Construction of Road Improvements on Trinity Boulevard, American Boulevard and US Highway 360 Frontage Road Increasing City Participation by $103,609.90, City Participation with Regional Toll Revenue by $191,990.40, and Extending the Completion Deadline to January 30, 2022, Authorize Execution of Change Order No. 2 to City Secretary Contract No. 51820 for a Revised Contract Amount of $3,544,671.10, Adopt Appropriation Ordinances, and Amend the Fiscal Years 2022-2026 Capital Improvement Program RECOMMENDATION: It is recommended that City Council: 1. Authorize the execution of Amendment No. 3 to City Secretary Contract No. 51820, an Enhanced Community Facilities Agreement with American Airlines, Inc. for the construction of road improvements on Trinity Boulevard, American Boulevard and US Highway 360 Frontage Road, increasing City Participation by $103,609.90 and City Participation with Regional Toll Revenue by $191,990.40, and extending the completion deadline to January 30, 2022; 2. Adopt the attached appropriation ordinance adjusting appropriations in the 2014 Bond Program Fund in the amount of $487,703.00 by increasing appropriations in the CFA-AA Headquarters P & TSign project (City Project No. 101828) and by decreasing appropriations in the CFA-American Airlines Pvn & SG project (City Project No. 101314) by the same amount; 3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Government Community Facilities Agreement Fund in the amount of $14,473.39 for the purpose of funding development fees for the CFA-AA Headquarters P&T Sign project (City Project No. 101828); and 4. Amend the Fiscal Years 2022-2026 Capital Improvement Program. DISCUSSION: On November 10, 2015, the City Council adopted Ordinance No. 21968-11-2015, Mayor and Council Communication (M&C) G- 18605, designating Tax Abatement Reinvestment Zone No. 91, and approved execution of a Tax Abatement Agreement with American Airlines, Inc., (Developer), and the Dallas/ Fort Worth International Airport Board for development of a corporate headquarters facility (Headquarters Project) on property at Dallas -Fort Worth International Airport located within the City of Fort Worth, City Secretary Contract No. 47341, as amended. Under the Tax Abatement Agreement, the City agreed to abate a maximum of between 75 to 90 percent of the incremental real and personal property taxes from the site for a period of one year provided that Developer expended at least $200 million in real property improvements by December 31, 2019 on property in the reinvestment zone and consider up to $2,000,000.00 in enhanced community facility funds for public infrastructure projects associated with the Headquarters Project. As part of the project, the Developer anticipated expending approximately $1,650,000.00 for the construction of road improvements including deceleration lanes, turn lanes, signaling, sidewalks and street light improvements on Trinity Boulevard, American Boulevard, US Highway 360 Frontage Road Public Infrastructure. On June 13, 2017, the City Council authorized execution of an Enhanced Community Facilities Agreement (ECFA), M&C C-28274, under which the City would reimburse Developer up to $950,000.00 of construction costs. The Developer proposed to expand the scope of the Public Infrastructure project to include widened roadways and turn lanes on Trinity Boulevard, US Highway 360 Frontage Road, and American Boulevard to accommodate the planned additional employee traffic at a total approximate cost of $7,000,000.00. On June 12, 2018, by M&C C- 28730, the City Council rescinded M&C C-28274 to cancel the 2017 ECFA that was never executed and authorized execution of a new ECFA with City participation in an amount not to exceed $1,700,000. 00. After further design and discussions with the Developer, through approval of M&C C-28898, the City Council rescinded M&C C-28730 and authorized entering into a new agreement increasing the City's participation in the Public Infrastructure project to $2,000,000.00 representing the entire commitment in the original tax abatement agreement. The M&C authorized execution of an Advance Funding Agreement (AFA) between the City and the State of Texas, acting through Texas Department of Transportation, for Regional Toll Revenue (RTR) for the public infrastructure improvements along Trinity Boulevard, American Boulevard and US Highway 360 Frontage Road. The M&C also authorized the execution of one or more ECFAs with the Developer consisting of the RTR funds as well as Non- RTR Funds comprised of ECFA funds and Transportation Impact Fee funds in an amount not to exceed $2,000,000.00 for the Public Infrastructure. The AFA (City Secretary Contract No. 82071), provided the City with RTR funds in an amount not to exceed $4,170,491.00, with a twenty percent local match requirement of $1,042,623.00. The ECFA, (City Secretary Contract No. 51820) was executed on January 31, 2019. The Developer is responsible for all costs exceeding the RTR funds received by the City under the AFA and the City's participation with Non-RTR funds. On June 3, 2019, the ECFA was amended to include the construction of additional public infrastructure improvements in the vicinity of American Blvd. that are were not funded by the AFA. On June 25, 2019 through M&C C-29166, the City Council authorized execution of an amendment to the ECFA and the Tax Abatement Agreement to extend the completion deadlines under the agreements pursuant to the force majeure provisions due to delays in the Texas Transportation Commission not approving the Regional Toll Revenue funding until January 31, 2019. The purpose of this M&C is to authorize the execution of Amendment No. 3 to the ECFA in order to finalize the amount of City Participation owed to the Developer and closeout the projects (City Project Nos. 101314 and 101828). The public infrastructure improvements were substantially completed on October 22, 2020. The final inspection was conducted on March 11, 2021. City staff have been working with the Developer, contractor and TxDOT on the final close out of the projects. Approval of this M&C, will authorize City staff to close out the projects and make the final payments to the Developer for all work that was completed. Upon approval of this M&C, City staff will execute Amendment No. 3 to the ECFA with the Developer and execute the corresponding Change Order No. 2 between the Developer and the contractor. Funding for the CFA-American Airlines Pvn project is summarized in the table below: Fund Existing Budget Change Project Total Funding (Increase/Decrease) 30106- $5,600,000.00 $0.00 $5,600,000.00 Intergovernmental Contribution 34014 2014 Bond $1,275,000.00 $(487,703.00) $787,297.00 Program Fund 31002 Grants $5,095,491.00 $0.00 $5,095,491.00 Capital Project State 39001 2007 Critical $725,000.00 $0.00 $725,000.00 Capital Projects 39008 Trans Impact $200,000.00 $0.00 $200,000.00 Fee Cap Legacy Project Total $12,895,491.00 $(487,703.00) $12,407,788.00 Funding for the CFA-AA Headquarters P & TSign project is summarized in the table below: Fund Existing Budget Change Project Total Funding (Increase/Decrease) 30111 Govt Community Facilities $14,473.39 $0.00 $14,473.39 Agmt 34014 2014 Bond $0.00 $487,703.00 $487,703.00 Program Fund Project Total $14,473.39 $487,703.00 $502,176.39 Funding for Enhanced Community Facilities Agreements was included in the 2014 Bond Program. Available resources within the General Fund will be used to provide interim financing until debt is issued. Once debt associated with the project is sold, bond proceeds will reimburse the General Fund in accordance with the statement expressing official Intent to Reimburse that was adopted as part of the ordinance canvassing the bond election (Ordinance No. 21241-05-2014) and subsequent actions taken by the Mayor and Council. Funding for the CFA-AA Headquarters P&T Sign project was not included in the FY2022-2026 Capital Improvement Program. Funding in the amount of $502,176.39 ($14,473.39 from developer fees and $487,703.00 from 2014 Bond Funds) is needed to cover construction fees and pay the final amount of City Participation owned to the Developer to close out the Project. This action in this M&C will amend the Fiscal Years 2022- 2026 Capital improvement Program as approved in connection with Ordinance 25073-09-2021. The CFA-AA Headquarters P&T Sign project previously received funding from the Government Community Facilities Agreement Fund in the amount of $14,473.39 for developer fees that were previously paid by the Developer. Recommendation #3 will formalize the appropriation of these funds from the Government Community Facilities Agreement Fund, as the funds were transferred from the Unspecified project through former delegated authority, which is no longer recognized. The Project is located in COUNCIL DISTRICT 5. A Form 1295 is not required because: This contract will be with a publicly -traded business entity or a wholly -owned subsidiary of a publicly -traded business entity: American Airlines FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the CFA-American Airlines Pvn & SG project within the 2014 Bond Program Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the 2014 Bond Program Fund for the CFA-AA Headquarters P & TSign project to support the approval of the above recommendations and execution of the amendment and change order. Prior to an expenditure being incurred, the Transportation and Public Works department has the responsibility of verifying the availability of funds. Submitted for Citv Manaaer's Office bv: Dana Burghdoff 8018 Oriainatina Business Unit Head: D.J. Harrell 8032 Additional Information Contact: Debbie Willhelm 2481 Jennifer Ezernack 8423