City Of Fort worth
Change Order Request
Facility and Project Diamond Hill Community Center Renovation
Description:
Funding (FID) No.(s) FID # 34018 0800450 5740010101652 004580
Contractor: I Muckleroy & Falls
City Project Mgr.IAlfonso Meza
Phone Number: 1 (817) 392-8274
Original Contract Amount------------------------------- ---------------------------
Extrasto Date------------------------------- •-----------------------------------------
Credits to Date •------------------------------------------------
Pending Change Orders (in M&C Process) ---------------------------
Contract Cost to Date------------------------------ •--------------------------------
Amount of Proposed Change Order -------------------------------------------------
Revised Contract Amount-------------------------------- ------------------------
Original Funds Available for Change Orders -----------------------------------------------
Remaining Funds Available for this CO -------------------------------------------------
Additional Funding (if necessary) -------------------------------------------------
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%)
Change Order #
City Inspector:
Phone Number:
CSC No. 56216-0O3
City Sec No. 156216
City Proj. No. 101652
03 Date: 1 3/21/2024
Lisa Pyper
1 (817) 392-2391
---------------------- 58,219,906.80
------- $2,840.52
•---------------------------------------0.00
I 0.00
---------------- $8,222,-47.32
•----------------I �16,900.00
----------------------- i 58,239,647.32
•------0.00
•----------I 0.00
-------------------' 0.00
0.0) 4
$10,274,883.50
Contract Time
(CD)
390
0
0
0
390
311
701
JUSTIFICATION (REASONS) FOR CHANGE ORDER
The purpose of Change Order #3 is to add the cost of additional wall pads to both the north and south side of the gym per request by the manager of the facility.
This change order in the amount of $16,900.00 increases the cost to the original contract amount ($8,219,906.80) plus cost of CO #1 for $2,840.00 and CO#2
(no cost) for a total contract amount of $8,239,647.32. This is an increase of 0.024% to the original contract amount.
It is understood and agreed that the acceptance of this Change Order by the contractor consitutes an accord and satisfaction and represents payment in full (both
Contractor's Company Name Contractor Name Contractor Signature Date
Muckleroy & Falls /C'll / Me1 11 Mar 22, 2024
PMD Inspector
Date
Architecural Services Manager
Date
L%yoe,�
Mar 22, 2024
Mar 25, 2024
PMD Superintendent
Date
Director/Property Management Department
Date
Mar 22, 2024
Mar 27, 2024
Project Manager
Date
Assistant City Attorney
Date
Mar 25, 2024
Apr 9, 2024
Project Architect
Date
Assistant City Manager
Darte
KaKt b Aantu cs ft/d
Mar25, 2024
J76fNa $
Apr 10, 2024
M&C Number I N/A
M&C Date Approved
N/A
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible OFFICIAL RECORD
for the monitoring and adminstration of this contract, including CITY SECRETARY Nikita Watts
ensuring all performance and reporting requirements. FT. WORTH, TX Architectural Services Manager
'W' MUCKLEROY & FALLS
Project Name: Diamond Hill Community Center
MF Job Number: 21667 Date: 03/11/24
PCO 86
To: City of Fort Worth
1 General Conditions
$
5,710.00
2 Self -Perform
$
120.00
3 Subcontractors, (Breakdowns Attached)
$
9,350.00
4 Builders Risk Insurance
$
47.00
5 General & Excess Liability Insurance
$
137.00
SUBTOTAL
$
15,364.00
6 Contractor Fee 10%
$
1,536.00
7 Payment & Performance Bonds
$
0.00
PROPOSED CHANGE TOTAL
$
16,900.00
DESCRIPTION: Add 22 wall pads per attached bid proposal.
This PC is issued to incorporate the revisions as specifically detailed on the attached cost summary and
supporting documents. If additional costs become apparent at a later date, or additional documents to
this scope of work become available, we reserve the right to price any additional costs and/or schedule
impacts as they become known.
Excludes any scope not listed above.
Please sign and return this PCO by March 12, 2024
HM & MF Ltd., dba Muckleroy & Falls
PCO
Date: 03/11/2024
EXTENDED BY KM
Project Name: JOB NO 21667 SHEET I OF I
CONSTRUCTION ESTIMATE DISTRIBUTION OF ITEMIZED COSTS
- I OW I UM I DIRECT LABOR DIRECT MATERIAL I SUB -CONTRACTS I T..T..T,.
DESCRIPTION OF WORK ITEMS UNIT I AMOUNT I UNIT I AMOUNT UNIT I AMOUNT AMOUNT
ADP Lemco-Added 22 Wall pads per exhibit
1 LS
$ $ $
$
$
$
8,450 $ 8,450
ADP Lemco-M&F plug Z-clips installation
1 LS
$ $ $
$
$
$
900 $ 900
M&F Project Director
1 LS
$ $ $
$
$
$
350.00 $ 350.00
M&F Asst PM
1 LS
$ $ $
$
$
$
460.00 $ 460.00
M&F Superintendent(on site Supervision)
1 LS
$ $ $
$
$
$
3,000.00 $ 3,000.00
M&F Field Services, General Requiments, Accounting
1 LS
$ $ $
$
$
$
1,900.00 $ 1,900.00
1 LS
$ $ $
$
$
$
- $ -
1 LS
$ $ $
$
$
$
$
1 LS
$ $ $
$
$
$
$
1 LS
$ $ $
$
$
$
$
1 LS
$ $ $
$
$
$
$
1 LS
$ $ $
$
$
$
$
1 LS
$ $ $
$
$
$
$
1 LS
$ $ $
$
$
$
$
1 LS
$ $ $
$
$
$
$
1 LS
$ $ $
$
$
$
$
1 LS
$ $ $
$
$
$
$
Subtotal
$
$ 15,060.00
Subtotal
$ 15,060.00
'W' MUCKLEROY & FALLS
February 19, 2024
Mr. Jackson Jones
Diamond Hill Community Center
1700 NE 37th Street
Fort Worth, TX 76106
Re: Diamond Hill Community Center
Bid Proposal for Added Wall Pads
Dear Mr. Jones,
3200 Riverfront Drive, Suite 200 Fort Worth, TX 76107
817.877.3510 1 www.MuckleroyFalls.com
Please find attached our Bid Proposal for added wall pads as requested:
• Provide and install (22) new RED wall pads as indicated per attached drawing.
• Lead time is 8 weeks from approval.
• Please note these are red, and that the dye lot may have a slight difference in color
between these and the original pads.
• Excludes an drywall repairs, added wood blocking, paint, or any scope not specifically
included above.
Bid: $16,900
Sincerely,
Muckleroy & Falls
� kL�-�
Keith Melton
Project Director
L E A D E R S H I P I H O N E S T Y I L O Y A L T Y I W 0 R K E T H I C
R
3
P
0
m
1ff�
Diamond Hill Community Center
t°
m_
z
1701 NE 36th St.
® n
m
a p
s T'a�
x
Fort Worth, TX 76106
O
0 ti
Cn
ISSUE FOR CONSTRUCTION
• ARCHITECTS
Dallas I Fort Worth I Austin
"' I
H�
IIIII
<mIIIIII
®
D
00
z X
s'y5
a
x
44
�b
c
o T _
Diamond Hill Community Center
1701 NE 36th St.
Fort Worth, TX 76106
ISSUE FOR CONSTRUCTION
I
• ARCHITECTS
Dallas I Fort Worth I Austin
AX GENERAL BID
ADP EMCO
I N C O R P O R A T E D
13702 S 200 W B9
Draper, UT 84020
Phone # 801-280-4000
PROJECT MANAGER
TOM CEDERLUND TOMC@ADPLEMCO.COM
THIS BID IS LIMITED TO ITEMS, SIZES,
QUANTITIES, AND SPECIFICATIONS ON THIS
QUOTE ONLYAND IS BASED ON ADP LEMCO
PRODUCTS UNLESS OTHERWISE SPECIFIED
HEREIN. IF THERE ARE ANY DISCREPANCIES
PLEASE CONTACT ESTIMATOR FOR A REVISED
PRICE
Qty
1 FREIGHT
1 INSTALLATION
24 SAFETY WALL PADS
Sales Tax Item for Retention Invoices Only
Date
2/12/2024
QUOTE #
16082
PROJECT NAME:
MUCKLER0Y & FALLS
3200 RIVERFRONT DRIVE SUITE 200
FORT WORTH, TX 76107
LOCATION:
DIAMOND HILL COMMUNITY CENTER
MUCKLEROY & FALLS
1701 NE 36th Street
FORT WORTH, TX 76102
SECTIONS ADDENDA
LEAD TIME (WEEKS) CONTRACTOR LICENSE
Description
Plug -Add Zclips $900
QUOTE IS VALID FOR 30 DAYS Total $8,450.00