Contract 61193-PM1
CSC No. 61193-PM1 PROJECT MANUAL FOR THE CONSTRUCTION OF WATER & SEWER IMPROVEMENTS TO SERVE: QUARRY FALLS MULTI -FAMILY IPRC Record No. 23-0125 City Project No. 105084 FID No. 30114-0200431-105084 EO7685 File No. W-3000 Mattie Parker David Cooke Mayor City Manager Christopher P. Harder, P.E. Director, Water Department Lauren Prieur, P.E. Director, Transportation and Public Works Department 03/28/2024 OF 71 blot 9seae ANDREA E. TAYLOR `e -�b 124055 aeao Prepared for The City of Fort Worth March 2024 mama 519 E. Border Street Arlington, TX 76010 www.mmatexas.com ataylor@mmatexas.com tbpe #f-2759 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 000010 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 6 SECTION 00 00 10 TABLE OF CONTENTS DEVELOPER AWARDED PROJECTS Division 00 - General Conditions nn�3 ln.yit tie t Bidders nn�3 irs+..,,etiors t Last Revised 03/20/2020 004100 00 42 43 0043 3 Bidders Bid Fo Proposal Form Unit Price Bid Ben 03/20/2020 040:2,12014 05/22/2019 040:2,12014 0045 11 Bidders U -o,,u l:fie ti n's Prequalification Statement nn in 4 09/01/2015 0045 12 nno0 45 13 Bidder- v -o.,u l;fieatioi kWipa 03 in v 00 45 26 Contractor Compliance with Workers' Compensation Law 04/02/2014 nQ i 0045 40 00 52 43 Mine -ity Btisi ess Enterprise Goal Agreement a 06/16/2016 00 61 25 hh�T Certificate of Insurance Pert t ffi tee Boo l 07/01/2011 Maintenance Bond 01/31/2012 00 62 19 00 73 00 0073 10 c„rri oment., -y Conditions Standard City Conditions of the Construction Contract for Developer 07 in i 1120 i 01/10/2013 Awarded Projects Division 01- General Requirements Last Revised 01 1100 Summary of Work 12/20/2012 01 25 00 Substitution Procedures 08/30/2013 01 31 19 i�0 Preconstruction Meeting 08/30/2013 0 01 32 33 Pr-ej eet Meet' Preconstruction Video 07/OiQn 08/30/2013 013300 Submittals 08/30/2013 01 35 13 Special Project Procedures 08/30/2013 01 45 23 Testing and Inspection Services 03/20/2020 01 50 00 Temporary Facilities and Controls 07/01/2011 01 5526 Street Use Permit and Modifications to Traffic Control 07/01/2011 01 57 13 Storm Water Pollution Prevention Plan 07/01/2011 01 60 00 Product Requirements 03/20/2020 01 66 00 Product Storage and Handling Requirements 04/07/2014 01 70 00 Mobilization and Remobilization 04/07/2014 01 71 23 Construction Staking 04/07/2014 01 74 23 Cleaning 04/07/2014 01 77 19 Closeout Requirements 04/07/2014 01 78 23 Operation and Maintenance Data 04/07/2014 01 78 39 Project Record Documents 04/07/2014 CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised March 20, 2020 00 00 10 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 6 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents Division 02 - Existing Conditions NONE Division 03 - Concrete NONE Division 26 - Electrical NONE Division 31- Earthwork NONE Division 32 - Exterior Improvements NONE Division 33 - Utilities NONE Division 34 - Transportation NONE CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised March 20, 2020 00 00 10 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 6 Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: httD:Hfortworthtexas.aov/tvw/contractors/ or httDs:Hanus.fortworthtexas.Lyov/Proi ectResources/ Division 02 - Existing Conditions Last Revised 0241 13 Selective Site Demolition 12/20/2012 02 41 14 rUt;lit-y Re,..,..,.,1/At afi r,...ort 12/�1-2 0241 15 Paving Removal 02/06 Division 03 - Concrete 033000 Ceol, L. PLaoa Genefete 12/ 0334 13 Controlled Low Strength Material (CLSM) 12/20/2012 Division 26 - Electrical 260500 !-''.,..-...-,e Wef4E Results f Ele tmr-iea 1 1 /7�viJ 260533 Raee,. ays .,-a 1?e*es Fe,-- Eleetfieal Systems 12/�1zz�-zvizviz 2605 43 r ade-gr-etm Duets a -a n,.,.o,. ays f f Lloatl"YJal E"iy'stems n�/no,, 1�n 260550 E0:S4�'i�ll'41,.., ,,,.. Multi Duet Conduit 02/2642 �o Division 31- Earthwork 31 1000 Site Clearing 12/20/2012 3123 16 Unclassified Excavation 01/28/2013 31�3 BE)FFE) n 1 /0 4�13 1 n1 /28/-2n14 �8 PAY.I'A�'AI.li��tC oz,-z-�,--� 31 25 00 Erosion and Sediment Control 12/20/2012 31 36 00 Gabions 12/20/2012 3 ,moo Ripr-ap 1 'f1 /'f�-20A2012 Division 32 - Exterior Improvements 3'�9 Lime TreeAe a Base r..,,,s 12/7zzr20QO12 Eali'10ffit TY.. rLrtvravzz '27�T Liquid T-Fe to.l Soil St.,l.n4/'fwr�irivi-5 27� 1k .Zalt 12/7rc�-20QO12 37�6 lfial- U-.xt -%, ng 12/2z CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS 105084 Revised March 20, 2020 00 00 10 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 6 2'l�3 32 5 3231 3 '27�0 Payefnef4 Nita -kings ram,, t, Address PaipAing Fv�rr� Cka Gates W -e l-ef es .-ad Ga4es 11 /22QW3 1 1 /n�13 2 12/20QO1nr. �� 11/�12 Z7�3 27� 3 Cast i Ulaee C ner-ete D:tn,.-�ing Wa44 T.... sei Dl....ome 4 ..n.1 Finishing of Pa fk.. ays TT.,dre NI-t l,.b.ing Seeding, n.1 C'...a.aing 06/no c�a 12/')zzr20420 2 11/'f�zrzvriviz 'i�2 Division 33 Tf:ees and C`l..ubs - Utilities 17/'f�zrzvriviz 33 01 30 Sewer and Manhole Testing 12/20/2012 33 0131 Circuit Television (CCTV) Inspection 03/03/2016 ZZ�v 33 04 10 33 04 11 7Cllosed r Pu. ing of Existing Sewer- Systems joint Bending and Eleetfieal lsela&) Ceffesion Geatfel Test Stations 11/'fr�-svriviz 12/20QO12 12/2OQOt2 33 04 12 33 04 30 33 04 40 >\aagnesitff node r.,thed Pfete tie Systeffl Tompef:ar-y Watef: Setwie Cleaning and Acceptance Testing of Water Mains 11/�12 0�/non 02/06/2013 33 04 50 Cleaning of Sewer Mains 12/20/2012 3305 10 Utility Trench Excavation, Embedment, and Backfill 12/12/2016 3305 12 Water Line Lowering 12/20/2012 33 05 13 Frame, Cover and Grade Rings — Cast Iron 01/22/2016 33 n�0 >; - e Coyef: *,l n a o Ringrs Composite 01 /o� 6 33 05 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to 12/20/2012 Grade 33 05 16 Concrete Water Vaults 12/20/2012 33 05 17 Concrete Collars 12/20/2012 /�12 33 05 20Auger-11 �3-A3-21 r Tu�rr.-nil ar- Pla4e 11 /�12 33 05 22 Steel Casing Pipe 12/20/2012 171 /'fez 330523 23 33 05 24 330526 Installation of Carrier Pipe in Casing or Tunnel Liner Plate T 444- , A lar-ke fs /T ,,,... e fs 06/19/2013 12/20Qz 33 05 30 33 1105 T , ea4io of Existing U44i ;ems Bolts, Nuts, and Gaskets 12/�1z 12/20/2012 33 11 10 Ductile Iron Pipe 12/20/2012 33 11 11 Ductile Iron Fittings 12/20/2012 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 11/16/2018 ?'3 11 13 Eenefete P2a�ja7.- P*,z, Bar 114appe cool Cylinder- Type 11 /�12 1 1 14 Bur-ied Steel Pipe and >riAin.s 11 /�12 33 12 10 Water Services 1-inch to 2-inch 02/14/2017 33 1211 Large Water Meters 12/20/2012 33 1220 Resilient Seated Grate Valve 12/20/2012 22� AWW k Ru b r. Fea4e BtAte,.fly Valves 1 q/'lrz�-avriviz 33 1225 Connection to Existing Water Mains 02/06/2013 33 1230 Combination Air Valve Assemblies for Potable Water Systems 12/20/2012 33 1240 Fire Hydrants 01/03/2014 CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised March 20, 2020 0000 10 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 5 of 6 1 33 1250 Watol,,Sarl��.e Stations 12�12 33 1260 Standard Blow -off Valve Assembly Dlaee Pipe 06/19/2013 11 /�12 3331 2 33 31 3 Giffed i (CIPDI Fibefslxa 1_oCc ,.ee Pipe for- r -a-y t EGmitaly-Sewer-s 12/20QO12 �z 33 31 15 High Density Polyethylene (HDPE) Pipe for Sanitary Sewer 12/20/2012 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 06/19/2013 33 31 21 Polyvinyl Chloride (PVC) Closed Profile Gravity Sanitary Sewer 12/20/2012 Pipe 33 31 22 Sanitary Sewer Slip Lining 12/20/2012 33 31 23 Safi t., y C`owef: Pipe Bn.l t 12/wiz 33 31 50 Sanitary Sewer Service Connections and Service Line 04/26/2013 33 39 10 Cast -in -Place Concrete Manholes 12/20/2012 33 39 20 Precast Concrete Manholes 12/20/2012 33 39 30 F-iborg1mr-1\anholes 11 /'�12 33 39 60 Epoxy Liners for Sanitary Sewer Structures r Pipe/r„lyet4s 12/20/2012 n�n�/„ 1�n 33-44 10 1 11 Reinfefeed ne fete St,.,..,., Sewef High Density Polyethylene (14DPE) Pipe F ,- Ct.,.-.-., Tl,-.,i 12/'f�zrzvriviz �! 112 33 4600 Reif F ,-ee PolyetL.le*e (ERPE) Dire 11 /1 5 171 /7zz�-20QO12 33 4601 ,Stibdr-ainage Slotted Storm Denim. n�/no 1�,�n �3-4H-02 3 49 10 �ar�h ��u�r� Cast i Ulaee Nitaf Ales .,.-..l T,,netio Boxes n�/n1 /2n1 1 ,n 12/'fez 33 4920 33 4940 Curb and Tl,-.,p h lets Storm Dic inage uo.,,aw,.11s and Wingw,.11s 12/20QO12 n�/no 1�,o�n Division 34 - Transportation 3n n�no_11 Attaehmeat A r nt eller- Ca i et 12/1 /1�15 3 n n�02 Att-aeh eattB Geatf.01RAx FTwafe �o��en 0 2 afieation '2A�= Te1*PE„-aFY T,-affi . C`:..., a! 1 11 1 /'f�vi3 ?il i i if Reet gulp Ili d Fk-\.Airlg Beaeon 111 1 /' 3 34 41 16 �o gedoG*��AI-I;brid Signal 1 1 /22QO 1 3 34 44 20 Assemblies Mies 12/2042012 �y Illurn��ti�� 3n n�01 r r 06/154201c i�QYI� . J�1�'�' .1,1I�1a�1��35 vvrrarav�� 34 412002 >~ -eeway r ED n,,.,,1.:.., r 06/1 c/�n1 c .�71'��'l�il QS �� 3n n�no3 1 r >, n,,,.a... - r 06/15QO -5 dcrfti� � ��ii���o o�� 34-4 30 Ahwrinum figns 1111 /1�n 3471 13 Traffic Control 11/22/2013 CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS 105084 Revised March 20, 2020 000010 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Appendix Page 6 of 6 GG 4.04- A-vailab,.lity-&PL� GC-4.02 Subsurface and Physical Conditions GC 4.04 Undefground Faeilities- GG 4.06 Hazafdetis Envifenmen4a! Condition at Site GG 6.0 MinEwity a*d Women Owned Business Efftefpf:ise Complianee GG 6.0-7 Wage R-Mes GC 6.0-9 Rermitvam-l-t� GC 6.24 NeadisatirAk-zatim GR-01 60 00 Product Requirements END OF SECTION CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised March 20, 2020 UNIT PRICE BID IBidlist Item) No. � 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information Description 00 42 43 DAP - BID PROPOSAL Page I oft Bidder's Application Bidder's Proposal Specification Unit of Bid Section No. I Measure I Quantity Unit Price Bid Value UNIT I: WATER IMPROVEMENTS 0241.1300 Remove Conc Curb&Gutter 0241 15 3201.0202 Asphalt Pvmt Repair Beyond Defined Width, 33 01 17 Arterial 3305.0109 Trench Safety 33 05 10 3305.2008 30" Water Carrier Pipe 33 05 24 3311.0001 Ductile Iron Water Fittinqs w/ Restraint 33 11 11 3311.0141 6" Water Pipe 3311 f10&121 3311.0261 8" PVC Water Pipe 3311 12 3311.0541 16" Water Pipe 3311 f10&121 3311.0551 16" DIP Water 3311 f10&121 3311.0567 16" PVC C905 Water Pipe, CLSM Backfill 3311 12 3312.0001 Fire Hydrant 33 12 40 3312.0106 Connection to Existinq 16" Water Main 33 12 25 3312.0117 Connection to Exitinq 4"-12" Water Main 33 12 25 3312.1002 2" Combination Air Valve Assemblv for 33 12 30 Water 3312.2003 1" Water Service 33 12 10 3312.2203 2" Water Service 33 12 10 3312.2801 3" Water Meter and Vault 33 12 11 3312.3002 6" Gate Valve 33 12 20 3312.3003 8" Gate Valve 33 12 20 3312.3006 16" Gate Valve W/ Vault 33 12 20 3312.6002 6" Blow Off Valve 33 12 60 9999.0000 Non -Standard Item - 3" Water Pipe 00 00 00 9999.0000 Non -Standard Item - Automatic Flusher 00 00 00 TOTAL UNIT I: LF 397 $15.00 SY 2354 $50.00 LF 3400 $1.00 LF 95 $260.00 TON 4.1 $8,000.00 LF 20 $60.00 LF 125 $80.00 LF 2934 $180.00 LF 102 $250.00 LF 100 $195.00 EA 7 $6,000.00 EA 1 $10,000.00 EA 1 $8,500.00 EA EA 2 EA 2 EA 2 EA 4 EA 6 EA 11 EA 3 LF 119 EA 1 WATERIMPROVEMENTS $4,800.00 $3,000.00 $4,500.00 $30,000.00 $2,500.00 $3,500.00 $34,500.00 $6,500.00 $40.00 $5,500.00 1 $5,955.00 1 $117, 700.001 $3,400.00 1 $24, 700.00 1 $32,800.00 1 $1,200.00 1 $10, 000.00 1 $528,120.00 1 $25,500.001 $19, 500.00 1 $42, 000.00 1 $10, 000.00 $8, 500.00 1 $14,400.00 $6, 000.00 1 $9,000.001 $60, 000.00 1 $10, 000.00 $21, 000.00 1 $379,500.00 1 $19, 500.00 1 $4, 760.00 1 $5,500.00 1 $1,359,035.001 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 WATER AND SEWER_00 42 43_Bid Proposal_DAP 00 42 43 DAP - BID PROPOSAL Page 2 of 4 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal �Bidlist Item Description Specification Unit of Bid Unit Price Bid Value No. Section No. Measure Quantity UNIT II: SANITARY SEWER IMPROVEMENTS 1 0241.1300 Remove Conc Curb&Gutter 0241 15 LF 50 $15.00 $750.001 3301.0101 Manhole Vacuum Testing 3301 30 EA 11 $150.00 $1,650.001 2 3136.0104 Twisted Gabion Mattresses 31 3600 SY 539 $120.00 $64,680.001 3 3201.0202 Asphalt Pvmt Repair Beyond Defined Width, 3301 17 SY 178 $50.00 $8,900.001 4 3301.0002 Post -CCTV Inspection 3301 31 LF 1854 $2.00 $3,708.001 5 3305.0109 Trench Safety 33 05 10 LF 1854 $1.00 $1,854.001 6 3305.3008 20" Sewer Carrier Pipe 33 05 24 LF 80 $265.00 $21,200.001 3331.4108 6" Sewer Pipe 3311 10, 7 3331 12, LF 187 3331 20 $75.00 $14,025.00 3331.4115 8" Sewer Pipe 3311 10 8 3331 12 LF 403 3331 20 $90.00 $36,270.00 9 3331.4201 10" Sewer Pipe 3311 10 LF 958 $100.00 $95,800.001 10 3331.5750 10" DIP Sewer, CLSM Backfill 3311 10 LF 196 $100.00 $19,600.001 3331.5747 8" Sewer Pipe, CLSM Backfill 3311 10 11 3331 12 LF 60 3331 20 $95.00 $5,700.00 3331.5749 10" Sewer Pipe, CLSM Backfill 3311 10 12 3331 12 LF 50 3331 20 $105.00 $5,250.00 13 3339.0001 Epoxy Manhole Liner 33 39 60 VF 40 $200.00 $8,000.001 14 3339.1001 4' Manhole 33 39 10 EA 10 33 39 20 $6,000.00 $60,000.00 15 3339.1002 4' Drop Manhole 33 39 10 EA 1 33 39 20 $7,500.00 $7,500.00 16 3339.1003 4' Extra Depth Manhole 33 39 10 VF 51 33 39 20 $350.00 $17,850.00 TOTAL UNIT II: SANITARY SEWER IMPROVEMENTSI $372,737.001 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 WATER AND SEWER_00 42 43_Bid Proposal_DAP UNIT PRICE BID SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information 00 42 43 DAP - BID PROPOSAL Page 3 of 4 Bidder's Application �Bidlist Item Description Specification Unit of Bid No. Section No. Measure I Quantity UNIT I -A: ALTERNATE WATER IMPROVEMENTS 1 3311.0001 Ductile Iron Water Fittings w/ Restraint 3311 11 TON 0.3 2 3311.0461 12" PVC Water Pipe 3311 12 LF 791 3 3312.3005 12" Gate Valve 33 12 20 EA 4 4 3312.6002 6" Blow Off Valve(100% City Cost) 33 12 60 EA 1 TOTAL UNIT I -A: ALTERNATE WATER IMPROVEMENT:, Bidder's Proposal Unit Price I Bid Value $8,000.00 1 $2,400.001 $165.00 $130,515.001 $5,000.00 $20,000.001 $6,500.00 $6,500.001 $159,415.00 1 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 WATER AND SEWER_00 42 43_Bid Proposal_DAP UNIT PRICE BID SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information 00 42 43 DAP - BID PROPOSAL Page 4 of 4 Bidder's Application lBidlist Iteml I Description Specification Unit of Bid No. Section No. Measure Quantity Bid Summary l UNIT I: WATER IMPROVEMENTS UNIT II: SANITARY SEWER IMPROVEMENTS Total Construction Bid UNIT I -A: ALTERNATE WATER IMPROVEMENTS Total Alternate Bid This Bid is submitted by the entity named below: BIDDER: GS Construction Great Plains, LLC 730 Town & Country Blvd. Suite 800 Houston, TX 77024 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. BY: *I' TITLE: Vice President DATE: 3.12.2024 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 Bidder's Proposal Unit Price I Bid Value $1,359,035.00 1 $372,737.00 1 $1,731,772.001 $159,415.00 1 $1,731,772.001 100 calendar days after the date when the WATER AND SEWER_00 42 43_Bid Proposal DAP 0045 12 DAP PREQUALIFICATION STATEMENT Page 1 of 1 SECTION 00 45 12 DAP — PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Major Work Tvpe" box provide the complete major work tvve and actual description as provided by the Water Department for water and sewer and TPW for paving. Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date Wastewater new development open cut Bandera Utility Contractors (12" and under); Water new development open cut (16" and under) 04/30/2024 The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: GS Construction Great Plains, LLC 730 Town & Country Blvd. Suite 800 Houston. TX 77024 BY: (Signature) TITLE: Vice President DATE: 3.12.2024 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION PREQUALI FI CATION STATEMENT— DEVELOPER AWARDED PROJECTS UNIT 1_00 45 12_Prequalification Statement 2015_DAP Form Version September 1, 2015 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 00 45 26 - 1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No. 105084. Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: GS Construction Great Plains, LLC Company 730 Town & Country Blvd. Suite 800 Address Houston, Texas, 77024 City/State/Zip THE STATE OF TEXAS § COUNTY OF TARRANT § By: Philip Treacy (Please Print) Signature:r� Title: Vice President (Please Print) BEFORE ME, the undersigned authority, on this day personally appeared Philip Treacy , known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as the act and deed of Vice President for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this 19th day of December, 2023. W MPAY ANN PARMMR ry ftft. SLp of Texas y OMOV Ot, 0 E:ir'ra_.CY)fo, Aa4,e/ lLn.ynr,lo2rOTAAY Q /31 ip7342 Notaroublic in and for the State of Texas 39 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised April 2, 2014 Quarry Falls Multi -Family 105084 2 3 SECTION 00 52 43 AGREEMENT 00 52 43 - 1 Developer Awarded Project Agreement Pagel of 4 4 THIS AGREEMENT, authorized on 3.20.2024 is made by and between the Developer, 5 GS Quarry Falls Phase 1 Owner, L.P. , authorized to do business in Texas 6 ("Developer"), and GS CONSTRUCTION GREAT PLAINS. LLC, authorized to do business in 7 Texas, acting by and through its duly authorized representative, ("Contractor"). 8 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 9 follows: 10 Article 1. WORK 11 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 12 Project identified herein. 13 Article 2. PROJECT 14 The project for which the Work under the Contract Documents may be the whole or only a part is 15 generally described as follows: 16 Ouarry Falls Multi-Familv 17 105084 18 Article 3. CONTRACT TIME 19 3.1 Time is of the essence. 20 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 21 Documents are of the essence to this Contract. 22 3.2 Final Acceptance. 23 The Work will be complete for Final Acceptance within 100 calendar days after the date 24 when the Contract Time commences to run as provided in Paragraph 12.04 of the Standard 25 City Conditions of the Construction Contract for Developer Awarded Projects. 26 3.3 Liquidated damages 27 Contractor recognizes that time is of the essence of this Agreement and that Developer 28 will suffer financial loss if the Work is not completed within the times specified in 29 Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of 30 the Standard City Conditions of the Construction Contract for Developer Awarded 31 Projects. The Contractor also recognizes the delays, expense and difficulties involved in 32 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not 33 completed on time. Accordingly, instead of requiring any such proof, Contractor agrees 34 that as liquidated damages for delay (but not as a penalty), Contractor shall pay 35 Developer Zero Dollars $ $0 for each day that expires 36 after the time specified in Paragraph 3.2 for Final Acceptance until the City issues the 37 Final Letter of Acceptance. CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised June 16, 2016 00 52 43 - 2 Developer Awarded Project Agreement Page 2 of 4 37 Article 4. CONTRACT PRICE 38 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract 39 Documents an amount in current funds of One Million Seven Hundred Thirty -One Thousand 40 Seven Hundred Seventv-Two Dollars and Zero Cents ($1,731,772.00). 41 Article 5. CONTRACT DOCUMENTS 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 A. The Contract Documents which comprise the entire agreement between Developer and Contractor concerning the Work consist of the following: 1. This Agreement. 2. Attachments to this Agreement: a. Bid Form (As provided by Developer) 1) Proposal Form (DAP Version) 2) Prequaliiication Statement 3) State an Fede ., l do clump: b. Insurance ACORD Form(s) e. � nn Payment Bend (DAP Ve -s;on) tt Perf9iiiianee B".,..7 (DAD A7er-gieo e. Maintenance Bond (DAP Version) g. Worker's Compensation Affidavit a. Nimirrtnl'.,nt F:7-.vn (if required) 3. Standard City General Conditions of the Construction Contract for Developer Awarded Projects. 1. �atrtlo��tar,, r„ 5. Specifications specifically made a part of the Contract Documents by attachment or, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents. 6. Drawings. 7. Addenda. 8. Documentation submitted by Contractor prior to Notice of Award. 9. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS 105084 Revised June 16, 2016 00 52 43 - 3 Developer Awarded Project Agreement Page 3 of 4 76 Article 6. INDEMNIFICATION 77 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 78 expense, the city, its officers, servants and employees, from and against any and all 79 claims arising out of, or alleged to arise out of, the work and services to be performed 80 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 81 under this contract. This indemnification provision is specifically intended to overate 82 and be effective even if it is alleged or proven that all or some of the damages being 83 sought were caused. in whole or in part, by anv act. omission or negligence of the citv. 84 This indemnity provision is intended to include, without limitation, indemnity for 85 costs, expenses and legal fees incurred by the city in defending against such claims and 86 causes of actions. 87 88 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 89 the city, its officers, servants and employees, from and against any and all loss, damage 90 or destruction of property of the city, arising out of, or alleged to arise out of, the work 91 and services to be performed by the contractor, its officers, agents, employees, 92 subcontractors, licensees or invitees under this contract. This indemnification 93 provision is suecificallv intended to operate and be effective even if it is alleged or 94 vroven that all or some of the damages being sought were caused, in whole or in part, 95 by anv act, omission or negligence of the city. 96 97 Article 7. MISCELLANEOUS 98 7.1 Terms. 99 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of 100 the Construction Contract for Developer Awarded Projects. 101 7.2 Assignment of Contract. 102 This Agreement, including all of the Contract Documents may not be assigned by the 103 Contractor without the advanced express written consent of the Developer. 104 7.3 Successors and Assigns. 105 Developer and Contractor each binds itself, its partners, successors, assigns and legal 106 representatives to the other party hereto, in respect to all covenants, agreements and 107 obligations contained in the Contract Documents. 108 7.4 Severability. 109 Any provision or part of the Contract Documents held to be unconstitutional, void or 110 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 111 remaining provisions shall continue to be valid and binding upon DEVELOPER and 112 CONTRACTOR. 113 7.5 Governing Law and Venue. 114 This Agreement, including all of the Contract Documents is performable in the State of 115 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 116 Northern District of Texas, Fort Worth Division. CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised June 16, 2016 117 118 119 120 121 122 123 124 125 126 00 52 43 - 4 Developer Awarded Project Agreement Page 4 of 4 7.6 Authority to Sign. Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized signatory of the Contractor. IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple counterparts. This Agreement is effective as of the last date signed by the Parties ("Effective Date"). Contractor: Developer: GS CONSTRUCTION GREAT PLAINS, LLC GS Quarry Falls Phase 1 Owner, L.P. By: f f La — (Signature) Philip Treacy (Printed Name) Title: Vice President Company Name: GS Construction Great Plains, LLC Address: 730 Town & Country Blvd. Suite 800 City/State/Zip: Houston, Texas 77024 By: (Signature) JR Thulin (Printed Name) Title: Vice President Company name: Greystar Development Central, LLC Address:600 E. Las Colinas Boulevard, STE. 2100 City/State/Zip: Irving, Texas 75039 Date 3.20.2024 Date 3.20.2024 127 CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised June 16, 2016 006219-1 MAINTENANCE BOND Page 1 of 3 1 SECTION 00 62 19 2 MAINTENANCE BOND 3 Bond Number 800170306 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we GS CONSTRUCTION GREAT PLAINS, LLC , known as 9 "Principal" herein and Atlantic Specialty Insurance Company , a corporate surety 10 (sureties, if more than one) duly authorized to do business in the State of Texas, known as 11 "Surety" herein (whether one or more), are held and firmly bound unto the Developer, 12 GS Quarry Falls Phase 1 Owner, L.P., authorized to do business in Texas 13 ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), in the sum of 14 One Million Seven Hundred Thirtv-One Thousand Seven Hundred Seventv-Two Dollars and Zero 15 Cents ($1,731,772.00), lawful money of the United States, to be paid in Fort Worth, Tarrant 16 County, Texas, for payment of which sum well and truly be made jointly unto the Developer and 17 the City as dual obligees and their successors, we bind ourselves, our heirs, executors, 18 administrators, successors and assigns, jointly and severally, firmly by these presents. 19 20 WHEREAS, Developer and City have entered into an Agreement for the construction of 21 community facilities in the City of Fort Worth by and through a Community Facilities 22 Agreement, CFA Number CFA23-0174 ;and 23 WHEREAS, the Principal has entered into a certain written contract with the Developer 24 awarded theme day of March , 2094, which Contract is 25 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all 26 materials, equipment labor and other accessories as defined by law, in the prosecution of the 27 Work, including any Work resulting from a duly authorized Change Order (collectively herein, 28 the "Work") as provided for in said Contract and designated as Quarry Falls Multi -Family Phase 29 1 B; and 30 31 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 32 accordance with the plans, specifications and Contract Documents that the Work is and will 33 remain free from defects in materials or workmanship for and during the period of two (2) years 34 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS 105084 Revised January 31, 2012 1 2 3 4 5 6 7 8 9 10 11 12 13 14 l5 16 17 18 19 20 21 22 006219-2 MAINTENANCE BOND Page 2 of 3 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon receiving notice from the Developer and/or City of the need thereof at any time within the Maintenance Period. NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy any defective Work, for which timely notice was provided by Developer or City, to a completion satisfactory to the City, then this obligation shall become null and void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely noticed defective Work, it is agreed that the Developer or City may cause any and all such defective Work to be repaired and/or reconstructed with all associated costs thereof being bome by the Principal and the Surety under this Maintenance Bond; and PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division; and PROVIDED FURTHER, that this obligation shall be continuous in nature and successive recoveries may be had hereon for successive breaches. CITY OF FORT WORTH STANDARD CITY CONDITIONS DEVELOPER AWARDED PROJECTS Revised January 31, 2012 Quarry Falls Muter -Family 105084 006219-3 MAINTENANCE BOND Page 3 of 1 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the 22nd day of March 3 .20 24 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 ATTEST: (Principal) Secretary Witness as to Principal Witness as to Surety PRINCIPAL: GS CONSTRUCTION GREAT PLAINS, LLC BY: Signature Name and Title Address: SURETY: Atlantic Svecialtv Insurance Comuanv h: /,i gn t/ //. V� ature Laura E. Sudduth, Attomey-In-Fact Name and Title Address: 605 Hi2hwaX 169 North. Suite 800 Plymouth, MN 55441 Telephone Number: (952) 852-2431 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CITY CONDITIONS DEVELOPER AWARDED PROJECTS 105084 Revised January 31, 2012 intact INSURANCE I Power of Attorney KNOW ALL MEN BY THESE PRESENTS, that ATLANTIC SPECIALTY INSURANCE COMPANY, a New York corporation with its principal office in Plymouth. Minnesota, does hereby constitute and appoint: Amanda R. Turman-Avina, Barbara Norton, Cristina Nino, Jennie Goonie, Jessica Richmond, Laura E. Sudduth, Madison K Diaz, Mario Arzamendi, Mary Ann Garcia, Misty Witt, Stephanie Gross, Teuta Luri, each individually if there be more than one named, its true and lawful Attomey-in-Fact, to make, execute, seal and deliver, for and on its behalf as surety, any and all bonds, recognizances, contracts of indemnity, and all other writings obligatory in the nature thereof; provided that no bond or undertaking executed under this authority shall exceed in amount the sum of: unlimited and the execution of such bonds, recognizances, contracts of indemnity, and all other writings obligatory in the nature thereof in pursuance of these presents, shall be as binding upon said Company as if they had been fully signed by an authorized officer of the Company and sealed with the Company seal. This Power of Attorney is made and executed by authority of the following resolutions adopted by the Board of Directors of ATLANTIC SPECIALTY INSURANCE COMPANY on the twenty-fifth day of September, 2012: Resolved: That the President, any Senior Vice President or Vice -President (each an "Authorized Officer") may execute for and in behalf of the Company any and all bonds, recognizances, contracts of indemnity, and all other writings obligatory in the nature thereof, and affix the seal of the Company thereto; and that the Authorized Officer may appoint and authorize an Attomey-in-Fact to execute on behalf of the Company any and all such instruments and to affix the Company seal thereto; and that the Authorized Officer may at any time remove any such Attomey-in-Fact and revoke all power and authority given to any such Attomey-in- Fact. Resolved: That the Attorney -in -Fact may be given full power and authority to execute for and in the name and on behalf of the Company any and all bonds, recognizances, contracts of indemnity, and all other writings obligatory in the nature thereof, and any such instrument executed by any such Attomey-in-Fact shall be as binding upon the Company as if signed and sealed by an Authorized Officer and, further, the Attomey-in-Fact 's hereby authorized to verify any affidavit required to be attached to bonds, recognizances, contracts of indemnity, and all other writings obligatory in the nature thereof. This power of attorney is signed and sealed by facsimile under the authority of the following Resolution adopted by the Board of Directors of ATLANTIC SPECIALTY INSURANCE COMPANY on the twenty-fifth day of September, 2012: Resolved: That the signature of an Authorized Officer, the signature of the Secretary or the Assistant Secretary, and the Company seal may be affixed by Facsimile to any power of attorney or to any certificate relating thereto appointing an Attorney -in -Fact for purposes only of executing and sealing any bond, undertaking, recognizance or other written obligation in the nature thereof, and any such signature and seal where so used, being hereby adopted by the Company as the original signature of such officer and the original seal of the Company, to be valid and binding upon the Company with the same force and effect as though manually affixed. IN WITNESS WHEREOF, ATLANTIC SPECIALTY INSURANCE COMPANY has caused these presents to be signed by an Authorized Officer and the seal of the Company to be affixed this first day of January, 2023. 01 ,.o IU,Q 1a =4G `�FPOq,IlF9ni =y SEAL m:— r 1986 0, By STATE OF MINNESOTA = s WFW ros = � a a . Sarah A. Kolar, Vice President and General Counsel HENNEPIN COUNTY On this first day of January, 2023, before me personally came Sarah A, Kolar, Vice President and General Counsel of ATLANTIC SPECIALTY INSURANCE COMPANY, to me personally known to be the individual and officer described in and who executed the preceding instrument, and she acknowledged the execution of the same, and being by me duly sworn, that she is the said officer of the Company aforesaid, and that the seal affixed to the preceding instrument is the seal of said Company and that the said seal and the signature as such officer was duly affixed and subscribed to the said instrument by the authority and at the direction of the Company. ALISON DWAN HASH TROUT ' NOTARYPUBUC-MINNESOTA �M4/,w- My Commission Expires January 31, 2025 Notary Public f, the undersigned, Secretary of ATLANTIC SPECIALTY INSURANCE COMPANY, a New York Corporation, do hereby certify that the foregoing power of attorney is in full force and has not been revoked, and the resolutions set forth above are now in force. Signed and sealed. Dated 21 st day of March 2424. ,- -Al `t INS& 1 i 4I6 �OPPOIt't a rjo y SEAL Y 1986 os- — This Powerf Attorney expires =V4jY' ba ° January 3120 5 11 .�,„it Kara L.B. Barrow, Secretary Please direct bond verifications toswetXant aciinsureitee coin IMPORTANT NOTICE AVISO IMPORTANTE To obtain information or make a complaint: Para obtener informacion o para someter una queja: You may contact your agent. Puede communicarse con su agente. You may call your Insurance Carrier's toll -free Usted puede Ilamar al numero de telefono gratis de su telephone number for information or to make compania de seguros para informacion o para someter a complaint at: una queja al: 1-800-321-2721 You may also write to your Insurance Carrier at Atlantic Specialty Insurance Company Paralegal 605 Highway 169 North, Suite 800 Plymouth, MN 55441 Email: surety@intactinsurance.com Phone:1-800-662-0156 1.800-321-2721 Usted tambien puede escribir a su compania de seguros en: Atlantic Specialty Insurance Company Paralegal 605 Highway 169 North, Suite 800 Plymouth, MN 55441 Email: surety@intactinsurance.com Phone:1-800-662-0156 You may contact the Texas Department of Puede comunicarse con el Departamento de Seguros de Insurance to obtain information on Texas para obtener informacion acerca de companias, companies, coverages, rights or complaints coberturas, derechos o quejas al: at 1.800 252- 439 You may write the Texas Department of Insurance: P.O. Box 149104, Austin, TX 78714-9104 Fax: (512) 490-1007 Web: www.tdi.texas.gov E-mail: ConsumerProtection tdi.texas.00v 1-800 252-3439 Puede escribir al Departamento de Seguros de Texas: P.O. Box 149104, Austin, TX 78714 Fax: (512) 490-1007 Web: www.tdi.texas.gov E-mail: ConsumerProtection tdi.texas:iov PREMIUM OR CLAIM DISPUTES: Should DISPUTES SOBRE PRIMAS . , RECLAMOS: Si tiene you have a dispute concerning your premium una disputa concerniente a su prima o a un reclamo, debe or about a claim you should contact the agent comunicarse con el agente primero. Si no se resuelve la first. If the dispute is not resolved, you may disputa, puede entonces comunicarse con el contact the Texas Department of Insurance. departamento (TDI). ATTACH THIS NOTICE TO YOUR POLICY: UNA ESTE AVISO A SU POLIZA: Este aviso es solo This notice is for information only and does (,para proposito de informacion y no se convierte en parte not become a part or condition of the attached condicion del documento adjunto. document. VCM PHN TX 001 1013 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS TABLE OF CONTENTS Article 1 — Definitions and Terminology ............................................... 1.01 Defined Terms.................................................................... 1.02 Terminology....................................................................... Article 2 — Preliminary Matters ........................ 2.01 Before Starting Construction....... 2.02 Preconstruction Conference......... 2.03 Public Meeting ............................. Page .............................................1 .............................................1 ............................................. 5 ....................................................... 6 ....................................................... 6 ....................................................... 6 ....................................................... 6 Article 3 — Contract Documents and Amending............................................................................................... 6 3.01 Reference Standards..................................................................................................................... 6 3.02 Amending and Supplementing Contract Documents.................................................................. 6 Article 4 — Bonds and Insurance....................................................................................................................... 7 4.01 Licensed Sureties and Insurers..................................................................................................... 7 4.02 Performance, Payment, and Maintenance Bonds........................................................................ 7 4.03 Certificates of Insurance............................................................................................................... 7 4.04 Contractor's Insurance.................................................................................................................. 9 4.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................12 Article 5 — Contractor's Responsibilities........................................................................................................12 5.01 Supervision and Superintendent.................................................................................................12 5.02 Labor; Working Hours................................................................................................................13 5.03 Services, Materials, and Equipment...........................................................................................13 5.04 Project Schedule..........................................................................................................................14 5.05 Substitutes and "Or-Equals".......................................................................................................14 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors).....................................16 5.07 Concerning Subcontractors, Suppliers, and Others...................................................................16 5.08 Wage Rates..................................................................................................................................18 5.09 Patent Fees and Royalties...........................................................................................................19 5.10 Laws and Regulations.................................................................................................................19 5.11 Use of Site and Other Areas.......................................................................................................19 5.12 Record Documents......................................................................................................................20 5.13 Safety and Protection.................................................................................................................. 21 5.14 Safety Representative.................................................................................................................21 5.15 Hazard Communication Programs.............................................................................................22 5.16 Submittals....................................................................................................................................22 5.17 Contractor's General Warranty and Guarantee..........................................................................23 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 5.18 Indemnification........................................................................................................................... 24 5.19 Delegation of Professional Design Services..............................................................................24 5.20 Right to Audit: ............................................................................................................................ 25 5.21 Nondiscrimination.......................................................................................................................25 Article 6 - Other Work at the Site...................................................................................................................26 6.01 Related Work at Site...................................................................................................................26 Article 7 - City's Responsibilities...................................................................................................................26 7.01 Inspections, Tests, and Approvals.............................................................................................. 26 7.02 Limitations on City's Responsibilities....................................................................................... 26 7.03 Compliance with Safety Program...............................................................................................27 Article 8 - City's Observation Status During Construction...........................................................................27 8.01 City's Project Representative.....................................................................................................27 8.02 Authorized Variations in Work.................................................................................................. 27 8.03 Rejecting Defective Work..........................................................................................................27 8.04 Determinations for Work Performed..........................................................................................28 Article9 - Changes in the Work.....................................................................................................................28 9.01 Authorized Changes in the Work...............................................................................................28 9.02 Notification to Surety..................................................................................................................28 Article 10 - Change of Contract Price; Change of Contract Time................................................................28 10.01 Change of Contract Price............................................................................................................28 10.02 Change of Contract Time............................................................................................................28 10.03 Delays..........................................................................................................................................28 Article 11 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work......................29 11.01 Notice of Defects........................................................................................................................29 11.02 Access to Work...........................................................................................................................29 11.03 Tests and Inspections.................................................................................................................. 29 11.04 Uncovering Work.......................................................................................................................30 11.05 City May Stop the Work.............................................................................................................30 11.06 Correction or Removal of Defective Work................................................................................30 11.07 Correction Period........................................................................................................................30 11.08 City May Correct Defective Work............................................................................................. 31 Article12 - Completion.................................................................................................................................. 32 12.01 Contractor's Warranty of Title................................................................................................... 32 12.02 Partial Utilization........................................................................................................................ 32 12.03 Final Inspection...........................................................................................................................32 12.04 Final Acceptance.........................................................................................................................33 Article 13 - Suspension of Work....................................................................................................................33 13.01 City May Suspend Work............................................................................................................ 33 Article 14 - Miscellaneous .......................................... 14.01 Giving Notice .......................................... CITY OF FORT WORTH STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 34 34 14.02 Computation of Times ........... 14.03 Cumulative Remedies ............ 14.04 Survival of Obligations.......... 14.05 Headings ................................. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 34 34 35 35 0073 10- 1 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 1 of 35 ARTICLE 1— DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Agreement - The written instrument which is evidence of the agreement between Developer and Contractor covering the Work 2. Asbestos —Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 3. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 4. Buzzsaw — City's on-line, electronic document management and collaboration system. 5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. 6. City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by, its governing body through its City Manager, his designee, or agents authorized pursuant to its duly authorized charter on his behalf. 7. Community Facilities Agreement (CFA) A Contract between the Developer and the City for the Construction of one or more following public facilities within the City public right-of- way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs. A CFA may include private facilities within the right-of-way dedicated as private right-of- way or easement on a recorded plat. 8. Contract —The entire and integrated written document incorporating the Contract Documents between the Developer, Contractor, and/or City concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 9. Contract Documents —Those items that make up the contract and which must include the Agreement, and it's attachments such as standard construction specifications, standard City Conditions, other general conditions of the Developer, including: a. An Agreement CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-2 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 2 of 35 b. Attachments to the Agreement i. Bid Form ii. Vendor Compliance with State Law Non -Resident Bidder iii. Prequalification Statement C. Current Prevailing Wage Rates Table (if required by City) d. Insurance Accord Form e. Payment Bond f. Performance Bond g. Maintenance Bond h. Power of Attorney for Bonds i. Workers Compensation Affidavit j. MWBE Commitment Form( If required by City) k. General Conditions 1. Supplementary Conditions in. The Standard City Conditions n. Specifications specifically made part of the Contract Documents by attachment, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents o. Drawings P. Documentation submitted by contractor prior to Notice of Award. q. The following which may be delivered or issued after the effective date if the Agreement and, if issued become an incorporated part of the Contract Documents i. Notice to Proceed ii. Field Orders iii. Change Orders iv. Letters of Final Acceptance r. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 10. Contractor —The individual or entity with whom Developer has entered into the Agreement. 11. Day or day —A day, unless otherwise defined, shall mean a Calendar Day. 12. Developer — An individual or entity that desires to make certain improvements within the City of Fort Worth 13. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 14. Engineer —The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the Developer. 15. Final Acceptance — The written notice given by the City to the Developer and/or Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 3 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 3 of 35 16. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 17. General Requirements —A part of the Contract Documents between the Developer and a Contractor. 18. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 19. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 20. Milestone —A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 21. Non -Participating Change Order —A document, which is prepared for and reviewed by the City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 22. Participating Change Order —A document, which is prepared for and approved by the City, which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 23. Plans — See definition of Drawings. 24. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 25. Project —The Work to be performed under the Contract Documents. 26. Project Representative —The authorized representative of the City who will be assigned to the Site. 27. Public Meeting — An announced meeting conducted by the Developer to facilitate public participation and to assist the public in gaining an informed view of the Project. 28. Regular Working Hours — Hours beginning at 7: 00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 29. Samples Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 4 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 4 of 35 30. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 31. Site —Lands or areas indicated in the Contract Documents as being furnished by City or Developer upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City or Developer which are designated for the use of Contractor. 32. Specifications —That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 33. Standard City Conditions — That part of the Contract Documents setting forth requirements of the City. 34. Subcontractor —An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of apart of the Work at the Site. 35. Submittals All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 36. Superintendent — The representative of the Contractor who is available at all times and able to receive instructions from the City and/or Developer and to act for the Contractor. 37. Supplementary Conditions —That part of the Contract Documents which amends or supplements the General Conditions. 38. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 40. Weekend Working Hours — Hours beginning at 9: 00 a. in. and ending at 5: 00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 5 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 5 of 35 41. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Participating Change Order, Non -Participating Change Order, or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 42. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p. m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.13 through D are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. C. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 6 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 6 of 35 ARTICLE 2 — PRELIMINARY MATTERS 2.01 Before Starting Construction Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting the Work. New schedules will be submitted to City when Participating Change Orders or Non - Participating Change Orders occur. 2.02 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.03 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. ARTICLE 3 — CONTRACT DOCUMENTS AND AMENDING 3.01 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.02 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Participating Change Order or a Non -Participating Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 7 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 7 of 35 1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or 2. City's written interpretation or clarification. ARTICLE 4 — BONDS AND INSURANCE 4.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverage so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided Section 4.04. 4.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 4.01 and 4.02.C. 4.03 Certificates of Insurance Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee identified in these Standard City Conditions certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 8 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 8 of 35 1. The certificate of insurance shall document the City, an as "Additional Insured" on all liability policies. 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in these Standard City Conditions. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 9. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-9 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 9 of 35 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 11. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 12. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either parry or the underwriter on any such policies. 13. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 4.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. 3. The limits of liability for the insurance shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations a. Statutory limits b. Employer's liability CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 10 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 10 of 35 1) $100,000 each accident/occurrence 2) $100,000 Disease - each employee 3) $500,000 Disease - policy limit B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. 1. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project 2. Contractor's Liability Insurance under this Section which shall be on a per project basis covering the Contractor with minimum limits o£ a. $1,000,000 each occurrence b. $2,000,000 aggregate limit 3. The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. 4. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. 1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in an amount not less than the following amounts: a. Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 11 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 1 I of 35 1) $1, 000, 000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: 2) $250,000 Bodily Injury per person 3) $500,000 Bodily Injury per accident / 4) $100,000 Property Damage D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the following requirements: 1. The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks owned and operated by: NONE 2. The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. 3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: a. General Aggregate: NO N E b. Each Occurrence:: NONE 4. With respect to the above outlined insurance requirements, the following shall govern: a. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at -grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. b. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights -of - CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 12 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 12 of 35 way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. c. If, in addition to a grade separation or an at -grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at -grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. d. If no grade separation is involved but other work is proposed on a railroad company's right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. 5. No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. 6. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 4.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the Developer and City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the Developer or City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the Developer or City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 5 — CONTRACTOR'S RESPONSIBILITIES 5.01 Supervision and Superintendent A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 13 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 13 of 35 Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 5.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 5.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 14 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 14 of 35 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 5.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and the General Requirements) proposed adjustments in the Project Schedule. 2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 9. Adjustments in Contract Time for projects with City participation shall be made by participating change orders. 5.05 Substitutes and "Or -Equals " A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or -Equal" Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 15 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 15 of 35 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 5.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 0125 00 and: 1) shall certify that the proposed substitute item will: i. perform adequately the functions and achieve the results called for by the general design; ii. be similar in substance to that specified; iii. be suited to the same use as that specified; and 2) will state: i. the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; ii. whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; iii. whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: i. all variations of the proposed substitute item from that specified; ii. available engineering, sales, maintenance, repair, and replacement services; and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 16 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 16 of 35 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 5.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.13. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Participating Change Order. 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors) A. The Contractor and any subcontractors are required to be prequalified for the work types requiring pre -qualification 5.07 Concerning Subcontractors, Suppliers, and Others A. Minority and Women Owned Business Enterprise Compliance: CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 17 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 17 of 35 ❑ Required for this Contract. © Not Required for this Contract. It is City policy to ensure the full and equitable participation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent of the City's MWBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MWBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. C. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 18 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 18 of 35 Documents, Contractor shall provide City contract numbers and reference numbers to the Subcontractors and/or Suppliers. 5.08 Wage Rates ❑ Required for this Contract. ❑X Not Required for this Contract. A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the I Ith day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 19 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 19 of 35 occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 5.09 Patent Fees and Royalties A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 5.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.01. 5.11 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 20 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 20 of 35 other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and shall be entitled to recover its cost in doing so. The City may withhold Final Acceptance until clean-up is complete and cost are recovered. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 5.12 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 21 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 21 of 35 Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 5.13 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 5.14 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 22 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 22 of 35 5.15 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 5.16 Submittals A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal will be identified as required by City. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 5.16.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 5.16.C. B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 23 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 23 of 35 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 5.17 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City or Developer of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 24 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 24 of 35 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 4.02.13. The City will give notice of observed defects with reasonable promptness. 5.18 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 5.19 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 25 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 25 of 35 C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 5.16.C. 5.20 Right to Audit: A. The City reserves the right to audit all projects utilizing City funds B. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 5.21 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 26 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 26 of 35 ARTICLE 6 — OTHER WORK AT THE SITE 6.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. ARTICLE 7 — CITY'S RESPONSIBILITIES 7.01 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 11.03. 7.02 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 27 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 27 of 35 7.03 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 5.13. ARTICLE 8 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 8.01 City's Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City's representative during construction are set forth in the Contract Documents. A. City's Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Representative's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents. 8.02 Authorized Variations in Work City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City Developer, and also on Contractor, who shall perform the Work involved promptly. 8.03 Rejecting Defective Work City will have authority to reject Work which City's Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or completed. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 28 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 28 of 35 8.04 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). ARTICLE 9 — CHANGES IN THE WORK 9.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Participating Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a project with City participation, a Field Order may be issued by the City. 9.02 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. ARTICLE 10 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 10.01 Change of Contract Price A. The Contract Price may only be changed by a Participating Change Order for projects with City participation. 10.02 Change of Contract Time A. The Contract Time may only be changed by a Participating Change Order for projects with City participation. 10.03 Delays A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 29 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 29 of 35 ARTICLE 11— TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 11.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 11.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 11.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations approved by City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 30 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 30 of 35 3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the Testing Lab by Contractor. Developer/Contractor. City will forward all invoices for retests to 4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance until the Testing Lab is Paid E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. 11.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. 11.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 11.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 11.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 31 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 31 of 35 Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 11.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor and Developer should such additional warranty coverage be required. Contractor's obligations under this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 11.08 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 32 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 32 of 35 stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 11.09. ARTICLE 12 — COMPLETION 12.01 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment will pass to City no later than the time of Final Acceptance and shall be free and clear of all Liens. 12.02 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 12.03 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 33 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 33 of 35 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 12.04 Final Acceptance A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction of the following: 1. All documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; 2. consent of the surety, if any, to Final Acceptance; 3. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and 4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. 5. after all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. ARTICLE 13 — SUSPENSION OF WORK 13.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will stop contract time on City participation projects. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 34 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 34 of 35 available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. ARTICLE 14 — MISCELLANEOUS 14.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given i£ 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 14.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 14.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 35 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 35 of 35 14.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 14.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 01 11 00 SUMMARY OF WORK 011100-1 DAP SUMMARY OF WORK Pagel of 3 5 A. Section Includes: 6 1. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 11 2. Division 1 - General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 A. Work Covered by Contract Documents 1. Work is to include furnishing all labor, materials, and equipment, and performing all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work 1. Any and all Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included on the standard bid item list, then the item shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. C. Use of Premises 1. Coordinate uses of premises under direction of the City. 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. 3. Use and occupy only portions of the public streets and alleys, or other public places or other rights -of -way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the City. a. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects 105084 Revised December 20, 2012 011100-2 DAP SUMMARY OF WORK Page 2 of 3 1 b. Excavated and waste materials shall be stored in such a way as not to interfere 2 with the use of spaces that may be designated to be left free and unobstructed 3 and so as not to inconvenience occupants of adjacent property. 4 c. If the street is occupied by railroad tracks, the Work shall be carried on in such 5 manner as not to interfere with the operation of the railroad. 6 1) All Work shall be in accordance with railroad requirements set forth in 7 Division 0 as well as the railroad permit. 8 D. Work within Easements 9 1. Do not enter upon private property for any purpose without having previously 10 obtained permission from the owner of such property. 11 2. Do not store equipment or material on private property unless and until the 12 specified approval of the property owner has been secured in writing by the 13 Contractor and a copy furnished to the City. 14 3. Unless specifically provided otherwise, clear all rights -of -way or easements of 15 obstructions which must be removed to make possible proper prosecution of the 16 Work as a part of the project construction operations. 17 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, 18 lawns, fences, culverts, curbing, and all other types of structures or improvements, 19 to all water, sewer, and gas lines, to all conduits, overhead pole lines, or 20 appurtenances thereof, including the construction of temporary fences and to all 21 other public or private property adjacent to the Work. 22 5. Notify the proper representatives of the owners or occupants of the public or private 23 lands of interest in lands which might be affected by the Work. 24 a. Such notice shall be made at least 48 hours in advance of the beginning of the 25 Work. 26 b. Notices shall be applicable to both public and private utility companies and any 27 corporation, company, individual, or other, either as owners or occupants, 28 whose land or interest in land might be affected by the Work. 29 c. Be responsible for all damage or injury to property of any character resulting 30 from any act, omission, neglect, or misconduct in the manner or method or 31 execution of the Work, or at any time due to defective work, material, or 32 equipment. 33 6. Fence 34 a. Restore all fences encountered and removed during construction of the Project 35 to the original or a better than original condition. 36 b. Erect temporary fencing in place of the fencing removed whenever the Work is 37 not in progress and when the site is vacated overnight, and/or at all times to 38 provide site security. 39 c. The cost for all fence work within easements, including removal, temporary 40 closures and replacement, shall be subsidiary to the various items bid in the 41 project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects 105084 Revised December 20, 2012 011100-3 DAP SUMMARY OF WORK Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 END OF SECTION 12 13 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects 105084 Revised December 20, 2012 012500-1 DAP SUBSTITUTION PROCEDURES SECTION 0125 00 SUBSTITUTION PROCEDURES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Pagel of4 1. The procedure for requesting the approval of substitution of a product that is not equivalent to a product which is specified by descriptive or performance criteria or defined by reference to 1 or more of the following: a. Name of manufacturer b. Name of vendor c. Trade name d. Catalog number 2. Substitutions are not "or -equals". B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Request for Substitution - General 1. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2. Certain types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or -equals," as determined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a. Or -equals are unavailable due to strike, discontinued production of products meeting specified requirements, or other factors beyond control of Contractor; or, CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised August 30, 2013 01 25 00 - 2 DAP SUBSTITUTION PROCEDURES Page 2 of 4 b. Contractor proposes a cost and/or time reduction incentive to the City. 1.5 SUBMITTALS A. See Request for Substitution Form (attached) B. Procedure for Requesting Substitution 1. Substitution shall be considered only: a. After award of Contract b. Under the conditions stated herein 2. Submit 3 copies of each written request for substitution, including: a. Documentation 1) Complete data substantiating compliance of proposed substitution with Contract Documents 2) Data relating to changes in construction schedule, when a reduction is proposed 3) Data relating to changes in cost b. For products 1) Product identification a) Manufacturer's name b) Telephone number and representative contact name c) Specification Section or Drawing reference of originally specified product, including discrete name or tag number assigned to original product in the Contract Documents 2) Manufacturer's literature clearly marked to show compliance ofproposed product with Contract Documents 3) Itemized comparison of original and proposed product addressing product characteristics including, but not necessarily limited to: a) Size b) Composition or materials of construction c) Weight d) Electrical or mechanical requirements 4) Product experience a) Location of past projects utilizing product b) Name and telephone number of persons associated with referenced projects knowledgeable concerning proposed product c) Available field data and reports associated with proposed product 5) Samples a) Provide at request of City. b) Samples become the property of the City. c. For construction methods: 1) Detailed description of proposed method 2) Illustration drawings C. Approval or Rejection 1. Written approval or rejection of substitution given by the City 2. City reserves the right to require proposed product to comply with color and pattern of specified product if necessary to secure design intent. 3. In the event the substitution is approved, if a reduction in cost or time results, it will be documented by Change Order. CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised August 30, 2013 01 25 00 - 3 DAP SUBSTITUTION PROCEDURES Page 3 of 4. Substitution will be rejected if: a. Submittal is not through the Contractor with his stamp of approval b. Request is not made in accordance with this Specification Section c. In the Developer's opinion, acceptance will require substantial revision of the original design d. In the City's or Developer's opinion, substitution will not perform adequately the function consistent with the design intent 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. In making request for substitution or in using an approved product, the Contractor represents that the Contractor: 1. Has investigated proposed product, and has determined that it is adequate or superior in all respects to that specified, and that it will perform function for which it is intended 2. Will provide same guarantee for substitute item as for product specified 3. Will coordinate installation of accepted substitution into Work, to include building modifications if necessary, making such changes as may be required for Work to be complete in all respects 4. Waives all claims for additional costs related to substitution which subsequently arise 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised August 30, 2013 01 25 00 - 4 DAP SUBSTITUTION PROCEDURES EXHIBIT A REQUEST FOR SUBSTITUTION FORM: TO: Page 4 of 4 PROJECT: DATE: We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature Recommended Recommended as noted Firm Not recommended Received late Address By Date Date Remarks Telephone For Use by City: Approved Rejected City Date CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised August 30, 2013 013119-1 DAP PRECONSTRUCTION MEETING SECTION 01 31 19 PRECONSTRUCTION MEETING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Pagel of 3 1. Provisions for the preconstruction meeting to be held prior to the start of Work to clarify construction contract administration procedures B. Deviations from this City of Fort Worth Standard Specification 1. No construction schedule required unless requested by the City. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the delivery of the distribution package to the City. a. The meeting will be scheduled and administered by the City. 2. The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3. Attendance shall include: a. Developer and Consultant b. Contractor's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Quarry Falls Multi -Family Revised August 30, 2013 105084 01 31 19 - 2 DAP PRECONSTRUCTION MEETING Page 2 of 3 e. Other City representatives f. Others as appropriate 4. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals m. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre -Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. MBE/SBE procedures hh. Final Acceptance ii. Final Payment J. Questions or Comments CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Quarry Falls Multi -Family Revised August 30, 2013 105084 01 31 19 - 3 DAP PRECONSTRUCTION MEETING Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log I DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Quarry Falls Multi -Family Revised August 30, 2013 105084 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 0132 33 PRECONSTRUCTION VIDEO 01 32 33 - 1 DAP PRECONSTRUCTION VIDEO Page 1 of 2 5 A. Section Includes: 6 1. Administrative and procedural requirements for: 7 a. Preconstruction Videos 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. Though not mandatory, it is highly recommended on infill developer projects. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 — General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 A. Preconstruction Video 20 1. Produce a preconstruction video of the site/alignment, including all areas in the 21 vicinity of and to be affected by construction. 22 a. Provide digital copy of video upon request by the City. 23 2. Retain a copy of the preconstruction video until the end of the maintenance surety 24 period. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE [NOT USED] 30 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 31 1.11 FIELD [SITE] CONDITIONS [NOT USED] 32 1.12 WARRANTY [NOT USED] 33 PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised August 30, 2013 01 32 33 - 2 DAP PRECONSTRUCTION VIDEO Page 2 of 2 PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised August 30, 2013 013300-1 DAP SUBMITTALS Pagel of 8 1 SECTION 0133 00 2 DAP SUBMITTALS 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General methods and requirements of submissions applicable to the following 7 Work -related submittals: 8 a. Shop Drawings 9 b. Product Data (including Standard Product List submittals) 10 c. Samples 11 d. Mock Ups 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1 — General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Coordination 24 1. Notify the City in writing, at the time of submittal, of any deviations in the 25 submittals from the requirements of the Contract Documents. 26 2. Coordination of Submittal Times 27 a. Prepare, prioritize and transmit each submittal sufficiently in advance of 28 performing the related Work or other applicable activities, or within the time 29 specified in the individual Work Sections, of the Specifications. 30 b. Contractor is responsible such that the installation will not be delayed by 31 processing times including, but not limited to: 32 a) Disapproval and resubmittal (if required) 33 b) Coordination with other submittals 34 c) Testing 35 d) Purchasing 36 e) Fabrication 37 f) Delivery 38 g) Similar sequenced activities 39 c. No extension of time will be authorized because of the Contractor's failure to 40 transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised August 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 01 33 00 - 2 DAP SUBMITTALS Page 2 of 8 d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering 1. When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 03 30 00-08-B 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification 1. Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents 2. Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) `By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8 'h inches x 11 inches to 8 'h inches x 11 inches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised August 30, 2013 01 33 00 - 3 DAP SUBMITTALS Page 3 of 8 1 2. The Project title and number 2 3. Contractor identification 3 4. The names of- 4 a. Contractor 5 b. Supplier 6 c. Manufacturer 7 5. Identification of the product, with the Specification Section number, page and 8 paragraph(s) 9 6. Field dimensions, clearly identified as such 10 7. Relation to adjacent or critical features of the Work or materials 11 8. Applicable standards, such as ASTM or Federal Specification numbers 12 9. Identification by highlighting of deviations from Contract Documents 13 10. Identification by highlighting of revisions on resubmittals 14 11. An 8-inch x 3-inch blank space for Contractor and City stamps 15 F. Shop Drawings 16 1. As specified in individual Work Sections includes, but is not necessarily limited to: 17 a. Custom -prepared data such as fabrication and erection/installation (working) 18 drawings 19 b. Scheduled information 20 c. Setting diagrams 21 d. Actual shopwork manufacturing instructions 22 e. Custom templates 23 £ Special wiring diagrams 24 g. Coordination drawings 25 h. Individual system or equipment inspection and test reports including: 26 1) Performance curves and certifications 27 i. As applicable to the Work 28 2. Details 29 a. Relation of the various parts to the main members and lines of the structure 30 b. Where correct fabrication of the Work depends upon field measurements 31 1) Provide such measurements and note on the drawings prior to submitting 32 for approval. 33 G. Product Data 34 1. For submittals of product data for products included on the City's Standard Product 35 List, clearly identify each item selected for use on the Project. 36 2. For submittals of product data for products not included on the City's Standard 37 Product List, submittal data may include, but is not necessarily limited to: 38 a. Standard prepared data for manufactured products (sometimes referred to as 39 catalog data) 40 1) Such as the manufacturer's product specification and installation 41 instructions 42 2) Availability of colors and patterns 43 3) Manufacturer's printed statements of compliances and applicability 44 4) Roughing -in diagrams and templates 45 5) Catalog cuts 46 6) Product photographs CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised August 30, 2013 01 33 00 - 4 DAP SUBMITTALS Page 4 of 8 1 7) Standard wiring diagrams 2 8) Printed performance curves and operational -range diagrams 3 9) Production or quality control inspection and test reports and certifications 4 10) Mill reports 5 11) Product operating and maintenance instructions and recommended 6 spare -parts listing and printed product warranties 7 12) As applicable to the Work 8 H. Samples 9 1. As specified in individual Sections, include, but are not necessarily limited to: 10 a. Physical examples of the Work such as: 11 1) Sections of manufactured or fabricated Work 12 2) Small cuts or containers of materials 13 3) Complete units of repetitively used products color/texture/pattern swatches 14 and range sets 15 4) Specimens for coordination of visual effect 16 5) Graphic symbols and units of Work to be used by the City for independent 17 inspection and testing, as applicable to the Work 18 I. Do not start Work requiring a shop drawing, sample or product data nor any material to 19 be fabricated or installed prior to the approval or qualified approval of such item. 20 1. Fabrication performed, materials purchased or on -site construction accomplished 21 which does not conform to approved shop drawings and data is at the Contractor's 22 risk. 23 2. The City will not be liable for any expense or delay due to corrections or remedies 24 required to accomplish conformity. 25 3. Complete project Work, materials, fabrication, and installations in conformance 26 with approved shop drawings, applicable samples, and product data. 27 J. Submittal Distribution 28 1. Electronic Distribution 29 a. Confirm development of Project directory for electronic submittals to be 30 uploaded to City's Buzzsaw site, or another external FTP site approved by the 31 City. 32 b. Shop Drawings 33 1) Upload submittal to designated project directory and notify appropriate 34 City representatives via email of submittal posting. 35 2) Hard Copies 36 a) 3 copies for all submittals 37 b) If Contractor requires more than 1 hard copy of Shop Drawings 38 returned, Contractor shall submit more than the number of copies listed 39 above. 40 c. Product Data 41 1) Upload submittal to designated project directory and notify appropriate 42 City representatives via email of submittal posting. 43 2) Hard Copies 44 a) 3 copies for all submittals 45 d. Samples 46 1) Distributed to the Project Representative 47 2. Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised August 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 01 33 00 - 5 DAP SUBMITTALS Page 5 of 8 a. Shop Drawings 1) Distributed to the City 2) Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. 3. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review 1. The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code I 1) "NO EXCEPTIONS TAKEN' is assigned when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. b. Code 2 CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised August 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 01 33 00 - 6 DAP SUBMITTALS Page 6 of 8 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non -conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked b. Submittals for each item will be reviewed no more than twice at the City's expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the Developer at least 7 Calendar Days prior to release for manufacture. CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised August 30, 2013 01 33 00 - 7 DAP SUBMITTALS Page 7 of 8 1 9. When the shop drawings have been completed to the satisfaction of the City, the 2 Contractor may carry out the construction in accordance therewith and no further 3 changes therein except upon written instructions from the City. 4 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days 5 following receipt of submittal by the City. 6 L. Mock ups 7 1. Mock Up units as specified in individual Sections, include, but are not necessarily 8 limited to, complete units of the standard of acceptance for that type of Work to be 9 used on the Project. Remove at the completion of the Work or when directed. 10 M. Qualifications 11 1. If specifically required in other Sections of these Specifications, submit a P.E. 12 Certification for each item required. 13 N. Request for Information (RFI) 14 1. Contractor Request for additional information 15 a. Clarification or interpretation of the contract documents 16 b. When the Contractor believes there is a conflict between Contract Documents 17 c. When the Contractor believes there is a conflict between the Drawings and 18 Specifications 19 1) Identify the conflict and request clarification 20 2. Sufficient information shall be attached to permit a written response without further 21 information. 22 23 24 25 26 1.5 SUBMITTALS [NOT USED] 27 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 28 1.7 CLOSEOUT SUBMITTALS [NOT USED] 29 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 30 1.9 QUALITY ASSURANCE [NOT USED] 31 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 32 1.11 FIELD [SITE] CONDITIONS [NOT USED] 33 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised August 30, 2013 013300-8 DAP SUBMITTALS Page 8 of 8 1 PART 2 - PRODUCTS [NOT USED] 2 PART 3 - EXECUTION [NOT USED] 3 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised August 30, 2013 1 2 3 4 PART1- GENERAL 5 1.1 SUMMARY 0135 13- 1 DAP SPECIAL PROJECT PROCEDURES Page 1 of 7 SECTION 0135 13 SPECIAL PROJECT PROCEDURES 6 A. Section Includes: 7 1. The procedures for special project circumstances that includes, but is not limited to: 8 a. Coordination with the Texas Department of Transportation 9 b. Work near High Voltage Lines 10 c. Confined Space Entry Program 11 d. Air Pollution Watch Days 12 e. Use of Explosives, Drop Weight, Etc. 13 £ Water Department Notification 14 g. Public Notification Prior to Beginning Construction 15 h. Coordination with United States Army Corps of Engineers 16 i. Coordination within Railroad permits areas 17 j. Dust Control 18 k. Employee Parking 19 1. [Coordination with North Central Texas Council of Governments Clean 20 Construction Specification [remove if not required]) 21 B. Deviations from this City of Fort Worth Standard Specification 22 1. None. 23 C. Related Specification Sections include, but are not necessarily limited to: 24 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 25 2. Division 1 — General Requirements 26 3. Section 33 12 25 — Connection to Existing Water Mains 27 28 1.2 REFERENCES 29 A. Reference Standards 30 1. Reference standards cited in this Specification refer to the current reference 31 standard published at the time of the latest revision date logged at the end of this 32 Specification, unless a date is specifically cited. 33 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 34 High Voltage Overhead Lines. 35 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction 36 Specification 37 1.3 ADMINISTRATIVE REQUIREMENTS 38 A. Coordination with the Texas Department of Transportation 39 1. When work in the right-of-way which is under the jurisdiction of the Texas 40 Department of Transportation (TxDOT): CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised August, 30, 2013 1 2 3 4 5 6 7 8 9 10 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 01 35 13-2 DAP SPECIAL PROJECT PROCEDURES Page 2 of 7 a. Notify the Texas Department of Transportation prior to commencing any work therein in accordance with the provisions of the permit b. All work performed in the TxDOT right-of-way shall be performed in compliance with and subject to approval from the Texas Department of Transportation B. Work near High Voltage Lines 1. Regulatory Requirements a. All Work near High Voltage Lines (more than 600 volts measured between conductors or between a conductor and the ground) shall be in accordance with Health and Safety Code, Title 9, Subtitle A, Chapter 752. 2. Warning sign a. Provide sign of sufficient size meeting all OSHA requirements. 3. Equipment operating within 10 feet of high voltage lines will require the following safety features a. Insulating cage -type of guard about the boom or arm b. Insulator links on the lift hook connections for back hoes or dippers c. Equipment must meet the safety requirements as set forth by OSHA and the safety requirements of the owner of the high voltage lines 4. Work within 6 feet of high voltage electric lines a. Notification shall be given to: 1) The power company (example: ONCOR) a) Maintain an accurate log of all such calls to power company and record action taken in each case. b. Coordination with power company 1) After notification coordinate with the power company to: a) Erect temporary mechanical barriers, de -energize the lines, or raise or lower the lines c. No personnel may work within 6 feet of a high voltage line before the above requirements have been met. C. Confined Space Entry Program 1. Provide and follow approved Confined Space Entry Program in accordance with OSHA requirements. 2. Confined Spaces include: a. Manholes b. All other confined spaces in accordance with OSHA's Permit Required for Confined Spaces D. Use of Explosives, Drop Weight, Etc. 1. When Contract Documents permit on the project the following will apply: a. Public Notification 1) Submit notice to City and proof of adequate insurance coverage, 24 hours prior to commencing. 2) Minimum 24 hour public notification in accordance with Section 0131 13 E. Water Department Coordination CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised August, 30, 2013 013513-3 DAP SPECIAL PROJECT PROCEDURES Page 3 of 7 1 1. During the construction of this project, it will be necessary to deactivate, for a 2 period of time, existing lines. The Contractor shall be required to coordinate with 3 the Water Department to determine the best times for deactivating and activating 4 those lines. 5 2. Coordinate any event that will require connecting to or the operation of an existing 6 City water line system with the City's representative. 7 a. Coordination shall be in accordance with Section 33 12 25. 8 b. If needed, obtain a hydrant water meter from the Water Department for use 9 during the life of named project. 10 c. In the event that a water valve on an existing live system be turned off and on 11 to accommodate the construction of the project is required, coordinate this 12 activity through the appropriate City representative. 13 1) Do not operate water line valves of existing water system. 14 a) Failure to comply will render the Contractor in violation of Texas Penal 15 Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor 16 will be prosecuted to the full extent of the law. 17 b) In addition, the Contractor will assume all liabilities and 18 responsibilities as a result of these actions. 19 F. Public Notification Prior to Beginning Construction 20 1. Prior to beginning construction on any block in the project, on a block by block 21 basis, prepare and deliver a notice or flyer of the pending construction to the front 22 door of each residence or business that will be impacted by construction. The notice 23 shall be prepared as follows: 24 a. Post notice or flyer 7 days prior to beginning any construction activity on each 25 block in the project area. 26 1) Prepare flyer on the Contractor's letterhead and include the following 27 information: 28 a) Name of Project 29 b) City Project No (CPN) 30 c) Scope of Project (i.e. type of construction activity) 31 d) Actual construction duration within the block 32 e) Name of the contractor's foreman and phone number 33 f) Name of the City's inspector and phone number 34 g) City's after-hours phone number 35 2) A sample of the `pre -construction notification' flyer is attached as Exhibit 36 A. 37 3) Submit schedule showing the construction start and finish time for each 38 block of the project to the inspector. 39 4) Deliver flyer to the City Inspector for review prior to distribution. 40 b. No construction will be allowed to begin on any block until the flyer is 41 delivered to all residents of the block. 42 G. Public Notification of Temporary Water Service Interruption during Construction 43 1. In the event it becomes necessary to temporarily shut down water service to 44 residents or businesses during construction, prepare and deliver a notice or flyer of 45 the pending interruption to the front door of each affected resident. 46 2. Prepared notice as follows: 47 a. The notification or flyer shall be posted 24 hours prior to the temporary 48 interruption. CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised August, 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 01 35 13 - 4 DAP SPECIAL PROJECT PROCEDURES Page 4 of 7 b. Prepare flyer on the contractor's letterhead and include the following information: 1) Name of the project 2) City Project Number 3) Date of the interruption of service 4) Period the interruption will take place 5) Name of the contractor's foreman and phone number 6) Name of the City's inspector and phone number c. A sample of the temporary water service interruption notification is attached as Exhibit B. d. Deliver a copy of the temporary interruption notification to the City inspector for review prior to being distributed. e. No interruption of water service can occur until the flyer has been delivered to all affected residents and businesses. f. Electronic versions of the sample flyers can be obtained from the Project Construction Inspector. H. Coordination with United States Army Corps of Engineers (USACE) 1. At locations in the Project where construction activities occur in areas where USACE permits are required, meet all requirements set forth in each designated permit. I. Coordination within Railroad Permit Areas 1. At locations in the project where construction activities occur in areas where railroad permits are required, meet all requirements set forth in each designated railroad permit. This includes, but is not limited to, provisions for: a. Flagmen b. Inspectors c. Safety training d. Additional insurance e. Insurance certificates f. Other employees required to protect the right-of-way and property of the Railroad Company from damage arising out of and/or from the construction of the project. Proper utility clearance procedures shall be used in accordance with the permit guidelines. 2. Obtain any supplemental information needed to comply with the railroad's requirements. J. Dust Control 1. Use acceptable measures to control dust at the Site. a. If water is used to control dust, capture and properly dispose of waste water. b. If wet saw cutting is performed, capture and properly dispose of slurry. K. Employee Parking 1. Provide parking for employees at locations approved by the City. L. {Coordination with North Central Texas Council of Governments (NCTCOG) Clean Construction Specification [if required for the project] 1. Comply with equipment, operational, reporting and enforcement requirements set forth in NCTCOG's Clean Construction Specification.} CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised August, 30, 2013 013513-5 DAP SPECIAL PROJECT PROCEDURES Page 5 of 7 1 1.4 SUBMITTALS [NOT USED] 2 1.5 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 3 1.6 CLOSEOUT SUBMITTALS [NOT USED] 4 1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.8 QUALITY ASSURANCE [NOT USED] 6 1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.10 FIELD [SITE] CONDITIONS [NOT USED] 8 1.11 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 12 DATE NAME 8/31/2012 D.Johnson 13 END OF SECTION Revision Log SUMMARY OF CHANGE 1.3.13— Added requirement of compliance with Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised August, 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 01 35 13 - 6 DAP SPECIAL PROJECT PROCEDURES Page 6 of 7 EXHIBIT A (To be printed on Contractor's Letterhead) Date: CPN No.: Project Name: Mapsco Location: Limits of Construction: THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> OR Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised August, 30, 2013 2 4 Date: EXHIBIT B FORT WORTH DOE NO. xxxx Project Name: 013513-7 DAP SPECIAL PROJECT PROCEDURES Page 7 of 7 NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, ,CONTRACTOR CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised August, 30, 2013 014523-1 DAP TESTING AND INSPECTION SERVICES Page 1 of 2 1 SECTION 0145 23 2 TESTING AND INSPECTION SERVICES 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Testing and inspection services procedures and coordination 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 — General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 a. Contractor is responsible for performing, coordinating, and payment of all 17 Quality Control testing. 18 b. City is responsible for performing and payment for first set of Quality 19 Assurance testing. 20 1) If the first Quality Assurance test performed by the City fails, the 21 Contractor is responsible for payment of subsequent Quality Assurance 22 testing until a passing test occurs. 23 a) Final acceptance will not be issued by City until all required payments 24 for testing by Contractor have been paid in full. 25 1.3 REFERENCES [NOT USED] 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Testing 28 1. Complete testing in accordance with the Contract Documents. 29 2. Coordination 30 a. When testing is required to be performed by the City, notify City, sufficiently 31 in advance, when testing is needed. 32 b. When testing is required to be completed by the Contractor, notify City, 33 sufficiently in advance, that testing will be performed. 34 3. Distribution of Testing Reports 35 a. Electronic Distribution 36 1) Confirm development of Project directory for electronic submittals to be 37 uploaded to City's Buzzsaw site, or another form of distribution approved 38 by the City. CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised August 30, 2013 014523-2 DAP TESTING AND INSPECTION SERVICES Page 2 of 2 1 2) Upload test reports to designated project directory and notify appropriate 2 City representatives via email of submittal posting. 3 3) Hard Copies 4 a) 1 copy for all submittals submitted to the Project Representative 5 b. Hard Copy Distribution (if required in lieu of electronic distribution) 6 1) Tests performed by City 7 a) Distribute 1 hard copy to the Contractor 8 2) Tests performed by the Contractor 9 a) Distribute 3 hard copies to City's Project Representative 10 4. Provide City's Project Representative with trip tickets for each delivered load of 11 Concrete or Lime material including the following information: 12 a. Name of pit 13 b. Date of delivery 14 c. Material delivered 15 B. Inspection 16 1. Inspection or lack of inspection does not relieve the Contractor from obligation to 17 perform work in accordance with the Contract Documents. 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 24 25 26 27 28 29 30 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 17TIII��I ►�if�l END OF SECTION Revision Log SUMMARY OF CHANGE CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised August 30, 2013 01 50 00 - 1 DAP TEMPORARY FACILITIES AND CONTROLS Pagel of 4 1 SECTION 0150 00 2 TEMPORARY FACILITIES AND CONTROLS 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provide temporary facilities and controls needed for the Work including, but not 7 necessarily limited to: 8 a. Temporary utilities 9 b. Sanitary facilities 10 c. Storage Sheds and Buildings 11 d. Dust control 12 e. Temporary fencing of the construction site 13 B. Deviations from this City of Fort Worth Standard Specification 14 1. None. 15 C. Related Specification Sections include, but are not necessarily limited to: 16 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 17 2. Division 1 — General Requirements 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A. Measurement and Payment 20 1. Work associated with this Item is considered subsidiary to the various Items bid. 21 No separate payment will be allowed for this Item. 22 1.3 REFERENCES [NOT USED] 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Temporary Utilities 25 1. Obtaining Temporary Service 26 a. Make arrangements with utility service companies for temporary services. 27 b. Abide by rules and regulations of utility service companies or authorities 28 having jurisdiction. 29 c. Be responsible for utility service costs until Work is approved for Final 30 Acceptance. 31 1) Included are fuel, power, light, heat and other utility services necessary for 32 execution, completion, testing and initial operation of Work. 33 2. Water 34 a. Contractor to provide water required for and in connection with Work to be 35 performed and for specified tests of piping, equipment, devices or other use as 36 required for the completion of the Work. 37 b. Provide and maintain adequate supply of potable water for domestic 38 consumption by Contractor personnel and City's Project Representatives. 39 c. Coordination 40 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised JULY 1, 2011 01 50 00 - 2 DAP TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 1 d. Contractor Payment for Construction Water 2 1) Obtain construction water meter from City for payment as billed by City's 3 established rates. 4 3. Electricity and Lighting 5 a. Provide and pay for electric powered service as required for Work, including 6 testing of Work. 7 1) Provide power for lighting, operation of equipment, or other use. 8 b. Electric power service includes temporary power service or generator to 9 maintain operations during scheduled shutdown. 10 4. Telephone 11 a. Provide emergency telephone service at Site for use by Contractor personnel 12 and others performing work or furnishing services at Site. 13 5. Temporary Heat and Ventilation 14 a. Provide temporary heat as necessary for protection or completion of Work. 15 b. Provide temporary heat and ventilation to assure safe working conditions. 16 B. Sanitary Facilities 17 1. Provide and maintain sanitary facilities for persons on Site. 18 a. Comply with regulations of State and local departments of health. 19 2. Enforce use of sanitary facilities by construction personnel at job site. 20 a. Enclose and anchor sanitary facilities. 21 b. No discharge will be allowed from these facilities. 22 c. Collect and store sewage and waste so as not to cause nuisance or health 23 problem. 24 d. Haul sewage and waste off -site at no less than weekly intervals and properly 25 dispose in accordance with applicable regulation. 26 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 27 4. Remove facilities at completion of Project 28 C. Storage Sheds and Buildings 29 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor 30 above ground level for materials and equipment susceptible to weather damage. 31 2. Storage of materials not susceptible to weather damage may be on blocks off 32 ground. 33 3. Store materials in a neat and orderly manner. 34 a. Place materials and equipment to permit easy access for identification, 35 inspection and inventory. 36 4. Equip building with lockable doors and lighting, and provide electrical service for 37 equipment space heaters and heating or ventilation as necessary to provide storage 38 environments acceptable to specified manufacturers. 39 5. Fill and grade site for temporary structures to provide drainage away from 40 temporary and existing buildings. 41 6. Remove building from site prior to Final Acceptance. 42 D. Temporary Fencing 43 1. Provide and maintain for the duration or construction when required in contract 44 documents 45 E. Dust Control CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised JULY 1, 2011 01 50 00 - 3 DAP TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1 1. Contractor is responsible for maintaining dust control through the duration of the 2 project. 3 a. Contractor remains on -call at all times 4 b. Must respond in a timely manner 5 F. Temporary Protection of Construction 6 1. Contractor or subcontractors are responsible for protecting Work from damage due 7 to weather. 8 1.5 SUBMITTALS [NOT USED] 9 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 10 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE [NOT USED] 13 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 14 1.11 FIELD [SITE] CONDITIONS [NOT USED] 15 1.12 WARRANTY [NOT USED] 16 PART 2 - PRODUCTS [NOT USED] 17 PART 3 - EXECUTION [NOT USED] 18 3.1 INSTALLERS [NOT USED] 19 3.2 EXAMINATION [NOT USED] 20 3.3 PREPARATION [NOT USED] 21 3.4 INSTALLATION 22 A. Temporary Facilities 23 1. Maintain all temporary facilities for duration of construction activities as needed. 24 3.5 [REPAIR] / [RESTORATION] 25 3.6 RE -INSTALLATION 26 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 27 3.8 SYSTEM STARTUP [NOT USED] 28 3.9 ADJUSTING [NOT USED] 29 3.10 CLEANING [NOT USED] 30 3.11 CLOSEOUT ACTIVITIES 31 A. Temporary Facilities CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised JULY 1, 2011 01 50 00 - 4 DAP TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1 1. Remove all temporary facilities and restore area after completion of the Work, to a 2 condition equal to or better than prior to start of Work. 3 3.12 PROTECTION [NOT USED] 4 3.13 MAINTENANCE [NOT USED] 5 3.14 ATTACHMENTS [NOT USED] 6 END OF SECTION 7 0 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised JULY 1, 2011 0157 13- 1 DAP STORM WATER POLLUTION PREVENTION Pagel of 3 1 SECTION 0157 13 2 STORM WATER POLLUTION PREVENTION 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Procedures for Storm Water Pollution Prevention Plans 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the 11 Contract 12 2. Division 1 — General Requirements 13 3. Section 3125 00 — Erosion and Sediment Control 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Construction Activities resulting in less than 1 acre of disturbance 17 a. Work associated with this Item is considered subsidiary to the various Items 18 bid. No separate payment will be allowed for this Item. 19 2. Construction Activities resulting in greater than 1 acre of disturbance 20 a. Measurement and Payment shall be in accordance with Section 3125 00. 21 1.3 REFERENCES 22 A. Abbreviations and Acronyms 23 1. Notice of Intent: NOI 24 2. Notice of Termination: NOT 25 3. Storm Water Pollution Prevention Plan: SWPPP 26 4. Texas Commission on Environmental Quality: TCEQ 27 5. Notice of Change: NOC 28 A. Reference Standards 29 1. Reference standards cited in this Specification refer to the current reference 30 standard published at the time of the latest revision date logged at the end of this 31 Specification, unless a date is specifically cited. 32 2. Integrated Storm Management (iSWM) Technical Manual for Construction 33 Controls 34 1.4 ADMINISTRATIVE REQUIREMENTS 35 A. General 36 1. Contractor is responsible for resolution and payment of any fines issued associated 37 with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised July 1, 2011 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 01 57 13 - 2 DAP STORM WATER POLLUTION PREVENTION Page 2 of 3 B. Construction Activities resulting in: 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 3125 00 and Drawings. 2. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 3. 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 40 1.5 SUBMITTALS 41 42 43 44 45 46 47 A. SWPPP 1. Submit in accordance with Section 0133 00, except as stated herein. a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City as follows: 1) 1 copy to the City Project Manager a) City Project Manager will forward to the City Department of Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised July 1, 2011 0157 13 - 3 DAP STORM WATER POLLUTION PREVENTION Page 3 of 3 1 B. Modified SWPPP 2 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City 3 in accordance with Section 0133 00. 4 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 5 1.7 CLOSEOUT SUBMITTALS [NOT USED] 6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 7 1.9 QUALITY ASSURANCE [NOT USED] 8 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 9 1.11 FIELD [SITE] CONDITIONS [NOT USED] 10 1.12 WARRANTY [NOT USED] 11 PART 2 - PRODUCTS [NOT USED] 12 PART 3 - EXECUTION [NOT USED] 13 END OF SECTION 14 15 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised July 1, 2011 01 66 00 - 1 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Pagel of 4 1 SECTION 0166 00 2 PRODUCT STORAGE AND HANDLING REQUIREMENTS 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Scheduling of product delivery 7 2. Packaging of products for delivery 8 3. Protection of products against damage from: 9 a. Handling 10 b. Exposure to elements or harsh environments 11 B. Deviations from this City of Fort Worth Standard Specification 12 1. None. 13 C. Related Specification Sections include, but are not necessarily limited to: 14 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 15 2. Division 1 — General Requirements 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES [NOT USED] 21 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 22 1.5 SUBMITTALS [NOT USED] 23 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 24 1.7 CLOSEOUT SUBMITTALS [NOT USED] 25 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 26 1.9 QUALITY ASSURANCE [NOT USED] 27 1.10 DELIVERY AND HANDLING 28 A. Delivery Requirements 29 1. Schedule delivery of products or equipment as required to allow timely installation 30 and to avoid prolonged storage. 31 2. Provide appropriate personnel and equipment to receive deliveries. 32 3. Delivery trucks will not be permitted to wait extended periods of time on the Site 33 for personnel or equipment to receive the delivery. CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 01 66 00 - 2 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 1 4. Deliver products or equipment in manufacturer's original unbroken cartons or other 2 containers designed and constructed to protect the contents from physical or 3 environmental damage. 4 5. Clearly and fully mark and identify as to manufacturer, item and installation 5 location. 6 6. Provide manufacturer's instructions for storage and handling. 7 B. Handling Requirements 8 1. Handle products or equipment in accordance with these Contract Documents and 9 manufacturer's recommendations and instructions. 10 C. Storage Requirements 11 1. Store materials in accordance with manufacturer's recommendations and 12 requirements of these Specifications. 13 2. Make necessary provisions for safe storage of materials and equipment. 14 a. Place loose soil materials and materials to be incorporated into Work to prevent 15 damage to any part of Work or existing facilities and to maintain free access at 16 all times to all parts of Work and to utility service company installations in 17 vicinity of Work. 18 3. Keep materials and equipment neatly and compactly stored in locations that will 19 cause minimum inconvenience to other contractors, public travel, adjoining owners, 20 tenants and occupants. 21 a. Arrange storage to provide easy access for inspection. 22 4. Restrict storage to areas available on construction site for storage of material and 23 equipment as shown on Drawings, or approved by City's Project Representative. 24 5. Provide off -site storage and protection when on -site storage is not adequate. 25 a. Provide addresses of and access to off -site storage locations for inspection by 26 City's Project Representative. 27 6. Do not use lawns, grass plots or other private property for storage purposes without 28 written permission of owner or other person in possession or control of premises. 29 7. Store in manufacturers' unopened containers. 30 8. Neatly, safely and compactly stack materials delivered and stored along line of 31 Work to avoid inconvenience and damage to property owners and general public 32 and maintain at least 3 feet from fire hydrant. 33 9. Keep public and private driveways and street crossings open. 34 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to 35 satisfaction of City's Project Representative. 36 a. Total length which materials may be distributed along route of construction at 37 one time is 1,000 linear feet, unless otherwise approved in writing by City's 38 Project Representative. CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 01 66 00 - 3 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 ERECTION [NOT USED] 9 3.5 REPAIR / RESTORATION [NOT USED] 10 3.6 RE -INSTALLATION [NOT USED] 11 3.7 FIELD [OR] SITE QUALITY CONTROL 12 A. Tests and Inspections 13 1. Inspect all products or equipment delivered to the site prior to unloading. 14 B. Non -Conforming Work 15 1. Reject all products or equipment that are damaged, used or in any other way 16 unsatisfactory for use on the project. 17 3.8 SYSTEM STARTUP [NOT USED] 18 3.9 ADJUSTING [NOT USED] 19 3.10 CLEANING [NOT USED] 20 3.11 CLOSEOUT ACTIVITIES [NOT USED] 21 3.12 PROTECTION 22 A. Protect all products or equipment in accordance with manufacturer's written directions. 23 B. Store products or equipment in location to avoid physical damage to items while in 24 storage. 25 C. Protect equipment from exposure to elements and keep thoroughly dry if required by 26 the manufacturer. 27 3.13 MAINTENANCE [NOT USED] 28 3.14 ATTACHMENTS [NOT USED] 29 END OF SECTION 30 CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 01 66 00 - 4 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 01 70 00 - 1 DAP MOBILIZATION AND REMOBILIZATION Pagel of 4 1 SECTION 0170 00 2 MOBILIZATION AND REMOBILIZATION 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 1. Mobilization and Demobilization a. Mobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies to the Site 2) Establishment of necessary general facilities for the Contractor's operation at the Site 3) Premiums paid for performance and payment bonds 4) Transportation of Contractor's personnel, equipment, and operating supplies to another location within the designated Site 5) Relocation of necessary general facilities for the Contractor's operation from 1 location to another location on the Site. b. Demobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies away from the Site including disassembly 2) Site Clean-up 3) Removal of all buildings and/or other facilities assembled at the Site for this Contract c. Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. 2. Remobilization a. Remobilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: 1) Demobilization a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b) Site Clean-up as designated in the Contract Documents 2) Remobilization a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site necessary to resume the Work. b) Establishment of necessary general facilities for the Contractor's operation at the Site necessary to resume the Work. 3) No Payments will be made for: a) Mobilization and Demobilization from one location to another on the Site in the normal progress of performing the Work. b) Stand-by or idle time c) Lost profits 3. Mobilizations and Demobilization for Miscellaneous Projects a. Mobilization and Demobilization CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 01 70 00 - 2 DAP MOBILIZATION AND REMOBILIZATION Page 2 of 4 1 1) Mobilization shall consist of the activities and cost on a Work Order basis 2 necessary for: 3 a) Transportation of Contractor's personnel, equipment, and operating 4 supplies to the Site for the issued Work Order. 5 b) Establishment of necessary general facilities for the Contractor's 6 operation at the Site for the issued Work Order 7 2) Demobilization shall consist of the activities and cost necessary for: 8 a) Transportation of Contractor's personnel, equipment, and operating 9 supplies from the Site including disassembly for each issued Work 10 Order 11 b) Site Clean-up for each issued Work Order 12 c) Removal of all buildings or other facilities assembled at the Site for 13 each Work Oder 14 b. Mobilization and Demobilization do not include activities for specific items of 15 work for which payment is provided elsewhere in the contract. 16 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects 17 a. A Mobilization for Miscellaneous Projects when directed by the City and the 18 mobilization occurs within 24 hours of the issuance of the Work Order. 19 B. Deviations from this City of Fort Worth Standard Specification 20 1. None. 21 C. Related Specification Sections include, but are not necessarily limited to: 22 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 23 2. Division 1 — General Requirements 24 1.2 PRICE AND PAYMENT PROCEDURES 25 A. Measurement and Payment 26 1. Mobilization and Demobilization 27 a. Measure 28 1) This Item is considered subsidiary to the various Items bid. 29 b. Payment 30 1) The work performed and materials furnished in accordance with this Item 31 are subsidiary to the various Items bid and no other compensation will be 32 allowed. 33 2. Remobilization for suspension of Work as specifically required in the Contract 34 Documents 35 a. Measurement 36 1) Measurement for this Item shall be per each remobilization performed. 37 b. Payment 38 1) The work performed and materials furnished in accordance with this Item 39 and measured as provided under "Measurement" will be paid for at the unit 40 price per each "Specified Remobilization" in accordance with Contract 41 Documents. 42 c. The price shall include: 43 1) Demobilization as described in Section 1.1.A.2.a.1) 44 2) Remobilization as described in Section 1.1.A.2.a.2) 45 d. No payments will be made for standby, idle time, or lost profits associated this 46 Item. CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 01 70 00 - 3 DAP MOBILIZATION AND REMOBILIZATION Page 3 of 4 1 3. Remobilization for suspension of Work as required by City 2 a. Measurement and Payment 3 1) This shall be submitted as a Contract Claim in accordance with Article 10 4 of Section 00 72 00. 5 2) No payments will be made for standby, idle time, or lost profits associated 6 with this Item. 7 4. Mobilizations and Demobilizations for Miscellaneous Projects 8 a. Measurement 9 1) Measurement for this Item shall be for each Mobilization and 10 Demobilization required by the Contract Documents 11 b. Payment 12 1) The Work performed and materials furnished in accordance with this Item 13 and measured as provided under "Measurement" will be paid for at the unit 14 price per each "Work Order Mobilization" in accordance with Contract 15 Documents. Demobilization shall be considered subsidiary to mobilization 16 and shall not be paid for separately. 17 c. The price shall include: 18 1) Mobilization as described in Section 1.1.A.3.a.1) 19 2) Demobilization as described in Section 1.1.A.3.a.2) 20 d. No payments will be made for standby, idle time, or lost profits associated this 21 Item. 22 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects 23 a. Measurement 24 1) Measurement for this Item shall be for each Mobilization and 25 Demobilization required by the Contract Documents 26 b. Payment 27 1) The Work performed and materials furnished in accordance with this Item 28 and measured as provided under "Measurement" will be paid for at the unit 29 price per each "Work Order Emergency Mobilization" in accordance with 30 Contract Documents. Demobilization shall be considered subsidiary to 31 mobilization and shall not be paid for separately. 32 c. The price shall include 33 1) Mobilization as described in Section 1.1.A.4.a) 34 2) Demobilization as described in Section 1.1.A.3.a.2) 35 d. No payments will be made for standby, idle time, or lost profits associated this 36 Item. 37 1.3 REFERENCES [NOT USED] 38 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 39 1.5 SUBMITTALS [NOT USED] 40 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 41 1.7 CLOSEOUT SUBMITTALS [NOT USED] 42 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 43 1.9 QUALITY ASSURANCE [NOT USED] 44 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 01 70 00 - 4 DAP MOBILIZATION AND REMOBILIZATION Page 4 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION [NOT USED] 5 END OF SECTION 6 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application 7 CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 017123-1 DAP CONSTRUCTION STAKING AND SURVEY Page I of SECTION 01 71 23 CONSTRUCTION STAKING AND SURVEY PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Requirements for construction staking and construction survey B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Staking a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 2. Construction Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Submittals, if required, shall be in accordance with Section 0133 00. B. All submittals shall be approved by the City prior to delivery. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS A. Certificates 1. Provide certificate certifying that elevations and locations of improvements are in conformance or non-conformance with requirements of the Contract Documents. a. Certificate must be sealed by a registered professional land surveyor in the State of Texas. CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 01 71 23 - 2 DAP CONSTRUCTION STAKING AND SURVEY Page 2 of 4 B. Field Quality Control Submittals 1. Documentation verifying accuracy of field engineering work. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Construction Staking 1. Construction staking will be performed by the City. 2. Coordination a. Contact City's Project Representative at least 2 weeks in advance for scheduling of Construction Staking. b. It is the Contractor's responsibility to coordinate staking such that construction activities are not delayed or negatively impacted. 3. General a. Contractor is responsible for preserving and maintaining stakes furnished by City. b. If in the opinion of the City, a sufficient number of stakes or markings have been lost, destroyed or disturbed, by Contractor's neglect, such that the contracted Work cannot take place, then the Contractor will be required to pay the City for new staking with a 25 percent markup. The cost for staking will be deducted from the payment due to the Contractor for the Project. B. Construction Survey 1. Construction Survey will be performed by the City. 2. Coordination a. Contractor to verify that control data established in the design survey remains intact. b. Coordinate with the City prior to field investigation to determine which horizontal and vertical control data will be required for construction survey. c. It is the Contractor's responsibility to coordinate Construction Survey such that construction activities are not delayed or negatively impacted. d. Notify City if any control data needs to be restored or replaced due to damage caused during construction operations. 1) City shall perform replacements and/or restorations. 3. General a. Construction survey will be performed in order to maintain complete and accurate logs of control and survey work as it progresses for Project Records. b. The Contractor will need to ensure coordination is maintained with the City to perform construction survey to obtain construction features, including but not limited to the following: 1) All Utility Lines a) Rim and flowline elevations and coordinates for each manhole or junction structure 2) Water Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Every 250 linear feet CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 01 71 23 - 3 DAP CONSTRUCTION STAKING AND SURVEY Page 3 of (2) Horizontal and vertical points of inflection, curvature, etc. (All Fittings) (3) Cathodic protection test stations (4) Sampling stations (5) Meter boxes/vaults (All sizes) (6) Fire lines (7) Fire hydrants (8) Gate valves (9) Plugs, stubouts, dead-end lines (10) Air Release valves (Manhole rim and vent pipe) (11) Blow off valves (Manhole rim and valve lid) (12) Pressure plane valves (13) Cleaning wyes (14) Casing pipe (each end) b) Storm Sewer (1) Top of pipe elevations and coordinates at the following locations: (a) Every 250 linear feet (b) Horizontal and vertical points of inflection, curvature, etc. c) Sanitary Sewer (1) Top of pipe elevations and coordinates for sanitary sewer lines at the following locations: (a) Every 250 linear feet (b) Horizontal and vertical points of inflection, curvature, etc. (c) Cleanouts c. Construction survey will be performed in order to maintain complete and accurate logs of control and survey work associated with meeting or exceeding the line and grade required by these Specifications. d. The Contractor will need to ensure coordination is maintained with the City to perform construction survey and to verify control data, including but not limited to the following: 1) Established benchmarks and control points provided for the Contractor's use are accurate 2) Benchmarks were used to furnish and maintain all reference lines and grades for tunneling 3) Lines and grades were used to establish the location of the pipe 4) Submit to the City copies of field notes used to establish all lines and grades and allow the City to check guidance system setup prior to beginning each tunneling drive. 5) Provide access for the City to verify the guidance system and the line and grade of the carrier pipe on a daily basis. 6) The Contractor remains fully responsible for the accuracy of the work and the correction of it, as required. 7) Monitor line and grade continuously during construction. 8) Record deviation with respect to design line and grade once at each pipe joint and submit daily records to City. 9) If the installation does not meet the specified tolerances, immediately notify the City and correct the installation in accordance with the Contract Documents. 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 0171 23 - 4 DAP CONSTRUCTION STAKING AND SURVEY Page 4 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. It is the Contractor's responsibility to maintain all stakes and control data placed bythe City in accordance with this Specification. B. Do not change or relocate stakes or control data without approval from the City. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP application CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 017719-1 DAP CLOSEOUT REQUIREMENTS Pagel of 3 SECTION 0177 19 CLOSEOUT REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. The procedure for closing out a contract B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Guarantees, Bonds and Affidavits 1. No application for final payment will be accepted until all guarantees, bonds, certificates, licenses and affidavits required for Work or equipment as specified are satisfactorily filed with the City. B. Release of Liens or Claims 1. No application for final payment will be accepted until satisfactory evidence of release of liens has been submitted to the City. 1.5 SUBMITTALS A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 017719-2 DAP CLOSEOUT REQUIREMENTS Page 2 of 3 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] PART 2 - PRODUCTS [NOTUSED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 CLOSEOUT PROCEDURE A. Prior to requesting Final Inspection, submit: 1. Project Record Documents in accordance with Section 0178 39 2. Operation and Maintenance Data, if required, in accordance with Section 01 78 23 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 01 74 23. C. Final Inspection 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b. Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective or incomplete. 2. Upon receiving written notice from the City, immediately undertake the Work required to remedy deficiencies and complete the Work to the satisfaction of the City. 3. Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. 4. Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified spare parts b. Adequate oil and grease as required for the first lubrication of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses £ Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of all equipment D. Notice of Project Completion CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 017719-3 DAP CLOSEOUT REQUIREMENTS Page 3 of 3 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) f. Contractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP application CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 017823-1 DAP OPERATION AND MAINTENANCE DATA Pagel of 5 SECTION 0178 23 OPERATION AND MAINTENANCE DATA PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Product data and related information appropriate for City's maintenance and operation of products furnished under Contract 2. Such products may include, but are not limited to: a. Traffic Controllers b. Irrigation Controllers (to be operated by the City) c. Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Schedule 1. Submit manuals in final form to the City within 30 calendar days of product shipment to the project site. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00. All submittals shall be approved by the City prior to delivery. 1.6 INFORMATIONAL SUBMITTALS A. Submittal Form 1. Prepare data in form of an instructional manual for use by City personnel. 2. Format a. Size: 8 1/2 inches x 11 inches b. Paper 1) 40 pound minimum, white, for typed pages 2) Holes reinforced with plastic, cloth or metal c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 01 78 23 - 2 DAP OPERATION AND MAINTENANCE DATA Page 2 of 5 d. Drawings 1) Provide reinforced punched binder tab, bind in with text 2) Reduce larger drawings and fold to size of text pages. e. Provide fly -leaf for each separate product, or each piece of operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. f. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subject matter covered in the manual Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupings. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content 1. Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify each product by product name and other identifying symbols as set forth in Contract Documents. 2. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable information 3. Drawings a. Supplement product data with drawings as necessary to clearly illustrate: 1) Relations of component parts of equipment and systems 2) Control and flow diagrams b. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. c. Do not use Project Record Drawings as maintenance drawings. 4. Written text, as required to supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures. b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 01 78 23 - 3 DAP OPERATION AND MAINTENANCE DATA Page 3 of 5 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel giving: 1) Proper procedures in event of failure 2) Instances which might affect validity of warranties or bonds C. Manual for Materials and Finishes 1. Submit 5 copies of complete manual in final form. 2. Content, for architectural products, applied materials and finishes: a. Manufacturer's data, giving full information on products 1) Catalog number, size, composition 2) Color and texture designations 3) Information required for reordering special manufactured products b. Instructions for care and maintenance 1) Manufacturer's recommendation for types of cleaning agents and methods 2) Cautions against cleaning agents and methods which are detrimental to product 3) Recommended schedule for cleaning and maintenance Content, for moisture protection and weather exposure products: a. Manufacturer's data, giving full information on products 1) Applicable standards 2) Chemical composition 3) Details of installation b. Instructions for inspection, maintenance and repair D. Manual for Equipment and Systems 1. Submit 5 copies of complete manual in final form. 2. Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts 1) Function, normal operating characteristics and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Operating procedures 1) Start-up, break-in, routine and normal operating instructions 2) Regulation, control, stopping, shut -down and emergency instructions 3) Summer and winter operating instructions 4) Special operating instructions c. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Alignment, adjusting and checking d. Servicing and lubrication schedule 1) List of lubricants required e. Manufacturer's printed operating and maintenance instructions f. Description of sequence of operation by control manufacturer 1) Predicted life of parts subject to wear 2) Items recommended to be stocked as spare parts g. As installed control diagrams by controls manufacturer h. Each contractor's coordination drawings 1) As installed color coded piping diagrams CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 01 78 23 - 4 DAP OPERATION AND MAINTENANCE DATA Page 4 of 5 i. Charts of valve tag numbers, with location and function of each valve j. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage k. Other data as required under pertinent Sections of Specifications 3. Content, for each electric and electronic system, as appropriate: a. Description of system and component parts 1) Function, normal operating characteristics, and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards 1) Electrical service 2) Controls 3) Communications c. As installed color coded wiring diagrams d. Operating procedures 1) Routine and normal operating instructions 2) Sequences required 3) Special operating instructions e. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking £ Manufacturer's printed operating and maintenance instructions g. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage h. Other data as required under pertinent Sections of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Provide operation and maintenance data by personnel with the following criteria: 1. Trained and experienced in maintenance and operation of described products 2. Skilled as technical writer to the extent required to communicate essential data 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 01 78 23 - 5 DAP OPERATION AND MAINTENANCE DATA 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] DATE NAME 8/31/2012 D. Johnson 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE 1.5.A.1 — title of section removed Revised for DAP Application Page 5 of 5 CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 SECTION 0178 39 PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 017839-1 DAP PROJECT RECORD DOCUMENTS Page 1 of 1. Work associated with the documenting the project and recording changes to project documents, including: a. Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to City's Project Representative. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Accuracy of Records 1. Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. 2. Accuracy of records shall be such that future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 01 78 39 - 2 DAP PROJECT RECORD DOCUMENTS Page 2 of 4 3. To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 4. Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modification of the Work to proceed without lengthy and expensive site measurement, investigation and examination. 1.10 STORAGE AND HANDLING A. Storage and Handling Requirements 1. Maintain the job set of Record Documents completely protected from deterioration and from loss and damage until completion of the Work and transfer of all recorded data to the final Project Record Documents. 2. In the event of loss of recorded data, use means necessary to again secure the data to the City's approval. a. In such case, provide replacements to the standards originally required by the Contract Documents. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2-PRODUCTS 2.1 OWNER -FURNISHED [oR] OWNER -SUPPLIED PRODUCTS [NOT USED] f►�►4•.71CK1 '71 1 IZ�111u111�I�IF." A. Job set 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no charge to the Contractor, 1 complete set of all Documents comprising the Contract. B. Final Record Documents 1. At a time nearing the completion of the Work and prior to Final Inspection, provide the City 1 complete set of all Final Record Drawings in the Contract. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set 1. Immediately upon receipt of the job set, identify each of the Documents with the title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 01 78 39 - 3 DAP PROJECT RECORD DOCUMENTS Page 3 of 2. Preservation a. Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. b. Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. c. Maintain the job set at the site of work. 3. Coordination with Construction Survey a. At a minimum clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4. Making entries on Drawings a. Record any deviations from Contract Documents. b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c. Date all entries. d. Call attention to the entry by a "cloud" drawn around the area or areas affected. e. In the event of overlapping changes, use different colors for the overlapping changes. 5. Conversion of schematic layouts a. In some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b. Show on the job set of Record Drawings, by dimension accurate to within 1 inch, the centerline of each run of items. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in ceiling plenum", "exposed", and the like). 3) Make all identification sufficiently descriptive that it may be related reliably to the Specifications. c. The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. B. Final Project Record Documents Transfer of data to Drawings a. Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. b. Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. c. Call attention to each entry by drawing a "cloud" around the area or areas affected. CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 0178 39 - 4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP Application CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 0178 39 - 4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 GC-4.02 Subsurface and Physical Conditions THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 GEOTECHNICAL EXPLORATION QUARRY FALLS NEC Old Decatur Road and Loop 820 Fort Worth, Texas ALPHA Report No. W221178 June 16, 2022 Prepared for: GREYSTAR - IRVING 600 E. Las Colinas Blvd., Suite 2100 Irving, Texas 75039 Attention: Mr. Kendall Hatch Prepared By: ALPHA /TESTING WHERE IT ALL BEGINS A L P H A /� T E S T I N G Geotechnical 5058Brush Creek Road TEL: 817.496.5600 Construction Materials Fort Worth, Texas 76119 Fax: 817.496.5608 A Universal Engineering Sciences ComEnvironmental www.alphatesting.com Firm No. 813 June 16, 2022 Greystar - Irving 600 E. Las Colinas Blvd., Suite 2100 Irving, Texas 75039 Attention: Mr. Kendall Hatch Re: Geotechnical Exploration Quarry Falls NEC Old Decatur Road and Loop 820 Fort Worth, Texas ALPHA Report No. W221178 Attached is the report of the geotechnical exploration performed for the project referenced above. This study was authorized by Mr. JR Thulin on April 20, 2022 and performed in accordance with ALPHA Proposal No. 90505 dated April 13, 2022. This report contains results of field explorations and laboratory testing and an engineering interpretation of these with respect to available project characteristics. The results and analyses were used to develop recommendations to aid design and construction of foundations and private pavement. ALPHA TESTING, LLC appreciates the opportunity to be of service on this project. If we can be of further assistance, such as providing construction and materials testing services, please contact our office. Sincerely, ALPHA TESTING, LLC Karina Cohuo Geotechnical Project Manager GSF-BJH/kc Copies: (1-PDF) Client Brian J. Hoyt, P.E. Regional Manager TABLE OF CONTENTS ALPHA REPORT NO. W221178 1.0 PURPOSE AND SCOPE.................................................................................................... 1 2.0 PROJECT CHARACTERISTICS...................................................................................... 1 3.0 FIELD EXPLORATION.................................................................................................... 2 4.0 LABORATORY TESTS.................................................................................................... 2 5.0 GENERAL SUBSURFACE CONDITIONS...................................................................... 2 6.0 DESIGN RECOMMENDATIONS.................................................................................... 3 6.1 Existing Fill and Deep Fills.................................................................................... 3 6.2 Slab -on -Grade Foundations.................................................................................... 4 6.3 Post -Tensioning Institute, Design of Post -Tensioned Slab -on -Grade .................... 4 6.4 Seismic Considerations........................................................................................... 5 6.5 Swimming Pool and Pool Deck.............................................................................. 5 6.6 Pavement.................................................................................................................5 6.6.1 Portland -Cement Concrete (PCC) Pavement .............................................. 6 6.6.2 Lime Stabilization of Pavement Subgrade.................................................. 7 6.7 Drainage and Other Considerations........................................................................ 7 7.0 GENERAL CONSTRUCTION PROCEDURES AND GUIDELINES ............................. 8 7.1 Site Preparation and Grading.................................................................................. 8 7.2 Foundation Excavations........................................................................................ 10 7.3 Fill Compaction.................................................................................................... 10 7.4 Utilities..................................................................................................................11 7.5 Groundwater......................................................................................................... 12 8.0 LIMITATIONS.................................................................................................................12 APPENDIX A-1 Methods of Field Exploration Boring Location Plan — Figure 1 B-1 Methods of Laboratory Testing Logs of Borings Key to Soil Symbols and Classifications ALPHA Report No. W221178 11t% 1.0 PURPOSE AND SCOPE The purpose of this geotechnical exploration is for ALPHA TESTING, LLC (ALPHA) to evaluate for Greystar - Irving (Client) some of the physical and engineering properties of subsurface materials at selected locations on the subject site with respect to formulation of appropriate geotechnical design parameters for the proposed construction. The field exploration was accomplished by securing subsurface samples from widely spaced test borings performed across the expanse of the site. Engineering analyses were performed from results of the field exploration and results of laboratory tests performed on representative samples. Also included are general comments pertaining to reasonably anticipated construction problems and recommendations concerning earthwork and quality control testing during construction. This information can be used to evaluate subsurface conditions and to aid in ascertaining construction meets project specifications. Recommendations provided in this report were developed from information obtained in test borings depicting subsurface conditions only at the specific boring locations and at the particular time designated on the logs. Subsurface conditions at other locations may differ from those observed at the boring locations, and subsurface conditions at boring locations may vary at different times of the year. The scope of work may not fully define the variability of subsurface materials and conditions that are present on the site. The nature and extent of variations between borings may not become evident until construction. If significant variations then appear evident, our office should be contacted to re-evaluate our recommendations after performing on -site observations and possibly other tests. 2.0 PROJECT CHARACTERISTICS It is proposed to construct an apartment complex with 20 apartment buildings and two leasing/clubhouse buildings with swimming pools and pavement for associated parking and drives on a site generally located on the northeast corner of Old Decatur Road and Loop 820 in Fort Worth, Texas. A site plan illustrating the general outline of the property is provided as Figure 1, the Boring Location Plan, in the Appendix. At the time the field exploration was performed, the site generally consisted of a tract of land with scattered trees. Review of historical images available from Google Earth® indicate stockpiles of fill previously occupied the site with grading operations occurring in the northwest, northeast and southern half of the site. No information regarding previous development on the site was provided to us. Review of topographical maps available at www.dfwmaDs.com indicates the site slopes down towards the east about 42 ft (Appx. Elev. 750 ft to Appx. Elev. 708 ft). The new structures are expected to create light loads to be carried by the foundations. Based on conversations with the Client, we understand the new apartments and leasing buildings will be supported with slab foundations designed for post -construction seasonal movements of about 2 inches. The swimming pool and pool deck will be designed for post -construction seasonal movements of about 1 inch. Pavement for the project will consist of portland cement concrete (PCC). No below grade slabs are planned. Grading plans were not available at the time of this study. For the purpose of our analysis, we have assumed maximum cuts and fills of about 2 ft will be required to achieve final grade in the building pad areas. 1 ALPHA Report No. W221178 11t% 3.0 FIELD EXPLORATION Subsurface conditions on the site were explored by drilling 24 test borings drilled to a depth of about 20 ft each. The test borings were drilled in general accordance with ASTM Standard D 420 using standard rotary drilling equipment. The approximate location of each test boring is shown on the Boring Location Plan, Figure 1, enclosed in the Appendix. Details of drilling and sampling operations are briefly summarized in Methods of Field Exploration, Section A-1 of the Appendix. Subsurface types encountered during the field exploration are presented on Log of Boring sheets (boring logs) included in the Appendix. The boring logs contain our Field Technician's and Engineer's interpretation of conditions believed to exist between actual samples retrieved. Therefore, these boring logs contain both factual and interpretive information. Lines delineating subsurface strata on the boring logs are approximate and the actual transition between strata may be gradual. 4.0 LABORATORY TESTS Selected samples of the subsurface materials were tested in the laboratory to evaluate their engineering properties as a basis in providing information for foundation design and earthwork construction. A brief description of testing procedures used in the laboratory can be found in Methods of Laboratory Testing, Section B-1 of the Appendix. Individual test results are presented on the Log of Boring sheets in the Appendix. 5.0 GENERAL SUBSURFACE CONDITIONS Based on geological atlas maps available from the Bureau of Economic Geology, published by the University of Texas at Austin, the project site lies within the Fort Worth Limestone and Duck Creek formation, mapped as undivided. This undivided formation generally consists of limestone with marl layers. Residual soils associated with this formation generally consist of clay soils with low to high shrink/swell potential. Subsurface conditions encountered in most of the borings generally consisted of clay and/or clayey gravel to depths of about 1 ft to 2 ft below the ground surface underlain by limestone extending to the 20 ft termination depth of the borings. Subsurface conditions encountered in Borings 18, 19, 20 and 22 generally consisted of clay to depths of about 4 ft to 17 ft below the ground surface underlain by limestone extending to the 20 ft termination depth. Subsurface conditions encountered in Boring 4 consisted of clay to a depth of about 1 ft underlain by limestone to a depth of about 18 ft. Clay was then encountered extending to the 20 ft termination depth of the boring. Subsurface conditions encountered in Borings 10 and 17 generally consisted of limestone at the surface extending to the 20 ft termination depth of the borings. The upper 2 ft to 17 ft of clay encountered in Borings 18 through 22 was visually classified as fill and possible fill material. More detailed stratigraphic information is presented on the attached Log of Boring sheets. The granular soils (clayey gravel) encountered in the borings are relatively permeable and are anticipated to have a relatively rapid response to water movement. However, the clay and limestone encountered in the borings are relatively impermeable and are anticipated to have a relatively slow response to water movement. Therefore, several days of observation would be required to evaluate actual groundwater levels within the depths explored. Also, the groundwater PJ ALPHA Report No. W221178 level at the site is anticipated to fluctuate seasonally depending on the amount of rainfall, prevailing weather conditions and subsurface drainage characteristics. No free groundwater was encountered in the borings. However, it is common to encounter seasonal groundwater in granular and fill materials, from natural fractures within the clayey matrix, at the soil/rock (limestone) interface, or from fractures in the rock, particularly during or after periods of precipitation. If more detailed groundwater information is required, monitoring wells or piezometers can be installed. Further details concerning subsurface materials and conditions encountered can be obtained from the Log of Boring sheets provided in the Appendix. 6.0 DESIGN RECOMMENDATIONS The following design recommendations were developed on the basis of the previously described Project Characteristics (Section 2.0) and General Subsurface Conditions (Section 5.0). If project criteria should change, our office should conduct a review to determine if modifications to the recommendations are required. Further, it is recommended our office be provided with a copy of the final plans and specifications for review prior to construction. The following design criteria were developed based on our understanding that maximum fills of 2 ft will be required to achieve final grade in the building pad areas. Grading on the site other than described can alter the recommended foundation design parameters. Therefore, it is recommended our office be contacted before performing other cutting and filling on site to verify appropriate design parameters are utilized for final foundation design. 6.1 Existing Fill and Deep Fills As discussed in Section 2.0, stockpiles of fill previously occupied the site. In addition, the upper 2 ft to 17 ft of clay encountered in Borings 18 through 22 was visually classified as fill and possible fill materials. It is unknown if this fill was placed under engineering supervision with compaction records. If compaction records for this fill cannot be obtained, the existing fill should be considered as uncontrolled fill. Uncontrolled fill is generally not considered suitable for support of foundations due to the risk of under -compacted zones resulting in failures of weak soil and/or indeterminate levels of settlement. Any existing uncontrolled fill should be removed from the building pad areas and replaced with engineered fill as recommended in Section 7.3. The excavated materials may be suitable for reuse as engineered fill provided, they are free of organics, boulders, rubble, and other debris. The lateral extent, depth and nature of the existing fill are not known. Test pits could be performed prior to construction to verify the presence, lateral extent, depth, and nature of the existing fill materials. ALPHA would be pleased to provide this service if desired. Possible fill was encountered to a depth of about 17 ft below the ground surface in Boring 20. Test pits can be performed to verify whether this material is fill or not. If this material is fill, then total fill depths could be 15 ft to 19 ft for buildings constructed within 2 ft of existing grade in the vicinity of Boring 20. Even if fill is properly compacted as recommended in Section 7.3, fills in excess of about 10 ft are still subject to settlements over time of up to about 1 to 2 percent of the total fill thickness. This should be considered when planning or placing deep fills. Therefore, any 3 ALPHA Report No. W221178 fill placed deeper than 15 ft below final grade within the building pads should consist of flexible base material compacted to 100 percent maximum dry density of standard proctor (ASTM D 698) as described in Section 7.3. 6.2 Slab -on -Grade Foundations Slab -on -grade foundations for the apartments and amenity buildings should be designed with exterior and interior grade beams adequate to provide sufficient rigidity to the foundation system. A net allowable bearing pressure of 2.0 kips per sq ft can be used for all grade beams bearing on undisturbed cuts in native onsite soils, on fill material placed as recommended in Section 7.3 or on limestone. Grade beams should bear a minimum depth of 12 inches below final grade and should have a minimum width of 10 inches considering the recommended bearing capacity. To reduce cracking as normal movements occur in foundation soils, all grade beams and slab foundations should be adequately reinforced with steel (conventional reinforcing steel and/or post - tensioned reinforcement). It is common to experience some minor cosmetic distress to structures with slab -on -grade foundation systems due to normal ground movements. A properly designed and constructed moisture barrier should be placed between the slabs and subgrade soils to retard moisture migration through the slabs. Our findings indicate slab foundations constructed within 2 ft of existing grade will be subject to about 2 inches of potential seasonal movement. This estimate of potential movement is based on the assumption that any fill used to raise the grade should consist of onsite or similar imported material with a plasticity index of 20 or less. The use of fill with a plasticity index higher than 20 could result in potential movements exceeding 2 inches. Therefore, any fill used in the building pads should consist of fill material with a plasticity index of 20 or less. Slab foundations supported on uncontrolled fill are subject to indeterminate settlements. Any fill used to backfill excavations of uncontrolled fill should consist of onsite or similar soil with a plasticity index of 25 or less. Potential seasonal movements were estimated using results from absorption swell tests, in general accordance with methods outlined by the Texas Department of Transportation (TxDOT) Test Method Tex-124-E and engineering judgment and experience. Estimated movements were calculated assuming the moisture content of the in -situ soil within the normal zone of seasonal moisture content change varies between a "dry" condition and a "wet" condition as defined by Tex-124-E. Also, it was assumed a 1 psi surcharge load from the floor slab acts on the subgrade soils. Movements exceeding our estimates could occur if positive drainage of surface water is not maintained or if soils are subject to an outside water source, such as leakage from a utility line or subsurface moisture migration from off -site locations. 6.3 Post -Tensioning Institute, Design of Post -Tensioned Slab -on -Grade Table B contains information for design of the post -tensioned, slab -on -grade foundation. Design parameters were evaluated based on the conditions encountered in the borings and using information and correlations published by PTI Third Edition and VOLFLO 1.5 computer program provided by Geostructural Tool Kit, Inc. (GTI). 4 ALPHA Report No. W221178 11tX TABLE B PTI Design Parameters Potential Seasonal Movement = 2 inches Edge Lift Center Lift Edge Moisture Distance (em), ft 4.3 9.0 Differential Soil Movement (ym), inches 1.6 (swell) 1.2 (Shrink) 6.4 Seismic Considerations The Site Class for seismic design is based on several factors that include soil profile (soil or rock), shear wave velocity, and strength, averaged over a depth of 100 ft. Since our borings did not extend to 100-foot depths, we based our determinations on the assumption that the subsurface materials below the bottom of the borings were similar to those encountered at the termination depth of the borings. Based on Section 1613.3.2 of the 2012 International Building Code and Table 20.3-1 in the 2010 ASCE-7, we recommend using Site Class C (very dense soil or soft rock) for seismic design at this site. 6.5 Swimming Pool and Pool Deck The pool and deck subgrade should be performed similar to that recommended for slab foundations in Section 6.2. Any fill placed below the pool and deck should consist of soils with a plastic index of 25 or less. At least 2 ft of soil placed below the deck should consist of soil with a plasticity index of 20 or less. Limestone was encountered within 4 ft of the ground surface in Boring 22 and could be encountered during excavation and grading in the pool area, depending on the depth of the pool and final grading requirements. To reduce the risk of differential movements, the pool and deck should be entirely supported on soil. If limestone is encountered at the bearing depth, the limestone should be excavated so that a minimum 6 inch soil cushion is provided below all elements of the swimming pool. From our experience, this limestone can be hard and difficult to excavate. Rock excavation methods (including, but not limited to rock teeth, rippers, jack hammers, or sawcutting) may be required to remove the limestone. Crushing equipment may be required to process this limestone if it is desired to use this material as compacted fill on the site. The contractor selected should have experience with excavation in hard limestone. 6.6 Pavement To permit correlation between information from test borings and actual subgrade conditions exposed during construction, a qualified Geotechnical Engineer should be retained to provide subgrade monitoring and testing during construction. If there is any change in project criteria, the recommendations contained in this report should be reviewed by our office. Calculations used to determine the required pavement thickness are based only on the physical and engineering properties of the materials and conventional thickness determination procedures. Pavement joining the buildings should be constructed with a curb and the joint between the building and curb should be sealed. Related civil design factors such as subgrade drainage, ALPHA Report No. W221178 shoulder support, cross -sectional configurations, surface elevations, reinforcing steel, joint design and environmental factors will significantly affect the service life and must be included in preparation of the construction drawings and specifications, but were not included in the scope of this study. Normal periodic maintenance will be required for all pavements to achieve the design life of the pavement system. Please note, the recommended pavement sections are considered the minimum necessary to provide satisfactory performance based on the expected traffic loading. In some cases, City minimum standards for pavement section construction may exceed our recommendations. 6.6.1 Portland -Cement Concrete (PCC) Pavement Following subgrade improvement recommended in Section 6.6.2, PCC (reinforced) pavement sections are recommended in Table C. TABLE C Recommended PCC Pavement Sections Paving Areas and/or Type Subgrade Thickness, PCC Thickness, Inches Inches Parking Areas Subjected Exclusively to Scarified and 5 Passenger Vehicle Traffic Compacted (native), 6 Drive Lanes, Fire Lanes, Areas Subject to Lime Modified, 6 6 Light Volume Truck Traffic Dumpster Traffic Areas, Areas subject to Lime Modified, 6 7 Moderate Volume Truck Traffic Portland -cement concrete should have a minimum compressive strength of 3,000 lbs per sq inch (psi) at 28 days in light -duty traffic areas and 3,500 psi in drive lanes and truck traffic areas. Concrete should be designed with 4.5 + 1.5 percent entrained air. Joints in concrete paving should not exceed 15 ft. Reinforcing steel should consist of No. 3 bars placed at 18 inches on -center in two directions. Lime stabilization of the pavement subgrade is recommended for drive lanes, fire lanes, and pavement subject to truck traffic. Lime treatment of the pavement subgrade is not necessary for pavements subjected exclusively to passenger vehicle traffic, although lime treatment is these areas would be generally beneficial to the long-term performance of the pavement. Lime treatment of the subgrade is described in Section 6.6.2. Alternately, lime stabilization of the pavement subgrade could be eliminated by increasing the corresponding PCC thickness presented in the pavement sections in Table C by 1 inch. Prior to construction of pavement on untreated clay subgrade soil, the exposed subgrade should be scarified to a depth of at least 6 inches and compacted to at least 95 percent of standard Proctor maximum dry density (ASTM D 698) and within the range of 0 to 4 percentage points above the material's optimum moisture content. 6 ALPHA Report No. W221178 //tt 6.6.2 Lime Stabilization of Pavement Subiz Where lime stabilization is used, the exposed surface of the final pavement subgrade should be scarified to a depth of 6 inches and mixed with a minimum 6 percent hydrated lime (by dry soil weight) in conformance with TxDOT Standard Specifications Item 260. Assuming an in -place unit weight of 100 pcf for the pavement subgrade soils, this percentage of lime equates to about 27 lbs of lime per sq yard of treated subgrade. The actual amount of lime required should be confirmed by additional laboratory tests (ASTM C 977 Appendix XI) prior to construction. In all areas where hydrated lime is used to stabilize subgrade soil, routine Atterberg-limit tests should be performed to verify the resulting plasticity index of the soil -lime mixture is at/or below 15. The soil -lime mixture should be compacted to at least 95 percent of standard Proctor maximum dry density (ASTM D 698) and within the range of 0 to 4 percentage points above the mixture's optimum moisture content. Lime stabilization is not required where the final pavement subgrade consists of limestone. Flexible base material, limestone cuttings or cuttings from adjacent lime stabilized soils can be used as a leveling course in these areas. Lime stabilization procedures should extend at least 1 ft beyond the edge of the pavement to reduce effects of seasonal shrinking and swelling upon the extreme edges of pavement. Lime stabilization of the pavement subgrade soil will not prevent normal seasonal movement of the underlying untreated materials. Pavement and other flatwork will have the same potential for movement as slabs constructed directly on the existing undisturbed soils. Good surface drainage and perimeter drainage with a minimum slope of 2 percent away from the pavement is recommended. The use of sand as a leveling course below pavement and the use of an aggregate base course supported on expansive clays should be avoided. Normal maintenance of pavement should be expected over the life of the structures. 6.7 Drainage and Other Considerations Adequate drainage should be provided to reduce seasonal variations in the moisture content of foundation soils. All pavement and sidewalks within 10 ft of the buildings should be sloped away from the structure to prevent ponding of water around the foundation. Final grades within 10 ft of the structure should be adjusted to slope away from the structure at a minimum slope of 2 percent. Maintaining positive surface drainage throughout the life of the structures is essential. In areas with pavement or sidewalks adjacent to the new structure, a positive seal must be maintained between the structures and the pavement or sidewalk to minimize seepage of water into the underlying supporting soils. Post -construction movement of pavement and flat -work is common. Normal maintenance should include inspection of all joints in paving and sidewalks, etc. as well as resealing where necessary. Several factors relate to civil and architectural design and/or maintenance, which can significantly affect future movements of the foundation and floor slab systems: 7 ALPHA Report No. W221178 • Preferably, a complete system of gutters and downspouts should carry runoff water a minimum of 5 feet from the completed structure. • Large trees and shrubs should not be allowed closer to the foundation than a horizontal distance equal to roughly one-half of their mature height due to their significant moisture demand upon maturing. • Moisture conditions should be maintained "constant" around the edge of the slab. Ponding of water in planters, in unpaved areas, and around joints in paving and sidewalks can cause slab movements beyond those predicted in this report. • Planter box structures placed adjacent to the buildings should be provided with a means to assure concentrations of water are not available to the subsoil stratigraphy. • The root systems from any existing trees at this site will have dried and desiccated the surrounding clay soils, resulting in soil with near -maximum swell potential. Clay soils surrounding tree root mats within the building areas or areas to be covered with grade slabs (including, but not limited to, foundations, flatwork, pavement, equipment pads, etc.) should be removed to a depth of at least 1 ft below the root ball and compacted in -place with moisture and density control as described in Section 7.3. Trench backfill for utilities should be properly placed and compacted as outlined in Section 7.4 and in accordance with requirements of local City standards. Since granular bedding backfill is used for most utility lines, the backfilled trench should not become a conduit and allow access for surface or subsurface water to travel toward the new structures. Concrete cut-off collars or clay plugs should be provided where utility lines cross building lines to prevent water from traveling in the trench backfill and entering beneath the structures. 7.0 GENERAL CONSTRUCTION PROCEDURES AND GUIDELINES Variations in subsurface conditions could be encountered during construction. To permit correlation between test boring data and actual subsurface conditions encountered during construction, it is recommended a registered Professional Engineering firm be retained to observe construction procedures and materials. Some construction problems, particularly degree or magnitude, cannot be anticipated until the course of construction. The recommendations offered in the following paragraphs are intended not to limit or preclude other conceivable solutions, but rather to provide our observations based on our experience and understanding of the project characteristics and subsurface conditions encountered in the borings. 7,1 Site Preparation and Grading As discussed in Section 2.0, stockpiles of fill previously occupied the site. In addition, existing and possible fill materials were encountered to depths of about 2 ft to 17 ft below the ground surface in Borings 18 through 22. Although not encountered in the borings, existing fill materials could contain organics, boulders and other debris which could be encountered during site grading and general excavation. The earthwork and excavation contracts should contain provision for ALPHA Report No. W221178 removal of unsuitable materials in the existing fill. Test pit excavations performed prior to construction can be used to evaluate the depth, lateral extent and composition of uncontrolled fill at this site. ALPHA would be pleased to provide this service if desired. Limestone was encountered at the ground surface in Borings 10 and 17 and within 4 ft of the ground surface in several borings and we expect limestone will be encountered during general excavation and grading in some areas of the site. From our experience, this limestone can be hard and difficult to excavate. Rock excavation methods (including, but not limited to rock teeth, rippers, jack hammers, or sawcutting) may be required to remove the limestone. Crushing equipment may be required to process this limestone if it is desired to use this material as compacted fill on the site. The contractor selected should have experience with excavation in hard limestone. All areas supporting slab foundations, pavement, flatwork, or areas to receive new fill should be properly prepared. • After completion of the necessary stripping, clearing, and excavating and prior to placing any required fill, the exposed soil subgrade should be carefully evaluated by probing and testing. Any undesirable material (organic material, wet, soft, or loose soil) still in place should be removed. • The exposed soil subgrade should be further evaluated by proof -rolling with a heavy pneumatic tired roller, loaded dump truck or similar equipment weighing approximately 20 tons to check for pockets of soft or loose material hidden beneath a thin crust of possibly better soil. • Proof -rolling procedures should be observed routinely by a Professional Engineer, or his designated representative. Any undesirable material (organic material, wet, soft, or loose soil) exposed during the proof -roll should be removed and replaced with well -compacted material as outlined in Section 7.3. • Prior to placement of any fill, the exposed soil subgrade should then be scarified to a minimum depth of 6 inches and recompacted as outlined in Section 7.3. If fill is to be placed on existing slopes (natural or constructed) steeper than six horizontal to one vertical (6:1), the fill materials should be benched into the existing slopes in such a manner as to provide a minimum bench -key width of five (5) ft. This should provide a good contact between the existing soils and new fill materials, reduce potential sliding planes, and allow relatively horizontal lift placements. Even if fill is properly compacted as recommended in Section 7.3, fills in excess of about 10 ft are still subject to settlements over time of up to about 1 to 2 percent of the total fill thickness. This should be considered when planning or placing deep fills. Slope stability analysis of embankments (natural or constructed) and global stability analysis for retaining walls was not within the scope of this study. 9 ALPHA Report No. W221178 The contractor is responsible for designing any excavation slopes, temporary sheeting or shoring. Design of these structures should include any imposed surface surcharges. Construction site safety is the sole responsibility of the contractor, who shall also be solely responsible for the means, methods and sequencing of construction operations. The contractor should also be aware that slope height, slope inclination or excavation depths (including utility trench excavations) should in no case exceed those specified in local, state and/or federal safety regulations, such as OSHA Health and Safety Standard for Excavations, 29 CFR Part 1926, or successor regulations. Stockpiles should be placed well away from the edge of the excavation and their heights should be controlled so they do not surcharge the sides of the excavation. Surface drainage should be carefully controlled to prevent flow of water over the slopes and/or into the excavations. Construction slopes should be closely observed for signs of mass movement, including tension cracks near the crest or bulging at the toe. If potential stability problems are observed, a geotechnical engineer should be contacted immediately. Shoring, bracing or underpinning required for the project (if any) should be designed by a professional engineer registered in the State of Texas. Due to the nature of the clayey soils found near the surface at the borings, traffic of heavy equipment (including heavy compaction equipment) may create pumping and general deterioration of shallow soils. Therefore, some construction difficulties should be anticipated during periods when these soils are saturated. 7.2 Foundation Excavations All foundation excavations should be properly monitored to verify loose, soft, or otherwise undesirable materials are removed and foundations will bear on satisfactory material. Surface runoff should be drained away from excavations and not allowed to pond in the bottom of the excavation. The exposed foundation soils should not be allowed to become excessively dry or wet before placement of concrete. All concrete for foundations should be placed as soon as practical after the excavation is made. Prolonged exposure of the bearing surface to air or water will result in changes in strength and compressibility of the bearing stratum. Therefore, if delays occur, excavations should be slightly deepened and cleaned, in order to provide a fresh bearing surface. 7.3 Fill Compaction The following recommendations pertain to general fill. Fill material placed within 2 ft of the bottom of floor slabs should have a plasticity index of 20 or less. Deeper fills to backfill excavations of uncontrolled fill in the building pads should have a plasticity index of 25 or less. Fills placed deeper than 15 ft in the building pad should consist of flexible base material compacted to 100 percent maximum dry density per standard proctor (ASTMD 698) Flexible Base Material: Flexible base material used as non -expansive fill for the building pad area should meet the requirements of TxDOT Item 247, Type A or D, Grade 1-2 or 3. The material should be compacted to a minimum 95 percent of standard Proctor maximum dry density (ASTM D 698) and within -2 to +3 percentage points of the material's optimum moisture content. Flexible base placed deeper than 15 ft should be compacted to 100 percent standard proctor dry density. 10 ALPHA Report No. W221178 Clay soils used for general fill with a plasticity index equal to or greater than 25 should be compacted to a dry density between 93 and 98 percent of standard Proctor maximum dry density (ASTM D 698). The compacted moisture content of the clays during placement should be within the range of +2 to +6 percentage points of the material's optimum moisture. Clay soils with a plasticity index below 25 should be compacted to a dry density of at least 95 percent of standard Proctor maximum dry density (ASTM D 698) and within the range of 1 percentage point below to 3 percentage points above the material's optimum moisture content. Clay fill should be process and the largest particle or clod should be less than 6 inches prior to compaction. Processed limestone used as fill should be compacted to at least 95 percent of standard Proctor maximum dry density. The compacted moisture content of the processed limestone is not considered crucial to proper performance. However, if the material's moisture content during placement is within 3 percentage points of optimum, the compactive effort required to achieve the minimum compaction criteria may be minimized. Individual rock pieces larger than 6 inches in dimension should not be used as fill. However, if rock fill is utilized within 3 ft below the bottom of floor slabs or pool/deck, the maximum allowable size of individual rock pieces should be reduced to 3 inches. Processed limestone used as fill should incorporate sufficient fines to prevent the presence of voids around larger diameter rock pieces. A gradation of at least 40 percent passing a standard No. 4 sieve is recommended. Where mass fills are deeper than 10 ft, the fillfbackfill below 10 ft should be compacted to at least 100 percent of standard Proctor maximum dry density (ASTM D 698) and within — 2 to +2 percentage points of the material's optimum moisture content. The portion of the fill/backfill shallower than 10 ft should be compacted as outlined above. Compaction should be accomplished by placing fill in about 8-inch thick loose lifts and compacting each lift to at least the specified minimum dry density. Field density and moisture content tests should be performed on each lift. 7.4 Utilities Where utility lines are deeper than 10 ft, the fill/backfill below 10 ft should be compacted to at least 100 percent of standard Proctor maximum dry density (ASTM D 698) and within —2 to +2 percentage points of the material's optimum moisture content. The portion of the fill/backfill shallower than 10 ft should be compacted as previously outlined. Density tests should be performed on each lift (maximum 12-inch thick) and should be performed as the trench is being backfilled. Even if fill is properly compacted, fills in excess of about 10 ft are still subject to settlements over time of up to about 1 to 2 percent of the total fill thickness. This should be considered when designing pavement over utility lines and/or other areas with deep fill. If utility trenches or other excavations extend to or beyond a depth of 5 ft below construction grade, the contractor or others shall be required to develop an excavation safety plan to protect personnel entering the excavation or excavation vicinity. The collection of specific geotechnical data and the development of such a plan, which could include designs for sloping and benching or various II ALPHA Report No. W221178 types of temporary shoring, is beyond the scope of this study. Any such designs and safety plans shall be developed in accordance with current OSHA guidelines and other applicable industry standards. 7.5 Groundwater Groundwater was not encountered in the borings. However, from our experience, groundwater could be encountered during general excavation at this site. The risk of encountering seepage is increased during or after periods of precipitation. Standard sump pit and pumping procedures should be adequate to control seepage on a local basis for relatively shallow excavations. In any areas where cuts are made, attention should be given to possible seasonal water seepage that could occur through natural cracks and fissures in the newly exposed stratigraphy. The risk of seepage is increased where limestone is exposed in excavations and slopes or is near final grade. In these areas, subsurface drains may be required to intercept seasonal groundwater seepage. The need for these or other de -watering devices should be carefully addressed during construction. Our office could be contacted to visually observe the final grades to evaluate the need for such drains. 8.0 LIMITATIONS Professional services provided in this geotechnical exploration were performed, findings obtained, and recommendations prepared in accordance with generally accepted geotechnical engineering principles and practices. The scope of services provided herein does not include an environmental assessment of the site or investigation for the presence or absence of hazardous materials in the soil, surface water or groundwater. ALPHA, upon written request, can be retained to provide these services. ALPHA is not responsible for conclusions, opinions or recommendations made by others based on this data. Information contained in this report is intended for the exclusive use of the Client (and their designated design representatives), and is related solely to design of the specific structures outlined in Section 2.0. No parry other than the Client (and their designated design representatives) shall use or rely upon this report in any manner whatsoever unless such party shall have obtained ALPHA's written acceptance of such intended use. Any such third party using this report after obtaining ALPHA's written acceptance shall be bound by the limitations and limitations of liability contained herein, including ALPHA's liability being limited to the fee paid to it for this report. Recommendations presented in this report should not be used for design of any other structures except those specifically described in this report. In all areas of this report in which ALPHA may provide additional services if requested to do so in writing, it is presumed that such requests have not been made if not evidenced by a written document accepted by ALPHA. Further, subsurface conditions can change with passage of time. Recommendations contained herein are not considered applicable for an extended period of time after the completion date of this report. It is recommended our office be contacted for a review of the contents of this report for construction commencing more than one (1) year after completion of this report. Non- compliance with any of these requirements by the Client or anyone else shall release ALPHA from any liability resulting from the use of, or reliance upon, this report. 12 ALPHA Report No. W221178 Recommendations provided in this report are based on our understanding of information provided by the Client about characteristics of the project. If the Client notes any deviation from the facts about project characteristics, our office should be contacted immediately since this may materially alter the recommendations. Further, ALPHA is not responsible for damages resulting from workmanship of designers or contractors. It is recommended the Owner retain qualified personnel, such as a Geotechnical Engineering firm, to verify construction is performed in accordance with plans and specifications. 13 #t\ APPENDIX ALPHA Report No. W221178 11t\ A-1 METHODS OF FIELD EXPLORATION Using standard rotary drilling equipment, 24 test borings were performed for this geotechnical exploration at the approximate locations shown on the Boring Location Plan, Figure 1. The boring locations were staked by using a handheld GPS device or by pacing/taping and estimating right angles from landmarks which could be identified in the field and as shown on the site plan provided during this study. The locations of the test borings shown on the Boring Location Plan are considered accurate only to the degree implied by the methods used to define them. Relatively undisturbed soil samples were obtained by hydraulically pressing 3-inch O.D. thin -wall sampling tubes into the underlying soils at selected depths (ASTM D 1587). These samples were removed from the sampling tubes in the field and evaluated visually. One representative portion of each sample was sealed in a plastic bag for use in future visual evaluation and possible testing in the laboratory. Texas Department of Transportation Texas Cone Penetration (TCP) tests were completed in the field to determine the apparent in -place strength characteristics of the rock type materials. A 3- inch diameter steel cone driven by a 170-pound hammer dropped 24 inches is the basis for TxDOT strength correlations. Depending on the resistance (strength) of the materials, either the number of blows of the hammer required to provide 12 inches of penetration, or the inches of penetration of the cone due to 100 blows of the hammer are recorded on the field logs and are shown on the Log of Boring sheets as "TX Cone" (reference: TxDOT Test Method TEX 132-E). The boring logs are included in this Appendix. The logs show visual descriptions of subsurface strata encountered in the borings using the Unified Soil Classification System. Sampling information, pertinent field data, and field observations are also included. Samples not consumed by testing will be retained in our laboratory for at least 14 days and then discarded unless the Client requests otherwise. B-21 B-19 /B- 2 0 B-1 � - B-12 B-13 B-22` B-7� . B-2 -- B-14 x �., B-15 ` B-23 rj d B-s dB-3 B-9 B-16 1 B-17 B-4 B-24 O 'p d B-11 �.r ....� B-18 B-5 f - h k B-6 f GEOTECHNICAL EXPLORATION QUARRY FALLS NEC OLD DECATUR ROAD AND LOOP 820 FORT WORTH, TEXAS ALPHA PROJECT NO. W221178 ALRNA'kTEST ING INHERE IT ALL BEGINS FIGURE 1 BORING LOCATION PLAN Y APPROXIMATE BORING LOCATION ALPHA Report No. W221178 11tx B-1 METHODS OF LABORATORY TESTING Representative samples were evaluated and classified by a qualified member of the Geotechnical Division and the boring logs were edited as necessary. To aid in classifying the subsurface materials and to determine the general engineering characteristics, natural moisture content tests (ASTM D 2216), Atterberg-limit tests (ASTM D 4318) and dry unit weight determinations were performed on selected samples. In addition, unconfined compressive strength tests (ASTM D 2166) and pocket -penetrometer tests were conducted on selected soil samples to evaluate the soil shear strength. Results of these laboratory tests are provided on the Log of Boring sheets. ALPHA /TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 1 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W221178 www.alphatesting.com Grevstar - Irvinq Location: Fort Worth, Texas Quarry Falls Surface Elevation: 5/25/2022 End Date: 5/25/2022 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) XZOn Rods (ft): NONE Drilling (ft): DRY oZAfter 7After Hours (ft): O MATERIAL DESCRIPTION Brown CLAYEY GRAVEL Tan LIMESTONE with clay seams and layers _5 10_ Gray LIMESTONE with shale seams and layers _15_ _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 o.S d E a)t _ x > `o C) o E E o >� NC E N� w Jo� J y5oza a ow oo .S 3 V) � O oZ C cOC Jax a- aa 23 1.0 100/ 0.75" 63 14.0 L 100/ 1" 11. 20.0 L 100/ ALPHA /TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 2 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W221178 www.alphatesting.com Grevstar - Irvinq Location: Fort Worth, Texas Quarry Falls Surface Elevation: 5/25/2022 End Date: 5/25/2022 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS XZOn Rods (ft): NONE oZAfter Drilling (ft): DRY O 7After Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY Tan LIMESTONE with clay seams and layers _5 10_ _15 Gray LIMESTONE with shale seams and layers 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 o.S d E a)t _ x > `o C) o E E o >� NC 3 Y E 6L N� OC Jo� J y a oW oza oo .S a� pw� Z �a a- a 2.0 27 60 22 38 1.0 100/ 1" 100/ 3.5" 100/ 1.25" 18.0 100/ 20.0 k 1.5" ALPHA /TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 3 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W221178 www.alphatesting.com Grevstar - Irvinq Location: Fort Worth, Texas Quarry Falls Surface Elevation: 5/25/2022 End Date: 5/25/2022 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS XZOn Rods (ft): NONE Drilling (ft): DRY oZAfter 7After Hours (ft): O MATERIAL DESCRIPTION Brown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers _5 10_ _15 Gray LIMESTONE with shale seams and layers 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 o.S d E a)t _ x > `o C) o E E o >� NC 3 Y E 6L N� OC Jo� J y a oW oza oo .S a� pw� Z �a a- a 2.75 26 43 18 25 1.0 100/ 1" 100/ 2.25" 100/ 2.5" 16.0 100/ 20.0 L 1.5" ALPHA /TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 4 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W221178 www.alphatesting.com Grevstar - Irvinq Location: Fort Worth, Texas Quarry Falls Surface Elevation: 5/23/2022 End Date: 5/23/2022 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS XZOn Rods (ft): NONE oZAfter Drilling (ft): DRY O 7After Hours (ft): MATERIAL DESCRIPTION jBrown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers 5 _15 jTan CLAY with calcareous deposits 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 o.S d E a)t _ x > `o C) o E E o >� NC 3 Y E 6L N� OC Jo� a oW oza oo .S a� 3 (n � o� Z J ax �a a- a 4.5+ 7 1.0 18.0 20.0 1 5" 1. 100/ 5" 72 4.5+ 15 ALPHA /TESTING WHERE IT ALL BEGINS Client: Grevstar - Irvinq Project: Quarry Falls Start Date: 5/23/2022 End Date: Drilling Method: CONTINUOUS FLIGHT AU 0) GROUND WATER OBSERVATIONS ,2 J XZOn Rods (ft): NONE oZAfter Drilling (ft): DRY O 7After Hours (ft): MATERIAL DESCRIPTION Brown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers _5_ 10 _15 -Shale layer at 15 ft _20 TEST BORING TERMINATED AT 20 FT 5058 Brush Creek Rd. BORING NO.: 5Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W221178 www.alphatesting.com Location: Fort Worth, Texas Surface Elevation: 5/23/2022 West: GER North: Hammer Drop (lbs / in): 170 / 24 d o.S a)t _ x E o U� c' E E c o >� 3 Y 6Lc aw� °C -JoNCE Coo cc) oW o°o .SzapJ y cn X c ca m o T Ha a- Z 3 4.5+ 6 42 16 26 2.0 100/ 3.5" 100/ 3.5" 71 11. 20.0 L 100/ ALPHA /TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 6 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W221178 www.alphatesting.com Grevstar - Irvinq Location: Fort Worth, Texas Quarry Falls Surface Elevation: 5/24/2022 End Date: 5/24/2022 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS XZOn Rods (ft): NONE oZAfter Drilling (ft): DRY O 7After Hours (ft): MATERIAL DESCRIPTION Tan CLAYEY GRAVEL Tan LIMESTONE with clay seams and layers _5 10_ _15 Gray LIMESTONE with shale seams and layers 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 o.S d E a)t _ x > `o C) o E E o >� NC E N� w Jo� J y5oza a ow oo .S 3 V) � O oZ C cOC Jax a- aa 1.0 100/ 0.25" 100/ 3" 6 100/ 1" 17.0 100/ 20.0 L 1.5" ALPHA /TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 7 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W221178 www.alphatesting.com Grevstar - Irvinq Location: Fort Worth, Texas Quarry Falls Surface Elevation: 5/25/2022 End Date: 5/25/2022 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) XZOn Rods (ft): NONE Drilling (ft): DRY oZAfter 7After Hours (ft): O MATERIAL DESCRIPTION jDark Brown CLAY Tan LIMESTONE with clay seams and layers _5 10_ Gray LIMESTONE with shale seams and layers _15_ _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 o.S d E a)t o E _ E x > NC `o C) N� w Jo� J o y5oza a >� ow E oo .S 3 O oZ Jax V) � a- C cOC aa 2.0 33 1.0 100/ 0.25" 12" 14.0 6 100/ 1" 20.0 L 100/ 100/ ALPHA /TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 8 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W221178 www.alphatesting.com Grevstar - Irvinq Location: Fort Worth, Texas Quarry Falls Surface Elevation: 5/25/2022 End Date: 5/25/2022 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS XZOn Rods (ft): NONE Drilling (ft): DRY oZAfter 7After Hours (ft): O MATERIAL DESCRIPTION jBrown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers 5 10_ Gray LIMESTONE with shale seams and layers _15_ _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 o.S d E a)t _ x > `o C) o E E o �' N� >C1 3 00 Y E �E 6L oar N m� w o C O J o J y a ow oz ao o .S c a� p�� U n .5 3 V) � x o O Z � cd J a �a a- 3 a 4.5+ 18 1.0 100/ 0.5" 100/ 4" 14.0 100/ 1" 100/ 20.0 L 1.7 ALPHA /TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 9 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W221178 www.alphatesting.com Grevstar - Irvinq Location: Fort Worth, Texas Quarry Falls Surface Elevation: 5/25/2022 End Date: 5/25/2022 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS XZOn Rods (ft): NONE Drilling (ft): DRY oZAfter 7After Hours (ft): O MATERIAL DESCRIPTION Brown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers _5 Gray LIMESTONE with shale seams and layers _10 _15 20_ TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 o.S d E a)t _ x > `o C) o E E o >� NC 3 Y E 6L N� OC Jo� J y a oW oza oo .S a� pw� Z �a a- a 0.75 21 48 17 31 1.0 8.0 100/ 0.25" 100/ 2.75" 100/ 1.25" 100/ 20.0 , 1.25" ALPHA /TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 10 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W221178 www.alphatesting.com Grevstar - Irvinq Location: Fort Worth, Texas Quarry Falls Surface Elevation: 5/24/2022 End Date: 5/24/2022 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS XZOn Rods (ft): NONE oZAfter Drilling (ft): DRY O 7After Hours (ft): MATERIAL DESCRIPTION Tan LIMESTONE with clay seams and layers _10— _15_ 20 Gray LIMESTONE with shale seams and layers TEST BORING TERMINATED AT 20 FT 13.0 Hammer Drop (lbs / in): 170 / 24 oS 2 d E a) t _ x > `o U� E E o > o uE e O -o .2 a oW oZ a° o c a� (n CU � x� o- o a Z J a �a a- a 100/ 0.5" 16" 6 100/ 1" 100/ 20.0 , 1.25" ALPHA /TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 11 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W221178 www.alphatesting.com Grevstar - Irvinq Location: Fort Worth, Texas Quarry Falls Surface Elevation: 5/24/2022 End Date: 5/24/2022 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) XZOn Rods (ft): NONE Drilling (ft): DRY oZAfter 7After Hours (ft): O MATERIAL DESCRIPTION Tan CLAYEY GRAVEL Tan LIMESTONE with clay seams and layers _5 10_ Gray LIMESTONE with shale seams and layers _15 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 oS .4 d E a) t _ x > `o U� E E o > o uE e O -o .2 a oW oZ a° o c a� (n CU � x� o- o a Z J a �a a- a t 1.0 13.0 100/ 0.5" 100/ 5" 1. 100/ 0.5" 100/ 20.0 , 1 ALPHA /TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 12 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W221178 www.alphatesting.com Grevstar - Irvinq Location: Fort Worth, Texas Quarry Falls Surface Elevation: 5/25/2022 End Date: 5/25/2022 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS XZOn Rods (ft): NONE Drilling (ft): DRY oZAfter 7After Hours (ft): O MATERIAL DESCRIPTION jBrown and Tan CLAY with limestone fragments Tan LIMESTONE with clay seams and layers 5 10_ Gray LIMESTONE with shale seams and layers _15_ _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 oS .4 d E a) t _ x > 6U z:-- C� E E o > o uE 4)75 m� e O -o .2 a oW oZ a° o c a� p�� U n •2 3 (n CU � x� o- o a Z J a �CU a a- 3 a 2.0 34 62 23 39 1.0 100/ 0.5" 100/ 5" 14.0 L 100/ 1.5" 11. 20.0 L 100/ ALPHA /TESTING WHERE IT ALL BEGINS Client: Grevstar - Irvinq Project: Quarry Falls Start Date: 5/27/2022 End Date: Drilling Method: CONTINUOUS FLIGHT AU GROUND WATER OBSERVATIONS 0) XZOn Rods (ft): NONE Drilling (ft): DRY oZAfter 7After Hours (ft): O MATERIAL DESCRIPTION jBrown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers _5_ 10 Gray LIMESTONE with shale seams and layers _15_ _20 TEST BORING TERMINATED AT 20 FT 5058 Brush Creek Rd. BORING NO.: 13 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W221178 www.alphatesting.com Location: Fort Worth, Texas Surface Elevation: 5/27/2022 West: GER North: Hammer Drop (lbs / in): 170 / 24 d o.S E a) t _ x o U� C.- E E c o 0 a) 3 Y 6L N w C J J y >C1 �o uE �a� m� e O -o .2 a oW oZ a° o c a� Un af X c c° u) ° i= m o `� Ha a- Z 2.0 30 2.0 100/ 1.25" 100/ 5" 1. 14.0 6 100/ 1" 11. 20.0 L 100/ ALPHA /TESTING WHERE IT ALL BEGINS Client: Grevstar - Irvinq Project: Quarry Falls Start Date: 5/26/2022 End Date: Drilling Method: CONTINUOUS FLIGHT AU GROUND WATER OBSERVATIONS 0) XZOn Rods (ft): NONE Drilling (ft): DRY oZAfter 7After Hours (ft): O MATERIAL DESCRIPTION jDark Brown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers 10 Gray LIMESTONE with shale seams and layers _15_ _20 TEST BORING TERMINATED AT 20 FT 5058 Brush Creek Rd. BORING NO.: 14 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W221178 www.alphatesting.com Location: Fort Worth, Texas Surface Elevation: 5/26/2022 West: GER North: Hammer Drop (lbs / in): 170 / 24 d oS .4 E a) t _ x o U� C.- E E c o 0 a) 3 Y 6L N w C J J y >C1 �o uE �a� m� e O -o .2 a oW oZ a° o c a� Un af X c c° u) ° i= m o `� Ha a- Z 3.0 33 68 24 44 2.0 100/ 1" 100/ 1.25" 14.0 L 100/ 1" 20.0 L 100/ 100/ ALPHA /TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 155 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W221178 www.alphatesting.com Grevstar - Irvinq Location: Fort Worth, Texas Quarry Falls Surface Elevation: 5/27/2022 End Date: 5/27/2022 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS XZOn Rods (ft): NONE Drilling (ft): DRY oZAfter 7After Hours (ft): O MATERIAL DESCRIPTION jBrown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers 5 10_ Gray LIMESTONE with shale seams and layers _15_ _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 oS .4 d E a) C� t E _ E x > 6U z:-- o a > oW o oZ uE o 4)75 c m� a� e p�� O -o U .2 n •2 3 CU a° o- o a J a (n � x� �CU a a- Z 3 a 2.5 32 1.0 100/ 1.75" 100/ 1.25" 14.0 100/ 1" 11. 20.0 L 100/ ALPHA /TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 16 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W221178 www.alphatesting.com Grevstar - Irvinq Location: Fort Worth, Texas Quarry Falls Surface Elevation: 5/24/2022 End Date: 5/24/2022 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) XZOn Rods (ft): NONE Drilling (ft): DRY oZAfter 7After Hours (ft): O MATERIAL DESCRIPTION Tan CLAY Tan LIMESTONE with clay seams and layers _5 Gray LIMESTONE with shale seams and layers _10_ _15 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 oS .4 d E a) t _ x > `o U� E E o > o uE e O -o .2 a oW oZ a° o c a� (n CU � x� o- o a Z J a �a a- a 4.5+ 13 35 17 18 1.0 100/ 0.25" 9.0 100/ 1.5" 100/ 2.75" 100/ 20.0 , 1 ALPHA /TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 17 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W221178 www.alphatesting.com Grevstar - Irvinq Location: Fort Worth, Texas Quarry Falls Surface Elevation: 5/24/2022 End Date: 5/24/2022 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS XZOn Rods (ft): NONE oZAfter Drilling (ft): DRY O 7After Hours (ft): MATERIAL DESCRIPTION Tan LIMESTONE with clay seams and layers _10— _15_ _20 Gray LIMESTONE with shale seams and layers TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 oS .4 d E a) t _ x > `o U� E E o > o uE e O -o .2 a oW oZ a° o c a� (n CU � x� o- o a Z J a �a a- a 100/ 0" 100/ 1.25" 11.0 6 100/ 1" 100/ 20.0 , 0.75" ALPHA /TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 18 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W221178 www.alphatesting.com Grevstar - Irvinq Location: Fort Worth, Texas Quarry Falls Surface Elevation: 5/24/2022 End Date: 5/24/2022 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS XZOn Rods (ft): NONE Drilling (ft): DRY oZAfter 7After Hours (ft): O MATERIAL DESCRIPTION Brown and Tan CLAY with limestone fragments - FILL Tan LIMESTONE with clay seams and layers 5 10 Gray LIMESTONE with shale seams and layers _15_ _20 TEST BORING TERMINATED AT 20 FT 3.0 Hammer Drop (lbs / in): 170 / 24 oS .4 d E a) t _ x > 6U z:-- C� E E o > o uE 4)75 m� e O -o .2 a oW oZ a° o c a� p�� U n •2 3 (n CU � x� o- o a Z CU J a �a a- 3 a 1 4.5+ 16 48 18 30 100/ 0.25" 100/ 4" 14.0 100/ 0.75" 20.0 L 100/ 100/ 4.5+ 10 ALPHA /TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 19 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W221178 www.alphatesting.com Grevstar - Irvinq Location: Fort Worth, Texas Quarry Falls Surface Elevation: 5/26/2022 End Date: 5/26/2022 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) XZOn Rods (ft): NONE Drilling (ft): DRY oZAfter 7After Hours (ft): O MATERIAL DESCRIPTION Brown and Tan CLAY with limestone fragments - FILL j Dark Brown CLAY 5 Tan LIMESTONE with clay seams and layers _10_ 15 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 oS .4 d E a) t _ x > `o U� E E o > o uE e O -o .2 a oW oZ a° o c a� (n CU � x� o- o a Z J a �a a- a 1 2.5 17 4.5+ 6 4.0 5.0 4.5+ 14.5 114 14 49 19 30 100/ 2.25" 100/ 5" 1. 100/ 20.0 , 1.5" 5058 Brush Creek Rd. BORING NO.: 20 ALPHA , TESTING Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W221178 WHERE IT ALL BEGINS www.alphatesting.com Client: Project: Start Date: Drilling Method: Grevstar - Irvinq Location: Fort Worth, Texas Quarry Falls Surface Elevation: 5/26/2022 End Date: 5/26/2022 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS XZOn Rods (ft): NONE oZAfter Drilling (ft): DRY O 7After Hours (ft): MATERIAL DESCRIPTION Brown CLAY with limestone cobbles- FILL jTan CLAY with limestone seams - possible fill j-5 j 10� j — Tan CLAY with limestone fragments - possible j fill _15 Tan LIMESTONE with clay seams and layers 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 oS .4 d E a) t _ x > 6U z:-- C� E E o N� >C1 3 .o Y uE 6L �a� N mc, w e C O J -o J .2 y a o o� a° o c a04 0— U n •2 3 (n rCU n x o- o a Z J a � a a a 2.5 16 2.0 9 4.5" 7 .5 3.5" 11 .5 11.0 4.0 13 39 15 24 17.0 20.0 L 1.7 100/ ALPHA /TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 21 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W221178 www.alphatesting.com Grevstar - Irvinq Location: Fort Worth, Texas Quarry Falls Surface Elevation: 5/26/2022 End Date: 5/26/2022 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS XZOn Rods (ft): NONE Drilling (ft): DRY oZAfter 7After Hours (ft): O MATERIAL DESCRIPTION Brown and Tan CLAY with limestone fragments - FILL Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 d oS .4 E a)t _ x o Ut6 c' E E c o >C1 °o °E ° ° -o .2 a °W oZ a° o c a� Ha a- Z a 2.75 16 2.0 100/ 1.75" 100/ 2" 100/ 1.75" 100/ 20.0 , 1.5" ALPHA /TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 22 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W221178 www.alphatesting.com Grevstar - Irvinq Location: Fort Worth, Texas Quarry Falls Surface Elevation: 5/26/2022 End Date: 5/26/2022 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS XZOn Rods (ft): NONE oZAfter Drilling (ft): DRY O 7After Hours (ft): MATERIAL DESCRIPTION Brown CLAY with limestone fragments - FILL jTan CLAY with limestone fragments Tan LIMESTONE with clay seams and layers 5 _10 15 Gray LIMESTONE with clay seams and layers 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 oS .4 d E a) t _ x > 6U z:-- C� E E o N� >C1 3 �o Y uE 6L �a� N c, m w e C O J -o J .2 y a oW o� a° o c a04 0— U n •2 3 (n CU � x� o- o a Z J a �a a- a 1 3.0 17 2.0 4.0 100/ 1.75" 100/ 5" 1. 17.0 100/ 20.0 66 1 4.5+ 10 39 19 20 ALPHA /TESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 23 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W221178 www.alphatesting.com Grevstar - Irvinq Location: Fort Worth, Texas Quarry Falls Surface Elevation: 5/27/2022 End Date: 5/27/2022 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS XZOn Rods (ft): NONE oZAfter Drilling (ft): DRY O 7After Hours (ft): MATERIAL DESCRIPTION FTan CLAY Tan LIMESTONE with clay seams and layers _5_ Gray LIMESTONE with shale seams and layers 10 15 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 oS .4 d E a) t _ x > 6U z:-- C� E E o N� >C1 3 .o Y uE 6L �a� N mc, w e C O J -o J .2 y a o o� a° o c a04 0— U n •2 3 (n CU � x� o- o a Z J a �a a- a 2.0 27 37 19 18 2.0 100/ 1.25" 7.0 6 100/ 1" 6 100/ 1" 100/ 20.0 , 0.75" ALPHA /TESTING WHERE IT ALL BEGINS Client: Grevstar - Irvinq Project: Quarry Falls Start Date: 5/26/2022 End Date: Drilling Method: CONTINUOUS FLIGHT AU 0) GROUND WATER OBSERVATIONS XZOn Rods (ft): NONE oZAfter Drilling (ft): DRY O 7After Hours (ft): MATERIAL DESCRIPTION FTan CLAY with limestone fragments Tan LIMESTONE with clay seams and layers _5_ 10 Gray LIMESTONE with shale seams and layers _15_ _20 TEST BORING TERMINATED AT 20 FT 5058 Brush Creek Rd. BORING NO.: 24 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W221178 www.alphatesting.com Location: Fort Worth, Texas Surface Elevation: 5/26/2022 West: GER North: Hammer Drop (lbs / in): 170 / 24 oS .4 d E a) t _ x > co `o 0't6 0 z:-- C� E E o a)0 >C1 3 �o Y uE 6L N �a� m� w e C O J -o J .2 y a oW oZ a° o c a� (n UCU a)) af x� � o� o a Z J o Ha a- 4.5+ 15 37 18 19 2.0 100/ 2.5" 100/ 5" 1. 14.0 L 100/ 1" 20.0 L 100/ 100/ A L P H A #NtTESTING KEY TO SOIL SYMBOLS WHERE IT ALL BEGINS AND CLASSIFICATIONS SOIL & ROCK SYMBOLS RELATIVE DENSITY OF COHESIONLESS SOILS (blows/ft) ® (CH), High Plasticity CLAY VERY LOOSE 0 TO 4 ® (CL), Low Plasticity CLAY LOOSE 5 TO 10 MEDIUM 11 TO 30 (SC), CLAYEY SAND DENSE 31 TO 50 VERY DENSE OVER 50 (SP), Poorly Graded SAND (SW), Well Graded SAND SHEAR STRENGTH OF COHESIVE SOILS (tsfl (SM), SILTY SAND VERY SOFT LESS THAN 0.25 SOFT 0.25 TO 0.50 IN(ML), SILT FIRM 0.50 TO 1.00 STIFF 1.00 TO 2.00 ® (MH), Elastic SILT VERY STIFF 2.00 TO 4.00 HARD OVER 4.00 19 LIMESTONE RELATIVE DEGREE OF PLASTICITY (PI) ® SHALE / MARL LOW 4 TO 15 SANDSTONE MEDIUM 16 TO 25 HIGH 26 TO 35 o (GP), Poorly Graded GRAVEL VERY HIGH OVER 35 (GW), Well Graded GRAVEL ® (GC), CLAYEY GRAVEL RELATIVE PROPORTIONS (%) W (GM), SILTY GRAVEL m(OL), ORGANIC SILT TRACE 1 TO 10 LITTLE 11 TO 20 SOME 21 TO 35 (OH), ORGANIC CLAY AND 36 TO 50 1mm S SAMPLING SYMBOLS PARTICLE SIZE IDENTIFICATION (DIAMETER) ■SHELBY TUBE (3" OD except where BOULDERS 8.0" OR LARGER noted otherwise) COBBLES 3.0" TO 8.0" SPLIT SPOON (2" OD except where COARSE GRAVEL 0.75' TO 3.0" noted otherwise) FINE GRAVEL 5.0 mm TO 3.0" ® AUGER SAMPLE COURSE SAND 2.0 mm TO 5.0 mm ❑ TEXAS CONE PENETRATION MEDIUM SAND FINE SAND 0.4 mm TO 5.0 mm 0.07 mm TO 0.4 mm ❑SILT ROCK CORE (2" ID except where CLAY 0.002 mm TO 0.07 mm LESS THAN 0.002 mm noted otherwise) 0178 39 - 4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 GR-01 60 00 Product Requirements THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH Quarry Falls Multi -Family STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105084 Revised April 7, 2014 FORT WORTH: CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 lApprovall Spec No. I Classsification Manufacturer I Model No. National Spec I Size Water & Sewer - Manholes & Bases/ComDonents 33-39-10 (Rev 2/3/16) I 07/23/97 3305 13 Urethane Hydrophilic Waterston, Asahi Kogyo K.K. Adeka Ultra -Seal P-201 ASTM D2240/D412/13792 I 04/26/00 3305 13 Offset Joint for 4' Dam. MH Hanson Concrete Products Drawing No. 35-0048-001 I 04/26/00 3305 13 Profile Gasket f T Dim. MH. Press -Seal Gasket Corp. 250-4G Gasket ASTM C-443/C-361 SS MH I 1/26/99 3305 13 HDPE Manhole Adjustment Rings Ladtmh, hic HDPE Adjustment Ring Traffic and Non -traffic area I 5/13/05 I 3305 13 Manhole External Wrap Canusa - CPS WmpidSml Manhole Encapsulation System Water & Sewer - Manholes & Bases/Fiberglass 33-39-13 (1/8/131 I 1/26/99 33 39 13 Fibe g ass Manhole Fluid Containment, Inc. Flowtife ASTM 3753 Non -traffic area I 08/30/06 I 33 39 13 Fiberglass Manhole L.F. Manufacturing Non -traffic area Water &Sewer -Manholes &Bases/Frames &Covers/Rectangular 33-05-13 (Rev 2/3/16) I3305 13 IManhole Frames and Covers I Western Iron Works, Bass & Hays Foundry 1001 24".." WD Water & Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13 (Rev 2/3/16) * 3305 13 Manhole Frames and Covers Western hon Works, Bass & Hays Foundry 30024 24" Dia. I * 3305 13 Manhole Frames and Covers McKinley Iron Works hic. A 24 AM 24" Dia. I 08/24/18 3305 13 Manhole Frames and Covers Neenah Foundry R-1272 ASTM A48 & AASHTO M306 24" Dia. I 08/24/18 3305 13 Manhole Frames and Covers Neenah Foundry NF 1274 ASTM A48 & AASHTO M306 30" Dia. I3305 13 Manhole Frames and Covers Sigma Corporation MH-144N I3305 13 Manhole Frames and Covers Sigma Corporation MH-143N I3305 13 Manhole Frames and Covers Pont-A-Mousson GTS-STD 24" dia. I3305 13 Manhole Frames and Covers Neenah Casting 24" dia. I 10/31/06 3305 13 Manhole Frames and Covers (Hinged) Powerseal Hinged Ductile Iron Manhole ASTM A536 24" Dia. I 7/25/03 3305 13 Manhole Frames and Covers Saint-Gobain Pipelines (Pamrex/rexus) RE32-R8FS 30" Dia. I 01/31/06 3305 13 30" Dia. MH Ring and Cover East Jordan Iron Works V 1432-2 and V 1483 Designs AASHTO M306-04 30" Dia. I 11/02/10 3305 13 30" Dia. MH Ring and Cover Sigma Corporation MH1651FWN & MH16502 30" Dia I 07/19/11 3305 13 30" Dia. MH Ring and Cover Star Pipe Products MH32FTWSS-DC 30" Dia I 08/10/11 3305 13 30" Dia. MH Ring and Cover Accucast 220700 Heavy Duty with Gasket Ring 30" Dia 30" ERGO XL Assembly 10/1.11 3305 13 30" Dia. MH Ring and Cover (I-hnged & Lockable) East Jordan Iron Works with Cann Lock/MPIC/T-Gasket ASSHTO M105 & ASTM A536 30" Dia CAP-ONE-30-FTW, Composite, w/ Lock -9/16/19 3305 13 30" is. MH Ring and Cover Composite Access Products, L.P. w/o Hing 30" Dia. 1 I 10/07/21 340513 30" Dia. MH Ring and Cover Trumbull Manufacturing 32"(30") Frame and 30" Dia. I Water & Sewer - Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight 33-05-13 (Rev 2/3/16) I I 3305 13 Manhole Frames and Covers Pont-A-Mousson Pamtight 24" Dia. I I 3305 13 Manhole Frames and Covers Neenah Casting 24" Dia. I I3305 13 Manhole Frames and Covers Western Iron Works,Bass & Hays Foundry 300-24P 24" Dia. I I 3305 13 Manhole Frames and Covers McKinley Iron Works Inc. WPA24AM 24" Dia. I I 03/09/00 3305 13 Manhole Frames and Covers Acc ucast RC-2100 ASTM A 48 24" Dia. I I 04/20/01 I 3305 13 Manhole Frames and Covers (SIP)Serampore Industries Private Ltd. 300-24-23.75 Ring and Cover ASTM A 48 24" Dia. I Water & Sewer - Manholes & Bases/Precast Concrete (Rev 1/8/131 I 3339 10 Manhole, Precast Con ete Hydro Conduit Cop SPL I em ri49 ASTM C 478 48" I * 3339 10 Manhole, Precast Concrete Wall Concrete Pipe Co. Inc. ASTM C-443 48" I 09/23/96 3339 10 Manhole. Precast Concrete Concrete Product Inc. 48" I.D. Manhole w/ 32" Cone ASTM C 478 48" w/32" cone 05/08/18 3339 10 Manhole, Precast Concrete The Turner Company 48", 60" I.D. Manhole w/ 32" Cone ASTM C 478 48", 60" 10/27/06 3339 10 Manhole, Precast Concrete Oldcastle Precast Inc. 48" I.D. Manhole w/ 24" Cone ASTM C 478 48" Dim w 24" Ring 06/09/10 3339 10 Manhole, Precast (Reinforced Polymer)Conerete US Composite Pipe Reinforced Polymer Concrete ASTM C-76 48" to 72" 09/06/19 33 39 20 Manhole, Precast Concrete Forterm Pipe and Precast 60" & 72" I.D. Manhole w/32" Cone ASTM C-76 60" & 72" 10/07/21 32 39 20 Manhole, Precast Concrete Forterra Pipe and Precast 48" I.D. Manhole w/32" Cone ASTM C-77 48" 10/07/21 33 39 20 Manhole, Precast (Reinforced Polymer) Concrete Armorock 48" & 60" I.D. Manhole w/32" Cone 48" & 60" 10/07/21 33 39 20 Manhole, Precast (Hybrid) Polymer & PVC Predl Systems 48" & 60" I.D. Manhole w/32" Cone 48" & 60" Non Traffic Areas ASTM C-478; ASTM C-923; 03/07/23 33 39 20 Manhole, Precast Concrete AmeriTex Pipe and Products, LLC 48" & 60" I.D. Manhole w/32" Cone ASTM C-443 03/07/23 33 39 20 Manhole, Precast (Reinforced Polymer) Concrete P3 Polymers, RoekIlardscp 48" & 60" I.D. Manhole w/32" Cone 04/28/07 Manhole, Precast (Remf ced Polymer) Concrete Amitech USA Meyer Polverete Pipe (Sewer -(WAC) Wastewater Access Chamber 33 39 40 For use when Std. MH cannot be Water & Sewer - Manholes & Bases/Rehab Svstems/Cementitious I EI-14 Manhole Rehab Systems Quadcx I 04/23/01 EI-14 Manhole Rehab Systems Standard Cement Materials, Inc. Reliner MSP EI-14 Manhole Rehab Systems AP/M Permaform I 4/20/01 EI-14 Manhole Rehab System Strong Company Strong Seal MS2A Rehab System I 5/12/03 EI-14 Manhole Rehab System (Liner) Triplex Lining System MH repair product to stop infiltration ASTM D5813 I08/30/06 I General Concrete Repair Fl-Krete Technologies Vinyl Polyester Repair Product Misc. Use * From Original Standard Products List 1 CITY OF FORT WORTH FORT WORTH.: WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 (Approval Spec No. I Classsification I Manufacturer Model No. National Spec Size Water & Sewer - Manholes & Bases/Rehab Svstems/NonCementitious I 05/20/96 E1-14 Manhole Rehab Systems Sprayroq, Spray Wall Polyurethane Coating ASTM 13639/13790 I I12/14/01 Coating for Corrosion protection(Extenor) ERTECH Series, 20230 and 2100 (Asphatic Emulsion) Structures Only I I01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1HB, Sl, S2 Acid Resistance Test Sewer Applications I I8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications I 33 05 16, 33 39 10, RR&C Dampproo6ng Non-Fibered Spray For Exterior Coating of Concrete 03/19/18 I 33 3920 Coating for Corrosion protection(Exterior) Sherwin Williams Grade (Asphatic Emulsion) Structures Only I Water & Sewer - Manhole Inserts - Field Onerations Use Only Bev 2/3/161 I * 3305 13 Manhole Insert Knutson Enterprises Made to Order - Plastic ASTM D 1249 For 24" dia. I * 3305 13 Manhole Insert South Western Packaging Made to Order - Plastic ASTM D 1248 For 24" dia. I * 3305 13 Manhole Insert Noflow-Inflow Made to Order - Plastic ASTM D 1248 For 24" dia. I 09/23/96 3305 13 Manhole Insert Southwestern Packing & Seals, Inc. LifeSaver - Stainless Steel For 24" dia. I 09/23/96 3305 13 Manhole Insert Southwestern Packing & Seals, Inc. TethuLok - Stainless Steel For 24" dia I Water & Sewer - Pine Casine Snacers 33-05-24 (07/01/131 I 11/04/02 Steel Band Casing Spacers Advanced Products and Systems, Inc. Carbon Steel Spacers, Model SI 02/02/93 Stainless Steel Casing Spacer Advanced Products and Systems, Inc. Stainless Steel Spacer, Model SSI 04/22/87 Casing Spacers Cascade Waterworks Manufacturing Casing Spacers 09/14/10 Stainless Steel Casing Spacer Pipeline Seal and Insulator. Stainless Steel Casing Spacer Up to 48" 09/14/10 Coated Steel Casin Spacers Pipeline Seal and Insulator Coated Steel Cnin Spacers Up to 48" 05/10/11 Stainless Steel Casing Spacer Powerseal 4810 Powerchock Up to 48" 03/19/18 Casing Spacers BWM SS-12 Casing Spacer(Stainless Steel) 03/19/18 Casing Spacers BWM FB-12 Casing Spacer (Coated Carbon Steel) for Non_pressure Pipe and Grouted Casing 03/29/22 3305 13 Casing Spacera CCI Pipeline Systems CSC12, CSS12 I Water & Sewer - Pines/Ductile Iron 33-11-10(1/8/13) I I * 33 11 10 Ductile Iron Pipe Griffin Pipe Products, Co. Super Bell-Tite Ductile Iron Pressure Pipe, AW WA C150, C151 I 3" thrn 24" 08/24/18 33 11 10 Duane Iron Pipe American Ductile Iron Pipe Co. American Futile Pipe (Bell Spigot) AW WA C150, C151 4" thru 30" 08/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co. American Flex Ring (Restrained Joint) AW WA C150, C151 4" thru 30" * 33 11 10 Ductile Iron Pipe U.S. Pipe and Foundry Co. AW WA C150, C151 * 33 11 10 Ductile Iron Pipe McWane Cast Iron Pipe Co. AW WA C150, C151 I Water & Sewer - Utility Line Marker (08/24/2018) I I Sewer - Coatines/EDOxv 33-39-60 (01/08/13) I I 02/25/02 Epoxy Lining System Sauereisen, hic Se Urad 21 ORS LA County #210-1.33 I I 12/14/01 Epoxy Lining System Ertech Technical Coatings Etch 2030 and 2100 Series I 04/14/05 Interior Ductile Iron Pipe Coating Induron Protecto 401 ASTM B-117 Ductile ban Pipe Only I 01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1HB, Sl, S2 Acid Resistance Test Sewer Applications I8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications I I Sewer - Coatinr/Polyurethane I I Sewer - Combination Air Valves I 05/25/18 I 33-31-70 Air Release Valve A.R.I. USA, Inc. D025LTP02(Composite Body) 2" I I Sewer - Pioes/Concrete I * E]-04 Conc. Pipe, Reinforced Wall Concrete Pipe Co. Inc. ASTM C 76 * E1-04 Conc. Pipe, Reinforced Hydro Conduit Corporation Class III T&G, SPL Item #77 ASTM C 76 * E1-04 Cone. Pipe, Reinforced Hanson Concrete Products #99 pipeASTM C 76 * E1-04 Conc. Pipe, Reinforced Concrete Pipe & Products Co. Inc. ASTM C 76 Sewer - Pioe Enlargment Svstem (Method)33-31-23 (01/18/13) SystemPIMCorporationPolyethylene PIM Corp., Piscata Way, N.J. Approved Previously �PRIMS cConnell Systems McLat Construction Polyethylene Houston, Texas Approved Previously Systems Trenchless Replacement Svstem Polyethylene Calgary, Canada Approved Previously * From Original Standard Products List 2 CITY OF FORT WORTH FORT WORTH.: WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 (Approval Spec No. J Classsification Manufacturer Model No. National Spec Size Sewer - PiDe/Flberalass Reinforced/ 33-31-13(1/8/13) I 7/21/97 3111 13 Cent. Fiberglass (FRP) Hobas Pipe USA, hic. Hobas Pipe (Non -Pressure) ASTM D3262/D3754 I 03/22/10 gCast 33 3l l3 Fibe lass Pipe (FRP) Ameron Bondstrand RPMP Pipe ASTM D3262/D3754 I 04/09/21 33 31 13 Glass -Fiber Reinforced Polymer Pipe (FRP) Thompson Pipe Group Thompson Pipe (Flowtite) ASTM D3262/D3754 03/07/23 I 33 31 13 lFiberglass Pipe (FRP) Future Ape Industries Fiberstrong FRP ASTM D3262, ASTM D3681, ASTM D4161, AW WA M45 Sewer - Pioe/Polvmer Pine I 4/14/05 Polymer Modified Concrete Ape Amitech USA Meyer Polycrete Pipe ASTM C33, A276, F477 8" to 102", Class V I 06/09/10 I EI-9 Reinforced Polymer Concrete Ape US Composite Pipe Reinforced Polymer Concrete Pipe ASTM C-76 Sewer - PIDes/HDPE 33-31-23(1/8/13) I Highdensiry polyethylene pipe Phillips Driscopipe, Inc. Opticore Ductile Polyethylene Pipe ASTM D 1248 8" I High -density polyethylene pipe Plexco Inc. ASTM D 1248 8" I * High -density polyethylene pipe Polly Pipe, Inc. ASTM D 1248 8" I ILgh-density polyethylene pipe CSR Hydro Con luit/Pivelme Systems McConnell Pipe Enlargement ASTM D 1248 Sewer - PIDeS/PVC (Pressure Sewer) 33-11-12 (4/1/13) 12/02/11 33-11-171 DR-1d PVC Pressure Pipe Pipehfe Jetstream PVC Pressme Pipe AW WA C900 4" thro 12" 10/22/14 33-11-12 DR-14 PVC Pressme Pipe Roya] Building Products Royal Seal PVC Pressure Pipe AW WA C900 4" thm 12" I Sewer - Pioes/PVC* 33-31,-711 /7/l/13) I * 33-31-10 PVC Sewe Pipe J-M Manufacturing Co., Inc (JM Eagle) SDR-26 (PS115) ASTM D 3034 4" - 15" I 12/23/97* 33-31-20 PVC Sewer Pipe Diamond Plastics Corporation SDR-26 (PS115) ASTM D 3034 4" th u 15" I * 33-31-20 PVC Sewer Pipe Lamson Vvlon Pipe I SDR-26 (PS115) ASTM D 3034 I 4" thru 15" * 33-31-20 PVC Sewer Pi J-M Manufacturi�v Co, Inc (JM Eagle) I PS 115 1 ASTM F 679 18" - 28" 05/06/05 33-31-20 PVC Solid Wall Pipe Diamond Plastics Corporation I PS 115 ASTM F-679 18" to 48" 04/27/06 33-31-20 PVC Sewer Fittings Harco SDR-26 (PS 115) Gasket Fittings ASTM D-3034, D-1784, etc 4" - 15" * 33-31-20 PVC Sewer Fittings Plastic Trends, Inc(Westlake) Gasketed PVC Sewer Main Fittings ASTM D 3034 3/19/2018 33 31 20 PVC Sewer Pipe Pipellfe Jet Stream I SDR 26 (PS 115) ASTM F679 I8"- 24" 3/19/2018 33 31 20 PVC Sewer Ppe Pipellfe Jet Stream SDR 26 AS D3034 4"- 15" 3/29/2019 33 31 20 Gasketed Fittings (PVC) GPK Products, Inc. SDR 26 ASTM D3034 4"- 15" 10/21/2020 33 31 20 PVC Sewer Pipe NAPCO(Wesdake) SDR 26 ASTM D3034 4" - 15" 10/22/2020 33 31 20 PVC Sewer Pipe Sanderson Pipe Corp. SDR 26 ASTM D3034 4"- 15" 10/21/2020 33 31 20 PVC Sewer Pipe NAPCO(Westlal I SDR 26 PS 115 ASTM F-679 I8"- 36" Sewer - Pioes/Rehab/CIPP 33-31-12 (01/18/131 * Cured in Place Pipe Insituform Texark, Inc ASTM F 1216 05/03/99 Cured in Place Pipe National Envirotech Group National Liner, (SPL) Item #27 ASTM F-1216/D-5813 05/29/96 Cured in Place Pipe Reynolds Ine/Inliner Tmhnolgy (Inliner USA) Inliner Technology ASTM F 1216 Sewer - Pioes/Rehab/Fold & Form * Fold and Form Pipe Cullum Pipe Systems, Inc. 11/03/98 Fold and Form Pipe Insituform Technologies, hic. hisimform "NuPIPc' ASTM F-1504 Fold and Form Pipe American Pipe & Plastics, hic. Demo. Purpose Only 12/04/00 Fold and Form Pipe Ultraliner Ultralmer PVC Alloy Pipelmer ASTM F-1504, 1871, 1867 06/09/03 Fold and Form Pipe Miller Pipeline Corp. EX Method ASTM F-1504, F-1947 Up to 18" diameter Sewer - PiDeS/011en Profile Large Diameter 09/26/91 E100-2 PVC Sewer Pipe, Ribbed Lamson Vvlon Pipe Carlin Vvhm H.C. Closed Profile Pipe, ASTM F 679 18" to 48" 09/26/91 E100-2 PVC Sewer Pipe, Ribbed Extrusion Technologies, Inc. Ultra -Rib Open Profile Sewer Pipe ASTM F 679 IS" to 48" E100-2 PVC Sewer Pipe. Ribbed Uponor ETI Company 11/10/10 (E100-2) Polypropylene (PP) Sewer Pipe, Double Wall Advanced Drainage Systems (ADS) SaniTite HP Double Wall (Corrugated) ASTM F 2736 24"-30" 11/10/10 (E100-2) Polypropylene (PP) Sewer Pipe, Triple Wall Advanced Drainage Systems (ADS) SaniTite HP Triple Wall Pipe ASTM F 2764 30" to 60" * From Original Standard Products List 3 FORT WORTH: (Approval Spec No. Classsification Water - Amur enances 33-12-10 (07/01/13) 01/18/18 33-12-10 Double Strap Saddle 08/28/02 Double Strap Saddle 07/23/12 33-12-10 Double Strap Service Saddle 03/07/23 33-12-10 Double Strap Service Saddle 10/27/87 Curb Stops -Ball Meter Valves 10/27/87 Curb Stops -Ball Meter Valves 1/25/2018 33-12-10 Curb Stops -Ball Meter Valves 1/25/2018 33-12-10 Curb Stops -Ball Meter Valves 1/25/2018 33-12-10 Curb Stops -Ball Meter Valves 1/25/2018 33-12-10 Curb Stops -Ball Meter Valves 51510.8 3342-10 Curb Stops -Ball Meter Valves 1151018 334240 Curb Stops -Ball Meter Valves 01/26/00 Coated Tapping Saddle with Double SS Straps 0/5/21/12 33-12-25 Tapping Sleeve (Coated Steel) 03/29/22 33-12-25 Tapping St- (Coated or Stainless Steel) 05/10/11 Tapping Sleeve(Stainless Steel) 02/29/12 33-12-25 Tapping Sleeve (Coated Steel) 02/29/12 33-12-25 Tapping Sleeve (Stainless Steel) 02/29/12 33-12-25 Tapping Sleeve(Stainless Steel) 05/10/11 Joint Repair Clamp Plastic Meter Box WComposite Lid Plastic Meter Box w/Composite Lid 08/30/06 Plastic Meter Box w/Composite Lid Concrete Meter Box Concrete Meter Box Concrete Meter Box Water - Bolts. Nuts. and Gaskets 33-11-05 (01/08/13) Water - Combination Air Release 33-31-70 (01/08/13) * EI-11 Combination Air Release Valve * E]-11 Combination Air Release Valve * E1-11 Combination Air Release Valve Water - Dry Barrel Fire Hvdrants 33-1240 (01/15/14) 10/01/87 E-1-12 Dry Barrel Fire Hydrant 03/31/88 E-1-12 Dry Barrel Fire Hydrant 09/30/87 E-1-12 Dry Barrel Fire Hydrant 01/12/93 E-1-12 Dry Barrel Fire Hydrant 08/24/88 E-1-12 Dry Barrel Fire Hydrant E-1-12 Dry Barrel Fire Hydrant 09/24/97 E-1-12 Dry Barrel Fire Hydrant 10/14/87 E-1-12 Dry Barrel Fire Hydrant 01/15/88 E1-12 Dry Barrel Fire Hydrant 10/09/87 E-1-12 Dry Barrel Fire Hydrant 09/16/87 E-1-12 Dry Barrel Fire Hydrant 08/12/16 33-12-40 Dry Barrel Fire Hydrant Water - Meters 02/05/93 E101-5 Detector Check Meter 08/05/04 Magnetic Drive Vertical Turbine CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 Manufacturer Model No. National Spec Size Romac 202NS Nylon Coated AW WA C800 1"-2" SVC, up to 24" Pipe Smith Blair #317 Nylon Coated Double Strap Saddle Mueller Company DR2S Double (SS) Strap DI Saddle AW WA C800 1"-2" SVC, up to 24" Pipe Powerseal 3450AS, Incl. Corp. Stop, Dbl Strap, Stainless NSF ANSI 372 1"-2" SVC, up to 24" Pipe McDonald 6100M,6100MT & 61OMT 3/4" and 1" McDonald 4603B, 4604B, 6100M, 610OTM and 6101M 1'h" and 2" FB600-7NL, FB1600-7-NL, FV23-777-W-NL, Ford Meter Box Co., Inc. L22-77NL AW WA C800 2" FB600-6-NL, FB1600-6-NL, FV23-666-W- Ford Meter Box Co., Inc. NL, L22-66NL AW WA C800 1-1 FB600-4-NL, FB1600-4-NL, B11-444-WR- Ford Meter Box Co., Inc. NL, B22444-WR-NL, L28-44NL AW WA C800 I" B-25000N, B-24277N-3, B-20200N-3, H- AW WA C800, ANSF 61, Mueller Co., Ltd. 15000N, , H-1552N, H142276N ANSENSF 372 2" B-25000N, B-20200N-3, B-24277N-3,H- AW WA C800, ANSF 61, Mueller Co., Ltd. 15000N, H-14276N, H-15525N ANSI/NSF 372 1-1 B-25000N, B-20200N-3,11-15000N, H- AW WA C800, ANSF 61, Mueller Co., Ltd. 15530N ANSI/NSF 372 1" JCM Industries, Inc. #406 Double Band SS Saddle V-2" Taps on up to 12" JCM Industries, Inc. 412 Tapping Sleeve ESS AW WA C-223 Up to 30" w/12" Out JCM Industries, Inc. 415 Tapping Sleeve AW WA C-223 Concrete Pape Only Powerseal 3490AS (Flange) & 3490MJ 4"-8" and 16" Rome PTS 420 AW WA C-223 U p to 42" w/24" Out Romac SST Stainless Steel AW WA C-223 Up to 24" w/12" Out Romac SST III Stainless Steel AW WA C-223 Up to 30" w/12" Out Powerseal 3232 Bell Joint Repair Clamp 4" to 30" DFW Plastics Inc. DFW37C-12-IEPAF FTW DFW Plastics Inc. DFW39C-12-IEPAF FTW DFW Plastics Inc. DFW65C-14-lEPAF FTW Class "A" Bass & Hays CMB37-B12 1119 LID-9 Bass & Hays CMB-18-Dual 1416 LID-9 Bass & Hays CMB65-B65 1527 LID-9 CA Industries, Inc. Empire Air and Vacuum Valve, Model 935 ASTM A 126 Class B, ASTM A 1" & 2" Multiplex Manufacturing Co. Crispin Air and Vacuum Valves, Model No. 1/2", 1" & 2" Valve and Primer Corp. APCO #143C, 9145C and #147C 1", 2" & 3" Amencan-Darling Valve Drawing Nos. 90-18608, 94-18560 AW WA C-502 I American Darling Valve Shop Drawing No. 94-18791 AW WA C-502 Clow Connotation Shop Drawing No. D-19895 AW WA C-502 Amencan AVK Company Model 2700 AWWA C-502 Clow Connotation Drawings D20435, D20436, B20506 AW WA C-502 ITT Kennedy Valve Shop Drawing No. D-80783FW AW WA C-502 M&H Valve Company Shop Drawing No. 13476 AW WA C-502 Shop Drawings No. 6461 Mueller Company A-423 Centurion AW WA C-502 Shop Drawing FH-12 Mueller Company A-423 Super Centurion 200 AW WA C-502 U.S. Pipe & Foundry Shop Drawing No. 960250 AW WA C-502 American Flow Control (AFC) Waterous Pacer W1367 AW WA C-502 EJ (East Jordan Iron Works) WaterMaster 5CD250 Ames Company Model 1000 Detector Check Valve AW WA C550 4" - 10" Hersey Magnetic Drive Vertical AW WA C701, Class 1 3/4" - 6" * From Original Standard Products List 4 FORT WORTH: CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 lApprovall Spec No. I Classsification I Manufacturer I Model No. National Spec I Size l Water - Pines/PVC (Pressure Water) 33-31-70 (01/08/13) 1 AW WA C900, AW WA C605, 12/05/23 33-11-12 PVC Pressure Pipe Vin (tech PVC Pie DR14 ASTM D1784 4"46" 1 AW WA C900, AW WA C605, 12/05/23 33-11-12 PVC Pressure Pipe Vinyltech PVC Pipe DR18 ASTM D1784 16"-18" 3/19/2018 33 1112 PVC Pressure Pipe Pipelife Jet Stream DR14 AW WA C900 4"-12" 3/19/2018 33 11 12 PVC Pressure Pipe Pipelife Jet Stream DR18 AW WA C900 16"-24" 5/25/2018 33 1112 PVC Pressure Pipe Diamond Plastics Corporation DR 14 AW WA C900 4"42" 5/25/2018 33 1112 PVC Pressure Pipe Diamond Plastics Corporation DR 18 AW WA C900 16"-24" AW WA C900-16 UL 1285 12/6/2018 33 11 12 PVC Pressure Pipe J-M Manufacturing Co, Inc d/b/a JM Eagle DR 14 ANSI/NSF 61 4" 28" FM 1612 12/6/2018 33 1112 PVC Pressure Pipe J-M Manufacturing Co, Inc d/b/a JM Eagle DR 18 " r n , 0 16"-24" 9/6/2019 33 11 12 PVC Pressure Pipe Underground Solutions Inc. DR14 Fusible PVC AW WA C900 4" - 8" 9/6/2019 33 1112 PVC Pressure Pipe NAPCO(Westlake) DR18 AW WA C900 16" - 24" 9/6/2019 33 1112 PVC Pressure Pipe NAPCO(Westtake) DR14 AW WA C900 4"- 12" 9/6/2019 33 11 12 PVC Pressure Pipe Sanderson Pipe Corp. DR14 AW WA C900 4"- 12" Water - PioesNalves & Fittings/Ductile Iron Fittings 33-11-11 (01/08/131 07/23/92 E1-07 Ductile Iron Fillings §tar Pipe Products, Ina Mechanical Joint Fittings AW WA C153 & C110 * E1-07 Ductile Iron Fillings Griffin Pipe Products. Co. Mechanical Joint Fittings AW WA C 110 * E1-07 Ductile Iron Fillings McWane/Tyler Pipe/ Union Utilities Division Mechanical Joint Fittings, SSB Class 350 Aµ WA C 153, C 110, C Ill 08/11/98 E1-07 Ductile Iron Fittings Sigma, Co. Mechanical Joint Fittings, SSB Class 351 Aµ WA C 153, C 110, C 112 02/26/14 E1-07 MJ Fittings Accucast Class 350 C-153 MJ Fittings AW WA C153 4"42" 05/14/98 E1-07 Ductile Iron Joint Restraints Ford Meter Box Co./Uni-Flange Uni-Flange Series 1400 AW WA CH I/C153 4" to 36" 05/14/98 E1-24 PVC Joint Restraints Ford Meter Box Co./Uni-Flange Uni-Flange Series 1500 Circle -Lock AW WA CH I/C153 4" to 24" 11/09/04 E1-07 Ductile Iron Joint Restraints One Bolt, Inc. One Bolt Restrained Joint Fitting AW WA Cl I l/C116/C153 4" to 12" 02/29/12 33-11-11 Ductile Iron Pipe Mechanical Joint Restraint EBAA Iron, Inc. Megalug Series 1100 (for DI Pipe) AW WA Cl I l/C116/C153 4" 11 " 02/29/12 33-11-I1 PVC Pipe Mechanical Joint Restraint EBAA Iron, Inc. Megalug Series 2000 (for PVC Pipe) AW WA Cl I l/Cl l6/C153 4" to 24" 08/05/04 EI-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLC4 - SLC10 AW WA CI l l/C153 4" to 10" 03/06/19 33-11-11 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLCS4 - SLCS12 AW WA CI l l/C153 4" to 12" 08/05/04 EI-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One -Lek SLCE AWWACIII/C153 12" to 24" 08/10/98 EI-07 MJ Fittings(DIP) Sigma, Co. Sigma One-Lok SLDE AW WA C153 4" - 24" 10/12/10 EI-24 Interior Restrained Joint System S & B Techneial Products Bulldog System ( Diamond Lok 21 & JM ASTM F-1624 4" to 12" 08/16/06 EI-07 Mechanical Joint Fittings SIP Industries(Saampore) Mechanical Joint Fittings AW WA C153 4" to 24" 11/07/16 33-11-11 Mechanical Joint Rctai— Glands Star Pipe Products, Inc. PVC Sorgrip Series 4000 ASTM A536 AW WA CI I I 11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. DIP Stargrip Series 3000 ASTM A536 AW WA CI I I EZ Grip Joint Restraint (EZD) Black For DIP 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Serampme) ASTM A536 AW WA CI l l 3.48" EZ Grtp Jomt Restramt (EZD) Red for C900 03/19/18 33-I1-I1 Mechanical Joint Retainer Glands SIP Industries(Somurpore) DR14 PVC Pipe ll ASTM A536 AW WA C111 4"42" EZ Gnp Jomt Restramt (EZD) Red for C900 03/19/18 33-I1-I1 Mechanical Joint Retainer Glands SIP Industries(Serampore) DR18 PVC Pipe ASTM A536 AW WA C111 16"-24" Water - Piues/Valves & Fittings/Resilient Seated Gate Valve* 33-12-20 (05/13/15) Resilient Wedged Gate Valve w/no Gears American Flow Control Series 2500 Drawing # 94-20247 16" 12/13/02 Resilient Wedge Gate Valve American Flow Control Series 2530 and Series 2536 AW WA C515 30" and 36" 09/31/99 Resilient Wedge Gate Valve American Flow Control Series 2520 & 2524 (SD 94-20255) AW WA C515 20" and 24" 05/18/99 Resilient Wedge Garc Valve American Flow Control Series 2516 (SD 94-20247) AW WA C515 16" 10/24/00 EI-26 Resilient Wedge Gate Valve American Flow Control Series 2500 (Ductile Iron) AW WA C515 4" to 12" 08/05/04 Resilient Wedge Gate Valve American Flow Control 42" and 48" AFC 2500 AW WA C515 42" and 48" 05/23/91 EI-26 Resilient Wedge Gate Valve American AVK Company American AVK Resilient Seaded GV AW WA C509 4" to 12" 01/24/02 EI-26 Resilient Wedge Gate Valve American AVK Company 20" and smaller * E1-26 Resilient Seated Gate Valve Kennedy 4" - 12" * E1-26 Resilient Seated Gate Valve M&H 4" - 12- - E1-26 Resilient Seated Gate Valve Mueller Co. 4" - 12" 11/08/99 Resilient Wedge Gate Valve Mueller Co. Series A2361 (SD 6647) AW WA C515 16" 01/23/03 Resilient Wedge Gate Valve Mueller Co. Serves A2360 for 18"-24" (SD 6709) AW WA C515 24" and smaller 05/13/05 Resilient Wedge Gate Valve Mueller Co. Mueller 30" & 36", C-515 AW WA C515 30" and 36" 01/31/06 Resilient Wedge Gate Valve Mueller Co. Mueller 42" & 48", C-515 AW WA C515 42" and 48" 01/28/88 E1-26 Resilient Wedge Gate Valve Clow Valve Co. AW WA C509 4" - 12" 10/04/94 Resilient Wedge Gate Valve Clow Valve Co. 16" RS GV (SD D-20995) AW WA C515 16" 11/08/99 E1-26 Resilua t Wedge Gate Valve Clow Valve Co. Clow RW Valve (SD D-21652) AW WA C515 24" and smaller 11/29/04 Resilient Wedge Gate Valve Clow Valve Co. Clow 30" & 36" C-515 AW WA C515 30" and 36" (Note 3) 11/30/12 Resilient Wedge Gate Valve Clow Valve Co. Clow Valve Model 2638 AW WA C515 24" to 48" (Note 3) 05/08/91 E1-26 Resilient Seated Gate Valve Steckham Valves & Fittings AW WA C 509, ANSI 420 - stem, 4" - 12" * E1-26 Resilient Seated Gate Valve U.S. Pipe and Foundry Co. Metrosee1250, requirements SPL #74 3" to 16" 10/26/16 33-12-20 Resilient Seated Gate Valve EJ (East Jordan Iron Works) EJ FI—Mader Gate Valve & Boxes 09/24/18 Mateo Gate Valve Mateo-Norca 225 MR AW WA/ANSI C115/An21.15 4" to 16" * From Original Standard Products List 5 FORT WORTH: CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST (Approval Spec No. �Classsification Manufacturer Water - Pioes alves & Fittines/Rubber Seated Butter v Valve 33-12-21 (07/10/14) ' E1-30 Rubber Seated Butterfly Valve Henry Pratt Co. - E1-30 Rubber Seated Butterfly Valve Mueller Co. 1/11/99 E1-30 Rubber Seated Butterfly Valve Dezurik Valves Co. 06/12/03 E1-30 Valmatic American Butterfly Valve Valmatic Valve and Manufacturing Corp. 04/06/07 EI-30 Rubber Seated Butterfly Valve M&H Valve 03/19/18 33 1221 Rubber Seated Butterfly Valve G. A. Industries (Golden Anderson) Water - Polvethvlene Encasement 33-11-10 (01/08/13) 05/12/05 E]-13 Polvethvlene Encasment Flexsol Packaging 05/12/05 E]-13 Polyethylene Encasment Mountain States Plastics (MSP) and AEP In 05/12/05 EI-13 Polyethylene Encasment AEP Industries 09/06/19 33-11-11 lPolvethylene Encaament Northtown Products Inc. Water - Saom ins Station 03/07/23 33 12 50 l Water Sampling Station Eclmse Water - Automatic Flusher 101-Ill Automated Flushing System Mueller Hydrian and 04/09/21 Automated Flushing System Kupferle Foundry Company 04/09/21 Automated Flushing System Kupferle Foundry Company Model No. Valmatic American Butterfly Valve, M&H Style 4500 & 1450 AW WA C504 Butterfly Valve Fulton Enterprises Standard Hardware Bullstrong by Cowtown Bolt & Gasket PE Encasement for DIP Number 88, 12-inch Depth of Bury HG6-A-IN-2-BRN-LPRR(Pormble) HG2-A-IN--2-PVC-018-LPLG(Pennanent) Eclipse #9800wc Eclipse #9700 (Portable) Updated: 12/29/2023 National Spec Size AWWAC-504 24" AW WA C-504 24"and smaller AW WA C-504 24" and larger AW WA C-504 Up to 84" diameter AW WA C-504 24" to 48" AW WA C-504 30"-54" AWWAC105 8mfl LLD AWWAC105 8rail LLD AWWAC105 8ind LLD AWWAC105 8mil LLD As shown in spec. 33 12 50 The Fort Worts Water Department's Standard Products List has been developed to minimize the submittal review ofproducts which meet the Fort Worth Water Department's Standard Specifications during utility construction projects. When Technical Specifications for specific products, are included as part of the Construction Contract Documents, the requirements of the Technical Specification will override the Fort Worth Water Department's Standard Specifications and the Fort Worth Water Department's Standard Products List and approval of the specific products will be based on the requirements of the Technical Specification whether or not the specific product meets the Fort Worth Water Department's Standard Specifications or ism the Fort Worth Water Yellow Highlight indicates recent changes * From Original Standard Products List 6