Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 61248
Received Date: 4/10/2024 Received Time: 4:47 p.m. Developer and Project Information Cover Sheet: Developer Company Name: D.R. Horton - Texas, Ltd. Address, State, Zip Code: Phone & Email: Authorized Signatory, Title: Project Name: Brief Description: Project Location: Plat Case Number: Mapsco: CFA Number: None provided 641A, E and J 24-0005 City of Fort Worth, Texas Standard Community Facilities Agreement Rev. 9/21 6751 North Freeway, Fort Worth, TX 76131 817-230-0805 1 ibosworth(a-)drhorton.com Justin Bosworth, Assistant Secretary Lone Star at Liberty Trails Phase I Water, Sewer, Paving, Storm Drain and Streetlight City of Fort Worth ETJ, Northeast corner of Pembine Lane and SH 114 Plat Name: Council District: None provided ETJ City Project Number: 104866 I IPRC23-0064 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 1 of 16 City Contract Number: 61248 STANDARD COMMUNITY FACILITIES AGREEMENT This COMMUNITY FACILITIES AGREEMENT ("Agreement") is made and entered into by and between the City of Fort Worth ("City"), a home -rule municipal corporation of the State of Texas, acting by and through its duly authorized Assistant City Manager, and D.R. HORTON — TEXAS, LTD. ("Developer"), acting by and through its duly authorized representative. City and Developer are referred to herein individually as a "party" and collectively as the "parties." WHEREAS, Developer is constructing private improvements or subdividing land within the corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as Lone Star at Liberty Trails Phase 1A ("Project"); and WHEREAS, the Project is located on property that is the subject of an Amended Agreement Concerning the Operation of South Denton County Water Control and Improvement District No. 1 (City Secretary Contract No. 42127-A1 and A2), an Amended Development Agreement (City Secretary Contract No. 42128-Al and A2); and a Utility and Infrastructure Agreement (City Secretary Contract No. 58477); and WHEREAS, the City desires to ensure that all developments are adequately served by public infrastructure and that the public infrastructure is constructed according to City standards; and WHEREAS, as a condition of approval of the Project, Developer is required to bear a portion of the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as described in this Agreement ("Community Facilities" or "Improvements"); and WHEREAS, as a condition of approval of the Project, Developer is required to meet the additional obligations contained in this Agreement, and Developer may be required to make dedications of land, pay fees or construction costs, or meet other obligations that are not a part of this Agreement; and WHEREAS, the City is not participating in the cost of the Improvements or Project; and WHEREAS, the Developer and the City desire to enter into this Agreement in connection with the collective Improvements for the Project; NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: 1. OFFICIAL RECORD City of Fort Worth, Texas CITY SECRETARY Page 2 of 16 Standard Community Facilities Agreement FT. WORTH, TX Rev. 9/21 CFA Ordinance The Community Facilities Agreements Ordinance ("CFA Ordinance"), as amended, is incorporated into this Agreement by reference, as if it was fully set out herein. Developer agrees to comply with all provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in connection with the work performed by the contractors. If a conflict exists between the terms and conditions of this Agreement and the CFA Ordinance, the CFA Ordinance shall control. 2. Incorporation of Engineering Plans The engineering plans for the Improvements that have been approved by the City ("Engineering Plans") are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the Improvements required by this Agreement. 3. Description of Improvements; Exhibits and Attachments The following exhibits describe the general location, nature and extent of the Improvements that are the subject of this Agreement and are attached hereto and incorporated herein by reference: © Exhibit A: Water ® Exhibit A-1: Sewer ® Exhibit B: Paving ® Exhibit 13-1: Storm Drain ® Exhibit C-1: Street Lights & Signs The Location Map and Cost Estimates are also attached hereto and incorporated herein by reference. To the extent that Exhibits A, A-1, B, B-1, C-1, the Location Map, or the Cost Estimates conflict with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1 — Changes to Standard Community Facilities Agreement, Attachment 2 — Phased CFA Provisions, and Attachment 3 — Concurrent CFA Provisions, are attached hereto and incorporated herein for all purposes. 4. Construction of Improvements Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the Improvements, and this Agreement. Developer acknowledges that City will not accept the Improvements until the City receives affidavits and lien releases signed by Developer's contractors verifying that the contractors, and all subcontractors and material suppliers, have been paid in full for constructing the Improvements, and consent of the surety on payment and performance bonds provided for the Improvements. 671 City of Fort Worth, Texas Page 3 of 16 Standard Community Facilities Agreement Rev. 9/21 Financial Guarantee Developer has provided the City with a financial guarantee in the form and amounts set forth in this Agreement which guarantees the construction of the Improvements and payment by Developer of all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee"). Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the CFA Ordinance. 6. Completion Deadline; Extension Periods This Agreement shall be effective on the date this Agreement is executed by the City's Assistant City Manager ("Effective Date"). Developer shall complete construction of the Improvements and obtain the City's acceptance of the Improvements within two (2) years of the Effective Date ("Term"). If construction of the Improvements has started during the Term, the Developer may request that this Agreement be extended for an additional period of time ("Extension Period"). All Extension Periods shall be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement. In no event shall the Term of this Agreement plus any Extension Periods be for more than three years. 7. Failure to Construct the Improvements (a) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements if at the end of the Term, and any Extension Periods, the Improvements have not been completed and accepted by the City. (b) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of the Improvements before the expiration of the Term, and any Extension Period, if the Developer breaches this Agreement, becomes insolvent, or fails to pay costs of construction. (c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers are not paid for construction costs or materials supplied for the Improvements the contractors and suppliers may place a lien upon any property which the City does not have an ownership interest that is the subject of the Completion Agreement. (d) Nothing contained herein is intended to limit the Developer's obligations under the CFA Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's contractors, or other related agreements. 8. Termination If Developer desires to terminate this Agreement before Developer's contractors begin constructing the Improvements, Developer agrees to the following: (a) that Developer and City must execute a termination of this Agreement in writing; City of Fort Worth, Texas Page 4 of 16 Standard Community Facilities Agreement Rev. 9/21 (b) that Developer will vacate any final plats that have been filed with the county where the Project is located; and (c) to pay to the City all costs incurred by the City in connection with this Agreement, including time spent by the City's inspectors at preconstruction meetings. 9. Award of Construction Contracts (a) Developer will award all contracts for the construction of the Improvements and cause the Improvements to be constructed in accordance with the CFA Ordinance. (b) Developer will employ construction contractors who meet the requirements of the City to construct the Improvements including, but not limited, to being prequalified, insured, licensed and bonded to construct the Improvements in the City. (c) Developer will require Developer's contractors to provide the City with payment and performance bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent (100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and performance bonds shall guarantee construction of the Improvements and payment of all subcontractors and material suppliers. Developer agrees to require Developer's contractors to provide the City with a maintenance bond naming the City as an obligee, in the amount of one hundred percent (100%) of the cost of the Improvements, that guarantees correction of defects in materials and workmanship for the Improvements by the contractor and surety for a period of two (2) years after completion and final acceptance of the Improvements by the City. All bonds must be provided to the City before construction begins and must meet the requirements of the City's Standard Conditions, Chapter 2253 of the Texas Government Code, and the Texas Insurance Code. (d) Developer will require Developer's contractors to provide the City with insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City must be named as an additional insured on all insurance policies. The Developer must provide the City with a Certificate of Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's insurance provider, which shall be made a part of the Project Manual. (e) Developer will require the Developer's contractors to give forty-eight (48) hours' advance notice of their intent to commence construction of the Improvements to the City's Construction Services Division so that City inspection personnel will be available. Developer will require Developer's contractors to allow construction of the Improvements to be subject to inspection at any and all times by the City's inspectors. Developer will require Developer's contractors to not install or relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives consent to proceed, and to allow such laboratory tests as may be required by the City. (f) Developer will not allow Developer's contractors to begin construction of the Improvements until a notice to proceed to construction is issued by the City. (g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and service lines have been completed to the satisfaction of the City. City of Fort Worth, Texas Page 5 of 16 Standard Community Facilities Agreement Rev. 9/21 10. Utilities Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project; and (2) to construct the Improvements required herein. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the Improvements to be constructed pursuant to this Agreement. 11. Easements and Rights -of -Way Developer agrees to provide, at its expense, all necessary rights -of -way and easements required for the construction and dedication to the City of the Improvements provided for by this Agreement. 12. Liability and Indemnification (a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT. (b) THE DEVELOPER COVENANTS AND AGREES TO, AND BY THESE PRESENTS DOES HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM ALL SUITS, ACTIONS OR CLAIMS OF ANYCHARACTER, WHETHERREAL ORASSERTED, BROUGHTFOR OR ONACCOUNT OFANYINJURIES OR DAMAGES SUSTAINED BYANYPERSONS, INCLUDING DEATH, OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE CONSTRUCTION, DESIGN, PERFORMANCE OR COMPLETION OF ANY WORK TO BE PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO PROPERLY SAFEGUARD THE WORK, OR ONACCOUNT OFANYACT, INTENTIONAL OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS CONTRACTORS, SUB -CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES. (c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY, INCLUDING DEATH, RESULTING FROM, OR INANY WAY CONNECTED WITH, THE CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN. FURTHER, DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY FOR ANY LOSSES, DAMAGES, COSTS OR EXPENSES SUFFERED BY THE CITY OR CAUSED AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE MANNER, FREE FROM DEFECTS, IN CONFORMANCE WITH THE CFA ORDINANCE, AND IN ACCORDANCE WITH ALL PLANS AND SPECIFICATIONS. City of Fort Worth, Texas Page 6 of 16 Standard Community Facilities Agreement Rev. 9/21 13. Right to Enforce Contracts Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its contractors, along with an assignment of all warranties given by the contractors, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. 14. Estimated Fees Paid by Developer; Reconciliation Prior to execution of this Agreement, Developer has paid to the City the estimated cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees in the amounts set forth in the Cost Summary section of this Agreement. Pursuant to the Amended Development Agreement and the Utility and Infrastructure Agreement, inspections and testing of all other improvements, except water and sewer Improvements, shall be performed by inspectors retained and paid for by the Brookfield Water Control and Improvement District of Denton County ("District"), or the property owner on behalf of the District, said inspectors to be approved by the City. Copies of all inspection and testing reports shall be provided to the City by the Developer within five (5) business days of the date of the inspection. The City shall have the right to test the Improvements at any time and to participate in final inspection of all Improvements. Upon completion of the construction of the Improvements, the City will reconcile the actual cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer, the Developer must pay the difference to the City before the Improvements will be accepted by the City. If the actual costs of the fees are less than the estimated payments made by the Developer, the City will refund the difference to the Developer. If the difference between the actual costs and the estimated payments made by the Developer is less than fifty dollars ($50.00), the City will not issue a refund and the Developer will not be responsible for paying the difference. The financial guarantee will not be released by the City or returned to the Developer until reconciliation has been completed by the City and any fees owed to the City have been paid by the Developer. 15. Material Testing The City maintains a list of pre -approved material testing laboratories. The Developer must contract with material testing laboratories on the City's list. Material testing laboratories will provide copies of all test results directly to the City and the Developer. If the Improvements being constructed fail a test, the Developer must correct or replace the Improvements until the Improvements pass all retests. The Developer must pay the material testing laboratories directly for all material testing and retesting. The City will obtain proof from the material testing laboratories that the material testing laboratories have been paid in full by the Developer before the City will accept the Improvements. Pursuant to the Amended Development Agreement and the Utility and Infrastructure Agreement, material testing of Improvements, except for water and sewer Improvements, shall be performed by inspectors retained and paid for by the District, or the property owner on behalf of the District. Copies of all testing reports shall be provided to the City by the Developer within five (5) business days of the date of the inspection. The City shall have the right to test the Improvements at any time. City of Fort Worth, Texas Page 7 of 16 Standard Community Facilities Agreement Rev. 9/21 16. Notices All notices required or permitted under this Agreement may be given to a party by hand - delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be deemed to have been received when deposited in the United States mail so addressed with postage prepaid: CITY: Development Coordination Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 With conies to: City Attorney's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 and City Manager's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 DEVELOPER: D.R. Horton — Texas, Ltd. 6751 North Freeway Fort Worth, Texas 76131 Or to such other address one party may hereafter designate by notice in writing addressed and mailed or delivered to the other party hereto. 17. Right to Audit Developer agrees that, until the expiration of three (3) years after acceptance by the City of the Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to examine any directly pertinent books, documents, papers and records of the Developer involving transactions relating to this Agreement. Developer agrees that the City shall have access during normal working hours to all necessary Developer facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section. The City shall give Developer reasonable advance notice of intended audits. Developer further agrees to include in all contracts with Developer's contractors for the Improvements a provision to the effect that the contractor agrees that the City shall, until the expiration of three (3) years after final payment under the contract, have access to and the right to examine any directly pertinent books, documents, papers and records of such contractor, involving transactions to the contract, and further, that City shall have access during normal working hours to all of the contractor's facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the City of Fort Worth, Texas Page 8 of 16 Standard Community Facilities Agreement Rev. 9/21 provisions of this section. City shall give Developer's contractors reasonable advance notice of intended audits. 18. Independent Contractor It is expressly understood and agreed that Developer and its employees, representative, agents, servants, officers, contractors, subcontractors, and volunteers shall operate as independent contractors as to all rights and privileges and work performed under this Agreement, and not as agents, representatives or employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement, Developer shall have the exclusive right to control the details of its operations and activities and be solely responsible for the acts and omissions of its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat superior shall not apply as between the City and its officers, representatives, agents, servants and employees, and Developer and its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the creation of a partnership or joint enterprise between City and Developer. It is further understood that the City shall in no way be considered a co -employer or a joint employer of Developer or any employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer. Neither Developer, nor any officers, agents, servants, employees or subcontractors of Developer shall be entitled to any employment benefits from the City. Developer shall be responsible and liable for any and all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. The City, through its authorized representatives and employees, shall have the sole and exclusive right to exercise jurisdiction and control over City employees. 19. Applicable Law; Venue This Agreement shall be construed under and in accordance with Texas law. Venue shall be in the state courts located in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. 20. Non -Waiver The failure of the City to insist upon the performance of any term or provision of this Agreement or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent of City's right to assert or rely on any such term or right on any fixture occasion. 21. Governmental Powers and Immunities. It is understood that by execution of this Agreement, the City does not waive or surrender any of its governmental powers or immunities. 22. Headings City of Fort Worth, Texas Page 9 of 16 Standard Community Facilities Agreement Rev. 9/21 The paragraph headings contained herein are for the convenience in reference and are not intended to define or limit the scope of any provision of this Agreement. 23. Severability In the event that any clause or provision of this Agreement shall be held to be invalid by any court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the remaining provisions hereof. 24. Review of Counsel City and Developer, and if they so choose, their attorneys, have had the opportunity to review and comment on this document; therefore any rule of contract construction or interpretation that would normally call for the document to be interpreted as against the drafting party shall not apply in interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be construed solely on the basis of the language contained therein, regardless of who authored such language. 25. Prohibition on Boycotting Israel Developer acknowledges that in accordance with Chapter 2271 of the Texas Government Code, the City is prohibited from entering into a contract with a company with 10 or more full-time employees that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" have the meanings ascribed to those terms by Chapter 2271 of the Texas Government Code. To the extent that Chapter 2271 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of this Agreement. 26. Prohibition on Boycotting Energy Companies Developer acknowledges that in accordance with Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City with a company with 10 or more full-time employees unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meanings ascribed to those terms by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. 27. City of Fort Worth, Texas Page 10 of 16 Standard Community Facilities Agreement Rev. 9/21 Prohibition on Discrimination Against Firearm and Ammunition Industries Developer acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City with a company with 10 or more full-time employees unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. 28. Immigration and Nationality Act Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'SEMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. 29. Amendment No amendment, modification, or alteration of the terms of this Agreement shall be binding unless the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer. 30. Assignment and Successors Developer shall not assign or subcontract all or any part of its rights, privileges, or duties under this Agreement without the prior written consent of City. Any attempted assignment or subcontract without the City's prior written approval shall be void and constitute a breach of this Agreement. 31. No Third -Party Beneficiaries City of Fort Worth, Texas Page 11 of 16 Standard Community Facilities Agreement Rev. 9/21 The provisions and conditions of this Agreement are solely for the benefit of the City and Developer, and any lawful assign or successor of Developer, and are not intended to create any rights, contractual or otherwise, to any other person or entity. 32. Compliance with Laws, Ordinances, Rules and Regulations Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed and understood that, if City calls to the attention of Developer any such violation on the part of Developer or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately desist from and correct such violation. 33. Signature Authority The person signing this Agreement on behalf of Developer warrants that he or she has the legal authority to execute this Agreement on behalf of the Developer, and that such binding authority has been granted by proper order, resolution, ordinance or other authorization of the entity. The City is fully entitled to rely on this warranty and representation in entering into this Agreement. 34. Counterparts This Agreement may be executed in multiple counterparts, each of which will be deemed an original, but which together will constitute one instrument. 35. Entire Agreement This written instrument, together with any attachments, exhibits, and appendices, constitutes the entire understanding between the City and Developer concerning the work to be performed hereunder, and any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall be void. [REMAINDER OF PAGE INTENTIONALLY BLANK] City of Fort Worth, Texas Page 12 of 16 Standard Community Facilities Agreement Rev. 9/21 36. Cost Summary Sheet Project Name: Lone Star at Liberty Trails Phase IA CFA No.: 24-0005 Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total City Project No.: 104866 B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer 4. Signals TPW Construction Cost Total Total Construction Cost (excluding the fees) Estimated Construction Fees: C. Construction Inspection Service Fee D. Administrative Material Testing Service Fee E. Water Testing Lab Fee Total Estimated Construction Fees: Financial Guarantee Options, choose one Bond = 100% Completion Aqreement = 100% / Holds Plat Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Pavinq/Storm Drain = 125% Letter of Credit = 125% Escrow Pledqe Agreement = 125% Developer's Cost $ 3,382,269.80 $ 2,406,213.00 $ 5,788,482.80 $ 5,700,757.75 $ 4,374,934.00 $ 833,984.39 $ 10,909,676.14 $ 16,698,158.94 $28,200.00 $17,640.00 $3,690.00 $ 49,530.00 IPRC No.: 23-0064 Choice Amount (Mark one $ 16,698,158.94 X $ 16,698,158.94 $ 7,235,603.50 $ 13,637,095.18 $ 20,872,698.68 City of Fort Worth, Texas Page 13 of 16 Standard Community Facilities Agreement Rev. 9/21 IN WITNESS WHEREOF, the City and Developer have each executed this Agreement by their duly authorized signatories to be effective on the date executed by the City's Assistant City Manager. CITY OF FORT WORTH bares Bc�A6ui Dana Burghdoff (Apr lb, 2024 i :24 CDT) Dana Burghdoff Assistant City Manager Date: Apr 10, 2024 Recommended by: Bichson Nguyen Contract Compliance Specialist Development Services Approved as to Form & Legality: Richard McCracken (Apr 5, 2024 07:32 CDT) Richard A. McCracken Sr. Assistant City Attorney DEVELOPER D.R. Horton — Texas, Ltd., a Texas limited partnership By: D.R. Horton Inc., a Delaware Corporation, its authorized agent Justin Bosworth Assistant Secretary Date: Apr 3, 2024 M&C No. N/A Date: Apr 5, 2024 Contract Compliance Manager: Form 1295: N/A Q4ovvouu p�� F FORto9Ap By signing, I acknowledge that I am the person ads o.+d responsible for the monitoring and ATTEST: p g o0ooa,r administration of this contract, including a,k44 nExA5o4p ensuring all performance and reporting requirements. JanneCtte S. Goodall City Secretary Rebecca Owen (Apr 3, 202416:37 CDT) Rebecca Diane Owen Development Manager OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Page 14 of 16 Standard Community Facilities Agreement Rev. 9/21 The following attachments are incorporated into this Agreement. To the extent a conflict exists between the main body of this Agreement and the following attachments, the language in the main body of this Agreement shall be controlling. Included Attachment © Attachment 1 - Changes to Standard Community Facilities Agreement ❑ Attachment 2 — Phased CFA Provisions ❑ Attachment 3 — Concurrent CFA Provisions ® Location Map ® Exhibit A: Water Improvements ❑X Exhibit A-1: Sewer Improvements X❑ Exhibit B: Paving Improvements © Exhibit B-1: Storm Drain Improvements © Exhibit C-1: Street Lights and Signs Improvements © Cost Estimates (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Page 15 of 16 Standard Community Facilities Agreement Rev. 9/21 ATTACHMENT "I" Changes to Standard Community Facilities Agreement City Project No. 104866 Changes incorporated into body of this agreement. City of Fort Worth, Texas Page 16 of 16 Standard Community Facilities Agreement Rev. 9/21 W J H Z 1111111111�'�1 ��� �111111111111 ��� ;111111�1�111��� e7kil-CITY OF -PHASE 1 A ,, 1( kaUUIA I Y LOCATION MAP SCALE: 1" = 4000' MAPSCO NO. 641 A. 641 E. 641 J COUNCIL DISTRICT TETJ C.P.N.: 104866 N = OWNER/DEVELOPER: VICINITY MAP SCALE: 1' 4,000' D.R. HORTON - TEXAS, LTD. LONE STAR AT LIBERTY o N 0 4,000' 6751 NORTH FREEWAY TRAILS PHASE 1A FORT WORTH, TX 76131 FORT WORTH, TEXAS a FdPAPE-DAWSON ENGINEERS 201 MAIN ST, STE 901 1 FT. WORTH, TX 76102 1 817.870.3668 TEXAS ENGINEERING FIRM REGISTRATION #470 t 1 n n FUTURE _ 3 PHASE 16 _ N � � I MONTELLO LANE r h 2 W 1 ' �STREET25�, tl a• m � STREET & 3 MATCH LINE -THIS SHEET o g �W Lai 3 I I F4 I I I I CN a LL 0 00 CD ro MATCH LINE THIS SHEET cn t x w Q Cal c � O •� U .- � U � rn J CV C lE rn o LEGEND o EXISTING. WATER LINE � j PROPOSED 8" WATER LINE 24" W-A �--� *NOTE: ALL PROPOSED WATER LINES ARE S" UNLESS A -_ CONNECT TO EXIST 24• T- X-27028 CPN 10351A d1 o OTHERWISE NOTED Z3 4 N OWNER/DEVELOPER: EXHIBIT A: WATER PAPE-DAWSON N _ ENGINEERS LONE STAR AT LIBERTY D.R. HORTON TEXAS, LTD. TRAILS PHASE 1 A rd U d SCALE 1'- 400' 0 � 400' a 2W 40N 6751 NORTH FREEWAY C.P.N. 104866 201 MAIN ST, STE 901 1 FT. WORTH, TX 76102 1 817.870.3868 FORT WORTH, TX 76131 TEXAS ENGINEERING FIRM REGISTRATION #470 FORT WORTH, TEXAS 0 r r ■ ■ C"l c / O •� c U rn 0 L� N J / c — cn �o �O / E M / O Oi % N M 4 oIrf-) U c •� O SCALE 1'- 400' p 4ar a 2W 400' N C, .a> c� Li n n FUTURE •/ III PHASE 16 S7-RFF7.2q I �� STgE FTg ti W cv W ? W h 0. 0: y fREET 25y 2" SS-1 Ll • ST9�`crs • N • Z tj W M J I I [S'TREET 1� 12"SS5 SS-ST—r o•� .� �. �. \ N_ it MATCH LINE THIS SHEET -IEET LEGEND `f I EXISTING SEWER LINE PROPOSED SEWER LINE _ A - \ s ss-, I *NOTE: ALL PROPOSED SEWER LINES ARE 8" UNLESS —S — —CONNECT TO EX 15" SS LINE d OTHERWISE NOTED 9999 SEE X-27028 CPN 103519 OWNER/DEVELOPER: EXHIBIT Al: SEWER PAPE-DAWSON LONE STAR AT LIBERTY ENGINEERS D.R. HORTON TEXAS, LTD. TRAILS PHASE 1 A rd 6751 NORTH FREEWAY C.P.N. 104866 201 MAIN ST, STE 901 1 FT. WORTH, TX 76102 1 817.870.3868 FORT WORTH, TX 76131 FORT WORTH, TEXAS TEXAS ENGINEERING FIRM REGISTRATION 8470 r ■ ■ FUTURE STREET24 •• PHASE 113 ' I ' MONTELLO LANE ILL r J a I L IL / STREET 9 . STREET24 DALRYMPLE LANE —STREET25 4L .STREET5 _y STREET 8 • - LI L l a 1 STREET 25 {-( STREET 23� I L STREET 8 \ L L1.K STREETIS T STREET6-/ - L L L L L L 3 L 8TREET2 STREET MATCH LINE THIS SHEET I L L L — C .� —STREET 3 - � DALRYMPLE LANE • • LQL i STREET 4 L , L �_ L N I LI STREET2• ' IL I L _ Q L I U I I �`iTRiET I1. I I L 00 00 1 1 I 1 1 O L ro MATCH LINE THIS SHEET LL L L LJ W L L 0 L LEGEND L � U 29' B/B 50 ROW (TYP) - L j 37' B/B 60 ROW (TYP) ® -LL _I;.L o •� 62' B/B 110 ROW (TYP) LLLLLLLL _4 L U L. 38' B/B 60 ROW (TYP) O L_ j ,y H.C. RAMPS BY DEVELOPER Q o 0 SIDEWALK BY DEVELOPER SIDEWALK BY HOMEBUILDER {" cV 4 N OWNER/DEVELOPER: EXHIBIT B: PAVING PAPE-DAWSON N _ ENGINEERS LONE STAR AT LIBERTY D.R. HORTON TEXAS, LTD. TRAILS PHASE 1 A rd U d SCALE 1•-400' 0 � 400' a 2W 40N 6751 NORTH FREEWAY C.P.N. 104866 201 MAIN ST, STE 901 1 FT. WORTH, TX 76102 1 817.870.3868 FORT WORTH, TX 7613FORT WORTH, TEXAS 1 TEXAS ENGINEERING FIRM REGISTRATION 8470 0 r r ■ ■ I FUTURE _ PHASE 16 REETpq MONTELLO LANEI STq EFTg " s W w w y g ti � w h lb F • I STREET 25� • f , • I • , I • • `ram' ' •� STREET & - r 3 MATCH LINE -THIS SHEET Cn �� rn y 5 U iTREET 1 00 00 I I CDro Q MATCH LINE - THIS SHEET oe c / t w Cal c � O � <) LEGEND LL j PROPOSED STORM DRAIN c o •cf) PROPOSED INLET L a� 4 PROPOSED HEADWALL o I 14 ,y EXISTING STORM DRAIN o 0 EXISTING INLET L IUD 0 EXISTING HEADWALL- cV 4 N OWNER/DEVELOPER: EXHIBIT B1: STORM PAPE-DAWSON N _ LONE STAR AT LIBERTY ENGINEERS D.R. HORTON TEXAS, LTD. TRAILS PHASE 1 A F U 0-SCALE 1'- 400' 0 - 4a' a 2W 40N 6751 NORTH FREEWAY C.P.N. 104866 201 MAIN ST, STE 901 1 FT. WORTH, TX 76102 1 817.870.3868 FORT WORTH, TX 7613FORT WORTH, TEXAS 1 TEXAS ENGINEERING FIRM REGISTRATION #470 �ba PHASER1B Q°T 3 9 MATCH LINE - THIS SHEET J w _ w N DALRYMPLE LANE v Q ¢ uj w Ll "' i l CN LL Ilk )TREET00 1 / 1 11 I 11 CD ro MATCH LINE THIS SHEET cn t x w Cal c � 0 .� � U rn 0 w (-1 J C 1E .� cn CD V) � ,y LEGEND cfl 0 PROPOSED STREET LIGHT '( jPROPOSED STREET NAME/STOP SIGN - SH UL=jj� GH 14 cV 4 N OWNER/DEVELOPER: EXHIBIT Cl:STREET LIGHTS PAPE-DAWSON N _ LONE STAR AT LIBERTY ENGINEERS D.R. HORTON TEXAS, LTD. TRAILS PHASE 1 A U 0-SCALE 1'- 400' 0 '-- 400' a am' 40N 6751 NORTH FREEWAY C.P.N. 104866 201 MAIN ST, STE 901 1 FT. WORTH, TX 76102 1 817.870.3868 FORT WORTH, TX 7613FORT WORTH, TEXAS 1 TEXAS ENGINEERING FIRM REGISTRATION #470 o r r t Paving DAP - BID PROPOSAL Page 1 or 1 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Lonestar at Liberty Trails, Phase IA UNIT PRICE BID Bidder's Application Project Item Information I Bidders Proposal Bidlist Item No. Description Specification Section No. I Unit of Measure I Bid Quantity Unit Price Bid Value UNIT IV: PAVING IMP 40VEMENTS 1 3211.0400 Hydrated Lime 3211 29 TN 1,411.1 $320.00 $451,552.00 2 3211.0501 6" Lime Treatment 3211 29 SY 37,140 $4.60 $170,844.00 3 3211.0502 8" Lime Treatment 32 1129 SY 38,900 $4.80 $186,720.00 4 3213.0101 6" Cone Pvmt 32 13 13 SY 35,508 $44.70 $1,587,207.60 5 3213.0102 7.5" Cone Pvmt 32 13 13 SY 10,032 $58.25 $584,364.00 6 3213.0105 10" Cone Pvmt 32 13 13 SY 26,606 $64.35 $1,712,096.10 7 3213.0301 4" Cone Sidewalk 32 13 20 SF 97,205 $7.55 $733,897.75 8 3213.0501 Barrier Free Ramp, Type R-1 32 13 20 EA 28 $3,10000 $86,800.00 9 3213.0506 Barrier Free Ramp, Type P-1 32 13 20 EA 26 $2,400.00 $62,400.00 10 3217.0103 6" BRK Pvmt Marking HAS (W) 32 17 23 LF 7702 $2.15 $16,559.30 11 3217.0102 6" SLD Pvmt Marking HAS (Y) 32 17 23 LF 1170 $2.15 $2,515.50 12 3217.0108 6" DOT Pvmt Marking HAS (Y) 32 17 23 LF 65 $2.15 $139.75 13 3217.0201 8" SLD Pvmt Marking HAS (W) 32 17 23 LF 3846 $2.75 $10,576.50 14 3217.0401 18" SLD Pvmt Marking HAE (W) 32 17 23 LF 619 $2.75 $1,702.25 15 3217.0502 Preformed Thermoplastic Contrast Markings - 24" Crosswalk 32 17 23 LF 160 $27.00 $4,320.00 16 3217.0504 Preformed Thermoplastic Contrast Markings - 24' Stop Bars 32 17 23 LF 216 $27.00 $5,832.00 17 3217.1002 Lane Legend Arrow 32 17 23 EA 30 $390.00 $11,700.00 18 3217.1004 Lane Legend Only 32 17 23 EA 18 $435.00 $7,830.00 19 3217.2103 REFL Raised Marker TY II -A -A 32 17 23 EA 18 $6.00 $108.00 20 3217,2104 REFL Raised Marker TY II-C-R 32 17 23 EA 303 $6.00 $1,818.00 21 3441.4003 Furnish/Install Alum Sign Ground Mount City Sid. (D3-1) 3441 30 EA 56 $550.00 $30,800.00 22 3441.4003 Furnish/Install Alum Sign Ground Mount City Sid. (RI 0-15aR) 3541 30 EA 2 $450.00 $900.00 23 3441.4003 Furnish/Install Alum Sign Ground Mount City Sid. (R1-1) 3441 30 EA 25 $445.00 $11,125.00 24 3441.4003 Fumish/Install Alum Sign Ground Mount City Std. (RI-5b) 34 41 30 EA 2 $445.00 $890.00 25 3441.4003 Fumish/Install Alum Sign Ground Mount City Sid. (R2-1) 34 41 30 EA 1 $44500 $445.00 26 3441.4003 Furnish/Install Alum Sign Ground Mount City Sid. (R3-7) 3441 30 EA 1 $445.00 $445.00 27 3441.4003 Furnish/lnstall Alum Sign Ground Mount City Sid. (R5-1A) 3441 30 EA 1 $445.00 $446.00 28 3441.4003 Furnish/Install Alum Sign Ground Mount City Sid. (R6-1R) 3441 30 EA 1 $445.00 $445.00 29 3441.4003 Furnish/Install Alum Sign Ground Mount City Std. (W11-2) 35 41 30 EA 2 $446.00 $890.00 30 3441.4003 Furnish/Install Alum Sign Ground Mount City Sid. (W16-7P) 3541 30 EA 2 $445.00 $890.00 31 3471.001 Traffic Control 3471 13 MO 1 $2,200.00 $2,200.00 32 9999.0001 Pavement Header 99 99 99 EA 6 $650.00 $3,900.00 33 9999,0002 Pavement Barricade 99 99 99 EA 6 $1,400.00 $8,400.00 TOTAL UNIT IV: PAVIN6 IMPROVEMENTS $5,700,757.75 Bid Summary UNIT IV: PAVING IMPROVEMENTS $5,700,757.751 Total Constniction Bid I $5,700,757.761 This Bid is submitted by the entity named below: BIDDER: GLENN THURMAN, INC. P.O. BOX $50842 MESQUITE, TEXAS 75185 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 BY: RI PL >i TITLCONTRACT MANA ER DATE: 10/23/2023 120 working days after the date when the Lone Star at Liberty Trals 1A Street Lights DAP - BID PROPOSAL Page 1 of 1 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidhst Item Description Specification Section No. Unit of Bid Unit Price Bid Value No. Measure Quantity UNIT V: STREET LIGHTING IMPROVEMENTS 1 2605.3015 2" CONDT PVC SCH 80 (T) 26 05 33 LF 11,751 15.73 184,843.23 2 3441.1405 NO 2 Insulated Elec Condr 3441 10 _ LF 25,524 3.46 88,313.04 3 3441.1410 NO 10 Insulated Elec Condr 3441 10 LF 9,729 1.28 12,453.12 4 3441.1645 Furnish/Install Type 33A Arm 34 41 20 EA 50 301.00 15,050.00 5 3441.1646 Furnish/Install Type 33B Arm 34 41 20 EA 75 301.00 22,575.00 6 3441.3050 Furnish/Install Luminare (ATBO P101 MVOLT R2 3K MP 3441 20 EA NL P7 AO RFD325607) 69 328.00 22,632.00 7 3441.3050 Furnish/Install Luminare (ATBO P101 MVOLT R4 3K MP 3441 20 EA NL P7 AD RFD325606) 6 328.00 1,968.00 8 3441.3050 Furnish/Install Luminare (ATBO P303 MVOLT R2 3K MP 3541 20 EA NL P7 AO RFD322792) 50 466.00 23,300.00 9 3441.3301 Rdwy Illum Foundation Type 1 34 41 20 EA 75 1,438.00 107,850.00 10 3441.3302 Rdwy Illum Foundation Type 3 33 41 20 EA 50 1,708.00 85,400.00 11 3441.3341 Rdwy Illum TY 11 Pole 344126 EA 75 1,830.00 137,250.00 12 3441.3352 Rdwy Illum TY 18 Pole 3441 20 EA 50 2,647.00 132,350.00 TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS 833,984.39 Bid Summary UNIT V: STREET LIGHTING IMPROVEMENTS Total Construction Bid $833,984.391 This Bid is submitted by the entity named below: BIDDER: Independent Utility Construction, Inc. 5109 Sun Valley Drive Fort Worth, TX 76119 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. END OF SECTION BY: Rii/f d Wolfe � TITLE: President DATE' 01 /17/2024 75 working days after the date when the CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 004243_Bid Proposal DAP (lA).xlsx Utilities DAP - Bm PROPOSAL Page 1 of2 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information I Bidder's Proposal Bidlist I Description Specification Section No. Unit of I Bid Quantity Unit Price Bid Value Item No. Measure UNIT I: W!-ER IMPROVEMENTS 1 3305.0109 Trench Safety 33 05 10 LF 18,446 $1.00 $18,446.00 2 3305.1003 20" Steel Casing 33 05 22 LF 55 $261.00 $14,355.00 3 3305.1007 42" Steel Casing 33 05 22 LF 110 $427.00 $46,970.00 4 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 27.2 $7,339.00 $199,620.80 5 3311.0241 8" Water Pipe 33 11 10, 33 11 12 LF 13,077 $53.00 $693,081.00 6 3311.0251 8" DIP 3311 10 LF 75 $180.00 $13,500.00 7 3311.0441 12" Water Pipe 33 11 10, 33 11 12 LF 490 $105.00 $51,450.00 8 3311.0641 24" Water Pipe 33 11 10, 33 11 12, 33 11 LF 13.331114 4,754 $272.00 $1,293,088.00 9 3311.0651 24" DIP 3311 10 LF 125 $287.00 $35,875.00 10 3312.0001 Fire Hydrant 331240 EA 22 $8,413.00 $185,086.00 11 3312.0108 Connection to Existing 24" Water Main 33 12 25 EA 1 $19,323.00 $19,323.00 12 3312.0117 Connection to Existing 4"-12" Water Main 33 12 25 EA 1 $3,961.00 $3,961.00 13 3312.2003 1" Water Service 33 12 10 EA 323 $1,546.00 $499,358.00 14 3312.2103 1" Water Service (Irrigation) 33 12 10 EA 7 $1,849.00 $12,943.00 15 3312.2203 2" Water Service 331210 EA 1 $3,181.00 $3,181.00 16 3312.3003 8" Gate Valve 33 12 20 EA 48 $2,594.00 $124,512.00 17 3312.3005 12" Gate Valve 33 12 20 EA 1 $3,873.00 $3,873.00 18 3312.3008 24" Gate Valve & Vault 33 12 20 EA 3 $45,915.00 $137,745.00 19 3312.6003 8" Blow off Assembly 33 12 60 EA 1 $16,455.00 $16,455.00 20 9999.0001 Flushing Valve 99 99 99 EA 1 $9,447.00 $9,447.00 TOTAL UNIT I: WATER IMPROVEMENTS $3,382,269.80 UNIT II: SANITARY SEWET IIPVEMEN� 1 3301.0002 Post -CCTV Inspection 0 1 LF 15,136 $2.00 $30,272.00 2 3301.0101 Manhole Vacuum Testing 3301 30 EA 69 $165.00 $11,385.00 3 3305.0109 Trench Safety 33 05 10 LF 15,136 $1.00 $15,136.00 4 3305.0112 Concrete Collar for Manhole 33 05 17 EA 2 $917.00 $1,834.00 5 3305.1004 24" Steel Casing 33 05 22 LF 140 $258.00 $36,120.00 6 3331.3101 4" Sewer Service 3331 50 EA 323 $1,519.00 $490,637.00 7 3331.3201 6" Sewer Service 3331 50 EA 1 $2,347.00 $2,347.00 8 3331.4115 8" Sewer Pipe 3311 10, 33 31 12, 33 31 LF 7,412 $60.00 $444,720.00 9 3331.4116 8" Sewer Pipe, CSS Backfill 3311 10, 33 31 12, 33 31 LF 480 $125.00 $60,000.00 10 3331.4201 10" Sewer Pipe 3311 10, 33 31 12, 33 31 LF 2,428 $71.00 $172,388.00 11 3331.4202 10" Sewer Pipe, CSS Backfill 3311 10, 33 31 12, 33 31 LF 160 $141.00 $22,560.00 12 3331.4205 10" DIP 3311 10 LF 70 $124.00 $8,680.00 13 3331.4208 12" Sewer Pipe 3311 10, 33 31 12, 33 31 LF 1,632 $96.00 $156,672.00 14 3331.4209 12" Sewer Pipe, CSS Backfill 3311 10, 33 31 12, 33 31 LF 60 $195.00 $11,700.00 15 3331.4215 15" Sewer Pipe 3311 10, 33 31 12, 33 31 LF 2,554 $125.00 $319,250.00 16 3331.4216 15" Sewer Pipe, CSS Backfill 3311 10, 33 31 12, 33 31 LF 220 $272.00 $59,840.00 17 3331.4222 16" DIP 3311 10 LF 120 $225.00 $27,000.00 18 3339.0001 Epoxy Manhole Liner 33 39 60 VF 227 $418.00 $94,886.00 19 3339.1001 4' Manhole 33 39 10, 33 39 20 EA 68 $4,323.00 $293,964.00 20 3339.1002 4' DROP MANHOLE 33 39 10, 33 39 20 EA 1 $6,634.00 $6,634.00 21 3339.1003 Extra Depth Manhole 33 39 10, 33 39 20 VF 404 $347.00 $140,188.00 TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS $2,406,213.00 Bid Summary UNIT I: WATER IMPROVEMENTS UNIT ll: SANITARY SEWER IMPROVEMENTS Total Water and Sewer Construction Bid CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 Bid Proposal_DAP - Utilities (IA) Utilities DAP - Bm PROPOSAL Page 2 of2 UNIT PRICE BID Bidlist Item No. � 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Bidder's Application Project Item Information Description Specification Section No. Unit of I Bid Quantity Measure UNIT III: DR.":NAGE IMPROVEMENTS 3137.0105 Medium Stone Riprap, grouted 31 3700 SY 3,008 3305.0109 Trench Safety 33 05 10 LF 12,085 3341.0201 21" RCP, Class III 3241 10 LF 1,284 3341.0205 24" RCP, Class III 3341 10 LF 2,570 3341.0208 27" RCP, Class III 3341 10 LF 1,260 3341.0302 30" RCP, Class III 3341 10 LF 757 3341.0309 36" RCP, Class III 3341 10 LF 1,453 3341.0402 42" RCP, Class III 3341 10 LF 1,699 3341.0409 48" RCP, Class 111 3341 10 LF 339 3341.1102 4'x3' Box Culvert 3341 10 LF 161 3341.1103 4'x4' Box Culvert 3341 10 LF 279 3341.1202 5'x4' Box Culvert 3341 10 LF 887 3341.1303 6'x4' Box Culvert 3341 10 LF 624 3341.1502 8'x5' Box Culvert 3341 10 LF 772 3349.0001 4' Storm Junction Box 33 49 10 EA 15 3349.0002 5' Storm Junction Box 33 49 10 EA 9 3349.0003 6' Storm Junction Box 33 49 10 EA 1 3349.0005 8' Storm Junction Box 33 49 10 EA 5 3349.1005 CH-FW-0 HDWL (30" RCP, 1 Pipe) 33 49 40 EA 1 3349.1007 CH-FW-0 HDWL (36" RCP, 1 Pipe) 33 49 40 EA 1 3349.2003 PW-2 HDWL (24" RCP, 1 Pipe) 33 49 40 EA 1 3349.5001 10' Curb Inlet 33 49 20 EA 69 3349.5002 15' Curb Inlet 33 49 20 EA 3 3349.5003 20' Curb Inlet 33 49 20 EA 2 9999.0001 6' W ide, 6" Thick Concrete Flume 99 99 99 SY 236 9999.0002 PR11 Pedestrian Rail, Steel Pipe (42" Tall) 99 99 99 LF 685 9999.0003 FW-0 HDWL (4'x4' RCB, 1 Pipe & 4'x3', 3 Pipes) 99 99 99 EA 2 9999.0004 FW-0 HDWL (6'x4' RCB, 1 Pipe) 99 99 99 EA 1 1Q11313131. CD HDWL (48" RCP. 1 Piy�el 99 99 99 EA 1 �J�J�J�J.���6 PW-1 HDWL (8'x5` RCB, 7 Pipes) 99 99 99 EA 1 9999.0007 PW-1 HDWL (8'x5' RCB, 7 Pipes & 21" RCP, 1 Pipe & 999999 EA 42" RCP. 1 PiRe) 1 9999.0008 PW-2 HDWL (5'x4' RCB, 1 Pipe) 99 99 99 EA 1 9999.0009 PW-2 HDWL (5'x4' RCB, 3 Pipes & 42" RCP, 1 Pipe) 99 99 99 EA 1 9999.0010 PW-2 HDWL (5'x4' RCB, 3 Pipes) 99 99 99 EA 1 9999.0011 TXDOT SETB-PD (6:1) 99 99 99 EA 1 TOTAL UNIT III: DRAINAGE IMPROVEMENTS Bid Summary UNIT I: WATER IMPROVEMENTS UNIT II: SANITARY SEWER IMPROVEMENTS UNIT III: DRAINAGE IMPROVEMENTS This Bid is submitted by the entity named below: BIDDER: WRIGHT CONSTRUCTION CO., INC. 600 W. WALL ST. GRAPEVINE, TEXAS 76051 PHASE 1A START DATE: FEB. 28, 2023 WORKING DAYS TO BE READY FOR PAVING: 75 WD PHASE 1B START DATE: MAY 13, 2023 WORKING DAYS TO BE READY FOR PAVING: 55 WD Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. END OF SECTION Total Construction Bid BY: JOE LIPSCOMB TITLE: SR. ESTIMATOR DATE: OCTOBER 23, 2023 Bidder's Proposal Unit Price I Bid Value $165.00 $1.00 $87.00 $96.00 $109.00 $115.00 $145.00 $185.00 $227.00 $261.00 $286.00 $365.00 $432.00 $570.00 $6,059.00 $7,883.00 $8,726.00 $11,837.00 $6,062.00 $7,162.00 $17,251.00 $8,203.00 $11,782.00 $12,608.00 $123.00 $242.00 $38,976.00 $18,274.00 $7 351.00 $64� 68.00 $100,668.00 $28,982.00 $91,868.00 $50,068.00 $5,459.00 75 worldng days after the date when the $496,320.00 $12,085.00 $111,708.00 $246,720.00 $137,340.00 $87,055.00 $210,685.00 $314,315.00 $76,953.00 $42,021.00 $79,794.00 $323,755.00 $269,568.00 $440,040.00 $90,885.00 $70,947.00 $8,726.00 $59,185.00 $6,062.00 $7,162.00 $17,251.00 $566,007.00 $35,346.00 $25,216.00 $29,028.00 $165,770.00 $77,952.00 $18,274.00 $7 351.00 $64� 68.00 $100,668.00 $28,982.00 $91,868.00 $50,068.00 $5,459.00 $4,374,934.00 $3,382,269.80 $2,406,213.00 $4,374,934.00 $10,163,416.80 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 Bid Proposal_DAP - Utilities (IA)