HomeMy WebLinkAboutContract 59004-PM1CSC No. 59004-PMI
PROJECT MANUAL
FOR
THE CONSTRUCTION OF
WATER AND SANITARY SEWER IMPROVEMENTS
TO SERVE
WICHITA INDUSTRIAL
IPRC Record No. 22-0104
City Project No. 104140
FID No.30114-0200431-104140-EO7685
X File No. 27384
Mattie Parker David Cooke
Mayor City Manager
Christopher P. Harder, P.E.
Director, Water Department
Lauren Prieur, P.E.
Director, Transportation and Public Works Department
Prepared for
The City of Fort Worth
APRIL 2024
RUNAWAY
DUNAWAY ASSOCIATES, L.P.
550 Bailey Avenue, Suite 400
Ft. Worth, TX 76107
Office: 817-335-1121 / Fax: 817-429-1370
TX REG. F-1114
www.dunaway.com
DA Project#B006085.002
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 1 of 5
SECTION 00 00 10
TABLE OF CONTENTS
DEVELOPER AWARDED PROJECTS
Division 00 - General Conditions
Last Revised
00 11 13
irviia4io to Bidders
03/20/2020
0021 13
lastFuetions to Bidde :s
03/20/2020
00 41 00
Bid Fe
04/02/2014
00 42 43
Proposal Form Unit Price
05/22/2019
0043 13
Bid Ben
04/02/2014
0045 11
Bidders Pf:eq, alifie tief's
04/02/2014
0045 12
Prequalification Statement
09/01/2015
0045 13
Bidde . Pfegtta1 i;,,a4ien kWiaz.,ian
03/09/2020
00 45 26
Contractor Compliance with Workers' Compensation Law
04/02/2014
00 45 40
r, iner-;ty Business E tefpr- se Goa
08/21/2018
00 52 43
Agreement
06/16/2016
00 61 25
Certificate of Insurance
07/01/2011
00 62 13
Performance Bond
01/31/2012
00 62 14
Payment Bond
01/31/2012
00 62 19
Maintenance Bond
01/31/2012
00 72 00
General Conditions
11/15/2017
00 73 00
r"„„leme tary Conditions
07/01/2011
0073 10
Standard City Conditions of the Construction Contract for Developer
01/10/2013
Awarded Projects
Division 01- General Requirements
Last Revised
01 1100
Summary of Work
12/20/2012
01 25 00
Substitution Procedures
08/30/2013
01 31 19
Preconstruction Meeting
08/30/2013
013120
D-ejeetMeet;ngs
07/01/2011
01 32 33
Preconstruction Video
08/30/2013
01 33 00
Submittals
08/30/2013
01 35 13
Special Project Procedures
08/30/2013
01 45 23
Testing and Inspection Services
03/20/2020
01 50 00
Temporary Facilities and Controls
07/01/2011
01 5526
Street Use Permit and Modifications to Traffic Control
07/01/2011
01 57 13
Storm Water Pollution Prevention Plan
07/01/2011
01 60 00
Product Requirements
03/20/2020
01 66 00
Product Storage and Handling Requirements
04/07/2014
01 70 00
04/07/2014
01 71 23
Geastfitetiorl E"teaking
04/07/2014
01 74 23
Cleaning
04/07/2014
0177 19
Closeout Requirements
04/07/2014
01 78 23
Operation and Maintenance Data
04/07/2014
01 78 39
Project Record Documents
04/07/2014
City of Fort Worth Water Department Standard Product List
11/08/2021
CITY OF FORT WORTH Water & Sanitary Sewer Wichita Industrial
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 104140
Revised March 20, 2020
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 2 of 5
Technical Specifications which have been modified by the Engineer specifically for this
Project; hard copies are included in the Project's Contract Documents
NONE
Technical Specifications listed below are included for this Project by reference and can be
viewed/downloaded from the City's website at:
htti):Hfortworthtexas.aov/tvw/contractors/
or
httus:Hauus.fortworthtexas.2ov/Proi ectResources/
Division 02 - Existing Conditions
Last Revised
0241 13 Seleetio U.'Si Jaen
12/20/2012
0241 14 Utility Removal/Abandonment
12/20/2012
0241 15 Paving Removal
02/02/2016
Division 03 - Concrete
03 30 00 Cast -In -Place Concrete
12/20/2012
0334 13 Controlled Low Strength Material (CLSM)
12/20/2012
0334 16 C nef:ete Base Ma4er-;^i for- T -efie Repair-
12/20/2012
03 80 00 raedifiea4i as t E*istiag Genefete ctruetffes
12/20/2012
Division 26 - Electrical
26 05 00 room"" WedE Results f r Eleetr4eal
11/22/2013
2605 10 Demolition f Y EleetfiM Systems
12/20/2012
26 05 33 Raee a-ys a -a Bees for- B'eetfie ' cyst
12/20/2012
26 05 43 Undergr-eun a Dtiets a -a Raee a-ys f f Electriaal E"iy,�
07/01/2011
26 05 50 Eo.m,,'mumi^^tions Multi Duet Conduit
02/26/2016
Division 31- Earthwork
31 1000
Site r�
12/20/2012
3123 16
Unclassified Excavation
01/28/2013
31 23 23
Borrow
01/28/2013
31 24 00
Embankments
01/28/2013
31 25 00
Erosion and Sediment Control
12/20/2012
31 36 00
Gabions
12/20/2012
31 37 00
Riprap
12/20/2012
Division 32
- Exterior Improvements
3201 17
n^... a-ne"t Asphalt t Pa-vi g Repair-
12/20/2012
3201 18
To.. pef:^ ... A ^. hak Pa-yi g n epai .
12/20/2012
3201 29
Conefete Paving Repa ,
12/20/2012
32 1123
Fle* ble Base Gets see-
12/20/2012
32 1129
Lime Treated Base C.Aeu see
12/20/2012
32 11 33
GamoRt Treated Base G ^^^
12/20/2012
32 1137
Liquid ,;a Treated Seil ctabil ,^,
08/21/2015
32 1216
A spha t Paying
12/20/2012
32 1273
A*halt A-4- n r aek Sea1af t^
12/20/2012
CITY OF FORT WORTH Water & Sanitary Sewer Wichita Industrial
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 104140
Revised March 20, 2020
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 3 of 5
32 13 13
r'^^^r^te Paving
12/20/2012
32 1320
C fef:ete Sidewalks, Driveways and BafFieF Fro^ Ramps
06/05/2018
32 1373
Genefete Pa-vi g joint C'o.,l
12/20/2012
32 1416
B-63k- Urtitpa-vifig
12/20/2012
32 16 13
C f^.^te ruFb and QdReFS ^"a Valley r„tteFS
10/05/2016
32 1723
Pa-ve e t Mar4i figs
11/22/2013
32 1725
CurbAdozz lhi.:skr,g
11/04/2013
3231 13
C!nr. Forzoas ^
12/20/2012
32 31 26
W -e Fenees and rates
12/20/2012
32 31 29
Weed Fences and rates
12/20/2012
3232 13
Cast i Plate C f^.ote D:fn,.-�ing `ems
06/05/2018
3291 19
Topsoil Placement and Finishing of Parkways
12/20/2012
32 92 13
Hydro -Mulching, Seeding, and Sodding
12/20/2012
32 93 43
Trees 3 arubc
12/20/2012
Division 33 -
Utilities
33 01 30
Sewer and Manhole Testing
12/20/2012
33 01 31
Closed Circuit Television (CCTV) Inspection
03/03/2016
3303 10
Bypass Pumping of Existing Sewer Systems
12/20/2012
3304 10
r,,;rt Beading ^"a Qeet iea lsela4ie
12/20/2012
33 04 11
Ceffesion Cetitfel -rest Stetiefis
12/20/2012
33 04 12
r agaesitff Anode r^thedie Pfeteetie S ysteffl
12/20/2012
33 04 30
T^m....,-ary Water- Sefviees
07/01/2011
33 04 40
Cleaning and Acceptance Testing of Water Mains
02/06/2013
33 04 50
Cleaning of Sewer Mains
12/20/2012
3305 10
Utility Trench Excavation, Embedment, and Backfill
12/12/2016
3305 12
Water Line Lowering
12/20/2012
3305 13
Frame, Cover and Grade Rings — Cast Iron
01/22/2016
3305 13.10
Frame, Coyef:�'a* Credo Ri:�z z
01/22/2016
33 OS 14
Adjusting Tv
kil t^Valve Boxes, Sti
12/20/2012
l� aFAieles, and detl�'cste
Gfade
3305 16
Genefete W tef Vaults
12/20/2012
33 05 17
Concrete Collars
12/20/2012
33 05 20
Auger Boring
12/20/2012
33 05 21
Turr-rjl l.inar- Pla4e
12/20/2012
33 05 22
Steel Casing Pipe
12/20/2012
33 05 23
Hand Tu ewliMg
12/20/2012
33 05 24
Installation of Carrier Pipe in Casing or Tunnel Liner Plate
06/19/2013
33 05 26
Utility Markers/Locators
12/20/2012
33 05 30
Location of Existing Utilities
12/20/2012
33 1105
Bolts, Nuts, and Gaskets
12/20/2012
33 11 10
Ductile Iron Pipe
12/20/2012
33 11 11
Ductile Iron Fittings
12/20/2012
33 11 12
Polyvinyl Chloride (PVC) Pressure Pipe
11/16/2018
33 11 13
Eexefet3 Pr000uro Piro, Bar Wfapped, Steei Cyli def Type
12/20/2012
33 11 14
Buried Steel Pipe and Fittings
12/20/2012
33 1210
Water Services 1-inch to 2-inch
02/14/2017
33 1211
r ^ e Wa4e. mote,.^
12/20/2012
33 1220
Resilient Seated Gate Valve
12/20/2012
CITY OF FORT WORTH Water & Sanitary Sewer Wichita Industrial
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 104140
Revised March 20, 2020
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 4 of 5
33 1221
AWWA Rubber -Seated Butterfly Valves
12/20/2012
33 1225
Connection to Existing Water Mains
02/06/2013
33 1230
r,..,..bin io it v i.,o A0ooniWks for- Potable Water- Syste , �
12/20/2012
33 1240
Fire Hydrants
01/03/2014
33 1250
Water Sample Stations
12/20/2012
33 1260
Sta-nd ra Blow eff Valve ve n sseff b!)
06/19/2013
3331 12
Cur-ed in Dlaee Pipe (CIDDI
12/20/2012
3331 13
Fibefg1wo P_ocfer-ee Pipe for- r -a-v t EG.Aita? -Sewer$
12/20/2012
3331 15
High Deal t-y D l.,ethylene (HDPE4 Pipe fe f Sanitary Sewef
12/20/2012
33 31 20
Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe
06/19/2013
33 31 21
Polyvinyl Chlef:ide Closed Profile Gr-avity Sa*iiafy Sewef
12/20/2012
(PVC)
Pipe
33 31 22
ra~' Par F)i* li&rng
12/20/2012
33 31 23
Safiit y Sewe, T' pj Bally cement
12/20/2012
33 31 50
Sanitary Sewer Service Connections and Service Line
04/26/2013
33 31 70
Combi xida if: Valve f3F BGnitwy Sewer Fef:ee Mains
12/20/2012
33 39 10
Cast -in -Place Concrete Manholes
12/20/2012
33 39 20
Precast Concrete Manholes
12/20/2012
33 39 30
F-ibcrglxr_ Manholes
12/20/2012
33 39 40
Wastewater- n eeess Chaff bee: �W n C4
12/20/2012
33 39 60
Epoxy Liners for Sanitary Sewer Structures
12/20/2012
3341 10
Reinforced Concrete Storm Sewer Pipe/Culverts
07/01/2011
3341 11
High Density Polyethylene (HDPE4 Dire for- St.-,.-
12/20/2012
3341 12
Reinf reed Pelyet lene E) Dina
11/13/2015
33 46 00
e„l�
12/20/2012
33 46 01
warm Diuin-.
07/01/2011
33 46 02
T r-,-,mk ���
07/01/2011
33 49 10
Ccol, k: Plyze Manholes and I„n f e Be*es
12/20/2012
33 49 20
Curl' and T'"^" blots
12/20/2012
33 49 40
Stor. DId-nsa^e 14ead ^ells and Wingwells
07/01/2011
Division 34 -
Transportation
3441 10
'T'r^rfi^ Sigga is
10/12/2015
3441 10.01
ARaehmef4 ACptreller Cabinet
12/18/2015
3441 10.02
Attaehmeat B C-eatfallzr fro men
02/2012
3441 10.03
Attaehment G Se€twafespeei£eatien
01/2012
3441 11
Temper^Y" Tr-affie Signals
11/22/2013
3441 13
Removing ' 'T r-aff e Signals
12/20/2012
3441 15
Reetangulx Ram d FlwJhxg Been
11/22/2013
3441 16
gedoo*�aA I-I;brid Signal
11/22/2013
34 41 20
Read Illurncyatia Assemblies
12/20/2012
34 41 20.01
ArtolVJ.
06/15/2015
34 41 20.02
Free ay LED Read '
06/15/2015
34 41 20.03
Residential LED Readw" ' Dan. irswi-es
06/15/2015
34 41 30
Aluminum E"igns
11/12/2013
34 41 50
Single e r lode Fiber- artie r 1.1 0
02/26/2016
3471 13
Traffic Control
11/22/2013
CITY OF FORT WORTH Water & Sanitary Sewer Wichita Industrial
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN 104140
Revised March 20, 2020
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Appendix
Page 5 of 5
FG4,91
Availulit-y' ,.P
GG 4.02
Fi.-./arr e . a a Physie i r n a; iefi
Fib-406
IhzGrI etis Enyi efff ,en4a Condition , 4 Site
GG 6.07
W
GG-6-M
f\ar iitvax.a r T
1
1`T�ac�atian
GR-01 60 00 Product Requirements
END OF SECTION
CITY OF FORT WORTH Water & Sanitary Sewer Wichita Industrial
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 104140
Revised March 20, 2020
UNIT PRICE BID
Bidlist Item
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
Wichita Industrial - CPN: 104140
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Project Item Infonuation
Description
Specification Section
Unit of
No.
Measure
UNIT I: WATER IMPROVEMEN—S
3311.0441 12" Water Pipe
3311 12
LF
3311.0241 8" Water Pipe
3311 12
LF
3311.0451 12" DIP Water
3311 10
LF
9999.0001 24" Steel Encasement
99 99 99
LF
3312.0117 Connection to Ex. 4"-12" Water Main
33 12 25
EA
3312.3005 12" Gate Valve
33 12 20
EA
3312.3003 8" Gate Valve
33 12 20
EA
3312.0001 Fire Hydrant
33 12 20
EA
3311.0001 Ductile Iron Water Fittings w/ Restraint
3311 11
TON
0241.1118 4" - 12" Pressure Plug
0241 14
EA
3305.0109 Trench Safety
34 05 10
LF
3312.2203 2" Water Service (Domestic)
33 12 10
EA
3312.2203 2" Water Service (Irrigation)
33 12 10
EA
3312.4211 24"X12" Tapping Sleeve and Valve
33 12 25
EA
3305.0005 12" Waterline Lowering
33 05 12
EA
9999.0002 Rip Rap
99 99 99
SF
3305.0203 Imported Embed ment/Backfill, CLSM
33 05 10
CY
00 42 43
DAP - BID PROPOSAL
Page 1 of4
Bidder's Application
Bid
Quantity
1613
105
175
175
1
4
3
3
2.25
4
1893
3
3
1
2
4200
78
TOTAL UNIT I: WATER IMPROVEMENTS
Bidder's Proposal
Unit Price I Bid Value
$110.00
$78.00
$200.00
$300.00
$7,500.00
$4,150.00
$2,150.00
$4,500.00
$12,500.00
$1, 000.00
$1.50
$5,000.00
$3,000.00
$33,500.00
$6,600.00
$1.25
$100.00
1
$177,430.00 1
$8,190.00 1
$35,000.00 1
$52,500.00 1
$7,500.00 1
$16,600.00 1
$6,450.00 1
$13,500.00 1
$28,125.00 1
$4,000.00 1
$2,839.50 1
$15,000.00 1
$9,000.00 1
$33,500.00 1
$13,200.00 1
$5,250.00 1
$7,800.00 1
$435,884.50 1
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019 Copy of 00 42 43_Bid Proposal_DAP - 2022.11.16
UNIT PRICE BID
Bidlist Item
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
Wichita Industrial - CPN: 104140
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Project Item Infonuation
Description
I Specification Section
Unit of
No.
Measure
UNIT II: SANITARY SEWER IMPROVEMENTS
3339.1001 4' Sewer Manhole
0241 14
EA
3339.1101 5' Sewer Manhole
33 39 10
EA
9999.0003 5' Sewer Manhole w/ Watertight Gaskets & 99 99 99
EA
Covers
9999.0004 4' Sewer Manhole w/ Watertight Gaskets & 99 99 99
EA
Covers
3331.4115 8" Sewer Pipe
3311 10
LF
3331.4225 18" Sewer Pipe
3311 10
LF
3331.4229 18" DIP Sewer
3311 10
LF
3331.4226 18" Sewer Pipe, CSS Backfill
3311 10
LF
3305.0109 Trench Safety
33 05 10
LF
3339.0001 Epoxy Manhole Liner
33 39 60
VF
3301.0002 Post -CCTV Inspection
3301 31
LF
3301.0101 Manhole Vacuum Testing
3301 30
EA
3331.5756 18" Sewer Pipe, CLSM Backfill
3311 10
LF
9999.0004 Rip Rap
99 99 99
SF
3331.4227 18" Sewer Pipe, Select Backfill
3311 10
LF
0241.2015 Remove 12" Sewer Line
0241 14
LF
0241.2201 Remove 4' Sewer Manhole
0241 14
EA
9999.0005 36" Steel Encasement
99 99 99
LF
00 42 43
DAP - BID PROPOSAL
Page 2 of 4
Bidder's Application
Bidder's Proposal
Bid Unit Price Bid Value
Quantity
3 $9,250.00
6 $11,500.00
1 $17,000.00
1 $15,700.00
355
$100.00
1587
$200.00
443
$440.00
20
$380.00
1942
$1.50
130
$15.00
1942
$3.00
1942
$2.00
280
$195.00
12720
$1.25
120
$80.00
1393
$30.00
5
$1,250.00
290
$478.00
TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS
1
$27,750.00 1
$69,000.00 1
$17,000.00
$15,700.001
$35,500.00 1
$317,400.00 1
$194,920.00 1
$7,600.00 1
$2,913.00 1
$1,950.00 1
$5,826.00 1
$3,884.00 1
$54,600.00 1
$15,900.00 1
$9,600.00 1
$41,790.001
$6,250.00 1
$138,620.00 1
$966,203.00 1
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019 Copy of 00 42 43_13id Proposal_DAP - 2022.11.16
Wichita Industrial - CPN: 104140
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP - BID PROPOSAL
Page 3 of 4
Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item I Specification Section Unit of Bid
Description Unit Price Bid Value
No. No. Measure Quantity
Bid Summary
UNIT I: WATER IMPROVEMENTS $435,884.501
UNIT II: SANITARY SEWER IMPROVEMENTS $966,203.001
1
Total Construction Bid $1,402,087.50 1
This Bid is submitted by the entity named below:
BIDDER:
Bratjen Construction Company
1701 E Lamar Blvd.
Suite 290
Arlington, TX 76006
Contractor agrees to complete WORK for FINAL ACCEPTANCE within
CONTRACT commences to run as provided in the General Conditions.
BY: Benjamin Bratcher
Ben Bratcher
TITLE: CEO
DATE: 11 /16/2022
END OF SECTION
1 180 working days after the date when the
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019 Copy of 00 42 43_Bid Proposal DAP - 2022.11.16
0045 12
DAP PREQUALIFICATION STATEMENT
Page 1 of 1
SECTION 00 45 12
DAP — PREQUALIFICATION STATEMENT
Each Bidder is required to complete the information below by identifying the prequalified contractors
and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Maior Work
Tvpe" box provide the complete maior work tvpe and actual description as _provided by the Water
Department for water and sewer and TPW for paving.
Major Work Type
Water New Development, Rehabilitation, and
Redevelopment Open Cut (42" and Under)
Wastewater New Development, Rehabilitation,
and Redevelopment Open Cut (42" and Under)
Contractor/Subcontractor
Company Name
Venus Construction Company
Venus Construction Company
Prequalification
Expiration Date
5/31/2024
5/31/2024
The undersigned hereby certifies that the contractors and/or subcontractors described in the table above
are currently prequalified for the work types listed.
BIDDER:
Bratjen Construction Company BY
1701 E Lamar Blvd., Suite 290
Arlington, TX 76006
TIT CEO
DA'i t: 2/16/2024
END OF SECTION
CITY OF FORT WORTH Water & Sanitary Sewer to Serve Wichita Industrial
STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT— DEVELOPER AWARDED PROJECTS 0045 12_Prequalification Statement 2015_DAP.docx
Form Version September 1, 2015 CPN 104140
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
00 45 26 - 1
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Page 1 of 1
SECTION 00 45 26
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it
provides worker's compensation insurance coverage for all of its employees employed on City
Project No.104140 Contractor further certifies that, pursuant to Texas Labor Code, Section
406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with
worker's compensation coverage.
CONTRACTOR:
Bratien Construction
Company
1701 E Lamar Blvd., Suite 290
Address
Arlington. TX 76006
City/State/Zip
THE STATE OF TEXAS §
COUNTY OF TARRANT §
By: Benj -
-- - ^ ^--�-�--
Signature:
Title: CE(
(Please Print)
BEFORE ME, the undersigned authority, on this day personally appeared
Beniamin C. Bratcher , known to me to be the person whose name is
subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as
the act and deed of Bratien Construction Comaanv for the purposes and
consideration therein expressed and in the capacity therein stated.
GIVEN UNDER MY HAND AND SEAL OF OFFICE this 16th day of
February , 2024
MELONIE LOWRIE�
, ^ ` ,s Notary Public
'•'�• STATE OF TEXAS 1 Notary Public in and for the State of Texas
iD# 13063723-9
My Comm. Exo. Apr. 26, 2024 1
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised April 2, 2014
Water & Sanitary Sewer to Serve Wichita Industrial
CPN.•104140
1
SECTION 00 52 43
005243-1
Developer Awarded Project Agreement
Page 1 of 4
2 AGREEMENT
3 THIS AGREEMENT, authorized on 4/1 /2024 is made by and between the Developer,
4 PRIH/HLCI WICHITA STREET. L.P. authorized to do business in Texas ("Developer") , and
5 SRATJEN CONSTRUCTION COMPANY. authorized to do business in Texas, acting by and
6 through its duly authorized representative, ("Contractor").
7 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as
8 follows:
9 Article I. WORK
10 Contractor shall complete all Work as specified or indicated in the Contract Documents for the
11 Project identified herein.
12 Article 2. PROJECT
13 The project for which the Work under the Contract Documents may be the whole or only a part is
14 generally described as follows:
15 WICHITA INDUSTRIAL
16 CITY PROJECT NO. I04140
17 Article 3. CONTRACT TIME
18 3.1 Time is of the essence.
19 All titne limits for Milestones, if any, and Final Acceptance as stated in the Contract
20 Documents are of the essence to this Contract.
21 3.2 Final Acceptance.
22 The Work will be complete for Final Acceptance within 180 working days after the date
23 when the Contract Time commences to run as provided in Paragraph 12.04 of the Standard
24 City Conditions of the Construction Contract for Developer Awarded Projects.
25 3.3 Liquidated damages
26 Contractor recognizes that time is of the essence of this Agreement and that Developer
27 will suffer financial loss if the Work is not completed within the times specified in
28 Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of
29 the Standard City Conditions of the Construction Contract for Developer Awarded
30 Projects. The Contractor also recognizes the delays, expense and difficulties involved in
31 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not
32 completed on time. Accordingly, instead of requiring any such proof , Contractor agrees
33 that as liquidated damages for delay (but not as a penalty), Contractor shall pay
34 Developer ZERO Dollars $0.00 for each day that expires after the time specified in
35 Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of Acceptance.
CITY OF FORT WORTH Water & Sanitary Sewer to Serve Wichita Industrial
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104140
Revised June 16, 2016
005243 -2
Developer Awarded Project Agreement
Page 2 of 4
36 Article 4. CONTRACT PRICE
37 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract
38 Documents an amount in current funds of ONE MILLION FOUR HUNDRED TWO
39 THOUASAND EIGHTY-SEVEN DOLLARS AND FIFTY CENTS ($1.402.087.50).
40 Article 5. CONTRACT DOCUMENTS
41
5.1 CONTENTS:
42
A. The
Contract Documents which comprise the entire agreement between Developer and
43
Contractor
concerning the Work consist of the following:
44
1.
This Agreement.
45
2.
Attachments to this Agreement:
46
a. Bid Form (As provided by Developer)
47
1) Proposal Form (DAP Version)
48
2) Prequalification Statement
49
3) State and Federal documents (project specific)
50
b. Insurance ACORD Form(s)
51
c. Payment Bond (DAP Version)
52
d. Performance Bond (DAP Version)
53
e. Maintenance Bond (DAP Version)
54
f. Power of Attorney for the Bonds
55
g. Worker's Compensation Affidavit
56
h. MBE and/or SBE Commitment Form (If required)
57
3.
Standard City General Conditions of the Construction Contract for Developer
58
Awarded Projects.
59
4.
Supplementary Conditions.
60
5.
Specifications specifically made a part of the Contract Documents by attachment
61
or, if not attached, as incorporated by reference and described in the Table of
62
Contents of the Project's Contract Documents.
63
6.
Drawings.
64
7.
Addenda.
65
8.
Documentation submitted by Contractor prior to Notice of Award.
66
9.
The following which may be delivered or issued after the Effective Date of the
67
Agreement and, if issued, become an incorporated part of the Contract Documents:
68
a. Notice to Proceed.
69
b. Field Orders.
70
c. Change Orders.
71
d. Letter of Final Acceptance.
72
73
CITY OF FORT WORTH Water & SeaiWy Sewer to Serve Wichita Industrial
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS CPN: 104140
Revised Jme 16, 2016
005243-3
Developer Awarded Project Agreement
Page 3 of
74 Article 6. INDEMNIFICATION
75 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
76 expense, the city, its officers, servants and employees, from and against any and all
77 claims arising out of, or alleged to arise out of, the work and services to be
78 performed by the contractor, its officers, agents, employees, subcontractors, licenses
79 or invitees under this contract. This indemnification Drovision is svecifically
80 intended to operate and be effective even if it is alleged or Droven that all or some of
81 the damages being sought were caused, in whole or in Dart, by anv act, omission or
82 negligence of the citv. This indemnity provision is intended to include, without
83 limitation, indemnity for costs, expenses and legal fees incurred by the city in
84 defending against such claims and causes of actions.
85
86 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense,
87
the city, its officers, servants and employees, from and against any and all loss, damage
88
or destruction of property of the city, arising out of, or alleged to arise out of, the work
89
and services to be performed by the contractor, its officers, agents, employees,
90
subcontractors, licensees or invitees under this contract. This indemnification
91
Drovision is suecificallv intended to overate and be effective even if it is alleged or
92
Droven that all or some of the damages being sought were caused. in whole or in Dart.
93
by anv act. omission or negligence of the citv.
94
95
Article 7. MISCELLANEOUS
96
7.1
Terms.
97
Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of
98
the Construction Contract for Developer Awarded Projects.
99
7.2
Assignment of Contract.
100
This Agreement, including all of the Contract Documents may not be assigned by the
101
Contractor without the advanced express written consent of the Developer.
102
7.3
Successors and Assigns.
103
Developer and Contractor each binds itself, its partners, successors, assigns and legal
104
representatives to the other party hereto, in respect to all covenants, agreements and
105
obligations contained in the Contract Documents.
106
7.4
Severability.
107
Any provision or part of the Contract Documents held to be unconstitutional, void or
108
unenforceable by a court of competent jurisdiction shall be deemed stricken, and all
109
remaining provisions shall continue to be valid and binding upon DEVELOPER and
110
CONTRACTOR -
ill
7.5
Governing Law and Venue.
112
This Agreement, including all of the Contract Documents is performable in the State of
113
Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the
114
Northern District of Texas, Fort Worth Division.
CITY OF FORT WORTH Water & Sanitary Sewer to Serve Winldta Industrial
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS CPN: 104140
Revised Jane 16, 2016
005243-4
Developer Awarded Project Agreement
Page 4 of 4
115
116 7.6 Authority to Sign.
117 Contractor shall attach evidence of authority to sign Agreement, if other than duly
118 authorized signatory of the Contractor.
119
120 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple
121 counterparts.
122
123 This Agreement is effective as of the last date signed by the Parties ("Effective Date').
124
125
Contractor:
Bratjen Construction Company
By:
j (Signature)
Beniamin C. Bratcher - --
(Printed Name)
Developer:
r<
B Or1 !A
Jgnature
RUTTCN W NS FuKo
(Printed Name)
Title: CEO Title: VP OF GFA/CRAL PAKTNrtt
Company Name: Bratjen Construction Company name:PK IIt/RLC1 WICHIrA STp.FCT, LT.
Address: 1701 E. Lamar Blvd. Address:5g5o 6kP FSHIRE LN
Suite 290 SUITC qoo
City/state/Zip: Arlington, TX 76006
2/16/2024
Date
City/State/Zip: PA -Lk, Tx 7522S
Li/i /ZoZy
Date
CITY OF FORT WORTH Water& Sanitary Sewer W serve Wichita Indws l
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN: 104140
Revised June 16, 2016
EXECUTED IN TRIPLICATE 006219-1
MAINTENANCE BOND
Page 1 of 3
Bond No.107969751
1 SECTION 00 62 19
2 MAINTENANCE BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That we Bratien Construction Comganv , known as
8 "Principal" herein and Travelers Casualty and Suretv Company of America a corporate surety
9 (sureties, if more than one) duly authorized to do business in the State of Texas, known as
10 "Surety" herein (whether one or more), are held and firmly bound unto the Developer,
11 (PRIII/HLCI WICHITA STREET, L.P.I authorized to do business in Texas ("Developer") and
12 the City of Fort Worth, a Texas municipal corporation ("City"), in the sum of ONE MILLION
13 FOUR HUNDRED TWO THOUSAND EIGHTY-SEVEN DOLLARS AND FIFTY CENTS
14 (S1,402,087.50), lawful money of the United States, to be paid in Fort Worth, Tarrant County,
15 Texas, for payment of which sum well and truly be made jointly unto the Developer and the City
16 as dual obligees and their successors, we bind ourselves, our heirs, executors, administrators,
17 successors and assigns, jointly and severally, firmly by these presents.
18
19 WHEREAS, Developer and City have entered into an Agreement for the construction of
20 community facilities in the City of Fort Worth by and through a Community Facilities
21 Agreement, CFA Number CFA22-0169 and
22 WHEREAS, the Principal has entered into a certain written contract with the Developer
23 awarded the 1 st day of ADrll . 2024, which Contract is hereby referred to and made a
24 part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor
25 and other accessories as defined by law, in the prosecution of the Work, including any Work
26 resulting from a duly authorized Change Order (collectively herein, the "Work") as provided for
27 in said Contract and designated as WICHITA INDUSTRIAL. 104140; and
28
29 WHEREAS, Principal binds itself to use such materials and to so construct the Work in
30 accordance with the plans, specifications and Contract Documents that the Work is and will
31 remain free from defects in materials or workmanship for and during the period of two (2) years
32 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and
33
CITY OF FORT WORTH Water & Sanitary Sewer to Serve Wichita Industrial
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN:104140
Revised January 31, 2012
006219-2
MAINTENANCE BOND
Page 2 of 3
1 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part
2 upon receiving notice from the Developer and/or City of the need thereof at any time within the
3 Maintenance Period.
4
5 NOW THEREFORE, the condition of this obligation is such that if Principal shall
6 remedy any defective Work, for which timely notice was provided by Developer or City, to a
7 completion satisfactory to the City, then this obligation shall become null and void; otherwise to
8 remain in full force and effect.
9
10 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely
11 noticed defective Work, it is agreed that the Developer or City may cause any and all such
12 defective Work to be repaired and/or reconstructed with all associated costs thereof being borne
13 by the Principal and the Surety under this Maintenance Bond; and
14
15 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
16 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
17 Worth Division; and
18
19 PROVIDED FURTHER, that this obligation shall be continuous in nature and
20 successive recoveries may be had hereon for successive breaches.
21
22
23
CITY OF FORT WORTH Water & Sanitary Sewer to Serve Wichita Industrial
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN:104140
Revised January 31, 2012
006219-3
MAINTENANCE BOND
Page 3 of 3
1 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this
2 instrument by duly authorized agents and officers on this the 1 St day of
3 April 2094.
4
5
6
7
8
9
10
11 ATTEST:
12
13:__-
14 (Pipal)2wa_ �
15
16
17
18
19
20 Witness as to Principal
21
22
23
24
25
26
27
28
29 ATTEST:
31 J,
3(wit
32 (S s yn Simchik, Witness
33
34
35 ess as to Surety Alex Rausch, Witness
36
Dn TXTrTn e T
Benjamin C. Bratcher. CEO
Name and Title
Address: 1701 E Lamar Blvd.
Arlington TX 76006
SURETY:
Travelers Casualty and Surety Company of America
BY:
Signature
Sean J McCauley, Jr., Attomey-in-Fact
Name and Title
Address: One Tower Square
Hartford, CT 06183
Telephone Number: (860) 277-0111
37 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract
38 from the by-laws showing that this person has authority to sign such obligation. If
39 Surety's physical address is different from its mailing address, both must be provided.
40
41 The date of the bond shall not be prior to the date the Contract is awarded.
42
CITY OF FORT WORTH Water & Sanitary Sewer to Serve Wichita Industrial
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN.•104140
Revised January 31, 2012
EXECUTED IN TRIPLICATE
006213-1
PERFORMANCE BOND
Page 1 of 3
Bond No.107969751
1 SECTION 00 62 13
2 PERFORMANCE BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That we, Bratjen Construction Company , known as
8 "Principal" herein and Travelers Casualty and Surety Company of America , a corporate
9 surety(sureties, if more than one) duly authorized to do business in the State of Texas, known as
10 "Surety" herein (whether one or more), are held and firmly bound unto the Developer,
11 PRIH/HLCI WICHITA STREET. L.P. authorized to do business in Texas ("Developer") and
12 the City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum of, ONE
13 MILLION FOUR HUNDRED TWO THOUSAND EIGHTY-SEVEN DOLLARS AND
14 FIFTY CENTS ($1.402,087.50), lawful money of the United States, to be paid in Fort Worth,
15 Tarrant County, Texas for the payment of which sum well and truly to be made jointly unto the
16 Developer and the City as dual obligees, we bind ourselves, our heirs, executors, administrators,
17 successors and assigns, jointly and severally, firmly by these presents.
18 WHEREAS, Developer and City have entered into an Agreement for the construction of
19 community facilities in the City of Fort Worth by and through a Community Facilities
20 Agreement, CFA Number CFA22-0169 and
21 WHEREAS, the Principal has entered into a certain written contract with the Developer awarded
22 the 1 St day of April , 2024, which Contract is hereby referred to and made a
23 part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor
24 and other accessories defined by law, in the prosecution of the Work, including any Change
25 Orders, as provided for in said Contract designated as WICHITA INDUSTRIAL.
26 NOW, THEREFORE, the condition of this obligation is such that if the said Principal
27 shall faithfully perform it obligations under the Contract and shall in all respects duly and
28 faithfully perform the Work, including Change Orders, under the Contract, according to the plans,
29 specifications, and contract documents therein referred to, and as well during any period of
30 extension of the Contract that may be granted on the part of the Developer and/or City, then this
31 obligation shall be and become null and void, otherwise to remain in full force and effect.
CITY OF FORT WORTH Water & Sanitary Sewer to Serve Wichita Industrial
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN: 104140
Revised January 31, 2012
006213-2
PERFORMANCE BOND
Page 2 of 3
1 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
2 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
3 Worth Division.
4 This bond is made and executed in compliance with the provisions of Chapter 2253 of the
5 Texas Government Code, as amended, and all liabilities on this bond shall be determined in
6 accordance with the provisions of said statue.
7 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED
8 this instrument by duly authorized agents and officers on this the 1 St day of
9 April 2o24.
10
11
12
13
14
15
16
16 ATTES'I':
17 r
19 (Yrtlacipal) Secretaft Q _ �; t��
20
21
22
23
24
25 Witness as to Principal
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40 Witness as to Surety -flex Rausch, Witness
41
42
43
DD TAT(`TD AT .
Benjamin C. Bratcher. CFO
Name and Title
Address: 1701 E Lamar Blvd.
Arlinaton TX 76006
SURETY:
Travelers Casualtv and Suretv Companv of America
4
l _
BY:
Signature
Sean J McCauley, Jr., Attorney -in -Fact
Name and Title
Address: One Tower Square
Hartford. CT 06183
Telephone Number: (860) 277-0111
44 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract
45 from the by-laws showing that this person has authority to sign such obligation. If
46 Surety's physical address is different from its mailing address, both must be provided.
47
CITY OF FORT WORTH Water & Sanitary Sewer to Serve Wichita Industrial
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN: 104140
Revised January 31, 2012
0062 13 -3
PERFORMANCE BOND
Page 3 of 3
The date of the bond shall not be prior to the date the Contract is awarded.
CITY OF FORT WORTH Water & Sanitary Sewer to Serve Wichita Industrial
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN: 104140
Revised January 31, 2012
EXECUTED IN TRIPLICATE
006214-1
PAYMENTBOND
Page 1 of 2
Bond No.107969751
1 SECTION 00 62 14
2 PAYMENT BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That we, Bratjen Construction Company known as
8 "Principal" herein, and Travelers Casualtv and Surety Companv of America a
9 corporate surety ( or sureties if more than one), duly authorized to do business in the State of
10 Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the
11 Developer, PRHI/HLCI WICHITA STREET. L.P. authorized to do business in Texas
12 "(Developer"), and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal
13 sum of ONE MILLION FOUR HUNDRED TWO THOUSAND EIGHTY-SEVEN,
14 DOLLARS AND FIFTY CENTS ($1,402.087.50), lawful money of the United States, to be
15 paid in Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be made
16 jointly unto the Developer and the City as dual obligees, we bind ourselves, our heirs, executors,
17 administrators, successors and assigns, jointly and severally, firmly by these presents:
18 WHEREAS, Developer and City have entered into an Agreement for the construction of
19 community facilities in the City of Fort Worth, by and through a Community Facilities
20 Agreement, CFA Number CFA22-0169 and
21 WHEREAS, Principal has entered into a certain written Contract with Developer,
22 awarded the 1 St day of April , 20 24 , which Contract is hereby
23 referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all
24 materials, equipment, labor and other accessories as defined by law, in the prosecution of the
25 Work as provided for in said Contract and designated as WICHITA INDUSTRIAL.
26 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if
27 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in
28 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under
29 the Contract, then this obligation shall be and become null and void; otherwise to remain in full
30 force and effect.
CITY OF FORT WORTH Water & Sanitary Sewer to Serve Wichita Industrial
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN: 104140
Revised January 31, 2012
1
2
3
4
5
6
7
8
9
10
11
12
13
14
006214-2
PAYMENT BOND
Page 2 of 2
This bond is made and executed in compliance with the provisions of Chapter 2253 of the
Texas Government Code, as amended, and all liabilities on this bond shall be determined in
accordance with the provisions of said statute.
IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED
this instrument by duly authorized agents and officers on this the 1 St day of
April 2024
1Ntpal)
�.OrdL
Witness as to Principal
ATTEST:
�i��
(S rety) �,ynshlSimchik, Witness
at_, /---
Witness as to Surety Alex Rausch, Witness
PRINCIPAL:
I
Benjamin C. Bratcher, CEO
Name and Title
Address: 1701 E Lamar Blvd.
Arlinqton TX 76006
SURETY:
Travelers Casualtv and Suretv Companv of America
BY:
Signature
Sean J McCauley, Jr., Attornev-in-Fact
Name and Title
Address: One Tower Square
Hartford, CT 06183
Telephone Number: (860) 277-0111
Note: If signed by an officer of the Surety, there must be on file a certified extract from the
bylaws showing that this person has authority to sign such obligation. If Surety's physical
address is different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
END OF SECTION
CITY OF FORT WORTH Water & Sanitary Sewer to Serve Wichita Industrial
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN: 104140
Revised January 31, 2012
Travelers Casualty and Surety Company of America
CAW Travelers Casualty and Surety Company
TRAVELERS St. Paul Fire and Marine Insurance Company
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and
St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein
collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint SEAN J MCCAULEY JR of
DALLAS , Texas their true and lawful Attorney(s)-in-Fact to sign, execute, seal and
acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of
the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or
guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law.
IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 21st day of April,
2021.
OX' 7iF �Jp4TY Ay�.�
HAMM
N. 'CON
G
State of Connecticut
City of Hartford ss.
By:
rR*bertRane enior Vice President
On this the 21st day of April, 2021, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior
Vice President of each of the Companies, and that he, as such, being authorized so to do, executed the foregoing instrument for the
purposes therein contained by signing on behalf of said Companies by himself as a duly authorized officer.
IN WITNESS WHEREOF, I hereunto set my hand and official seal.
My Commission expires the 30th day of June, 2026
MWO Anna P. Nowik, Notary Public
This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of each of
the Companies, which resolutions are now in full force and effect, reading as follows:
RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice
President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint
Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority
may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings
obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may
remove any such appointee and revoke the power given him or her; and it is
FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or
any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided
that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is
FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance,
or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive
Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the
Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary;
or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her
certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is
FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President,
any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to
any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in -
Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of
Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed
and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or
understanding to which it is attached.
I, Kevin E. Hughes, the undersigned, Assistant Secretary of each of the Companies, do hereby certify that the above and foregoing is a
true and correct copy of the Power of Attorney executed by said Companies, which remains in full force and effect.
Dated this day of
®rflp�
J�44Y —W4 IN aq,
W ONN. 4
FM
Hughes, Assi tant Secretary
To verify the authenticity of this Fower oft ftorn&y, please call us at 1-800-411-3880.
Please refer to the above -named Attorneys) -in -Fact and the det,yils of the bond to which this Power ofAttorney is attached.
'nil IfRMC-111
z :e*
Certificate of Authority
c=pI with the laws of the Sty of Texas applicable thereto and Is hereby auftrized to transact tbe
busing of
Fire: Allied Coverages; Hail —growing crops only: i nInland Marine;
Ocean Marine; Aircraft --Liability & Physical Damage; workers'
CQmpensation & Employers' Liability, Liability
Automobile --Liability Physical D ag ; Liability other than
Automobile; Fidelity & Surety; Mass; Burglary "Theft; Forgery;
Boiler & Machinery; Credit; Livestock and Reinsurance on all limes
authorized to he written on A dit-6dt b,ssts
insurance within the stares of T+cxas. This Certificate of Autberity shall be in full farce and effect until it is
revoked, canceled or suspended according to law.
IN TESTIMONY HOMP. wimess my hand and seal of
offcc at Austin, Texss, tMs
list day of my A.D. 1"'
ELTON 50bWA
COMMISSIONER OF INSLMANCE
l
BY
A. Wilcox
Director
Insurer Ser iO
IMPORTANT NOTICE
To obtain information or make a complaint:
You may call Travelers Casualty and Surety Company of America and its affiliates'
toll -free telephone number for information or to make a complaint at:
1-800-328-2189
You may contact the Texas Department of Insurance to obtain information on
companies, coverages, rights or complaints at:
1-800-252-3439
You may write the Texas Department of Insurance:
P. O. Box 149104
Austin, TX 78714-9104
Fax: (512) 475-1771
Web: httr)://www.tdi.state.tx.us
E-mail: ConsumerProtection(d)tdi.state.tx.us
PREMIUM OR CLAIM DISPUTES:
Should you have a dispute concerning your premium or about a claim you should
contact your Agent or Travelers first. if the dispute is not resolved, you may contact the
Texas Department of Insurance.
ATTACH THIS NOTICE TO YOUR BOND:
This notice is for information only and does not become a part or condition of the
attached document and is given to comply with Texas legal and regulatory requirements.
(PN-042-B) Ed.10.18.07
STANDARD CITY CONDITIONS
OF THE CONSTRUCTION CONTRACT
FOR DEVELOPER AWARDED PROJECTS
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
STANDARD CITY CONDITIONS OF THE
CONSTRUCTION CONTRACT
FOR DEVELOPER AWARDED PROJECTS
TABLE OF CONTENTS
Article 1 — Definitions and Terminology..........
1.01 Defined Terms ...............................
1.02 Terminology ..................................
Article 2 —
Preliminary Matters .......................
2.01
Before Starting Construction......
2.02
Preconstruction Conference........
2.03
Public Meeting ............................
Page
.............................................1
.............................................1
............................................. 5
....................................................... 6
....................................................... 6
....................................................... 6
....................................................... 6
Article 3 — Contract Documents and Amending............................................................................................... 6
3.01 Reference Standards..................................................................................................................... 6
3.02 Amending and Supplementing Contract Documents.................................................................. 6
Article 4 — Bonds and Insurance....................................................................................................................... 7
4.01 Licensed Sureties and Insurers..................................................................................................... 7
4.02 Performance, Payment, and Maintenance Bonds........................................................................ 7
4.03 Certificates of Insurance............................................................................................................... 7
4.04 Contractor's Insurance.................................................................................................................. 9
4.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................12
Article 5 —
Contractor's Responsibilities........................................................................................................12
5.01
Supervision and Superintendent.................................................................................................12
5.02
Labor; Working Hours................................................................................................................13
5.03
Services, Materials, and Equipment...........................................................................................13
5.04
Project Schedule..........................................................................................................................14
5.05
Substitutes and "Or-Equals".......................................................................................................14
5.06
Pre -Qualification of Bidders (Prime Contractors and Subcontractors).....................................16
5.07
Concerning Subcontractors, Suppliers, and Others...................................................................16
5.08
Wage Rates..................................................................................................................................18
5.09
Patent Fees and Royalties...........................................................................................................19
5.10
Laws and Regulations.................................................................................................................19
5.11
Use of Site and Other Areas.......................................................................................................19
5.12
Record Documents......................................................................................................................20
5.13
Safety and Protection..................................................................................................................
21
5.14
Safety Representative.................................................................................................................21
5.15
Hazard Communication Programs.............................................................................................22
5.16
Submittals....................................................................................................................................22
5.17
Contractor's General Warranty and Guarantee..........................................................................23
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
5.18 Indemnification ............................................
5.19 Delegation of Professional Design Services
5.20 Right to Audit: .............................................
5.21 Nondiscrimination ........................................
Article 6 - Other Work at the Site.......
6.01 Related Work at Site .......
Article 7 - City's Responsibilities ............................................
7.01 Inspections, Tests, and Approvals .......................
7.02 Limitations on City's Responsibilities ................
7.03 Compliance with Safety Program ........................
Article 8 - City's Observation Status During Construction.......
8.01 City's Project Representative .................................
8.02 Authorized Variations in Work ..............................
8.03 Rejecting Defective Work ......................................
8.04 Determinations for Work Performed ......................
Article 9 - Changes in the Work ......................
9.01 Authorized Changes in the Work
9.02 Notification to Surety ...................
Article 10 - Change of Contract Price; Change of Contract Time
10.01 Change of Contract Price ...........................................
10.02 Change of Contract Time ...........................................
10.03 Delays.........................................................................
Article 11 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work ............
11.01 Notice of Defects..............................................................................................................
11.02 Access to Work.................................................................................................................
11.03 Tests and Inspections........................................................................................................
11.04 Uncovering Work.............................................................................................................
11.05 City May Stop the Work...................................................................................................
11.06 Correction or Removal of Defective Work......................................................................
11.07 Correction Period..............................................................................................................
11.08 City May Correct Defective Work...................................................................................
Article 12 - Completion ...........................................
12.01 Contractor's Warranty of Title ............
12.02 Partial Utilization .................................
12.03 Final Inspection ....................................
12.04 Final Acceptance ..................................
Article 13 - Suspension of Work .....................................
13.01 City May Suspend Work .............................
Article 14 - Miscellaneous .........................................
14.01 Giving Notice .........................................
CITY OF FORT WORTH
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
24
24
25
25
26
26
26
26
26
27
a
a
... 29
... 29
... 29
... 29
... 30
... 30
... 30
... 30
... 31
................................. 32
................................. 32
................................. 32
................................. 32
................................. 33
............................................................. 33
............................................................. 33
34
34
14.02 Computation of Times................................................................................................................ 34
14.03 Cumulative Remedies................................................................................................................. 34
14.04 Survival of Obligations...............................................................................................................35
14.05 Headings......................................................................................................................................35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 1
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 1 of 35
ARTICLE 1— DEFINITIONS AND TERMINOLOGY
1.01 Defined Terms
A. Wherever used in these General Conditions or in other Contract Documents, the terms listed
below have the meanings indicated which are applicable to both the singular and plural thereof,
and words denoting gender shall include the masculine, feminine and neuter. Said terms are
generally capitalized or written in italics, but not always. When used in a context consistent with
the definition of a listed -defined term, the term shall have a meaning as defined below whether
capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial
capital letters in the Contract Documents include references to identified articles and paragraphs,
and the titles of other documents or forms.
1. Agreement - The written instrument which is evidence of the agreement between Developer
and Contractor covering the Work
2. Asbestos —Any material that contains more than one percent asbestos and is friable or is
releasing asbestos fibers into the air above current action levels established by the United
States Occupational Safety and Health Administration.
3. Business Day — A business day is defined as a day that the City conducts normal business,
generally Monday through Friday, except for federal or state holidays observed by the City.
4. Buzzsaw — City's on-line, electronic document management and collaboration system.
5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight.
6. City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by,
its governing body through its City Manager, his designee, or agents authorized pursuant to
its duly authorized charter on his behalf.
7. Community Facilities Agreement (CFA) A Contract between the Developer and the City
for the Construction of one or more following public facilities within the City public right-of-
way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs.
A CFA may include private facilities within the right-of-way dedicated as private right-of-
way or easement on a recorded plat.
8. Contract —The entire and integrated written document incorporating the Contract
Documents between the Developer, Contractor, and/or City concerning the Work. The
Contract supersedes prior negotiations, representations, or agreements, whether written or
oral.
9. Contract Documents —Those items that make up the contract and which must include the
Agreement, and it's attachments such as standard construction specifications, standard City
Conditions, other general conditions of the Developer, including:
a. An Agreement
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10-2
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 2 of 35
b. Attachments to the Agreement
i. Bid Form
ii. Vendor Compliance with State Law Non -Resident Bidder
iii. Prequalification Statement
C. Current Prevailing Wage Rates Table (if required by City)
d. Insurance Accord Form
e. Payment Bond
f. Performance Bond
g. Maintenance Bond
h. Power of Attorney for Bonds
i. Workers Compensation Affidavit
j. MWBE Commitment Form( If required by City)
k. General Conditions
1. Supplementary Conditions
in. The Standard City Conditions
n. Specifications specifically made part of the Contract Documents by attachment, if
not attached, as incorporated by reference and described in the Table of Contents of
the Project's Contract Documents
o. Drawings
P. Documentation submitted by contractor prior to Notice of Award.
q. The following which may be delivered or issued after the effective date if the
Agreement and, if issued become an incorporated part of the Contract Documents
i. Notice to Proceed
ii. Field Orders
iii. Change Orders
iv. Letters of Final Acceptance
r. Approved Submittals, other Contractor submittals, and the reports and drawings of
subsurface and physical conditions are not Contract Documents.
10. Contractor —The individual or entity with whom Developer has entered into the Agreement.
11. Day or day —A day, unless otherwise defined, shall mean a Calendar Day.
12. Developer — An individual or entity that desires to make certain improvements within the
City of Fort Worth
13. Drawings —That part of the Contract Documents prepared or approved by Engineer which
graphically shows the scope, extent, and character of the Work to be performed by
Contractor. Submittals are not Drawings as so defined.
14. Engineer —The licensed professional engineer or engineering firm registered in the State of
Texas performing professional services for the Developer.
15. Final Acceptance — The written notice given by the City to the Developer and/or Contractor
that the Work specified in the Contract Documents has been completed to the satisfaction of
the City.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 3
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 3 of 35
16. Final Inspection — Inspection carried out by the City to verify that the Contractor has
completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in
conformance with the Contract Documents.
17. General Requirements —A part of the Contract Documents between the Developer and a
Contractor.
18. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes,
and orders of any and all governmental bodies, agencies, authorities, and courts having
jurisdiction.
19. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or
personal property.
20. Milestone —A principal event specified in the Contract Documents relating to an
intermediate Contract Time prior to Final Acceptance of the Work.
21. Non -Participating Change Order —A document, which is prepared for and reviewed by the
City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or
revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on
or after the Effective Date of the Agreement.
22. Participating Change Order —A document, which is prepared for and approved by the City,
which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or
revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on
or after the Effective Date of the Agreement.
23. Plans — See definition of Drawings.
24. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with
the General Requirements, describing the sequence and duration of the activities comprising
the Contractor's plan to accomplish the Work within the Contract Time.
25. Project —The Work to be performed under the Contract Documents.
26. Project Representative —The authorized representative of the City who will be assigned to
the Site.
27. Public Meeting — An announced meeting conducted by the Developer to facilitate public
participation and to assist the public in gaining an informed view of the Project.
28. Regular Working Hours — Hours beginning at 7: 00 a.m. and ending at 6:00 p.m., Monday
thru Friday (excluding legal holidays).
29. Samples Physical examples of materials, equipment, or workmanship that are
representative of some portion of the Work and which establish the standards by which such
portion of the Work will be judged.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 4
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 4 of 35
30. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required
submittals and the time requirements to support scheduled performance of related
construction activities.
31. Site —Lands or areas indicated in the Contract Documents as being furnished by City or
Developer upon which the Work is to be performed, including rights -of -way, permits, and
easements for access thereto, and such other lands furnished by City or Developer which are
designated for the use of Contractor.
32. Specifications —That part of the Contract Documents consisting of written requirements for
materials, equipment, systems, standards and workmanship as applied to the Work, and
certain administrative requirements and procedural matters applicable thereto.
Specifications may be specifically made a part of the Contract Documents by attachment or,
if not attached, may be incorporated by reference as indicated in the Table of Contents
(Division 00 00 00) of each Project.
33. Standard City Conditions — That part of the Contract Documents setting forth requirements
of the City.
34. Subcontractor —An individual or entity having a direct contract with Contractor or with any
other Subcontractor for the performance of apart of the Work at the Site.
35. Submittals All drawings, diagrams, illustrations, schedules, and other data or information
which are specifically prepared or assembled by or for Contractor and submitted by
Contractor to illustrate some portion of the Work.
36. Superintendent — The representative of the Contractor who is available at all times and able
to receive instructions from the City and/or Developer and to act for the Contractor.
37. Supplementary Conditions —That part of the Contract Documents which amends or
supplements the General Conditions.
38. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having
a direct contract with Contractor or with any Subcontractor to furnish materials or
equipment to be incorporated in the Work by Contractor or Subcontractor.
39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires,
manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any
encasements containing such facilities, including but not limited to, those that convey
electricity, gases, steam, liquid petroleum products, telephone or other communications,
cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or
other control systems.
40. Weekend Working Hours — Hours beginning at 9: 00 a. in. and ending at 5: 00 p.m., Saturday,
Sunday or legal holiday, as approved in advance by the City.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 5
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 5 of 35
41. Work —The entire construction or the various separately identifiable parts thereof required
to be provided under the Contract Documents. Work includes and is the result of performing
or providing all labor, services, and documentation necessary to produce such construction
including any Participating Change Order, Non -Participating Change Order, or Field
Order, and furnishing, installing, and incorporating all materials and equipment into such
construction, all as required by the Contract Documents.
42. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or
legal holidays authorized by the City for contract purposes, in which weather or other
conditions not under the control of the Contractor will permit the performance of the
principal unit of work underway for a continuous period of not less than 7 hours between 7
a.m. and 6 p. m.
1.02 Terminology
A. The words and terms discussed in Paragraph 1.02.13 through D are not defined but, when used in
the Bidding Requirements or Contract Documents, have the indicated meaning.
B. Defective:
1. The word "defective," when modifying the word "Work," refers to Work that is
unsatisfactory, faulty, or deficient in that it:
a. does not conform to the Contract Documents; or
b. does not meet the requirements of any applicable inspection, reference standard, test, or
approval referred to in the Contract Documents; or
c. has been damaged prior to City's written acceptance.
C. Furnish, Install, Perform, Provide:
1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or
the word "Supply," or any combination or similar directive or usage thereof, shall mean
furnishing and incorporating in the Work including all necessary labor, materials, equipment,
and everything necessary to perform the Work indicated, unless specifically limited in the
context used.
D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known
technical or construction industry or trade meaning are used in the Contract Documents in
accordance with such recognized meaning.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 6
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 6 of 35
ARTICLE 2 — PRELIMINARY MATTERS
2.01 Before Starting Construction
Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting
the Work. New schedules will be submitted to City when Participating Change Orders or Non -
Participating Change Orders occur.
2.02 Preconstruction Conference
Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as
specified in the Contract Documents.
2.03 Public Meeting
Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor
attending the Public Meeting as scheduled by the City.
ARTICLE 3 — CONTRACT DOCUMENTS AND AMENDING
3.01 Reference Standards
A. Standards, Specifications, Codes, Laws, and Regulations
1. Reference to standards, specifications, manuals, or codes of any technical society,
organization, or association, or to Laws or Regulations, whether such reference be specific or
by implication, shall mean the standard, specification, manual, code, or Laws or Regulations
in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there
were no Bids), except as may be otherwise specifically stated in the Contract Documents.
2. No provision or instruction shall be effective to assign to City, or any of its officers,
directors, members, partners, employees, agents, consultants, or subcontractors, any duty or
authority to supervise or direct the performance of the Work or any duty or authority to
undertake responsibility inconsistent with the provisions of the Contract Documents.
3.02 Amending and Supplementing Contract Documents
A. The Contract Documents may be amended to provide for additions, deletions, and revisions in
the Work or to modify the terms and conditions thereof by a Participating Change Order or a
Non -Participating Change Order.
B. The requirements of the Contract Documents may be supplemented, and minor variations and
deviations in the Work not involving a change in Contract Price or Contract Time, may be
authorized, by one or more of the following ways:
1. A Field Order;
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 7
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 7 of 35
1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or
2. City's written interpretation or clarification.
ARTICLE 4 — BONDS AND INSURANCE
4.01 Licensed Sureties and Insurers
All bonds and insurance required by the Contract Documents to be purchased and maintained by
Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized
in the State of Texas to issue bonds or insurance policies for the limits and coverage so required.
Such surety and insurance companies shall also meet such additional requirements and qualifications
as may be provided Section 4.04.
4.02 Performance, Payment, and Maintenance Bonds
A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in
accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount
equal to the Contract Price as security for the faithful performance and payment of all of
Contractor's obligations under the Contract Documents.
B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount
equal to the Contract Price as security to protect the City against any defects in any portion of the
Work described in the Contract Documents. Maintenance bonds shall remain in effect for two
(2) years after the date of Final Acceptance by the City.
C. All bonds shall be in the form prescribed by the Contract Documents except as provided
otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list
of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and
as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial
Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed
by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney
which shall show that it is effective on the date the agent or attorney -in -fact signed each bond.
D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or
its right to do business is terminated in the State of Texas or it ceases to meet the requirements of
Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event
giving rise to such notification, provide another bond and surety, both of which shall comply
with the requirements of Paragraphs 4.01 and 4.02.C.
4.03 Certificates of Insurance
Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee
identified in these Standard City Conditions certificates of insurance (and other evidence of
insurance requested by City or any other additional insured) which Contractor is required to
purchase and maintain.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 8
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 8 of 35
1. The certificate of insurance shall document the City, an as "Additional Insured" on all
liability policies.
2. The Contractor's general liability insurance shall include a, "per project" or "per location",
endorsement, which shall be identified in the certificate of insurance provided to the City.
3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the
insured, be complete in its entirety, and show complete insurance carrier names as listed in
the current A.M. Best Property & Casualty Guide
4. The insurers for all policies must be licensed and/or approved to do business in the State of
Texas. Except for workers' compensation, all insurers must have a minimum rating of A-:
VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial
strength and solvency to the satisfaction of Risk Management. If the rating is below that
required, written approval of City is required.
5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor
of the City. In addition, the Contractor agrees to waive all rights of subrogation against the
Engineer (if applicable), and each additional insured identified in these Standard City
Conditions. Failure of the City to demand such certificates or other evidence of full
compliance with the insurance requirements or failure of the City to identify a deficiency
from evidence that is provided shall not be construed as a waiver of Contractor's obligation
to maintain such lines of insurance coverage.
6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess
Liability insurance for any differences is required. Excess Liability shall follow form of the
primary coverage.
7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If
coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with
or prior to the date of the effective date of the agreement and the certificate of insurance shall
state that the coverage is claims -made and the retroactive date. The insurance coverage shall
be maintained for the duration of the Contract and for three (3) years following Final
Acceptance provided under the Contract Documents or for the warranty period, whichever is
longer. An annual certificate of insurance submitted to the City shall evidence such
insurance coverage.
8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the
required lines of coverage, nor decrease the limits of said coverage unless such endorsements
are approved in writing by the City. In the event a Contract has been bid or executed and the
exclusions are determined to be unacceptable or the City desires additional insurance
coverage, and the City desires the contractor/engineer to obtain such coverage, the contract
price shall be adjusted by the cost of the premium for such additional coverage plus 10%.
9. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance
coverage shall be approved by the City in regards to asset value and stockholders' equity. In
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10-9
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 9 of 35
lieu of traditional insurance, alternative coverage maintained through insurance pools or risk
retention groups, must also be approved by City.
10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a
first -dollar basis, must be acceptable to and approved by the City.
11. City, at its sole discretion, reserves the right to review the insurance requirements and to
make reasonable adjustments to insurance coverage's and their limits when deemed
necessary and prudent by the City based upon changes in statutory law, court decision or the
claims history of the industry as well as of the contracting party to the City. The City shall
be required to provide prior notice of 90 days, and the insurance adjustments shall be
incorporated into the Work by Change Order.
12. City shall be entitled, upon written request and without expense, to receive copies of policies
and endorsements thereto and may make any reasonable requests for deletion or revision or
modifications of particular policy terms, conditions, limitations, or exclusions necessary to
conform the policy and endorsements to the requirements of the Contract. Deletions,
revisions, or modifications shall not be required where policy provisions are established by
law or regulations binding upon either parry or the underwriter on any such policies.
13. City shall not be responsible for the direct payment of insurance premium costs for
Contractor's insurance.
4.04 Contractor's Insurance
A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such
insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers'
Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for
Employers' Liability as is appropriate for the Work being performed and as will provide
protection from claims set forth below which may arise out of or result from Contractor's
performance of the Work and Contractor's other obligations under the Contract Documents,
whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly
or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts
any of them may be liable:
1. claims under workers' compensation, disability benefits, and other similar employee benefit
acts;
2. claims for damages because of bodily injury, occupational sickness or disease, or death of
Contractor's employees.
3. The limits of liability for the insurance shall provide the following coverages for not less
than the following amounts or greater where required by Laws and Regulations
a. Statutory limits
b. Employer's liability
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 10
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 10 of 35
1) $100,000 each accident/occurrence
2) $100,000 Disease - each employee
3) $500,000 Disease - policy limit
B. Commercial General Liability. Coverage shall include but not be limited to covering liability
(bodily injury or property damage) arising from: premises/operations, independent contractors,
products/completed operations, personal injury, and liability under an insured contract. Insurance
shall be provided on an occurrence basis, and as comprehensive as the current Insurance
Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to
any other insurance or self-insurance programs afforded to the City. The Commercial General
Liability policy, shall have no exclusions by endorsements that would alter of nullify
premises/operations, products/completed operations, contractual, personal injury, or advertising
injury, which are normally contained with the policy, unless the City approves such exclusions
in writing.
1. For construction projects that present a substantial completed operation exposure, the City
may require the contractor to maintain completed operations coverage for a minimum of no
less than three (3) years following the completion of the project
2. Contractor's Liability Insurance under this Section which shall be on a per project basis
covering the Contractor with minimum limits of:
a. $1,000,000 each occurrence
b. $2,000,000 aggregate limit
3. The policy must have an endorsement (Amendment — Aggregate Limits of Insurance)
making the General Aggregate Limits apply separately to each job site.
4. The Commercial General Liability Insurance policies shall provide "X", "C", and "U"
coverage's. Verification of such coverage must be shown in the Remarks Article of the
Certificate of Insurance.
C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto",
defined as autos owned, hired and non -owned and provide indemnity for claims for damages
because bodily injury or death of any person and or property damage arising out of the work,
maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by
anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone
for whose acts any of them may be liable.
1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in
an amount not less than the following amounts:
a. Automobile Liability - a commercial business policy shall provide coverage on "Any
Auto", defined as autos owned, hired and non -owned.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 11
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 11 of 35
1) $1, 000, 000 each accident on a combined single limit basis. Split limits are
acceptable if limits are at least:
2) $250,000 Bodily Injury per person
3) $500,000 Bodily Injury per accident /
4) $100,000 Property Damage
D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of
railroad right-of-way, the Contractor shall comply with the following requirements:
1. The Contractor's construction activities will require its employees, agents, subcontractors,
equipment, and material deliveries to cross railroad properties and tracks owned and
operated by:
Write the name of the railroad company. (If none, then write none)
2. The Contractor shall conduct its operations on railroad properties in such a manner as not to
interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use
or operation of its/their trains or other property. Such operations on railroad properties may
require that Contractor to execute a "Right of Entry Agreement" with the particular railroad
company or companies involved, and to this end the Contractor should satisfy itself as to the
requirements of each railroad company and be prepared to execute the right -of -entry (if any)
required by a railroad company. The requirements specified herein likewise relate to the
Contractor's use of private and/or construction access roads crossing said railroad company's
properties.
3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions
shall provide coverage for not less than the following amounts, issued by companies
satisfactory to the City and to the Railroad Company for a term that continues for so long as
the Contractor's operations and work cross, occupy, or touch railroad property:
a. General Aggregate:
b. Each Occurrence: :
Enter limits provided by Railroad Company (If none, write none)
Enter limits provided by Railroad Company (If none, write none)
4. With respect to the above outlined insurance requirements, the following shall govern:
a. Where a single railroad company is involved, the Contractor shall provide one insurance
policy in the name of the railroad company. However, if more than one grade separation
or at -grade crossing is affected by the Project at entirely separate locations on the line or
lines of the same railroad company, separate coverage may be required, each in the
amount stated above.
b. Where more than one railroad company is operating on the same right-of-way or where
several railroad companies are involved and operated on their own separate rights -of -
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 12
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 12 of 35
way, the Contractor may be required to provide separate insurance policies in the name
of each railroad company.
c. If, in addition to a grade separation or an at -grade crossing, other work or activity is
proposed on a railroad company's right-of-way at a location entirely separate from the
grade separation or at -grade crossing, insurance coverage for this work must be included
in the policy covering the grade separation.
d. If no grade separation is involved but other work is proposed on a railroad company's
right-of-way, all such other work may be covered in a single policy for that railroad, even
though the work may be at two or more separate locations.
5. No work or activities on a railroad company's property to be performed by the Contractor
shall be commenced until the Contractor has furnished the City with an original policy or
policies of the insurance for each railroad company named, as required above. All such
insurance must be approved by the City and each affected Railroad Company prior to the
Contractor's beginning work.
6. The insurance specified above must be carried until all Work to be performed on the railroad
right-of-way has been completed and the grade crossing, if any, is no longer used by the
Contractor. In addition, insurance must be carried during all maintenance and/or repair work
performed in the railroad right-of-way. Such insurance must name the railroad company as
the insured, together with any tenant or lessee of the railroad company operating over tracks
involved in the Project.
E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation
or other loss of insurance coverage. Contractor shall stop work until replacement insurance has
been procured. There shall be no time credit for days not worked pursuant to this section.
4.05 Acceptance of Bonds and Insurance; Option to Replace
If City has any objection to the coverage afforded by or other provisions of the bonds or insurance
required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis
of non-conformance with the Contract Documents, the Developer and City shall so notify the
Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence
requested). Contractor shall provide to the City such additional information in respect of insurance
provided as the Developer or City may reasonably request. If Contractor does not purchase or
maintain all of the bonds and insurance required by the Contract Documents, the Developer or City
shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure
to maintain prior to any change in the required coverage.
ARTICLE 5 — CONTRACTOR'S RESPONSIBILITIES
5.01 Supervision and Superintendent
A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting
such attention thereto and applying such skills and expertise as may be necessary to perform the
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 13
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 13 of 35
Work in accordance with the Contract Documents. Contractor shall be solely responsible for the
means, methods, techniques, sequences, and procedures of construction.
B. At all times during the progress of the Work, Contractor shall assign a competent, English-
speaking, Superintendent who shall not be replaced without written notice to City. The
Superintendent will be Contractor's representative at the Site and shall have authority to act on
behalf of Contractor. All communication given to or received from the Superintendent shall be
binding on Contractor.
C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of
construction.
5.02 Labor; Working Hours
A. Contractor shall provide competent, suitably qualified personnel to perform construction as
required by the Contract Documents. Contractor shall at all times maintain good discipline and
order at the Site.
B. Except as otherwise required for the safety or protection of persons or the Work or property at
the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work
at the Site shall be performed during Regular Working Hours. Contractor will not permit the
performance of Work beyond Regular Working Hours or for Weekend Working Hours without
City's written consent (which will not be unreasonably withheld). Written request (by letter or
electronic communication) to perform Work:
1. for beyond Regular Working Hours request must be made by noon at least two (2) Business
Days prior
2. for Weekend Working Hours request must be made by noon of the preceding Thursday
3. for legal holidays request must be made by noon two Business Days prior to the legal
holiday.
5.03 Services, Materials, and Equipment
A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full
responsibility for all services, materials, equipment, labor, transportation, construction
equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary
facilities, temporary facilities, and all other facilities and incidentals necessary for the
performance, Contractor required testing, start-up, and completion of the Work.
B. All materials and equipment incorporated into the Work shall be as specified or, if not specified,
shall be of good quality and new, except as otherwise provided in the Contract Documents. All
special warranties and guarantees required by the Specifications shall expressly run to the benefit
of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of
required tests) as to the source, kind, and quality of materials and equipment.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 14
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 14 of 35
C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed,
connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of
the applicable Supplier, except as otherwise may be provided in the Contract Documents.
5.04 Project Schedule
A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01
and the General Requirements as it may be adjusted from time to time as provided below.
1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and
the General Requirements) proposed adjustments in the Project Schedule.
2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be
submitted in accordance with the requirements of Article 9. Adjustments in Contract Time
for projects with City participation shall be made by participating change orders.
5.05 Substitutes and "Or -Equals "
A. Whenever an item of material or equipment is specified or described in the Contract Documents
by using the name of a proprietary item or the name of a particular Supplier, the specification or
description is intended to establish the type, function, appearance, and quality required. Unless
the specification or description contains or is followed by words reading that no like, equivalent,
or "or -equal" item or no substitution is permitted, other items of material or equipment of other
Suppliers may be submitted to City for review under the circumstances described below.
1. "Or -Equal" Items: If in City's sole discretion an item of material or equipment proposed by
Contractor is functionally equal to that named and sufficiently similar so that no change in
related Work will be required, it may be considered by City as an "or -equal" item, in which
case review and approval of the proposed item may, in City's sole discretion, be
accomplished without compliance with some or all of the requirements for approval of
proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of
material or equipment will be considered functionally equal to an item so named if:
a. City determines that:
1) it is at least equal in materials of construction, quality, durability, appearance,
strength, and design characteristics;
2) it will reliably perform at least equally well the function and achieve the results
imposed by the design concept of the completed Project as a functioning whole; and
3) it has a proven record of performance and availability of responsive service; and
b. Contractor certifies that, if approved and incorporated into the Work:
1) there will be no increase in cost to the City or increase in Contract Time; and
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 15
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 15 of 35
2) it will conform substantially to the detailed requirements of the item named in the
Contract Documents.
2. Substitute Items:
a. If in City's sole discretion an item of material or equipment proposed by Contractor does
not qualify as an "or -equal" item under Paragraph 5.05.A.1, it may be submitted as a
proposed substitute item.
b. Contractor shall submit sufficient information as provided below to allow City to
determine if the item of material or equipment proposed is essentially equivalent to that
named and an acceptable substitute therefor. Requests for review of proposed substitute
items of material or equipment will not be accepted by City from anyone other than
Contractor.
c. Contractor shall make written application to City for review of a proposed substitute item
of material or equipment that Contractor seeks to furnish or use. The application shall
comply with Section 0125 00 and:
1) shall certify that the proposed substitute item will:
i. perform adequately the functions and achieve the results called for by the general
design;
ii. be similar in substance to that specified;
iii. be suited to the same use as that specified; and
2) will state:
i. the extent, if any, to which the use of the proposed substitute item will prejudice
Contractor's achievement of final completion on time;
ii. whether use of the proposed substitute item in the Work will require a change in
any of the Contract Documents (or in the provisions of any other direct contract
with City for other work on the Project) to adapt the design to the proposed
substitute item;
iii. whether incorporation or use of the proposed substitute item in connection with
the Work is subject to payment of any license fee or royalty; and
3) will identify:
i. all variations of the proposed substitute item from that specified;
ii. available engineering, sales, maintenance, repair, and replacement services; and
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 16
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 16 of 35
4) shall contain an itemized estimate of all costs or credits that will result directly or
indirectly from use of such substitute item, including costs of redesign and Damage
Claims of other contractors affected by any resulting change.
B. Substitute Construction Methods or Procedures: If a specific means, method, technique,
sequence, or procedure of construction is expressly required by the Contract Documents,
Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure
of construction approved by City. Contractor shall submit sufficient information to allow City, in
City's sole discretion, to determine that the substitute proposed is equivalent to that expressly
called for by the Contract Documents. Contractor shall make written application to City for
review in the same manner as those provided in Paragraph 5.05.A.2.
C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each
proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.13. City may require
Contractor to furnish additional data about the proposed substitute. City will be the sole judge of
acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review
is complete, which will be evidenced by a Change Order in the case of a substitute and an
accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination.
D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special
performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall
indemnify and hold harmless City and anyone directly or indirectly employed by them from and
against any and all claims, damages, losses and expenses (including attorneys fees) arising out
of the use of substituted materials or equipment.
E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or
submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City
approves a substitute so proposed or submitted by Contractor, Contractor may be required to
reimburse City for evaluating each such proposed substitute. Contractor may also be required to
reimburse City for the charges for making changes in the Contract Documents.
F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or
"or -equal" at Contractor's expense.
G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute
shall be incorporated to the Contract by Participating Change Order.
5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors)
A. The Contractor and any subcontractors are required to be prequalified for the work types
requiring pre -qualification
5.07 Concerning Subcontractors, Suppliers, and Others
A. Minority and Women Owned Business Enterprise Compliance:
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 17
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 17 of 35
❑ Required for this Contract.
(Check this box if there is any City Participation)
❑ Not Required for this Contract.
It is City policy to ensure the full and equitable participation by Minority and Women Business
Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the
Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent
of the City's MWBE Ordinance (as amended) by the following:
1. Contractor shall, upon request by City, provide complete and accurate information regarding
actual work performed by a MWBE on the Contract and payment therefor.
2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without
written consent of the City. Any unjustified change or deletion shall be a material breach of
Contract and may result in debarment in accordance with the procedures outlined in the
Ordinance.
3. Contractor shall, upon request by City, allow an audit and/or examination of any books,
records, or files in the possession of the Contractor that will substantiate the actual work
performed by an MWBE. Material misrepresentation of any nature will be grounds for
termination of the Contract. Any such misrepresentation may be grounds for disqualification
of Contractor to bid on future contracts with the City for a period of not less than three years.
B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors,
Suppliers, and other individuals or entities performing or furnishing any of the Work just as
Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract
Documents:
1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity
any contractual relationship between City and any such Subcontractor, Supplier or other
individual or entity; nor
2. shall create any obligation on the part of City to pay or to see to the payment of any moneys
due any such Subcontractor, Supplier, or other individual or entity except as may otherwise
be required by Laws and Regulations.
C. Contractor shall be solely responsible for scheduling and coordinating the Work of
Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the
Work under a direct or indirect contract with Contractor.
D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing
any of the Work shall communicate with City through Contractor.
E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an
appropriate agreement between Contractor and the Subcontractor or Supplier which specifically
binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 18
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 18 of 35
Documents, Contractor shall provide City contract numbers and reference numbers to the
Subcontractors and/or Suppliers.
5.08 Wage Rates
❑ Required for this Contract.
❑ Not Required for this Contract.
A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of
Chapter 2258, Texas Government Code (as amended), including the payment of not less than the
rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in
accordance with Chapter 2258. Such prevailing wage rates are included in these Contract
Documents.
B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage
shall, upon demand made by the City, pay to the City $60 for each worker employed for each
calendar day or part of the day that the worker is paid less than the prevailing wage rates
stipulated in these contract documents. This penalty shall be retained by the City to offset its
administrative costs, pursuant to Texas Government Code 2258.023.
C. Complaints of Violations and City Determination of Good Cause. On receipt of information,
including a complaint by a worker, concerning an alleged violation of 2258.023, Texas
Government Code, by a Contractor or Subcontractor, the City shall make an initial
determination, before the 31 st day after the date the City receives the information, as to whether
good cause exists to believe that the violation occurred. The City shall notify in writing the
Contractor or Subcontractor and any affected worker of its initial determination. Upon the
City's determination that there is good cause to believe the Contractor or Subcontractor has
violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or
claimants as the difference between wages paid and wages due under the prevailing wage rates,
such amounts being subtracted from successive progress payments pending a final determination
of the violation.
D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of
Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected
worker, shall be submitted to binding arbitration in accordance with the Texas General
Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any
affected worker does not resolve the issue by agreement before the 15th day after the date the
City makes its initial determination pursuant to Paragraph C above. If the persons required to
arbitrate under this section do not agree on an arbitrator before the 1 Ith day after the date that
arbitration is required, a district court shall appoint an arbitrator on the petition of any of the
persons. The City is not a party in the arbitration. The decision and award of the arbitrator is
final and binding on all parties and may be enforced in any court of competent jurisdiction.
E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3)
years following the date of acceptance of the work, maintain records that show (i) the name and
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 19
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 19 of 35
occupation of each worker employed by the Contractor in the construction of the Work provided
for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be
open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right
to Audit, shall pertain to this inspection.
F. Progress Payments. With each progress payment or payroll period, whichever is less, the
Contractor shall submit an affidavit stating that the Contractor has complied with the
requirements of Chapter 2258, Texas Government Code.
G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at
all times.
H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall
otherwise require all of its Subcontractors to comply with Paragraphs A through G above.
5.09 Patent Fees and Royalties
A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold
harmless City, from and against all claims, costs, losses, and damages (including but not limited
to all fees and charges of engineers, architects, attorneys, and other professionals and all court
or arbitration or other dispute resolution costs) arising out of or relating to any infringement of
patent rights or copyrights incident to the use in the performance of the Work or resulting from
the incorporation in the Work of any invention, design, process, product, or device not specified
in the Contract Documents.
5.10 Laws and Regulations
A. Contractor shall give all notices required by and shall comply with all Laws and Regulations
applicable to the performance of the Work. Except where otherwise expressly required by
applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's
compliance with any Laws or Regulations.
B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws
or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not
limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
court or arbitration or other dispute resolution costs) arising out of or relating to such Work.
However, it shall not be Contractor's responsibility to make certain that the Specifications and
Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of
Contractor's obligations under Paragraph 3.01.
5.11 Use of Site and Other Areas
A. Limitation on Use of Site and Other Areas:
1. Contractor shall confine construction equipment, the storage of materials and equipment, and
the operations of workers to the Site and other areas permitted by Laws and Regulations, and
shall not unreasonably encumber the Site and other areas with construction equipment or
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 20
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 20 of 35
other materials or equipment. Contractor shall assume full responsibility for any damage to
any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas
resulting from the performance of the Work.
2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is
carrying on operations in a portion of a street, right-of-way, or easement greater than is
necessary for proper execution of the Work, the City may require the Contractor to finish the
section on which operations are in progress before work is commenced on any additional
area of the Site.
3. Should any Damage Claim be made by any such owner or occupant because of the
performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim.
4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and
against all claims, costs, losses, and damages arising out of or relating to any claim or
action, legal or equitable, brought by any such owner or occupant against City.
B. Removal of Debris During Performance of the Work: During the progress of the Work
Contractor shall keep the Site and other areas free from accumulations of waste materials,
rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other
debris shall conform to applicable Laws and Regulations.
C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the
clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the
Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as
the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the
written notice (by letter or electronic communication), and shall be entitled to recover its cost in
doing so. The City may withhold Final Acceptance until clean-up is complete and cost are
recovered.
D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and
the Work and make it ready for utilization by City or adjacent property owner. At the completion
of the Work Contractor shall remove from the Site all tools, appliances, construction equipment
and machinery, and surplus materials and shall restore to original condition or better all property
disturbed by the Work.
E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded
in any manner that will endanger the structure, nor shall Contractor subject any part of the Work
or adjacent property to stresses or pressures that will endanger it.
5.12 Record Documents
A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor
and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change
Orders, Field Orders, and written interpretations and clarifications in good order and annotated
to show changes made during construction. These record documents together with all approved
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 21
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 21 of 35
Samples and a counterpart of all accepted Submittals will be available to City for reference.
Upon completion of the Work, these record documents, any operation and maintenance manuals,
and Submittals will be delivered to City prior to Final Inspection. Contractor shall include
accurate locations for buried and imbedded items.
5.13 Safety and Protection
A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety
precautions and programs in connection with the Work. Such responsibility does not relieve
Subcontractors of their responsibility for the safety of persons or property in the performance of
their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall
take all necessary precautions for the safety of, and shall provide the necessary protection to
prevent damage, injury or loss to:
1. all persons on the Site or who may be affected by the Work;
2. all the Work and materials and equipment to be incorporated therein, whether in storage on
or off the Site; and
3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks,
pavements, roadways, structures, utilities, and Underground Facilities not designated for
removal, relocation, or replacement in the course of construction.
B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of
persons or property, or to the protection of persons or property from damage, injury, or loss; and
shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall
notify owners of adjacent property and of Underground Facilities and other utility owners when
prosecution of the Work may affect them, and shall cooperate with them in the protection,
removal, relocation, and replacement of their property.
C. Contractor shall comply with the applicable requirements of City's safety programs, if any.
D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any,
with which City's employees and representatives must comply while at the Site.
E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused,
directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any
other individual or entity directly or indirectly employed by any of them to perform any of the
Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor.
F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue
until such time as all the Work is completed and City has accepted the Work.
5.14 Safety Representative
Contractor shall inform City in writing of Contractor's designated safety representative at the Site.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 22
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 22 of 35
5.15 Hazard Communication Programs
Contractor shall be responsible for coordinating any exchange of material safety data sheets or other
hazard communication information required to be made available to or exchanged between or
among employers in accordance with Laws or Regulations.
5.16 Submittals
A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal
will be identified as required by City.
1. Submit number of copies specified in the General Requirements.
2. Data shown on the Submittals will be complete with respect to quantities, dimensions,
specified performance and design criteria, materials, and similar data to show City the
services, materials, and equipment Contractor proposes to provide and to enable City to
review the information for the limited purposes required by Paragraph 5.16.C.
3. Submittals submitted as herein provided by Contractor and reviewed by City for
conformance with the design concept shall be executed in conformity with the Contract
Documents unless otherwise required by City.
4. When Submittals are submitted for the purpose of showing the installation in greater detail,
their review shall not excuse Contractor from requirements shown on the Drawings and
Specifications.
5. For -Information -Only submittals upon which the City is not expected to conduct review or
take responsive action may be so identified in the Contract Documents.
6. Submit required number of Samples specified in the Specifications.
7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers,
the use for which intended and other data as City may require to enable City to review the
submittal for the limited purposes required by Paragraph 5.16.C.
B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any
related Work performed prior to City's review and acceptance of the pertinent submittal will be
at the sole expense and responsibility of Contractor.
C. City's Review:
1. City will provide timely review of required Submittals in accordance with the Schedule of
Submittals acceptable to City. City's review and acceptance will be only to determine if the
items covered by the submittals will, after installation or incorporation in the Work, conform
to the information given in the Contract Documents and be compatible with the design
concept of the completed Project as a functioning whole as indicated by the Contract
Documents.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 23
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 23 of 35
2. City's review and acceptance will not extend to means, methods, techniques, sequences, or
procedures of construction (except where a particular means, method, technique, sequence,
or procedure of construction is specifically and expressly called for by the Contract
Documents) or to safety precautions or programs incident thereto. The review and
acceptance of a separate item as such will not indicate approval of the assembly in which the
item functions.
3. City's review and acceptance shall not relieve Contractor from responsibility for any
variation from the requirements of the Contract Documents unless Contractor has complied
with the requirements of Section 01 33 00 and City has given written acceptance of each
such variation by specific written notation thereof incorporated in or accompanying the
Submittal. City's review and acceptance shall not relieve Contractor from responsibility for
complying with the requirements of the Contract Documents.
5.17 Contractor's General Warranty and Guarantee
A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract
Documents and will not be defective. City and its officers, directors, members, partners,
employees, agents, consultants, and subcontractors shall be entitled to rely on representation of
Contractor's warranty and guarantee.
B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by:
1. abuse, modification, or improper maintenance or operation by persons other than Contractor,
Subcontractors, Suppliers, or any other individual or entity for whom Contractor is
responsible; or
2. normal wear and tear under normal usage.
C. Contractor's obligation to perform and complete the Work in accordance with the Contract
Documents shall be absolute. None of the following will constitute an acceptance of Work that is
not in accordance with the Contract Documents or a release of Contractor's obligation to
perform the Work in accordance with the Contract Documents:
1. observations by City;
2. recommendation or payment by City or Developer of any progress or final payment;
3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by
City;
4. use or occupancy of the Work or any part thereof by City;
5. any review and acceptance of a Submittal by City;
6. any inspection, test, or approval by others; or
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 24
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 24 of 35
7. any correction of defective Work by City.
D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to
other work or property resulting therefrom which shall appear within a period of two (2) years
from the date of Final Acceptance of the Work unless a longer period is specified and shall
furnish a good and sufficient maintenance bond, complying with the requirements of Article
4.02.13. The City will give notice of observed defects with reasonable promptness.
5.18 Indemnification
A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the
City, its officers, servants and employees, from and against any and all claims arising out of, or
alleged to arise out of, the work and services to be performed by the Contractor, its officers,
agents, employees, subcontractors, licenses or invitees under this Contract. THIS
INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE
AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME
OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY
ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is
intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by
the City in defending against such claims and causes of actions.
B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its
officers, servants and employees, from and against any and all loss, damage or destruction of
property of the City, arising out of, or alleged to arise out of, the work and services to be
performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees
under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY
INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR
PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE
CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF
THE CITY.
5.19 Delegation of Professional Design Services
A. Contractor will not be required to provide professional design services unless such services are
specifically required by the Contract Documents for a portion of the Work or unless such
services are required to carry out Contractor's responsibilities for construction means, methods,
techniques, sequences and procedures.
B. If professional design services or certifications by a design professional related to systems,
materials or equipment are specifically required of Contractor by the Contract Documents, City
will specify all performance and design criteria that such services must satisfy. Contractor shall
cause such services or certifications to be provided by a properly licensed professional, whose
signature and seal shall appear on all drawings, calculations, specifications, certifications, and
Submittals prepared by such professional. Submittals related to the Work designed or certified
by such professional, if prepared by others, shall bear such professional's written approval when
submitted to City.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 25
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 25 of 35
C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services,
certifications or approvals performed by such design professionals, provided City has specified
to Contractor performance and design criteria that such services must satisfy.
D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design
drawings will be only for the limited purpose of checking for conformance with performance
and design criteria given and the design concept expressed in the Contract Documents. City's
review and acceptance of Submittals (except design calculations and design drawings) will be
only for the purpose stated in Paragraph 5.16.C.
5.20 Right to Audit:
A. The City reserves the right to audit all projects utilizing City funds
B. The Contractor agrees that the City shall, until the expiration of three (3) years after final
payment under this Contract, have access to and the right to examine and photocopy any directly
pertinent books, documents, papers, and records of the Contractor involving transactions relating
to this Contract. Contractor agrees that the City shall have access during Regular Working Hours
to all necessary Contractor facilities and shall be provided adequate and appropriate work space
in order to conduct audits in compliance with the provisions of this Paragraph. The City shall
give Contractor reasonable advance notice of intended audits.
C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that
the subcontractor agrees that the City shall, until the expiration of three (3) years after final
payment under this Contract, have access to and the right to examine and photocopy any directly
pertinent books, documents, papers, and records of such Subcontractor, involving transactions to
the subcontract, and further, that City shall have access during Regular Working Hours to all
Subcontractor facilities, and shall be provided adequate and appropriate work space in order to
conduct audits in compliance with the provisions of this Paragraph. The City shall give
Subcontractor reasonable advance notice of intended audits.
D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the
City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate
published in the Texas Administrative Code in effect as of the time copying is performed.
5.21 Nondiscrimination
A. The City is responsible for operating Public Transportation Programs and implementing transit -
related projects, which are funded in part with Federal financial assistance awarded by the U.S.
Department of Transportation and the Federal Transit Administration (FTA), without
discriminating against any person in the United States on the basis of race, color, or national
origin.
B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of
the Act and the Regulations as further defined in the Supplementary Conditions for any project
receiving Federal assistance.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 26
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 26 of 35
ARTICLE 6 — OTHER WORK AT THE SITE
6.01 Related Work at Site
A. City may perform other work related to the Project at the Site with City's employees, or other
City contractors, or through other direct contracts therefor, or have other work performed by
utility owners. If such other work is not noted in the Contract Documents, then written notice
thereof will be given to Contractor prior to starting any such other work; and
B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility
owner, and City, if City is performing other work with City's employees or other City
contractors, proper and safe access to the Site, provide a reasonable opportunity for the
introduction and storage of materials and equipment and the execution of such other work, and
properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of
the Work that may be required to properly connect or otherwise make its several parts come
together and properly integrate with such other work. Contractor shall not endanger any work of
others by cutting, excavating, or otherwise altering such work; provided, however, that
Contractor may cut or alter others' work with the written consent of City and the others whose
work will be affected.
C. If the proper execution or results of any part of Contractor's Work depends upon work
performed by others under this Article 7, Contractor shall inspect such other work and promptly
report to City in writing any delays, defects, or deficiencies in such other work that render it
unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's
failure to so report will constitute an acceptance of such other work as fit and proper for
integration with Contractor's Work except for latent defects in the work provided by others.
ARTICLE 7 — CITY'S RESPONSIBILITIES
7.01 Inspections, Tests, and Approvals
City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph
11.03.
7.02 Limitations on City's Responsibilities
A. The City shall not supervise, direct, or have control or authority over, nor be responsible for,
Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety
precautions and programs incident thereto, or for any failure of Contractor to comply with Laws
and Regulations applicable to the performance of the Work. City will not be responsible for
Contractor's failure to perform the Work in accordance with the Contract Documents.
B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 27
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 27 of 35
7.03 Compliance with Safety Program
While at the Site, City's employees and representatives shall comply with the specific applicable
requirements of Contractor's safety programs of which City has been informed pursuant to
Paragraph 5.13.
ARTICLE 8 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION
8.01 City's Project Representative
City will provide one or more Project Representative(s) during the construction period. The duties
and responsibilities and the limitations of authority of City's representative during construction are
set forth in the Contract Documents.
A. City's Project Representative will make visits to the Site at intervals appropriate to the various
stages of construction as City deems necessary in order to observe the progress that has been
made and the quality of the various aspects of Contractor's executed Work. Based on
information obtained during such visits and observations, City's Project Representative will
determine, in general, if the Work is proceeding in accordance with the Contract Documents.
City's Project Representative will not be required to make exhaustive or continuous inspections
on the Site to check the quality or quantity of the Work. City's Project Representative's efforts
will be directed toward providing City a greater degree of confidence that the completed Work
will conform generally to the Contract Documents.
B. City's Project Representative's visits and observations are subject to all the limitations on
authority and responsibility in the Contract Documents.
8.02 Authorized Variations in Work
City's Project Representative may authorize minor variations in the Work from the requirements of
the Contract Documents which do not involve an adjustment in the Contract Price or the Contract
Time and are compatible with the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents. These may be accomplished by a Field Order and will be
binding on City Developer, and also on Contractor, who shall perform the Work involved promptly.
8.03 Rejecting Defective Work
City will have authority to reject Work which City's Project Representative believes to be defective,
or will not produce a completed Project that conforms to the Contract Documents or that will
prejudice the integrity of the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents. City will have authority to conduct special inspection or
testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or
completed.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 28
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 28 of 35
8.04 Determinations for Work Performed
Contractor will determine the actual quantities and classifications of Work performed. City's Project
Representative will review with Contractor the preliminary determinations on such matters before
rendering a written recommendation. City's written decision will be final (except as modified to
reflect changed factual conditions or more accurate data).
ARTICLE 9 — CHANGES IN THE WORK
9.01 Authorized Changes in the Work
A. Without invalidating the Contract and without notice to any surety, City may, at any time or
from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall
promptly proceed with the Work involved which will be performed under the applicable
conditions of the Contract Documents (except as otherwise specifically provided). Extra Work
shall be memorialized by a Participating Change Order which may or may not precede an order
of Extra work.
B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a
project with City participation, a Field Order may be issued by the City.
9.02 Notification to Surety
If the provisions of any bond require notice to be given to a surety of any change affecting the
general scope of the Work or the provisions of the Contract Documents (including, but not limited
to, Contract Price or Contract Time), the giving of any such notice will be Contractor's
responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the
effect of any such change.
ARTICLE 10 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME
10.01 Change of Contract Price
A. The Contract Price may only be changed by a Participating Change Order for projects with City
participation.
10.02 Change of Contract Time
A. The Contract Time may only be changed by a Participating Change Order for projects with City
participation.
10.03 Delays
A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or
damages (including but not limited to all fees and charges of engineers, architects, attorneys, and
other professionals and all court or arbitration or other dispute resolution costs) sustained by
Contractor on or in connection with any other project or anticipated project.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 29
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 29 of 35
ARTICLE 11— TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF
DEFECTIVE WORK
11.01 Notice of Defects
Notice of all defective Work of which City has actual knowledge will be given to Contractor.
Defective Work may be rejected, corrected, or accepted as provided in this Article 13.
11.02 Access to Work
City, independent testing laboratories, and governmental agencies with jurisdictional interests will
have access to the Site and the Work at reasonable times for their observation, inspection, and
testing. Contractor shall provide them proper and safe conditions for such access and advise them of
Contractor's safety procedures and programs so that they may comply therewith as applicable.
11.03 Tests and Inspections
A. Contractor shall give City timely notice of readiness of the Work for all required inspections,
tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required
inspections or tests.
B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any
of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full
responsibility for arranging and obtaining such independent inspections, tests, retests or
approvals, pay all costs in connection therewith, and furnish City the required certificates of
inspection or approval; excepting, however, those fees specifically identified in the
Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR)
inspections, which shall be paid as described in the Supplementary Conditions.
C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection
with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or
equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment
submitted for approval prior to Contractor's purchase thereof for incorporation in the Work.
Such inspections, tests, re -tests, or approvals shall be performed by organizations approved by
City.
D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to
perform any inspections or tests ("Testing") for any part of the Work, as determined solely by
City.
1. City will coordinate such Testing to the extent possible, with Contractor;
2. Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other
similar negative result, the Contractor shall be responsible for paying for any and all retests.
Contractor's cancellation without cause of City initiated Testing shall be deemed a negative
result and require a retest.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 30
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 30 of 35
3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the
Testing Lab by Contractor.
Developer/Contractor.
City will forward all invoices for retests to
4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance
until the Testing Lab is Paid
E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by
Contractor without written concurrence of City, Contractor shall, if requested by City, uncover
such Work for observation.
11.04 Uncovering Work
A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it
must, if requested by City, be uncovered for City's observation and replaced at Contractor's
expense.
11.05 City May Stop the Work
If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials
or equipment, or fails to perform the Work in such a way that the completed Work will conform to
the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until
the cause for such order has been eliminated; however, this right of City to stop the Work shall not
give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any
Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent
of any of them.
11.06 Correction or Removal of Defective Work
A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to
an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has
been rejected by City, remove it from the Project and replace it with Work that is not defective.
Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not
limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
court or arbitration or other dispute resolution costs) arising out of or relating to such correction
or removal (including but not limited to all costs of repair or replacement of work of others).
Failure to require the removal of any defective Work shall not constitute acceptance of such
Work.
B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07,
Contractor shall take no action that would void or otherwise impair City's special warranty and
guarantee, if any, on said Work.
11.07 Correction Period
A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may
be prescribed by the terms of any applicable special guarantee required by the Contract
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 31
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 31 of 35
Documents), any Work is found to be defective, or if the repair of any damages to the land or
areas made available for Contractor's use by City or permitted by Laws and Regulations as
contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without
cost to City and in accordance with City's written instructions:
1. repair such defective land or areas; or
2. correct such defective Work; or
3. if the defective Work has been rejected by City, remove it from the Project and replace it
with Work that is not defective, and
4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work
of others or other land or areas resulting therefrom.
B. If Contractor does not promptly comply with the terms of City's written instructions, or in an
emergency where delay would cause serious risk of loss or damage, City may have the defective
Work corrected or repaired or may have the rejected Work removed and replaced. All claims,
costs, losses, and damages (including but not limited to all fees and charges of engineers,
architects, attorneys, and other professionals and all court or other dispute resolution costs)
arising out of or relating to such correction or repair or such removal and replacement (including
but not limited to all costs of repair or replacement of work of others) will be paid by Contractor.
C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or
removed and replaced under this Paragraph 11.07, the correction period hereunder with respect
to such Work may be required to be extended for an additional period of one year after the end
of the initial correction period. City shall provide 30 days written notice to Contractor and
Developer should such additional warranty coverage be required. Contractor's obligations under
this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this
Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any
applicable statute of limitation or repose.
11.08 City May Correct Defective Work
A. If Contractor fails within a reasonable time after written notice from City to correct defective
Work, or to remove and replace rejected Work as required by City in accordance with Paragraph
11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents,
or if Contractor fails to comply with any other provision of the Contract Documents, City may,
after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such
deficiency.
B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed
expeditiously. In connection with such corrective or remedial action, City may exclude
Contractor from all or part of the Site, take possession of all or part of the Work and suspend
Contractor's services related thereto, and incorporate in the Work all materials and equipment
incorporated in the Work, stored at the Site or for which City has paid Contractor but which are
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 32
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 32 of 35
stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants,
employees, and City's other contractors, access to the Site to enable City to exercise the rights
and remedies under this Paragraph.
C. All claims, costs, losses, and damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and all court or other dispute resolution
costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph
13.09 will be charged against Contractor, and a Change Order will be issued incorporating the
necessary revisions in the Contract Documents with respect to the Work; and City shall be
entitled to an appropriate decrease in the Contract Price.
D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the
performance of the Work attributable to the exercise of City's rights and remedies under this
Paragraph 11.09.
ARTICLE 12 — COMPLETION
12.01 Contractor's Warranty of Title
Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any
Application for Payment will pass to City no later than the time of Final Acceptance and shall be
free and clear of all Liens.
12.02 Partial Utilization
A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed
part of the Work which has specifically been identified in the Contract Documents, or which
City, determines constitutes a separately functioning and usable part of the Work that can be
used by City for its intended purpose without significant interference with Contractor's
performance of the remainder of the Work. City at any time may notify Contractor in writing to
permit City to use or occupy any such part of the Work which City determines to be ready for its
intended use, subject to the following conditions:
1. Contractor at any time may notify City in writing that Contractor considers any such part of
the Work ready for its intended use.
2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and
Contractor shall make an inspection of that part of the Work to determine its status of
completion. If City does not consider that part of the Work to be substantially complete, City
will notify Contractor in writing giving the reasons therefor.
3. Partial Utilization will not constitute Final Acceptance by City.
12.03 Final Inspection
A. Upon written notice from Contractor that the entire Work is complete in accordance with the
Contract Documents:
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 33
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 33 of 35
1. within 10 days, City will schedule a Final Inspection with Contractor.
2. City will notify Contractor in writing of all particulars in which this inspection reveals that
the Work is incomplete or defective. Contractor shall immediately take such measures as are
necessary to complete such Work or remedy such deficiencies.
12.04 Final Acceptance
A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the
Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction
of the following:
1. All documentation called for in the Contract Documents, including but not limited to the
evidence of insurance required by Paragraph 5.03;
2. consent of the surety, if any, to Final Acceptance;
3. a list of all pending or released Damage Claims against City that Contractor believes are
unsettled; and
4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to
City) of all Lien rights arising out of or Liens filed in connection with the Work.
5. after all Damage Claims have been resolved:
a. directly by the Contractor or;
b. Contractor provides evidence that the Damage Claim has been reported to Contractor's
insurance provider for resolution.
6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or
other requirements of the Contract Documents which specifically continue thereafter.
ARTICLE 13 — SUSPENSION OF WORK
13.01 City May Suspend Work
A. At any time and without cause, City may suspend the Work or any portion thereof by written
notice to Contractor and which may fix the date on which Work will be resumed. Contractor
shall resume the Work on the date so fixed. During temporary suspension of the Work covered
by these Contract Documents, for any reason, the City will stop contract time on City
participation projects.
B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the
control of and without the fault or negligence of the Contractor, and should it be determined by
mutual consent of the Contractor and City that a solution to allow construction to proceed is not
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 34
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 34 of 35
available within a reasonable period of time, Contractor may request an extension in Contract
Time, directly attributable to any such suspension.
C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall
store all materials in such a manner that they will not obstruct or impede the public unnecessarily
nor become damaged in any way, and he shall take every precaution to prevent damage or
deterioration of the work performed; he shall provide suitable drainage about the work, and erect
temporary structures where necessary.
ARTICLE 14 — MISCELLANEOUS
14.01 Giving Notice
A. Whenever any provision of the Contract Documents requires the giving of written notice, it will
be deemed to have been validly given i£
1. delivered in person to the individual or to a member of the firm or to an officer of the
corporation for whom it is intended; or
2. delivered at or sent by registered or certified mail, postage prepaid, to the last business
address known to the giver of the notice.
B. Business address changes must be promptly made in writing to the other party.
C. Whenever the Contract Documents specifies giving notice by electronic means such electronic
notice shall be deemed sufficient upon confirmation of receipt by the receiving party.
14.02 Computation of Times
When any period of time is referred to in the Contract Documents by days, it will be computed to
exclude the first and include the last day of such period. If the last day of any such period falls on a
Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last
day of the period.
14.03 Cumulative Remedies
The duties and obligations imposed by these General Conditions and the rights and remedies
available hereunder to the parties hereto are in addition to, and are not to be construed in any way as
a limitation of, any rights and remedies available to any or all of them which are otherwise imposed
or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the
Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically
in the Contract Documents in connection with each particular duty, obligation, right, and remedy to
which they apply.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 35
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 35 of 35
14.04 Survival of Obligations
All representations, indemnifications, warranties, and guarantees made in, required by, or given in
accordance with the Contract Documents, as well as all continuing obligations indicated in the
Contract Documents, will survive final payment, completion, and acceptance of the Work or
termination or completion of the Contract or termination of the services of Contractor.
14.05 Headings
Article and paragraph headings are inserted for convenience only and do not constitute parts of these
General Conditions.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
1
2
3 PART1- GENERAL
4 1.1 SUMMARY
SECTION 01 11 00
SUMMARY OF WORK
011100-1
DAP SUMMARY OF WORK
Pagel of 3
5 A. Section Includes:
6 1. Summary of Work to be performed in accordance with the Contract Documents
7 B. Deviations from this City of Fort Worth Standard Specification
8 1. None.
9 C. Related Specification Sections include, but are not necessarily limited to:
10 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract
11 2. Division 1 - General Requirements
12 1.2 PRICE AND PAYMENT PROCEDURES
13 A. Measurement and Payment
14 1. Work associated with this Item is considered subsidiary to the various items bid.
15 No separate payment will be allowed for this Item.
16 1.3 REFERENCES [NOT USED]
17 1.4 ADMINISTRATIVE REQUIREMENTS
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
A. Work Covered by Contract Documents
1. Work is to include furnishing all labor, materials, and equipment, and performing
all Work necessary for this construction project as detailed in the Drawings and
Specifications.
B. Subsidiary Work
1. Any and all Work specifically governed by documentary requirements for the
project, such as conditions imposed by the Drawings or Contract Documents in
which no specific item for bid has been provided for in the Proposal and the item is
not a typical unit bid item included on the standard bid item list, then the item shall
be considered as a subsidiary item of Work, the cost of which shall be included in
the price bid in the Proposal for various bid items.
C. Use of Premises
1. Coordinate uses of premises under direction of the City.
2. Assume full responsibility for protection and safekeeping of materials and
equipment stored on the Site.
3. Use and occupy only portions of the public streets and alleys, or other public places
or other rights -of -way as provided for in the ordinances of the City, as shown in the
Contract Documents, or as may be specifically authorized in writing by the City.
a. A reasonable amount of tools, materials, and equipment for construction
purposes may be stored in such space, but no more than is necessary to avoid
delay in the construction operations.
CITY OF FORT WORTH Water & Sanitary Sewer to Serve Wichita Industrial
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects 104140
Revised December 20, 2012
011100-2
DAP SUMMARY OF WORK
Page 2 of 3
1 b. Excavated and waste materials shall be stored in such a way as not to interfere
2 with the use of spaces that may be designated to be left free and unobstructed
3 and so as not to inconvenience occupants of adjacent property.
4 c. If the street is occupied by railroad tracks, the Work shall be carried on in such
5 manner as not to interfere with the operation of the railroad.
6 1) All Work shall be in accordance with railroad requirements set forth in
7 Division 0 as well as the railroad permit.
8 D. Work within Easements
9 1. Do not enter upon private property for any purpose without having previously
10 obtained permission from the owner of such property.
11 2. Do not store equipment or material on private property unless and until the
12 specified approval of the property owner has been secured in writing by the
13 Contractor and a copy furnished to the City.
14 3. Unless specifically provided otherwise, clear all rights -of -way or easements of
15 obstructions which must be removed to make possible proper prosecution of the
16 Work as a part of the project construction operations.
17 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants,
18 lawns, fences, culverts, curbing, and all other types of structures or improvements,
19 to all water, sewer, and gas lines, to all conduits, overhead pole lines, or
20 appurtenances thereof, including the construction of temporary fences and to all
21 other public or private property adjacent to the Work.
22 5. Notify the proper representatives of the owners or occupants of the public or private
23 lands of interest in lands which might be affected by the Work.
24 a. Such notice shall be made at least 48 hours in advance of the beginning of the
25 Work.
26 b. Notices shall be applicable to both public and private utility companies and any
27 corporation, company, individual, or other, either as owners or occupants,
28 whose land or interest in land might be affected by the Work.
29 c. Be responsible for all damage or injury to property of any character resulting
30 from any act, omission, neglect, or misconduct in the manner or method or
31 execution of the Work, or at any time due to defective work, material, or
32 equipment.
33 6. Fence
34 a. Restore all fences encountered and removed during construction of the Project
35 to the original or a better than original condition.
36 b. Erect temporary fencing in place of the fencing removed whenever the Work is
37 not in progress and when the site is vacated overnight, and/or at all times to
38 provide site security.
39 c. The cost for all fence work within easements, including removal, temporary
40 closures and replacement, shall be subsidiary to the various items bid in the
41 project proposal, unless a bid item is specifically provided in the proposal.
CITY OF FORT WORTH Water & Sanitary Sewer to Serve Wichita Industrial
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects 104140
Revised December 20, 2012
011100-3
DAP SUMMARY OF WORK
Page 3 of 3
1 1.5
SUBMITTALS [NOT USED]
2 1.6
ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
3 1.7
CLOSEOUT SUBMITTALS [NOT USED]
4 1.8
MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
5 1.9
QUALITY ASSURANCE [NOT USED]
6 1.10
DELIVERY, STORAGE, AND HANDLING [NOT USED]
7 1.11
FIELD [SITE] CONDITIONS [NOT USED]
8 1.12
WARRANTY [NOT USED]
9 PART 2 - PRODUCTS [NOT USED]
10 PART 3 - EXECUTION [NOT USED]
11 END OF SECTION
12
13
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH Water & Sanitary Sewer to Serve Wichita Industrial
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects 104140
Revised December 20, 2012
012500-1
DAP SUBSTITUTION PROCEDURES
SECTION 0125 00
SUBSTITUTION PROCEDURES
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
Page 1 of 4
The procedure for requesting the approval of substitution of a product that is not
equivalent to a product which is specified by descriptive or performance criteria or
defined by reference to 1 or more of the following:
a. Name of manufacturer
b. Name of vendor
c. Trade name
d. Catalog number
2. Substitutions are not "or -equals".
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various items bid. No
separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Request for Substitution - General
1. Within 30 days after award of Contract (unless noted otherwise), the City will
consider formal requests from Contractor for substitution of products in place of
those specified.
2. Certain types of equipment and kinds of material are described in Specifications by
means of references to names of manufacturers and vendors, trade names, or catalog
numbers.
a. When this method of specifying is used, it is not intended to exclude from
consideration other products bearing other manufacturer's or vendor's names,
trade names, or catalog numbers, provided said products are "or -equals," as
determined by City.
3. Other types of equipment and kinds of material may be acceptable substitutions
under the following conditions:
a. Or -equals are unavailable due to strike, discontinued production of products
meeting specified requirements, or other factors beyond control of Contractor;
or,
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised August 30, 2013
012500-2
DAP SUBSTITUTION PROCEDURES
Page 2 of 4
b. Contractor proposes a cost and/or time reduction incentive to the City.
1.5 SUBMITTALS
A. See Request for Substitution Form (attached)
B. Procedure for Requesting Substitution
1. Substitution shall be considered only:
a. After award of Contract
b. Under the conditions stated herein
2. Submit 3 copies of each written request for substitution, including:
a. Documentation
1) Complete data substantiating compliance of proposed substitution with
Contract Documents
2) Data relating to changes in construction schedule, when a reduction is
proposed
3) Data relating to changes in cost
b. For products
1) Product identification
a) Manufacturer's name
b) Telephone number and representative contact name
c) Specification Section or Drawing reference of originally specified
product, including discrete name or tag number assigned to original
product in the Contract Documents
2) Manufacturer's literature clearly marked to show compliance of proposed
product with Contract Documents
3) Itemized comparison of original and proposed product addressing product
characteristics including, but not necessarily limited to:
a) Size
b) Composition or materials of construction
c) Weight
d) Electrical or mechanical requirements
4) Product experience
a) Location of past projects utilizing product
b) Name and telephone number of persons associated with referenced
projects knowledgeable concerning proposed product
c) Available field data and reports associated with proposed product
5) Samples
a) Provide at request of City.
b) Samples become the property of the City.
c. For construction methods:
1) Detailed description of proposed method
2) Illustration drawings
C. Approval or Rejection
1. Written approval or rejection of substitution given by the City
2. City reserves the right to require proposed product to comply with color and pattern
of specified product if necessary to secure design intent.
3. In the event the substitution is approved, if a reduction in cost or time results, it will
be documented by Change Order.
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised August 30, 2013
012500-3
DAP SUBSTITUTION PROCEDURES
Page 3 of 4
4. Substitution will be rejected if.
a. Submittal is not through the Contractor with his stamp of approval
b. Request is not made in accordance with this Specification Section
c. In the Developer's opinion, acceptance will require substantial revision of the
original design
d. In the City's or Developer's opinion, substitution will not perform adequately
the function consistent with the design intent
1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE
A. In making request for substitution or in using an approved product, the Contractor
represents that the Contractor:
1. Has investigated proposed product, and has determined that it is adequate or
superior in all respects to that specified, and that it will perform function for which it
is intended
2. Will provide same guarantee for substitute item as for product specified
3. Will coordinate installation of accepted substitution into Work, to include building
modifications if necessary, making such changes as may be required for Work to be
complete in all respects
4. Waives all claims for additional costs related to substitution which subsequently
arise
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised August 30, 2013
012500-4
DAP SUBSTITUTION PROCEDURES
Page 4 of 4
EXHIBIT A
REQUEST FOR SUBSTITUTION FORM:
PROJECT: DATE:
We hereby submit for your consideration the following product instead of the specified item for
the above project:
SECTION PARAGRAPH SPECIFIED ITEM
Proposed Substitution:
Reason for Substitution:
Include complete information on changes to Drawings and/or Specifications which proposed
substitution will require for its proper installation.
Fill in Blanks Below:
A. Will the undersigned contractor pay for changes to the building design, including engineering
and detailing costs caused by the requested substitution?
B. What effect does substitution have on other trades?
C. Differences between proposed substitution and specified item?
D. Differences in product cost or product delivery time?
E. Manufacturer's guarantees of the proposed and specified items are:
Equal Better (explain on attachment)
The undersigned states that the function, appearance and quality are equivalent or superior to the
specified item.
Submitted By: For Use by City
Signature Recommended
as noted
Firm Not recommended
Address By
Date
Date Remarks
Telephone
For Use by City:
Approved Rejected
City Date
Recommended
Received late
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised August 30, 2013
013119-1
DAP PRECONSTRUCTION MEETING
SECTION 01 31 19
PRECONSTRUCTION MEETING
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
Page 1 of 3
1. Provisions for the preconstruction meeting to be held prior to the start of Work to
clarify construction contract administration procedures
B. Deviations from this City of Fort Worth Standard Specification
1. No construction schedule required unless requested by the City.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Coordination
1. Attend preconstruction meeting.
2. Representatives of Contractor, subcontractors and suppliers attending meetings
shall be qualified and authorized to act on behalf of the entity each represents.
3. Meeting administered by City may be tape recorded.
a. If recorded, tapes will be used to prepare minutes and retained by City for
future reference.
B. Preconstruction Meeting
1. A preconstruction meeting will be held within 14 days after the delivery of the
distribution package to the City.
a. The meeting will be scheduled and administered by the City.
2. The Project Representative will preside at the meeting, prepare the notes of the
meeting and distribute copies of same to all participants who so request by fully
completing the attendance form to be circulated at the beginning of the meeting.
3. Attendance shall include:
a. Developer and Consultant
b. Contractor's project manager
c. Contractor's superintendent
d. Any subcontractor or supplier representatives whom the Contractor may desire
to invite or the City may request
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised August 30, 2013
01 31 19 - 2
DAP PRECONSTRUCTION MEETING
Page 2 of 3
e. Other City representatives
f. Others as appropriate
4. Preliminary Agenda may include:
a. Introduction of Project Personnel
b. General Description of Project
c. Status of right-of-way, utility clearances, easements or other pertinent permits
d. Contractor's work plan and schedule
e. Contract Time
f. Notice to Proceed
g. Construction Staking
h. Progress Payments
i. Extra Work and Change Order Procedures
j. Field Orders
k. Disposal Site Letter for Waste Material
1. Insurance Renewals
m. Payroll Certification
n. Material Certifications and Quality Control Testing
o. Public Safety and Convenience
p. Documentation of Pre -Construction Conditions
q. Weekend Work Notification
r. Legal Holidays
s. Trench Safety Plans
t. Confined Space Entry Standards
u. Coordination with the City's representative for operations of existing water
systems
v. Storm Water Pollution Prevention Plan
w. Coordination with other Contractors
x. Early Warning System
y. Contractor Evaluation
z. Special Conditions applicable to the project
aa. Damages Claims
bb. Submittal Procedures
cc. Substitution Procedures
dd. Correspondence Routing
ee. Record Drawings
ff. Temporary construction facilities
gg. MBE/SBE procedures
hh. Final Acceptance
ii. Final Payment
J. Questions or Comments
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised August 30, 2013
013119-3
DAP PRECONSTRUCTION MEETING
Page 3 of 3
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised August 30, 2013
013216-1
DAP CONSTRUCTION PROGRESS SCHEDULE
Page 1 of 5
SECTION 0132 16
CONSTRUCTION PROGRESS SCHEDULE
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. General requirements for the preparation, submittal, updating, status reporting and
management of the Construction Progress Schedule
2. Specific requirements are presented in the City of Fort Worth Schedule Guidance
Document
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
IWAKUW41W.Iel7Z%140IBlel89ZIZy011117V
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES
A. Definitions
1. Schedule Tiers
a. Tier 1 - No schedule submittal required by contract. Small, brief duration
projects
b. Tier 2 - No schedule submittal required by contract, but will require some
milestone dates. Small, brief duration projects
c. Tier 3 - Schedule submittal required by contract as described in the
Specification and herein. Majority of City projects, including all bond program
projects
d. Tier 4 - Schedule submittal required by contract as described in the
Specification and herein. Large and/or complex projects with long durations
1) Examples: large water pump station project and associated pipeline with
interconnection to another governmental entity
e. Tier 5 - Schedule submittal required by contract as described in the
Specification and herein. Large and/or very complex projects with long
durations, high public visibility
1) Examples might include a water or wastewater treatment plant
2. Baseline Schedule - Initial schedule submitted before work begins that will serve
as the baseline for measuring progress and departures from the schedule.
3. Progress Schedule - Monthly submittal of a progress schedule documenting
progress on the project and any changes anticipated.
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised July 1, 2011
013216-2
DAP CONSTRUCTION PROGRESS SCHEDULE
Page 2 of 5
4. Schedule Narrative - Concise narrative of the schedule including schedule
changes, expected delays, key schedule issues, critical path items, etc
B. Reference Standards
1. City of Fort Worth Schedule Guidance Document
1.4 ADMINISTRATIVE REQUIREMENTS
A. Baseline Schedule
1. General
a. Prepare a cost -loaded baseline Schedule using approved software and the
Critical Path Method (CPM) as required in the City of Fort Worth Schedule
Guidance Document.
b. Review the draft cost -loaded baseline Schedule with the City to demonstrate
understanding of the work to be performed and known issues and constraints
related to the schedule.
c. Designate an authorized representative (Project Scheduler) responsible for
developing and updating the schedule and preparing reports.
B. Progress Schedule
1. Update the progress Schedule monthly as required in the City of Fort Worth
Schedule Guidance Document.
2. Prepare the Schedule Narrative to accompany the monthly progress Schedule.
3. Change Orders
a. Incorporate approved change orders, resulting in a change of contract time, in
the baseline Schedule in accordance with City of Fort Worth Schedule
Guidance Document.
C. Responsibility for Schedule Compliance
1. Whenever it becomes apparent from the current progress Schedule and CPM Status
Report that delays to the critical path have resulted and the Contract completion
date will not be met, or when so directed by the City, make some or all of the
following actions at no additional cost to the City
a. Submit a Recovery Plan to the City for approval revised baseline Schedule
outlining:
1) A written statement of the steps intended to take to remove or arrest the
delay to the critical path in the approved schedule
2) Increase construction manpower in such quantities and crafts as will
substantially eliminate the backlog of work and return current Schedule to
meet projected baseline completion dates
3) Increase the number of working hours per shift, shifts per day, working
days per week, the amount of construction equipment, or any combination
of the foregoing, sufficiently to substantially eliminate the backlog of work
4) Reschedule activities to achieve maximum practical concurrency of
accomplishment of activities, and comply with the revised schedule
2. If no written statement of the steps intended to take is submitted when so requested
by the City, the City may direct the Contractor to increase the level of effort in
manpower (trades), equipment and work schedule (overtime, weekend and holiday
work, etc.) to be employed by the Contractor in order to remove or arrest the delay
to the critical path in the approved schedule.
a. No additional cost for such work will be considered.
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised July 1, 2011
013216-3
DAP CONSTRUCTION PROGRESS SCHEDULE
Page 3 of 5
D. The Contract completion time will be adjusted only for causes specified in this
Contract.
a. Requests for an extension of any Contract completion date must be
supplemented with the following:
1) Furnish justification and supporting evidence as the City may deem
necessary to determine whether the requested extension of time is entitled
under the provisions of this Contract.
a) The City will, after receipt of such justification and supporting
evidence, make findings of fact and will advise the Contractor, in
writing thereof.
2) If the City finds that the requested extension of time is entitled, the City's
determination as to the total number of days allowed for the extensions
shall be based upon the approved total baseline schedule and on all data
relevant to the extension.
a) Such data shall be included in the next updating of the Progress
schedule.
b) Actual delays in activities which, according to the Baseline schedule,
do not affect any Contract completion date shown by the critical path in
the network will not be the basis for a change therein.
2. Submit each request for change in Contract completion date to the City within 30
days after the beginning of the delay for which a time extension is requested but
before the date of final payment under this Contract.
a. No time extension will be granted for requests which are not submitted within
the foregoing time limit.
b. From time to time, it may be necessary for the Contract schedule or completion
time to be adjusted by the City to reflect the effects of job conditions, weather,
technical difficulties, strikes, unavoidable delays on the part of the City or its
representatives, and other unforeseeable conditions which may indicate
schedule adjustments or completion time extensions.
1) Under such conditions, the City will direct the Contractor to reschedule the
work or Contract completion time to reflect the changed conditions and the
Contractor shall revise his schedule accordingly.
a) No additional compensation will be made to the Contractor for such
schedule changes except for unavoidable overall contract time
extensions beyond the actual completion of unaffected work, in which
case the Contractor shall take all possible action to minimize any time
extension and any additional cost to the City.
b) Available float time in the Baseline schedule may be used by the City
as well as by the Contractor.
3. Float or slack time is defined as the amount of time between the earliest start date
and the latest start date or between the earliest finish date and the latest finish date
of a chain of activities on the Baseline Schedule.
a. Float or slack time is not for the exclusive use or benefit of either the
Contractor or the City.
b. Proceed with work according to early start dates, and the City shall have the
right to reserve and apportion float time according to the needs of the project.
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised July 1, 2011
013216-4
DAP CONSTRUCTION PROGRESS SCHEDULE
Page 4 of 5
c. Acknowledge and agree that actual delays, affecting paths of activities
containing float time, will not have any effect upon contract completion times,
providing that the actual delay does not exceed the float time associated with
those activities.
E. Coordinating Schedule with Other Contract Schedules
1. Where work is to be performed under this Contract concurrently with or contingent
upon work performed on the same facilities or area under other contracts, the
Baseline Schedule shall be coordinated with the schedules of the other contracts.
a. Obtain the schedules of the other appropriate contracts from the City for the
preparation and updating of Baseline schedule and make the required changes
in his schedule when indicated by changes in corresponding schedules.
2. In case of interference between the operations of different contractors, the City will
determine the work priority of each contractor and the sequence of work necessary
to expedite the completion of the entire Project.
a. In such cases, the decision of the City shall be accepted as final.
b. The temporary delay of any work due to such circumstances shall not be
considered as justification for claims for additional compensation.
1.5 SUBMITTALS
A. Baseline Schedule
1. Submit Schedule in native file format and pdf format as required in the City of Fort
Worth Schedule Guidance Document.
a. Native file format includes:
1) Primavera (P6 or Primavera Contractor)
2. Submit draft baseline Schedule to City prior to the pre -construction meeting and
bring in hard copy to the meeting for review and discussion.
B. Progress Schedule
1. Submit progress Schedule in native file format and pdf format as required in the
City of Fort Worth Schedule Guidance Document.
2. Submit progress Schedule monthly no later than the last day of the month.
C. Schedule Narrative
1. Submit the schedule narrative in pdf format as required in the City of Fort Worth
Schedule Guidance Document.
2. Submit schedule narrative monthly no later than the last day of the month.
D. Submittal Process
1. The City administers and manages schedules through Buzzsaw.
2. Contractor shall submit documents as required in the City of Fort Worth Schedule
Guidance Document.
3. Once the project has been completed and Final Acceptance has been issued by the
City, no further progress schedules are required.
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised July 1, 2011
013216-5
DAP CONSTRUCTION PROGRESS SCHEDULE
Page 5 of 5
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE
A. The person preparing and revising the construction Progress Schedule shall be
experienced in the preparation of schedules of similar complexity.
B. Schedule and supporting documents addressed in this Specification shall be prepared,
updated and revised to accurately reflect the performance of the construction.
C. Contractor is responsible for the quality of all submittals in this section meeting the
standard of care for the construction industry for similar projects.
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised July 1, 2011
013233-1
DAP PRECONSTRUCTION VIDEO
Page 1 of 2
SECTION 0132 33
PRECONSTRUCTION VIDEO
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Administrative and procedural requirements for:
a. Preconstruction Videos
B. Deviations from this City of Fort Worth Standard Specification
1. Though not mandatory, it is highly recommended on infill developer projects.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Preconstruction Video
1. Produce a preconstruction video of the site/alignment, including all areas in the
vicinity of and to be affected by construction.
a. Provide digital copy of video upon request by the City.
2. Retain a copy of the preconstruction video until the end of the maintenance surety
period.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised August 30, 2013
01 32 33 - 2
DAP PRECONSTRUCTION VIDEO
Page 2 of 2
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised August 30, 2013
SECTION 0133 00
DAP SUBMITTALS
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
013300-1
DAP SUBMITTALS
Page 1 of 8
General methods and requirements of submissions applicable to the following
Work -related submittals:
a. Shop Drawings
b. Product Data (including Standard Product List submittals)
c. Samples
d. Mock Ups
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Coordination
1. Notify the City in writing, at the time of submittal, of any deviations in the
submittals from the requirements of the Contract Documents.
2. Coordination of Submittal Times
a. Prepare, prioritize and transmit each submittal sufficiently in advance of
performing the related Work or other applicable activities, or within the time
specified in the individual Work Sections, of the Specifications.
b. Contractor is responsible such that the installation will not be delayed by
processing times including, but not limited to:
a) Disapproval and resubmittal (if required)
b) Coordination with other submittals
c) Testing
d) Purchasing
e) Fabrication
f) Delivery
g) Similar sequenced activities
c. No extension of time will be authorized because of the Contractor's failure to
transmit submittals sufficiently in advance of the Work.
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised August 30, 2013
013300-2
DAP SUBMITTALS
Page 2 of 8
d. Make submittals promptly in accordance with approved schedule, and in such
sequence as to cause no delay in the Work or in the work of any other
contractor.
B. Submittal Numbering
When submitting shop drawings or samples, utilize a 9-character submittal cross-
reference identification numbering system in the following manner:
a. Use the first 6 digits of the applicable Specification Section Number.
b. For the next 2 digits number use numbers 01-99 to sequentially number each
initial separate item or drawing submitted under each specific Section number.
c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e.
A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical
submittal number would be as follows:
03 30 00-08-B
1) 03 30 00 is the Specification Section for Concrete
2) 08 is the eighth initial submittal under this Specification Section
3) B is the third submission (second resubmission) of that particular shop
drawing
C. Contractor Certification
Review shop drawings, product data and samples, including those by
subcontractors, prior to submission to determine and verify the following:
a. Field measurements
b. Field construction criteria
c. Catalog numbers and similar data
d. Conformance with the Contract Documents
2. Provide each shop drawing, sample and product data submitted by the Contractor
with a Certification Statement affixed including:
a. The Contractor's Company name
b. Signature of submittal reviewer
c. Certification Statement
1) `By this submittal, I hereby represent that I have determined and verified
field measurements, field construction criteria, materials, dimensions,
catalog numbers and similar data and I have checked and coordinated each
item with other applicable approved shop drawings."
D. Submittal Format
1. Fold shop drawings larger than 8 '/2 inches x 11 inches to 8 '/2 inches x 11 inches.
2. Bind shop drawings and product data sheets together.
3. Order
a. Cover Sheet
1) Description of Packet
2) Contractor Certification
b. List of items / Table of Contents
c. Product Data /Shop Drawings/Samples /Calculations
E. Submittal Content
1. The date of submission and the dates of any previous submissions
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised August 30, 2013
013300-3
DAP SUBMITTALS
Page 3 of 8
2. The Project title and number
3. Contractor identification
4. The names of:
a. Contractor
b. Supplier
c. Manufacturer
5. Identification of the product, with the Specification Section number, page and
paragraph(s)
6. Field dimensions, clearly identified as such
7. Relation to adjacent or critical features of the Work or materials
8. Applicable standards, such as ASTM or Federal Specification numbers
9. Identification by highlighting of deviations from Contract Documents
10. Identification by highlighting of revisions on resubmittals
11. An 8-inch x 3-inch blank space for Contractor and City stamps
F. Shop Drawings
1. As specified in individual Work Sections includes, but is not necessarily limited to:
a. Custom -prepared data such as fabrication and erection/installation (working)
drawings
b. Scheduled information
c. Setting diagrams
d. Actual shopwork manufacturing instructions
e. Custom templates
f. Special wiring diagrams
g. Coordination drawings
h. Individual system or equipment inspection and test reports including:
1) Performance curves and certifications
i. As applicable to the Work
2. Details
a. Relation of the various parts to the main members and lines of the structure
b. Where correct fabrication of the Work depends upon field measurements
1) Provide such measurements and note on the drawings prior to submitting
for approval.
G. Product Data
1. For submittals of product data for products included on the City's Standard Product
List, clearly identify each item selected for use on the Project.
2. For submittals of product data for products not included on the City's Standard
Product List, submittal data may include, but is not necessarily limited to:
a. Standard prepared data for manufactured products (sometimes referred to as
catalog data)
1) Such as the manufacturer's product specification and installation
instructions
2) Availability of colors and patterns
3) Manufacturer's printed statements of compliances and applicability
4) Roughing -in diagrams and templates
5) Catalog cuts
6) Product photographs
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised August 30, 2013
013300-4
DAP SUBMITTALS
Page 4 of 8
7) Standard wiring diagrams
8) Printed performance curves and operational -range diagrams
9) Production or quality control inspection and test reports and certifications
10) Mill reports
11) Product operating and maintenance instructions and recommended
spare -parts listing and printed product warranties
12) As applicable to the Work
H. Samples
As specified in individual Sections, include, but are not necessarily limited to:
a. Physical examples of the Work such as:
1) Sections of manufactured or fabricated Work
2) Small cuts or containers of materials
3) Complete units of repetitively used products color/texture/pattern swatches
and range sets
4) Specimens for coordination of visual effect
5) Graphic symbols and units of Work to be used by the City for independent
inspection and testing, as applicable to the Work
I. Do not start Work requiring a shop drawing, sample or product data nor any material to
be fabricated or installed prior to the approval or qualified approval of such item.
1. Fabrication performed, materials purchased or on -site construction accomplished
which does not conform to approved shop drawings and data is at the Contractor's
risk.
2. The City will not be liable for any expense or delay due to corrections or remedies
required to accomplish conformity.
3. Complete project Work, materials, fabrication, and installations in conformance
with approved shop drawings, applicable samples, and product data.
J. Submittal Distribution
Electronic Distribution
a. Confirm development of Project directory for electronic submittals to be
uploaded to City's Buzzsaw site, or another external FTP site approved by the
City.
b. Shop Drawings
1) Upload submittal to designated project directory and notify appropriate
City representatives via email of submittal posting.
2) Hard Copies
a) 3 copies for all submittals
b) If Contractor requires more than 1 hard copy of Shop Drawings
returned, Contractor shall submit more than the number of copies listed
above.
c. Product Data
1) Upload submittal to designated project directory and notify appropriate
City representatives via email of submittal posting.
2) Hard Copies
a) 3 copies for all submittals
d. Samples
1) Distributed to the Project Representative
2. Hard Copy Distribution (if required in lieu of electronic distribution)
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised August 30, 2013
013300-5
DAP SUBMITTALS
Page 5 of 8
a. Shop Drawings
1) Distributed to the City
2) Copies
a) 8 copies for mechanical submittals
b) 7 copies for all other submittals
c) If Contractor requires more than 3 copies of Shop Drawings returned,
Contractor shall submit more than the number of copies listed above.
b. Product Data
1) Distributed to the City
2) Copies
a) 4 copies
c. Samples
1) Distributed to the Project Representative
2) Copies
a) Submit the number stated in the respective Specification Sections.
Distribute reproductions of approved shop drawings and copies of approved
product data and samples, where required, to the job site file and elsewhere as
directed by the City.
a. Provide number of copies as directed by the City but not exceeding the number
previously specified.
K. Submittal Review
1. The review of shop drawings, data and samples will be for general conformance
with the design concept and Contract Documents. This is not to be construed as:
a. Permitting any departure from the Contract requirements
b. Relieving the Contractor of responsibility for any errors, including details,
dimensions, and materials
c. Approving departures from details furnished by the City, except as otherwise
provided herein
2. The review and approval of shop drawings, samples or product data by the City
does not relieve the Contractor from his/her responsibility with regard to the
fulfillment of the terms of the Contract.
a. All risks of error and omission are assumed by the Contractor, and the City will
have no responsibility therefore.
3. The Contractor remains responsible for details and accuracy, for coordinating the
Work with all other associated work and trades, for selecting fabrication processes,
for techniques of assembly and for performing Work in a safe manner.
4. If the shop drawings, data or samples as submitted describe variations and show a
departure from the Contract requirements which City finds to be in the interest of
the City and to be so minor as not to involve a change in Contract Price or time for
performance, the City may return the reviewed drawings without noting an
exception.
5. Submittals will be returned to the Contractor under 1 of the following codes:
a. Code 1
1) "NO EXCEPTIONS TAKEN' is assigned when there are no notations or
comments on the submittal.
a) When returned under this code the Contractor may release the
equipment and/or material for manufacture.
b. Code 2
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised August 30, 2013
013300-6
DAP SUBMITTALS
Page 6 of 8
1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of
the notations and comments IS NOT required by the Contractor.
a) The Contractor may release the equipment or material for manufacture;
however, all notations and comments must be incorporated into the
final product.
c. Code 3
1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is
assigned when notations and comments are extensive enough to require a
resubmittal of the package.
a) The Contractor may release the equipment or material for manufacture;
however, all notations and comments must be incorporated into the
final product.
b) This resubmittal is to address all comments, omissions and
non -conforming items that were noted.
c) Resubmittal is to be received by the City within 15 Calendar Days of
the date of the City's transmittal requiring the resubmittal.
d. Code 4
1) "NOT APPROVED" is assigned when the submittal does not meet the
intent of the Contract Documents.
a) The Contractor must resubmit the entire package revised to bring the
submittal into conformance.
b) It may be necessary to resubmit using a different manufacturer/vendor
to meet the Contract Documents.
6. Resubmittals
a. Handled in the same manner as first submittals
1) Corrections other than requested by the City
2) Marked with revision triangle or other similar method
a) At Contractor's risk if not marked
b. Submittals for each item will be reviewed no more than twice at the City's
expense.
1) All subsequent reviews will be performed at times convenient to the City
and at the Contractor's expense, based on the City's or City
Representative's then prevailing rates.
2) Provide Contractor reimbursement to the City within 30 Calendar Days for
all such fees invoiced by the City.
c. The need for more than 1 resubmission or any other delay in obtaining City's
review of submittals, will not entitle the Contractor to an extension of Contract
Time.
7. Partial Submittals
a. City reserves the right to not review submittals deemed partial, at the City's
discretion.
b. Submittals deemed by the City to be not complete will be returned to the
Contractor, and will be considered "Not Approved" until resubmitted.
c. The City may at its option provide a list or mark the submittal directing the
Contractor to the areas that are incomplete.
8. If the Contractor considers any correction indicated on the shop drawings to
constitute a change to the Contract Documents, then written notice must be
provided thereof to the Developer at least 7 Calendar Days prior to release for
manufacture.
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised August 30, 2013
013300-7
DAP SUBMITTALS
Page 7 of 8
9. When the shop drawings have been completed to the satisfaction of the City, the
Contractor may carry out the construction in accordance therewith and no further
changes therein except upon written instructions from the City.
10. Each submittal, appropriately coded, will be returned within 30 Calendar Days
following receipt of submittal by the City.
L. Mock ups
1. Mock Up units as specified in individual Sections, include, but are not necessarily
limited to, complete units of the standard of acceptance for that type of Work to be
used on the Project. Remove at the completion of the Work or when directed.
M. Qualifications
1. If specifically required in other Sections of these Specifications, submit a P.E.
Certification for each item required.
N. Request for Information (RFI)
1. Contractor Request for additional information
a. Clarification or interpretation of the contract documents
b. When the Contractor believes there is a conflict between Contract Documents
c. When the Contractor believes there is a conflict between the Drawings and
Specifications
1) Identify the conflict and request clarification
2. Sufficient information shall be attached to permit a written response without further
information.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised August 30, 2013
013300-8
DAP SUBMITTALS
Page 8 of 8
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
D 31111=1x4011130
Revision Log
DATE NAME SUMMARY OF CHANGE
12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised August 30, 2013
0135 13- 1
DAP SPECIAL PROJECT PROCEDURES
Page 1 of 7
1 SECTION 0135 13
2 SPECIAL PROJECT PROCEDURES
3 PART1- GENERAL
4 1.1 SUMMARY
5
A. Section Includes:
6
1. The
procedures for special project circumstances that includes, but is not limited to:
7
a.
Coordination with the Texas Department of Transportation
8
b.
Work near High Voltage Lines
9
c.
Confined Space Entry Program
10
d.
Air Pollution Watch Days
11
e.
Use of Explosives, Drop Weight, Etc.
12
£
Water Department Notification
13
g.
Public Notification Prior to Beginning Construction
14
h.
Coordination with United States Army Corps of Engineers
15
i.
Coordination within Railroad permits areas
16
j.
Dust Control
17
k.
Employee Parking
18
B. Deviations from this City of Fort Worth Standard Specification
19
1. None.
20 C. Related Specification Sections include, but are not necessarily limited to:
21 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
22 2. Division 1 — General Requirements
23 3. Section 33 12 25 — Connection to Existing Water Mains
24
25 1.2 REFERENCES
26 A. Reference Standards
27 1. Reference standards cited in this Specification refer to the current reference
28 standard published at the time of the latest revision date logged at the end of this
29 Specification, unless a date is specifically cited.
30 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752.
31 High Voltage Overhead Lines.
32 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction
33 Specification
34 1.3 ADMINISTRATIVE REQUIREMENTS
35 A. Coordination with the Texas Department of Transportation
36 1. When work in the right-of-way which is under the jurisdiction of the Texas
37 Department of Transportation (TxDOT):
38 a. Notify the Texas Department of Transportation prior to commencing any work
39 therein in accordance with the provisions of the permit
CITY OF FORT WORTH Water & Sewer to Serve Wichita Industrial
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104140
Revised August, 30, 2013
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
013513-2
DAP SPECIAL PROJECT PROCEDURES
Page 2 of 7
b. All work performed in the TxDOT right-of-way shall be performed in
compliance with and subject to approval from the Texas Department of
Transportation
B. Work near High Voltage Lines
1. Regulatory Requirements
a. All Work near High Voltage Lines (more than 600 volts measured between
conductors or between a conductor and the ground) shall be in accordance with
Health and Safety Code, Title 9, Subtitle A, Chapter 752.
2. Warning sign
a. Provide sign of sufficient size meeting all OSHA requirements.
3. Equipment operating within 10 feet of high voltage lines will require the following
safety features
a. Insulating cage -type of guard about the boom or arm
b. Insulator links on the lift hook connections for back hoes or dippers
c. Equipment must meet the safety requirements as set forth by OSHA and the
safety requirements of the owner of the high voltage lines
4. Work within 6 feet of high voltage electric lines
a. Notification shall be given to:
1) The power company (example: ONCOR)
a) Maintain an accurate log of all such calls to power company and record
action taken in each case.
b. Coordination with power company
1) After notification coordinate with the power company to:
a) Erect temporary mechanical barriers, de -energize the lines, or raise or
lower the lines
c. No personnel may work within 6 feet of a high voltage line before the above
requirements have been met.
C. Confined Space Entry Program
1. Provide and follow approved Confined Space Entry Program in accordance with
OSHA requirements.
2. Confined Spaces include:
a. Manholes
b. All other confined spaces in accordance with OSHA's Permit Required for
Confined Spaces
D. Use of Explosives, Drop Weight, Etc.
1. When Contract Documents permit on the project the following will apply:
a. Public Notification
1) Submit notice to City and proof of adequate insurance coverage, 24 hours
prior to commencing.
2) Minimum 24 hour public notification in accordance with Section 0131 13
E. Water Department Coordination
1. During the construction of this project, it will be necessary to deactivate, for a
period of time, existing lines. The Contractor shall be required to coordinate with
the Water Department to determine the best times for deactivating and activating
those lines.
CITY OF FORT WORTH Water & Sewer to Serve Wichita Industrial
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104140
Revised August, 30, 2013
013513-3
DAP SPECIAL PROJECT PROCEDURES
Page 3 of 7
1 2. Coordinate any event that will require connecting to or the operation of an existing
2 City water line system with the City's representative.
3 a. Coordination shall be in accordance with Section 33 12 25.
4 b. If needed, obtain a hydrant water meter from the Water Department for use
5 during the life of named project.
6 c. In the event that a water valve on an existing live system be turned off and on
7 to accommodate the construction of the project is required, coordinate this
8 activity through the appropriate City representative.
9 1) Do not operate water line valves of existing water system.
10 a) Failure to comply will render the Contractor in violation of Texas Penal
11 Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor
12 will be prosecuted to the full extent of the law.
13 b) In addition, the Contractor will assume all liabilities and
14 responsibilities as a result of these actions.
15 F. Public Notification Prior to Beginning Construction
16 1. Prior to beginning construction on any block in the project, on a block by block
17 basis, prepare and deliver a notice or flyer of the pending construction to the front
18 door of each residence or business that will be impacted by construction. The notice
19 shall be prepared as follows:
20 a. Post notice or flyer 7 days prior to beginning any construction activity on each
21 block in the project area.
22 1) Prepare flyer on the Contractor's letterhead and include the following
23 information:
24
a) Name of Project
25
b) City Project No (CPN)
26
c) Scope of Project (i.e. type of construction activity)
27
d) Actual construction duration within the block
28
e) Name of the contractor's foreman and phone number
29
f) Name of the City's inspector and phone number
30
g) City's after-hours phone number
31
2) A sample of the `pre -construction notification' flyer is attached as Exhibit
32
A.
33
3) Submit schedule showing the construction start and finish time for each
34
block of the project to the inspector.
35
4) Deliver flyer to the City Inspector for review prior to distribution.
36
b. No construction will be allowed to begin on any block until the flyer is
37
delivered to all residents of the block.
38 G. Public Notification of Temporary Water Service Interruption during Construction
39 1. In the event it becomes necessary to temporarily shut down water service to
40 residents or businesses during construction, prepare and deliver a notice or flyer of
41 the pending interruption to the front door of each affected resident.
42 2. Prepared notice as follows:
43 a. The notification or flyer shall be posted 24 hours prior to the temporary
44 interruption.
45 b. Prepare flyer on the contractor's letterhead and include the following
46 information:
47 1) Name of the project
48 2) City Project Number
CITY OF FORT WORTH Water & Sewer to Serve Wichita Industrial
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104140
Revised August, 30, 2013
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
01 35 13 - 4
DAP SPECIAL PROJECT PROCEDURES
Page 4 of 7
3) Date of the interruption of service
4) Period the interruption will take place
5) Name of the contractor's foreman and phone number
6) Name of the City's inspector and phone number
c. A sample of the temporary water service interruption notification is attached as
Exhibit B.
d. Deliver a copy of the temporary interruption notification to the City inspector
for review prior to being distributed.
e. No interruption of water service can occur until the flyer has been delivered to
all affected residents and businesses.
f. Electronic versions of the sample flyers can be obtained from the Project
Construction Inspector.
H. Coordination with United States Army Corps of Engineers (USACE)
1. At locations in the Project where construction activities occur in areas where
USACE permits are required, meet all requirements set forth in each designated
permit.
I. Coordination within Railroad Permit Areas
1. At locations in the project where construction activities occur in areas where
railroad permits are required, meet all requirements set forth in each designated
railroad permit. This includes, but is not limited to, provisions for:
a. Flagmen
b. Inspectors
c. Safety training
d. Additional insurance
e. Insurance certificates
f. Other employees required to protect the right-of-way and property of the
Railroad Company from damage arising out of and/or from the construction of
the project. Proper utility clearance procedures shall be used in accordance
with the permit guidelines.
2. Obtain any supplemental information needed to comply with the railroad's
requirements.
J. Dust Control
1. Use acceptable measures to control dust at the Site.
a. If water is used to control dust, capture and properly dispose of waste water.
b. If wet saw cutting is performed, capture and properly dispose of slurry.
K. Employee Parking
1. Provide parking for employees at locations approved by the City.
CITY OF FORT WORTH Water & Sewer to Serve Wichita Industrial
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104140
Revised August, 30, 2013
013513-5
DAP SPECIAL PROJECT PROCEDURES
Page 5 of 7
1 1.4
SUBMITTALS [NOT USED]
2 1.5
ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
3 1.6
CLOSEOUT SUBMITTALS [NOT USED]
4 1.7
MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
5 1.8
QUALITY ASSURANCE [NOT USED]
6 1.9
DELIVERY, STORAGE, AND HANDLING [NOT USED]
7 1.10
FIELD [SITE] CONDITIONS [NOT USED]
8 1.11
WARRANTY [NOT USED]
9 PART 2 - PRODUCTS [NOT USED]
10 PART 3 - EXECUTION [NOT USED]
11 END OF SECTION
12
13
Revision Log
DATE NAME SUMMARY OF CHANGE
1.3.13— Added requirement of compliance with Health and Safety Code, Title 9.
8/31/2012 D. Johnson Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines.
CITY OF FORT WORTH Water & Sewer to Serve Wichita Industrial
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104140
Revised August, 30, 2013
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
01 35 13 - 6
DAP SPECIAL PROJECT PROCEDURES
Page 6 of 7
EXHIBIT A
(To be printed on Contractor's Letterhead)
Date:
CPN No.:
Project Name:
Mapsco Location:
Limits of Construction:
THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT
WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR
PROPERTY.
CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE
OF THIS NOTICE.
IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER
ISSUE, PLEASE CALL:
Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.>
OR
Mr. <CITY INSPECTOR> AT < TELEPHONE NO.>
AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306
PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL
CITY OF FORT WORTH Water & Sewer to Serve Wichita Industrial
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104140
Revised August, 30, 2013
2
3
4
Date:
EXHIBIT B
FORT WORTH
DOE NO. xxxx
Project Name:
013513-7
DAP SPECIAL PROJECT PROCEDURES
Page 7 of 7
NOTICE OF TEMPORARY WATER SERVICE
INTERRUPTION
DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR
WATER SERVICE WILL BE INTERRUPTED ON
BETWEEN THE HOURS OF AND
IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL:
MR. AT
(CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER)
OR
MR. AT
(CITY INSPECTOR) (TELEPHONE NUMBER)
THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE.
THANK YOU,
CONTRACTOR
CITY OF FORT WORTH Water & Sewer to Serve Wichita Industrial
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104140
Revised August, 30, 2013
01 45 23
DAP TESTING AND INSPECTION SERVICES
Page 1 of 2
SECTION 0145 23
TESTING AND INSPECTION SERVICES
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Testing and inspection services procedures and coordination
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
a. Contractor is responsible for performing, coordinating, and payment of all
Quality Control testing.
b. City is responsible for performing and payment for first set of Quality
Assurance testing.
1) If the first Quality Assurance test performed by the City fails, the
Contractor is responsible for payment of subsequent Quality Assurance
testing until a passing test occurs.
a) Final acceptance will not be issued by City until all required payments
for testing by Contractor have been paid in full.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Testing
1. Complete testing in accordance with the Contract Documents.
2. Coordination
a. When testing is required to be performed by the City, notify City, sufficiently
in advance, when testing is needed.
b. When testing is required to be completed by the Contractor, notify City,
sufficiently in advance, that testing will be performed.
3. Distribution of Testing Reports
a. Electronic Distribution
1) Confirm development of Project directory for electronic submittals to be
uploaded to the City's document management system, or another form of
distribution approved by the City.
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised March 20, 2020
01 45 23
DAP TESTING AND INSPECTION SERVICES
Page 2 of 2
2) Upload test reports to designated project directory and notify appropriate
City representatives via email of submittal posting.
3) Hard Copies
a) 1 copy for all submittals submitted to the Project Representative
b. Hard Copy Distribution (if required in lieu of electronic distribution)
1) Tests performed by City
a) Distribute 1 hard copy to the Contractor
2) Tests performed by the Contractor
a) Distribute 3 hard copies to City's Project Representative
4. Provide City's Project Representative with trip tickets for each delivered load of
Concrete or Lime material including the following information:
a. Name of pit
b. Date of delivery
c. Material delivered
B. Inspection
1. Inspection or lack of inspection does not relieve the Contractor from obligation to
perform work in accordance with the Contract Documents.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
03/20/2020 D.V. Magana Removed reference to Buzzsaw and noted that electronic submittals be uploaded
through the City's document management system.
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised March 20, 2020
015000-1
DAP TEMPORARY FACILITIES AND CONTROLS
Page 1 of 4
SECTION 0150 00
TEMPORARY FACILITIES AND CONTROLS
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
Provide temporary facilities and controls needed for the Work including, but not
necessarily limited to:
a. Temporary utilities
b. Sanitary facilities
c. Storage Sheds and Buildings
d. Dust control
e. Temporary fencing of the construction site
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Temporary Utilities
1. Obtaining Temporary Service
a. Make arrangements with utility service companies for temporary services.
b. Abide by rules and regulations of utility service companies or authorities
having jurisdiction.
c. Be responsible for utility service costs until Work is approved for Final
Acceptance.
1) Included are fuel, power, light, heat and other utility services necessary for
execution, completion, testing and initial operation of Work.
2. Water
a. Contractor to provide water required for and in connection with Work to be
performed and for specified tests of piping, equipment, devices or other use as
required for the completion of the Work.
b. Provide and maintain adequate supply of potable water for domestic
consumption by Contractor personnel and City's Project Representatives.
c. Coordination
1) Contact City 1 week before water for construction is desired
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised JULY 1, 2011
01 50 00 - 2
DAP TEMPORARY FACILITIES AND CONTROLS
Page 2 of 4
d. Contractor Payment for Construction Water
1) Obtain construction water meter from City for payment as billed by City's
established rates.
3. Electricity and Lighting
a. Provide and pay for electric powered service as required for Work, including
testing of Work.
1) Provide power for lighting, operation of equipment, or other use.
b. Electric power service includes temporary power service or generator to
maintain operations during scheduled shutdown.
4. Telephone
a. Provide emergency telephone service at Site for use by Contractor personnel
and others performing work or furnishing services at Site.
5. Temporary Heat and Ventilation
a. Provide temporary heat as necessary for protection or completion of Work.
b. Provide temporary heat and ventilation to assure safe working conditions.
B. Sanitary Facilities
1. Provide and maintain sanitary facilities for persons on Site.
a. Comply with regulations of State and local departments of health.
2. Enforce use of sanitary facilities by construction personnel at job site.
a. Enclose and anchor sanitary facilities.
b. No discharge will be allowed from these facilities.
c. Collect and store sewage and waste so as not to cause nuisance or health
problem.
d. Haul sewage and waste off -site at no less than weekly intervals and properly
dispose in accordance with applicable regulation.
3. Locate facilities near Work Site and keep clean and maintained throughout Project.
4. Remove facilities at completion of Project
C. Storage Sheds and Buildings
1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor
above ground level for materials and equipment susceptible to weather damage.
2. Storage of materials not susceptible to weather damage may be on blocks off
ground.
3. Store materials in a neat and orderly manner.
a. Place materials and equipment to permit easy access for identification,
inspection and inventory.
4. Equip building with lockable doors and lighting, and provide electrical service for
equipment space heaters and heating or ventilation as necessary to provide storage
environments acceptable to specified manufacturers.
5. Fill and grade site for temporary structures to provide drainage away from
temporary and existing buildings.
6. Remove building from site prior to Final Acceptance.
D. Temporary Fencing
Provide and maintain for the duration or construction when required in contract
documents
E. Dust Control
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised JULY 1, 2011
01 50 00 - 3
DAP TEMPORARY FACILITIES AND CONTROLS
Page 3 of 4
1. Contractor is responsible for maintaining dust control through the duration of the
project.
a. Contractor remains on -call at all times
b. Must respond in a timely manner
F. Temporary Protection of Construction
1. Contractor or subcontractors are responsible for protecting Work from damage due
to weather.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 INSTALLATION
A. Temporary Facilities
1. Maintain all temporary facilities for duration of construction activities as needed.
3.5 [REPAIR] / [RESTORATION]
3.6 RE -INSTALLATION
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES
A. Temporary Facilities
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised JULY 1, 2011
01 50 00 - 4
DAP TEMPORARY FACILITIES AND CONTROLS
Page 4 of 4
1. Remove all temporary facilities and restore area after completion of the Work, to a
condition equal to or better than prior to start of Work.
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised JULY 1, 2011
015526-1
DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page 1 of 3
SECTION 0155 26
STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Administrative procedures for:
a. Street Use Permit
b. Modification of approved traffic control
c. Removal of Street Signs
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
3. Section 34 71 13 — Traffic Control
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES
A. Reference Standards
1. Reference standards cited in this specification refer to the current reference standard
published at the time of the latest revision date logged at the end of this
specification, unless a date is specifically cited.
2. Texas Manual on Uniform Traffic Control Devices (TMUTCD).
1.4 ADMINISTRATIVE REQUIREMENTS
A. Traffic Control
1. General
a. When traffic control plans are included in the Drawings, provide Traffic
Control in accordance with Drawings and Section 34 71 13.
b. When traffic control plans are not included in the Drawings, prepare traffic
control plans in accordance with Section 34 71 13 and submit to City for
review.
1) Allow minimum 10 working days for review of proposed Traffic Control.
B. Street Use Permit
1. Prior to installation of Traffic Control, a City Street Use Permit is required.
a. To obtain Street Use Permit, submit Traffic Control Plans to City
Transportation and Public Works Department.
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised July 1, 2011
015526-2
DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page 2 of 3
1) Allow a minimum of 5 working days for permit review.
2) Contractor's responsibility to coordinate review of Traffic Control plans for
Street Use Permit, such that construction is not delayed.
C. Modification to Approved Traffic Control
Prior to installation traffic control:
a. Submit revised traffic control plans to City Department Transportation and
Public Works Department.
1) Revise Traffic Control plans in accordance with Section 34 71 13.
2) Allow minimum 5 working days for review of revised Traffic Control.
3) It is the Contractor's responsibility to coordinate review of Traffic Control
plans for Street Use Permit, such that construction is not delayed.
D. Removal of Street Sign
1. If it is determined that a street sign must be removed for construction, then contact
City Transportation and Public Works Department, Signs and Markings Division to
remove the sign.
E. Temporary Signage
1. In the case of regulatory signs, replace permanent sign with temporary sign meeting
requirements of the latest edition of the Texas Manual on Uniform Traffic Control
Devices (MUTCD).
2. Install temporary sign before the removal of permanent sign.
3. When construction is complete, to the extent that the permanent sign can be
reinstalled, contact the City Transportation and Public Works Department, Signs
and Markings Division, to reinstall the permanent sign.
F. Traffic Control Standards
1. Traffic Control Standards can be found on the City's Buzzsaw website.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised July 1, 2011
015526-3
DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page 3 of 3
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised July 1, 2011
015713-1
DAP STORM WATER POLLUTION PREVENTION
Page 1 of 3
SECTION 0157 13
STORM WATER POLLUTION PREVENTION
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Procedures for Storm Water Pollution Prevention Plans
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the
Contract
2. Division 1 — General Requirements
3. Section 3125 00 — Erosion and Sediment Control
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Construction Activities resulting in less than 1 acre of disturbance
a. Work associated with this Item is considered subsidiary to the various Items
bid. No separate payment will be allowed for this Item.
2. Construction Activities resulting in greater than 1 acre of disturbance
a. Measurement and Payment shall be in accordance with Section 3125 00.
1.3 REFERENCES
A. Abbreviations and Acronyms
1. Notice of Intent: NOI
2. Notice of Termination: NOT
3. Storm Water Pollution Prevention Plan: SWPPP
4. Texas Commission on Environmental Quality: TCEQ
5. Notice of Change: NOC
A. Reference Standards
1. Reference standards cited in this Specification refer to the current reference
standard published at the time of the latest revision date logged at the end of this
Specification, unless a date is specifically cited.
2. Integrated Storm Management (iSWM) Technical Manual for Construction
Controls
1.4 ADMINISTRATIVE REQUIREMENTS
A. General
1. Contractor is responsible for resolution and payment of any fines issued associated
with compliance to Stormwater Pollution Prevention Plan.
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised July 1, 2011
01 57 13 - 2
DAP STORM WATER POLLUTION PREVENTION
Page 2 of 3
B. Construction Activities resulting in:
1. Less than 1 acre of disturbance
a. Provide erosion and sediment control in accordance with Section 3125 00 and
Drawings.
2. 1 to less than 5 acres of disturbance
a. Texas Pollutant Discharge Elimination System (TPDES) General Construction
Permit is required
b. Complete SWPPP in accordance with TCEQ requirements
1) TCEQ Small Construction Site Notice Required under general permit
TXR150000
a) Sign and post at job site
b) Prior to Preconstruction Meeting, send 1 copy to City Department of
Transportation and Public Works, Environmental Division, (817) 392-
6088.
2) Provide erosion and sediment control in accordance with:
a) Section 3125 00
b) The Drawings
c) TXR150000 General Permit
d) SWPPP
e) TCEQ requirements
5 acres or more of Disturbance
a. Texas Pollutant Discharge Elimination System (TPDES) General Construction
Permit is required
b. Complete SWPPP in accordance with TCEQ requirements
1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee
a) Sign and post at job site
b) Send copy to City Department of Transportation and Public Works,
Environmental Division, (817) 392-6088.
2) TCEQ Notice of Change required if making changes or updates to NOI
3) Provide erosion and sediment control in accordance with:
a) Section 3125 00
b) The Drawings
c) TXR150000 General Permit
d) SWPPP
e) TCEQ requirements
4) Once the project has been completed and all the closeout requirements of
TCEQ have been met a TCEQ Notice of Termination can be submitted.
a) Send copy to City Department of Transportation and Public Works,
Environmental Division, (817) 392-6088.
1.5 SUBMITTALS
A. SWPPP
Submit in accordance with Section 0133 00, except as stated herein.
a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City
as follows:
1) 1 copy to the City Project Manager
a) City Project Manager will forward to the City Department of
Transportation and Public Works, Environmental Division for review
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised July 1, 2011
0157 13 -3
DAP STORM WATER POLLUTION PREVENTION
Page 3 of 3
B. Modified SWPPP
1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City
in accordance with Section 0133 00.
1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised July 1, 2011
015813-1
DAP TEMPORARY PROJECT SIGNAGE
Page 1 of 3
SECTION 0158 13
TEMPORARY PROJECT SIGNAGE
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Temporary Project Signage Requirements
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART2- PRODUCTS
2.1 OWNER -FURNISHED [oR] OWNER-SUPPLIEDPRODUCTS [NOT USEDI
2.2 EQUIPMENT, PRODUCT TYPES, AND MATERIALS
A. Design Criteria
1. Provide free standing Project Designation Sign in accordance with City's Standard
Details for project signs.
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised April 7, 2014
01 58 13 - 2
DAP TEMPORARY PROJECT SIGNAGE
Page 2 of 3
B. Materials
1. Sign
a. Constructed of 3/4-inch fir plywood, grade A-C (exterior) or better
2.3 ACCESSORIES [NOT USED]
2.4 SOURCE QUALITY CONTROL [NOT USED]
PART 3 - EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 INSTALLATION
A. General
1. Provide vertical installation at extents of project.
2. Relocate sign as needed, upon request of the City.
B. Mounting options
a. Skids
b. Posts
c. Barricade
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE
A. General
1. Maintenance will include painting and repairs as needed or directed by the City.
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised April 7, 2014
0158 13 -3
DAP TEMPORARY PROJECT SIGNAGE
DATE NAME
4/7/2014 M. Domenech
Revision Log
SUMMARY OF CHANGE
Revised for DAP application
Page 3 of 3
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised April 7, 2014
SECTION 0160 00
PRODUCT REQUIREMENTS
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
01 60 00
DAP PRODUCT REQUIREMENTS
Page 1 of 2
1. References for Product Requirements and City Standard Products List
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES [NOT USED]
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A list of City approved products for use is available through the City's website at:
httDs://apps.fortworthtexas.2ov/ProiectResources/ and following the directory
path: 02 - Construction Documents\Standard Products List
A. Only products specifically included on City's Standard Product List in these Contract
Documents shall be allowed for use on the Project.
1. Any subsequently approved products will only be allowed for use upon specific
approval by the City.
B. Any specific product requirements in the Contract Documents supersede similar
products included on the City's Standard Product List.
1. The City reserves the right to not allow products to be used for certain projects even
though the product is listed on the City's Standard Product List.
C. Although a specific product is included on City's Standard Product List, not all
products from that manufacturer are approved for use, including but not limited to, that
manufacturer's standard product.
D. See Section 0133 00 for submittal requirements of Product Data included on City's
Standard Product List.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised March 20, 2020
01 60 00
DAP PRODUCT REQUIREMENTS
Page 2 of 2
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
10/12/12 D. Johnson Modified Location of City's Standard Product List
4/7/2014 M.Domenech Revised for DAP application
03/20/2020 D.V. Magafia Removed reference to Buzzsaw and noted that the City approved products list is
accessible through the City's website.
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised March 20, 2020
016600-1
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 1 of 4
SECTION 0166 00
PRODUCT STORAGE AND HANDLING REQUIREMENTS
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Scheduling of product delivery
2. Packaging of products for delivery
3. Protection of products against damage from:
a. Handling
b. Exposure to elements or harsh environments
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY AND HANDLING
A. Delivery Requirements
1. Schedule delivery of products or equipment as required to allow timely installation
and to avoid prolonged storage.
2. Provide appropriate personnel and equipment to receive deliveries.
3. Delivery trucks will not be permitted to wait extended periods of time on the Site
for personnel or equipment to receive the delivery.
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised April 7, 2014
01 66 00 - 2
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 2 of 4
4. Deliver products or equipment in manufacturer's original unbroken cartons or other
containers designed and constructed to protect the contents from physical or
environmental damage.
5. Clearly and fully mark and identify as to manufacturer, item and installation
location.
6. Provide manufacturer's instructions for storage and handling.
B. Handling Requirements
1. Handle products or equipment in accordance with these Contract Documents and
manufacturer's recommendations and instructions.
C. Storage Requirements
1. Store materials in accordance with manufacturer's recommendations and
requirements of these Specifications.
2. Make necessary provisions for safe storage of materials and equipment.
a. Place loose soil materials and materials to be incorporated into Work to prevent
damage to any part of Work or existing facilities and to maintain free access at
all times to all parts of Work and to utility service company installations in
vicinity of Work.
3. Keep materials and equipment neatly and compactly stored in locations that will
cause minimum inconvenience to other contractors, public travel, adjoining owners,
tenants and occupants.
a. Arrange storage to provide easy access for inspection.
4. Restrict storage to areas available on construction site for storage of material and
equipment as shown on Drawings, or approved by City's Project Representative.
5. Provide off -site storage and protection when on -site storage is not adequate.
a. Provide addresses of and access to off -site storage locations for inspection by
City's Project Representative.
6. Do not use lawns, grass plots or other private property for storage purposes without
written permission of owner or other person in possession or control of premises.
7. Store in manufacturers' unopened containers.
8. Neatly, safely and compactly stack materials delivered and stored along line of
Work to avoid inconvenience and damage to property owners and general public
and maintain at least 3 feet from fire hydrant.
9. Keep public and private driveways and street crossings open.
10. Repair or replace damaged lawns, sidewalks, streets or other improvements to
satisfaction of City's Project Representative.
a. Total length which materials may be distributed along route of construction at
one time is 1,000 linear feet, unless otherwise approved in writing by City's
Project Representative.
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised April 7, 2014
016600-3
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 3 of 4
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 ERECTION [NOT USED]
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL
A. Tests and Inspections
1. Inspect all products or equipment delivered to the site prior to unloading.
B. Non -Conforming Work
1. Reject all products or equipment that are damaged, used or in any other way
unsatisfactory for use on the project.
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION
A. Protect all products or equipment in accordance with manufacturer's written directions.
B. Store products or equipment in location to avoid physical damage to items while in
storage.
C. Protect equipment from exposure to elements and keep thoroughly dry if required by
the manufacturer.
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised April 7, 2014
01 66 00 - 4
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 4 of 4
Revision Log
DATE NAME SUMMARY OF CHANGE
4/7/2014 M.Domenech Revised for DAP application
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised April 7, 2014
SECTION 0174 23
CLEANING
PART1- GENERAL
1.1 SUMMARY
017423-1
DAP CLEANING
Page 1 of 4
A. Section Includes:
1. Intermediate and final cleaning for Work not including special cleaning of closed
systems specified elsewhere
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Scheduling
1. Schedule cleaning operations so that dust and other contaminants disturbed by
cleaning process will not fall on newly painted surfaces.
2. Schedule final cleaning upon completion of Work and immediately prior to final
inspection.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 STORAGE, AND HANDLING
A. Storage and Handling Requirements
1. Store cleaning products and cleaning wastes in containers specifically designed for
those materials.
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised April 7, 2014
01 74 23 - 2
DAP CLEANING
Page 2 of 4
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART2- PRODUCTS
2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED]
2.2 MATERIALS
A. Cleaning Agents
1. Compatible with surface being cleaned
2. New and uncontaminated
3. For manufactured surfaces
a. Material recommended by manufacturer
2.3 ACCESSORIES [NOT USED]
2.4 SOURCE QUALITY CONTROL [NOT USED]
PART 3 - EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 APPLICATION [NOT USED]
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING
A. General
1. Prevent accumulation of wastes that create hazardous conditions.
2. Conduct cleaning and disposal operations to comply with laws and safety orders of
governing authorities.
3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in
storm or sanitary drains or sewers.
4. Dispose of degradable debris at an approved solid waste disposal site.
5. Dispose of nondegradable debris at an approved solid waste disposal site or in an
alternate manner approved by City and regulatory agencies.
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised April 7, 2014
01 74 23 - 3
DAP CLEANING
Page 3 of 4
6. Handle materials in a controlled manner with as few handlings as possible.
7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with
this project.
8. Remove all signs of temporary construction and activities incidental to construction
of required permanent Work.
9. If project is not cleaned to the satisfaction of the City, the City reserves the right to
have the cleaning completed at the expense of the Contractor.
10. Do not burn on -site.
B. Intermediate Cleaning during Construction
1. Keep Work areas clean so as not to hinder health, safety or convenience of
personnel in existing facility operations.
2. At maximum weekly intervals, dispose of waste materials, debris and rubbish.
3. Confine construction debris daily in strategically located container(s):
a. Cover to prevent blowing by wind
b. Store debris away from construction or operational activities
c. Haul from site at a minimum of once per week
4. Vacuum clean interior areas when ready to receive finish painting.
a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance.
5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which
may become airborne or transported by flowing water during the storm.
C. Exterior (Site or Right of Way) Final Cleaning
1. Remove trash and debris containers from site.
a. Re -seed areas disturbed by location of trash and debris containers in accordance
with Section 32 92 13.
2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object
that may hinder or disrupt the flow of traffic along the roadway.
3. Clean any interior areas including, but not limited to, vaults, manholes, structures,
junction boxes and inlets.
4. If no longer required for maintenance of erosion facilities, and upon approval by
City, remove erosion control from site.
5. Clean signs, lights, signals, etc.
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised April 7, 2014
DATE NAME
4/7/2014 M.Domenech
END OF SECTION
Revision Log
SUMMARY OF CHANGE
Revised for DAP application
01 74 23 - 4
DAP CLEANING
Page 4 of 4
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised April 7, 2014
SECTION 0177 19
CLOSEOUT REQUIREMENTS
PART1- GENERAL
1.1 SUMMARY
017719-1
DAP CLOSEOUT REQUIREMENTS
Page 1 of 3
A. Section Includes:
1. The procedure for closing out a contract
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Guarantees, Bonds and Affidavits
1. No application for final payment will be accepted until all guarantees, bonds,
certificates, licenses and affidavits required for Work or equipment as specified are
satisfactorily filed with the City.
B. Release of Liens or Claims
1. No application for final payment will be accepted until satisfactory evidence of
release of liens has been submitted to the City.
1.5 SUBMITTALS
A. Submit all required documentation to City's Project Representative.
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised April 7, 2014
017719-2
DAP CLOSEOUT REQUIREMENTS
Page 2 of 3
1.6 INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 CLOSEOUT PROCEDURE
A. Prior to requesting Final Inspection, submit:
1. Project Record Documents in accordance with Section 0178 39
2. Operation and Maintenance Data, if required, in accordance with Section 0178 23
B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section
01 74 23.
C. Final Inspection
1. After final cleaning, provide notice to the City Project Representative that the Work
is completed.
a. The City will make an initial Final Inspection with the Contractor present.
b. Upon completion of this inspection, the City will notify the Contractor, in
writing within 10 business days, of any particulars in which this inspection
reveals that the Work is defective or incomplete.
2. Upon receiving written notice from the City, immediately undertake the Work
required to remedy deficiencies and complete the Work to the satisfaction of the
City.
3. Upon completion of Work associated with the items listed in the City's written
notice, inform the City, that the required Work has been completed. Upon receipt
of this notice, the City, in the presence of the Contractor, will make a subsequent
Final Inspection of the project.
4. Provide all special accessories required to place each item of equipment in full
operation. These special accessory items include, but are not limited to:
a. Specified spare parts
b. Adequate oil and grease as required for the first lubrication of the equipment
c. Initial fill up of all chemical tanks and fuel tanks
d. Light bulbs
e. Fuses
f. Vault keys
g. Handwheels
h. Other expendable items as required for initial start-up and operation of all
equipment
D. Notice of Project Completion
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised April 7, 2014
017719-3
DAP CLOSEOUT REQUIREMENTS
Page 3 of 3
1. Once the City Project Representative finds the Work subsequent to Final Inspection
to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet).
E. Supporting Documentation
1. Coordinate with the City Project Representative to complete the following
additional forms:
a. Final Payment Request
b. Statement of Contract Time
c. Affidavit of Payment and Release of Liens
d. Consent of Surety to Final Payment
e. Pipe Report (if required)
£ Contractor's Evaluation of City
g. Performance Evaluation of Contractor
F. Letter of Final Acceptance
1. Upon review and acceptance of Notice of Project Completion and Supporting
Documentation, in accordance with General Conditions, City will issue Letter of
Final Acceptance and release the Final Payment Request for payment.
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
DATE NAME
4/7/2014 M.Domenech
END OF SECTION
Revision Log
SUMMARY OF CHANGE
Revised for DAP application
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised April 7, 2014
017839-1
DAP PROJECT RECORD DOCUMENTS
Page 1 of 4
SECTION 0178 39
PROJECT RECORD DOCUMENTS
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Work associated with the documenting the project and recording changes to project
documents, including:
a. Record Drawings
b. Water Meter Service Reports
c. Sanitary Sewer Service Reports
d. Large Water Meter Reports
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
1.5 SUBMITTALS
A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to
City's Project Representative.
1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE
A. Accuracy of Records
1. Thoroughly coordinate changes within the Record Documents, making adequate
and proper entries on each page of Specifications and each sheet of Drawings and
other Documents where such entry is required to show the change properly.
2. Accuracy of records shall be such that future search for items shown in the Contract
Documents may rely reasonably on information obtained from the approved Project
Record Documents.
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised April 7, 2014
01 78 39 - 2
DAP PROJECT RECORD DOCUMENTS
Page 2 of 4
3. To facilitate accuracy of records, make entries within 24 hours after receipt of
information that the change has occurred.
4. Provide factual information regarding all aspects of the Work, both concealed and
visible, to enable future modification of the Work to proceed without lengthy and
expensive site measurement, investigation and examination.
1.10 STORAGE AND HANDLING
A. Storage and Handling Requirements
1. Maintain the job set of Record Documents completely protected from deterioration
and from loss and damage until completion of the Work and transfer of all recorded
data to the final Project Record Documents.
2. In the event of loss of recorded data, use means necessary to again secure the data
to the City's approval.
a. In such case, provide replacements to the standards originally required by the
Contract Documents.
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART2- PRODUCTS
2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED]
2.2 RECORD DOCUMENTS
A. Job set
1. Promptly following receipt of the Notice to Proceed, secure from the City, at no
charge to the Contractor, 1 complete set of all Documents comprising the Contract.
B. Final Record Documents
1. At a time nearing the completion of the Work and prior to Final Inspection, provide
the City 1 complete set of all Final Record Drawings in the Contract.
2.3 ACCESSORIES [NOT USED]
2.4 SOURCE QUALITY CONTROL [NOT USED]
PART 3 - EXECUTION
3.1 INSTALLERS [NOT USED]
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION [NOT USED]
3.4 MAINTENANCE DOCUMENTS
A. Maintenance of Job Set
1. Immediately upon receipt of the job set, identify each of the Documents with the
title, "RECORD DOCUMENTS - JOB SET".
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised April 7, 2014
017839-3
DAP PROJECT RECORD DOCUMENTS
Page 3 of 4
2. Preservation
a. Considering the Contract completion time, the probable number of occasions
upon which the job set must be taken out for new entries and for examination,
and the conditions under which these activities will be performed, devise a
suitable method for protecting the job set.
b. Do not use the job set for any purpose except entry of new data and for review
by the City, until start of transfer of data to final Project Record Documents.
c. Maintain the job set at the site of work.
3. Coordination with Construction Survey
a. At a minimum clearly mark any deviations from Contract Documents
associated with installation of the infrastructure.
4. Making entries on Drawings
a. Record any deviations from Contract Documents.
b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the
change by graphic line and note as required.
c. Date all entries.
d. Call attention to the entry by a "cloud" drawn around the area or areas affected.
e. In the event of overlapping changes, use different colors for the overlapping
changes.
Conversion of schematic layouts
a. In some cases on the Drawings, arrangements of conduits, circuits, piping,
ducts, and similar items, are shown schematically and are not intended to
portray precise physical layout.
1) Final physical arrangement is determined by the Contractor, subject to the
City's approval.
2) However, design of future modifications of the facility may require
accurate information as to the final physical layout of items which are
shown only schematically on the Drawings.
b. Show on the job set of Record Drawings, by dimension accurate to within 1
inch, the centerline of each run of items.
1) Final physical arrangement is determined by the Contractor, subject to the
City's approval.
2) Show, by symbol or note, the vertical location of the Item ("under slab", "in
ceiling plenum", "exposed", and the like).
3) Make all identification sufficiently descriptive that it may be related
reliably to the Specifications.
c. The City may waive the requirements for conversion of schematic layouts
where, in the City's judgment, conversion serves no useful purpose. However,
do not rely upon waivers being issued except as specifically issued in writing
by the City.
B. Final Project Record Documents
Transfer of data to Drawings
a. Carefully transfer change data shown on the job set of Record Drawings to the
corresponding final documents, coordinating the changes as required.
b. Clearly indicate at each affected detail and other Drawing a full description of
changes made during construction, and the actual location of items.
c. Call attention to each entry by drawing a "cloud" around the area or areas
affected.
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised April 7, 2014
01 78 39 - 4
DAP PROJECT RECORD DOCUMENTS
Page 4 of 4
d. Make changes neatly, consistently and with the proper media to assure
longevity and clear reproduction.
2. Transfer of data to other Documents
a. If the Documents, other than Drawings, have been kept clean during progress of
the Work, and if entries thereon have been orderly to the approval of the City,
the job set of those Documents, other than Drawings, will be accepted as final
Record Documents.
b. If any such Document is not so approved by the City, secure a new copy of that
Document from the City at the City's usual charge for reproduction and
handling, and carefully transfer the change data to the new copy to the approval
of the City.
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
DATE NAME
4/7/2014 M.Domenech
END OF SECTION
Revision Log
SUMMARY OF CHANGE
Revised for DAP Application
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised April 7, 2014
SECTION 34 4120 -
LED PILOT PROGRAM
CFW LED Residential
100 - 150W Replacement
Specification
December 2013
City of Fort Worth
Specification for Residential LED Roadway Luminaires
PART 1— GENERAL
1.1. REFERENCES
The publications listed below form a part of this specification to the extent referenced.
Publications are referenced within the text by their basic designation only. Versions listed shall
be superseded by updated versions as they become available.
A. American National Standards Institute (ANSI)
1. C136.2-2004 (or latest), American National Standard for Roadway and Area Lighting
Equipment—Luminaire Voltage Classification
2. C136.10-2010 (or latest), American National Standard for Roadway and Area Lighting
Equipment - Locking -Type Photocontrol Devices and Mating Receptacle Physical and
Electrical Interchangeability and Testing
3. C136.15-2011 (or latest), American National Standard for Roadway and Area Lighting
Equipment— Luminaire Field Identification
4. C136.22-2004 (R2009 or latest), American National Standard for Roadway and Area
Lighting Equipment — Internal Labeling of Luminaires
5. C136.25-2009 (or latest), American National Standard for Roadway and Area Lighting
Equipment— Ingress Protection (Resistance to Dust, Solid Objects and Moisture) for
Luminaire Enclosures
6. C136.31-2010 (or latest), American National Standard for Roadway Lighting Equipment—
Luminaire Vibration
7. C136.37-2011 (or latest), American National Standard for Roadway and Area Lighting
Equipment - Solid State Light Sources Used in Roadway and Area Lighting
B. American Society for Testing and Materials International (ASTM)
1. B117-09 (or latest), Standard Practice for Operating Salt Spray (Fog) Apparatus
2. D1654-08 (or latest), Standard Test Method for Evaluation of Painted or Coated
Specimens Subjected to Corrosive Environments
3. D523-08 (or latest), Standard Test Method for Specular Gloss
4. G154-06 (or latest), Standard Practice for Operating Fluorescent Light Apparatus for UV
Exposure of Nonmetallic Materials
C. Council of the European Union (EC)
1. RoHS Directive 2002/95/EC, on the restriction of the use of certain hazardous
substances in electrical and electronic equipment
D. Federal Trade Commission (FTC)
1. Green Guides, 16 CFR Part 260, Guides for the Use of Environmental Marketing Claims
E. Illuminating Engineering Society of North America (IESNA or IES)
1. DG-4-03 (or latest), Design Guide for Roadway Lighting Maintenance
2. HB-10-11 (or latest), IES Lighting Handbook, 10th Edition
3. LM-50-99 (or latest), IESNA Guide for Photometric Measurement of Roadway Lighting
Installations
4. LM-61-06 (or latest), IESNA Approved Guide for Identifying Operating Factors
Influencing Measured Vs. Predicted Performance for Installed Outdoor High Intensity
Discharge (HID) Luminaires
5. LM-79-08 (or latest), IESNA Approved Method for the Electrical and Photometric
Measurements of Solid -Sate Lighting Products
Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires, Version 1.0 P a g e I 1
City of Fort Worth
Specification for Residential LED Roadway Luminaires
6. LM-80-08 (or latest), IESNA Approved Method for Measuring Lumen Maintenance of
LED Light Sources
7. RP-8-00 (or latest), ANSI / IESNA American National Standard Practice for Roadway
Lighting
8. RP-16-10 (or latest), ANSI/IES Nomenclature and Definitions for Illuminating Engineering
9. TM-3-95 (or latest), A Discussion of Appendix E - "Classification of Luminaire Lighting
Distribution," from ANSI/IESNA RP-8-83
10. TM-15-11 (or latest), Luminaire Classification System for Outdoor Luminaires
11. TM-21-11 (or latest), Projecting Long Term Lumen Maintenance of LED Light Sources
F. Institute of Electrical and Electronics Engineers (IEEE)
1. IEEE C62.41.2-2002 (or latest), IEEE Recommended Practice on Characterization of
Surges in Low -Voltage (1000 V and less) AC Power Circuits
2. ANSI/IEEE C62.45-2002 (or latest), IEEE Recommended Practice on Surge Testing for
Equipment Connected to Low -Voltage (1000 V and Less) AC Power Circuits
G. National Electrical Manufacturers Association (NEMA)
1. ANSI/NEMA/ANSLG C78.377-2008 (or latest), American National Standard for the
Chromaticity of Solid State Lighting Products
H. National Fire Protection Association (NFPA)
1. 70— National Electrical Code (NEC)
I. Underwriters Laboratories (UL)
1. 1449, Surge Protective Devices
2. 1598, Luminaires
3. 8750, Light Emitting Diode (LED) Equipment for Use in Lighting Products
1.2. RELATED DOCUMENTS
A. Contract Drawings and conditions of Contract (including General Conditions, Addendum to the
General Conditions, Special Conditions, Division 01 Specifications Sections and all other Contract
Documents) apply to the work of this section.
a. See the separate Specification for Adaptive Control and Remote Monitoring of LED
Roadway Luminaires for additional driver performance and interface requirements.
1.3. DEFINITIONS
A. Lighting terminology used herein is defined in IES RP-16. See referenced documents for
additional definitions.
Exception: The term "driver" is used herein to broadly cover both drivers and power
supplies, where applicable.
Clarification: The term "LED light source(s)" is used herein per IES LM-80 to broadly
cover LED package(s), module(s), and array(s).
1.4. QUALITY ASSURANCE
A. Before approval and purchase, Owner may request luminaire sample(s) identical to product
configuration(s) submitted for inspection. Owner may request IES LM-79 testing of luminaire
sample(s) to verify performance is within manufacturer -reported tolerances.
Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires, Version 1.0 P a g e 12
City of Fort Worth
Specification for Residential LED Roadway Luminaires
B. After installation, Owner may perform IES LM-50 field measurements to verify performance
requirements outlined in Appendix A, giving consideration to measurement uncertainties
outlined in IES LM-61.
1.5. LIGHTING SYSTEM PERFORMANCE
A. Energy Conservation
1. Connected Load
a. Luminaires shall have maximum nominal luminaire input wattage as specified
for each luminaire type in Appendix A.
2. Lighting Controls
a. See separate controls specification identified in section 1.2 above, if applicable.
b. See section 2.1-13 below for driver control interface and performance
requirements.
c. See section 2.1-K below for photocontrol receptacle requirements.
B. Photometric Requirements
1. Luminaires shall meet the general criteria provided in the body of this specification and
the particular criteria for each luminaire type defined in Appendix A.
1.6. REQUIRED SUBMITTALS FOR EACH LUMINAIRE TYPE DEFINED IN APPENDIX A
A. General submittal content shall include
1. Completed Appendix E submittal form
2. Luminaire cutsheets
3. Cutsheets for LED light sources
4. Cutsheets for LED driver(s)
a. If dimmable LED driver is specified, provide diagrams illustrating light output
and input power as a function of control signal.
5. Cutsheets for surge protection device, if applicable
6. Instructions for installation and maintenance
7. Summary of luminaire recycled content and recyclability per the FTC Green Guides,
expressed by percentage of luminaire weight
B. LM-79 luminaire photometric report(s) shall be produced by the test laboratory and include
1. Name of test laboratory
a. The test laboratory must hold National Voluntary Laboratory Accreditation
Program (NVLAP) accreditation for the IES LM-79 test procedure or must be
qualified, verified, and recognized through the U.S. Department of Energy's
CALIPER program. For more information, see
httr)://ts.nist.gov/standards/scopes/eelit.htm or
www.ssl.enerRv.Rov/test labs.html.
2. Report number
3. Date
4. Complete luminaire catalog number
a. Provide explanation if catalog number in test report(s) does not match catalog
number of luminaire submitted
i. Clarify whether discrepancy does not affect performance, e.g., in the
case of differing luminaire housing color.
Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires, Version 1.0 P a g e 13
City of Fort Worth
Specification for Residential LED Roadway Luminaires
ii. If nominal performance of submitted and tested products differ, submit
additional LM-79 report(s) and derivation as indicated in Appendix C.
5. Description of luminaire, LED light source(s), and LED driver(s)
6. Goniophotometry
C. Calculations and supporting test data per Appendix B indicating a lumen maintenance life of not
less than 36,000 operating hours
D. Computer -generated point -by -point photometric analysis of maintained photopic light levels as
per Appendix A
1. Calculations shall be for maintained values, i.e. Light Loss Factor (LLF) < 1.0, where LLF =
LLD x LDD x LATF, and
a. Lamp Lumen Depreciation (LLD)
i. Shall be 0.95.
ii. Shall be the percentage of initial output calculated in section 1.6-C.
b. Luminaire Dirt Depreciation (LDD) = 0.90, as per IES DG-4 for an enclosed and
gasketed roadway luminaire installed in an environment with less than 150
µg/m3 airborne particulate matter and cleaned every four years.
c. Luminaire Ambient Temperature Factor (LATF) = 1.00
2. Calculation/measurement points shall be per IES RP-8.
E. Summary of reliability testing performed for LED driver(s)
F. Written product warranty as per section 1.7 below
G. Safety certification and file number
1. Applicable testing bodies are determined by the US Occupational Safety Health
Administration (OSHA) as Nationally Recognized Testing Laboratories (NRTL) and
include: CSA (Canadian Standards Association), ETL (Edison Testing Laboratory), and UL
(Underwriters Laboratory).
H. Buy American documentation
1. Manufacturers listed on the current NEMA Listing of Companies Offering Outdoor
Luminaires Manufactured in U.S.A. for Recovery Act Projects need only provide a copy
of the document.
2. Other manufacturers shall submit documentation as per the DOE Guidance on
Documenting Compliance with the Recovery Act Buy American Provisions
(http://wwwl.eere.enerizv.jzov/recoverv/buv american provision.html).
1.7. WARRANTY
A. Provide a minimum ten-year warranty covering maintained integrity and functionality of
1. Luminaire housing, wiring, and connections
2. LED light source(s)
a. Negligible light output from more than 10 percent of the LED packages
constitutes luminaire failure.
3. LED driver(s)
B. Warranty period shall begin 90 days after date of invoice, or as negotiated by owner such as in
the case of an auditable asset management system.
PART 2 — PRODUCTS
2.1. LUMINAIRE REQUIREMENTS
Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires, Version 1.0 P a g e 14
City of Fort Worth
Specification for Residential LED Roadway Luminaires
A. General Requirements
1. Luminaires shall be as specified for each type in Appendix A.
2. Luminaire shall have an external label per ANSI C136.15
3. Luminaire shall have an internal label per ANSI C136.22.
4. Luminaire to have internal label of manufactured date visible when drive compartment
opened.
5. Nominal luminaire input wattage shall account for nominal applied voltage and any
reduction in driver efficiency due to sub -optimal driver loading.
6. Luminaires shall start and operate in -20°C to +40°C ambient.
7. Electrically test fully assembled luminaires before shipment from factory.
8. Effective Projected Area (EPA) and weight of the luminaire shall not exceed the values
indicated in Appendix A.
9. Luminaires shall be designed for ease of component replacement and end -of -life
disassembly.
10. Luminaires shall have tool -less entry for access to driver compartment
11. Luminaires shall be a minimum of IP65 rated
12. Luminaires must be available in 4000 K and 3000 K options
13. Luminaires shall be rated for the ANSI C136.31 Vibration Level indicated in Appendix A.
14. LED light source(s) and driver(s) shall be RoHS compliant.
15. Transmissive optical components shall be applied in accordance with OEM design
guidelines to ensure suitability for the thermal/mechanical/chemical environment.
B. Driver
1. Rated case temperature shall be suitable for operation in the luminaire operating in the
ambient temperatures indicated in section 2.1-A above.
2. Shall have a drive current no higher than 700mA
3. Shall accept the voltage or voltage range indicated in Appendix A at 50/60 Hz, and shall
operate normally for input voltage fluctuations of plus or minus 10 percent.
4. Shall have a minimum Power Factor (PF) of 0.90 at full input power and across specified
voltage range.
5. Control signal interface
a. Luminaire types indicated "Required" in Appendix A shall accept a control signal
as specified via separate controls specification referenced in section 1.2 above,
e.g., for dimming.
b. Luminaire types indicated "Not Required" in Appendix A need not accept a
control signal.
C. Electrical immunity
Luminaire shall meet the "Basic" requirements in Appendix D. Manufacturer shall
indicate on submittal form (Appendix E) whether failure of the electrical immunity
system can possibly result in disconnect of power to luminaire.
Luminaire shall meet the "Elevated" requirements in Appendix D. Manufacturer shall
indicate on submittal form (Appendix E) whether failure of the electrical immunity
system can possibly result in disconnect of power to luminaire.
D. Electromagnetic interference
1. Shall have a maximum Total Harmonic Distortion (THD) of 20% at full input power and
across specified voltage range.
2. Shall comply with FCC 47 CFR part 15 non -consumer RFI/EMI standards.
Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires, Version 1.0 Page 15
City of Fort Worth
Specification for Residential LED Roadway Luminaires
E. Electrical safety testing
1. Luminaire shall be listed for wet locations by an OSHA NRTL.
2. Luminaires shall have locality -appropriate governing mark and certification.
F. Painted or finished luminaire components exposed to the environment
1. Shall exceed a rating of six per ASTM D1654 after 1000hrs of testing per ASTM B117.
2. The coating shall exhibit no greater than 30% reduction of gloss per ASTM D523, after
500 hours of QUV testing at ASTM G154 Cycle 6.
G. Thermal management
1. Mechanical design of protruding external surfaces (heat sink fins) for shall facilitate
hose -down cleaning and discourage debris accumulation.
2. Liquids or other moving parts shall be clearly indicated in submittals, shall be consistent
with product testing, and shall be subject to review by Owner.
H. IES TM-15 limits for Backlight, Uplight, and Glare (BUG Ratings) shall be as specified for each
luminaire type in Appendix A.
1. Calculation of BUG Ratings shall be for initial (worst -case) values, i.e., Light Loss Factor
(LLF) = 1.0.
2. If luminaires are tilted upward for calculations in section 1.6-D, BUG Ratings shall be
calculated for the same angle(s) of tilt.
I. Minimum Color Rendering Index (CRI): 70.
J. Correlated Color Temperature (CCT)
1. If nominal CCT specified in Appendix A is listed in Table 1 below, measured CCT and Duv
shall be as listed in Table 1.
Table 1. Allowable CCT and Duv (adapted from NEMA C78.377)
Manufacturer -Rated
Allowable LM-79 Chromaticity Values
Nominal CCT (K)
Measured CCT (K)
=Measured Duv
2700
2580 to 2870
-0.006 to 0.006
3000
2870 to 3220
-0.006 to 0.006
3500
3220 to 3710
-0.006 to 0.006
4000
3710 to 4260
-0.005 to 0.007
4500
4260 to 4746
-0.005 to 0.007
5000
4745 to 5311
-0.004 to 0.008
5700
5310 to 6020
-0.004 to 0.008
6500
6020 to 7040
-0.003 to 0.009
2. If nominal CCT specified in Appendix A is not listed in Table 1, measured CCT and Duv
shall be as per the criteria for Flexible CCT defined in NEMA C78.377.
K. The following shall be in accordance with corresponding sections of ANSI C136.37
1. Wiring and grounding
a. All internal components shall be assembled and pre -wired using modular
electrical connections.
2. Mounting provisions
a. Specific configurations are indicated in Appendix A
3. Terminal blocks for incoming AC lines
4. Photocontrol receptacle
5. Latching and hinging
6. Ingress protection
Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires, Version 1.0 P a g e 16
City of Fort Worth
Specification for Residential LED Roadway Luminaires
2.2. PRODUCT MANUFACTURERS
A. Any manufacturer offering products that comply with the required product performance and
operation criteria may be considered.
2.3. MANUFACTURER SERVICES
A. Manufacturer or local sales representative shall provide installation and troubleshooting
support via telephone and/or email.
END OF SECTION
Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires, Version 1.0 P a g e 17
City of Fort Worth
Specification for Residential LED Roadway Luminaires
APPENDIX A
MATERIAL SPECIFICATION
LUMINAIRE TYPE "A"
EXISTING LUMINAIRE TO BE REPLACED
(FOR REFERENCE ONLY)
BENCHMARK
LUMINAIRE:
Lamp wattage and type
100 W HPS/ 150W
MH
Initial downward luminaire output (lumens below horizontal)
--
0.80
Light loss factor
LENS:
❑ Flat ("cutoff' style) 0 Sag/drop
IES' FORWARD TYPE:
❑ I ❑ II 2111 ❑ IV ❑ V ❑ VS
IES1 LATERAL TYPE:
❑ Very short ❑ Short 0 Medium ❑ Long ❑ Very long
PERFORMANCE CRITERIA: LED LUMINAIRE
INPUT POWER:
Max. nominal luminaire input power
105 W
NOMINAL CCT:
Rated correlated color temperature
3000 K
PHOTOPICZ DOWNWARD
Minimum maintained luminaire output below horizontal
LUMINAIRE OUTPUT:
CUTOFF CLASSIFICATION
Full Cutoff Only
VOLTAGE:
Nominal luminaire input voltage
120/208/240 V
FINISH:
Luminaire housing finish color
Gray
WEIGHT:
Maximum luminaire weight
30 lb
EPA:
Maximum effective projected area
0.7 ftz
MOUNTING:
Mtg. method ❑ Post -top 0 Side -arm ❑ Trunnion/yoke ❑ Swivel -tenon
Tenon nominal pipe size (NPS)
1-1/4" to 2-3/8"
VIBRATION:
ANSI test level 0 Level 1 (normal) ❑ Level 2
(bridge/overpass)
DRIVER:
Control signal interface 0 Not required ❑ Required
Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires, Version 1.0 P a g e 18
Appendix B
Estimating LED Lumen Maintenance
IES TM-21 allows for extrapolation of expected lumen maintenance from available test data. The extent
of such extrapolation is limited by the duration of testing completed and the number of samples used in
the testing. The TM-21 methodology shall be used by the manufacturer to determine lamp lumen
depreciation (LLD) at end of lumen maintenance life per section 1.6-C.
The applicant may estimate lumen maintenance in one of two ways:
Option 1: Component Performance
Under this compliance path, the applicant must submit calculations per TM-21 predicting lumen
maintenance at the luminaire level using In Situ Temperature Measurement Testing (ISTMT) and
LM-80 data. To be eligible for the Component Performance option, ALL of the conditions below
must be met. If ANY of the conditions is not met, the component performance option may not
be used and the applicant must use Option 2 for compliance.
1. The LED light source(s) have been tested according to LM-80.
2. The LED drive current specified by the luminaire manufacturer is less than or equal to the
drive current specified in the LM-80 test report.
3. The LED light source(s) manufacturer prescribes/indicates a temperature measurement
point (Ts) on the light source(s).
4. The Ts is accessible to allow temporary attachment of a thermocouple for measurement of
in situ temperature. Access via a temporary hole in the housing, tightly resealed during
testing with putty or other flexible sealant is allowable.
5. For the hottest LED light source in the luminaire, the temperature measured at the Ts
during ISTMT is less than or equal to the temperature specified in the LM-80 test report
for the corresponding drive current or higher, within the manufacturer's specified
operating current range.
a. The ISTMT laboratory must be approved by OSHA as a Nationally Recognized
Testing Lab (NRTL), must be qualified, verified, and recognized through DOE's
CALIPER program, or must be recognized through UL's Data Acceptance Program.
b. The ISTMT must be conducted with the luminaire installed in the appropriate
application as defined by ANSI/UL 1598 (hardwired luminaires), with bird -fouling
appropriately simulated (and documented by photograph) as determined by the
manufacturer.
Option 2: Luminaire Performance
Under this compliance path, the applicant must submit TM-21 calculations based on LM-79
photometric test data for no less than three samples of the entire luminaire. Duration of
operation and interval between photometric tests shall conform to the TM-21 criteria for LED
light sources. For example, testing solely at 0 and 6000 hours of operation would not be
adequate for the purposes of extrapolation.
Between LM-79 tests, the luminaire test samples must be operated long-term in the appropriate
application as defined by ANSI/UL 1598 (hardwired luminaires). The test laboratory must hold
Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires P a g e I B-1
NVLAP accreditation for the LM-79 test procedure or must be qualified, verified, and recognized
through the U.S. Department of Energy (DOE)'s CALIPER program. The extent of allowable
extrapolation (either 5.5 or 6 times the test duration) depends on the total number of LED light
sources (no less than 10 and preferably more than 19) installed in the luminaire samples, as per
TM-21.
This compliance path poses a greater testing burden to luminaire manufacturers but
incorporates long-term testing of other components in the system, such as drivers.
Under either compliance path, values used for extrapolation shall be summarized per TM-21 Tables 1
and 2. Submitted values for lumen maintenance lifetime and the associated percentage lumen
maintenance shall be "reported" rather than "projected" as defined by TM-21. Supporting diagrams are
requested to facilitate interpretation by Owner.
Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires P a g e I B-2
APPENDIX C
PRODUCT FAMILY TESTING
LM-79 AND ISTMT
It is recognized that due to the time and cost required for product testing, it would not be realistic to
expect manufacturers offering a multitude of unique luminaire configurations to test every possible
configuration. Therefore, the "product families" method may be utilized for LM-79 and ISTMT, whereby
manufacturers identify a set of representative products for which test data can be used to demonstrate
the accuracy of interpolated or extrapolated performance of product configurations lacking test data.
Precedent for this approach can be found in LM-80.
If the particular luminaire configuration submitted has not been tested, the performance may be
conservatively represented by test data for another luminaire configuration having:
• The same intensity distribution (typically only applies to LM-79)
• The same or lower nominal CCT
• The same or higher nominal drive current
• The same or greater number of LED light source(s)
• The same or lower percentage driver loading and efficiency
• The same or smaller size luminaire housing.
A more accurate estimate of performance can be obtained by linear interpolation between two or more
tests differing in terms of the six parameters listed above. For example, consider a hypothetical
luminaire offered in a single size housing, and having the following parameters:
• Three intensity distributions: IES Type II, III, or IV
• Three CCTs: 4000, 5000, and 6000K
• Three drive currents: 350, 525, and 700 mA
• Four LED quantities: 20, 40, 60, or 80 LEDs.
Table CA illustrates a set of tests which could allow for accurate interpolation between tested
configurations, given a single luminaire housing size and essentially constant driver efficiency; these 10
tests may provide representative data for the 108 possible product configurations. Note that
normalized intensity distribution must not be affected by the other three parameters.
Table C.I. Representative testing of a single luminaire housing size
Tests
Intensity distribution
(I ES Type)
CCT
(K)
Drive current
(mA)
# of LEDs
4,5
6,7
8, 9, 10
II, III, IV
IV
IV
IV
4000
5000, 6000
4000
4000
700
700
325,525
700
80
80
80
20, 40, 60
For example, the manufacturer could detail interpolation as shown in Table C.2, applying the following
multipliers to the base test #2 to model a configuration with Type III intensity distribution, 5000K CCT,
525 mA drive current, and 40 LEDs:
• Ratio of test #4 lumens to test #3 lumens
• Ratio of test #7 lumens to test #3 lumens
• Ratio of test #9 lumens to test #3 lumens.
Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires P a g e I C-1
Table C.2. Multipliers for Test #2 to yield: Type III , 5000K, 525mA, 40 LEDs
Test #
Intensity distribution
(I ES Type)
CCT
(K)
Drive current
(mA)
# of LEDs
Multiplier
(lumens ratio)
2
III
4000
700
80
n/a
3
IV
4000
700
80
n/a
4
IV
I 5000
700
80
#4 / #3
7
IV
I 525
80
#7 / #3
4000
9
IV
4000
700
40
#9 / #3
Interpolation between minimal LM-79 and ISTMT data is more difficult if housing size increases with
increasing wattage; it may not be clear whether the lowest -wattage configuration would be expected to
"run cooler" than the highest -wattage configuration. In these circumstances, the adequacy of
submitted data is subject to Owner approval.
At this time, the "successor" method cannot be used; luminaires tested must utilize the LED light
source(s) characterized by the submitted LM-80 report.
Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires P a g e I C-2
APPENDIX D
ELECTRICAL IMMUNITY
Test Procedure
• Electrical Immunity Tests 1, 2 and 3, as defined by their Test Specifications, shall be performed on an
entire powered and connected luminaire, including any control modules housed within the
luminaire, but excluding any control modules mounted externally, such as a NEMA socket connected
photo -control. A shorting cap should be placed across any such exterior connector.
• The luminaire shall be connected to an AC power source with a configuration appropriate for
nominal operation. The AC power source shall have a minimum available short-circuit current of
200A. The luminaire shall be tested at the nominal input voltage specified in Appendix A, or at the
highest input voltage in the input voltage range specified in Appendix A.
• Electrical Immunity test waveforms shall be superimposed on the input AC power line at a point
within 6 inches (15cm) of entry into the luminaire using appropriate high -voltage probes and a
series coupler/decoupler network (CDN) appropriate for each coupling mode, as defined by
ANSI/IEEE C62.45-2002. The test area for all tests shall be set up according to ANSI/IEEE C62.45-
2002, as appropriate.
• Prior to electrical immunity testing a set of diagnostic measurements shall be performed, and the
results recorded to note the pre -test function of the luminaire after it has reached thermal
equilibrium. These measurements should include at a minimum:
a) For all luminaires, Real Power, Input RMS Current, Power Factor and THD at full power/light
output
b) For luminaires specified as dimmable, Real Power, Input RMS Current, Power Factor and THD at
a minimum of 4 additional dimmed levels, including the rated minimum dimmed level
• Tests shall be applied in sequential order (Test 1, followed by Test 2, followed by Test 3). If a failure
occurs during Test 3, then Test 3 shall be re -applied to a secondary luminaire of identical
construction.
• Following the completion of Tests 1, 2, and 3, the same set of diagnostic measurements performed
pre -test should be repeated for all tested luminaires, and the results recorded to note the post-test
function of the luminaire(s).
• A luminaire must function normally and show no evidence of failure following the completion of
Test 1 + Test 2 + Test 3 (for a single tested luminaire), or the completion of Test 1 + Test 2 on a
primary luminaire and Test 3 on a secondary luminaire. Abnormal behavior during testing is
acceptable.
• A luminaire failure will be deemed to have occurred if any of the following conditions exists
following the completion of testing:
a) A hard power reset is required to return to normal operation
b) A noticeable reduction in full light output (e.g. one or more LEDs fail to produce light, or become
unstable) is observed
c) Any of the post-test diagnostic measurements exceeds by ±5% the corresponding pre -test
diagnostic measurement.
d) The luminaire, or any component in the luminaire (including but not limited to an electrical
connector, a driver, a protection component or module) has ignited or shows evidence of
Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires P a g e I D-1
melting or other heat -induced damage. Evidence of cracking, splitting, rupturing, or smoke
damage on any component is acceptable.
Test Specifications
NOTE: L1 is typically "HOT", L2 is typically "NEUTRAL" and PE = Protective Earth.
Test 1) Ring Wave: The luminaire shall be subjected to repetitive strikes of a "C Low Ring Wave" as
defined in IEEE C62.41.2-2002, Scenario 1, Location Category C. The test strikes shall be applied as
specified by Table D.I. Prior to testing, the ring wave generator shall be calibrated to simultaneously
meet BOTH the specified short circuit current peak and open circuit voltage peak MINIMUM
requirements. Note that this may require that the generator charging voltage be raised above the
specified level to obtain the specified current peak. Calibrated current probes/transformers designed for
measuring high -frequency currents shall be used to measure test waveform currents.
Test waveform current shapes and peaks for all strikes shall be compared to ensure uniformity
throughout each set (coupling mode + polarity/phase angle) of test strikes, and the average peak
current shall be calculated and recorded. If any individual peak current in a set exceeds by ±10% the
average, the test setup shall be checked, and the test strikes repeated.
Table D.1: 0.5 µS — 100Hz Ring Wave Specification
Parameter Test Level/Configuration
Short Circuit Current Peak
0.5 kA
Open Circuit Voltage Peak
6 kV
Source Impedance
12 Q
Coupling Modes
L1 to PE, L2 to PE, L1 to L2
Polarity and Phase Angle
Positive at 90' and Negative at 270°
Test Strikes
5 for each Coupling Mode and Polarity/Phase Angle
combination
Time between Strikes
1 minute
Total Number of Strikes
= 5 strikes x 4 coupling modes x 2 polarity/phase angles
= 40 total strikes
Test 2) Combination Wave: The luminaire shall be subjected to repetitive strikes of a "C High
Combination Wave" or "C Low Combination Wave", as defined in IEEE C62.41.2-2002, Scenario 1,
Location Category C. The test strikes shall be applied as specified by Table D.2. The "Low" test level shall
be used for luminaires with Basic Electrical Immunity requirements, while the "High" test level shall be
used for luminaires with Elevated Electrical Immunity requirements. Prior to testing, the combination
wave generator shall be calibrated to simultaneously meet BOTH the specified short circuit current peak
and open circuit voltage peak MINIMUM requirements. Note that this may require that the generator
charging voltage be raised above the specified level to obtain the specified current peak. Calibrated
current probes/transformers designed for measuring high -frequency currents shall be used to measure
test waveform currents.
Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires P a g e I D-2
Test Duration
Total Test Duration
Test waveform current shapes and peaks for all strikes shall be compared to ensure uniformity
throughout each set (coupling mode + polarity/phase angle) of test strikes, and the average peak
current shall be calculated and recorded. If any individual peak current in a set exceeds by ±10% the
average, the test setup shall be checked, and the test strikes repeated.
Table D.2: 1.2/50µS — 8/20 µS Combination Wave Specification
Parameter
Test Level/ Configuration
1.2/50 µS Open Circuit Voltage Peak
Low: 6 kV High: 10kV
8/20 µS Short Circuit Current Peak
Low: 3 kA High: 10kA
Source Impedance
2Q
Coupling Modes
L1 to PE, L2 to PE, L1 to L2
Polarity and Phase Angle
Positive at 90' and Negative at 270°
Test Strikes
5 for each Coupling Mode and Polarity/Phase Angle
combination
Time Between Strikes
1 minute
Total Number of Strikes
= 5 strikes x 4 coupling modes x 2 polarity/phase angles
= 40 total strikes
Test 3) Electrical Fast Transient (EFT): The luminaire shall be subjected to "Electrical Fast Transient
Bursts", as defined in IEEE C62.41.2 -2002. The test area shall be set up according to IEEE C62.45-2002.
The bursts shall be applied as specified by Table D.3. Direct coupling is required; the use of a coupling
clamp is not allowed.
Table D.3: Electrical Fast Transient (EFT) Specification
Parameter Test Level/ Configuration
Open Circuit Voltage Peak 3 kV
Burst Repetition Rate 2.5 kHz
Burst Duration 15 mS
Burst Period 300 mS
Coupling Modes L1 to PE, L2 to PE, L1 to L2
Polarity Positive and Negative
1 minute for each Coupling Mode and Polarity combination
= 1 minute x 7 coupling modes x 2 polarities
= 14 minutes
Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires Page I D-3
APPENDIX E
PRODUCT SUBMITTAL FORM
Luminaire Type'
Manufacturer
Model number
Housing finish color
Tenon nominal pipe size (inches)
Nominal luminaire weight (lb)
Nominal luminaire EPA (ft2)
Nominal input voltage (V)
ANSI vibration test level
Nominal BUG Ratings
Make/model of LED light source(s)
Make/model of LED driver(s)
Dimmability
Control signal interface
Upon electrical immunity system failure
Thermal management
Lumen maintenance testing duration (hr
Reported lumen maintenance life (hr) 2
Warranty period (yr)
Parameter
Initial photopic output (Im)
Maintained photopic output (Im)
Lamp lumen depreciation
Initial input power (W)
Maintained input power (W)
Initial LED drive current (mA)
Maintained LED drive current (mA)
Drive current used
In -situ LED Tc ('C)
CCT (K)
Additional product description
0 Level 1 (Normal) I ❑ Level 2 (bridge/overpass)
❑ Dimmable I 0 Not dimmable
❑ Possible disconnect ❑ No possible disconnect
❑ Moving parts 0 No moving parts
Nominal value I Tolerance (%)
See Appendix A, and attach supporting documentation as required.
2 Value shall be no less than as specified in section 1.6-C, and shall not exceed six times the testing
duration indicated in the row above. Value shall be consistent with values submitted in the rows below for
maintained light output, maintained input power, and maintained drive current.
Adapted from the DOE MSSLC Model Specification for LED Roadway Luminaires P a g e I E-1
017823-1
DAP OPERATION AND MAINTENANCE DATA
Page 1 of 5
SECTION 0178 23
OPERATION AND MAINTENANCE DATA
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Product data and related information appropriate for City's maintenance and
operation of products furnished under Contract
2. Such products may include, but are not limited to:
a. Traffic Controllers
b. Irrigation Controllers (to be operated by the City)
c. Butterfly Valves
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Schedule
1. Submit manuals in final form to the City within 30 calendar days of product
shipment to the project site.
1.5 SUBMITTALS
A. Submittals shall be in accordance with Section 0133 00. All submittals shall be
approved by the City prior to delivery.
1.6 INFORMATIONAL SUBMITTALS
A. Submittal Form
1. Prepare data in form of an instructional manual for use by City personnel.
2. Format
a. Size: 8 1/2 inches x 11 inches
b. Paper
1) 40 pound minimum, white, for typed pages
2) Holes reinforced with plastic, cloth or metal
c. Text: Manufacturer's printed data, or neatly typewritten
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised April 7, 2014
01 78 23 - 2
DAP OPERATION AND MAINTENANCE DATA
Page 2 of 5
d. Drawings
1) Provide reinforced punched binder tab, bind in with text
2) Reduce larger drawings and fold to size of text pages.
e. Provide fly -leaf for each separate product, or each piece of operating
equipment.
1) Provide typed description of product, and major component parts of
equipment.
2) Provide indexed tabs.
f. Cover
1) Identify each volume with typed or printed title "OPERATING AND
MAINTENANCE INSTRUCTIONS".
2) List:
a) Title of Project
b) Identity of separate structure as applicable
c) Identity of general subject matter covered in the manual
3. Binders
a. Commercial quality 3-ring binders with durable and cleanable plastic covers
b. When multiple binders are used, correlate the data into related consistent
groupings.
4. If available, provide an electronic form of the O&M Manual.
B. Manual Content
Neatly typewritten table of contents for each volume, arranged in systematic order
a. Contractor, name of responsible principal, address and telephone number
b. A list of each product required to be included, indexed to content of the volume
c. List, with each product:
1) The name, address and telephone number of the subcontractor or installer
2) A list of each product required to be included, indexed to content of the
volume
3) Identify area of responsibility of each
4) Local source of supply for parts and replacement
d. Identify each product by product name and other identifying symbols as set
forth in Contract Documents.
2. Product Data
a. Include only those sheets which are pertinent to the specific product.
b. Annotate each sheet to:
1) Clearly identify specific product or part installed
2) Clearly identify data applicable to installation
3) Delete references to inapplicable information
3. Drawings
a. Supplement product data with drawings as necessary to clearly illustrate:
1) Relations of component parts of equipment and systems
2) Control and flow diagrams
b. Coordinate drawings with information in Project Record Documents to assure
correct illustration of completed installation.
c. Do not use Project Record Drawings as maintenance drawings.
4. Written text, as required to supplement product data for the particular installation:
a. Organize in consistent format under separate headings for different procedures.
b. Provide logical sequence of instructions of each procedure.
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised April 7, 2014
01 78 23 - 3
DAP OPERATION AND MAINTENANCE DATA
Page 3 of 5
5. Copy of each warranty, bond and service contract issued
a. Provide information sheet for City personnel giving:
1) Proper procedures in event of failure
2) Instances which might affect validity of warranties or bonds
C. Manual for Materials and Finishes
1. Submit 5 copies of complete manual in final form.
2. Content, for architectural products, applied materials and finishes:
a. Manufacturer's data, giving full information on products
1) Catalog number, size, composition
2) Color and texture designations
3) Information required for reordering special manufactured products
b. Instructions for care and maintenance
1) Manufacturer's recommendation for types of cleaning agents and methods
2) Cautions against cleaning agents and methods which are detrimental to
product
3) Recommended schedule for cleaning and maintenance
3. Content, for moisture protection and weather exposure products:
a. Manufacturer's data, giving full information on products
1) Applicable standards
2) Chemical composition
3) Details of installation
b. Instructions for inspection, maintenance and repair
D. Manual for Equipment and Systems
1. Submit 5 copies of complete manual in final form.
2. Content, for each unit of equipment and system, as appropriate:
a. Description of unit and component parts
1) Function, normal operating characteristics and limiting conditions
2) Performance curves, engineering data and tests
3) Complete nomenclature and commercial number of replaceable parts
b. Operating procedures
1) Start-up, break-in, routine and normal operating instructions
2) Regulation, control, stopping, shut -down and emergency instructions
3) Summer and winter operating instructions
4) Special operating instructions
c. Maintenance procedures
1) Routine operations
2) Guide to "trouble shooting"
3) Disassembly, repair and reassembly
4) Alignment, adjusting and checking
d. Servicing and lubrication schedule
1) List of lubricants required
e. Manufacturer's printed operating and maintenance instructions
f. Description of sequence of operation by control manufacturer
1) Predicted life of parts subject to wear
2) Items recommended to be stocked as spare parts
g. As installed control diagrams by controls manufacturer
It. Each contractor's coordination drawings
1) As installed color coded piping diagrams
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised April 7, 2014
01 78 23 - 4
DAP OPERATION AND MAINTENANCE DATA
Page 4 of 5
i. Charts of valve tag numbers, with location and function of each valve
j. List of original manufacturer's spare parts, manufacturer's current prices, and
recommended quantities to be maintained in storage
k. Other data as required under pertinent Sections of Specifications
3. Content, for each electric and electronic system, as appropriate:
a. Description of system and component parts
1) Function, normal operating characteristics, and limiting conditions
2) Performance curves, engineering data and tests
3) Complete nomenclature and commercial number of replaceable parts
b. Circuit directories of panelboards
1) Electrical service
2) Controls
3) Communications
c. As installed color coded wiring diagrams
d. Operating procedures
1) Routine and normal operating instructions
2) Sequences required
3) Special operating instructions
e. Maintenance procedures
1) Routine operations
2) Guide to "trouble shooting"
3) Disassembly, repair and reassembly
4) Adjustment and checking
f. Manufacturer's printed operating and maintenance instructions
g. List of original manufacturer's spare parts, manufacturer's current prices, and
recommended quantities to be maintained in storage
h. Other data as required under pertinent Sections of Specifications
4. Prepare and include additional data when the need for such data becomes apparent
during instruction of City's personnel.
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE
A. Provide operation and maintenance data by personnel with the following criteria:
1. Trained and experienced in maintenance and operation of described products
2. Skilled as technical writer to the extent required to communicate essential data
3. Skilled as draftsman competent to prepare required drawings
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised April 7, 2014
01 78 23 - 5
DAP OPERATION AND MAINTENANCE DATA
Page 5 of 5
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
DATE NAME
8/31/2012 D. Johnson
4/7/2014 M.Domenech
END OF SECTION
Revision Log
SUMMARY OF CHANGE
1.5.A.1 — title of section removed
Revised for DAP Application
CITY OF FORT WORTH [Insert Project Name]
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number]
Revised April 7, 2014
FORT WORTH.
CITY OF FORT WORTH
WATER DEPARTMENT
STANDARD PRODUCT LIST
Updated:
03/07/2023
Note: All water or sewer pipe larger than 1S inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding maybe required for some pipes.
Approval
IModel
INational
Water & Sewer - Manholes & Bases/Components 33-39-10 (Rev 2/3/16)
`
07/23/97
33 05 13
Urethane Hydrophilic Waterstop
Asahi Kogyo K.K.
Adeka Ultra -Seal P-201
ASTM D2240/D412/1)792
04/26/00
33 05 13
Offset Joint for 4' Diam. MH
Hanson Concrete Products
Drawing No. 35-0048-001
04/26/00
33 05 13
Profile Gasket for 4' Diam. MIR.
Press -Seal Gasket Corp.
250-4G Gasket
ASTM C-443/C-361
SS MH
1126199
33 05 13
HOPE Manhole Adjustment Rings
Ladtech, Inc
HDPE Adjustment Ring
Traffic and Non -traffic area
5/13/05
33 05 13
Manhole External Wrap
Canusa - CPS
WrapidSeal Manhole Encapsulation System
er - Manholes & Bases/Fiberelass 33-39-13 (1/8/13
1/26/99
33 39 13
Fiberglass Manhole
Fluid Containment, Inc.
Flowti[e
ASTM 3153
Non -traffic area
08/30/06
33 39 13
Fiberglass Manhole
L.F. Manufacturing
Non -traffic area
1
j
Water & Sewer - Manholes & Bases/Frames & Covers/Rectammlar 33-05-13 (Rev 2/3/16)
1
*
33 05 13
(Manholc Frames and Covers
Western Iron Works, Bass & Hays Foundry
1001
24"x40" WE)
Water & Sewer - Manholes & Bases/Frames & Covers/Standard Boundl 33-05-13 (Rev
2/3/16)
3305 13
Manhole Frames and Covers
Western Iron Works, Bass & Hays Foundry
30024
24" Dia.
*
3305 13
Manhole Frames and Covers
McKinley Iron Works Inc.
A 24 AM
24" Dia.
1 08/24/18
3305 13
Manhole Frames and Covers
Neenah Foundry
R-1272
ASTM A48 & AASHTO M306
24" Dia.
1 08/24/18
3305 13
Manhole Frames and Covers
Neenah Foundry
R- 165-LM (Hinged)
ASTM A48 & AASHTO M306
24" Dia.
1 08/24/18
3305 13
Manhole Frames and Covers
Neenah Foundry
NF 1274
ASTM A48 & AASHTO M306
30" Dia.
1 08/24/18
3305 13
Manhole Frames and Covers
Neenah Foundry
R-1743-LM (Hinged)
ASTM A48 & AASHTO M306
30" dia.
1
33 05 13
Manhole Frames and Covers
Sigma Corporation
MH-144N
1
33 05 13
Manhole Frames and Covers
Sigma Corporation
MH-143N
1
33 05 13
Manhole Frames and Covers
Pont-A-Mousson
GTS-STD
24" dia.
1
33 05 13
Manhole Frames and Covers
Neenah Casting
24" dia.
1 10/31/06
33 05 13
Manhole Frames and Covers (Hinged)
Powerseal
Hinged Ductile Iron Manhole
ASTM A536
24" Dia.
1 7/25/03
3305 13
Manhole Frames and Covers
Saint-Gobain Pipelines (Pamrex/rexus)
RE32-R8FS
30" Dia.
1 01/31/06
3305 13
30" Dia. MH Ring and Cover
East Jordan Iron Works
V1432-2 and V1483 Designs
AASFITO M306-04
30" Dia.
11/02/10
3305 13
30" Dia. MH Ring and Cover
Sigma Corporation
MH165IFWN & MH16502
30" Dia
1 07/19/1 t
3305 13
30" Dia. MH Ring and Cover
Star Pipe Products
NIH32FTWSS-DC
30" Dia
1 08/10/11
3305 13
30" Dia. MH Ring and Cover
Accucast
220700 Heavy Duty with Gasket Ring
30" Dia
30" ERGO XL Assembly
10/14/13
3305 13
30" Dia. MH Ring and Cover, (Hinged & Lockable)
East Jordan Iron Works
with Cam Lock/MPIC/T-Gasket
ASSEITO MI 05 & ASTM A536
30" Dia
06/01/17
3405 13
30" Dia. MH Ring and Cover (Hinged & Lockable) CI
SIP Industries
2280 (32")
ASTM A 48
30" Dia.
CAP-ONE-30-FTW, Composite, w/ Lack
.111111
33 OS 13
30" Dia. MH Ring and Cover
Composite Access Products, L.P.
w/o Hmg
30" Dia.
10/07/21
3405 13
30" Dia. MH Ring and Cover
Trumbull Manufacturing
32"(30") Frame and Cover
30" Dia.
Water &der - Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight 33-05-13 (Rev 2/3/1�
33 05 13
Manhole Frames and Covers
Pont-A-Mousson
Pamtight
24" Dia.
*
3305 13
Manhole Frames and Covers
Neenah Casting
24" Dia.
*
3305 13
Manhole Frames and Covers
Western Iron Works,Bass & Hays Foundry
300-24P
24" Dia.
*
3305 13
Manhole Frames and Covers
McKinley Iron Works Inc.
WPA24AM
24" Dia.
03/08/00
3305 13
Manhole Frames and Covers
Accucast
RC-2100
ASTM A 48
24" Dia.
04/20/01
3305 13
Manhole Frames and Covers
(SIP)Serampore Industries Private Ltd.
300-24-23.75 Ring and Cover
ASTM A 48
24" Dia.
�Wr - Manholes & Bases/Precast Concrete l2ev
33 39 10 Manhole, Precast Concrete
1/8/13
Hydro Conduit Corp
SPL Item 449
ASTM C 478
41"
*
33 39 10
Manhole, Precast Concrete
Wall Concrete Pipe Co. hic.
ASTM C-443
48"
09/23/96
33 39 10
Manhole, Precast Concrete
Concrete Product Inc.
48" I.D. Manhole w/ 32" Cone
ASTM C 478
48" w/32" cone
05/08/18
33 39 10
Manhole, Precast Concrete
The Turner Company
48", 60" I.D. Manhole w/ 32" Cone
ASTM C 478
48", 60"
10/27/06
33 39 10
Manhole, Precast Concrete
Oldeastle Precast Inc.
48" I.D. Manhole w/ 24" Cone
ASTM C 478
48" Diam w 24" Ring
1 06/09/10
33 39 10
Manhole, Precast (Reinforced Polymer)Conaete
US Composite Pipe
Reinforced Polymer Concrete
ASTM C-76
48" to 72"
1 09/06/19
33 3920
Manhole, Precast Concrete
Forterra Pipe and Precast
60" & 72" I.D. Manhole w/32" Cone
ASTM C-76
60" & 72"
10/07/21
32 39 20
Manhole, Precast Concrete
Forterra Pipe and Precast
48" I.D. Manhole w/32" Cone
ASTM C-77
48"
10/07/21
33 3920
Manhole, Precast (Reinforced Polymer) Concrete
Armorock
48" & 60" I.D. Manhole w/32" Cone
48" & 60"
10/07/21
33 3920
Manhole, Precast (Hybrid) Polymer & PVC
Predl Systems
48" & 60" I.D. Manhole w/32" Cone
48" & 60" Non Traffic Areas
ASTM C-478; ASTM C-923;
03/07/23
33 3920
Manhole, Precast Concrete
AmeriTex Pi a and Products, LLC
48" & 10" I.D. Manhole w/32" Cone
ASTM C-443
03/07/23
33 3920
IManhole, Precast (Reinforced Pol er) Concrete
P3 Polymers, RockHards
48" & 60" I.D. Manhole w/32" Cone
04/28/07
IManholc, Precast (Reinforced Polymcr) Concrete
Amitech USA
Meyer Polycrete Pipe
Eater & Sewer - Manholes & Bases/Rehab Svstems/Cementitlous
EI-14
Manhole Rehab Systems
Quadex
04/23/01
EI-14
Manhole Rehab Systems
Standard Cement Materials, Inc.
Relmer MSP
E1-14
Manhole Rehab Systems
AP/M Permaform
4120101
E I-14
Manhole Rehab System
Strong Company
Strong Seal MS2A Rehab System
5/12/03
EI-14
Manhole Rehab System (Liner)
Triplex Lining System
MH repair product to stop infiltration
ASTM D5813
08/30/06
General Concrete Repair
FlexKrete Technologies
Vinyl Polyester Repair Product
Mise. Use
* From Original Standard Products List
CITY OF FORT WORTH
FORT WORTH. WATER DEPARTMENT
STANDARD PRODUCT LIST
Updated: 03/07/2023
Note: All water or sewer pipe larger than 1S inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding maybe required for some pipes.
Approv pec No./ IManufacturer Model1. National Spec
Water &Sewer - an o es Bases/Rehab Svstems/NonCementitiousI mmmmw`Moir
05/ 00/96 E1-14 Manhole Rehab Systems Sprayroa, Spray Wall Polyurethane Coating ASTM D639/D790
I 12/14/01 Coating for Corrosion protection(Exterior) ERTECH Series 20230 and 2100 (Asphatic Emulsion) Structures Only
I01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1BB, Sl, S2 Acid Resistance Test Sewer Applications
I8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications
» v�33
nu�pP�ooung i�P�ayolloull-
x `Structures
03/19/18
I
39 20� Coating for Corrosion orotection(Exterim)
Sherwin Williams
Grade (Asohatic Emulsion)
Only
I
33 05 13 Manhole Insert
ME
Knutson Enterprises
Made to Order - Plastic
ASTM D 1248
For 24" dia.
I *
33 05 13 Manhole Insert
South Western Packaging
Made to Order - Plastic
ASTM D 1248
For 24" dia. I
I *
3305 13 Manhole Insert
Noflow-Inflow
Made to Order - Plastic
ASTM D 1248
For 24" dia. I
I 09/23/96
3305 13 Manhole Insert
Scuthwestcon Packing & Seals, Inc.
Lifesaver - Stainless Steel
For 24" dia. I
I 09/23/96
3305 13 Manhole Insert
Southwestern Packing & Seals, Inc.
TetherLok - Stainless Steel
For 24" dia I
I
711111.72
ara e�Sewer - Pine Casim SDacers 33-05-24 (07/01/13)
I
Steel Band Casing Spacers
Advanced Products and Systems, Inc.
Carbon Steel Spacers, Model SI
IO2/02/93
Stainless Steel Casing Spacer
Advanced Products and Systems, Inc.
Stainless Steel Spacer, Model SSI
I04/22/87
Casing Spacers
Cascade Waterworks Manufacturing
Casing Spacers
I09/14/10
Stainless Steel Casing Spacer
Pipeline Seal and Insulator
Stainless Steel Casing Spacer
Up to 48"
I09/14/10
Coated Steel Casin Spacers
Pipeline Seal and Insulator
Coated Steel Casin Spacers
Up to 48"
I 05/10/11
Stainless Steel Casing Spacer
Powerseal
4810 Powerchock
Up to 48"
03/19/18
Casing Spacers
BWM
SS-12 Casing Spacer(Stainleas Steel)
03/19/18
Casing Spacers
BWM
FB-12 Casing Spacer (Coated Carbon Steel)
for Non_pressure Pipe and Grouted Casing
03/29/22
33 05 13 Casing Spacers
CCI Pipeline Systems
CSC12, CSS12
PEW I
Water & Sewer - Pines/Ductile Iron 33-11-10(1/8/13) i
I
*
33 11 10 Ductile Iron Pipe
Griffin Pipe Products, Co.
Super Bell-Tite Ductile Iron Pressure Pipe,
AW WA C150, C151
3" thrn 24"
OS/24/18
33 11 10 Ductile Iron Pipe
American Ductile Iron Pipe Co.
American Fastite Pipe (Bell Spigot)
AW WA C150, C151
4" thrn 30"
08/24/18
33 11 10 Ductile Iron Pipe
American Ductile Iron Pipe Co.
American Flex Ring (Restrained Joint)
AW WA C150, C151
4" thin 30"
*
33 11 10 Ductile Iron Pipe
U.S. Pipe and Foundry Co.
AW WA C150, C151
*
33 11 10 Ductile Iron Pipe
McWane Cast Iron Pipe Co.
AW WA C150, C151
I
Water & Sewer - Utility Line Marker (08/24/2018)
I
I
ewer - Coatinss/EDD -39-60 (01/08/13)
I
INEK
02/25/02
Epoxy Lining System
Sauereisen, Inc
SewerGard 21 ORS
LA County 9210-1.33
I 12/14/01
Epmv Lmmg System
Ertech Technical Coatings
Ertcch 2030 and 2100 Series
I
I 04/14/05
Interim Ductile Iron Pipe Coating
Induron
Protecto 401
ASTM B-117
Ductile Iron Pipe Only I
I01/31/06
Coatings for Corrosion Protection
Chesterton
Arc 791, S1HB, Sl, S2
Acid Resistance Test
Sewer Applications I
I8/28/2006
Coatings for Corrosion Protection
Warren Environmental
S-301 and M-301
Sewer Applications I
I
INNE
Sewer - Coatings/Polvurethane
I
I
Sewer - Combination Air Valves
I
I 05/25/18
I
33-31-70
Air Release Valve
A.R.I. USA, Inc.
D121LTP02(Compwite Body)
2"
I
I
Sewer - Pines/Concrete
I
*
EI-04
C. Pipe, Reinforced
Wall Concrete Pipe Co. Inc.
ASTM C 76
I
E I-04
Conc. Pipe, Reinforced
Hydro Condun Corporation
Class III T&G, SPL Item #77
ASTM C 76
I
I
E I-04
Conc. Pipe, Reinforced
Hanson Concrete Products
SPL item 495 hirsaliele, 998 Pipe
ASTM C 76
I
IE
I-04
Conc. Pipe, Reinforced
Concrete Pipe & Products Co. Inc.
ASTM C 76
I
I
Sewer - Pine Enlargment Svstem (Method)33-31-23 (01/18/13).
I
Svstem
PIM Corporation
Polyethylene
PIM Corp., Piscata Way, N.J.
Approved Previously
�Plm
McConnell Systems
McLat Construction
Polyethylene
Houston, Texas
Approved Previously I
TRS Systems
Trenchless Replacement System
Polyethylene
Calgary, Canada
Approved Previously I
I
Sewer - PiDe/Fibere
as_ss Reinforced/ 33-31-13(1/8/13)
I
Hobas Pipe USA, Inc.
Holies Pipe (Non -Pressure)
ASTM D3262/D3754
I 7/21 /97
33 31 13
Cent. Cast Fiberglass (FRP)
I 03/22/10
333 13
Fiberglass It,. (FRP)
Ameroa
Bondstmod RPMP Pipe
AST- D3262-3154
I
04/09/21
33 31 13
Glass -Fiber Reinforced Polviner Pipe FRP
Thompson Pie Group
Thompson Pipe Flowtite
ASTM D32621D3754
03/07/23
3331 13
lFiber.lass Pine (FRP)
Future Pine Industries
Fiberstron¢ FRP
ASTM D3212. ASTM D3681.
ASTM D4161. AW WA M45
Sewer - PiDe/Polvmer Pine
4/14/OS Polvmer Modified Concrete Pioe Amrtech USA Meyer Polycrete Pioe ASTM C33, A276, F477 8" tp 1112", Class V
I06/09/10 El-9 Reinforced Polymer Concrete Pipe US Composite Pipe Reinforced Polymer Concrete Pioe ASTM C-76 I
I I
/HDPE 33-31-23(1/8/13)
* From Original Standard Products List
CITY OF FORT WORTH
FORT WORTH. WATER DEPARTMENT
STANDARD PRODUCT LIST
Updated: 03/07/2023
Note: All water or sewer pipe larder than 1S inch diameter shall be approved for use by the Water Department on a proiect specific basis. Special bedding maybe required for some
I ' hdsity polyethylene pipe
Phillips Driswpipe, Inc.
Opticore Ductile Polyethylene Pipe
ASTM D 1248
8" I
* gh-density polyethylene pipe
�'Ih�gh_d_maitv
PI- Inc.
ASTM D 1248
8"
* gh-density polyethylene pipe
Polly Pipe, Inc.
ASTM D 1248
8"
polyethylene pipe
CSR Hydro CondmUPioelme Systems
McConnell Pipe Enlargement
ASTM D 1248
Sewer - PiDes/PVC (Pressure Sewer) 33-11-12 (4/1/13)
12/02/11
33-11-1�
DR -Id PVC Pressure Pipe
Prpelife Jetstream
PVC PressurePipe
AWWA C900
4"[tiro 12"
10/22/14 33-11-12 DR-14 PVC Pressure Pipe
Royal Building Products
Royal Seal PVC Pressure Pipe
AW WA C900
4" thru 12"
33-31-20
PVC Sewer Poe
12/23/97*
33-31-20
PVC Sewer Pipe
*
33-31-20
PVC Sewer Pipe
01/18/18
33-31-20
PVC Sewer Pipe
11/11/98
33-31-20
PVC Sewer Pipe
*
33-31-20
PVC Sewer Pipe
09/11/12
33-31-20
PVC Sewer
05/06/05
33-31-20
,
PVC Sohd Wall Pipe
04/27/06
33-31-20
PVC Sewer Fittings
*
33-31-20
PVC Sewer Fittings
1 3/19/2018
33 3120
PVC Sewer Pipe
1 3/19/2018
33 3120
PVC Sewer Pre
1 3/29/2019
33 3120
Gasketed Fittings (PVC)
1 10/21/2020
33 3120
PVC Sewer Pipe
1 10/22/2020
33 3120
PVC Sewer Pipe
1 10/21/2020
33 3120
PVC Sewer Pipe
P 33-31-12 1
*
Cured in Place Pipe
05/03/99
Cured in Place Ape
05/29/96
Cured in Place Pipe
Sewer - Pipes/Rehab/Fold & Form
Fold and Form Pi
11/03/98
Fold and Form Pipe
Fold and Form Pipe
12/04/00
Fold and Form Pipe
06/09/03
Fold and Form Pipe
1-M Manufacturing Co., Inc. (JM Eagle)
Diamond Plastics Corporation
Lamson Vylon Pipe
Vinyltech PVC Pipe
Diamond Plastics Corporation
J-M Manufacturing Co, Inc. (JM Eagle)
P,qq life Jet Stream
Diamond Plastics Corporation
Harco
Plastic Trends, Inc.(Westlak )
Pipelife Jet Stream
Pipelife Jet Stream
GPK Products, Inc.
NAPCO(Westlake)
Sanderson Pipe Corp.
NAPCO(Westlake)
Insimfrrm Texark, Inc
National Envirotech Group
Remolds Inc/Inliner Technolgy (Inliner USA)
Cullum Pipe Systems, Inc.
Insimfirm Technologies, Inc.
American Pipe & Plastics, Inc.
Ultralmer
Miller Pipeline Corp.
Sewer - PiDes/ODen Prot -de Laree Diameter i
09/26/91
E100-2
PVC Sewer Pipe, Ribbed
Lamson Vvlon Pipe
09/26/91
E100-2
PVC Sewer Pipe, Ribbed
Extmsim Technologies, Inc.
E100-2
PVC Sewer Pipe, Ribbed
Up -or ETI Company
11/10/10
(E100-2)
Polypropylene (PP) Sewer Pipe, Double Wall
Advanced Drainage Systems (ADS)
11/10/10
(E100-2)
Polypropylene (PP) Sewer Pipe, Triple Wall
Advanced Drainage Systems (ADS)
05/16/11
Steel Reinforced Polyethylene Pipe
ConTech Construction Products
SDR-26
SDR-26
Gravity Sewer
"S" Gravity Sewer Pipe
SDR 26/35 PS 115/46
SDR-26 and SDR-35
SDR 26/35 PS 115/46
SDR-26 and SDR-35 Gasket Fittings
Gasketed PVC Sewer Main Finings
SDR 35
SDR 26
SDR 26
SDR 26
SDR 26
SDR 26/35 PS 115/46
National Liner, (SPL) Item #27
Inliner Technology
Insim "NuPIpe"
Ultralmer PVC Alloy Pipelmer
EX Method
Carlon Vylon H.C. Closed Profile Pipe,
Ultra -Rib Open Profile Sewer Pipe
SaniTite HP Double Wall (Corrugated)
SamTne HP Triple Wall Pipe
Durmaxx
ASTM D 3034
ASTM D 3034
ASTM F 789
ASTM D3034
ASTM F 679
ASTM F 679
ASTM F-679
ASTM F-679
ASTM D-3034, D-1784, etc
ASTM D 3034
ASTM F679
ASTM D3034
ASTM D3034/F-679
ASTM D3034
ASTM D3034
ASTM F-679
ASTM F 1216
ASTM F-1216/D-5813
ASTM F 1216
ASTM F-1504
ASTM F-1504, 1871, 1867
ASTM F-1504, F-1947
ASTM F 679
ASTM F 679
ASTM F 2736
ASTM F 2764
ASTM F 2562
4" - 15"
4" thru 15"
4" thru 15"
4" thru 15"
18" to 27"
18" - 28"
18"
18" to 48"
4" - 11"
18"- 24"
4"- 15"
4"- 15"
4" - 15"
4"- 15"
18"- 36"
Demo. Purpose Only
Up to 18" diameter
18" to 48"
18" to 48"
24"-30"
30" to 60"
24" to 72"
* From Original Standard Products List
CITY OF FORT WORTH
FORT
WORTH.
WATER DEPARTMENT
STANDARD PRODUCT
LIST
Updated: 03/07/2023
Note: All water or sewer pipe larger than 1S inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding maybe required for some pipes.
Approval
Spec I
on
1W
Manufacturer
Model1.
National Spec
Water - Aoour�enancesgig -10 (07/Ol/13)
Ol/18/18
33-12-10
Double Strap Saddle
Romac
202NS Nylon Coated
AWWA C800
1"-2"SVC, no 124"Pipe
08/28/02
Double Strap Saddle
Smith Blair
4317 Nylon Coated Double Strap Saddle
07/23/12
33-12-10
Double StrapService Saddle
Mueller Company
U-S Double SS Strap DI Saddle
AWWA C800
1"-2" SVC, u to 24" Pi e
03/07/23
33-12-10
Double StrapService Saddle
Powerseal
3450AS, Inc. Corp. Stop, ON Strap, Stainless
NSF ANSI 372
1"-2" SVC, u to 24 Pi e
10/27/87
Curb Stops -Ball Meter Valves
McDonald
6100M,6100MT & 610MT
3/4" and 1"
10/27/87
Curb Stops -Ball Meter Valves
McDonald
4603B, 4604B, 610UM, 6100TM and 6101M
1 h" and 2"
FB600-7NL, FB1600-7-NL, FV23-777-W-NL,
1/25/2018
33-12-10
Curb Stops -Ball Meter Valves
Ford Meter Box Co., Inc.
L22-77NL
AWWA C800
2"
FB600-6-NL, FB1600-6-NL, FV23-666-W-
1111018
33-12-10
Curb Stops -Ball Meter Valves
Ford Meter Box Co., Inc.
NL, L22-66NL
AWWA C800
1-1/2"
FB600-4-NL, FB1600-4-NL, B11-444-WR-
1111018
33-12-1.
Curb Stops -Ball Meter Valves
Ford Meter Box Co., Inc.
NL, B22444-WR-NL, L28-44NL
AWWA C800
I "
13-25000N, B-24277N-3, B-20200N-3, H-
AWWA C800, ANSF 61,
1/25/2018
33-12-10
Curb Stops -Ball Meter Valves
Mueller Co., Ltd.
15000N, , H-1552N, H142276N
ANSI/NSF 372
_
B-25000N, B-20200N-3, B-24277N-3,H-
AWWA C800, ANSF 61,
1111.1.
33-12-1.
Curb Stops -Ball Meter Valves
Mueller Co., Ltd.
15000N, H-14276N, H-15525N
ANSI/NSF 372
1-1/2"
5/25/2018
33-12-10
Curb Stops -Ball Meter Valves
Mueller Co., Ltd.
15530N
ANSI/NSF 372
V,
01/26/00
Coated Tapping Saddle with Double SS Straps
1CM Industries, Inc.
#406 Double Band SS Saddle
1"-2" Taps on up to 12"
0/5/21/12
33-12-25
Tapping Sleeve (Coated Steel)
1CM Industries, Inc.
412 Tapping Sleeve ESS
AWWA C-223
Up to 30" w/12" Out
03/29/22
33-12-25
Tapping Sleeve (Coated or Stainless Steel)
1CM Industries, Inc.
415 Tapping Sleeve
AWWA C-223
Concrete Pipe Only
05/10/11
Tapping Sleeve (Stainless Steel)
Powerseal
3490AS (Flange) & 3490MJ
4"-1" and 16"
02/29/12
33-12-25
Tapping Sleeve (Coated Steel)
Romac
FTS 420
AWWA C-223
U p to 42" w/24" Out
02/29/12
33-12-25
Tapping Sleeve (Stainless Steel)
Romac
SST Stainless Steel
AWWA C-223
Up to 24" w/12" Out
02/29/12
33-12-25
Tapping Sleeve (Stainless Steel)
Romac
SST III Stainless Steel
AWWA C-223
Up to 30" w/12" Out
05/10/11
Joint Repair Clamp
Powerseal
3232 Bell Joint Repair Clamp
4" to 30"
Plastic Meter Box w/Composite Lid
DFW Plastics lnc.
DFW37C-12-lEPAFFTW
Plastic Meter Box w/Composite Lid
DFW Plastics lnc.
DFW39C-12-lEPAFFTW
08/30/06
Plastic Meter Box w/Composite Lid
DFW Plastics Inc.
DFW65C-14-lEPAF FTW
Class "A"
Concrete Meter Box
Bass & Hays
CMB37-B12 1118 LID-9
Concrete Meter Box
Bass & Hays
CMB-18-Dual 1416 LID-9
Concrete Meter Box
Bass & Hays
CMB65-B65 1527 LID-9
r
Water - Combination Air Release 33-31-70 (01/08/13)
1
E I -I I
Au Release Valve
GA Industries, Inc.
Empve Air and Vacuum Valve, Model 935
ASTM A 126 Class B, ASTM A
1" &W21'
*
EI-11
[oribriation
ombmation Ar Release Valve
Multiplex Manufacturing Co.
Crispin Air and Vacuum Valves, Model No.
1/2", 1" & 2"
EI-11
ombination Air Release Valve
Valve and Primer Corp.
APCO #143C, #145C and #147C
1", 2" & 3"
Water Barrel Fire Hvdrants
10/Ol/87
E-1-12
Dry Barrel Fire Hydrant
American -Darting Valve
Drawing Nos. 90-18608, 94-18560
AWWA C-502
03/31/88
E-1-12
Dry Barrel Fire Hydrant
American Darling Valve
Shop Drawing No. 94-18791
AWWA C-502
09/30/87
E-1-12
Dry Barrel Fire Hydrant
Clow Corporation
Shop Drawing No. D-19895
AWWA C-502
01/12/93
E-1-12
Dry Barrel Fire Hydrant
American AVK Company
Model 2700
AWWA C-502
08/24/88
E-1-12
Dry Barrel Fire Hydrant
Clow Corporation
Drawings D20435, D20436, B20506
AWWA C-502
E-1-12
Dry Barrel Fire Hydrant
ITT Kennedy Valve
Shop Drawing No. D-80783FW
AWWA C-502
0.1.7
E-1-12
Dry Barrel Fire Hydrant
M&H Valve Company
Shop Drawing No. 13476
AWWA C-502
Shop Drawings No. 6461
t0/14/87
E-1-12
Dry Barrel Fire Hydrant
Mueller Company
A-423 Centurion
AW WA C-502
01/15/88
E1-12
Dry Barrel Fire Hydrant
Mueller Company
A-423 Super Centurion 200
AWWA C-502
10/09/87
E-1-12
Dry Barrel Fire Hydrant
U.S. Pipe & Foundry
Shop Drawing No. 960250
AWWA C-502
09/16/87
E-1-12
Dry Barrel Fire Hydrant
American Flow Control (AFC)
Waterous Pacer WB67
AWWA C-502
08/12/16
33-12-40
Dry Barrel Fire Hydrant
EI (East Jordan Iron Works)
WaterMaster 5CD250
I
02/05/93
E101-5
Detector Check Meter
Ames Company
Model 1000 Detector Check Valve
AWWA C550
4" - 10"
08/05/04
Magnetic Drive Vertical Turbine
Hersey
Magnetic Drive Vertical
AWWA C701, Class 1
3/4" - 6"
* From Original Standard Products List
CITY OF FORT WORTH
FORT WORTH. WATER DEPARTMENT
STANDARD PRODUCT LIST
Updated: 03/07/2023
Note: All water or sewer pipe larger than 1S inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding maybe required for some pipes.
Approval
IModel
INational
Water -Pines/PVC(Pressure Waterl33-31-70(01/08/13) -W MEL M`
—AL
I 01/18/18
33-11-12
PVC Pressure Pipe
Vinyltech PVC Pipe
DR14
ASTM D1784
V-12" I
I 3/19/2018
33 11 12
PVC Pressure Pipe
Pipelife Jet Stream
DR14
AWWA C900
4"-12" I
I 3/19/2018
33 11 12
PVC Pressure Pipe
Pipelife Jet Stream
DR18
AWWA C900
16"-24" I
I 5/25/2018
33 11 12
PVC Pressure Pipe
Diamond Plastics Corporation
DR 14
AWWA C900
4"-12" I
5/25/2018
3311 12
PVC Pressure Pipe
Diamond Plastics Corporation
DR 18
AWWA C900
16"-24"
AWWA C900-16
UL 1285
12/6/2018
3311 12
PVC Pressure Pipe
J-M Manufacnrring Co., Inc d/b/a JM Eagle
DR 14
ANSI/NSF 61
4"-28"
FM 1612
12/6/2018
33 11 12
PVC Pressure Pipe
J-M Manufacturing Co., Inc d/b/a JM Eagle
DR 18
°
16"-24"
9/6/2019
33 11 12
PVC Pressure Pipe
Underground Solutions Inc.
DR14 Fusible PVC
AWWA C900
4" - 8"
9/6/2019
33 11 12
PVC Pressure Pipe
NAPCO(Westlake)
DR18
AWWA C900
16"-24"
9/6/2019
33 11 12
PVC Pressure Pipe
NAPCO(Westlake)
DR14
AWWA C900
4"-12"
9/6/2019
33 11 12
PVC Pressure Pipe
Sanderson Pipe Corp.
DR14
AWWA C900
4"- 12"
I
Water - Pines/Valves & Fittin¢s/Ductile Iron Fittines 33--11 (01/08/13)
I
07/23/92
EI-07
Ductile Iron Fittings
Star Pipe Products, Inc.
Mechanical Joint Finings
AW WA C153 & C110
I
EI-07
Ductile Iron Fittings
Griffin Pipe Products, Co.
Mechanical Joint Fittiq @
AWWA C 110
I *
E1-07
Ductile Iron Fittings
McWane/Tyler Pipe/ Union Utilmes Division
Mechanical Joint Finings, SSB lass 350
AWWA C 153, C 110, C 111
I 08/11/98
E1-07
Ductile Iron Fittings
Sigma, Co.
Mechanical Joint Finings, SSB Class 351
AWWA C 153, C 110, C 112
I 02/26/14
E1-07
MJ Fittings
Accucast
Class 350 C-153 MJ Fittings
AW WA C153
4"-12"
I 05/14/98
E1-07
Ductile Iron Joint Restraints
Ford Meter Box Co./Uni-Flange
Uni-Flange Series 1400
AW WA C111/C153
4" to 36"
I 05/14/98
E1-24
PVC Joint Restraints
Ford Meter Box Co./Uni-Flange
Uni-Flange Series 1500 Circle -Lock
AW WA C111/C153
4" to 24"
I 11/09/04
E1-07
Ductile Iron Joint Restraints
One Bolt, Inc.
One Bolt Restrained Joint Fitting
AWWA C111/C116/C153
4" to 12" I
I 02/29/12
33-11-11
Ductile Iron Pipe Mechanical Joint Restraint
EBAA Iron, Inc.
Megalug Series 1100 (for DI Pipe)
AWWA C111/C116/C153
4" to 42" I
I 02/29/12
33-11-11
PVC Pipe Mechanical Joint Restraint
EBAA Iron, hic.
Megalug Series 2000 (for PVC Pipe)
AWWA C111/C116/C153
4" to 24" I
I 08/05/04
E1-07
Mechanical Joint Retainer Glands(PVC)
Sigma, Co.
Sigma One-Lok SLC4 - SLC10
AW WA C111/C153
4" to 10" I
I 03/06/19
33-11-11
Mechanical Joint Retainer GlandaFVC)
Sigma, Co.
Sigma One-Lok SLCS4 - SLCS12
AW WA C111/C153
4" to 12" I
I 08/05/04
E1-07
Mechanical Joint Retainer Glands(PVC)
Sigma, Co.
Sigma One-Lok SLCE
AW WA C111/C153
12" to 24" I
I 08/10/98
E1-07
MJ Fiffir IP)
Sigma, Co.
Sigma One-Lok SLDE
AW WA C153
4" - 24" I
I 10/12/10
E1-24
Interim Restrained Joint Svatem
S & B Techncial Products
Bulldog System ( Diamond Lok 21 & JM
ASTM F-1624
4" to 12" I
I 08/16/06
E1-07
Mechanical Joint Fittings
SIP Ind-nies(Serampore)
Mechanical Joint Fittings
AW WA C153
4" to 24" I
I 11/07/16
33-11-11
Mechanical Joint Retainer Glands
Star Pipe Products, Inc.
PVC Stargrip Series 4000
ASTM A536 AW WA CI I I
I
I 11/07/16
33-11-11
Mechanical Joint Retainer Glands
Star Pipe Products, Inc.
DIP Stmgrip Series 3000
ASTM A536 AW WA CI I I
I
EZ Grip Joint Restraint (EZD) Black For DIP
03/19/18
33-11-I1
Mechanical Joint Retainer Glands
SIP Industries(Seramnore)
ASTM A536 AW WA CI I I
3"-48"
EZ Grip Joint Restraint (EZD) Red for C900
03/19/18
33-11-11
Mechanical Joint Retainer Glands
SIP Industries(Serampore)
DRl4 PVC Ape
ASTM A536 AW WA CI I I
4"-12"
03/19/18
33-11-11
Mechanical Joint Retainer Glands
SIP Industries(Sersmpore)
�` vuP, V11i. nn, oa„ �,.t.�`VJ nGLL �V1 �J°✓
ASTM A536 AW WA CI11
16"-24"
I
Water - Pioes/Valves & Fittings/Resilient Seated Gate Valve* 33-12-20 (05/13/15).
I
Resilient Wedged Gate Valve w/no Gears
American Flow Control
Series 2500 Drawing # 94-20247
16"
I 12/13/02
Resilient Wedge Gate Valve
American Flow Control
Series 2530 and Series 2536
AWWA C515
30" and 36" I
I 08/31/99
Resilient Wedge Gate Valve
American Flow Control
Series 2520 & 2524 (SD 94-20255)
AW WA C515
20" and 24" I
I 05/18/99
Resilient Wedge Gate Valve
American Flow Control
Series 2516 (SD 94-20247)
AWWA C515
16" I
I 10/24/00
E1-26
Resilient Wedge Gate Valve
American Flow Control
Series 2500 (Ductile Iron)
AWWA C515
4" to 12" I
I 08/05/04
Resilient Wedge Gate Valve
American Flow Control
42" and 48" AFC 2500
AWWA C515
42" and 48" I
I 05/23/91
E1-26
Resilient Wedge Gate Valve
American AVK Company
American AVK Resilient Seeded GV
AWWA C509
4" to 12" I
I01/24/02
E1-26
Resilient Wedge Gate Valve
American AVK Company
20" and smaller I
I *
E1-26
Resilient Seated Gate Valve
Kennedy
4" - 12" I
I
E1-26
Resilient Seated Gate Valve
M&H
4" - 12" I
I *
E1-26
Resilient Seated Gate Valve
Mueller Co.
4" - 12" I
I 11/08/99
Resilient Wedge Gate Valve
Mueller Co.
Series A2361 (SD 6647)
AWWA C515
16" I
I 01/23/03
Resilient Wedge Gate Valve
Mueller Co.
Series A2360 for 18"-24" (SD 6709)
AWWA C515
24" and smaller
I 05/13/05
Resilient Wedge Gate Valve
Mueller Co.
Mueller 30" & 36", C-515
AW WA C515
30" and 36"
I 01/31/06
Resilient Wedge Gate Valve
Mueller Co.
Mueller 42" & 48", C-515
AW WA C515
42" and 48"
I 01/28/88
EI-26
Resilient Wedge Gate Valve
Clow Valve Co.
AWWA C509
4" - 12"
I 10/04/94
Resilient Wedge Gate Valve
Clow Valve Co.
16" RS GV (SD D-20995)
AW WA C515
16"
I 11/08/99
EI-26
Resilient Wedge Gate Valve
Clow Valve Co.
Clow RW Valve (SD D-21652)
AW WA C515
24" and smaller
I 11/29/04
Resilient Wedge Gate Valve
Clow Valve Co.
Clow 30" & 36" C-515
AWWA C515
30" and 36" (Note 3)
11/30/12
Resilient We Crate Valve
Clow Valve Co.
Clow Valve Model 2638
AW WA C515
24" to 48" (Nora 3)
05/08/91
E1-26
Resilient Seat Gate Valve
Stockham Valves & Fittings
AWWA C 509, ANSI 420 - stem,
4" - 12"
I
E1-26
Resilient Seated Gate Valve
U.S. Pipe and Foundry Co.
Mcoesw1250, regwremerts SPL #74
3" to 16"
11/26/16
33-12-20
Resilient Seated Gate Valve
EJ (East Jordan Iron Works)
EJ Fluo Master Gat. Valve & Boxes
08/24/18
I
Mateo Gate Valve
Matco-Norca
225 MR
AWWA/ANSI C115/An21.15
4" to 16"
I
* From Original Standard Products List
FORT WORTH®
Note: All water or
CITY OF FORT WORTH
WATER DEPARTMENT
STANDARD PRODUCT LIST
than 1S inch diameter shall be approved for use by the Water
basis.
for some
Updated: 03/07/2023
I *
E1-30 Rubber Seated Butterfly Valve
Henry Pratt Co.
AW WA C-504
24" I
*
E1-30 Rubber Seated ButterFly Valve
Mueller Co.
AW WA C-504
24"and smaller
1/11/99
E1-30 Rubber Seated Butterfly Valve
De ik Valves Co.
AW WA C-504
24" and larger
06/12/03
E1-30 Valmatm American Butterfly Valve
Valmanc Valve and Manufacturing Cert.
Valmatic American Butterfly Valve.
AW WA C-504
Up to 84" diameter
04/06/07
E1-30 Rubber Seated ButterFly Valve
M&H Valve
M&H Style 4500 & 1450
AW WA C-504
24" to 48"
03/19/18
33 12 21 Rubber Seated Butterfly Valve
G. A. Industries (Golden Anderson)
AW WA C504 Butterfly Valve
AW WA C-504
30"-54"
Water�ne Encasement 33-11-10 (01/08/13)
05/12/OS
EI-13 Polyethylene Encasment
Flessol Packaging
Fulton Enterprises
AW WA C105
8 mil LLD
05/12/05
EI-13 Polyethylene Encasment
Mountain States Plastics (MSP) and AEP Ind.
Standard Hardware
AW WA C105
8 mil LLD
05/12/05
E1-13 Polyethylene Encasment
AEP Industries
Bullstrong by Cowtown Bolt & Gasket
AW WA C105
8 mil LLD
09/06/19
33-11-11 Polyethylene Encasment
Northtown Products Inc.
PE Encasement for DIP
AW WA C105
8 mil LLD
Water - Samnlint= Station
03/07/23
33 12 50 Water Sam lin Station I
Eclipse
Number 88 , 12-inch Depth of Bur
As shown in spec. 33 12 50
00,1,-k
Water - Automatic Flusher
Automated Flushing System
Mueller Hydrogaud
HG2-A-IN-2-PVC-018-LPLG(Permanent)
04/09/21
Automated Flushing System
Kupf le Foundry Company
Eclipse #9800wc
04/09/21
Automated Flushing System
Kupf le Foundry Company
Eclipse 99700 (Portable)
* From Original Standard Products List