HomeMy WebLinkAboutContract 58896-CO1CSC No. 58896-COI
FoxT�WIoRTH .
City of Fort Worth
Change Order Request
Project Namel 2023 Downtown Resurfacing Project I City Sec # 58896
Client Project #(s)l 104184
Project Description
Resurfacing of streets and curb ramp replacement in downtown at various locations.
Contractorl Texas Materials Group I Change Order #1 1 1 Date 3/25/2024
City Project Mgr.l Tariqul Islam l City Inspectorl Cody Horton
Dept.
TPW
Contract Time
Totals
(CD)
Original Contract Amount
$4,568,805.04
$4,568,805.04
180
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
$4,568,805.04
$4,568,805.04
180
Amount of Proposed Change Order
$0.00
$0.00
179
Revised Contract Amount
$4,568,805.04
$4,568,805.04
359
Original Funds Available for Change Orders
$100,000.00
$100,000.00
Remaining Funds Available for this CO
$100,000.00
$100,000.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $5,711,006.30
JUSTIFICATION (REASONS) FOR CHANGE ORDER
The change order will add a pavement marking removal bid item due to the change requested by Traffic Management to remove the 24-inch-wide striping in a few intersections.
A quote was received from the contractor for the striping removal and was found reasonable compared with similar items from recent bids. The change order will add two months
of traffic control for the delay. The change order will also add 179 calendar days to contract days due to the following delays:
(1) 44 days delay due to asphalt mix design change (from 7/14/2023 to 8/27/2023): Before starting paving of the project, the contractor proposed an alternate mix design (SSM)
for asphalt paving of the project at no additional cost to the City with an intent of higher durability and higher UV resistant capacity in heavily traffic downtown streets. The City
delayed the approval of this new mix design, and the contractor had to reschedule with their milling sub -contractor, affecting the construction start date. (2)105-day delay due to
conflict with developers' projects (from 12-04-2023 to 3-18-2024): Two developers were working on projects on Commerce St from 7th St to 9th St with lane closures of a few
street segments within the project limit. We couldn't pave Commerce from 7th St to 9th St, 7th Street from Commerce to Calhoun, and 9th Street from Commerce to Calhoun until
the development projects were complete. (3) 30 days to complete the delayed work (from 03-18-2024 to 04-16-2024): This is the time the Contractor requested to mobilize back
to the site to complete the work after the developers finished their work to mill and overlay the three street segments and install the pavement markings.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Name Contractor (Name) I Contract Signature Date
Texas Bit Matthew Harper ,„„°ef,,�,�,o 1,�, Apr 3, 2024
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
--
Apr3,2024
---
Apr3,2024
Program Manager
Date
Senior Capital Project Officer
Date
Zefa(p(AA6%
Apr 8, 2024
-
Apr 8, 2024
istante t
Date
Director, Contracting Department (Dept)
Date
Apr 9, 2024
Apr 9, 2024
Assistant City Attorne
Date
Assistant City Manager
Date
ioa& „kAdi,,o,s.o o Apr 11, 2024 I14� Apr 11, 2024
Council Action (it required)
q9 oq M&C Number I I M&C Date Approved
ATTEST:
Jannette Goodall, City Secretary
n
pp FpOR.y.*04A
QdQn QEaasap
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORTWORTH City of Fort Worth
Change Order Additions
Project Name 1 2023 Downtown Resurfacing Project City Sec # 1 58896 1
Client Project# 1 104184 1
Contractorl Texas Materials Group IPMI Tariqul Islam Inspectorl Cody Horton
Change Order Submittal # 0 Date 1 3/25/2024 1
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 1
New Remove 24 inch striping I PW 865.00000WU LF $3.86 $3,338.9U1
91 Traffic Control TPW 2.00000001) MO $21,156.47 $42,312.941
1
I
1
I
I
1
I
1
I
1
I
1
I
1
I
I
1
1
1
1
1
I
1
1
1
I
1
1
1
1
I
1
1
1
I
I
I
1
1
I
1
I
1
I
1
I
1
I
1
I
I
1
I
1
I
1
I
I
I
I
I
I
1
I
1
I
1
I
TF W $45,651.841
1
1
1
Sub Total Additions $45,651.841
Change Order Additions Page 2 of 3
FORT WHO
Project Name 1 2023 Downtown Resurfacing Project
Client Project # 1 104184
Contractorl Texas Materials Group
I I tM DtSCHIP I IUN
92 Paving Construction Allowance
City of Fort Worth
Change Order Deletions
City Sec# 1 58896 1
1
PMl Tariqul Islam l Inspedorl Cody Horton l
Change Order Submittal # Date 1 3/25/2024 1
DELETIONS
DEPI Uty Unit Unit Cost total
TPW 0.45651840 LS $100,000.00 $45,651.84
TPW $45,651.84
Sub Total Deletions $45,651.84
Change Order Deletions Page 3 of 3
MISBE for this Change Order
MISBE Sub Type of Service Amount for this CO
Not Applicable Not Applicable Not Applicable
Total $0.00
Previous Change Orders
CO # DATE I AMOUNT
Not Applicable Not Applicable Not Applicable
Total 1 $0.00 I
FORT WORTH.
Routing and Transmittal Slip
Transportation and Public Works
Department
DOCUMENT TITLE: 2023 Downtown Resurfacinq Contract, CO 1
M&C CPN 104184
DATE:
To: Curtis Green
1.
Texas Bit — Matthew Harper
2.
s.Cody Horton (Inspector)
4.Tariqul Islam (PM)
5 Zelalem Arega (PGM)
6 Mary Hanna (SCPO)
7. Patricia Wadsack (AD)
$ Lauren Prieur (Director)
9 Doug Black (ACA)
10. Jesica McEachern (ACM)
11, Jannette Goodall (CS)
CSO # 58896 DOC#
INITIALS DATE OUT
71�W Apr 3, 2024
Apr 3, 2024
a
Apr 3, 2024
Z�
Apr 8, 2024
W�
Apr 8, 2024
PLW
Apr 9, 2024
dw
Apr 9, 2024
DB r>15
Apr 11, 2024
C01-
JM
Apr 11, 2024
;
Apr 12, 2024
DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: U Yes ❑✓ No
RUSH: ❑ Yes❑✓ No SAME DAY: []Yes No NEXT DAY: []Yes 2 No
ROUTING TO CSO: DYes [—]No
Action Required:
❑ As Requested 171 Attach Signature, Initial and NotaryTa
■ Signature/Routing and or Recording
❑ Comment
❑ File
Return to: Please call
at ext. for pick up when completed. Thank you.