Loading...
HomeMy WebLinkAboutIR 6949 INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 6949 �I,NT(Ne'p DfOklA To the Mayor and Members of the City Council July 3, 1984 ITr JOHN T. WHITE ROAD Era Subject: COOKS LANE IMPROVEI�TI'S FROM 167 TO BRERIWOOD STAIR ROAD INCLUDING FULL INTERCHANGE WITH INTERSTATE 30 On May 30, 1980 (M&C G-4548), the City Council approved the 1980-81 Capital Improvement Program which included design funds for the Cooks Lane project. Construction funding in the amount of $5.5 million was subsequently authorized in the 1982-85 C.I.P. Acquisition of needed right-of-way has been underway since February, 1983. All right-of-way from Brentwood Stair Finad north to the I-30 interchange area has been secured. At the interchange area itself, property to acccnux)date the access ramps has been acquired on all but the northwest quadrant. Acquisition of this parcel is necessary in order to construct the inter- change. On June 27, 1984, a meeting was held involving City staff, Mr. Jim Sowell (owner of the property), and Mr. Sowell's attorney regarding the purchase of the property needed to construct the interchange. A pro- posed settlement was tentatively reached and will be presented to City Council in a separate Mayor and Council Corncaznication. The City staff believes a basic policy question exists as to whether or not the City should proceed with the construction of this interchange at this time or defer the project for an indefinite period. Valid argu- ments can be made for either option. Postponement of the project is feasible for several reasons. The existing Eastchase Parkway interchange located to the east of Cooks Lane provides adequate access to I-30 and allows active developmnt in that portion of east Lbrt Worth. Furthermore, traffic volumes are relatively light in the area at this time. On the other hand, the Cooks Lane interchange project and other Cooks Lane improvements will have to be constructed eventually. The inter- change would improve access to I-30 for those citizens living in the Cook's Meadow Addition and would have some favorable impact on traffic at the I-30/820 interchange. Construction of the project in the near future is possible because voters approved the project in the last bond election, and the interchange right-of-way dispute appears to be resolved. However, with inflation at its current rate, a delay of even a few months could jeopardize the City's ability to fund construction of the south approach. Provided below for City Council review is a current summary of the funding available for this project. The staff will be available to address any questions the City Council may have regarding this project. ISSUED BY THE CITY MANAGER - FORT WORTH, TEXAS INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 6949 - P•2 y��p Tf qE� July 3, 1984 of�ORT� To the Mayor and Members of the City Council ' V »TExAy Subject: COOKS LANE IMPROVEMENTS FROM JOHN T. WHITE ROAD TO BRENTWOOD STAIR ROAD INCLUDING FULL INTERCHANGE WITH INTERSTATE 30 Funding Summary Cooks Lane @ I-30 Funding: ° 1980-82 Bonds (Design Engineering) $ 250,000 ° Water Department Revenue Bonds 237,150 ° Original Allotment from 1982-84 CIP 5,589,000 ° Refund from Texas Turnpike Authority of Excess Funds 547,011 ° Available from Excess Funds on Brentwood Stair Road 78,585 TOTAL FUNDS AVATT ART F $6,702,746 Project Costs: To Date ° R.O.W. $1,000,000 ° Engineering 293,873 ° Water Line Relocation 237,150 ° Clearing R.O.W. 5,000 TOTAL COSTS To DAM $1,536,023 To Ccrnplete Base Project (Interchange and Paving South to Brentwood Stair) • Additional R.O.W. $ 200,117* • Demolition 6,500 • Unit I (Interchange) 3,982,000 • Unit II (Cooks Lane to Brentwood Stair Read) 961,500 TOTAL CUMPLETION OOSPS FOR $5,150,117 BASE PROJECT Subtotal For Expenses to Late and Completion $6,686,140 of Base Project Net Funds Available Less Cost to Complete $16,606 Base Project *Funds necessary to acquire right of way for the northeast quadrant of the interchange. ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 6949 - 3 y�,,P r f NFO of 40RTy To the Mayor and Members of the City Council July 3, 1984 �ap �TExP�. Subject: COOKS LANE IMPROVEMENTS FROM JOHN T. WHITE ROAD TO BRENTWOOD STAIR ROAD INCLUDING FULL INTERCHANGE WITH INTERSTATE 30 Cooks Lane from I-30 to John T. White Road • Additional R.O.W. $25,500 • Unit III (I-30 to John T. White) 482,800 ADDITIONAL OOSP FOR FULL P14W E LV $506,300 NET SI Oiff'AIL $491,694 If additional information is required, it will be furnished upon request. t--beL. Herchert rt ity Manager % RLI-i:kcnn ISSUED BY THE CITY MANAGER - — FORT WORTH, TEXAS