HomeMy WebLinkAboutContract 57011-AR12FORT WORTH. City of Fort Worth Construction Allowance Request Project Name I Trinity Boulevard Phase 1 - IH 820 to Salado Trail Client Project#(s) 102101 City Sec# 57011 �------------------------------------� D P�Jti·�ct Trinity Boulevard Phase 1 -Roadway, Drainage, Illumination, Landscape and Traffic Improvementsescnp on ::=======================.------.... -_-_-_-_-_-_-_-_-_-_ -_,,------.... -_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-...::: ContractorlSJ Louis Construction ofTexas LTD. CA #I 12 Datel 3/14/2024 City Project Mgr. I Mitch Aiton City Inspector I Steve Johnson UNIT or DEPT Original Contract Amount Extras to Date Credits to Date Current Contract Amount !Amount of ProDosed AllocationOriginal Allowance Available to AllocationAllowance Funds Previously Allocated Revised Allowance Balance Unltl,IV&V Unltll Unit Ill - $16 716 606.80 $5 063 103.22 $230 906.00 :li16 716 606.80 :li5 063 103.22 :li230 906.00 M.1411,UU IU,UU IU,UU IU,UU $500,000.00 $100,000.00 $20,000.00 $244 566.47 $81 092.90 $13 307.34 $251 293.53 �18 907.10 �6 692.66 $0.00 JU (REASONS) FOR CONSTRU'-IIIUII ALLOWANCE Totals 522 010 616.02 :li22 010 616.02 M.1411,UU 5620 000.00 $338 966.71 :li276 893.29 IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST, THE CONTRACT SHALL: Furnish all labor and material as per attached proposed Construction Allowance Request (with attachments): This construction allowance is to add item 86A Additional Cost for Open Back Option to 10' Inlet for 2 EA at $2,070 for a total of $4,140.00. There was a grading/ponding issue discovered on the North Trinity Lakes Intersection. The adjacent property owner was not in favor of significantly regrading the front yard and driveway. There is an option with the inlets to have an open back so the road can be higher than adjacent property and still collect drainage as intended. With the inlet bottoms already poured, the contractor needed to modify the inlet tops for the open back inlet. This is the cost to modify the tops of those two inlets. Its not anticipated this will need to be done again on the project. The existing price for the 10' Inlets is $5, 175.00/EA. To modify the top of the inlets is an additional $2,070/EA. Similar Sidewalk Bridge Txdot Inlet has an average price of $10, 170/EA. Proposed price is fair and justified. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Construction Allowance Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Contractor's Com ame SJ Louis Construction of Texas LTD. ATTEST: Jannette Goodall �::��signed by Jannette Contractor ame Adam Lunsford Date Pro"ecl and Contract Com iance Mana er Apr 1,2024 Date: 2024.04.15 08:10:13-05'00' Jannette Goodall, City Secretary Construction Allowance SUMMARY Page 1 of 4 Date Aprl,2024 Date Mar 20, 2024 Date Apr2,2024 Date Apr9,2024 Date Apr 12,2024 CSC No. 57011-AR12 FORT WORTH City of Fort Worth � Construction Allowance Additions Project Name Trinity Boule mrd Phase 1-�IH 8Q to Salad oTrail ity Sec # C376i�- Client Project # 102101 Contractor SJ Louis Construction of Texas LTD. PM Mitch Aiton � Inspector Steve Johnson Construction Allowance Submittal # 0 ate �'(1�1 ADDITIONS Construction Allowance Additions Page 2 of 4 FORT WORTH City of Fort Worth ��� Construction Allowance Value Project Name Trinity Bou1e vad Phase 1- IH 820 to Salado Trail City Sec #�f'5761�-1, Client Project # �02101 Contractor SJ Louis Construction of Texas LTD. � PM Mitch Aiton � Inspector Steve Johnson Construction Allowance Submittal # � Date �31�41�0�� CONSTRUCTION ALLOWANCE VALUE BEING USED ITEM DESCRIPTION Qty Unit Unit Cost Total Unit 1 Item 84 9999.0025 Construction Allowance 0.008280 LS $500 000.00 $4140.00 Construction Allowance Value 3of4 MISBE for this Construction Allowance Request MISBE Sub Tvpe of Service Amount for this CAR Total � $0.00 Previous Construction Allowance Requests CAR # DATE AMOUNT CA #1 8/412022 $90,332.51 CA #2 9/12/2022 $18,096.00 CA #3 9/30/2022 $10,112.90 CA #4 10/14/2022 $12,600.00 CA #5 10/31/2022 $21,551.00 CA #6 11 /28/2022 $27,678.51 CA #7 (Water Dept) 12/1/2022 $9,171.52 CA #8 (Water Dept) 12/13/2022 $71,921.38 CA #9 1/23/2023 $58,869.69 CA #10 9/13/2023 $7,400.00 CA #11 10/31 /2023 $11,233.20 Total $338,966.71 Construction Allowance MSBE Data Page 4 of 4 12 Trinity Boulevard Phase 1- IH 820 to Salado Trail Ronald Etter Project Manager Modified Open Back Inlet �• • NO CHANGE INCREASE IN COST $ 4,140.00 DECREASE IN COST 57011 SJ Louis NO CHANGE INCREASE IN TIME DECREPSE IN TIME 1 SJ Louis Construction of Texas LTD. 940-399-6757 # of Days = # of Days = 12/19/23 The base of the road has been graded and the base of the inlets have been poured. There is a grading issue at the North Trinity Lakes intersection that we need to discuss. If we don't signifcantly regrade some front yards and driveways, we'll create ponding. . .� � . .• . Regrade the adjacent property yards and driveways. Mitch Aiton Sr Professional Engineer 682-715-9424 12/19/23 12/21/23 Talking to the property owner we'll negatively impact some landscaping and a large tree. Property owner is not in favor of adding a significant grade to their driveway. There are some open back inlet options we can do to raise the road but still collect drainage on the backside. Modify the top of the inlets with an open back so we can collect drainage from the properties and prevent ponding. The existing price for the 10' Inlets is $5,175.00/EA. To modify the top of the inlets is an additional $2,070/EA. Similar Sidewalk Bridge Txdot Inlet has an average price of $10,170/EA. Proposed price is fair and justified. No Schedule Impact Mitch Aiton, Sr Professional Engineer �•%W�� ��_ 03/13/24 �N ^R �1�� �'- _� �� n� � < a � L N�� w _ �:. 5 � � a - _� _� .• � � � �30 �U � F'� �n� `a ? Q � � ,-Wa, - - - � L a A ¢�F u., � - _�� �,�� `�"�i' , � � � a aq �' � � A a � - -- :"! � I � z � ;za °''a' - - ow -- 8'4'��:�� �� ', � 3 z � m � o w � H � - - 4�',� ; "" � �, ^ _ a p w �^ � H � _ _�� _ '4a��'�` �'^ � �., A F" ¢ � � F - S?��'<��`oomrcao A 1 .' [`" Q'� fX � W F - - - Y/ - � a[.Q. [- Q x Q p z_auawua_v,m3�nupv,� � - U a U C�'"" V] 'Z i a � > � & 3 � � � W J & � Ja 5 � ~> � z� �� s � H V � 2 F — O � - Z -- - - ��3 W` '�� ��n� 'I � I�� I g� �o I � �: �o. s` � o �:: a a � i �< '_ �i W o g .4 .F4,, � "'i� x �;L,' .s I F^.', r t % iii� F � � p� +� ,Ij � � � �a � �� o m ;��� '�, W � �� / �p` ; ��'���i �� =t,o� ���¢�� I Sil .4l .4l "'�'-�~ob tim#��� � '�"0'€— —ga°�- .uza � g'mgifgmd ag��ts_ � I w`�I �o� � s �'k'�`c_ m8�� �¢ . : a��" � mS��z �_�3 .t:i�j �$kiN�o " " - �� � �� I I'-. iwm�g;� ��� � , I ;� .. � � � f -- -_ �� 0z � ���� -- w < p I jY � L�o - H �� / � ���z zi � � �� �s —��� F oe — � � J�� a =¢ _, z � / �� � 3.. —> �� I �V 30 _ �-V9 ���� �O- w / $ Qo _ 021VA31l108 AlINRIl �,�+,d> + �Naz � � � S � � � � � Q � y--� � � O � > � w Y Q J > � � Z � �� N 0 N N 0 � � o � O ± O O + O �3NYluiH�t1 HieO.� 20s^j [�i5�•:i ":-.�-r?�2 N••'�, i� =�a. a�auL 'ES=.��S� S�-.0-r:0� �F. '�-� � Request for Proposal -roject Name C.M.R. - Proposal No. Date Trinity Blvd., Phase I(I.H. 820 to Salado Trail) City of Fort Worth, Texas 21 March 11, 2024 IResponse Required By Transmitted By Mr. Mitch Aiton, P.E., PMP Ronald Etter 200 Texas Street Project Manager Fort Worth, Texas 76102 Signature Via Email Roywdd Effe,�- cc: Mr. Trenton Tidwell- Kimley Horn, Via Email IDescri tion o Work This CMR is submitted for changing the standard inlets on Trinity Lakes Drive to open back inlets to work with drainage issues in the parkways. This is just additional cost for the extra work on the inlets to make them open back in lieu of standard. Bid item 86 will also need to be billed in conjuction with this CMR for these (2) inlets. IBreakdown of Proposa[ Trinit Blvd., Phase I I.H. 820 to Salado Trail) DOKIR Construction Gas Well Gate Relocation Item Description Quantity Unit Price Extension New Additional cost to chan e from Standard 10' inlet to 10' O en Back 2 EA $2 070.00 $4 140.00 $0.00 $0.00 $0.00 $0.00 $0.00 Net Change: $4,140.00 Additional Calendar Days: 0 If acceptable, please provide an authorization signature below and return one (1) copy to our office. S J. Louis Construction Action xc: S. J. Louis Pro'ect No. 22111 S.J. Louis Construction of Te�eas Ltd. 520 S. 6th Avenue Mansfield, Texas 76063 (817) 477-0320 Office (817) 477-0552 Fax IMT Construction, LLC 306 W. Overly Dr. Lake Dallas, TX 75065 469.456.5604 estimatingC�imtconstruction.com Additional Bid February8th,zoza Trinity Blvd - Fort Worth IMT Construction is excited to have an opportunity to partner with you by providing the following quote. Item Description QN UNIT PRICE EXTENDED PRICE Open Back Inlet F.W 10' (tops) additional to 2 EA $1,800.00 $3,600.00 existing bid. Bid only valid 60 days after bid date. Quote Total $3,600.00 Quote above includes the following: Labor, ConerMe, Steel, and other materials as needed to complete the �ob. Quote above does NOT include the following: Troffic Contro4 Barrfcades, Bonds, Permfts, Eroslon Contro4 �cing Rock in Structures, Testfng, Testi ng Fees, Stakfng, Haul-OH, Removals, Trench Safety, ShoHng, Excavallon, DewateNng, loiM & Sea4 Shop Drowings, Railings,FormLlner,Veneer,CoWNng,SpttialConcrete,andBackfill. CostforAddklonalSafety,Badging,BackgroundChecksandCenlfledPayrolL •Additfonal Work will be submitted as a Change Order *All items bid as cast-in-place unless otherwise specified. •Prices are bid per current available information and assume normal smpe of work. Additional depth, larger-than-normal thraats, special rings & cavers, or any variant beyond normal smpe may incur an addRional cost. Taxes, if appliwble, will add approximately 5%to prices. Pricez subjeR to eswlation, not ta exceed 10%, every 12 months, beginning from date of wntract agreement. Once Contrac[ is agreed to 6y IM7, our portion of the work on the projec[ must begin within 6 months for prices to remafn valid. IMTConstruction Submitted By: Contractor: Accepted By: Print Name: y U N rn m a`> Q � N � m Y � � Y >O > � d M a ch v N M M � � � d 0 `� ai vi a � � v n m u"'i C u � � � '0 w 4�i 1A d; a a' O � } i-i M' �+ p C �±1 � � p O � `1 n, u a u� O � � � r- o �n a� o 0 a a o�o m 1� (p N � �D �D i w- iy u� ff) �. � Ori O U ca o n a F o m o n ai �i � � .n .s�� as> � a v r- o w T N O - d o oi a` n m � � � 2 m ri � � w � .n i a E o c, r� � .d v_ � n� p m � n U 6 E n ai .,i 9 >+ m �1 c � � w � a`i O � _ � N Y _ d � W � A � 2 W a 0 m o � z m ti d 0 �i i r N � N �si m u� a m 1 � O ti � �i nl �� a m 0 ti O ri � �n 0 0 � ri f �T ri � .s�a 0 0 0 � O 0 v i N 0 0 ti ti � ti d N .w V d � Cl Y -S i � i H N � V � �i nl Z ��� III ilt � � T � � � Q a � a > > r � � � � � N d' .__. .._. -� � � N a a � n w T � O O O ~ C W 4 U v x N ~ W W � � flJ � � p m Z 2 Z , � N _ rL, 00 Gl lD lf1 1� I� 01 N N N ti � � � � � p lf VJ Ut U'� � O O] ¢t �f V 'T Q u 0 0 0 0 o �ri O (I Qi (J � � � M n� � o a a o 0 0 0 0� � M � � � O 0 0 o efi [f� H Fs. a�s 0 0 c] � o �ri � ei N (V trr ha 0 C� rf �-� w Z N L!1 a C � � � � � � • � � � C .� C O - � � � w � _ � N - a � '� � W VI C _ a N U � E E � a � f0 a — m m _ � '� o v y � m,_. +' � y a o � c� w-- v w�. _ m o a -o Q a � a o Q �a ,�r� � m Q in� m ¢ J m J o" � a` � >�" 0 0 O w 0 0 0 0 W O 0 0 O �ti � 0 0 0 O e,v c 0 0 0 0 o d O O � M 0 0 0 0 � o iri tn VT �H O � 0 0 0 0 �n �, �ri �n .n c.� o � 0 0 0 0 �n tn � �-i � i F- F I.IJ H � a a = � � l'J v �V V~t � � W c Z Z l�fi �O lD � � � tfl lA l!I � � � V s1 �f i N 11] Q S J LOUIS CONSTRUCTION OF TEXAS LTD - Construction Contract Allowance Request - Final Audit Report 2024-04-10 Created: 2024-03-20 By: Barbara Pryor (Barbara.Pryor@fortworthtexas.gov) Status: Canceled / Declined Transaction ID: CBJCHBCAABAAqMLItjSU5iq9QACP4xYUqOLAbrbfswle "S J LOUIS CONSTRUCTION OF TEXAS LTD - Construction C ontract Allowance Request -" History Document created by Barbara Pryor (Barbara.Pryor@fortworthtexas.gov) 2024-03-20 - 10:16:46 PM GMT- IP address: 204.10.90.100 Document emailed to Mitchell Aiton (mitchell.aiton@fortworthtexas.gov) for signature 2024-03-20 - 10:39:50 PM GMT Email viewed by Mitchell Aiton (mitchell.aiton@fortworthtexas.gov) 2024-03-20 - 11:46:19 PM GMT- IP address: 204.10.90.100 �=�� Document e-signed by Mitchell Aiton (mitchell.aiton@fortworthtexas.gov) Signature Date: 2024-03-20 - 11:47:03 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Jessica Rodriguez (jessica.rodriguez@fortworthtexas.gov) for filling 2024-03-20 - 11:47:06 PM GMT Email viewed by Jessica Rodriguez Qessica.rodriguez@fortworthtexas.gov) 2024-03-21 - 11:50:30 AM GMT- IP address: 204.10.90.100 � w� Form filled by Jessica Rodriguez (jessica.rodriguez@fortworthtexas.gov) Form filling Date: 2024-03-21 - 10:00:10 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to adaml@sjlouis.com for signature 2024-03-21 - 10:00:13 PM GMT - Email viewed by adaml@sjlouis.com 2024-03-22 - 0:27:11 AM GMT- IP address: 192.153.67.78 -` Email viewed by adaml@sjlouis.com 2024-03-27 - 5:44:59 PM GMT- IP address: 206.204.33.150 �����j`jd���q Paweredby � Adohe Acrobat Sign � New document URL requested by Jessica Rodriguez (jessica.rodriguez@fortworthtexas.gov) 2024-03-29 - 1:38:53 PM GMT- IP address: 204.10.90.100 Email viewed by adaml@sjlouis.com 2024-04-01 - 4:08:38 PM GMT- IP address: 94.176.63.165 �=�;� Signer adaml@sjlouis.com entered name at signing as Adam Lunsford 2024-04-01 - 4:09:37 PM GMT- IP address: 63.145.51.2 �`� Document e-signed by Adam Lunsford (adaml@sjlouis.com) Signature Date: 2024-04-01 - 4:09:39 PM GMT - Time Source: server- IP address: 63.145.51.2 Document emailed to Daniel Roy (daniel.roy@fortworthtexas.gov) for signature 2024-04-01 - 4:09:42 PM GMT Email viewed by Daniel Roy (daniel.roy@fortworthtexas.gov) 2024-04-01 - 4:11:32 PM GMT- IP address: 204.10.90.100 � Document e-signed by Daniel Roy (daniel.roy@fortworthtexas.gov) Signature Date: 2024-04-01 - 4:11:48 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Raul Lopez Roura (Raul.LopezRoura@fortworthtexas.gov) for signature 2024-04-01 - 4:11:50 PM GMT -_,__ Document e-signed by Raul Lopez Roura (Raul.LopezRoura@fortworthtexas.gov) Signature Date: 2024-04-01 - 8:16:15 PM GMT - Time Source: server- IP address: 204.10.90.100 Document signing automatically delegated to Raul.Lopez@fortworthtexas.gov by Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) 2024-04-01 - 8:16:18 PM GMT Document emailed to Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) for signature 2024-04-01 - 8:16:18 PM GMT Document emailed to Raul.Lopez@fortworthtexas.gov for signature 2024-04-01 - 8:16:18 PM GMT �=��� Document e-signed by Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) Signature Date: 2024-04-02 - 1:38:29 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Patricia Wadsack (patricia.wadsack@fortworthtexas.gov) for signature 2024-04-02 - 1:38:32 PM GMT -��;� Signer Patricia Wadsack (patricia.wadsack@fortworthtexas.gov) entered name at signing as Patricia L. Wadsack 2024-04-09 - 8:48:21 PM GMT- IP address: 204.10.90.100 �����j`jd���q Paweredby � Adohe Acrobat Sign -_ Document e-signed by Patricia L. Wadsack (patricia.wadsack@fortworthtexas.gov) Signature Date: 2024-04-09 - 8:48:23 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Lauren Prieur (Lauren.Prieur@fortworthtexas.gov) for signature 2024-04-09 - 8:48:26 PM GMT _ Email viewed by Lauren Prieur (Lauren.Prieur@fortworthtexas.gov) 2024-04-09 - 11:04:09 PM GMT- IP address: 166.205.54.3 �� Document e-signed by Lauren Prieur (Lauren.Prieur@fortworthtexas.gov) Signature Date: 2024-04-09 - 11:11:25 PM GMT - Time Source: server- IP address: 166.205.54.3 Document emailed to Priscilla Ramirez (Priscilla.Ramirez@fortworthtexas.gov) for approval 2024-04-09 - 11:11:27 PM GMT Email viewed by Priscilla Ramirez (Priscilla.Ramirez@fortworthtexas.gov) 2024-04-10 - 1:01:15 PM GMT- IP address: 204.10.90.100 �== Document approved by Priscilla Ramirez (Priscilla.Ramirez@fortworthtexas.gov) Approval Date: 2024-04-10 - 1:01:28 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Douglas Black (Douglas.Black@fortworthtexas.gov) for signature 2024-04-10 - 1:01:30 PM GMT . Document canceled by Barbara Pryor (Barbara.Pryor@fortworthtexas.gov) Cancel reason: Canceling Routing to insert updated page four that lists previous 11 CA's 2024-04-10 - 1:52:23 PM GMT- IP address: 204.10.90.100 �����j`jd���q Paweredby � Adohe Acrobat Sign FORTWORTH� Routing and Transmittal Slip Transportation & Public Works. Department DOCUMENT TITLE: Trinitv Boulevard CA #12 M&C: N/A Date: 3/14/2024 � � � � � � � � : � � � � Name Mitch Aiton Jessica Rodriquez Adam Lunsford Steve Johnson Raul Lopez Lissette Acevedo Patricia Wadsack Lauren Prieur Doug Black Jesica McEachern Jannette Goodall TPW Contracts CPN: 102101 CSO: 57011 Department Initials TPW - Signature ^.'� TPW - Review ,� SJ Louis - Signature �� TPW - Signature � TPW - Signature �� TPW — Signature TPW — Signature ��.� TPW — Signature ?� i,e�al — Signature �B CMO — Signature �` JM CSO - Si�nature z DOC#: N/A Date Out M a r 20, 2024 Mar 21, 2024 Apr1,2024 Apr1,2024 Apr1,2024 Apr 2, 2024 Apr 9, 2024 Apr9,2024 Apr 11, 2024 Apr 12, 2024 Apr 12, 2024 CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES �No RUSH: ❑YES �No SAME DAY: ❑YES �No ROUTING TO CSO: �YES ❑No NEXT DAY: ❑YES �No Action Reguired: ❑ Attach Signature, Initial and Notary Tabs ❑ As Requested � For Your Information � Signature/Routing and or Recording � Comment ❑ File Return To: Please notify TPWContracts(a�fortworthtexas.�ov for pickup when complete. Call ext. 7233 or ext. 8363 with questions. Thank you!