HomeMy WebLinkAboutContract 56748-A2City of Fort Worth, Texas W&SS Repl. Contract 2019, WSM-O Prof Services Agreement Amendment Template CPN 103381 Revision Date: 12/08/2023 Page 1 of 2 AMENDMENT No.2 TO CITY SECRETARY CONTRACT No. 56748 WHEREAS, the City of Fort Worth (CITY) and A.N.A Consultants, LLC,(ENGINEER) made and entered into City Secretary Contract No. 56748, (the CONTRACT) which was authorized by M&C 21-0728 on the 21st day of September, 2021 in the amount of $327,235.00; and WHEREAS, the contract was subsequently revised by Amendment Number 1 in the amount of $57,440.00 authorized by M&C # 22-0324 April 26, 2022. WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2019, WSM-O, CPN 103381; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $3,690.00 . 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $388,365.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth, Texas W&SS Repl. Contract 2019, WSM-O Prof Services Agreement Amendment Template CPN 103381 Revision Date: 12/08/2023 Page 2 of 2 EXECUTED and EFFECTIVE as of the date subscribed by the City’s designated Assistant City Manager. APPROVED:ENGINEER City of Fort Worth A.N.A Consultants, LLC Fernando Costa Mark N. Assaad, P.E. Assistant City Manager President DATE: _______________DATE: _________________ ATTEST: Jannette Goodall City Secretary APPROVAL RECOMMENDED: Chris Harder, P.E. Director,Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. _______________________________ Pratima Poudyal, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY:M&C No.#: ___________________ M&C Date: __________________ Douglas W. Black Form 1295 No.: ______________ Sr. Assistant City Attorney � EN6IHEERS SLIRVEYOQB � PLqHpfER3 January 31, 2024 Ms. Pratima Poudyal, P.E. City of Fort Worth Water Department 200 Texas Street Fort Worth, Texas 76102 Re: Amendment No. 2-Professional Services Water and Sanitary Sewer Replacements Contract 2019, WSM-O City Project No.: 103381 5000 Thompson Terrace Colleyville, Texas 76034 (817) 335-9900 Fax (817) 335-9955 Dear Ms. Poudyal: At the request of the City, A.N.A. Consultants has been asked to provide Engineering and Survey Design services for the above-referenced project. This request for additional services is not part of our existing contract and will exceed our current scope. A.N.A. Consultants, L.L.C. is recommending that our current contract be amended to include these additional services as well as the corresponding fee adjustments. Below are the List of Tasks completed as part of this Amendment: • Split the Project into two parts (Planset and Contract Manual). • Incorporate the TPW pavement replacement with this project for all the streets. • Revising the plan sheets to include paving design: Street pavement replacement, driveways, and sidewalks. • Pavement re-striping design were required on John T White and Williams. • Update the Sheet-by-sheet project quantities to include Unit 3 Paving, and Water/Sewer/Paving split quantities for certain items. • 1117 Williams — Survey service locations marked by the owner, and revise the Water & Sewer design to service the subdivided lots. Contract / Amendment Total Ori inal Contract $327,235 Amendment No. 1 $57,440 Amendment No. 2 $21,190 Additional Services $-17,500 Net for Amendment #2 = Amendment #2 — Additional Services = $21,190.00 - $17,500.00 = $3,690.00 Total $388,365 The expected fee for Amendment No. 2 is $3,690.00 for these additional engineering and survey design for Water and Sanitary Sewer Replacements Contract 2019, WSM-O. Sincerely, A.N.A. Consul nts, L.L.C. � � Alex Srur, P. . Project Manager J:12f01601ContractlAmendment2lAmendment No2.-2019 CFW WSM-O-103381.docx CL/ENT SATISFACTION lS OUR BUSINESS Sewer - $ 7,205Water - $13,985 > 0 � � x v L O 3 C 0 C�J E m 3 a� ui = 3 � « E 16 W C � N