HomeMy WebLinkAboutContract 52651-FP1FORT WORTH® PARK & RECREATION DEPARTMENT NOTICE OF PROJECT COMPLETION 52651-FP1 City Secretary No: 52651 Date Received: 04/24/24 City Project N9.: 100333 & 101630 Regarding contract 52651 Alliance Park Phase 1 & 2 for as required by the PARK & RECREATION DEPARTMENT as approved by City Council on 5/14/2019 through M&C C-29125 the director of the PARK & RECREATION DEPARTMENT upon the recommendation of the Assistant Director of the Park & Recreation Department has accepted the project as complete. Original Contract Prices: Amount of Approved Change Orders: Revised Contract Amount: Total Cost Work Completed: Less Deductions: Liquidated Damages: Pavement Deficiencies: Total Deduction Amount: Total Cost Work Completed: Less Previous Payments: Final Payment Due $ 5,003,000.00 $0 No 0 $ 5,003,000.00 $ 5,003,000.00 $ 5,003,000.00 $ 4,991,633.68 $11,366.32 Days @ $650.00/ Day Apr 23, 2024 Recommended for Acceptance Asst. Director, Date PARK & RECREATION DEPARTMENT Accepted Director, PARK & RECREATION DEPARTMENT Asst. City Manager Comments: Apr 23, 2024 Date Apr 24, 2024 Date OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX C-620 Signature Page o4 rzio Invoice No. E _O Remit to (If Not Automatic Deposit ): Fain Group Inc FW080-0000006344 & FW080-0000012916 z a U 0 ro 0000027241 100333 & 101630 rl Ire Application For Payment $5,003,000.00 $5,003,000.00 6A EA EA U 2 a U 0 U yH 0 Net change by Change Orders Current Contract Price (Line 1 ± 2) M a 0 WF CG 0 a z 0 F .a a 0 U 00 F $5,003,000.00 $5,003,000.00 $4,991,633.68 fiA EA RA EA EA V9 4, (Progress Estimate, Construction Allowance and Change Orders) $5,003,000.00 Work Completed X X R z h c. Total Retainage (Line 5a + Line 5b) AMOUNT ELIGIBLE TO DATE (Line 4 - Line 5c) b LESS PREVIOUS PAYMENTS (Line 6 from prior AMOUNT DUE THIS APPLICATION W Approved Change Orders 0 Si 0 b ¢ It TOTALS NET CHANGE BY CHANGE ORDERS E— N M rr ,A cO l.... 00 5A (Column G on Progress Estimate+ CA + COs + Line 5 above) Days Awarded 10. CONTRACT TIME: Days Added by CO Days Remaining C ti Contractor's Certification TIEa) T w .� v ; 0 0. ❑ � � N � N � O O J" v `a : o 0 obi .E o SS.. �y TCg �gtg a0'91 �8 U o �E a1 '« -o ,9 m p-IE§ m wo R 0b y T C O 7 U W .O v U❑� ro .� C A .� rI• E OwT',. b1�'o N 5. O • W V U N CO O 'C N A tNtyy N O C O a 0 7 U N 0 r3 ty b E a 0 6 O oUt,3 0 °te .0 b V .L' N aa)U O F O LL cUC CL R. oo N U Lar raze 4 22, 2024 17:10 CDT) Contractor's Application Progress Estimate 2 k 8 ), )r `®° ®®!!!!!!!!!!!!!!!!!!!!!!!!!!!! 888888888888888888888888888888 ®!!!!!!!!!!!!!!!!!!!!!!!!!! 888888888888888888888888888 ®£ .2 )/ "1; $6,323.15 $96,633.00 $8,400.92 $128,331.00 $16,928.251 f $14,773.00 \} $97,500.00 $116,220.00 $155,836.00 $7,278.00 $14,585.00 $42,637.00 \\}( $143,099.18 $36,474.08 $16,612.18I $8,921.601 $2,765.27 $18,895.00 $54,740.001 $11,500.00 $33,333.33 \ $49,560.00 $135,000.00 (( $18,952.78 $60,000.00 $39,578.00 $55,010.00 $106,273.50 $96,633.00 $289,397.00 $12,524.00 $16,928.25 $4,792.50 $14,773.00 $81,795.00 §\}} _ $155,654.00 $7,278.00 $29,024.00 $69,907.88 \\ , Materials Presently Stored (not m C) ) ] ( ---------- - MWO $155,836.00 $7,278.00 $14,585.00 $42,637.00 $143,099.18 $36,474.08 $16,612.18 $8,92160 $2,765.27 $18,895.00 $54,740.00 $11,500.00 $33,333.33 clidddeioidcOdeiei ---- com - $289,397.00 $12,524.00 64 SiE $155,654.00 $7,278.00 $29,024.00 $69,907.88 ] } ! $' , - , - - „ --- , For (contract) Alliance Park Phase I & II Application Period. \\\\\\\\\\\\\k\\(\(\\\\\\\\\\\ \ $49,560.00 $135,000.00 \\ $18,952.781 $60,000.00 $39,578.001 $55,010.00 $106,273.50 $96,633.00 $289,397.00 $12,524.00 \\// $22,353.161 $21,100.00 \\ $155,654.00 $7,278.00 $29,024.00 $69,907.88 $116,220.00 $36,474.08 {] 12 .............................. ......................... 1.00000000 1.00000000 1.00000000 m ! m $41,914.43 $106,273.50 $6,323.15 $96,633.00 $8,400.92 $128,331.00 $16,928.25 $14,773.00 $4,792.50 $45,000.00 $97,500.00 $116,220.00 $155,836.00 $7,278.00 $14,585.00 $42,637.00 }\\ $143,099.181 $36,474.08 $16,612.18 $8,921.60 $2,765.27 $18,895.00 $54,740.00 $11,500.00 $33,333.33 \\\/ $6,323.15 $18,952.78 $60,000.D0 $39,578.00 \/ $96,633.00 $289,397.00 $12,524.00 $16,928.25 $4,792.50 $14,773.00 $81,795.00 $22,353.16 $97,500.00 $155,654.00 $7,278.00 $29,024.00 $69,907.88 $116,220.00 $36,474.08 Unit Price $ 6,323.15 $ 96,633.00 $ 8,400.92 $ 128,331.00 $ 16,928.25 $ 14,773.00 $ 155,836.00 $ 7,278.00 $ 14,585.00 $ 42,637.00 $ 2,681.51 $ 9,437.39 $ 12,144.22 $ 6,352.00 $ 143,099.18 $ 36,474.08 $ 2,765.27 $ 18,895.00 $ 54,740.00 $ 11,500.00 $ 33,333.33 $ 49,560.00 $ 135,000.00 $ 200,000.00 $ 6,323.15 $ 18,952.78 $ 60,000.00 $ 39,578.00 $ 55,010.00 $ 106,273.50 $ 96,633.00 $ 289,397.00 $ 12,524.00 $ 16,928.25 $ 4,792.50 $ 14,773.00 $ 81,795.00 $ 45,000.00 $ 97,500.00 $ 155,654.00 $ 7,278.00 $ 29,024.00 $ 69,907.88 $ 116,220.00 $ 36,474.08 Bid Quantity 0, PAVING, VEGETATION LS I 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 )) 99999999999999999999999999999 999999999999999999999999999 I. }\ «` e , / Item Bid Item No. Description ALLIANCE PHASE I - NORTH FIELDS: PREPARATION, 1 SWPPP/EROSION BMP'S WATER LINE ROADWAY LIME ROADWAY PAVING (30' road) NORTH PARKING LOT LIME NORTH PARKING LOT JOINT SEALANTS PAVEMENT MARKINGS PARKING WHEELSTOPS NORTH FIELD FINE GRADING NORTH FIELD IRRIGATION NORTH FIELD SOD NORTH CONCRETE TRAIL NORTH FIELD BLEACHER PADS PAVILLION CONCRETE PAVILLION STRUCTURE PAVILLION PICNIC TABLES DRINKING FOUNTAIN PLAYGROUND DRAINAGE PLAYGROUND BORDER PLAYGROUND EQUIPMENT NORTH FIELD BLEACHERS NORTH FIELD GOALS BENCHES TRASH RECEPTACLE LANDSCAPING HYDROMULCH TEMPORARY WATERING NORTH PARKING LOT LIGHTING ALLIANCE PARK PHASE II - SOUTH FIELDS: PREPARR P&P & MAINTENANCE BONDS SURVEYING SITE DEMO MASS EXCAVATION ROADWAY LIME SOUTH PARKING LOT LIME TOPSOIL REPLACEMENT STORM DRAIN ROAD CULVERT/HEADWALLS WATER LINE ROADWAY PAVING (30' road) SOUTH PARKING LOT HANDRAIUGUARDRAIL JOINT SEALANTS PARKING WHEELSTOPS PAVEMENT MARKINGS MULTI -USE COURT MULTI -USE COURT FENCE MULTIUSE COURT AMENITIES (GOALS and ?) SOUTH FIELD FINE GRADING SOUTH FIELD IRRIGATION SOUTH FIELD CONCRETE TRAIL SOUTH FIELD BLEACHER PADS SOUTH FIELD FENCING MOW STRIP SOUTH FIELD FENCING SOUTH FIELD SOD SOUTH FIELD BLEACHERS 20 21 30 38 39 48 49 50 51 Contractor's Application Progress Estimate z w a " z Aw a''' I eE,„ o000000000000aae00000000000000aae00000 0 0 0 Total Completed and Stored to Date (D + E) �woM $54,740.00 $11,500.00 o0 $33,333.34 $33,333.33 0000 FAQ@ $56,400.00 $9,792.00 oe $4,354.90 $9,385.18 000"' .7.-8A821 $72,453.00I $7,797.021 2888 3a $10,473.00 $7,267.00 $46,603.951 $9,576.00 $6,250.00 $9,576.00 $327,298.13 o 0 E Materials Presently Stored (not m C) •°e '4. 4 N t S 1 w w.e.e.e ory wa42 � r�re.e.e.e.e re ww For (contract) Alliance Park Phase I & II Application Period. ❑ 4 > w w .e .a $49,225.001 $9,000.00 $33,333.341 $33,333.33 $150,000.00 $26,500.00 $43,092.00 $68,422.50 $56,400.00 $9,792.00 w $4,354.901 $9,385.18 $8,498.00 $40,028.50 $17,466.001 $28,265.15 $34,612.361 $93,550.00 $72,453.001 $7,797.02 $165,759.95 $1,155.00 $4,481.55 $142,438.00 $10,473.00 $7,267.00 $46,603.951 $9,576.00 $6,250.001 $9,576.00 $327,298.131 g w » 14 88 w > W w $56,400.00 $9,792.00 $60,474.50 $101,563.44 $4,354.90 $9,385.18 $8,498.00 $40,028.50 $17,466.00 $28,265.15 $72,453.00 $7,797.02 $165,759.95 $1,155.00 w w » 4 W a $ 24,918.07 $ 9,437.39 $ 8,921.60 $ 21,909.33 $ 54,740.001 $ 11,500.00 88 - V $ 33,333.34 $ 33,333.33 $ 150,000.00 $ 26,500.00 $ 43,092.00 $ 68,422.50 $ 56,400.00 $ 9,792.00 $ 60,474.50 $ 101,563.44 $ 4,354.90 $ 9,385.18 $ 8,498.001 $ 40,028.50 $ 17,466.001 $ 28,265.15 $ 34,612.36 $ 93,550.00 $ 72,453.00 $ 7,797.02 $ 165,759.95 $ 1,155.00 $ 4,481.55 $ 142,438.00 $ 10,473.00 $ 7,267.00 $ 46,603.95 $ 9,576.00 $ 6,250.00 $ 9,576.00 $327,298.131 $ 28,000.00 Bid Quantity 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Item Bid Item No. Description Specification Unit of Section No. Measure 99999999999999999999999999999999999999 J J SOUTH FIELD GOALS DRINKING FOUNTAIN BENCHES LANDSCAPING HYDROMULCH TEMPORARY WATERING ELECTRICAL SERVICE UTILITY SPOIL HAULOFF ROADWAY LIGHTING SOUTH PARKING LOT LIGHTING IRRIGATION CONTINGENCY RETAINING WALL MASONRY SELECT FILL AT MULTIPURPOSE COURT ADDITIONAL LIME STABILIZATION ADDITIONAL 90 30" CALIPER TREES ADDITIONAL 106" CALIPER TREES ALTER DRAINAGE SWALE SOD TO BUFFALO CHANGE HYDROMULCH TO THUNDERTURF LIGHT POLE RELOCATION TEMPORARY WATERLINE RELOCATE DRINKING FOUNTAIN WATERLINE ENTRY SIGN CONCRETE BLEACHER EXTENSION COSERV TRANSFORMER COSERV SWITCHGEAR SOCCER SHADE STRUCTURES GRAVITY RETAINING WALL ADDITIONAL GATES AT THE SOUTH FIELDS WATER METERS INTERPRETIVE SIGN STANDS COURT STRIPING RIGHT OF WAY SIDEWALKS AT LITSEY RD BUFFALO SOD TREE STAKING BUFFALO SOD AT ROW TIF SOD AT S SIDE OF N FIELDS RETAINING WALL45 DEG BENDS SIDEWALK (BASKETBALL COURTS) CMAR FEE (7% OF CONSTRUCTION COSTS) AMENDMENT No. 1 ADDITIONAL ROW & BASKETBALL SIDEWALK Totals 58 59 6L OL 72 73 74 75 82 83 94 95 U 100333 & 101630 Project Number: Application Date: FW080-0000012916 Alliance Park Phase I & II O ty Secretary Contract Num: Application Period: N Z $1,400.00 N- M (0 co W !fJ O c c —— — n I O O N M (0 c0 0) 0) EA Retainage O O O O V V3 O C C O O O E» Gross 1 c c E Amt Remaining E ( c c C ) Joj O O o Total Completed Funding Identification (FID) Original Contract Z Q w c%) M M 0 O 6 0 O O M 0 N 7 O M 34018-2060000-101769-RETAIN 0 0 0 0 0 0 0 0 0 Change Order 1 34014-2060000-100333-RETAIN 34018-2060000-101769-RETAIN 0 0 0 0 0 0 0 0 0 Change Order 2 Z_ Q w c%) co M 0 O O 0 0 O M 0 N 7 O co 34018-2060000-101769-RETAIN 0 0 0 0 0 0 0 0 0 Change Order 3 I34014-2060000-100333-RETAIN 34018-2060000-101769-RETAIN U 100333 & 101630 Project Number: Application Date: 023 M oo O O O d Alliance Park Phase I & II FW080-0000012916 z 01 O ty Secretary Contract Num: Application Period: d z m rn m c ca Amt Remaining Total Completed O O Funding Identification (FID) 0 0 0 0 0 0 0 0 0 Tr Tr M M 0 0 0 0 0 0 0 0 0 L O z z Q Q vww C ch M (O M N- O o O O gr O O O O O O o o CO O O O N N 7 OD Tr 7 M CO 0 0 0 0 0 0 0 0 0 to Gf L O d a) z z 1Q c.)ww cc cc C7 O) c) co M f- O o o O O O O O O o o M M O O N N 4 00 4 4 M M 0 0 0 to E E 0 u_ 4- O U 100333 & 101630 Project Number: Application Date: FW080-0000012916 Alliance Park Phase I & II z 01 O ty Secretary Contract Num: Application Period: Z d O) R C a) E 5) E Q 0 U O O 0 d O V 0 0 O O c b O O O O r N 0 N O) O r U Z ww c%, M O O 6 Tr O O O O N 7 O M 34018-2060000-101769-RETAIN O O O O co a) 'a 0 N 0) c Z s Q U W M M f% 0 0 6 O O 0 M 0 (V Tr O M 34018-2060000-101769-RETAIN O O O 0 0 34018-2060000-101769-RETAIN O U 100333 & 101630 Project Number: Application Date: FW080-0000012916 Alliance Park Phase I & II O if 1 ty Secretary Contract Num: Application Period: d Z d co R C Amt Remaining Total Completed Funding Identification (FID) 0 0 O O 0 O d c Grand Total 0 0 0 FORT WORTH, TRANSPORTATION AND PUBLIC WORKS March 6, 2024 Fain Group 1616 N Sylvania Ave Fort Worth, TX 76111 RE: Acceptance Letter Project Name: Alliance Park Phase 1 & 2 Project Type: Park and Recreation City Project No.: 100333 & 101630 To Whom It May Concern: On June 10, 2022 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on November 9, 2022. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on November 9, 2022, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-5734. Sincerely, ,�Fo ol Carlos M. Gonzalez, Project Manager Cc: Fabian Diaz, Inspector Troy Gardner, Inspection Supervisor Cody Horton, Senior Inspector Carlos M. Gonzalez, Program Manager Freese and Nichols, Consultant Fain Group, Contractor N/A, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov 0 Before & After Pictures Rev. 8/20/19 AFFIDAVIT OF BILLS PAID AND RELEASE OF LIENS BY CONTRACTOR The undersigned The Fain Group, Inc (name of contractor) having furnished materials, services and/or performed labor in connection with the construction of certain improvements for and in consideration of the payment to the Contractor of the sum hereinafter specified does hereby acknowledge and release as follows: Upon the receipt of $11,366.32 for materials, services and/or labor performed by the Contractor for the project Alliance Park Phase I&II (the "Work"); Contractor will waive and release any and all liens, rights and interests (whether choate or inchoate, and including, without limitation, all mechanic' s and materialmen's liens under the Constitution and the statutes of the "Property" state) which are or may be owed, claimed or held by Contractor in and to the Property and the improvements constructed thereon by reason of the Work or otherwise, and Contractor will thereby RELEASE AND FOREVER DISCHARGE any and all claims, debts, demands or causes of action the Contractor has or may have as a result of the same including, without limitation, any liens of Contract for the Work now or hereafter filed for record in said County. Contractor represents, warrants, and certifies that all bills owed by the Contractor for materials furnished and labor performed in connection with the Work have been or will be fully paid and satisfied. If for any reason a lien or liens are filed for materials or labor against the Property by virtue of the Contractor's participation in the Project by any person claiming by, through, or under the Contractor, then Contractor will immediately obtain a settlement of such lien or liens and obtain and furnish to the owners of the Property a release thereof. Contractor shall indemnify such owners and their respective heirs, successors and assigns from any such bill or liens and from all costs and expenses, including attorney's fees, incurred in discharging any such bills or removing such liens. Executed March 18, 2024. Contractor Name: The Fain Group, Inc. By: Larry Frazier Title: President Witness Subscribed and sworn to before me under my official seal of office this 18 day of IJJ rch, 2024. CONSENT OF OWNER SURETY COMPANY ARCHITECT 0 TO FINAL PAYMENT CONTRACTOR 0 AIA DOCUMENT G707 SURETY 0 OTHER ❑ Bond # 398500G PROJECT: Alliance Park Phase I & II Improvements, CPN 100333/101630, FT Worth (name, address) TO (Owner) City of Fort Worth 1000 Throckmorton FT. Worth, TX 76102 CONTRACTOR: The Fain Group, Inc. ARCHITECT'S PROJECT NO: 52651 CONTRACT FOR: CONTRACT DATE: 08/09/2019 In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the (here insert name and address of Surety Company) Westfield Insurance Company P 0 Box 5001 Westfield Center, OH 44251-5001 on bond of (here insert name and address of Contractor) The Fain Group, Inc. P 0 Box 164308 Fort Worth, TX 76161 ,SURETY COMPANY, ,CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety company of any of its obligations to (here insert name and address of Owner) City of Fort Worth 1000 Throckmorton, FT. Worth, TX 76102 as set forth in the said Surety Company's bond ,OWNER, IN WITNESS WHEROF, The Surety Company has hereunto set its hand this 19th day of March, 2024. Attest (seal): Westfield Insur Surety Comp ce Company Si R :tore of Authori '' d Representative Johnny Moss, Attorney -in -Fact Title NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBT AND CLAIMS, Current Edition AIA DOCUMENT G707 * CONSENT OF SURETY COMPANY TO FINAL PAYMENT *APRIL 1970 EDITION *AIA 1970 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE. NW WASHINGTON, D.C. 2006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. THIS POWER OF ATTORNEY SUPERCEDES ANY PREVIOUS POWER BEARING THIS SAME POWER # AND ISSUED PRIOR TO 05/25/22, FOR ANY PERSON OR PERSONS NAMED BELOW. General POWER NO. 4220012 14 Power Westfield Insurance Co. of Attorney Westfield National Insurance Co. Ohio Farmers Insurance Co. Westfield Center, Ohio CERTIFIED COPY Know All Men by These Presents, That WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, corporations, hereinafter referred to individually as a "Company" and collectively as "Companies," duly organized and existing under the laws of the State of Ohio, and having its principal office in Westfield Center, Medina County, Ohio, do by these presents make, constitute and appoint TONY FIERRO, JOHNNY MOSS, JAY JORDAN, MISTIE BECK, JEREMY BARNETT, JADE PORTER, ROBERT G. KANUTH, JARRETT WILLSON, JACK NOTTINGHAM, BRADY WILSON, BRENNAN WILLIAMSON, JOINTLY OR SEVERALLY of ROCKWALL and State of TX its true and lawful Attorney(s)-in-Fact, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings, or other instruments or contracts of suretyship in any penal limit. LIMITATION: THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE GUARANTEE, OR BANK DEPOSITORY BONDS. and to bind any of the Companies thereby as fully and to the same extent as if such bonds were signed by the President, sealed with the corporate seal of the applicable Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney(s)-in-Fact may do in the premises. Said appointment is made under and by authority of the following resolution adopted by the Board of Directors of each of the WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY: "Be It Resolved, that the President, any Senior Executive, any Secretary or any Fidelity & Surety Operations Executive or other Executive shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attorney(s)-in-Fact to represent and act for and on behalf of the Company subject to the following provisions: The Attorney -in -Fact. may be given full power and authority for and in the name of and on behalf of the Company, to execute, acknowledge and deliver, any and all bonds, recognizances, contracts, agreements of indemnity and other conditional or obligatory undertakings and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attorney -in -Fact shall be as binding upon the Company as if signed by the President and sealed and attested by the Corporate Secretary." "Be it Further Resolved, that the signature of any such designated person and the seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signatures or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached." (Each adopted at a meeting held on February 8, 2000). In Witness Whereof, WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY have caused these presents to be signed by their National Surety Leader and Senior Executive and their corporate seals to be hereto affixed this 25th day of MAY A.D., ruz-2 . Co orate .../.w,,14, rP •,43'..u..... ., seals lQ,.• Affixed ��; \olt Ito IPSE AL 1V4- alt State of Ohio County of Medina ss.: w :9z tom.•gNGRTF1P,f SEAL o . cD? . .. 'i s ;z-a. * ;• 'vim WESTFIELD INSURANCE COMPANY WESTFIELD NATIONAL INSURANCE COMPANY OHIO FARMERS INSURANCE COMPANY By: Gary W. tumper, National"Surety Leader and Senior Executive On this 25th day of MAY A.D., 2022 , before me personally came Gary W. Stumper to me known, who, being by me duly sworn, did depose and say, that he resides in Medina, OH; that he is National Surety Leader and Senior Executive of WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, the companies described in and which executed the above instrument; that he knows the seals of said Companies; that the seals affixed to said instrument are such corporate seals; that they were so affixed by order of the Boards of Directors of said Companies; and that he signed his name thereto by like order. Notarial Na,........w,,,( Seal p1AL % Affixed S' z • State of Ohio Iii°_ / Jpo� County of Medina ss.: ., 17. o f ff,; id,e-OA. David A. Kotnik, Attorney at Law, Notary Public My Commission Does Not Expire (Sec. 147.03 Ohio Revised Code) I, Frank A. Carrino, Secretary of WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said Companies, which is still in full force and effect; and furthermore, the resolutions of the Boards of Directors, set out in the Power of Attorney are in full force and effect. In Witness Whereof, I have hereunto set my hand and affixed the seals of said Companies at Westfield Center, Ohio, this 19th day of March A.D., 2024 5E 3 a- z y '�11hRTE1PEQ� .u~, SEAL :m_ o' :zgo .%;:, 1848 r;•.. 'e BPOAC2 (combined) (03-22) A Frank A. Carrino, Secretary Alliance Park Phase I & II Before & After Pictures Alliance Park Phase I & II (CD8) — Before 2018 Alliance Park Phase 1 & II (CD8)) — After 2023 Alliance Park Phase I & II Before & After Pictures Alliance Park Phase I & II (CD8) — Before 2018 Alliance Park Phase I & II (CD8) — After 2023 Alliance Park Phase I & II Before & After Pictures Alliance Park Phase I & II (CD8)) — Before 2018 Alliance Park Phase I & II (CD8) — After 2023 Alliance Park Phase I & II Before & After Pictures Alliance Park Phase I & II (CD8)) — Before 2018 Alliance Park Phase I & II (CD8) — After 2023