Construction Allowance Request
Project Name
Client Project #(s)
Project
Description
Contractor
Trinity Boulevard Phase 1 - IH 820 to Salado Trail
City Sec #
57011
102101
Trinity Boulevard Phase 1 - Roadway, Drainage, Illumination, Landscape and Traffic Improvements
SJ Louis Construction of Texas LTD.
City Project Mgr.
Mitch Aiton
UNIT or DEPT
Original Contract Amount
Extras to Date
Credits to Date
Current Contract Amount
rAmount of Proposed Allocation
Original Allowance Available to Allocation
Allowance Funds Previously Allocated
Revised Allowance Balance
CA #
13
City Inspector
Date
4/3/2024
Stephen Bamard
Unit I, IV & V
Unit II
Unit III
-
Totals
$16,716,606.80
$5,063,103.22
$230.906.00
$22,010,616.02
$16,716,606.80
$5,063,103.22
$230.906.00
, $22010,616.02
$5,945.50
$5,945.50
$0.00
$0.00
$0.00
$500,000.00
$100,000.00
$20.000.00
$620,000.00
$248,706.47
$81,092.90
$13,307.34
$343,106.71
$245,348.03
$18.907.10
$6.692.66
$0.00
$270,947.79
JUSTIFICATION (REASONS) FOR CONSTRUCTION ALLOWANCE
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST, THE CONTRACT SHALL: Furnish all labor and material as per
the attached proposed Construction Allowance Request (with attachments):
This Construction Allowance Request adds an item for Work Zone Removable Yellow Markers at LS cost of $5,945.50. Price includes
subcontractor's cost plus contractor's 15% markup. They are used to separate two-way traffic instead of the existing two-way paddles on the new
22-foot-wide concrete section along the north side of the project. They have worked better than the 2-way paddles by staying down and keeping
drivers in their lane. Drivers have also been more cautious and slowed down in work zones. The price equals to $0.63/EA, which is less than
TxDOT's average price is $0.88/EA for the buttons. Staff deems the proposed price is fair and justified.
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and
satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Construction
Allowance Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and
administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Name
Contractor(Name) Contractor Signature
Date -
SJ Louis Construction of Texas LTD.
Adam Lunsford --
Apr 5, 2024
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
SK(
Apr 9, 2024
��
Apr 5, 2024
,,, o� Enos. za4 sss �o,
Program Manager
Date
Senior Capital Project Officer
Date
P""` 3s
Apr 15, 2024
j.1_
Apr 16, 2024
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
Patricia L. wadsa K
Apr 17, 2024
��/Ziw
Apr 17, 2024
Assistant City Attorney
Date
Assistant City Manager
Date
Apr 19, 2024
;, -, ,
Apr 22, 2024
oa
ATTEST:
oann
pO4F:411*
piso A ?yoo
At 0
°v0(w�1/ °=0d
Jannette Goodall, City Secretary °a,,* ��og,
dpp� nEx�°p5oo
Construction Allowance SUMMARY
Page 1 of 4
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH,
Project Name
Client Project #
Contractor
City of Fort Worth
Construction Allowance Additions
Trinity Boulevard Phase 1- IH 820 to Salado Trail
ity Sec #
57011
102101
SJ Louis Construction of Texas LTD.
PM
Mitch Aiton
Construction Allowance Submittal #
ADDITIONS
13
Inspector
ate
Stephen Barnard
4 3/2024
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
72A
Work Zone Removable Yellow Markers
Unit I, IV & V
1.0000
LS
$5,945.50
$5,945.50
Unit I, IV & V
$5,945.50
Unit II
$0.00
Unit III
$0.00
$0.00
Total Additions
$5,945.50
Construction Allowance Additions
Page 2 of 4
Foe T�M
Project Name
Client Project #
Contractor
City of Fort Worth
Construction Allowance Value
I Trinity Boulevard Phase 1 - IH 820 to Salado Trail
City Sec #
57011
1102101
SJ Louis Construction of Texas LTD.
PM
Mitch Aiton
Construction Allowance Submittal #
I 13 I
CONSTRUCTION ALLOWANCE VALUE BEING USED
Inspector
Date
Stephen Barnard
I 4/3/2024 I
ITEM
DESCRIPTION
Qty
Unit
Unit Cost
Total
Unit 1
Item 84
9999.0025 Construction Allowance
0.011891
LS
$500,000.00
$5,945.50
Construction Allowance Value
3 of 4
L
M/SBE for this Construction Allowance Request
M/SBE Sub
Type of Service
Amount for this CAR
Previous Construction Allowance Requests
Total
$0.00
CAR#
DATE
AMOUNT
CA #1
8/4/2022
$90,332.51
CA #2
9/12/2022
$18,096.00
CA #3
9/30/2022
$10,112.90
CA #4
10/14/2022
$12,600.00
CA #5
10/31/2022
$21,551.00
CA #6
11/28/2022
$27,678.51
CA #7 (Water Dept)
12/1/2022
$9,171.52
CA #8 (Water Dept)
12/13/2022
$71,921.38
CA #9
1/23/2023
$58,869.69
CA #10
9/13/2023
$7,400.00
CA #11
10/31/2023
$11,233.20
CA #12
3/14/2024
$4,140.00
Total
$343,106.71
Construction Allowance MSBE Data
Page 4 of 4
REQUEST FOR INFORMATION REPORT (RFI)
RFI NO.
PAGE NO.
13
1
CONTRACT TITLE
CONTRACT NO.
PRIME CONTRACTOR
Trinity Boulevard Phase 1 - IH 820 to Salado Trail
57011
SJ Louis Construction of Texas LTD.
CONTRACTOR'S REQUEST FOR INFORMATION
REQUESTING PARTY NAME
REQUESTING PARTY TITLE
REQUESTING PARTY ORG.
PHONE
DATE OF REQUEST
Ronald Etter
Project Manager
SJ Louis
940-399-6757
03/04/24
RFI SUBJECT
SECTION(S) REFERENCED
Work Zone Removable Yellow Markers
POTENTIAL COST IMPACT
NO CHANGE
INCREASE IN COST
5,945.50
DECREASE IN COST
POTENTIAL SCHEDULE IMPACT
NO CHANGE
INCREASE IN TIME
DECREASE IN TIME
# of Days =
# of Days =
INFORMATION REQUESTED
The two-way paddles used to divide temporary two-way traffic have been knocked over a lot, and cars will wander outside their
lane. With traffic moving to the new concrete lanes, we expect this issue to worsen with narrower lanes than while on the existing
asphalt pavement.
CONTRACTOR RECOMMENDATION
Proposing to use temporary yellow traffic buttons instead of the two way paddles to separate traffic.
RESPONDING PARTY NAME
GOVERNMENT RESPONSE
RESPONDING PARTY TITLE
PHONE
DATE RECEIVED
DATE OF RESPONSE
Mitch Aiton
Sr Professional Engineer
682-715-9424
03/04/24
03/09/24
GOVERNMENT RESPONSE TO CONTRACTOR
Install the buttons and we'll monitor to confirm it continues to be the best solution.
COST IMPACT JUSTIFICATION
SCHEDULE IMPACT
Price is shown as lump sum but the price for the temporary
markings is $0.63/EA. TxDOT average price is $0.88/EA. Proposed
price is fair and justified.
No Schedule Impact
QA REVIEWER'S NAME & TITLE QA REVIEWER'S SIGNATURE
DATE
Mitch Aiton, Sr Professional Engineer
03/11/24
Request for Proposal
Project Name
Trinity Blvd., Phase I (I.H. 820 to Salado Trail)
City of Fort Worth, Texas
C.M.R. - Proposal No.
22 rev. 1
Date
April 1, 2024
Response Required By
Mr. Mitch Aiton, P.E., PMP
200 Texas Street
Fort Worth, Texas 76102
Via Email
Transmitted By
Ronald Etter
Project Manager
Signature
Row.add. Eft&
cc: Mr. Trenton Tidwell- Kimley Horn, Via Email
Description of Work
This CMR is submitted for adding some Work Zone Pavement Removable Marking Buttons along Trinity Blvd to assist with traffic control
and safety of the citizens. There was also 55 LF of 24" Solid Pavement Markings (W) added that will be billed under Pay Item 55.
Breakdown of Proposal
Trinity Blvd., Phase I (LH. 820 to Salado Trail)
Temp Marking Removable Buttons
Item
Description
Quantity
Unit Price
Extension
New
Trinity Blvd Temp Striping- Work Zone Pavement Marking
Removable Buttons
1
LS
$5,945.50
$5,945.50
Net Change:
$5,945.50
Additional Calendar Days:
0
If acceptable, please provide an authorization signature below and return one (1) copy to our office.
1.J. Louis Construction Action
xc: S. J. Louis Project No. 22111
At 9400 Buttons, equals
out to $0.63/Button
S.J. Louis Construction of Texas Ltd.
520 S. 6th Avenue
Mansfield, Texas 76063
(817) 477-0320 Office (817) 477-0552 Fax
ROAD MASTER STRIPING, LLC
1301 SE McKinney St
Rice, TX 75155
903-326-4530
dv@roadmasterstriping.com
INVOIrr
BILL TO
SJ LOUIS CONSTRUCTION
SJ LOUIS CONSTRUCTION OF TEXAS Ltd
P.O. BOX 834
MANSFILED, TX 76063
INVOICE 6133
DATE 03/14/2024
TERMS Net 30
DUE DATE 04/13/2024
ACTIVITY
DESCRIPTION
662 2099
Thank you for your business.
TRINITY BLVD
WK ZN PAV MRK REMOV (Y) 4" (SLD)
Not included on this
BALANCE DUE
9,400 0.55
5,170.00
$5, 610.00
Page 1 of 1
Workbook: Bid Item Average Cost
3/25/24, 10:58 AM
2
o.
0
m
0
L
BID ITEM DESCRIPTION
00
N
0
00
0
0
-69
N
0
0
E
Ol
m
WKZN PAV MRKREMOV (W)(WORD}
C7
0
4.0
10
10
Actual Let Date Range
w
W K ZN PAV MRK RE MOV (W )13" (YLD TR!)
co
10
10
Last 3 months
Bidder Rank
M
O
M
ri
co
n
nl
d
e1
CO
0 0
O of
N
W KZN PAV MRK REMOV (W)36"(VLDTRI)
C.
N
0
ui
v
C.
0
LD
M
r{
V K ZN PAV MRK P EMOV I
Lo
0
10
u
ci
N KZN PAV MRKREMOV (Y)6' (BRK)
0
'O
co
10
c
0
N
0
N
L 141 1 LID
00
i O ND-
s 0
0
M
O
w
0 0 0
1r. 0
O CO N
10 M 00
CO'
N
a 0 0
u o
M CO Lf1
00 01 N
u-
ZN PAV MRK REMOV (Y)6"(DOT)
n
4.0
ID
10
w K2N PAV MRK REMOV (Y)G"(SLD)
W K ZN PAV MRK RE MOV (Y)B"(SLD)
ZN PAV MRK REMOV (')12"(SLD)
CO v) 0
CO 0 0 d
CO ID N
0 0 0
00 0 0
https://tab leau.txd ot.gov/views/Bid ItemAverageCost/Bid ItemAvgCostDashboard?%3Aembed=y&%3AisGuestRedirectFromVizportal=y&%3Aorigin=card_share_link
FORT WORTH®
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Trinity Boulevard CA #13
M&C: N/A
CPN: 102101
CSO: 57011
DOC#: N/A
Date: 4/4/2024
To:
Name
Department
Initials
Date Out
1.
Mitch Aiton
TPW - Signature
Apr 5, 2024
MAr,
2.
Jessica Rodriquez
TPW - Reviewer
Apr 5, 2024
3.
Adam Lunsford
SJ Louis - Signature
Apr 5, 2024
A1-
4.
Stephen Barnard
TPW - Signature
Apr 9, 2024
MKA4K
5.
Raul Lopez
TPW - Signature
,ecz-
Apr 15, 2024
6.
Lissette Acevedo
TPW — Signature
A
Apr 16, 2024
7.
Patricia Wadsack
TPW — Signature
?LW
Apr 17, 2024
8.
Lauren Prieur
TPW — Signature
?0 -
Apr 17, 2024
9.
Doug Black
Legal — SignatureDL
Apr 19, 2024
10.
Jesica McEachern
CMO — Signature
Apr 22, 2024
,a`
11.
Jannette Goodall
CSO - Signature
J-6
Apr 22, 2024
,G
12.
TPW Contracts
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW
Contracts
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: DYES No
RUSH: DYES No SAME DAY: DYES No NEXT DAY: DYES No
ROUTING TO CSO: ®YES ❑No
Action Required: ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
® For Your Information
® Signature/Routing and or Recording
® Comment
❑ File