Loading...
HomeMy WebLinkAboutContract 58122-CO3CSC No. 58122-0O3 FORT WORTH. Project Name City of Fort Worth Change Order Request University Drive Phase 1 Client Project #(s) I 101588 Project Description Contractor City Project Mgr. City Sec # 58122 University Drive Phase 1 - Mill & overlay, striping, sidewalks, traffic signals, street lights, medians and landscape along University Drive Texas Materials Group Inc., dba Texas Bit I Bereket Birhane Change Order # City Inspector Date 3/14/2024 Stephen Bamard Dept. TPW Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date (Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) Water Totals Contract Time (CD) $3,039,583.96 $219,822.26 $366,472.90 $0.00 $3,406,056.86 $219,822.26 365 20 $3,259,406.22 $28,829.70 $3,288,235.92 $0.00 $28,829.70 $366,472.90 $0.00 $366,472.90 $0.00 $3,625,879.12 $28,829.70 $3,654,708.82 $0.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER $28,829.70 7.30% $4,257,571.08 385 385 - High early strength concrete needs to be used for University Village Park driveway crosswalk to expedite construction and minimize impact on business. - A valley gutter at the intersection of Old University and University Dr needs to be replaced due to age and drainage issues (holding water). City of Fort Worth staff and consultant team have evaluated proposed quantities and unit prices using recent City, TxDOT and other sources and found them to be acceptable. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Contractor's Company Name ] Contractor (Name) 1 Contract Signature Date Texas Materials Group, Inc. (Jamie Greenway I Mar31, 2024 Inspector/Inspection Supervisor Date I Project and Contract Compliance Manager Date Apr8,2024 j a2n" Apr2,2024 Program Manager Date Senior Capital Project Officer Date <. Apr 8, 2024 - Apr 12, 2024 Assistant Director (Dept) Date irector, Contracting Department (Dept) Date p., / r' ti 41 �' L.MtZ •'1t' Apr 18, 2024 Apr 18, 2024 Assistant City Attorney er Date •woe. Apr 23, 2024 1,,?y Apr24,2024 Council Action (if required) an Q fr FORT 9�0 ATTEST: 60iR A ate^ °9°a "" Jannette Goodall, City Secretary 4,,,r" aan nEa M&C Number M&C Date Approved OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORT Project Name Client Project # City of Fort Worth Change Order Additions University Drive Phase 1 City Sec # 58122 101588 Contractor Texas Materials Group Inc., dba Texas Bit PM ADDITIONS Bereket Birhane Change Order Submittal # 3 Inspecto Date Stephen Barnard 3/14/2024 DESCRIP PION DEPf Qty Unit Unit Cost Total NEW High Early Strength Concrete Premium @ University Village Park & Old University TPW 150.00000000 SY $5.6 $850.50 NEW Remove Valley Gutter TPW 87.00000000 SY $86.52 527.2 , NEW Replace Valley Gutter TPW 87.00000000 SY $235.08 '.20,,5 .96 TPW $28,829.70 Water $0.00 Change Order Additions Page 1 of 1 Sub Total Additions $28,829.70 FORT WORTH Project Name Client Project # Contractor City of Fort Worth Change Order Deletions University Drive Phase 1 City Sec # 58122 101588 Texas Materials Group Inc., dba Texas Bit PM Bereket Birhane Change Order Submittal # DELETIONS 3 Inspector Date Stephen Barnard 3/14/2024 ITEM DESCRIPTION DEPT Oty Unit Unit Cost Total TPW $0.00 Water $0.00 Sub Total Deletions $0.00 Change Order Deletions Page 3 of 4 M/SBE for this Chance Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co# DATE AMOUNT 1 07/07/2023 $97,289.30 2 11/29/2023 $122,532.96 Total $219,822.26 A CRH COMPANY Texas Bit PROPOSED CHANGE ORDER # 12 A CRH COMPANY OWNER: City of Fort Worth Attn: Bereket 200 Texas St City, State, Zip DATE: March 4, 2024 ENGINEER: PROJECT: University Drive High Early Concrete for Crosswalks@ Old University and DESCRIPTION OF CHANGE AND/OR EXTRA WORK: Village Park UNIT ADD: Description Quantity Unit PRICE AMOUNT, New High Early Concrete @ University Village Park & Old University Breakdown Materials Sub Quote Profit 5% 150 SY 810.00 810.00 40.50 Total 5.67 850.50 850.50 UNIT DEDUCT: Description Quantity Unit PRICE AMOUNT Change Order Add Change Order Deduct Total Change Order Amount = All other items and conditions of our contract with you remain the same and this order is made a part thereof. Kindly signify your acceptance and approval of this agreement by signing and returning to us the enclosed copy. ACCEPTED BY OWNER: Submitted By: Texas Materials Group, Inc dba: Texas Bit By: Date: By: Jamie Greenway Project Manager (214) 543-5705 Cell A CRH COMPANY Texas Bit PROPOSED CHANGE ORDER # 11 -Revised A CRH COMPANY OWNER: City of Fort Worth Attn: Bereket 200 Texas St City, State, Zip DATE: March 14, 2024 ENGINEER: PROJECT: University Drive RFI# 15 - Valley Gutter University @ Old University (East DESCRIPTION OF CHANGE AND/OR EXTRA WORK: Side) UNIT ADD: Description Quantity Unit PRICE AMOUNT New New Notes Remove Valley Gutter Replace Valley Gutter Materials Equipment Labor Sub Quote Profit 5% Breakdown 87 SY 87 SY 86.52 235.08 7,527.07 20,451.96 13008.05 5373.62 8265.00 26646.67 1,332.33 Total 27,979.00 Revised Quote - Use HES Concrete, and do as 2 move -ins. Total UNIT DEDUCT: Description Quantity Unit PRICE AMOUNT Change Order Add Change Order Deduct Total Change Order Amount = All other items and conditions of our contract with you remain the same and this order is made a part thereof. Kindly signify your acceptance and approval of this agreement by signing and returning to us the enclosed copy. $ 27,979.00 $ 27,979.00 ACCEPTED BY OWNER: Submitted By: Texas Materials Group, Inc dba: Texas Bit By: Date: By: Jamie Greenway Project Manager (214) 543-5705 Cell Pay Scale Regular Hourly Rate Overtime Rate (1.5) 1 2 3 4 5 1 2 I 3 4 I 5 $50.00 $35.00 $35.00 $35.00 $75.00 I $75.00 $52.50 $52.50 $52.50 $112.50 Enter regular hourly rates 1 thru 5 m _ c o • 0 EE 0 O 0 O _ m EE E E 1n Grand Total E a 0) 2 W 0 N O O LD rvi O N 1 u} 0 O 0 N C 0 Remove the V G O 00 N ti 00 N d 0 N 00 N d 00 N co 0 N m �1 O 06 Q o N x 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O O of of of of of of 0 0 0 0 0 0 0 of ✓ T VT VT VT VT VT VT VT VT VT V T OS i6 N O E u} u} u} u} u} u} VI- u} Friday 7 O E Q N x co > 0 2 O E ✓ 1 Vt Vt Vt Vt Vt V0 V0 V0 V0 V0 V0 V0 Vt Monday 7 O E Q i Monday = 3 o E 0 N - 0 N - 0 N - 0 N - 0 N - 0 N - 0 m y 2 0 V 0 V 0 V 0 V 0 V 0 V 0 V 18-Mar-24 Monday Cu1 E Q 0 ri Vt 0 00 N Vt 0 00 l\ Vt 0 00 N Vt 0 00 1...N Vt 0 u1 Vt Vt Vt Vt Vt Vt Vt Vt $ 337.50 y 2 0 V 0 V 0 V 0 V 0 V 0 V 0 V Pay Scale 00 00 00 00 00 00 Ln Name Juan R. Antonio P. Enrique L. 2 Jose G. Efrain G. Lupe Z 0 0 0 0 O 0 O O 0 Vf 0 0 0 0 1.6 O O 0 0 O O 0 O O 0 1.6 0 O 0 CO VF 0 1.11 0 00 fa f0 2 f6 a c o O E Saturday C 3 0 E Q Friday C 7 O E Q Thursday E. 7 O E Q 0. Wednesday C 7 O E Q VT Tuesday C 7 o E Q O O . 0 0 c-i Monday C 3 0 O E Q 0 0 0 0 O 0 Vf 0 0 O O 0 O O 0 0 0 vt O 0 O O 0 4/F 0 0 0 0 0 0 0 O O a W c O E VT VT VT VT VT VT VT VT N x Saturday 3 O E Q V} V} V} V} V} V} V} V} V! Friday C 7 O i i E Q (0 1 Monday 3 O E Q V} V} V) V) Vl V) V) V) T CO 13 Monday C i i 7 0 E Q V? V? VT V? VT VT VT VT T R 0 Monday -. O 0 $ 200.00 O 00 00 E Q V1• V1• V1• V1 V1 V1 V1 T O O 0 CO O 0 .-i 0 c-i 0 .--i Monday C 3 o 0 0� n 0 m co $ 200.00 m .--I Q VY V) V) 0 0 0 0 CO00 00 O c-i c-i c-i c-i T OS O O • 00 $835.00 O O 0 $133.62 O N N 0} u* Type Equipment Back Hoe Skid Steer Mobilization N m rri n O O 0 0 0 0 0 O O O 0 0 0 0 0 O 0 0 VI- VI- VI- 0 0 0 0 0 vF O 0 0 0 w w w w w 0 ., O E N O 0 0 0 0 0 c O E 0 0 O 0 O m li O E O O 0 0 0 co n 0 2 C 0 E O 0 0 0 0 m 0 2 O E O O 0 0 0 as 0 2 C 3 O 0 0 0 cn .- 0 0 0 ti 0 0 fV 0 0 N 0 m O O ... O O O o ,0 cn 0 Le, T co o O E a . VI-^ 2 0 0 fV 0 0 N 0 m O O E E N Grand Total 0 8 r1 0 0 N 00 m 1 O 0 00 0 o 0 ti O 0 cri > 0 E 0 0 s v as N s a d v O C v N N 2 00 0 (a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O o 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N 0 E u* u* u* u* u* u* u* u* u* u* u* u* u* N x l6 a cn as 0 E Q 0 0 3 H 0 Q v1 v1 v1 v1 v, v, v, v, v, v, v, v, v? v? 0 1 Wednesday O O O O O O 0 = 3 0 O O O O 0 . . . . . O O - - - - - - Om E Q , , , , , , u} u} u} u} u} v, v,_ , N O O O O O O O 1 00 00 00 00 00 00 00 0 0 H C 0 Q $ 210.00 $ 210.00 $ 210.00 $ 210.00 $ 210.00 $ 210.00 u* u* u* u* u* u* u* $ 450.00 i 1 O lD O lD O lD O lD O SO O (0 0 sis Wednesday 0 0 0 0 0 0 $ 300.00 = o 0 0 0 0 0 0 E Q vt vt vt vt vt vt u} u} u} u} u} u} u} N 000000 0 2 00 00 00 00 00 00 00 Tuesday C 3 O E $ 210.00 $ 210.00 $ 210.00 $ 210.00 $ 210.00 O O O N $ 450.00 " 0 0 0 0 0 0 0 = (0 (0 (0 (0 (0 (0 tD Pay Scale 00 In In In In In (0 Name Juan R. Antonio P. Enrique L. 2 Jose G. Efrain G. Lupe Z 0 ro 0 00 O O O 0 O O 0 uti O O O O O O 0 O O Co O 0 n O O 00 0 0 00 a -I O O N 0 O O 00 fa L CD 2 0 E 0 E 0 E 0 E 0 E 0 E 0Q 0 I— C O E o N v uti O alN uti o u? $ 525.00 O N u? 1 $ 4,000.00 o 0^0 ti V1 $ 50.00 $ 300.00 O O O O O O O O O O O O O O O O O O ti ti ti ti ti ti ti ti ti N O O O w O O 0 O O a O O O O 0 40/F 0 O O a 0 O O O O of 0 O E 0 x u * u* u* u* u* u* u* u* a 3 0 E v* v* v* v* v* v* v* v* C 0 0 i i 0 Q 3 VT v? v? v? v? v? v? v? N 1 a 3 0 E u } u} u} Tuesday 7 0 0 0 )0 i E Q V? VT VT VT VT VT VT VT N 0 I .ti a 3 0 E uti u} u} u} u} u} u} u} Tuesday sw C 3 E Q 0 co i 0 2 00 > _ y 0 R O 2 O O m 0. Type Equipment skid Steer Zamora Weekly Chargeable Report Time Labor Material Equipment Other Total Week 1 $2,565.00 $300.00 $3,703.62 $600.00 $ 7,168.62 Week 2 $5,700.00 $11,708.05 $1,670.00 $400.00 $ 19,478.05 Week 3 $0.00 $0.00 $0.00 $0.00 $ Week 4 $0.00 $0.00 $0.00 $0.00 $ Week 5 $0.00 $0.00 $0.00 $0.00 $ Week 6 $0.00 $0.00 $0.00 $0.00 $ Week 7 $0.00 $0.00 $0.00 $0.00 $ TOTAL $ 26,646.7 FORT WORTH.} Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: University Drive Phase 1 Change Order #3 M&C: N/A CPN: 101588 CSO: 58122 DOC#: N/A Date: 3/14/2024 To: Name Department Initials Date Out 1. Ann Estes TPW - Review 4,- Apr 1, 2024 2. Bereket Birhane TPW - Signature /IRvQ- Apr 2, 2024 3. Jamie Greenway TexasBit - Sign U ` Mar 31, 2024 4. Stephen Barnard TPW - Signature- Apr 8, 2024 5. Raul Lopez TPW - Signature 'C- Apr 8, 2024 6. Lissette Acevedo TPW — Signature clitY Apr 12, 2024 7. Patricia Wadsack TPW — Signature pL'W' Apr 18, 2024 8. Lauren Prieur TPW — Signature ? _ Apr 18, 2024 9. Doug Black Legal — Signature °B Apr 23, 2024 „„ 10. Jesica McEachern CMO — Signature Apr 24, 2024 ,or l 1. Jannette Goodall CSO - Signature Apr 24, 2024 ,»7G 12. TPW Contracts CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: DYES ZNo RUSH: DYES No SAME DAY: OYES No NEXT DAY: OYES No ROUTING TO CSO: ®YES ❑No Action Required: ['Attach Signature, Initial and Notary Tabs ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File Return To: Please notify TPWContracts(u�fortworthtexas.gov for pickup when complete. Call ext. 7233 or ext. 8363 with questions. Thank you!