Loading...
HomeMy WebLinkAboutContract 60069-CO1FORT WORTH Change Order Request CSC No. 60069-CO1 Project NamefWater & Sanitary Sewer Replacement Contract 2019 WSM-0, Part -1 _J City Sec No. 60069 Project No.(s)I'S6007106004301000430157400101001780 DOE No. Project Description Contractor N/A City Pro. No. 103381-1 Replacing Water & Sanitary Sewer on John T White Rd. and Williams Rd. Jackson Construction, Ltd. City Project Mgr.I Pratima Poudyal Phone Number:[ 317-392-6149 Dept, Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date !Amount of Proposed Change Order Revised Contract Amount Orig. Funds Available for Change Orders Remaining Funds Available for tha CO Additional Funding (if necessary) Change Order fl City Inspector Byron McDonald I Phone Number:J 817-392-8306 1 1 Date: 2120/2024 7 Unit I • Water Unit IIA • Sewer Unit IIB - Sewer Unit III • Paving Totals C en y TIDam, (Cetendar Days) $2,655,455.00 $1,320,558.00 $530,877.00 $490,533.00 $4,997,423.00 540 $2,655,455.00 $1,320,558,00 $530,877.00 $490,533.00 $4,997,423.00 540 $0.00 527,630.00 $0.00 50,00 527,630,00 20 $2,655,455.00 $1,348,188.00 $530,877.00 $490,533.00 $5,025,053.00 560 $146,050.00 $146,050.00 $101,829.00 $101,829.00 $0.00 { $24,527.00 $272,406.00 $0.00 ` $24,527.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.55% $6,246,778.75 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No, 1 primarily provides for the following that are necessary on the project: • 12" DI pipe for water with acceptable backfill that was inadvertently omitted at the time the project was advertised for bid. • Extension of the sewer main on Williams Road to accommodate future development. • Portable Message Board for traffic control for school traffic. • Additional temporary pavement repair. Staff concurs with the contractor's request for 20 additional calendar days on the change order. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment In full (both time and money) for all costs arising out of, or incidental to, the above Change Order. ////���' Contractor Name /) Contractor Sign to Contractor's Company Name Jackson Construction, Ltd. Carmen Estep Inspector Project Manager V / Date 4-77/ cZ--_ / 04/18/2024 Director (Water Dept) Constructio S pervisor (TP Date Christopher Harder -T• S �`' %--4-� a � _ 4 l ib' zi hristopherHarder Apr23, 2024-a CST) Senior Assistant City Attorney As stant City Manager Date • Wi , ,rm Apr 23, 2024 ooe„ Council Action (If required) M&C Number F NIA M&C Date Approved [ N!A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORT WORTH Project Name Project No.(s) Project Description Contractor City Project Mgr. City of Fort Worth Change Order Additions Water & Sanitary Sewer Replacement Contract 2019 WSM-0, Part -1 56002/0600430/000430/5740010/001780 DOE No. N/A City Sec No. City Pro. No. 60069 103381-1 Replacing Water & Sanitary Sewer on John T White Rd. and Williams Rd. Jackson Construction, Ltd. Pratima Poudyal ADDITIONS Change Order # City Inspector 1 Date: 2/20/2024 Byron McDonald ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 31 Temporary Asphalt Paving Repair (2" HMAC on 6"Flexbase) Unit I - Water 12.0 LF $40.00 $480.00 63 1" Water Service (Williams Road) Unit I - Water 2.0 EA $2,500.00 $5,000.00 82 12" Water Pipe DIP, Acceptable Backfill Unit I - Water 93.0 LF $707.00 $65,751.00 1 8" Sewer Pipe PVC SDR-26, Acceptable Backfill Unit IIA - Sewer 330.0 LF $130.00 $42,900.00 2 8" Sewer Pipe PVC SDR-26, CLSM Backfill Unit IIA - Sewer 40.0 LF $300.00 $12,000.00 20 Temporary Asphalt Paving Repair (2" HMAC on 6"Flexbase) Unit IIA - Sewer 419.0 LF $40.00 $16,760.00 34 Pre -CCTV Inspection Unit IIA - Sewer 810.0 LF $9.00 $7,290.00 35 Post -CCTV Inspection Unit IIA - Sewer 330.0 LF $7.00 $2,310.00 36 Manhole Vacuum Testing Unit IIA - Sewer 1.0 EA $200.00 $200.00 39 Trench Safety Unit IIA - Sewer 335.0 LF $2.00 $670.00 41 Concrete Collar Unit IIA - Sewer 1.0 EA $700.00 $700.00 47 4" Sewer Service Unit IIA - Sewer 3.0 EA $2,000.00 $6,000.00 51 4' Manhole Unit IIA - Sewer 1.0 EA $10,000.00 $10,000.00 53 4' Extra Depth Manhole Unit IIA - Sewer 4.0 VF $200.00 $800.00 59 Portable Message Board Unit IIA - Sewer 4.0 WK $750.00 $3,000.00 Unit I - Water $71,231.00 Unit IIA - Sewer $102,630.00 Unit IlB - Sewer Unit III - Paving Additions Sub Total $173,861.00 Page 1 of 1 FORT WoRT1-1 Project Name Project No.(s) Project Description Contractor City Project Mgr. City of Fort Worth Change Order Deletions Water & Sanitary Sewer Replacement Contract 2019 WSM-0. Part -1 56002/0600430/000430/5740010/001780 DOE No. N/A City Sec No. City Pro. No. 60069 103381-1 Replacing Water & Sanitary Sewer on John T White Rd. and Williams Rd. Jackson Construction, Ltd. Pratima Poudyal Change Order # City Inspector DELETIONS 1 Date 2/20/2024 Byron McDonald ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 81 Construction Allowance Unit I - Water 0.71231 LS $100,000.00 $71,231.00 59 Construction Allowance Unit IIA - Sewer 1.00 LS $75,000.00 $75,000.00 Unit I - Water $71,231.00 Unit IIA - Sewer $75,000.00 Unit IIB - Sewer Unit III - Paving Deletions Sub Total $146,231.00 Page 1 of 1 MWWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total Previous Change Orders $0.00 co # DATE AMOUNT Total $0.00 2/20/24 CPN 103381-1 Water and Sanitary Sewer Replacement Contract 2019, WSM-O, Part 1 Change Order 1 Notes Staff has reviewed the requested prices and considers them to be fair and reasonable. Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Pratima Poudyal, P.E. Name of Employee Project Manager Title ATTEST: aQ� nEXP?o4p Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX