NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Mercantile Beach Industrial Development
City Project No.: 104306
Improvement Type(s): Water x❑ Sewer x❑
Original Contract Price: $253,558.00
Amount of Approved Change Order(s) $94,552.40
Revised ContractAmount:
Total Cost of Work Complete:
71Xz4,,-6'Zua,WZ
Mark Duvall (Apr 24, 202416:57 CDT)
Contractor
Executive VP
Title
Bob Moore Construction
Company Name
Carlos Mom (Apr 24. 2024 22:57 CDT)
Project Inspector
PPrro�j4Fe/ct Manager
Reberra Owan (Anr 99. 9024 08:03 CDT)
CFA Manager
Lauren Prieur (Apr29, 202408:09 CDT)
TPW Director
Asst. City Manager
$348,110.40
$348,110.40
Apr 24, 2024
Date
Apr 24, 2024
Date
Apr 28, 2024
Date
Apr 29, 2024
Date
Apr 29, 2024
Date
Apr 29, 2024
Date
OFFICIAL RECORD 1 of 2
CITY SECRETARY
FT. WORTH, TX
Notice of Project Completion
Project Name: Mercantile Beach Industrial Development
City Project No.: 104306
City's Attachments
Final Pay Estimate E
Change Order(s): E Yes ❑ N/A
Pipe Report: E Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time: 60 WD
Work Start Date: 9/26/2023
Completed number of Soil Lab Test: 36
Completed number of Water Test: 2
Days Charged: 102
Work Complete Date: 3/12/2024
Page 2of2
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name MERCANTILE BEACH INDUSTRAL DEVELOPMENT
Contract Limits
Project Type WATER & SEWER
City Project Numbers 104306
DOE Number 4306
Estimate Number 1 Payment Number 1 For Period Ending 3/12/2024
WD
City Secretary Contract Number Contract Time 6WD
Contract Date Days Charged to Date 102
Project Manager NA Contract is 100.00 Complete
Contractor BOB MOORE CONSTRUCTION, INC.
1110 N WATSON ROAD
ARLINGTON , TX 76011
Inspectors G. DEYON / C.GARCIA
Wednesday, March 27, 2024 Page 1 of 5
City Project Numbers 104306 DOE Number 4306
Contract Name MERCANTILE BEACH INDUSTRAL DEVELOPMENT Estimate Number I
Contract Limits Payment Number 1
Project Type WATER & SEWER For Period Ending 3/12/2024
Project Funding
UNIT I: WATER IMPROVEMNTS
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1
6" WATER PIPE
14 LF
$60.00
$840.00
14
$840.00
2
8" WATER PIPE
23 LF
$105.00
$2,415.00
23
$2,415.00
3
12" WATER PIPE
638 LF
$125.00
$79,750.00
638
$79,750.00
4
12" WATER PIPE, SELECT BACKFILL
202 LF
$135.00
$27,270.00
202
$27,270.00
5
2" WATER SERVCIE
4 EA
$3,456.00
$13,824.00
4
$13,824.00
6
TRENCH SAFETY
877 LF
$1.00
$877.00
877
$877.00
7
6" GATE VALVE
1 EA
$2,345.00
$2,345.00
1
$2,345.00
8
8" GATE VALVE
3 EA
$2,789.00
$8,367.00
3
$8,367.00
9
12" GATE VALVE (CO #2)
2 EA
$5,125.00
$10,250.00
2
$10,250.00
10
DUCTILE IRON WATER FITTINGS W/
1.9 TN
$2,800.00
$5,320.00
1.9
$5,320.00
RESTRAINT
11
CONNECTION TO EXISTING 4"-12" WATER
I EA
$750.00
$750.00
1
$750.00
MAIN
12
4"-12" PRESSURE PLUG
I EA
$469.00
$469.00
1
$469.00
13
FIRE HYDRANT
1 EA
$6,148.00
$6,148.00
1
$6,148.00
14
AUTOMATICE FLUSHING DEVICE
I EA
$5,569.00
$5,569.00
1
$5,569.00
Sub -Total of Previous Unit $164,194.00 $164,194.00
- - - - - - - - - - - - - - - - - - -
UNIT II: SANITARY IMPROVEMNTS
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
---------------------------------------
1
8" SEWER PIPE, SELECT BACKFILL
130 LF
$85.00
$11,050.00
130
$11,050.00
2
TRENCH SAFETY
141 LF
$1.00
$141.00
141
$141.00
3
4' MANHOLE
4 EA
$12,458.00
$49,832.00
4
$49,832.00
4
EPDXY MANHOLE LINER
38 VF
$325.00
$12,350.00
38
$12,350.00
5
CONCRETE COLLAR
2 EA
$500.00
$1,000.00
2
$1,000.00
6
POST - CCTV INSPECTION
141 EA
$1.00
$141.00
141
$141.00
7
MANHOLE VACUUM TESTING
6 EA
$150.00
$900.00
6
$900.00
8
REMOVE 4' SEWER MANHOLE (CO# 2)
2 EA
$1,250.00
$2,500.00
2
$2,500.00
9
4' SEWER PIPE, SELECT BACKFILL
1 1 If
$75.00
$825.00
11
$825.00
10
4' SHALLOW MANHOLE (CO #2)
3 EA
$8,500.00
$25,500.00
3
$25,500.00
Wednesday, March 27, 2024 Page 2 of 5
City Project Numbers 104306 DOE Number 4306
Contract Name MERCANTILE BEACH INDUSTRAL DEVELOPMENT Estimate Number I
Contract Limits Payment Number 1
Project Type WATER & SEWER For Period Ending 3/12/2024
Project Funding
11 POST - CCTV INSPECTION (EXISTING 21" 1874 EA $12.50 $23,425.00 1874 $23,425.00
SEWER MAIN) (CO#1)
12 PRE -CCTV INSPECTION (CO#1) 1874 EA $15.00 $28,110.00 1874 $28,110.00
13 CONCRETE ENCASEMENT FOR UTILITY PIPE 15 LF $1,876.16 $28,142.40 15 $28,142.40
(CO#1)
Sub -Total of Previous Unit $183,916.40 $183,916.40
Wednesday, March 27, 2024 Page 3 of 5
City Project Numbers 104306
Contract Name MERCANTILE BEACH INDUSTRAL DEVELOPMENT
Contract Limits
Project Type WATER & SEWER
Project Funding
Contract Information Summary
Original Contract Amount
Change Orders
Change Order Number 1
Change Order Number 2
Change Order Number 2
Total Contract Price
DOE Number 4306
Estimate Number 1
Payment Number 1
For Period Ending 3/12/2024
$253,558.00
$79,677.40
$5,125.00
$9,750.00
$348,110.40
Total Cost of Work Completed $348,110.40
Less % Retained $0.00
Net Earned $348,110.40
Earned This Period $348,110.40
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$348,110.40
Wednesday, March 27, 2024 Page 4 of 5
City Project Numbers 104306
Contract Name MERCANTILE BEACH INDUSTRAL DEVELOPMENT
Contract Limits
Project Type WATER & SEWER
Project Funding
Project Manager NA
Inspectors G. DEYON / C.GARCIA
Contractor BOB MOORE CONSTRUCTION, INC.
1110 N WATSON ROAD
ARLINGTON , TX 76011
DOE Number 4306
Estimate Number I
Payment Number 1
For Period Ending 3/12/2024
City Secretary Contract Number
Contract Date
Contract Time 60 WD
Days Charged to Date 102 WD
Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $348,110.40
Less % Retained $0.00
Net Earned $348,110.40
Earned This Period $348,110.40
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$348,110.40
Wednesday, March 27, 2024 Page 5 of 5
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
PROJECT NAME: Mercantile Beach
CONTRACT: A - Water, Sewer, & Paving Construction
CFA # 22-0149 I CITY PARTICIPATION:I NO
CITY PROJECT # 104306
FID # 30114-0200431-102560-EO7685
FILE # K-30027
INSPECTOR: Phone No:
PROJECT MANAGER: Sandip Adhikari, P.E. Phone No: 817-392-8424
WATER
Developer
Cost
City Cost
ORIGINAL CONTRACT
$159,069.00
$0.00
EXTRAS TO DATE
$0.00
$0.00
CREDITS TO DATE
$0.00
$0.00
CONTRACT TO DATE
$159,069.00
$0.00
AMOUNT OF PROP. CHANGE ORDER
$0.00
$0.00
REVISED CONTRACT AMOUNT
$159,069.00
$0.00
TOTAL REVISED CONTRACT AMOUNT
PER UNIT
$159,069.00
REVISED COST SHARE
Dev. Cost:
TOTAL REVISED CONTRACT
CONTRACT UNIT
SEWER
PAVING
Developer
Developer
Cost
City Cost
Cost City Cost
$94,489.00
$0.00
$56,366.37 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$94,489.00
$0.00
$56,366.37 $0.00
$ 79,677.40
$0.00
$0.00 $0.00
$174,166.40
$0.00
$56,366.37 $0.00
$174,166.40
$56,366.37
$389,601.77
City Cost:
$389,601.77
CHANGE
ORDER No:
1
DRAINAGE
Developer
Cost
City Cost
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
REVIEWED
lBy Sandip Adhikari at 10:45 am, Sep 22, 2023
STREET
LIGHTS
Developer
Cost
City Cost
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
CONTRACT
DAYS
60
60
60
Revised: 10-12-2011 Page 1
You are directed to make the following changes in the contract documents
CITY BI#D ITEM
PAY ITEM #
I
QUANTITY
UNIT
ITEM DESCRIPTION
UNIT PRICE
TOTAL
UNIT II: SANITARY SEWER IMPROVEMENTS
11"
3301.0002
1874
EA
Post -CCTV Inspection (existing 21" wer main)
$ 12.50
$ 23,425.00
12"
3301.0001
1874
EA
I
Pre -CCTV Inspection
�
$ 15.00
I
$ 28,110.00
13"
3305.0116
15
LF
Concrete Encasement for Utility Pipe
$ 1,876.16
$ 28,142.40
TOTAL
$ 79,677.40
" - New Pay Item Added
REASONS FOR CHANGE ORDER
Existing sanitary sewer encroaching with proposed storm drain, changes correspond to Revision No. 1, Change Order 1-A1, which
include CCTV inspection
and
concrete encasement to secure existing sewer as shown on revised sheets 7R1, 9A, 9B, 12R1, and 12A of the construction plans.
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
RECOMMENDED:
Pacheco Koch, a Westwood C mpa
By:
Name: Preston Bartley
Title: Proiect Manager
APPROVED:
Velocis Mercantile JV, LP
By:
Name: Paul Smith
Title: Vice President
APPROVED:
Bob Moore Construction
By. ";,1/
Name: Mark Duvall
Title: Executive Vice President
REVIEWED
lBy Sandip Adhikari at 10:45 am, Sep 22, 2023
Revised: 10-12-2011 Page 2
IPROJECT NAME:
CONTRACT:
CFA #
ICITY PROJECT #
FID #
FILE #
INSPECTOR:
PROJECT MANAGER:
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
Mercantile Beach CHANGE
A - Pavina Construction; C - Water & Sewer Construction ORDER No:
22-0149 CITY PARTICIPATION: NO
104306
2
30114-0200431-102560-E07685
K-30027
Carlos Garcia Phone No: 817-925-4381
Sandip Adhikari, P.E. Phone No: 817-392-8424
WATER
Developer
Cost
City Cost
ORIGINAL CONTRACT
$159,069.00
$0.00
EXTRAS TO DATE
$0.00
$0.00
CREDITS TO DATE
$0.00
$0.00
CONTRACT TO DATE
$159,069.00
$0.00
AMOUNT OF PROP. CHANGE ORDER
$ 5,125.00
$0.00
REVISED CONTRACT AMOUNT
$164,194.00
$0.00
TOTAL REVISED CONTRACT AMOUNT
PER UNIT
$164,194.00
REVISED COST SHARE
Dev. Cost:
TOTAL REVISED CONTRACT
SEWER
Developer
Cost
City Cost
$94,489.00
$0.00
$79,677.40
$0.00
$0.00
$0.00
$174,166.40
$0.00
$ 9,750.00
$0.00
$183,916.40 1 $0.00
$183,916.40
$348,110.40
CONTRACT UNIT
PAVING
Developer
Cost
City Cost
$56,366.37
$0.00
$0.00
$0.00
$0.00
50.00
$56,366.37
$0.00
(56,366.37)
$0.00
$0.00
$0.00
DRAINAGE
Developer
Cost
City Cost
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
50.00
$0.00
$0.00
$0.00
$0.00
50.00 I $0.00
City Cost:
$348,110.40
REVIEWED
By Sandip Adhikari at 6:49 pm, Feb 06, 2024
STREET LIGHTS
Developer
Cost
City Cost
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
50.00
$0.00
$0.00
1 $0,00
$0.00
I
CONTRACT
DAYS
60
60
60
Revised: 10-12-2011
Page 1
You are directed to make the followinq chanqes in the contract documents:
I CITY BID ITEM
I
I
I
I
PAY ITEM #
QUANTITY
UNIT
ITEM DESCRIPTION
UNIT PRICE
TOTAL
1
UNIT 1: WATER IMPROVEMENTS
9
1 3312.3005 1 1 I EA
I 12" Gate Valve
1 $ 5,125.00
$
5,125.00
1
Water Total
$
5,125.00
I
UNIT 11: SANITARY SEWER IMPROVEMENTS
1 8
0241.2201
1
EA
Remove 4' Sewer Manhole
$ 1,250.00
$
1,250,00
1 10
339.1004
I 1
I EA
4' Shallow Manhole
$ 8,500.00
$
8,500,00
Sewer Total
1 $
9.750.00
UNIT IV: PAVING IMPROVEMENTS
I
1
9999.0001 -24 SY
Remove Gravel Driveway
$ 16.13 $
(387.12)1
2
0241.1300 -180 LF
Remove Cone Curb & Gutter
$ 10.00 $
(1.800.00)1
3
3213.0301 -5267 SF
4" Cone Sidewalk
$ 5.25 $
(27.651.75)1
4
3471.0001 -1 MO
Traffic Control
$ 1,500.00 $
(1.500.00)1
5
3213.0403 -1492 SF
8" Concrete Driveway
S 5.75 $
(8.579.00)1
6
3291.0100 -10 CY
TO
$ 6.30 $
(63.00)1
I 7
3292.0100 -85 SY
Block Sod Placement
$ 3.30 $
(280.50)1
1 8
3211.0501 -250 SY
6" Lime Treatment
$ 60.00 $
(15,000.00)1
1 9
3211.0400 -3.4 TN
Hydrated Lime
$ 325.00 $
(1,105.00)1
Paving Total $
(56,366.37)1
1
TOTAL
$
(41,491.37)1
New Pay Item Added
REASONS FOR CHANGE ORDER
Plan Revision 2 - Added a 12" Gate Valve just after the connection
Plan Revision 3 - Removed all paving improvements in the Beach right-of-way. This pavement is being installed by an issued parkway permit instead of this
Plan Revision 4 - Removed and replaced an existing manhole due to change in finished grade over the
manhole
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
RECOMMENDED:
APPROVED:
APPROVED:
Westwood Professional Services
Velocis Mercanti! J//�^""(. //��,"
J
Bob Moore Contor
By:
�
By: �"'l
By:
Name:
Preston Bartley
Name: Paul Smith
Name: Mark Duvall
Title:
Project Manaqer
Title: Vice President
Title: Executive Vice President
REVIEWED
By Sandip Adhikari at 6:49 pm, Feb 06, 2024
Revised: 10-12-2011 Page 2
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Mercantile Beach Industrial Development
CITY PROJECT NUMBER: 104306
WATER
PIPE LAID SIZE TYPE OF PIPE LF
C900 6" PVC 14
C900 8" PVC 23
C900 12" PVC 638
FIRE HYDRANTS: 1 VALVES (16" OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: YES UPLOADED TO ACCELA
NEW SERVICES: 2" COPPER 4
I SEWER
PIPE LAID SIZE TYPE OF PIPE LF
SDR26 8" PVC 130
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: YES DOWNLOAD TO ACCELA
NEW SERVICES:
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311
(817) 392 - 7941 • Fax: (817) 392 - 7845
FORTWORTH.
TRANSPORTATION AND PUBLIC WORKS
March 20, 2024
Bob Moore
1110 N Watson RD
Arlington, TX 76011
RE: Acceptance Letter
Project Name: Mercantile Beach Industrial Development
Project Type: Water, Sewer
City Project No.: 104306
To Whom It May Concern:
On March 20, 2024 a final inspection was made on the subject project. There were no punch list items
identified at that time. The final inspection indicates that the work meets the City of Fort Worth
specifications and is therefore accepted by the City. The warranty period will start on March 20, 2024,
which is the date of the final inspection and will extend of two (2) years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
925-4381.
Sincerely,
_e
Sandip Adhikari, Project Manager
Cc: Carlos Garcia, Inspector
Gary Deyon, Inspection Supervisor
Edward D'Avila, Senior Inspector
Victor Tornero, Program Manager
Pacheco Koch Consulting Engineers, INC, Consultant
Venus Construction, Contractor
Bob Moore, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 08/20/19
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Mark Duvall,
Executive Vice President Of Bob Moore Construction, Inc., known to me
to be a credible person, who being by me duly sworn, upon his oath
deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Project Name: Mercantile Beach Industrial Development
City Project No.: 104306
BY
Name or Title
Subscribed and sworn before me on this date 24th of April, 2024.
Notary Public
Tarrant County, Texas
�l�yp�gGc VALERIE C RIDGEWAY
NOTARY PUBLIC
" STATE OF TEXAS
�q,F F,pS MY COMM. EXP. 10/17/26
NOTARY ID 604420.5
Bond No. 107603647
°=A I A Document G707ry -1994
Consent Of Surety to Final Payment
PROJECT: (Name and address) ARCHITECT'S PROJECT NUMBER: 70271-05 OWNER: ❑
Mercantile Logistics Station Public
Improvements CONTRACT FOR: General Construction ARCHITECT: ❑
4107 N. Beach Street CONTRACTOR: ❑
Fort Worth, TX 76137
TO OWNER: (Name and address) CONTRACT DATED: March 1, 2023 SURETY: ❑
Velocis Mercantile JV, LP OTHER: ❑
300 Cresent Court, Suite 850
Dallas, TX 76051
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
(Insert name and address of Surety)
Travelers Casualty & Surety Company of America
One Tower Square
Hartford, CT 06183
SURETY,
on bond of
(Insert name and address of Contractor)
Bob Moore Construction, Inc.
3611 William D. Tate Avenue
Grapevine, TX 76051
,CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall
not relieve the Surety of any of its obligations to
(Insert name and address of Owner)
Velocis Mercantile JV, LP
300 Cresent Court, Suite 850
Dallas, TX 76051
OWNER,
as set forth in said Surety's bond.
IN WITNESS WHEREOF, the Surety has hereunto set its hand on this date: April 10, 2024
(Insert in writing the month followed by the numeric date and year)
Travelers Casualty & Surety Company of America
( ety) `'
( (Signat r of authorized representative)
Attest: I " Payton Blanchard, Attorney -in -Fact
(Seal): (Printed name and title)
AIA Document G707 — 1994. Copyright @ 1982 and 1994. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the
AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 17:25:07 ET on 12/04/2023
under Order No.4104245587 which expires on 09/26/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA
Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (3139ADA60)
Travelers Casualty and Surety Company of America
AOW Travelers Casualty and Surety Company
TRAVELERSJ St. Paul Fire and Marine Insurance Company
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St.
Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein collectively called the
"Companies"), and that the Companies do hereby make, constitute and appoint Payton Blanchard of FORT WORTH
Texas , their true and lawful Attorney -in -Fact to sign, execute, seal and acknowledge any and all bonds, recognizances,
conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the
fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any
actions or proceedings allowed by law.
IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 17th day of January,
2019.
.k,
41��Ap Y a,y0@
F 69
Got"
� iIM
State of Connecticut
City of Hartford ss.
By:
Robert L. Rane ,Senior Vice President
On this the 17th day of January, 2019, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President
of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, and
that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of said
Companies by himself as a duly authorized officer.
IN WITNESS WHEREOF, I hereunto set my hand and official seal
My Commission expires the 30th day of June, 2021
/711'y�P't7. $��4 �i
4,ria
UBLIe
"]
P. Nowik, Notary Public
This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Travelers Casualty and
Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, which resolutions are now in full
force and effect, reading as follows:
RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any
Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and
Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign
with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a
bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke
the power given him or her; and it is
FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice
President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such
delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is
FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional
undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any
Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any
Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if
required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one
or more Company officers pursuant to a written delegation of authority; and it is
FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice
President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of
Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in -Fact for purposes only of
executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing
such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile
signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached.
I, Kevin E. Hughes, the undersigned, Assistant Secretary of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety
Company, and St. Paul Fire and Marine Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of the Power of
Attorney executed by said Companies, which remains in full force and effect.
Dated this 10th day of April , 2024
CONK
. tt COliei. O
'ar
Kevin E. Hughes�Assistant Secretary
To verify the authenticity of this Power of Attorney, please call us at 1-800-421-3880.
Please refer to the above -named Attorney -in -Fact and the details of the bond to which this Power of Attorney is attached.