Loading...
HomeMy WebLinkAboutContract 58683-CO2FORT WORTH City of Fort Worth CSC No. 58683-0O2 Change Order Request Project Name:1 Village Creek WRF Digester Mixing, Flare, Dome Improvements Phase 1 City Sec No.: 1 58683 Project No.(s):I 56021/0700430/5740010/001780 I M&C: I 22-1046 City Proj. No.: I 102652 1 Project Description:) Digester mixing, flare, and dome improvements, new digeseter gas dryers, and new hydrogen sulfide scrubbers. Contractor: Eagle Contracting, LLC Change Order# 2 I Date: 4/25/2024 City Project Mgr.l Suzy Abbe I City Inspector: I Nathan Gray Phone Number:) 817-392-8209 1 Phone Number:) 817-991-0629 Dept. Sewer Totals Contract Time (Calender days) Original Contract Amount $39,773,000.00 $39,773,000.00 1,095 Extras to Date $13,120.00 $13,120.00 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $39,786,120.00 $39,786,120.00 1,095 Amount of Proposed Change Order $302,221.00 $302,221.00 0 Revised Contract Amount $40,088,341.00 $40,088,341.00 1,095 Original Funds Available for Change Orders $318,184.00 $318,184.00 Remaining Funds Available for this CO $305,064.00 $305,064.00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.79% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) 1$49,716,250.00 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No. 2 will provide an additional cleanout in a 14-inch digested sludge line to allow bi-directional cleaning of the line, the inclusion of a layer of asphalt in the annular seals for Digesters 1 through 8 for a longer lasting and robust gas seal, adjustments to the chiller concrete pad and piping, bracket and additional concrete repairs for Digesters 7 and 8, and lead remediation for Digester 8 to remove previously unknown lead material that was encountered during construction. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Contractor Name Contractor Signature.;;.,_ Date. . Eagle Contracting, LLC Victor Dorantes vicwmranles Apr 30, 2024 Inspector Director (Water Dept) Senior Assistant City Attorney iff Date ,Projftct Manager Da Apr30,2024 Apr30,2024 Date Construction Supervisor (Water Dept) Date Apr 30, 2024 --- Apr 30, 2024 Date Assistant City Manager Date May 1, 2024 May 1, 2024 ' Council Action (If Required) M&C Number 24-0355 M&C Date Approved 4/23/2024 FORT WORTH City of Fort Worth Change Order Additions Project Name Village Creek WRF Digester Mixing, Flare, Dome Improvements Phase 1 City Sec No.: 58683 Project No.(s): 56021/0700430/5740010/001780 1 DOE No.1 22-104q City Proj. No.: 102652 DProject I Digester mixing, flare, and dome improvements, new digeseter gas dryers, and new hydrogen sulfide scrubbers. escription Contractor Eagle Contracting, LLC I Change Order: 0 Date: 1 4/25/2024 City Project Mgr. Suzy Abbe City Inspector I Nathan Gray ADDITIONS I I tM ' DES( RIP I ION DEPT Qty Unit Unit Cost Total 27 CMR-13 - additional cleanout in 14" DS pipe Sewer 1.00 LS $5,661.00 $5,661.00 28 CMR-15 - asphalt for annular seal Sewer 1.00 LS $174,124.00 $174,124.00 29 CMR-17 - chiller pad and piping redesign Sewer 1.00 LS $14,957.00 $14,957.00 30 CMR-19 - Digester 7 and 8 bracket repair and additional concrete repair Sewer 1.00 LS $33,881.00 $33,881.00 31 CMR-20 - Digester 8 lead abatement Sewer 1.00 LS $73,598.00 $73,598.00 Sewer $302, 221.00 Page 1 of 1 lAdditions Sub Total $302,221.00 FORT «On-rki City of Fort Worth Change Order Deletions Project Name I Village Creek WRF Digester Mixing, Flare, Dome Improvements Phase 1 City Sec No.: I 58683 Project No.(s): I 56021/0700430/5740010/001780 I DOE No. I 22-10� City Proj. No.: I 102652 Project Description I Digester mixing, flare, and dome improvements, new digeseter gas dryers, and new hydrogen sulfide scrubbers. I Contractor I Eagle Contracting, LLC I Change Order: F2—] Date I 4/25/2024 City Project Mgr. I Suzy Abbe City Inspector: I Nathan Gray DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total (Sewer Page 1 of 1 IDeletions Sub Total MWWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00 Page 1 of 1 4/25/2024 CPN 102652 Digester Mixing, Flare, Dome Improvements Phase 1 Change Order 2 Notes • The plans include a clean -out in the 14" DS line that allow cleaning the line in one direction. This change order provides for an additional clean -out on 14" DS line to allow cleanout in both directions (CMR-13). • The plans call for removal and replacement of the existing annular seals on Digesters 1-8 with 24" oakum, backer rod, and sealant. Oakum expands and contracts, and there was concern that 24" of oakum would expand and push out the backer rod and sealant. This change order replaces approximately 15" of oakum with asphalt. The asphalt will hold the oakum in place and will also serve as a sealant (CMR-15). The proposed seal is similar to the existing annular seals in the digesters. • Additional labor, materials and equipment for the redesign of the chiller pads and associated drain pipe and service water pipe (CMR-17). The redesign was necessary because manufacturer's shop drawings were for a system with a larger footprint and different configuration than they gave the consultant during design. • Additional labor and materials for the repair of brackets connecting the digester dome to the concrete for Digesters 7 and 8. The repairs include replacing brackets and repairing cracked concrete around the anchors. The repairs are needed prior to the installation of the annular seal (CMR-19). • Lead remediation for Digester No. 8 (CMR-20). Lead remediation will include complete removal and disposal of lead paint on Digester No. 8. Labor hours, material costs, and quantities in the contractors' proposal were reviewed. Approved CMR's are saved in BIM 360. A summary of negotiations is provided in the table below. Additional contract time for CMR-13, 17, and 19 is not provided because the work is not on a critical path. Additional contract time for CMR-15 and 20 will be addressed in separate change order. CMR Days CMR-13 0 CMR-15' TBD CMR-17 0 CMR-19" 0 CMR-20"' TBD Total Original Proposal $ 5,661.00 $ 208,822.00 $ 25,002.00 $ 74,492.00 $ 73,598.00 $ 387,575.00 $ 13,671.00 COF Counter $ 5,661.00 $ 8,010.00 Approved Price $ 5,661.00 $ 174,124.00 $ 14,957.00 $ 33,881.00 $ 73,598.00 $ 302,221.00 The City checked the proposed asphalt quantity and found it to exceed what was necessary for the project. The contractor reviewed and reduced the proposed quantity. "Additional compensation for delays and work that was covered by bid items in the contract were removed from the proposed price. "' quotes were obtained from two remediation companies. The quotes were comparable. The contractor selected the company with the slightly lower price and shorter schedule. City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, April 23, 2024 REFERENCE NO.: **M&C 24-0355 LOG NAME: 60VCWRF DIGESTER MIXING -FLARE -DOME IMPROVP1CO2-EAGLE SUBJECT: (CD 5) Authorize Execution of Change Order No. 2 in the Amount of $302,221.00 to a Contract with Eagle Contracting, LLC., for the Village Creek Water Reclamation Facility Digester Improvements Project and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2024-2028 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of Change Order No. 2 in an amount of $302,221.00 to City Secretary Contract No. 58683 with Eagle Contracting, LLC. for the Village Creek Water Reclamation Facility Digester Improvements project (City Project No. 102652) for a revised contract amount of $40,088,341.00; 2. Adopt the attached appropriation ordinance adjusting appropriations in the W&S Rev Bonds Series 2023 Fund by increasing appropriations in the Village Creek Water Reclamation Facility Digester Improvements project (City Project No. 102652) in the amount of $302,221.00 and decreasing appropriations in the W&S Commercial Paper project (City Project No. UCMLPR) by the same amount to effect a portion of Water's Contribution to the Fiscal Years 2024-2028 Capital Improvement Program. DISCUSSION: On December 13, 2022, Mayor and Council Communication (M&C) 22-1046, the City Council authorized a contract with Eagle Contracting, LLC. for construction of the Village Creek Water Reclamation (VCWRF) Facility Digester Improvements Phase 1 project for an amount of $39,773,000.00. The contract was subsequently revised by Change Order No.1 with a total amount of $13,120.00 administratively authorized November 29, 2023 to provide for adjustments to piping and concrete pads due to utility conflicts, replacement of door hardware in a control building with panic hardware, changes to pressure sensing piping at the proposed flares to reduce pressure swings at the digesters, and replacing asphalt paving with concrete paving. Change Order No. 2 will provide an additional cleanout in a 14-inch digested sludge line to allow bi- directional cleaning of the line, the inclusion of a layer of asphalt in the annular seals for Digesters 1 through 8 for a longer lasting and robust gas seal, adjustments to the chiller concrete pad and piping, bracket and additional concrete repairs for Digesters 7 and 8, and lead remediation for Digester 8 to remove previously unknown lead material that was encountered during construction. It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year (FY), instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will amend the City of Fort Worth's Fiscal Year 2024-2028 Capital Improvement Program as follows: 60VCWRF DIGESTER MIXING -FLARE -DOME IMPROVP1CO2-EAGLE Capital Revised Fund y Project FY2024 CIP Authority Budget Change Name Appropriations (Increase/Decrease024 Name ) FY2FY2 Budget 56021 102652 - $0.00 This M&C $302,221.00 $302,221.00 — W&S Digester Rev Improvements Bonds Series 2023 Funding is currently available in the Commercial Paper project within the W&S Rev Bond Series 2023 Fund for the purpose of funding the VCWRF Digester Improvements project. Funding for the VCWRF Facility Digester Improvements project is depicted below: FUND Existing Additional project Total* Appropriations Appropriations W&S Rev Bonds Series 2021 - $1,020,150.00 $0.00 $1,020,150.00 Fund 56019 W&S Rev Bonds Series 2022 - $2,218,432.00 $0.00 $2,218,432.00 Fund 56020 W&S Rev Bonds Series 2023 - $25,000,000.00 $302,221.00 $25,302,221.00 Fund 56021 Water/Sewer Gas Lease Cap $16,763,858.00 $0.00 $16,763,858.00 Proj — Fund 53004 W&S Capital Projects — Fund $4,122,829.54 $0.00 $4,122,829.54 56002 Sewer Capital Legacy— Fund $1,284,942.08 $0.00 $1,284,942.08 59607 Project Total � $50,410,211.62 � $302,221.00 �$50,712,432.62 *Numbers rounded for presentation purposes. Business Equity —A waiver of the goal for Business Equity subcontracting requirements was requested, and approved by the DVIN, in accordance with the applicable Ordinance, because the purchase of goods or services is from sources where subcontracting or supplier opportunities are negligible. The project is located in COUNCIL DISTRICT 5. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Commercial Paper project within the W&S Rev Bonds Series 2023 Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Rev Bonds Series 2023 Fund for the Digester Improvements project to support the approval of the above recommendations and execution of the contract. Prior to an expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs): TO Fund Department Account Project ProgramActivity Budget Reference # Amount 11 ID Year (Chartfield 2) FROM Fund Department Account) Project Program ctivityl Budget Reference # Amount ID ID Year (Chartfield 2) CERTIFICATIONS: Submitted for Citv Manager's Office by: Fernando Costa (6122) Originating Department Head: Chris Harder (5020) Additional Information Contact: Suzanne Abbe (4970) ATTACHMENTS 1. 60VCWRF DIGESTER MIXING -FLARE -DOME IMPROVP1CO2- EAGLE FID Table rev (WCF 04.01.24).xlsx (CFW Internal) 2. 60VCWRF DIGESTER MIXING -FLARE -DOME IMPROVP1CO2- EAGLE Form 1295.pdf (CFW Internal) 3. 60VCWRF DIGESTER MIXING -FLARE -DOME IMPROVP1CO2- EAGLE MAP.pdf (Public) 4. 60VCWRF DIGESTER MIXING -FLARE -DOME IMPROVP1CO2- EAGLE MWBE Waiver.pdf (CFW Internal) 5. 60VCWRF DIGESTER MIXING -FLARE -DOME IMPR0VP1CO2-EAGLE.docx (CFW Internal) 6. Entitvinformation Eagle.pdf (CFW Internal) 7. ORD.APP 60VCWRF DIGESTER MIXING -FLARE -DOME IMPR0VP1CO2- EAGLE 56021A024(r2)_(1).docx (Public) 8. PBS CPN 102652.pdf (CFW Internal) 60VCWRF DIGESTER MIXING -FLARE -DOME IMPROVP1CO2- EAGLE FID Table 5 56021 0700430 4905151 102652 2024 $302,221.00 5 56021 0600430 UCMLPR 2024 ($302,221.00) 5 56021 0700430 102652 2024 $302,221.00 5 56021 0600430 4905151 UCMLPR UNSPEC 9999 $302,221.00 5 56021 0700430 4905151 102652 001780 9999 ($302,221.00) 2 56021 0700430 5740010 102652 001780 VNIM $302,221.00 To pay contractor Contract Compliance Manaeer By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Suzanne Abbe Name of Employee Senior Engineer, Capital Project Delivery Title 4,0-p4Up4�� �oo� FORt�o�� ATTEST: o C� dda� nEaAS�pp Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX