HomeMy WebLinkAboutContract 60914-CO1CSC No. 60914-COI
Fc>RT W40RTtt
City of Fort Worth
Change Order Request
Project Name:) Emergency Response - Sewer Main Rapair South of Rosedale Street
City Sec No.: 60914
Project No.(s):l NIA
I DOE No. I N/A
City Proj. No.: NIA
Project Description:I Sewer Main Rapair South of Rosedale Street
Contractor: William J. Schultz, Inc, dba Circle C Construction Co. I Change Order # I
1 Date: I 4/3012024
City Project Mgr.1 Tony Sholola
City Inspector:
John Robinson
Phone Number. 817.392-6055
Phone Number:
817-392-8452
Dept.
Sewer
Totals Contract Time
lCalender days)
Original Contract Amount
$2,000,000.00
$2,000,000.00 IJIA
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
$2,000,000.00
$2000,000.00
$i2,215.21
`Amount of Proposed Change Order
2,982,215.21
$4,982,215.21
Revised Contract Amount
,982,215.21
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
$2,982,215.21
$2,982,215.21
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
This Change Order authorized by the attached memorandum of April 24, 2024 which supplements the
February 1, 2024 emergency memorandum resulting in City Secretary Contract No. 60914 with William J.
Schultz, Inc. dba Circle C Construction Co, for emergency services to repair the sanitary sewer main south
of Rosedale Street.
The change order will provide additional funding for increased work scope as described in the attached
supplement memorandum ated April 28, 2024.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising
out of, or incidental to, the above Change Order.
Contractor's Company Name I
Contractor Name
I contractor Signature
I Date
fWiliam J. Schuh, ice. dba Oda c conswction co.
Teri Skelly
X.
Inspector
Date
Protect Ma`fflier (
����
D to
14 3� Zy
Director (Water Dept)
Date
Consbuttfon Supervisor (Water Deptl-
Date
1,11v1,11111111 1„
T� S, May 1, 2024
'�
Assistant, City Attomey
Date
Assistant City Manager
Date
x.,.
May 1 Zo
r
May 1, 2024
I
Council Action or
Required)
M&C Number NIA
M&C Date Approved NIA
'
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT Wn>E rm City of Fort Worth
Change Order Additions
Project Name I Emergency Response - Sewer Main Rapair South of Rosedale Street I City Sec No.: 60914
Project No.(s): NIA I DOE No.1 N/A City Proj, No.: NIA
Project I Sewer Main Rapair South of Rosedale Street
Description
Contractor I William J. Schultz, Inc. dba Circle C Construction Co. Change Order: Date: 1 4/30/2024
City Project Mgr. 1 Tony Sholola City Inspector I John Robinson
ADDITIONS
I I tM UhbUKIF I IUN DEPT Qty Unit Unit Cost I Total
2 Additional Work Scope Sewer 1.00 LS $2,982,215.21 $2,982,215.21
Page 1 of 1
I I
Sewer $2,982,215.21
Additions Sub Total $2,982,215.21
FO RT WO R-ir City of Fort Worth
Change Order Deletions
Project Name I Emergency Response - SaworMainRepairSouthofRosedaleStreet City Sec No.: 60914
Project No.(s): I N/A DOE No. I N/A I City Proj. No.: N/A
Project Description I Sewer Main Rapair South of Rosedale Street
Contractor William J. Schultz, Inc, dba Circle C Construction Co. Change Order: Date I 4/30/2024
City Project Mgr. I Tony Sholola City Inspector: I John Robinson
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
Sewer
Page 1 of 1 Deletions Sub Total
M/WBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
Co # DATE AMOUNT
Total $0.00
Page 1 of 1
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
TVA4 di)/o
J
Signature
Tony Sholola
Name of Employee
Assistant Water Director
Title
ATTEST:
V `b -&1 -
Jannette Goodall
City Secretary
gVon I.
4ovovp��
ago =o
�o
OpP�*000 oo*�
�a� rEXA`�o4p
�bnnaaa4
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
INTEROFFICE MEMO
Date: April 24, 2024
To: Fernando Costa, Assistant City Manager
From: Chris Harder, P.E., Water Director
Via: Doug Black, Senior Assistant City Attorney
Jo Ann Gunn, Chief Procurement Officer
Subject: SUPPLEMENT TO 02/01/2024 MEMORANDUM / CITY SECRETARY
CONTRACT NO. 60914
This memo is submitted to request authorization for additional funding for emergency services
outlined below, at increased cost of $2,982,215.21.
On January 28, 2024 Water Field Operations became aware of a sanitary sewer overflow that Wass
discharging 200 gpm into Lake Arlington. Upon further investigation a break was discovered on
the City's 54-inch sewer main (M-503) south of Rosedale Street which caused up -stream sewer
backup, resulting in overflow at the discharge point in the vicinity of the 3000 block of Quail
Street. The segment of the pipe crossing Rosedale Street was also discovered to be deteriorated
and blocked with debris further exacerbating the situation. Water Department Field Operation
crews are not equipped to handle an emergency of this nature. Under the February 01, 2024
Emergency Authorization (copy attached), the Water Department engaged William J Schultz,
Inc. d/b/a Circle C Construction Company ("Circle C") to conduct the necessary work to
replace the sewer main.
The emergency work was estimated to be $2,000,000,00,
The original plan provided for the existing sewer tunnel to be rehabilitated and put back into
service. However, it was determined that the tunnel is to severely deteriorated to be rehabilitated
and must be abandoned and removed from service. It is therefore necessary to install a new tunnel
across Rosedale Street which necessitates a tunnel liner plate, additional 54-inch sewer pipe, 6-ft
diameter manholes and additional by-pass pumping. This memorandum provides additional
construction costs in the amount of $2,982,215.21 for the additional work to be performed on the
emergency.
A confirming M&C will be circulated to ratify the contract after the work has been performed.
With the supplement the revised contract amount is $4,982,215.21.
SUPPLEMENT TO EMERGENCY SEWER MAIN (M-503) SOUTH OF ROSEDALE STREET
Page 1 of 2
APPROVED FOR EMERGENCY PROCUREMENT:
Recommended:
Approved as to form and Legality:
Approve:
Approve:
C�if^r�rc'v�2e� N��7e�
ChristopherHarberIApr25.2024 06:50 CDT,
Chris Harder, P.E., Director, Water Department
Douy,las Black IApr 26, 2024 08:50 CDT)
Douglas W. Black, Sr. Assistant City Attorney
Jo GunrKApr 5, 2024 08:47 CDT)
Jo Ann Gunn, Chief Procurement Officer
Y"- f--
Fernando Costa, Assistant City Manager
SUPPLEMENT TO EMERGENCY SEWER MAIN (M-503) SOUTH OF ROSEDALE STREET OFFICIAL RECORD
Page 2 of 2 CITY SECRETARY
FT. WORTH, TX
IN'Y'EROFFICE MEMO
Date: February 1, 2024
To: Fernando Costa, Assistant City Manager
From: Chris Harder, P.E., Water Director
Via: Doug Black, Senior Assistant City Attorney
Jo Ann Gunn, Chief Procurement Officer
Subject: SANITARY SEWER OVERFLOW IN THE VICINITY OF 3000 QUAIL
STREET: EMERGENCY SEWER MAIN REPAIR SOUTH OF ROSEDALE
STREET
On January 28, 2024 Water Field Operations became aware of a sanitary sewer overflow that is
discharging 200 gpm into Lake Arlington. Upon further investigation a break was discovered on
the City's 54-inch sewer main (M-503) south of Rosedale Street which caused up -stream sewer
backup, resulting in overflow at the discharge point in the vicinity of the 3000 block of Quail
Street. The segment of the pipe crossing Rosedale Sheet was also discovered to be deteriorated
and blocked with debris further exacerbating the situation.
This memo is submitted to inform the CMO that, pursuant to the emergency authority found in
City Code Chapter 2, Article I, Section 2-9 of the City's Code of Ordinances, the Water
Department will be engaging William J Schultz, Inc. d/b/a Circle C Construction Company to
conduct necessary by-pass pumping to allow for the replacement of the broken pipe segment (s).
This contract will be in an amount up to $2,000,000 and work will be billed against it on a task
order basis.
Waiting to bid and award a contract to perform this work is not the best interest of the health and
safety of the City of Fort Worth. In addition to the citations, above, Section 252.022 of the Local
Government Code exempts from normal bidding requirements expenditures that are necessary to
preserve or protect public health or safety of the municipality's residents and procurements
necessary because of unforeseen damage to public machinery, equipment, or property.
A confirming M&C will be circulated to ratify the contract after the work has been performed.
EMERGENCY SEWER REPAIR SOUTH Or ROSEDALE STREET
Page I of 2
APPROVED FOR EMERGENCY PROCUREMENT:
�f �c tf�
Recommended enris�oPnenm trw i,m
Chris Harder, P.E., Director, Water Department
QWC
Approved as to form and Legality: DOI' AIf-1,zWiI'V,C'Ai
Douglas W. Black, Sr. Assistant City Attorney
Approve: u —�1.»,uiresn
Approve:
Jo Ann Gunn, Chief Procurement Officer
7�_
Fernando Costa, Assistant City Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
EMERGENCY SEWER REPAIR SOUTI4 OF ROSEDALE STREET
Page 2 0r2
I Fr-1 At 1 -7
:'A
16t
;FLUSMOMAIN460 FTFROM 112+73
v
I CAMERA CANT PASS 376 FF DUE TO
tilt c•{HEAVYDEMSAND BOTTOM OFPIPEMISSING
7.
fit
M603•DOWISOME%WERE
WEEN ROSEDALE & 1230
tip
A
. t.
I # At
All
-Z
Vol
M @ 200 (;P;Tl