Loading...
HomeMy WebLinkAboutContract 60021-A1CSCO No. 60021-Al TRANSPORTATION IMPACT FEE CREDIT AGREEMENT AMENDMENT AMENDMENT NO.1 TO CITY SECRETARY CONTRACT NO.60021 WHEREAS, the City of Fort Worth ("City") and a Texas home rule municipal corporation, and Bloomfield Homes, LP, a Texas corporation authorizes to do business in Texas ("Owner") made and entered into a Transportation Impact Fee Credit Agreement, City Secretary Contract No. 60021 (the "Agreement"); and WHEREAS, the Owner has dedicated 62,120 square feet of right-of-way for Cleburne Crowley Road with FP-21-091, recorded as Instrument D222238061, 09/29/2022; and WHEREAS, the Owner has received approval for construction plan IPRC20-0162 And executed Community Facilities Agreement CFA21-0040, and obtained final acceptance by the City of Cleburne Crowley Road, City Project Number 103141, on May 18, 2021; and WHEREAS, it has become necessary to execute this Amendment No. 1 to said Agreement to incorporate additional credits by amending Exhibit 'B" with the Exhibit 'B-1", and to replace Exhibit "C" with the Exhibit "C-1", Exhibit 'D" with the Exhibit 'D-1", Exhibit "E" with Exhibit 'E-1" Exhibit "F" with the Exhibit "7-1'; NOW, THEREFORE, for and in consideration of the mutual agreements, covenants, and conditions contained herein, and other good and valuable consideration, the City and the Owner hereby covenant and agree as follows: 1. Recitals. The recitals contained in this Agreement are true and correct as of the Effective Date and form the basis upon which the Parties negotiated and entered into this Agreement. 2. Exhibits "B", "C", "D", "E", and "F" to the Agreement shall be replaced with Exhibits 64B-166, 64C-1", D-1", "E-1", and F-1" respectively, attached hereto and incorporated herein by this reference. 3. All other provisions of Agreement which are not expressly amended herein shall remain in full force and effect. (Remainder of Page Intentionally Left Blank) OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Transportation Impact Fee Credit Agreement - CA-22-008-A 1 Page 1 of 12 Amendment Hulen Trails Phase 2 04/23/2024 IN WITNESS WHEREOF, the undersigned parties have executed this Agreement to be effective as of the date subscribed by the City's Assistant City Manager. CITY OF FORT WORTH, TEXAS bana Ewah Olq Dana Burghdoff (MayY202411f4`/ CDT) Dana Burghdoff Assistant City Manager Date: May 3, 2024 Recommended By: Dalton Harrell Pay 1, 2024 08:51 CDT) DJ Harrell Director, Development Services Approved as to Form and Legality: 4)� Douglas Black (May 3, 2024 09:03 CDT) Douglas Black Assistant City Attorney M&C: None required Form 1295: None required ATTEST: FORT Uy o aF o a p00000,,o�YOy !.g t dVS °=d A OaQ*'�o o^ •d ad4pd�XoS,00- Jannette Goodall City Secretary Transportation Impact Fee Credit Agreement - CA-22-008-A 1 Amending Hulen Trails Phase 2 OWNER Bloomfield Homes, L.P. a Corporation Y1^ \A — Donald J Dykstra (Apr 26, 202410:20 CDT) Donald J. Dykstra President City Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Tanya oyd (Apr 0 :9 07 CDT) Tanya M. Boyce Planning Manager Development Services Department OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 2 of 12 04/23/2024 EXHIBIT LIST "B-1" Map of Property "C-I" Development Plan "D-1" Eligible Transportation Improvements "E-l" Additional Credits Against Transportation Impact Fees "F-1" Allocation of Credits Transportation Impact Fee Credit Agreement - CA-22-008-A 1 Page 3 of 12 Amending Hulen Trails Phase 2 04/23/2024 EXHIBIT B-1 Map of Property I VICINITY MAP, Transportation Impact Fee Credit Agreement - CA-22-008-A 1 Page 4 of 12 Amending Hulen Trails Phase 2 04/23/2024 EXHIBIT C-1 Development Plan: Hulen Trails, PP-18-054 KIT i� 0 Soo, 39 30*N BR91' _ Transportation Impact Fee Credit Agreement - CA-22-008-A 1 Page 5 of 12 Amending Hulen Trails Phase 2 04/23/2024 EXHIBIT D-1 Transportation Improvements >- Ewa s: LU • a 3 g EXHIBIT D-1 = �^JN^-1 r GREYBERR Hulen Trails Phase 2 N f E YY p *Eligible for Credit Against s LYRE L Transportation Impact Fees rt f Right -of -Way SNA Dedication & Construction �►ll1f• IL y� tIj BMWORTH Z W"ALIk cQi ;1= W N " Q0 y 4k; PENTRIDGE m LU , m - - RIDGEHURST Q ' ' • CHITAL _. _ w CLEBURNEw@0 Lu I?yy04ZOW M` uiFgLLS HITCHING POST W V ` WATER LILY = to o ' MISTY SHADOWS _ MEADOW VISTA 2 BLUIE MIST N Z COPPER POINT BRENTFIELD g NORCROSS CLEBURNE CROWLEYr r Eligible Improvements limits Cleburne Crowley ROW Dedication (FP-21-091) Cleburne Crowley ROW Construction (CPN 103141) 6 - IL � Transportation Impact Fee Credit Agreement - CA-22-008-A 1 Page 6 of 12 Amending Hulen Trails Phase 2 04/23/2024 EXHIBIT E-1 Additional Credits Against Transportation Impact Fees Hule n Trails Phase 2 Transportation Impact Fee Credit Overview Value of ROW Dedication Ins trume nt # Final Plat # Eligible Arterial Value D222238061 FP-21-091 Cleburne Crowley Rd $208,723.20 TOTAL ROW TRANSPORTATION IMPACT FEE CREDIT $208,723.20 Value of Community Facilities Agreement Construction City Secretary # CFA/CPN # Eligible Arterial(s) Value 55738 CFA21-0040 Cleburne Crowley Rd CPN103141 $648,503.18 Engineering, Surveying and Material Testing = 20% of eligible construction costs $127,594.74 TOTAL COMMUNITY FACILITIES AGREEMENT CREDIT $776,097.92 TOTAL TRANSPORTATION IMPACT FEE CREDIT ADDED BYTHE AMENDMENT $984,821.12 Transportation Impact Fee Credit Agreement - CA-22-008-A 1 Page 7 of 12 Amending Hulen Trails Phase 2 04/23/2024 Right -of -Way Valuation for HulenTrails, Phase 2 Valuation Method 1- Percentage of TIP Project Cost EI i gi ble Arterial Cleburne Crowley Rd 2017 Transportation Improvements Plan Project Y-27 Number Esti mated Construction Costs from 2022 $6,134,000 Tra ns portation I mprovements Plan ValueofTotal Project Right-of-Way(20%of $1,226,800 Construction Cost) Tota I Project Length (LF) 4,570 Arterial Cross -Section Width (LF) 80 Additional ROW needed for Roundabout (SF) 0 Total Project Right -of -Way (SF) 365,600 Right -of -Way Value PerSquare Foot $3.36 Valuation Method 2 - Percentage of Construction Project Cost EI i gi ble Arterial Cleburne Crowley Rd City Project Number 103141 Fi na I Construction Costs from Notice of Completion $648,503.18 (Green Sheet) ValueofTotal Project Right-of-Way(20%of $129,701 Construction Cost) Tota I Project Length (LF) 1,553 Arterial Cross -Section Width (LF) 40 Additional ROW needed for Roundabout (SF) 0 Total Project Ri ght-of-Way (SF) 62,120 Right -of -Way Value PerSquare Foot $2.09 Valuation Method 3 - TAD appraised value TAD Va I ue a s of 1/15/2021 TAD Account Tota I Area (SF) Appraised Value Value per Square Foot Right -of -Way Dedication Recording Instrument Number Final Plat Number Recording Date Total area of ROW dedicated (SF) Value per SF Total Credit Available 42654775 4,072,250 $2,239,738.00 $0.56 Cleburne Crowley Rd D222238061 FP-21-091 9/29/2022 62,120 $3.36 $208,723.20 Transportation Impact Fee Credit Agreement - CA-22-008-A 1 Page 8 of 12 Amending Hulen Trails Phase 2 04/23/2024 Paving Item No. Description Unit Eligible Quantity Completed Quantity Unit Price Credit Available 1 REMOVE ASPHALT PVMT SY 3,429 3,429 $7.50 $25,717.50 2 HYDRATED LI ME@ 30 LBS/S. Y. TN 0 509 $170.00 $0.00 (RESIDENTIAL) 3 HYDRATEDLIME@36 LBS/S.Y. TN 84 84 $170.00 $14,212.00 (ARTERIAL) 4 6" LIMETREATED SUBGRADE SY 0 33,954 $2.65 $0.00 (RESIDENTIAL) 5 6" LIMETREATED SUBGRADE SY 4,647 4,647 $2.65 $12,314.55 (ARTERIAL) 6 ASPHALT PVMTTYPE D SY 706 706 $66.00 $46,596.00 7 6" CONCRETE PAVEMENT SY 0 31,764 $35.50 $0.00 (RESIDENTIAL) 8 9" CONCRETE PAVEMENT (ARTERIAL) SY 4,268 4,268 $43.50 $185,658.00 9 5'CONCSIDEWALK SF 0 2,215 $5.75 $0.00 10 R-1 RAMP EA 0 24 $2,050.00 $0.00 11 P-1 RAMP EA 4 12 $1,750.00 $7,000.00 12 4" SLD PVMT MARKI NG HAS (W) LF 58 58 $1.30 $75.40 13 4"SLD PVMT Marking HAS LF 3,599 3,599 $1.30 $4,678.70 14 8"SLD PVMT Marking HAS LF 332 332 $2.75 $913.00 15 24"SLDPVMTMARKINGHAE(W) LF 32 32 $15.95 $510.40 16 Seeding HYDROMULCH SY 0 210 $3.50 $0.00 17 FURNISH/INSTALLALUMSIGN EA 0 28 $250.00 $0.00 GROUND CTYSTD 18 TRAFFICCONTROL LS 1 1 $6,000.00 $6,000.00 19 1O'CONCSIDEWALK SF 14,030 14,030 $5.75 $80,672.50 20 install END OF RAOD BARRICADE EA 0 3 $1,500.00 $0.00 21 CONCRETE HEADER LF 0 87 $10.00 $0.00 22 CONNECTTO Existing PAVEMENT EA 0 2 $500.00 $0.00 23 REMOVE24"STOP BAR EA 0 32 $6.50 $0.00 24 RELOCATE STOP SIGN EA 0 1 $650.00 $0.00 25 RI -I STOPSIGN EA 0 26 $95.00 $0.00 26 ST MARKER BLADE EA 0 112 $27.50 $0.00 27 ASPAHLT PVMTTYPED (ARTERIAL EDGE SY 730 730 $66.00 $48,180.00 TRAN I S I TI O N TO EX. ASPHALT) 28 SAWCUT, REMOVE&REPLACE LF 0 18S $25.00 $0.00 ASPHALT PAVEMENT 29 SAWCUTCLEAN EDGE,ASPHALT LF 1,640 1,640 $10.00 $16,400.00 PAVEMENT Paving Subtotal $ 448,928.05 Transportation Impact Fee Credit Agreement - CA-22-008-A 1 Page 9 of 12 Amending Hulen Trails Phase 2 04/23/2024 Storm Drain Item Eligible Completed No. Description Unit Quantity Quantity Unit Price Credit Available 1 MEDIUM RIPRAP,DRY SY 32 193 $74.28 $2,376.96 2 TRENCH SAFETY LF 0 6,793 $0.27 $0.00 3 CONCRETE COLLAR EA 0 2 $664.80 $0.00 4 21" RCP LF 475 950 $53.46 $25,393.50 5 24" RCP LF 1,691 2,571 $62.33 $105,400.03 6 27" RCP LF 0 1,359 $69.92 $0.00 7 30" RCP LF 0 194 $79.91 $0.00 8 36" RCP LF 0 178 $108.18 $0.00 9 42" RCP LF 0 403 $139.57 $0.00 10 48" RCP LF 0 563 $167.60 $0.00 11 4X2 BOX CULVERT LF 0 128 $177.99 $0.00 12 4X3 BOX CULVERT LF 0 186 $202.05 $0.00 13 4X4 BOX CULVERT LF 0 88 $228.60 $0.00 14 4' STORM JUNCTION BOX EA 2 8 $3,849.96 $7,699.92 15 5' STORM JUNCTION BOX EA 0 3 $5,319.50 $0.00 16 6' STORM JUNCTION BOX EA 1 3 $7,098.11 $7,098.11 17 HEADWALL, BOX CULVERT(CO #2) CY 0 5 $991.36 $0.00 18 21" SET EA 1 2 $2,361.76 $2,361.76 19 36" SET EA 0 2 $3,673.85 $0.00 20 24" SET EA 0 1 $2,624.18 $0.00 21 10' CURB INLET EA 5 13 $4,420.28 $22,101.40 22 15' CURB INLET EA 0 16 $5,609.91 $0.00 23 5X2 BOX CULVERT LF 0 173 $240.57 $0.00 24 4X3 SET I, PIPE EA 0 1 $4,956.78 $0.00 25 4X4SET, I PIPE EA 0 1 $5,306.67 $0.00 26 2-4X2 & 1-24" SET EA 1 2 $12,275.31 $12,275.31 27 5X2 SET, I PIPE EA 0 1 $5,423.30 $0.00 28 3' DROP I NLET EA 1 2 $4,338.64 $4,338.64 Storm Drain Subtotal $ 189,045.63 Transportation Impact Fee Credit Agreement - CA-22-008-A I Page 10 of 12 Amending Hulen Trails Phase 2 04/23/2024 Street Light Improvements Item Description Unit Quantity Eligible UnitPrice Credit Available No. Quantity 1 2" CO NDT PVC SC 40 (T) (CO #4) LF 4544 0 $11.89 $0.00 2 NO 6 INSULATED ELEC CONDR (CO #4) LF 13632 0 $1.15 $0.00 3 NO 6 INSULATED ELEC CONDR (CO #4) EA 30 0 $172.00 $0.00 4 LED LI GHTI NG FIXTURE (R-2) EA 32 6 $282.00 $1,692.00 5 LED LIGHTING FIXTURE (R-4) EA 4 0 $282.00 $0.00 6 RDWYILLUMFOUNDATION TYI,2, EA 30 0 $1,090.00 $0.00 AND 4 (CO #4) 7 RDWYILLUM FOUNDATI ON TY 11 POLE EA 30 0 $1,502.00 $0.00 (CO #4) 8 CHANGE ORDER#4 1 1 $850.00 $8,837.50 Street Lights Subtotal $10,529.50 Pavi ng5ubtotal $448,928.05 Storm Drai n Subtotal $189,045.63 Street Lights Subtotal $10,529.50 CONSTRUCTION SUBTOTAL $648,503.18 Transportation Impact Fee Credit Agreement - CA-22-008-A 1 Page 11 of 12 Amending Hulen Trails Phase 2 04/23/2024 EXHIBIT F-I Allocation of Credits Credit shall be allocated on a first -come, first -served basis within the preliminary plat boundary of Hulen Trails, PP-18-054 Imo• 37me manr / � vvw n. .i rn M�d.ra.v r:.•.'. e{r u . KIP Transportation Impact Fee Credit Agreement - CA-22-008-A 1 Page 12 of 12 Amending Hulen Trails Phase 2 04/23/2024