Loading...
HomeMy WebLinkAboutContract 61369Received Date: 5/6/2024 Received Time: 7:47 a.m. Developer and Project Information Cover Sheet: Developer Company Name Address, State, Zip Code: Phone & Email: Authorized Signatory, Title: Project Name: Brief Description: Project Location: Plat Case Number: Mapsco: CFA Number: 117E&J 24-0041 D.R. Horton — Texas, Ltd. 6751 North Freeway, Fort Worth TX 76131 (817) 230- 0800; ibosworth(&drhorton.com Justin Bosworth, Assistant Secretary Longhorn Estates — Phase 1 Water, sewer, paving, drainage, and streetlight South of W Cleburne Crowley & S Hulen St. intersection Plat Name: Longhorn Estate Council District: 16 City Project Number: 1105087 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Page 1 of 18 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 City Secretary Number: 61369 STANDARD COMMUNITY FACILITIES AGREEMENT WITH CITY PARTICIPATION This COMMUNITY FACILITIES AGREEMENT ("Agreement") is made and entered into by and between the City of Fort Worth ("City"), a home -rule municipal corporation of the State of Texas, acting by and through its duly authorized Assistant City Manager, and D.R. Horton — Texas, Ltd. ("Developer"), acting by and through its duly authorized representative. City and Developer are referred to herein individually as a "party" and collectively as the "parties." WHEREAS, Developer is constructing private improvements or subdividing land within the corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as Longhorn Estates —Phase 1 ("Project"); and WHEREAS, the City desires to ensure that all developments are adequately served by public infrastructure and that the public infrastructure is constructed according to City standards; and WHEREAS, as a condition of approval of the Project, Developer is required to bear a portion of the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as described in this Agreement ("Community Facilities" or "Improvements"); and WHEREAS, as a condition of approval of the Project, Developer is required to meet the additional obligations contained in this Agreement, and Developer may be required to make dedications of land, pay fees or construction costs, or meet other obligations that are not a part of this Agreement; and WHEREAS, the City desires to participate in this Agreement in an amount not to exceed $1,286,022.69 to enlarge the scope of the Improvements beyond what Developer is responsible for constructing by oversizing an 8-inch water main to a 24-inch water main as authorized by City Council through approval of M&C 24-0224 on March 19, 2024 ("City Participation"); and WHEREAS, the City Participation includes reimbursement to Developer in amounts not to exceed $1,249,149.69 for construction costs and $24,982.99 for material testing costs. The remaining City Participation in the amount of $11,890.00 shall not be paid to Developer, but will be used by City to pay for the City's portion of construction inspection service fees and administrative material testing fees; and WHEREAS, the Developer and the City desire to enter into this Agreement in connection with the collective Improvements for the Project; NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Page 2 of 18 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 1. CFA Ordinance The Community Facilities Agreements Ordinance ("CFA Ordinance"), as amended, is incorporated into this Agreement by reference, as if it was fully set forth herein. Developer agrees to comply with all provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in connection with the work performed by the contractors. If a conflict exist between the terms and conditions of this Agreement and the CFA Ordinance, the CFA Ordinance shall control. 2. Incorporation of Engineering Plans The engineering plans for the Improvements that have been approved by the City ("Engineering Plans") are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the Improvements required by this Agreement. 3. Description of Improvements; Exhibits and Attachments The following exhibits describe the general location, nature and extent of the Improvements that are the subject of this Agreement and are attached hereto and incorporated herein by reference: ❑X Exhibit A: Water ® Exhibit Al: Sewer ® Exhibit B: Paving ❑X Exhibit B 1: Storm Drain ® Exhibit C: Street Lights & Signs ❑ Exhibit Cl: Traffic Signal & Striping The Location Map and Cost Estimates are also attached hereto and incorporated herein by reference. To the extent that Exhibits A, Al, B, 131, C, Cl, the Location Map, or the Cost Estimates conflict with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1 — Changes to Standard Community Facilities Agreement, Attachment 2 — Phased CFA Provisions, and Attachment 3 — Concurrent CFA Provisions, are attached hereto and incorporated herein for all purposes. 4. Construction of Improvements Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the Improvements, and this Agreement. Developer acknowledges that City will not accept the Improvements until the City receives affidavits and lien releases signed by Developer's contractors verifying that the contractors, and all subcontractors and material suppliers, have been paid in full for constructing the Improvements, and consent of the surety on payment and performance bonds provided for the Improvements. If the Developer's contractors: (a) are not constructing the Improvements in accordance City of Fort Worth, Texas Page 3 of 18 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 with the Engineering Plans; (b) the contractors violate federal law, state law or local law, policies, rules or regulations in connection with the construction of the Improvements; or (c) coordination of the timing of the construction of adjacent utilities is necessary to avoid having to remove and replace Improvements that Developer's contractors are about to install, the City may temporarily suspend the construction of the Improvements by delivering a written notice to Developer and Developer's contractors. The temporary suspension of the construction of the Improvements shall only occur for the amount of time necessary for Developer's contractors to correct the violation or for the coordination of the utilities to be completed, and upon any such suspension, City agrees to reimburse Developer for the City's share of construction costs for work properly completed through the date City suspended construction. 5. Financial Guarantee Developer has provided the City with a financial guarantee in the form and amounts set forth in this Agreement which guarantees the construction of the Improvements and payment by Developer of all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee"). Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the CFA Ordinance. 6. Completion Deadline; Extension Periods This Agreement shall be effective on the date this Agreement is executed by the City's Assistant City Manager ("Effective Date"). Developer shall complete construction of the Improvements and obtain the City's acceptance of the Improvements within two (2) years of the Effective Date ("Term"). If construction of the Improvements has started during the Term, the Developer may request that this Agreement be extended for an additional period of time ("Extension Period"). All Extension Periods shall be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement. In no event shall the Term of this Agreement plus any Extension Periods be for more than three years. 7. Failure to Construct the Improvements (a) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements if at the end of the Term, and any Extension Periods, the Improvements have not been completed and accepted by the City. If the Improvements are not completed at the end of the Term, and any Extension Periods, there will be no further obligation for City Participation to be paid to the Developer. (b) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of the Improvements before the expiration of the Term, and any Extension Period, if the Developer breaches this Agreement, becomes insolvent, or fails to pay costs of construction. (c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers are not paid for construction costs or materials supplied for the Improvements the contractors and suppliers may place a lien upon any property which the City does not have an ownership interest that is the subject of the Completion Agreement. City of Fort Worth, Texas Page 4 of 18 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 (d) Nothing contained herein is intended to limit the Developer's obligations under the CFA Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's contractors, or other related agreements. 8. Termination If Developer desires to terminate this Agreement before Developer's contractors begin constructing the Improvements, Developer agrees to the following: (a) that Developer and City must execute a termination of this Agreement in writing; (b) that Developer will vacate any final plats that have been filed with the county where the Project is located; and (c) to pay to the City all costs incurred by the City in connection with this Agreement, including time spent by the City's inspectors at preconstruction meetings. 9. Award of Construction Contracts (a) Developer will award all contracts for the construction of the Improvements and cause the Improvements to be constructed in accordance with the CFA Ordinance. (b) Developer will employ construction contractors who meet the requirements of the City to construct the Improvements including, but not limited, to being prequalified, insured, licensed and bonded to construct the Improvements in the City. (c) Developer will require Developer's contractors to provide the City with payment and performance bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent (100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and performance bonds shall guarantee construction of the Improvements and payment of all subcontractors and material suppliers. Developer agrees to require Developer's contractors to provide the City with a maintenance bond naming the City as an obligee, in the amount of one hundred percent (100%) of the cost of the Improvements, that guarantees correction of defects in materials and workmanship for the Improvements by the contractor and surety for a period of two (2) years after completion and final acceptance of the Improvements by the City. All bonds must be provided to the City before construction begins and must meet the requirements of the City's Standard Conditions, Chapter 2253 of the Texas Government Code, and the Texas Insurance Code. (d) Developer will require Developer's contractors to provide the City with insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City must be named as an additional insured on all insurance policies. The Developer must provide the City with a Certificate of Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's insurance provider, which shall be made a part of the Project Manual. (e) Developer will require the Developer's contractors to give forty-eight (48) hours' advance notice of their intent to commence construction of the Improvements to the City's Construction Services Division so that City inspection personnel will be available. Developer will require Developer's City of Fort Worth, Texas Page 5 of 18 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 contractors to allow construction of the Improvements to be subject to inspection at any and all times by the City's inspectors. Developer will require Developer's contractors to not install or relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives consent to proceed, and to allow such laboratory tests as may be required by the City. (f) Developer will not allow Developer's contractors to begin construction of the Improvements until a notice to proceed to construction is issued by the City. (g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and service lines have been completed to the satisfaction of the City. (h) Developer shall ensure the contractors are paid the City's wage rates in effect during construction of the Improvements. 10. Utilities Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project; and (2) to construct the Improvements required herein. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the Improvements to be constructed pursuant to this Agreement. 11. Easements and Rights -of -Way Developer agrees to provide, at its expense, all necessary rights -of -way and easements required for the construction and dedication to the City of the Improvements provided for by this Agreement. 12. Liability and Indemnification (a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT. (b) THE DEVELOPER COVENANTS AND AGREES TO, AND BY THESE PRESENTS DOES HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM ALL SUITS, ACTIONS OR CLAIMS OF ANY CHARACTER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ONACCOUNT OFANYINJURIES OR DAMAGES SUSTAINED BYANYPERSONS, INCLUDING DEATH, OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE CONSTRUCTION, DESIGN, PERFORMANCE OR COMPLETION OF ANY WORK TO BE PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO PROPERLY SAFEGUARD THE WORK, OR ONACCOUNT OF ANYACT, INTENTIONAL OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS CONTRACTORS, SUB -CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE City of Fort Worth, Texas Page 6 of 18 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. (c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY, INCLUDING DEATH, RESULTING FROM, OR INANY WAY CONNECTED WITH, THE CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY FOR ANY LOSSES, DAMAGES, COSTS OR EXPENSES SUFFERED BY THE CITY OR CAUSED AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE MANNER, FREE FROM DEFECTS, IN CONFORMANCE WITH THE CFA ORDINANCE, AND IN ACCORDANCE WITH ALL PLANS AND SPECIFICATIONS. 13. Right to Enforce Contracts Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its contractors, along with an assignment of all warranties given by the contractors, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. 14. Estimated Fees Paid by Developer; Reconciliation Prior to execution of this Agreement, Developer has paid to the City the Developer's portion of the estimated cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the construction of the Improvements, the City will reconcile the actual cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid by Developer. If the actual costs of the Developer's portion of the fees are more than the estimated payments made by the Developer, the Developer must pay the difference to the City before the Improvements will be accepted by the City. If the actual costs of the fees are less than the estimated payments made by the Developer, the City will refund the difference to the Developer. If the difference between the actual costs and the estimated payments made by the Developer is less than fifty dollars ($50.00), the City will not issue a refund and the Developer will not be responsible for paying the difference. The financial guarantee will not be released by the City or returned to the Developer until reconciliation has been completed by the City and any fees owed to the City have been paid by the Developer. 15. Material Testing The City maintains a list of pre -approved material testing laboratories. The Developer must City of Fort Worth, Texas Page 7 of 18 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 contract with material testing laboratories on the City's list. Material testing laboratories will provide copies of all test results directly to the City and the Developer. If the Improvements being constructed fail a test, the Developer must correct or replace the Improvements until the Improvements pass all retests. The Developer must pay the material testing laboratories directly for all material testing and retesting. The City will obtain proof from the material testing laboratories that the material testing laboratories have been paid in full by the Developer before the City will accept the Improvements. 16. Notices All notices required or permitted under this Agreement may be given to a party by hand - delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be deemed to have been received when deposited in the United States mail so addressed with postage prepaid: CITY: Development Coordination Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 With copies to: City Attorney's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 and City Manager's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 DEVELOPER: D.R. Horton — Texas, Ltd. 6751 North Freeway Fort Worth, Texas 76131 Or to such other address one party may hereafter designate by notice in writing addressed and mailed or delivered to the other party hereto. 17. Right to Audit Developer agrees that, until the expiration of three (3) years after acceptance by the City of the Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to examine any directly pertinent books, documents, papers and records of the Developer involving transactions relating to this Agreement. Developer agrees that the City shall have access during normal working hours to all necessary Developer facilities and shall be provided adequate and appropriate City of Fort Worth, Texas Page 8 of 18 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 workspace in order to conduct audits in compliance with the provisions of this section. The City shall give Developer reasonable advance notice of intended audits. Developer further agrees to include in all contracts with Developer's contractors for the Improvements a provision to the effect that the contractor agrees that the City shall, until the expiration of three (3) years after final payment under the contract, have access to and the right to examine any directly pertinent books, documents, papers and records of such contractor, involving transactions to the contract, and further, that City shall have access during normal working hours to all of the contractor's facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. City shall give Developer's contractors reasonable advance notice of intended audits. 18. Independent Contractor It is expressly understood and agreed that Developer and its employees, representative, agents, servants, officers, contractors, subcontractors, and volunteers shall operate as independent contractors as to all rights and privileges and work performed under this Agreement, and not as agents, representatives or employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement, Developer shall have the exclusive right to control the details of its operations and activities and be solely responsible for the acts and omissions of its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat superior shall not apply as between the City and its officers, representatives, agents, servants and employees, and Developer and its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the creation of a partnership or joint enterprise between City and Developer. It is further understood that the City shall in no way be considered a co -employer or a joint employer of Developer or any employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer. Neither Developer, nor any officers, agents, servants, employees or subcontractors of Developer shall be entitled to any employment benefits from the City. Developer shall be responsible and liable for any and all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. The City, through its authorized representatives and employees, shall have the sole and exclusive right to exercise jurisdiction and control over City employees. 19. Applicable Law; Venue This Agreement shall be construed under and in accordance with Texas law. Venue shall be in the state courts located in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. 20. Non -Waiver The failure of the City to insist upon the performance of any term or provision of this Agreement or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent of City's right to assert or rely on any such term or right on any future occasion. City of Fort Worth, Texas Page 9 of 18 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 21. Governmental Powers and Immunities. It is understood that by execution of this Agreement, the City does not waive or surrender any of its governmental powers or immunities. 22. Headings The paragraph headings contained herein are for the convenience in reference and are not intended to define or limit the scope of any provision of this Agreement. 23. Severability In the event that any clause or provision of this Agreement shall be held to be invalid by any court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the remaining provisions hereof. 24. Review of Counsel City and Developer, and if they so choose, their attorneys, have had the opportunity to review and comment on this document; therefore any rule of contract construction or interpretation that would normally call for the document to be interpreted as against the drafting party shall not apply in interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be construed solely on the basis of the language contained therein, regardless of who authored such language. 25. Prohibition on Boycotting Israel Developer acknowledges that in accordance with Chapter 2271 of the Texas Government Code, the City is prohibited from entering into a contract with a company with 10 or more full-time employees that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" have the meanings ascribed to those terms by Chapter 2271 of the Texas Government Code. To the extent that Chapter 2271 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of this Agreement. 26. Prohibition on Boycotting Energy Companies Developer acknowledges that in accordance with Chapter 2276 of the Texas Government Code the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City with a company with 10 or more full-time City of Fort Worth, Texas Page 10 of 18 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 employees unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. To the extent that Chapter 2276 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. 27. Prohibition on Discrimination Against Firearm and Ammunition Industries Developer acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City with a company with 10 or more full-time employees unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. 28. Compliance with Public Information Act Requests The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Agreement and Developer agrees that the Agreement can be terminated if Developer knowingly or intentionally fails to comply with a requirement of that subchapter. Developer acknowledges that section 552.371 of the Texas Government Code applies to this Agreement if. (1) this Agreement has a stated expenditure of at least $1 million in public funds for the purchase of good or services by the City; or (2) this Agreement results in the expenditure of at least $1 million in public funds for the purchase of goods or services by the City in a fiscal year of the City. To the extent that section 552.371 of the Texas Government Code applies to this Agreement, Developer shall comply with section 552.372 of the Texas Government Code by: (1) preserving all contracting information relating to this Agreement as provided by the records retention requirements applicable to the City for the duration of the Agreement; (2) promptly providing the City any contracting information related to this Agreement that is in the custody or possession of Developer on request of the City; and (3) on completion of the Agreement, either (a) providing at no cost to the City all contracting information related to the Agreement that is in the custody or possession of Developer; or (b) preserving the contracting information relating to the Agreement as provided by the retention requirements application to the City. 29. Immigration and Nationality Act Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, City of Fort Worth, Texas Page 11 of 18 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. 30. Amendment No amendment, modification, or alteration of the terms of this Agreement shall be binding unless the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer. 31. Assignment and Successors Developer shall not assign or subcontract all or any part of its rights, privileges, or duties under this Agreement without the prior written consent of City. Any attempted assignment or subcontract without the City's prior written approval shall be void and constitute a breach of this Agreement. 32. No Third -Party Beneficiaries The provisions and conditions of this Agreement are solely for the benefit of the City and Developer, and any lawful assign or successor of Developer, and are not intended to create any rights, contractual or otherwise, to any other person or entity. 33. Compliance with Laws, Ordinances, Rules and Regulations Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed and understood that, if City calls to the attention of Developer any such violation on the part of Developer or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately desist from and correct such violation. 34. Signature Authority The person signing this Agreement on behalf of Developer warrants that he or she has the legal authority to execute this Agreement on behalf of the Developer, and that such binding authority has been granted by proper order, resolution, ordinance or other authorization of the entity. The City is fully entitled to rely on this warranty and representation in entering into this Agreement. 35. Counterparts This Agreement may be executed in multiple counterparts, each of which will be deemed an original, but which together will constitute one instrument. 36. Entire Agreement City of Fort Worth, Texas Page 12 of 18 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 This written instrument, together with any attachments, exhibits, and appendices, constitutes the entire understanding between the City and Developer concerning the work to be performed hereunder, and any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall be void. 37. City Participation; Fiscal Funding Limitation (a) The City shall reimburse Developer in amounts not to exceed $1,249,149.69 for construction costs and $24,982.99 for material testing costs. The remaining City Participation in the amount of $11,890.00 shall not be paid to Developer, but will be used by City to pay for the City's portion of construction inspection service fees and administrative material testing fees. The City will reimburse the City Participation to Developer after presentation of proper documentation by Developer to the City that the Improvements have been constructed and accepted by the City and all contractors and material suppliers have been paid. Developer must register as a vendor of the City in order for the City Participation to be paid to Developer. The City Participation for construction costs was calculated as follows: City Participation Exhibit- Longhorn Estates Unit of Contractor CF-t tint IPRC23-0129 CP_\ 105087 Aleasure Qt3' Unit Price Pie Unit Price Difference Total 12" VOL, Calcuation:100% Price difference 18" PVC Water Line LF 2656I $ 46.00 $ 105.00 m 112" PVC Water Line .00 $ 81.00 $ 160.00 581$46 $35 $ 92,96t1.00 18" DIP Water lane, CSS backfill LF $ 127.00 $ 111.65 $16410 - Sll 11.65= $52$ B 112" DIP Water Line, CSS backfill 61.0D $ 176.00 $ 164.10 ..45 3,199.45 3 I20" Steel Casing by, cut FA 50.00 $ 198.42 $ 63.77 $101.15- $63.77= $3738 $ 1,869.00 124" Steel Casing by open cut $ 212.00 $ 101.15 18" Crate Valve EA 6.00 $ 2,575.00 $ 3,500.00 $4315-52,575=$1.740 $ 10,440.00 112" Gate Vale $ 4,315.00 $ 4,600.00 18" Ductile Iran Fitwigs w restraint 2.61 12" Ductile Iron FittingsTONS w restraint 470 $ 11,639.00 $ 6,750.00 2.09 Tams x $6,750 $ 14,107.50 tint 113-1 $ 122,575.95 24" ■VL Calculation: City 84.1%/ Developer 15.9% 124" PVC Water pipe LF 3448.00 $195.00 $460.00 $672,360.00 124" PVC CSS hac1cill LF 2000.$409.00 $500.00 $8,180.00I m 124" Gate Valve & Vault FA 6.00 $47,164.00 $70,000.00 $282,984.00 3 18" Eilowoff Valve EA 1.00 $28,240.00 $22,500.00 $22,500.00 IDuctile Iron Fittings w restraintjmnts TONS 1950.$11,639.00 $28,500.00 $226,960.50I a 14" Air Release Valve EA 2.00 $44,845.00 $42,5D0.00 $85,000.00 I42"Steel Casing by other thou open cut LF' 40.00 $426.00 $1,450.00 $17,040.00 124" Carrier Pipe (DIP) wl css backfill LF 60.00 $4D9.00 $6W,00 $24,540.00, Total Unit 16-2 $1,339,564.50 16-2 City Cost share 84,1% $1,126,573.74 TOTAL COST SHARE AMOUNT $ 1,249,149.69 (b) hi the event no funds or insufficient funds are appropriated and budgeted or are otherwise unavailable by any means whatsoever in any fiscal period for payments due under this Agreement, then the City will immediately notify Developer of such occurrence and this Agreement shall be terminated on the last day of the fiscal period for which appropriations were received without penalty or expense to the City of any kind whatsoever, except to the portions of annual payments herein agreed upon for which funds shall have been appropriated. (c) Substantial completion of the Improvements shall occur after Developer's Contractors notify the City that the Improvements are constructed and ready for their intended use, the City and City of Fort Worth, Texas Page 13 of 18 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 Developer's Contractor inspect the Improvements, and the City concurs that the Improvements are substantially complete. This Agreement does not provide for any retainage to be withheld from the City Participation. [REMAINDER OF PAGE INTENTIONALLY BLANK] City of Fort Worth, Texas Page 14 of 18 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 38 Cost Summary Sheet Project Name: Longhorn Estates — Phase 1 CFA No. 24-0041 Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer 4. Signals TPW Construction Cost Total Total Construction Cost (excluding the fees) Estimated Construction Fees: C. Construction Inspection Service Fee D. Administrative Material Testing Service Fee E. Water Testing Lab Fee F. Material Tesing Fee Total Estimated Construction Fees: TOTAL PROJECT COST Financial Guarantee Options, choose one Bond = 100% Cash Escrow Agreement= 125% Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Pavinq/Storm Drain = 125% Letter of Credit = 125% IPRC No. 23-0129 City Project No.105087 City of Fort Worth, Texas Standard Community Facilities Agreement with City Participation Rev. 4/2/20 Developer's Cost City's Cost Total Cost $ 2,289,949.98 $ 1,249,149.69 $ 3,539,099.67 $ 2,739,064.00 $ - $ 2,739,064.00 $ 5,029,013.98 $ 1,249,149.69 $ 6,278,163.67 $ 5,323,325.70 $ $ 5,323,325.70 $ 4,384,347.00 $ $ 4,384,347.00 $ 605,993.06 $ $ 605,993.06 $ 10,313,665.76 $ $ 10,313,665.76 $ 15,342,679.74 $ 1,249,149.69 $ 16,591,829.43 $ 106,800.00 $ 11,400.00 $ 118,200.00 $ 45,080.00 $ 490.00 $ 45,570.00 $ 3,690.00 $ - $ 3,690.00 $ - $ 24,982.99 $ 24,982.99 $ 155,570.00 $ 36,872.99 $ 192,442.99 $ 15,498,249.74 $ 1,286,022.69 $ 16,784,272.42 Choice Amount (Mark one $ 16,591,829.43 X $ 20,739,786.79 $ 7,847,704.59 $ 12,892,082.20 $ 20,739,786.79 Page 15 of 18 IN WITNESS WHEREOF, the City and Developer have each executed this Agreement by their duly authorized signatories to be effective on the date executed by the City's Assistant City Manager. CITY OF FORT WORTH Bu. �si Dana Burghdoff (May 2024 cor) Dana Burghdoff Assistant City Manager Date: May 3, 2024 Recommended by: Bichson Nguyen Contract Compliance Specialist Development Services Department Approved as to Form & Legality: Richard McCracken (May 3, 202413:24 CDT) Richard A. McCracken Sr. Assistant City Attorney M&C No. 24-0224 Date: 3/19/24 Form 1295: 2024-1118306 b44�o,lnu ,p opQa,s� O 0oo4;�0610, b aFfx 00o °= ddATTEST: . oo0 000*" TEXASaAb 11buaavao JUannette Goodall City Secretary City of Fort Worth, Texas Standard Community Facilities Agreement with City Participation Rev. 4/2/20 DEVELOPER D.R. Horton - Texas, Ltd. A Texas limited partnership By: D.R. Horton, Inc. A Delaware corporation Its Authorized Agent By: Name: Justin Bosworth Title: Assistant Secretary Date: May 3, 2024 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. -UIIn Rebecca Owen (May 3, 202411:40 CDT) Rebecca Diane Owen Development Manager OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 16 of 18 The following attachments are incorporated into this Agreement. To the extent a conflict exists between the main body of this Agreement and the following attachments, the language in the main body of this Agreement shall be controlling. Included Attachment © Attachment 1 - Changes to Standard Community Facilities Agreement ❑ Attachment 2 — Phased CFA Provisions ❑ Attachment 3 — Concurrent CFA Provisions © Location Map ® Exhibit A: Water Improvements ® Exhibit Al: Sewer Improvements ® Exhibit B: Paving Improvements ® Exhibit B 1: Storm Drain Improvements ® Exhibit C: Street Lights and Signs Improvements ❑ Exhibit Cl: Traffic Signal and Striping Improvements ® Cost Estimates (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Page 17 of 18 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 ATTACHMENT "I" Changes to Standard Community Facilities Agreement City Project No. 105087 None City of Fort Worth, Texas Page 18 of 18 Standard Community Facilities Agreement with City Participation Rev. 4/2/20 I to J Q w II _WUSTR 0 3 ' _ �r -CITY OF - O�� S EII CLRNE RD , 3 - EBU_ T__ L W Y J ° CROWLE w(�Is,a4 gE'�. srWEST CLEBURNE H SITE- ] vi x w I T ­1 LIMIT U I 0 0 N / U O N N x w �- � U C 0 � co SCALE: 1 "= 250' CD 0 4,000' E rD 6 O c;� oo _ N CD! OWNER/DEVELOPER: Q) D.R. HORTON—TEXAS, LTD. O 6751 NORTH FREEWAY FORT WORTH, TX 76131 PH: 817-230-0805 REPRESENTATIVE: JUSTIN BOSWORTH o iy r IN T-L � I LONGHORN TRAIL p I CROWLEY-PLOVER RD I, I I I TARRANT COUNTY LOCATION MAP SCALE: 1" = 4000' MAPSCO NO. 117E & 117J COUNCIL DISTRICT 6 CPN 105087 VICINITY MAP LONGHORN ESTATES PHASE 1 FORT WORTH, TEXAS CPN: 105087 raiPAPE-DAWSOW ENGINEERS 201 MAIN ST, STE 901 1 FT. WORTH, TX 76102 1 817.870.3668 TEXAS ENGINEERING FIRM REGISTRATION 4470 GPM: MICHELLE LASA PH: 817.870.3668� 24" W-13 W CLEBURNE CROWLEY . ' � /J — � \ J Z24 W 13J \�16" W STUB `21W-13 z J LLI CONNECT TO EX 12" WATERLINE FOR FUTURE DEVELOPMENT J = I HULEN TRAILS PH 2 I = r (� CITY PROJECT #103141 I (� X-26785 10X Q I 8" W STUB I ¢ O1 I FUTURE LONGHORN 297.083 AC TRACT ESTATES PHASE 4 . z 8" W STUBS I WTXS, LUC w FOR FUTURE DEVELOPMENT I 8" W STUB 8 15 FUTURE LONGHORN 16 y� _ 1X 3 O I O1 ESTATES PHASE 4 " it STREET Al17 �\ 6 a 7 8 9 10 0 11 12 13 14 15 16 17 /18 SCALE: 1 "= 300' \\ 5 5 MREET 1 19 O K ( _ 20 0 300 STREET 17 24 wi 4 15 4 \I w 3 3 w 22 21 20 19 18 17 16 15 14 13 12 W ¢ (J111 21 8" W STUB ix N FUTURE LONGHORN 1 2 2 N ° y 22 ESTATES PHASE 3 1 1 2 3 4 5 61 7 8 9 10 11 I 23 2411 STREET 16 STREET 16 STREET 3� ST iEET'_ P5 18 1 1 1 1 1 2 3 4 5 6 7 8 9 10 11 26 8" W STUB 18 2 I 17 2 2 2 � ( ,, 27 FUTURE LONGHORN h U ESTATES PHASE 3 3 Q�4� 16 3 3 3 y /I 22 21 20 19 18 17 16 15 14 13 12 28 4 ll 29 4 5 15 19 4 4 5 � 14 5 5 .� 5 -.TREET4 30 rn sT74 13 6 ?�� 6 31 3 2 r'� 12 7 6}= 3g' 1 12 3 4 5 6 7 8 9 10 11 12 � 8" W STUB 11 7 Nb 7 (1 w 32 FUTURE LONGHORN 8 S� '4 ¢ ESTATES PHASE 3 16J / 9 8 y 8 (I w 33 -X 9 9 23 22 21 20 19 18 117 16 15 14 13 34 Q i3 4\�� 14 15 1 11 10 1110 STREETF- 35 O U 11 13LL 2 0 1 TI 1 36 I SJ. 12 11 12 3 Sr9 12 11 13 2 1 4I 4 5 6 [76 9 1� 11 12 13 14 q� 4 1 FFr I 5 37 O 18 Sr4 10 5 2 1X I 38 O 19 9 6 3 16 15 14 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 _ 20 7 4 P39 / 21 8 5 5.0 Sp9F — - - - � 40 Q 6 J��� �� FT _ — iTREET 7 �\ O 6 22 lI I 41 U 23 7 9� �"� 1 2 3 4 1 14 11 1 2 3 4 5 6 7 8 9 10 24 8 // w 42 O 2 13 w (1 ¢ ST9 5 ° 3 12 ¢ y 43 F�c w �� p� 20 19 18 17 16 15 14 13 12 11 I I 44 T 1 5% 10 6 ? 4 11 l/ _ I 8" W STUB �4G� 10 8 i 6 1 9 'TREET FUTURE LONGHORN s \l t ESTATES PHASE 2 9 7 8 1 2 3 4 5 6 7 8 9 10 8 Ld 24" W STUB FUTURE LONGHORN \�O \ '�STREET10 m ESTATES PHASE 2 ix / 8" W STUB ix X ® W •j FUTURE LONGHORN q� z U ESTATES PHASE 2 ® J v6i 12"W lg 12"W_t5 8" W STUB Q rn FUTURE LONGHORN LONGHORN T I .� ESTATES PHASE 2 RA1L-� W 8" W STUB LEGEND CD z 12" W 15 FUTURE LONGHORN j J --- ESTATES PHASE 2 EXISTING WATER LINE E to LONGHORN TRAIL 1z o C J PROPOSED 8" WATER LINE L2 '- CONNECT TO EX 12" WATERLINE WL Q CROEY ISO EDUCATION CENTER 'NOTE: ALL PROPOSED WATER LINES ARE LC) 00 CITY PROJECT #103141 8" UNLESS OTHERWISE NOTED 1 1 X-25832 N OWNER/DEVELOPER: EXHIBIT A - WATER PAPS-DAWSOtt N D.R. HORTON—TEXAS, LTD. LONGHORN ESTATES ENGINEERS o 6751 NORTH FREEWAY Q / FORT WORTH, TX 76131 PHASE 1 201 MAIN ST, STE 901 1 FT. WORTH, TX 76102 1 817.870.3868 PH: 817-230-0805 FORT WORTH, TEXAS TEXAS ENGINEERING FIRM REGISTRATION #470 a REPRESENTATIVE: JUSTIN BOSWORTH CPN-. 105087 PM: MICHELLE LASA PH: 817.870.3668 rI I 297.083 AC TRACT WTXS, LLC 8" SS STUB FUTURE LONGHORN ESTATES PHASE 4 SCALE: 1 "= 300' 0 300 STREET 17� 8" SS STUB FUTURE LONGHORN ESTATES PHASE 3 8" SS STUB 1C£ FUTURE LONGHORN ESTATES PHASE 3 3 9F� 'N CLEBURNE CROWLE' 1n `CONNECT TO EX 15" SS EXTENSION SEWELL TRACT I I CITY PROJECT #103983 l X-27437 8" SS STUB �� 1OX FUTURE LONGHORN ESTATES PHASE 4 I w 8' SS STUBS FOR FUTURE DEVELOPMENT I z a J 8 15 ix 1 16 m 1X 1 = O \ O SET 17 Ilh ldlll 7 y 7 8 9 10 0 11 12 13 14 15 i6 17 18 N 5 5 6 j �CTREET 24 4 , 5 - 4 (\ w m 22 21 20 19 18 17 16 15 14 13 12 21 1X ¢ 3 3 17 w ® Li 222 1�11 2 3 4 5 6 7 8 9 10 11 23 EETig- �C EET16- STREET3J QT iEET 24 112" SS-2B--" - 25 1 18 1 1 1 1 2 3 4 5 6 7 8 9 10 11 26 17 2 2 2 I w 27 2 V wl 16 3 3 y 3 22 21 20 19 18 17 16 15 14 13 12 v 28 / 4 / 29 15 19 4 4 =TRE=T ". 14 5 5 30 13 6 0 6 5 � 211 �i2 6 �Q� 7 i l 2 3 4 5 64 7 8 9 10 11 12 32 3 8" SS STUB 1 11 12 7 7 ^ �� FUTURE LONGHORN 8 a• - ESTATES PHASE 3 16 9 9 8 SJ 8 I 34co 3 .2 15 16 10 y 9 23 22 21 20 19 18 17 16 15 14 13 L j 14 ,�h 15 1 p 10 lam 12 y�P�O 14 1 11 11-�TREETF \ 35 13 J'T 12 5`' 1 ST9F� 1 11 12 3 2 0' s9F��� 11 13 2 1 2 .. M34 5 6 7 8 9 10 11 12 13 14 36 N 37 �y 4 9 0) 10 5 - O 18 19 9 6 e`1"y�t��1ry 3 2 1X 16 15 14 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 I w 38 7 qP ST J w 39 20 21 8 9 4 9FPr. - ITREET7 5 u 40 Ll a 21 6 22 7 6 ry50'L ��QF.�' ' S" SS-6� • [F15' SS-6 15" SS-.; - - - 4123 ^ ° ? 1 2 3 4 1141 2 3 4 5 6 7 8 9 10 42 24 `'`l's�8 J� 13 n n 04 O e`L ��P�� SFr 5 3 12 ¢ 43 w F- 20 19 18 17 16 15 14 13 12 11 44 10 6 4 C 11 \l 04 �O. 1X 7 L 5 10 °TREE(n 12"SS STUB SS108 6 9FUTURE LONGHORN ESTATES PHASE 2 9 72 3 4 5 6 7 8 9 10 8,LEI STREET 10� j N CV L / 8" SS STUB c :> FUTURE LONGHORN 0) U ESTATES PHASE 2 O � CV 3 / C [] •� 8" SS STUB FUTURE LONGHORN n ESTATES PHASE 2 �O C'4 EM 00 % CX) 00 (V N % OWNER/DEVELOPER: o D.R. HORTON-TEXAS, LTD. 0 6751 NORTH FREEWAY u_ FORT WORTH, TX 76131 PH: 817-230-0805 o REPRESENTATIVE: JUSTIN BOSWORTH, 1X 9tiT ix 0 8 ---------------------------- LONGHORN TRAIL LEGEND 8" SS STUB FUTURE LONGHORN EXISTING SEWER LINE ESTATES PHASE 2 PROPOSED 8" SEWER LINE 'NOTE: ALL PROPOSED SEWER LINES ARE 8" UNLESS OTHERWISE NOTED EXHIBIT Al -SEWER PAPS-DAWSOW LONGHORN ESTATES FzJENGINEERS PHASE 1 201 MAIN ST, STE 901 1 FT. WORTH, TX 76102 1 817.870.3668 FORT WORTH, TEXAS TEXAS ENGINEERING FIRM REGISTRATION #470 CPN: 105087 MICHELLE LASA PH: 817.870.36682 rPM: ' EX W CLEBURNE CROWI EY .L LLLLLLLLLLLLLLLLL�ZL`LLLLLLLVLLLLLLLLLLLk LLi LL' lLL LL ASPHALT TRANSITION TO EXISTING LL V W CLEBURNE CROWLEY W CLEBURNE CROWLEY PAVEMENT LL LL / LL LL LL LL FUTURE LONGHORN ESTATES S HULEN STREETS LL 1X 10X PHASE 4 LL L © 0 297.083 AC TRACT STREET15 L WTXS, LLC L L 8 15 I IL STREET17 16i ix L 1 O 1 \ 7 L 7 8 9 10 10 11 12 13 14 15 16 17 18 6 L 6 STREET 2 SCALE: 1 "= 300' STREET 17 5 L s 9 0 300 24 STREET 12� 4 15 L 4 20 L 22 21 20 19 18 17 16 15 14 13 12 21 STREET 15 3 L 3 1 55 2 O L 2 STREET 2 22 STREET16 1 STREET i6 1 L 1 1 2 3 4 5 6�STREET3 9 10 11 23 i 2q L - 25 18 1 1 L STREET 3 1 1 2 3 4 5 6 7 8 9 10 11 26 FUTURE LONGHORN ESTATES 18 17 2 2 L 2 _ STREETS 27 PHASE 3 2 L 3 3 16 3 3 L 3 22 21 20 19 18 17 16 15 14 13 12 28 STREET13 4 L 4 4 STREET4 29 5 g 4 � 5 14 STREET 12 L 5 3p l 3 13 6 5 20 L 6 12 7 6} L 1[2T3 4 5 6 7 8 9 10 11 12 31 C1 8 S HULEN STREET L 7 4 32 16 L 8 9 8 STREET6 33 15 16 L 10 L 9 23 9 22 21 20 19 18 17 16 15 14 13 34 X LLI 14 15 LL 10 STREET5 Q 3 STREET 14 14 1 LL STRE­11' LL 11 35 U STREET 15 2 12 LL 12 1 36 12 3 2 11 3 4 5 6 7 8 9 10 11 12 13 14 1 2 4 LLL 3 q 37 GO O 10 STREET 12 18 LL 2 L 1X v 38 O 19 9 6 3 L 16 15 14 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 N 20 7 4 L STREET7 39 Q21 8 5 LL LL 40 21 6 U 26 22 p3 STREET 14 LL LL STREET 7 1 14 41 21 9 L 1 2 3 - 1 2 3 4 5 6 7 8 9 1�- STREET B 42 STREET 12 L 2 STREET 10 � (7) L LL S HULEN STREET STREET 6 _\ 3 12 43 L L 20 19 18 17 16 15 14 13 12 11 44 1 25 10 6 4 9 11 r STREET 9 N ix _ 10 � 10 FUTURE LONGHORN ESTATES 6 9 1 2 3 4 5 6 7 8 9 10 7 PHASE 2 _ 7 8 X 8 LONGHORN TRAIL STREET 10 I U LEGEND 1X z � PROP. 29' B/B 50' ROW-6" CONC (TYP) LONGHORN TRAIL _ 3 j PROP. 34' B/B 60' ROW-7.5" CONC (TYP) 0 Q o a PROP. 34' B/B 80' ROW-10" CONIC (TYP) _ LLLLLLu iirlai, i�iiy Ci I PROP. VARIABLE WIDTH ROW-7.5" CONIC (TYP) FUTURE LONGHORN ESTATES Lu LONGHORN TRAIL O PHASE 2 Z N H.C. RAMPS BY DEVELOPER O M = 0 EXLONGHORN a CDSIDEWALK BY DEVELOPER U TRAIL 00 jSIDEWALK BY HOMEBUILDER N N (_0 OWNER/DEVELOPER: EXHIBIT B - PAVING PAPE-DAWSOA? Q) D.R. HORTON-TEXAS, LTD. LONGHORN ESTATES rai ENGINEERS � 0 6751 NORTH FREEWAY PHASE 1 FORT WORTH, TX 76131 201 MAIN ST, STE 901 1 FT. WORTH, TX 76102 1 817.870.3668 PH: 817-25C-0805 FORT WORTH, TEXAS TEXAS E NE NG FIRM RE STRATION #470 REPRESENTATIVE: JUSTIN BOSWORTH CPN: 105087 PM: MICHELLE LASA PH: 817.870.3668r a o iy ■ ' .W CLEBURNE CROWLE �I w DETENTION POND A z ix lox 36" STORM STUB I = © O FUTURE LONGHORN 297.083 AC TRACT ESTATES PHASE 4 WTXS, LLC I 1 8 15 I 1 N 4'x4' DROP INLET 16 9m STREET I7 1X 1 I 1 FUTURE LONGHORN 1 a \ , 7 II�'I - ESTATES PHASE 4 � -� 0 6 \ 7 8 9 10 I � � 11 12 13 1O4 15 i6 17 18 6 STREET2 19 SCALE: 1 "= 300' � s s / � � 0 300 STREET17 24 O l 1 w 4 15 4 ,� 20 'L 22 21 20 19 18 17 16 15 14 13 12 ix N 3 3 w 21 w °C 17 y 22 2 2 27" STORM STUB 1 1 2 3 4 5 6 7 8 9 10 11 Y3 Q FUTURE LONGHORN I i 1 ESTATES PHASE 3 ;� ll `STREET I6 `STREET3 SiFEETI 24 STREET16 25 18 1 1 1 1 1 2 3 4 5 6 7 8 9 10 11 26 4'x4' DROP INLET 18 17 2 2 2 w 27 FUTURE LONGHORN 2 U w ESTATES PHASE 3 3 16 3 3 ¢ 28 3 22 21 20 19 18 17 16 15 14 13 12 u 4 15 19 4 4 VTR EET 29 S 14 5 �i �� 5 _ 30 yFP 13 6 y� S Q y 6 31 2 6 �= 1 / � 2 3 4 5 6 7 8 9 10 11 12 U 48" STORM STUB 1 11 12 7 7 . 7 32 FUTURE LONGHORN 8 h 4 ESTATES PHASE 3 16 9 8 8 tie�� 33 10 9 9 5 z3 22 21 20 19 18 17 16 15 14 13 34 x 14 �h l.� 12 , 9� 13 14 15 1 `P7q 11 10 1110 STREET5� _ 1\\ 35 O U S 11 2 AFT 12 12 1 36 Ty�FT 11 12 3 �� 11 13 2 3T45 6 7 8 9 10 11 12 13 14 ry 4 ,ry 1 37 O 18 10 5 0`�� 2 ix j 38 O 19 9 6 9�P 3 16 15 14 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 39 N 20 7 4 8 `rT9 -TREET 7 40 a 21 5 21 � ���. 6 22 7 6 �O - 41 10 23 S. 8 �.F� 1 2 3 4 I 1 14 1 2 3 4 5 6 7 8 9 10 w 42 w O 24 9F�� 5�J I 2 13 (7) w 43 04 v 5 3 12 tO 20 19 18 17 16 15 14 13 12 11 T 1 10 6 2 4 C9 11rr) 44 jj CV 42" STORM STUB ix 7 ai I 5 10 I eT iEET 9 I FUTURE LONGHORN ESTATES PHASE 2 10 8 6 9 1 2 3 4 5 6 7 8 9 �10 X 5'x5' DROP INLET 9 l 7 �8 Lv FUTURE LONGHORN �OSTREET 1 l�j ESTATES PHASE 2 T 0) CV 1X L 1� 27" STORM STUB 1X FUTURE LONGHORN DETENTION POND BC LEGEND ESTATES PHASE 2 oIt 3 c'i PROPOSED STORM DRAIN c 21 "-48" RCP & 7'x5' RCB LONGHORN TRAIL PROPOSED INLET N 24" STORM STUB 0 FUTURE LONGHORN o PROPOSED HEADWALL ESTATES PHASE 2 1- EXISTING STORM DRAIN 24" STORM STUB DETENTION POND D E FUTURE LONGHORN 0 EXISTING INLET ESTATES PHASE 2 p ago/ ill ao 00 EXISTING HEADWALL N % OWNER/DEVELOPER: EXHIBIT B1 - STORM PAPS-DAWSOW D.R. HORTON-TEXAS, LTD. LONGHORN ESTATES ENGINEERS 0 6751 NORTH FREEWAY rd FORT WORTH, TX 76131 PHASE 1 201 MAIN ST, STE 901 I FT. WORTH, TX 76102 1 817.870.3668 PH: 817-230-0805 FORT WORTH, TEXAS TEXAS ENGINEERING FIRM REG I STRA ON #470 o REPRESENTATIVE:JUSTIN BOSWORTH CPN:105087 PM:MICHELLE LASA PH:817.870.3668 o U- ■ r ■ FUTURE LONGHORN ESTATES PHASE 4 297.083 AC TRACT WTXS, LLC STREET 17 — SCALE: 1 "= 300' 0 300 297 083 AC TRACT WTXS, LLC FUTURE LONGHORN ESTATES PHASE 3 STREET13 as 3 13 2 12 1 � 9 x 16 10 W Q y 15 U l STREET 14 SCQ' I 11 2 1 CD18 2 19 6 1Q3 N / 20 7 4 L 21 8 5 21 U 6 22 6 23 STREET14 O 24 8 N SF N FUTURE LONGHORN ESTATES x PHASE 2 W 0) N C > � U � N 3 / C 0 � co FUTURE LONGHORN ESTATES a5 0 PHASE 2 � o N C3 M 6 O 00 / 0� 00 / _ N N ! OWNER/DEVELOPER: D.R. HORTON-TEXAS, LTD. o 6751 NORTH FREEWAY FORT WORTH, TX 76131 PH: 817-230-0805 a ° REPRESENTATIVE: JUSTIN BOSWORTH o iy r W CLEBURNE CROWLEY 6 7 8 9 10 ESTREET9 15 14 13 12 11 LEGEND PROPOSED STREET LIGHT PROPOSED STREET SIGN EXHIBIT C - STREET LIGHTS PAPS-DAWSOA? LONGHORN ESTATES mENGINEERS PHASE 1 201 MAIN ST, STE 901 1 FT. WORTH, TX 76102 1 817.870.3668 FORT WORTH, TEXAS TEXAS ENGINEERING FIRM REGISTRA ON #470 CPN: 105087 ItPM: MICHELLE LASA PH: 817.870.3668a UNIT PRICE BID Bullkt Item No. I 1 I 2 I 3 14 5 I 6 17 16 19 1 10 I 11 I 12 1 13 14 15 1 16 1 17 18 1 19 1 20 I 21 1 22 I 23 1 24 1 25 1 26 I 27 28 1 29 1 30 31 1 32 1 33 f 34 1 35 1 36 1 37 1 38 I Psv4ng DAP- EM PROPOSAL PogaJ orI SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Bidder's Application Project Item Information Description I Specification Section No. Unit of Bid { Measure Quantity UNIT IV: PAVING [WROVEMENTS 3211.0400 Hydrated Lime ; 32 11 29 TN 1,226.0 3211.0501 6" Lime TTeat merit 3211 29 SY 41,97C 3211.0502 8" Lime Treatment 3211 29 SY 26,376 3212.0302 2" Asphalt Pvmt Type D 3212 16 SY 976 3212.0303 3" AsphaN Pvmt Type D 32 12 16 SY 20E 3212.0502 5" Asphaft Base Type B 32 12 16 SY 97E 3212.0503 6" Asphalt Base Type B 32 12 16 SY 208 3213.0101 6" Conc Pvmt 32 13 13 SY 38,293 3213.0102 7.5" Conc Pvmt 32 13 13 SY 13,221 3213.0105 10" Conc Pvmt 32 13 13 $Y 10,014 3213.0301 4" Conc Sidewalk 32 13 20 SF 86,233 3213.0501 Barrier Free Ramp, Type R-1 32 13 20 EA 32 3213.050B Barrier Free Ramp, Type P-1 32 13 20 FA 44 3217.0101 6" SLD Pvmt Marking HAS (W) 32 17 23 LF 621 3217.0102 W SLID Pvmt Marking HAS (Y) 32 17 23 LF 11,320 3217.0107 6" BRK Pvmt Marking HAS (Y) 32 17 23 LF 2,991 3217,0201 8" SLID Pvmt Marking HAS (W) 32 17 23 LF 2,296 3217.0401 18" SLID Pvmt Marking HAE (W) 32 17 23 LF 43 3217.0403 16" SLID Pvmt Marking HAE m 32 17 23 LF 101 3217.0504 Preformed Thermoplastic Contrast Markings - 24" Crosswalk 32 17 23 LF 225 3217.0504 Preformed Thermoplastic Contrast Markings - 24" Stop Bar 32 17 23 LF 220 3217A002 Lane Legend Arrow 32 17 23 EA 30 3217.1004 Lane Legend Only 34 41 30 EA 13 3217.2103 REFL Raised Marker TY II -A -A 32 17 23 EA 180 3217.2104 REFL Raised Marker TY II-C-R 32 17 23 EA 140 3441.4003 Fumishllnstall Alum Sign Ground Mount City Std. (03-1) 34 41 30 EA 77 3441.4003 Fumishllnstall Alum Sign Ground Mount City Std. (R1-1) 34 41 30 EA 34 3441.4003 Fumishllnstall Alum Sign Ground Mount City Std. (R1-3P) 34 41 30 EA 4 3441.4003 Fumishllnstall Alum Sign Ground Mount City Std. (R2-1) 34 41 30 FA 4 3441.4003 Fumishllnstall Alum Sign Ground Mount City Std. (84-1) 344130 EA 1 3441.4003 Fumishllnstall Alum Sign Ground Mount City Std. (S4-3P) 34 41 30 EA 1 3441.4003 Furnish/Install Alum Sign Ground Mount City Std. (S5-3) 344130 EA 1 3441.4003 Furnish/Install Alum Sign Ground Mount City Std. (S7-1 T) 34 41 30 EA 1 3471.0001 Traffic Control 3471 13 MO 2 9999.99991 W Conc Pvmt (Stamped Concrete Type'N) 99 99 99 SY 786 9999.9999 10" Conc Pvmt (Stamped Concrete Typs'B') 99 99 99 SY 475 9999,9999 7.5" Conc Pvmt (Stamped Concrete Type'A') 99 99 99 SY 153 9999.9999 7.5" Conc Pvmt (Stamped Concrete Type'B') 99 99 99 SY 108 TOTAL UNIT IV: PAVING IMPROVEMENTS Bid Summary UNIT IV' PAVING IMPROVEMENTS This Bid is submitted by the entity named below: BIDDER: Glen Thurman, lot. P.O. Box ffi.59542 Mesquite, TX 75195 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to ran as provided in the General Conditions. END OF SECTION 7blal Cooslrucliun Bid Bidders Proposal Unit Price a Bid Value $320.00 $392,320.001 $4.75 $199,357.601 $4.90 $129,242.401 $35.00 $34,160.001 $57.00 $11,850.00 $79.00 $77,104.00l $91,00 $18,928.001 $45.40 $1,738502.201 $55.40 $732,443,401 $66.55 $666,431.701 $7.60 $646,747.50 $3,200.00 $102.400.00 $2,400.00 $105,600.00 $2.85 $1,769.85 $2.85 $32,2B2.00 $2.85 $8,524.35 $3.30 $7,576.80 $13.50 $5B0.50 $1350 $1,363.50 $40.00 $9,000.00 $28.20 $6,204,00 $300.00 $9.000.001 $350.00 $4,550.001 $6.60 $1,188.001 $6.60 $924,00 $235.00 $18,095.001 $100.00 $3,400.001 $55.00 $220,001 $470.00 $1,880.001 $90.00 $90.001 $90.00 $90.00 $475.00 $475.00 $90,00 $90.00 $4,250.00 $8,500.001 $235.00 $184,710.001 $235.00 $111,025,001 $215.00 $32,895.001 $215.00 $23,220,001 $5,323,325.701 BY7 TITLE: 4v'o;y,,.y,...szs DATE: -7-/,L6/7,t-I $5,323,325.70 $5,323,325.701 Sir working days after the date when the CITY OF PORT WORM STANDARD C.ONSTRUMION WCMCATION LIOC[MlIMS-D6'vt UVER AWARDED PROJECTS F-Masi M"22,2019 00 42 4.1Bid Foposel DAP,x�sp Street Lights DAP - BID PROPOSAL Page 1 of 1 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Section No. Unit of Bid Unit Price Bid Value No. Measure Quantity UNIT V: STREET LIGHTING IMPROVEMENTS 1 2605.3015 2" CONDT PVC SCH 80 (T) 26 05 33 LF 7,808 $15.55 $121,414.401 2 3341.1410 NO 10 Insulated Elec Condr 3441 10 LF 20,516 $1.45 $29,748.201 3 3441.1405 NO 2 Insulated Elec Condr 3441 10 LF 2,889 $3.14 $9,071.461 4 3441.1632 Install Type 33A Arm 3441 20 EA 5 $362.00 $1,810.001 5 3441.1633 Install Type 33B Arm 3441 20 EA 96 $362.00 $34,752.001 6 3441.3050 Furnish/Install Luminaire (ATBO P101 MVOLT R2 3K 3441 20 EA MP NILP7 AO RFD325607) 90 $390.00 $35,100.00 7 3441.3050 Furnish/Install Luminaire (ATBO P101 MVOLT R4 3K 3441 20 EA MP NILP7 AO RFD325606) 6 $390.00 $2,340.00 8 3441.3050 Furnish/Install Luminaire (ATBO P303 MVOLT R2 3K 3541 20 EA MP NILP7 AO RFD322792) 5 $583.00 $2,915.00 1 9 3441.3301 Rdwy Illum Foundation TY 1 3441 20 EA 96 $1,525.00 $146,400.001 1 10 3441.3302 Rdwy Illum Foundation TY 3 3441 20 EA 5 $1,823.00 $9,115.001 1 11 3441.3341 Rdwy Illum TY 11 Pole 3441 20 EA 96 $2,072.00 $198,912.001 1 12 3441.3342 Rdwy Illum TY 18 Pole 3441 20 EA 5 $2,883.00 $14,415.001 TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS $605,993.061 Bid Summary UNIT V: STREET LIGHTING IMPROVEMENTS $605,993.061 Total Construction Bid $605,993.061 This Bid is submitted by the entity named below: BIDDER: Independent Utility Construction, Inc. 5109 Sun Valley Drive fort Worth, TX 76119 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. END OF SECTION BY: Rrd Wolfe TITLE: President DATE: 02/22/2024 75 working days after the date when the CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Vernon May 22, 2019 00 42 43_Bid Proposal_DAP.xlsx Utilities DAP - BID PROPOSAL Page 1 of5 UNIT PRICE BID SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item information Bidder's Application Bidder's Proposal Bidlist item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price UNIT I: WATER IMPROVEMENTS 1 0241.0100 Remove Sidewalk 0241 13 SF 4,510 $4.00 2 0241 A 100 Remove Asphalt Pvmt 0241 15 SY 164 $24.00 3 3201.0114 T Wide Asphalt Pvmt Repair, Residential 3201 17 LF 210 $93.00 4 3213.0301 4" Conc Sidewalk 32 13 20 SF 4,510 $13.00 If 5 3305.0109 Trench Safety 33 05 10 LF 20,254 $1.00 6 3305.1004 24" Casing By Open Cut 33 05 22 LF 50 $212.00 7 3305.1007 42" Casing By Open Cut 33 05 22 LF 60 $426.00 8 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 47.53 $11,639.00 9 3311.0241 8" Water Pipe 33 11 10, 33 11 12 LF 13,169 $46.00 10 3311.0254 8" DIP Water, CLSM Backfill 3311 10 LF 840 $127.00 11 3311.0441 12" Water Pipe 33 11 10, 33 11 12 LF 2,656 $81.00 12 3311.0457 12" DIP Water, CLSM Backfill 33 11 10, 33 11 12 LF 61 $176.00 13 3311.0641 24" Water Pipe 3311 10, 33 11 12, 33 11 13,33 f LF 3,448 $195.00 11 14 14 3311.0657 24" DIP Water, CLSM Backfill 3311 10 LF 80 $409.00 15 3312.0001 Fire Hydrant 33 12 40 EA 14 $9,025.00 16 3312.0106 Connection to Existing 16" Water Main 33 12 25 EA 1 $10,297.00 17 3312.0117 Connection to Existing 4"-12" Water Main 33 12 25 EA 2 $6,119.00 18 3312A004 4" Combination Air Valve Assembly for Water 33 12 30 I EA 2 $44,845.00 19 3312.2003 1" Water Service 33 12 10 EA 297 $1,449.00 20 3312.2103 1 1/2" Water Service (Irrigation) 33 12 10 I EA 6 $2,364.00 21 3312.2203 2" Water Service 33 12 10 EA 1 $3,491.00 22 3312.3003 8" Gate Valve 33 12 20 EA 63 $2,575.00 23 3312.3005 12" Gate Valve 33 12 20 EA 6 $4,315.00 24 3312.3008 24" Gate Valve & Vault 33 12 20 EA 6 $47,164.00 25 3312.6003 8" Blow Off Valve 33 12 60 j EA 1 $28,240.00 TOTAL UNIT 1: WATER IMPROVEMENTS CITY OF rORT NOR-.tl STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS- DEVELOPER AWARDED PROJECTS Form Version Mai 22, 2019 Bid Value $18,040.00 1 $3,936.001 $19,530.001 $58,630.00 1 $20,254.00 1 $10,600.001 $25,560.00 1 $553,201.67 1 $605,774.00 1 $106,680.001 $215,136.00 1 $10,736.001 $672,360.00I $32,720.00 $126,350.00 $10,297.00 $12,238.00 $89,690.00 $430,353.00 $14,184.001 $3,491.001 $162,225.001 $25,890.00� $282,994.00 $28,240.00 $3,539,099.67 00 42 41_Bid Pruposa1_DAP.%1SX Utilities DAP- BID PROPOSAL Page 2 of 5 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal 1BidlistIteml I Unit of Bid No. Description Specification Section No. Measure Quantity Unit Price Bid Value UNIT I -A: ALTERNATE WATER IMPROVEMENTS 2 13312.6002 6" Blow Off Valve en Cut 331260 I EA 1211 $28,240.001 $28,240.00 TOTAL UNIT I -A: ALTERNATE WATER IMPROVEMENTSI $52,050.40 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 00 42 4$_Bid Proposal_DAP.xlss udlilies DAP -BID PROPOSAL Pe8e 3 or5 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidlist Item) No. Description 1 3301.0002 Post -CCTV Inspection 2 3301.0101 Manhole Vacuum Testing 3 3305.0107 Manhole Adjustment, Minor 4 3305.0109 Trench Safety 5 3305.1003 20" Casing By Open Cut 6 3331.3101 4" Sewer Service 7 3331.3106 4" DIP Sewer Service 8 3331.4115 8" Sewer Pipe 9 3331.4116 8" Sewer Pipe, CSS Backfill 10 3331.4119 8" DIP Sewer Pipe 11 3331.4201 10" Sewer Pipe 12 3331.4202 10" Sewer Pipe, CSS Backfill 13 3331.4208 12" Sewer Pipe 14 3331.4209 12" Sewer Pipe, CSS Backfill 15 3331.4215 15" Sewer Pipe 16 3331.4216 15" Sewer Pipe, CSS Backfill 17 3331.5747 8" Sewer Pipe, CLSM Backfill 18 3331.5748 8" DIP Pipe, CLSM Backfill 19 3339.0001 Epoxy Manhole Liner 20 3339.1001 4' Manhole 21 3339.1002 4' Drop Manhole 22 3339.1003 Extra Depth Manhole Project Item Informatiion Specification Section No. I IN,- 11. 0ACCtlUCO IUOOMICUC\Re Bidder's Application Bidder's Proposal Unit of I Bid Measure Quantity Unit Price Bid Value 3301 31 LF 15,395II 3301 30 EA 78I 33 05 14 EA 1 ll 33 05 10 LF 15,395 33 05 22 LF 20 3331 50 EA 285 3331 50 EA 13 3311 10,3331 12,3331 20 LF 9,137 3311 10,3331 12,3331 20 LF 600 331110 LF 180l 3311 10,3331 12,3331 20 LF 191 3311 10,3331 12,3331 20 LF 20 3311 10,3331 12,3331 20 LF 1,293 3311 10,3331 12,333120 LF 818 3311 10,3331 12,3331 20 LF 1,382 3311 10,3331 12,3331 20 LF 1,734 3411 10,3331 12,3331 20 LF 20 3511 10,3331 12,3331 20 LF 20 33 39 60 VF 335 33 39 10, 33 39 20 EA 69 33 39 10, 33 39 20 j EA 9 33 39 10, 33 39 20 I VF 370 TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS $2.00 $30,790.00 $198.00 $15,444.00 $1,395.00 $1,395.00 $1.00 $15,395.00 $305.00 $6,100.00 $1,854.00 $528,390.00 $8,451.00 $109,863.00 $55.00 $502,535.001 $83.00 $49,800.001 $112.00 $20,160.00� $82.00 $15,662.00 $119.00 $2,380.00 $78.00 $100,854.00 $153.00 $125,154.00 $104.00 $143,728.00 $263.00 $456,042.00 $100.00 $2,000.001 $100.00 $2,000.001 $418.00 $140,030.001 $4,227.00 $291,663.00 $5,411.00 $48,699.00 $354.00 $130,980.001 $2,739, 064.00 1 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DF.VF.LOPER AWARDED PROJECTS Form Version May 22, 20I9 0042 43_Bid P,.p..I_DAP.xlss Ulilities DAP - BID PROPOSAL Pzgc 4 or5 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project item Information Bidder's Proposal Bidlist Item Description I No. Specification Section No. Unit of Measure I Bid Quantity Unit Price I Bid Value UNIT III: DRAINAGE IMPROVEMENTS 1 3137.0105 Medium Stone Riprap, Grouted 31 3700 SY 1,292 $149.00 $192,508.00 2 3305.0109 Trench Safety 33 05 10 LF 12,803 $1.00 $12,803.00 3 3341.0201 21" RCP, Class III 3241 10 LF 736 $81.00 $59,616.00 4 3341.0205 24" RCP, Class III 3341 10 LF 2434 $90.00 $219,060.00 5 3341.0208 27" RCP, Class III 3341 10 LF 506 $106.00 $53,636.00 6 3341.0302 30" RCP, Class III 3341 10 LF 208 $112.00 $23,296.00 7 3341.0309 36" RCP, Class III 3341 10 LF 924 $143.00 $132,132.00 8 3341.0402 42" RCP, Class III 3341 10 LF 854 $206.00 $175,924.00 9 3341.0409 48" RCP, Class III 3341 10 LF 2,576 $241.00 $620,816.00 f 10 3341.1001 3'x2' Box Culvert 3341 10 LF 108 $222.00 $23,976.00 11 3341.1101 4'x2' Box Culvert 3341 10 LF 75 $252.00 $18,900.00 12 3341.1103 4'x4' Box Culvert 3341 10 LF 863 $276.00 $238,188.00 13 3341.1202 5'x4' Box Culvert 3341 10 LF 1,210 $332.00 $401,720.00 14 3341.1203 5'x5' Box Culvert 3341 10 LF 321 $384.00 $123,264.00 15 3341.1304 6'x5' Box Culvert 3341 10 LF 1,268 $451.00 $571,868.001 1 16 13349.0001 4' Storm Junction Box 33 49 10 EA 17 $7,471.00 $127,007.001 1 17 13349.0002 5' Storm Junction Box 33 49 10 EA 11 $9,836.00 $108,196.001 1 18 13349.0003 6' Storm Junction Box 33 49 10 EA 4 $11,715.00 $46,860.001 1 19 13349.0004 7' Storm Junction Box 33 49 10 EA 1 $15,345.00 $15,345.001 1 20 13349.0005 8' Storm Junction Box 33 49 10 EA 10 $15,675.00 $156,750.001 1 21 13349.4105 24" SET, 1 pipe 33 49 40 EA 2 $3,985.00 $7,970.001 1 22 13349.4107 30" SET, 1 pipe 33 49 40 EA 1 $5,250.00 $5,250.001 1 23 13349.4109 36" SET, 1 pipe 33 49 40 EA 2 $5,495.00 $10,990.001 1 24 ]3349.4111 42" SET, 1 pipe 33 49 40 EA 1 $6,210.00 $6,210.001 1 25 13349.4113 48" SET, 1 pipe 33 49 40 EA 2 $6,650.00 $13,300.001 1 26 13349.5001 10' Curb Inlet 33 49 20 EA 41 $8,251.00 $338,291.001 1 27 13349.5002 15' Curb Inlet 33 49 20 EA 5 $10,091.00 $50,455.001 1 28 13349.5003 20' Curb Inlet 33 49 20 EA 81 $11,766.00 $94,128.001 1 29 13349.7001 4' Drop Inlet 33 49 20 EA 61 $7,621.00 $45,726.001 1 30 13349.7002 5' Drop Inlet 33 49 20 EA 31 $12,461.00 $37,383.001 1 31 19999.0001 5'x2' Box Culvert 99 99 99 LF 6201 $304.001 $188,480.001 32 I999C969; 0002p �ETP-CD Headwall (5'x2' RCB, 5 pipes & 5'x4' 99 99 99 EA 2 $35,250.00 $70,500.00 1 33 19999.0003 SETP-CD Headwall (5'x5' RCB, 1 pipe) 99 99 99 EA 11 $15,285.001 $15,285.001 1 34 19999.0004 SETP-CD Headwall (6'x5' RCB, 1 pipe) I 99 99 99 EA 1 $17,870.00] $17,870.00 35 9999.0005 SETB-SW-0 Headwall (5'x5' RCB, 1 pipe) 99 99 99 EA 1 $19,960.00] $19,960.00 36 9999.0006 SETP-CD Headwall (2'x4', 1 Pipe) 99 99 99 EA 21 $7,695.00 $15,390.00 37 9999.0007 SETP-CD Headwall (2'x3', 2 Pipe) 99 99 99 EA 21 $13,195.00 $26,390.00 38 9999.0008 Concrete Liner for Pond Spillway I 99 99 99 SY 9511 $104.00 $98,904.00 TOTAL UNIT III: DRAINAGE IMPROVEMENTS I $4,384,347.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS- DEVELOPER AWARDED PROJECTS Form Version Nay 22, 2019 00 42 43_Bid Proposal_DAP.ch, ulilili,s DAP- BID PROPOSAL Page 5 of5 UNIT PRICE BID Bidlist Item No. SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Bidder's Application Project item Information Bidder's Proposal Description Specification Section No. Unit of Measure QBid uantity Unit Price Bid Value Bid Summary UNIT I: WATER IMPROVEMENTS $3,539,099.671 UNIT II: SANITARY SEWER IMPROVEMENTS 1 $2.739,064.001 UNIT III: DRAINAGE IMPROVEMENTS $4 384 347.00 UNIT I -A: ALTERNATE WATER IMPROVEMENTS This Bid is submitted by the entity named below: BIDDER: Wright Construction Co. Inc. 60VW. Wall St. Grapevine, Texas 76051 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Fom, Version May 22, 2019 BY: TITLE: DATE: END OF SECTION Total Construction Bidl $10,662,510.671 1 $52,050.401 Total Alternate Bidl $52,050.401 5;,/?-11zo-enf - 120 working days after the date when the 0042 43_Bid Proposal_DAP.xlsx City of Fort Worth, Texas Mayor and Council Communication DATE: 03/19/24 M&C FILE NUMBER: M&C 24-0224 LOG NAME: 60LONGHORN ESTATES PHASE 1 WATER IMPROVMENTS SUBJECT (CD 6) Authorize Execution of a Community Facilities Agreement with D.R. Horton -Texas, LTD., with City Participation in the Amount Up to $2,753,063.55 for Oversizing an 8-Inch to a 12-Inch Water Main and an 8-Inch to 24-Inch Water Main for Longhorn Estates Phase 1 Development Located in South Fort Worth, and Adopt Appropriation Ordinances to Effect a Portion of Water's Contribution to the Fiscal Years 2024-2028 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize the execution of a Community Facilities Agreement with D.R. Horton -Texas, LTD., with City participation in the amount up to $2,753,063.55 for oversizing an 8-inch to a 12-inch water main and an 8-inch to 24-inch water main for Longhorn Estates Phase 1 Development located in northwest Fort Worth; and 2. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Water & Sewer Capital Project 2018 Fund by increasing estimated receipts and appropriations in the Community Facilities Agreement Bucket programmable project (City Project No. P00001) in the amount of $3,290,549.00 and decreasing estimated receipts and appropriations in the Unspecified -All Funds project (City Project No. UNSPEC) by the same amount for the purpose of funding the Community Facilities Agreement — Longhorn Estates Phase 1 project (City Project No.105087) and to effect a portion of Water's contribution to the Fiscal Years 2024-2028 Capital Improvements Program. DISCUSSION: D.R. Horton -Texas, LTD., (Developer) is constructing the Longhorn Estates Phase 1 development project located east of Chisholm Trail Parkway and north of Interstate Highway 1187. The City is participating in the project to oversize approximately 5,238 linear feet of an 8-inch water main to a 12-inch water main and approximately 3,565 linear feet of an 8-inch water main to a 24-inch water main for Longhorn Estates Phase 1 Development and anticipated future growth in the area. The construction cost for the 24-inch water main is estimated to be allocated at 15.9% for the Developer and 84.1 % for the City. The Longhorn Estates Phase 1 project is assigned City Project No. 105087 and Accela System Record I PRC23-0129. In accordance with Chapter 212, Subchapter C of the Texas Local Government Code, the City's participation in the contract is exempt from competitive bidding requirements because the contract is for oversizing public improvements being constructed by the Developer, the Developer will execute a performance bond to cover the total project cost, including all of the City's cost participation, and the City's cost participation will be determined in accordance with the City's community facilities agreement (CFA) unit price ordinance. The City's cost participation in oversizing of the water mains is estimated to be in an amount not to exceed $2,753,063.55 as shown in the table below. Payments to the Developer are estimated to be $2,687,425.05 for construction costs and $53,748.50 for material testing costs. The City's cost participation also includes $11,890.00 to cover the City's portion of construction inspection service fees, administrative material testing fees, and water lab fees. An additional $537,485.01 in the contingency funds will cover the City's portion of any change orders. The following table shows the cost sharing breakdown for the project between all parties: A. Public Improvements Developer City Cost Total Cost Cost 1. Water $853,794.53$2,687,425.05 $3,541,219.57 �2. Sewer $2,731,445.00 $0.00 $2,731,445.00 Contingency $0.00 $537,485.01 $537,485.01 �3. Paving $5,719,784.85 $0.00 $5,719,784.85 �4. Street Lights $605,988.06 $0.00 $605,988.06 1 �5. Storm Drains B. Inspections & Testing 1. Construction Inspection Fee 2. Admin Material Testing Fee �3. Material Testing Cost �4. Water Lab Fee Total Project Cost $4,438,015.00 $0.00 $4,438,015.00 $106,800.00 $11,400.00 $118,200.00 $45,080.00 $490.00 $45,570.00 $0.00 $53,748.50 $53,748.50 $3,690.00 $0.00 $3,690.00 $14,504,597.44 $3,290,548.56 $17,795,146.00 *Numbers will be rounded up for accounting purposes. The reimbursement of the City participation, excluding inspection and material testing fees, is not a lump -sum amount and may be less than the stated amount depending upon the actual quantities and unit prices from the Notice of Final Completion package, commonly referred to as the Green Sheet package. It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the Mayor & Council Communication (M&C) will appropriate funds in support of the Water Department's portion of the City of Fort Worth's Fiscal Years 2024-2028 Capital Improvements Program, as follows: 60LONGHORN ESTATES PHASE 1 WATER IMPROVMENTS Capital Budget Revised Fund Project FY2024 CIP Change Authority Name Name Appropriations (Increase/ Budget Budget B Decrease) 56014 — 105087 - W&S CFA- Capital Proj Longhorn Estates $0.00 This M&C $3,290,549.00 $3,290,549.00 2018 Fund Phase1 Funding is available in the Unspecified -All Funds project within the Water & Sewer Capital Projects 2018 Fund for the purpose of funding the CFA- Longhorn Estates Phase 1 project. Funding for the Community Facility Agreement (CFA) — Longhorn Estates Phase 1 project as depicted in the table below: IFUND JExisting AppropriationsIlAdditional Appropriations 11 Project Total* IW&S Capital Proj 2018 — Fund 56014I1 $0.0011 $3,290,549.0011$3,290,549.00 (Project Total 1 $0.001I $3,290,549.00II$3,290,549.00 *Numbers rounded for presentation purposes. BUSINESS EQUITY- D.R HORTON-Texas, LTD., the developer is in compliance with the City's Business Equity Ordinance by committing to 7% MWBE participation on this project. The City's MWBE goal on this project is 7%. This project is located in COUNCIL DISTRICT 6. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Unspecified - All Funds project within the W&S Capital Proj 2018 Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in W&S Capital Proj 2018 Fund for the CFA- Longhorn Estates Phase 1 project to support the approval of the above recommendations and execution of the agreement. Prior to an expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. Submitted for Citv Manaaer's Office bv: Fernando Costa 6122 Oriainatina Business Unit Head: Chris Harder 5020 Additional Information Contact: Suby Varughese 8009 Melissa Harris 8028