HomeMy WebLinkAboutContract 59715-CO3CSC No. 59715-0O3 Fox�RTH ., Project Name Client Project #(s) Project Description Contractor City Project Mgr. City of Fort Worth Change Order Request 2023 Concrete Restoration Contract 4 City Sec # 59715 104771 Concrete pavement replacement on various locations Makou Inc. Marwan Hafez Change Order# 3 City Inspector Date 5/3/2024 Habte Taezaz Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date TPW Totals Contract Time (CD) $2,280,180.00 $2,280,180.00 240 $58,450.00 $58,450.00 30 $2,338,630.00 $2,338,630.00 270 !Amount of Proposed Change Order $20,000.00 $20,000.00 20 Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) CHANGE $2,358,630.00 $2,358,630.00 290 $100,000.00 $100,000.00 J $41,550.00 $41,550.00 ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) 3.44% $2,850,225.00 JUSTIFICATION (REASONS) FOR CHANGE ORDER This Change Order #3 will provide for: 1. Additional quantities for irrigation utility adjustments on Championship Pkwy under the existing Item 12. Due to the site conditions of damaged concrete panels and drainage issues, more panels were considered for replacement on Championship Pkwy. The additional concrete panel replacement required fixing the existing irrigation system in the parkway and median behind the curb. It's necessary to increase the allowance under this bid item to repair the damaged system during construction. 2. Adding 20 days for the contractor to complete the additional work. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. ontractor's Com.an Name ontractor Nam Contract Si. nature Date Makou, Inc. Maqsood Khan May 8, 2024 ,,, 7, ,,,,— ,, InspedWnspection Supervisor Date Project and Contract Compliance Manager Date twd ( May 8, 2024 _Ea— May 8, 2024 Program Manager Date Senior Capital Project Officer M. Date ..tom. May 8, 2024 W May 9, 2024 Assistant Director (Dept) Date Director, Contracting Department (Dept) — Date atFica L WMrack May 9, 2024 .16...a. May 9, 2024 Assistant City Attorney Date Assistant City Manager Date May 13, 2024 May 17, 2024 w.,Moe „r Council Ac ion (if required) M&C Number M&C Date Approved ATTEST: Jannette Goodall, City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORT Project Name Client Project # Contractor City of Fort Worth Change Order Additions 2023 Concrete Restoration Contract 4 City Sec # 59715 104771 Makou Inc. PM Marwan Hafez Change Order Submittal # ADDITIONS 3 Inspector Date Habte Taezaz I 51312024 I ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 12 3305.0108 Miscellaneous Adjustment (Utilities) TRW 1.00000000 LS $20 000 00 $20 000 00 TPW $20 000.00 Sub Total Additions $20,000.00 Change Order Additions Page 2 of 4 Fox r� Project Name Client Project # Contractor City of Fort Worth Change Order Deletions 2023 Concrete Restoration Contract 4 City Sec # I 104771 Makou Inc. PM Marwan Hafez Change Order Submittal # DELETIONS 3 Inspector Date 59715 Habte Taezaz I 5/3/2024 DESCRIP PION DEPf Qty Unrt Unit Cost Total TPW $0.00 Sub Total Deletions $0.00 Change Order Deletions Page 3 of 4 M/SBE for this Change Order M/SBE Sub Type of Service Amount for this CO $0.00 Total $0.00 Previous Change Orders CO # DATE AMOUNT CO #1 9/27/2023 $33,050.00 CO #2 3/22/2024 $25,400.00 Total $58,450.00 FORT WORTH.,, Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: 2023 CONCRETE RESTORATION CONTRACT 4 M&C: 23-0466 CPN: 104771 CSO: 59715 DOC#: CO3 Date: 5/3/2024 To: Name Department Initials Date Out 1 Sophia Flores (BSP) TPW May 8, 2024 2 Maqsood Khan/Makou, Inc. Vendor` May 8, 2024 3 Habte Taezaz (Inspector) TPW ►( May 8, 2024 4 Marwan Hafez (PM) TPW M, May 8, 2024 5 Zelalem Arega (PGM) TPW 7A- May 8, 2024 ZA 6 Mary Hanna (SCPO) TPW N7i7 May 9, 2024 J 7 Patricia Wadsack (AD) TPW PL W May 9, 2024 8 Lauren Prieur (Director) TPW ?17-- May 9, 2024 9 Doug Black (ACA) Legal DE May 13, 2024 DB 10 Jesica McEachern (ACM) CMO of, May 17, 2024 11 Jannette Goodall (CS) CSOJG L76 May 17, 2024 12 TPW Contracts TPW CC: ALSO Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, List: - Bus Sppt: Sophia Flores; Prg Mgr: Zelalem Arega- Sr CPO: Mary Hanna TPW Contracts DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: DYES ®No RUSH: OYES No SAME DAY: OYES ❑No NEXT DAY: OYES No ROUTING TO CSO: ®YES ❑No Action Required: ❑ As Requested ❑ For Your Information ❑ Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return To: Please notify TPWContractsn,,fortworthtexas.gov for pickup when complete. Ca11 ext. 7233 or ext. 8363 with questions. Thank you!