HomeMy WebLinkAboutContract 59023-FP2 (2)FORT WORTH. -FP2 City Secretary Contract No. 59023 Date Received 05/09/2024 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Sycamore Landing Phase 2 City Project No.: 103921 Improvement Type(s): x❑ Paving ❑ Drainage (Original Contract Price: (Amount of Approved Change Order(s): Revised Contract Amount: Total Cost of Work Complete: ❑ Street Lights ❑ Traffic Signals $1,139,610.31 $1,139,610.31 ,7awer MGAClbbeh May 8, 2024 James McKibben (Mav 8. 202411:23 CDT) Contractor Date Project Manager Title L.H. Lacy Company, LTD Company Name R&A,t�,k g May 8, 2024 Roderick Baker (Mav 8. 202411:36 CDT( Project Inspector Date May 8, 2024 Project Manager Date May 9, 2024 T� en (Mav 9. 202408:05 CDT) CFA Manager Date A. =- May 9, 2024 Lauren Pneur (May 9, 202408:06 CDT) TPW Director Date C�P� May 10, 2024 Asst. City Manager Date OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 1 of 2 Notice of Project Completion Project Name: Sycamore Landing Phase 2 City Project No.: 103921 City's Attachments Final Pay Estimate x❑ Change Order(s): ❑ Yes ❑x N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time 160 WD Work Start Date: 4/24/2023 Completed number of Soil Lab Test: 466 Completed number of Water Test: 59 Days Charged: 188 Work Complete Date: 4/18/2024 Page 2of2 FoRTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name SYCAMORE LANDING PHASE 2 Contract Limits Project Type PAVING IMPROVEMENTS City Project Numbers 103921 DOE Number 3921 Estimate Number 1 Payment Number 1 City Secretary Contract Number Contract Date Project Manager NA Contractor L.H. LACY COMPANY P.O. BOX 541297 Inspectors For Period Ending 4/18/2024 WD Contract Time 5WD Days Charged to Date 188 Contract is 100.00 Complete DALLAS , TX 75354 M. GLOVER / R.BAKER Tuesday, April 23, 2024 Page 1 of 4 City Project Numbers 103921 DOE Number 3921 Contract Name SYCAMORE LANDING PHASE 2 Estimate Number I Contract Limits Payment Number 1 Project Type PAVING IMPROVEMENTS For Period Ending 4/18/2024 Project Funding UNIT IV: PAVING IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 6" REINFORCED CONC PVMT 16044 SY $53.44 $857,391.36 16044 $857,391.36 2 6" LIME TREATMENT 17079 SY $3.97 $67,803.63 17079 $67,803.63 3 HYDRATED LIME (32#/SY PER GEOTECH) 274 TN $236.17 $64,710.58 274 $64,710.58 4 4" CONC SIDEWALK 10574 SF $7.86 $83,111.64 10574 $83,111.64 5 TOP SOIL 119 CY $22.57 $2,685.83 119 $2,685.83 6 BLOCK SOD PLACEMENT 713 SY $15.91 $11,343.83 713 $11,343.83 7 BARRIER FREE RAMP, TYPE P-1 16 EA $2,278.51 $36,456.16 16 $36,456.16 8 CONNECT TO EXISTING PAVEMENT 4 EA $2,862.92 $11,451.68 4 $11,451.68 9 FURNISH/INSTALL ALUM SIGN GROUND 8 EA $84.75 $678.00 8 $678.00 MOUNT CITY STD Rl-1 STOP SIGN 10 FURNISH/INSTALL ALUM SIGN GROUND 22 EA $180.80 $3,977.60 22 $3,977.60 MOUNT CITY STD - STREET NAME BLADE PAIR Sub -Total of Previous Unit $1,139,610.31 $1,139,610.31 Tuesday, April 23, 2024 Page 2 of 4 City Project Numbers 103921 Contract Name SYCAMORE LANDING PHASE 2 Contract Limits Project Type PAVING IMPROVEMENTS Project Funding Contract Information Summary Original Contract Amount Chanhe Orders Change Order Number DOE Number 3921 Estimate Number 1 Payment Number 1 For Period Ending 4/18/2024 $1,139,610.31 Total Contract Price $1,139,610.31 Total Cost of Work Completed $1,139,610.31 Less % Retained $0.00 Net Earned $1,139,610.31 Earned This Period $1,139,610.31 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $1,139,610.31 Tuesday, April 23, 2024 Page 3 of 4 City Project Numbers 103921 Contract Name SYCAMORE LANDING PHASE 2 Contract Limits Project Type PAVING IMPROVEMENTS Project Funding Project Manager NA Inspectors M. GLOVER / R.BAKER Contractor L.H. LACY COMPANY P.O. BOX 541297 DALLAS, TX 75354 DOE Number 3921 Estimate Number 1 Payment Number 1 For Period Ending 4/18/2024 City Secretary Contract Number Contract Date Contract Time 55 WD Days Charged to Date 188 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $1,139,610.31 Less % Retained $0.00 Net Earned $1,139,610.31 Earned This Period $1,139,610.31 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $1,139,610.31 Tuesday, April 23, 2024 Page 4 of 4 FORTWORTH. TRANSPORTATION AND PUBLIC WORKS April 18, 2024 L.H. Lacy Company LTD 1880 Crown Dr. Suite 1200 Dallas, Texas 75234 RE: Acceptance Letter Project Name: Sycamore Landing Phase 2 Project Type: Paving City Project No.: 103921 To Whom It May Concern: On March 14, 2024 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on April 18, 2024. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on April 18, 2024, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-8424. Sincerely, e Sandip Adhikari, Project Manager Cc: Roderick Baker, Inspector Mike Glover, Inspection Supervisor Randy Horton, Senior Inspector Andrew Goodman, Program Manager UA Engineering, Consultant L H Lacy Company LTD, Contractor Sycamore Landing LTD, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19 AFFIDAVIT STATE OF Texas COUNTY OF Dallas Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Bobby Gordon, President Of L.H. Lacy Company, Ltd, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; City Project #103921 - Sycamore Landing Phase 2 BY Bobby W. Don, Partner/CEO Subscribed and sworn before me on this date 1 of May, 2024. tart' Public Dallas County, State of Texas Z�:R •,,r 7 "`` DARLENE CONEY Notary ID #10317301 My Commission Expires March 9, 2028 CONSENT OF SURETY TO FINAL PAYMENT AM Docu"WrO G707 Bond No. 4844449 TO CMNER (AW-r snarad&%W) City of Fort Worth & Sycamore Landing LTD 13141 Northwest Freeway Houston, TX 77040 PROJECT: (Nrmrrand"*wj Sycamore Landing Phase 2 - Paving OWNER O ARCED TRCi D CONPRACTOR 11 SURETY $7 OTHER Q ARCHITECT'S PROJECT NO.: CONTRACT FOR: Sycamore Landing Phase 2 - Paving CONTRACT DATED: In accordance with the provisions of the Contract between the Owner and the Contractox as hKbcm-d abcwe, the (lamrmoreAW ofsm-ty) Great American Insurance Company 301 East Fourth Street Cincinnati, OH 45202 , SURETV, on bond of prawn name and addmwgf*)wraaur) L.H. Lacy Company, Ltd. 1880 Crown Dr., Suite 1200 Dallas, TX 75234 , CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees rhat final payment to the Contractor shall nrx relieve the Surety of any of its obligadons to ffi wrtnamewtdardalrwgfoaww- City of Fort Worth & Sycamore Landing LTD 13141 Northwest Freeway Houston, TX 77040 as set forth fn said Surety's bond. IN WiTNBS WHEREOF, the Surety has hereunto set its hand on thfs date: March 21, 2024 (rnwd in mitt rbr arowrb�tlarrd?� adcmramicsk+amrd�eara (Sew). `c Al Johns , , Witness OWNIM sl4P Great American Insurance Company ai �• :� fir *`• � � fs]yhnurrQiaxrba�aNieprs�rnrsrhrl David T. Miclette (h*mvdiauar aad tkk) Attorney -in -Fact G707w--1994 GREAT AMERICAN INSURANCE COMPANY® Administrative Office: 301 E 4TH STREET • CINCINNATI, OHIO 45202 • 513-369-5000 • FAX 513-723-2740 The number of persons authorized by this power of attorney is not more than Fourteen POWER OF ATTORNEY No. 0 22183 KNOW ALL MEN BY THESE PRESENTS: That the GREATAMERICAN INSURANCE COMPANY, a corporation organized and existing under and by virtue of the laws of the State of Ohio, does hereby nominate, constitute and appoint the person or persons named below, each individually if more than one is named, its true and lawful attomey-in-fact, for it and in its name, place and stead to execute on behalf of the said Company, as surety, any and all bonds, undertakings and contracts of suretyship, or other written obligations in the nature thereof; provided that the liability of the said Company on any such bond, undertaking or contract of suretyship executed under this authority shall not exceed the limit stated below. Name Address Limit of Power Stacey Bosley Nikole Jeannette Lucas Lomax All Ashley Britt David T. Miclette Norma Toups $100,000,000 Jennifer Mitchell Lacey Hitchcock Will Duke Robert M. Overbey, Jr. All of Rita G. Gulizo Stacy Owens Houston, Texas Robert C. Davis Barry K. McCord This Power of Attorney revokes all previous powers issued on behalf of the attomey(s)-in-fact named above. IN WITNESS WHEREOF the GREAT AMERICAN INSURANCE COMPANY has caused these presents to be signed and attested by its appropriate officers and its corporate seal hereunto affixed this 18th day of September 1 2023 Attest GREAT AMERICAN INSURANCE COMPANY :3 A it 904 w Assistant Secretary Divisional Senior Pce President STATE OF OHIO, COUNTY OF HAMILTON - ss: MARK vicARio (977-377-2405) On this 18th day of September 2023 , before me personally appeared MARK VICARIO, to me known, being duly sworn, deposes and says that he resides in Cincinnati, Ohio, that he is a Divisional Senior Vice President of the Bond Division of Great American Insurance Company, the Company described in and which executed the above instrument; that he knows the seal of the said Company; that the seal affixed to the said instrument is such corporate seal; that it was so affixed by authority of his office under the By -Laws of said Company, and that he signed his name thereto by like authority. y IUSAN A KOHORST Notary Public State of Ohio My Comm. Expires May 18, 2025 This Power of Attorney is granted by authority of the following resolutions adopted by the Board of Directors ofGreatAmerican Insurance Company by unanimous written consent dated June 9, 2008. RESOLVED: That the Divisional President, the several Divisional Senior Vice Presidents, Divisional Vice Presidents and Divisonal Assistant Vice Presidents, or am one of them, be and hereby is anthorLed, from time to time, to appoint one or more Attorneys -in -Fact to execute on behalf of the Compam, as surety, any and all bonds, undertakings and contracts ofstiretyship, or other written obligations in the nature thereof' to prescribe their respective duties and the respective limits of their authority; and to revoke any such appointment at any time. RESOLVED FURTHER: That the Company seal and the signature of any of the aforesaid officers and any Secretary or Assistant Secretary of the Company maybe affixed by facsimile to any power of attorney or certificate of either given for the execution of any bond, undertaking, contract of suretyship, or other written obligation in the nature thereof, such signature and seal when so used being hereby adopted by the Company as the original signature ofsuch officer and the original seal of the Company, to be valid and binding upon the Company, with the same farce and effect as though manually affixed. CERTIFICATION I, STEPHEN C. BERAHA, Assistant Secretary of Great American Insurance Company, do hereby certify that the foregoing Power of Attorney and the Resolutions of the Board of Directors of June 9, 2008 have not been revoked and are now in full force and effect. Signed and sealed this 21 st day of March 2024 i Assistant Secretary S1029AH (03/20)