HomeMy WebLinkAboutContract 61069-CO1CSC No. 61069-COI Fox_ T� rtM Project Namel 2024 Asphalt Resurfacing Contract 2 Client Project #(s)I 104961 Project Description) Contractorl Texas Materials Group City Project Mgr.I Tariqul Islam Dept Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) TPW $1,908,743.34 City of Fort Worth Change Order Request Resurfacing of Everman Pkwy and W. Risinger Rd Change Order #I 1 I City Inspector City Sec # I 61069 Date 4/9/2024 $1,908,743.34 $0.00 $1,908,743.34 $190,874.00 $190,874.00 Fabian Diaz Aguinaga Contract Time Totals (CD) $1,908,743.34 210 $1,908,743.34 210 $0.00 $1,908,743.34 210 $190,874.00 $190,874.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 0.00% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) 1 $2,385,929.18 JUSTIFICATION (REASONS) FOR CHANGE ORDE A change order has been issued for the contract to change the 2-inch hot mix asphalt surface layer from PG64-22 Type D to SuperPave SP-D PG70-22XR. This change has been recommended by the Pavement Management staff due to the high volume of truck traffic on Risinger Rd and Everman Pkwy. The contractor has provided a reasonable quote for the mix, which has been compared to other asphalt mixes used in recent bids. As a result of this change, the contract pay item for the Type D mix will be deleted, resulting in an additional $8,627.20 added to the contract. However, the net change order amount will be zero ($0) as the construction allowance pay item will be used to negate the additional cost. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting reauirements. Contractor's Company Name Contractor (Name) Contract Signature Date Texas Bit Matthew Harper pp„g,o„ o3 0 Apr 29, 2024 Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date on U Apr 24, 2024 ��W— Apr 24, 2024 Program Managglo, Date Senior Capital Project Officer Date ZelovyAfW 11 Apr 29, 2024 — Apr 29, 2024 As ' Date Director, Contracting Department (Dept) Date „.a z o.� May 2, 2024 May 3, 2024 Assistant City Attorney Date A Date May 7, 2024j{Q May 10, 2024 Council Ac ATTEST: o vvapq 0 *o Jannette Goodall, City Secretary d ~a d 008 o=d OPT*oo o°°*�d 3ann nEXp5o4 M&C Number I I M&C Date Approved OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FoR_ T�W�o Project Name 2024 Asphalt Resurfacing Contract 2 Client Project # 104961 Contractorl Texas Materials Group City of Fort Worth Change Order Additions I I tM UESCRIP I ION 39-New 2 Inch Asphalt Paving with MAC SP-D SAC -A 70-22 XR City Sec # 61069 PMl Tariqul Islam Inspector raul Gnan nla� l Change Order Submittal # 0 Date 1 4/9/2024 ADDITIONS DEP I Oty Unit Unit Cost I otal 1 TPW 61,670.0000000IJ SY $17.32 $894,924.401 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I I I 1 I 1 I 1 TPW $894,924.401 1 1 1 Sub Total Additions $894,924.401 Change Order Additions Page 2 of 4 FOeH Project Name 1 2024 Asphalt Resurfacing Contract 2 Client Project # 1 104961 Contractorl Texas Materials Group ITEM DESCRIPTION 14 2 Inch Asphalt Pavement I ype D 38 Paving Construciton Allowancew City of Fort Worth Change Order Deletions City Sec # 61069 PMl Tariqul Islam l Inspector real Anan nla� l Change Order Submittal # Date 4/9/2024 DELETIONS DEPT Oily Unit Unit Cost Total IPW b1,6/u.uuumud Sv $11.16 $886,6b1201 TPW 0.11810286 LS $70,000.00 $8,267.201 TF W $894,924.401 1 1 1 Sub Total Deletions $894,924.40 1 Change Order Deletions Page 3 of 4 M/SBE for this Change Order M/SBE Sub Type of Service Amount for this CO Not Applicable Not Applicable Not Applicable Total $0.00 Previous Change Orders CO # DATE AMOUNT Not Applicable Not Applicable Not Applicable Total I $0.00 1 FORT WORTH. Routing and Transmittal Slip Transportation and Public Works Department DOCUMENT TITLE: 2024 Asphalt Resurfacinq Contract 2, CO 1 M&C CPN 104961 CSO # 61069 DATE: INITIALS To: 1. Crystal Greene (Business Support; 09 2.Texas Bit — Matthew Harper it H MH 3. Fabian Diaz Aguinaga (Inspector) FD FD 4. Oscar Aguillon (Sr. Inspector) o,� OA 5.Tariqul Islam (PM) ' a 6 Zelalem Arega (PGM) 7. Mary Hanna (SCPO)� s. Patricia Wadsack (AD) g Lauren Prieur (Director) L DOC# DATE OUT Apr 24, 2024 Apr 29, 2024 Apr 24, 2024 Apr 29, 2024 Apr 24, 2024 Apr 29, 2024 Apr 29, 2024 May 2, 2024 May 3, 2024 10. Doug Black (ACA) DB0 May 7, 2024 11. Jesica McEachern (ACM) J May 10, 2024 12. Jannette Goodall (CS) _a May 13, 2024 JG DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: U Yes ❑✓ No RUSH: ❑ ❑✓ SAME DAY: ❑Yes ❑✓ No NEXT DAY: []Yes ❑✓ No ROUTING TO CSO: OYes [—]No Action Required: Ei As Requested ❑ Attach Signature, Initial and Notary Ta ■ Signature/Routing and or Recording ❑ Comment ❑ File Return to: Please call at ext. for pick up when completed. Thank you.