HomeMy WebLinkAboutContract 59323-CO1CSC No. 59323-COI
Foxes
Project Namel 102980 - 2022 Bond Yr 1- Contract 6
Client Project #(s)I
Project
Description
Contractorl
City Project Mgr
City of Fort Worth
Change Order Request
l City Sec # l 59323
Combined Street Paving Improvements, Water and Sanitary Sewer Main Replacements for 2022 Bond Year 1 - Contract 6
Stabile and Winn, Inc. Change Order#1 1 l Datel 4/22/2024
Sandip Uprety City Inspectorl Pedro Hernandez
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
Unit 1: Water Unit 2: Sewer Unit 3: Paving Unit 4: Storm
$3,207,420.25 $1,103,711.00 $3,690,507.84
$3,207,420.25
$1,103,711.00
$3,690,507.84
$20,040.00
$20,022.00
$0.00
$0.00
$3,227,460.25
$1,123,733.00
$3,690,507.84
$160,371.00
$77,260.00
$184,525.16
$160,371.00
$77,260.00
$184,525.16
Contract Time
Totals (CD)
$8,001,639.09 450
$8,001,639.09 450
$40,062.00 85
$8,041,701.09 535
$422,156.16
$422,156.16
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.50%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $10,002,048.86
IN ACCORDANCE WITH THIS CHANGE ORDER REQUEST, THE CONTRACTOR SHALL: Furnish all labor and material as per the proposed Change Order #1.
" A total of 52 additional water services (WS) need to be installed (28 WS were due to late plat requests from residents and 24 WS to replace the WS found during the
construction but were not included in the plan) . The bid items needed to perform this work are based on the original bid proposal. The contractor requests 25 Calendar Days
(CDs) to install the 52 water services on E. Arlington, Belzise, Harvey, Davis, and E. Jessamine Avenue.
k Subdrain will be installed on both sides of E. Arlington between Sta 13+00 and 16+50 to resolve the groundwater issues encountered. Approximately 100 feet of the street
section exhibiting mud pumping needs to be restabilized. The items needed to perform this work are based on the original bid proposal. 26 CD is requested to install the
subdrain and restabilize the street section.
An additional sewer improvement on Belzise includes a 331 LF 8" PVC sanitary sewer main extension and five sewer services installation on Belzise per the request of the
resident developing their property. The bid items needed to perform the work are included on the original bid proposal, except the cost to "Connect to an Existing Manhole" is
not in the original bid proposal. The contractor requests 30 CD to perform the sewer improvement work.
'Due to 2 different pressure planes at Arlington and Daniel, the contractor was instructed to install a 1" By -Pass Valve. A new line item, "l" Bypass pumping,' is added.
'An additional 4 CD is requested for negotiating and processing the change order.The total CD extension requested for this change order is 85 CD.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reporting requirements.
Contractor's Com
Stabile and Winn, Inc. I Jerry Henderson 1,/ I Apr 25, 2024
Inspector/Inspection Supervisor
Date
Project and
Date
P� �•�
Apr 25, 2024U
Apr 25, 2024
m Mana er
Date
Senior Capital Project Officer
Date
May 9, 2024
w —
May 10, 2024
Date
Director, Contracting Department Dept
Date
Pctl-ricia L. WadcacK
,.wiM��,oa con
May 13, 2024�
May 13, 2024
Date
Assistant City Manager
Date
o ..AlowG ,os<on
May 13, 2024
May 15, 2024
Council Action (if required)
M&C Number I I M&C Date Approved
�oQ RT�d
ATTEST:
b6. d%
Jannette Goodall, City Secretary aasp a�
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FOR1-W/',RTH City of Fort Worth
I' Change Order Additions
Project Name 1 102980 - 2022 Bond Yr 1- Contract E
City Sec # 1 59323 1
Client Project # I
I
Contractorl Stabile and Winn, Inc. I
PMI Sandip
Uprety
Inspectorl Pedro Hernandez
Change Order Submittal # 0
Date 1 4/22/2024 1
ADDITIONS
IItIN
UtJI:KIF'I IUN
Lid,I
Uty
unit
unit Cost
total 1
26
3312.2003 1" Water Service
Unit 1: Water
52.000000OU
EA
$3,500.OU
$182,000.001
1 31
3305.0202 Imported Embedmenf/Backfill, CSS
Unit 1: Water
15.00OOOOOU
CY
$110.0U
$1,650.001
1 49
0171.0001 Construction Survey IlUPS Red Line Survey)
Unit 1: Water
0.06875000
LS
KUOOZ
$550.001
1 51
3471.0001 Traffic Control Waterl
Unit 1: Water
1.000O0009
MNTH
$7,800.01J'
$7,800.001
1 2
3331.4115 8" Sewer Pipe (PVC S11DR26, P5115) By Open Cui
Unit 2: Sewer
331.00000000
LF
$105.OU
$34,755.001
1 4
3339.1001 4' Manhole
Unit 2: Sewer
1.00000000
EA
$10,400.OU
$10,400.001
l 7
3331.3101 4" Sewer Service
Unit 2: Sewer
5.00000000
EA
$2,500.00
$12,500.001
1 9
3301.0101 Manhole Vacuum Testing
Unit 2: Sewer
1.00000006
EA
$250.01J
$250.001
22
3305.0202 Imported EmbedmenUBackfill, CSS
Unit 2: Sewer
80.00OOOOOC,
CY
$110.00
$8,800.001
1 26
33u1.uuuz Post -CC I V inspection
Unit 2: Sewer
331.00000009
LF
$6.O0
$1,986.001
1 27
3'SUb.0109 I ranch Satety
Unit 2: Sewer
331.00000000
LF
$1.00
$331.001
l 41
3471.0001 Traffic Control (Sewer)
Unit 2: Sewer
1.000OO000
MNTH
$7,800.00
$7,800.001
42
U1 n mvu1 Construction Survey (UvP , Kea Line Survey)
Unit 2: Sewer
0.062500D(l
LS
$4,DOO.DU'
$250.001
I 43
U1 /1.0001 Construction Staring (Sewer)
Unit 2: Sewer
0.11764Z0
LS
$8,500.0U,
$1,000.001
45
Connect to Existing manhole
Unit 2: Sewer
Jl
1.0000000UI
EA
$2,150.DU
$2,150.001
I!`
3B
JZ11.U4uu rlyorateo Ume 3z ws/by
Unit 3: Paving
10.0000000
TN
$305.OU
$3,050.001
1 4B
3211.Ub1.12 S" Lime I reatmem
Unit 3: Paving
517.00000000
SY
$6.50
$3,360.501
1 7B
ssuo.ulur MannoleAajustment,minor
Unit 3:Paving
1.0000000U
EA
$550.OU
$550.001
1 59
3471.0001 Traffic Control (Paving)
Unit 3: Paving
1.00OOOOOU
MNTH
$7,800.O1J
$7,800.001
53
33303.0001 1" Bypass purliping
Unit 1: Water
1.0000000U
EA
$3,450.01J'
$3,450.001
26
3211.0601 CEMLIMET" (32lbs/SY
Unit 3: Paving
7.00000009
TN
$395.DU
$2,765.001
53
JJ46.000S 4, ripe unael'aram, Type a
Unit 3: Paving
30.0000000U
LF
$25.01J'
$750.001
61
I
I
I
I
I
9999.0002 12" Stabilization w/ Cem-Lime
Unit 3: Paving
259.00000000
SY
$8.50
$2,201.501
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
Unit
1:Water
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
95,450.001
Unit
2:Sewer
80,222.001
Unit 3:Paving
$20,477.001
Unit
4: Storm
$0.001
Sub I otal Atltlrtlons
$296,149.UU1
Change Order Additions Page 2 of 4
FORTWORTH
City of Fort Worth
Change Order Deletions
Project Name 1 102980 - 2022 Bond Yr 1- Contract 6
City Sec # 1 59323
Client Project # I
I
Contractorl Stabile and Winn, Inc.
I PMI Sandip Uprety
Inspectorl Pedro Hernandez
Change Order Submittal # 0
Date 1 4/22/2024 1
DELETIONS
I I LM
ULSUKll' I IUN
ULP I U
unit Unit Cost
I otal I
52
9999.0001 Water Construction Allowance
unit 'I:water 9uuuuuuu
La $'luu,uuu.uU
$9u,uuu.uul
44
9999.0001 Sewer Construction Allowance
Unit 2: Sewer 0.8600000U
LS $70,000.UU
$60,20U.UUl
60
9999.0010 Paving Construction Allowance
Unit 3: Paving 0.20477000
LS $100,000.0u
$20,477.001
7
3201.0113 6' Wide Asphalt Pvmt Repair, Residential
Unit 1: Water 113.00001JUUU
LF $150.UU
$16,950.001
9
3201.0400 Temporary Asphalt Pvmt Repair S2" HMAG on 6" Flex Base CoursdUnit 1: Water 1,500.00000000
LF $35.00
$52,500.0Uj
24
3312.2004 1" Private Water Service Relocallon
Unit 1: Water 360.00000UUU
LF $42A1J
$15,96U.00I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
Unit f: Water
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
75,410.001
Unit 2: Sewer
60,200.001
120,477.001
Unit 3: Paving
Unit 4: Storm
$0.001
Sub Total Deletions
$256,0 7.UU1
Change Order Deletions Page 3 of 4
MISBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
NA NA $0.00
Total $0.00
Previous Change Orders
CO # DATE I AMOUNT
$0.00
Total I $0.00 I
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE• 2022 Bond Year 1 Contract 6 — Change Order #1
M&C: CPN: 102980 CSO: 59323 DOC#:
Date: 1/29/2024
To:
Name
Department Initials
Date Out
l .
Filogonio Munoz
TPW - initial
Apr 25, 2024
2.
Jerry Henderson
contractor - signature
Apr 25, 2024
3.
Pedro Hernandez
TPW - signature
Apr 25, 2024
4.
Sandip Uprety
TPW - signatures
Apr 25, 2024
5.
Pratima Poudyal
Water - initial
Apr 26, 2024
6.
Greg Robbins
TPW - signature 74R
May 9, 2024
7
Mary Hanna
TPW - signature m,,11
May 10, 2024
8
Patricia Wadsack
TPW - signature
May 13, 2024
9
Lauren Prieur
TPW - signature
May 13, 2024
10.
Doug Black
Legal - signature DBLE
May 13, 2024
11.
Jesica McEachern
CMO - signature CO-
May 15, 2024
12.
Jannette Goodall
CSO - signature ,J-a
May 15, 2024
13.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments
requesting City Manager's
signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval
first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: [—]YES ®No NEXT DAY: ❑YES ®No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts(a,FortWorthTexas.2ov at ext. 7233 for pick up when completed.
Thank you!