HomeMy WebLinkAboutContract 61420FORTWORTH.
CSC No. 61420
CONTRACT
FOR
THE CONSTRUCTION OF
TRINITY BOULEVARD PHASE 2
SALADO TRAIL TO THAMES TRAIL
City Project No. 103280
Mattie Parker David Cooke
Mayor City Manager
Chris Harder
Director, Water Department
Lauren Prieur
Director, Transportation and Public Works Department
Prepared for
The City of Fort Worth
Transportation and Public Works Department
2024
Kimley»>Horn
Texas Registered Engineering Firm F-928
KH No. 061018402
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORTWORTH.
"I'll
City of Fort Worth
Standard Construction Specification
Documents
Adopted September 2011
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 1 of 7
SECTION 00 00 00
TABLE OF CONTENTS
Division 00 - General Conditions
Last Revised
0005 10
Mayor and Council Communication
07/01/2011
0005 15
Addenda
07/01/2011
0011 13
Invitation to Bidders
02/08/2024
0021 13
Instructions to Bidders
01/17/2024
0035 13
Conflict of Interest Statement
02/24/2020
00 41 00
Bid Form
09/30/2021
00 42 43
Proposal Form Unit Price
01/20/2012
0043 13
Bid Bond
09/11/2017
00 43 37
Vendor Compliance to State Law Nonresident Bidder
06/27/2011
0045 11
Bidders Prequalifications
08/13/2011
00 45 12
Prequalification Statement
09/30/2021
0045 13
Prequalification Application
08/13/2021
00 45 26
Contractor Compliance with Workers' Compensation Law
07/01/2011
00 45 40
Business Equity Goal
10/27/2021
00 52 43
Agreement
3/08/2024
0061 13
Performance Bond
12/08/2023
0061 14
Payment Bond
12/08/2023
0061 19
Maintenance Bond
12/08/2023
00 61 25
Certificate of Insurance
07/01/2011
00 72 00
General Conditions
03/08/2024
00 73 00
Supplementary Conditions
03/08/2024
Division 01- General Requirements
Last Revised
01 1100
Summary of Work
12/20/2012
01 2500
Substitution Procedures
07/01/2011
01 31 19
Preconstruction Meeting
08/17/2012
01 3120
Project Meetings
07/01/2011
01 3216
Construction Schedule
10/06/2023
01 3233
Preconstruction Video
07/01/2011
01 33 00
Submittals
12/20/2012
01 35 13
Special Project Procedures
03/11/2022
01 45 23
Testing and Inspection Services
03/09/2020
01 5000
Temporary Facilities and Controls
07/01/2011
01 5526
Street Use Permit and Modifications to Traffic Control
03/22/2021
01 57 13
Storm Water Pollution Prevention Plan
07/01/2011
01 58 13
Temporary Project Signage
07/01/2011
01 60 00
Product Requirements
03/09/2020
01 66 00
Product Storage and Handling Requirements
07/01/2011
01 70 00
Mobilization and Remobilization
11/22/2016
01 7123
Construction Staking and Survey
02/14/2018
01 74 23
Cleaning
07/01/2011
01 77 19
Closeout Requirements
03/22/2021
01 78 23
Operation and Maintenance Data
12/20/2012
01 78 39
Project Record Documents
07/01/2011
CITY OF FORT
WORTH
TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
CITY PROJECT No. 103280
Revised March 8, 2024
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 2 of 7
Technical Specifications which have been modified by the Engineer specifically for this
Project; hard copies are included in the Project's Contract Documents
Division 02 - Existing Conditions
0241 13 Seleetiye Site r emel;tio
Division IConcrete
03 0 Cast in •
03 800
Division 26 - Electrical
Demolition2605 1�o
Division 31- Earthwork
31� Site C
3123 16 Unclassified Excavation
312323 Beffe
31 24 00 Embankments
�o
Erosion and Sediment Gentfe4
313600 Gabiens
313700 Ripr-ap
Division 32 - Exterior Improvements
32 n 1 1 4a To,.�.,...,- Asphalt Awing Repai
�
32 Ai 21 Gone -ete n,,ying n era
32 1123 Flexible Base Getifses
32 W 29 Lime Treated Base Getffses
32 1133 Cement Treated Base Go
32 1137 Liquid Treated Soil Stabili
32 �v
Asphalt Pwviag
32 13 3 G ete n
32 1373 Goner-ete Paving joint Sealants
32 14 �o
32 i7 25 G 1. Address Paintin323129 Weed Fenees and Gates
.
Date
Modified
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT No. 103280
Revised March 8, 2024
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 3 of 7
2'� Topsoil Dl.,,.o.,- ent and Firi"Uhimg of Park.:,.,.
3 Sedding
32 93 43 Trees and Shrubs
Division 33 - Utilities
330130 Sewer- and Manhole Testing
33 04 11 Geffesien Control Test Stations
33 04-12 Magnesium Anode Cathodic Protection System
3304-40 Cleaning and neeept n e Testing fW to,.>\ airs
33 04 50 Cleaning of Sewer- Mains
33 0510 Utility T-ene1. L`.,,..,.,,,tion, Fmt-ad eat an .,,.1�F; B11
51 3302 Water- LieLowering3305 13 Fr-ame, Cover- and Grade Rings Cast ken
3305 13.01 Fr-ame, Cover- and Grade Rings Composite
33-A5-14 Adjusting Manholes, inlets,Boxes, Valve
and Other- Stfuetufes to
Grade
6 Gone -ete Water- Vaults
3305 17 Gone -ete Cog- f
33-0520 Auger- Ber-ing
22� Tunnel Liner- Plate
33 05 22 Steel Casing Pipe
22� installation ..f!''.,f fie,- Pipe in !''acingor- Tunnel 7 ;
33 0526 Utility >`, ar-ke -s 47 ,,,,,,tees
330530 7 ..e tie of Existing Utilities
22� Belts Nttom and Gaskets
33 11 10 Ductile Iron Pipe
2 2� 71ue l e ir-en Fittings
33- 11 13 Goner-ete iffe Pipe Bar- ALFapped, Stool Cylinder- Type
331114 Buried Steel Pipe and Fittings
Large Water- Metefs
33 1220 Resilient Seated Gate V.,l.,o
33 1221 nAL n R—dbbef Seated Bt4te-fly Valves
33 1225 Genneetien to Existing Water- Main
33 1230 Gembinatien Air- Valve Assemblies for Potable Watef Systems
33 1240 Fire�
33 1250 Watar PuvW.a Staters
33 0 Standard Blow off Valve n ssomb!
33-31 12 Giffea i Dlaee Pipe (GIPP)
3331 3 Fiber -glass Reinf ,-ee Pipe for- G-.w tom, l''.,nitafy C'o..,o,
3331 3 High Density Polyethylene (HDPE) Pica for- S ritaf., Sewer
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT No. 103280
Revised March 8, 2024
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 4 of 7
333120 PelyviaY4 Chloride (PVC) Gnwity Sanitafy Sewer- Pipe
333121 Polyvinyl Chloride (PVC) Closed Profile Gravity Sanitat=y Sewe
31 11 Sanitafy Se or Or, ✓Ming
333123 Sanitafy Sewer- Pipe L'a la -,.omen
333150 S ritaf., Sewer- Sefy; e r nneet ori;-amid Carviee Line
333170 Combination Air- Valve f S ritaty Sewer- l or-ee >\a,,;r�
333920 Pr-ee st r, ..rote Manholes
33-39-30 Fiber -glass Manholes
3341 10 Reinforced Concrete Storm Sewer Pipe/Culverts
33-4411 HighDensity Polyethylene (HDPB) Pirefor- form Dsrc�m
33-44 12 Reinf -ee Polyethylene (ERPB) Piro
33 41 13 Polypropylene Pipe f Storm Dmin
33 4600 S4dr-ainage
33 4601 Slottedl4
�orni Drc�nc
33 4602 doh Dm�ng
33 49 10 Cast in Plaee Manholes and Rinefien Boxes
33 20 Gufb and Prop inlets
33-49 40 &orm Dmin.ge Hea L\klc,�id AWng-,�
Division 34 - Transportation
34 41 �o
Tr-affie Signals
3 n n�01 Attaehment A Gentr-el l o. Cabinet
3 n n�n02 Attaehment B Geatr-ell o. Speeifieation
34 41 10.03 Attaehment G—Softw'-arevpeeifieatie
34 41 �r
3441 13 Dom,..,ing T-.,ffie Signals
34 41 �v
Pedestrian Hybrid Signal.
3n�0 Readw Illumin;t4o4 nssLembl;es
34 4120.01 -Aftark�\ LED P_aadwy D,.NminoZrrs
34 ^�-�z-z .02 Fr-eew LED Raadw D,u,nin,�rrs
34�vs Res�tk,! LED Raadw 1. aAmirlo�ras
34 4130 Aluminum fi gns
3471 13 Traffic Control
Non -Standard Specifications
0305 13 Integral Colored Concrete
32 84 00 Site Irrigation System
33 01 33 Closed Circuit Television (CCTV) Inspection for Water Transmission Mains
TxDOT Specifications
432 Riprap
450 Railing
465 Junction Boxes, Manholes, and Inlet
466 Headwalls and Wingwalls
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT No. 103280
Revised March 8, 2024
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 5 of 7
Division 02 - Existing Conditions
0241 13 Selective Site Demolition
0241 14 Utility Removal/Abandonment
0241 15 Paving Removal
Division 03 - Concrete
03 30 00 Cast in Ulaee Gone-ete
Division 26 - Electrical
260500 f`,.mm,.n WorkDos„lts f Eleet-iea
26 05 33 Raceways and Boxes for Electrical Systems
3 T rider- r-et aa Duets and Raee.. ays f Eleetr- ea Systems
Division 31- Earthwork
31 0000 Site Clearing
312323 Beffe
3124 n 00 > l
-vv
31 25 00 Erosion and Sediment Control
313600 Gabiens
313700 Reap
Division 32 - Exterior Improvements
32 1123
Flexible Base Courses
32 11 29
32 1133
Lime Treated Base Courses
Cement Treated Base r
32 1137
32 12 16
Liquid Treated Soil Stabilizef
Asphalt Paving
32 13 13
Concrete Paving
32 1320
Concrete Sidewalks, Driveways and Barrier Free Ramps
32 14 16
�o
32 1613
B .,., -iek Unit Uin
Concrete Curb and Gutters and Valley Gutters
32 1723
32 i7 25
3231 13
Pavement Markings
Ct a. Address Painfin .
Chain Fenees and Gates
gar,
323126
323129
27�
3291 19
-e Fenees and Gates
Weed Fenees and Gates
Cast i Dlaee r..,-e-ete Retaining A7.,ll�
Topsoil Placement and Finishing of Roadway Right-of-ways
32 92 13
Sodding
Last Revised
03/11/2022
12/20/2012
02/02/2016
034 Y20
1 l Plz
12/20/2012
07/01/2014
02/ o
03/22/2021
oi/29QW3
n1 i3
n1 i�3
04/29/2021
1���'�iz
1���'�iz
1 �' /'TL20 20 Q
1 �' /'TL20 20 Q
1 �' /'TL20 20 Q
12/20/2012
12/20/2012
06/1 i
09i s
12/20/2012
i2N z
06/ 10/2022
12/09/2022
12/wiz
1 'l Nrz/20/20 Q
12/09/2022
06/ 10/2022
1111 /n-3
1��i'�iz
1��i'�iz
1��i'�iz
06/05i204a8
03/11/2022
05/13/2021
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT No. 103280
Revised March 8, 2024
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 6 of 7
32 92 14 Non -Native Seeding 05/13/2021
32 92 15 Native G-a,,ad Wildflower Seeding inin��
3293 43 Trees and ft.-.4/3 , ��Q
Division 33 - Utilities
33 01 31
Close r; .,,,,;t Television (CCTV) laspeetio i Fmitafy Sew@f
n3 ii�z
33-A�32
�e� • e�t� Television �� eete��o ���n
Closed (CCTV) lase
i2/09/2m�
3303 10
33 04-10
33 04 11
%ywo PLx-Ari&.g of Existin. Sewer- Systev �
joint Beading and >rle tr-ie,1 1selatieft
Geffesion Control Test Stations
, ��i
,2i��
i2/20/2012
33 04-12
33 04 30
rlagaesii± Anode r tt,e ie Preto tier caste,,.,
Temporary Water Services
��i�i
07/01/2011
33 04 40
Cleaning and Acceptance Testing of Water Mains
02/06/2013
33 04 50
3305 10
Cleaning of Pies
Utility Trench Excavation, Embedment, and Backfill
Tine T ,
034 2022
04/02/2021
, 2 /�i
3305 12
3305 13
Water- wer-iag
Frame, Cover and Grade Rings
09/09/2022
3305 14
Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to
03/11/2022
Grade
3305 16
Concrete Water Vaults
12/20/2012
3305 17
Concrete Collars
03/11/2022
33 05 20
Auger Boring
12/20/2012
33 05 21
Tunnel Liner Plate
Stool
12/20/2012
� i�Q
330522
33 05 23
Casing -Pipe
Hand Tunneling
12/20/2012
33 05 24
Installation of Carrier Pipe in Casing or Tunnel Liner Plate
12/09/2022
33 05 26
Utility Markers/Locators
12/20/2012
33 05 30
Location of Existing Utilities
12/20/2012
33 1105
Bolts, Nuts, and Gaskets
12/20/2012
i 2 in
33 44 10
33 11 11
Duefile e lr-e Pipe
Ductile Iron Fittings
i
09/20/2017
33 1111 112P��o��lyvinyl77��C,,..��hloride
33 44 13
(PVC) Pressure Pipe
Cl ner-ete �-essiffe Pipe, Bar- W,-.,,.pe Steel Cylinder- Type
09/09/2022
i2/2z
33 1220
Resilient Seated Gate Valve
05/06/2015
33 1221
AWWA Rubber -Seated Butterfly Valves
04/23/2019
33 1225
Connection to Existing Water Mains
02/06/2013
33 1230
Combination Air Valve Assemblies for Potable Water Systems
12/20/2012
33 1240
Fire Hydrants
01/03/2014
33 1250
Water CC�.umr)a cars
""�Q
33 1260
Standard Blow -off Valve Assembly
06/19/2013
High Density Polyethylene (IIDPB) Pica
Pipe
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT No. 103280
Revised March 8, 2024
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 7 of 7
333122 Sanitafy Sewar .1r, .JM. lrig �z
33 31 50 e nitaf., Sewer- Sefviee G nneetioriG-arid Epee Lin 04'1v/
�262013
33 31 70 G,., bin lien Air- - Valve for- S nitaf., Sewer- For-ee Mains Q/wiz
3339 10 Gast i Ulaee r, ..rote M.,nheles Q/�, ^�z
333920 Pr-ee st r, ..rote Aa..nL.,,12/'lrz720/201-2
333930 Fiber -glass Manholes Q/20/20Q
333940 Wastewater- n eeess r>,,,mbe. ()A n r4 12/�tz
33 419 Reinf -ee Gone-ete Stet.., Sewer-
Pipe/ram„1�.,ot4s 07/0T
22� High Density Pel�.ethylo,�.o (�T17DPE) P1r. a for-z7torm ✓7� src�n i2/'l z
22� D einf ,-ee Polyethylene (V .l E) Pira 1 1 /1 s
33 41 13 Polypropylene Pipe for- Storm Dsmin 06/10/202"
3 2� Stibdr-ainage 1 'f /'fez
33 4601 Slotted orm DpcknG 07/nmr0i/20 T
33 4602 T-r-enobi Dwim 07/0i/20i i
33 49 10 Cast -in -Place Manholes and Junction Boxes 12/20/2012
33 49 20 Curb and Drop Inlets 03/11/2022
33-49 40 Storm Dtkn.ge Hea L\L�rid Wingwalls 07/ T
Division 34 - Transportation
3441 10 Traffic Signals 03/11/2022
3 ^ ^env 11 Attaehmeat A Eentreller Gimlet 1 ' /0is
3^ ^�O2 AttaehmeatB Eeatreller- Speeifieatierl 2
3n n�o3 Attaehmeat r Software Spee fie ti ft n,�Q
34 41 20 Roadway Illumination Assemblies 12/20/2012
2n n�Ql 1 r r 06/,5/201c
A�tar� J� P_ � .�,xri�il��r� ��
3 n n�02 Fr-eew r aad�J �V-a�, T /, c /2 n, c
.�.� R .�'R311Ru'�Y9S 06 ��
3n n�o3 1 r T 06/,5/201c
tl'� �� � ' ._7:�'°ii11R��YrS vvrroraoz�
34 41 30 Aluminum Signs 11/12/2013
34 �o 02/26/20��o
Appendix
GG 4.0?
GC-4.02
Subsurface and Physical Conditions
GC-4.04
Underground Facilities
GG 4.
k%zaxdouz
GC-6.06.D
Minority and Women Owned Business Enterprise Compliance
GC-6.07
Wage Rates
GG 6.09
Lt`�'S'SSiYt�/a%:•1 Utilities
GG 6.24
Na ayxw :�i--xi
GR-01 60 00
Product Requirements
END OF SECTION
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT No. 103280
Revised March 8, 2024
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 04/09/24 M&C FILE NUMBER: M&C 24-0282
LOG NAME: 20TRINITY BLVD PHASE 2 CONSTRUCTION
SUBJECT
(CD 5) Authorize Execution of a Contract with Jackson Construction, LTD. in the Amount of $12,099,342.00 for Trinity Boulevard Phase 2 from
Salado Trail to Thames Trail; Adopt Resolution Expressing Official Intent to Reimburse Expenditures with Proceeds of Future Debt for the Trinity
Boulevard Phase 2 Project, Adopt Appropriation Ordinance to Affect a Portion of Water's Contribution to the Fiscal Years 2024-2028 Capital
Improvement Program, Adopt Appropriation Ordinance and Amend the Fiscal Years 2024-2028 Capital Improvement Program (2022 Bond
Program)
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of a contract with Jackson Construction, LTD in the amount of $12,099,342.00 for the construction of Trinity Boulevard
Phase 2 from Salado Trail to Thames Trail project (City Project No. 103280);
2. Adopt the attached resolution expressing official intent to reimburse expenditures with proceeds of future debt for the Trinity Boulevard Phase 2
project;
3. Adopt the attached appropriation ordinance adjusting appropriations in the 2022 Bond Program Fund by increasing appropriations in Trinity
Boulevard Phase 2 project (City Project No. 103280) in the amount of $500,000.00 and decreasing appropriations in the Heritage Trace Pkwy 1
project (City Project No. 103300) by the same amount;
4. Adopt the attached appropriation ordinance adjusting appropriations in the Water & Sewer Commercial Paper Fund by increasing
appropriations in Trinity Boulevard Phase 2 project (City Project No. 103280) in the amount of $5,400,542.00 and decreasing appropriations in
the W&S Commercial Paper project (City Project No. UCMLPR) by the same amount, to affect a portion of Water's contribution to the Fiscal Years
2024-2028 Capital Improvement Program; and
5. Amend the Fiscal Years 2024-2028 Capital Improvement Program.
r] 6f@111±*4Is] ►I
The purpose of this Mayor and Council Communication (M&C) is to authorize execution of a contract with Jackson Construction, LTD in the amount
of $12,099,342.00 for Trinity Boulevard Phase 2 from Salado Trail to Thames Trail. Trinity Boulevard Phase 2 from Salado Trail to Thames Trail will
include a 4-lane concrete road, divided median, replacement of the existing 36" water transmission line, landscape, drainage and illumination
improvements. A ten -foot -wide sidewalk and a traffic signal at the intersection of Trinity Boulevard with Shoreside Parkway / Sequin Trail are also
included.
The following table demonstrates the funding history and total budget for the project:
Capital Fund Name Project Name Appropriations Budget Revised Fiscal Year
Adjustment 2024 Budget
34027-2022 Bond Program Fund
103280-Trinity
Boulevard Phase 2
30108-Transportation Impact Fee
103280-Trinity
Cap Fund
Boulevard Phase 2
30104-Developer Contribution
103280-Trinity
Fund
Boulevard Phase 2
39008 - Transportation Impact Fee
103280-Trinity
Legacy Fund
Boulevard Phase 2
56022-W&S Commercial Paper
103280-Trinity
Fund
Boulevard Phase 2
(Project Total
$6,150,000.00 $500,000.00 $6,650,000.00
$1,771,868.35 $0.00 $1,771,868.35
$250,000.00 $0.00 $250,000.00
$28,131.65 $0.00 $28,131.65
$0.00 $5,400,542.00 $5,400,542.00
$8,200,000.00 $5,900,542.00 $14,100,542.00
The project was advertised for bid on December 28, 2023 and January 4, 2024 in the Fort Worth Star -Telegram. On February 1, 2024 the
following bids were received:
Bidders Amount
Jackson Construction, LTD $12,099,342.00
McClendon Construction $13,221,561.50
The Transportation & Public Works Department's share on this contract is $7,117,637.00. The paving funds for this project are included in the
2022 Bond Program. The Water Department's share on this contract is $4,981,705.00 (Water) and will be available in the W&S Commercial
Paper Fund for the project (City Project No. 103280).
In addition to the contract amount, $1,138,220.00 (Water: $269,386.00, TPW: $868,834.00) is required for project management, material testing,
and inspection and $362,980.00 (Water: $149,451.00, TPW: $213,529.00) is provided for project contingencies.
This project is anticipated to be included in a future revenue bond issue for the Water & Sewer Fund. Available cash within the Water and Sewer
portfolio and the City's portfolio along with the appropriation authority authorized under the callable Commercial Paper Program (CP) will be used
to provide interim financing for this project until debt is issued. Once debt associated with this project is sold, bond proceeds will be used to
reimburse the Water and Sewer portfolio and the City's portfolio in accordance with the attached Reimbursement Resolution. Under federal law,
debt must be issued within approximately three years in order for the expenses to be reimbursable. Adoption of the attached resolution does not
obligate the City to sell bonds, but preserves the ability to reimburse itself from tax-exempt bond proceeds.
It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year (FY), instead of within the annual budget ordinance,
as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds
in support of the Water's portion of the City of Fort Worth's Fiscal Years 2024-2028 Capital Improvement Program.
Funding is budgeted in the W&S Commercial Paper project within the W&S Commercial Paper Fund and the 2022 Bond Program Fund for the
purpose of funding the Trinity Boulevard, Phase 2 project.
Construction of Trinity Boulevard Phase 2 from Salado Trail to Thames Trail is anticipated to begin in early Fall 2024.
This project is included in the 2022 Bond Program. The City's Extendable Commercial Paper (ECP) (M&C 22-0607; Ordinance 25675-08-2022)
provides liquidity to support the appropriation. Available resources will be used to make any interim progress payments until debt is issued. Once
debt associated with a project is sold, debt proceeds will reimburse the interim financing source in accordance with the statement expressing
official Intent to Reimburse that was adopted as part of the ordinance canvassing the bond election (Ordinance 25515-05-2022).
Funding appropriated for this project by this M&C was not included in the FY2024-2028 Capital Improvement Program (CIP) because construction
cost estimates were not complete at the time of CIP development. The action in this M&C will amend the FY2024-2028 Capital Improvement
Program as approved in connection with Ordinance 26453-09-2023.
DVIN-BE: Jackson Construction, LTD is in compliance with the City's Business Equity Ordinance by committing 5% MWBE participation and
documenting a good faith effort. Jackson Construction identified several subcontracting and supplier opportunities. However, the firms contacted
in the areas identified did not respond or did not submit the lowest bids. The City's MWBE goal on this project is 16%.
The Project is located in COUNCIL DISTRICT 5
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies the funds are currently available in the Commercial Paper project within the W&S Commercial Paper Fund and in
the Heritage Trace Pkwy 1 project within the 2022 Bond Program Fund and upon approval of the above recommendations and adoption of the
attached appropriation ordinances, funds will be available in the current capital budget, as appropriated, in the W & S Commercial Paper Fund
and 2022 Bond Program Fund for the Trinity Boulevard Phase 2 project. Prior to expenditures being incurred, the Transportation & Public Works
Department has the responsibility to validate the availability of funds.
Submitted for Citv Manaaer's Office bv: Jesica McEachern 5806
Oriainatina Business Unit Head: Lauren Prieur 6035
Additional Information Contact: Monty Hall 8662
Expedited
TRINITY BOULEVARD PHASE 2 (CPN 103280) ADDENDUM NO. 1
CITY OF FORT WORTH TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
ADDENDUM No. 1
TO THE SPECIFICATIONS AND CONTRACT DOCUMENTS FOR:
TRINITY BOULEVARD PHASE 2
SALADO TRAIL TO THAMES TRAIL
City Project No. 103280
Addendum No. 1. Issue Date: January 17, 2024
Bid Receipt Date: February 1, 2024
This addendum forms part of the contract documents referenced above and modifies the original Contract
Documents. Failure to acknowledge receipt of this addendum by completing the requested information at
the following locations shall be grounds for rendering the bid non -responsive:
1. In the space provided in Section 00 4100 — Bid Form of the Bid Proposal
2. Execute acknowledgement below and submit signed copy with your proposal at the time of the bid
submittal.
SPECIFICATIONS
1. Specification 00 00 00 — Table of Contents
o This specification is hereby replaced with the table of contents attached to this document.
o Specification 33 11 14 was added to the modified specifications listing on page 3 of 9
2. Specification 00 42 43 — Proposal Form
o Item 1-47 was added, 42" RCP, Class III.
o The quantity for item 1-46, 36" RCP Class III, was reduced to 470 LF.
3. Specification 33 1114 — Buried Steel Pipe and Fittings
o This specification is hereby added to the project manual as attached to this document.
4. Specification 32 84 00 Irrigation System
o This specification is hereby replaced with the attached specification attached to this
document.
o Section 1.8 was modified as follows: Section 1.8 Maintenance
o Section 1.8 A. was modified as follows: Maintenance is required through Time of
Completion/Green Sheet.
0
5. Specification 32 93 43 Trees and Shrubs
o This specification is hereby replaced with the attached specification attached to this
document.
o Section 3.13 Maintenance was modified as follows: Maintenance Period shall be through
Notice of Completion/Green Sheet.
Page 1
TRINITY BOULEVARD PHASE 2 (CPN 103280) ADDENDUM NO. 1
BIDDER OUESTIONS
Received as of 1/17/2024
Question/Comment Answer
Related to the irrigation system — who will Contractor is to furnish the water meter.
furnish the water meter?
Who will cover the impact fees for the water City Project Manager will pay Water department for
meter? the impact fee with project funds.
If contractor is to pay any impact fees, we
will need to know the amounts the city
charges
3 Where will power be provided to the
irrigation controller? How is the power
service paid for?
4 Notes on C15.01 relating to Existing
Irrigation: Will there be a reimbursement
item set up for this? No contractor can
assess the need for modification of existing
systems nor the cost for any modification.
5 Is there a timetable for clearance of existing
utilities? Atmos, Poles on north side, Fiber
optic on North side?
6 The connection at 0+00 for proposed Water
Line A on sheet C10.07 calls for a 2' long
Bell x Flange spool piece. Can you confirm
that the piece we'd be tying onto is a
flange?
Bid item II-6 is for 74 LF of 36" steel
AWWA C200 pipe for BFV and
connections, but it is in the base bid section
and not an alternate. If we decide to bid the
job using ductile then we would not use
steel for the BFV / connections, we'd use
ductile and it's typically just paid by the LF
of pipe and there's not a specific item for the
BFV / connection pipe. Could you
provide clarification of why that 74' would
be paid separately?
City will pay Oncor to provide power to the irrigation
controller.
Existing Irrigation impacts will be paid for through
Construction Allowance if needed.
Utilities expected to be clear calendar year 2024. The
utilities will not impact the water line construction,
they would only impact phase 2 of construction per
the TCP plan. If there is an issue that impacts the
contractor we'll work on a fair solution in terms of
added days or stopped time.
Existing stub -out has a TR Flex Plug on a TR Flex
spigot. New pipeline sequence will be as follows: (1)
remove TR Flex Plug, (2) connect new TR Flex Bell x
FL spool piece to existing spigot (with bell end), (3)
install flange isolation kit at STA 0+02, (4) continue
new pipeline from STA 0+02 on beginning with a
flanged connection.
Approximately 12 LF of Steel Pipe is required inside
butterfly valve vaults as demonstrated in Detail
D128M/C10.17, DIP is not permitted after proposed
flange connections. This is being paid separately as
the butterfly valve and vault bid item does not include
piping to ensure the correct pipeline material is
accounted for in the bid. Additional linear footage of
steel piping is required for water line B and C
connections as shown in Details A and B on Sheet
C10.19.
Page 2
TRINITY BOULEVARD PHASE 2 (CPN 103280) ADDENDUM NO. 1
Question/Comment
The plans say to remove 1866' of the
existing 33" waterline which doesn't fit well
in the phasing and will be difficult to
accomplish, would the city be open to
grouting and abandoning the line in place?
Can you provide clarification on bid item II-
36 Cathodic Protection System Re -Testing?
Answer
Please bid as currently specified. Proposed solution
would require approximately 410 CY of flowable
grout to be installed which is anticipated to be more
costly than pipeline removal.
Cathodic Protection System Re -Testing is further
defined in modified standard specification 33 04 12
which is included in the Project Manual. Re -Testing is
required to ensure system is still operating as intended
after roadway is constructed.
All other provisions of the contract documents, plans and specifications shall remain unchanged.
This addenda and the contract documents
RECEIPT ACKNOWLEDGED:
By:
Company:Jackso Construction, LTD
Di971alty signed by Utchell Mon
DN: C=US
Mitchell Aiton CN Mt hellinol`QfohoMtexas.g-
By: Data: 2024.01.17 19:18:01-06'00'
Mitch Aiton, P.E.
Project Manager
Transportation and Public Works
Page 3
CITY OF FORT WORTH
Transportation and Public Works
Trinity Boulevard Phase 2
City Project No. 103280
ADDENDUM NO. # 1
- END OF SECTION -
Trinity Boulevard Phase 2
City Project No. 103280
ADDENDUM NO. # 1
TRINITY BOULEVARD PHASE 2 (CPN 103280) ADDENDUM NO.2
CITY OF FORT WORTH TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
ADDENDUM No. 2
TO THE SPECIFICATIONS AND CONTRACT DOCUMENTS FOR:
TRINITY BOULEVARD PHASE 2
SALADO TRAIL TO THAMES TRAIL
City Project No. 103280
Addendum #w4—Issue Date: January 19, 2024
Bid Receipt Date: February 1, 2024
This addendum forms part of the contract documents referenced above and modifies the original Contract
Documents. Failure to acknowledge receipt of this addendum by completing the requested information at
the following locations shall be grounds for rendering the bid non -responsive:
1. In the space provided in Section 00 4100 — Bid Form of the Bid Proposal
2. Execute acknowledgement below and submit signed copy with your proposal at the time of the bid
submittal.
SPECIFICATIONS
1. Specification 00 42 43 — Proposal Form
o The quantity for item I-14, 6" Flexbase (Temporary), was increased to 600 SY.
o The quantity for item I-17, 4" Asphalt Type B (Temporary), was increased to 600 SY.
PLANS
1. Traffic Control — Phase 1
o Sheets C 12.07 an C 12.08 have been updated to increase the buffer between traffic and
construction.
BIDDER OUESTIONS
Received as of 1/19/2024
Question/Comment
Looking at the traffic control plan, the low barrier wall is too
close to the proposed waterline ditch and it doesn't leave us
enough room to work, especially considering the depth of the
proposed line (15' - 16). Would you consider adding an item
for temporary pavement to widen the existing roadway on the
north side so that we could move the traffic away from the
proposed waterline in order to provide a safe workspace?
Answer
The traffic control plan has been
updated to increase the buffer
between traffic and the water line.
The temporary asphalt quantity has
also been increased.
All other provisions of the contract documents, plans and specifications shall remain unchanged.
Page 1
TRINITY BOULEVARD PHASE 2 (CPN 103280) ADDENDUM NO.2
RECEIPT ACKNOWLEDGED:
By:'��
CompanyJack on Construction, LTD
Digitally signed by Mitche0 Afton
Mitchell Aiton DN:C=116,
N et.aitonQtorlvunhte:as.gov,
C=MitNMitche0 Afton
By: Date: 2024.01.19 16:17:29-06'00'
Mitch Aiton, P.E.
Project Manager
Transportation and Public Works
Page 2
Aiton, Mitch
From: Aiton, Mitch
Sent: Monday, April 15, 2024 10:18 AM
To: Hadley -McGhee, Michelle
Subject: FW: Revised BE Utilization Form
Attachments: 02.01.24_CPN 103280_Low Bidder - JACKSON CONSTRUCTION -Addendum 2.pdf
Please see attached, below.
Thanks,
Mitch Aiton, PE, PMP
Sr. Professional Engineer
Transportation and Public Works
200 Texas Street
Fort Worth, Texas 76102
682-715-9424 Cell
817.392.8092 Fax
mitchell aitonafortworthtexas.eov
City of Fort Worth — Working together to build a strong community.
How am I doing?
Please contact my supervisor. raul.looez(&lbrtworthtexas.00v
From: nicolem@jacksontx.net <nicolem@jacksontx.net>
Sent: Tuesday, April 9, 2024 8:34 AM
To: Aiton, Mitch <Mitchell.Aiton@fortworthtexas.gov>
Subject: RE: Revised BE Utilization Form
CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open attachments
unless you recognize the sender and know the content is safe.
Mitch
See attached.
Thank you,
Nicole McCollum
Jackson Construction
5112 Sun Valley Dr
Fort Worth, TX 76119
Phone: 817-572-3303
Fax: 817-478-0443
From: carmene@iacksontx.net <carmene@iacksontx.net>
Sent: Monday, April 8, 2024 8:17 PM
To: nicolem@iacksontx.net
Cc: Troy Jackson <trovi@iacksontx.net>; steveh iacksontx.net
Subject: Fwd: Revised BE Utilization Form
Nicole
Will you get Troy to initial this and return it to Mitch?
Get Outlook for iOS
From: Aiton, Mitch <Mitchell.Alton(@fortworthtexas.eov>
Sent: Monday, April 8, 2024 5:29:39 PM
To: carmene@iacksontx.net <carmene@iacksontx.net>
Subject: RE: Revised BE Utilization Form
Hi Carmen,
Our ACM moved your contract up to the 4/9 Council Agenda. We should be routing this contract for signature by the
end of the week.
On our Addendum 2, we had a typo listing it as Addendum 1. They asked me to strike it out, put No. 2, initial it and have
ya'II initial it as well. Can ya'll initial this, scan and send back and then we should be working out this contract soon.
Thanks!
Mitch Aiton, PE, PMP
Sr. Professional Engineer
Transportation and Public Works
200 Texas Street
Fort Worth, Texas 76102
682-715-9424 Cell
817.392.8092 Fax
mitchell aitonaa,fortworthtexas.eov
City of Fort Worth — Working together to build a strong community.
How am I doing?
Please contact my supervisor. raul.lot3ez(dfortworthtexas.gov
CITY OF FORT WORTH
Transportation and Public Works
Trinity Boulevard Phase 2
City Project No. 103280
ADDENDUM NO. # 2
- END OF SECTION -
Trinity Boulevard Phase 2
City Project No. 103280
ADDENDUM NO. # 2
TRINITY BOULEVARD PHASE 2 (CPN 103280) ADDENDUM NO.3
CITY OF FORT WORTH TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
ADDENDUM No. 3
TO THE SPECIFICATIONS AND CONTRACT DOCUMENTS FOR:
TRINITY BOULEVARD PHASE 2
SALADO TRAIL TO THAMES TRAIL
City Project No. 103280
Addendum No. 3. Issue Date: January 26, 2024
Bid Receipt Date: February 1, 2024
This addendum forms part of the contract documents referenced above and modifies the original Contract
Documents. Failure to acknowledge receipt of this addendum by completing the requested information at
the following locations shall be grounds for rendering the bid non -responsive:
1. In the space provided in Section 00 41 00 — Bid Form of the Bid Proposal
2. Execute acknowledgement below and submit signed copy with your proposal at the time of the bid
submittal.
SPECIFICATIONS
1. Specification 00 42 43 — Proposal Form
o The quantity for item I-49, 4' Storm Junction Box — Water Tight Hinged Manhole Frame,
Cover, and Grade Rings, was decreased to 0 EA.
o The quantity for item I-49, 5' Storm Junction Box — Water Tight Hinged Manhole Frame,
Cover, and Grade Rings, was increased to 2 EA.
o The Quantity for item IV 11, Irrigation Booster Pump, was decreased to 1 EA.
PLANS
1. Storm Plan — System A
o Sheets C9.06 and C9.07 have been updated to show the location of the 5' Storm Junction
Box — Water Tight Hinged Manhole Frame, Cover, and Grade Rings.
2. Irrigation Plan — Details & Specifications
o Added booster pump detail to sheet C15.08.
Page 1
TRINITY BOULEVARD PHASE 2 (CPN 103280) ADDENDUM NO.3
BIDDER OUESTIONS
Received as of 1/26/2024
Question/Comment Answer
Reference Section 33 11 14 Article 2.2, B, 13 and Drawing CMC Overcoat shall be at least the
C10.16 Detail D106. Per the spec and drawing, CMC same as the thickness of the internal
overcoat and brush bands are required. However, the CMC CM lining.
thickness is not given. What is the required CMC overcoat
thickness?
2 We also wanted to see if you would be open to changing the
CSS to being paid by the cubic yard / ton instead of being
subsidiary to the pipe. One reason is the bore logs show
clayey sand in most areas throughout the project which
should be more than suitable to use for backfilling the line.
The other reason is, if it is subsidiary then contractors are
forced to bid it high to protect themselves in case the ditch
starts to cave because CSS is very expensive.
3 Is there a reason that we couldn't go ahead and connect WL
A @ 0+00 and leave the existing butterfly valve off? If we
can connect there when we start then it will make loading the
line a much easier task.
4 The irrigation spec's call for two booster pumps. The
drawings show only one pump total.
There isn't any information about the pumps i.e.. 120V or
240V, three phase or two phase, motor size, pump size
gallons per minute, type of enclosure, heated or not.
No, CSS will remain as subsidiary to
pipe where indicated in the
drawings.
This sequencing modification is
acceptable
Added detail with booster pump
information to sheet C15.08.
Quantity for booster pump decreased
to 1 EA.
All other provisions of the contract documents, plans and specifications shall remain unchanged.
RECEIPT ACKNOWLEDGED:
By:
Company: Jacks n Construction, LTD
DI�eaY a13retl W AQMN Non
By: Mitchell Aiton EEE'�,
''
Dab:=4.01]616:14�W
Mitch Aiton, P.E.
Project Manager
Transportation and Public Works
Page 2
CITY OF FORT WORTH
Transportation and Public Works
Trinity Boulevard Phase 2
City Project No. 103280
ADDENDUM NO. # 3
- END OF SECTION -
Trinity Boulevard Phase 2
City Project No. 103280
ADDENDUM NO. # 3
TRINITY BOULEVARD PHASE 2 (CPN 103280) ADDENDUM NO. 4
CITY OF FORT WORTH TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
ADDENDUM No. 4
TO THE SPECIFICATIONS AND CONTRACT DOCUMENTS FOR:
TRINITY BOULEVARD PHASE 2
SALADO TRAIL TO THAMES TRAIL
City Project No. 103280
Addendum No. 4. Issue Date: January 30, 2024
Bid Receipt Date: February 1, 2024
This addendum forms part of the contract documents referenced above and modifies the original Contract
Documents. Failure to acknowledge receipt of this addendum by completing the requested information at
the following locations shall be grounds for rendering the bid non -responsive:
1. In the space provided in Section 00 41 00 — Bid Form of the Bid Proposal
2. Execute acknowledgement below and submit signed copy with your proposal at the time of the bid
submittal.
SPECIFICATIONS
1. Specification 00 42 43 — Proposal Form
o Item I-50, 42" Flared Headwall, 1 pipe was added — quantity of 1 each.
All other provisions of the contract documents, plans and specifications shall remain unchanged.
RECEIPT ACKNOWLEDGED:
DgilC- slOneE b/ Mrt hell Anon
Mitchell Aiton °" 05
// E=llYlfllellaiton'pJlnMviNexas.qov,
By: lid//// D.W 20MY /'ton
/{^/!f/r I By. Date: 202401.301255'S0-0fi'00'
Mitch Aiton, P.E.
Company:Jack on Construction, LTD Project Manager
Transportation and Public Works
Page 1
CITY OF FORT WORTH
Transportation and Public Works
Trinity Boulevard Phase 2
City Project No. 103280
ADDENDUM NO. # 4
- END OF SECTION -
Trinity Boulevard Phase 2
City Project No. 103280
ADDENDUM NO. # 4
00 11 13
INVITATION TO BIDDERS
Page 1 of 2
SECTION 00 1113
INVITATION TO BIDDERS
RECEIPT OF BIDS
Sealed bids for the construction of Trinity Boulevard Phase 2; City Project No. 103280
("Project") will be received by the City of Fort Worth Purchasing Office until 1:30 P.M. CST,
Thursday, February 1, 2024 as further described below:
City of Fort Worth
Purchasing Division
200 Texas Street
Fort Worth, Texas 76102
Bids will be accepted by: US Mail, Courier, FedEx or hand delivery at the address above;
Bids will be opened publicly and read aloud at 2:00 PM CST in the City Council Chambers.
GENERAL DESCRIPTION OF WORK
The major work will consist of the (approximate) following: 16,000 SY of 10" Concrete Paving,
46,000 SF Concrete Sidewalk, Storm Drain for the roadway corridor and a traffic signal
installation. Additionally, there will be 2,200 LF 36" Water line, Utility Adjustments, Street
Lighting, Pavement Marking and Signage, Landscaping along the street corridor, and Stamped &
Colored Concrete.
PREQUALIFICATION
Certain improvements included in this project must be performed by a contractor or designated
subcontractor who is pre -qualified by the City at the time of bid opening. The procedures for
qualification and pre -qualification are outlined in the Section 3 of 00 21 13 — INSTRUCTIONS
TO BIDDERS.
DOCUMENT EXAMINATION AND PROCUREMENTS
The Bidding and Contract Documents may be examined or obtained on-line by visiting the City
of Fort Worth's Purchasing Division website at htty://www.fortworthtexas.aov/purchasing/ and
clicking on the link to the advertised project folders on the City's electronic document
management and collaboration system site. The Contract Documents may be downloaded,
viewed, and printed by interested contractors and/or suppliers.
EXPRESSION OF INTERSEST
To ensure potential bidders are kept up to date of any new information pertinent to this project, all
interested parties are requested to email Expressions of Interest in this procurement to the City
Project Manager and the Design Engineer. The email should include the company's name,
contact person and that individual's email address and phone number. All Addenda will be
distributed directly to those who have expressed an interest in the procurement and will also be
posted in the City of Fort Worth's purchasing website at http://fortworthtexas.gov/purchasing/
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CITY PROJECT No. 103280
Revised 7/19/2021
00 11 13
INVITATION TO BIDDERS
Page 2 of 2
PREBID CONFERENCE — Web Conference
A prebid conference will be held as discussed in Section 00 21 13 - INSTRUCTIONS TO
BIDDERS at the following date, and time via a web conferencing application:
DATE: January 9, 2024
TIME: 2 PM
Invitations with links to the web conferencing application will be distributed directly to those
who have submitted an Expression of Interest. The presentation and any questions and answers
provided at the prebid conference will be issued as an Addendum to the call for bids.
CITY'S RIGHT TO ACCEPT OR REJECT BIDS
City reserves the right to waive irregularities and to accept or reject any or all bids.
AWARD
City will award a contract to the Bidder presenting the lowest price, qualifications and
competencies considered.
INQUIRIES
All inquiries relative to this procurement should be addressed to the following:
Attn: Mitch Aiton, City of Fort Worth
Email: Mitchell.Afton@fortworthtexas.gov
Phone: 682-715-9424
AND/OR
Attn: Trenton Tidwell, Kimley-Horn and Associates, Inc.
Email: Trenton.Tidwell@kimley-horn.com
Phone: 817-339-2281
ADVERTISEMENT DATES
December 28, 2023
January 4, 2024
END OF SECTION
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CITY PROJECT No. 103280
Revised 7/19/2021
0021 13
INSTRUCTIONS TO BIDDERS
SECTION 00 2113
INSTRUCTIONS TO BIDDERS
1. Defined Terms
Page 1 of 10
1.1. Capitalized terms used in these INSTRUCTIONS TO BIDDERS are defined in Section
00 72 00 - GENERAL CONDITIONS.
1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the
meanings indicated below which are applicable to both the singular and plural thereof.
1.2.1. Bidder: Any person, firm, partnership, company, association, or corporation acting
directly through a duly authorized representative, submitting a bid for performing
the work contemplated under the Contract Documents.
1.2.2. Nonresident Bidder: Any person, firm, partnership, company, association, or
corporation acting directly through a duly authorized representative, submitting a
bid for performing the work contemplated under the Contract Documents whose
principal place of business is not in the State of Texas.
1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City
(on the basis of City's evaluation as hereinafter provided) makes an award.
2. Copies of Bidding Documents
2.1. Neither City nor Engineer shall assume any responsibility for errors or misinterpretations
resulting from the Bidders use of incomplete sets of Bidding Documents.
2.2. City and Engineer in making copies of Bidding Documents available do so only for the
purpose of obtaining Bids for the Work and do not authorize or confer a license or grant
for any other use.
3. Prequalification of Bidders (Prime Contractors and Subcontractors)
3.1. Bidders or their designated subcontractors are required to be prequalified for the work
types requiring prequalification as per Sections 00 45 11 BIDDERS
PREQUALIFICATIONS and 00 45 12 PREQUALIFICATION STATEMENT. Firms
seeking pre -qualification, must submit the documentation identified in Section 00 45 11
on Section 00 45 13 PREQUALIFICATION APPLICATION at least seven (7)
calendar days prior to Bid opening for review and, if qualified, acceptance. The
subcontractors listed by a Bidder on 00 45 12 must be prequalified for the appropriate
work types. Subcontractors must follow the same timelines as Bidders for obtaining
prequalification review. Bidders or Subcontractors who are not prequalified at the time
bids are opened and reviewed may cause the bid to be rejected.
Prequalification requirement work types and documentation are available by accessing all
required files through the City's website at:
httos:Hann s. fortworthtexas. 2ov/Proj ectRe sources/
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CITY PROJECT No. 103280
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 2 of 10
3.1.1. Paving — Requirements document located at:
httos:Happs. fortworthtexas.2ov/Proi ectResources/ResourcesP/02%20-
%20Construction%20Documents/Contractor%20Precivalification/TPW%20Pavin2
%20Contractor%20Precivalification%20Proaram/PREQUALIFICATION%20REO
UIREMENTS%20F0R%20PAVING%20C0NTRACT0RS.pdf
3.1.2. Roadway and Pedestrian Lighting — Requirements document located at:
httos:HaDDs. fortworthtexas. aov/Proi ectResources/ResourcesP/02%20-
%20Construction%20Documents/Contractor%20Precivalification/TPW%20Roadwa
v%20and%20Pedestrian%20Li2htina%20Pre(ivalifi cation%20Pro2ram/STREET%
20LIGHT%20PRE0UAL%20RE0MNTS.Ddf
3.1.3. Water and Sanitary Sewer — Requirements document located at:
htti)s:Happs. fortworthtexas.2ov/Proi ectResources/ResourcesP/02%20-
%20Construction%20Documents/Contractor%20Precivalification/Water%20and%2
OSanitarv%20Sewer%20Contractor%20Prequalification%20Proaram/W S S%20pre
qual%20requirements.pdf
3.2. Each Bidder, unless currently prequalified, must submit to City at least seven (7)
calendar days prior to Bid opening, the documentation identified in Section 00 45 11,
BIDDERS PREQUALIFICATIONS.
3.2.1. Submission of and/or questions related to prequalification should be addressed to
the City contact as provided in Paragraph 6.1.
3.3. The City reserves the right to require any pre -qualified contractor who is the apparent low
bidder for a project to submit such additional information as the City, in its sole
discretion may require, including but not limited to manpower and equipment records,
information about key personnel to be assigned to the project, and construction schedule
to assist the City in evaluating and assessing the ability of the apparent low bidder to
deliver a quality product and successfully complete projects for the amount bid within
the stipulated time frame. Based upon the City's assessment of the submitted
information, a recommendation regarding the award of a contract will be made to the
City Council. Failure to submit the additional information, if requested, may be grounds
for rejecting the apparent low bidder as non -responsive. Affected contractors will be
notified in writing of a recommendation to the City Council.
3.4. In addition to prequalification, additional requirements for qualification may be required
within various sections of the Contract Documents.
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CITY PROJECT No. 103280
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 3 of 10
4. Examination of Bidding and Contract Documents, Other Related Data, and Site
4.1. Before submitting a Bid, each Bidder:
4.1.1. Shall examine and carefully study the Contract Documents and other related data
identified in the Bidding Documents (including "technical data" referred to in
Paragraph 4.2. below). No information given by City or any representative of the
City other than that contained in the Contract Documents and officially
promulgated addenda thereto, shall be binding upon the City.
4.1.2. Should visit the site to become familiar with and satisfy Bidder as to the general,
local and site conditions that may affect cost, progress, performance or furnishing
of the Work.
4.1.3. Shall consider federal, state and local Laws and Regulations that may affect cost,
progress, performance or furnishing of the Work.
4.1.4. Omitted
4.1.5.Shall study all: (i) reports of explorations and tests of subsurface conditions at or
contiguous to the Site and all drawings of physical conditions relating to existing
surface or subsurface structures at the Site (except Underground Facilities) that
have been identified in the Contract Documents as containing reliable "technical
data" and (ii) reports and drawings of Hazardous Environmental Conditions, if any,
at the Site that have been identified in the Contract Documents as containing
reliable "technical data."
4.1.6. Is advised that the Contract Documents on file with the City shall constitute all of
the information which the City will furnish. All additional information and data
which the City will supply after promulgation of the formal Contract Documents
shall be issued in the form of written addenda and shall become part of the Contract
Documents just as though such addenda were actually written into the original
Contract Documents. No information given by the City other than that contained in
the Contract Documents and officially promulgated addenda thereto, shall be
binding upon the City.
4.1.7. Should perform independent research, investigations, tests, borings, and such other
means as may be necessary to gain a complete knowledge of the conditions which
will be encountered during the construction of the project. For projects with
restricted access, upon request, City may provide each Bidder access to the site to
conduct such examinations, investigations, explorations, tests and studies as each
Bidder deems necessary for submission of a Bid. Bidder must fill all holes and
clean up and restore the site to its former conditions upon completion of such
explorations, investigations, tests and studies.
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CITY PROJECT No. 103280
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 4 of 10
4.1.8. Shall determine the difficulties of the Work and all attending circumstances
affecting the cost of doing the Work, time required for its completion, and obtain all
information required to make a proposal. Bidders shall rely exclusively and solely
upon their own estimates, investigation, research, tests, explorations, and other data
which are necessary for full and complete information upon which the proposal is
to be based. It is understood that the submission of a proposal or bid is prima -facie
evidence that the Bidder has made the investigations, examinations and tests herein
required.
4.1.9. Shall promptly notify City of all conflicts, errors, ambiguities or discrepancies in or
between the Contract Documents and such other related documents. The Contractor
shall not take advantage of any gross error or omission in the Contract Documents,
and the City shall be permitted to make such corrections or interpretations as may
be deemed necessary for fulfillment of the intent of the Contract Documents.
4.2. Reference is made to Section 00 73 00 — Supplementary Conditions for identification o£
4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to
the site which have been utilized by City in preparation of the Contract Documents.
The logs of Soil Borings, if any, on the plans are for general information only.
Neither the City nor the Engineer guarantee that the data shown is representative of
conditions which actually exist.
4.2.2. those drawings of physical conditions in or relating to existing surface and
subsurface structures (except Underground Facilities) which are at or contiguous to
the site that have been utilized by City in preparation of the Contract Documents.
4.2.3. copies of such reports and drawings will be made available by City to any Bidder
on request. Those reports and drawings may not be part of the Contract
Documents, but the "technical data" contained therein upon which Bidder is entitled
to rely as provided in Paragraph 4.02. of the General Conditions has been identified
and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is
responsible for any interpretation or conclusion drawn from any "technical data" or
any other data, interpretations, opinions or information.
4.2.4. Standard insurance requirements, coverages and limits.
4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder: (i)
that Bidder has complied with every requirement of this Paragraph 4, (ii) that without
exception the Bid is premised upon performing and furnishing the Work required by the
Contract Documents and applying the specific means, methods, techniques, sequences or
procedures of construction (if any) that may be shown or indicated or expressly required
by the Contract Documents, (iii) that Bidder has given City written notice of all
conflicts, errors, ambiguities and discrepancies in the Contract Documents and the
written resolutions thereof by City are acceptable to Bidder, and when said conflicts,
etc., have not been resolved through the interpretations by City as described in
Paragraph 6., and (iv) that the Contract Documents are generally sufficient to indicate
and convey understanding of all terms and conditions for performing and furnishing the
Work.
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CITY PROJECT No. 103280
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 5 of 10
4.4. The provisions of this Paragraph 4, inclusive, do not apply to Asbestos, Polychlorinated
biphenyls (PCBs), Petroleum, Hazardous Waste or Radioactive Material covered by
Paragraph 4.06. of the General Conditions, unless specifically identified in the Contract
Documents.
5. Availability of Lands for Work, Etc.
5.1. The lands upon which the Work is to be performed, rights -of -way and easements for
access thereto and other lands designated for use by Contractor in performing the Work
are identified in the Contract Documents. All additional lands and access thereto
required for temporary construction facilities, construction equipment or storage of
materials and equipment to be incorporated in the Work are to be obtained and paid for
by Contractor. Easements for permanent structures or permanent changes in existing
facilities are to be obtained and paid for by City unless otherwise provided in the
Contract Documents.
5.2.Outstanding right-of-way, easements, and/or permits to be acquired by the City are listed
in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right-
of-way, easements, and/or permits are not obtained, the City reserves the right to cancel
the award of contract at any time before the Bidder begins any construction work on the
project.
5.3. The Bidder shall be prepared to commence construction without all executed right-of-
way, easements, and/or permits, and shall submit a schedule to the City of how
construction will proceed in the other areas of the project that do not require permits
and/or easements.
6. Interpretations and Addenda
6.1. All questions about the meaning or intent of the Bidding Documents are to be directed to
City in writing on or before 2 p.m., the Monday prior to the Bid opening. Questions
received after this day may not be responded to. Interpretations or clarifications
considered necessary by City in response to such questions will be issued by Addenda
delivered to all parties recorded by City as having received the Bidding Documents.
Only questions answered by formal written Addenda will be binding. Oral and other
interpretations or clarifications will be without legal effect.
Address questions to:
City of Fort Worth
200 Texas Street
Fort Worth, TX 76102
Attn: Mitch Aiton, Transportation and Public Works
Fax: 817-392-8092
Email: Mitchell.Aiton@fortworthtexas.gov
Phone:682-715-9424
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CITY PROJECT No. 103280
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 6 of 10
6.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by
City.
6.3. Addenda or clarifications may be posted via the City's electronic document management
and collaboration system; web link to be provided.
6.4. A prebid conference may be held at the time and place indicated in the Advertisement or
INVITATION TO BIDDERS. Representatives of City will be present to discuss the
Project. Bidders are encouraged to attend and participate in the conference. City will
transmit to all prospective Bidders of record such Addenda as City considers necessary
in response to questions arising at the conference. Oral statements may not be relied
upon and will not be binding or legally effective.
7. Bid Security
7.1. Each Bid must be accompanied by a Bid Bond made payable to City in an amount of five
(5) percent of Bidder's maximum Bid price, on the form attached or equivalent, issued
by a surety meeting the requirements of Paragraph 5.01 of the General Conditions.
7.2. The Bid Bonds provided by a Bidder will be retained until the conditions of the Notice of
Award have been satisfied. If the Successful Bidder fails to execute and return the
Contract Documents within 14 days after the Notice of Award conveying same, City
may consider Bidder to be in default, rescind the Notice of Award and act on the Bid
Bond. Such action shall be City's exclusive remedy in the event Bidder is deemed to
have defaulted.
8. Contract Times
The number of days within which, or the dates by which, Milestones are to be achieved in
accordance with the General Requirements and the Work is to be completed and ready for
Final Acceptance is set forth in the Agreement or incorporated therein by reference to the
attached Bid Form.
9. Liquidated Damages
Provisions for liquidated damages are set forth in the Agreement.
10. Substitute and "Or -Equal" Items
The Contract, if awarded, will be on the basis of materials and equipment described in the
Bidding Documents without consideration of possible substitute or "or -equal" items.
Whenever it is indicated or specified in the Bidding Documents that a "substitute" or "or -
equal" item of material or equipment may be furnished or used by Contractor if acceptable to
City, application for such acceptance will not be considered by City until after the Effective
Date of the Agreement. The procedure for submission of any such application by Contractor
and consideration by City is set forth in Paragraphs 6.05A., 6.05B. and 6.05C. of the General
Conditions and is supplemented in Section 0125 00 of the General Requirements.
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CITY PROJECT No. 103280
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 7 of 10
11. Subcontractors, Suppliers and Others
11.1. In accordance with the City's Business Equity Ordinance No.25165-10-2021 the City
has goals for the participation of minority business and/or women business
enterprises in City contracts $100,000 or greater. See Section 00 45 40 for the
M/WBE Project Goals and additional requirements. Failure to comply shall render
the Bidder as non -responsive.
Business Equity Ordinance No.25165-10-2021, as amended (replacing Ordinance
No. 24534-11-2020), codified at:
httDs://codelibrarv.amle2al.com/codes/ftworth/latest/ftworth tx/0-0-0-22593
11.2. No Contractor shall be required to employ any Subcontractor, Supplier, other person
or organization against whom Contractor or City has reasonable objection.
12. Bid Form
12.1. The Bid Form is included with the Bidding Documents; additional copies may be
obtained from the City.
12.2. All blanks on the Bid Form must be completed and the Bid Form signed in ink.
Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A
Bid price shall be indicated for each Bid item, alternative, and unit price item listed
therein. In the case of optional alternatives, the words "No Bid," "No Change," or
"Not Applicable" may be entered. Bidder shall state the prices for which the Bidder
proposes to do the work contemplated or furnish materials required. All entries shall
be legible.
12.3. Bids by corporations shall be executed in the corporate name by the president or a
vice-president or other corporate officer accompanied by evidence of authority to
sign. The corporate seal shall be affixed. The corporate address and state of
incorporation shall be shown below the signature.
12.4. Bids by partnerships shall be executed in the partnership name and signed by a
partner, whose title must appear under the signature accompanied by evidence of
authority to sign. The official address of the partnership shall be shown below the
signature.
12.5. Bids by limited liability companies shall be executed in the name of the firm by a
member and accompanied by evidence of authority to sign. The state of formation of
the firm and the official address of the firm shall be shown.
12.6. Bids by individuals shall show the Bidder's name and official address.
12.7. Bids by joint ventures shall be executed by each joint venture in the manner indicated
on the Bid Form. The official address of the joint venture shall be shown.
12.8. All names shall be typed or printed in ink below the signature.
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CITY PROJECT No. 103280
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 8 of 10
12.9. The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of
which shall be filled in on the Bid Form.
12.10. Postal and e-mail addresses and telephone number for communications regarding the
Bid shall be shown.
12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of
Texas shall be provided in accordance with Section 00 43 37 — Vendor Compliance
to State Law Non Resident Bidder.
13. Submission of Bids
Bids shall be submitted on the prescribed Bid Form, provided with the Bidding Documents,
at the time and place indicated in the Advertisement or INVITATION TO BIDDERS,
addressed to Purchasing Manager of the City, and shall be enclosed in an opaque sealed
envelope, marked with the City Project Number, Project title, the name and address of
Bidder, and accompanied by the Bid security and other required documents. If the Bid is sent
through the mail or other delivery system, the sealed envelope shall be enclosed in a separate
envelope with the notation "BID ENCLOSED" on the face of it.
14. Withdrawal of Bids
14.1. Bids addressed to the Purchasing Manager and filed with the Purchasing Office may
be withdrawn prior to the time set for bid opening. A request for withdrawal must be
made in writing and delivered to the Purchasing Office to receive a time stamp prior
to the opening of Bids. A timely withdrawn bid will be returned to the Bidder or, if
the request is within one hour of bid opening, will not be read aloud and will
thereafter be returned unopened.
14.2. In the event any Bid for which a withdrawal request has been timely filed has been
inadvertently opened, said Bid and any record thereof will subsequently be marked
"Withdrawn" and will be given no further consideration for the award of contract.
15. Opening of Bids
Bids will be opened and read aloud publicly. An abstract of the amounts of the base Bids and
major alternates (if any) will be made available to Bidders after the opening of Bids.
16. Bids to Remain Subject to Acceptance
All Bids will remain subject to acceptance for a minimum of 90 days or the time period
specified for Notice of Award and execution and delivery of a complete Agreement by
Successful Bidder. City may, at City's sole discretion, release any Bid and nullify the Bid
security prior to that date.
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CITY PROJECT No. 103280
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 9 of 10
17. Evaluation of Bids and Award of Contract
17.1. City reserves the right to reject any or all Bids, including without limitation the rights
to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids
and to reject the Bid of any Bidder if City believes that it would not be in the best
interest of the Project to make an award to that Bidder. City reserves the right to
waive informalities not involving price, contract time or changes in the Work and
award a contract to such Bidder. Discrepancies between the multiplication of units of
Work and unit prices will be resolved in favor of the unit prices. Discrepancies
between the indicated sum of any column of figures and the correct sum thereof will
be resolved in favor of the correct sum. Discrepancies between words and figures
will be resolved in favor of the words.
17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists
among the Bidders, Bidder is an interested party to any litigation against City,
City or Bidder may have a claim against the other or be engaged in litigation,
Bidder is in arrears on any existing contract or has defaulted on a previous
contract, Bidder has performed a prior contract in an unsatisfactory manner, or
Bidder has uncompleted work which in the judgment of the City will prevent or
hinder the prompt completion of additional work if awarded.
17.2. In addition to Bidder's relevant prequalification requirements, City may consider the
qualifications and experience of Subcontractors, Suppliers, and other persons and
organizations proposed for those portions of the Work where the identity of such
Subcontractors, Suppliers, and other persons and organizations must be submitted as
provided in the Contract Documents or upon the request of the City. City also may
consider the operating costs, maintenance requirements, performance data and
guarantees of major items of materials and equipment proposed for incorporation in
the Work when such data is required to be submitted prior to the Notice of Award.
17.3. City may conduct such investigations as City deems necessary to assist in the
evaluation of any Bid and to establish the responsibility, qualifications, and financial
ability of Bidders, proposed Subcontractors, Suppliers and other persons and
organizations to perform and furnish the Work in accordance with the Contract
Documents to City's satisfaction within the prescribed time.
17.4. Contractor shall perform with his own organization, work of a value not less than
35% of the value embraced on the Contract, unless otherwise approved by the City.
17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and
responsive Bidder whose evaluation by City indicates that the award will be in the
best interests of the City.
17.6. Pursuant to Texas Government Code Chapter 2252.001, the City will not award
contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than
the lowest bid submitted by a responsible Texas Bidder by the same amount that a
Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a
comparable contract in the state in which the nonresident's principal place of
business is located.
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CITY PROJECT No. 103280
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 10 of 10
17.7. A contract is not awarded until formal City Council authorization. If the Contract is
to be awarded, City will award the Contract within 90 days after the day of the Bid
opening unless extended in writing. No other act of City or others will constitute
acceptance of a Bid. Upon the contract award, a Notice of Award will be issued by
the City.
17.7.1. The contractor is required to fill out and sign the Certificate of Interested
Parties Form 1295 and the form must be submitted to the Project Manager
before the contract will be presented to the City Council. The form can be
obtained at htti)s://www.ethics.state.tx.us/data/forms/1295/1295.pdf
17.8. Failure or refusal to comply with the requirements may result in rejection of Bid.
18. Signing of Agreement
18.1. en City issues a Notice of Award to the Successful Bidder, it will be accompanied
by the required number of unsigned counterparts of the Project Manual. Within 14
days thereafter, Contractor shall sign and deliver the required number of counterparts
of the Project Manual to City with the required Bonds, Certificates of Insurance, and
all other required documentation.
18.2. City shall thereafter deliver one fully signed counterpart to Contractor.
END OF SECTION
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CITY PROJECT No. 103280
Revised/Updated November 2, 2021
003513
CONFLICT OF INTEREST STATEMENT
Page 1 of 13
SECTION 00 35 13
CONFLICT OF INTEREST STATEMENT
Each bidder, offeror or respondent to a City of Fort Worth procurement is required to complete a
Conflict of Interest Questionnaire or certify that one is current and on file with the City Secretary's
Office pursuant to state law.
If a member of the Fort Worth City Council, any one or more of the City Manager or Assistant
City Managers, or an agent of the City who exercise discretion in the planning, recommending,
selecting or contracting with a bidder, offeror or respondent is affiliated with your company, then
a Local Government Officer Conflicts Disclosure Statement (CIS) may be required.
You are urged to consult with counsel regarding the applicability of these forms and Local
Government Code Chapter 176 to your company.
The referenced forms may be downloaded from the links provided below.
Form CIQ (Conflict of Interest Questionnaire) (state.tx.us)
httDs://www.ethics.state.tx.us/data/forms/conflict/CIS.r)df
El CIQ Form does not apply
❑ CIQ Form is on file with City Secretary
❑ CIQ Form is being provided to the City Secretary
2 CIS Form does not apply
❑ CIS Form is on File with City Secretary
❑ CIS Form is being provided to the City Secretary
BIDDER:
Jackson Construction, Ltd.
5112 Sun Valley Drive
Fort Worth, Texas 76119
END OF SECTION
By: Troy L. Jackson
Signature„ ,�/2�ClChi
Title: I President
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised February 24, 2020
TRINITY BOULEVARD PH 2
CITY PROJECT No. 103280
0041 00
BID FORM
Page 2 of 13
SECTION 00 41 00
BID FORM
TO: The Purchasing Manager
c/o: The Purchasing Division
200 Texas Street
City of Fort Worth, Texas 76102
FOR: Trinity Boulevard Phase 2 from Salado Trail to Thames Trail
City Project No.: 103280
Units/Sections: Unit I - Roadway & Drainage
Unit II - Water
Unit III - Illumination & Traffic Signal
Unit IV - Landscape & Irrigation
1. Enter Into Agreement
The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form
included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents
for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions
of the Contract Documents.
2. BIDDER Acknowledgements and Certification
2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and
INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond.
2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will
provide a valid insurance certificate meeting all requirements within 14 days of notification of award.
2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed
individual or entity and is not submitted in conformity with any collusive agreement or rules of any group,
association, organization, or corporation.
2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.
2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding.
2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract.
For the purposes of this Paragraph:
a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to
influence the action of a public official in the bidding process.
b. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the
bidding process to the detriment of City (b) to establish Bid prices at artificial non-competitive
levels, or (c) to deprive City of the benefits of free and open competition.
c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without
the knowledge of City, a purpose of which is to establish Bid prices at artificial, non-competitive
levels.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS TRINITY BOULEVARD PH 2
Revised 9/30/2021 CITY PROJECT No. 103280
0041 00
BID FORM
Page 3 of 13
d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their
property to influence their participation in the bidding process or affect the execution of the
Contract.
3. Prequalification
The Bidder acknowledges that the following work types must be performed only by prequalified contractors and
subcontractors:
a. TUNNELING - 36 INCHES - 60 INCHES, AND 350 LF OR LESS
b. WATER TRANSMISSION, URBAN/RENEWAL, 42-INCHES AND SMALLER
c. CCTV, 42-INCHES AND SMALLER
d. CONCRETE PAVING CONSTRUCTION/RECONSTRUCTION (15,000 SY AND GREATER)
e. ROADWAY AND PEDESTRIAN LIGHTING
f. -
M
IM
4. Time of Completion
4.1. The Work will be complete for Final Acceptance within 730 days after the date when the
the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions,
4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete
the Work {and/or achievement of Milestones) within the times specified in the Agreement.
5. Attached to this Bid
The following documents are attached to and made a part of this Bid:
a. This Bid Form, Section 00 41 00
b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph
5.01 of the General Conditions.
c. Proposal Form, Section 00 42 43
d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37
e. MWBE Forms (optional at time of bid)
f. Prequalification Statement, Section 00 45 12
g. Conflict of Interest Affidavit, Section 00 35 13
*If necessary, CIQ or CIS forms are to be provided directly to City Secretary
h. Any additional documents that may be required by Section 12 of the Instructions to Bidders
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS TRINITY BOULEVARD PH 2
Revised 9/30/2021 CITY PROJECT No. 103280
0041 00
BID FORM
Page 4 of 13
6. Total Bid Amount
6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the
space provided below, please enter the total bid amount for this project. Only this figure will be read publicly
by the City at the bid opening.
6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is
subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective
estimated quantities shown in this proposal and then totaling all of the extended amounts.
Total Bid
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised 9/30/2021
$12,099,342.00
TRINITY BOULEVARD PH 2
CITY PROJECT No. 103280
7. Bid Submittal
This Bid is submitted on February 1, 2024
Respectful) ubmitted,
B Y.
(S nature)
Trov L. Jackson
(Printed Name)
Title: Presiden
Company: Jackson Construction, Ltd.
Address: 5112 Sun Valley Drive
Fort Worth, Texas 76119
State of Incorporation: TX
Email: office@jacksontx.net
Phone: 817-572-3303
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised 9/30/2021
0041 00
BID FORM
Page 5 of 13
by the entity named below.
Receipt is acknowledged of the Initial
following Addenda:
Addendum No. 1:
Addendum No. 2:
Addendum No. 3:
Addendum No. 4:
/
Corporate Seal:
TRINITY BOULEVARD PH 2
CITY PROJECT No. 103280
00 42 43
BID PROPOSAL
Page 6 of 13
SECTION 00 42 43
PROPOSAL FORM
UNIT PRICE BID
Bidder's Application
Project Item Information
Bidder's Proposal
Unit I - Roadway
& Drainage
Bidlist
Description
Specification
Unit of
Bid
Unit Price
Bid Value
Item No.
Section No.
Measure
Quantity
1-1
0170.0100Mobilization
017000
LS
1
S500,000.00
$500,000001
1-2
0241.0100 Remove Sidewalk
0241 13
SF
540
$2.00
$1,080 001
1-3
0241.4201 Remove 4' Drop Inlet
0241 14
EA
1
$800.00
$800 00 1
1-4
0241.1000 Remove Cone Pvmt
0241 15
SY
290
$42.00
$12,180,001
I-5
0241.1100 Remove Asphalt Pvmt
0241 15
SY
14,500
$13.00
$188,500 001
1-6
0241 1300 Remove Cone Curb&Gutter
0241 15
LF
380
$10.00
$3,800.001
1-7
3441 3501 Salvage Street Light Pole
3441 20
EA
1
$1,200,00
$1,200.001
1-8
3441 4108 Remove Sign Panel and Post
3441 30
EA
4
$200 00
$800.00 1
I-9
31 10,0102 6"-12" Tree Removal
31 1000
EA
64
$900 00
$57,600.001
1-10
31100103 12"-18"Tree Removal
311000
EA
2
$1,40000
$2,800.001
1-11
3123 0101 Unclassified Excavation by Plan
31 23 16
CY
14,720
$33.00
$485,760.001
I-12
3124 0101 Embankment by Plan
31 2400
CY
770
$26.00
$20,020.001
1-13
3125,0101 SWPPP ? I acre
31 2500
LS
1
$25,000.00
$25,000.001
1-14
9999.0001 6" Flexbase (Temoorarv)
32 11 23
SY
600
$58.00
$34,800.001
1-15
3211.0400 Hydrated Lime
32 11 29
TN
400
$370.00
$148,000.001
1-16
3211.0502 8" Lime Treatment (48 LBS/SY)
32 11 29
SY
16,580
$7.00
$116,060,001
1-17
9999,0002 4" Asphalt Type B (Temoorarv)
32 12 16
SY
600
$72.00
$43,200,001
1-18
9999.0003 Monolithic Median Nose - Tvoe 3
32 13 13
EA
2
$4,600.00
$9,200.001
1-19
3213.0105 10" Conc Pvmt
32 13 13
SY
15,530
$97.00
$1,506,410.001
1-20
3213.0301 4" Cone Sidewalk
32 1320
SF
28,180
$Z00
$197,260.00
1-21
3213.0311 4" Cone Sidewalk, Adiacent to Curb
32 1320
SF
19,710
$8.50
$167,535,001
1-22
3213.0322 Cone Curb at Back of Sidewalk
32 1320
LF
520
$17 00
$8,840,001
I-23
3213.0506 Barrier Free Ramp, Type P-1
32 1320
EA
8
$4,000.00
$32.000,001
1-24
3213 0501 Barrier Free Ramp. Type R-1
32 1320
EA
1
$4,000.00
$4,000.001
[-25
3216,0101 6" Cone Curb and Gutter
32 16 13
LF
250
$100.00
$25,000.001
1-26
9999.0004 Integral Colored/Stamned 4" Concrete Median
0335 13
SY
170
$180.00
$30,600.001
1-27
9999 0005 RAIL (PRI 1)
TxDOT 450
LF
20
$260.00
$5,200.001
1-28
3217 0101 6" SLD Pvmt Marking HAS (1V)
32 1723
LF
910
$2.50
$2,275.001
1-29
3217 0102 6" SLD Pvmt Marking HAS (Y)
32 1723
LF
4,640
$2.50
$11,600.001
1-30
3217.0103 6" BRK Pvmt Marking HAS (W)
32 1723
LF
1,100
$2,50
$2,750 00
1-31
3217.0201 8" SLD Pvmt Markine, HAS (W)
32 1723
LF
200
$3,00
$600,00
1-32
3217,0401 18" SLD Pvmt Marking HAE (W)
32 1723
LF
320
$9.00
$2.880 00
1-33
3217,0501 24" SLD Pvmt Marking HAE (W)
32 1723
LF
530
$10.00
$5,300.00
I-34
3217.0502 Preformed Thermoplastic Contrast Markings - 24" Crosswalk
32 1723
LF
390
$42 00
$16,380 00
1-35
3217.1002 Lane Legend Arrow
321723
EA
6
$185.00
$1,110.00
1-36
3217.1003 Lane Legend DBL Arrow
32 1723
EA
2
$185 00
$370.00
I-37
3217.1004 Lane Legend Only
32 1723
EA
2
$185.00
$370.00
1-38
3217.2103 REFL Raised Marker TY II -A -A
32 1723
EA
3
$5.00
$15.00
1-39
3217.2104 REFL Raised Marker TV II-C-R
32 1723
EA
120
$5.00
$600.00
1-40
0241.0800 Remove Rip Rap
0241 13
SF
2,500
$8.00
$20,000.00
1-41
3137.0102 Large Stone Riprap, dry
31 3700
CY
240
$170.00
$40,800.00
I-42
3305.0109 Trench Safety
3305 10
LF
2,860
$2.00
$5.720.001
1-43
334L0205 24" RCP, Class Ill
3341 10
LF
1,230
$103.00
$126.690.001
1-44
3341 0208 27" RCP, Class III
3341 10
LF
280
$112.00
$31,360.001
1-45
3341 0302 30" RCP, Class 111
3341 10
LF
410
$123.00
$50,430.00 1
I-46
3341 0309 36" RCP, Class 111
3341 10
LF
470
$161.00
$75.670.001
1-47
3341,0402 42' RCP, Class 111
3341 10
LF
490
$213.00
$104,370.001
1-48
3349,0001 4' Storm Junction Box
33 49 10
EA
4
$7,000.00
$28,000.001
1-49
3349.0001 A 5' Stomni Junction Box - Water Tight Hinged Manhole Frannie, Cover, and
33 49 10
EA
2
Grade Rings
$11,000.00
$22,000.00
I-50
3349,100942"Flared Headwall, 1nice
334940
EA
1
$12,000.00
$12,000.001
I-51
3349,6001 10' Recessed Inlet
33 49 20
EA
8
$10,000.00
$80,000.00l
I-52
3349,6002 15' Recessed Inlet
33 49 20
EA
3
$13,000.00
$39,000.001
I-53
3349 7001 4' Drop Inlet
33 49 20
EA
1
$9,000.00
$9,000.001
1-54
3349 8001 10' Type 2 Inlet
33 49 20
EA
1
$12,000.00
$12,000.001
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS TRINITY BOULEVARD PH 2
Remised 9/30/2021
CITY PROJECT No 103280
00 42 43
BID PROPOSAL
Page 7 of 13
I-55
9999,0006 Miscellaneous Structure Adiustment (Sta 158+90)
3471 13
EA
1
$25,000.00
$25,000.001
1-56
0171.0101 Construction Staking
01 71 23
LS
1
$32,000.00
$32,000.001
1-57
3471 0001 Traffic Control
3471 13
MO
12
$11,000.00
$132,000.001
1-58
3471,0002 Portable Message Sign
347113
WK
16
$700.00
$11,200001
I-59
9999,0007 Construction Allowance
00 00 00
LS
1
$350,000.00
$350,000.001
Sub -Total Unit
I - Roadway & Drainage
$4,879,135.00
Unit II - Water
Bidlist
Specification
Unit of
Bid
Item No.
Description
Section No
Measure
Quantity
Unit Price
Bid Value
II-1 A*
3311.0852 36" DIP Water, CSS Backfill
33 11 10
LF
1,029
$870.00
$895,230.001
II-1 B*
3311.0862 36" Steel AWWA C200 Water Pipe, CSS Backfill
33 11 14
LF
1,029
II-2A*
3311.0855 36" DIP Water, CSS Backfill (Restrained Joints)
33 11 10
LF
1,080
$1,010.00
$1,090,800001
II-2B*
3311.0865 36" Steel AWWA C200 Water Pipe, CSS Backfill (Restrained Joints)
33 11 14
LF
1,080
1
II-3A*
3311.0755 30" DIP Water, CSS Backfill (Restrained Joints)
33 11 10
LF
45
$1,270.00
$57,150.001
II 3B*
33 11 14
LF
45
331 L0765 30" Steel AWWA C200 Water Pipe, CSS Backfill (Restrained Joints)
II-4A*
3311.0001 Ductile Iron Water Fittings w/ Restraint (30-inch and Larger)
33 11 11
TON
10.3
$35,000 00
$360,500.001
II-4B*
3311.0011 Steel Fittings
33 11 14
LS
I
*Bidder to provide Unit Price / Extended Price for only one of the pipe material alternatives for
Items 1, 2,
3, and 4
DO NOT PROVIDE UNIT PRICE / EXTENDED PRICE FOR EACH ALTERNATIVE
11-5
331 L0852 36" DIP Water, CSS Backfill (WLA STA 0+00 Connection)l
33 11 10
1
2
$3,700.00
$7,400.001
3311.0864 36" Steel AWWA C200 Water Pipe (Restrained Joints) - BEV Vault and
I1-6
Connections
33 11 10
LF
74
$1,100.00
$81,400.001
II-7
3305 2009 36" Water Carrier Pipe
33 05 24
LF
11
$1,700.00
$18300.001
II-8
3305.1204 54" Casing/Tunnel Liner Plate By Other Than Open Cut
33 05 21, 33 05 22
LF
11
$4,600.00
$50.600.001
I1-9
3311.0242 8" Water Pipe, CSS Backfill
33 11 10,33 11 12
LF
46
$136.00
$6,256,001
II-10
9999.0008 Connection to Existing 33" Water Main
33 1225
EA
1
$115,000.00
$115,000 001
II-11
3312.0110 Connection to Existing 36" Water Main
33 1225
EA
2
$90,000.00
$180,000,001
II-12
3312.01 17 Connection to Existing 4"-12" Water Main
33 1225
EA
1
$4,500.00
$4,500 00
I1-13
3312,1005 6" Combination Air Valve Assembly for Water
33 1230
EA
3
$1 17,000.00
$351,000.00
II-14
3312.3003 8" Gate Valve
33 1220
EA
1
$2,500.00
$2,500.00
11-15
3312.5000 36" AWWA Butterfly Valve, w/ Vault
33 1221
EA
3
$290,000.00
$870,000.00
II-16
3312.3009 30" Gate Valve w/ Vault
33 1220
EA
1
$108,000.00
$108,000.00
II-17
3312.6003 8" Blow Off Valve
33 1260
EA
1
$49,000.00
$49,000.00
1I-18
3311.0001 Ductile Iron Water Fittings w/ Restraint (8-inch and Smaller)
33 11 11
TON
0.2
$28,000.00
$5,600.00
II-19
0171.0101 Construction Staking
01 71 23
LS
1
$32,000.00
$32,000.00
II-20
0171.0102 As -Built Survey
01 71 23
LS
1
$1,50000
$1,500.001
II-21
0241 1001 Water Line Grouting
0241 14
CY
50
$800 00
$40,000.00 1
11-22
0241.1013 Remove 8" Water Line
0241 14
LF
63
$8.00
$504.001
II-23
0241.1019 Remove 24" Water Line
0241 14
LF
50
$61.00
$3,050.001
II-24
9999 0009 Remove 33" Water Line
0241 14
LF
1,866
$62.00
$115,692,001
1I-25
0241,1021 Remove 36" Water Line
0241 14
LF
85
$83.00
$7,055,001
II-26
0241 1109 24" Pressure Plug
0241 14
EA
I
$5,000.00
$5.000.001
11-27
0241.1302 Remove 6" Water Valve
024114
EA
1
$100,00
$I00.00I
11-28
0241,1303 Remove 8" Water Valve
024114
EA
1
$100.00
$100.00
I1-29
0241.1354 Salvage 24" Water Valve
0241 14
EA
2
$2,400.00
$4,800.00
11-30
9999.0010 Salvage 33" Water Valve
0241 14
EA
1
$2,400 00
$2,400,001
II-31
0241.2201 Remove4'Manhole
0241 14
EA
1
$1,000.00
$1,000.001
11-32
0241 1602 Remove Concrete Water Vault
0241 14
EA
3
$19,000.00
$57,000.001
II-33
9999 001 14" Asphalt Type B (Temporary)
3201 18
LF
2,274
$52.00
$118,248.001
II-34
9999 0012 CCTV for Water Transmission Mains
3301 33
LF
2,174
$3.00
$6,522.001
II-35
33040002 Cathodic Protection
330412
LS
1
$19,000.00
$19,000.00)
II-36
9999.0013 Cathodic Protection System Re -Testing
3304 12
LS
1
$100,000.00
$100,000.00
II-37
3305.0103 Exploratory Excavation of Existing Utilities
33 05 30
EA
6
$1,600 00
$9,600 00
II-38
3305.0109 Trench Safety
3305 10
LF
2,274
$2.00
$4,548.00
11-39
3305 0110 Utility Markers
33 05 26
LS
1
$500.00
$500.00
11-40
9999.0014 Portable Low Profile Concrete Traffic Barrier
TxDOT 512
LF
2,150
$23 00
$49,450.00
11-41
9999.0015 Water Allowance
00 72 00
LS
1
$150,000 00
$150,000.00
Sub -Total
Unit 11- Water
$4,981,705.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS TRINITY BOULEVARD PH 2
Rc,iscd 9/30/2021 CITY PROJECT No. 103280
00 42 43
BID PROPOSAL
Pnge 8 of 13
Unit III - Illumination & Traffic Signal
BJdlist
Description
Item No
I11-1 2605 3015 2" CONDT PVC SCH 80 (T)
I11-2 2605 3016 2" CONDT PVC SCH 80 (B)
III-3 2605.3021 3" CONDT PVC SCH 40 (T)
11I-4 2605,3031 4" CONDT PVC SCH 40 (T)
1I1-5 2605 3032 4" CONDT PVC SCH 40 (B)
111-6 3305,0103 Exploratory Excavation of Existing Utilities
11I-7 3441,1001 Fumisl3/Install3-Sect Sienal Head Assemblv
III-8 3441.1002 Furnish/Install 4-Sect Sienal Head Assembly
111-9 3441.1012 Fumisldlnstall Ped Sienal Head Assmblv
111-10 3441.1031 Fumisldlnstall Audible Pedestrian Pushbutton Station
III-11 3441,1209 Fumisli/Install BBU System EXT Mounted
I11-12 3441.1215 Furnish/Install Hybrid Detection Device
111-13 3441.1260 Fumisldlnstall CATS Ethemet Cable
111-14 3441.1221 Funish/Insall Model 711 Preemption Detector
111-15 3441.1224 Furnish/Install Preemption Cable
111-16 3441.1250 Furnisli/Install PTZ Camera
I11-17 3441.1255 Furnish/Install Communication Modem
111-18 3441.131 1 51C 14 AWG Multi -Conductor Cable
I1I-19 3441.1312 7/C 14 AWG Multi -Conductor Cable
11I-20 3441.1315 20/C 14 AWG Multi -Conductor Cable
111-21 3441 1322 3/C 14 AWG Multi -Conductor Cable
1I1-22 3441.1405 NO 2 Insulated Elec Condr
III-23 3441.1408 NO 6 Insulated Elec Condr
III-24 3441 1410 NO 10 Insulated Elec Condr
111-25 3441.1413 NO 6 Bare Flee Condr SLD
111-26 3441.1414 NO 8 Bare Flee Condr
111-27 3441.1502 Ground Box Tvoe B, w/Apron
1I1-28 3441.1503 Ground Box Tvoe D, w/Apron
111-29 3441.1506 Ground Box Tvoe D
III-30 3441 A 603 Fumisldlnstall 10'- 14' Ped Pole Assmblv
III-31 3441.1611 Furnlsldlnstall Type 41 Signal Pole
III-32 3441.1613 Fumisldlnstall Tvue 43 Sienal Pole
III-33 3441.1615 Fumisldlnstall Type 45 Sienal Pole
I11-34 3441 1623 Finnish/Install Mast Ann 16'- 36'
I11-35 3441.1625 Furnish/Install Mast Ann 52' - 69
I11-36 3441.1645 Fumisldlnstall Tvae 33A Ann
11I-37 3441.1701 TY I Signal Foundation
111-38 3441 1703 TY 3 Sienal Foundation
111-39 3441 1705 TY 5 Signal Foundation
111-40 3441.1715 Signal Cabinet Foundation - 352i & BBU
111-41 3441,1725 Fumisli/Install ATC Signal Controller
III-42 3441.1741 Furnish/Install 352i Controller Cabinet Assembly
III-43 3441.1771 Fumisldlnstall 120-240 Volt Sinale Phase Metered Pedestal
111-44 3441.1772 Furnish/Install 240-480 Volt Single Phase Transocket Metered Pedestal
III-45 3441.3037 Furnish/Install 10'- 14' Washington Standard Liaht Pole & Fixture LED
11I-46 3441.3051 Fumisldlnstall LED Lighting Fixture (137 watt ATB2 Cobra Head)
111-47 3441.3302 Rdwv Illum Foundation TY 3,5,6, and 8
111-48 3441.3303 Rdrw Illum Foundation TY 7
111-49 3441.3352 Fumisldlnstall Rdway Illum TY 18 Pole
111-50 3441.4001 Furnish/Install Alum Sign Mast Ann Mount
Specification
Unit of
Bid
Unit Price
Bid Value
Section
No.
Measure
Quantity
26 05
33
LF
6,950
$32.00
$222,400.001
26 05
33
LF
960
$44.00
$42.240.001
26 05
33
LF
205
$39.00
$7.995.001
26 05
33
LF
60
$44.00
$2,640.001
26 05
33
LF
440
$54.00
$23,760.001
33 05
30
EA
ISO
$128 00
$19,200 001
344110
EA
11
$1,50000
$16,500,001
344110
EA
2
$1,90000
$3,800.001
3441
10
EA
8
$800.00
$6,400.001
344110
EA
8
$1,800.00
$14,400.001
344110
EA
1
$11,000.00
$11.000.001
344110
APR
4
$12,000.00
$48,000.001
3441
10
LF
895
$3.00
$2,685.001
3441
10
EA
4
$6,900.00
$27.600.001
3441
10
LF
820
$4.00
$3,280.001
3441
10
EA
1
$7,200 00
$7,200 001
3441
10
EA
1
$3,600.00
$3,600,001
344110
LF
745
$3.00
$2.235.001
344110
LF
530
$4.00
$2,120.001
3441
10
LF
650
$9.00
$5,850.001
344110
LF
1,350
$3.00
$4,050.001
344110
LF
14,675
$6.00
$88,050.001
3441
10
LF
24,895
$3.00
$74,685.001
344110
LF
1,700
$2.00
$3,400.001
344110
LF
35
$3.00
$105.001
344110
LF
1,175
$3.00
$3,525.001
344110
EA
17
$1,700.00
$28,900.001
344110
EA
4
$2,500.00
$10,000.001
3441
10
EA
2
$2,000.00
$4,000.001
3441
10
EA
4
$1.700 00
$6,800.001
3441
10
EA
2
$16,000 00
$32,000.001
344110
EA
2
$17,000.00
$34,000.001
3441
10
EA
2
$23,000.00
$46,000.001
344110
EA
2
$7,900,00
$15,800.00)
344110
EA
2
$15,000.00
$30,000.001
3441
20
EA
29
$700.00
$20,300.001
344110
EA
4
$1.700.00
$6,800.001
344110
EA
2
$6,000.00
$12,000.001
3441
10
EA
2
$9,000.00
$18,000 001
3441
10
EA
1
$9,000 00
$9,000 00 1
3441
10
EA
1
$8,000.00
$8,000.001
3441
10
EA
1
$33,000.00
$33,000.001
344110
EA
1
$10,000.00
$10,000.001
3541
10
EA
2
$11,000.00
$22,000.001
344120
EA
85
$6,200.00
$527,000.001
3441
20
EA
33
$900.00
$29,700.001
344120
EA
16
$2,500.00
$40,000.001
344120
EA
85
$1,700.00
$144,500.001
3441
20
EA
16
$3,800.00
$60,800.001
3441
30
EA
10
$900.00
$9,000.001
Sub -Total
Unit III -
Illumination
& Traffic Signal
$1,804,320.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Rer,sed 9/30/2021
TRINITY BOULEVARD PH 2
CITY PROJECT No 103280
0042 43
BID PROPOSAL
Pap 9 of 13
Unit IV - Landscape & Irrigation
Bidlist
Description
Specification
Unit of
Bid
Unit Price
Bid Value
Item No.
Section No.
Measure
Quantity
IV-1
3293,0106 Plant 100 Gallon Minimum Tree
See Plans
EA
13
$1,500.00
$19,500.001
IV-2
3293,0104 Plant 65 Gallon Minimum Tree
See Plans
EA
36
$1.200.00
$43,200,001
IV-3
3293.0103 Plant 45 Gallon Minimum Tree
See Plans
EA
26
$1,000.00
$26.000.001
IV-4
3312.2203 2" Water Service
33 12 10
EA
1
$4,300.00
$4,300.001
IV-5
3291.0100 TODSDII(4"Depth)
3291 19
CY
1,215
$61.00
$74,115.001
IV-6
3292.0100 Block Sod Placement
3292 13
SY
5,525
$6.00
$33,150.001
IV-7
3292.0200 Seeding, Broadcast
3292 14
SY
5,395
$1.00
$5,395.00
IV-8
9999.0016 Plant Bedding Mix (12" Depth)
See Plans
CY
82
$81.00
S6.642.00
IV-9
9999.0017 Shredded Hardwood Mulch (3" DeDtlr)
See Plans
CY
20
$44.00
$880 001
IV-10
9999.0018 Tree Protection
See Plans
EA
60
$200.00
$12,000,001
IV-11
9999.0019 Irrigation Booster Pump
See Plans
EA
1
$24,000.00
$24,000.00
IV-12
9999 0020 Irrigation System
32 84 00 & See Plan_
LS
1
$185,000.00
$185,000.00
Sub -Total Unit
IV - Landscape & Irrigation
$434,182.001
Total Bidl
$12,099,342.00�
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS TRINITY BOULEVARD PH 2
R—.d 9/30/2021
CITY PROJECT No. 103280
Bid Bond
CONTRACTOR:
(Name, legal stalls and adc1r"-;)
Jackson Construction, Ltd
5112 Sun Valley Drive
Fort Worth, TX 76119
OWNER:
(Name, legal statrrs and ad<fi ess)
City of Fort Worth
200 Texas Street
Fort Worth, TX 76102
BOND AMOUNT: $ 5%
Document A310 Ton — 2010�-
Conforms with The American Institute of Architects AIA Document 310
SURETY:
(blame, legal stalas and principal place of hruhrecs)
The Hanover Insurance Company
440 Lincoln Street
Worcester, MA 01653
Five Percent of Amount Bid
PROJECT:
(Nanle, location or address and Project number.. if a!{h)
Trinity Boulevard Phase 2
CPN. 103280
This document has important
legal consequences. Consultation
with an attorney is encouraged
with respect to its completion or
modification.
Any singular reference to
Contractor, Surety, Owner or
other party shall be considered
plural where applicable.
The Contractor and Surety are bound to the Owner ill the amount set forth above, for the payment of which the Contractor and Surety bind
themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this
Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period
as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with
the terms of such bid, and gives such bond or bonds as stay be specified in the bidding or Contract documents, with a surety admitted ill
the jurisdiction of the 1'roiect and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt
payment of labor and material famished in the prosecution thereof. or (2) pays to tine Owner the difTerence, not to exceed the amount of
this Bond, between the amount specified in said bid and such larger amount for which tine Owner tray in good faith contract with another
party to perlorin the work covered by said bid, then this obligation shall be null and void, otherwise to remain in lull lbree and ellect. The
Surety hereby waives any notice ol'an agreement between the Owner and Contractor to extend the time in which the Owner may accept the
bid. "kaiver ol'nolicc by the Surety ~hall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time lirr
acceptance ol'bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent lbr an extension beyond
sixty (60) days.
If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deenied to be
Subcontractor and the term Owner shall be deemed to be Contractor.
When this Bond has been lurnished to comply with a statutory or other legal requirement in the location ol'the Project. any provision in
this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conlihnning to such
statutory or other legal requirement shall be deemed incorporated herein. When so lihmished, the intent is that this Bond shall be construed
us a statutory bond and not as a common la%v bond.
Signed and scaled this 1st day of February, 2024
A-"�--,.,
(1Pfnless)
Jackson Construction, Ltd.
(Principal) (Seral)
By:
Mile) /Igredi Zen(
The Hanover Insurance Company
(,Snr y ;act
By: rney i (Title o y e Atto
S•0054/AS 8/10
THE HANOVER INSURANCE COMPANY
MASSACHUSETTS DAY INSURANCE COMPANY
CITIZENS INSURANCE COMPANY OF AMERICA
POWER OFATTORNEV
THIS Power of Attorney limits the acts of those named herein, and they have no authority to hind the Company except in the manner and to the
extent herein stated.
KNOW ALL PERSONS BY THESE PRESENTS:
ThatTHE HANOVER INSURANCE COMPANY and MASSACHUSETTS UAYINSURANCE COMPANY. both beiargcoapaarationsorganizedand e)dsffrq underthe
laws of the State of New Hampshire. and CITIZENS INSURANCE COMPANY OF AMERICA. a corporation organized and existing vnderthe laws ofthe State of
Michigan. (hereinafter IndividuaRy and collectively the'Company) does hereby constitute and appoint
Holly Clevenger
of Dallas, TX individually. ifthere be more than one named. as its true and lawful attofneyisyln-factlo sign. execute. seaLacknowledpand
delver for, and on Its behalf. and as Its act anal deed any place Wthin the United States. any and all surety bonds. reonniz;ances, undertakings. orothersurety
obliga-ions. The execution of such surety bonds, recogniunces. undertakings orsurety obligations.in pursuance oftheso presents. shall be aswr4tnf; upon the
Company as if they had been duty signed by the president and attested by the secretary of the Company. in their awn proper persons. Provided however. that this
pawner of attorney limits the acts of those named herein: and they have no authority to bind the Company except* in the manner stated and to the extent olany
limitation stated below.
Any such obligations in the United States, not to exceed I" Million and Noli(10 (140,000,000) in any single instance
Thatthis power is made and executed pursuant to the authority ofthe folowing Resolutions passed bythe Board Company. and saidResokitions
remain in full force and effect
Swoty Bond Number Bid Bond
Principal: Jackson Construction, Ltd.
Obligoo: City of Fort Worth
RESOLVED: That the President cc any Vice President in conjunction wfth any Vice President be and they hereby we authorized and empowered to
appoint Attamays-In-fact of the Company. In its name and as it acts. to execute and acknowledge for and on is behalf as surety. any and all bonds.
recognizances. contracts ofirulemnity. waivers of citation and all other wr&%% obtillatoy in the nature thereof. with power to offsch thereto the sealailhe
Company. Any such writings so executed by such Attorneys -in -fact S11611 be binding upon the Company as if they had been duty executed and
acknowledged by the reguladi etacted officers of tare Company in their am proper persons.
RESOLVED: That any and all Powers of Attorney and Certified Copies of such Powers of Attorney and cartification in rospec., thercio. granted and
executedbythe PresidentorVicePresidentin conjunctionwith any Vice Presidentofthe Company. shall be binding on the Company to the same extent
as i1allsfWmiures (herein were manuaRyoffixed. even though one or mom ofany such signatures thereon maybe facsimile. (Adopted October7.1931 —
The Hanover Insurance Company, Adopted April 14.1902 — Massachusetts Bayinsutance Company: Adopted September 7.2001 —Cit�*erts Insurance
Company ofAmadca and affirmed by each Company on March 24.2014)
IN WITNESS WHEREOF. THE HANOVER INSURANCE COMPANY, MASSACHUSETTS BAY INSURANCE COMPANY sent CITIZENS INSURANCECOMPANY
OF AMERICA have caused these presents to be seated with their respective corporate seals, duly aftsted by two Vice Presidents. this 614 day of April, 2023
`Ift 114AQVCC tasur"Ke CAMPAY
M&M41i"eft Bay lar*ftare C4=p#ty
h"09" Comp"T.AfAmcfkA
d*. "K1WW51'.roP+v*4nt
STATE OF CONNECTICUT
COUNTY OF HARTFORD
'Ike II&OWtv lasuran" cecopany
" kvkm BAY
0
I&SMEWe CO"Ity OfAxoica
'07 P1 Af
67
;kl Alow"
On this 641 day ofApril 2023 before me come the above named Executive Vice President and Vice President of The Hanover Insurance Company, Massachusetts
Bay Insurance Company and Citizens. Insurance Company of America. to me personally known to be am individuals and officers described herein, and
acknowledged that the seats affixed to the preceding instrument are the corporate seals of The Hanover Insurance Company. Massachusetts Say Insurance
Company and Ciftens Insurance Company of America. respectively. and that ft said corporate seals and Pier signatures as offi.cers were duty affixed and
"."-b and directkn of said Corporations.
Wendy, Latoumes
WdndiUtou F UYM F'-'
-MY, CWdH40ft E4*611 J* 31.2M ANY uly 31, 2M
I. the undersigned Vice President of The Hanover Insurance ComImny. Massachusetts Bay Insurance Company and Citizens Insurance Company of America,
huarobyoerGtytthattheaboveandforegoing isa full. trueand correct copy afthe "inal Power ofAthmey issued bysaid Companies. and do herebyfig8mceffly
that Me said Powers ofAflomay are stR in force and effect
GIVEN under my hand and the seats of said Companies. at Worcester, Massachusetts. oft 18t day of -FebruarV — _3024
The re
CERTIFIED COPY
16-Y 6 —y
4k* IterWAtr, Vkr rmhlraj
IMPORTANT NOTICE
To obtain information or make a complaint:
You may call The Hanover Insurance Company/
Citizens Insurance Company of America's toll -free
telephone number for information or to make a
complaint at:
1-800-343-6044
You may also write to The Hanover Insurance Company/
Citizens Insurance Company of America at:
440 Lincoln Street
Worcester, MA 01653
You may contact the Texas Department of Insurance
to obtain information on companies, coverages,
rights or complaints at:
1-800-252-3439
You may write the Texas Department of Insurance:
P. O. Box 149104
Austin, TX 78714-9104
Fax: (512) 475-1771
Web: http://www.tdi.texas.gov
E-mail: ConsumerProtection@tdi.texas.gov
PREMIUM OR CLAIM DISPUTES:
Should you have a dispute concerning your premium
or about a claim you should contact the agent or the
company first. If the dispute is not resolved, you may
contact the Texas Department of Insurance.
ATTACH THIS NOTICE TO YOUR POLICY: This
notice is for information only and does not become
a part or condition of the attached document.
Texas Complaint Notice
Commercial Lines
AVISO IMPORTANTE
Para obtener informacion o para someter una queja:
Usted puede Ilamar al numero de telefono gratis de
The Hanover Insurance Company/Citizens Insurance
Company of America's para informacion o para
someter una queja al:
1-800-343-6044
Usted tambien puede escribir a The Hanover Insurance
Company/Citizens Insurance Company of America al:
440 Lincoln Street
Worcester, MA 01653
Puede comunicarse con el Departamento de Seguros
de Texas para obtener informacion acerca de
companias, coberturas, derechos o quejas al:
1-800-252-3439
Puede escribir al Departamento de Seguros de Texas:
P. O. Box 149104
Austin, TX 78714-9104
Fax: (512) 475-1771
Web: http://www.tdi.texas.gov
E-mail: ConsumerProtection@tdi.texas.gov
DISPUTAS SOBRE PRIMAS O RECLAMOS:
Si tiene una disputa concerniente a su prima o a un
reclamo, debe comunicarse con el agente o la com-
pania primero. Si no se resuelve la disputa, puede
entonces comunicarse con el departamento (TDI).
UNA ESTE AVISO A SU POLIZA: Este aviso es solo
para proposito de informacion y no se convierte en
parte o condicion del documento adjunto.
The Hanover Insurance Company 1440 Lincoln Street, Worcester, MA 01653
181-7457 (12/13) Page 1 of 1 Citizens Insurance Company ofAmerica 1808 North Highlander Way, Howell, MI 48843
hanover.com
00 43 37
VENDOR COMPLIANCE TO STATE LAW
Page 12 of 13
SECTION 00 43 37
VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER
Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law
provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors
whose corporate offices or principal place of business are outside the State of Texas) bid projects for
construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident
bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in
order to obtain a comparable contract in the State which the nonresident's principal place of business is located.
The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet
specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident
bidders must check the box in Section B.
A. Nonresident bidders in the State of , our principal place of business,
are required to be percent lower than resident bidders by State Law. A copy of the
statute is attached.
Nonresident bidders in the State of our principal place of business,
are not required to underbid resident bidders.
B. The principal place of business of our company or our parent company or majority owner is
in the State of Texas. P]
Jackson Construction, Ltd.
5112 Sun Valley Drive
Fort Worth, Texas 76119
END Or SECTION
By: Troy L. Jackson
Ignature)
Title: President
Date: February 1, 2024
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS TRINITY BOULEVARD PH 2
Revised 9/30/2021 CITY PROJECT No. 103280
0045 11 -1
BIDDERS PREQUALIFICATIONS
Page 1 of 3
1 SECTION 00 45 11
2 BIDDERS PREQUALIFICATIONS
4 1. Summary. A Bidder or their designated subcontractors are required to be prequalified or
5 have applied for prequalification by the City for the work types requiring prequalification
6 prior to submitting bids. To be considered for award of contract the Bidder must submit
7 Section 00 45 12, PREQUALIFICATION STATEMENT for the work type(s) listed with
8 their Bid. Any contractor or subcontractor who is not prequalified for the work type(s) listed
9 must submit Section 00 45 13, PREQUALIFICATION APPLICATION in accordance with
10 the requirements below. The information must be submitted seven (7) days prior to the
11 date of the opening of bids. Subcontractors must follow the same timelines as contractors
12 for obtaining prequalification review. Bidders or Subcontractors who are not prequalified at
13 the time bids are opened and reviewed may cause the bid to be rejected.
14
15 The prequalification process will establish a bid limit based on a technical evaluation and
16 financial analysis of the contractor. For example, a contractor wishing to submit bids on
17 projects to be opened on the 7th of April must file the information by the 31 st day of March
18 in order to be eligible to work on these projects. In order to facilitate the approval of a
19 Bidder's Prequalification Application, the following must accompany the submission.
20 a. A complete set of audited or reviewed financial statements.
21 (1) Classified Balance Sheet
22 (2) Income Statement
23 (3) Statement of Cash Flows
24 (4) Statement of Retained Earnings
25 (5) Notes to the Financial Statements, if any
26 b. A certified copy of the firm's organizational documents (Corporate Charter, Articles
27 of Incorporation, Articles of Organization, Certificate of Formation, LLC
28 Regulations, Certificate of Limited Partnership Agreement).
29 c. A completed Bidder Prequalification Application.
30 (1) The firm's Texas Taxpayer Identification Number as issued by the Texas
31 Comptroller of Public Accounts. To obtain a Texas Taxpayer Identification
32 number visit the Texas Comptroller of Public Accounts online at the
33 following web address www.window.state.tx.us/taxnennit/ and fill out the
34 application to apply for your Texas tax ID.
35 (2) The firm's e-mail address and fax number.
36 (3) The firm's DUNS number as issued by Dun & Bradstreet. This number
37 is used by the City for required reporting on Federal Aid projects. The DUNS
38 number may be obtained at www.dnb.com.
39 d. Resumes reflecting the construction experience of the principles of the firm for firms
40 submitting their initial prequalification. These resumes should include the size and
41 scope of the work performed.
42 e. Other information as requested by the City.
43
44 2. Prequalification Requirements
45 a. Financial Statements. Financial statement submission must be provided in
46 accordance with the following:
47 (1) The City requires that the original Financial Statement or a certified copy
48 be submitted for consideration.
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT No. 103280
Revised August 13, 2021
0045 11 -2
BIDDERS PREQUALIFICATIONS
Page 2 of 3
1
(2)
To be satisfactory, the financial statements must be audited or reviewed
2
by an independent, certified public accounting firm registered and in
3
good standing in any state. Current Texas statues also require that
4
accounting firms performing audits or reviews on business entities within
5
the State of Texas be properly licensed or registered with the Texas State
6
Board of Public Accountancy.
7
(3)
The accounting firm should state in the audit report or review whether
8
the contractor is an individual, corporation, or limited liability company.
9
(4)
Financial Statements must be presented in U.S. dollars at the current rate
10
of exchange of the Balance Sheet date.
11
(5)
The City will not recognize any certified public accountant as
12
independent who is not, in fact, independent.
13
(6)
The accountant's opinion on the financial statements of the contracting
14
company should state that the audit or review has been conducted in
15
accordance with auditing standards generally accepted in the United
16
States of America. This must be stated in the accounting firm's opinion.
17
It should: (1) express an unqualified opinion, or (2) express a qualified
18
opinion on the statements taken as a whole.
19
(7)
The City reserves the right to require a new statement at any time.
20
(8)
The financial statement must be prepared as of the last day of any month,
21
not more than one year old and must be on file with the City 16 months
22
thereafter, in accordance with Paragraph 1.
23
(9)
The City will determine a contractor's bidding capacity for the purposes
24
of awarding contracts. Bidding capacity is determined by multiplying the
25
positive net working capital (working capital = current assets — current
26
liabilities) by a factor of 10. Only those statements reflecting a positive
27
net working capital position will be considered satisfactory for
28
prequalification purposes.
29
(10)
In the case that a bidding date falls within the time a new financial
30
statement is being prepared, the previous statement shall be updated with
31
proper verification.
32
b. Bidder Prequalification Application. A Bidder Prequalification Application must be
33
submitted along with audited or reviewed financial statements by firms wishing to be
34
eligible to bid on all classes of construction and maintenance projects. Incomplete
35
Applications
will be rejected.
36
(1)
In those schedules where there is nothing to report, the notation of
37
"None" or "N/A" should be inserted.
38
(2)
A minimum of five (5) references of related work must be provided.
39
(3)
Submission of an equipment schedule which indicates equipment under
40
the control of the Contractor and which is related to the type of work for
41
which the Contactor is seeking prequalification. The schedule must
42
include the manufacturer, model and general common description of
43
each piece of equipment. Abbreviations or means of describing
44
equipment other than provided above will not be accepted.
45
46 3. Eligibility for Award of Contract
47 a. The City shall be the sole judge as to a contractor's prequalification.
48 b. The City may reject, suspend, or modify any prequalification for failure by the
49 contractor to demonstrate acceptable financial ability or performance.
50 c. The City will issue a letter as to the status of the prequalification approval.
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT No. 103280
Revised August 13, 2021
0045 11 -3
BIDDERS PREQUALIFICATIONS
Page 3 of 3
1 d. If a contractor has a valid prequalification letter, the contractor will be eligible to
2 perform the prequalified work types until the expiration date stated in the letter.
3
8 END OF SECTION
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT No. 103280
Revised August 13, 2021
00 45 12
PREQUALIFICATION STATEMENT
Page 13 of 13
SECTION 00 45 12
PREQUALIFICATION STATEMENT
Each Bidder for a City procurement is required to complete the information below by identifying the prequalified
contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed.
Major Work Type
TUNNELING - 36 INCHES - 60
INCHES, AND 350 LF OR
LESS
WATER TRANSMISSION,
URBAN/RENEWAL, 42-
INCHES AND SMALLER
CCTV, 42-INCHES AND
SMALLER
I,VIV I.,RC 1 C r-mvnv�
CONSTRUCTION/RECONST
RUCTION (15,000 SY AND
rRGOTGR\
ROADWAY AND
PEDESTRIAN LIGHTING
Contractor/Subcontractor Company Name Prequalification
Expiration Date
fir` c 4130G 4
Jackson Construction, Ltd. 4/30/2024
ArmeyiCkkfo O( yr<SFeCV, r'C. I
0 `1
Jackson Construction, Ltd. 12/31/2024
The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are
currently prequalified for the work types listed.
Jackson Construction, Ltd. By: Troy L. Jackson
5112 Sun Valley Drive
S*ature)
Fort Worth, Texas 76119
Title: Presiden
Date: / a'
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS TRINITY BOULEVARD PH 2
Revised 09/30/2021 CITY PROJECT No. 103280
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
00 45 26 - 1
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Page 1 of 1
SECTION 00 45 26
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it
provides worker's compensation insurance coverage for all of its employees employed on City
Project No. 103280. Contractor further certifies that, pursuant to Texas Labor Code, Section
406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with
worker's compensation coverage.
CONTRACTOR:
Jackson Construction, LTD By: Troy L. Jackson
Company (Ple a Print)
5 1 1 Q J Un VA I t6iA
, Signature: %
Address 'F
6(-+- War44, � Title: sj
City/State/Zip (Please Print)
THE STATE OF TEXAS §
COUNTY OFTARRANT §
BEFORE ME, the undersigned authority, on this day personally appeared
Trot/ L. Jackson , known to me to be the person whose name is
subscribed to the foregoing instru> enter, an
acknowledged to me that he/she executed the same as
the act and deed of for the purposes and
consideration therein expressed and in the capacity therein stated.
GIVEN UNDER MY HAND AND SEAL OF OFFICE this _ r d day of
20_a.q .
McCollum ,
F&Nicole
y Com 3s12o26xpires Ctoo No Public in and for the State of Texas
otary ID129952648
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised July 1, 2011
TRINITY BOULEVARD PH 2
CITY PROJECT No. 103280
004540-1
Business Equity Goal
Page 1 of 2
1 SECTION 00 45 40
2 Business Equity Goal
3 APPLICATION OF POLICY
4 If the total dollar value of the contract is $100,000 or more, then a Business Equity goal is applicable.
5 A Business Equity Firm refers to certified Minority-, and/or Women-, owned Business Enterprises
6 (M/WBEs).
7
8 POLICY STATEMENT
9 It is the policy of the City of Fort Worth to ensure the full and equitable participation of Business Equity
10 Firms when applicable, in the procurement of all goods and services. All requirements and regulations
11 stated in the City's Business Equity Ordinance No.25165-10-2021, (replacing Ordinance No. 24534-11-
12 2020 (codified at: httDS:Hcodelibrarv.amle2al.com/codes/ftworth/latest/ftworth tx/0-0-0-22593) apply to
13 this bid.
14
15 BUSINESS EOUITY PROJECT GOAL
16 The City's Business Equity goal on this project is 16% of the total bid value of the contract (Base bid
17 applies to Parks and Community Services).
18
19 METHODS TO COMPLY WITH THE GOAL
20 On City contracts where a Business Equity Goal is applied, offerors are required to comply with the City's
21 Business Equity Ordinance by meeting or exceeding the above stated goal or otherwise comply with the
22 ordinance through one of the following methods: 1. Commercially useful services performed by a
23 Business Equity prime contractor, 2. Business Equity subcontracting participation, 3. Combination
24 of Business Equity prime services and Business Equity subcontracting participation, 4. Business
25 Equity Joint Venture/Mentor-Protege participation, 5. Good Faith Effort documentation, or 6.
26 Prime contractor Waiver documentation.
27
28 SUBMITTAL OF REOUIRED DOCUMENTATION
29 Applicable documents (listed below) must be received by the Purchasing Division, OR the offeror shall
30 EMAIL the Business Equity documentation to the assigned City of Fort Worth Project Manager or
31 Department Designee. Documents are to be received no later than 2:00 p.m., on the third City
32 business day after the bid opening date, exclusive of the bid opening date.
33
34 The Offeror must submit one or more of the following documents:
35 1. Utilization Form and Letter(s) of Intent, if the goal is met or exceeded;
36 2. Good Faith Effort Form and Utilization Form, including supporting documentation, if
37 participation is less than stated goal, or no Business Equity participation is accomplished;
38 3. Prime Contractor Waiver Form, including supporting documentation, if the Offeror will perform
39 all subcontracting/supplier opportunities; or
40 4. Joint Venture/Mentor-Protege Form, if goal is met or exceeded with a Joint Venture or Mentor-
41 Protege participation.
42
43 These forms can be found at:
44 Business Equity Utilization Form and Letter of Intent
45 httDS://apes.fortworthtexas.2ov/Pro_iectResources/ResourcesP/60 - MW EBusiness &I_uity Utilization
46 Form DVIN 2022 220324.Ddf
47
48 Letter of Intent
49
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT No. 103280
Revised October 27, 2021
004540-2
Business Equity Goal
Page 2 of 2
1 httr)s://abbs.fortworthtexas.2ov/Pro_iectResources/ResourcesP/60 - MWBE/Letter of Intent DVIN
2 2021.ndf
3
4 Business Equity Good Faith Effort Form
5 htti)s:Habbs.fortworthtexas.2ov/Pro_iectResources/ResourcesP/60 - MWBE/Good Faith Effort
6 Form DVIN 2022.ndf
7
8 Business Equity Prime Contractor Waiver Form
9 httl)s:Habbs.fortworthtexas.2ov/ProiectResources/ResourcesP/60 - MWBE/MWBE Prime Contractor
10 Waiver-220313.ndf
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Business Equity Joint Venture Form
httos://abbs.fortworthtexas.2ov/ProiectResources/ResourcesP/60 - MWBE/MWBE Joint
Venture 220225.Ddf
FAILURE TO ACHIEVE THE GOAL OR OTHERWISE COMPLY WITH THE ORDINANCE WILL
RESULT IN THE BIDDER/OFFEROR BEING DECLARED NON -RESPONSIVE AND THE BID
REJECTED.
FAILURE TO SUBMIT THE REQUIRED BUSINESS EOUTY DOCUMENTATION OR OTHERWISE
COMPLY WITH THE ORDINANCE WILL RESULT IN THE BID BEING DECLARED NON-
RESPONSIVE, THE BID REJECTED AND MAY SUBJECT THE BIDDER/OFFEROR TO SANCTIONS
AS DESCRIBED IN SEC. 20-373 OF THE ORDINANCE.
For Questions, Please Contact The Business Equity Division of the Department of Diversity and
Inclusion at (817) 392-2674.
END OF SECTION
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT No. 103280
Revised October 27, 2021
00 52 43 - 1
Agreement
Page 1 of 6
SECTION 00 52 43
AGREEMENT
THIS AGREEMENT, authorized on April 9, 2024 is made by and between the City of Fort
Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager,
("City"), and Jackson Construction, LTD. authorized to do business in Texas, acting by and through
its duly authorized representative, ("Contractor"). City and Contractor may jointly be referred to as
Parties.
City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows:
Article 1. WORK
Contractor shall complete all Work as specified or indicated in the Contract Documents for the
Project identified herein.
Article 2. PROJECT
The project for which the Work under the Contract Documents may be the whole or only a part is
generally described as follows:
Trinitv Boulevard Phase 2, Salado Trail to Thames Trail
CPN 103280
Article 3. CONTRACT PRICE
City agrees to pay Contractor for performance of the Work in accordance with the Contract
Documents an amount, in current funds, of Twelve Million Ninetv-Nine Thousand Three
Hundred Forty -Two 00/100 Dollars ($12,099,342.00). Contract price may be adjusted by change
orders duly authorized by the Parties.
Article 4. CONTRACT TIME
4.1 Final Acceptance.
The Work shall be complete for Final Acceptance within 730 days after the date when the
Contract Time commences to run, as provided in Paragraph 2.02 of the General Conditions,
plus any extension thereof allowed in accordance with Article 12 of the General Conditions.
4.2 Liquidated Damages
Contractor recognizes that time is of the essence for completion of Milestones, if any, and
to achieve Final Acceptance of the Work and City and the public will suffer from loss of
use if the Work is not completed within the time(s) specified in Paragraph 4.1 above. The
Contractor also recognizes the delays, expense and difficulties involved in proving in a
legal proceeding, the actual loss suffered by the City if the Work is not completed on time.
Accordingly, instead of requiring any such proof, Contractor agrees that as liquidated
damages for delay (but not as a penalty), Contractor shall pay City One Thousand Two
Hundred Fiftv and 00/100 Dollars ($1,250.00) for each day that expires after the time
specified in Paragraph 4.1 for Final Acceptance until the City issues the Final Letter of
Acceptance.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
CITY OF FORT WORTH TRINITYBOULEVARD PH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITYPROJECT No. 103280
Revised March 3, 2024
00 52 43 - 2
Agreement
Page 2 of 6
Article 5. CONTRACT DOCUMENTS
5.1 CONTENTS:
A.The Contract Documents which comprise the entire agreement between City and
Contractor concerning the Work consist of the following:
1. This Agreement.
2. Attachments to this Agreement:
a. Bid Form
1) Proposal Form
2) Vendor Compliance to State Law Non -Resident Bidder
3) Prequalification Statement
4) State and Federal documents (project specific)
b. Current Prevailing Wage Rate Table
c. Insurance Certification Form (ACORD or equivalent)
d. Payment Bond
e. Performance Bond
f. Maintenance Bond
g. Power of Attorney for the Bonds
h. Worker's Compensation Affidavit
i. MBE and/or SBE Utilization Form
3. General Conditions.
4. Supplementary Conditions.
5. Specifications specifically made a part of the Contract Documents by attachment or,
if not attached, as incorporated by reference and described in the Table of Contents
of the Project's Contract Documents.
6. Drawings.
7. Addenda.
8. Documentation submitted by Contractor prior to Notice of Award.
The following which may be delivered or issued after the Effective Date of the
Agreement and, if issued, become an incorporated part of the Contract Documents:
a. Notice to Proceed.
b. Field Orders.
c. Change Orders.
d. Letter of Final Acceptance.
Article 6. INDEMNIFICATION
6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
expense, the city, its officers, servants and employees, from and against any and all
claims arising out of, or alleged to arise out of, the work and services to be performed
by the contractor, its officers, agents, employees, subcontractors, licenses or invitees
under this contract. This indemnification provision is specifically intended to operate
and be effective even if it is alleged or proven that all or some of the damages being
sought were caused, in whole or in part, by anv act, omission or negligence of the city.
This indemnity provision is intended to include, without limitation, indemnity for costs,
expenses and legal fees incurred by the city in defending against such claims and causes
of actions.
CITY OF FORT WORTH OFFICIAL RECORD TRINITY BOULEVARD PH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY SECRETARY CITYPROJECT No. 103280
Revised March 3, 2024 FT. WORTH, TX
005243-3
Agreement
Page 3 of 6
6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense,
the city, its officers, servants and employees, from and against any and all loss, damage
or destruction of property of the city, arising out of, or alleged to arise out of, the work
and services to be performed by the contractor, its officers, agents, employees,
subcontractors, licensees or invitees under this contract. This indemnification provision
is specifically intended to operate and be effective even if it is alleged or proven that all
or some of the damages being sought were caused, in whole or in part, by anv act,
omission or negligence of the city.
Article 7. MISCELLANEOUS
7.1 Terms.
Terms used in this Agreement which are defined in Article 1 of the General Conditions Will
have the meanings indicated in the General Conditions.
7.2 Assignment of Contract.
This Agreement, including all of the Contract Documents may not be assigned by the
Contractor without the advanced express written consent of the City.
7.3 Successors and Assigns.
City and Contractor each binds itself, its partners, successors, assigns and legal
representatives to the other party hereto, in respect to all covenants, agreements and
obligations contained in the Contract Documents.
7.4 Severability/Non-Waiver of Claims.
Any provision or part of the Contract Documents held to be unconstitutional, void or
unenforceable by a court of competent jurisdiction shall be deemed stricken, and all
remaining provisions shall continue to be valid and binding upon City and Contractor.
The failure of City or Contractor to insist upon the performance of any term or provision of
this Agreement or to exercise any right granted herein shall not constitute a waiver of City's
or Contractor's respective right to insist upon appropriate performance or to assert any such
right on any future occasion.
7.5 Governing Law and Venue.
This Agreement, including all of the Contract Documents is performable in the State of
Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the
Northern District of Texas, Fort Worth Division.
7.6 Authority to Sign.
Contractor shall attach evidence of authority to sign Agreement if signed by someone other
than the duly authorized signatory of the Contractor.
7.7 Non -appropriation of Funds.
In the event no funds or insufficient funds are appropriated by City in any fiscal period for
any payments due hereunder, City will notify Vendor of such occurrence and this Agreement
shall terminate on the last day of the fiscal period for which appropriations were received
without penalty or expense to City of any kind whatsoever, except as to the portions of the
payments herein agreed upon for which funds have been appropriated.
CITY OF FORT WORTH OFFICIAL RECORD TRINITY BOULEVARD PH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY SECRETARY CITYPROJECT No. 103280
Revised March 3, 2024
FT. WORTH, TX
00 52 43 - 4
Agreement
Page 4 of 6
7.8 Prohibition On Contracts With Companies Boycotting Israel.
Contractor, unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of
the Texas Government Code, if Contractor has 10 or more full time -employees and the
contract value is $100,000 or more, the City is prohibited from entering into a contract with
a company for goods or services unless the contract contains a written verification from the
company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of
the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to
those terms in Section 808.001 of the Texas Government Code. By signing this contract,
Contractor certifies that Contractor's signature provides written verification to the
City that if Chapter 2271, Texas Government Code applies, Contractor: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract.
7.9 Prohibition on Boycotting Energy Companies.
Contractor acknowledges that in accordance with Chapter 2276 of the Texas Government
Code, the City is prohibited from entering into a contract for goods or services that has a
value of $100,000 or more, which will be paid wholly or partly from public funds of the City,
with a company (with 10 or more full-time employees) unless the contract contains a written
verification from the company that it: (1) does not boycott energy companies; and (2) will
not boycott energy companies during the term of the contract. The terms "boycott energy
company" and "company" have the meaning ascribed to those terms by Chapter 2276 of the
Texas Government Code. To the extent that Chapter 2276 of the Government Code is
applicable to this Agreement, by signing this Agreement, Contractor certifies that
Contractor's signature provides written verification to the City that Contractor: (1)
does not boycott energy companies; and (2) will not boycott energy companies during
the term of this Agreement.
7.10 Prohibition on Discrimination Against Firearm and Ammunition Industries.
Contractor acknowledges that except as otherwise provided by Chapter 2274 of the Texas
Government Code, the City is prohibited from entering into a contract for goods or services
that has a value of $100,000 or more which will be paid wholly or partly from public funds
of the City, with a company (with 10 or more full-time employees) unless the contract
contains a written verification from the company that it: (1) does not have a practice, policy,
guidance, or directive that discriminates against a firearm entity or firearm trade association;
and (2) will not discriminate during the term of the contract against a firearm entity or firearm
trade association. The terms "discriminate," "firearm entity" and "firearm trade association"
have the meaning ascribed to those terms by Chapter 2274 of the Texas Government
Code. To the extent that Chapter 2274 of the Government Code is applicable to this
Agreement, by signing this Agreement, Contractor certifies that Contractor's signature
provides written verification to the City that Contractor: (1) does not have a practice,
policy, guidance, or directive that discriminates against a firearm entity or firearm
trade association; and (2) will not discriminate against a firearm entity or firearm trade
association during the term of this Agreement.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
CITY OF FORT WORTH TRINITYBOULEVARD PH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITYPROJECT No. 103280
Revised March 3, 2024
005243-5
Agreement
Page 5 of 6
7.11 Immigration Nationality Act.
Contractor shall verify the identity and employment eligibility of its employees who perform
work under this Agreement, including completing the Employment Eligibility Verification
Form (I-9). Upon request by City, Contractor shall provide City with copies of all 1-9 forms
and supporting eligibility documentation for each employee who performs work under this
Agreement. Contractor shall adhere to all Federal and State laws as well as establish
appropriate procedures and controls so that no services will be performed by any Contractor
employee who is not legally eligible to perform such services. CONTRACTOR SHALL
INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY
CONTRACTOR, CONTRACTOR'S EMPLOYEES, SUBCONTRACTORS,
AGENTS, OR LICENSEES. City, upon written notice to Contractor, shall have the right
to immediately terminate this Agreement for violations of this provision by Contractor.
7.12 No Third -Party Beneficiaries.
This Agreement gives no rights or benefits to anyone other than the City and the Contractor
and there are no third -parry beneficiaries.
7.13 No Cause of Action Against Engineer.
Contractor, its subcontractors and equipment and materials suppliers on the PROJECT or their
sureties, shall maintain no direct action against the Engineer, its officers, employees, and
subcontractors, for any claim arising out of, in connection with, or resulting from the engineering
services performed. Only the City will be the beneficiary of any undertaking by the Engineer.
The presence or duties of the Engineer's personnel at a construction site, whether as on -site
representatives or otherwise, do not make the Engineer or its personnel in any way
responsible for those duties that belong to the City and/or the City's construction contractors
or other entities, and do not relieve the construction contractors or any other entity of their
obligations, duties, and responsibilities, including, but not limited to, all construction
methods, means, techniques, sequences, and procedures necessary for coordinating and
completing all portions of the construction work in accordance with the Contract Documents
and any health or safety precautions required by such construction work. The Engineer and
its personnel have no authority to exercise any control over any construction contractor or
other entity or their employees in connection with their work or any health or safety
precautions.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
CITY OF FORT WORTH TRINITYBOULEVARD PH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITYPROJECT No. 103280
Revised March 3, 2024
005243-6
Agreement
Page 6 of 6
IN WITNESS WHEREOF, City and Contractor have each executed this Agreement to be effective
as of the date subscribed by the City's designated Assistant City Manager ("Effective Date").
Contractor:
Jackson Construction, LTD.
By:
Troy L. Jackson (May 6, 2024 08:33 CDT)
Signature
Troy L. Jackson
(Printed Name)
President
Title
5112 Sun Valley Drive
Fort Worth, Texas 76119
Address
Fort Worth, TX 76119
City/State/Zip
May 6, 2024
Date
City of Fort Worth
By:
Jesica McEachern
Assistant City Manager
May 15, 2024
on
Date 4FOpT nod
°°°koado
Attest:
adaIl nEXPSaa
Jannette Goodall, City Secretary
(Seal)
M&C: 24-0282
Date: 4/9/2024
Approved as to Form and Legality:
lj G
Douglas Black (May 13, 202415:40 CDT)
Douglas W. Black
Sr. Assistant City Attorney
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
CITY OF FORT WORTH TRINIT)' BOULE ARD PII2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT No. 103280
Revised March 3, 2024
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
0061 13 - 1
PERFORMANCE BOND
Page 1 of 2
Bond 1108239
SECTION 00 6113
PERFORMANCE BOND
THE STATE OF TEXAS §
§ KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT §
That we, Jackson Construction, LTD., known as "Principal" herein and
The Hanover Insurance Company , a corporate surety(sureties, if more than one)
duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or
more), are held and firmly bound unto the City of Fort Worth, a municipal corporation created
pursuant to the laws of Texas, known as "City" herein, in the penal sum of, Twelve Million
Ninetv-Nine Thousand Three Hundred Fortv-Two 00/100 Dollars ($12.099,342.00), lawful
money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of
which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators,
successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has entered into a certain written contract with the City awarded
the 9th day of April, 2024, which Contract is hereby referred to and made a part
hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and other
accessories defined by law, in the prosecution of the Work, including any Change Orders, as
provided for in said Contract designated as Trinity Boulevard Phase 2, CPN 103280.
NOW, THEREFORE, the condition of this obligation is such that if the said Principal
shall faithfully perform it obligations under the Contract and shall in all respects duly and faithfully
perform the Work, including Change Orders, under the Contract, according to the plans,
specifications, and contract documents therein referred to, and as well during any period of
extension of the Contract that may be granted on the part of the City, then this obligation shall be
and become null and void, otherwise to remain in full force and effect.
PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
Worth Division.
This bond is made and executed in compliance with the provisions of Chapter 2253 of the
Texas Government Code, as amended, and all liabilities on this bond shall be determined in
accordance with the provisions of said statue.
33 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this
34 instrument by duly authorized agents and officers on this the 2nd day of May
35 20 24
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT No. 103280
Revised December 8, 2023
0061 13 - 2
PERFORMANCE BOND
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
ATTEST:
- A
(Principal) Secretary
C
+itn ss as to "Principal
Page 2 of 2
PRINCIPAL:
Jackson Construction, LTD.
BY
Sign ture
Troy L Jackson, President
Name and Title
Address: 5112 Sun Vallev Drive
Fort Worth, TX 76119
SURETY:
The Hanover Insurance Company
l)
BY:
nature
Jack M Crowley, Attorney in Fact
Name and Title
Address: 500 N Akard Street, #4300
j I/I , VM
Dallas, TX 75201
Witness as to Surety Crowley Telephone Number: 972-385-9800
Email Address: Jack.Crowley@wtwco.com
*Note: If signed by an officer of the Surety Company, there must be on file a certified extract
from the by-laws showing that this person has authority to sign such obligation. If
Surety's physical address is different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised December 8, 2023
TRINITY BOULEVARD PH 2
CITY PROJECT No. 103280
0061 14 - 1
PAYMENTBOND
Page 1 of 2
Bond 1108239
1 SECTION 00 6114
2 PAYMENT BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That we, Jackson Construction. LTD.. known as "Principal" herein, and
8 The Hanover Insurance Company , a corporate surety (sureties), duly authorized to
9 do business in the State of Texas, known as "Surety" herein (whether one or more), are held and
10 firmly bound unto the City of Fort Worth, a municipal corporation created pursuant to the laws of
11 the State of Texas, known as "City" herein, in the penal sum of Twelve Million Ninetv-Nine
12 Thousand Three Hundred Fortv-Two 00/100 Dollars ($12.099.342.00). lawful money of the United
13 States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which sum well and
14 truly be made, we bind ourselves, our heirs, executors, administrators, successors and assigns,
15 jointly and severally, firmly by these presents:
16 WHEREAS, Principal has entered into a certain written Contract with City, awarded the
17 9th day of April, 2024 which Contract is hereby referred to and made
18 a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, labor
19 and other accessories as defined by law, in the prosecution of the Work as provided for in said
20 Contract and designated as Trinity Boulevard Phase 2, CPN 103280.
21 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if
22 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in
23 Chapter 2253 of the Texas Govermnent Code, as amended) in the prosecution of the Work under
24 the Contract, then this obligation shall be and become null and void; otherwise to remain in full
25 force and effect.
26 This bond is made and executed in compliance with the provisions of Chapter 2253 of the
27 Texas Government Code, as amended, and all liabilities on this bond shall be determined in
28 accordance with the provisions of said statute.
29
CITY OF FORT WORTH TRINPI'Y BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT No. 103280
Revised December 8, 2023
0061 14-2
PAYMENTBOND
Page 2 of 2
1 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED
2 this instrument by duly authorized agents and officers on this the 2nd day of
3 May 20 24 .
4
5
6
7
8
9
10
11
12
ATTEST:
OAA
(Principal) Secretary
LAAI-
it ss as to Principal
ATTEST:
(Surety) Se e%
W1tneg as toCrety�(ijK Crowley
PRINCIPAL:
Jackson Construction, LTD.
BY:
.�
SignGature
Troy L Jackson, Attorney in Fact
Name and Title
Address: 5112 Sun Vallev Drive
Fort Worth. TX 76119
SURETY:
The Hanover Insurance Company
BY:
Sign
Jack M Crowley, Attorney in Fact
Name and Title
Address: 500 N Akard Street, #4300
Dallas, TX 75201
Telephone Number: 972-385-9800
Email Address: Jack.Crowlev@wtwco.com
Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws
showing that this person has authority to sign such obligation. If Surety's physical address is
different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
END OF SECTION
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT No. 103280
Revised December 8, 2023
0061 19 - 1
MAINTENANCE, BOND
Page 1 of 3
1108239
1 SECTION 00 6119
2 MAINTENANCE BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That we Jackson Construction. LTD.. known as "Principal" herein and
8 The Hanover Insurance Company , a corporate surety (sureties, if more than one)
9 duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or
10 more), are held and firmly bound unto the City of Fort Worth, a municipal corporation created
11 pursuant to the laws of the State of Texas, known as "City" herein, in the sum of Twelve Million
12 Ninety -Nine Thousand Three Hundred Fortv-Two 00/100 Dollars ($12.099.342.00). lawful money
13 of the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment of which sum
14 well and truly be made unto the City and its successors, we bind ourselves, our heirs, executors,
15 administrators, successors and assigns, jointly and severally, finely by these presents.
16
17 WHEREAS, the Principal has entered into a certain written contract with the City awarded
18 the 9th day of April 2024 which Contract is hereby
19 referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all materials,
20 equipment labor and other accessories as defined by law, in the prosecution of the Work, including
21 any Work resulting from a duly authorized Change Order (collectively herein, the "Work") as
22 provided for in said contract and designated as Trinity Boulevard Phase 2, CPN 103280; and
23
24 WHEREAS, Principal binds itself to use such materials and to so construct the Work in
25 accordance with the plans, specifications and Contract Documents that the Work is and will remain
26 free from defects in materials or workmanship for and during the period of two (2) years after the
27 date of Final Acceptance of the Work by the City ("Maintenance Period"); and
28
29 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon
30 receiving notice from the City of the need therefor at any time within the Maintenance Period.
31
CITY OF PORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT No. 103280
Revised December 8, 2023
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
IK
W
0061 19 - 2
MAINTENANCE BOND
Page 2 of 3
NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy
any defective Work, for which timely notice was provided by City, to a completion satisfactory to
the City, then this obligation shall become null and void; otherwise to remain in full force and
effect.
PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely
noticed defective Work, it is agreed that the City may cause any and all such defective Work to be
repaired and/or reconstructed with all associated costs thereof being borne by the Principal and the
Surety under this Maintenance bond; and
PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
Worth Division; and
PROVIDED FURTHER, that this obligation shall be continuous in nature and successive
recoveries may be had hereon for successive breaches.
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT No. 103280
Revised December 8, 2023
0061 19 - 3
MAINTENANCE BOND
Page 3 of 3
1 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this
2 instrument by duly authorized agents and officers on this the 2nd day of May
3 20 24
4
5
6
7
8
9
10
11
12 ATTEST:
13 �.
14
15 (Principal) Secretary
16
17
18
19 CeIA tivl
20
21 it ess as to Principal
22
23
24
25
26
27
28
29
30 ATTEST:
31�
32
33 (Surety) Sec�r=ettaar e
34 l`�/ I �A
35 K
36 Wrtness as to Surety MK Coley
37
38
PRINCIPAL:
Jackson Construction. LTD.
BY:
Sig ture
Troy L Jackson, President
Name and Title
Address: 5112 Sun Vallev Drive
Fort Worth, TX 76119
SURETY:
The Hanover Insurance Company
BY:
S ature
Jack M Crowley, Attorney in Fact
Name and Title
Address: 500 N Akard Street, #4300
Dallas, TX 75201
Telephone Number: 972-385-9800
Email Address: Jack.Crowley@wtwco.com
39 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract
40 from the by-laws showing that this person has authority to sign such obligation. If
41 Surety's physical address is different from its mailing address, both must be provided.
42 The date of the bond shall not be prior to the date the Contract is awarded.
43
CITY OF FORT WORTH TRINITY BOULEVARD PH 2
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT No. 103280
Revised December 8, 2023
THE HANOVER INSURANCE COMPANY
MASSACHUSETTS BAY INSURANCE COMPANY
CITIZENS INSURANCE COMPANY OF AMERICA
POWER OF ATTORNEY
THIS Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the
extent herein stated.
KNOW ALL PERSONS BY THESE PRESENTS:
That THE HANOVER INSURANCE COMPANY and MASSACHUSETTS BAY INSURANCE COMPANY, both being corporations organized and existing underthe
laws of the State of New Hampshire, and CITIZENS INSURANCE COMPANY OF AMERICA, a corporation organized and existing under the laws of the State of
Michigan, (hereinafter individually and collectively the "Company') does hereby constitute and appoint,
Jack M. Crowley, Laurie Pflug , and/or Holly Clevenger
Of Willis Towers Watson Insurance Services West, Inc of Dallas, TX each individually, if there be more than one named, as its true and lawful attorney(s)-in-fact
to sign, execute, seal, acknowledge and deliver for, and on its behalf, and as its act and deed any place within the United States, any and all surety bonds,
recognizances, undertakings, or other surety obligations. The execution of such surety bonds, recognizances, undertakings or surety obligations, in pursuance of
these presents, shall be as binding upon the Company as if they had been duly signed by the president and attested by the secretary of the Company, in their own
proper persons. Provided however, that this power of attorney limits the acts of those named herein; and they have no authorityto bind the Company except in the
manner stated and to the extent of any limitation stated below:
Any such obligations in the United States, not to exceed Fifty Million and No/100 ($50,000,000) in any single instance
That this power is made and executed pursuant to the authority of the following Resolutions passed by the Board of Directors of said Company, and said Resolutions
remain in full force and effect:
RESOLVED: That the President or any Vice President, in conjunction with any Vice President, be and they hereby are authorized and empowered to
appoint Attorneys -in -fact of the Company, in its name and as it acts, to execute and acknowledge for and on its behalf as surety, any and all bonds,
recognizances, contracts of indemnity, waivers of citation and all other writings obligatory in the nature thereof, with powerto attach thereto the seal ofthe
Company. Any such writings so executed by such Attorneys -in -fact shall be binding upon the Company as if they had been duly executed and
acknowledged by the regularly elected officers of the Company in their own proper persons.
RESOLVED: That any and all Powers of Attorney and Certified Copies of such Powers of Attorney and certification in respect thereto, granted and
executed bythe President or Vice President in conjunction with any Vice President of the Company, shall be binding on the Companyto the same extent
as if all signatures therein were manually affixed, even though one or more of any such signatures thereon may be facsimile. (Adopted October 7,1981—
The Hanover Insurance Company; Adopted April 14,1982 — Massachusetts Bay Insurance Company; Adopted September 7, 2001—Citizens Insurance
Company of America and affirmed by each Company on March 24, 2014)
IN WITNESS WH EREOF, THE HANOVER INSU RANCE COMPANY, MASSACHUSETTS BAY INSURANCE COMPANYand CITIZENS INSURANCE COMPANY
OF AMERICA have caused these presents to be sealed with their respective corporate seals, duly attested by two Vice Presidents, this 12th day of September,
2023
'�, g ry4.a. �$
:eta i "+�wD +lard �I
4 � iwe P
The Hanover Insurance Cumpany
massaehrsetts Pay Insurance Company
Citizens Insurance Cempanyof America
awA A X4,W �
J a H. Kawi•cki,1 co Pres dent
STATE OF CONNECTICUT )
COUNTY OF HARTFORD ) ss.
The Hanover Insurance Company
121
Say insurance Company
act Company of Ametka
Iten M. Mendoza, Vice President
On this 12'1 day of September, 2023 before me came the above named Executive Vice President and Vice President of The Hanover Insurance Company,
Massachusetts Bay Insurance Companyand Citizens Insurance Company of America, to me personally known to be the individuals and officers described herein,
and acknowledged that the seals affixed to the preceding instrument are the corporate seals of The Hanover Insurance Company, Massachusetts Bay Insurance
Company and Citizens Insurance Company of America, respectively, and that the said corporate seals and their signatures as officers were duly affixed and
subscribed to said instrument by the authority and direction of said Corporations.
Wendy Latoumes --
Notary Pt, C' Stote of Connecticut
wy Cornt*Wm Expires Jldy 31, 2025
tNlEn "la�OU -es, U
filly conwissi n ex irtea July 31, 2025
I-
I, the undersigned Vice President of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America,
hereby certifythatthe above and foregoing is a full, true and correct copy of the Original Power of Attorney issued bysaid Companies, and do hereby further certify
that the said Powers of Attorney are still in force and effect. %� /
GIVEN under my hand and the seals of said Companies, at Worcester, Massachusetts, this" day of
The as a Insurance empa
i!t C b say iaf aqy
CERTIFIED COPY CI sura cc A
ohs Rowedder, Vice Presldeat
'Me
Hanover The Hanover Insurance Company 1440 Lincoln Street, Worcester, MA 01653
Insurance Group® Citizens Insurance Company of America 1645 West Grand River Avenue, Howell, MI 48843 Texas Complaint Notice
IMPORTANT NOTICE
To obtain information or make a complaint:
You may call The Hanover Insurance Company/Citizens
Insurance Company of America`s toll -free telephone
number for information or to make a complaint at:
1-800-608-8141
AVISO IMPORTANTE
Para obtener informacion o para someter una queja:
Usted puede Ilamar al numero de telefono gratis de The
Hanover Insurance Company/Citizens Insurance Company
of Americas para informacion o para someter una queja al:
1-800-608-8141
You may also write to The Hanover Insurance Company/ Usted tambien puede escribir a The Hanover Insurance
Citizens Insurance Company of America at: Company/Citizens Insurance Company of America al:
440 Lincoln Street
Worcester, MA 01615
You may contact the Texas Department of. Insurance to
obtain information on companies, coverages, rights or
complaints at:
1-800-252-3439
You may write the Texas Department of Insurance
R O. Box 149104
Austin, TX 78714-9104
Fax: (512) 475-1771
Web: http://www.tdi.texas.gov
E-mail: ConsumerProtection@tdi.state.tx.us
PREMIUM OR CLAIM DISPUTES:
Should you have a dispute concerning your premium or
about a claim you should contact the agent or the com-
pany first. If the dispute is not resolved, you may contact
the Texas Department of Insurance.
ATTACH THIS NOTICE TO YOUR POLICY: This notice is
for information only and does not become a part or con-
dition of the attached document.
440 Lincoln Street
Worcester, MA 01615
Puede comunicarse con el Departamento de Seguros de
Texas para obtener informacion acerca de companias,
coberturas, derechos o quejas al:
1-800-252-3439
Puede escribir al Departamento de Seguros de Texas:
R O. Box 149104
Austin, TX 78714-9104
Fax: (512) 475-1771
Web: http://www.tdi.texas.gov
E-mail: ConsumerProtection@tdi.state.b(.us
17 �11�JI r':�1��7 ���;7: 1►�,► • '�>�iTu
Si tiene una disputa concerniente a su prima o a un rec-
lamo, debe comunicarse con el agente o la compania
primero. Si no se resuelve la disputa, puede entonces
comunicarse con el departamento (TDI).
UNA ESTE AVISO A SU POLKA: Este aviso es solo para
proposito de information y no se convierte en parte o
condition del documento adjunto.
181-1457 (5/12)
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Trinitv Boulevard Imarovements. Phase 2
M&C: 24-0282 CPN:
103280 CSO: 61420
DOCM
Date:
05/09/24
To:
Name
Department Initials
Date Out
1
Donnette Murphy
Risk -Approver °M
05/09/24
2.
Patricia Wadsack
TPW Approver
05/09/24
3.
Lauren Prieur
TPW-Signer
05/09/24
4.
Priscilla Ramirez
Legal -Approver
05/09/24
5.
Doug Black
Legal -Signer A
35/13/24
6.
Jesica McEachern
bo
ACM -Signer`
05/15/24
7
Ronald Gonzales
CSCO-Approver P
)5/15/24
8
Janette Goodall
CSCO-Signer 7
05/15/24
9
Allison Tidwell
CSCO-Form Filler lu-
05/16/24
10.
TPW Contracts
TPW
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW
Contracts
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: []YES ®No
RUSH: []YES ®No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Re uired:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File Link to the General Conditions & specifications
❑ Attach Signature, Initial and Notary Tabs
Return To: Please notify TPWContracts a@fortworthtexas. qvv for pickup when complete. Call eat.
7233 or eat. 8363 with questions. Thank you!
FORTWORTH,
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Trinitv Blvd, Phase 2
M&C: 24-0282 CPN: 103280 CSO:
Date: 04/18/24
To: Name
Department Initials
1. Troy Jackson/Jackson Construct.
Vendor -Signer
2. ProjMgr: Mitch Aiton
TPW-Signer
3. Michelle Hadley -McGhee
TPW-Review e
4.
5.
6.
7
8
9
10.
DOC#:
Date Out
05/06/24
05/06/24
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW
Contracts
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your lulfOrInation
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: Please notify TPWContracts(a�fortworthtexas. eov for pickup when complete. Call ext.
7233 or ext. 8363 with questions. Thank you!
■ Bond Verification ■ M & C
From: Crowlev. Jack
To: Hadlev-McGhee. Michelle
Subject: RE: PLEASE REPLY - BOND VERIFICATION REQUEST [CPN #103280 - Trinity Boulevard Phase 2]
Date: Wednesday, May 8, 2024 12:57:22 PM
Attachments: imaae001.Dna
CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open
attachments unless you recognize the sender and know the content is safe.
Hi Michelle, Yes that amount is correct and the Bonds are Valid. Thanks, Jack
Jack Crowley
Vice President Surety
WTW
Willis Towers Watson Insurance Services West, Inc.
500 N Akard Street, #4300
Dallas, TX 75201
817-360-1922
Jack.Crowley@wtwco.com
From: Hadley -McGhee, Michelle <Michelle.Hadley-McGhee@fortworthtexas.gov>
Sent: Wednesday, May 08, 2024 12:44 PM
To: Crowley, Jack <Jack.Crowley@wtwco.com>
Subject: PLEASE REPLY - BOND VERIFICATION REQUEST [CPN #103280 - Trinity Boulevard Phase 2]
05/08/2024
Good afternoon.
The City of Fort Worth is in receipt of the following referenced bond(s) — BOND
#1108239, in the amount of $12,099,342.00 (Twelve Million Ninety -Nine
Thousand, Three Hundred Forty -Two and 00/100 Dollars), from Jackson
Construction Ltd., for City Project #103280 (Trinity Boulevard Phase 2).
Please provide confirmation that both the bond(s) and dollar amount(s) are valid. Your
prompt attention to this matter is greatly appreciated!
If there are additional questions or concerns, please do not hesitate to contact me at,
michelle. had lev-mcahee(&fortworthtexas.aov, or by phone, 817-392-7233.
Should this request have reached you in error, or needs to be directed elsewhere, please
be so kind to provide the name of the contact, with both an email address & phone number
of the person or department being referenced. It is appreciated.
,,fookia� fotwa-rd 00�o�ozeciative,
Michelle Hadley -McGhee
Contract Compliance Specialist
City of Fort Worth
Transportation & Public Works (TPW)
200 Texas Street, Fort Worth, TX 76102
Direct: 817-392-7233
Michelle.HadIev-McGhee(@fortworthtexas.gov
F RT WORTH*
Working together to build a strong community.
For information pertaining to Willis Towers Watson's email confidentiality and monitoring policy, usage restrictions, or for specific
company registration and regulatory status information, please visit httos://www.willistowerswatson.com/en-GB/Notices/leaal-disclaimers
Willis Towers Watson is a leading global advisory, broking and solutions company that helps clients around the world turn risk into a path
for growth. Willis Towers Watson has offices in 140 countries and markets. For a complete list of office locations, please click here
You may receive direct marketing communications from Willis Towers Watson. If so, you have the right to opt out of these