HomeMy WebLinkAboutContract 61452CSC No. 61452 CITY OF FORT WORTH, TEXAS STANDARD AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL SERVICES This AGREEMENT is between the City of Fort Worth, a Texas home -rule municipality ("CITY"), and G rver LLC., authorized to do business in Texas, ("ENGINEER"), for a PROJECT generally described as: Airfield Pavement Evaluation and a Pavement Management System Update at Fort Worth Spinks Airport. RECITALS WHEREAS, On April 29, 2020 and May 6, 2020, a Request for Qualifications (RFQ) was advertised for General Airport Engineering Services at Fort Worth Spinks Airport ("Airport"); WHEREAS, the RFQ allows for the City to utilize the statements and qualifications received from the RFQ to determine who is most qualified for certain engineering services over a five-year period; WHEREAS, On May 21, 2020, four statements of qualifications were received, one of which was submitted by ENGINEER; and WHEREAS, the City has determined that ENGINEER, based on the statements and qualifications submitted under the RFQ, is the most highly qualified provider for the services required under this Agreement. The Agreement documents shall include the following: 1. This Standard Agreement for Professional Services; 2. Attachment "A" — Scope of Services; 3. Attachment "B" — Compensation; 4. Attachment "C" — Project Schedule; 5. Attachment "D" — Location Map 6. Attachment "E" — Federal Contract Provisions Attachments "A", "B", "C", "D" and "E" which are attached hereto and incorporated herein, are made a part of this Agreement for all purposes. In the event of any conflict between the terms and conditions of the Attachments and the terms and conditions set forth in the body of this Agreement, the terms and conditions of this Agreement shall control. Standard Agreement for Airfield Pavement Evaluation and Pavement Management System Update at Fort Worth Spinks Airport OFFICIAL RECORD Between City of Fort Worth and Garver, LLC CITY SECRETARY Page 1 of 20 FT. WORTH, TX Article I Scope of Services The Scope of Services is set forth in Attachment A. Article II Compensation and Term of Agreement A. The ENGINEER's compensation shall be in an amount not to exceed $90,000.00 as set forth in Attachment B. B. Unless otherwise terminated pursuant to Article VI. D. herein, this Agreement shall be for a term beginning upon the effective date, as described below, and shall continue until the expiration of the funds or completion of the Scope of Services contemplated herein, whichever occurs first. Article III Terms of Payment Payments to the ENGINEER will be made as follows: A. Invoice and Payment (1) The Engineer shall provide the City sufficient documentation, including but not limited to meeting the requirements set forth in Attachment A and B to this AGREEMENT, to reasonably substantiate the invoices. (2) The ENGINEER will issue monthly invoices for all work performed under this AGREEMENT. Invoices are due and payable within 30 days of receipt. (3) Upon completion of services enumerated in Article I, the final payment of any balance will be due within 30 days of receipt of the final invoice. (4) In the event of a disputed or contested billing, only that portion so contested will be withheld from payment, and the undisputed portion will be paid. The CITY will exercise reasonableness in contesting any bill or portion thereof. No interest will accrue on any contested portion of the Standard Agreement for Airfield Pavement Evaluation and Pavement Management System Update at Fort Worth Spinks Airport Between City of Fort Worth and Garver, LLC Page 2 of 20 billing until mutually resolved. (5) If the CITY fails to make payment in full to ENGINEER for billings contested in good faith within 60 days of the amount due, the ENGINEER may, after giving 7 days' written notice to CITY, suspend services under this AGREEMENT until paid in full. In the event of suspension of services, the ENGINEER shall have no liability to CITY for delays or damages caused the CITY because of such suspension of services. Article IV Obligations of the Engineer A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement, providing professional engineering consultation and advice and furnishing customary services incidental thereto and identified in more detail within Attachment "A" herein. B. Standard of Care The ENGINEER shall perform its services: (1) with the professional skill and care ordinarily provided by competent engineers practicing in the same or similar locality and under the same or similar circumstances and professional license; and (2) as expeditiously as is prudent considering the ordinary professional skill and care of a competent engineer. C. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurface investigations in connection with design and engineering work to be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Standard Agreement for Airfield Pavement Evaluation and Pavement Management System Update at Fort Worth Spinks Airport Between City of Fort Worth and Garver, LLC Page 3 of 20 Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of the ENGINEER. (3) ENGINEER will not be responsible for damage to underground utilities if ENGINEER followed all preventative measures before any geotechnical, potholing, construction, or allowing other subconsultants working under a subcontract to this Agreement access to do the same. Preventative measures shall include, but is not limited to, having requested and waited for all utility companies to properly mark their respective utilities before conducting any work as described in this section. D. Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible mylar sheets and electronic files in .pdf format, or as otherwise approved by CITY, which, subject to Section VI.B, when delivered to the CITY pursuant to this AGREEMENT, shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. E. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on -site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, Standard Agreement for Airfield Pavement Evaluation and Pavement Management System Update at Fort Worth Spinks Airport Between City of Fort Worth and Garver, LLC Page 4 of 20 in general, if the work on the PROJECT is being performed in a manner indicating that the PROJECT, when completed, will be in accordance with the Contract Documents, nor shall anything in the Contract Documents or this AGREEMENT between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on -site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT. If the ENGINEER makes on -site observation(s) of a deviation from the Contract Documents, the ENGINEER shall inform the CITY. (3) When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the Contract Documents. F. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A. (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by third parties; quality, type, management, or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. G. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the Contract Documents; that the final work will be acceptable in all respects; that the Standard Agreement for Airfield Pavement Evaluation and Pavement Management System Update at Fort Worth Spinks Airport Between City of Fort Worth and Garver, LLC Page 5 of 20 ENGINEER has made an examination to ascertain how or for what purpose the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are not other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. H. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. Minority Business and Small Business Enterprise (MBE)(SBE) Participation In accord with the City of Fort Worth Business Diversity goals (Chapter 20, Article X of the City's Code of Ordinances a/k/a Ordinance No. 20020-12- 2011, as amended), the CITY has goals for the participation of minority business enterprises and/or small business enterprises in CITY contracts. ENGINEER acknowledges the MBE and SBE goals established for this contract and its accepted written commitment to MBE and SBE participation. Any misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the ENGINEER may result in the termination of this Agreement and debarment from participating in CITY contracts for a period of time of not less than three (3) years. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract. ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Section. The CITY shall give ENGINEER reasonable advance written notice of intended audits. Notwithstanding anything in this AGREEMENT, the CITY's audit rights are limited to cost reimbursable and time and material services. (2) ENGINEER further agrees to include in all its subcontractor agreements Standard Agreement for Airfield Pavement Evaluation and Pavement Management System Update at Fort Worth Spinks Airport Between City of Fort Worth and Garver, LLC Page 6 of 20 hereunder a provision to the effect that the subcontractor agrees that the CITY shall, until the expiration of five (5) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subcontractor, involving transactions to the subcontract, and further, that the CITY shall have access during normal working hours to all subcontractor facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this Section together with subsection (3) hereof. CITY shall give subcontractor reasonable written advance notice of intended audits. (3) ENGINEER and subcontractor agree to photocopy such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of copies at the rate published in the Texas Administrative Code in effect as of the time copying is performed. K. INSURANCE (1) ENGINEER'S INSURANCE a. Commercial G neral Liability — the ENGINEER shall maintain commercial general liability (CGL) and, if necessary, commercial umbrella insurance with a limit of not less than $1,000,000.00 per each occurrence with a $2,000,000.00 aggregate. If such Commercial General Liability insurance contains a general aggregate limit, it shall apply separately to this PROJECT or location. The CITY shall be included as an additional insured with all rights of defense under the CGL, using ISO additional insured endorsement or a substitute providing equivalent coverage, and under the commercial umbrella, if any. This insurance shall apply as primary insurance with respect to any other insurance or self- insurance programs afforded to the CITY. The Commercial General Liability insurance policy shall have no exclusions or endorsements that would alter or nullify: premises/operations, products/completed operations, contractual, bodily injury, or advertising injury, which are normally contained within the policy, unless the CITY specifically approves such exclusions in writing. ii. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the commercial general liability or commercial umbrella liability insurance maintained in Standard Agreement for Airfield Pavement Evaluation and Pavement Management System Update at Fort Worth Spinks Airport Between City of Fort Worth and Garver, LLC Page 7 of 20 accordance with this AGREEMENT. b. Business Auto — the ENGINEER shall maintain business auto liability and, if necessary, commercial umbrella liability insurance with a limit of not less than $1,000,000 each accident. Such insurance shall cover liability arising out of "any auto", including owned, hired, and non -owned autos, when said vehicle is used in the course of the PROJECT. If the ENGINEER owns no vehicles, coverage for hired or non -owned is acceptable. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the business auto liability or commercial umbrella liability insurance obtained by ENGINEER pursuant to this AGREEMENT or under any applicable auto physical damage coverage. c. Workers' Compensation — ENGINEER shall maintain workers compensation and employers liability insurance and, if necessary, commercial umbrella liability insurance with a limit of $100,000.00 each accident for bodily injury by accident or $100,000.00 each employee for bodily injury by disease, with $500,000.00 policy limit. i. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by workers compensation and employer's liability or commercial umbrella insurance obtained by ENGINEER pursuant to this AGREEMENT. d. Professional Liability — ENGINEER shall maintain professional liability, a claims -made policy, of $1,000,000.00 per claim and aggregate. The policy shall contain a retroactive date prior to the date of the contract or the first date of services to be performed, whichever is earlier. Coverage shall be maintained for a period of 5 years following the completion of the contract. An annual certificate of insurance specifically referencing this project shall be submitted to the CITY for each year following completion of the contract. (2) G NERAL INSURANCE REQUIREMENTS a. Certificates of insurance evidencing that the ENGINEER has obtained all required insurance shall be attached to this AGREEMENT prior to its execution. b. To the extent of ENGINEER's indemnity obligations, applicable policies Standard Agreement for Airfield Pavement Evaluation and Pavement Management System Update at Fort Worth Spinks Airport Between City of Fort Worth and Garver, LLC Page 8 of 20 shall be endorsed to name the CITY an Additional Insured thereon, subject to any defense provided by the policy, as its interests may appear. The term CITY shall include its employees, officers, officials, agents, and volunteers as respects the contracted services. c. Certificate(s) of insurance shall document that insurance coverage specified in this AGREEMENT are provided under applicable policies documented thereon. d. Any failure on part of the CITY to attach the required insurance documentation hereto shall not constitute a waiver of the insurance requirements. e. A minimum of thirty (30) days notice of cancellation or material change in coverage shall be provided to the CITY by ENGINEER. A ten (10) days notice by ENGINEER shall be acceptable in the event of non-payment of premium. Notice shall be sent to the respective Department Director (by name), City of Fort Worth, 1000 Throckmorton, Fort Worth, Texas 76102. f. Insurers for all policies must be authorized to do business in the State of Texas and have a minimum rating of A -(minus) or greater, in the current A.M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. g. Any deductible or self insured retention in excess of $25,000.00 that would change or alter the requirements herein is subject to approval by the CITY in writing, if coverage is not provided on a first -dollar basis. The CITY, at it sole discretion, may consent to alternative coverage maintained through insurance pools or risk retention groups. Dedicated financial resources or letters of credit may also be acceptable to the CITY. i. The CITY hereby accepts ENGINEER's self -insured retention in excess of $25,000 as part of this AGREEMENT. h. Applicable policies shall each be endorsed with a waiver of subrogation in favor of the CITY as respects the PROJECT. The CITY shall be entitled, upon its request and without incurring expense, to review the ENGINEER's insurance policies including endorsements thereto and, at the CITY's discretion; the ENGINEER may be required to provide proof of insurance premium payments. j. Lines of coverage, other than Professional Liability, underwritten on a claims -made basis, shall contain a retroactive date coincident with or prior to the date of the contractual AGREEMENT. The certificate of Standard Agreement for Airfield Pavement Evaluation and Pavement Management System Update at Fort Worth Spinks Airport Between City of Fort Worth and Garver, LLC Page 9 of 20 insurance shall state both the retroactive date and that the coverage is claims -made. k. Coverages, whether written on an occurrence or claims -made basis, shall be maintained without interruption nor restrictive modification or changes from date of commencement of the PROJECT until final payment and termination of any coverage required to be maintained after final payments. The CITY shall not be responsible for the direct payment of any insurance premiums required by this AGREEMENT. m. Sub consultants and subcontractors to/of the ENGINEER shall be required by the ENGINEER to maintain the same or reasonably equivalent insurance coverage commensurate with the subconsultant's scope of work as required by the ENGINEER. When sub consultants/subcontractors maintain insurance coverage, ENGINEER shall provide CITY with documentation thereof on a certificate of insurance. L. Independent Consultant The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. The doctrine of respondent superior shall not apply. M. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract. N. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the CITY may request the ENGINEER to assist in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. Standard Agreement for Airfield Pavement Evaluation and Pavement Management System Update at Fort Worth Spinks Airport Between City of Fort Worth and Garver, LLC Page 10 of 20 O. Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this AGREEMENT was executed, the ENGINEER shall revise plans and specifications, as required, as a part of existing authorized fees between the CITY and ENGINEER, meaning the ENGINEER will not invoice or submit for payment to City for these types of design changes. However, if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this AGREEMENT which the ENGINEER could not have been reasonably aware of or otherwise were not in affect at the time of execution of this AGREEMENT, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. P. Schedule ENGINEER shall manage the PROJECT in accordance with the schedule developed per Attachment C to this AGREEMENT. Article V Obligations of the City A. City -Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B. Access to Facilities and Property The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER's performance of its services. The CITY will perform, at no cost to the ENGINEER, such tests of equipment, machinery, pipelines, and other components of the CITY's facilities as may be required in connection with the ENGINEER's services. The CITY will be responsible for all acts of the CITY's personnel. Standard Agreement for Airfield Pavement Evaluation and Pavement Management System Update at Fort Worth Spinks Airport Between City of Fort Worth and Garver, LLC Page 11 of 20 C. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights - of -way, and access necessary for the ENGINEER's services or PROJECT construction. D. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule prepared in accordance with Attachment C. E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors. F. Asbestos or Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY's facilities that may contain hazardous materials, including asbestos containing materials, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage, or disposition of such materials. In consideration of the associated risks that may give rise to claims by third parties or employees of CITY, CITY hereby releases ENGINEER from any damage or liability related to the presence of such materials. (2) The release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER's negligence or if ENGINEER brings such hazardous substance, contaminant or asbestos onto the project. G. Contractor Indemnification and Claims The CITY agrees to include in all construction contracts the provisions of Article IV.E. regarding the ENGINEER's Personnel at Construction Site, and Standard Agreement for Airfield Pavement Evaluation and Pavement Management System Update at Fort Worth Spinks Airport Between City of Fort Worth and Garver, LLC Page 12 of 20 provisions providing for contractor indemnification of the CITY and the ENGINEER for contractor's negligence. H. Contractor Claims and Third -Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the CITY will be the beneficiary of any undertaking by the ENGINEER." (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third -party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third -party beneficiary rights under this AGREEMENT. (4) Nothing contained in this Section H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. CITY's Insurance (1) The CITY may maintain property insurance on certain pre-existing structures associated with the PROJECT. (2) The CITY may secure Builders Risk/Installation insurance at the replacement cost value of the PROJECT. The CITY may provide ENGINEER a copy of the policy or documentation of such on a certificate of insurance. (3) The CITY will specify that the Builders Risk/Installation insurance shall be comprehensive in coverage appropriate to the PROJECT risks. J. Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY Standard Agreement for Airfield Pavement Evaluation and Pavement Management System Update at Fort Worth Spinks Airport Between City of Fort Worth and Garver, LLC Page 13 of 20 requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated between the parties. K. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article VI General Legal Provisions A. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. B. Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER (see "Deliverables" in Attachment A), whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents that are delivered to the CITY in accordance with the requirements of this AGREEMENT; provided however, any and all underlying intellectual property, if any (unless provided by CITY), shall remain the property of ENGINEER such that ENGINEER may continue to perform its business in the normal course. Upon payment in full, ENGINEER shall grant CITY an irrevocable, non-exclusive, royalty -free license to use the same for the purposes contemplated under this AGREEMENT. Standard Agreement for Airfield Pavement Evaluation and Pavement Management System Update at Fort Worth Spinks Airport Between City of Fort Worth and Garver, LLC Page 14 of 20 C. Force Majeure CITY and ENGINEER will exercise good faith efforts to meet their respective duties and obligations as set forth in this Agreement, but will not be held liable for any delay or omission in performance due to force majeure or other causes beyond their reasonable control, including, but not limited to, compliance with any government law, ordinance, or regulation; acts of God; acts of the public enemy; fires; strikes; lockouts; natural disasters; wars; riots; epidemics or pandemics; government action or inaction; orders of government; material or labor restrictions by any governmental authority; transportation problems; restraints or prohibitions by any court, board, department, commission, or agency of the United States or of any States; civil disturbances; other national or regional emergencies; or any other similar cause not enumerated herein but which is beyond the reasonable control of the Party whose performance is affected (collectively, "Force Majeure Event"). The performance of any such obligation is suspended during the period of, and only to the extent of, such prevention or hindrance, provided the affected Party provides notice of the Force Majeure Event, and an explanation as to how it prevents or hinders the Party's performance, as soon as reasonably possible after the occurrence of the Force Majeure Event, with the reasonableness of such notice to be determined by the City in its sole discretion. The notice required by this section must be addressed and delivered in accordance with this Agreement. D. Termination (1) This AGREEMENT may be terminated a.) by the CITY for its convenience upon 30 days' written notice to ENGINEER. b.) by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and the nonperforming party does not commence correction of such nonperformance within ten (10) days' written notice or thereafter fails to diligently complete the correction. (2) If this AGREEMENT is terminated for the convenience of the CITY, the ENGINEER will be paid for termination expenses as follows: a.) Cost of reproduction of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; b.) Out-of-pocket expenses, including those incurred for purchasing electronic data files and other data storage supplies or services; Standard Agreement for Airfield Pavement Evaluation and Pavement Management System Update at Fort Worth Spinks Airport Between City of Fort Worth and Garver, LLC Page 15 of 20 c.) The time requirements for the ENGINEER'S personnel to document the work underway at the time of the CITY'S termination for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all termination expenses. The CITY'S approval will be obtained in writing prior to proceeding with termination services. E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECT's schedule, commitment and cost of the ENGINEER's personnel and subcontractors, and ENGINEER's compensation will be made. F. Indemnification In accordance with Texas Local Government Code Section 271.904, the ENGINEER shall indemnify or hold harmless the CITY against third party liability for any damage committed by the ENGINEER or ENGINEER's agent, consultant under contract, or another entity over which the ENGINEER exercises control to the extent that the damage is caused by or resulting from an act of negligence or intentional tort resulting in bodily injury (including death) or tangible property damage, intellectual property infringement (except to the extent information and/or technology was provided by the CITY), or failure to pay a subcontractor or supplier (provided ENGINEER has received payment for services from CITY) in conjunction with performance of this AGREEMENT. CITY is entitled to recover its reasonable attorney's fees in proportion to the ENGINEER's liability. G. Assignment Neither party shall assign all or any part of this AGREEMENT without the prior written consent of the other party. H. Jurisdiction The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be Tarrant County, Texas. Standard Agreement for Airfield Pavement Evaluation and Pavement Management System Update at Fort Worth Spinks Airport Between City of Fort Worth and Garver, LLC Page 16 of 20 Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause. J. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all CITY ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. The foregoing obligation to abide by applicable laws, regulations, and ordinances is applicable throughout the term of this AGREEMENT. ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees as a result of third -party claims or liability arising out of the violation of any such applicable order, law, ordinance, or regulation, whether it be due to action under this AGREEMENT by itself or its employees, in conjunction with or related to the performance of ENGINEER'S services under this AGREEMENT. K. Immigration Nationality Act ENGINEER shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (1-9). Upon request by CITY, ENGINEER shall provide CITY with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. ENGINEER shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any ENGINEER employee who is not legally eligible to perform such services. ENGINEER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES INCURRED BY THIRD PARTY GOVERNMENTAL AUTHORITIES DUE TO VIOLATIONS OF APPLICABLE LAW DESCRIBED UNDER THIS PARAGRAPH AND COMMITTED BY ENGINEER, ENGINEER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. CITY, upon written notice to ENGINEER, shall have the right to immediately terminate this AGREEMENT for violations of this provision by ENGINEER. Standard Agreement for Airfield Pavement Evaluation and Pavement Management System Update at Fort Worth Spinks Airport Between City of Fort Worth and Garver, LLC Page 17 of 20 L. Prohibition On Contracts With Companies Boycotting Israel If ENGINEER has fewer than 10 employees or the AGREEMENT is for less than $100,000, this section does not apply. ENGINEER acknowledges that in accordance with Chapter 2270 of the Texas Government Code, CITY is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this AGREEMENT, Engineer certifies that Engineer's signature provides written verification to CITY that ENGINEER: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the AGREEMENT. M. Waiver of Special and Punitive Damages NOTWITHSTANDING NYTHING N THE AGREEMENT TO THE CONTRARY, NEITHER PARTY (INCLUDING ITS SUBCONSULTANTS, AGENTS, ASSIGNEES, AFFILIATES AND VENDORS) SHALL BE LIABLE TO THE OTHER FOR ANY SPECIAL (CONSEQUENTIAL OR INDIRECT) AND PUNITIVE DAMAGES OF ANY KIND REGARDLESS OF THE CAUSE OR ACTION. N. Prohibition on Boycotting Energy Companies ENGINEER acknowledges that in accordance with Chapter 2274 of the Texas Government Code -(as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2), the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more, which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full- time employees) unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, ENGINEER certifies that ENGINEER's signature provides written verification to the CITY that ENGINEER: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. Standard Agreement for Airfield Pavement Evaluation and Pavement Management System Update at Fort Worth Spinks Airport Between City of Fort Worth and Garver, LLC Page 18 of 20 O. Prohibition on Discrimination Against Firearm and Ammunition Industries ENGINEER acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1), the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, ENGINEER certifies that ENGINEER's signature provides written verification to the CITY that ENGINEER: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. This AGREEMENT, including its attachments and schedules, constitutes the entire AGREEMENT, which supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. This AGREEMENT may be executed in one or more counterparts and each counterpart shall, for all purposes, be deemed an original, but all such counterparts shall together constitute but one and the same instrument. Duly executed by each party's designated representative to be effective on the date subscribed by the CITY'S designated Assistant City Manager. (Signature page to follow) Standard Agreement for Airfield Pavement Evaluation and Pavement Management System Update at Fort Worth Spinks Airport Between City of Fort Worth and Garver, LLC Page 19 of 20 BY: CITY OF FORT WORTH Valerie Washington (May 77, )07417:30 CD I) Valerie Washington Assistant City Manager Date: May 22, 2024 APPROVAL RECOMMENDED: By: Roger Venables Director, Aviation Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Er'%w L . 2d-cle� Erin Roden Senior Contract Compliance Specialist APPROVED AS TO FORM AND LEGALITY t By: Jeremy Anato-Mensah Assistant City Attorney pQ�ona� FORT�p� p>o �9dp ATTEST: Pda� nEXA5o4p L Jannette Goodall City Secretary Standard Agreement for Airfield Pavement Evaluation and Pavement Management System Update at Fort Worth Spinks Airport Between City of Fort Worth and Garver, LLC Page 20 of 20 BY: GARVER, LLC A"4 &Z2r Mitchell McAnally Texas Aviation Director Date: May 21, 2024 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX ATTACHMENT A (SCOPE OF SERVICES) Generally, the Scope of Services includes the following services for the evaluation of airfield pavements at Fort Worth Spinks Airport (FWS). Pavements to be evaluated within this Scope are shown in Exhibit C. The Scope of Services is divided into two parts as described below. 1. Part 1 — Inspection Services 2. Part 2 — PowerPM (Pavement Management Tool) & Executive Summary A.1 Part 1 — Inspection Services A.1.1 Preliminary Inspection Services Garver will compile inventory data and review construction history from available sources for airside improvements including airfield pavements. The client shall provide Garver historical data pertaining to the pavements including construction, maintenance, and rehabilitation records. The airfield pavements will be divided into branches, with a branch being a readily identifiable part of the network that has a distinct function. Each branch will then be broken into sections. Each section will be divided into sample units that are 5,000 ± 1,OOOft2 in size for asphalt pavements and 20 slabs ± 8 for concrete pavements. Each subdivided branch, section, and sample unit will be input into PAVER. Available historical data, including construction, rehabilitation, and maintenance information, will also be input into a PAVER database for each section. A.1.2 Pavement Condition Index (PCI) Site Inspection Garver will conduct a PCI survey in accordance with ASTM D 5340 for the airfield pavements shown within Exhibit B. Garver will coordinate field survey activities with the airport. A schedule for the airport surveys will be developed and distributed to all parties concerned in advance of any field activities. Prior to arrival, Garver will coordinate any closures (NOTAM's) required to perform the condition survey with the airport. Upon arrival, Garver will provide a briefing for the airport staff involved with the work. Once cleared by airport staff to operate on the airfield, the PCI survey team will begin the inspection by laying out the sample units and evaluating the surface condition of each sample unit. The Airport shall provide personnel to escort the Garver inspectors while on the airfield and coordination with ATCT. During the inspections, the PCI survey team will verify the accuracy of the initial section layout and sample unit maps and make field changes as necessary. The PCI surveys will be conducted by inspectors using tablets and walking the pavement network and recording distresses. The recorded data in the field will be downloaded to the PAVER database. Digital photographs will be taken for each section to show typical conditions or any unusual distresses. The digital photographs will be provided to the client upon completion of the project via the PowerPM tool (see Section A.2.1). A.1.3 Site Inspection QC Review Garver will examine data and photographs collected during the PCI site inspection phase to perform a general quality control review of all data obtained through site inspections. Attachment A — Scope of Services FWS Airfield Pavement Evaluation Garver Project No. 2400703 GARVER A.2 Part 2 — PowerPM and Executive Summary A.2.1 PowerPM Pavement Management Tool Garver will analyze the results of the PCI site inspections and generate pavement condition and distress information for the Airport in accordance with ASTM D 5340. Garver will then compile pavement condition data within the PowerPM Pavement Management online dashboard. Garver will host and provide access to the online dashboard for a period of 3-years from the date of distribution of final deliverables. The PowerPM online dashboard will include: Site Conditions: o Interactive Pavement Inventory and Map: • Section name ■ Pavement use (runway, taxiway, apron, etc.) ■ Pavement age (if record data is available) ■ Pavement structure (if record data is available) o Condition Information ■ Pavement Condition Index (PCI) ■ Inspection Photographs Work History Data o Limited to data provided to Garver by airport prior to draft project deliverables Extrapolated Distress Data o Performance Models o Forecasted PCI • Capital Planning o Work Types and Typical Sections o Unit Costs o Unconstrained Project List o Budget Scenarios A.2.2 Executive Summary Garver will develop a Summary Report including overall pavement conditional values at the Branch level. The Summary Report will document work types evaluated in maintenance planning scenarios, estimated unit costs and inflation parameters for future projects, and budget scenario summaries (no budget, unconstrained budget, and constrained budget). The Summary Report will outline up to five (5) major pavement projects recommended to be included within the airport CIP. A.3 Project Deliverables The following deliverables will be submitted to the Client. Unless otherwise noted below, all deliverables shall be electronic. • PowerPM Pavement Management Tool via online access o Airport will be provided Username and Password Credentials • Google Earth .kml file presenting as -inspected PCI conditions • Executive Summary via electronic PDF file A.4 Additional Services The following items are not included under this agreement but will be considered as additional services to be added under Amendment if requested by the Owner. Attachment A — Scope of Services FWS Airfield Pavement Evaluation Garver Project No. 2400703 GARVER 1. Submittals or deliverables beyond those listed herein. 2. Landside pavement evaluation. 3. Subsurface exploration to determine existing pavement sections. 4. Pavement Classification Rating (PCR) or PCR determination 5. Engineering, architectural, or other professional services beyond those listed herein. 6. Bid documents, specifications, or details for performing pavement maintenance. 7. Project Work History updates based on future construction and rehabilitation. 8. Future PCI updates or Additional PCI Surveys. A.5 Fee • Part 1 — Inspection Services: $54,000 • Part 2 — PowerPM and Executive Summary: $36,000 Total Fee: $90,000 (Lump Sum) A.6 Schedule Garver shall begin work under this Agreement within ten (10) days of execution of this Agreement and shall complete the work within a mutually agreeable schedule. Attachment A — Scope of Services FWS Airfield Pavement Evaluation Garver Project No. 2400703 ATTACHMENT B Fort Worth Spinks Pavement Evaluation COM ENSATION Title I Service Lump Sum Part 1 - Inspection Services Lump Sum Part 2 - PowerPM and Executive Summary Subtotal for Title I Service Fee Type Estimated Fees $ 54,000.00 $ 36,000.00 $ 90,000.00 ATTACHMENT B Fort Worth Spinks Pavement Evaluation Part 1 - Inspection Services WORK TASK DESCRIPTION 1. Preliminary Inspection Services Existing Data Compilation and Record Document Revie PAVER Database and Map Updates Subtotal - Preliminary Inspection Services 2. Site Inspection Inspection Setup and Client Coordination On -Site Inspection Subtotal - Site Inspection 3. Site Inspection QC Review QC Review PAVER Exports for Analysis Subtotal - Site Inspection QC Review Hours Salary Costs SUBTOTAL - SALARIES: DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly Lodging Costs ($167/night x 12 nights) Meals and Incidentals ($64/day x 12 days) Travel Costs ($0.67/mile x 990 miles) SUBTOTAL - DIRECT NON -LABOR EXPENSES: SUBTOTAL: SUBCONSULTANTS FEE: E-4 E-3 E-2 E-1 D-1 $271.00 $230.00 $193.00 $165.00 $148.00 hr hr hr hr hr 4 8 8 8 2 8 64 4 10 0 16 72 4 8 8 12 130 4 8 0 8 142 4 12 10 8 2 10 4 12 0 12 18 12 30 0 36 232 $3,252.00 $6,900.00 $0.00 $5,940.00 $34,336.00 $50,428.00 $40.70 $2,100.00 $768.00 $663.30 $3,572.00 $54,000.00 $0.00 TOTAL FEE: $54,000.00 ATTACHMENT B Fort Worth Spinks Pavement Evaluation Part 2 - PowerPM and Executive Summary WORK TASK DESCRIPTION 1. Analysis and PowerPM Development 1.1 Pavement Inventory Branch and Section Work History Pavement Structure 1.2 Pavement Conditions PCI Index Inspection Photos 1.3 Performance Models and Forecasted PCI 1.4 Capital Planning Work Types Unit Costs Unconstrained Project List Budget Tool Subtotal -Analysis and PowerPM Development 2. Executive Summary 2.1 Project Recommendations Rehabilitation Strategy and Project Prioritization Project Cost Estimates (CIP Level) 2.2 Summary Report Report Preparation QC Review Subtotal - Executive Summary Hours SUBTOTAL - SALARIES: DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly Postage/Freight/Courier Travel Costs SUBTOTAL - DIRECT NON -LABOR EXPENSES: SUBTOTAL: SUBCONSULTANTSFEE: TOTAL FEE: E-4 E-3 E-1 D-1 AM-4 hr hr hr hr hr 2 8 6 2 2 2 2 2 2 2 8 2 4 8 8 2 2 2 4 2 2 4 2 4 8 4 8 0 20 20 14 50 1 8 4 1 2 8 16 24 4 4 6 30 36 0 0 6 50 56 14 50 $35,938.00 $62.00 $0.00 $0.00 $62.00 $36,000.00 $0.00 $36,000.00 ATTACHMENT C Project Schedule - Fort Worth Spinks Airfield Pavement Evaluation Task Duration Anticipated Start Anticipated End (Preliminary) (Preliminary) NTP Issued - June 3 Kickoff Meeting - June 5 Preliminary Inspection Phase 21 June 3 June 23 (Record Document Review/Mapping/Inspection Setup) Inspection Window (12 days on -site) 21 June 24 July 14 PowerPM Portal Development and Inspection QC 49 July 15 September 1 Site Conditions Review and Project Prioritization Meeting - September 2 Recommendations and Summary Report 56 September 2 1 October 27 Draft Deliverables to FWS - October 28 Draft Deliverable and PowerPM Portal Review Meeting - November 4 Final Deliverables to FWS _ Approximately 2 Weeks After Receipt of Comments Ae C\UsersWegireme—Deve- GarvehDesMpp%ylekpl-dw Lest Save 612/2023 613 PM Lests - by VAG—t. o by Gbamala, VNlne A PMSNIa AEG.—Ub PlM Scale 2023218 PM Plane DWG T. PDF pc3 N F x SPINKS AIRPORT (FWS) FORT WORTH, TEXAS � ILI M 0 al, :1 r� r3 IRE DA E DESDRIPTID� 11 m=oga �= m m€ aSm" ATTACHMENT E FORT WORTH.. "I'll City of Fort Worth Federal Contract Provisions FCP-1 GENERAL CIVIL RIGHTS PROVISIONS In all its activities within the scope of its airport program, the Contractor agrees to comply with pertinent statutes, Executive Orders, and such rules as identified in Title VI List of Pertinent Nondiscrimination Acts and Authorities to ensure that no person shall, on the grounds of race, color, national origin (including limited English proficiency), creed, sex (including sexual orientation and gender identity), age, or disability be excluded from participating in any activity conducted with or benefiting from Federal assistance. This provision is in addition to that required by Title VI of the Civil Rights Act of 1964. The above provision binds the Contractor and subcontractors from the bid solicitation period through the completion of the contract. FCP-2 CIVIL RIGHTS — TITLE VI ASSURANCES TITLE VI LIST OF PERTINENT NONDISCRIMINATION ACTS AND AUTHORITIES During the performance of this contract, the Contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the "Contractor") agrees to comply with the following non-discrimination statutes and authorities; including but not limited to: • Title VI of the Civil Rights Act of 1964 (42 USC § 2000d et seq., 78 stat. 252) (prohibits discrimination on the basis of race, color, national origin); • 49 CFR part 21 (Non-discrimination in Federally -Assisted programs of the Department of Transportation —Effectuation of Title VI of the Civil Rights Act of 1964); • The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 USC § 4601) (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal -aid programs and projects); 0 Section 504 of the Rehabilitation Act of 1973 (29 USC § 794 et seq.), as amended (prohibits discrimination on the basis of disability); and 49 CFR part 27 (Nondiscrimination on the Basis of Disability in Programs or Activities Receiving Federal Financial Assistance); • The Age Discrimination Act of 1975, as amended (42 USC § 6101 et seq.) (prohibits discrimination on the basis of age); • Airport and Airway Improvement Act of 1982 (49 USC § 47123), as amended (prohibits discrimination based on race, creed, color, national origin, or sex); • The Civil Rights Restoration Act of 1987 (PL 100-259) (broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, the Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms "programs or activities" to include all of the programs or activities of the Federal -aid recipients, sub -recipients and contractors, whether such programs or activities are Federally funded or not); • Titles II and III of the Americans with Disabilities Act of 1990 (42 USC § 12101, et seq) (prohibit discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities) as implemented by U.S. Department of Transportation regulations at 49 CFR parts 37 and 38; • The Federal Aviation Administration's Nondiscrimination statute (49 USC § 47123) (prohibits discrimination on the basis of race, color, national origin, and sex); • Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low -Income Populations (ensures nondiscrimination against minority populations by discouraging programs, policies, and activities with disproportionately high and adverse human health or environmental effects on minority and low-income populations); • Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and resulting agency guidance, national origin discrimination includes discrimination because of limited English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable steps to ensure that LEP persons have meaningful access to your programs [70 Fed. Reg. 74087 (2005)]; • Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because of sex in education programs or activities (20 USC § 1681, et seq). COMPLIANCE WITH NONDISCRIMINATION REQUIREMENTS: During the performance of this contract, the Contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the "Contractor"), agrees as follows: 1. Compliance with Regulations: The Contractor (hereinafter includes consultants) will comply with the Title VI List of Pertinent Nondiscrimination Acts and Authorities, as they may be amended from time to time, which are herein incorporated by reference and made a part of this contract. 2. Nondiscrimination: The Contractor, with regard to the work performed by it during the contract, will not discriminate on the grounds of race, color, national origin (including limited English proficiency), creed, sex (including sexual orientation and gender identity), age, or disability in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The Contractor will not participate directly or indirectly in the discrimination prohibited by the Nondiscrimination Acts and Authorities, including employment practices when the contract covers any activity, project, or program set forth in Appendix B of 49 CFR part 21. Solicitations for Subcontracts, including Procurements of Materials and Equipment: In all solicitations, either by competitive bidding or negotiation made by the Contractor for work to be performed under a subcontract, including procurements of materials, or leases of equipment, each potential subcontractor or supplier will be notified by the Contractor of the contractor's obligations under this contract and the Nondiscrimination Acts and Authorities on the grounds of race, color, or national origin. 4. Information and Reports: The Contractor will provide all information and reports required by the Acts, the Regulations, and directives issued pursuant thereto and will permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the Sponsor or the Federal Aviation Administration to be pertinent to ascertain compliance with such Nondiscrimination Acts and Authorities and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish the information, the Contractor will so certify to the Sponsor or the Federal Aviation Administration, as appropriate, and will set forth what efforts it has made to obtain the information. 5. Sanctions for Noncompliance: In the event of a Contractor's noncompliance with the non- discrimination provisions of this contract, the Sponsor will impose such contract sanctions as it or the Federal Aviation Administration may determine to be appropriate, including, but not limited to: a. Withholding payments to the Contractor under the contract until the Contractor complies; and/or b. Cancelling, terminating, or suspending a contract, in whole or in part. Incorporation of Provisions: The Contractor will include the provisions of paragraphs one through six in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Acts, the Regulations, and directives issued pursuant thereto. The Contractor will take action with respect to any subcontract or procurement as the Sponsor or the Federal Aviation Administration may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided, that if the Contractor becomes involved in, or is threatened with litigation by a subcontractor, or supplier because of such direction, the Contractor may request the Sponsor to enter into any litigation to protect the interests of the Sponsor. In addition, the Contractor may request the United States to enter into the litigation to protect the interests of the United States. FORT WORTH Routing and Transmittal Slip Aviation Department DOCUMENT TITLE: FWS Airfield Pavement Evaluation & Management System Update M&C CPN CSO # DATE: 5/21 /2024 INITIALS TO: J 1. Joe Hammond 2. Roger Venables R� 3. Jeremy Anato-Mensah �J� �1O 4. Valerie Washington 5. Janette Goodall 59 DOC# DATE OUT May 21, 2024 May 21, 2024 May 22, 2024 May 22, 2024 May 23, 2024 DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: ❑ Yes ❑x No RUSH: ❑ Yes ❑X No SAME DAY: ❑ Yes ❑ No NEXT DAY: ❑ Yes ❑ No ROUTING TO CSO: ❑x Yes ❑ No Action Required: ❑ As Requested ❑ For Your Information 1 Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return to: Please call Tyler Dale at ext. 541 for pick up when completed. Thank you.