Loading...
HomeMy WebLinkAboutContract 56457-FP1-FP1 City Secretary Contract No. 56457 FORT WORTH. Date Received 05/22/2024 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Trinity Basin Preparatory Addition - Bolt City Project No.:103537 Improvement Type(s): Water 0 Sewer 0 Original Contract Price: $85,838.00 Amount of Approved Change Order(s): Revised Contract Amount: Total Cost of Work Complete: $85,838.00 TosH Con'fi'Bras- May 20, 2024 Josh Contreras (Mav 20. 202415:51 CDT) Contractor Date Project Manager Title Butler Cohen Company Name °- a 1 4 Y 1, Russell Rogers (May 21, 2024 07:46 CDT) Project Inspector Date May 21, 2024 Project Manager Date -^ May 22 2024 Rebecca Owen 22.202409:23 CDT) Y CFA Manager Date May 22, 2024 Lauren Prieur (May 22, 2024 09:26 CDT) TPW Director Date C-�)�' - l May 23, 2024 Asst. City Manager Date OFFICIAL RECORD CITY SECRETARY Page 1 of 2 FT. WORTH, TX Notice of Project Completion Project Name: Trinity Basin Preparatory Addition - Bolt City Project No.: 103537 City's Attachments Final Pay Estimate ❑x Change Order(s): ❑ Yes ❑x N/A Pipe Report: ❑x Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time: 50 WD Work Start Date: 2/14/2022 Completed number of Soil Lab Test: 70 Completed number of Water Test: 4 Days Charged: 379 Work Complete Date: 12/18/2023 Page 2 of 2 FORTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name TRINITY BASIN PREPARATORY ADDITION - BOLT Contract Limits Project Type WATER & SEWER City Project Numbers 103537 DOE Number 3537 Estimate Number 1 Payment Number 1 City Secretary Contract Number Contract Date 10/20/2021 For Period Ending 12/18/2023 WD Contract Time 5WD Days Charged to Date 379 Project Manager NA Contractor BUTLER-COHEN 3200 SOUTHWEST FREEWAY, SUITE 1575 HOUSTON , TX 77027 Inspectors CORDOVA, R / ROGERS, R Contract is 100.00 Complete Friday, January 5, 2024 Page 1 of 4 City Project Numbers 103537 Contract Name TRINITY BASIN PREPARATORY ADDITION - BOLT Contract Limits Project Type WATER & SEWER Project Funding UNIT I: WATER IMPROVEMENTS Item Description of Items Estimated Unit No. Quanity 1 1-1/2" WATER SERVICE 2 EA 2 2" WATER SERVICE 1 EA 3 6" WATER PIPE, CSS BACKFILL 52 LF 4 12"X6" TAPPING SLEEVE AND VALVE 1 EA 5 8"X6" TAPPING SLEEVE AND VALVE 1 EA 6 CONNECTION TO EXISTING 4"-12" WATER 2 EA MAIN 7 TRENCH SAFETY 52 LF - - Sub -Total of Previous Unit - - - - - - - - - - - - - - - - - UNIT II: SANITARY SEWER IMPROVEMENTS Item Description of Items Estimated Unit No. Quanity 1 8" SEWER SERVICE 2 EA 2 8" SEWER, CSS BACKFILL 6 LF 3 4' DIA MANHOLE 1 EA 4 TRENCH SAFETY 6 LF 5 POST -CCTV INSPECTON 6 LF 6 MANHOLE VACUUM TESTING 1 EA Sub -Total of Previous Unit DOE Number 3537 Estimate Number 1 Payment Number 1 For Period Ending 12/18/2023 Unit Cost Estimated Completed Completed Total Quanity Total $5,000.00 $10,000.00 2 $10,000.00 $7,268.00 $7,268.00 1 $7,268.00 $100.00 $5,200.00 52 $5,200.00 $15,000.00 $15,000.00 1 $15,000.00 $14,000.00 $14,000.00 1 $14,000.00 $10,000.00 $20,000.00 2 $20,000.00 $10.00 $520.00 $71,988.00 Unit Cost Estimated Total $1,415.00 $2,830.00 $100.00 $600.00 $8,000.00 $8,000.00 $20.00 $120.00 $50.00 $300.00 $2,000.00 $2,000.00 $13,850.00 52 $520.00 $71,988.00 Completed Completed Quanity Total 2 $2,830.00 6 $600.00 1 $8,000.00 6 $120.00 6 $300.00 1 $2,000.00 $13,850.00 Friday, January 5, 2024 Page 2 of 4 City Project Numbers 103537 Contract Name TRINITY BASIN PREPARATORY ADDITION - BOLT Contract Limits Project Type WATER & SEWER Project Funding Contract Information Summary Original Contract Amount Change Orders Total Contract Price DOE Number 3537 Estimate Number 1 Payment Number 1 For Period Ending 12/18/2023 $85,838.00 $85,838.00 Total Cost of Work Completed $85,838.00 Less % Retained $0.00 Net Earned $85,838.00 Earned This Period $85,838.00 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $85,838.00 Friday, January 5, 2024 Page 3 of 4 City Project Numbers 103537 Contract Name TRINITY BASIN PREPARATORY ADDITION - BOLT Contract Limits Project Type WATER & SEWER Project Funding Project Manager NA Inspectors CORDOVA, R / ROGERS, R Contractor BUTLER-COHEN 3200 SOUTHWEST FREEWAY, SUITE 1575 HOUSTON, TX 77027 DOE Number 3537 Estimate Number 1 Payment Number 1 For Period Ending 12/18/2023 City Secretary Contract Number Contract Date 10/20/2021 Contract Time 50 WD Days Charged to Date 379 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $85,838.00 Less % Retained $0.00 Net Earned $85,838.00 Earned This Period $85,838.00 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $85,838.00 Friday, January 5, 2024 Page 4 of 4 FORTWORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Trinity Basin Preparatoy Addition -Bolt PROJECT NUMBER: CPN 103537 DOE NUMBER: WATER PIPE LAID SIZE TYPE OF PIPE LF pvc 6" C900 FIRE HYDRANTS: N/a VALVES (16" OR LARGER) N/A PIPE ABANDONED SIZE TYPE OF PIPE LF N//A DENSITIES: Densities taken and uploaded to Accela NEW SERVICES: 1 1/2" copper 2" copper SEWER PIPE LAID SIZE TYPE OF PIPE LF PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: Densities taken and uploaded to Accela NEW SERVICES: 2-8" SDR-26 Sewer Services TRANSPORTATION AND PUBLIC WORKS �° The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 52 2 1 20 FORTWORTH. M, TRANSPORTATION AND PUBLIC WORKS January 5, 2024 Butler Cohen 3200 Southwest Fwy #1575 Houston, TX 77027 RE: Acceptance Letter Project Name: Trinity Basin Preparatory -Bolt Project Type: Water, Sewer, Paving, Street lighting City Project No.: 103537 To Whom It May Concern: On January 5, 2024 a final inspection was made on the subject project. There were no punch list items identified at that time. The final inspection indicates that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on January 5, 2024, which is the date of the final inspection and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-6251. Sincerely, G�Iid2uv' iO4�v,o Andrew Goodman, Project Manager Cc: Russell Rogers, Inspector Gary Deyon, Inspection Supervisor Troy Gardner, Senior Inspector Victor Tornero, Program Manager Hart Gaugler, Consultant Butler Cohen, Contractor Trinity Basin Preparatory, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 08/20/19 DocuSign Envelope ID: 8F13D1C2-1B41-4098-B38E-E86A6FFF4BE8 AFFIDAVIT STATE OF TEXAS COUNTY OF HARRIS Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Sean Butler, Authorized Agent Of Butler -Cohen Design Build, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Trinity Basin Preparatory CPN 103537 - Water and Sanitary BY Authorized Agent Subscribed and sworn before me on this date 15 of February, 2024. '.Si� tUdLd .� Notary Public Harris County, Texas ------------- STACEY WILLIAMS Notary ID #729229967 i My Commission Expires 9�'or November 23, 2025 DocuSign Envelope ID: 8F13D1C2-1B41-4098-B38E-E86A6FFF4BE8 AFFIDAVIT STATE OF TEXAS COUNTY OF HARRIS Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Sean Butler, Authorized Agent Of Butler -Cohen Design Build, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Trinity Basin Preparatory CPN 103537 - Water and Sanitary BY Authorized Agent Subscribed and sworn before me on this date 15 of February, 2024. '.Si� tUdLd .� Notary Public Harris County, Texas ------------- STACEY WILLIAMS Notary ID #729229967 i My Commission Expires 9�'or November 23, 2025