Loading...
HomeMy WebLinkAboutContract 60352-A1AMENDMENT NO. 1 TO AGREEMENT STANDARD AGREEMENT FOR PROFESSIONAL SERVICES NORTHWEST PATROL DIVISION — NEW FACILITY STATE OF TEXAS 60352-A1 CITY SECRETARY CONTRACT NO. COUNTY OF TARRANT WHEREAS, The City of Fort Worth and FPI Builders, LLC (Consultant) made and entered into City Secretary Contract No. 60352 (The Contract) which was authorized by the City Council by M&C 23-0771, the 12th day of September 12, 2023, for the design of the Fort Worth Police Department's Northwest Patrol Division — New Facility; and WHEREAS, further amendment is necessary to reimburse the Consultant as part of the design services agreement for additional design services to reduce the programmed space requirements, for additional construction administration services due to the estimated construction duration, and for additional geotechnical services. NOW THEREFORE, City and Consultant, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I — Scope of Services, Paragraph (2) shall be added to read as follows: (2) Provide additional design services for the design and detailing of the Northwest Patrol Division — New Facility. The cost of this additional service is $101,000.00 plus $0.00 (Zero) in reimbursable expenses. The scope of services is described in FPI Builders, LLC's Letter dated April 30, 2024, subject: "Proposal Number: 001." 2. Article II — Compensation, first paragraph, is amended as follows: "Consultant shall be compensated in accordance with the Fee Schedule shown in Attachment "A". Payment shall be considered full compensation for all labor, materials, supplies, and equipment necessary to complete the services described in Attachment "A". However, the total fee paid by the City shall not exceed a total of $1,431,001.00 unless the City and the Consultant mutually agree upon a fee amount for additional services and amend this Agreement accordingly." OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas — Std. Agreement for Professional Svcs. AMENDMENT (Rev. 20Mar2O2O) Page 1 of 2 NW Patrol Division — New Facility May 2024 Executed effective as of the date signed by the Assistant City Manager below. FORT WORTH: City of Fort Worth T-c ' . By: Dana Burghdoff (May , 2024 COT) Name: Dana Burghdoff, AICP Title: Assistant City Manager Date: May 23, 2024 Approval Recommended: By: Name: Marilyn Marvin, Interim Director Title: Property Management Dept. Attest: poF0000000, �yaa �o pp o�A,o oo*pd ad4p n (!Y� �J �' "/ nEXA5o4d / By: Name: Jannette Goodall Title: City Secretary VENDOR: FPI Builders, LLC /J D-U. By: Kevin S Drake (May 9, 202414:26 CDT) Name: Kevin S. Drake Title: Manager/Owner Date: May 9, 2024 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. By: Name: Nikita Watts Title: Sr. Capital Projects Officer Approved as to Form and Legality: By: Douglas 3lack (May 21, 202,111517 CD 1) Name: Doug Black Title: Sr. Assistant City Attorney Contract Authorization: N/A MSC: OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas — Std. Agreement for Professional Svcs. AMENDMENT (Rev. 20Mar2O2O) Page 2 of 2 NW Patrol Division — New Facility May 2024 A "- Builders,LLc I ATTACHMENT "A" Project: Design CS60352 North West Patrol Division — New Facility Project Number: FW021-00000189387 Proposal Number: 001 Dear Mr. Meza — FPI BUILDERS, LLC 2116 Wenneca Avenue Fort Worth, Texas 76102 Telephone: (817) 336-1161 Fax: (817) 336-1164 www.fDibuilders.com April 30, 2024 Please see the attached proposals from GFF design and TSiT Engineering Consultants for the additional design services required in the amount of $101,000.00 for the new North West Patrol New Facility project. Should you have any questions, please feel free to reach out to me or Kevin Drake. r Thank you, �-- Jason Shaw Vice President, Estimating & Preconstruction GFFdesign Dallas Fort Worth Austin 3030 Nowitzki Way — Suite 400 1701 River Run — Suite 800 114 West 7th Street — Suite 200 Dallas, Texas 75219 Fort Worth, Texas 76107 Austin, Texas 78701 214 303 1500 817 303 1500 512 807 0433 April 26, 2024 Kevin Drake Managing Owner FPI Builders, LLC 2116 Wenneca Ave, Fort Worth, TX 76102 RE: ADDITIONAL SERVICE REQUEST #1 FOR CITY OF FORT WORTH NORTHWEST PATROL DIVISION FACILITY Dear Kevin: Thank you for the opportunity to submit an additional service proposal on the above referenced project. So far, our teams have successfully collaborated through the completion of the Schematic Design phase. This proposal requests additional services for design -build team members related to additional scope now understood at this point in the project. l,YK01 a =901;9 =1 [IV IN *3 Additional Services The project site contains several challenging physical features that must be dealt with by the design -build team to deliver this project successfully. Those challenges include subsurface rock making traditional stormwater capture and detention unfeasible, steep slopes requiring engineered retaining wall systems, substantial excess excavation required to create a level building pad, and robust tree canopies requiring detailed survey work to determine the projects lot line extents. This additional service request provides design -build team fees to coordinate these previously unforeseen site complexities. Initial effort spent by the user group, owner and design -build team validated a space program close to 37,000 square feet. The design -build team, owner and user group proceeded to design towards this 37,000 square foot program. At the completion of schematic design, the user group stated that the facility should be no larger than 32,000 square feet. This additional service request accommodates effort by the design -build team to bring the project back under 32,000 square feet. The project will take 13 months to construct compared with the originally anticipated 11-month duration. This additional service request provides design -build team fees for an additional 2 months of construction. FEES: We propose to perform this work for a fixed sum as follows Architectural GFF Architects $53,558 Structural Click Structures $6,000 MEP B&H Engineering $2,300 Survey G&A, Inc. $5,742 TOTAL $67, 600 • Revisions and other additional services Additional services not included in this Additional Service Request will be billed monthly as charges are incurred. We propose to perform this work on an hourly basis at the rates included in our prime agreement dated 101912023. April 26, 2024 Page 2 of 2 OTHER PROVISIONS: • Terms and conditions shall be as set forth in the prime agreement dated: 10/9/2023 unless otherwise specifically set forth herein. "Work", as used therein and further in relation to the Architect's Services, including any documents issued or executed by Architect in the course of providing services under this Agreement, shall mean the construction and services required by any contract documents, within the scope of services set forth in the prime agreement. • This proposal shall be valid for a period of up to 60 days from the date of the proposal If this proposal is acceptable, please sign and return one (1) copy to my office, to signify your acceptance, which shall also serve as our authorization to proceed. As an alternative, in the event services or instruments of service are provided by Architect and accepted by you, this shall also constitute acceptance of this proposal. Thank you again for the opportunity to be a part of your team. Sincerely, GFF Jason Cave, AIA Associate Principal + Director of Civic Practice cc: Evan Beattie, AIA, LEED AP Allison Hubbard, MBA Jim West, AIA LEED AP Kent Pontious, AIA ACKNOWLEDGED AND APPROVED: Signature Name/Title Date The Texas Board of Architectural Examiners, PO Box 12337, Austin, TX 78711-2337, Phone: 512/305-9000, has jurisdiction over individuals licensed under the Architects Registration Law, Chapter 1051 of the Texas Occupational Code. Master Version 03.22.2024 S:\GFF MASTER DOCS\Legal\Proposal_Fixed Fee_GFF.docx FPI BUILDERS, LLC 2116 Wenneca Avenue Fort Worth, Texas 76102 Telephone No: (817) 336-116 Builders, LLC Fax No: (817) 336-1164 www.faibuilders.com DROJECT NUMBER — r NEEDS APPPROVAL BY DROPOSAL NUMBER 001 ADDITIONAL WORKING DL • • FPI Builders, LLC is asking for assistance from the City of Fort Worth to consider the impact the Geotechnical investigation will encounter due to the existing topography, clearing of vegetation, grading for truck mounted drilling rig, additional drilling footage required to reach the proposed foundation elevation and drilling, testing, engineering and slope stability test for retaining walls located at 3900 Angle Avenue. We allocated $10,000.00 in our budget to perform this study. Please see the attached back up documentation totaling $43,400.00. FPI Builders, LLC is asking for assistance in the amount of $33,400.00. Thank you in advance for this consideration. LABOR: HR. SUPERINTENDENT HR. CARPENTER HR. CONCRETE FINISHER HR. LABORER TAXES, INSURANCE & BENEFITS: MATERIAL: @ 35% $ TOTAL $ EQUIPMENT: $ $ P.U. / DELIVERY: $ - FEE: @ 5.00% $ - LAB, MAT,EQUIP,TOTALS: $ - SUB -CO NTRACT(S): TSiT Engineering & Consulting, Inc. $ 36,000.00 Waddell Excavating, Inc. $ 7,400.00 FPI Builders, LLC $ (10,000.00) FEE: @ 0.00% $ - SUB -CONTRACT TOTAL: $ 33,400.00 BOND: @ 0% $ - SUB GL INS: @ 0.00000 $ EO&P INS: @ 0.0000 $ BUILD RISK INS: @ 0.0000 $ REMODEL TAX: 8.25% @ 0.00% $ - SUBTOTAL: $ 33,400.00 TOTAL AMOUNT OF PROPOSAL RESPONSE: $ 33,400.00 FPI BUILDERS, LLC GFF Design City of Fort Worth BY: BY: BY: Manager Architect Owner DATE: DATE: DATE: March 8, 2024 Attn: Kevin Drake P 817-336-1161 E Kevin@fpibuilders.com Re: Geotechnical Investigation Proposal FWNW Police Division Angle Avenue & Limestone Acres Fort Worth, TX TSIT Proposal No. P23139R Dear Mr. Drake: =)1 ■ TSIT ENGINEERING &CONSULTING, LLC TSIT is pleased to submit this proposal for providing a geotechnical investigation for the above referenced project. This proposal is prepared based on the information provided by the client via email on February 29, 2024. If there are any changes or deviations from the initial information, TSIT will be glad to revise this proposal to accommodate them. We appreciate this opportunity to provide our services. If you have any questions, please contact the undersigned. Sincerely, TSIT Engineering & Consulting, LLC Firm Registration F-5278 Kemp E Akeman, PE Jared Lankford, GIT Ex. Vice President Project Manager Fort Worth: Euless: Austin: 7473Airport Freeway 11301 Mosier Valley Road 3 3 -azel •,00d St. SUIte 1 Fort Worth, Texas 76118 Euless, Texas 76040 Leanc:er Texas 73C-1 Phone: (817) 589-9933 Phone: (972) 573-&083 Phone: (512) 337-5595 1. PROJECT SCOPE Based on information provided, TSIT understands the project consists of the construction of a Police Department with accompanying pavement and retaining wall structures in Fort Worth, Texas. The location of planned structures and boring locations was provided by the client in a pdf named "FWNW Police Division Boring Location map". Project scope was defined in a separate pdf named "FWNW Police Division Geotech Scope Letter". 2. GEOTECHNICAL SUBSURFACE INVESTIGATIONS 2.1 Drilling and Sampling TSIT proposes investigating the site by exploratory borings listed as follows: One (1) Boring to a maximum depth of 40 feet. Two (2) Borings to a maximum depth of 35 feet. Building Two (2) Borings to a maximum depth of 30 feet. Three (3) Borings to a maximum depth of 20 feet. Two (2) Boring to a maximum depth of 40 feet. Retaining Walls One (1) Boring to a maximum depth of 30 feet. Three (3) Borings to a maximum depth of 20 feet. Pavement Two (2) Borings to a maximum depth of 10 feet. Please note that the proposed borings described above are distributed based on assumed quantities. The proposed boring depths have been adjusted based on the proposed grading sheet provided as FWNW Boring Location Map. Borings on the western portion of the site require additional depth due to the excavation depths required. Sampling will be performed continuously to 10 feet, and at 5-feet intervals thereafter or at each change in material until the termination depth of each boring. Cohesive soils will be sampled with thin -walled (Shelby) tube sampler in accordance with ASTM D-1587. Standard penetration tests will be performed on cohesionless soils in accordance with ASTM D- 1586. Any unweathered bedrock encountered will be evaluated by means of the Texas Highway Department's Cone Penetrometer Test (TCP) in accordance with Tex-132-E. Rock core samples will be taken in select borings. Rock cores will be 5 feet long and will be collected in accordance with ASTM D2113. All samples will be extruded in the field and packaged to protect them from disturbance and preserve their in -situ moisture. TSIT Proposal P24037 P A G E 1 OF 3 We are assuming that you will provide vegetation -tree clearing to the boring locations and access to the borings on slopes where we will need access with a rubber tire vehicle. Also that the stake 2.2 Utilities TSIT assumes that the client has the right of entry to the property and that the boring locations are accessible to drilling equipment during normal working days. Items to be provided by the client include the right of entry to conduct the exploration and an awareness and/or location of any private subsurface utilities existing on the property. TSIT will request DIGTESS/One-Call to clear public utilities (electric, water lines, sewer lines, fiber glass, cable etc.) prior to our firm performing drilling services. This service may take 3 days or longer to have DIGTESS locators clear the site. 3. LABORATORY TESTING Laboratory tests will be performed on representative samples to establish the pertinent engineering properties of the various strata. All the field and laboratory tests will be performed according to ASTM standards. We anticipate these tests will primarily consist of moisture content and dry density determinations, Atterberg Limits, unconfined compression tests, and absorption swell tests. Unconfined compression tests on rock cores will be evaluated to provide the drilled pier bearing recommendations. 4. ENGINEERING REPORT The results of field and laboratory studies will be compiled into an engineering report with our comments and recommendations on various appropriate design parameters and construction procedures. An electronic copy of the report with original seals will be provided. The report will include the following: • Plan of Borings, Boring logs, groundwater level observations and summary of laboratory test results. • Deep Foundation recommendations, including Bearing Capacity, Lateral Resistance, and settlement including L-pile parameters. • Recommendations for both slab on ground construction and suspended slab foundation. • Retaining wall design parameters including Active/Passive forces, backfill parameters and shallow foundation recommendations. TSIT Proposal P24037 P A G E 2 OF 3 • Rock Coring for unconfined compressive strength for drilled pier bearing and skin friction values and for rock hardness for excavation contractor. • Global Stability Analysis for retaining walls. • General earthwork recommendations including concentrations of sulfates and chlorides. TSIT will be available to consult on geotechnical and construction aspects for this project. Any consultation services beyond the scope of services listed will require additional engineering effort. 5. ASSUMPTIONS The following assumptions were made in preparing this scope: • Field survey of the borings locations is not part of our scope. • Site will be accessed by a truck mounted drill rig, clearing and grading to be provided by client. • Right of entry to the property will be provided by the owner. 6. SCHEDULE After notice to proceed, we will require 25 to 30 working days to submit the draft geotechnical report. Below is our typical schedule. • 2 weeks for etackng,4oAzac amA drilling operation. • 2 weeks for laboratory testing. • One week for engineering and draft report preparation. We will begin report preparation based on the preliminary borings and will update report information to the design team as additional boring data is available. In case of site inaccessibility or wet weather conditions, a 1-2 week delay could be anticipated to the schedule described above. 7. ESTIMATED BUDGET The cost of performing the complete geotechnical subsurface investigations (Drilling, Sampling & Field Testing; Laboratory Testing; and Engineering Report) is as follows: Drilling, Testing and Engineering Costs for Building: $ 23,000.00 Drilling and Testing Costs for Retaining Wall Borings: $ 9,700.00 Slope Stability Test and Engineering Costs: $ 3,300.00 Total Cost: $ 36,000.00 TSIT Proposal P24037 P A G E S OF 3 An initial invoice in the amount of $20,000 will be issued at the time the drilling is completed. The final invoice in the amount of $16,000.00 will be issued on completion of the report. Our terms are net 15 days from the date of the invoice. This cost is a budget figure and will not be exceeded, for the described scope of work, without prior approval. Any additional scope beyond the services described will need to be re-evaluated and a change in work scope may be required. The estimated cost is based on TSIT staking the borings based on a site plan provided with your authorization. The boring program is based on the assumption that soil conditions will be relatively uniform across the site. Should unusual soil conditions be encountered, we will call you with a recommendation and cost estimate to explore these unusual conditions. 8. CLOSURE: For formal approval of this proposal, please execute and return one copy to us as authorization for our services. Please also have a copy of the site plan forwarded to our office. We appreciate this opportunity to present our proposal and look forward to being part of the project team. Signing this document is formal approval of all its contents, including our Terms & Conditions, appended to this proposal. Approval from CLIENT: Signature: Printed Name: Title Firm: Address: City I State I ZIP: Date: Billing Address: City I State I ZIP: Same as address O Billing Contact: Billing email: TSIT Proposal P24037 PAGE 4 OF 3 — -*— O U— N p N '^ '^ A 1 � O O ell VM,r 1 M - • C) .,`.. CV y 00 .- 1 N �( 4 C r mw, CO LO f` CL CY ' MM1 it �L 1 4 1// C`7 I I CO m 0 O cY) I N Q� Q—� y ti RIco W� m B1 B2 B3 B4 B5 B6 B7 B8 R1 R2 R3 R4 R5 R6 P1 P2 Boring Table with Depths, foundation elevation references. Ground Foundation Depth Total depth Elevation Elevation to foundation Depth belowfdn 625 616.5 8.5 40 31.5 621 616.5 4.5 30 25.5 609 616.5 0 20 20 610 616.5 0 30 30 611 616.5 0 20 20 621 616.5 4.5 35 30.5 620 616.5 3.5 35 32.5 612 616.5 0 20 20 620 613.8 6.2 30 23.8 634.5 618.7 15.8 40 24.2 635.5 621.35 14.15 40 25.85 624 619.3 4.7 20 15.3 612.5 609.9 2.6 20 17.4 608.5 604 4.5 20 15.5 611.5 610 0 10 10 617 615 2 10 8 420 342.05 260 Rock core 30 20 20 30 30 30 160 Waddell Excavating, Inc. Estimate 3137 Horton Road P O Box 15038 DATE ESTIMATE NO. Fort Worth, TX 76119 Phone # 817.535.0301 3/5/2024 272488A Fax # 817.535.8783 NAME/ADDRESS FPI 2116 Wenneca Ave. Fort Worth Texas 76102 Attn:Kevin P.O. NO, PROJECT North Patrol Prelim ITEM DESCRIPTION QTY COST TOTAL Contract Provide trackloader with operator to clear ROW for surveyor/Drill rig for 15 1 4,500.00 4,500.00 boring locations. Contract Provide and install staking for 15 boring locations. 1 2,500.00 2,500.00 Contract Mobilize equipment. 1 400.00 400.00 Exclude:Tree expoMsite grading,sales tax,gate access, remobi I ization,and all work not specified above. Call if questions and thanks for the opportunity to bid on this project. TOTAL $7,400.00