HomeMy WebLinkAboutContract 56320-A1CSC No. 56320-A1 AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 56320 WHEREAS, the City of Fort Worth (CITY) and Arredondo, Zepeda & Brunz, LLC, (ENGINEER) made and entered into City Secretary Contract No. 56320, (the CONTRACT) which was authorized by M&C 21-0538 on the 3rd day of August, 2021 in the amount of $302,590.50; and WHEREAS, the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation Contract 118; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $39,081.85. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $341,672.35. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. OFFICIAL RECORD City of Fort Worth, Texas CITY SECRETARY SS Rehab. Contract 118 Prof Services Agreement Amendment Template CPN: 102789 Revision Date: 12/08/2023 FT. WORTH, TX Page 1 of 2 APPROVED: City of Fort Worth �C-4_ Fernando Costa Assistant City Manager DATE: May 22, 2024 �nIl pO� fORT & ATTEST:A-1-o0,°9 Jannette Goodall City Secretary APPROVAL RECOMMENDED: Chnkovhet- 1fadav ChrittnnhPr HArHar (Mag 71 9094 1 S-41 CDTI Chris Harder, P.E. Director, Water Department Contract Compliance Manager: ENGINEER Arredondo, Zepeda & Brunz, LLC M,So G Alfarao P. Garza, .E. Managing Principal DATE: 5-21-2024 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Preeti KC, P.E. Project Manager APPRO AS TO FORM AND LEGALITY: Douglas Black (May 22, 202410:12 CDT) Douglas W. Black Sr. Assistant City Attorney M&C No.#: N/A M&C Date: N/A Form 1295: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas SS Rehab. Contract 118 Prof Services Agreement Amendment Template CPN: 102789 Revision Date: 12/08/2023 Page 2 of 2 v=vc_r. . _ . A=% W . � ■ ARDURRA com y April 17, 2024 Preeti KC, PE City of Fort Worth Water Department 9087 Monroe St. Fort Worth, TX 76102 Re: Sanitary Sewer Replacement Contract 118 Ms. KC: Please find attached our fee and scope of services for additional design and survey effort required to complete the following tasks not included in the original contract that have been requested by the Water Department. SANITARY SEWER DESIGN • Preparation of Existing Utility Matrix • Additional site visit and meeting with property owners to address concerns about granting a sewer easement for Line L-1579. • Changes in alignment, construction method, and easement limits from the 30% design approved in May 2022 to reduce negative impacts on property owners. • Re-route Sewer Line M-75 from private property into W. Cantey Street as shown on Exhibit 1. • Re-route Sewer Lines L-4814 and L-4963 to gravity flow northward to Line L-4885 as shown on Exhibit 1. • Verify existing services laterals can be connected to re-routed sewer lines, and if necessary, design re-routed laterals. • On site test hole coordination to verify utility location and depth (performed October 2023). FEE ADJUSTMENT • Basic Design Services for Sanitary Sewer Design, Utility Matrix and On -Site Coordination with Property Owners: $34,115.06 • Additional Topographic Survey for Sanitary Sewer Design (see proposal provided by Spooner & Associates): $5,775 • Remaining City Directed Services Budget from Easement Document Anticipated but not Required (Three (3) Easements @ $1,400 each):-$4,200 • On -site storm sewer test hole coordination by consultant: $1,000 • Project Management and QA/QC: $2,313.04 • 5% Sub Markup: $78.75 The additional lump sum fee requested for the additional design effort identified above is $39,081.85. Please refer to the attached Scope of Services and Task/Hour Breakdown for additional details. ORIGINAL CONTRACT AMOUNT $302,590.50 CONTRACT AMENDMENT #1 AMOUNT $39,081.85 TOTAL REVISED CONTRACT AMOUNT $341,672.35 Sincerely, Ar go ndo, re a & Brunz,LLC M.y vo P. Garza, Pg, RPLS Managing Principal agarza@ardurra.com (214) 908-7493 Lump Sum and City Directed Services Lump Sum Services Lump Sum and City Directed Services Task Description Management ig the Team Sanitary Sewer Re-routes Data Collection Re-route Line M-75 into Canley St. (2 Additional PIP Sheets) Re-route Line L-4814 to Connect to Ld885) (Revise & Extend 3 Existing PIP Sheets) Design Re-route for Six (6) Laterals Connecting to Existing M-75 Prepare Existi99yy Utilir Matrix Update Utility f�Aatrix for M-75 & L-4814 Re-routes ISite Visit, Coordination w/ Prqm Owners, Line L-1579 Altematrves Analysis, Line LS. - Update Bid Quantities, Unit Prices, & OPCC (Sanitary Sewer Re-routes) Update Bid Quantities, Unit Prices, & OPCC (L-1579) Surveyy 1Additidnal Design Survey, M-75 Re-route (See Spooner & Assoc. Inc. proposal) Additional Design Surveyy, L-4814 Re-route See Spooner & Assoc. Inc. proposal) Easement Documents l(micipated but not squired (3@$1400 ea) Subsurface Utilirv1 ErJ?neerinQ Vn-Bite I ast Mo(O I:((lir.ination 6yj consupant Totals City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8.09.2012 Level of Effort Spreadsheet Additional Services TASK/HOUR BREAKDOWN Water Department Design Services for Sanitary Sewer and Water Rehabilitation Contract 118 City Project No. 102789 Labor (hours) Total Labor Co; Subconsultant Err nse Total Expense Task Sub Total % Complete Remaining Senior. Senior I Project I Project Senior Cost Budget Project Engineer Manager Engineer EIT Technician Technician Subconsultant Reproduction f 26 31 2 8 22 4 l 6 a a 4 f 16 1 1 04% $34,115.06 $1,575.00 014. $1,575.00 0 I I 1,000.001 0% $1.000.00 01 39,003.101 0% $39,003.10 eat Summary Total Hours 165 Total Labor $37,428.10 Total Expense $1.575.00 MWBE Subconsultant 0 SBE Subconsultant $1.575.00 5% Sub Markup $78.75 MBE/SBE Participation 4.0% Total Project Cost $39,081.85 WE