HomeMy WebLinkAboutOrdinance 26909-05-2024Ordinance No. 26909-05-2024
AN ORDINANCE INCREASING ESTIMATED RECEIPTS AND
APPROPRIATIONS IN THE WATER AND SEWER CAPITAL PROJECTS FUND
IN THE AMOUNT OF $1,958,899.00, TRANSFERRED FROM AVAILABLE
PAYGO RESIDUALS IN THE WATER AND SEWER CAPITAL PROJECTS
FUND, FORTHE PURPOSE OF FUNDING THE 16 INCH TO30INCH CAST IRON
WATER MAINS REPLACEMENTS IN HOLLY — EAST SIDE PUMP STATION
PROJECT (CITY PROJECT NO. 105069); PROVIDING FOR A SEVERABILITY
CLAUSE; MAKING THIS ORDINANCE CUMULATIVE OF PRIOR
ORDINANCES; REPEALING ALL ORDINANCES IN CONFLICT HEREWITH;
AND PROVIDING AN EFFECTIVE DATE.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS:
SECTION 1.
That the budget of the City of Fort Worth for Fiscal Year 2023-2024, as enacted by Ordinance 26453-09-
2023, as amended, is hereby further amended to make the following adjustments by increasing estimated
receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $1,958,899.00,
transferred from available PayGo Residuals in the Water and Sewer Capital Projects Fund, for the purpose of
funding the 16 inch to 30 inch Cast Iron Water Mains Replacements in Holly — East Side Pump Station project
(City Project No. 105069).
SECTION 2.
That should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void
for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair
the remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall
be and remain in full force and effect.
SECTION 3.
That this ordinance shall be cumulative of Ordinance 26453-09-2023 and all other ordinances and
appropriations amending the same except in those instances where the provisions of this ordinance are in
direct conflict with such other ordinances and appropriations, in which instance said conflicting provisions of
said prior ordinances and appropriations are hereby expressly repealed.
SECTION 4.
This ordinance shall take effect upon adoption.
APPROVED AS TO FORM AND LEGALITY: CITY SECRETARY
Douglas 61ac� (May 28, 2024 SO-,11 COTS
Douglas W. Black Jannette S. Goodall
Senior Assistant City Attorney City Secretary a4vv�n
p 1 * FORT*�a�
47 °p°0°4°
ADOPTED AND EFFECTIVE: May 14, 2024 ��ra . 0
�o a
on
00
T 0
00000000 Td
MAYOR AND COUNCIL COMMUNICATION
60ESI DECASTIRONWMREPLACE-LAN
I
Ll
fig
w I4# �.
;jib
MAYOR AND COUNCIL COMMUNICATION
60ESI DECASTI RONWMREPLACE-LAN
MAYOR AND COUNCIL COMMUNICATION
60ESIDECASTIRONWMREPLACE-LAN ( ^OVERALL MAP)
!� ti O 1 M +� 1= GALVEZ AVE
x x . AWM1l O ID ST
AVE
x ENNUIS AVE_ s.
SALLE,ST
w:
uj;
U G `CJ z O m O �8 m
s Z�J _ Fz" C1R 9�TF S
OCA
e
z �l0� ly ! j�e EAST Y �`� ``a)
lyGASTER RAMP R4�A HOMAR AVE
1"-
,o91N,30}W6 �A E LAN
casrER AVE
.. _,
F"C PRESIDIO ,ST W
I.
lip
:� ... 51LL1-A ST �7 t �.
w 9Li
7Q BESSIL ST FX �T�y
u! E TUCKER ST r��. U_
w Q " z a E ANNIE ST R� S 0_
Q �?_;E HATTIE ST Q�I p
s �. O
fmi
E CANNO' mEUo a
E TERRELL AVL"(�%4
j. AVE
w " U'
Lu m co__ SAVE B
,z E ROSEDALE- c
e S T � n �Asrslne
PUMP STATION
inn
w E MAGNOLIA AVEFT-Tqq �
_ N EffiT }
�} Q_.7" 1 � . .-s- t` _ .. � � AVE Cn . ®•lys
o 0
(n
E ALI-ENAVE
L
co
FORT NORTH.
w. E MORPHY�ST
EMYR1LE ST
X AVE
J
7 E MADDO`C_S,
Q O
t,
Y
0.' O
pa �LLMWOOb AYE'.
R,3 E�JEFFFRSON _AVE, w � o
m E4e.r nw.r+ • z }
RICHMOND AVE a q
z �_ E B4LTIMORE AVE r �'
0.Lij
0 V 'y U _
VNGTdN AVE a 4
E DAVIS AV (_n } `T w w
N 2 0
{ARVEY AVE R w cr _L N
ELL-, AVE m -_ .. 42f _.... a m
City of Fort worth,
Mayor and
Texas
Council Communication
DATE: 05114/24 M&C FILE NUMBER: M&C 24-0420
LOG NAME: 60ESIDE CASTIRONWMREPLACE - LAN
SUBJECT
(CD 8 and CD 9) Authorize Execution of an Engineering Agreement with Lockwood Andrews & Newnam, Inc., in the Amount of $1,448,273.00, for
the 16 Inch to 30 Inch Cast Iron Water Main Replacements in Holly- East Side Pump Station Project and Adopt Appropriation Ordinance to Effect
a Portion of Water's Contribution to Fiscal Years 2024-2028 Capital Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of an engineering agreement with Lockwood Andrews & Newnam, Inc., in the amount of $1,448,273.00, for the 16 inch
to 30 inch Cast Iron Water Main Replacements in Holly — East Side Pump Station project; and
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund
in the amount of $1,958,899.00 from available PayGo residuals within the Water and Sewer Capital Projects Fund for the purpose of funding
the 16 inch to 30 inch Cast Iron Water Mains Replacements in Holly -- East Side Pump Station project (City Project No. 105069) and to effect
a portion of Water's contribution to Fiscal Years 2024-2028 Capital Improvement Program.
DISCUSSION:
Replacement of existing cast iron water lines, installed before the general use of concrete cylinder pipe and ductile iron pipe, is a major goal of the
Fort Worth Water Department (FWWD) due to cast iron pipe's excessive break record. The Water Department has routinely replaced cast iron
waterlines as part of water replacementfrehabilitation projects and in support of street bond (street rehabilitation) projects. However, due to the
severe street damage and flooding resulting from large cast.1ron (16-in and larger) water main breaks, the Department is placing a high priority on
replacement of large diameter cast iron water transmission mains.
This Mayor and Council Communication (M&C) is to authorize the execution of an engineering agreement with Lockwood Andrews & Newnam,
Inc., in the amount of $1,448,273.00, for the 16 inch to 30 inch Cast Iron Water Main Replacements in Holly — East Side Pump Station project for
the preparation of plans and specifications for water and sanitary sewer main replacements as indicated on the following streets in the Eastside
area of the City:
Scope
Street
From
To
of
Work
95 feet south of
Lancaster
Avenue
Throckmorton Street I
Lancaster Avenue
East 1,025 feet east
then 131 feet south
Water
Intersection
Lancaster
Avenue
Kentucky Avenue
Pine Street
Water
Lancaster
Avenue
Riverside Drive
East 2, 385 feet
Water!
Sewer
131 feet south of
Main Street
Lancaster Avenue
Lancaster Avenue
Main Street
Water
Intersection
Pine Street
E Lancaster Avenue
El Paso Street
Waterl
Sewer
EI Paso Street
Easement
JPine Street ---- - J
West 459 feet
Water
east of Pine
El Paso
E. Vickery Boulevard
Water
Street
Kentucky
Avenue
Virginia Avenue
E. Broadway
Water
Pff::]Kentucky
Avenue
S. Virginia Avenue
S. Virginia
Avenue
E. Vickery
_Boulevard
E. Vickery Boulevard
I
New York Avenue
E. Dasset Avenue
--]
Woodrow Avenue
Water/
Sewer
Water 1
Sewer
Emest Street 11E.
Vickery Boulevard
Exeter Street
Water
E. Tucker
E. Vickery Boulevard
Exeter Street
Water
Exeter Street
E. Tucker Street
Union Pacific
Water
Railroad
Easement
east of Union
Riverside Drive
West 711 feet
Water
Pacific
Railroad
Riverside
Water!
Drive
Union Pacific Railroad
Bomar Avenue
Sewer
In addition to the contract amount, $510,626.00 (Water: $470,726.00; Sewer: $39,900.00) is required for project management, real property
acquisition, utility coordination, and material testing. This project will have no impact on the Water Department's operating budget when completed.
The sewer component of the project is part of the Water Department's Sanitary Sewer Overflow Initiative Program.
It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year (FY), instead of within the annual budget ordinance,
as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds
in support of the Water's portion of the City of Fort Worth's Fiscal Years 2024-2028 Capital, as follows:
60ESIDE CASTIRONWMREPLACE -LAN
Capital Fund
Name
Project
Name
FY2024 CIP
Appropriations
Authority
Budget Change
(increase/Decrease)I
Revised
FY2024
Budget
105069
-16
W&S
to 301n
Capital Projects
CI WM
$0.00,
This M&C
$1,958,899.00
$1,958,899.00
- Fund 56002
Repl.
Ha[ly-
ESPS
Funding is available in the Unspecified All -Funds project within the Water & Sewer Capital Project Fund for the purpose of funding the 16 inch to
30 inch Cast Iron Water Main Replacements in Holly - East Side Pump Station project.
Appropriations for the 16 inch to 30 inch Cast Iron Water Main Replacements in Holly — East Side Pump Station project are as depicted below:
und7�l
Existing IF
Appropriations 11
Additional
Appropriations
Project TotaI*
W&S Capital
Projects - Fund
$0.00
$1,958,899.00
$1,958,899.00
56002
Project Total
$0.001
$1,958,899.00
$1,958,899.00
Business Equity: Lockwood, Andrews & Newnam, Inc., is in compliance with the City's Business Equity Ordinance by committing to 23 percent
MWBE participation on this project. The City's MWBE goal on this project is 8 percent.
This project is located in COUNCIL DISTRICTS 8 and 9.
FISCAL INFORMATION 1 CERTIFICATION:
The Director of Finance certifies that funds are currently available in the Unspecified All -Fund project within the W&S Capital Projects Fund, and
upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Capital
Projects Fund for the 16-30in Cl WM Repl Holly-ESPS project to support execution of the engineering agreement. Prior to any expenditure being
incurred, the Water Department has the responsibility of verifying the availability of funds.
Submitted for City Manager's Office by Femando Costa 6122
Originating Business Unit Head: Chris Harder 5020