HomeMy WebLinkAboutContract 59557-CO1CSC No. 59557-COI
FORT WORTH. City of Fort Worth
Change Order Request
Project Namel 2022 CDBG Reconstruction Project- W. Ripy Street Improvements
Client Project #(s)l 103020 & 103708
Project Reconstruction of W. Ripy Street
Description
Contractorl Peachtree Construction, Ltd. Change Order #1 1
City Project Mgr.l Riad Nusrallah
l City Sec # l 59557
l Datel 5/13/2024
City Inspectorl Fabian Diaz-Aguinaga
Dept.
TPW
Contract Time
Totals
(CD)
Original Contract Amount
$1,602,187.50
$1,602,187.50
150
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
$1,602,187.50
$1,602,187.50
150
Amount of Proposed Change Order
-$60.45
-$60.45
30
Revised Contract Amount
$1,602,127.05
$1,602,127.05
180
Original Funds Available for Change Orders
$0.00
$0.00
Remaining Funds Available for this CO
$0.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $2,002,734.38
JUSTIFICATION (REASONS) FOR CHANGE ORDER
This Change Order includes an expansion of the scope of work and an increase in quantities within the existing bid items, such as sidewalks, driveways, and valley gutters
along W. Ripy Street, due to existing conditions found on site that required the removal and replacement of these items. Details of the changes in bid item quantities are in the
addition section. No additional funds are needed for this change order.
Time - This change order will add 30 calendar days to the project contract time due to the required additional quantities. Here is the breakdown for these additional days: 3
days to remove concrete driveways, 5 days to install 6" driveways, 2 days to remove sidewalk, 4 days to install 4" concrete sidewalk, 6 days to install valley gutters, 6 days to
install barrier -free ramps, 2 days to remove trees, and, 2 days to install block sod.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges
that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting
requirements.
Contractor's Company Nam Contract Sign
Peachtree Construction, Ltd. J. Barry Clark May 16, 2024
Inspector/Inspection Supery I DateW
Project and Contract Compliance Manager
jr Date
May 16, 2024
May 24, 2024
Program Manager Date
Seni ital Project Officer
Date
Zelateo►k✓ma May 24, 2024
May 24, 2024
ate
III ling Department (Dept)
Date
dgk�a„a,2o„111, 1, May28,2024
May 28,2024
ssistant City Attorne In ate
gz�a os ors May 30, 2024
Assistant City Manager
Date
May 31, 2024
Council Action (if required)
bp6�vnn�� M&C Number
ATTEST: �� xko
F F-Rt *ya
y G
Jannette Goodall, City Secretary 0,0- °=d
O°o.
o°#o
O04" dta0o ,4'
I M&C Date Approved
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
-T--- Change Order Additions
Project Name 1 2022 CDBG Reconstruction Project - W. Ripy Street Improvements I City Sec # 1 59557 1
Client Project # 1 103020 & 103708 1
Contractorl Peachtree Construction, Ltd. PMI Riad Nusrallah Inspector rduidn uidc-
Change Order Submittal # 0 Date 1 5/13/2024 1
ADDITIONS
HEM EM
UESCKIP I ION
UEP I
Oty
Unit
Unit Cost
I otal 1
4
Kemove Concrete Unveway
I PW
88U
5F
$b.b
$4,84U.UU1
5
6" Concrete Driveway
TPW
1,000
SF
$13.5
$13,500.001
6
Remove Sidewalk
TPW
2,500
SF
$4.59
$11,250.001
7
4" Concrete Sidewalk
TPW
138
SY
$10.501
$1,445.551
10
7" Concrete Valley Gutter
TPW
137
SY
$142.00'
$19,454.001
13
Barrier Free Ramp, Type P-1
TPW
5
Ea
$2,700.00'
$13,500.001
15
18"-24" Tree Removal
TPW
4
Ea
$2,300.00
$9,200.001
23
Block Sod
TPW
400
SY
$9.0C,
$3,600.001
I
1
I
1
I
1
I
1
I
1
1
I
1
I
1
I
1
I
1
I
1
1
I
1
I
1
I
1
I
1
1
I
TPW
1
I
I
1
I
1
I
1
I
1
I
1
I
I
1
I
1
I
1
I
1
I
1
I
1
1
I
1
I
1
1
$76,789.551
I
I
I
Sub Total
Additions
I
I
$76,789.551
Change Order Additions
Page 2 of 4
FOR_ T� H City of Fort Worth
Change Order Deletions
Project Name 1 2022 CDBG Reconstruction Project - W. Ripy Street Improvements City Sec # 59557
Client Project # I 103020 & 103708 I
Contractor Peachtree Construction, Ltd. I PMI Riad Nusrallah I Inspector reu a J
Change Order Submittal # 0 Date 1 5113/2024
DELETIONS
IIFM DESI:HIF'I IUN UEF'I
uty Unit
Unit Uost
lotal
t r 3"Aspnalt Pavement type u I PVV
3UU.000U 5Y
$23.0
$b,9UU.UUI
19 11 " Pavement Pulverization TPW
1,500.0000 SY
$11.5U
$17,250.001
12 Barrier Free Ramp, Type R-1 TPW
17.000U Ea
$3,100.OU
$52,700.001
TPW $76,850.001
1
1
Sub Total Deletions $76,850.001
Change Order Deletions Page 3 of 4
N/A
M/SBE for this Chanae Order
M/SBE Sub I Type of Service I Amount for this CO
Total $0.00
Previous Change Orders
co # DATE I AMOUNT
Total I $0.00 1
103020 & 103708-CNCO-Change Order No.
1 for 2022 CDBG Reconstruction Project — W.
Ripy Street Improvements
Final Audit Report 2024-05-17
Created: 2024-05-16
By: Andrea Munoz (Andrea. M unoz@fortworthtexas.gov)
Status: Canceled / Declined
Transaction ID: CBJCHBCAABAAmLUukCDbAmnhxLSliPO ht 01tz104h
"103020 & 103708-CNCO-Change Order No. 1 for 2022 CDBG
Reconstruction Project — W. Ripy Street Improvements" History
Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2024-05-16 - 6:17:14 PM GMT- IP address: 204.10.90.100
Document emailed to Alexandra Ripley (alexandra.ripley@fortworthtexas.gov) for filling
2024-05-16 - 6:40:39 PM GMT
Document emailed to jbclark@peachtreecon.com for signature
2024-05-16 - 6:40:39 PM GMT
Document emailed to Fabian Diaz-Aguinaga (Fabian.Diaz-Aguinaga@fortworthtexas.gov) for signature
2024-05-16 - 6:40:39 PM GMT
Document emailed to Donald Watson (Donald.Watson@fortworthtexas.gov) for signature
2024-05-16 - 6:40:39 PM GMT
Email viewed by jbclark@peachtreecon.com
2024-05-16 - 6:51:45 PM GMT- IP address: 66.182.214.203
Email viewed by Alexandra Ripley (alexandra.ripley@fortworthtexas.gov)
2024-05-16 - 6:54:02 PM GMT- IP address: 204.10.90.100
Signer jbclark@peachtreecon.com entered name at signing as J. Barry Clark
2024-05-16 - 6:56:16 PM GMT- IP address: 66.182.214.203
Document e-signed by J. Barry Clark Qbclark@peachtreecon.com)
Signature Date: 2024-05-16 - 6:56:18 PM GMT - Time Source: server- IP address: 66.182.214.203
FORTW❑RTHg I Paw m"Y
Adobe
Acrobat Sign
Email viewed by Fabian Diaz-Aguinaga (Fabian.Diaz-Aguinaga@fortworthtexas.gov)
2024-05-16 - 7:10:19 PM GMT- IP address: 107.77.201.142
Document e-signed by Fabian Diaz-Aguinaga (Fabian.Diaz-Aguinaga@fortworthtexas.gov)
Signature Date: 2024-05-16 - 7:12:34 PM GMT - Time Source: server- IP address: 107.77.201.142
Email viewed by Donald Watson (Donald.Watson@fortworthtexas.gov)
2024-05-16 - 8:57:06 PM GMT- IP address: 204.10.91.100
Document e-signed by Donald Watson (Donald.Watson@fortworthtexas.gov)
Signature Date: 2024-05-16 - 8:57:27 PM GMT - Time Source: server- IP address: 204.10.90.100
Document declined by Alexandra Ripley(aexandra.ripley@fortworthtexas.gov)
Decline reason: M&C number needs to be revised to 23-0429
2024-05-17 - 6:33:15 PM GMT- IP address: 204.10.90.100
FORTW❑RTHg I P°He1� Y
Adobe
Acrobat Sign
FORT WORTH.,
-�l ��
Routing and Transmittal Slip
Transportation and Public Works
Department
DOCUMENT TITLE: Change Order No. 1 for 2022 CDBG Reconstruction Proiect — W. Riov
Street Improvements
M&C 23-0429 CPN 103020 & 103708 CSO # 59557 DOC#
DATE: 4/ 1 9/ 2 0 2 4 INITIALS DATE OUT
TO:
1. Alexandra Ripley
May 17, 2024
2. J. Barry Clark - Peachtree Construction, Ltd.
JBC
May 16, 2024
3. Fabian Diaz-Aguinaga (Inspector)
LEL
May 16, 2024
4. Donald Watson (Sr. Inspector)
ow
May 16, 2024
5. Riad Nusrallah Islam (PM)
May 24, 2024
6. Zelalem Arega (PGM)
Z-A-
May 24, 2024
7. Mary Hanna (SCPO)
�W�
May 24, 2024
8. Patricia Wadsack (AD)
May 28, 2024
9. Lauren Prieur (Director)
May 28, 2024
10. Doug Black (ACA)
May 30, 2024
11. Jesica McEachern (ACM)
May 31, 2024
12. Jannette Goodall (CS)
DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: U Yes ❑✓ No
RUSH: ❑ Yes ❑✓ Nc SAME DAY: ❑ Yes ❑✓ No NEXT DAY: []Yes L&1:l No
ROUTING TO CSO: ❑✓ Yes ❑No
Action Required:
❑ As Requested
❑ Attach Signature, Initial and Notary Ta
■ Signature/Routing and or Recording
❑ Comment
❑ File
Return to: Please call Riad Nusrallah at ext. 2729 for pick up when completed. Thank