HomeMy WebLinkAboutContract 61511City of Fort Worth, Texas 16”-30” Cast Iron Water Main Repl. Holly- East Side PS Standard Agreement for Engineering Related Design Services CPN 105069 Revised Date: 12-08-2023 Page 1 of 15 CITY OF FORT WORTH, TEXAS STANDARD AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL SERVICES This AGREEMENT is between the City of Fort Worth, a Texas home-rule municipality ("CITY"), and Lockwood, Andrews & Newnam, Inc., authorized to do business in Texas, ("ENGINEER"), for a PROJECT generally described as: 16 Inch to 30 Inch Cast Iron Water Main Replacements in Holly - East Side Pump Station – Project No. 105069. Article I Scope of Services The Scope of Services is set forth in Attachment A. Negotiated changes to this Agreement, if any, are included in Attachment C. Article II Compensation The ENGINEER's compensation shall be in the amount up to $1,448,273.00 as set forth in Attachment B. Payment shall be considered full compensation for all labor (including all benefits, overhead and markups), materials, supplies, and equipment necessary to complete the Services. Engineer shall provide monthly invoices to City. The Engineer shall provide the City sufficient documentation, including but not limited to meeting the requirements set forth in Attachment D to this AGREEMENT, to reasonably substantiate the invoices. Payments for services rendered shall be made in accordance with the Texas Prompt Payment Act (Texas Government Code Ch. 2251). Acceptance by Engineer of said payment shall release City from all claims or liabilities under this Agreement for anything related to, performed, or furnished in connection with the Services for which payment is made, including any act or omission of City in connection with such Services. Article III Term Time is of the essence. Unless otherwise terminated pursuant to Article VI. D. herein, this Agreement shall be for a term beginning upon the effective date, as described below, and shall continue until the expiration of the funds or completion of the subject matter contemplated herein pursuant to the schedule, whichever occurs first. Unless specifically otherwise amended, the original term shall not exceed five years from the original effective date. CSC No. 61511 City of Fort Worth, Texas 16”-30” Cast Iron Water Main Repl. Holly- East Side PS Standard Agreement for Engineering Related Design Services CPN 105069 Revised Date: 12-08-2023 Page 2 of 15 Article IV Obligations of the Engineer A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement, providing professional engineering consultation and advice and furnishing customary services incidental thereto. B. Standard of Care The ENGINEER shall perform its services: (1) with the professional skill and care ordinarily provided by competent engineers practicing under the same or similar circumstances and professional license; and (2) as expeditiously as is prudent considering the ordinary professional skill and care of a competent engineer. C. Designation of Engineer’s Personnel (1) The ENGINEER and CITY shall agree upon the designation of the ENGINEER’s “Project Manager” prior to starting work on contract. (2) ENGINEER shall inform CITY in writing of a proposed change to their designated project manager prior to making the change or immediately upon receiving notification that the designated project manager is separating employment with the ENGINEER. (3) ENGINEER shall provide resumes to the CITY of the proposed replacement project manager(s), who shall have similar qualifications and experience as the outgoing person, for review and approval. D. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurface investigations in connection with design and engineering work to be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. City of Fort Worth, Texas 16”-30” Cast Iron Water Main Repl. Holly- East Side PS Standard Agreement for Engineering Related Design Services CPN 105069 Revised Date: 12-08-2023 Page 3 of 15 (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of the ENGINEER. E. Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible mylar sheets and electronic files in .pdf format, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. F. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on-site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the contract documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed in a manner indicating that the PROJECT, when completed, will be in accordance with the contract documents, nor shall anything in the contract documents or this AGREEMENT between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on-site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT. If the ENGINEER makes on-site observation(s) of a City of Fort Worth, Texas 16”-30” Cast Iron Water Main Repl. Holly- East Side PS Standard Agreement for Engineering Related Design Services CPN 105069 Revised Date: 12-08-2023 Page 4 of 15 deviation from the contract documents, the ENGINEER shall inform the CITY. (3) When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the contract documents. G. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A. (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by third parties; quality, type, management, or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. H. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the contract documents; that the final work will be acceptable in all respects; that the ENGINEER has made an examination to ascertain how or for what purpose the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are no other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. City of Fort Worth, Texas 16”-30” Cast Iron Water Main Repl. Holly- East Side PS Standard Agreement for Engineering Related Design Services CPN 105069 Revised Date: 12-08-2023 Page 5 of 15 I. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. J. Business Equity Participation City has goals for the full and equitable participation of minority business and/or women business enterprises in City contracts greater than $100,000. In accordance with the City’s Business Equity Ordinance No. 25165-10-2021 (as codified in Chapter 20, Article X of the City’s Code of Ordinances, as amended, and any relevant policy or guidance documents), Engineer acknowledges the MBE and WBE goals established for this Agreement and its execution of this Agreement is Engineer’s written commitment to meet the prescribed MBE and WBE participation goals. Any misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Engineer may result in the termination of this Agreement and debarment from participating in City contracts for a period of time of not less than three (3) years. K. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract. ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultant agreements hereunder a provision to the effect that the subconsultant agrees that the CITY shall, until the expiration of five (5) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subconsultant, involving transactions to the subcontract, and further, that the CITY shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with City of Fort Worth, Texas 16”-30” Cast Iron Water Main Repl. Holly- East Side PS Standard Agreement for Engineering Related Design Services CPN 105069 Revised Date: 12-08-2023 Page 6 of 15 subsection (3) hereof. CITY shall give subconsultant reasonable advance notice of intended audits. (3) ENGINEER and subconsultant agree to reproduce such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of hard copies at the rate published in the Texas Administrative Code in effect as of the time copying is performed. L. INSURANCE Engineer shall not commence work under this Agreement until it has obtained all insurance required under Attachment F and City has approved such insurance. M. Independent Consultant The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. The doctrine of respondeat superior shall not apply. N. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract. O. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the CITY may request the ENGINEER to assist in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. P. Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, City of Fort Worth, Texas 16”-30” Cast Iron Water Main Repl. Holly- East Side PS Standard Agreement for Engineering Related Design Services CPN 105069 Revised Date: 12-08-2023 Page 7 of 15 at its own cost and expense. However, if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. Q. Schedule ENGINEER shall manage the PROJECT in accordance with the schedule developed per Attachment D to this AGREEMENT. Article V Obligations of the City A. City-Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B. Access to Facilities and Property The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER's performance of its services. The CITY will perform, at no cost to the ENGINEER, such tests of equipment, machinery, pipelines, and other components of the CITY's facilities as may be required in connection with the ENGINEER's services. The CITY will be responsible for all acts of the CITY's personnel. C. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights-of-way, and access necessary for the ENGINEER's services or PROJECT construction. D. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule prepared in accordance with Attachment D. City of Fort Worth, Texas 16”-30” Cast Iron Water Main Repl. Holly- East Side PS Standard Agreement for Engineering Related Design Services CPN 105069 Revised Date: 12-08-2023 Page 8 of 15 E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors. F. Asbestos or Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY's facilities that may contain hazardous materials, including asbestos containing materials, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage, or disposition of such materials. In consideration of the associated risks that may give rise to claims by third parties or employees of City, City hereby releases ENGINEER from any damage or liability related to the presence of such materials. (2) The release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER’s negligence or if ENGINEER brings such hazardous substance, contaminant or asbestos onto the project. G. Contractor Indemnification The CITY agrees to include in all construction contracts the provisions of Article IV.E. regarding the ENGINEER's Personnel at the construction site, and provisions providing for contractor indemnification of the CITY and the ENGINEER for contractor's negligence. H. Contractor Claims and Third-Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the CITY will be the beneficiary of any undertaking by the ENGINEER." (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third-party beneficiaries. City of Fort Worth, Texas 16”-30” Cast Iron Water Main Repl. Holly- East Side PS Standard Agreement for Engineering Related Design Services CPN 105069 Revised Date: 12-08-2023 Page 9 of 15 (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third-party beneficiary rights under this Agreement. (4) Nothing contained in this Section H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. I. Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated between the parties. J. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article VI General Legal Provisions A. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. B. Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. City of Fort Worth, Texas 16”-30” Cast Iron Water Main Repl. Holly- East Side PS Standard Agreement for Engineering Related Design Services CPN 105069 Revised Date: 12-08-2023 Page 10 of 15 C. Force Majeure CITY and ENGINEER shall exercise their best efforts to meet their respective duties and obligations as set forth in this Agreement, but shall not be held liable for any delay or omission in performance due to force majeure or other causes beyond their reasonable control, including, but not limited to: acts of the public enemy, fires, strikes, lockouts, natural disasters, epidemics/pandemics, wars, riots, material or labor restrictions by any governmental authority and/or any other similar causes. D. Termination (1) This AGREEMENT may be terminated a.) by the City for its convenience upon 30 days' written notice to ENGINEER. b.) by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and the nonperforming party does not commence correction of such nonperformance within 5 days’ written notice or thereafter fails to diligently complete the correction. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Reasonable cost of reproduction or electronic storage of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; b.) The reasonable time requirements for the ENGINEER'S personnel to document the work underway at the time of the CITY'S termination for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all projected termination expenses. The CITY'S approval shall be obtained in writing prior to proceeding with termination services. E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECT's schedule, City of Fort Worth, Texas 16”-30” Cast Iron Water Main Repl. Holly- East Side PS Standard Agreement for Engineering Related Design Services CPN 105069 Revised Date: 12-08-2023 Page 11 of 15 commitment and cost of the ENGINEER's personnel and subcontractors, and ENGINEER's compensation will be made. F. Indemnification The ENGINEER shall indemnify or hold harmless the CITY against liability for any damage committed by the ENGINEER or ENGINEER’s agent, consultant under contract, or another entity over which the ENGINEER exercises control to the extent that the damage is caused by or resulting from an act of negligence, intentional tort, intellectual property infringement, or failure to pay a subcontractor or supplier.CITY is entitled to recover its reasonable attorney’s fees in proportion to the ENGINEER’s liability. G. Assignment ENGINEER shall not assign all or any part of this AGREEMENT without the prior written consent of CITY. H. Jurisdiction The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be Tarrant County, Texas. I. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause. J. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees from and against all City of Fort Worth, Texas 16”-30” Cast Iron Water Main Repl. Holly- East Side PS Standard Agreement for Engineering Related Design Services CPN 105069 Revised Date: 12-08-2023 Page 12 of 15 claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. K. Contract Construction/No Waiver The parties acknowledge that each Party and, if it so chooses, its counsel, have reviewed and revised Agreement and that the normal rule of contract construction, to the effect that any ambiguities are to be resolved against the drafting party, must not be employed in the interpretation of Agreement or any amendments or exhibits hereto. The failure of CITY or ENGINEER to insist upon the performance of any term or provision of this Agreement or to exercise any right granted herein shall not constitute a waiver of CITY’s or ENGINEER’s respective right to insist upon appropriate performance or to assert any such right on any future occasion. L. Immigration Nationality Act ENGINEER shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by CITY, ENGINEER shall provide CITY with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. ENGINEER shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any ENGINEER employee who is not legally eligible to perform such services. ENGINEER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY ENGINEER, ENGINEER’S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. CITY, upon written notice to ENGINEER, shall have the right to immediately terminate this Agreement for violations of this provision by ENGINEER. M. Prohibition On Contracts With Companies Boycotting Israel ENGINEER unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of the Texas Government Code, if ENGINEER has 10 or more full time-employees and the contract value is $100,000 or more, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms “boycott Israel” and “company” City of Fort Worth, Texas 16”-30” Cast Iron Water Main Repl. Holly- East Side PS Standard Agreement for Engineering Related Design Services CPN 105069 Revised Date: 12-08-2023 Page 13 of 15 shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, ENGINEER certifies that ENGINEER’S signature provides written verification to the City that if Chapter 2271, Texas Government Code applies, ENGINEER: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. N.Prohibition on Boycotting Energy Companies ENGINEER acknowledges that in accordance with Chapter 2276 of the Texas Government Code, the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more, which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms “boycott energy company” and “company” have the meaning ascribed to those terms by Chapter 2276 of the Texas Government Code. To the extent that Chapter 2276 of the Government Code is applicable to this Agreement, by signing this Agreement, ENGINEER certifies that ENGINEER’s signature provides written verification to the CITY that ENGINEER: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. O. Prohibition on Discrimination Against Firearm and Ammunition Industries ENGINEER acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code, the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms “discriminate,” “firearm entity” and “firearm trade association” have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, ENGINEER certifies that ENGINEER’s signature provides written verification to the CITY that ENGINEER: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or City of Fort Worth, Texas 16”-30” Cast Iron Water Main Repl. Holly- East Side PS Standard Agreement for Engineering Related Design Services CPN 105069 Revised Date: 12-08-2023 Page 14 of 15 firearm trade association during the term of this Agreement. This AGREEMENT, including its attachments and schedules, constitutes the entire AGREEMENT, which supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. This AGREEMENT may be executed in one or more counterparts and each counterpart shall, for all purposes, be deemed an original, but all such counterparts shall together constitute but one and the same instrument. The following attachments and schedules are hereby made a part of this AGREEMENT: Attachment A - Scope of Services Attachment B - Compensation Attachment C - Amendments to Standard Agreement for Engineering Services Attachment D - Project Schedule Attachment E - Location Map Attachment F – Insurance Requirements City of Fort Worth, Texas 16”-30” Cast Iron Water Main Repl. Holly- East Side PS Standard Agreement for Engineering Related Design Services CPN 105069 Revised Date: 12-08-2023 Page 15 of 15 Duly executed by each party’s designated representative to be effective on the date subscribed by the City’s designated Assistant City Manager. BY: CITY OF FORT WORTH BY: ENGINEER Fernando Costa Assistant City Manager Date:__________________ Lockwood, Andrews & Newnam, Inc. Justin C. Reeves, P.E. Vice President Date:____________________________ ATTEST: Jannette Goodall City Secretary APPROVAL RECOMMENDED: By: Christopher Harder, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY By: Douglas W Black Sr. Assistant City Attorney Form 1295 No.: 2024-1132645 M&C No.:___24-0420_______ M&C Date:_May 14, 2024____ Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. _______________________________ Walter Norwood, P.E. Project Manager May 17, 2024 ATTACHMENT A DESIGN SERVICES FOR CAST IRON WATER MAIN REPLACEMENTS - EASTSIDE CITY PROJECT NO.: 105069 City of Fort Worth, Texas Attachment A PMO Release Date: 07.23.2012 Page 1 of 21 ATTACHMENT A Scope for Engineering Design Related Services for Water and/or Sanitary Sewer Improvements DESIGN SERVICES FOR CAST IRON WATER MAIN REPLACEMENTS - EASTSIDE CITY PROJECT NO.: 105069 The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. WORK TO BE PERFORMED Task 1. Design Management Task 2. Conceptual Design Task 3. Preliminary Design Task 4. Final Design Task 5. Bid Phase Services Task 6. Construction Phase Services Task 7. ROW/Easement Services Task 8. Survey and Subsurface Utility Engineering Services Task 9. Plan Submittal Checklists Task 10. Stream Crossing Services Task 11. Additional Parks Coordination Project includes: The design of water lines (16- to 30-inch) to replace existing 16- to 24-inch cast iron water lines generally east of downtown Fort Worth totaling approximately 36,555 linear feet (L.F.). The replacement lines over 24-inch will require valving and connections to existing distribution lines including some parallel lines for service meters. The design also includes replacement of 660 L.F. of 8-inch sewer replacements for a total of 37,215 L.F. of pipeline replacements. The routes below are the best estimate of the final route at this time. The preferred route will be determined in the execution of this work. This project is proposed to be advertised (bid) in two packages. Design includes the following pipelines and locations: 1. Segment 1 - 36-inch Replacement From the Intersection of South Freeway and East Vickery Blvd. (along East Vickery) to the Intersection of Ernest Street and Vickery Blvd, then down Ernest Street to the East Side Pump Station: Segment Details 9,755 L.F. of 36-inch Open-Cut. ATTACHMENT A DESIGN SERVICES FOR CAST IRON WATER MAIN REPLACEMENTS - EASTSIDE CITY PROJECT NO.: 105069 City of Fort Worth, Texas Attachment A PMO Release Date: 01.28.2024 Page 2 of 21 400 L.F. of 36-inch By other than open-cut (BOTOC). Proposed Vertical Shaft Tunnel installation at US 287 Crossing to mitigate elevation differences. Proposed Tunnel at Railroad Bridge Crossing (Depending on permitting requirements of UPRR). Open-cut crossing of Sycamore Creek requiring a Corps of Engineers (COE) permit and streambank protections. Service Connections cannot connect to the 36-inch replacement water line. Service connections will utilize a proposed parallel 12-inch line for distribution (size to be finalized by the CoFW modeling team) to the 36-inch replacement water line and include strategic connections and valves to the proposed 30-inch waterline. Grout abandon existing 16-inch cast iron line through Sycamore Park. Replace and reconnect existing small diameter distribution water lines within road ROW along the alignment given. Sewer Replacements are not to be included except for 250 L.F. of 6-inch in Vickery Blvd. Provide detailed traffic control to close one side of Vickery Blvd. The traffic control plan (TCP) should also include a removal plan that allows traffic to become accustomed to the removal of traffic control devices and begin driving on the correct side of the Blvd. section when work is complete. Limits Length Ex. Size New Size Length Ex. Size New Size Water Sewer E Vickery Blvd. and Kentucky Ave. to E Vickery Blvd. and Ernest St. 9775 L.F. - 36" - - - E Vickery Blvd. and Kentucky Ave. 40 L.F. 20" 36" - - - E Vickery Blvd. and E Broadway Ave. 540 L.F. 6" 8" - - - E Vickery Blvd. and Stella St. 250 L.F. 6" 8" - - - 1503 E Vickery Blvd. to E. Vickery Blvd. and IH-30 2840 L.F. 16" 12" - - - E Vickery Blvd. and Loney St. 50 L.F. 8" 8" - - - E Vickery Blvd. and Exeter St. 75 L.F. 6" 8" - - - 1727 E Vickery Blvd. 40 L.F. 8" 8" - - - E Vickery Blvd. and Cromwell St. 55 L.F. 8" 8" - - - E Vickery Blvd. and Ash Crescent St. 40 L.F. 6" 8" - - - E Vickery Blvd. and Belzise Terrace 40 L.F. 6" 8" - - - E Vickery Blvd. and Ann St. 50 L.F. 6" 8" - - - E Vickery Blvd. and IH-30 to E Vickery Blvd. and Ernest St. 1950 L.F. 16" 12" - - - E Vickery Blvd. and McCurdy St. 10 L.F. 6" 8" - - - E Vickery Blvd. and Sycamore Terrace 25 L.F. 6" 8" - - - E Vickery Blvd. and Sycamore St. 25 L.F. 6" 8" - - - E Vickery Blvd. and Ernest St. 50 L.F. 6" 8" - - - ATTACHMENT A DESIGN SERVICES FOR CAST IRON WATER MAIN REPLACEMENTS - EASTSIDE CITY PROJECT NO.: 105069 City of Fort Worth, Texas Attachment A PMO Release Date: 01.28.2024 Page 3 of 21 Limits Length Ex. Size New Size Length Ex. Size New Size Water Sewer E Vickery Blvd. and Ernest St. 655 L.F. 20" 24" - - - E Vickery Blvd. and New York Ave. (Sewer) - - - 250 L.F. 2. Segment 2 24-inch Replacement From the Intersection of East Tucker Street and East Vickery Blvd. to the Intersection of East Tucker Street and Exeter Street, then north on Exeter to the crossing UPRR and US 287 to East Ave., then north along Riverside Ave. under and to the north side of IH 30. Also, from the Intersection of Riverside Ave. and East Lancaster Ave., down Lancaster Ave. to Sycamore Creek bridge, then south to reconnect to an existing line at the UPRR ROW. Segment Details 7,000 L.F. of 30-inch Open-Cut. 400 L.F. of 30-inch BOTOC. Proposed Boring at UPRR Crossing. Proposed Boring at US 287 Crossing. Proposed Boring at IH-30 Crossing. Service Connections cannot connect to 30-inch replacement water line. Service connections will utilize a proposed parallel 8-inch line for distribution (size to be finalized by the CoFW modeling team) to the 30-inch replacement water line and include strategic connections and valves to the proposed 30-inch water line. Replace and reconnect existing lines within road ROW except 8-inch parallel along Lancaster Ave. Sewer Replacements are not to be included. Connection to Riverside Drive Improvements North of IH-30. Coordinate with others to connect to the new line designed by others on the south side of Trinity River and the north side of I-30. No existing pipe is to remain between the two segments. Provide detailed traffic control to close one side of Lancaster Bd. The TCP should also include a removal plan that allows traffic to become accustomed to the removal of traffic control devices and begin driving on the correct side of the Blvd. section when work is complete Limits Length Ex. Size New Size Length Ex. Size New Size Water Sewer E Vickery Blvd. and E Tucker St. to 2118 E Lancaster Ave. 6340 L.F. - 30" - - - S Riverside Dr. and E Lancaster Ave. to IH-30 1300 L.F. - 30" - - - 2400 S Riverside Dr. 55 L.F. 6" 8" - - - ATTACHMENT A DESIGN SERVICES FOR CAST IRON WATER MAIN REPLACEMENTS - EASTSIDE CITY PROJECT NO.: 105069 City of Fort Worth, Texas Attachment A PMO Release Date: 01.28.2024 Page 4 of 21 Limits Length Ex. Size New Size Length Ex. Size New Size Water Sewer East Ave. and S Riverside Dr. to East Ave. and Grafton St. 685 L.F. - 8" - - - East Lancaster Ave. and Riverside Dr. 40 L.F. 6" 8" - - - S Riverside Dr. and Bomar Ave. 50 L.F. 8" 8" - - - 3. Segment 3 30-inch Replacement From the Intersection of West Lancaster Ave. and Thockmorton St. to the Intersection of Main Street and East Lancaster Ave., then south along Main Street to East Vickery Blvd. Segment Details 2,700 L.F. of 16-inch Open-Cut. 500 L.F. of 16-inch BOTOC. Proposed boring at TxDOT and UPRR, TRE and BNSF ROWs. Replacement of existing water line along the east side of the USPS building for service. Also including small line needed for service from West Vickery. Replace, abandon and reconnect existing lines within road ROWs. Service connections to 16-inch Replacement. Grout abandon existing 16-inch line through Railroad and TxDOT ROW and from under building. Sewer replacements are not included. Limits Length Ex. Size New Size Length Ex. Size New Size Water Sewer W Lancaster Ave. and Throckmorton St to Main St and W Vickery Blvd. 2200 L.F. 30" 16" - - - 251 W Lancaster Ave. 320 L.F. 30" 12" - - - 400 W Vickery Blvd. 230 L.F 30" 12" - - - Main St and W Vickery Blvd. to Industrial Ave. 270 L.F. 8" 8" - - - 4. Segment 4 16-inch Replacement From the Intersection of East Lancaster Ave. and South Freeway to the Intersection of East Lancaster Ave. and Pine Street, then south along Pine Street to the Intersection of Pine Street and East El Paso Street, then east along El Paso Street to the middle of the block to turn south to cross UPRR and enter South Virginia Ave. and proceed to East Vickery Blvd. ATTACHMENT A DESIGN SERVICES FOR CAST IRON WATER MAIN REPLACEMENTS - EASTSIDE CITY PROJECT NO.: 105069 City of Fort Worth, Texas Attachment A PMO Release Date: 01.28.2024 Page 5 of 21 Segment Details 4,000 L.F. of 16-inch Open-Cut. 500 L.F. of 16-inch BOTOC. Proposed boring at Railroad ROW Replace and reconnect existing lines within road ROW that are not to standards. Extended service connections due to project conditions. Service Connections to 16-inch Replacement. Sewer Replacements are not to be included except for 410 L.F. of 8-inch east of S Virginia Ave. Limits Length Ex. Size New Size Length Ex. Size New Size Water Sewer E Lancaster Ave. and N Kentucky Ave. to W Vickery Blvd. and S Virgina Ave. 4250 L.F. 10" 16" - - - E Lancaster Ave. and N Kentucky Ave. 45 L.F. 16" 16" - - - 1221 E Lancaster Ave. 20 L.F. 12" 12" - - - E Lancaster Ave. and Cedar St. 60 L.F. 12" 12" - - - E Lancaster Ave. and Chambers St. 30 L.F. 8" 8" - - - E Lancaster Ave. and Cypress St. 60 L.F. 10" 10" - - - E Lancaster Ave. and Pine St. 40 L.F. 10" 10" - - - E Lancaster Ave. and E Presidio St. 20 L.F. 12" 12" - - - E El Paso St. and Pine St. 40 L.F. 10" 10" - - - 1734 E El Paso St. 700 L.F. 24" 8" - - - East of S Virginia Ave. at Vickery Blvd. - - - 410 L.F. 5. Segment 5 16-inch Replacement From the Intersection of Broadway Ave. and Kentucky Ave. south to the Intersection of Kentucky Ave. and East Tucker Street, then east to the Intersection of East Tucker Street and South Virginia Ave. Segment Details 3,000 L.F. of 16-inch Open-Cut. No anticipated BOTOC on this Segment. Replace and reconnect existing lines within road ROW that are not to standards. Service Connections to 16-inch Replacement. Sewer Replacements are not to be included. ATTACHMENT A DESIGN SERVICES FOR CAST IRON WATER MAIN REPLACEMENTS - EASTSIDE CITY PROJECT NO.: 105069 City of Fort Worth, Texas Attachment A PMO Release Date: 01.28.2024 Page 6 of 21 Length Ex. Size New Size Length Ex. Size New Size Water Sewer Kentucky Ave. and E Broadway Ave. to E Tucker St. and S Virgina Ave. 3050 L.F. 16" 16" - - - Kentucky Ave. and E Broadway Ave 55 L.F. 6" 8" - - - Kentucky Ave. and Bessie St. 20 L.F. 6" 8" - - - Kentucky Ave. and E Tucker St. 45 L.F. 6" 8" - - - Kentucky Ave. and E Tucker St. 40 L.F. 12" 12" - - - E Tucker St. and Pine St. 30 L.F. 4" 8" - - - E Tucker St. and S Virginia Ave. 50 L.F. 6" 8" - - - 6. Grout Abandonment Abandonment Details 6,000 L.F. of 24-inch Abandonment in UPRR ROW. 1,600 L.F. of 16-inch Abandonment in UPRR ROW & Sycamore Park. Connections to 24-inch will be plugged at existing UPRR ROW crossing. The old line will be grouted. Small diameter line(s) will be necessary to restore services. 530 L.F. of 8-inch Sewer Abandonment East of S Virginia Ave. at Vickery Blvd. Detailed design will include: Pipeline design; By other than open cut pipeline design under streets, deep sections, railroad, creek, and highway crossings; Small diameter replacement within the street ROW as listed herein. The sizing is to be confirmed by the . TASK 1. DESIGN MANAGEMENT. resources. ENGINEER shall: Manage change, Communicate effectively, Coordinate internally and externally as needed, and Proactively address reasonable as necessary to make progress on the work. ATTACHMENT A DESIGN SERVICES FOR CAST IRON WATER MAIN REPLACEMENTS - EASTSIDE CITY PROJECT NO.: 105069 City of Fort Worth, Texas Attachment A PMO Release Date: 01.28.2024 Page 7 of 21 1.1 Managing the Team Lead, manage and direct design team activities, Ensure quality control is practiced in performance of the work, Communicate internally among team members, and Task and allocate team resources. 1.2 Communications and Reporting Attend a pre-design project kickoff/chartering meeting for segments 1 through 5 with CITY staff to confirm and clarify scope, understand CITY objectives, and ensure economical and functional designs that meet CITY requirements (1 meeting). Conduct review meetings with the CITY at the end of each design phase. It is assumed that segments 1 through 5 will be discussed in a single meeting after each design phase (3 meetings total). Prepare invoices and submit monthly in the format requested by the CITY. Prepare and submit progress reports in the format provided by the Water Department with each invoice. Prepare and submit baseline Project Schedule initially, and Project Schedule updates with a schedule narrative monthly, as required in Attachment D to this Document. Complete all weekly M/WBE Reporting requirements as required by the new requirements of the Inclusion Department. Coordinate with other agencies and entities as necessary for the design of the proposed infrastructure and provide and obtain information needed to prepare the design. With respect to coordination with permitting authorities, ENGINEER shall communicate with the following permitting authorities (TxDOT, UPRR, BNSF, TRE, and THC) such that their regulatory requirements are appropriately reflected in the designs. ENGINEER shall work with regulatory authorities to obtain approval of the designs, and make changes necessary to meet their requirements, as part of the design scope. Personnel and Vehicle Identification: When conducting site visits to the project location, the ENGINEER or any of its sub-consultants shall carry readily available information identifying the name of the company and the company representative. ASSUMPTIONS 15 MWBE reports will be prepared 4 meetings with city staff (Kickoff, 30 percent, 60 percent, and 90 percent review meetings) 15 monthly water department progress reports will be prepared ATTACHMENT A DESIGN SERVICES FOR CAST IRON WATER MAIN REPLACEMENTS - EASTSIDE CITY PROJECT NO.: 105069 City of Fort Worth, Texas Attachment A PMO Release Date: 01.28.2024 Page 8 of 21 15 monthly project schedule updates will be prepared DELIVERABLES A. Meeting summaries with action items B. Monthly invoices C. Monthly progress reports D. Baseline design schedule E. Monthly schedule updates with schedule narrative describing any current or anticipated schedule changes F. Monthly M/WBE Report Form and Final Summary Payment Report Form G. Plan Submittal Checklists (See Task 9) TASK 2. CONCEPTUAL DESIGN (30 PERCENT). The Conceptual Design shall be submitted to CITY per the approved Project Schedule. The purpose of the conceptual design is for the ENGINEER to: Study the project, Identify and recommend a proposed corridor for the replacements that successfully addresses the design problem, Present (through the defined deliverables) these alternatives to the CITY, and ENGINEER will develop the conceptual design of the infrastructure as follows. Conceptual design will be submitted as a single package. The project will be separated into 2 packages in later phases of design. 2.1 ENGINEER will contact private and public stakeholders adjacent to segments 1 through 5 to coordinate the project specifics where it may cross their property, utility, infrastructure or interfere with their use of the property. 2.2 ENGINEER will develop a stakeholder coordination plan by segment 1 through 5. ENGINEER will maintain a list of all stakeholders to include: Contact name, email, phone number, address, (including public and private) and Notes regarding most recent conversations with permitting entities (TxDOT, UPRR, BNSF, TRE, and THC). 2.3 ENGINEER shall obtain/attempt to obtain temporary right of entry (TROE) permission from all stakeholders prior to entering property. Letters will be sent via certified mail with require a signed form granting permission in return. One letter will be sent. Owners refusing TROE or unresponsive shall be promptly reported to the City. The documentation shall be provided in conformance with the checklists and site. ATTACHMENT A DESIGN SERVICES FOR CAST IRON WATER MAIN REPLACEMENTS - EASTSIDE CITY PROJECT NO.: 105069 City of Fort Worth, Texas Attachment A PMO Release Date: 01.28.2024 Page 9 of 21 2.4 Data Collection In addition to data obtained from the CITY, ENGINEER will research proposed improvements in conjunction with any other known, planned future improvements that may influence the project. The ENGINEER will also identify and seek to obtain data for existing conditions that may impact the project including but not limited to; utilities, agencies (TxDOT and railroads), City Master Plans, and property ownership as available from the Tax Assessor's office. The data collection efforts will also include conducting up to two special coordination meetings with affected property owners and businesses as necessary to develop utility re-routing plans. 2.5 ENGINEER will develop the Conceptual Design package. The Conceptual Design Package shall include the following: Cover Sheet. Plan view drawings of the recommended design concept using aerial imagery as the background. Proposed delineation of Package 1 and Package 2 based on location, estimate of probable construction costs, and the . Meeting minutes taken during the 30 percent design review meeting with the CITY will document key design decisions. Estimate of probable construction costs by segments 1 through 5. ASSUMPTIONS 6 copies of the conceptual design package (30 percent design) will be delivered. Report shall be letter sized and comb- bound with a clear plastic cover. Drawings will be 11x17 size fold outs bound in the report. DWF files created from design CAD drawings will be uploaded to the designated project folder in . ENGINEER shall prepare the meeting minutes of the Concept Review meeting and revise the report, if needed. ENGINEER shall not proceed with Preliminary Design activities without obtaining written approval by the CITY of the Conceptual Design Package. ENGINEER assumes that the recommended realignment was determined prior to contracting and providing multiple alternatives is excluded from the scope. ATTACHMENT A DESIGN SERVICES FOR CAST IRON WATER MAIN REPLACEMENTS - EASTSIDE CITY PROJECT NO.: 105069 City of Fort Worth, Texas Attachment A PMO Release Date: 01.28.2024 Page 10 of 21 The project phasing is limited to Segments 1 through 5 and will be broken down by Level D SUE will be conducted prior to developing the 30 percent graphics. No geotechnical investigation will be performed prior to preliminary design. DELIVERABLES A. Conceptual Design Package B. Data Base listing names and addresses of residents and businesses affected by the project. TASK 3. PRELIMINARY DESIGN (60 PERCENT). Preliminary plans and specifications shall be submitted to CITY per the approved Project Schedule. ENGINEER will develop the preliminary design of the infrastructure for two separate design packages as follows. 3.1 Development and review of Preliminary Design Drawings and Specifications shall include the following: Cover Sheet. This task will be completed twice, once for each design package. A Project Control Sheet, showing all Control Points, used or set while gathering data, generally on a scale of not less than 1:400. The following information shall be indicated for each Control Point Identified (e.g. existing City Monument, PK Nail, referred bearing base. Z coordinate on City Datum only; descriptive location (e.g. set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). This task will be completed twice, once for each design package. Overall project water and/or sanitary sewer layout sheets. The water layout sheet shall identify the proposed water main improvement/ existing water mains in the vicinity and all water appurtenances along with pressure plane boundaries, water tanks, pump stations, valves, and fire hydrants. The sewer layout will not be shown on the water layout sheet. It shall identify the proposed sewer main improvement/existing sewer mains and all sewer appurtenances in the vicinity. The existing water and sewer lines shall be shown on the map with the size of the line indicated. This task will be completed twice, once for each design package. Overall water and/or sanitary sewer abandonment sheet indicating all lines to be abandoned with cross hatching. This task will be completed twice, once for each design package. General Notes sheets. This task will be completed twice, once for each design package. Plan and profile sheets which show the following: proposed water and/or sanitary sewer plan/profile and recommended pipe size, fire hydrants, water service lines and meter boxes, gate valves, isolation valves, manholes, existing meter numbers and sizes that are to be replaced, existing sample locations, existing fire line ATTACHMENT A DESIGN SERVICES FOR CAST IRON WATER MAIN REPLACEMENTS - EASTSIDE CITY PROJECT NO.: 105069 City of Fort Worth, Texas Attachment A PMO Release Date: 01.28.2024 Page 11 of 21 locations, existing utilities and utility easements, and all pertinent information needed to construct the project. Legal description (Lot Nos., Block Nos., and Addition Names) along with property ownership shall be provided on the plan view. The age, pipe material and record drawing (X-File) number for each line shown on the plan sheets shall be shown along the line. The plan and profiles sheets will be delineated by segment 1 through 5 and distributed to the appropriate design package 1 or 2. Plan and profile sheets will include: o Coordinates in the same coordinate system as the Control Points. o Bench marks per 1,000 ft of plan/profile sheet two or more. o Bearings given on all proposed centerlines, or baselines. The ENGINEER will prepare standard and special detail sheets for water line installation and sewer replacement that are not already included in the D-section of include connection details between various parts of the project, tunneling details, boring and jacking details, water line relocations, details unique to the construction of the project, trenchless details, and special service lateral reconnections. This task will be completed twice, once for each design package. The ENGINEER will prepare an overview sheet of roadways requiring replacement. The sheet will include quantities of replacement and typical street details. The pavement replacement will be curb-to-curb where construction in the roadway is required. ENGINEER will update the probable construction costs by segments 1 through 5. 3.2 Geotechnical Investigation Soil investigations, including field and laboratory tests, 13 borings not to exceed 30 feet in depth, related engineering analysis and recommendations for determining soil conditions will be made for tunnel crossings. 3.3 Utility Clearance The Department, Water Department, other CITY departments and other government agencies to determine the approximate location of above and underground utilities, and other facilities (current and future) that have an impact or influence on the project for CITY transmission mains. The City will coordinate public distribution utilities and private utilities. The ENGINEER shall upload individual PDF files of the approved preliminary plan set to the designated project folder in ebuilder for forwarding to all utility companies which have facilities within the limits of the project. 3.4 Traffic Control Plan ATTACHMENT A DESIGN SERVICES FOR CAST IRON WATER MAIN REPLACEMENTS - EASTSIDE CITY PROJECT NO.: 105069 City of Fort Worth, Texas Attachment A PMO Release Date: 01.28.2024 Page 12 of 21 Develop a traffic control plan utilizing standard traffic reroute configurations posted if included in the sealed contract documents. Develop supplemental traffic control drawings for review and approval by the Traffic Division of the Transportation and Public Works Department for Vickery Blvd., Lancaster Ave., and Riverside Dr. These drawings shall be sealed by a professional engineer registered in the State of Texas. On divided boulevard sections requiring closure of one side of the boulevard, i.e. Vickery Bd., the engineer shall develop a plan to reinstate the traffic to both sides of the boulevard. 3.5 Railroad Permits Engineer will research to determine current requirements of the railroad company that has ownership at the water line crossing areas. Engineer will develop documents and exhibits for the CITY to submit for permits each time the proposed pipeline crosses, abandons and connects to existing lines within the railroad ROWs. Up to 6 permits are expected from UPRR, TRE and BNSF. The permitting fee is included in the scope of the project. 3.6 TxDOT Permitting Engineer will research to determine current requirements of TxDOT for all of the crossing locations. Engineer will assist the CITY by developing documents and exhibits for submission to the RULIS system each time the proposed pipeline crosses, installs new water lines, or abandons old water lines within the TxDOT ROW. Up to 6 permits are expected to need to be obtained from TxDOT. 3.7 Environmental Permitting ENGINEER will review site and conduct environmental review of the project site to obtain clearance from state permitting and environmental jurisdictions. ASSUMPTIONS 0 public meeting(s) will be conducted or attended during the preliminary design phase. 13 geotechnical borings between a maximum depth of 50 feet each will be provided. 2 sets of 11x17 size plans will be delivered for the Constructability Review. 5 sets of 11x17 size plans will be delivered for the Preliminary Design (60% design). 2 sets of specifications will be delivered for the Preliminary Design (60% design). only supplement the technical specifications if needed. ATTACHMENT A DESIGN SERVICES FOR CAST IRON WATER MAIN REPLACEMENTS - EASTSIDE CITY PROJECT NO.: 105069 City of Fort Worth, Texas Attachment A PMO Release Date: 01.28.2024 Page 13 of 21 2 sets of 11x17 size drawings will be delivered for Utility Clearance. ENGINEER shall not proceed with Final Design activities without written approval by the CITY of the Preliminary Design plans. Profiles of proposed water lines will only be provided by the ENGINEER for 12- inches in diameter or bigger. Roadway profiles and cross-section are not included in the scope of this project. No meetings are anticipated with the permitting, CITY, or utility owners to coordinate clearances. Additional archaeological digging and site investigation is assumed to be additional services and not included in this scope of work. The site is assumed to be disturbed and assumed approval for construction from the Texas Historical Commission and United States Corps of Engineers. Any additional permitting will require additional compensation. Traffic control plans are limited to standard traffic control plans and devices as identified in the Texas Manual of Uniform Traffic Control Devices except as specifically listed in this scope of services. Additional design of replacements of CITY utilities to accommodate the proposed transmission mains will require additional services. DELIVERABLES A. Preliminary Design drawings and specifications B. TxDOT and Railroad Permit drawings C. Storm Water Pollution Prevention Plan D. Estimates of probable construction cost TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT). The following tasks will be completed twice, once for each design package. Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as follows: For this project, the Contractor will be responsible for preparing and submitting the Storm Water Pollution Prevention Plan (SWPPP) for segments 1 through 5 with appropriate regulatory agencies. The Engineer will provide a proposed erosion control plan with the construction documents according to the current CITY iSWM Criteria Manual for Site Development and Construction to the contractor. Draft Final plans (90%) for segments 1 through 5 and any changes to technical specifications shall be submitted to CITY for each design package per the approved Project Schedule. Following a 90% construction plan review meeting with the CITY, the ENGINEER shall revise the 90% drawings and technical specifications and submit Construction Documents (100%) to the CITY per the approved Project Schedule. Each plan ATTACHMENT A DESIGN SERVICES FOR CAST IRON WATER MAIN REPLACEMENTS - EASTSIDE CITY PROJECT NO.: 105069 City of Fort Worth, Texas Attachment A PMO Release Date: 01.28.2024 Page 14 of 21 sheet shall be stamped, dated, and signed by the ENGINEER registered in State of Texas. The ENGINEER shall submit a final design estimate of probable construction cost with both the 90% and 100% design packages. This estimate shall use ONLY standard CITY bid items. ASSUMPTIONS 5 sets of 11x17 size drawings and 2 sets of 22x34 size drawings and 2 specifications will be delivered for the 90% Design package. A DWF file for the 90% Design will be created from design CAD drawings and will be uploaded to the project folder in . 8 sets of 11x17 size drawings and 3 specifications will be delivered for the100% Design package. The shall only supplement the technical specifications if needed. Engineer to provide estimated final sheet list (cover/index, general notes, control point location, no. of plan/profiles, special detail sheets, etc.) DELIVERABLES A. 90% construction plans and specifications. B. 100% construction plans and specifications. C. Detailed estimates of probable construction costs including summaries of bid items D. Original cover mylar for the signatures of authorized CITY officials. TASK 5. BID PHASE SERVICES. ENGINEER will support the bid phase of the project as follows. This project will be advertised (bid) in two packages. The listed bid phase services are applicable to each of the two construction contracts. 5.1 Bid Support The ENGINEER shall upload all plans and contract documents onto for access to potential bidders. o Contract documents shall be uploaded in a .xls file. o Unit Price Proposal documents are to be created utilizing CFW Bidtools only and combined in a specified spreadsheet workbook, Bid Proposal Worksheet Template, and will be populated and configured so that all pages are complete and the Summary Worksheet(s) in the workbook detail and automatically summarize the totals from the inserted Unit Price Proposal document worksheets. ATTACHMENT A DESIGN SERVICES FOR CAST IRON WATER MAIN REPLACEMENTS - EASTSIDE CITY PROJECT NO.: 105069 City of Fort Worth, Texas Attachment A PMO Release Date: 01.28.2024 Page 15 of 21 o Plan Sets are to be uploaded to in two formats, .pdf and .dwf files. The .pdf will consist of one file of the entire plan set. The .dwf will consist of individual files, one for each plan sheet, and will be numbered and named in a manner similar to that of the plan set index. The ENGINEER will receive and answer additional information. The procedures shall include a log of all significant bidders questions and requests and the response thereto. The log shall be housed and folder titled Request for Information. The ENGINEER will provide technical interpretation of the contract bid documents and will prepare proposed responses to all bidders questions and requests, in the form of addenda. The ENGINEER shall upload all approved addenda onto and mail addenda to all plan holders. Attend the virtual prebid conference in support of the CITY. Attend the virtual bid opening in support of the CITY. Tabulate and review all bids received for the construction project, assist the CITY in evaluating bids, and recommend award of the contract. A copy of the Bid Tabulation and the CFW Data Spreadsheet created utilizing CFW Bidtools only are Results folder on . Incorporate all addenda into the contract documents and issue conformed sets. 5.2 Final Design Drawings Final Design Drawings shall be submitted in both Adobe Acrobat PDF format (version 6.0 or higher) format and DWF format. There shall be one (1) PDF file and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for the Water plan set. Each PDF file shall be created from the original CAD drawing files and shall contain all associated sheets of the particular plan set. Singular PDF and DWF files for each sheet of a plan set will not be accepted. PDF and DWF files shall conform to naming conventions as follows: I. TPW file name example -- Example: W-0053_org3.pdf and K-0320_org5.pdf II. Water and Sewer file name example -- an Example: X-12755_org18.pdf . ATTACHMENT A DESIGN SERVICES FOR CAST IRON WATER MAIN REPLACEMENTS - EASTSIDE CITY PROJECT NO.: 105069 City of Fort Worth, Texas Attachment A PMO Release Date: 01.28.2024 Page 16 of 21 In addition to the PDF and DWF files, the ENGINEER shall submit each plan sheet as an individual DWG file with all reference files integrated into the sheet. If the plans were prepared in DGN format, they shall be converted to DWG prior to uploading. The naming convention to be used for the DWG files shall be as follows: I. TPW files shall use the W number as for PDF and DWF files, but shall include the sheet number in the name -- II. Water and Sewer file names shall use the X number as for PDF and DWF files, but shall include the sheet number in the name -- For information on the proper manner to submit files and to obtain a file number for the project, contact the Department of Transportation and Public Works Vault at telephone number (817) 392-8426. File numbers will not be issued to a project unless the appropriate project numbers and fund codes have been assigned and are in the Department of Transportation and Public Works database. ASSUMPTIONS The project will be bid in two bid packages and each awarded to an individual contractor. Only preapproved bidders are allowed to submit on this project. Review of bidder qualifications is not required. 2 sets of construction documents will be sold to and made available on ebuilder for plan holders and/or given to plan viewing rooms. 8 sets of 11x17 size and 2 sets of 22x34 size drawings plans and 8 specifications (conformed, if applicable) will be delivered to the CITY. PDF files will be uploaded to . The CITY will provide a response to bidder questions regarding approving alternate materials or manufactured products if they meet the project specifications. DELIVERABLES A. Addenda B. Bid tabulations C. CFW Data Spreadsheet D. Recommendation of award E. Construction documents (conformed, if applicable) ATTACHMENT A DESIGN SERVICES FOR CAST IRON WATER MAIN REPLACEMENTS - EASTSIDE CITY PROJECT NO.: 105069 City of Fort Worth, Texas Attachment A PMO Release Date: 01.28.2024 Page 17 of 21 TASK 6. ROW/EASEMENT SERVICES. ENGINEER will support and perform activities related to ROW and land as outlined below, 6.1 Right-of-Way Research The ENGINEER shall determine rights-of-way, easement needs for construction of the project. Required temporary and permanent easements will be identified based on available information and recommendations will be made for approval by the CITY. 6.2 Right-of-Way/Easement Preparation and Submittal. The ENGINEER shall prepare 10 documents to be used to obtain right-of-way and permanent and/or temporary easements required to construct the improvements. The ENGINEER shall submit the right-of-way and/or easement documents to CITY PM for real property acquisition. The documentation shall be provided in conformance with the checklists and ebuilder site. ASSUMPTIONS 10 Permanent and/or Temporary Easements or right-of-way documents included in the scope of work. The legal description required for the Parks Conversion application (if necessary) is assumed to be one of the 10 easement or right-of-way documents. Right-of-Way research and mapping includes review of property/right-of-way records based on current internet-based Tarrant Appraisal District (TAD) information available at the start of the project and available on-ground property information (i.e. iron rods, fences, stakes, etc.). It does not include effort for chain of title research, parent track research, additional research for easements not included in the TAD, right-of-way takings, easement vacations and abandonments, right-of-way vacations, and street closures. DELIVERABLES A. Easement exhibits and meets and bounds provided on CITY forms TASK 7. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES. ENGINEER will provide survey support for segments 1 through 5 as follows. 7.1 Design Survey ENGINEER will perform field surveys to collect horizontal and vertical elevations and other information needed by ENGINEER in design and preparation of plans for the project. Information gathered during the survey shall include topographic data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations, paint ATTACHMENT A DESIGN SERVICES FOR CAST IRON WATER MAIN REPLACEMENTS - EASTSIDE CITY PROJECT NO.: 105069 City of Fort Worth, Texas Attachment A PMO Release Date: 01.28.2024 Page 18 of 21 marks and utility appurtenances, structures, and other features relevant to the final plan sheets. Existing drainage at intersections will be verified by field surveys. Spot elevations will be shown on intersection layouts with cross slope to fit intersecting grade lines. ENGINEER will field locate visible meters for buildings adjacent to the waterline replacements. The CITY will provide the meter numbers and sizes on all existing meters to be replaced from the ENGINEERS investigation on the project. ENGINEER shall identify existing sample stations and fire line locations. The minimum survey information to be provided on the plans shall include the following: o A Project Control Sheet, showing all Control Points, used or set while gathering data generally on a scale of not less than 1:400. o The following information about each Control Point; a. Identified (Existing CITY Monument b. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on CITY Datum only. c. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). o same coordinate system, as the Control. o No less than two horizontal bench marks, per line or location. o Bearings given on all proposed centerlines, or baselines. o Station equations relating utilities to paving, when appropriate. 7.2 Subsurface Utility Engineering Information derived from existing utility records; ENGINEER will produce a utility file, in AutoCAD format, depicting the type and horizontal location of the designated utilities. The size of each utility will be presented in the utility file if this information is indicated on available record drawings. ENGINEER will also provide a summary sheet of the test hole percent submittal. and proposed pipeline alignments. obtained by surveying visible above-ground utility features such as valves, hydrants, meters, manhole covers, etc. utilities will be adjusted per field investigation and survey and shown on the 60 ATTACHMENT A DESIGN SERVICES FOR CAST IRON WATER MAIN REPLACEMENTS - EASTSIDE CITY PROJECT NO.: 105069 City of Fort Worth, Texas Attachment A PMO Release Date: 01.28.2024 Page 19 of 21 percent submittal. (excluding property boundary surveys). ENGINEER shall conduct two- dimensional (x,y) information obtained through the application and interpretation on non-destructive level provides the horizontal position of subsurface utilities within approximately one foot. is not included in the scope of work except only as necessary to identify . ENGINEER will conduct three dimensional (x,y,z) utility information obtained utilizing non-destructive vacuum excavation equipment to expose utilities at critical points which are then tied by surveying. Also known as utilities within approximately 0.05 feet. hole location. 0 locations to be recommended by the ENGINEER and agreed upon by the CITY prior to mobilizing field work. ASSUMPTIONS Topographic survey at intersection will include no more than 100 feet in each direction except in public right-of-way. When in public right-of-way, the survey shall be from right-of-way line to right-of-way line. Tree surveys are not included in the scope of work. 10 Level A testholes are anticipated for this project. DELIVERABLES A. Copies of field survey data and notes signed and sealed by a licensed surveyor. B. Drawing of the project layout with dimensions and coordinate list. TASK 8. PLAN SUBMITTAL CHECKLISTS. Engineer shall complete and submit Plan Submittal Checklists in accordance with the following table throughout duration of the design: PLAN SUBMITTAL CHECKLIST REQUIREMENTS Type Traffic Signal (Submit All @ 30%) Storm Water 30% Storm Water 60% Street Lights (Submit All @ 30% Water /Sewer (Submit All @ 60%) Traffic Engineering (Submit All @ 60%) Traffic Control 30% Traffic Control 60% Traffic Control 90% Required for all work in City ROW Street X X X X X* X X X X Storm Water X X X X X ATTACHMENT A DESIGN SERVICES FOR CAST IRON WATER MAIN REPLACEMENTS - EASTSIDE CITY PROJECT NO.: 105069 City of Fort Worth, Texas Attachment A PMO Release Date: 01.28.2024 Page 20 of 21 Water / Sewer X X X X *If included in street project ASSUMPTIONS Any inspection phase services with the requirements or the Department of Inclusion for SBE and MBE firms. ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES Additional Services not included in the existing Scope of Services CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: Construction phase services. Construction control survey and easement staking. Negotiation of easements or property acquisition including temporary right-of- entries. Roadway re-design including profiles and cross sections. Services related to development of the project financing and/or budget. Services related to disputes over pre-qualification, bid protests, bid rejection and re-bidding of the contract for construction. Design of stream bank stabilization. Design or field testing for cathodic protection. in this scope of work. Construction management and inspection services. Design phase public meetings. Performance of materials testing or specialty testing services. Services necessary due to the default of the Contractor. Services necessary due to defective or incorrect work provided by the Contractor. Services related to damages caused by fire, flood, earthquake or other acts of God. Services related to warranty claims, enforcement and inspection after final completion. ATTACHMENT A DESIGN SERVICES FOR CAST IRON WATER MAIN REPLACEMENTS - EASTSIDE CITY PROJECT NO.: 105069 City of Fort Worth, Texas Attachment A PMO Release Date: 01.28.2024 Page 21 of 21 Services related to Survey Construction Staking Services related to acquiring real property including but not limited to easements, right-of-way, and/or temporary right-of-entries. Services to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. Construction Shop drawing review, samples and other submittals submitted by the contractor. Performance of miscellaneous and supplemental services related to the project as requested by the CITY. ATTACHMENT B COMPENSATION City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 1 of 3 B-1 Design Services for Cast Iron Water Main Replacements – Eastside City Project No. _105069___ Lump Sum Project I. Compensation A. The ENGINEER shall be compensated a total lump sum fee of $_1,448,273.00___ as summarized in Exhibit B-1 – Engineer Invoice and Section IV – Summary of Total Project Fees. The total lump sum fee shall be considered full compensation for the services described in Attachment A, including all labor materials, supplies, and equipment necessary to deliver the services. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment A. Partial payment shall be made to the ENGINEER monthly upon City’s approval of an invoice prepared and submitted by the ENGINEER in the format and including content as presented in Exhibit B-1, Progress Reports as required in item III. of this Attachment B, and Schedule as required in Attachment D to this Agreement. B. The estimated current physical percent complete as required on the invoice shall be calculated from the progress schedule as required in Attachment D to this Standard Agreement and according to the current version of the City of Fort Worth’s Schedule Guidance Document. C. The cumulative sum of such monthly partial fee payments shall not exceed the total current project budget including all approved Amendments. D. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Water Department monthly progress reports and schedules in the format required by the City. ATTACHMENT B COMPENSATION City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 2 of 3 B-2 IV. Summary of Total Project Fees Firm Primary Responsibility Fee Amount % Prime Consultant Lockwood, Andrews & Newnam, Inc. Engineering Design $1,071,120.00 Proposed MWBE Sub-Consultants Hanna Surveying & Engineering LLC Topographical Survey and ROW/Easement Survey $221,735.00 Yellow Rose Mapping, LLC Subsurface Utility Engineering $32,500.00 HVJ North Texas Chelliah Consultants, Inc. Geotechnical Engineering $89,518.00 Non-MWBE Consultants aci Consulting Environmental Assessment $33,400.00 TOTAL $_1,448,273.00_ 100% Project Number & Name Total Fee MWBE Fee MWBE % Cast Iron Water Main Replacements – Eastside City Project No. 105069 $_1,448,273.00___$_343,753____ _23.7_% City MWBE Goal = _8.0_% Consultant Committed Goal = _23.7__ % EXHIBIT “B-1” ENGINEER INVOICE (Supplement to Attachment B) City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 3 of 3 B-3 Insert required invoice format following this page, including negotiated total budget and allocations of budgets across work types and work phases. � � � � 7 N a� � � ♦+ � � w N C N � C .� � d � V � O � > C � _ � N � N �, m V � o �� N U� � � � O � u .N � � �i �.% o O �O a L V .�r aa� E Z d U .� c � � U O C _ V� U � � d U N C y � W p� a c � _ N IL d � Z c� v N � U � 0 w u .0 7 T � � a A 3 � N m' r � � � U �. �v �9 >w �� :: w � �o aa E o c U L N, N 3 U � > 9 C � � � T � �„ d� r 3� N � R Z T � m a � 0 U �C G! 'O C Q O _ � L . Q � � � X aEiOF�i E � m � 3 n a � tk � O V 3 lL H a°>aa,��v � � � 0 0 O a a`_,=vv„ � V V U C C � � � O 3 3 ITO G/ G/ � v>v>av>v>5 0 0 a1 ro ro C N � � �� ti N u) = V �N •16 N � (6 � N m � C � N V � ; 7 � U — y >' c� � � o C > _ y v, a` C = G! � � Q GI y a � a� � a� _ � a o J � � o a v 00 y o 0 _ �� a �� E � v �, �o � `) � � V E9 aa � C N � � � � O c � a Q E Q O O O O � Y W � G) = OJ W y3 � � O a � v � aa"' c O G. �L r.i N d � d Q H Y O � � C R � LL `m 3 m � �n � N M O N�p �, c c c c c c G1 F F F F F F G% Y Y Y Y Y Y � � � � � � � 0 � N O v c m Q � d �1 R .r o � � � N L � d a a � a� 9 0 O r � O � � �O > C N L H N io O H a t 0 m .; vc c 3 � o � T T � N Q � 9 O > R a m �� u 3 �� m c r V rrj� C F N a � _ o a� e�� O R � U y � c � o a ui6i y � � ti o a v 01 Z m c � c E a `v ;o U C m � i�i � m � c 3 o � v .. N y � u `m � ` �'�v F � a� C � R U� � W j C � � � W p� j� � N � O. C r- N O W � � L p a` � w ii 3 U � C �C C � U (a n a> � c .� � C� � •� � � � N O � � � V% Oa�+ �U�� 3 � � f6 i.i y .. � O �p E? Z .N��� ZD � tA C1 �, a m w � a` ~ in � Q' Y V � � � a�'+ O�y � � aa��LLc,a � N (D r x � L � � 0 o N u c a o � � � O O O O (n N N � W W � o r r � w w a N w � 'G ui 'O C Q � -da R � d IC �o�LL N 0 e Z A � 0 t0 � X � a .� � � a # .�+ � O V 7 lL H i'o �.. a>d;:::;! N C� � � � N N= N N y .a.Q£��� aa>,� Z o ��Rad> mu>au>m5 0 ro C N v°Di = C N .� � � C R � N m � d' C d N V � ; = C U — a u � � o c � w a` c � c�i d a`� y a � .°i+ c m � a o J � � U a O = y G � C y G% 3 lC N ��o� aa C d � � C � �a Q C N � � a C � � Z a 0 c W d c � 3 N d o V L � � aa«, O .J UI 0 N � = ` R � a � 0 ro N N V C � Q � � G1 fC r O � W � W L N � � a R � � O 0 � N V � .� � N t H N r � � v L O taf N O a � 'c � q O � T d � T -p �a o � > m � a R a � u '0 0� c Y � R 9 N N N :% o � U aa` o m .a U y � -O w ui6i � � u U `w « a a a �` 2 p, v c E a 'y o c > � U t > � N. C ; o = a .. � - N V N OI � � U C � C (n C W � C � � �' o ;? ia (0 °1 rn T 3 ` W 6 � t C a� N IL 3 v° � C N � U (a n a> � c .� � v � •� > C � N O N - rn V � o d �(a u� 3 Z U�w 3 � � f6 i.i y .. � O �p E? Z .N��� ZD � tA C1 �, a m w � a` ~ in � Q' Y V � � � a�'+ O�y � � aa��LLc,a � N O � F r � LL 0 v � � u - U d c ¢ o a` � V V ., o 0 3� � ro ro 0^^ a N m m w �o ui -a c ao � � L Q R w d X do�� � ic Z N E N O 0 0 a .� � 3 a # .�+ � O V 7 lL H i'o �.. a>d;:::;! N C� � � � N N= N N y .a.Q£��� aa>,� Z o ��Rad> mu>au>m5 0 �a� ._ � �� .� � � eR dm � �� �� �� �� U — d— U = � O C > _ y v'. a` = c c�i d d y a � G7 Q d 7 � a o J O Q U O C � O a = Y � `1 O 10 N Qa�� C d C � i � �a a C d � L� C = � Z Q � i d C � 3 � E "' V Qa O .� a�i ❑ N � = ` R � a � ��� r � N Q � N 6] R O � � � � N � a ILO N 7 O � O N c � � r � N f6 O H 00 0� I� M I� � I� � � M � O M CO � 1p Ch � I� 0� lf) CO lf) I� � I� CO aD Cfl � L� O1 � M N N ri r-I �} �} ff? H? f!} Ef-} H? i/� Lf) I� � M CO lf) 00 � 00 I� M 00 M N M CO (fl r-I Cp o� I� N o0 6) N� 1!; � � N � � r � � � N �i�+?�i�+?�i�i�i�+?v� �, � v o c� � � � �n c � � M � I� 0� lf') C� � lf') lfi O; � M �� M N� N O � � � �i �+? �i �i �i �i �? i/� 00 0� � M O� O� M �� I� O 00 M I� M �O �� CO O CO � O� N N 00 �� 6� � N CO � r-1 ��� Cfl � � CO N M �i v? �i �+? �i �? � Et} v� � N c'') � N CO I� M M � ch M � ch M O � N N� � f� 00 ri � I� N I� Cfl M O N O M 00 � M N M i..� � � � �p �} H} EfT H? Ef-} �} H} i/� O O 00 O O O u1 O M N u'f � 0p N I� 01 O 00 � � �A 01 ei M 00 N M V1 d M N I� M r-I u'f O lD O LL � 00 M O 1!1 N 01 00 r-I � M N M � � O H EA N i/� �llf [/� N i/� N i/� � � v � � C C vI ,U � � •� � (�j i � v Q N a a� � i cn t .L � � O 'vi � +' �. (, C ca L � N QI � ca y� +�.� � � v�i � � a-�� 0 � Q.� � �6 v N Y U �,� � d cNC � � � O O � � � \ N H H a v a m� c O � � a Y � = O O O O O O O O �� � N M� �fl lfl I� 00 Z � R _ 0 v ;, z a � o ° m `Q � a aw � � � � � � m y d o�v� � w � �� o= � � �No.� J F fn E � ry ��o �= r�' ��� � `o � m x F � iq � ' a � r � _ 2� m d � _ ` O w � � � � ° U Q H � n � � � N N V V _ ? .� '� O � � U � C � ,n a 'r d - U U � a a � a a - N � w - W W m A 00 00 � � p N N O W � W W � m m m � � � Z E � ry ��o �= r�' ��� � `o � m x F � iq � ' a � r � _ 2� m d � _ ` O w � � � � ° U Q H � City of Fort Worth, Texas Attachment C PMO Release Date: 05.19.2010 Page 1 of 1 CHANGES AND AMENDMENTS TO STANDARD AGREEMENT Design Services for City Project No. 0 � z w � x U H Q ��� � � o= _�- ., o - I � e o 0 0 o e o 0 0 0 o e o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o e o o e o 0 o e o 0 0 0 0 0 0 o e o 0 0 0 0 0 0 o e o 0 0 0 0 0 0 o a- ,. \ ,� � � 3 r r 3 3 3 f � F � � r 3 r ,� r r ,� i � � 3 3 � � � r �. � � r ,� r r r \ ,� � i � � � i � i � � � � �. � � � ,� ,� ,� r 3 LL _ p _ _ 3 3 r r c 3 3 s 3 3��,� E�` r LL r� r� 3 r� 3 3 P- �. LL u LL LL u�. LL LL LL�. '���� 3 3 3 3 3 3��� 3 3� �� r' 3 r r�., ., m� c� m�c o m N � N M. �., �.- m A., m M � �n ., M,. .. �.. � o.�. � N a.�. � M.. ., n.. .. .�. m e e N o.3. ,. .. � e„ e � e.- .. N� � E 0 F I I I F c o E E 0 � E j E _- E _ F 3 E _ _ A' a 3 p P' - _ _ - _ 3 3 _ - - _ � ._ _ _ _ - - � � C m 3 � E _ _ _ t '^ _ 3 E _ � 3 - n E _ _ = 3 E C - 'E a � `� C o m E 3 E cY o e'p E E O n � E E� ¢ E pE - � _ � n � E -a - E a 3= 3 E E 3 F` 3$� � 3 _ 3 3 ? 3 E N � N N b s � _ � _ � ms � _ � Q N �5 S O ` 3N o� E. BROADWAY AVE COUNCIL DISTRICT - 8 COUNCIL DISTRICT - 11 COUNCIL DISTRICT - 9 P E TERRELL AVE ENNIS AVE LE ST E MADDOX AV E E HATTIE ST E AL L EN AVE E RO S EDAL E M AG NOL I A AV E STELLA ST E RI CHMOND AV E E JEF FERS ON AV E E BALTIM ORE AVE E LEUDA ST HARVEY AVE E MORPHY ST E ANNIE ST E M YRTLE S T E DAVIS AVE C GALVEZ AVE LAW NW OOD ST FI S HER AV E RLI NG T ON AV E ELMW OOD AVE E P RES I DI O S T W ELL AVE UP RR (OVERALL MAP) EASTSIDE PUMP STATION AVE A AVE B KERY BLVD W L W DAGGETT AVE E DAGGETT AVE TRE E LANCASTER AVE AVE STELLA ST KENNEDY ST AM E ANNIE S T US287 NB EXIT LANCASTER RA E EL PASO S T E TUCKER ST E BROADWAY AV E UP RR E V ICKERY BLVD E ST AVE B AVE C SCOTT AVE E BROADWAY AVE E LEUDA ST AVE D TER BESS IE ST AVE E E TUCKER S T EASTSIDE PUMP STATION AVE A AVE B � N � � z � � W � U � a �ao 0 � 2 �� �� � � � -' ��� � �.; -yr ,`� � r� . ,� � ,__'� i �. k ' �'y� . � ��A ; ; � � .'�. ._,— �`" � .'� "",� I � f + i,� . j ��` � ,��� 6 A � � �i, � ��� f � � '.. fJ ,* �... . ���. v'�' . 1 S 1 S3N2�3 .�8 e,( ^ 'RlpY � m � "y.�^.� � .� � 8� ���z ,§� ��w� � �y � � � I� r.�,� r f �''�,���' �;'"f���� �'"i� t. �� <aa���a�';, + �0.R-<is'� �. �� .�d � �` �. }' - f ""4, � �t '�J -..� s F��, ��+=' e .. . 4� T � �j�. �,�F � � �'ti� j.� . Y.'; 4 f R+'� 4� .+�'� �.. A � y'g 7e ,�° r �b� �I � � F .. � .. , ��" ...:«a _. �e� r J � � .��_1��c-�,.s;_. a,3 � �.� ���y,.���� � Z � � LSZ-S(1 a � �� s ` r` '�.�.���' W � U ' �����' r ��4 ,�%r�� � e�. � O? t c; �,. ��'.: � r e r� s��,��R: � � ,�g1 w � � � `�'•. -��� �� � � � � �r�, � � . . � � M .- �`�"�r � " a -,�,s°'_'" R �' . °k J� � � . ' 3 ° h�q� -_ �� _.@��� �� � � Q W � � � � U �r�a z � N O Q � ��= W U � i � � � � q ��� ;�`� � � `� t � ��a' �c � I �4 '. ., c 4 '� I a s�t l�, t` a. .� , lA � T � �. l� i f� F�n •°~ � �! M � � �;'� � ~ � � = W N = �o? � � N % � � �� ����G G� �� . � j > � �''��� � "� � � �p � �s 2�a 301S2�3/1R� ,. ro '' � ' � . • -• / ;. � a4 �- �+ �'" t ,��;'7�j' �`r �i �R.'.q.n" . . . �' - s+. �"+ r � � �� v a- �. - w �� � �� � - , �% —� � U ..: � t� ,:�,3 �r � ;, = 1 S 2�313X3 ' � $, ;�' vi -,�,'�.." hn . � W ;�; � �' �� .. �i a � � ^� � � �'s w. • * " - `,. ., F . , �, � ' � t� , ��: a � �;�'*'°`' ,� : i e � "' � .�,rt ?�ZI �SN9 � ': : .r,€ '� �+ � �. �;�.��.�. �,` � i � �-� : ;�r ,. ��' . . (— 1 � ',Te a .� F t ,. � - ' . . _ i " � -�&--, a� . � • . 1 � � � � .. . ��� � �. � � � � : ', <; � W � = 1 s 3N�d `� � . ,. �� � r �f' W ��c.� � ;� � � � � al �, C� O i � � � O � � � - � � � � ` �'d� ,�,., '� � �, F �"�� O � -r "" W e_ •�{�. ,w•��� 9:-�' �'°'"' .� � .'.._: � -�� �, °o � : � � � P +� � '.. � � a� e� 9 � �'' �� �m..t �:' I � ' �d"i � •'�s,r �1f ' � � rS. 7 W r �.�°F � . p il c��' � ' .,� � � w � �x a5��!� � � S"� � • �`e�, ro ' . `, . L4 4 . < �'; � � 4 . �' �.� � �'"� � " � � a � .� ..�• � � � � �.� � � p�,� f4g�9'�' � � � '�. .� r�i �: �� : � a , ' 3n e,���n1N3� :,_ ��� �� . r, �F ► F� , .. , p m� F .., _ k_ . ,� �z �.,,': �R,. �,:. � J , ��� � 0 M _ �: , ` �k"' � �"` .i .�'( ��� �—., ;�,/ ,.� ��a.�q� � � <.', �_ __ _—'�:.. �i7l�r.�, a �'i Y.- �" ��y��'�s, . _ _ :R_ —_ - M5�-HI � _ , — — * � * � ° ,�r"' ,RQ , ' -�+'n.. +wii� � �, t3� r�� t4� �f e.. �� �JNL7 - _ . . �r 4�" : .aa wr-, ' � � ,,,x,w..x 0 J m i— W U � � . � �..>_. . —. x.��_ � .. , -�,.ay i �e�� �„ d �r.»�. �,_ —�,, 1 - � . �'-'.�'-� ,. � } i � � f . - �._. .. � u,.:� ►+>- �... . � � '_�-.+-•� � e+.a.. -~�u- � '_�, � � r•:r • 4 F rr� �i t+;�. L:a r,r,ri -- `!, ' ��,,.,�s`°'""„'w*•w—�... s�.�...i � �. r c �: � �' ,� �, a �-�.' i"�.s � �► ._�,,.•� :.�-. �� t " #"v �i`'� '€�i" �'%' i c I I � } L A '� « � � �' '� c"' _.`. � �u�..� + � t� �i g- �`ey I_s 1 �; E .r. �'r; � 7 t " � I +i> ga ,,;d.,�� � "ii f3 � 1� f � ,� , ' . �1 .. � � ..J...� c.-, !.'iMs�._ '� il 3*(`��`, 0 :4r......: `�+ ..� W�a � � �;.'� � :-i`�� : „"` �n_ �� ri_� f r�r-Y`tT f'"" ; � a a � � ';�._ � �,�� ���Y �� ;�- 1L..c a � ��� . �„ F_,. -a �`"" ! �> � � . �;: E ��'� f-, i� �''��� � .�,�,�, �� N N O � � � � 3 d � V C Q 3; Y y C� Z J � � � City of Fort Worth, Texas Attachment F PMO Release Date: 05.19.2010 Page 1 of 1 ATTACHMENT “F” CERTIFICATE OF INSURANCE Design Services for 16 Inch to 30 Inch Cast Iron Water Main Replacements in Holly - East Side Pump Station City Project No. 105069 � � City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, May 14, 2024 LOG NAME: 60ESIDE CASTIRONWMREPLACE - LAN REFERENCE NO.: **M&C 24-0420 SUBJECT: (CD 8 and CD 9) Authorize Execution of an Engineering Agreement with Lockwood Andrews & Newnam, Inc., in the Amount of $1,448,273.00, for the 16 Inch to 30 Inch Cast Iron Water Main Replacements in Holly - East Side Pump Station Project and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to Fiscal Years 2024-2028 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of an engineering agreement with Lockwood Andrews & Newnam, Inc., in the amount of $1,448,273.00, for the 16 inch to 30 inch Cast Iron Water Main Replacements in Holly — East Side Pump Station project; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $1,958,899.00 from available PayGo residuals within the Water and Sewer Capital Projects Fund for the purpose of funding the 16 inch to 30 inch Cast Iron Water Mains Replacements in Holly — East Side Pump Station project (City Project No. 105069) and to effect a portion of Water's contribution to Fiscal Years 2024-2028 Capital Improvement Program. DISCUSSION: Replacement of existing cast iron water lines, installed before the general use of concrete cylinder pipe and ductile iron pipe, is a major goal of the Fort Worth Water Department (FWWD) due to cast iron pipe's excessive break record. The Water Department has routinely replaced cast iron waterlines as part of water replacement/rehabilitation projects and in support of street bond (street rehabilitation) projects. However, due to the severe street damage and flooding resulting from large cast iron (16-in and larger) water main breaks, the Department is placing a high priority on replacement of large diameter cast iron water transmission mains. This Mayor and Council Communication (M&C) is to authorize the execution of an engineering agreement with Lockwood Andrews & Newnam, Inc., in the amount of $1,448,273.00, for the 16 inch to 30 inch Cast Iron Water Main Replacements in Holly — East Side Pump Station project for the preparation of plans and specifications for water and sanitary sewer main replacements as indicated on the following streets in the Eastside area of the City: Street From To Scope of Work 95 feet south of Lancaster Throckmorton Street / Avenue Lancaster Avenue Intersection Lancaster Avenue Kentucky Avenue East 1,025 feet east then 131 feet south Pine Street Lancaster Riverside Drive East 2, 385 feet Avenue Sewer 131 feet south of Main Street Lancaster Avenue Lancaster Avenue / Water Main Street Intersection Pine Street E Lancaster Avenue EI Paso Street Water / Sewer EI Paso Street Pine Street West 459 feet Water Easement east EI Paso E. Vickery Water of Pine Street Boulevard Kentucky Virginia Avenue E. Broadway Water Avenue E. Tucker Kentucky Avenue S. Virginia Avenue Water Street S. Virginia E. Vickery Boulevard E. Dasset Avenue Water / Avenue Sewer E. Vickery New York Avenue Woodrow Avenue Water / Boulevard Sewer Ernest Street E. Vickery Boulevard Exeter Street Water E. Tucker E. Vickery Boulevard Exeter Street Water Exeter Street E. Tucker Street Union Pacific �/ater Railroad Easement east of Union Riverside Drive West 711 feet Water Pacific Railroad Riverside Drive Union Pacific Railroad Bomar Avenue Water / _ Sewer In addition to the contract amount, $510,626.00 (Water: $470,726.00; Sewer: $39,900.00) is required for project management, real property acquisition, utility coordination, and material testing. This project will have no impact on the Water Department's operating budget when completed. The sewer component of the project is part of the Water Department's Sanitary Sewer Overflow Initiative Program. It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year (FY), instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2024-2028 Capital, as follows: 60ESIDE CASTIRONWMREPLACE -LAN Capital Fund Project FY2024 CIP Budget Change Revised Nam� Name Appropriations Authority �Increase/Decrease)� FY2024 J Budget 105069 -16 W&S to 30in Capital Projects CI WM $0.00 This M&C $1,958,899.00 $1,958,899.00 - Fund 56002 Repl. Holly- ESPS Funding is available in the Unspecified All-Funds project within the Water & Sewer Capital Project Fund for the purpose of funding the 16 inch to 30 inch Cast Iron Water Main Replacements in Holly - East Side Pump Station project. Appropriations for the 16 inch to 30 inch Cast Iron Water Main Replacements in Holly — East Side Pump Station project are as depicted below: Fund Existing Additional project Total* Appropriations Appropriations W&S Capital Projects - $0.00' $1,958,899.00'$1,958,899.00 Fund 56002 i Project Total $0.00 $1,958,899.00 $1,958,899.00 Business Equity: Lockwood, Andrews & Newnam, Inc., is in compliance with the City's Business Equity Ordinance by committing to 23 percent MWBE participation on this project. The City's MWBE goal on this project is 8 percent. This project is located in COUNCIL DISTRICTS 8 and 9. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Unspecified All-Fund project within the W&S Capital Projects Fund, and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Capital Projects Fund for the 16- 30in CI WM Repl Holly-ESPS project to support execution of the engineering agreement. Prior to any expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs),: TO �nd Department Accoun Project Program ctivity Budget Reference # moun ID ID Year (Chartfield 2) FROM Func Department �Accoun� Project �Progra ID ID CERTIFICATIONS: Submitted for City Manager's Office by_ Originating Department Head: Additional Information Contact: Budget Year Reference # moun (Chartfield 2) Fernando Costa (6122) Chris Harder (5020) Walter Norwood (5026) ATTACHMENTS 1. 60ESIDE CASTIRONWMREPLACE - LAN.docx (CFW Internal) 2. 60ESIDE CASTIRONWMREPLACE-LAN Compliance Memo.pdf (CFW Internal) 3. 60ESIDE CASTIRONWMREPLACE-LAN FID Table (WCF 03.22.24).xlsx (CFW Internal) 4. 60ESIDE CASTIRONWMREPLACE-LAN Form 1295.pdf (CFW Internal) 5. 60ESIDE CASTIRONWMREPLACE-LAN MAP (1)_pdf (Public) 6. 60ESIDE CASTIRONWMREPLACE-LAN MAP 2.pdf (Public) 7. 60ESIDE CASTIRONWMREPLACE-LAN MAP 3.pdf (Public) 8. 60ESIDE CASTIRONWMREPLACE-LAN MAP 4.pdf (Public) 9. 60WSSC19WSMLA1-LAN SAM.pdf (CFW Internal) 10. ORD.APP 60ESIDE CASTIRONWMREPLACE - LAN 56002 A024(r2)_(1).docx (Public) 11. PBS CPN 105069.pdf (CFW Internal) 60ESIDE CASTIRONWMREPLACE-LAN FID TableRec #FundDept #AccountProject IDActivityBudget YearCF 2Program Amount PurposeXfer256002 0600430 4956001 105069 2024 $1,893,314.00256002 0600430 105069 2024 $1,893,314.00256002 0700430 4956001 105069 2024 $65,585.00256002 0700430 105069 2024 $65,585.00Rec #FundDept #AccountProject IDActivityBudget YearCF 2Program Amount PurposeXfer256002 0600430 4956001 UNSPEC UNSPEC 9999 $1,893,314.00256002 0600430 4956001 105069 001730 9999($1,893,314.00)2 56002 0600430 4956001 UNSPEC UNSPEC 9999 $65,585.00 2 56002 0700430 4956001 105069 0017309999($65,585.00)Rec #FundDept #AccountProject IDActivityBudget YearCF 2Program Amount PurposeXfer256002 0600430 4956001 105069 001730 9999($1,893,314.00)256002 0600430 5110101 105069 001730 9999 $258,188.00 Water Staff Cost256002 0600430 5550102 105069 001730 9999 $4,000.00 Public Outreach156002 0600430 5330500 105069 001730 9999 $1,422,588.00 Contract256002 0600430 5710010 105069 001740 9999$60,000.00 Easement Acquisition256002 0600430 5110101 105069 001740 9999 $10,000.00 Easement Acquisition256002 0600430 5330500 105069 001740 9999 $5,000.00 Easement Acquisition256002 0600430 5740010 105069 001780 9999 $5,000.00 Easement Acquisition256002 0600430 5310350 105069 001770 9999 $4,000.00 Utility Coordination256002 0600430 5330500 105069 001784 9999 $100,238.00 Soil Lab Consultant256002 0600430 5310350 105069 001784 9999 $24,300.00 Soil Lab TPW Staff256002 0700430 4956001 105069 001730 9999($65,585.00)256002 0700430 5110101 105069 001730 9999 $18,900.00 Water Staff Cost156002 0700430 5330500 105069 001730 9999$25,685.00 Contract256002 0700430 5710010 105069 001740 9999$10,000.00 Easement Acquisition256002 0700430 5110101 105069 001740 9999 $5,000.00 Easement Acquisition256002 0700430 5330500 105069 001740 9999 $2,500.00 Easement AcquisitionFIDs (Budget)FIDs (Actual)FIDs (REVENUE or EXPENSE - No KK or GL Entries Needed) 256002 0700430 5740010 105069 001780 9999 $2,500.00 Easement Acquisition256002 0700430 5310350 105069 001770 9999 $1,000.00 Utility Coordination56002 2060000 105069 RETAIN Retainage Combo Code