Loading...
HomeMy WebLinkAboutContract 58528-CO7CSC No. 58528-007 FORT WORTH City of Fort Worth . s Change Order Request Project Name: I Sanitary Sewer Rehabilitation Contract 98 I City Sec No.: 58528 ProjectNo.(s):56002-0600430-0700430-0200430-5740010 M&C: 1 22-0288 City Proj. No.: CO2719 Project Description:) Water, sanitary sewer, and paving Improvements in the Northside Neighborhood. Contractor: Woody Contractors, Inc. ChangeOrder# 7 I Dale: 5/24/2024 I City Project Mgr.1 Suzy Abbe City Inspector: Charles Hayes Phone Number:) 817-392-8209 Phone Number] 682-213-0240 Dept. Water Sewer Paving Totals Contract Time (Calender days) Original Contract Amount $3,043,559.00 $3,253,980.00 $957,884.25 $7,255,423.25 550 Extras to Date $6,200.00 $8,431.05 $0.00 $14,631.05 030 Credits to Date $18,950.00 $18,950.00 Pending Change Orders (in M&C Process) I Contract Cost to Date $3,030,809.00 $3,262,411.05 $957,884.25 $7,251,104.30 580 Amount of Proposed Change Order $0.00 $0,00 $0,00 $0.00 evised Contract Amount $3,030,809.00 $3,262,411.05 $957,884.25 $7.251,104.30 580 Original Funds Available for Change Orders $121,742.00 $130,159.00 $57,473.00 $309,374.00 Remaining Funds Available for this CO $121,742.00 $121,727.95 $57,473.00 $300,942.95 Additional Funding (if necessary) ; CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.06% MAXALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%) 1$9,069',279.06 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No. 7 provides for: • 7-inch surface milling and 7-inch asphalt to match existing paving at the intersection of 25th Street and Ross Avenue and a credit for the 11-inch pulverization, 8-inch lime stabilization, and 3-inches of asphalt that were originally planned for the intersection. • Removal of the existing liner which is in poor condition and re -lining two manholes at the intersection of 25th Street and Ross Avenue that included a major manhole adjustment. • Reinforced concrete riprap for slope stabilization around two manholes that were replaced near a drainage structure at the dead end of NE 20th Street. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name I Contrfor Name I C,prltractor Signature I Date Wood Contractors, Inc. Tro / S"• �(� Inspector Director ]ter Dept) t Senior Assistant City Attorne M&C Number I N/A ' Date -! Project M 5/28/24 � _7, Date Construction Supervisor (TPW Dept) Jun 7, 2024 7i-oy C76vYo(hel Date Assistant City Manager J u n 10, 2024 Council Action (If Required) M&C Date Approved L N/A Date 5/30/2024 Date 5-30-24 Date Jun 10, 2024 j OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORT WORTH City of Fort Worth �-V'-- Change Order Additions Project Name LSanitary Sewer Rehabilitation Contract 98 City Sec No.: I 2U8 Project No.(s): 56002-0600430-0700430-0200430-5740010 J DOE No.1 22-088q City Proj. No.: I CO2719 Project Water, sanitary sewer, and paving Improvements in the Northside Neighborhood. Description Contractor Woody Contractors, Inc. Change Order: �J Date: 1 5/24/2024 1 City Project Mgr. I Suzy Abbe I City Inspector I Charles Hayes ADDITIONS ITEM uESC6:iP I JUN DEPT Qtv Unit Unit Cost Total 104 7" Milling Water 91.50 SY $21.35 $1,953.53 105 7" HMAC Pavement Water 91.50 SY $49.05 $4,488.08 104 7" Milling Sewer 91.50 SY $21.35 $1,953.53 105 7" HMAC Pavement Sewer 91.50 SY $49.05 $4,488.08 106 Remove and Replace Existing Epoxy Liner on Manhole Sewer 11.00 VF $765.00 $8,415.00 107 Concrete Riprap Sewer 45.00 SY $220.00 $9,900.00 29 7" Milling Paving 183.00 SY $21.35 $3,907.05 30 7" HMAC Pavement Paving 183.00 SY $49.05 $8,976.15 Water $6,441.60 Sewer $24,756.60 Paving $12, 883.20 lAdditions Sub Total $44,081.40 Page 1 of 1 FORT WORTH City of Fort Worth Change Order Deletions Project Name Sai tay S ever R etabilitati a Contract 98 I City Sec No.: 58528 Project No.(s): 56002-0600430-0700430-0200430-5740010 DOE No. M 22-081 City Proj. No.: CO2719 Project Description I Water, sanitary sewer, and paving Improvements in the Northside Neighborhood. Contractor Woody Contractors, Inc. i Change Order: F7 Date City Project Mgr. Suzy Abbe I City Inspector: I Charles Hayes DELETIONS 5/24/2024 I� I ITEM DESCRIPTION DEPT Qty Unit Unit Cost 78 11" Pavement Pulverization (50/50) 79 8" Cem-Lime Stabilization @ 32 Ibs (50/50) 81 3" Surface Course Asphalt Type D (50/50) 72 11" Pavement Pulverization (50/50) 73 8" Cem-Lime Stabilization @ 32 Ibs (50/50) 75 3" Surface Course Asphalt Type D (50/50) 13 11" Pavement Pulverization (50/50) 14 8" Cem-Lime Stabilization @ 32 Ibs (50/50) 16 3" Surface Course Asphalt Type D (50/50) 96 Construction Allowance 93 Construction Allowance 28 Construction Allowance Water Water Water Sewer Sewer Sewer Paving Paving Paving Water Sewer Paving Page 1 of 1 91.50 SY 1.46 TN 91.50 SY 91.50 SY 1.46 TN 91.50 SY 183.00 SY 2.93 TN 183.00 SY 0.026802 LS 0.139968 LS 0.107154 LS $12.30 $270.00 $24.50 $12.30 $270.00 $24.50 $12.30 $270.00 $24.50 $100,000.00 $150,000.00 $50,000.00 Water Sewer Paving Deletions Sub Total Total $1,125.45 $394.20 $2,241.75 $1,125.45 $394.20 $2, 241.75 $2,250.90 $791.10 $4,483.50 $2,680.20 $20,995.20 $5,357.70 $6,441.60 $24,756.60 $12,883.20 $44,081.40 MMBE Breakdown for this Change Order ... . ......... IP .... I`1Total RItINNW' Previous Change Orders IM Y") VIM. AM, N Total I P. Page 1 of 1 5/6/2024 CPN CO2719 Sanitary Sewer Rehabilitation Contract 98 Change Reauest 7 Notes The intersection at 25th and Ross Avenue had 7" of asphalt over a concrete base. The contractor proposed removingthe existing asphalt and replacing with 7" of asphalt, and the TPW inspector agreed with the recommendation. Change Order No. 7 provides a credit for the 11" pulverization, 8" of cem- lime stabilization, and 3" of asphalt that was originally planned for the intersection and adds the cost of 7" surface milling and 7" of asphalt. Recent bid prices for 2"-3" surface milling vary from $8 to $10/SY.1 The proposed price for milling a 7" depth $21.35/SY is comparable to recent bid prices when adjusted for the additional 4"-5" of depth. The proposed price for the 7" asphalt is comparable to the project bid price of$24.50/SYfor3" asphalt when adjusted forthe additional 4" depth. Two major manhole adjustments were made at the intersection of 25th and Ross Avenue. The manholes are lined, the existing liner is in poor condition, and the new cones were unlined. Change Order No. 7 includes removal of the existing liner and lining the manhole for a combined cost of $765/VF. The project bid price for liner installation manhole is $450/VF. Recent bid prices for liner removal ranged from $467.80-$500/VF.2 The proposed price is reasonable. Concrete placed for slope stabilization was removed during the replacement of the pipe and a manhole at the drainage area at the dead end of 201 Street. A second manhole was in a sloped area near the drainage channel. Change Order No. 7 provides for approximately 45 SY of 6" reinforced concrete riprap with a tow around the perimeter for slope stabilization for two manholes on MB at the dead end of NE 20th Street. The proposed price of $220/SY is in line with the bid price for concrete pavement repair $230/SY. 1 Bid tabulations for Historic Southside Paving, Water, Sewer, and Storm Improvements, CPN 102932 and TAMU FW Law & Education Building Utility Improvements, CPN 104855. 1 Bid Tabulations for 2024 Miscellaneous Sanitary Sewer Manhole Repair Contract, CPN 105359. Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Suzanne Abbe Name of Employee Senior Engineer, Capital Project Delivery Title FORt��d ATTEST: °ono a=c° CTV Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX