HomeMy WebLinkAboutContract 58528-CO7CSC No. 58528-007
FORT WORTH City of Fort Worth
. s Change Order Request
Project Name: I Sanitary Sewer Rehabilitation Contract 98 I City Sec No.: 58528
ProjectNo.(s):56002-0600430-0700430-0200430-5740010 M&C: 1 22-0288 City
Proj. No.: CO2719
Project Description:) Water, sanitary sewer, and paving Improvements in the Northside Neighborhood.
Contractor: Woody Contractors, Inc. ChangeOrder# 7
I Dale:
5/24/2024 I
City Project Mgr.1 Suzy Abbe City Inspector: Charles
Hayes
Phone Number:) 817-392-8209 Phone Number] 682-213-0240
Dept. Water Sewer Paving
Totals
Contract Time
(Calender days)
Original Contract Amount $3,043,559.00 $3,253,980.00 $957,884.25
$7,255,423.25
550
Extras to Date $6,200.00 $8,431.05 $0.00
$14,631.05
030
Credits to Date $18,950.00
$18,950.00
Pending Change Orders (in M&C Process) I
Contract Cost to Date $3,030,809.00 $3,262,411.05 $957,884.25
$7,251,104.30
580
Amount of Proposed Change Order $0.00 $0,00 $0,00
$0.00
evised Contract Amount $3,030,809.00 $3,262,411.05 $957,884.25
$7.251,104.30
580
Original Funds Available for Change Orders $121,742.00 $130,159.00 $57,473.00
$309,374.00
Remaining Funds Available for this CO $121,742.00 $121,727.95 $57,473.00
$300,942.95
Additional Funding (if necessary)
;
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
0.06%
MAXALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%)
1$9,069',279.06
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Change Order No. 7 provides for:
• 7-inch surface milling and 7-inch asphalt to match existing paving at the intersection of 25th Street and Ross Avenue and a credit for the
11-inch pulverization, 8-inch lime stabilization, and 3-inches of asphalt that were originally planned for the intersection.
• Removal of the existing liner which is in poor condition and re -lining two manholes at the intersection of 25th Street and Ross Avenue that
included a major manhole adjustment.
• Reinforced concrete riprap for slope stabilization around two manholes that were replaced near a drainage structure at the dead end of NE
20th Street.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's Company Name I Contrfor Name I C,prltractor Signature I Date
Wood Contractors, Inc. Tro / S"• �(�
Inspector
Director ]ter Dept) t
Senior Assistant City Attorne
M&C Number I N/A
'
Date
-!
Project M
5/28/24
� _7,
Date
Construction Supervisor (TPW Dept)
Jun 7, 2024
7i-oy C76vYo(hel
Date
Assistant City Manager
J u n 10, 2024
Council Action
(If Required)
M&C Date Approved L N/A
Date
5/30/2024
Date
5-30-24
Date
Jun 10, 2024
j
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
�-V'-- Change Order Additions
Project Name LSanitary Sewer Rehabilitation Contract 98 City Sec No.: I 2U8
Project No.(s): 56002-0600430-0700430-0200430-5740010 J DOE No.1 22-088q City Proj. No.: I CO2719
Project Water, sanitary sewer, and paving Improvements in the Northside Neighborhood.
Description
Contractor Woody Contractors, Inc. Change Order: �J Date: 1 5/24/2024 1
City Project Mgr. I Suzy Abbe I City Inspector I Charles Hayes
ADDITIONS
ITEM
uESC6:iP I JUN
DEPT
Qtv Unit
Unit Cost
Total
104
7" Milling
Water
91.50 SY
$21.35
$1,953.53
105
7" HMAC Pavement
Water
91.50 SY
$49.05
$4,488.08
104
7" Milling
Sewer
91.50 SY
$21.35
$1,953.53
105
7" HMAC Pavement
Sewer
91.50 SY
$49.05
$4,488.08
106
Remove and Replace Existing Epoxy Liner on Manhole
Sewer
11.00 VF
$765.00
$8,415.00
107
Concrete Riprap
Sewer
45.00 SY
$220.00
$9,900.00
29
7" Milling
Paving
183.00 SY
$21.35
$3,907.05
30
7" HMAC Pavement
Paving
183.00 SY
$49.05
$8,976.15
Water
$6,441.60
Sewer
$24,756.60
Paving
$12, 883.20
lAdditions Sub Total
$44,081.40
Page 1 of 1
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name Sai tay S ever R etabilitati a Contract 98 I City Sec No.: 58528
Project No.(s): 56002-0600430-0700430-0200430-5740010 DOE No. M 22-081 City Proj. No.: CO2719
Project Description I Water, sanitary sewer, and paving Improvements in the Northside Neighborhood.
Contractor Woody Contractors, Inc. i Change Order: F7 Date
City Project Mgr. Suzy Abbe I City Inspector: I Charles Hayes
DELETIONS
5/24/2024 I�
I
ITEM DESCRIPTION DEPT Qty Unit Unit Cost
78 11" Pavement Pulverization (50/50)
79 8" Cem-Lime Stabilization @ 32 Ibs (50/50)
81 3" Surface Course Asphalt Type D (50/50)
72 11" Pavement Pulverization (50/50)
73 8" Cem-Lime Stabilization @ 32 Ibs (50/50)
75 3" Surface Course Asphalt Type D (50/50)
13 11" Pavement Pulverization (50/50)
14 8" Cem-Lime Stabilization @ 32 Ibs (50/50)
16 3" Surface Course Asphalt Type D (50/50)
96 Construction Allowance
93 Construction Allowance
28 Construction Allowance
Water
Water
Water
Sewer
Sewer
Sewer
Paving
Paving
Paving
Water
Sewer
Paving
Page 1 of 1
91.50 SY
1.46 TN
91.50 SY
91.50 SY
1.46 TN
91.50 SY
183.00 SY
2.93 TN
183.00 SY
0.026802 LS
0.139968 LS
0.107154 LS
$12.30
$270.00
$24.50
$12.30
$270.00
$24.50
$12.30
$270.00
$24.50
$100,000.00
$150,000.00
$50,000.00
Water
Sewer
Paving
Deletions Sub Total
Total
$1,125.45
$394.20
$2,241.75
$1,125.45
$394.20
$2, 241.75
$2,250.90
$791.10
$4,483.50
$2,680.20
$20,995.20
$5,357.70
$6,441.60
$24,756.60
$12,883.20
$44,081.40
MMBE Breakdown for this Change Order
... . ......... IP ....
I`1Total RItINNW'
Previous Change Orders
IM
Y")
VIM.
AM,
N
Total I P.
Page 1 of 1
5/6/2024
CPN CO2719
Sanitary Sewer Rehabilitation Contract 98
Change Reauest 7 Notes
The intersection at 25th and Ross Avenue had 7" of asphalt over a concrete base. The contractor
proposed removingthe existing asphalt and replacing with 7" of asphalt, and the TPW inspector agreed
with the recommendation. Change Order No. 7 provides a credit for the 11" pulverization, 8" of cem-
lime stabilization, and 3" of asphalt that was originally planned for the intersection and adds the cost of
7" surface milling and 7" of asphalt. Recent bid prices for 2"-3" surface milling vary from $8 to $10/SY.1
The proposed price for milling a 7" depth $21.35/SY is comparable to recent bid prices when adjusted
for the additional 4"-5" of depth. The proposed price for the 7" asphalt is comparable to the project bid
price of$24.50/SYfor3" asphalt when adjusted forthe additional 4" depth.
Two major manhole adjustments were made at the intersection of 25th and Ross Avenue. The manholes
are lined, the existing liner is in poor condition, and the new cones were unlined. Change Order No. 7
includes removal of the existing liner and lining the manhole for a combined cost of $765/VF. The
project bid price for liner installation manhole is $450/VF. Recent bid prices for liner removal ranged
from $467.80-$500/VF.2 The proposed price is reasonable.
Concrete placed for slope stabilization was removed during the replacement of the pipe and a manhole
at the drainage area at the dead end of 201 Street. A second manhole was in a sloped area near the
drainage channel. Change Order No. 7 provides for approximately 45 SY of 6" reinforced concrete riprap
with a tow around the perimeter for slope stabilization for two manholes on MB at the dead end of NE
20th Street. The proposed price of $220/SY is in line with the bid price for concrete pavement repair
$230/SY.
1 Bid tabulations for Historic Southside Paving, Water, Sewer, and Storm Improvements, CPN 102932 and TAMU
FW Law & Education Building Utility Improvements, CPN 104855.
1 Bid Tabulations for 2024 Miscellaneous Sanitary Sewer Manhole Repair Contract, CPN 105359.
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Suzanne Abbe
Name of Employee
Senior Engineer, Capital Project Delivery
Title
FORt��d
ATTEST:
°ono a=c°
CTV
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX