Loading...
HomeMy WebLinkAboutContract 59067-CO1CSC No. 59067-COI FORT WORTH City of Fort Worth Change Order Request Project Name I Westside III - Phase 1 - 42" Water Transmission Main City Sec No. 59067 Project No.(s)I 56021-0600430-5740010-1480 1 DOE No. N/A City Proj. No. 102688-1 Westside 3 - Phase 1 - 42 Inch Dia. Water Transmission Main, Westside Water Treatment Plant to Ground Storage Tank Project Description:) at 1-20 (Markum Ranch) Contractor: I Thalle Construction Co„ Inc. Change Order: 1 Date: 6/4/2024 City Project Mgr.1 Walter Norwood City Inspector: Carmen Drake Phone Number: 817-392-5026 Phone Number: (817) 392-8347 Dept. Water Contract Time Totals (Calender days) Original Contract Amount $19,873,823.75 $19,873,823.75 550 Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $19,873,823.75 $19,873,823.75 650 Amount of Proposed Change Order $14,981.85 $14,981.85 -060 Revised Contract Amount $19,888,805.60 $19,888,805.60 610 Original Funds Available for Change Orders $347,792.00 $347,792.00 Remaining Funds Available for this CO $347,792.00 $347,792.00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.08% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $24,842,279.69 STlF - , Change Order No.1 provides for additonal tunneling to cross beneath a 24 inch dia. gas transmission main and relocation of Oncor pole. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. tonal 1220 days is provide dot ocmplete t Contractor Name. Contractor Signature Date Thalle Construction Co., Inc. John Zupan I (; 04.X02 Inspector 42 Director (Water Dept) Senior Assistant City Attorney �C Black (J,n 1G, 20241zs1CDT) M&C Number Project Manager Date _,&Dat4l Date Cons ction Supervisor f Wate�Dept) Date Jun 6, 2024 Date Assistant City`Manager Date J u n 10, 2024 Jun 10, 2024 i bouncil Action If Required) ! M&C Date Appl NIA OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FU RT WORTH City of Fort Worth Change Order Additions Project Name Westside III - Phase 1 - 42" Water Transmission Main City Sec No. 1 59067 Project No.(s) 56021-0600430-5740010-1480 DOE No. NIA City Proj. No. 1 102688-1 Project I Westside 3 - Phase 1 - 42 Inch Dia. Water Transmission Main, Westside Water Treatment Plant to Ground Storage Tank at � Description 1.20 (Markum Ranch) Contractor Thalle Construction Co., Inc. Change Order: F-T-] Date: 1 6/3/2024 City Project Mgr. Walter Norwood City Inspector I Carmen Drake ADDITIONS I I UVI Uhb(;KIN I IUN DEPT Q Unit Unit Cost -j Total 0.00 8 42" Water Carrier Pipe Water 5LF $500.00 $25,000.00 9 66" casing/Tunnel liner Plate By Other Than Open Cut Water 50.00 LF $3,000,00 $150,000.00 53 Relocate Power Pole Water 1.00 LS $6,981.85 $6,981.85 Water - $181,981.85 Page 1 of 1 {Additions Sub -Total $181,981.85 FQRr Wc11111T'H City of Fort Worth —�A6_— Change Order Deletions Project Name I Westside III - Phase 1 - 42" Water Transmission Main City Sec No. 59067 Project No.(s) I 56021-0600430-5740010-1480 1 DOE No. I NIA City Proj. No. 102688-1 Project Description Westside 3 - Phase 1 - 42 Inch Dia. Water Transmission Main, Westside Water Treatment Plant to Ground Storage Tank at 1-20 (Markum Ranch) Contractor Thalle Construction Co., Inc. Change Order: 0 Date 6/3/2024 City Project Mgr. Walter Norwood I City Inspector I Carmen Drake ITEM DESCRIPTION 2B 42" Steel AWWA C200 Water Pipe, CSS Backfill 52 Construction Allowance DELETIONS DEPT Qty Unit Unit Cost Total Water 50.00 LF $550.00 $27,500.00 Water 0.93 LS $150,000.00 $139,500.00 Page 1 of 1 'Water $167,000.00 Deletions Sub Total .$167,000.00 MMBE Breakdown for this Change Order r 'W, Typ e Total i1txYii.;;''stNhr':i..E..�k:.y.Y:�= Previous Change Orders M 4 Total Page 1 of 1 6/4/2024 Westside III — Phase 1 -42" Water Transmission Main CSC: 59067 CPN: 102688-1 Change Order 1 Notes Staff has reviewed the requested prices and considers them to be fair and reasonable. Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Walter Norwood Name of Employee Project Manager Title dp4Up� p� �FORt°D�pO ATTEST: -o Pva °=d Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX