HomeMy WebLinkAboutContract 59067-CO1CSC No. 59067-COI
FORT WORTH City of Fort Worth
Change Order Request
Project Name I Westside III - Phase 1 - 42" Water Transmission Main
City Sec No. 59067
Project No.(s)I 56021-0600430-5740010-1480 1 DOE No. N/A
City Proj. No. 102688-1
Westside 3 - Phase 1 - 42 Inch Dia. Water Transmission Main, Westside Water Treatment Plant to Ground Storage Tank
Project Description:)
at 1-20 (Markum Ranch)
Contractor: I Thalle Construction Co„ Inc. Change Order:
1 Date: 6/4/2024
City Project Mgr.1 Walter Norwood City Inspector: Carmen Drake
Phone Number: 817-392-5026 Phone Number: (817) 392-8347
Dept. Water
Contract Time
Totals
(Calender days)
Original Contract Amount $19,873,823.75
$19,873,823.75 550
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $19,873,823.75
$19,873,823.75 650
Amount of Proposed Change Order $14,981.85
$14,981.85 -060
Revised Contract Amount $19,888,805.60
$19,888,805.60 610
Original Funds Available for Change Orders $347,792.00
$347,792.00
Remaining Funds Available for this CO $347,792.00
$347,792.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
0.08%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%)
$24,842,279.69
STlF - ,
Change Order No.1 provides for additonal tunneling to cross beneath a 24 inch dia. gas transmission main
and relocation of Oncor pole.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
tonal 1220 days is provide dot ocmplete t Contractor Name. Contractor Signature Date
Thalle Construction Co., Inc. John Zupan I (; 04.X02
Inspector
42
Director (Water Dept)
Senior Assistant City Attorney
�C Black (J,n 1G, 20241zs1CDT)
M&C Number
Project Manager
Date
_,&Dat4l
Date
Cons ction Supervisor f Wate�Dept)
Date
Jun 6, 2024
Date
Assistant City`Manager
Date
J u n 10, 2024
Jun 10, 2024 i
bouncil Action If Required)
!
M&C Date Appl NIA
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FU RT WORTH City of Fort Worth
Change Order Additions
Project Name Westside III - Phase 1 - 42" Water Transmission Main City Sec No. 1 59067
Project No.(s) 56021-0600430-5740010-1480 DOE No. NIA City Proj. No. 1 102688-1
Project I Westside 3 - Phase 1 - 42 Inch Dia. Water Transmission Main, Westside Water Treatment Plant to Ground Storage Tank at
�
Description 1.20 (Markum Ranch)
Contractor Thalle Construction Co., Inc. Change Order: F-T-] Date: 1 6/3/2024
City Project Mgr. Walter Norwood City Inspector I Carmen Drake
ADDITIONS
I I UVI Uhb(;KIN I IUN DEPT Q Unit Unit Cost -j Total
0.00
8 42" Water Carrier Pipe Water 5LF $500.00 $25,000.00
9 66" casing/Tunnel liner Plate By Other Than Open Cut Water 50.00 LF $3,000,00 $150,000.00
53 Relocate Power Pole Water 1.00 LS $6,981.85 $6,981.85
Water - $181,981.85
Page 1 of 1 {Additions Sub -Total $181,981.85
FQRr Wc11111T'H City of Fort Worth
—�A6_— Change Order Deletions
Project Name I Westside III - Phase 1 - 42" Water Transmission Main City Sec No. 59067
Project No.(s) I 56021-0600430-5740010-1480 1 DOE No. I NIA City Proj. No. 102688-1
Project Description Westside 3 - Phase 1 - 42 Inch Dia. Water Transmission Main, Westside Water Treatment Plant to Ground Storage
Tank at 1-20 (Markum Ranch)
Contractor Thalle Construction Co., Inc. Change Order: 0 Date 6/3/2024
City Project Mgr. Walter Norwood I City Inspector I Carmen Drake
ITEM DESCRIPTION
2B 42" Steel AWWA C200 Water Pipe, CSS Backfill
52 Construction Allowance
DELETIONS
DEPT Qty Unit Unit Cost Total
Water 50.00 LF $550.00 $27,500.00
Water 0.93 LS $150,000.00 $139,500.00
Page 1 of 1
'Water $167,000.00
Deletions Sub Total .$167,000.00
MMBE Breakdown for this Change Order
r
'W, Typ e
Total
i1txYii.;;''stNhr':i..E..�k:.y.Y:�=
Previous Change Orders
M 4
Total
Page 1 of 1
6/4/2024
Westside III — Phase 1 -42" Water Transmission Main
CSC: 59067
CPN: 102688-1
Change Order 1 Notes
Staff has reviewed the requested prices and considers them to be fair and reasonable.
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Walter Norwood
Name of Employee
Project Manager
Title
dp4Up�
p� �FORt°D�pO
ATTEST: -o
Pva °=d
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX