Loading...
HomeMy WebLinkAboutContract 61113-CO1CSC No. 61113-CO1 FoR-a- w0p.-F14 City of Fort worth Change Order Request Project Name] Water & Sanitary Sewer Replacement on Camp Bowie Part 2 City Sec No.: 1 61113 Project No.(s):l 56002-0600.5740010-001780 I DOE No. I N/A City Proj. No.:1 105062 Project Description: 30-inch Waterline replacement on Camp Bowie (Montgomery to Clifton) William J. Schultz Inc, dba Circle C Construction Contractor: Company City Project Mgr, J Preeti KC Phone Numbed (817) 392-5467 Change Order # 1 1 1 Date: 1 5130/2024 City Inspector; I John Robinson Phone Number) (817) 392-8452 Dept, Water Sewer TPW Totals Contract Time (Callender days) Original Contract Amount $1,280,205.00 $1,28045.00 120 Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $1,280,205.00 $1,280,205.00 120 Amount of Proposed Change Order $691940.00 69,940.00 Revised ContractAmount 51,350,145.00 $1,150,1145.00 120 Original Funds Available for Change Orders $64,010.00 w,010.00 Remaining Funds Available for this CO S64,010.00 $fi4,010.00 Additional Funding (if necessary) $5,930.00 $5,930.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 5.46% MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) �-1,600,256.25 JUSTIFICATIM(REASONS) FOR CHANGE ORDER Change Order No. 1 will provide for the followings: • Additional quantities of select backfill due to unsuitable existing backfill material that was encountered during construction. • Increased quantities of 36-inch C303 pipe in 60-inch tunnel liner plate BOTC to achieve minimum cover at a future connection point. • 30-inch DIP in lieu of 36-inch C303 pipe to facilitate easier connection for a future phase of the project. • Additional pay item quantity of brick pavement to accomodate the extra pipe footage, i It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. CohVectat's Comm Name Corttraetcx Name r Contractor Signature Date Willam J. Schultz Inc. dba Circle C Consbudan Company Ted Skelly / Date Protect Man! Date , /GJ?� �GIZddKi �/4/�4 %o l 5 ho o .. w of" pree j KCu ELZq Dire (Water Dept) Data Conq elf Da d Jun 6.2024 , � � 5���`G Soft Assistant City Attomey Date sflamt City Manager bate I Jun 10, 2024 ,—ter-' J un 10, 2024 Council Aethm (It Requiotell M&C Number NIA M&C Date Approved NIA OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX I-PoR-r City of Fort worth Change Order Additions Project Name ( Water & Sanitary Sewer Replacement on Camp Bowie Part 2 City Sec No.: 1 61113 Project No.(s): 56002-0600-5740010-001780 1 DOE No.1 N/A City Proj. No.: 1 105062 Project ( 30-inch Water line replacement on Camp Bowie (Montgomery to Clifton) Description Contractor William J. Schultz Inc. dba Circle C Construction Company I Change Order: L J Date: 1 513012024 City Project Mgr. I Preen KC I City Inspector I John Robinson ADDITIONS 11 kM Ut GKll' I IUN 1113 36" Concrete AWWA C303 Water Pipe, (Restrained Joints) 2B 60" Tunnel Liner Plate By Other Than Open Cut 22 12"-18" Tree Removal 33 Select Backfill 34 Extra Brick Removal 35 Extra Brick Installation 36 30" Ductile Iron Pressure Class 150 Pipe 37 Additional grout around gas valve DEPT Qty Unit Unk Cost j Total Water 18.00 LF $625.00 $11,250.00 Water 20.00 LF $1,850.00 $37,000.00 Water 1.00 EA $2,500.00 $2,500.00 Water 1,000.00 CY $55.00 $55,000.00 Water 840.00 SF $26.00 $21,840.00 Water 840.00 SF $5.00 $4,200.00 Water 38.00 LF $800.00 $30,400.00 Water 20.00 LF $75.00 $1,500.00 Water $163,690.00 Sewer TPW Page 1 of'! Additions Sub Total 1F'"—n-r W"it7>t'tvm City of Fort Worth Change Order Deletions Project Name Water & Sanitary Sewer Replacement on Camp Bowie Part 2 City Sec No.: + 61113 Project No.(s): 56002-0600-5740010-001180 ( DOE No. I N/A City Proj. No.: 105062 Project Description I 30-inch Water line replacement on Camp Bowie (Montgomery to Clifton) 1 YYlllldlll J. Vlrllu'V- Illti, uua VII%4t; 1. l.iullzlll Ul.lull 1 Contractor � ,,, � Change Order: M Date l 5130l2024 City Project Mgr. I Preeti KC I City Inspector: I John Robinson DELETIONS ITEM DESCRIPTION DEPT taty Unit Unit Coat Total 113 36" Concrete AWWA C303 Water Pipe, (Restrained Joints) Water 38.00 LF $625.00 $23,750.00 32 Water Construction Allowance Water 1.00 LS $70,000.00 $70,000.00 Page 1 of 1 Water $93,750.00 Sewer TPW Deletions Sub Total $93,750.00 MWBE Sub co # MWWBE Breakdown for this Change Order Type of Service ,, Amount for this CO Total Previous Change Orders DATE I AMOUNT, Total Page 1 of 1 $0.00 $0.00 5/30/2024 Water & Sanitary Sewer Replacement on Camp Bowie Part 2 CSC: 61113 CPN:105062 Change Order 1 Notes Staff has reviewed the requested prices and considers them to be fair and reasonable. Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Preeti KC Name of Employee Sr. Professional Engineer Title 44444p4IlIl �poF �ORTw$ ° pd ATTEST: °°° ddnn R�A6 4p4d Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX