Loading...
HomeMy WebLinkAboutContract 61533City Secretary Contract No. 61533 FORTWORTH. 4* VENDOR SERVICES AGREEMENT (Information Technology) This Vendor Services Agreement ("Agreement") is made and entered into by and between the City of Fort Worth, a Texas home -rule municipal corporation (the "City" or "Client") and EMA, Inc. a Minnesota corporation ("Vendor"). City and Vendor are each individually referred to herein as a "party" and collectively referred to as the "parties." The term "Vendor" shall include Vendor, its officers, agents, employees, representatives, contractors or subcontractors. The term "City" shall include its officers, employees, agents, and representatives. CONTRACT DOCUMENTS: The Contract documents shall include the following: 1. This for Vendor Services Agreement; 2. Exhibit A — Scope Of Work Plus Any Amendments To The Scope Of Work; 3. Exhibit B — Payment Schedule; 4. Exhibit C — Milestone Acceptance Form; 5. Exhibit D — Network Access Agreement; and 6. Exhibit E — Signature Verification Form All Exhibits attached hereto are incorporated herein and made a part of this Agreement for all purposes. In the event of any conflict between the documents, the terms and conditions of this Agreement shall control. The term "Vendor" or "Contractor" shall include the Vendor or Contractor, and its officers, agents, employees, representatives, servants, contractors or subcontractors. The term "City" shall include its officers, employees, agents, and representatives. 1. Scone of Services. Vendor hereby agrees, with good faith and due diligence, to provide the City with a needs assessment and assistance in the development of the RFP specifications for the Water Customer Information System (CIS). Specifically, Vendor will perform all duties outlined and described in the Scope Of Work, which is attached hereto as Exhibit "A" and incorporated herein for all purposes, and further referred to herein as the "Services." Vendor shall perform the Services in accordance with standards in the industry for the same or similar services. hi addition, Vendor shall perform the Services in accordance with all applicable federal, state, and local laws, rules, and regulations. If there is any conflict between this Agreement and Exhibit A, the terms and conditions of this Agreement shall control. 2. Term. This Agreement shall commence upon the date signed by the Assistant City Manager below ("Effective Date") and shall expire five years from the date of commencement with no renewals, or Vendor Services Agreement — Technology (Rev. 8/19) OFFICIAL RECORD Page 1 of 13 CITY SECRETARY FT. WORTH, TX City Secretary Contract No. upon completion of the project ("Expiration Date"), unless terminated earlier in accordance with the provisions of this Agreement or otherwise extended by the parties. 3. Compensation. The City shall pay Vendor an amount not to exceed three hundred eighty-five thousand, one hundred seventy-eight dollars ($385,178.00), for Phase 1 only, in accordance with the provisions of this Agreement and Exhibit `B," Payment Schedule, which is attached hereto and incorporated herein for all purposes. If the Vendor and the City both agree to proceed with Phases 2 and 3 of the project, the contract will be amended to add the additional $800,000.00 as was approved by M&C 24-0235 up to $1,200,000.00. Vendor shall not perform any additional services for the City not specified by this Agreement unless the City requests and approves in writing the additional costs for such services. The City shall not be liable for any additional expenses of Vendor not specified by this Agreement unless the City first approves such expenses in writing. City agrees to pay all invoices of Vendor within thirty (30) days of receipt of such invoice. Vendor may charge interest on late payments not to exceed one percent (1%). 4. Termination. 4.1. Convenience. Either the City or Vendor may terminate this Agreement at any time and for any reason by providing the other party with 30 days written notice of termination. 4.2. Breach. If either party commits a material breach of this Agreement, the non - breaching Party must give written notice to the breaching party that describes the breach in reasonable detail. The breaching party must cure the breach ten (10) calendar days after receipt of notice from the non -breaching party, or other time frame as agreed to by the parties. If the breaching party fails to cure the breach within the stated period of time, the non -breaching party may, in its sole discretion, and without prejudice to any other right under this Agreement, law, or equity, immediately terminate this Agreement by giving written notice to the breaching party. 4.3. Fiscal Funding Out. In the event no funds or insufficient funds are appropriated by the City in any fiscal period for any payments due hereunder, the City will notify Vendor of such occurrence and this Agreement shall terminate on the last day of the fiscal period for which appropriations were received without penalty or expense to the City of any kind whatsoever, except as to the portions of the payments herein agreed upon for which funds have been appropriated. 4.4. Duties and Obligations of the Parties. In the event that this Agreement is terminated prior to the Expiration Date, the City shall pay Vendor for services actually rendered up to the effective date of termination and Vendor shall continue to provide the City with services requested by the City and in accordance with this Agreement up to the effective date of termination. Upon termination of this Agreement for any reason, Vendor shall provide the City with copies of all completed or partially completed documents prepared under this Agreement. In the event Vendor has received access to City information or data as a requirement to perform services hereunder, Vendor shall return all City provided data to the City in a machine-readable format or other format deemed acceptable to the City. 5. Disclosure of Conflicts and Confidential Information. 5.1. Disclosure of Conflicts. Vendor hereby warrants to the City that Vendor has made full disclosure in writing of any existing or potential conflicts of interest related to Vendor's services under this Agreement. In the event that any conflicts of interest arise after the Effective Date of this Agreement, Vendor hereby agrees immediately to make full disclosure to the City in writing. Vendor Services Agreement — Technology (Rev. 8/19) Page 2 of 13 City Secretary Contract No. 5.2. Confidential Information. Vendor, for itself and its officers, agents and employees, agrees that it will treat all information provided to it by City ("City Information") as confidential and will not disclose any such information specifically noted as such to a third party without the prior written approval of City. 5.3. Public Information Act. City is a government entity under the laws of the State of Texas and all documents held or maintained by City are subject to disclosure under the Texas Public Information Act. In the event there is a request for information marked Confidential or Proprietary, City shall promptly notify Seller. It will be the responsibility of Seller to submit reasons objecting to disclosure. A determination on whether such reasons are sufficient will not be decided by City, but by the Office of the Attorney General of the State of Texas or by a court of competent jurisdiction. 5.4. Unauthorized Access. Vendor shall store and maintain City Information in a secure manner and shall not allow unauthorized users to access, modify, delete or otherwise corrupt City Information in any way. Vendor shall notify the City immediately if the security or integrity of any City information has been compromised or is believed to have been compromised, in which event, Vendor shall, in good faith, use all commercially reasonable efforts to cooperate with the City in identifying what information has been accessed by unauthorized means and shall fully cooperate with the City to protect such information from further unauthorized disclosure. Riaht to Audit. 6.1. Vendor agrees that the City shall, until the expiration of three (3) years after final payment under this Agreement, have access to and the right to examine at reasonable times any directly pertinent books, documents, papers and records of the Vendor involving transactions relating to this Agreement at no additional cost to the City. Vendor agrees that the City shall have access during normal working hours to all necessary Vendor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The City shall give Vendor not less than 10 days written notice of any intended audits. 6.2. Vendor further agrees to include in all its subcontractor agreements hereunder a provision to the effect that the subcontractor agrees that the City shall, until expiration of three (3) years after final payment of the subcontract, have access to and the right to examine at reasonable times any directly pertinent books, documents, papers and records of such subcontractor involving transactions related to the subcontract, and further that City shall have access during normal working hours to all subcontractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this paragraph. City shall give subcontractor not less than 10 days written notice of any intended audits. 7. Independent Contractor. It is expressly understood and agreed that Vendor shall operate as an independent contractor as to all rights and privileges granted herein, and not as agent, representative or employee of the City. Subject to and in accordance with the conditions and provisions of this Agreement, Vendor shall have the exclusive right to control the details of its operations and activities and be solely responsible for the acts and omissions of its officers, agents, servants, employees, contractors and subcontractors. Vendor acknowledges that the doctrine of respondeat superior shall not apply as between the City, its officers, agents, servants and employees, and Vendor, its officers, agents, employees, servants, contractors and subcontractors. Vendor further agrees that nothing herein shall be construed as the creation of a partnership or joint enterprise between City and Vendor. It is further understood that the City shall in Vendor Services Agreement — Technology (Rev. 8/19) Page 3 of 13 City Secretary Contract No. no way be considered a Co -employer or a Joint employer of Vendor or any officers, agents, servants, employees or subcontractors of Vendor. Neither Vendor, nor any officers, agents, servants, employees or subcontractors of Vendor shall be entitled to any employment benefits from the City. Vendor shall be responsible and liable for any and all payment and reporting of taxes on behalf of itself, and any of its officers, agents, servants, employees or subcontractors. 8. INDEMNIFICATION. 8.1. INDEMNIFICATION — PROFESSIONAL SERVICES - VENDOR WILL BE LIABLE AND RESPONSIBLE FOR ANY AND ALL PROPERTY LOSS, PROPERTY DAMAGE AND/OR PERSONAL INJURY, INCLUDING DEATH, TO ANY AND ALL PERSONS, OF ANY KIND OR CHARACTER, TO THE EXTENT CAUSED BY THE NEGLIGENT ACT(S) OR OMISSION(S), MALFEASANCE OR INTENTIONAL MISCONDUCT OF VENDOR, ITS OFFICERS, AGENTS, SERVANTS, EMPLOYEES, CONTRACTORS, OR SUBCONTRACTORS FOR WHOM VENDOR IS LEGALLY LIABLE. 8.2. INDEMNIFICATION - OTHER THAN PROFESSIONAL SERVICES - VENDOR HEREBY COVENANTS AND AGREES TO INDEMNIFY, HOLD HARMLESS AND DEFEND CITY, ITS OFFICERS, AGENTS, SERVANTS AND EMPLOYEES, FROM AND AGAINST ANY AND ALL CLAIMS OR LAWSUITS OF ANY KIND OR CHARACTER, FOR EITHER PROPERTY DAMAGE OR LOSS AND/OR PERSONAL INJURY, INCLUDING DEATH, TO ANY AND ALL PERSONS, ARISING OUT OF OR IN CONNECTION WITH THIS AGREEMENT, TO THE EXTENT CAUSED BY THE NEGLIGENT ACTS OR OMISSIONS OR MALFEASANCE OF VENDOR, ITS OFFICERS, AGENTS, SERVANTS, EMPLOYEES, CONTRACTORS, OR SUBCONTRACTORS. 8.3. INTELLECTUAL PROPERTY INFRINGEMENT. Vendor agrees to indemnify City for infringement of any patent, copyright trademark, trade secret, or similar property right arising from City's use of the software and/or documentation in accordance with this Agreement 9. Assisnment and Subcontracting. 9.1. Vendor shall not assign or subcontract any of its duties, obligations or rights under this Agreement without the prior written consent of the City. If the City grants consent to an assignment, the assignee shall execute a written agreement with the City and the Vendor under which the assignee agrees to be bound by the duties and obligations of Vendor under this Agreement. The Vendor and assignee shall be jointly liable for all obligations under this Agreement prior to the assignment. If the City grants consent to a subcontract, the subcontractor shall execute a written agreement with the Vendor referencing this Agreement under which the subcontractor shall agree to be bound by the duties and obligations of the Vendor under this Agreement as such duties and obligations may apply. The Vendor shall provide the City with a fully executed copy of any such subcontract. 10. Insurance. 10.1. The Vendor shall carry the following insurance coverage with a company that is Vendor Services Agreement — Technology (Rev. 8/19) Page 4 of 13 City Secretary Contract No. licensed to do business in Texas or otherwise approved by the City: 10.1.1. Commercial General Liability: 10.1.1.1. Combined limit of not less than $2,000,000 per occurrence; $4,000,000 aggregate; or 10.1.1.2. Combined limit of not less than $1,000,000 per occurrence; $2,000,000 aggregate and Umbrella Coverage in the amount of $4,000,000. Umbrella policy shall contain a follow -form provision and shall include coverage for personal and advertising injury. 10.1.1.3. Defense costs shall be outside the limits of liability. 10.1.2. Automobile Liability Insurance covering any vehicle used in providing services under this Agreement, including owned, non -owned, or hired vehicles, with a combined limit of not less than $1,000,000 per occurrence. 10.1.3. Professional Liability (Errors & Omissions) in the amount of $1,000,000 per claim and $1,000,000 aggregate limit. 10.1.4. Statutory Workers' Compensation and Employers' Liability Insurance requirements per the amount required by statute. 10.1.5. Technology Liability (Errors & Omissions) 10.1.5.1. Combined limit of not less than $2,000,000 per occurrence; $4million aggregate or 10.1.5.2. Combined limit of not less than $1,000,000 per occurrence; $2,000,000 aggregate and Umbrella Coverage in the amount of $4,000,000. Umbrella policy shall contain a follow -form provision and shall include coverage for personal and advertising injury. The umbrella policy shall cover amounts for any claims not covered by the primary Technology Liability policy. Defense costs shall be outside the limits of liability. 10.1.5.3. Coverage shall include, but not be limited to, the following: 10.1.5.3.1. Failure to prevent unauthorized access; 10.1.5.3.2. Unauthorized disclosure of information; 10.1.5.3.3. Implantation of malicious code or computer virus; 10.1.5.3.4. Fraud, Dishonest or Intentional Acts with final adjudication language; 10.1.5.3.5. Intellectual Property Infringement coverage, Vendor Services Agreement — Technology (Rev. 8/19) Page 5 of 13 City Secretary Contract No. specifically including coverage for intellectual property infringement claims and for indemnification and legal defense of any claims of intellectual property infringement, including infringement of patent, copyright, trade mark or trade secret, brought against the City for use of Deliverables, Software or Services provided by Vendor under this Agreement; 10.1.5.3.6. Technology coverage may be provided through an endorsement to the Commercial General Liability (CGL) policy, a separate policy specific to Technology E&O, or an umbrella policy that picks up coverage after primary coverage is exhausted. Either is acceptable if coverage meets all other requirements. Technology coverage shall be written to indicate that legal costs and fees are considered outside of the policy limits and shall not erode limits of liability. Any deductible will be the sole responsibility of the Vendor and may not exceed $50,000 without the written approval of the City. Coverage shall be claims -made, with a retroactive or prior acts date that is on or before the effective date of this Agreement. Coverage shall be maintained for the duration of the contractual agreement and for two (2) years following completion of services provided. An annual certificate of insurance, or a full copy of the policy if requested, shall be submitted to the City to evidence coverage; and 10.1.5.3.7. Any other insurance as reasonably requested by City. 10.2. General Insurance Requirements: 10.2.1. All applicable policies shall name the City as an additional insured thereon, as its interests may appear. The term City shall include its employees, officers, officials, agents, and volunteers in respect to the contracted services. 10.2.2. The workers' compensation policy shall include a Waiver of Subrogation (Right of Recovery) in favor of the City of Fort Worth. 10.2.3. A minimum of Thirty (30) days' notice of cancellation or reduction in limits of coverage by endorsement must be provided to City. Ten (10) days' notice will be acceptable in the event of non-payment of premium. Notice must be sent to the Risk Manager, City of Fort Worth, 200 Texas Street, Fort Worth, Texas 76102, with copies to the Fort Worth City Attorney at the same address. 10.2.4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. All insurers must have a minimum rating of A- VII in the current A.M. Best Key Rating Guide, or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of Risk Management is required. 10.2.5. Any failure on the part of the City to request required insurance documentation shall not constitute a waiver of the insurance requirement. Vendor Services Agreement — Technology (Rev. 8/19) Page 6 of 13 City Secretary Contract No. 10.2.6. Certificates of Insurance evidencing that the Vendor has obtained all required insurance shall be delivered to and approved by the City's Risk Management Division prior to execution of this Agreement. II. Compliance with Laws, Ordinances, Rules and Regulations. Vendor agrees that in the performance of its obligations hereunder, it will exercise the reasonable professional standard of care to comply with all applicable federal, state and local laws, ordinances, rules and regulations and will exercise the reasonable professional standard of care so that any work it produces in connection with this Agreement will also comply with all applicable federal, state and local laws, ordinances, rules and regulations. If City notifies Vendor of any violation of such laws, ordinances, rules or regulations, Vendor must immediately desist from and correct the violation. 12. Non -Discrimination Covenant. Vendor, for itself, its personal representatives, assigns, subcontractors and successors in interest, as part of the consideration herein, agrees that in the performance of Vendor's duties and obligations hereunder, it shall not discriminate in the treatment or employment of any individual or group of individuals on any basis prohibited by law. If any claim arises from an alleged violation of this non-discrimination covenant by Vendor, its personal representatives, assigns, subcontractors or successors in interest, Vendor agrees to assume such liability and to indemnify and defend the City and hold the City harmless from such claim. 13. Notices. Notices required pursuant to the provisions of this Agreement shall be conclusively determined to have been delivered when (1) hand -delivered to the other party, its agents, employees, servants or representatives, (2) delivered by facsimile with electronic confirmation of the transmission, or (3) received by the other party by United States Mail, registered, return receipt requested, addressed as follows: TO THE CITY: City of Fort Worth Fernando Costa Attn: Assistant City Manager 200 Texas Street Fort Worth TX 76102 With Copy to the City Attorney at same address TO VENDOR: EMA, Inc. Attn: Michael Moosavi Vice President 2355 Highway 36 West, Suite 200 St. Paul, MN 55113 14. Solicitation of Emplovees. Neither the City nor Vendor shall, during the term of this Agreement and additionally for a period of one year after its termination, solicit for employment or employ, whether as employee or independent contractor, any person who is or has been employed by the other during the term of this Agreement, without the prior written consent of the person's employer. This provision shall not apply to an employee who responds to a general solicitation or advertisement of employment by either party. 15. Governmental Powers. It is understood and agreed that by execution of this Agreement, the City does not waive or surrender any of its governmental powers. 16. No Waiver. The failure of the City or Vendor to insist upon the performance of any term or provision of this Agreement or to exercise any right granted herein shall not constitute a waiver of the City's or Vendor's respective right to insist upon appropriate performance or to assert any such right on any Vendor Services Agreement — Technology (Rev. 8/19) Page 7 of 13 City Secretary Contract No. fixture occasion. 17. Governine Law and Venue. This Agreement shall be construed in accordance with the laws of the State of Texas. If any action, whether real or asserted, at law or in equity, is brought on the basis of this Agreement, venue for such action shall lie in state courts located in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. 18. Severability_ . If any provision of this Agreement is held to be invalid, illegal or unenforceable, the validity, legality and enforceability of the remaining provisions shall not in any way be affected or impaired. 19. Force Maieure. City and Vendor will exercise their best efforts to meet their respective duties and obligations as set forth in this Agreement, but will not be held liable for any delay or omission in performance due to force majeure or other causes beyond their reasonable control, including, but not limited to, compliance with any government law, ordinance, or regulation; acts of God; acts of the public enemy; fires; strikes; lockouts; natural disasters; wars; riots; widespread infectious disease outbreaks including, but not limited to, epidemics or pandemics; government action or inaction; orders of government; material or labor restrictions by any governmental authority; transportation problems; restraints or prohibitions by any court, board, department, commission, or agency of the United States or of any States; civil disturbances; other national or regional emergencies; or any other similar cause not enumerated herein but which is beyond the reasonable control of the Party whose performance is affected (collectively, "Force Majeure Event"). The performance of any such obligation is suspended during the period of, and only to the extent of, such prevention or hindrance, provided the affected Party provides notice of the Force Majeure Event, and an explanation as to how it prevents or hinders the Parry's performance, as soon as reasonably possible after the occurrence of the Force Majeure Event, with the reasonableness of such notice to be determined by the City in its sole discretion. The notice required by this section must be addressed and delivered in accordance with Section 13 of this Agreement. 20. Headings Not Controllins. Headings and titles used in this Agreement are for reference purposes only and shall not be deemed a part of this Agreement. 21. Review of Counsel. The parties acknowledge that each party and its counsel have reviewed this Agreement and that the normal rules of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this Agreement or exhibits hereto. 22. Amendments. No amendment of this Agreement shall be binding upon a party hereto unless such amendment is set forth in a written instrument, and duly executed by an authorized representative of each party. 23. Entirety of Agreement. This Agreement, including any exhibits attached hereto and any documents incorporated herein by reference, contains the entire understanding and agreement between the City and Vendor, their assigns and successors in interest, as to the matters contained herein. Any prior or contemporaneous oral or written agreement is hereby declared null and void to the extent in conflict with any provision of this Agreement. 24. Countemarts. This Agreement may be executed in one or more counterparts and each counterpart shall, for all purposes, be deemed an original, but all such counterparts shall together constitute one and the same instrument. An executed Agreement, modification, amendment, or separate signature page shall constitute a duplicate if it is transmitted through electronic means, such as fax or e-mail, and reflects the signing of the document by any party. Duplicates are valid and binding even if an original paper Vendor Services Agreement — Technology (Rev. 8/19) Page 8 of 13 City Secretary Contract No. document bearing each parry's original signature is not delivered. 25. Standard of Performance. Vendor shall perform its services with the care and skill ordinarily used by members of its profession practicing under similar circumstances at the same time and locality. Vendor shall be responsible for the technical accuracy of its professional services and documents resulting therefrom and City shall not be responsible for discovering deficiencies therein. Vendor shall correct such deficiencies without additional compensation except to the extent such action is directly attributable to deficiencies in City -furnished information. 26. Milestone Acceptance. Vendor shall verify the quality of each deliverable before submitting it to the City for review and approval. The City will review all deliverables to determine their acceptability and signify acceptance by execution of the Milestone Acceptance Form, which is attached hereto as Exhibit "C." If the City rejects the submission, it will notify the Vendor in writing as soon as the determination is made listing the specific reasons for rejection. The Vendor shall have ten (10) days to correct any deficiencies and resubmit the corrected deliverable. Payment to the Vendor shall not be authorized unless the City accepts the deliverable in writing in the form attached. The City's acceptance will not be unreasonably withheld. 27. Time is of the Essence. Time is of the essence in the performance of this Agreement and the services and deliverables to be provided by the Vendor and the City. Both parties agree to deliver the deliverables identified in Exhibit A in accordance with the deadlines and schedule provided therein. Both parties shall diligently and in a timely manner perform all obligations under this Agreement to ensure adherence to the schedule. In the event the Vendor faces any challenges in meeting any milestone or deliverable deadline set forth in Exhibits A and B, the City will notify the Vendor in writing to address the issue. If the Vendor does not resolve the issue within 30 calendar days and communicate the resolution to the City, the City may, at its sole discretion, temporarily withhold payment of the project management fee until the deliverable is provided or an alternative schedule acceptable to both parties is agreed upon in writing. Both parties shall promptly notify each other in writing of any actual or anticipated delays in meeting the milestones or deadlines set forth in Exhibits A and B, including reasons for such delay and any proposed alternative timeline for completion. The City's exercise of its right to temporarily withhold payment of the project management fee pursuant to this provision shall not constitute a waiver of any other rights or remedies available to the City under this Agreement or at law. 28. Network Access. 28.1. Citv Network Access. If Vendor, and/or any of its employees, officers, agents, servants or subcontractors (for purposes of this section "Vendor Personnel"), requires access to the City's computer network in order to provide the services herein, Vendor shall execute and comply with the Network Access Agreement which is attached hereto as Exhibit "D" and incorporated herein for all purposes. 28.2. Federal Law Enforcement Database Access. If Vendor, or any Vendor Personnel, requires access to any federal law enforcement database or any federal criminal history record information system, including but not limited to Fingerprint Identification Records System ("FIRS"), Interstate Identification Index System ("III System"), National Crime Information Center ("NCIC") of National Fingerprint File ("NFF"), or Texas Law Enforcement Telecommunications Systems ("TLETS"), that is governed by and/or defined in Title 28, Code of Federal Regulations Part 20 ("CFR Part 20"), for the purpose of providing services for the administration of criminal justice as defined therein on behalf of the City or the Fort Worth Police Department, under this Agreement, Vendor shall comply with the Criminal Justice Information Services Security Policy Vendor Services Agreement — Technology (Rev. 8/19) Page 9 of 13 City Secretary Contract No. and CFR Part 20, as amended, and shall separately execute the Federal Bureau of Investigation Criminal Justice Information Services Security Addendum. No changes, modifications, alterations, or amendments shall be made to the Security Addendum. The document must be executed as is, and as approved by the Texas Department of Public Safety and the United States Attorney General. 29. Immigration Nationality Act. Vendor shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Vendor shall provide City with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Vendor shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Vendor employee who is not legally eligible to perform such services. VENDOR SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY VENDOR, VENDOR'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Vendor, shall have the right to immediately terminate this Agreement for violations of this provision by Vendor. 30. Informal Dispute Resolution. Except in the event of termination pursuant to Section 4.2, if either City or Vendor has a claim, dispute, or other matter in question for breach of duty, obligations, services rendered or any warranty that arises under this Agreement, the parties shall first attempt to resolve the matter through this dispute resolution process. The disputing party shall notify the other parry in writing as soon as practicable after discovering the claim, dispute, or breach. The notice shall state the nature of the dispute and list the party's specific reasons for such dispute. Within ten (10) business days of receipt of the notice, both parties shall commence the resolution process and make a good faith effort, either through email, mail, phone conference, in person meetings, or other reasonable means to resolve any claim, dispute, breach or other matter in question that may arise out of, or in connection with this Agreement. If the parties fail to resolve the dispute within sixty (60) days of the date of receipt of the notice of the dispute, then the parties may submit the matter to non -binding mediation in Tarrant County, Texas, upon written consent of authorized representatives of both parties in accordance with the Industry Arbitration Rules of the American Arbitration Association or other applicable rules governing mediation then in effect. The mediator shall be agreed to by the parties. Each party shall be liable for its own expenses, including attorney's fees; however, the parties shall share equally in the costs of the mediation. If the parties cannot resolve the dispute through mediation, then either party shall have the right to exercise any and all remedies available under law regarding the dispute. Notwithstanding the fact that the parties may be attempting to resolve a dispute in accordance with this informal dispute resolution process, the parties agree to continue without delay all of their respective duties and obligations under this Agreement not affected by the dispute. Either party may, before or during the exercise of the informal dispute resolution process set forth herein, apply to a court having jurisdiction for a temporary restraining order or preliminary injunction where such relief is necessary to protect its interests. 31. No Bovcott of Israel. If Vendor has fewer than 10 employees or the Agreement is for less than $100,000, this section does not apply. Vendor acknowledges that in accordance with Chapter 2270 of the Texas Government Code, City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this Addendum, Vendor certifies that Vendor's signature provides written verification to City that Vendor: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the Agreement. 32. Reporting Reauirements. Vendor Services Agreement — Technology (Rev. 8/19) Page 10 of 13 City Secretary Contract No. 32.1. For purposes of this section, the words below shall have the following meaning: 32.1.1. Child shall mean a person under the age of 18 years of age. 32.1.2. Child pornography means an image of a child engaging in sexual conduct or sexual performance as defined by Section 43.25 of the Texas Penal Code. 32.1.3. Computer means an electronic, magnetic, optical, electrochemical, or other high-speed data processing device that performs logical, arithmetic, or memory functions by the manipulations of electronic or magnetic impulses and includes all input, output, processing, storage, or communication facilities that are connected or related to the device. 32.1.4. Computer technician means an individual who, in the course and scope of employment or business, installs, repairs, or otherwise services a computer for a fee. This shall include installation of software, hardware, and maintenance services. 32.2. Renortins Reauirement. If Vendor meets the definition of Computer Technician as defined herein, and while providing services pursuant to this Agreement, views an image on a computer that is or appears to be child pornography, Vendor shall immediately report the discovery of the image to the City and to a local or state law enforcement agency or the Cyber Tip Line at the National Center for Missing and Exploited Children. The report must include the name and address of the owner or person claiming a right to possession of the computer, if known, and as permitted by law. Failure by Vendor to make the report required herein may result in criminal and/or civil penalties. 33. Signature Authoritv. The person signing this agreement hereby warrants that he/she has the legal authority to execute this agreement on behalf of the respective party, and that such binding authority has been granted by proper order, resolution, ordinance or other authorization of the entity. This Agreement, and any amendment(s) hereto, may be executed by any authorized representative of Vendor whose name, title and signature is affixed on the Verification of Signature Authority Form, which is attached hereto as Exhibit " E" and incorporate herein by reference. Each party is fully entitled to rely on these warranties and representations in entering into this Agreement or any amendment hereto. 34. Survival of Provisions. The parties' duties and obligations pursuant to Section 4.4 (Duties and Obligations), 5 (Disclosure of Conflicts and Confidential Information), Section 6 (Right to Audit), and Section 8 (Liability and Indemnification) shall survive termination of this Agreement. 35. Prohibition on Bovcottin2 Ener2v Companies. Vendor acknowledges that in ac- cordance with Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City with a company with 10 or more full-time employees unless the contract contains a written verifi- cation from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Vendor certifies that Vendor Services Agreement — Technology (Rev. 8/19) Page 11 of 13 City Secretary Contract No. Contractor's signature provides written verification to the City that Contractor: (1) does not boy- cott energy companies; and (2) will not boycott energy companies during the term of this Agree- ment. 36. Prohibition on Discrimination Against Firearm and Ammunition Industries. Vendor acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City with a company with 10 or more full-time employees unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade associa- tion; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Vendor certifies that Contractor's sig- nature provides written verification to the City that Contractor: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. (signature page follows) Vendor Services Agreement — Technology (Rev. 8/19) Page 12 of 13 City Secretary Contract No. ACCEPTED AND AGREED: CITY: City of Fort Worth By: Name: Fernando Costa Title: Assistant City Manager Date: Jun 7, 2024 Approval Recommended: C%i'lSf"O0k7P!' t farrier By: Christopher Harder (Jun 6, 202413:35 CDT) Name: Christopher Harder Title: Director, Water Department Attest: "Ilea o%y'0 PUo By: Name: Jannette Goodall Title: City Secretary VENDOR: EMA, Inc. By: Name: Michael Moosavi Title: Vice President Date: Jun 5, 2024 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. By: Richard Lisenb a (Jun 5, 202408:32 CDT) Name: Richard Lisenbee Title: Sr. IT Manager, Water Department Approved as to Form and Legality: By: Name: Taylor Paris Title: Assistant City Attorney CONTRACT AUTHORIZATION: M&C: 24-0235 Date Approved: 3/26/24 Form 1295 Certification No.: 2024-1122117 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Vendor Services Agreement — Technology (Rev. 8/19) Page 13 of 13 City Secretary Contract No. EXHIBIT A SCOPE OF WORK PLUS ANY AMENDMENTS TO THE SCOPE OF WORK Vendor Services Agreement — Technology — Exhibit A SCOPE OF WORK The Water Customer Information System (CIS) Consultant project is proposed in three phases. Phase I is Requirements building, business process mapping review, and documentation leading to the development of a Request for Proposal (RFP). Phase 11 is the selection of CIS solution and system implementor (SI). Phase III is the CIS Implementation and go -live. This Scope of Work addresses Phase 1: Requirements building, business process mapping, and documentation leading to the development of an RFP. Task 1: Project Management This task includes project strategy and approach, managing the project budget, scope, schedule, and EMA resources. It also includes providing ongoing project communication, invoices, progress reports, and risk review during Phase 1. EMA's project manager will ensure that project activities are clearly defined, objectives are understood, risks are addressed, and deadlines are met. Project management during the first phase of the project will lay the foundation for the subsequent phases of the software vendor solution selection and implementation. Project Management Responsibilities: Project manager will lead the project team to ensure the project schedule and quality goals are met. Manage EMA resources. Assist FWWD Project Manager with project communication. Create and assist with maintaining project logs: issues, risks, action item, and decision logs. In collaboration with FWWD project sponsor and stakeholders, create the CIS Project Charter. Weekly and monthly status reporting to Project Sponsor. Internal project manager to act as central point of contact and have internal project coordination duties. Provide overall project direction and leadership. Ensure, commit, and coordinate FWWD resources. Manage internal and external project communication. Manage project issues, risks, action items, and decisions. Assist with maintaining project logs. Work with EMA to create the CIS Project Charter. Weekly and monthly status reporting to Project Sponsor. Ensure project deliverables meet the project goals and objectives Deliverables: • Project Management • Project plan and Schedule • Risk Management Plan • Project Charter • Communication Plan • Steering Team Facilitation • Monthly Progress Reports Task 2: Mobilization and Kickoff Ensure project deliverables meet the project goals and objectives This task entails the coordination of the EMA project team and the formulation of data requests for FWWD. EMA will lead and facilitate a one -day on -site workshop to discuss stakeholder visioning and objectives, finalization of the project plan in collaboration with FWWD, establishment of the CIS project team, and execution of the project kickoff. The mobilization workshop will address key aspects such as validating project goals, project governance, defining measures of success, addressing assumptions and constraints, outlining roles and responsibilities, and establishing the project schedule. EMA will assist FWWD with setting up a centralized Teams site to manage all project related documentation. Mobilization Responsibilities: Prepare and coordinate project mobilization with FWWD. Assist with planning and participation in the project kickoff meeting. Assist FWWD with identifying key project team roles, skillset, and responsibilities for conducting the project tasks. FWWD PM will assist with project mobilization, planning and participation in the project kickoff meeting. FWWD personnel will participate in workshops, interviews, meetings, and decisions. To support this, the roles of Project Sponsor, Steering Team, a cross -functional project team, and a testing team will be defined. 1► Work with FWWD PM to create the overall project schedule and plan. Deliverables: Work with EMA PM to create the overall project schedule and plan. • Data request • Stakeholder visioning meeting and documented vision • Project kickoff meeting and agreed upon project schedule Task 3: Conduct an assessment of FWWD's current CIS, business processes, interfaces, integrations, multi -use shadow systems, and technology constraints To gain an understanding of the current CIS functionality limitation, business process disconnects and bottlenecks, and technology gaps, EMA will conduct workshops to assess the current environment including: • Naviline CIS • As -Is Business Processes • Interfacing systems and Interfaces • Shadow systems • Data Quality • Technology constraints Naviline CIS Assessment EMA will perform the following: • Evaluate how the Naviline CIS system manages customer data, including account creation, updating customer information, and handling account relationships. • Assess the billing functionalities, including invoice generation, payment processing, and handling of various billing scenarios. • Assess how the CIS handles service requests, order processing, and service provisioning. • Evaluate how CIS manages the AMI meter data, readings, and related processes. • Evaluate Naviline CIS response time for common operations for acceptable performance. • Assess NaviLine CIS capability to generate reports based on specific business needs. V As -Is Business Process Assessment EMA will review the 150 business processes developed by the FWWD team to gain an understanding of the process gaps, inefficiencies and interaction with systems and data. EMA will conduct workshops with FWWD to review the 150 business processes that have been documented by FWWD with a focus on: • Identify gaps, bottlenecks, redundancies, and areas for improvement in the workflow. • Identify areas where customer satisfaction can be improved. • Assess the flow of activities among different work units for efficiency. • Define key performance indicators (KPIs) relevant to the meter -to -cash operation. • Identify opportunities for the adoption of new technologies to enhance efficiency. Interfacinq Svstems and Interfaces EMA will examine the integration capabilities and method of integration of FWWD's systems including: • Mulesoft Enterprise Service Bus (ESB); • NaviLine CIS; • Sensus AMI; • Harris Compass Meter Data Management System (MDMS); • Compass MDM; • MRSP; • ESRI GIS; • Oracle CRM; • Selectron IVR; • Smart Energy Water (SEW) customer web portal; • Paymentus payment processing; • Dataprose bill presentation; and, • PeopleSoft Financials EMA will focus on reliability and performance of the interfaces and document recommendations to reduce potential bottlenecks or points of failures. Based on our understanding of the marketplace we may also recommend consolidating a specific interfacing system to improve efficiencies. L! EMA will assess the following key elements of the interfacing systems: • Assess the ability of the NaviLine CIS to effectively integrate with AMI systems for real-time meter data. • Assess how well the NaviLine CIS interfaces with Compass MDM to manage and validate meter data throughout the data lifecycle. • Assess how the NaviLine CIS handles events or anomalies detected by Compass MDM and whether it triggers appropriate actions. • Evaluate the integration between NaviLine CIS and MRSP for seamless handling of service orders, including work order creation, status updates, and completion notifications. • Examine how exceptions, such as failed meter readings, are communicated and resolved between the NaviLine CIS and MRSP. • Assess how the CIS incorporates spatial data from ESRI GIS for accurate premise -based customer information. • Evaluate the integration for managing and updating asset (meter, valve, ERT, etc.) information in the CIS based on GIS data. • Understand in general the data flow between GIS, NaviLine CIS and other data sources. • Assess the integration between CIS and PeopleSoft for financial data. • Assess the performance and reliability of the Mulesoft Enterprise Service Bus (ESB) middleware connecting NaviLine CIS and PeopleSoft, ensuring data consistency and timeliness. Shadow Svstems EMA will conduct workshops to inventory, understand, and assess FWWD's existing use of key spreadsheets, Access databases, or other ancillary shadow systems that are used to perform daily CIS activities. We will make recommendations to replace the functionality and data in the CIS system. EMA will take the following steps to assess the shadow systems: • Identify and document key shadow systems within FWWD customer service, billing, and field operations. This includes spreadsheets, databases, manual processes, or any workaround solutions created to meet specific needs. • Meet with the owner of the shadow systems to understand the requirements for the shadow systems. • Document the functionalities of the shadow systems. • Include the shadow system requirements in the new CIS RFP. Data Quality Data quality is characterized by the extent to which information consistently aligns with the requirements and expectations of users in achieving their business objectives. Using EMA's proprietary process, EMA will conduct interview workshops with FWWD to identify data issues and their impact on the CIS system. Issues revealed through this process may include: • Absence of essential information. • Identification of outdated and/or poor -quality data. • Misalignment between application processes and business requirements, often requiring error - prone workarounds. Based on these workshops, EMA will generate a list of identified issues along with corresponding recommendations. Technoloqv Constraints Technology assessment is an important step in understanding the readiness of FWWD to transition to a new modern CIS and Cloud environment. EMA will meet with key FWWD technology staff review and discuss FWWD's IT strategy and ensure the new CIS and its components are aligned with the future IT strategy. We will Identify the specifications, capacities, and constraints of the current infrastructure. This will include assessment of the compatibility and limitation of the existing systems, software version, and databases to ensure compatibility and alignment with the new CIS and IT strategy. The technology assessment will also include: • Evaluating the technology supporting various communication channels (phone, email, chat, social media), including existing integrations. • Evaluating the existing network infrastructure in light of changing technology requirements. • Assessing the ability to provide a seamless and consistent experience across multiple channels. • Evaluating the availability of real-time reporting and dashboards for monitoring key performance indicators (KPIs) and team performance. Current State Assessment Responsibilities: Lead workshops to understand the current state Participate in the workshops to discuss current CIS functionality limitations, business process state limitations and assist in identifying inefficiencies & bottlenecks, and technology gaps Draft assessment report for review with FWWD limitations, inefficiencies, bottlenecks and gaps Review draft report and provide feedback F Deliverables: Assessment report including: • NaviLine CIS assessment and limitations • Business process review and identified gaps • Customer service KPIs • Interfacing systems and interface limitations • List of shadow systems to be replaced by CIS and other system of records • Technology constraints and limitations Task 4: Identify necessary resources and City personnel to be involved in the RFP specifications building, process mapping, and workflow documentation process EMA recommends the creation of a dedicated cross -functional team with expertise in the NaviLine CIS and technology environment. The team should include technology professionals, data analysts, customer service business process specialists, and representatives from the city and the water departments impacted by the new system. EMA will work with FWWD management to identify and recommend City and necessary staff augmentation consultants required to resource the project and backfill resources to maintain quality operations. The typical resources involved at this phase may include: • Project Manager: This is a critical role for the project and requires an individual with overall project management, coordination, facilitation, risk, and time management expertise. FWWD plans to hire a project manager reporting to the IT Manager. Technical Project Lead: Individual with comprehensive understanding of FWWD's technology infrastructure to assist with technical requirements for the new CIS. This person will call in other technical experts as required to support the various applications, systems and integrations involved in the project. Subject Matter Experts (SMEs): Resources with expertise in specific areas including metering, customer service, billing and collections, service order management and technology. These resources should be committed full-time to the project. These individuals should have the authority to approve business process changes within their area of representation and the discretion to know when changes might require broader discussion and approval. • Business Analysts: Individuals skilled in translating and documenting business processes and requirements. • Data Analysts: Individuals who can analyze and visualize data related to the current processes. • GIS Specialist: Individual with the ability to understand current GIS practices relating to land ownership and how information flows into GIS and to and from Navil-ine CIS. Preferably this person will be able to design and implement changes as well as pull in additional resources as required. • City Procurement Specialists: Individuals familiar with the city's procurement processes and regulations. • Project Stakeholders: Representatives from various city departments involved in or affected by the project. FWWD will ensure personnel will participate in workshops, interviews, meetings, and decisions to ensure the success of the project. To support this, the roles of Project Sponsor, Steering Team, and a cross -functional Project Team will be defined. The tables below outlines example roles, typical responsibilities and duties, and estimated FWWD time commitment for the first two phases: Table 1: Phases I and ll. Example Project Roles and Staff Time Commitment Project Sponsor Executive Team Champion the project 10% Member Provide overall project direction and executive leadership • Help create and carryout the project vision • Help to define and achieve project goals • Ensure necessary funding is available Project Manager Project Manager • Coordinate and manage overall project 40 - 50% related activities, schedule and budget • Develop and focus the implementation team • Prioritize team activities • Interface with other projects • Ensure risks are communicated • Coordinate with staff, EMA, and vendors • Work issues as they emerge Steering Team ypically the • Champion the project 1 - 5% Project Sponsor, • Provide overall project direction and plus Executive leadership Leadership • Review/comment and sign -off on recommendations • Ensure plan gets carried out and regularly updated • Stakeholder communications • Revisit project risks on a monthly basis E:? Core Project Team Subject Matter Experts Technical Project Lead Information Technology SME's Data Analysts Procurement Specialists • Resolve issues escalated to them Those who have Communicate with Stakeholders day-to-day • Actively participate in project workshops responsibility for and activities finance, Stay focused on goals accounting and Reviewing and evaluating responses to meter -to -cash the RFP functions Managing demonstration schedule and logistics, and evaluating the vendor demonstrations • Conducting reference checks and evaluating them • Managing site visit schedule and logistics • Conducting site visits and evaluating them Experts in supporting functions of the meter -to -pay functions Oversee technical aspects of the project Technical admin staff responsible for CIS and related interfaces 40 - 50% • Participate in selected interviews and 5 - 15% as workshops needed • Gather information and provide input as requested • Review and comment as requested • Assist PMs with technical aspects of the project • Technical team oversight and leadership • Assist with technical requirements development • Member(s) of Project Team • Provide input on technology requirements, standards, interfaces, and infrastructure Analysis of • Work with other stakeholders to legacy CIS data understand specific data requirements and data clean- and constraints up strategy • Evaluate existing data to identify inconsistencies, errors, and missing information • Develop strategies to address missing data Oversee the • Management of Procurement process Procurement • Assist project team with RFP process development • Assist with contract negotiations • Maintain required documentation 20 - 30% 5 - 15% as needed 10-20% 10-20% E Resource Identification Responsibilities: Collaborate with FWWD management to discuss, recommend, and identify the project team roles and responsibilities necessary to staff the project Document the time commitment and schedule commitments for the resources Deliverable: Collaborate with EMA to discuss, review recommendations, and identify the project team roles and responsibilities necessary to staff the project • City and optional staff augmentation resources, time commitment and engagement schedule Task 5: Conduct a comprehensive needs assessment and analysis of FWWD's future CIS system, including improvement to business processes, hardware upgrades, data resources and reporting, infrastructure, interface, operations, standards, and procedures This task will focus on leveraging the knowledge gained in Task 3: Current State Assessment, to analyze and establish FWWD's future CIS environment to drive the development of requirements. The assessment will include the following tasks and deliverables: Task 5.1: Business Process and Requirements Building on the assessment of FWWD's 150 business processes completed in the previous tasks, this task involves leveraging these insights to assess the future business processes and requirements for the new CIS, EMA will: • Review the detailed documentation from the previous task, summarizing key findings and identified areas for improvement. • Conduct workshops with key stakeholders and IT specialists, to gain a comprehensive understanding of their requirements for the future CIS. • Prioritize and document the identified gaps, manual activities, and opportunities for improvement based on their impact on efficiency, cost-effectiveness, and overall FWWD business and technology objectives. • Ensure that the proposed changes align with the business goals and objectives and IT Strategy. • Validate the proposed future state business process improvements and requirements with stakeholders to ensure that their input is considered and that the proposed changes align with their expectations. 10 • Evaluate the technology requirements for the new CIS based on the recommended improvements. Consider any necessary hardware upgrades, software integrations, and data management enhancements. EMA's team will facilitate in -person workshops to identify future state business process improvement recommendations and gather requirements from stakeholders, including Billing, Finance/Accounting, Information Technology, Operations, Metering and Field Services, Water Resources, Planning/Engineering, Conservation, and Public Relations. EMA will utilize our Meter -to -Cash (M2C) process library to assist with defining future state business process improvements and documenting requirements based on FWWD's business processes. Needs Assessment — Business Process Responsibilities: Conduct workshops to identify and assess future state business processes Document and prioritize business process gaps, manual steps, and opportunities Gather and document functional and technical requirements Review draft requirements with FWWD for completeness and prioritization Finalize functional and technical requirements for inclusion in the RFP Deliverables: • Business process improvement validation Subject Matter Experts to participate in business process workshops Subject Matter Experts to participate in business process workshops Be available to answer questions and provide input as needed Review and assist with requirements review and prioritization Be available to answer questions and provide input as needed • CIS business and technical requirements documentation with tracking and scoring method Task 5.2: Interface and Integration Requirements EMA will conduct workshops to gather requirements for integration of the CIS with other City and FWWD systems, including all current CIS interfaces and desired future interfaces. The requirements will list the type of interface, whether it is one-way or two-way, and the desired functionality of that interface. 11 Needs Assessment — Interface Requirements Responsibilities: Conduct workshops to assess current and Attend interface workshops desired interfaces Document draft of interface requirements and Review draft interface requirements and provide to FWWD for review provide feedback Finalize interface requirements for inclusion in Approve and sign off the RFP Deliverables: • Integration workshops and interviews • Interface requirements Task 5.3: Technical Requirements and Emerging Technology Opportunities EMA will conduct workshops to gather and document technical requirements needed to support the CIS and related systems. The technical requirements will capture FWWD's security, infrastructure, operating system, network, databases, middleware, and hardware requirements. EMA's technical and functional project team will work closely together to ensure that the technical requirements support the identified functional requirements. EMA will focus on available options for cloud vs. on -premises solutions or designing a hybrid solution, and the pros and cons of their service and manageability, respective infrastructure needs and challenges, and capital and operating expenses (CAPEX/OPEX) investment alternatives. EMA will conduct an emerging technologies opportunity analysis and we will review and analyze the impacts and potential benefits of new and emerging technologies in the areas of Cloud/SaaS/Hybrid, Mobility, Analytics, and managed services. We will draft a recommendations report for review with the City and FWWD's stakeholders. Needs Assessment — Technical Requirements & Emerging Technologies Responsibilities: Conduct workshops to gather and document Attend technical requirements workshops technical requirements Conduct workshops to review options for cloud vs. on -premises or hybrid solutions Perform emerging technology opportunity analysis and draft recommendations report for review with FWWD stakeholders Attend workshops Review draft recommendations report and provide feedback 12 Finalize recommendations report Document technical requirements Review draft requirements with FWWD for completeness and prioritization Finalize technical requirements for inclusion in the RFP Deliverables: Technical workshops and interviews • Technical requirements Review and assist with requirements review and prioritization Approve and sign off. • Emerging technologies analysis and recommendations report Task 5.4: Data Conversion Requirements EMA will conduct a workshop to determine high-level requirements for converting the Naviline CIS data to the new system, including identification of the current sources of data, and the roles and responsibilities for extracting, transforming, and loading the data into the new system. Needs Assessment — Data Conversion Responsibilities: Conduct workshop to gather and document conversion requirements Document conversion requirements Review draft requirements with FWWD for completeness and prioritization Finalize conversion requirements for inclusion in the RFP Deliverable: • Data conversion requirements Attend conversion requirements workshop Review and assist with requirements review and prioritization Approval and sign off Task 6: Assess the business drivers for technologies, confirm business strategy and goals, and identify desired processes As the implementation of CIS is shaped by factors within the water industry that target enhanced operational efficiencies and customer service, EMA will engage in discussions with FWWD management to ensure alignment with the upcoming technological trends in the industry including:. 13 • Integration of AMI and CIS to improve billing, response to high bill complaints and customer satisfaction. • Adoption of data analytics and business intelligence tools to analyze customer usage patterns, identify trends and better enterprise decision making. • Mobile technology and self-service to improve customer experience. • Integration with the GIS technology to improve accuracy and asset (meter) management. • Cloud/SaaS platform to improve efficiency and scalability. Business Drivers for Technology Responsibilities: Meet with FWWD management on emerging trends Draft business drivers assessment report Prepare final business drivers assessment report Deliverable: • Business drivers' assessment report Meet with EMA on emerging trends Review draft report and provide feedback Approval and sign off Task 7: Define the approach to CIS and implementor selection as either separate or integrated procurements and document the approach within a formal report EMA in collaboration with FWWD will discuss the pros and cons of integrated or separate procurement and define the approach for selecting the CIS solution and the system integrator (SI). EMA will facilitate a workshop with project stakeholders and discuss the uniqueness of FWWD's business and technology requirements, and strength and weakness of the system integrators. EMA will document this approach in a formal report, presenting a detailed recommendation for the CIS implementation and SI selection process. The report will include a strategy framework, pros and cons and rationale behind our strategy for FWWD to make an informed decision. Implementation Approach Responsibilities: Conduct workshop with FWWD stakeholders Attend workshops to discuss and review the approach and procurement options for CIS software and System implementor vendors 14 Draft CIS and SI procurement approach recommendation report Prepare final CIS and SI procurement approach recommendation report Deliverable: Review draft report and provide feedback Approval and sign off • Formal CIS and SI procurement approach report Task 8: Author a comprehensive RFP for CIS replacement based on CIS and SI procurement approach EMA will meet with FWWD's management and the City's Purchasing Services to discuss the City's RFP practices and requirements to ensure understanding of FWWD's desired process for the CIS selection and the City's procurement requirements. EMA will lead the development of a single RFP or two separate RFPs, one for the software solution and one for the System Integrator (SI) depending on FWWD's decision to issue a single RFP or a separate RFP for the SI. EMA will conduct workshops with FWWD's management to develop the vendor evaluation criteria and weighted scoring. EMA will prepare a draft RFP(s) for the project team's final review, and for final management and legal approval. The RFP(s) will include specific goals and objectives for the CIS solution, the RFP(s) timeline, vendor submission instructions, pricing components, evaluation methodology, functional requirements, technical architecture, interface definitions, reports requirements, data conversion, data sharing requirements, security requirements, end users and technical training, testing/quality assurance, systems performance, data, and ongoing support, maintenance, and upgrade requirements. EMA will work with FWWD to finalize the RFP(s). EMA will provide a list of vendors in the marketplace that we believe FWWD will want to consider EMA and FWWD will work jointly with the City to issue the RFP(s). 15 RFP Responsibilities: Facilitate meeting with FWWD management Attend workshop and Procurement to understand procurement requirements Lead development of the RFP(s) Assist with RFP development Conduct evaluation and scoring workshops Attend workshops to finalize scoring methodology Prepare draft RFP(s) for review Conduct workshops to review draft RFP(s) Assist FWWD to finalize the RFP(s) Meet with FWWD to review and discuss potential CIS vendors Deliverables: Attend workshops to review draft RFP(s) Assist EMA to finalize the RFP(s) Meet with EMA and review potential vendors • Workshops and meetings to develop selection criteria and scoring method • Draft RFP(s) • Workshop to review draft RFP(s) • Final RFP(s) • List of potential vendors Task 9: Identify and document opportunities for efficiencies, cost savings, and potential risks within a formal report Building upon the assessment of the current environment in Task 3, this task will focus on developing a list of opportunities for process efficiency and cost savings. EMA will identify potential risks and benefits for each recommendation. EMA will discuss our recommendations for possible replacement of the shadow systems functionalities with the new CIS with FWWD stakeholders. The recommended improvements are designed to streamline the customer service and billing processes and improve customer experience. To ensure thorough understanding of each recommendation, EMA will conduct facilitated workshops with FWWD stakeholders to clearly articulate each solution, its impact on the Lilt organization, cost savings, benefits and potential implementation risks. EMA will prepare a formal report including analysis of the expected financial benefits, including potential reductions in manual labor, enhanced operational efficiency and potential implementation risks. 17 Opportunities Responsibilities: Conduct workshops with FWWD to identify opportunities for efficiencies, cost savings, and potential risks Analyze the financial benefits, operational efficiencies, and implementation risks. Conduct workshop to review analysis with FWWD Prepare and review draft opportunities for improvement report with FWWD Prepare final opportunities for improvement report Deliverables: • Formal opportunities for improvement report Attend workshops Attend workshop and provide feedback Review opportunities for improvement report and provide feedback Approval and sign off Task 10: Propose solutions and estimate total cost of ownership, including implementation and sustained support within a formal report Upon FWWD's approval of the improvement recommendations presented in Task 9, EMA will document the costs, timing, and staff commitment involved with the CIS implementation. EMA will model proposed solutions, along with the estimated total cost of ownership, and sustained support over a 5-1 0-year period. EMA will conduct a workshop to present our recommendations to the stakeholders and receive feedback. EMA will incorporate the feedback and deliver a final formal report. Solutions and Total Cost of Ownership Responsibilities: Document costs, timing and resource commitments Prepare model for determining total cost of ownership Conduct workshop to present model and recommendations Prepare and submit final report Attend workshop and provide feedback Approve and sign off Deliverable: • EMA CIS Cost Analyzer tool reports; high-level implementation timeline; CIS replacement decision points SCHEDULE The projected duration will be approximately seven months, dependent upon workshop scheduling and required resource availability. A detailed schedule will be developed with FWWD to include a detailed work plan, dependencies, FWWD staff availability, and EMA team collaboration with FWWD. The following is a high-level initial project schedule that is subject to further planning with FWWD. Task 1: Project Management Task 2: Mobilization and Kickoff 0 Task 3: Conduct a comprehensive assessment Task 4: Identify necessary resources and City personnel to be involved in the RFP Task 5: Conduct a comprehensive needs assessment and analysis Task 5.1: Business Process and Requirements I I Task 5.2: Interface and Integration Requirements I I Task 5.3: Technical Requirements & Emerging Technology Opportunities I 1 Task 5.4: Data Conversion Requirements ] ] Task 6: Assess the business drivers for technologies Task 7: ❑efne the approach to CIS and implementor selection Task 8: Author a comprehensive RFP for CIS replacement. Task 9: Identify and document opportunities for efficiencies, cost, and risks Task 10: Propose solutions and estimate total cost of ownership 19 City Secretary Contract No. EXHIBIT B PAYMENT SCHEDULE Cost Schedule Summary And Compensation and Payment Schedule Vendor Services Agreement — Technology — Exhibit B EMA- EXHIBIT B: COST SCHEDULE SUMMARY This sheet will be used to evaluate costs and pricing. This sheet must be in a separate sealed envelope inside the main package marked "PRICING." Please do not include pricing within the proposal response documents. Proposer may include any additional services and fees. However, pricing for this RFP will only be evaluated for the cost of items listed below. If additional personnel are required to complete Phase 1, please add lines below "Other personnel, as needed", and include their position title, the estimated quantity of hours they will be needed during Phase 1, their hourly rate, and the total cost of their services for Phase 1. PHASE ONE (Estimated duration: 6 months) SERVICES QTY UOM UNIT TOTAL COST COST Michael Moosavi, Principal -in -Charge 26 HourlyRate $351 $9,126 Bill Rivers, Project Manager/Finance 250 Hourly $292 $73,000 Rate Alisa Mann, Customer Service/Meter-to- 28 Hourly $276 $7,728 Cash SME Rate Tammy Edinger, Billing/Meter-to-Cash 367 Hourly $236 $86,612 SME Rate Melissa Telford, Business Process/Meter- 349 Hourly $142 $49,558 to -Cash SME Rate Marla Hartson, Data Conversions 250 HourlyRate $234 $58,500 Eddie Cheong, Integrations 243 Hourly $172 $41,796 Rate Sandip Basu, Technical Lead 72 Hourly $277 $19,944 Rate EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 1 Direct Costs — Travel Each Optional Staff Augmentation Mark Germscheid, AMI/CSS/EBPP HourlyRate $217 Kayla Vogel, Testing Hourly Rate $137 Leslie Willett Black, OCM HourlyRate $198 Jackson Hardin, General Meter -to -Cash HourlyRate $101 Elaine Haykin, General Meter -to -Cash HourlyRate $124 Debbie Buchanan, Training HourlyRate $143 Total Contract Cost for PHASE ONE: $38,914 $385,178 Prompt Payment Discount Terms: 0 Percent N/A Days (i.e. 3% Net 15, etc.) PRICING PRICING: All percentages, hourly rates, and/or prices quoted shall be firm and fixed for the specified contract period. Ninety (90) days before the renewal, the Contractor shall submit any changes in pricing for consideration. The City, at its sole discretion, shall accept or reject any or all increases in costs or levels of performance requested. PROPOSAL ITEMS: Proposer shall factor all relevant considerations into their pricing, and must include all expenses related to providing the services as outlined in Exhibit A, Section 6.1. Considerations should include all incidentals including, but not limited to, all necessary personnel, transportation, insurance, etc. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 2 Compensation and Payment Schedule Fixed Price This is a Fixed Price deliverable -based agreement for services and actual expenses. The total cost to FWWD for the performance of the tasks contained in the Statement of Work (SOW) shall not exceed the amount shown, except in the case that executed Change Orders have been approved and executed. Milestone Payments The following table of milestones are based on the key activities of the project and are tied to the acceptance of the corresponding deliverables as found in the SOW. Table 1: Water Customer Information System (CIS) Consultant Project Milestone Payment Schedule Monthly 01 Project Management Month 1 Month #2 $11,526.67 Monthly 02 Project Management Month 2 Month #3 $11,526.67 Monthly 03 Project Management Month 3 Month #4 $11,526.67 Monthly 04 Project Management Month 4 Month #5 $11,526.67 Monthly 05 Project Management Month 5 Month #6 $11,526.67 Monthly 06 Project Management Month 6 Month #7 $11,526.67 MP01 Task 2: Mobilization and Kickoff Month #1 $13,712.00 MP02 Task 3: Conduct a comprehensive assessment of FWWD's current CIS, business Month #2 $106,956.00 processes, interfaces, integrations, shadow systems, and technology constraints MP03 Task 4: Identify necessary resources and City personnel to be involved in the RFP Month #1 $1,656.00 specifications building, process mapping, and workflow documentation process . MP04 Task 5.1: Business Process and Requirements Month #5 $47,840.00 MP05 Task 5.2: Interface and Integration Requirements Month #5 $5,160.00 MP06 Task 5.3: Technical Requirements and Emerging Technology Opportunities Month #5 $22,044.00 MP07 Task 5.4: Data Conversion Requirements Month #5 $3,744.00 MP08 Task 6: Assess the business drivers for technologies, confirm business strategy Month #4 $6,094.00 and goals, and identify desired processes. Water Customer Information System (CIS) Consultant Payment Schedule Page 11 MP09 Task 7: Define the approach to CIS and implementor selection as either separate Month #4 $2,216.00 or integrated procurements and document the approach within a formal report. MP10 Task 8: Author a comprehensive RFP for CIS replacement. Month #7 $43,846.00 MP11 Task 9: Identify and document opportunities for efficiencies, cost savings, and Month #4 $18,572.00 potential risks within a formal report. MP12 Task 10: Propose solutions and estimate total cost of ownership, including Month #4 $5,264.00 implementation and sustained support within a formal report. Total Milestones $346,264.00 Expenses $38,914.00 Contract Total $385,178.00 Water Customer Information System (CIS) Consultant Payment Schedule Page 12 City Secretary Contract No. EXHIBIT C MILESTONE ACCEPTANCE FORM Vendor Services Agreement — Technology — Exhibit C City Secretary Contract No. EXHIBIT C MILESTONE ACCEPTANCE FORM Services Delivered: Milestone / Deliverable Ref. #: Milestone / Deliverable Name: Unit Testing Completion Date: Milestone / Deliverable Target Completion Date: Milestone / Deliverable Actual Completion Date: Approval Date: Comments (if needed): Approved by Vendor: Signature: Printed Name: Title: Date: For Contract Compliance Manager Use Only: Contracted Payment Amount: Adjustments, including penalties: Approved Payment Amount: Approved by Contract Compliance Manager: Signature: Printed Name: Title: Date: Vendor Services Agreement - Technology - Exhibit C EXHIBIT D NETWORK ACCESS AGREEMENT City Secretary Contract No. EXHIBIT D NETWORK ACCESS AGREEMENT 1. The Network. The City owns and operates a computing environment and network (collectively the "Network"). Vendor wishes to access the City's network in order to provide a needs assessment and assistance in the development of the RFP specifications for the Water Customer Information System (CIS). In order to provide the necessary support, Vendor needs access to the Water Department network. 2. Grant of Limited Access. Vendor is hereby granted a limited right of access to the City's Network for the sole purpose of providing a needs assessment and assistance in the development of the RFP specifications for the Water Customer Information System (CIS). Such access is granted subject to the terms and conditions set forth in this Agreement and applicable provisions of the City's Administrative Regulation D-7 (Electronic Communications Resource Use Policy), of which such applicable provisions are hereby incorporated by reference and made a part of this Agreement for all purposes herein and are available upon request. 3. Network Credentials. The City will provide Vendor with Network Credentials consisting of user IDs and passwords unique to each individual requiring Network access on behalf of the Contractor. Access rights will automatically expire one (1) year from the date of this Agreement. If this access is being granted for purposes of completing services for the City pursuant to a separate contract, then this Agreement will expire at the completion of the contracted services, or upon termination of the contracted services, whichever occurs first. This Agreement will be associated with the Services designated below. 3.1. Services are being provided in accordance with City Secretary Contract No. Contract No.; 3.2. Services are being provided in accordance with City of Fort Worth Purchase Order No. PO No.; X 3.3. Services are being provided in accordance with the Agreement to which this Access Agreement is attached. 3.4. No services are being provided pursuant to this Agreement. 4. Renewal. At the end of the first year and each year thereafter, this Agreement may be renewed annually if the following conditions are met: 4.1. Contracted services have not been completed; 4.2. Contracted services have not been terminated; and 4.3. Within the thirty (30) days prior to the scheduled annual expiration of this Agreement, the Vendor has provided the City with a current list of its officers, agents, servants, employees or representatives requiring Network credentials. Notwithstanding the scheduled contract expiration or the status of completion of services, Vendor shall provide the City with a current list of officers, agents, servants, employees or representatives that require Network credentials on an annual basis. Failure to adhere to this requirement may result in denial of access to the Network and/or termination of this Agreement. 5. Network Restrictions. Contractor officers, agents, servants, employees or representatives may not share the City -assigned user IDs and passwords. Vendor acknowledges, agrees and hereby gives Vendor Services Agreement — Technology — Exhibit D City Secretary Contract No. its authorization to the City to monitor Contractor's use of the City's Network in order to ensure Contractor's compliance with this Agreement. A breach by Contractor, its officers, agents, servants, employees or representatives, of this Agreement and any other written instructions or guidelines that the City provides to Vendor pursuant to this Agreement shall be grounds for the City immediately to deny Vendor access to the Network and Contractor's Data, terminate the Agreement, and pursue any other remedies that the City may have under this Agreement or at law or in equity. 5.1. Notice to Vendor Personnel — For purposes of this section, Vendor Personnel shall include all officers, agents, servants, employees, or representatives of Contractor. Vendor shall be responsible for specifically notifying all Vendor Personnel who will provide services to the City under this agreement of the following City requirements and restrictions regarding access to the City's Network: 5.1.1. Contractor shall be responsible for any City -owned equipment assigned to Vendor Personnel, and will immediately report the loss or theft of such equipment to the City; 5.1.2. Contractor, and/or Vendor Personnel, shall be prohibited from connecting personally -owned computer equipment to the City's Network; 5.1.3. Contractor Personnel shall protect City -issued passwords and shall not allow any third party to utilize their password and/or user ID to gain access to the City's Network; 5.1.4. Contractor Personnel shall not engage in prohibited or inappropriate use of Electronic Communications Resources as described in the City's Administrative Regulation D7; 5.1.5. Any document created by Vendor Personnel in accordance with this Agreement is considered the property of the City and is subject to applicable state regulations regarding public information; 5.1.6. Contractor Personnel shall not copy or duplicate electronic information for use on any non -City computer except as necessary to provide services pursuant to this Agreement; 5.1.7. All network activity may be monitored for any reason deemed necessary by the City; and 5.1.8. A Network user ID may be deactivated when the responsibilities of the Vendor Personnel no longer require Network access 6. Termination. In addition to the other rights of termination set forth herein, the City may terminate this Agreement at any time and for any reason with or without notice, and without penalty to the City. Upon termination of this Agreement, Vendor agrees to remove entirely any client or communications software provided by the City from all computing equipment used and owned by the Contractor, its officers, agents, servants, employees and/or representatives to access the City's Network. 7. Information Securitv. Vendor agrees to make every reasonable effort in accordance with accepted security practices to protect the Network credentials and access methods provided by the City from unauthorized disclosure and use. Vendor agrees to notify the City immediately upon discovery of a breach or threat of breach which could compromise the integrity of the City's Network, including but not limited to, theft of Contractor -owned equipment that contains City -provided access software, termination or resignation of officers, agents, servants, employees or representatives with access to City -provided Network credentials, and unauthorized use or sharing of Network credentials. (signature page follows) Vendor Services Agreement — Technology — Exhibit D City Secretary Contract No. ACCEPTED AND AGREED: CITY: City of Fort Worth By: Name: Fernando Costa Title: Assistant City Manager Date: Jun 7, 2024 Approval Recommended: Christooher Kgider By: Christopher Harder (Jun 6, 202413:35 CDT) Name: Christopher Harder Title: Director, Water Department Attest: By: Name: Jannette Goodall Title: City Secretary VENDOR: EMA, Inc. By: Name: Michael Moosavi Title: Vice President Date: J u n 5, 2024 Vendor Services Agreement — Technology — Exhibit D Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. By: Richard Lisenb e (Jun 5, 202408:32 CDT) Name: Richard Lisenbee Title: Sr. IT Manager, Water Department Approved as to Form and Legality: By: Name: Taylor Paris Title: Assistant City Attorney EXHIBIT E VERIFICATION OF SIGNATURE AUTHORITY EMA, Inc. 2355 MN-36 #301 St Paul, MN 55113 Water Customer Information System (CIS) Consultant RFP # 24-0002 Execution of this Signature Verification Form ("Form") hereby certifies that the following individuals and/or positions have the authority to legally bind the Vendor and to execute any agreement, amendment or change order on behalf of Vendor. Such binding authority has been granted by proper order, resolution, ordinance or other authorization of Company. The City is fully entitled to rely on the warranty and representation set forth in this Form in entering into any agreement or amendment with Vendor. Vendor will submit an updated Form within ten (10) business days if there are any changes to the signatory authority. The City is entitled to rely on any current executed Form until it receives a revised Form that has been properly executed by the Vendor. 1. Name: Craig Yokopenic Position: Executive Vice President Ole', Signila�re 2. Name: Michael Moosavi Position: Vice President Ale N&61Za4 � Signature Name: Position: Signature Name: Sharon Peters Signature of President / CEO Other Title: Date: 3/14/2024 Vendor Services Agreement — Technology — Exhibit E 5/7/24, 7:59 AM M&C Review /CITY COUNCIL AGEND Create New From This M&C REFERENCE **M&C 24- 13P RFP 24-0002 WATER CIS DATE: 3/26/2024 NO.: 0235 LOG NAME: CONSULTING SERVICES AW WATER CODE: P TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: (ALL) Authorize Execution of Agreement with EMA, Inc. for the Purchase of Consulting Services Related to the Implementation of a New Water Customer Information System for the Water Department for a Contract Amount Up to $1,200,000.00 for a Five - Year Initial Term, Authorize Annual Renewal Options, and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2024-2028 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: Official site of the City of Fort Worth, Texas FORT WORTH �v Authorize execution of an agreement with EMA, Inc. for the purchase of consulting services related to the implementation of a new Water Customer Information System for the Water Department for a contract up to $1,200,000.00 for an initial five-year agreement term and authorize annual renewal options to be used only in the event that the project is not completed during the initial term; and Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water & Sewer Capital Projects Fund in the amount of $700,000.00, from available funds, for the purpose of funding the Water Customer Information System (CIS) Meter to Cash Program project (City Project No. 104667) to effect a portion of Water's contribution to the Fiscal Years 2024-2028 Capital Improvement Program. DISCUSSION: The Water Department approached the Purchasing Division for assistance with securing an agreement for the purchase of Water Customer Information System consulting services to replace their current CIS. The consulting services will be used to perform a needs assessment and assist in the development of the Request for Proposal (RFP) specifications for the CIS, and assist in selecting and implementing the new CIS. The project will take place in phases: phase 1 consists of the needs assessment and RFP development; phase 2 will consist of selecting a CIS replacement solution and system implementor; phase 3 will consist of implementation and successful launch of the new CIS. Purchasing issued an RFP that consisted of expectations and deliverables for each phase of the project, the qualifications and experience preferred, and the communication and project management requirements. The RFP was advertised in the Fort Worth Star - Telegram on November 1, 2023, November 8, 2023, November 15, 2023, November 22, 2023, November 29, 2023, and December 6, 2023. The City received twelve responses. However, upon an initial evaluation of responsiveness and responsibility, four proposers, Avero LLC dba Avero Advisors, Bid Lab, LLC, Ernst & Young, LLP, and Software Professionals, Inc. did not meet the minimum requirements for their proposal to be evaluated and were deemed non -responsive in accordance with the proposal documents. An evaluation panel consisting of representatives from the Water and Financial Management Services Departments reviewed and scored the proposals using Best Value criteria. During the technical evaluation, three proposers, Utility Planning Network, Validos, LLC, and Whitlock Consulting Group, LLC dba WCG Consulting, did not score at least 50\% of the total available points for technical criteria and were deemed non -responsive in accordance with the proposal documents. After the initial technical evaluations, the two firms with the highest scores, Raftelis Financial Consultants, Inc. dba Raftelis and EMA, Inc. were interviewed on January 17, 2024, and January 19, 2024, respectively. The City requested a Best and Final Offer (BAFO). EMA, Inc. submitted a BAFO resulting in changes to the points allocated for the cost of service; Raftelis chose not to submit a BAFO, and stayed firm on their initial offer. The individual scores were averaged for each of the criteria and the final scores are listed in the table below. Bidder EMA, Inc. Raftelis Financial Consultants, Inc. dba Raftelis Berry, Dunn, McNeil & Parker, LLC a b c 33.30 16.00 11.40 35.10 14.80 9.90 1 23.40 10.40 8.40 E Source Companies, LLC 24.30 13.60 7.20 Evaluation Factors 20.00 14.45 Proposer was not selected for an interview; therefore, cost was not evaluated Proposer was not selected for an interview; therefore, cost was not Total score 80.70 74.25 Proposer was not selected for an interview; therefore, cost was not evaluated Proposer was not selected for an interview; therefore, cost was not apps.cfwnet.org/council_packet/mc_review.asp?ID=31942&counciIdate=3/26/2024 1 /3 5/7/24, 7:59 AM M&C Review evaluated evaluated West Monroe Partners, Proposer was not selected for an Proposer was not selected for an LLC 25.20 10.80 7.20 interview; therefore, cost was not interview; therefore, cost was not evaluated evaluated Proposer did not score 50\% of the Proposer did not score 50\% of the Utility Planning Network 18.00 8.00 6.00 technical points; therefore, cost was technical points; therefore, cost was not evaluated not evaluated Proposer did not score 50\% of the Proposer did not score 50\% of the Validos, LLC 13.50 6.80 4.80 technical points; therefore, cost was technical points; therefore, cost was not evaluated not evaluated Whitlock Consulting Group, Proposer did not score 50\% of the Proposer did not score 50\% of the LLC dba WCG Consulting 23.40 9.20 7.20 technical points; therefore, cost was technical points; therefore, cost was not evaluated not evaluated Best Value Criteria: a. Consultant's project approach and methodology for all three phases to provide services such as project management and execution of services b. Consultant's qualifications, project experience, and references c. Team's Key Personnel d. Cost of service After evaluation, the panel concluded that EMA, Inc. presented the best value. Therefore, the panel recommends that Council authorize an agreement with EMA, Inc. No guarantee was made that a specific amount of services would be purchased. Staff certifies that the recommended vendor's proposal met specifications. The initial phase of the project is estimated to cost $400,000.00. If the contractor and the City both agree to proceed with Phase 2 and 3 of the project, the contract will be amended to add the additional $800,000.00 as approved by this M&C up to $1,200,000.00. If not, the City will proceed with a new bid for a contractor for the remaining phases. Mayor & Council 23-0980, approved on November 14, 2023, funded phase 1 of this project. This M&C will fund the remaining balance needed for the entire project including any renewal option that may be exercised by the City. It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2024-2028 Capital Improvement Program, as follows: 6013P RFP 24-0002 WATER CIS CONSULTING SERVICES AW WATER - Work Capital Fund Name Project Name FY2024 CIP Authority Budget Revised FY2024 Appropriations Adjustment Budget W&S Capital Projects — 104667 - Water CIS Meter To $500,000.00 This M&C $700,000.00 $1,200,000.00 Fund 56002 Cash Prgm Funding is currently available in the Unspecified -All Funds project within the Water & Sewer Capital Projects Fund for the purpose of funding the Water CIS Meter To Cash Program project. Appropriations for the Water CIS Meter To Cash Program project are as depicted below: Fund Existing Appropriations Additional Appropriations Project Total* W&S Capital Projects Fund 56002 $500,000.00 $700,000.00 $1,200,000.00 Project Total $500,000.00 $700,000.00 $1,200,000.00 'Numbers rounded for presentation purposes. DVIN-BE: Awaiver of the goal for Business Equity subcontracting requirement is approved by the DVIN-BE, in accordance with the Business Equity Ordinance, because the purchase of goods or services is from sources where subcontracting or supplier opportunities are negligible. AGREEMENT TERMS: Upon City Council approval, this agreement shall begin upon execution and expire five years from that date. RENEWAL TERMS: This agreement may be renewed annually only in the event that the project is not completed during the initial term. The expiration date of the agreement will not alter the maximum funding authorized for the agreement.This action does not require specific City Council approval provided that the City Council has appropriated sufficient funds to satisfy the City's obligations during the renewal term. ADMINISTRATIVE CHANGE ORDER: An administrative change order or increase may be made by the City Manager up to the amount allowed by relevant law and the Fort Worth City Code and does not require specific City Council approval as long as sufficient funds have been appropriated. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the Unspecified -All Fund project within the W&S Capital Projects Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Capital Projects Fund for the Water CIS Meter To Cash Prgm project to support the above recommendations and execution of the contract. Prior to any expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. BQN\\ apps.cfwnet.org/council packet/mc_review. asp? ID=31942&counciIdate=3/26/2024 2/3 5/7/24, 7:59 AM M&C Review TO Fund Department Account Project Program Activity Budget Reference # Amount I I ID Year (Chartfield 2) FROM Fund Department Account Project Program Activity Budget Reference # Amount ID ID I Year (Chartfield 2) Submitted for City Manager's Office by_ Originating Department Head: Additional Information Contact: Reginald Zeno (8517) Fernando Costa (6122) Reginald Zeno (8517) Christopher Harder (5020) Jo Ann Gunn (8525) Alyssa Wilkerson (8357) ATTACHMENTS 13P RFP 24-0002 WATER CIS CONSULT SVS AW WATER FID Table (WCF02.02.24).xlsx (CFW Internal) 13P RFP 24-0002 WATER CIS CONSULTING SERVICES AW WATER funds availabilitvpdf (CFW Internal) Business Eauity Waiver.pdf (CFW Internal) Form 1295- EMA. Inc.Ddf (CFW Internal) ORD.APP 13P RFP 24-0002 WATER CIS CONSULTING SERVICES AW WATER 56002 A024(r2).docx (Public) pbs cpn 104667.pdf (CFW Internal) SAMs Report- EMA. Inc..Ddf (CFW Internal) apps.cfwnet.org/council_packet/mc_review.asp?ID=31942&councildate=3/26/2024 3/3 FO RT WO RT H PURCHASING DIVISION RFP Cover Sheet REQUEST FOR PROPOSALS (RFP) No. 24-0002 For Water Customer Information System (CIS) Consultant Issued: October 31, 2023 PROPOSAL SUBMISSION DEADLINE: December 7, 2023 by 1:30PM Local Time NO LATE PROPOSALS WILL BE ACCEPTED Proposal shall be delivered/mailed to: Legal Name, d/b/a and address of Proposer The Senior Purchasing Manager submitting the Proposal: City of Fort Worth Purchasing Division, Lower Level, City Hall, 200 Texas Street, Fort Worth, Texas 76102 Note: Return this Cover Sheet with the Proposal Pre -Proposal Conference will be held in -person and via WebEx: 9:00 AM (local time) November 9, 2023 Development Conference Room, City Hall, 200 Texas St., Fort Worth, TX 76102, Lower Level at the North end of the building across from the elevators. Meeting Number (access code): 2550 650 2826 Meeting Password: Qcg2mAcPV72 Meeting Phone Number: 817-392-1111 Meeting link: httr)s://fortworthtexas.webex.com/fortworthtexas/i. php?MTI D=m3dbd 1508ea985fbfd5c77c28c032bd c4 For additional information/clarifications regarding this RFP, please see Section 5.0. Assigned Buyer: Alyssa Wilkerson FMSPurchasinciResponsesa..fortworthtexas.aov Authorized Person: Title: Signature: Contact Person Name: Phone: () Fax: ( ) Email: Bidder/Supplier ID with City of Fort Worth/ Federal ID Number (TIN): Will contract be available for Cooperative Agreement use? (See Section 29.0) Yes No • PDF or Adobe or electronic signature is acceptable on this RFP cover page. The Authorized Person, by his/her signature, represents that he/she is submitting a binding proposal and is authorized to bind. By signing and submitting, acknowledges that he/she has received and read the entire document packet, including all documents incorporated by reference, and agrees to be bound by the terms therein. • Proposals must be received in the Purchasing Office by 1:30 P.M., "Proposal Submission Deadline" AND TIME STAMPED PRIOR TO THE 1:30 DEADLINE IN ORDER TO BE CONSIDERED. Late bids will be returned or destroyed. • Proposals must be submitted in a sealed envelope WITH THE RFP NUMBER, RFP TITLE AND PROPOSER'S LEGAL NAME WRITTEN ON THE OUTSIDE OF THE ENVELOPE. In case of courier, it should be on the outside of the courier's shipping envelope. • Bids will be opened and read aloud publicly at 2:OOPM in the Council Chambers. Request for Proposal The City of Fort Worth (City) invites qualified consulting firms to participate in this Request for Proposal (RFP) for the procurement of a consultant that will perform a needs assessment and assist in the development of the RFP specifications for the Customer Information and Utility Billing System (CIS), and assist in selecting and implementing the new CIS for the Water Department. 1.0 SUBMISSION OF PROPOSALS 1.1 One (1) signed original, and one (1) USB flash drive containing electronic versions of all Proposal documents must be submitted in a sealed package. Failure to submit a signed original and a USB flash drive containing all proposal documents will deem the bid as non- responsive. PROPOSER's name, address and bid number should be marked on the outside of the package. Facsimile or electronic transmittals or offers communicated by telephone will not be accepted or considered. Proposal information that is not submitted in sealed packages will not be considered. 1.2 Mail or Deliver Responses to the Followinq Address: City of Fort Worth Purchasing Division RFP # 24-0002 200 Texas Street, Lower Level, City Hall Fort Worth, Texas 76102 2.0 DELIVERY OF PROPOSALS Proposals must be received in the CITY's Purchasing Division no later than the submission deadline. The submitting PROPOSER is responsible for the means of on -time delivery of the proposal to the location listed in Section 1.2. Delays due to any instrumentality used to transmit the Proposals, including delay occasioned by the PROPOSER or the CITY's internal mailing system, will be the responsibility of the PROPOSER. Proposals must be completed and delivered in sufficient time to avoid disqualification for lateness due to difficulties in delivery. The time and date stamp clock in CITY's Purchasing Division is the official clock for determining whether RFP 24-0002 Water Customer Information System Consultant Page 2 of 40 submittals are submitted timely. Late Proposal documents will not be accepted under any circumstances. 3.0 PROPRIETARY INFORMATION 3.1 If a PROPOSER does not desire proprietary information in the Proposal to be disclosed, it is required to identify all proprietary information in the Proposal. This identification must be done by noting the words "Proprietary Information" individually on each page on which such proprietary information is found. If the PROPOSER fails to identify proprietary information, it agrees that by submission of its Proposal that those sections shall be deemed non- proprietary and made available upon public request. 3.2 PROPOSERs are advised that the CITY, to the extent permitted by law, will protect Proposals from release. PROPOSER shall consider the implications of the Texas Public Information Act, particularly after the Request for Proposals (RFP) process has ceased and the Contract has been awarded. While there are provisions in the Texas Public Information Act to protect proprietary information where the PROPOSER can meet certain evidentiary standards, please be advised that a determination on whether those standards have been met will not be decided by the CITY, but by the Office of the Attorney General of the State of Texas. In the event a request for public information is made, the CITY will notify the PROPOSER, who may then make arguments to the Attorney General pursuant to 552.305, Texas Government Code. The CITY will not make arguments to the Attorney General on a PROPOSER's behalf. 4.0 COMPLETION OF PROPOSAL RESPONSES 4.1 Information presented in the Proposals will be used to evaluate the qualifications of the PROPOSER(s) and to determine the PROPOSER(s) which will be selected to provide services to the CITY. 4.2 Responses shall be completed in accordance with the requirements of this RFP. Statements made by a PROPOSER shall be without ambiguity, and with adequate elaboration, RFP 24-0002 Water Customer Information System Consultant Page 3 of 40 where necessary, for clear understanding. 4.4 Proposals shall be limited to a maximum of seventy-five (75), 8- 1/2" X 11" pages (one side only) using a font size no smaller than 11 point and margins of at least one inch in each direction. The required/requested attachments are a part of this page limit. 4.5 Responses must include the all documents and information specified in this RFP. 5.0 CLARIFICATIONS AND ISSUANCE OF ADDENDA 5.1 Any requests for explanation, clarification, or interpretation desired by a PROPOSER regarding any part of this RFP must be made prior to the published submission deadline, as referenced in Section 8.3 of this RFP. 5.2 IN ORDER FOR QUESTIONS TO BE ANSWERED, ALL QUESTIONS MUST BE SENT BY E-MAIL BEFORE THE QUESTION DEADLINE AND MUST BE IDENTIFIED AS FOLLOWS: 5.2.1 All explanation, clarification or questions must clearly identify the buyer's name and the bid number on the document or on the subject line, if sent by an email. For example: "Attention: Buyer name and Bid No. XX-XXXX". If the buyer's name and bid number is not included as specified above, the question will NOT be answered. 5.2.2 Delivery of questions: 5.2.2.1 Via Email - FMSPurchasinaRes ponses(a)fortworthtexas.pov 5.2.2.1.1 Please note, if an e-mail confirming receipt of your e-mail is not received within one (1) business day, please contact the Purchasing Office at 817- 392-2462. 5.3 If the CITY, in its sole discretion, determines that a change or RFP 24-0002 Water Customer Information System Consultant Page 4 of 40 additional information is needed or a clarification is required, the CITY shall issue a written addendum regarding such change, additional information, or clarification. Sole authority for issuing of addenda shall be vested in the CITY's Purchasing Division. 5.4 Interpretations, corrections or changes to the RFP are not binding upon the CITY if they are made in any manner other than a written addendum, and PROPOSERs shall not rely upon such written interpretations, corrections or changes. Oral explanations or instructions given before the award of the Contract are not binding. Each PROPOSER must acknowledge receipt of all addenda within its response. 6.0 UNAUTHORIZED COMMUNICATIONS Any oral communications are considered unofficial and non -binding with regard to this RFP. After release of this solicitation, PROPOSERs are prohibited from contacting or communicating with any CITY officer, employee, or representative regarding this RFP other than (i) the point of contact designated on the cover page of this RFP or (ii) the Minority Women and Business Enterprise (MWBE) Office. No officer, employee, agent or representative of the PROPOSERs shall, directly or indirectly through others, have any contact or discussion, oral or written, with any members of the CITY Council; members of the RFP evaluation, interview, or selection panels; CITY staff or CITY's consultants, or seek to influence any CITY Council member, CITY staff, or CITY's consultants regarding any matters pertaining to this solicitation, except as expressly provided herein. If a representative of any PROPOSER violates the foregoing prohibition by contacting any of the above listed parties with whom contact is not authorized, such contact may result in the PROPOSER's being disqualified from the procurement process. 7.0 WITHDRAWAL OF PROPOSALS An authorized representative of the PROPOSER may withdraw a Proposal at any time prior to the RFP submission deadline, upon presentation of acceptable identification as a representative of such company. RFP 24-0002 Water Customer Information System Consultant Page 5 of 40 8.0 AWARD OF CONTRACT 8.1 It is understood that the CITY reserves the right to accept or reject any and all Proposals and to re -solicit for Proposals, as it shall deem to be in the best interests of the CITY. Receipt and consideration of any Proposals shall under no circumstances obligate the CITY to accept any Proposals. If an award of contract is made, it shall be made to the responsible PROPOSER whose Proposal is determined to be the best evaluated offer taking into consideration the relative importance of the evaluation factors set forth in the RFP. 8.2 The information provided in this Request for Proposals is only to be used for the purpose of preparing a proposal or response to the CITY's requested services. The contract term will begin upon the execution of the City Secretary Contract ("Effective Date") and shall expire upon the completion of the Scope of Services included herein. 8.3 Tentative Schedule of Events RFP Release Date Pre -Proposal Conference Deadline for Questions Deadline for Answers Proposals Due Date and Time: Evaluation of Proposals Selected PROPOSER InRtefviews if applicable Selected PROPOSER Best and Final Offer submittals, if applicable (Refer to 8.3.2) City Council Approval Contract Effective (anticipated): Tuesday, October 31, 2023 Thursday, November 9, 2023 at 9:OOAM (Central Standard Time) Thursday, November 16, 2023 at 5:OOPM (Central Standard Time) Monday, November 20, 2023 Thursda December 7 2023 1:30 PM kentral Standard Till December 2023/ January 2024 January 2024 January 2024 February 2024 March 2024 RFP 24-0002 Water Customer Information System Consultant Page 6 of 40 8.3.1 The PROPOSER must be available for an in -person interview from January 8, 2024 to January 12, 2024, in the case the firm's proposal proceeds through the evaluation process. Not being available for interviews during the specified week, will deem your proposal as non -responsive. 8.3.2 If the firm's proposal is chosen to proceed in the evaluation process following interviews, the PROPOSER must submit their Best and Final Offer by Friday, January 19, 2024. 9.0 PERIOD OF ACCEPTANCE PROPOSER acknowledges that by submitting the Proposal, PROPOSER makes an offer that, if accepted in whole or part by the CITY, constitutes a valid and binding contract as to any and all items accepted in writing by the CITY. The period of acceptance of proposals is one hundred and eighty (180) calendar days from the date of opening, unless the PROPOSER notes a different period. 10.0 TAX EXEMPTION The CITY of Fort Worth is exempt from Federal Excise and State Sale Tax; therefore, tax must not be included in any contract that may be awarded from this RFP. 11.0 COST INCURRED IN RESPONDING All costs directly or indirectly related to preparation of a response to the RFP or any oral presentation required to supplement and/or clarify a Proposal which may be required by the CITY shall be the sole responsibility of and shall be borne by the participating PROPOSER. 12.0 NEGOTIATIONS The CITY reserves the right to negotiate all elements that comprise the successful PROPOSER's response to ensure that the best possible consideration be afforded to all concerned. RFP 24-0002 Water Customer Information System Consultant Page 7 of 40 13.0 CONTRACT INCORPORATION The contract documents shall include this RFP, the PROPOSER's Response to the RFP, the CITY's Vendor Services Agreement (Attachment B), and such other terms and conditions as the parties may agree. 14.0 NON -ENDORSEMENT If a Proposal is accepted, the successful PROPOSER, hereinafter "Contractor," shall not issue any news releases or other statements pertaining to the award or servicing of the agreement that state or imply the CITY of Fort Worth's endorsement of the successful PROPOSER's services. 15.0 PROPOSAL EVALUATION PROCESS 15.1 The CITY Purchasing Division will guide the evaluation of PROPOSER responses received. 15.2 An Evaluation Committee consisting of representatives from various CITY departments and CITY consultants may be appointed to review and evaluate RFP responses in accordance with this RFP. CITY reserves the right at its sole discretion to include additional representatives from other CITY departments and or other contractors. 15.3 CITY reserves the right at its sole discretion to determine the process for proposal evaluation and may elect to accelerate and/or decelerate the evaluation process by combining, eliminating or expanding phases as it is deemed in the public interest to do so. 15.4 The Evaluation Committee will review PROPOSER's references and criteria and may select PROPOSER candidates for onsite interviews. 15.5 RFP responses that deviate substantially from the requirements of the RFP will be rejected. 15.6 The CITY reserves the right to reject any or all proposals. 15.7 Contract award will be by phase or overall total whichever the RFP 24-0002 Water Customer Information System Consultant Page 8 of 40 CITY determines to be in the CITY's best interest. 15.8 The CITY anticipates selecting PROPOSER(s) that will be recommended to the CITY Council for award of a contract to provide the requested services to the CITY. 16.0 PROPOSAL EVALUATION FACTORS Selection will be based on the qualified PROPOSER(s) that is determined to be the most advantageous to the CITY considering the relative importance of valuation factors listed below. A bidder will be disqualified if they do not meet at least 50% of the technical points available. 16.1 Cost (Exhibit B) — up to 20 points available 16.1.1 Cost will be evaluated based on the items indicated on Exhibit B, Cost Schedule Summary. 16.2 Consultant's project approach and methodology for all three phases to provide services such as project management and execution of services — up to 45 points available 16.2.1 This evaluation factor will be evaluated based on the information provided in Sections 33.6 and 33.7. 16.3 Consultant's qualifications, project experience, and references — up to 20 points available 16.3.1 This evaluation factor will be evaluated based on the information provided in Section 33.3. 16.4 Team's Key Personnel — up to 15 points available 16.4.1 This evaluation factor will be evaluated based on the information provided in Section 33.5. 17.0 SUBCONSULTANTS PROPOSERs may include subconsultants for any part of services offered. CITY reserves the right at its sole discretion to accept or reject any proposal that includes subconsultants. Upon award of a RFP 24-0002 Water Customer Information System Consultant Page 9 of 40 contract, CITY reserves the right to pre -approve use of any and all subconsultants. 18.0 BEST AND FINAL OFFER The CITY at its sole discretion may elect to have PROPOSERs submitting proposals deemed most advantageous to the CITY may be requested to prepare a Best and Final Offer for consideration by the Evaluation Committee. Contract negotiations will then be based on submitted Best and Final Offers. 19.0 ASSIGNMENT The PROPOSERs shall not assign its rights or duties under an award without the prior written consent of the CITY. Such consent shall not relieve the assignor of liability in the event of default by its assignee. 20.0 ERRORS OR OMISSIONS The PROPOSER shall not be allowed to take advantage of any errors or omissions in this RFP. Where errors or omissions appear in this RFP, the PROPOSER shall promptly notify the CITY's Purchasing Division in writing of such error or omission it discovers. Any significant errors, omissions or inconsistencies in this RFP are to be reported no later than ten (10) days before time for the RFP response is to be submitted. 21.0 TERMINATION 21.1 If this award results in a contract, it shall remain in effect until contract expires, delivery and acceptance of products and/or performance of services ordered or terminated by the CITY or Contractor with a thirty (30) day written notice prior to cancellation. In the event of termination, the CITY reserves the right to award a contract to next lowest and best PROPOSER as it deems to be in the best interest of the CITY. 21.2 Further, the CITY may cancel this contract without expense to the CITY in the event that funds have not been appropriated for expenditures under this contract. The CITY will return any delivered but unpaid goods in normal condition to the PROPOSER or pay for the goods, at the CITY's sole direction. RFP 24-0002 Water Customer Information System Consultant Page 10 of 40 22.0 TERMINATION, REMEDIES, AND CANCELLATION Right to Assurance. Whenever the CITY has reason to question the PROPOSER's intent to perform, the CITY may demand that the PROPOSER(s) give written assurance of PROPOSER's intent to perform. In the event a demand is made, and no assurance is given within ten (10) calendar days, the CITY may treat this failure as an anticipatory repudiation of the contract. 23.0 CHANGE ORDERS No oral statement of any person shall modify or otherwise change or affect the terms, conditions or specifications stated in the resulting contract. All change orders to the contract will be made in writing by the CITY's Financial Management Services Department and signed by both parties. Change orders must be approved by CITY Council if dollar amount is over $50,000.00. 24.0 VENUE The agreement(s) will be governed and construed according to the laws of the State of Texas. The agreement(s) is (are) performable in Tarrant County, Texas. Venue shall lie exclusively in Tarrant County, Texas. 25.0 CONFLICT OF INTEREST No public official shall have interest in this contract, in accordance with Vernon's Texas Codes Annotated, Local Government Code Title 5, Subtitled C., Chapter 176. (see Attachment A). 26.0 INSURANCE For the duration of a contract resulting from this RFP, PROPOSER shall carry insurance in the types and amounts as specified in Attachment B of this RFP. Insurance coverage(s) required herein are intended to respond to occurrences which may arise from services and/or goods related to this bid solicitation. 27.0 CONTRACT CONSTRAINTS AND CONDITIONS 27.1 All services shall be provided in accordance with applicable requirements and ordinances of the CITY, laws of the State of Texas, and applicable federal laws. RFP 24-0002 Water Customer Information System Consultant Page 11 of 40 27.2 The proposed Vendor Services Agreement has been provided with this RFP as Attachment B. PROPOSERs must submit any objections to the contract provisions along with responses. 27.3 A fully executed contract shall be comprised of the following documents: i. Vendor Services Agreement ii. This Request for Proposals, including all Attachments iii. The Successful PROPOSERs written Proposal 28.0 INVOLVEMENT OF MINORITY & WOMEN OWNED BUSINESS ENTERPRISE (MWBEJ: 28.1 MWBE participation is not part of the selection criteria. 29.0 COOPERATIVE PURCHASING 29.1 Should other governmental entities decide to participate in this Contract, PROPOSERs shall indicate in their proposals whether they agree that all terms, conditions, specification, and pricing would apply. 29.2 If the successful PROPOSER agrees to extend the resulting Contract to other governmental entities, the following will apply: Governmental entities within utilizing Contracts with the CITY of Fort Worth will be eligible, but not obligated, to purchase material/services under this Contract(s) awarded as a result of this solicitation. All purchases by governmental entities other than the CITY of Fort Worth will be billed directly to that governmental entity and paid by that governmental entity. The CITY of Fort Worth will not be responsible for another governmental entity's debts. Each governmental entity will order its own material/services as needed. 30.0 BILLING FOR SERVICES, PAYMENT 30.1 PROPOSER shall bill for services based on the Proposed Service Fees and Charges Schedule for actual services performed, as presented in Exhibit B. 30.2 All payment terms shall be no later than 30 days from the date the RFP 24-0002 Water Customer Information System Consultant Page 12 of 40 City receives a properly prepared invoice that contains no errors. Please see Section 30.0 for invoicing requirements. Prompt/early payment discount(s) may be considered by the City. Bidder shall submit the proposed discount(s) on the "Cost Schedule Summary". 30.3 Successful bidders are encouraged to register for direct deposit payments prior to providing goods and/or services using the forms posted on the City's website at httiDs://www.fortworthtexas.gov/departments/finance/purchasing/ach 30.4 Service PROPOSER shall invoice no more frequently than monthly for services provided. 30.5 The City of Fort Worth has implemented an automated invoicing system. 30.6 The Contractor shall send invoices electronically to our centralized Accounts Payable department invoice email address: supplierinvoices@fortworthtexas.gov. This email address is not monitored so please do not send correspondence to this email address. The sole purpose of the supplier invoices email address is to receipt and process supplier invoices. 30.7 Please include the following on the subject line of your e-mail: vendor name, invoice number, and PO number, separated by an underscore (ex: Example, Inc._123456_FW013-0000001234) 30.8 To ensure the system can successfully process your invoice in an expedient manner, please adhere to the following requirements: • All invoices must be either a PDF or TIFF format. • Image quality must be at least 300 DPI (dots per inch). • Invoices must be sent as an attachment (i.e. no invoice in the body of the email). • One invoice per attachment (includes PDFs). Multiple attachments per email is acceptable but each invoice must be a separate attachment. • Please do not send handwritten invoices or invoices that contain handwritten notes. • Dot matrix invoice format is not accepted. • The invoice must contain the following information: RFP 24-0002 Water Customer Information System Consultant Page 13 of 40 • Supplier Name and Address; • Remit to Supplier Name and Address, if different; • Applicable City Department business unit# (i.e. FW013) • Complete City of Fort Worth PO number (i.e. the PO number must contain all preceding zeros); • Invoice number; • Invoice date; • Unit and total cost; and • Invoices should be submitted after delivery of the goods or services. 30.9 To prevent invoice processing delays, please do not send invoices by mail and email and please do not send the same invoice more than once by email to supplierinvoices@fortworthtexas.gov. To check on the status of an invoice, please contact the City Department ordering the goods/services or the Central Accounts Payable Department by email at: ZZ FIN AccountsPavable(a�fortworthtexas.gov. 30.10 If you are unable to send your invoice as outlined above at this time, please send your invoice to our centralized Accounts Payable department instead of directly to the individual City department. This will allow the City staff to digitize the invoice for faster processing. 30.11 If electronic invoicing is not possible, you may send your paper invoice to: City of Fort Worth Attn: FMS Central Accounts Payable 200 Texas Street Fort Worth, Texas, 76102 The City's goal is to receive 100% of invoices electronically so that all supplier payments are processed efficiently. To achieve this goal, we need the Contractor's support. If Contractor has any questions, please contact the Accounts Payable team at (817) 392-2451 or by email to ZZ FIN AccountsPavable(a)fortworthtexas.gov. 30.12 Contractor shall not include Federal, State of City sales tax in its invoices. City shall furnish a tax exemption certificate upon Vendor's request. RFP 24-0002 Water Customer Information System Consultant Page 14 of 40 31.0 CERTIFICATE OF INTERESTED PARTIES FORM 1295 The successful PROPOSER is required to complete online and sign the Certificate of Interested Parties Form 1295 and the form must be submitted to the Purchasing contact listed in the solicitation before the purchase/contact will be presented to the CITY Council. The form may be completed at httiDs://www.ethics.state.tx.us/whatsnew/elf info form1295.htm. 32.0 CHANGE IN COMPANY NAME OR OWNERSHIP The Vendor shall notify the CITY's Senior Purchasing Manager, in writing, of a company name, ownership, or address change for the purpose of maintaining updated CITY records. The president of the company or authorized official must sign the letter. A letter indicating changes in a company name or ownership must be accompanied with supporting legal documentation such as an updated W-9, documents filed with the state indicating such change, copy of the board of director's resolution approving the action, or an executed merger or acquisition agreement. Failure to do so may adversely impact future invoice payments. 33.0 PROPOSAL REQUIREMENTS/FORMAT Proposals should adequately address all evaluation factors listed in Section 16.0 and include the following list of required items that that will be used as part of the evaluation. Proposals should be prepared as simply as possible and provide a straightforward, concise description of the proposer's capabilities to satisfy the requirements of the RFP. Utmost attention should be given to accuracy, completeness, and clarity of content. All parts, pages, figures, or tables should be numbered and clearly labeled. Response information should be limited to pertinent information only. PROPOSER shall utilize the format below to submit their proposal. PROPOSER'S proposal submission must include the following information, failure to provide all the information will deem the bid non -responsive: 33.1 A completed and signed original Request for Proposals (RFP) Cover Sheet. The primary contact should be identified, together with both telephone number and email address. RFP 24-0002 Water Customer Information System Consultant Page 15 of 40 33.2 Executive Summary detailing the Proposer's interest and understanding of the project. 33.3 Relevant Project Experience: Provide Proposer's and any subconsultants' background, number of years in service, licenses, qualifications and experience including experience related to the requirements within this RFP, and past performance with a minimum of three projects of similar size and scope. Relevant project experience should include the following: 33.3.1 Project Name 33.3.2 Scope of services provided 33.3.3 Name of individuals that worked on the referenced project 33.3.4 Client references and contact information, including phone number and email address 33.3.5 Costs of the services provided by phase 33.3.6 Project schedule variance, including planned finish vs. actual finish 33.4 Organization Chart: Provide an organization chart depicting the structure, lines of authority and communication for all the Proposer's principals, personnel, and subconsultants to be involved in the project. 33.5 Key Personnel: Provide experience of the project team members of the Proposer and Subconsultants who will actually be performing services described in this RFP. Provide the personnels' names, roles and relevant work history. One -page resumes of key personnel may be included as an appendix with proposal submittals. 33.6 Schedule: Provide a proposed schedule for Phase 1 of the project estimated to require approximately six months. Demonstrate the Proposer's ability to deliver projects within the scheduled timeframe. 33.7 Approach and Methodology: Provide Proposer's project approach for completing and managing all three phases of the project described in Exhibit A. This document must include the following: 33.7.1 Approach and Methodology for completing the services RFP 24-0002 Water Customer Information System Consultant Page 16 of 40 described herein. Identify any key risks and potential mitigation strategies. 33.7.2 Outline project steps to be taken from initial consultation through CIS implementation 33.8 Proposed Cost Schedule Summary for Phase 1 — Exhibit B. All pricing shall be submitted in a separate sealed envelope labeled "Pricing" with your proposal. 33.9 A completed and signed original Conflict of Interest Questionnaire, Attachment A. 33.10 Any and all exceptions to the RFP must be listed on an item -by -item basis and cross-referenced. If there are no exceptions, the Proposer must expressly state that no exceptions are taken. 33.11 Any addendums sent out after the release of the RFP. 33.12 Any other document included in the Solicitation requiring completion or execution by the PROPOSER. 33.13 Scanned copy of all documents listed in Section 33.0 in a USB flash drive. Please note, only the items on the USB will be evaluated, therefore, all documents must be uploaded to the USB. RFP 24-0002 Water Customer Information System Consultant Page 17 of 40 EXHIBIT A SCOPE OF SERVICES 1.0 INTENT 1.1 The City of Fort Worth Water Department (FWWD) invites qualified consulting firms to conduct a comprehensive needs assessment for a Utility Customer Information and Utility Billing System solution. The needs assessment will determine the requirements and objectives to be included in a Request for Proposal (RFP) for a utility CIS that will address FWWD's needs. Additionally, the selected firm will assist FWWD in navigating the complexities of selecting and implementing a new CIS. 1.2 This RFP is intended to provide potential firms the necessary information to build a proposal that meets the utility's needs. Proposals should address the objectives, tasks and deliverables detailed in this RFP and provide information on the firm's practices, experience, and offerings that will meet or exceed the utility's expectations. Throughout the proposal, the Fort Worth Water Department (FWWD) may also be referred to as "the utility". 1.3 The Fort Worth Water Department is requiring that firms, be independent and not personally or financially affiliated with any CIS vendor. FWWD also requires that firms provide objective and vendor -neutral perspectives, as well as, exercise discretion and confidentiality during the selection process. 2.0 BACKGROUND The City of Fort Worth Water Department operates the City's Water Utility and administers the Utility's billing functions and the collection of fees for water, wastewater, stormwater, solid waste and related services. FWWD needs to migrate to a modern CIS solution in order to take advantage of new technologies and capabilities that leverage our advanced metering infrastructure (AMI) data and system integrations. The CIS is used to calculate and generate bills, and it includes the database that is the primary repository for all utility rates, fees, service orders and customer information. Additionally, RFP 24-0002 Water Customer Information System Consultant Page 18 of 40 FWWD would like to improve its time -to -market with new services for our customers by consolidating the various tools listed in Section 3.1 FWWD Environment and Key Stakeholders, into a reduced number of providers. The FWWD has launched an internal program called MyH2O 2.0 to improve the customer experience, advance business processes, enhance transparency and reduce water loss. A new CIS is a critical component of this program to support customer account data, calculate customer consumption and manage consumption rates, prepare and deliver bills, process and record payments, manage credit and collections, and conduct revenue analysis. 2.0 GOALS AND OBJECTIVES FWWD recognizes that the process for selecting and implementing a utility CIS has unique demands and complexities. FWWD is seeking a firm with a range of experience working with water utilities in modern CIS solutions, best practices in billing procedures, services and related principles including bill presentment, bill payment and reporting. FWWD expects active involvement by the selected firm and seeks to allow the selected firm to act as an extension of FWWD staff by taking a leading role when their expertise is most valuable. 2.1 The firm's experience and expertise will help FWWD meet its goals and objectives, which include: 2.1.1 A comprehensive assessment of required functionality for the replacement of FWWD's CIS. 2.1.2 Budget estimations for the replacement of current CIS and, if required, associated systems. 2.1.3 The development of an RFP for the selection of a replacement CIS. 2.1.4 Completion of an objective, impartial, and confidential selection process. 2.1.5 Successful contract negotiations with selected vendor(s), in conjunction with the City of Fort Worth Legal and Water RFP 24-0002 Water Customer Information System Consultant Page 19 of 40 Departments, resulting in an executed contract agreement. 2.1.6 Access to timely, targeted, and accurate data enabling enhanced business services and empowered customers. 2.1.7 Improved workflows and processes through the use of technology and increased levels of service. 2.1.8 Cost effective selection, implementation, and sustainment of the CIS solution and if required, associated systems and functionality. FWWD is not seeking a customized solution but desires a configurable commercial off -the - shelf software. 3.0 FWWD ENVIRONMENT AND KEY STAKEHOLDERS 3.1 FWWD is a combined regional water and wastewater utility that serves the City of Fort Worth and surrounding communities. With over II AM customers, 284,000 accounts and 292,000 metered connections, FWWD provides services to one of the fastest growing regions in the country. FWWD currently uses Sensus AMI and Harris Compass Meter Data Management System (MDMS) to remotely obtain meter readings. Manual meter reads and service order updates are captured in the field via MRSP's Smart Phone Meter Reading tool using cell phones. Additionally, FWWD utilizes Oracle Customer Relationship Management (CRM) system, Selectron Interactive Voice Response (IVR), Smart Energy Water (SEW) customer web portal, Paymentus payment processing and Dataprose bill presentation. System integrations are accomplished through Mulesoft Enterprise Service Bus (ESB). Mapping is provided by geographic information systems (GIS) and Environmental Systems Research Institute, Inc. (ESRI), business processes are documented using IBM Blueworks and the City's financial and HR software is Oracle's PeopleSoft. RFP 24-0002 Water Customer Information System Consultant Page 20 of 40 3.2 Key Stakeholders Division or Office N/A Customer Care Customer Care Customer Care Management Services Management Services N/A Environmental Services, Transportation & Public Works, Financial Management Services Team/Section Steering Team Customer Relations Meter Services Conservation Public Engagement Finance Org. Development Workforce Initiatives Water IT CIS Core Team Env Protection Solid Waste Stormwater Accounting Purchasing Role or Responsibility Executive Sponsor Strategic Guidance Customer Service Billing & Delinquency Customer Data Training Wholesale Workorder Management AMI Installation, Repair & Sustainment Enforcement & Stewardship Communication Budget Workflow & Process HR Support Systems Management Data Management Security System Integrations SME Dedicated CIS Replacement Team End Users RFP 24-0002 Water Customer Information System Consultant Page 21 of 40 4.0 CONTRACTOR'S REQUIREMENTS IN ORDER FOR PROPOSALS TO BE EVALUATED 4.1 The proposing firm shall be currently providing CIS consulting services, and have been doing so, no less than in the last five (5) consecutive years. 4.2 The proposing firm and designated consultant shall have experience conducting a comprehensive needs assessment, and successfully selecting and implementing a new CIS for water/wastewater entities. 5.0 PHASED APPROACH This project will be performed through three (3) distinct phases of execution. FWWD anticipates issuing an initial contract for Phase 1 services with the option for Phases 2 and 3 following the successful completion of Phase 1. Phase 1 is anticipated to have a start date of March 2024, and take approximately six months to complete. The selected firm will work with FWWD to assign a dedicated project manager and identify a dedicated CIS core team to support the project. The selected firm may be required to collaborate with other city departments and vendors during the course of this project. 5.1 Phase 1: Requirements building, process mapping, and documentation leading to the development of an RFP for a CIS solution. 5.2 Phase 2: Selection of CIS solution and implementor 5.3 Phase 3: Implementation and go -live. This will include the use of a system implementor. 6.0 SCOPE OF SERVICES FWWD expects the selected firm to maintain the same personnel assigned throughout the duration of this project. If it becomes necessary to replace any personnel, the firm will replace that person with an individual having equivalent experience, education, and competence. The firm will notify FWWD, in writing, within a week, and obtain approval for the replacement. RFP 24-0002 Water Customer Information System Consultant Page 22 of 40 FWWD understands there is a probability of uncontrollable and unforeseen circumstances, therefore approval of these instances will not be unreasonably withheld. 6.1 Phase 1: Requirements building, process mapping and documentation leading to the development of an RFP for a CIS solution. Phase 1 requires the selected firm to lead and conduct a needs assessment and finalize process maps and workflows in order to capture and document FWWD requirements. The selected firm will: 6.1.1 Conduct a comprehensive assessment of FWWD's current CIS, business processes, interfaces, integrations, shadow systems, and technology constraints. 6.1.2 Identify necessary resources and City personnel to be involved in the RFP specifications building, process mapping, and workflow documentation process. 6.1.3 Conduct a comprehensive needs assessment and analysis of FWWD's future CIS system, including improvement to business processes, hardware upgrades, data resources and reporting, infrastructure, interface, operations, standards, and procedures. 6.1.4 Assess the business drivers for technologies, confirm business strategy and goals, and identify desired processes. 6.1.5 Define the approach to CIS and implementor selection as either separate or integrated procurements and document the approach within a formal report. 6.1.6 Author a comprehensive RFP for CIS replacement. At a minimum, the selected firm will include the following in the RFP: 6.1.6.1 Functional requirements 6.1.6.2 Non-functional requirements 6.1.6.3 Data sharing requirements 6.1.6.4 Security requirements 6.1.6.5 System integration and interoperability RFP 24-0002 Water Customer Information System Consultant Page 23 of 40 requirements 6.1.6.6 Specific goals and objectives for CIS solution 6.1.7 Identify and document opportunities for efficiencies, cost savings, and potential risks within a formal report. 6.1.8 Propose solutions and estimate total cost of ownership, including implementation and sustained support within a formal report. 6.1.9 Take on the lead role in authoring the RFP to include the scope of work. 6.1.10 Identify CIS software vendors that meet specific needs for RFP distribution. 6.1.11 Recommend composition of selection team and evaluation criteria. 6.1.12 Identify and document current business processes 6.1.13 Provide optional consultant staff support (Part of Core Team) such as: 6.1.13.1 Project Manager 6.1.13.2 Business Lead 6.2 Phase 2: Selection of a solution and implementor. The selection approach is dependent on the outcome of the procurement approach defined under Section 6.1.5 above, and may result in the development of two separate RFPs; one for a solution/vendor and another for a dedicated system implementor. 6.2.1 If a separate system implementor procurement is required, the selected firm will follow the same RFP approach utilized in CIS selection to identify and select the system implementor. 6.2.2 During Phase 2, the selected firm is expected to act as the representative of FWWD. This will include working the City of Fort Worth's Purchasing Division to respond to any questions or clarifications potential CIS vendors may have. 6.2.3 In addition to acting as a representative of FWWD, the RFP 24-0002 Water Customer Information System Consultant Page 24 of 40 assigned consultant will: 6.2.3.1 Participate as an evaluation panelist in the city's evaluation process. 6.2.3.2 Review proposals and provide a summary report to FWWD. 6.2.3.3 Validate that proposed systems meet FWWD requirements and identify any potential gaps. 6.2.3.4 Inform FWWD of any potential policy or standard operating procedure changes associated with CIS vendors and proposed solutions. 6.2.3.5 Attend site visits/demonstrations. 6.2.3.6 Provide cost analysis of proposals by phase. 6.2.3.7 Document potential CIS/implementor fit and identify potential solution limitations and risks. 6.2.3.8 Provide assistance, advice, and review during the City's contract negotiations with the selected CIS vendor and implementor. 6.2.3.9 Provide optional consultant staff support (Part of Core Team) such as: 6.2.3.9.1 Project Manager 6.2.3.9.2 Business Lead 6.2.3.9.3 Training Lead/Trainer 6.2.3.9.4 Testing Lead 6.3 Phase 3: Implementation and go -live, consisting of implementation and launching the selected CIS. 6.3.1 During this phase the selected firm will: 6.3.1.1 Assist FWWD in troubleshooting and problem -solving issues. RFP 24-0002 Water Customer Information System Consultant Page 25 of 40 6.3.1.2 Recommend policy and/or process changes as necessary. 6.3.1.3 Collaborate with FWWD on change management practices and approaches. 6.3.1.4 Assist with contract compliance issues and actions. 6.3.1.5 Prepare FWWD for transition and cutover support with effective planning, documentation, and consultation. 6.3.1.6 Advise FWWD on best practices and evaluate/communicate impacts of decisions. 6.3.1.7 Provide optional consultant staff support (Part of Core Team) such as: 6.3.1.7.1 Project Manager 6.3.1.7.2 Business Lead 6.3.1.7.3 Training Lead 6.3.1.7.4 Testing Lead 7.0 COMMUNICATION AND UPDATE REQUIREMENTS The consultant shall provide routine updates and communication to key stakeholders throughout the life of the project. This will include weekly status report meetings with meeting notes for the executive sponsor, steering team and other key stakeholders. These meetings will be held in -person or through video conference and will include the following: 7.1 Problems and challenges, either anticipated or current 7.2 Timeline progress 7.3 Overview of upcoming activities 7.4 Milestone progress and/or completion 7.5 Identification of project risks and recommended mitigations 7.6 Updates on cost and/or schedule variances RFP 24-0002 Water Customer Information System Consultant Page 26 of 40 8.0 DESIRED KNOWLEDGE, SKILLS, AND ABILITIES The selected firm shall have personnel assigned to the project with the following knowledge, skills and abilities: 8.1 Knowledge of industry best practices, standards, and rules and regulations. 8.2 Understanding of water/wastewater-specific utility billing practices. 8.3 Understanding of billing software and solutions as well as experience working with data management. 8.4 Range of experience with CIS software vendors. 8.5 Ability to facilitate discussion and engagements. 8.6 Ability to communicate effectively, both orally and in writing. 8.7 Strong project management skills. 8.8 Strong analytical and problem -solving skills. 9.0 DATA OWNERSHIP 9.1 All materials developed under this contract are the property of the City. Under no circumstances shall the consultant place a copyright on any material that the consultant develops, provides and receives for payment under this contract. 9.2 All materials shall be provided to the city representative at the time of project completion and closeout in a format defined by the City. 9.3 All data, records, and reports relating to the City and its citizens, customers, and/or partners (collectively, "Records"), whether in existence at the execution of the contract or compiled in the course of performing the services, shall be the exclusive property of the City. 9.4 The furnishing of Records to, or access to Records by, the RFP 24-0002 Water Customer Information System Consultant Page 27 of 40 consultant and/or its subconsultants shall not grant to the consultant or its subconsultants any express or implied interest in or license to the Records other than as is necessary to perform and provide the services to the City. 9.5 Upon request by the City at any time and from time to time and without regard to the default status of the parties under the contract, the consultant and/or its subconsultants shall, at no additional cost to the City, promptly deliver to the City the records that exist at the time of the request in an electronic format that is usable by the City. 9.6 Utility customer and consumption data is designated as confidential and protected by Texas State Law. 9.7 In anticipation of conducting business with the consultant, it may be necessary for the City to share trade secrets and/or other confidential information and/or proprietary information or matter with the consultant. 9.8 The parties agree that such information and the materials referenced in the contract, the results, and developments therefrom are confidential/proprietary information that belongs to the City. 9.9 The consultant agrees not to disclose to any third party any such trade secrets and/or confidential or proprietary information for its own separate benefits. 9.10 The consultant will be responsible for its employees, subconsultants, or agents complying with the provisions of this contract. RFP 24-0002 Water Customer Information System Consultant Page 28 of 40 EXHIBIT B COST SCHEDULE SUMMARY This sheet will be used to evaluate costs and pricing. This sheet must be in a separate sealed envelope inside the main package marked "PRICING." Please do not include pricing within the proposal response documents. Proposer may include any additional services and fees. However, pricing for this RFP will only be evaluated for the cost of items listed below. If additional personnel are required to complete Phase 1, please add lines below "Other personnel, as needed", and include their position title, the estimated quantity of hours they will be needed during Phase 1, their hourly rate, and the total cost of their services for Phase 1. PHASE ONE (Estimated duration: 6 months) SERVICES QTY UOM UNIT TOTAL COST COST Consultant Hourly Rate Project Manager, as needed Hourly Rate Business Lead, as needed Hourly Rate Other personnel, as needed Hourly Rate Direct Costs Each Total Contract Cost for PHASE ONE: Prompt Payment Discount Terms: Percent Days (i.e. 3% Net 15, etc.) RFP 24-0002 Water Customer Information System Consultant Page 29 of 40 PRICING PRICING: All percentages, hourly rates, and/or prices quoted shall be firm and fixed for the specified contract period. Ninety (90) days before the renewal, the Contractor shall submit any changes in pricing for consideration. The City, at its sole discretion, shall accept or reject any or all increases in costs or levels of performance requested. PROPOSAL ITEMS: Proposer shall factor all relevant considerations into their pricing, and must include all expenses related to providing the services as outlined in Exhibit A, Section 6.1. Considerations should include all incidentals including, but not limited to, all necessary personnel, transportation, insurance, etc. RFP 24-0002 Water Customer Information System Consultant Page 30 of 40 ATTACHMENT A CONFLICT OF INTEREST DISCLOSURE REQUIREMENT Pursuant to Chapter 176 of the Local Government Code, any person or agent of a person who contracts or seeks to contract for the sale or purchase of property, goods, or services with a local governmental entity (i.e. The CITY of Fort Worth) must disclose in the Questionnaire Form CIQ ("Questionnaire") the person's affiliation or business relationship that might cause a conflict of interest with the local governmental entity. Bylaw, the Questionnaire must be filed with the Fort Worth CITY Secretary no later than seven days after the date the person begins contract discussions or negotiations with the CITY, or submits an application or response to a request for proposals or bids, correspondence, or another writing related to a potential agreement with the CITY. Updated Questionnaires must be filed in conformance with Chapter 176. A copy of the Questionnaire Form CIQ is enclosed with the submitta documents. The form is also available at http://www.ethics.state.tx.us/forms/CIQ.Pdf. If you have any questions about compliance, please consult your own legal counsel. Compliance is the individual responsibility of each person or agent of a person who is subject to the filing requirement. An offense under Chapter 176 is a Class C misdemeanor. NOTE: If you are not aware of a Conflict of Interest in any business relationship that you might have with the CITY, state Vendor name in the # 1, use N/A in each of the areas on the form. However, a signature is required in the #7 box in all cases. RFP 24-0002 Water Customer Information System Consultant Page 31 of 40 CONFLICT OF INTEREST QUESTIONNAIRE FORD CIO For vendor doing buslriess vtflth local governmental entity This quostionnaim rallaets d►anges made to dw law by H.111 a 84th Lag., Ragular Session OFFIGEUSE ONLY This gwslionnasre is i tiled in acoordairk" with Chfaptor 176, Laical C.Dvamnenl Cade, by a vondoe who Etas a business Wationslrp as Mined by Section 176.001(1-a) with a IDGei g fefnmankal amity aria the vendor meets reWiramerrls urldar Section 1746.0Wa). Py lava M quasaanrimra musi be tied with fie records arirrlaslrakx of the local govemmanial entry not lacer than dig 7th business dap after the dale the vondorr bDocaes aware of facts thal requF9 the suitemerht to be Ned. yes SamorN 1 A DuCa f j Local C,ar,+f}rnmenl COW. A vendor c omrnilz an offense ii the vendor knohrb* violates Seckic 176.006, Local Gavernrimi Cole. An aflorki unlit Ctrs so:rmn ss a lrrsdemra,#nix. J Name ofvendorwho has a business relafionship with local gorornmentalerttity J HCMoct4 lh is box 11Yau are tiling an update. to a prevlrouafy Illad gl,,oattnnnuro. (The lawreghwrgs thatyau tllaan upriaw c+}mploted questionnai-re with the appropriate filing authmity not later than the 7th business dap after the dale on which you bmaimo aware chat the originally ill&d questionnaira was rncompleia Of rfraccurata.} J Horne of local gowamnwni off cor about whom the Informntlon is being dlscic wd, ',]'tic3 C,'; u11cel 00scribe each employment or other business relationship with the laical government olficer, or a lamily member of Iho orficer, as described b3f Section 176.{iO3ia�(2�(,lil. Also dosenbe any family relationship with the local government otfiei�-r. Complot@ subparts A and 9 loreach emptoyrnem ar business relationship described. Artach sddi#tonal pages to this Farm Cla as necessary. A. Is the local government olficpr or a famiy memtxx of the officer receiving or likely to rye taxaW Fcome. other than in estnant income, from lira vandor7 71 Yas F7 No B. it ilia vartdm receiving of lively to ractwo taxabia incoma, other than irwastthant income, from of at tha direction of the laical glo vemment ofFiceiir it a family ffmmber of the of6 i AND the taxable income is nit received from the local , ., , Al ontigr7 YM = No DYascrdse aach , i I it or hualnass ralationshkip Itiai the vendor nimnad In SectYan 1 wa irniina wilth s corrporstkm or other business entity with rDspect to which it* local govarrwanit affrcor s vvas as arc officer or dtroclor, or holds an awrwrship interest al Dire percent ar more. J 7-1Chockthis box if the varidor hats groan the local government oilear or a tamofi marnber of the officer ona or more grits as described in Section 176.M(a)(2)(B), excluding gifts described !Ti Se iori 176- 1Gila-1j. 71 it g@ aAre d vendor oalng txrslness wrvh me govarnuwiat enay LI;W Farm p mend by Texas I=ftu Caurrrsow www.athres.state.rx.us RE%sed 1111-A21 RFP 24-0002 Water Customer Information System Consultant Page 32 of 40 CONFLICT OF INTEREST QUESTIONNAIRE For vendor doing business with focal governmental entity A completo copy of Chapler 176 of the Leal Government Code maybe found at http:;,vrww.Statutes. legis.slate.tx-us Vacs'LG htrn LG 176 him For easy reference. below are some of the sections cited on this form. Local Government Code § 176.0011(1-a.-Busine55 relationship" means a Connection between two or more parties based cn ,,,. i.i.,,k ,6.�al activity of one of the parties. The term does not include a connection based on: (A) a transaction that is subject to rate or tee regulation by a federal, state. or local governmental entity or an agency of a federal, stale, or local governmental amity; 1131 a transaction conducted at a price and stlbjectto terms available to the public: or IC) apurchase or lease of goods of services Irofn a person that is chartered by a state or federal agency and Ihat is subject to regular examination by, and reporting to, Mt 8i!p y. Local Govetmmeni Code § 1T6.DOXaMMand fBL (a) A local government officer aflalr ltld a Conflicts disclosure Statement witti respect to avendor it: (2) "vendov (A) has an employment or other business relationship with the Racal government officer or a family member of the officer that results in the officer of family member receiving taxable income. ether than investment income. that exceeds $2.500 during the 12-toroth period preceding the date that the Officer becomes aware that fil a contract between the local governmental entity and vendor has been executed'. the local groverninental entity is considering entering into a contract with the {W has given to the local government officer ar a family rnem ber of the officer one or more gifts that have an aggregate value of more than S 100 in the 12-month penod preceding the date the officer b2cornes aware that: (i) a contract between the local governmental entity and vendor has been executed; or (M.1 the local governmental entity is considering entering into a contract withthevendor. Local mimelnt Code A 176.006 M and fe-1 ) (a) A veridor shall file a completed conflict cif interest questionnaire if the vendor has a business relationship with a local governmental entity and- (1) has an employment or other busineSS relationship with a local .. 1 officer of that local governmental entity, or family member of the officer -described by Section 176-003(a)12)(A); (2) has given a local government officer of that local governmental entity, or a family member of the officer- one or more giftswilh then Meigata value specified by Section 176.00%a)(2)19), excluding any grit descNbedbyS tivn 176.003(a-1);ar (3) has a lamiy relatlotrship with a facet government officer of that local governmental entity - (a• 1) The completed conflict of interest questionnaire must befiledwdh the apprmpnafe records administrator not later than the seventh business day after the later of: (1) une date that the vendor: (A) begins discussions or negotiations to enter into a contract with the local garemirnental entity; or (S) suibmits to this local 9ok � <C.I entity an applicaiiion. response to a request tot proposals or bids, correspondence, or another writing related to a potential contract with Me local gcrvemmenla.l entity; or (21 the date the verKlor becomes aware: (A) of an employment of other business relationship with a local government oilrcet, or a fami ly member of the officer, described by Subsection (a); (S ) that the vendor has g iven one or more gifts described by S ubs:ection (a); or (C) of a Windy relationship with a local government officer. Form pwiNKMbyr Tiaaa6 Ethics Conocoion WMM elriics Stale IN us Re-Amd 1V1=1 RFP 24-0002 Water Customer Information System Consultant Page 33 of 40 ATTACHMENT B DRAFT VENDOR SERVICES AGREEMENT Draft Vendor Services Agreement is attached as a separate document. RFP 24-0002 Water Customer Information System Consultant Page 34 of 40 ATTACHMENT C DOCUMENTATION CHECKLIST *Proposer shall complete the below to aid in responsiveness* Refer to Section 33.0 for more information on the below required documents. Required Documents A completed and signed Request for Proposals (RFP) Cover Sheet Executive Summary detailing the Proposer's interest and understanding of the project Relevant Project Experience: Provide Proposer's and any sub -consultants' background, number of years in service, licenses, qualifications and experience including experience related to the requirements within this RFP, and past performance with a minimum of three projects of similar size and scope Organization Chart: Provide an organization chart depicting the structure, lines of authority and communication for all the Proposer's principals, personnel, and subconsultants to be involved in the project. Document Attached? Yes/No *Answering No to the below will result in the bid being deemed non- resaonsive* Page Number(s) of Proposal *Proposer will need to number each page of their proposal. * RFP 24-0002 Water Customer Information System Consultant Page 35 of 40 Key Personnel: Provide experience of the project team members of the Proposer and Subconsultants who will actually be performing services described in this RFP. Provide the personnels' names, roles and relevant work history. One -page resumes of key personnel may be included as an appendix with proposal submittals. Schedule: Provide a proposed schedule for Phase 1 of the project and demonstrate the Proposer's ability to deliver projects within the schedule timeframe. Approach and methodology for completing the services outlined in all three phases of the project, including identification of any key risks and potential mitigation strategies. Exhibit B - Cost Schedule Summary Attachment A - A completed and signed original Conflict of Interest Questionnaire Any and all exceptions to the RFP must be listed on an item -by -item basis and cross-referenced. If there are no exceptions, the Proposer must expressly state that no exceptions are taken. Any addendums sent out after the release of the RFP Any other document included in the Solicitation requiring completion or execution by the Proposer. Scanned Copy of all required documents on a USB Drive. Separate Sealed Envelope labeled "Pricing RFP 24-0002 Water Customer Information System Consultant Page 36 of 40 ATTACHMENT D CIS PROCESSES AND ASSOCIATED FUNCTIONAL CATEGORIES Alarms ICurrent State _Daily Reporting Alarms (Current State —Reverse Flow Alarm ICurrent State _AMI Endpoint Installation Current State _AMI Endpoint Removal Installation Complaints Current State Meter Procurement Meter Services Meter Change Out New Meter Set 2" and Under VI New Meter Set 3" and above Redevelopment Water Rehab GIS Future State Annual Backflow Assembly Testing Future State Backflow Events Processing Future State Backflow Inspection Backflow Section Future State CSI High Priority Enforcement Sub -Process (Online Testing for Commercial/Industrial Current State Backflow Assembly Testing Future State Billing_V2 Current State Calendars (Billing, Delq, Schedule Calc) (Rates Winter Quarter Average (WQA) Billing Billing Exceptions Subprocess Future State Schedule a payment Refund Pick Your Own Due Date Future State Waste Water Credit Prebill/ Budget (Average) Billing Credit & Collections Pending Current State Service Account Set -Up [Service Account Set -Up (Contact Center) In Person, Phone, Mail/Email/Portal j (Termination of Service (Move -Out) ICurrent State Account Transfer ICurrent State Customer Initiated Inquiry (High Bill Complaint) Future State Re -connect (Customer Service Reconnect Meter Change Out - Customer Initiated (Customer Inquiry/Complaint Extensions/ Payment Arrangements High Usage/ Adjustments (Account Investigation (Residential, Commercial & Irrigation)— ( Billing Inquiry- Billing History Billing Inquiry- Duplicate Bill Emergency Sewer - Emergency Water - Payment Plans- ICustomer Master File - I Bankruptcy (Credit Refund I Deposit Waiver I Write Off Reversal I Wholesale (Credit Collections - All Balance Transfer Inactive - Delinquency Contact Center (Emergency FOPS SUPPORT RFP 24-0002 Water Customer Information System Consultant Page 37 of 40 IVR payment/technical support Return to Associate Inquiry- General Solid Waste Special Event IStorm Water/ Storm Water Billing Adjustment I Water Conservation I Water Quality I IBA- Commercial , Irrigation & Residential Lid Replacement (Temp On/Off I Future State In -House Design (New Meter) IService Report Review I Razing Permit Review (Special Fees I Invoicing IPublic Information Request I Recording fees in Accela Waived by NEZ Infield Lot Review Kill tap_RG_ started Refunds and Adjustments IStorm Water Impervious Surface (Automatic Flusher (Commercial Review Checklist Residential Review Checklist Grading Permit Review Water Account Set -Up (Water Applications) Applications/Development I Miscellaneous Project Process - Current State_2022 Future State Non -pay Disconnect Delinquency Fire Hydrant Meter Contractor Agreement Future State Waste Water Credit Waste Water Credit - Water Applications Delinquency Policy Commercial complex 4 units or more Inactive Consumption Breakdown 2 Pledges Posting Inactive Charges for Water Used with No Active Account ISetting up PEM (Payment Plan) IH2Online PowerPoint I Billing & Consumption Requests Customer (Anonymous Queue Weekend Restores Support/Delinquency IH2online Report I Daily Pledge Count Report IService Not Restore IReturn Mail IOutgoing letters (Queue management IMunicipal Utility Lien I Billing Queue (Same Day-PEM-Non-Cash Queue) IManual Locks Monthly Delinquency Report Non -Cash Close Work Order for Meter off for Nonpayment Fire Hydrant Meter Agreement Billing Field Ops Supported I Fire Hydrant Meter Communication Monitoring IFire Hydrant Meter Testing RFP 24-0002 Water Customer Information System Consultant Page 38 of 40 Future State Wholesale Wastewater Metering Future State Wholesale Water Metering I Wholesale Wastewater Billing Schedule I Wholesale Water Billing Schedule Cheat Sheet Wholesale Adjustments (Wholesale Adjustments) Cheat Seat Wholesale Services Late Fee Procedures for Wholesale Water Wastewater and Reclaim Invocie I Impact Fee Process (Cheat Sheet Refunds I Wholesale Customer Refund Credits Immpact Fee Audit Wholesale (Cheat Sheet Totalizer Updating (Wholesale Totalizer Updating) (Cheat sheet WW INV Creation (Wholesale Wastewater Creation) (Cheat Sheet MTR Reads.Max Day.Hour Updating I Water Consumption Spreadsheet Updating ICheat Sheet WA INV Creation ICheat Sheet Reclaimed WA INV Creation (Wholesale Reclaimed Water Invoice Creation) ICheat Sheet Monthly CSH Request (Wholesale Monthly Consumption Request ICheat Sheet Raw Water Payment Report ICheat Sheet Monthly WA.WW Figures (Wholeslae Monthly Figures) (Current State Reclaim (formerly Future State Reclaim) Cheat Sheet Ventana Process Future State Chemical Testing (Customer Complaint) Chemical Testing I Future State Chemical Testing (Lead Test) Future State Chemical Testing (Treated Water Testing) Future State Smart Flush ISmart Flush(CARE) ISmart Flush(Voucher) ISmartRepair Conservation Programs I Future State Leak Detection (Continuous Consumption) Future State Leak Detection (Mainbreaks and Leaks) Future State Leak Detection (Proactive Survey Activity) Future State Major Main Break Detection (SCADA Alert) Ordinance Enforcement Future State Ordinance Enforcement - Customer and System Reports Future State Ordinance Enforcement - Escalation Pressure Monitoring Future State Pressure Monitoring (Customer Identified) Future State Pressure Monitoring (SCADA Alert) Theft Detection Theft Detection Izero Consumption RFP 24-0002 Water Customer Information System Consultant Page 39 of 40 ATTACHMENT E WATER INFORMATION TECHNOLOGY (IT) ORGANIZATIONAL CHART Jason Lyssy IT Solutions Manager Infrastructure / — — — — — — — — — — — — — — — Fabela Corey Wangler Senior lTTechnical Senior lTTechnical Support Analyst - Support Analyst— Cybersecurity Network Engineer Andrew Vieck VACANT SeniorlTTechnical IT Technical Support Analyst — Voice Support Analyst II_ and Surveilence Network/Security Jeff Rademaker Senior lTTechnical Support Analyst — User and Server Admin Steve Garcia IT Technical Support Analyst II - Infrastructure Tom Hattler IT Technical Support Analyst II - Infrastructure Infrastructure Charmaine Baylor Senior IT Business Planner — Contracts Homer Garza IT Solutions Manager Data Systems Rick Lisenbee Senior Water IT Manager Dee Youngblood PROPOSED Administrative CIS Project Manager Assistant Anu Narayanan Agnes Bonsu SeniorlT Business Process Programmer, An Manager-Utility Data Intergrations/Customs I Architecture Merhawi Temnewo Akum Mutagha Programmer — REACT/ Database Liferay(contractor) Administrator — Data Warehouses Greg Asamoah Database Donna Nguyen Administrator —ETL& IT Programmer/ SSIS (contractor) Analyst II -CRM Ryan Underwood Tim Shidal � Database Senior IT Administrator5 Business Planner - (contractortor)) Requirements � 1 — — — — — Data Systems — — — — — Robb Bailey IT Solutions Manager Applications — — — — — — — — — — — — / - Claudia Christeson David Lopez Systems Administrator- Systems Administrator— CIS Utility Billing Automated Metering Sandi Nadatani-Mendez Kpante Fikou Technical Support Technical Support _ Analyst II - CIS Utility Analyst I I —Automated Billing Metering Ron Fagan Leo Rosales Technical Support Technical Support _ Analyst II - CIS Utility Analyst I I —Automated Billing Metering Florence Stewart Technical Support Analyst II - CIS Utility Christi Eades Billing (contractor) Systems Administrator- Maximo EAM Ethan Ho Technical Support Analyst II - Maximo EAM Laura Walker Senior IT Programmer/ Analyst -CRM VACANT Technical Support Analyst II - Maximo EAM \ Applications / Jeff Ryan IT Solutions Manager GIS Spatial Data � 1 \ Antony Odongo Senior IT Programmer/Analyst— GIS Administrator Michael Wallace Senior Business Process Analyst — eBuilder / Field Tools Allen Patterson IT Programmer/ Analyst I I — GIS Mapping Coordinator Kelsey Corbin IT Programmer/ Analyst II — GIS Solutions Support Jesse Johnson Senior Engineering Technician —GIS Records and Public Info Jonathan Torres Senior Engineering Technician —GIS Mapping Matthew Franke Senior Engineering Technician —GIS Mapping 1 GIS y RFP 24-0002 Last Updated: 1012512023 Water Customer Information System Consultant Page 40 of 40 FORTWORTH. ADDENDUM TO REQUEST FOR PROPOSALS NO. 24-0002 WATER CUSTOMER INFORMATION SYSTEM (CIS) CONSULTANT PURCHASING DIVISION ADDENDUM NO. 1 DATE ISSUED: November 20, 2023 REQUEST FOR PROPOSALS (RFP): 24-0002 BID OPENING DATE: December 7, 2023 (UNCHANGED) RFP No. 24-0002, issued October 31, 2023, is hereby amended as follows: Section 4.4 has been changed to read from "Proposals shall be limited to a maximum of seventy- five (75), 8-1/2" X 11" pages (one side only) using a font size no smaller than 11 point and margins of at least one inch in each direction. The required/requested attachments are not part of this page limit." to "Proposals shall be limited to a maximum of seventy-five (75), 8-1/2" X 11" pages (one side only) using a font size no smaller than 11 point and margins of at least one inch in each direction. The required/requested attachments are a part of this page limit." in RFP 24-0002 Final Bid Document V2. 2. Questions and Answers document is hereby incorporated, in full text, on pages 2-5 of this addendum. All other terms and conditions remain unchanged. O Alyssa Wilkerson BUYER II .................................................... By the signature affixed below, Addendum No. 1 is hereby incorporated into and made part of the above referenced Request for Proposals. COMPANY NAME: SIGNATURE: NOTE: Company name and signature must be the same as on the original bid documents. Failure to return this form with your sealed proposal may constitute grounds for rejection of your offer. Questions and Answers Q1. What system are construction service orders issued through? Al. Construction service orders are issued using Maximo Software, but that is outside the scope of the work of the customer information system and its related software. Q2. Is the RFP the consultant will assist in building solely for the purchase of a new customer information system, or will the consultant be responsible for assisting in the procurement of a combination of systems? A2. Modern CIS solutions provide modules to automate all aspects of the Meter -to -Cash business cycle. The RFP will be solely for a new customer information system (CIS), but if the proposed CIS system has additional capabilities that allow the City of Fort Worth to consolidate some of the existing systems and processes, that may be added value for the project. FWWD will entertain recommendations in that regard in the procurement of the CIS. Q3. In Section 6.1.13 and 6.2.3.9 on Page 24 and 25 of RFP 24-0002 Final Bid Document V1, respectively, optional support staff is mentioned for Phase 1 and Phase 2 of the project. Are these recommended positions to be included in the proposal and its pricing? A3. These roles are intended to be staff augmentation contributions that could be provided by the Consultant. Pricing for these roles should be included in the proposal for Phase 1. The utility would like to have the option for additional support staff throughout this project (all phases) to assist staff with balancing their primary role in the utility with the work needed to have a successful CIS implementation. These positions should be clearly identified under the SERVICES Header as a staff augmentation option in Exhibit B, the Cost Schedule Summary. Q4. At the Pre -Proposal Conference 151 meter -to -cash processes were mentioned. Could you provide a list of these processes and the 16 functional areas that they relate to? A4. The list of processes that have been reviewed and documented is included on pages 6-8 of this addendum and as Attachment D to RFP 24-0002 Final Bid Document V2. Further consolidation of the list has been accomplished and we now have 15 functional categories and 150 processes. Q5. Could you provide an organization chart for the Water IT department? A5. The current Water IT organizational chart is included as page 9 of this addendum and as Attachment E to RFP 24-0002 Final Bid Document V2. The current chart includes a proposed CIS project manager; however, that full time equivalent (FTE) has not been approved. Q6. Is the City of Fort Worth open to a timeframe of less than 6 months for Phase 1? A6. Yes. Consultants should propose the timeframe that is best suited for a CIS project of Fort Worth's size and complexity. This timeframe may be shorter or longer than six months. Q7. Could you describe the anticipated involvement that Water IT and other City Departments will have in phase 1? A7. The intent is to assign a dedicated subject matter expert from Water IT and one from Customer Relations as the core members of the project team. An internal project manager role has been proposed as well, but that FTE has yet to be identified or approved. Other internal experts will be engaged as needed during the phases of discovery, analysis, project planning, process reviews, system design, and requirements definition. The make-up of the project participants and contributors from internal staff will fluctuate as the project progresses. Based upon consultant recommendations, internal staff experts may be dedicated to the project for brief or extended RFP 24-0002 Water Customer Information System (CIS) Consultant Addendum No. 1, Page 2 of 9 periods, as required, with their current duties to be covered by other staff or staffing overages. The selected Consultant will recommend the optimal make-up of the project team. The internal project participants will assist the Consultant with engaging the appropriate stakeholders from the Water Department, as well as, from other City Departments as needed to review processes, define requirements, and clarify the scope. An Executive Steering Committee has also been formed to provide oversight on the entire CIS replacement effort and will retain decision -making authority to provide the necessary resources and participation. Q8. How is the transfer planned for the Consultant that wins Phase 1? E.g. Will the Consultant that wins Phase 1 have to compete for Phases 2 and 3 as well? A8. The Fort Worth Water Department is not envisioning a separate procurement process will be required for Phases 2 and 3. There will be an option to renew the contract for the subsequent phases of the project if the consulting firm awarded the contract meets the department's goals/expectations for Phase 1. Q9. It is noted that the software used for FWWD documentation is "IBM Blueworks". Is it planned for future business processes to be developed and documented using this software? A9. Yes. Blueworks will continue to retain documentation of all business processes for the Utility. Internal staff will be assigned the responsibility to provide existing business process documentation and will update the Blueworks repository with the results of the Consultant's analysis and recommendations once they are approved by Customer Relations, Water IT, and the Executive Steering Committee. Q10. Could you please clarify how Bonfire Interactive will be used in relation to this RFP? A10. Phase 2 of the project, the procurement of a new CIS, will be facilitated using Bonfire Interactive. The Consultant will work with the City of Fort Worth Purchasing Division and the Water Department to draft the RFP, and evaluate the proposals using Bonfire. Q11. Would FWWD please clarify the intent of items 6.1.13, 6.2.3.9, and 6.3.1.7 within the Scope of Services? Are these meant to be related to staff augmentation for roles that would otherwise be filled by Department staff? Al 1. Correct. These roles are intended to be staff augmentation contributions that could be provided by the Consultant. The utility would like to have the option for additional support staff throughout this project (all phases) to assist staff with balancing their primary role in the utility with the work needed to have a successful CIS implementation. As mentioned in A3, these positions should be clearly identified as a staff augmentation option in the Cost Summary. Q12. It is noted that a Cost Schedule Summary is provided for Phase 1 only. Would the City confirm this is the only phase firms need to submit pricing for? Al 2. Pricing submittals should only cover the projected costs for Phase 1. Phase 1 discovery and analysis will significantly contribute to the scope of work and pricing for subsequent Phases. Q13. Would the City confirm the estimated duration of Phase 1 is expected to be 6 months, as depicted on the Cost Schedule Summary for that phase? Al 3. The 6-month timeframe for Phase 1 is an estimate. The consultant should recommend an appropriate timeframe for Phase 1 based upon their expertise and experience with previous CIS projects of similar size and complexity. Q14. Does the City have estimated durations for Phases 2 and 3? RFP 24-0002 Water Customer Information System (CIS) Consultant Addendum No. 1, Page 3 of 9 A14. The scope for Phases 2 and 3 will be refined from the discovery, analysis, and planning conducted in Phase 1. The Consultant will recommend estimated durations for subsequent phases. Q15. Would the cover, cover letter, table of contents, blank pages to facilitate double -sided printing, required forms, exceptions to the contract (if any), or resumes included in an Appendix count toward the page limit? A15. The page count is limited to 75 pages and includes the cover, cover letter, table of contents, required forms, exceptions to the contract (if any), and resumes. No double -siding printing is allowed for bid proposals. Q16. Are we able to use font sizes smaller than 11 pt for headers, footers, charts, graphics, and other elements apart from the main body text of the proposal as long as the text is legible? A16. Yes, font sizes smaller than 11 pt is allowed on headers, footers, charts, graphics, and other elements apart from the main body of text as long as is legible. The main body of text is required to be 11 pt font. Q17. What is the current CIS system that is being replaced with the new solution? A17. The current CIS system the City of Fort Worth has is Naviline from CentralSquare Technologies, formerly Superion, formerly Sungard. Q18. Do the process maps that are mentioned in Phase 1 entail editing existing process maps or creating new process maps for all CIS processes? A18. The Consultant's work could consist of both editing existing process maps and creating new ones. While the City of Fort Worth Water Department has attempted to review all existing processes, it is possible that the Consultant would facilitate a review of a process that has not been documented. Q19. Is the expectation to submit cost and schedule breakdowns for just Phase 1, or should costs and schedule estimates be provided for Phases 2 and 3 as well? A19. Pricing submittals should only cover the projected costs for Phase 1. Phase 1 discovery and analysis will significantly contribute to the scope of work and pricing for subsequent phases. Q20. What are the current systems for field workforce and asset management? Is the city considering the possibility of replacing these systems? A20. Meter Services uses a handheld tool called SPMR that allows them to collect manual meter reads, as needed, and track a few service order details, but the solution is not a comprehensive one. There are still manual and paper -based processes for managing customer -facing field work, so those solutions will be in the scope of the CIS replacement. Field work conducted by our Field Operations Division for the water distribution system and wastewater collection system work is managed by Maximo along with our asset management strategy. Maximo also manages field work conducted by our Plant Operations Division to track maintenance and lifecycle planning for vertical assets at the treatment plants. Maximo will remain in place and is not part of the scope of the CIS replacement project. Q21. Has the FWWD team conducted any research (online searches, conferences, demonstrations, etc.) on potential CIS options? If so, what solutions were included in this research and are there any preferred solutions at this time? RFP 24-0002 Water Customer Information System (CIS) Consultant Addendum No. 1, Page 4 of 9 A21. One of the primary objectives for hiring consulting services for this project is to conduct an unbiased assessment of the current CIS solutions that would be appropriate for Fort Worth Water. The procurement process for selecting a CIS solution will require well-defined requirements that drive the best decision for the Utility. The selected Consultant must demonstrate independence from associations with any specific CIS solution providers in order to maintain an unbiased evaluation. The FWWD has conducted some preliminary research to see what is offered from modern CIS platforms through our participation in the Customer Service Week conference, as well as, conducting other research and talking to our peer utilities. We have seen demonstrations and reviewed literature from the following solutions (in no particular order): Oracle, Itineris, SAP, Harris Cayenta, Open International, Vertex One, Tyler Technologies, and others. This is not a comprehensive list. Any CIS solution provider may compete for our business. The selected Consultant should maintain an unbiased approach and have expertise in evaluating multiple platforms to identify the best overall solution to meet our requirements. RFP 24-0002 Water Customer Information System (CIS) Consultant Addendum No. 1, Page 5 of 9 Alarms Current State _Daily Reporting Alarms Current State —Reverse Flow Alarm Current State _AMI Endpoint Installation Current State _AMI Endpoint Removal Installation Complaints Current State Meter Procurement Meter Services Meter Change Out New Meter Set 2" and Under VI New Meter Set 3" and above Redevelopment Water Rehab GIS Future State Annual Backflow Assembly Testing Future State Backflow Events Processing Future State Backflow Inspection Backflow Section Future State CSI High Priority Enforcement Sub -Process (Online Testing for Commercial/Industrial (Current State Backflow Assembly Testing Future State Billing_V2 Current State Calendars (Billing, Delq, Schedule Calc) Rates Winter Quarter Average (WQA) Billing Billing Exceptions Subprocess Future State Schedule a payment Refund Pick Your Own Due Date Future State Waste Water Credit Prebill/ Budget (Average) Billing Credit & Collections Pending Current State Service Account Set -Up [Service Account Set -Up (Contact Center) In Person, Phone, Mail/Email/Portal j (Termination of Service (Move -Out) Current State Account Transfer Current State Customer Initiated Inquiry (High Bill Complaint) Future State Re -connect Customer Service Reconnect Meter Change Out - Customer Initiated Customer Inquiry/Complaint Extensions/ Payment Arrangements High Usage/ Adjustments Account Investigation (Residential, Commercial & Irrigation)— Billing Inquiry- Billing History Billing Inquiry- Duplicate Bill Emergency Sewer - Emergency Water - Payment Plans- ICustomer Master File - I Bankruptcy Credit Refund Deposit Waiver J Write Off Reversal J Wholesale Credit Collections - All Balance Transfer Inactive - Delinquency Contact Center Emergency FOPS SUPPORT RFP 24-0002 Water Customer Information System (CIS) Consultant Addendum No. 1, Page 6 of 9 IVR payment/technical support Return to Associate Inquiry- General Solid Waste Special Event IStorm Water/ Storm Water Billing Adjustment I Water Conservation I Water Quality I IBA- Commercial , Irrigation & Residential Lid Replacement (Temp On/Off I Future State In -House Design (New Meter) IService Report Review I Razing Permit Review (Special Fees I Invoicing IPublic Information Request I Recording fees in Accela Waived by NEZ RFP �MOOID12t\WewCustomer Information System (CIS) Consultant Kill tap_RG_ staendum No. 1, Page 5 of 9 Refunds and Adjustments IStorm Water Impervious Surface (Automatic Flusher (Commercial Review Checklist Residential Review Checklist Grading Permit Review Water Account Set -Up (Water Applications) Applications/Development I Miscellaneous Project Process - Current State_2022 Future State Non -pay Disconnect Delinquency Fire Hydrant Meter Contractor Agreement Future State Waste Water Credit Waste Water Credit - Water Applications Delinquency Policy Commercial complex 4 units or more Inactive Consumption Breakdown 2 Pledges Posting Inactive Charges for Water Used with No Active Account ISetting up PEM (Payment Plan) IH2Online PowerPoint I Billing & Consumption Requests Customer (Anonymous Queue Weekend Restores Support/Delinquency IH2online Report I Daily Pledge Count Report IService Not Restore IReturn Mail IOutgoing letters (Queue management IMunicipal Utility Lien I Billing Queue (Same Day-PEM-Non-Cash Queue) IManual Locks Monthly Delinquency Report Non -Cash Close Work Order for Meter off for Nonpayment Fire Hydrant Meter Agreement Billing Field Ops Supported I Fire Hydrant Meter Communication Monitoring IFire Hydrant Meter Testing RFP 24-0002 Water Customer Information System (CIS) Consultant Addendum No. 1, Page 7 of 9 Future State Wholesale Wastewater Metering Future State Wholesale Water Metering I Wholesale Wastewater Billing Schedule I Wholesale Water Billing Schedule Cheat Sheet Wholesale Adjustments (Wholesale Adjustments) Cheat Seat Wholesale Services Late Fee Procedures for Wholesale Water Wastewater and Reclaim Invocie I Impact Fee Process (Cheat Sheet Refunds I Wholesale Customer Refund Credits Immpact Fee Audit Wholesale (Cheat Sheet Totalizer Updating (Wholesale Totalizer Updating) (Cheat sheet WW INV Creation (Wholesale Wastewater Creation) (Cheat Sheet MTR Reads.Max Day.Hour Updating I Water Consumption Spreadsheet Updating ICheat Sheet WA INV Creation ICheat Sheet Reclaimed WA INV Creation (Wholesale Reclaimed Water Invoice Creation) ICheat Sheet Monthly CSH Request (Wholesale Monthly Consumption Request ICheat Sheet Raw Water Payment Report ICheat Sheet Monthly WA.WW Figures (Wholeslae Monthly Figures) (Current State Reclaim (formerly Future State Reclaim) Cheat Sheet Ventana Process Future State Chemical Testing (Customer Complaint) Chemical Testing I Future State Chemical Testing (Lead Test) Future State Chemical Testing (Treated Water Testing) Future State Smart Flush ISmart Flush(CARE) ISmart Flush(Voucher) ISmartRepair Conservation Programs I Future State Leak Detection (Continuous Consumption) Future State Leak Detection (Mainbreaks and Leaks) Future State Leak Detection (Proactive Survey Activity) Future State Major Main Break Detection (SCADA Alert) Ordinance Enforcement Future State Ordinance Enforcement - Customer and System Reports Future State Ordinance Enforcement - Escalation Pressure Monitoring Future State Pressure Monitoring (Customer Identified) Future State Pressure Monitoring (SCADA Alert) Theft Detection Theft Detection Izero Consumption RFP 24-0002 Water Customer Information System (CIS) Consultant Addendum No. 1, Page 8 of 9 Fort Worth Water Department Management Services Division — Water Information Technology Section Jason Lyssy IT Solutions Manager Infrastructure — — — — — — - — — — — — — - Amanda Fabela Corey Wangler Senior lTTechnical Senior lTTechnical Support Analyst- I Support Analyst- Cybersecurity Network Engineer Andrew Vieck VACANT SeniorlTTechnical I IT Technical Support Analyst - Voice Support Analyst II - and Surveilence Network/Security I I Jeff Rademaker Senior lTTechnical I Support Analyst - User and Server Admin Steve Garcia IT Technical Support Analyst II - Infrastructure I Tom Hattler I IT Technical Support Analyst II - Infrastructure I — — — — Infrastructure Charmaine Baylor Senior IT Business Planner - Contracts Homer Garza IT Solutions Manager Data Systems Rick Lisenbee Senior Water IT Manager Dee Youngblood PROPOSED Administrative CIS Project Manager Assistant Anu Narayanan Agnes Bonsu SeniorlT Business Process Programmer, An Manager-Utility Data Intergrations/Customs Architecture I I I Merhawi Temnewo Akum Mutagha I Programmer -REACT/ Database Liferay(co ntractor) Administrator - Data I Warehouses I I Greg Asamoah I Database Donna Nguyen Administrator -ETL& IT Programmer/ SSIS (contractor) Analyst II - CRM I Ryan Underwood Tim Shidal I I Database Senior IT Administrator- DB2 CIS Business Planner- I (contractor) Requirements I 1 — — — — — Data Systems — — — — — Robb Bailey IT Solutions Manager Applications — — — — — — — — — — — — - /— ` Claudia Christeson David Lopez Systems Administrator- Systems Administrator - CIS Utility Billing Automated Metering Sandi Nadatani-Mendez Kpante Fikou Technical Support Technical Support _ Analyst II - CIS Utility Analyst I I -Automated Billing Metering Ron Fagan Leo Rosales Technical Support Technical Support _ Analyst II - CIS Utility Analyst I I -Automated Billing Metering Florence Stewart Technical Support Analyst II - CIS Utility Christi Eades Billing (contractor) Systems- I I MaximAdministrator Maximo EAM I � I I I Ethan Ho Technical Support Analyst II - Maximo EAM Laura Walker Senior IT Programmer/ Analyst -CRM VACANT Technical Support I Analyst II - Maximo EAM I I Applications— I Jeff Ryan IT Solutions Manager GIS Spatial Data Antony Odongo Senior IT Programmer/Analyst- GIS Administrator I I Michael Wallace Senior Business Process Analyst - eBuilder / Field Tools I I Allen Patterson IT Programmer/ Analyst II - GIS Mapping Coordinator I I Kelsey Corbin IT Programmer/ Analystll -GIS Solutions Support I Jesse Johnson Senior Engineering Technician -GIS Records and Public Info I I Jonathan Torres Senior Engineering Technician -GIS Mapping I I Matthew Franke Senior Engineering Technician -GIS Mapping — — —GIS — — RFP 24-0002 Water Customer Information System (CIS) Consultant Last Updated: 1012512023 Addendum No. 1, Page 9 of 9 FORTWORTH. RFP Cover Sheet PURCHASING DIVISION REQUEST FOR PROPOSALS (RFP) No. 24-0002 For Water Customer Information System (CIS) Consultant Issued: October 31, 2023 PROPOSAL SUBMISSION DEADLINE: December 7, 2023 by 1:30PM Local Time NO LATE PROPOSALS WILL BE ACCEPTED Proposal shall be delivered/mailed to: Legal Name, d/b/a and address of Proposer The Senior Purchasing Manager submitting the Proposal: City of Fort Worth EMA, Inc. Purchasing Division, Lower Level, City Hall, 2355 Highway 36 West, Suite 200 200 Texas Street, Fort Worth, Texas 76102 St. Paul, MN 55113 Note: Return this Cover Sheet with the Proposal. Pre -Proposal Conference will be held in -person and via WebEx: 9:00 AM (local time) November 9, 2023 Development Conference Room, City Hall, 200 Texas St., Fort Worth, TX 76102, Lower Level at the North end of the building across from the elevators. Meeting Number (access code): 2550 650 2826 Meeting Password: Qcg2mAcPV72 Meeting Phone Number: 817-392-1111 Meeting link: htti)s://fortworthtexas.webex.com/fortworthtexas/i. r)hr)?MTI D=m3dbd 1508ea985fbfd5c77c28cO32bd c4 For additional information/clarifications regarding this RFP, please see Section 5.0. Assigned Buyer: Alyssa Wilkerson FMSPurchasina Responses(o)fortworthtexas.aov Authorized Person: Michael Moosavi Title: Vice President Signature: !� ` Contact Person Name: Alisa Mann Phone: ( ) 702-378-7084 Fax: ( ) 651-639-5730 Email: amann@ema-inc.com Bidder/Supplier ID with City of Fort Worth/ Federal ID Number (TIN): 0000007136/41-1467091 Will contract be available for Cooperative Agreement use? (See Section 29.0) Yes X No • PDF or Adobe or electronic signature is acceptable on this RFP cover page. The Authorized Person, by his/her signature, represents that he/she is submitting a binding proposal and is authorized to bind. By signing and submitting, acknowledges that he/she has received and read the entire document packet, including all documents incorporated by reference, and agrees to be bound by the terms therein. • Proposals must be received in the Purchasing Office by 1:30 P.M., "Proposal Submission Deadline" AND TIME STAMPED PRIOR TO THE 1:30 DEADLINE IN ORDER TO BE CONSIDERED. Late bids will be returned or destroyed. • Proposals must be submitted in a sealed envelope WITH THE RFP NUMBER, RFP TITLE AND PROPOSER'S LEGAL NAME WRITTEN ON THE OUTSIDE OF THE ENVELOPE. In case of courier, it should be on the outside of the courier's shipping envelope. • Bids will be opened and read aloud publicly at 2:OOPM in the Council Chambers. CITY OF FORT WORTH FW00" E M A kNEM18 Water Customer Information System Consultant Proposal RFP No. 24-0002 December 7, 2023 1:30 PM CT Contact: Alisa Mann amann@ema-inc.com (702) 378-7084 EMA, Inc. 2355 Highway 36 West, Suite 200 St. Paul, MN 55113 W E MA hma. December 7, 2023 Alyssa Wilkerson City of Fort Worth 200 Texas Street, Lower Level, City Hall Fort Worth, Texas 76102 Dear Alyssa: EMA, Inc. 2355 Highway 36 West, Suite 200 St. Paul, MN 55113-3819 phone: 651.639.5600 www.ema-ine.com We are writing to express our interest in partnering with the City of Fort Worth Water Department (FWWD) as your strategic partner in evaluating, selecting, and assisting in the implementation of a modern Customer Information and Billing System (CIS). Our company, EMA, has a four -decade history of successfully assisting water utility clients, including similar utilities such as New York City Department of Environmental Protection, Boston Water and Sewer Commission, the City of Tucson, the City of Baltimore, Central Arkansas Water, and others. We are dedicated to enhancing the customer experience and streamlining business processes for water utilities. Our comprehensive industry experience and understanding of water utility software solution providers positions us as a knowledgeable and dependable partner to guide you through the selection and implementation of the most advantageous CIS solution. We have selected a highly experienced, multidisciplinary team for this important project. By partnering with EMA, FWWD will leverage our team's expertise and knowledge gained by assisting other utilities during selection and successful implementation of CIS solutions. Our track record of successfully implementing modern CIS solutions has resulted in tangible improvements in customer satisfaction, improved customer experience, and operational efficiency for our clients. Thank you in advance for reviewing our proposal and looking forward to the opportunity to discuss how our proposal can bring transformative benefits to FWWD. Sincerely, Michael Moosavi Vice President EMA, Inc. 0 TABLE OF CONTENTS DOCUMENTATION CHECKLIST................................................................................................1 EXECUTIVE SUMMARY..............................................................................................................3 Our Understanding of the Current Challenges Facing FWWD.....................................................4 PROJECT EXPERIENCE.............................................................................................................7 EMA Brings Extensive Water Utility Experience...........................................................................7 EMA Brings CIS Research Experience.........................................................................................8 EMA Facilitates the Water Customer Care Forum........................................................................9 EMA Plans, Configures, Integrates, Deploys, and Implements Core Utility Information Systems 9 EMA Has Exceptional Water Sector CIS Project Experience.....................................................10 References..................................................................................................................................11 City of Tucson Water Department CIS Selection and Implementation................................11 Boston Water and Sewer Commission CIS Requirements, Selection, and Implementation 12 New York City Department of Environmental Protection Bureau of Customer Services CIS Replacement........................................................................................................................13 ORGANIZATION CHART...........................................................................................................14 KEYPERSONNEL.....................................................................................................................15 Michael Moosavi, PMP, Principal -in -Charge .................. Bill Rivers, PMP, CSM, Project Manager/Finance ......... Alisa Mann, Ph.D., Customer Service/Meter-to-Cash SP Tammy Edinger, PMP, Billing/Meter-to-Cash SME ....... Melissa Telford, Business Process/Meter-to-Cash SME Marla Hartson, PMP, CSM, Data Conversions .............. Eddie Cheong, Integrations ........................................... Sandia Basu, MA, PMP, MBA, Technical Lead ............. 15 .........................................................16 ........................................................17 .........................................................17 .........................................................18 .........................................................18 .........................................................19 .........................................................19 SCHEDULE................................................................................................................................21 APPROACH AND METHODOLOGY.........................................................................................22 Methodology...............................................................................................................................22 Approach..................................................................................................................................... 22 Risk Mitigation Strategies...........................................................................................................23 EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 ProjectSteps...............................................................................................................................26 Phase 1: Requirements building, process mapping and documentation leading to the development of an RFP for a CIS solution (RFP 6.1).......................................................... 26 Phase 2: Selection of Software Solution and Implementor (RFP 6.2, 6.2.1, 6.2.2) ............. 39 Phase 3: Implementation and go -live, consisting of implementation and launching the selectedCIS.........................................................................................................................44 CONFLICT OF INTEREST QUESTIONNAIRE..........................................................................52 CONTRACT EXCEPTIONS........................................................................................................53 APPENDIX A: RESUMES..........................................................................................................56 ADDENDUMNO. 1.....................................................................................................................65 EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 ii 0 DOCUMENTATION CHECKLIST *Proposer shall complete the below to aid in responsiveness* Refer to Section 33.0 for more information on the below required documents. Document Attached? Page Yes/No Number(s) of Proposal *Answering No Required Documents to the below will *Proposerwill result in the bid need to number being deemed each page of non- their proposal. responsive* A completed and signed Request for Proposals (RFP) Yes Cover Cover Sheet Executive Summary detailing the Proposer's interest Yes 3 and understanding of the project Relevant Project Experience: Provide Proposer's and any sub -consultants' background, number of years in service, licenses, qualifications and experience Yes 7 including experience related to the requirements within this RFP, and past performance with a minimum of three projects of similar size and scope Organization Chart: Provide an organization chart depicting the structure, lines of authority and communication for all the Proposer's principals, Yes 14 personnel, and subconsultants to be involved in the project. Key Personnel: Provide experience of the project team members of the Proposer and Subconsultants who will 15 actually be performing services described in this RFP. Yes Resumes, Provide the personnels' names, roles and relevant Appendix A, work history. One -page resumes of key personnel may page 56 be included as an appendix with proposal submittals. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 Schedule: Provide a proposed schedule for Phase 1 of the project and demonstrate the Proposer's ability Yes 21 to deliver projects within the schedule timeframe. Approach and methodology for completing the services outlined in all three phases of the project, including Yes 22 identification of any key risks and potential mitigation strategies. Separate Sealed Exhibit B - Cost Schedule Summary Yes Envelope labeled "Pricing" Attachment A - A completed and signed original Yes 52 Conflict of Interest Questionnaire Any and all exceptions to the RFP must be listed on an item -by -item basis and cross-referenced. If there are Yes 53 no exceptions, the Proposer must expressly state that no exceptions are taken. Any addendums sent out after the release of the RFP Yes 65 Any other document included in the Solicitation N/A N/A requiring completion or execution by the Proposer. Scanned Copy of all required documents on a USB Drive. Yes >< EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 2 0 EXECUTIVE SUMMARY In a continuous effort to enhance business process efficiencies and elevate customer experience, the City of Fort Worth Water Department (FWWD) is soliciting the assistance of a qualified consulting firm to perform a needs assessment and assist in the development of the Request for Proposal (RFP) specifications for a Customer Information and Utility Billing System (CIS) and to assist in selecting and implementing the new CIS for FWWD. FWWD understands the complexity and demands of selecting and implementing a utility CIS system. FWWD plans to engage a consulting firm with a range of experience working with water utilities in modern CIS solutions, best practices in billing procedures, services and related principles including bill presentment, bill payment and reporting. FWWD expects the consulting firm to be actively engaged and to use its expertise and experience to meet FWWD's goals and objectives including: • A comprehensive assessment of required functionality for the replacement of FWWD's CIS. • Budget estimations for the replacement of the current CIS and, if required, associated systems. • The development of an RFP for the selection of a replacement CIS. • Completion of an objective, impartial, and confidential selection process. • Successful contract negotiations with selected vendor(s), in conjunction with the City of Fort Worth Legal and Water Departments, resulting in an executed contract agreement. Access to timely, targeted, and accurate data enabling enhanced business services and empowered customers. • Streamlining business process by removing non -value activities and process gaps. • Improved workflows and processes through the use of technology and increased levels of service. • Cost effective selection, implementation, and sustainment of the CIS solution and if required, associated systems and functionality. FWWD is not seeking a customized solution but desires configurable commercial off -the -shelf software. EMA is pleased to express our interest in partnering with FWWD to select and implement the most advantageous modern CIS to ensure FWWD's goals and objectives in improving efficiencies and enhancing customer experience are met. Our experience with similar projects and deep understanding of the water utility vendor landscape position us as an ideal partner for this critical and complex project. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 We commend FWWD for its proactive commitment to enhancing customer service, streamlining business processes, and improving overall customer experience. The successful implementation of Sensus Advanced Metering Infrastructure (AMI) and Meter Sense Meter Data Management (MDM) is an example of leveraging innovative technologies for operational efficiency and a desire to elevate customer experience. Your desire to replace the outdated NaviLine CIS system that was implemented in 1994 with a modern CIS reflects a commitment to the level of effort needed and desire to address the challenges involved in this project. This will allow FWWD to adapt to the evolving needs of FWWD and the ever -changing expectations of your customers. The desire to effect valuable outcomes is the exact type of project EMA is committed to in the utility industry. Our Understanding of the Current Challenges Facing FWWD We understand the challenges that FWWD currently faces. The outdated NaviLine CIS has been a bottleneck, impeding progress towards meeting your customers' demands and expectations. The configuration and real time integration limitations of NaviLine CIS, particularly in terms of expanding the AMI data, present a significant barrier in maximizing the benefits of the AMI system to improve process efficiencies and deliver optimal service to your customers. Furthermore, we acknowledge the complexities encountered during the implementation of the SEW customer portal, underscoring the need for a careful evaluation of the CIS vendor and the new system. Legacy NaviLine CIS The current legacy CIS used by FWWD presents several challenges and limitations. The CIS system that was offered by CentralSquare and implemented in 1994, is limited in functionality, configuration, and real-time integration capabilities. The limitations of the current NaviLine CIS system hinder FWWD's ability to address future and evolving business requirements in meeting the utility customers' demands and expectations. One significant drawback of NaviLine CIS is that the system is not built on a modern technology platform. As a result, it fails to provide the advanced capabilities and flexibility that are standard in most modern CIS systems to improve efficiency and customer experience. These modern capabilities offered by CIS vendors include better user interfaces, configuration flexibility, ready - built integration, intuitive user functionality, streamlined transaction processing, and cloud technology to enable more efficient meter -to -cash operations. The absence of essential functionalities and real-time integration capabilities in the NaviLine CIS has led to significant manual activities within the customer service business processes. Tasks such as billing exception processing, delinquency/collections management, payment arrangement, field service and service order management require more time, resources, and additional tools to complete due to the current system's limitations. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 Upgrading to a modern, integrated enterprise software solution will not only streamline operations but also position FWWD to take advantage of emerging technologies and industry best practices including SaaS/cloud technology, chatbots, artificial intelligence and machine learning, data analytics tools and dashboards, ease of configuration, and complex billing rate engine, ultimately contributing to enhancement of the overall efficiency and effectiveness of the utility services and customer experience. EMA developed an RFP in 2022 for Tucson Water to replace their current NaviLine CIS. We worked closely with them to evaluate four Tier One C/Ss. We ultimately selected one of the Tier One systems and led contract negotiations with the selected vendor. We are currently overseeing the implementation. We know what challenges to expect and can lead FWWD to successfully manage them. Challenges FWWD can expect include: • FWWD staff have been using the current system a long time and will struggle to adapt to a modern system. This will lead to multiple iterations to understand new business processes, the value of the new processes and how to leverage a new system. We understand this and will ensure the selected vendor approach includes addressing these requirements. EMA will work closely with the FWWD team to navigate the issues. • The selected vendor will assume FWWD will require a simple straightforward implementation. This will allow them to simplify their implementation approach. We will work with them until they understand these requirements and address them in their schedule and budget. • The NaviLine CIS database is complex, difficult to understand and difficult to access. This coupled with any data quality issues and custom developments that have accumulated over the years will need to be accounted for and addressed in vendor contract negotiations and the project planning. Data clean-up is a difficult iterative process under the best of circumstances, and it is even more difficult in a legacy system such as NaviLine CIS. Our experience and approach will address this significant issue and ensure it does not break the schedule or break the budget. Portal Implementation Challenges FWWD's partnership with Smart Energy Water (SEW) was aimed to significantly improve the utility's customer experience through the implementation of modern customer service portal tools. Unfortunately, SEW's misunderstanding of the requirements, configuration issues, and lack of skilled resources has contributed to delays and a considerable investment of FWWD staff's time in addressing configuration issues and retesting the new modifications. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 Limited Use of AMI Data FWWD has successfully implemented the Sensus AMI and the Harris Compass Meter Data Management System (MDMS), enabling the utility to remotely collect meter readings. With approximately 90% of the 292,000 meters being read remotely, FWWD has significantly improved operational efficiency and meter reading accuracy. However, despite the successful implementation of the AMI system, the utility faces challenges in maximizing the potential benefits of the AMI data due to limitations of the Navil-ine legacy CIS System. The existing system lacks the advanced functionality needed to fully utilize the data generated by the AMI system such as use of real-time data to improve billing accuracy, collections, responding to customer high bill complaints, and customer communication and experience. EMA is dedicated to ensuring the success of FWWD in achieving its goals of improving operational efficiencies and enhancing customer experience. We recognize the complexities associated with selecting and implementing a modern CIS, and we are well-equipped with the experience and knowledge necessary to mitigate these complexities. We are committed to leveraging our expertise to guide FWWD through a successful CIS selection and implementation process to realize your stated goals and objectives. Our proven track record in assisting our clients in selecting and implementing CIS solutions positions us as a reliable partner in achieving FWWD's goals and objectives towards meter -to -cash operational efficiency and enhanced customer experience enhancement. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 0 PROJECT EXPERIENCE EMA Brings Extensive Water Utility Experience Established in 1975, EMA, Inc. boasts over 48 years of delivering management and technology consulting services to utilities and municipalities. With a team of industry -leading professionals, EMA specializes in the implementation and integration of enterprise software applications. Our extensive experience includes implementing core water utility management applications, such as CIS, electronic bill payment and presentation, CSS, work management systems, CMMS, GIS, AMI, MDMS, FMS/ERP, SCADA, and call center applications, and integrating these systems to enhance operational efficiency. EMA has a proven track record of helping clients achieve significant results, including increased productivity, cost reduction, risk mitigation, improved customer service, and a higher return on investment. We excel in analyzing, recommending, planning, procuring, and managing system and process implementations for utilities. EMA brings an independent perspective, offering a fresh look at the factors crucial for decision -making in the selection and implementation of a new CIS. Our team is committed to providing highly technical and analytical support to aid FWWD in its Customer Service transformation. EMA offers a pragmatic perspective enriched by extensive real -world experience, with a specific emphasis on the water utility sector. Our focus extends beyond successful implementations to include remediation assistance for challenging projects. This unique approach ensures that we contribute valuable experience and offer informed guidance, actively participating in the development of solutions tailored to your specific circumstances. Having collaborated with virtually all major CIS vendors, EMA maintains vendor independence, enabling us to deliver objective consulting services to our clients. Our commitment to impartiality means we have no exclusive relationships that bind us to representing a single software product. We understand and are experts in the following: Utility Billing Systems Implementation EMA has successfully implemented leading CIS solutions, with several ongoing projects. Our extensive experience allows us to navigate the strengths and challenges of key vendors and their products. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 Legacy System Upgrades EMA has assisted numerous utilities in transitioning from legacy utility billing environments to upgraded CIS solutions provided by vendors. Recognizing the broad impact of such projects, we address the concerns of frontline staff dealing with customers and IT staff responsible for day-to-day support, system administration, and integration duties. Network of Knowledge and Contacts Our vast network of knowledge and contacts ensures that, regardless of the chosen approach or vendor, we likely have experience with the selected system(s) or close relationships with utilities that do. This provides a readily accessible network of water utility resources and experiences. Best Practices and Business Process Optimization As industry leaders, EMA identifies and implements best practices, collaborating with utilities to adopt strategies that enhance customer service, operations, maintenance, finance, human resources, and information technology. Our goal is to ensure that selected or upgraded products support streamlined business processes and data analytics, empowering staff to sustain and utilize the configured solution effectively. Data Conversion Requirements Recognizing the importance of data conversion and cleanup in CIS projects, EMA collaborates with clients to define historical data carryover, establishing clear data requirements and strategies for both current and future needs. This encompasses billing data, cross connections, service orders, and customer information. Call Center and Field Operations EMA specializes in analyzing and redesigning call center and field operations for utilities. We work closely with organizations to understand customer call reasons, service requests, resource requirements, and efficiently connect operational aspects. Our approach includes developing reporting against key performance indicators identified during the analysis and design phase. EMA Brings CIS Research Experience THE EMA served as the principal investigator for Water Research Water Foundation Project #4583, focusing on Planning and Implementing Research CIS and AMR/AMI projects. This initiative aimed to identify typical FOUNDATION activities and best practices within the water industry concerning the selection, implementation, use, and upgrading of key customer service technologies, viewed from a Meter -to -Cash (M2C) perspective. The project involved updating decade -old research on EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 selecting and implementing water utility CIS, conducting new research on maintaining and upgrading a CIS, exploring the implementation or upgrade of AMR/AMI systems and their organizational benefits, and delving into M2C cycle focus areas desired by participating utilities. Conducted in two phases, the project included extensive research l „- 0.: t ... efforts such as a survey of over 600 water utilities on CIS and AMR/AMI issues. Survey findings were analyzed to pinpoint leading PlannJng and mplementingCIS and Projects practices, and utility case studies were developed for both CIS and metering projects. The final report synthesizes project findings and offers best practice recommendations, providing valuable guidance to utilities at any stage of the technology life cycle. The report is fYjRtlY�fIYYYNXYR'YMPIetlYlilr•'Ytl.YIY accessible here: https://www.waterrf.orq/research/projects/plannincl- �i and-implementinq-cis-and-amrami-proiects. Figure 1: CIS and Leveraging insights from our extensive CIS project experience and AMR/AMI Report research results like these, EMA is well-equipped to furnish FWWD with comprehensive information, addressing potential challenges and outlining the optimal approach for the successful execution of similar projects. EMA Facilitates the Water Customer Care Forum EMA plays a pivotal role as a founding member and organizer of the WCCE Water Customer Care Forum (WCCF). This non-profit organization comprises 29 water utilities, each overseeing account management for between 130,000 and 900,000 accounts. The primary objective of the WCCF is to establish a platform for customer care executives from water utilities across North America to exchange information, share resources, and offer diverse perspectives. Drawing upon the valuable insights gained from this collaborative experience, we bring a wealth of knowledge to your project. EMA Plans, Configures, Integrates, Deploys, and Implements Core Utility Information Systems EMA's wealth of implementation and integration expertise encompasses a comprehensive range of core water utility applications. This includes a fusion of CIS, AMR/AMI, Mobile Workforce Management, Meter Data Management, CMMS, WAMS, GIS, SCADA, Financial Management Systems, Call Center, 311, and various other systems. We recognize the intricacies that can complicate CIS planning and implementation projects. From grasping technical language nuances to addressing complex challenges such as ensuring uninterrupted billing, fostering customer transparency, and mitigating risks, we understand the spectrum of operational efficiency requirements. Our adeptness in interfacing and integrating these fundamental utility systems ensures a sustainable solution that maximizes the utility of metering data and aligns with your customer service objectives. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 EMA Has Exceptional Water Sector CIS Project Experience Table 1: Sample of EMA's Completed or Active CIS -Related Projects Akron, OH • • • 80,000 Alameda County Water District, CA • • • • • • 80,000 Albuquerque, NM • • • 203,000 Allentown, PA • • 33,000 Ann Arbor, MI • • • 70,000 Baltimore, MD • • 425,000 Bismarck, ND • • • • 19,000 Boston Water & Sewer Commission, MA • • • • 88,000 Central Arkansas Water, AR • • • • • • 120,000 Chester Water Authority, PA • • • • • • 50,000 Coachella Valley Water District, CA • • 108,000 Columbus Water Works, GA • • • • • 75,000 Corpus Christi, TX • • 280,000* Detroit Water and Sewerage, MI • • • 285,000 El Paso Water Utilities, TX • • • • 195,000 Fort Wayne City Utilities, IN • • • • 100,000 Grand Rapids, MI • • • • • 77,000 Greater Cincinnati Water Works, OH • • • 425,000 Greeley, City of (CO) • • • 28,000 Hampton Roads Sanitation District, VA • 465,000 Hartford MDC, CT • • • • • 90,000 Honolulu Board of Water Supply, HI • • • • • • 167,000 Long Beach, CA • Navajo Tribal Utility Authority, AZ • • • • • 60,000 New York City Department of Environmental Protection, NY • • • • 836,000 Orange County Utilities, FL • • • 115,000 Pasco County Utilities, FL • • 80,000 Pinellas County Utilities Dept., FL • • • 130,000 Saint Cloud, FL • • 19,000 Saint Paul Regional Water Services, MN • • • • • 96,000 San Diego Water Department, CA • • • 280,000 San Francisco Public Utilities Commission, CA • • • 155,000 Sanitation District #1 of Northern Kentucky • Toho Water Authority, FL • • • • 100,000 Toronto Water, ON • • 470,000 Tucson Water, AZ • • • • • • • 245,000 Waterloo Water Works, IA • • • 26,000 Water Research Foundation, CO • • • • • Range EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 10 References The following three projects were completed in the past three years and demonstrate EMA's experience with water utilities similar to FWWD. City of Tucson Water Department CIS Selection and Implementation (as a part of the Digital Utility Transformation Program) Scope of Services Provided EMA collaborates with Tucson Water (TW) to offer PROJECT INFORMATION Program Management Services for the Digital Utility Company Name: Transformation program, a multi -year initiative City of Tucson, Tucson Water aimed at enhancing performance, functionality, and sustainability by reviewing all systems and business Contact Name: processes within the utility. The program Silvia Amparano, Deputy Water Director encompasses the replacement of the CIS. In Phone: (520) 837-2102 preparation for selection and implementation, EMA Email: silvia.amparano@tucsonaz.gov conducted workshops to update CIS business Planned Completion Date: 2025 processes in alignment with M2C leading practices. EMA has taken charge of developing the CIS RFP, Actual Completion Date: Currently in the Implementation phase managing the selection process, assisting in contract negotiations, and providing ongoing implementation support. This support includes project management assistance, continual analysis of business processes to align with the Digital Utility Transformation project's desired outcomes, configuration and testing support, data clean-up and conversion, interface development, report optimization, end user training, internal and external communications, as well as go -live support. Project Team Principal -in -Charge: Craig Yokopenic Project Manager: Kristi Ward Project Team: Bill Rivers, Tammy Edinger, Marla Hartson, Eddie Cheong, Bob Reilly, and Sandip Basu Cost of Services Labor: $3,669,350 — CIS portion of the Digital Utility Transformation program Total: $3,750,000 EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 11 Boston Water and Sewer Commission CIS Requirements, Selection, and Implementation Scope of Services Provided The Boston Water and Sewer Commission (BWSC) hired EMA to support them in replacing their current homegrown billing and customer relationship management system, BESS. EMA provided project oversight in all phases of the project with the goals of utilizing commercial -off -the -shelf functionality with minimal to no modifications and gaining business process improvement. The project contained three phases: requirements gathering, vendor selection and contract negotiation, and implementation. BWSC also implemented add -on products such as a new customer web portal and a mobile workforce management solution. Project Team Principal -in -Charge: Bill Rivers Project Manager: Martha Rodriquez Company Name: Boston Water and Sewer Commission Contact Name: Steve Serino, IT Project Manager Phone: (617) 989-7673 Email: serinos@BWSC.org Planned Completion Date: July 2019 Actual Completion Date: September 1, 2019 Project Team: Bill Rivers, Kayla Vogel, Mikey Middlestedt, Mark Germscheid, Marla Hartson, and Craig Patterson Cost of Services Labor: $1,894,083 Total: $2,188,645 EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 12 New York City Department of Environmental Protection Bureau of Customer Services CIS Replacement Scope of Services Provided NYC DEP Bureau of Customer Services (BCS) I retained EMA to assist them with the replacement of their 20-year-old legacy billing system. The project was executed in three phases. Phase 1, Requirements Gathering, was completed in August 2017. During this phase, an in-depth document analysis and review of BCS's business processes was conducted. With the information gathered, a Request for Proposal was written. Phase 2, Vendor Selection and Contract Negotiation was completed in the first quarter of 2019. Phase 3, Implementation, kicked off in the second quarter of 201 system in September 2021. Project Team Principal -in -Charge: Terry Draper Project Manager: Loren Walberg Company Name: New York City Dept. of Environmental Protection Contact Name: Albert Kramer, Project Director Phone: 718-595-4151 Email: akramer@dep.nyc.gov Planned Completion Date: May 2021 Actual Completion Date: September 2021 9. NYC DEP went live with its new billing Project Team: Marla Hartson, Judy Kulp, Troy Brown, Meghana Sawant, Mickey Middlestedt, Bill Rivers, Leslie W. Black, Lea Anderson, Tammy Edinger, Sandip Basu, and Kayla Vogel Cost of Services Labor: $6,282,711 Total: $6,648,108 EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 13 0 ORGANIZATION CHART The following organization chart shows the structure of EMA's project team. Alisa Mann Bill Rivers Tammy Edinger ita Conversions Integrations .. Michael Moosavi Melissa Telford Sandip Basu EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 14 • KEY PERSONNEL Michael Moosavi, PMP, Principal -in -Charge Michael is an EMA Vice President who helps clients develop and implement targeted business strategies. He has more than 25 years of experience in management consulting, customer service improvement strategies, and large-scale technology implementations. Michael has focused his efforts on Customer Service, SaaS, Cloud, Business Processes, and other enterprise management strategies. Relevant Work History • Leadership Strategy and Customer Service Organizational Assessment, New York City Department of Environmental Protection, NY, Management Consultant. • CIS Selection and Implementation, Central Arkansas Water, AR, Executive Sponsor. • Customer Service Bureau Marketing Plan, Greater Cincinnati Water Works, OH, Project Advisor. • Customer Service and Mobile Workforce Management process improvement, City of Fort Worth, TX, Management Consultant. • AMI Business Case Development, City of Fort Worth, TX. • Information Technology Strategy Development and CIS Selection and Implementation, City of Murfreesboro, TN, Management Consultant. • Business Application Technology Master Plan, City of Calgary, AB, Project Advisor. • Business Strategy Development and Implementation, City of Chicago Department of Water Management, IL, Project Director and Principal in Charge. • Business Strategy Development, selection, Oracle CC&B Implementation Management, Greenville Utilities Commission, Greenville, NC, Project Director and Principal in Charge. • Engineering and Technology Program Implementation and CIS Implementation Management, Henrico County Department of Public Utilities, Henrico, VA, IT Strategy. • Information Technology Development and CIS Selection and Implementation, City of Georgetown, TX, IT Advisory. • Oracle CC&B Project Implementation Turnaround Project, Cleveland Water, OH, Project Advisor. • CIS Integration, Connexus Energy, Minneapolis, MN, Program Manager. • CIS implementation and change management, Charlotte Mecklenburg Utilities, NC, Management Consultant. • Mobile Workforce Management Implementation, Charlotte Mecklenburg Utilities, NC, Management Consultant. • Texas Water Development Board, Austin, TX, Deputy Executive Administrator (COO) and CIO. • Texas General Land Office, Austin, TX, Deputy CIO and GIS Director. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 15 Bill Rivers, PMP, CSM, Project Manager/Finance With over 28 years of expertise in implementing CIS and ERP systems, Bill possesses a wealth of experience in overseeing CIS, AMI, and ERP projects. He holds certifications as a Certified Project Manager (PMP) and a Certified Scrum Master (CSM). Beyond his role in managing sizable projects, Bill has assumed diverse project responsibilities, including Quality Assurance manager, Testing manager, functional lead, and business analyst. Prior to his consulting career, Bill served as a Controller for several prominent corporations. His extensive background equips him to deliver effective solutions for our clients. Relevant Work History • Information Technology Business Operations Plan, Tucson Water, AZ, Meter -to -Cash Business Process Re -engineering. • CIS Implementation, Boston Water and Sewer Commission, Boston, MA, Project Sponsor. • CIS Requirements, RFP, Selection and Implementation, Central Arkansas Water, Project Manager / Meter -to -Cash Subject Matter Expert. • Customer Service Organizational and Business Process Assessment, City of Greeley Water Utilities, Greeley CO, Customer Service Meter -to -Cash Subject Matter Expert. • CIS Implementation — CIS Infinity (AUS), Columbus Water Works, Columbus, GA, Project Manager / Meter -to -Cash Subject Matter Expert. • CIS Requirements, Selection, and Implementation, New York City Dept. of Environmental Protection, New York, NY, Subject Matter Expert. • CIS Upgrade — Cayenta Utilities Version 7.8, City of Grand Rapids Water Department, MI, Project Manager. • CIS Implementation — Itineris CIS, City of Baltimore Department of Public Works, MD, Testing Manager. • AMI Meter Data Analytics, Water Research Foundation, Author, Editor. • CIP Capital Program Management Process Improvement, El Paso Water Utilities, TX, Project Manager / Subject Matter Expert. • CIS / ERP Requirements, Request for Proposal, and Vendor Selection, Macon Water Authority, GA, Project Manager / Subject Matter Expert. • CIS Implementation — CIS Infinity (AUS), Fort Wayne City Utilities, IN, Subject Matter Expert. • CIS/ERP System Assessment, Erie County Water Authority, Subject Matter Expert. • AMI Implementation — Sensus Metering Systems / SmartWorks MDMS / Cayenta Utilities, Bryan Texas Utilities, TX, Project Manager. • SunGard HTE/Navaline Upgrade to ONESolution, City of Bryan, TX, Project Manager. • Peace Utilities Billing Implementation, Direct Energy, Project Manager. • Cayenta Customer Information System, Bryan Texas Utilities, TX, Project Manager. • PeopleSoft Implementation, 407ETR (Canadian Tolling Highway), Project Manager. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 16 Alisa Mann, Ph.D., Customer Service/Meter-to-Cash SME Alisa is an executive leader with 30 years of experience as the voice of the customer. She is a highly skilled and dedicated professional leading customer -centric initiatives, supporting managers, supervisors, support professionals, technicians, and front-line staff, to provide an exceptional customer experience. She spent 21 years at a water utility overseeing the organization's entire relationship with its customers and driving efforts to assess and elevate experiences at each touch point across the customer journey. While there, she implemented technology to support the power shift of customers requiring easier access to information and data. Alisa is committed to providing world -class customer service while balancing the needs of the customer and the business. She also has strong technical skills with business software tools and applications and experience managing remote teams. Relevant Work History • EBPP RFP Assistance, San Francisco Public Utilities Commission, CA. • CIS Support, New York City Department of Environmental Protection, NY. • Digital Management, Tucson Water, AZ. • PeopleSoft, Oracle CC&B, and Oracle C2M System Implementations, Las Vegas Valley Water District, Executive Sponsor. • Director, Customer Care & Field Services, Las Vegas Valley Water District. • Customer Services Manager, Las Vegas Valley Water District. Tammy Edinger, PMP, Billing/Meter-to-Cash SME Tammy has more than 20 years of information technology experience with expertise in leading teams through system implementation initiatives, change management improvements, and ongoing daily support. Tammy is a Project Management Professional (PMP). Relevant Work History • CIS Implementation Support, NYC Department of Environmental Protection, NY, Business Process Lead. Post Go -Live stabilization Project Manager. • Information Technology Business Operations Plan, Tucson Water, AZ, Business Process Lead. • CIS Implementation, Central Arkansas Water, AR. Meter -to -Cash Subject Matter Expert. • CIS Implementation Specialist, Cape Fear Public Utility Authority, NC, Professional Services Manager. • CIS Implementation Specialist, Dakota Electric Cooperative, Inc., MN, Professional Services Manager. • Cayenta CIS Implementation Project Manager, Clay Electric Cooperative, Inc., FL. • AMR Data Services Supervisor, Lee County Electric Cooperative, Inc., Fort Myers, FL. • Project Manager, Lee County Electric Cooperative, Inc., Fort Myers, FL. • Business Analyst, Lee County Electric Cooperative, Inc., Fort Myers, FL. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 17 Melissa Telford, Business Process/Meter-to-Cash SME Melissa is a detail -oriented consultant with more than 10 years of utility industry experience. She is well -versed in utility business processes, AUS CIS Infinity, Cashiering systems, and Utility Customer Service. Melissa is client and process -focused, with strong troubleshooting, technical, and problem -solving skills. Relevant Work History Technical Analyst, Customer Success, Advanced Utilities — Multiple projects across the US and Canada. • System Administrator I, City of Independence, Independence, MO. • Customer Service Supervisor, City of Independence Utilities, Independence, MO. Marla Hartson, PMP, CSM, Data Conversions Marla has more than 30 years of experience in providing project management and information technology planning, analysis, and implementation services. Her technology expertise includes customer information systems (CIS), laboratory information management systems (LIMS), asset and work management systems, internal and external interaction systems, and plant operations support. Marla's industry contributions include serving as chair of a research committee, delivering conference presentations, authoring articles for publication in industry periodicals, and contributing to an industry Information Technology Manual of Practice. Relevant Work History • CIS Selection and Replacement — CIS Interfaces and Data Cleansing, New York City Department of Environmental Protection, NY, Technical Lead. • CIS Implementation — CIS Infinity (AUS), Columbus Water Works, Columbus, GA, Project Manager / Interfaces Lead. • CIS Selection and Implementation — CIS Interfaces and Data Cleansing, Backflow and Testing, Central Arkansas Water, AR, Technical Lead. • Information Technology Business Operations Plan, Tucson Water, AZ, Functional Lead. • CIS Phases 1-III, Requirements, Selection, and Implementation, Boston Water and Sewer Commission, MA, Technical Subject Matter Expert. • CIS Interfaces, Baltimore Department of Public Works, MD, Data Cleansing and Data Migration Lead. • CIS Requirements, Waterloo Water Works, IA, Analyst. • CIS Interfaces Coordination, Grand Rapids Water System, MI, Analyst. • Electronic Payment Processing Contract Negotiation Preparation, Greater Cincinnati Water Works, OH, Technical Documentation Lead. • Regional 3-1-1 Service Center Feasibility Analysis, Orange County, CA, Analyst. • Utility Billing and Account Management System Selection and Implementation, Pasco County, FL, Implementation Services Project Manager. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 18 • Information Technology Master Plan Update, Columbus Water Works GA, Project Manager. • Information Technology Master Plan, Alameda County Water District, CA, Senior Analyst. • Strategic Information Technology Master Plan — Plan 2014, El Paso Water Utilities, TX, Senior Analyst. • Information Technology Master Plan, Toho Water Authority, FL, Project Manager. • Management Information Systems Master Plan, Mount Pleasant Waterworks, SC, Technical Lead. • Strategic Technology Master Plan, Miami -Dade Water and Sewer Department, FL, Analyst. • Business Technology Master Plan, Dallas Water Utilities, TX, Consultant. • User Interface and Database System Redesign, MCES Environmental Information Management System (EIMS) Phase I, System Architect. Eddie Cheong, Integrations An experienced application consultant and manager, Eddie has specialized in utilities and software implementations and integrations with 10 years of utility industry experience. He has performed 20+ combined Customer Information Systems and Meter Data Management implementations with an average of 15 integrations per project. An effective communicator, he is capable of translating functional requirements into technical solutions, using industry best practices to fit each client's needs. Relevant Work History • AUS CIS Upgrade, Toho Water Authority, FL. • GIS Organization and Practices Assessment, City of Greeley, CO. • CIS Readiness Assessment, City of Greeley, CO. • CMMS Project, Parker Water and Sanitation District, CO. • IT Master Plan, Parker Water and Sanitation District, CO. • Digital Management, Tucson Water, AZ. • AMI Integration Project, Univerus, Peterborough, ON, Professional Services Lead. • AMI Integration Project, Util-Assist, Newmarket, ON, Utility Consultant. • CIS Project, Advanced Utility Systems, Toronto, ON, Team Lead — Professional Services. • CIS Project, Advanced Utility Systems, Toronto, ON, Application Consultant/Tech Lead. • CIS Project, Rogers Wireless, Toronto, ON, Quality Assurance Analyst. Sandip Basu, MA, PMP, MBA, Technical Lead Sandip is an accomplished and results -driven Information Technology leader with broad -based expertise overseeing technical infrastructure and IT projects, leading in digital transformation. His expert leadership has benefited internal operations and external client companies in the manufacturing, financial services, municipal, and utility industries. Sandip is an effective communicator who builds and leads high performing project teams. He navigates the complex and changing landscapes of business and technology to achieve high positive return on EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 19 investment in challenging, highly visible, and time -sensitive environments. Sandip has particular interest in leveraging technical innovation and advanced solutions to achieve the best results for the business and its customers, while keeping the focus on people aspects of a change environment. Relevant Work History • Wastewater Treatment Division's Enterprise Asset Management Systems Assessment, Selection, and Upgrade, King County, Seattle, WA, Project Manager. • San Francisco Public Utilities Commission Customer Service and Supporting Technology Strategic Plan Development, Project Manager. • IT Business Operations Plan, Tucson Water, Tucson, AZ, CIS and Technology SME. • CIS Requirements, Selection and Implementation, Central Arkansas Water, AR, Technology Integration and Conversion Lead. • CIS Requirements, Selection, and Implementation, New York City Department of Environmental Protection, Principal Consultant and Technology and QA Track Lead for the CIS Program. • IT Master Plan, Columbus Water Works, Columbus, GA, IS/IT SME. • AMI Assessment, RFP, Selection, and Implementation Project, Alameda County Water District, Fremont, CA, Integration SME. • IS Governance, Central Arkansas Water, Little Rock, AR, Principal Consultant. • CIS, CSS, EBPP Implementation Program, Greater Cincinnati Water Works, Cincinnati, Ohio, Consulting Program Manager. • CIS, Mobile WFM, CSS Deployment, DC Water, Washington, D.C., Consulting Technology Project Manager. • Oracle Consultant, Interactive Business Systems, Cincinnati, OH. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 20 0 SCHEDULE The projected duration will be approximately seven months, dependent upon workshop scheduling and required resource availability. A detailed schedule will be developed with FWWD to include a detailed work plan, dependencies, FWWD staff availability, and EMA team collaboration with FWWD. The following is a high-level initial project schedule that is subject to further planning with FWWD. Table 2: Phase 1 Project Schedule Requirements,Phase 1: Documentation,Development of RFP Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Task 1: Project Management I I 6.1-Task 2: Mobilization and Kickoff Ca 6.1.1: Conduct a comprehensive assessment 6.1.2: Identify necessary resources and City personnel to be involved in the RFP 6.1.3: Conduct a comprehensive needs assessment and analysis 6.1.3-Task 1: Business Process and Requirements 6.1.3-Task 2: Interface and Integration Requirements 6.1.3-Task 3: Technical Requirements & Emerging Technology Opportunities i 6.1.3-Task 4: Data Conversion Requirements I 6.1.4: Assess the business drivers for technologies 6.1.5: Define the approach to CIS and implementor selection 11 6.1.6: Author a comprehensive RFP for CIS replacement. I I� 6.1.7: Identify and document opportunities for efficiencies, cost, and risks 1 6.1.8: Propose solutions and estimate total cost of ownership EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 21 • APPROACH AND METHODOLOGY Methodology EMA's proven methodology, based on industry leadership and collaborative innovation, will guide FWWD's CIS selection and implementation process. Selecting and implementing a new CIS is a significant enterprise undertaking. It involves acknowledging vulnerabilities, letting go of the familiar and comfortable, and balancing business risks against business values. The selected CIS must meet all FWWD's defined business goals and objectives and gain organization acceptance. EMA has extensive experience with CIS projects and our approach capitalizes on our deep understanding of the meter -to -cash cycle. Our comprehensive water industry business knowledge, coupled with our technical expertise, enables us to provide practical and proven solutions and guidance. We continuously monitor the CIS vendor solution strategy to make sure we recommend the best and most cost-effective solutions to our clients. EMA's customer service selection and implementation methodology has evolved over 42 years of working with public and private water utilities. Our methodology is designed to promote effective application of organizational change, practices, and technology to support the evolving business and customer needs of an organization. Our methodology strategically integrates key elements for success. By addressing the people, processes, technology, information, and customers, we ensure a holistic and collaborative CIS selection and implementation approach. Approach Figure 2: EMA's OPT Methodology EMA's approach facilitates a customer -centric model, enhancing overall customer experience. EMA facilitates the alignment of FWWD's customer -centric objectives and requirements with a modern CIS solution that enables seamless interaction between various stakeholders. Our approach places a strong emphasis on: • Thoroughly understanding, documenting, and communicating FWWD's goals and objectives for process efficiencies and customer service improvement. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 22 • Understanding and optimizing the 150 "as is" business processes that have been developed by FWWD by eliminating manual activities, duplication of effort and miscommunication. • Clear documentation and communication of the business and technical requirements to prevent rework, delays, misunderstandings, and frustrations that currently exist with SEW portal implementation. • Addressing the enterprise view of the FWWD organization, processes, data, and stakeholder interaction to potentially consolidate the various systems currently being used to support the meter -to -cash processes. • Data analytics, reporting, and dashboard capabilities to facilitate meter -to -cash data transparency and informed decision making. • Collaboration and teamwork to encourage employee involvement and buy -in. Our approach is designed to create an integration of all critical components, establishing a solid foundation for the efficient and effective operation of a robust Customer Information System. Risk Mitigation Strategies CIS implementation projects are inherently risky due to the complexity and integration with other key systems. FWWD will be faced with many challenges during the implementation of the system. Proactive risk management is a key to ensuring project success. EMA will use our proven risk mitigation methodology to proactively identify and mitigate risks, ensuring the success of the CIS project. The risk assessment phase will identify and evaluate each risk ranging from technical, operational, or potential user resistance. In collaboration with the FWWD project team, a custom risk mitigation strategy and proactive measures are developed to address each risk. During the project, we will work with the FWWD project team to review the risk log and update the probability and impact of each risk. Below are common risks occurring during CIS projects. Executive Support Lack of executive support for the selection and implementation of the new CIS presents a substantial risk to the success of the project. Without an executive sponsor or steering committee, the project will face many challenges including lack of strategic alignment, inadequate cross functional project resources, limited budget, project delays, and insufficient buy -in threatening the success of the project. EMA's methodology includes a project charter that serves as a guiding document. It outlines the roles and responsibilities of the executive sponsor and actionable steps including providing strategic direction and guidance, championing the project at the highest level of the organization, removing barriers, and making sure decisions are made in a timely manner for a successful implementation of the CIS system. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 23 Data Clean Up The risk of inaccurate and inconsistent customer or account data poses a significant risk during the transition to a new CIS. Bad data can result in errors and confusion during testing and training, delaying the project implementation schedule. Bad data, if not cleaned and not detected during the implementation, may result in inaccurate bills Data • Investigate and address CIS data quality issues • Begin data cleanup • Review open service orders and bring to resolution to customers leading to customer dissatisfaction and decreased trust. To mitigate these risks, EMA recommends FWWD develop and execute a data cleanup plan. This involves thoroughly reviewing and updating customer information before and during the migration to the new system. Dedicated Project Team Organization and Staff Readiness • Evaluate staffs skills and roles • Impact on daily operations during project Lack of a dedicated project implementation team may result in significant risks such as lack of accountability, project delays and additional cost. To mitigate this risk, FWWD Backfilling plan should consider a cross -functional team of • technology, data management, business • Project team location subject matter experts and a project manager. • Educate staff in customer self-service By investing in a dedicated and options and CIS/mobility emerging knowledgeable team FWWD can enhance trends collaboration, streamline decision -making processes, and ultimately increase the likelihood of a successful and timely CIS project implementation. Data Migration One major risk is the potential for data migration issues. Transition to a new CIS requires accurately and seamlessly transferring large amounts of customer data. This can be complex, leading to errors, data loss, or inconsistencies. A mitigation strategy is to develop a comprehensive data validation Data Migration • Develop data migration strategy • Develop and test data validation scenarios • Develop and test data migration test scenario. Data migration procedures procedures should be tested before implementation. Each phase of testing before implementation should include data validation. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 24 Scope Change Another potential risk is the desire by Prevent Scope Creep management or stakeholders to expand the • Develop project charter scope of the project by introducing new • Include project governance criteria requirements late in the project • Obtain consensus on project charter implementation resulting in rework, delays, and additional cost to the project. A mitigation strategy is to include in the project charter how additional scope and requirements are addressed. The project charter will be reviewed and agreed on by management and stakeholders before project initiation. Change Management Another significant risk is resistance to change among employees. Developing "to Change Management be" business processes and introducing a • Develop a change management program modern CIS often requires employees to • Develop and implement communication adapt to new processes, policies, and user strategies interfaces. This resistance can impede the successful implementation of the system. To Include key employees early in the address this risk, comprehensive change decision making management programs, including training sessions and communication strategies, should be implemented. Involving employees early in the decision -making process and highlighting the benefits of the new system can help build a positive attitude towards change, promoting a smoother transition. Cybersecurity Risk Cybersecurity threats pose a considerable Cybersecurity Risk risk to the integrity and confidentiality of • Implement robust cybersecurity customer information in a modern CIS. measures, including encryption, firewalls, FWWD must implement robust cybersecurity and regular security audits, to protect measures, including encryption, firewalls, and sensitive customer data regular security audits, to protect sensitive • Create a culture of cybersecurity data. Creating a culture of cybersecurity awareness awareness among employees through training and education is also crucial in preventing and mitigating potential breaches. Careful consideration of PCI and PH data storage and validation helps mitigate security risks. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 25 Cost Overruns and Budgetary Constraints Cost overruns and budgetary constraints are common risks in CIS implementation projects. Together the EMA and FWWD project managers will regularly monitor, evaluate, and control the project expenses. Frequent and transparent communication about any potential budget adjustments can help mitigate financial risks and ensure the successful implementation of a modern CIS in water utilities. Project Steps Cost Management • Ensure comprehensive requirements and buy -in early in the project • Project Managers to regularly monitor, evaluate, and control project budget • Communicate any potential budget overrun risks Phase 1: Requirements building, process mapping and documentation leading to the development of an RFP for a CIS solution (RFP 6.1). The goal of Phase 1 is to develop a solid understanding of the current environment, finalize the business processes, develop business requirements and assist with the RFP development. During this phase EMA will conduct a comprehensive assessment of the existing environment, including NaviLine CIS, the hundred fifty business processes developed by FWWD, interfaces, integrations, and other ancillary systems. EMA will act in a dedicated partnership with FWWD to improve business processes, reduce manual activities, eliminate duplication, and reduce rework. Our processes and methodologies are mature, and deliverables go through an internal review for quality, accuracy, and professional standards before client submission. We ensure our work and deliverables are of the highest quality and meet clients' expectations. Our project manager regularly monitors and controls project execution to proactively address issues. We provide weekly and monthly status reports with identified risks and action items that allow for consistent validation of work in progress. 6.1-Task 1: Project Management (RFP 6.1). Project management plays a vital role during the selection and implementation of a new CIS system. It ensures a collaborative approach, high levels of communication, management of dependencies, development and execution of the project schedule, management of resources, and mitigation of project risks. During this critical phase, EMA's project manager will ensure that requirements are clearly defined, objectives are understood, risks are mitigated, and deadlines are met. Project management during the first phase of the project will lay the foundation for the subsequent phases of the software vendor solution selection and implementation. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 26 Deliverables: • Comprehensive project plan and schedule • Risk management plan • Communication plan • Detailed project charter document 6.1-Task 2: Mobilization and Kickoff (RFP 6.1). This task entails the coordination of the EMA project team and the formulation of data requests for FWWD. The requested data serves as the groundwork for understanding FWWD's existing CIS -related business processes and business rules. EMA will lead and facilitate a one -day on - site workshop to discuss stakeholder visioning and objectives, finalization of the project plan in collaboration with FWWD, establishment of the CIS project team, and execution of the project kickoff. The mobilization workshop will address crucial aspects such as validating project goals, project governance, defining measures of success, addressing assumptions and constraints, outlining roles and responsibilities, and establishing the project schedule. Deliverables: • Data request • Stakeholder visioning meeting and documented vision • Project kickoff meeting and agreed upon project schedule 6.1.1: Conduct a comprehensive assessment of FWWD's current CIS, business processes, interfaces, integrations, shadow systems, and technology constraints (RFP 6.1.1 & 6.1.12). EMA will conduct a comprehensive assessment of the current environment. This assessment is critical in understanding the CIS functionality limitations, business process inefficiencies and bottlenecks, and technology gaps. The comprehensive approach to the assessment will equip us with the knowledge necessary to recommend improvements tailored to the specific needs of FWWD. • NaviLine CIS Assessment — Our project team recently completed an assessment of NaviLine system for the City of Tucson and is intimately familiar with its limitations. EMA will apply the knowledge and experience learned from Tucson and prior projects to FWWD's project. We will examine the following: o Evaluate how the NaviLine CIS system manages customer data, including account creation, updating customer information, and handling account relationships. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 27 o Assess the billing functionalities, including invoice generation, payment processing, and handling of various billing scenarios. o Assess how the CIS handles service requests, order processing, and service provisioning. o Evaluate how CIS manages the AMI meter data, readings, and related processes. o Evaluate NaviLine CIS response time for common operations for acceptable performance. o Assess NaviLine CIS capability to generate reports based on specific business needs. • As -Is Business Process Assessment — Prior to the kickoff meeting we will review the 150 business processes developed by the FWWD team to get a good understanding of the process gaps, inefficiencies and interaction with systems and data flows before we are onsite at FWWD. The business process review will accelerate the workshops and facilitate a more meaningful and effective assessment. We will review the 150 business processes that have been documented by FWWD with the focus on: o Review, update and consolidate existing business process maps. o Identify gaps, bottlenecks, redundancies, and areas for improvement in the workflow. o Identify areas where customer satisfaction can be improved. o Assess the flow of activities among different work units for efficiency and flow of information. o Define key performance indicators (KPIs) relevant to the meter -to -cash operation. o Evaluate the effectiveness of existing technology solutions. o Assess the integration of technologies with business processes. o Identify opportunities for the adoption of new technologies to enhance efficiency. • Interfacinq Svstems and Interfaces — FWWD uses Mulesoft Enterprise Service Bus (ESB) to interface the NaviLine CIS system with other key interfacing systems. EMA will evaluate the integration capabilities and method of integration of each system including the NaviLine CIS, Sensus AMI, Harris Compass Meter Data Management System (MDMS), Compass MDM, MRSP, ESRI GIS, Oracle CRM, Selectron IVR, Smart Energy Water (SEW) customer web portal, Paymentus payment processing, Dataprose bill presentation and PeopleSoft financial system. We will focus on reliability and performance of the interfaces and document recommendations to reduce potential bottlenecks or points of failures. Based on our understanding of the marketplace we may also recommend consolidating a specific EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 28 interfacing system to improve efficiency and data sharing. We will assess the following key elements of the interfacing systems: o Assess the ability of the NaviLine CIS to effectively integrate with AMI systems for real-time meter data, including data retrieval, validation, and processing. o Assess the accuracy of the data transferred between NaviLine CIS and Sensus AMI system, especially for billing and customer usage analytics. o Assess how well the NaviLine CIS interfaces with Compass MDM to manage and validate meter data throughout the data lifecycle. o Assess how the NaviLine CIS handles events or anomalies detected by Compass MDM and whether it triggers appropriate actions. o Evaluate the integration between NaviLine CIS and MRSP for seamless handling of service orders, including work order creation, status updates, and completion notifications. o Examine how exceptions, such as failed meter readings, are communicated and resolved between the NaviLine CIS and MRSP. o Assess how the CIS incorporates spatial data from ESRI GIS for accurate premise -based customer information. o Evaluate the integration for managing and updating asset (meter, valve, ERT, etc.) information in the CIS based on GIS data. o Check if the NaviLine CIS utilizes GIS data for map visualization of customer locations and service areas. o Understand in general the data flow between GIS, NaviLine CIS and other data sources. o Assess the integration between CIS and PeopleSoft for employee data, payroll information, and HR-related processes. o Assess how financial transactions, such as invoicing and payment processing, are managed between CIS and PeopleSoft. o Assess the performance and reliability of the Mulesoft Enterprise Service Bus (ESB) middleware connecting NaviLine CIS and PeopleSoft, ensuring data consistency and timeliness. • Shadow Svstems — The use of spreadsheets, Access databases, or other ancillary systems for daily activities or individual use can present disadvantages, particularly when it comes to data sharing and transparency. One primary drawback is the lack of centralized control and visibility. Shadow systems are often managed independently by different departments or individuals, leading to data silos where information is compartmentalized and not readily accessible across the organization. This fragmentation limits collaboration, decision -making, and understanding of the enterprise view of the data. EMA will work with FWWD to identify EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 29 and assess the shadow systems and make recommendations to replace the functionality and data in the CIS system. Following are the steps we will take to assess the shadow systems: o Identify and document existing shadow systems within FWWD customer service, billing, and field operations. This includes spreadsheets, databases, manual processes, or any workaround solutions created to meet specific needs. o Meet with the owner of the shadow systems to understand the requirements for the shadow systems. o Identify the limitation or gap of the NaviLine CIS to perform the requirements of the shadow systems. o Document the functionalities of the shadow systems. o Include the shadow system requirements in the new CIS RFP. • Data Quality — Data quality is characterized by the extent to which information consistently aligns with the requirements and expectations of users in achieving their business objectives. EMA has devised a proprietary process for evaluating data quality, drawing from customer relationship management techniques and streamlined to deliver rapid and substantial benefits. Our methodical Data Quality Assessment identifies the origins of data issues and quantifies their impact. Prioritization of opportunities for change is based on their potential to yield enduring enhancements. Issues revealed through this process may include: o Absence of essential information. o Identification of outdated and/or poor -quality data. o Misalignment between application processes and business requirements, often requiring error -prone workarounds. o Gaps in processes leading to direct financial consequences. The data quality assessment initiates with two structured workshops. The first involves a group of up to twenty application users, while the second consists of up to ten power users and technical support staff. Each group undergoes a survey to comprehend their roles in working with the application. Subsequently, the team engages in a structured brainstorming activity aimed at uncovering known and ongoing issues integral to daily organizational processes. Based on these workshops, EMA will generate a comprehensive list of identified issues along with corresponding recommendations. • Technoloav Constraints — Technology assessment is an important step in understanding the readiness of FWWD to transition to a new modern CIS and Cloud environment. EMA will review and discuss FWWD's IT strategy and ensure the new CIS and its components are aligned with the future IT strategy. We will Identify the specifications, capacities, and constraints of the current infrastructure. This includes assessment of the compatibility and EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 30 limitation of the existing systems, network performance, software version, and databases to ensure compatibility and alignment with the new CIS and IT strategy. The technology assessment will also include: o Evaluating the technology supporting various communication channels (phone, email, chat, social media), including existing integrations. o Evaluating the existing network infrastructure in light of changing technology requirements. o Assessing the ability to provide a seamless and consistent experience across multiple channels. o Assessing the effectiveness of analytics in improving customer service processes and identifying areas for improvement. o Evaluating the availability of real-time reporting and dashboards for monitoring key performance indicators (KPIs) and team performance. Deliverables: Assessment report including: o NaviLine CIS assessment and limitations o Business process review and identified gaps o Customer service KPIs o Interfacing systems and interface limitations o List of shadow systems to be replaced by CIS and other system of records o Technology constraints 6.1.2: Identify necessary resources and City personnel to be involved in the RFP specifications building, process mapping, and workflow documentation process (RFP 6.1.2). EMA recommends the creation of a dedicated cross -functional team with expertise in the NaviLine CIS and technology environment. The project team should include technology professionals, data analysts, customer service business process specialists, and representatives from the city and the water departments impacted by the new system. EMA will work with FWWD management to identify and recommend City and necessary staff augmentation consultants required to resource the project and backfill resources to maintain quality operations. The typical resources involved at this phase may include: • Project Manager: This is a critical role for the project and requires an individual with overall project management, coordination, facilitation, risk, and time management expertise. FWWD plans to hire a project manager reporting to the IT Manager. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 31 • Technical Project Lead: Individual with comprehensive understanding of FWWD's technology infrastructure to assist with technical requirements for the new CIS. This person will call in other technical experts as required to support the various applications, systems and integrations involved in the project. • Subject Matter Experts (SMEs): Resources with expertise in specific areas including metering, customer service, billing and collections, service order management and technology. These resources should be committed full-time to the project. These individuals should have the authority to approve business process changes within their area of representation and the discretion to know when changes might require broader discussion and approval. • Business Analysts: Individuals skilled in translating and documenting business processes and requirements. • Data Analysts: Individuals who can analyze and visualize data related to the current processes. • GIS Specialist: Individual with the ability to understand current GIS practices relating to land ownership and how information flows into GIS and to and from NaviLine CIS. Preferably this person will be able to design and implement changes as well as pull in additional resources as required. • City Procurement Specialists: Individuals familiar with the city's procurement processes and regulations. • Project Stakeholders: Representatives from various city departments involved in or affected by the project. Deliverable: • City and optional staff augmentation resources, time commitment and engagement schedule 6.1.3: Conduct a comprehensive needs assessment and analysis of FWWD's future CIS system, including improvement to business processes, hardware upgrades, data resources and reporting, infrastructure, interface, operations, standards, and procedures (RFP 6.1.3). In the previous task (6.1.1), EMA completed a thorough examination of the current state of the NaviLine CIS, including business processes, hardware, data resources, reporting mechanisms, infrastructure and interfaces. This task will focus on leveraging the knowledge gained towards conducting a comprehensive needs assessment and analysis of FWWD's future CIS environment. The assessment will include the following tasks and deliverables: EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 32 6.1.3-Task 1: Business Process and Requirements (RFP 6.1). One of the most important and highly valued tasks for transitioning to a new CIS is to thoroughly identify and document the business process improvements and requirements. Building on the assessment of FWWD's 150 business processes completed in the previous tasks, this task involves leveraging these insights to assess the future business processes and requirements for the new CIS. The specific tasks include: • Review the detailed documentation from the previous task, summarizing key findings and identified areas for improvement. • Engage with key stakeholders and IT specialists, to gain a comprehensive understanding of their requirements for the future CIS. • Prioritize and document the identified gaps, manual activities, and opportunities for improvement based on their impact on efficiency, cost-effectiveness, and overall FWWD business and technology objectives. • Ensure that the proposed changes align with the business goals and objectives and IT Strategy. • Validate the proposed future state business process improvements and requirements with stakeholders to ensure that their input is considered and that the proposed changes align with their expectations. • Evaluate the technology requirements for the new CIS based on the recommended improvements. Consider any necessary hardware upgrades, software integrations, and data management enhancements. EMA's team will be on -site and facilitate in -person workshops for interviewing and discussing business process improvement recommendations and gather requirements for all stakeholders including Billing, Finance/Accounting, Information Technology, Operations, Metering and Field Services, Water Resources, Planning/Engineering, Conservation, and Public Relations. EMA will bring our established Meter -to -Cash (M2C) process library covering all services and business functions (e.g., customer service, account set up, rate structure, billing methodology, invoices/bills/letters/notices, payments and collections, finance, and field/meter service management). EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 33 Mqhu7.= ""� t. W/ won i f Manage Cngtatner Read CIa lcm1ate Consumption Prepare & Process & WnAy a Credit Conduct Revenue AcWUAt Bata meters 8 Manage Rates PeEver Hi11s Rewrd Payments & Collections AnAySia • Afn4C in J mrnc nel hIn]nlI9r,Lk1Rf hS3I I P�rnl[�nSS tS'ib • , • PIR•4 4ph • [,nrk6o![pmrcFeal� • C[eeliL [lxrky • FI011}'FLIInLR6iy nfld RlRSt9 @Rb14} RrAu . Calrulntrmr,zmn tSa�� n[un•IklnrrnlF Eexs ands s • C4Ish PJyr WTM% dloalaYe+aeditFratus 1lnsr IzLLsiamer [:nlrrel l .j�rrS .?!d Far: Rt[riaUP -{SWooxr-1—tinn -Pph- prossaw U lj 7ntLLf7UnIYT IIIi4f7ihUQSu bIwlll hn—l" n'nds .rsiLl�,arnmasln�ynr� - Imrf Rnen(T • fi&rlfl tWnkil • Ceedul hYLdt r�ard ��»»vvmmrnl -htxquuts� �q pi • E3arulnrnl slarapr end Rtrx'YnI [C75] VAt4ydAnt4glk411 t • Apply�rn4n.vuL mmLFiQP[LP&NIF -a5F - T,IInI]['nin P*1ar kLFendiees •lkllry[at 7smrrxmne -[a - 5kntroffi • 4iKdLtrFINI}xl7f all�I�kiFk )Slwu [+Tgf�96IR$ PiC1-61B rIlurpLiuu _r}yeg hirtrrtr_ SXW dpJWYI orhrrs -jg{� ]p( -cadedim tolls I}p!]t'UQ•.I81Es16 P8}Yb6rs Inlr1'f�rr nn[IIWb-0 je[ueu[ I114'n[tn1Ld 41n. IInW�d�lF! 1'11i �H1I,V nr - x[Is'/•d8 f_ RiJI oya,M[ �7deh�r}'DIAW .pa�vu�,u, - Sinkt•off EDrnCVY• kpddX IrtlW rld Cti Eri"t'S S�,4j]gu I AlRs 1l .cr CIiCIUfUrfL • AtiYT1�xy lnfnt - rurn nll n'ho 6eebiente[alt pplrrnrolIrd&pmiI 1'�er'Inprial�s sn.i.r Crt • ul9eyr6rrun • Ysty�urlstprartsaing d�r��qque¢q• • A; dnd s[s - - F3rrtrrnur lnnTern! timz•stigatiwr mere xrlx,turn nn j • Font end clnil J tm4n4n41 smizf'e4i Revenu SFP4V79115 InSpC4'1H,91,tn111 dF� �jPtlydlbt �,rYRM7lnlCln p�„p„R,jyp]j [r6ilisI, -tAwrioih ..t . MUrnR4tj MMWtb YlnYnl dndt} - 611ye tCes - 5et upbudgetb1I61Lj e[C.] �yd}}'77��11IIK141¢>Yhd{-q LICt! n1N upFr'AIfOIJut6 #mnLFrmrnla - Ia[n !n`a elds,F­IC4Ni34r4 fIeM • Phn +1i111 -$rhYcr • ALFF O I710- Ip[prIAT4;. , 7d�uwn-e -alt�l61l IICULS �. a�rlZ - On6rr ,J duhn 6 _ �FWhh jbne - 6'd ��1lV.sr�xsaasslug • Treodin5 Hud1u •C�rurinxi lltry4ni Flrlroeitx WP �L�tI LL7►15'1'90h l9f �nrls 9enkrv4[l!lnPrrM_ •llrirr aif tx - Rnrrinr - c•Ei,Lrt4ta •Refer arzVumsm -i'nnsnn,lairn4hr OreLrTVn {h[tiirlr G'nl![rairu, prelnl SC: • �IaLI�sX dada rr l�nted la ILr?'It7C: • nistn wrf Trpnnt 7 iawl of ILen • in - tbt171di Inrut9 nlnl V['h - airn•r ? at a r: / x�lrr.,t I'_ 3iater txaxra . srr,- - iiniluar MWff -seF Figure 3: WATER Utility Meter -to -Cash Cycle Our M2C library is built on leading practice process groups that will assist in improving FWWD's stakeholders' future state business processes with a high degree of confidence and quality. While we will leverage our existing library of requirements, we will also work with the FWWD team to define those functional requirements that list critical business processes focused on FWWD's unique needs, rather than using a generic list of CIS requirements that are common functionality of any CIS. All requirements will be traceable and trackable with a scoring method that includes priority points for selection, configuration, and customization decisions. It is important to note that EMA team members have a very high level of familiarity with a broad span of leading CIS vendors and their associated solutions that are prominent in the current market space. This gives our team the ability to advise the FWWD team on the feasibility of the requirements as they are put forward. Deliverables: • Business process improvement validation • CIS business and technical requirements documentation with tracking and scoring method • Key business process mapping and documentation. 6.1.3-Task 2: Interface and Integration Requirements (RFP 6.1.3). EMA will gather requirements for integration of the CIS with other City and FWWD systems. This includes identifying all current CIS interfaces and desired future interfaces. The requirements list the type of interface, whether it is one-way or two-way, and the desired EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 34 functionality of that interface. The goal is to ensure robust requirements for each interface are developed to enable higher accuracy of interfaces with the new system. Deliverables: • Integration workshops and interviews • Interface requirements 6.1.3-Task 3: Technical Requirements and Emerging Technology Opportunities (RFP 6.1.3). EMA will gather and document technical requirements needed to support the CIS for all the necessary functions identified in FWWD's technology environment. The technical requirements will capture FWWD's security, infrastructure, operating system, network, databases, middleware, and hardware requirements. EMA's technical and functional project team will work closely together to ensure that the technical requirements support the identified functional requirements. A focused discussion will be planned during this task for awareness and understanding of available options for cloud vs. on -premises solutions or designing a hybrid solution, their service and manageability pros and cons, respective infrastructure needs and challenges, and capital and operating expenses (CAPEX/OPEX) investment alternatives. EMA will conduct an emerging technologies opportunity analysis. Leveraging industry association information and our industry experience, we will review and analyze the impacts and potential benefits of new and emerging technologies in the areas of Cloud/SaaS/Hybrid, Mobility, Analytics, Smart/Intelligent Water, and others. We will draft a recommendations report for review with the City and FWWD's stakeholders. Deliverables: • Technical workshops and interviews • Technical requirements • Emerging technologies analysis and recommendations report 6.1.3-Task 4: Data Conversion Requirements (RFP 6.1.3). EMA will work with FWWD to determine high-level requirements for converting the Naviline CIS data to the new system. This includes the identification of the current sources of data, and the roles and responsibilities for extracting, transforming, and loading the data into the new system. This will benefit the new CIS system data conversion analysis and strategy leading to a comprehensive data conversion design and data transformation approach. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 35 Deliverable: • Data conversion requirements 6.1.4: Assess the business drivers for technologies, confirm business strategy and goals, and identify desired processes (RFP 6.1.4). During the kickoff meeting, we initiated round table discussions covering the vision and objectives, with management and stakeholders. We also assessed the existing environments and identified gaps and limitations within the current processes and technologies. In Task 6.1.3, we conducted a comprehensive needs assessment and analysis of FWWD's future CIS system. During this task, we will work with the FWWD project team and stakeholders to confirm FWWD's specific business drivers and identify desired business process. Since CIS implementation is influenced by the water industry drivers aimed to improve operational efficiencies and customer service, we will facilitate discussions around these drivers with FWWD management to ensure alignment with future industry technology direction including: • Integration of AMI and CIS to improve billing, response to high bill complaints and customer satisfaction. • Adoption of data analytics and business intelligence tools to analyze customer usage patterns, identify trends and better enterprise decision making. • Mobile technology and self-service to improve customer experience. • Integration with the GIS technology to improve accuracy and asset (meter) management. • Cloud/SaaS platform to improve efficiency and scalability. Deliverable: • Business drivers' assessment report 6.1.5: Define the approach to CIS and implementor selection as either separate or integrated procurements and document the approach within a formal report (RFP 6.1.5). EMA in collaboration with FWWD will discuss the pros and cons of integrated or separate procurement and define the approach for selecting the CIS solution and the system integrator (SI). Our consultants assigned to this important project have extensive knowledge of the CIS system vendors solutions and the system implementors in the water industry. We will facilitate a workshop with project stakeholders and discuss the uniqueness of FWWD's business and technology requirements, and strength and weakness of the system integrators. EMA will document this approach in a formal report, presenting a detailed recommendation for the CIS implementation and SI selection process. The report will include a strategy framework, pros and cons and rationale behind our strategy for FWWD to make an informed decision. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 36 Deliverable: • Formal CIS and SI procurement approach report 6.1.6: Author a comprehensive RFP for CIS replacement (RFP 6.1.6, 6.1.6.1, 6.1.6.2, 6.1.6.3, 6.1.6.4, 6.1.6.5, 6.1.6.6, 6.1.9, 6. 1.10 & 6. 1.11). A well -planned, organized, and fully transparent RFP and its requirements assessment, scoring and comprehensive evaluation is important for a strategic decision -making process. EMA's method allows FWWD a clearly visible and collaborative selection process that will expose critical facts and strengths and weaknesses of each responder. Thus, allowing the team members to understand business, technical, implementation methodology and personnel resources of all responders. All dimensions of selection criteria including functionality, risks, opportunities, scoring, and pricing will be factored into the final determination and judgement by FWWD. EMA will meet with FWWD's management and the City's Purchasing Services to ensure understanding of FWWD's desired process for the CIS selection. During this meeting, we will discuss the City's RFP practices and requirements. EMA will lead the development of the RFP including the scope of work (RFP section 6.1.9) and in collaboration with FWWD's management will develop the desired vendor evaluation criteria and weighted scoring based on priority or importance of each requirement. In this process, EMA will ensure coverage of all stakeholders' needs and project expectations. Additionally, EMA will gain an understanding of other requirements of the City's procurement process and author the draft RFP in compliance with the City's procurement requirements. After the RFP design/procurement planning meeting, EMA will prepare a draft RFP for the project team's final review, and for final management and legal approval. The RFP will include specific goals and objectives for the CIS solution, the RFP timeline, vendor submission instructions, pricing components, evaluation methodology, functional requirements, technical architecture, interface definitions, reports requirements, data conversion, data sharing requirements, security requirements, end users and technical training, testing/quality assurance, systems performance, data, and ongoing support/maintenance/upgrade requirements. EMA will work with FWWD to finalize the RFP. EMA is familiar with the potential CIS vendors that will be able to meet the defined stakeholder business requirements. We will provide a list of vendors in the marketplace that we believe FWWD will want to consider (6.1.10). EMA and FWWD will work jointly with the City to issue the RFP. Deliverables: • Workshops and meetings to develop selection criteria and scoring method • Draft RFP • Workshop to review draft RFP EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 37 Final RFP • List of potential vendors 6.1.7: Identify and document opportunities for efficiencies, cost savings, and potential risks within a formal report (RFP 6.1.7). In the assessment of the current environment task (6.1.1), we identified potential process gaps, duplication of efforts, manual activities, lack of data sharing and reporting. This task will focus on developing a list of opportunities for process efficiency and cost savings. We will identify potential risks and benefits for each recommendation. In addition, we will discuss our recommendations for possible replacement of the shadow systems functionalities with the new CIS with the stakeholders. The recommended improvements are designed to streamline the customer service and billing processes and improve customer experience. To ensure thorough understanding of each recommendation, we will conduct facilitated workshops with the stakeholders to clearly articulate each solution, its impact on the organization, cost savings, benefits and potential implementation risks. A detailed analysis of the expected financial benefits, including potential reductions in manual labor, enhanced operational efficiency and potential implementation risks will be included in the formal report. Deliverables: • Formal opportunities for improvement report 6.1.8: Propose solutions and estimate total cost of ownership, including implementation and sustained support within a formal report (RFP 6.1.8). Upon approval of the improvement recommendations presented in Task 6.1.7 by FWWD, EMA will use our proprietary tool called the "CIS Cost Analyzer", which helps our customers more accurately understand the costs, timing, and staff commitment involved with these projects. The proposed solutions, along with the estimated total cost of ownership, and sustained support over a 5-1 0-year period will present a strategic roadmap and position FWWD for future growth. We will present our recommendations to the stakeholders in facilitated workshops and receive feedback. EMA will incorporate the feedback and deliver a final formal report to FWWD. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 38 W EMA WON, r The EMA CIS Cost Analyzer is designed to help utilities understand the planninglbudget needed to support a CIS Replacement Froject_ CI SERVICES, ACCOUNTS, AND USERS This Cost Analyzer for: DURATION, STAFF, BACKFILLING FVVWU AND CONSULTANT IIII TRAINING AND FACILITIES List any Assumptions below: t Y ` y 1` 18 Month Implementation Duration Current # of Accounts ILINTERFACESANDADD-ms IE-SIDEAND NON CIS -SIDE) Tier 2 UREPORtS 0 There are currently ten areas in the Cf5 Cost Analyzer Each area can he accessedby clicking the appropriate buiinn to IIWsRdNARE, IMTA�ASE, IJ the left 4NfS�.Q�i 1. Services, Accounts, and Users - Determine estimated license costs for recurring billing (for ongoing services) II SYSTEM CHANGES 2. Duration, Staffing, Backfilling and Consultant- Define the time commitment to the project as well as laying P out the cost for staffing. It also addresses backfilling for Implementation Core Team and in which area (e.g.., Needs I II TRAVEL J Assessment, Requirements, etc.) a consultant may be required. �I 13- Training and Facilities - Determine training needs including facility and equipment needs. COSTBRFAI[DOWN 4. Interfaces and Add-Ons: CIS -Side and Non CIS -Side. Ability to select the desired interfaces to the CIS - exanies are Accounts Payable, Meter Reading System, etc. SLAIIIi Y IJ 5. Reports, including Queries and LetterslNotices. Document number of reports generated in current system and percentage that could be replaced by functionality in a new CIS. LSCENARIOS � L 6 Hardware, Database, and Network - Determine standard database and server operating system set tolerance for RECCNAIENDATIONS IJ downtime, and network size. I7. System Changes - Determine if vendor or internal IT staff will perform patches. upgrades and reconfigurations. I8. Travel - Travel costs associated with vendors implementation. EMA u2023 19. Cast Breakdown I10. Summary Figure 4: Example Screenshot of CIS Cost Analyzer Deliverable: • EMA CIS Cost Analyzer tool reports; high-level implementation timeline; CIS replacement decision points Phase 2: Selection of Software Solution and Implementor (RFP 6.2, 6.2.1, 6.2.2) An integral aspect of effective strategic decision -making is the establishment of a thorough methodology for scoring and evaluating proposals. Acting as an advocate representing FWWD, EMA's approach provides FWWD with a transparent and collaborative selection process, unveiling crucial facts and both strengths and weaknesses of each responder. This enables team members to gain insight into the business, technical aspects, implementation methodology, and personnel resources of all responders. FWWD's final determination and judgment will consider all dimensions of selection criteria, encompassing functionality, risks, opportunities, and pricing. During the RFP development process (Phase 1-Task 6.1.5), EMA and FWWD discussed the risks and benefits of developing a combined or two separate RFPs for the procurement of the CIS software and the SI. If separate RFPs are developed during the procurement approach, EMA will use the same selection methodology and approach used to select the CIS Software to EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 39 assist FWWD in selecting the SI. EMA will perform the following activities to ensure FWWD selects the most suitable CIS software and capable and reliable SI. Task 2-1: Project Management (RFP 6.2.2) Throughout the selection phase, EMA will continue overseeing the day-to-day activities of the project team to guarantee the execution, monitoring, and control of all project components align with the established goals and objectives. The EMA project manager is actively engaged with the client team, addressing any issues and considerations to consistently surpass client satisfaction. This responsibility encompasses the management of the budget, scope, EMA resources, and project schedule. Additionally, it involves continuous communication with FWWD project manager and stakeholders, handling invoicing, generating progress reports, and identifying, assessing, and formulating response options for potential risks. Deliverables: • Overall project management • Weekly and monthly progress reports • Project logs • Steering committee meetings Task 2-2: Proposal Management and Preparation for Evaluation (RFP 6.2.2) After the RFP has been issued, a Pre -Proposal conference call will be scheduled with interested vendors. EMA will support and facilitate workshops and assist FWWD with review and response to submitted questions. EMA will work closely with FWWD to prepare for evaluating RFP responses, reference checks, and demonstrations. EMA will conduct a two-hour workshop with FWWD's CIS selection team that will focus on: • Mission and goals orientation. • Introduction to the evaluation tools and processes. • Practical demonstration of developing and finalizing product demonstration scripts. After the workshop, EMA will update our proprietary Proposal Evaluation Tool to: • Adapt and reflect FWWD's selection criteria. • Incorporate the final format of the RFP and demonstration evaluation forms. • Gain alignment with FWWD's selected scoring methodology. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 40 The desired outcomes of this task are to empower the CIS selection team with the necessary knowledge and tools to effectively evaluate and select the shore -list of qualified CIS solution providers. Deliverables: • Teleconference facilitation • Response to vendor questions • Evaluation workshop • Proposal evaluation tool with scoring methodology • Demonstration evaluation forms Task 2-3: Demonstration Script Development and Vendor Invitations Right after the Selection Criteria Workshop, EMA will support FWWD in creating demonstration scripts. We'll provide guidance to FWWD on scheduling demonstrations and crafting instructions for vendors. EMA will craft a Demonstration Invitation Memo encompassing demonstration guidelines, logistical details, schedules, and product demonstration scripts. The purpose of these scripts is to enable vendors to showcase that their product possesses the required functionality using FWWD's CIS sample data and adhering to business rules. Deliverables: • Demonstration scripts • Demonstration invitation memo • Identified list of the City's data and processes (for vendor product demonstration) Task 2-4: Evaluate RFP Responses for Short List - up to three (RFP 6.2.3.1, 6.2.3.2, 6.2.3.3, 6.2.3.4, 6.2.3.6 and 6.2.3.7) Under the guidance of EMA, the selection team will thoroughly assess Vendor proposals. Our involvement extends to scoring responses, ranking them, and determining the top three recommendations for FWWD's management. Additionally, EMA will actively participate as an evaluation panelist, facilitating the proposal evaluation process. Simultaneously, we will review and analyze all proposals, providing a comprehensive summary report to FWWD. This report will include an evaluation of whether the proposed systems align with FWWD requirements, identification of potential gaps, and a cost analysis of the submitted proposals by phase. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 41 Furthermore, EMA will play a pivotal role in communicating any potential policy or standard operating procedure changes related to CIS vendors and proposed solutions to FWWD. This ensures that FWWD is informed of any evolving landscape that may impact decision -making. To foster collaboration and innovation, EMA will organize a dedicated selection team workshop. This workshop will serve as a platform to discuss, validate, and document conclusions for the top three vendors, contributing to a well-informed decision -making process. Deliverable: • Vendor proposal analysis report — including vendor fit/gap; limitations and risks; SOP/policy impacts; and cost analysis Task 2-5: Conduct Short -Listed Vendor On -Site Demonstrations - up to three (RFP 6.2.3.1) EMA will oversee the facilitation of vendor demonstrations, utilizing scripted presentations to illustrate how the proposed solutions manage crucial utility business rules and processes. The event will span up to two and a half days of thoroughly orchestrated demonstrations, followed by an additional half day during which the selection team will engage in vendor -guided hands-on exploration of the software. Post -demonstrations, EMA will conduct a workshop to further enlighten the selection team on key aspects of the offerings from the top three vendors. Deliverables: • Scripted vendor demonstrations (up to three) • Post -demonstration workshop • Comparative analysis of top vendors' offerings Task 2-6: Vendor Site Visits and Reference Calls (RFP 6.2.3.5) There is substantial benefit and value in utilities conducting on -site visits to other utilities that employ the proposed software. EMA will aid the selection team in coordinating these utility site visits. These visits will encompass a trip to the site, interviews, and on -site demonstrations. It is crucial that both the visiting and visited utilities comprehend the objectives of the site visit, and adequate planning and background information will be provided in advance. We will guide FWWD in scheduling and developing comprehensive plans for these visits. We will furnish reference checking forms to evaluate the effectiveness of how other utilities have implemented the solutions from the shortlisted vendor to meet their requirements. This process aims to identify potential issues, risks, or other considerations to be addressed during contract negotiations. Our approach involves FWWD staff personally reaching out to their counterparts at the reference sites, fostering more productive and informative conversations. While we oversee the process, the actual reference checking will be conducted by FWWD staff themselves. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 42 Deliverables: • Reference utilities site visit plan • Reference check scripts Task 2-7: Facilitate Determination of Preferred Vendor (RFP 6.2.3.1) EMA will lead a workshop in collaboration with the selection team to arrive at a recommendation for the preferred vendor. The outcomes of this workshop will be meticulously documented, encompassing the selection process, a comprehensive short-listed vendor comparison, a summary of scores, and potential negotiation points. EMA will then furnish a detailed report to FWWD detailing the scoring process, criteria, and rationale for selection. Deliverables: • Vendor selection workshop • Detailed selection report • Assist in determining final selection Task 2-8: Negotiate Contract (RFP 6.2.3.8) Upon FWWD's issuance of a notice of intent to award, EMA will organize a negotiation design workshop. The aim is to discuss the negotiation process and delineate the roles of FWWD's negotiation team members. EMA will actively contribute to the preparation and participation in vendor contract negotiations. This involves incorporating key deliverables into the contract, adhering to milestone -based and staged payment terms in alignment with FWWD's procurement policy. The intention is to establish leverage that minimizes project delivery risks. Throughout the contract negotiation process, EMA will provide technical and management support, offer tactical guidance on contract language, provide insights into terms and conditions, and consistently manage risks. The overarching goal is to maximize the value-added benefits realized by FWWD through a strategic and well-informed negotiation process. Deliverables: • Presentation to FWWD management • Contract review and analysis • Assistance and guidance in contract negotiation Task 2-9: Prepare to Implement EMA will conduct working sessions with FWWD in preparation for implementation. These sessions will involve activities such as formulating a staff backfill plan, providing an educational overview of the project, and conducting overall readiness planning for FWWD's project team. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 43 Deliverables: • Implementation readiness assessment Phase 3: Implementation and go -live, consisting of implementation and launching the selected CIS. Task 3-1: Project Management (RFP 6.3.1.1 & 6.3.1.4) During the Implementation phase, EMA will continue to monitor the day-to-day activities of the project team to ensure that the implementation process meets user, business, and technical requirements. Acting as a trusted advisor, EMA will advocate for FWWD's interests throughout the implementation. To facilitate effective project management, EMA will employ established tools such as decision logs, issue logs, action items, a risk register, steering committee updates, and general project correspondence. We will create and consistently update a comprehensive master project plan that encompasses all tasks to be undertaken by the System Implementor, EMA, and FWWD. This plan will be subject to review and updates during project status meetings. EMA will maintain regular communication with FWWD, conducting project progress reviews and addressing any outstanding issues, risks, or potential problems that may arise during the implementation process. EMA's project manager will undertake the following responsibilities: • Quality Assurance/Quality Control (QA/QC) o Review all project deliverables and statuses to ensure compliance with the contract and appropriate diligence has been exercised. o Provide guidance in the event of contract disputes and participate in the review and facilitation of negotiations for CIS contract amendments and/or change orders during the implementation phase. • Coordination of Implementation Team and Vendor Activities o Take the lead in coordinating activities between the utility's implementation team and vendors. • Communication and Coordination Protocols o Develop and oversee protocols for communication and coordination throughout the project. • Provide Project Leadership EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 44 o Provide leadership of the project team to maintain project quality, schedule and budget. Management of project risk by driving resolution of issues, action items and decisions. o Conduct meetings with FWWD leadership to address and resolve project issues as well as thoughtful analysis and recommendations leading to informed decisions. • Assuring FWWD Staff Participation o Ensure the active participation of FWWD staff in the project. EMA's approach emphasizes that achieving high-performance operations (process optimization) involves engaging both management and staff throughout the project. This involvement enables employees to learn industry -leading practices and emphasizes the importance of maximizing productivity. Managers, on the other hand, gain insights into business management practices of high -performing organizations and new approaches to developing and maximizing the productivity of a skilled and motivated workforce. • Vendor Meetings o Meet with vendors to ensure their understanding of FWWD's direction. Discuss and plan objectives, requirements, responsibilities, performance, and review business process analyses, reporting requirements, deliverable review procedures, and project schedules. • Vendor Submittals and Progress Reports o Review and obtain approval for vendor submittals and monthly progress reports. These progress reports should detail significant accomplishments, issues, or problems that could impact schedule or costs, along with plans for the upcoming month. The level of detail should ensure that pursued directions align with established and projected goals. • Approval of Vendor's Final Work Product and Invoices o Collaborate with FWWD's project team and project manager to approve the vendor's final work product (configured system) and authorize invoice payments. Deliverables: • Develop and maintain a detailed Project Plan identifying the activities, resources, and timing of tasks necessary to complete the project • Establish a Communication Plan • Establish a Project Collaboration Environment to act as a repository for project information • Conduct status meetings to monitor project progress • Weekly status reporting EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 45 • Management of project logs: Risk, Issues, Decisions, Action Items • Monthly Steering Committee meetings • Vendor invoice approvals Task 3-2: Pre -Implementation Mobilization EMA will support FWWD, the chosen CIS vendor, and the system implementor in planning activities in preparation for implementation. These planning activities will encompass: • Staffing Needs and Requirements o Addressing the necessary staffing needs and requirements for the successful execution of the project. • Overall Project Plan o Developing the comprehensive project plan, incorporating activities from the vendor, FWWD, and EMA, outlining roles and responsibilities, key processes, and data preparation. • Project Charter o Formulating the Project Charter to provide a clear understanding of the project's scope, objectives, and stakeholders. • Roles and Responsibilities o Defining and clarifying roles and responsibilities for all involved parties. • Key Processes o Identifying and outlining key processes critical to the project's success. • Data Preparation o Planning and preparing for the management and utilization of project -related data. • Application Environment and Infrastructure Readiness o Assessing and ensuring the readiness of the application environment and infrastructure for the implementation phase. • Testing Process and Preparation o Establishing the testing process and preparing for the necessary testing activities. • Preparation for and Participation in Project Kick-off Meeting o Preparing for and actively participating in the Project Kick-off meeting, ensuring all relevant aspects are covered. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 46 Deliverables: • Staffing needs and requirements documentation • Project charter • Risk plan • Project budget • Testing process and required preparation documentation • Preparation for, and participation in the Project Kick-off meeting • Kick-off meeting documentation • Kick-off workshop materials Task 3-3: CIS Discovery EMA will actively engage in the CIS vendor's discovery and configuration workshops to guarantee the comprehensive identification and capture of both business and technical requirements. Our role involves facilitating FWWD's comprehension of key concepts and ensuring that the project team fully grasps the consequences of configuration decisions on existing business processes. EMA will diligently document recommendations, issues, concerns, and potential business process improvements arising from these workshops. Our objective is to contribute to configuring the new system in a manner that aligns with leading practice business processes while appropriately integrating with past practices. Deliverable: • Detailed report summarizing recommendations, issues, concerns, and identified business process improvements Task 3-4: Support Interface Design In alignment with the specified requirements, EMA will aid FWWD in overseeing interface development, conducting integrated testing, and reviewing relevant documentation. Our support will extend to assisting FWWD in the evaluation of interface specifications provided by the CIS vendor. Additionally, EMA will collaborate with FWWD to coordinate activities with other interface vendors, including the review of their specifications. The responsibility for reviewing and finalizing vendor quotes and statements of work lies with FWWD, with EMA playing a supporting role in escalating any vendor -related delays or performance issues as needed. Deliverables: • Review of interface specifications • Assistance in interface testing EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 47 • Support in managing interfaces with third -party vendors • Documentation of Quality Assurance (QA) for interface design and testing Task 3-5: Data Cleansing and Data Conversion Assistance EMA will collaborate with FWWD to formulate an estimated work effort and methodology for the cleanup of data in its source system(s) and other databases. Active participation in the CIS vendor's data migration workshops will be a key aspect, involving the documentation of action items, identification of cleanup requirements, and facilitation of issue clarification among the vendor, technical support, and business users. Furthermore, EMA will engage with FWWD and the vendor to address any issues arising in the data migration process. This includes diligent follow-up on action items, regular reporting on cleanup status, and facilitation of meetings aimed at resolving identified issues. EMA's role extends to coordinating communication channels among the vendor, FWWD's IT team/data experts, and business users. Additionally, we will provide support in coordinating activities for each data extract and refresh until the project reaches the go -live stage. Task 3-6: CIS Testing Assistance The implementation of a new CIS is a multifaceted undertaking, necessitating thorough testing of both upstream and downstream business processes. Ensuring compliance with both functional and technical requirements involves rigorous testing of the CIS system configuration. EMA will play a vital role throughout the implementation phase by offering test management assistance to FWWD's staff, engaging in hands-on testing, and establishing the reporting structure for testing status. While the System Implementor is expected to provide generic test scripts, EMA will conduct workshops to pinpoint additional scenarios and develop testing scripts tailored to FWWD's specific needs. The FWWD test team will document the user steps required to execute tests, building on prior training. To enhance the efficiency and effectiveness of testing, EMA recommends the use of off -the - shelf test management software. Some CIS vendors may employ trouble ticketing software with integrated test management functionality, providing a comprehensive solution for tracking the quality and quantity of testing. Deliverables: • Testing plan • Test management • Test team protocols • Testing status updates and reporting EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 48 Task 3-7: Business Process Redesign and Documentation (RFP 6.3.1.6 & 6.3.1.2) This task involves a comprehensive review, assessment, and update of the business processes and workflow diagrams reviewed in Phase 1. Recommendations concerning Organization (0), Practices (P), and Technology (T) will be revisited, and any new opportunities identified during the implementation phase will be analyzed and evaluated. The impacts of business process changes will be communicated and vetted with FWWD. The essence of business process re - engineering lies in instigating organizational momentum for the change process, with a focus on identifying and modifying outdated legacy processes. EMA will conduct workshops with FWWD's project team and work group leadership, fostering a collaborative environment for the review and discussion of strategic perspectives. Consideration will be given to stakeholders and their business needs, reinforcing alignment by reaching agreement on business, technical, and other drivers and establishing criteria for measuring success and achieving desired outcomes. Subsequent workshops will be conducted to scrutinize and adjust the workflow diagrams as necessary to reflect the "future -state". EMA will capture and supplement reviewers' perspectives on how the optimized business processes may impact various elements such as job roles, policies, rules/regulations, stakeholders, and customers. To the extent possible, EMA will quantify the "future -state" recommendations, providing insights into the costs and benefits of adoption, along with potential value, challenges, and policy impacts. This information will empower FWWD to make informed decisions regarding whether, how, and when to proceed with business process updates. Deliverables: • Analysis report of strategic business, technical and other drivers Report on business process recommendations, impacts, cost/benefits, values, and challenges Task 3-8: Organization Change Management (RFP 6.3.1.3) Change management is interwoven throughout the project to address the human aspect of change, fostering awareness and a desire to engage, while also building knowledge, proficiency, and long-term sustainability. EMA will support FWWD in developing and executing their change management plan throughout the implementation. EMA's involvement includes assisting FWWD in creating an internal communication matrix, drawing input from FWWD's executives and management. This matrix will serve as a crucial tool for FWWD to implement their plan, incorporating various components that seamlessly connect to provide impacted groups with the awareness and understanding needed to actively engage, support the project, and embrace the proposed changes. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 49 Furthermore, EMA will aid FWWD in formulating an external communication matrix, which includes input from FWWD's executives, management, and public relations. This external communication plan is tailored for stakeholders external to FWWD, focusing on vital needs such as informing customers about changes they will experience during the go -live phase. FWWD will implement this plan throughout the project, delineating the intended messaging, timing, frequency, and medium of communications. Deliverables: Assist FWWD with: • Implementation of change management plan • Change input analysis • Readiness assessment • Stakeholder engagement • Internal and external communication matrix Task 3-9: Project Training Assistance EMA will assess the skills of staff slated to use the new CIS system and propose training recommendations aimed at establishing foundational skills and proficiency. Additionally, EMA will scrutinize the vendor's comprehensive training plan and offer recommendations for approval. Selected vendor training sessions will be audited by EMA, with documentation encompassing recommendations, issues, or concerns, aligning these assessments with the end users' business needs. To ensure alignment with project requirements and contractual obligations, EMA will actively participate in the vendor's initial training alongside FWWD's project team. This involvement aims to verify the comprehension of key concepts, maintain continuity with requirements and the contract, and ensure the project team possesses a practical understanding of the application. Any identified issues or concerns will be promptly flagged and documented. Deliverables: • Staff training recommendations • Report outlining the findings from the audit Task 3-10: Mock Go -Lives and Go -Live Cutover (RFP 6.3.1.5) EMA will actively participate in planning and executing cutover activities. We will assess the vendor's cutover plan, offering recommendations on the process's comprehensiveness, schedule, Go/No-Go criteria, and success benchmarks. Up to three mock go -lives will be closely monitored and reviewed by EMA, with documentation of any associated issues or concerns. As EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 50 part of a cutover coordination team, comprising representatives from the vendor, FWWD, and EMA, active participation will ensure a tested and coordinated approach to both the mock go - lives and the actual cutover. Deliverables: • Review of cutover plans • Assistance in managing mock go -lives • Documentation of issues identified during mock go -lives. Task 3-11: Post Go -Live Stabilization Assistance EMA will actively assist FWWD during the post go -live stabilization phase following the implementation of the CIS. This support involves collaborating with FWWD to establish a communication and work process designed to identify and track issues post go -live, with a commitment to reaching resolutions. EMA's role extends to offering recommendations for communication to customer -facing personnel, ensuring appropriate and effective responses. As part of the stabilization process, EMA will manage the vendor's punch list, providing recommendations for acceptance and noting necessary improvements. Additionally, selected documentation will undergo thorough review by EMA for accuracy and completeness. In cases where it is deemed appropriate, EMA will prepare and submit a recommendation affirming that the vendor has fulfilled its Statement of Work (SOW), signaling that the City may issue the final payment for the new system. Deliverables: • Post go -live communication and work plan • Post implementation status reports • Co -management of CIS vendor punch list EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 51 CONFLICT OF INTEREST QUESTIONNAIRE CONFLICT OF INTEREST QUESTIONNAIRE For vendor doing business with iocai governmental entity FORM CIO This gwgftrlrrelm reflects ctmnges moue to the Ilm 6y ILA 23, NO Leg_, Regular Se8a16R OFRCE USE ONLY ThsqueiiWnrolre is being Ned in ,......rdance with Chapter 176. 1 pm Cowemn ant Czde. by a vendor wtio Oyu Rmam;d f1a6 a firmness reWunstilp as d9nned try 3&dtlon 17f 00111-a1 with a laical goverrimental entity mtl the vendor meet& requlremenIs under Sector 17Ti_016(ak ey la+r thisquBuDnmire must fie nled wrih the reoads adrnlnratrmor c4 the" gN&rrwntal en 4 not L31K than the7th blrsfiemiLy alter Ihedale thev,r be, p aware of la= ttiat require the statement b7 be Md. See Secl.[Dn 176.046Wa-1). LmW GDyerrinngrill Code. A verrmr aomnis ari Uffierize n tine vendor 9ec1lcn 176.[bfi, Lace! Gawenmierrt Oade. An offense alder his seen Is a rnSdErIEaror. J Name 4vowforwhnhoe abueineserelationehipwith looalgovernmental entily_ EMA, Iflc- J ❑Chock thieboor"rfyauareflinganrqmiateloapreviauelyliadguealiorrrairaMmlawregr-asthEdyaufie enupJwEd oxnpleied guestionneirewith the appropriate filing autharihy nai laierthan the7th buaness dap aiterthe date on which you become enare that the originally fled questionnairB was ineixrp a or ineowrete.} Vienne of local government officer shoal whom the irdarmarlion is being disclosed HfA Name of CTf kcsr J Desoribeeach employment of other business relm[ianehip with the local govemrrient officer, or s farnily member o11he officer, as described by Section 176.CO3faXZ(A}- Alsodescribe anyfamily relabonshipwithlhelacW glavemirieiit officer Complete subparts Aand Bforeach employnnern or buairres8Felsliunship described- Anschaddrtionalpogestathie Form CIO as neaeasary. NIA A. Is the heal government offiow ar a iar* member of the officer reoeiuing or likely to renews taxable inmrne. -Diher than investment irrxrne, from the vendor? = Yea = No B. Ir.*e- verriorreceiving or Ii" to receive texatleinmme, other t-an investment income, from w et theduectian ai the local government officer or a family merrter of the aficerAND the lexatle inoDme is nut received from the keel glavernmerdal entity? Yea F—] No Describe each employrrentorbusiness relationship that the vendor named in Section i rnsintsinewilhacorporaden or other business er-il" with respecl towhich the local . _ officer nerves as an officer or director, orholdla m ownership interest of one percent or more. NIA J ❑ Check this box it fire varier has given the loA gavemment officer ar a IarrriFy member -of the officer one or more gib ae described in Section 17GDMje.)Q)I 13), exiAuding gifts doEir ibed in Secliori 17G.C69i�1}. DeCEITIbef 7, 2023 Signature of vandcr doling tauernms with tie gmernmemel wT4 Dade Form Prow6ed dF Texas Ebilee CuninMkm wwx.elhlcs_EIEl.-PA-ue ReAUd V1.2021 EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 52 CONTRACT EXCEPTIONS Where EMA is requesting contract language to be removed, it is represented by a strikethrough. Where EMA is requesting revised or additional language, it is underlined. 5.2 Confidential Information. Vendor, for itself and its officers, agents and employees, agrees that it will treat all information provided to it by City ("City Information") as confidential and will not disclose any such information specifically noted as such to a third party without the prior written approval of City. 8.1 114611 ITT INDEMNIFICATION — PROFESSIONAL SERVICES - VENDOR WILL BE LIABLE AND RESPONSIBLE FOR ANY AND ALL PROPERTY LOSS, PROPERTY DAMAGE AND/OR PERSONAL INJURY, INCLUDING DEATH, TO ANY AND ALL PERSONS, OF ANY KIND OR CHARACTER, WHETHER REAL OR ASSERTED, TO THE EXTENT CAUSED BY THE NEGLIGENT ACT(S) OR OMISSION(S), MALFEASANCE OR INTENTIONAL MISCONDUCT OF VENDOR, ITS OFFICERS, AGENTS, SERVANTS, EMPLOYEES, CONTRACTORS, OR SUBCONTRACTORS FOR WHOM VENDOR IS LEGALLY LIABLE. 8.2 GENERAL INDEMNIFICATION — OTHER THAN PROFESSIONAL SERVICES - VENDOR HEREBY COVENANTS AND AGREES TO INDEMNIFY, HOLD HARMLESS AND DEFEND CITY, ITS OFFICERS, AGENTS, SERVANTS AND EMPLOYEES, FROM AND AGAINST ANYAND ALL CLAIMS OR LAWSUITS OF ANY KIND OR CHARACTER, 1^Z4►►7 REAL QR n cc RT-n FOR EITHER PROPERTY DAMAGE OR LOSS ONG ► ►DiNG ALLEGED DAMAGE OR ► OSS TO ► ENDOR'S BUSINESS AND ANY RESU T►NG ► OST PROFITS4 AND/OR PERSONAL INJURY, INCLUDING DEATH, TO ANY AND ALL PERSONS, ARISING OUT OF OR IN CONNECTION WITH THIS AGREEMENT, TO THE EXTENT CAUSED BY THE NEGLIGENT ACTS OR OMISSIONS OR MALFEASANCE OF VENDOR, ITS OFFICERS, AGENTS, SERVANTS, EMPLOYEES, CONTRACTORS, OR SUBCONTRACTORS. 8.3 INTELLECTUAL PROPERTY INDEMNIFICATION — Vendor grees to day settle, or patent, Gelpyright 4rord de sorret or similar nrripe#y ri rm Ct y's use of the software o mark, trade g t anaingfi and/er deGumentatmen on aGGerdanGe with this Agreement, it being ��m � d that thio cgreemen to defend, settle —or pay will not cpply if City medifies or mio�V ss the software and/or dOGIUMeRtation. Se long as Vendor bears the GGSt and expense of payment fGF GlairRs er aGtOE)RE; EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 53 iRSt agar pursuant t claim er antien aR d all anolcim; hewer negotiations or lay oNit co nenessary to nretent (amity's interest and (amity agrees to noonerate with Vender in doing so In the event Gity, for whatever reason, assumes the responsibility for payment this Agreement, Gity will have the sele right te GenduGt the defense ef any SuGh Glaim er aGtien hewever, Vender will fully partiGipate and GGGperate with Gity in defense of SuGh Glaim or aGtmen-. Gity agrees te give Vender timely written n0tiGe of any SUGh Glairn er aGtien, with Gepies ef all -�o &,oa u epayment Of GGStS Or mil not ei'mminate # Vender's Agreement If the seftware and/er rdorr rmentatien er an" part th9reef is held to infringe andthe materially adversely restrinterd Vender rn„II, at ito own expense anrd as Gity's sole remedy, either: the software and/er ,-derr rmentatien to mare it non infringiRg, provided the sueh merdifiratien does RGt materially adversely affeGt r }, software and/er rdo tatien with Eom Able, and fi inntienall" rep c �,��r,�Qcen�eg p eq ��„oal�„ent-Ron infringing amend all ;mountc paid ♦e VeRder by City, subsequent tO which torminc�ien Git„ may seek any and all remedies available to Git„ under lark. Vendor agrees to indemnifv Citv for infringement of anv patent, copvriaht trademark, trade secret, or similar property right arising from Citv's use of the software and/or documentation in accordance with this Agreement. 10.2 (c) A minimum of Thirty (30) days' notice of cancellation or reduction in limits of coverage by endorsement must be provided to City. Ten (10) days' notice will be acceptable in the event of non-payment of premium. Notice must be sent to the Risk Manager, City of Fort Worth, 200 Texas Street, Fort Worth, Texas 76102, with copies to the Fort Worth City Attorney at the same address. 11. Compliance with Laws, Ordinances, Rules and Regulations. Vendor agrees that in the performance of its obligations hereunder, it will exercise the reasonable professional standard of care to comply with all applicable federal, state and local laws, ordinances, rules and regulations and will exercise the reasonable professional standard of care so that any work it produces in connection with this Agreement will also comply with all applicable federal, state and local laws, ordinances, rules and regulations. If City notifies Vendor of any violation of such laws, ordinances, rules or regulations, Vendor must immediately desist from and correct the violation. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 54 19. Force Majeure. City and Vendor will exercise their best efforts to meet their respective duties and obligations as set forth in this Agreement, but will not be held liable for any delay or omission in performance due to force majeure or other causes beyond their reasonable control, including, but not limited to, compliance with any government law, ordinance, or regulation; acts of God; acts of the public enemy; fires; strikes; lockouts; natural disasters; wars; riots; widespread infectious disease outbreaks includinq, but not limited to, epidemics or pandemics; government action or inaction; orders of government; material or labor restrictions by any governmental authority; transportation problems; restraints or prohibitions by any court, board, department, commission, or agency of the United States or of any States; civil disturbances; other national or regional emergencies; or any other similar cause not enumerated herein but which is beyond the reasonable control of the Party whose performance is affected (collectively, "Force Majeure Event"). The performance of any such obligation is suspended during the period of, and only to the extent of, such prevention or hindrance, provided the affected Party provides notice of the Force Majeure Event, and an explanation as to how it prevents or hinders the Party's performance, as soon as reasonably possible after the occurrence of the Force Majeure Event, with the reasonableness of such notice to be determined by the City in its sole discretion. The notice required by this section must be addressed and delivered in accordance with Section 13 of this Agreement. 2/1 Warranty of Sew+Ees.Ve�iarranto that ito oar„ines will he of a high quality and this warran"ithin thirt7 ('Z (1\ idovs from the rdo+a thct the services ore gomnleterd. In s,,gh eyep , Vender'sat in a manner that conforms With the warm Rty or (b) refs ,nrd the fees paid by Gity to Venddor for the nenGenferming seniires EMA proposes to replace this subsection with the following: 24. Standard of Performance. Vendor shall perform its services with the care and skill ordinarilv used by members of its profession practicing under similar circumstances at the same time and locality. Vendor shall be responsible for the technical accuracy of its professional services and documents resultinq therefrom and Citv shall not be responsible for discovering deficiencies therein. Vendor shall correct such deficiencies without additional compensation except to the extent such action is directly attributable to deficiencies in Citv-furnished information. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 55 0 Attached are resumes for the following EMA key personnel: • Michael Moosavi, PMP, Principal -in -Charge • Bill Rivers, PMP, CSM, Project Manager/Finance • Alisa Mann, Ph.D., Customer Service/Meter-to-Cash SME • Tammy Edinger, PMP, Billing/Meter-to-Cash SME • Melissa Telford, Business Process/Meter-to-Cash SME • Marla Hartson, PMP, CSM, Data Conversions • Eddie Cheong, Integrations • Sandip Basu, MA, PMP, MBA, Technical Lead APPENDIX A: RESUMES EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 56 MICHAEL MOOSAVI, PMP hood" Michael is an EMA Vice President who helps clients develop and implement EDUCATION targeted business strategies. He has more than 25 years of experience in business Master of Business development, management consulting, and large-scale technology Administration, E-Business, implementations. Michael has focused his efforts on Customer Service, SaaS, University of Phoenix Cloud, Business Processes, and other enterprise management strategies. Bachelor of Arts, Computer Detailed Project Experience Science, St. Edwards University, Austin, TX Customer Service Organizational Development and Leading Practices, City of New FIELDS OF SPECIAL York, NY, Management Consulting. Facilitated executive workshops and COMPETENCE guided the customer service leadership towards a customer -centric paradigm Program and Project to improve customer experience and operational efficiencies. He led the Management stormwater billing implementation organization readiness initiative and GIS and Asset Management participated in delinquency and collection process enhancement to increase account receivable and improve customer service. Michael will continue his Saas (Software as a Service) engagement as a lead customer service organization improvement initiative IT Strategy Development with the NY DEP. Business Process Customer Information System Implementation. Central Arkansas Water, AR, Improvements Executive Sponsor. Held the overall responsibility for ensuring the successful Organizational Change implementation of the Customer Service Information System (CIS). In this role, Management Michael provided guidance and direction to the project team, actively engaging Technology Project in project sponsor meetings to contribute valuable insights. He played a key Management role in resolving client issues, offering strategic recommendations for both Meter -to -Cash Strategies client and vendor project activities. Customer Service and Billing Customer Service and Mobile Workforce Management Process Improvement, City CERTIFICATES, LICENSES, of Fort Worth, TX, Management Consultant. Led the customer Service Mobile MEMBERSHIPS, AND Workforce Management assessment and improvement project. Developed AWARDS recommendations to improve customer service interaction and communication Project Management Institute with the filed staff. (PMI) Certified Project Information Technology Development and CIS Selection and Implementation, City (PMP) ement Professional of Georgetown, TX, IT Advisory. Led the sales, technology program management development and execution. Led the executive team through the Prosci Organization Change Management (OCM) Certified selection of an Advanced Metering Infrastructure, Enterprise Resource Planning system and Work and Maintenance Management System. City of charlotte, Certificate of Excellence in Innovation, 2008 Customer Information Management (CIS) Integration, Connexus Energy, Minneapolis, MN, Program Manager. Managed CIS integration project, City of Charlotte, Certificate of Appreciation for dedication and including requirements analysis, system analysis, code development, and leadership in implementing the testing. Conducted various workshops to capture business, system, and CIS and Mobile Workforce reporting requirements. Analyzed reporting requirements and provided Management, 2007 recommendations to replace existing Oracle -based proprietary reporting Texas Water Department, system. Certificate of Recognition from the Board of Directors for Mobile Workforce Management Implementation, Charlotte Mecklenburg Utilities, leadership and change NC, Management Consultant. Managed CIS integration project with a management, 1997 Mobile Workforce Management System, provided overall direction, Texas General Land Office, facilitated vendor interaction and communication, modeled the "To Be" Certificate of Recognition for business processes, facilitated change management activities, developed a Leadership in protecting the testing methodology, and directed technical project activities. environment through utilization of technology (GIS), 1995 EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 57 WEMA BILL RIVERS, PMP, CSM hood. Bill has more than 20 years of experience implementing CIS and ERP systems. EDUCATION He has extensive experience implementing CIS, AMI, and ERP projects. Bill is a Certified Project Manager (PMP) and Certified Scrum Master (CSM). In addition Finance, BBA, Sam Houston State University to managing large projects, he has performed various project roles including Quality Assurance manager, Test Manager, functional lead, and business analyst. FIELDS OF SPECIAL Prior to his systems implementations career, Bill was a Controller for several large COMPETENCE corporations. His broad experience base enables him to find effective solutions for Project Management our clients. Customer Information Detailed Project Experience Systems (CIS) Advanced Metering Information Technology Business Operations Plan, Tucson Water, AZ, Meter -to- Infrastructure (AMI) Cash Subject Matter Expert. Conducted workshops to review Call Center, IVR Enterprise Resource Planning and CIS business processes to understand Tucson Water's pain points and (ERP) make recommendations based on best practices. Documented current meter -to- cash processes and developed to -be workflows and processes. Testing Management Project QA CIS Implementation, Boston Water and Sewer Commission, Boston, MA, Project Sponsor. EMA assisted Boston Water and Sewer Commission (BWSC) and the Contract Management software vendor (Itineris) in the on -premises implementation of the UMAX 365 Business Analysis and customer billing system. This implementation included several products and Process Re -Engineering interfaces. Bill provided executive support to ensure BWSC's project sponsors' Financial Analysis expectations were met and the project stayed on track. During the Requirements, RFP, RFI, and SOW RFP and Selection phase, Bill was responsible for developing requirements for Development General Ledger, Cash, Accounts Receivable, and Revenue reconciliation and Supply Chain Management analysis. Quality Assurance and CIS Requirements, RFP, Selection and Implementation, Central Arkansas Water, Reliability Project Manager/ Meter -to -Cash Subject Matter Expert. Project Manager TECHNOLOGY responsible for gathering requirements, developing the RFP, and assisting with EXPERIENCE the selection of a new CIS vendor. Led requirements workshops for CIS business Itineris CIS processes and billing rates. Facilitated the scoring of respondent vendors and led the short-listed vendor on -site demonstrations. Currently the Project Manager for the implementation phase. CIS Implementation — CIS Infinity (A US), Columbus Water Works, Columbus, GA, Project Manager/Meter-to-Cash Subject Matter Expert. Testing, Data Quality and General Ledger interface management for the CIS replacement project. Led the CIS/Maximo interface design and development. The project is currently in the User Acceptance Testing phase. CIS Requirements, Selection, and Implementation, New York City — Dept. of Environmental Protection, New York, NY, Subject Matter Expert. During the Requirements, RFP and Selection phase, Bill was responsible for developing requirements for Payments and General Ledger, Accounts Receivable and Revenue reconciliation. Bill is currently the Test Manager for the implementation phase. CIS Upgrade — Cayenta Utilities Version 7.8, City of Grand Rapids Water Department, MI, Project Manager. Responsible for managing the CIS upgrade from version 7.5 to 7.8. Instituted a Risk Management plan. Project was delivered ahead of schedule and under budget. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 Cayenta Utilities CIS CIS Infinity (AUS) SmartWorks MDMS Sensus AMI Metering PeopleSoft ERP Microsoft Office, Project, Visio, Teams SharePoint CERTIFICATES, LICENSES, AND MEMBERSHIPS Project Management Professional (PMP) Certified ScrumMaster (CSM) Member — American Water Works Association (AWWA) 58 ALISA MANN, PH.D. Alisa is an executive leader with 30 years of experience as the voice of the customer. She is a highly skilled and dedicated professional leading customer - centric initiatives, supporting managers, supervisors, support professionals, technicians, and front-line staff, to provide an exceptional customer experience. She spent 21 years at a water utility overseeing the organization's entire relationship with its customers and driving efforts to assess and elevate experiences at each touch point across the customer journey. While there, she implemented technology to support the power shift of customers requiring easier access to information and data. Alisa is committed to providing world -class customer service while balancing the needs of the customer and the business. She also has strong technical skills with business software tools and applications and experience managing remote teams. Detailed Project Experience Director, Customer Care & Field Services, Las Vegas Valley Water District. Created a highly functional customer service organization. Developed a meter - to -cash organization supporting meter services, customer services, billing, credit/collections, quality and support teams, and technical and business analysis team. Led the building and development of a customer -centric strategy and technology roadmap to deliver an integrated, Omnichannel experience for all customers. Created and provided executive leadership support for multiple five-year technology roadmaps involving the implementation of major software applications. Developed and implemented a comprehensive digital transformation plan that included investments in technology platforms, infrastructure, and capabilities to support growth initiatives. Oversaw the implementation of three customer information systems (Peoplesoft, Oracle Customer Care & Billing, Oracle Customer 2 Meter), account management portal and mobile application, contact center telephony systems, data management systems, and quality management systems. Extensive experience and in-depth relationships with Oracle Energy & Water and industry consulting services and firms. Spearheaded efforts to improve operational efficiency with a focus on optimizing internal productivity and enhancing customer experience. Customer Services Manager, Las Vegas Valley Water District. Responsible for the creation of a customer service organization including staffing and new technology and infrastructure. Implemented a new customer information system, call center telephony, quality monitoring system, and various other support systems. Developed documentation, reports, and logs to identify and manage metrics. Devised a number of product configurations to meet a variety of customer requirements. Responsible for technical integration, systems engineering program management, customer support, and program management. Grew customer service organization from customer service call center to a customer -centric Omni channel contact center organization. Increased customer satisfaction by addressing and resolving issues with Information Technology and Public Information teams. Gained customer acceptance by demonstrating cost savings and operational improvements. W"EMA hood® EDUCATION Ph.D. in Organizational Leadership, University of Phoenix MBA in Business Management, Regis University BA in Business Administration, Stockton University FIELDS OF SPECIAL COMPETENCE Data collection and analysis Rate development and analysis Conservation programs Vendor management Inbound and outbound calling Executive management and senior leadership Fleet and field technician scheduling and dispatching 24/7 workforce scheduling Staff training and development TECHNOLOGY EXPERIENCE Advanced Metering Infrastructure Automated Meter Reading Mobile Workforce Management Meter Data Management Omni channel service centers Automatic call distribution ACID system Oracle Customer Care & Billing Oracle Customer 2 Meter System Genesys Cloud Contact Center Technology Avaya Call Center Technology CERTIFICATES, LICENSES, AND MEMBERSHIPS Board Member, Water Customer Care Forum Board Member, Financial Guidance Center EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 59 WEMA TAMMY EDINGER, PMP `ld® Tammy has more than 20 years of experience in the utility industry as both a utility EDUCATION employee and as a consultant. Her information technology experience includes expertise in leading teams through system implementation initiatives, change Bachelor of Science, Business Administration & management improvements, and ongoing daily support. Tammy is a Project Computer Information, Florida Management Professional (PMP). Gulf Coast University Detailed Project Experience FIELDS OF SPECIAL CIS Implementation Support, NYC Department of Environmental Protection, NY, COMPETENCE Business Process Lead. Responsible for leading business process design Customer Information workshops and providing guidance with "best practice" recommendations for Systems (CIS) system configuration. Customer Service Information Technology Business Operations Plan, Tucson Water, AZ, Business Utility Billing Process Lead. Responsible for the analysis of current call center business Business Process processes and recommendations for process efficiencies and improvements. Reengineering CIS Implementation Specialist, Cape Fear Public Utility Authority, NC, Strategic Planning Professional Services Manager. Lead consultant responsible for the Project Management implementation of UMAX CIS — finance domain, managed customer water and wastewater expectations, proactively identified risks, and provided solutions. Utilities CIS Implementation Specialist, Dakota Electric Cooperative, Inc., MN, Electric Utilities Professional Services Manager. Lead consultant on finance domain, assisted Meter to Cash Business with the development and implementation of UMAX software, translated Processes business and functional requirements into application solutions. Efficiency Improvement Cayenta CIS Implementation Project Manager, Clay Electric Cooperative, Inc., TECHNOLOGY SKILLS FL. Successfully led the selection, implementation of Cayenta CIS System testing, training). Led the project team in redesign of business (configuration, g, g)• p 1 9 Cayenta CIS practices, managed project risk, project budget and kept stakeholders Oracle CC&B apprised of project status. After implementation, responsible for the daily Itineris UMAX management and support of the Cayenta CIS system, including but not Microsoft Dynamics limited to management of vendor support, internal support, system upgrades and new process implementations. Aclara TWACS Oracle ERP AMR Data Services Supervisor, Lee County Electric Cooperative, Inc., Fort Myers, FL. Responsible for improving AMR system reading performance and SOL accuracy to a daily average of 98% of 200,000 meters. SOL Server Project Manager, Lee County Electric Cooperative, Inc., Fort Myers, FL. Provided Cognos project management of system implementations — Oracle CC&B, Oracle ERP, Crystal Reports Ultipro HR/Payroll, performed reliability analysis, reporting, and management of personnel. CERTIFICATIONS PMI Project Management Business Analyst, Lee County Electric Cooperative, Inc., Fort Myers, FL. Professional (PMP) Certified Responsible for system support, system implementations, data analysis, Microsoft Dynamics Finance report writing. and Operations Certified EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 60 WEMA MELISSA TELFORD `ld® Melissa is a detail -oriented Technical Analyst with more than 10 years of utility FIELDS OF SPECIAL industry experience. She is well -versed in utility business processes, AUS CIS CO ETENCE Infinity Utility Billing suite, and Inovah Central Cashiering System. Melissa is client Software Life Cycle and process -focused, with strong troubleshooting, technical, and problem -solving Management skills. System Testing Experience Business Process Technical Analyst, Customer Succes, Advanced Utilities, Toronto, Canada. Improvement Troubleshoot and resolve Team Support tickets submitted by clients regarding TECHNOLOGY technical issues with the CIS Infinity system. Work with clients to create new EXPERIENCE processes, including creating new walk-throughs and configuration of CIS AUS CIS Infinity Utility Billing Infinity, as well as detailed technical setup of import/export interfaces. Work with Suite Vendors of AMI solutions either through API or csv exports to determine the optimal business solution for the client. Conduct workshops with clients on Inovah Central Cashiering System training and business process improvement after major platform upgrades of CIS Infinity or as standalone business process improvement sessions. Microsoft SQL Research, validate, and correct data issues via SQL or PowerShell scripts. Microsoft PowerShell Work with internal and external system administrators to pinpoint and resolve Microsoft Office Suite network issues. System Administrator I, City of Independence, Independence, MO. Worked closely with Customer Service Management and Director to perform the training of, support, and implementation of new processes and policies. Determined and resolved hardware, software, and network issues, as well as oversee upgrades to utility billing system and cashiering software. Researched and created recommendations to multiple City departments for the procurement of hardware and software systems. Configured and deployed supported hardware and software for multiple departments. Monitored application servers and provided rapid response to faults and malfunctions Planned, implemented, and integrated updated system -oriented projects. Worked closely with team members to develop project requirements, review RFPs, deliver solutions, communicate, and troubleshoot with vendors to meet deadlines for projects. Set up user accounts, permissions, passwords, and defined network policies and procedures. Prepared reports for multiple Directors of City departments and the City Manager's office by using SQL to extract data from the utility billing system. Customer Service Supervisor, City of Independence Utilities, Independence, MO. Acted as core team member/SME working closely with Project Managers for the City and vendor on implementation of the new CIS Infinity utility billing software. Reviewed existing SOPs and updated or created new business processes with CIS vendor to maximize team efficiency. Supervised and trained new employees and existing staff on company policies and performed yearly performance evaluations. Kept current of company products and services to promptly resolve complaints and concerns. Assisted staff with resolving complex customer issues and implementing targeted solutions. Reviewed data conversions with Conversion Specialist, researched and troubleshooted issues with lead tech on the project. Created training schedules and training sessions for account representatives and other City department end -users for new billing system. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 61 WEMA MARLA K. HARTSON, PMP, CSM hold. Marla has more than 30 years of experience in providing project management EDUCATION and information technology planning, analysis, and implementation services. Associate of Arts Degree, Valencia Her technology expertise includes customer information systems (CIS), Community College, FL laboratory information management systems (LIMS), asset and work Coursework toward Bachelor of Science management systems, internal and external interaction systems, and plant Degree, Business/Management, operations support. Marla's industry contributions include serving as chair of a University of Phoenix, Maitland, FL research committee, delivering conference presentations, authoring articles for Coursework toward Bachelor of Science publication in industry periodicals, and contributing to an industry Information Degree, Computer Engineering, Technology Manual of Practice. University of Central Florida Customer Information Systems Project Experience North Central Bible College CIS Selection and Replacement - CIS Interfaces and Data Cleansing, New York FIELDS OF SPECIAL COMPETENCE City Department of Environmental Protection, NY, Technical Lead. Developed Project Management interface and conversion specifications; developed technical requirements; IT Planning, Analysis, & Implementation provided leading practices guidance on technical environments and staffing; Customer Information Systems and made recommendations regarding cloud versus on premises deployment. Automated Meter Reading and Coordinated planning and manual entry of data required at go -live, leveraging Infrastructure Systems a core team of 7 and up to 30 volunteers per day over one week, including Collaboration and Content Management validate and clean-up of manually entered data. Social Media and Customer Interaction CIS Implementation - CIS Infinity (A US), Columbus Water Works, Columbus, Asset and Work Management Systems GA, Project Manager/ Interfaces Lead. Testing, Data Loading, CIS/Maximo interface testing and Team coordination for the CIS replacement project. LIMS Supported User Acceptance Testing phase to Go -Live in early 2021. SCADA CIS Selection and Implementation - CIS Interfaces and Data Cleansing, Security Backflow and Testing, Central Arkansas Water, AR, Technical Lead. Helped Backflow CAW evaluate upgrading their current system versus selection and Data Quality implementation of a new system. Led development of technical and interface Database Design and Reporting requirements and participated in functional requirements and development of Interface Design, Development and SOPs. Developed the demonstration script and tools to facilitate vendor Testing evaluations. Helped organize and coordinated a data cleansing initiative prior CERTIFICATES, LICENSES, AND to vendor selection which significantly helped improve data quality for MEMBERSHIPS conversion. Supported conversion of backflow data from a separate data American Water Works Association source and provided assistance to the CAW test track lead. (AWWA) Information Management and Information Technology Business Operations Plan, Tucson Water, AZ, Technology Research CommitteeMember 2004-2011; Chair 2007-11 Functional Lead. Helped TW evaluate business practices and identify opportunities for improvement supporting development of business AWWA Information Management and Technology Conference Committee requirements for the CIS replacement RFP. Assisted with development of the 2010, Committee Member functional and technical requirements for the RFP. Assisting with the CIS Certified Project Management implementation. Professional - PMI (2005) CIS Phases I -Ill, Requirements, Selection, and Implementation, Boston Water PMI Agile Certified Practitioner - PMI- and Sewer Commission, MA, Technical Subject Matter Expert. Provided ACP (2018) technical guidance on migration, which allowed BWSC to implement a fully- Microsoft Certified Systems Engineer, tested data extract of their legacy billing system prior to initiation of the CIS NT 3.5 (expired 12/2000) implementation phase. Supported data migration and interface analysis for Competent Toastmaster, Toastmasters BWSC as Technical Lead of the CIS implementation project. International PMI Wicked Problem Solver (2021) EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 62 EMA EDDIE CHEONG `r® An experienced application consultant and manager, Eddie has specialized in EDUCATION utilities and software implementations and integrations with 10 years of utility industry experience. He has performed 20+ combined Customer Information Computer Programming with Analysis, Seneca College, Systems (CIS) and Meter Data Management (MDM) implementations with an Toronto, ON, Canada average of 15 integrations per project. An effective communicator, he is capable of translating functional requirements into technical solutions, using industry best FIELDS OF SPECIAL practices to fit each client's needs. COMPETENCE Previous Project Experience Utility business processes, industry standards, and best Univerus, Peterborough, ON, Professional Services Lead. Worked directly with practices clients to implement the Univerus/SmartGridCIS MDM and CIS products. Software development Performed requirements gathering, configuration, and training workshops to lifecycle (SDLC) empower the client to build long-term knowledge, technical solutions, and Fluent in Chinese workflow. Liaised between clients and development teams to support customization and feature enhancement within the Univerus MDM and TECHNOLOGY SmartGridCIS GridLink applications. Developed technical and business EXPERIENCE requirements to help steer the development of the SmartGridCIS GridLink Microsoft Office Suite application to ensure proper support for regulated utilities. Provided insight, Jira and Confluence guidance, and support to internal development, training, and data conversion teams on regulated utility practices, policies, and procedures. TeamSupport Util-Assist, Newmarket, ON, Utility Consultant. Evaluated multiple vendor bids Spiratest and RFP responses as part of an AMI procurement effort. Created workflows, SQL process documentation, and presentations for an AMI implementation project. Powershell C++ Led a client CIS procurement effort by facilitating discovery workshops, Java establishing project timelines, and developing business case justification. HTML and XHTML Assisted in an overhaul of internal RFP templates by working with stakeholders to analyze and update existing requirements and identify new Wireless devices, requirements to reflect current industry, technology, and business standards. applications, content, andservices on handheld Acted as the Technical SME to convert a utility's billing system to a modern operating systems such as CIS by defining data mapping, performing business process reviews, and Android and Apple iOS reviewing integration requirements. CERTIFICATES, LICENSES, Advanced Utility Systems, Toronto, ON, Team Lead — Professional Services. AND MEMBERSHIPS Performed all application consultant functions, including requirements CompTIA, A+ Hardware and gathering; CIS configuration and testing; data conversion facilitation; third- Software Certification party integration requirements gathering, documentation and configuration, and informal training and testing assistance. Led a team of 5 Application Consultants and oversee an additional 10 Technical Consultants as a second level supervisor. Created performance metrics, implemented process changes, and provided formal and informal training to internal resources. Evaluated the performance of team members during mid -year and year-end reviews. Completed managerial tasks such as approving purchase requests and expense reports. Advanced Utility Systems, Toronto, ON, Application Consultant/Tech Lead. Rogers Wireless, Toronto, ON, Quality Assurance Analyst. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 63 Sandip is an accomplished and results -driven Information Technology leader with broad -based expertise overseeing corporate technical infrastructure and high -profile IT projects, leading in digital transformation. His expert leadership has benefited internal operations and external client companies in the manufacturing, financial services, municipal, and utility industries. Sandip is an effective communicator who builds and leads high performing project teams. He navigates the complex and changing landscapes of business and technology to achieve high positive return on investment in challenging, highly visible, and time -sensitive environments. Sandip has particular interest in leveraging technical innovation and advanced solutions to achieve the best results for the business and its customers, while keeping the focus on people aspects of a change environment. Detailed Project Experience EMA �m EDUCATION Master of Business Administration, Xavier University, Ohio Master of Arts, Economics, University of Kalyani, India Bachelor of Arts, Economics, University of Kalyani, India Advanced Systems Management Diploma, National Institute of Technology (NIIT), India FIELDS OF SPECIAL COM ETENCE IT Business Operations Plan, Tucson Water, Tucson, AZ, CIS and Technology IT Strategic Leadership SME. Engaged with client to determine overall customer service and Technology Strategy revenue management processes, current issues, and constraints. This analysis helped determine short-, medium-, and long-term opportunities to gain efficiency, improve automation, reduce paper processes, increase transparency, maintain data consistency, and improve customer service effectiveness. Analyzed call center data and recommended procedural improvements. Provided CIS and CRM technology landscape review and strategic product comparison. Provided hosting solution alternatives, architecture review, and cost benefit analysis of operational and capital investment alternatives. Helped identify business process improvements and best practice opportunities. Provided strategic technical design approach for payment process consolidation. Provided industry standards and benchmarks for service level agreement (SLA) to inform contract development with payment and bill print (EBPP) services vendor. Analyzed and recommended scope, criteria, and SLA parameters for the master services contract and implementation scope of work. CIS Requirements, Selection, and Implementation, New York City Department of Environmental Protection, Principal Consultant and Technology and QA Track Lead for the CIS Program. Coordinated and facilitated technical approach, framework, technical testing, and performance of systems components. Reviewed, provided input, and guided best practices towards technical design and testing coverage documentation. Participated in analysis, design, and quality assurance review of internal and external integration items as part of the CIS-CSS-Field Services-EBPP program implementation. Provided input for integration design documents. Reviewed and developed cloud and on -premises infrastructure design documents. Assessed, planned, evaluated, designed, and performed testing team governance and execution of CIS implementation tracks for testing and QA activities — including development of testing team protocol, full -life cycle test track work plan, ETL Project and Program Management QA and Testing Management Change Management Customer Service CIS, Mobile Work Force Management, Web/Apps EBPP and Payment Processing Systems and Application Integration PCI Compliance Business Process Improvement Operations Management Network Infrastructure Database Management RFP Process, Vendor, and Contract Management CERTIFICATES, LICENSES, AND MEMBERSHIPS PMI Project Management Professional (PMP) Certified PRINCE2 Foundation Certified (AXELOS) Introduction to Kanban, Certified (LeanKanban University) Member ISACA/COBIT5 QA/testing plan and execution, UAT and SIT work plan, build business AWWA requirements library for discovering process improvement opportunities. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 64 0 ADDENDUM NO. 1 FORT WORTH„ ADDENCUM 70 REQUE57 FOR PROPOSALS NO-2d-0-042 INATER CUSTOMER INFORMATION SYSTEM {CIS} CONSULTANT PURCHASING DIVISION ADDENDUM NO-1 DATE ISSUED: November 20, 2023 REQUEST FOR PROPOSALS IRFP)= 244)W2 HID OPEIIING DATE: Decermber7, 2023 JUNCHANGEd} RFP No- 24-001U- Issued October 311. 2023, is hereby amended as follows- 1- Section 4.4 has been changed to read from'Pmposals shall be limited to a maximum of seventy- five (7!5} &-I r ' X 11' pages (one side only) using a font size no smaller Oran 11 point and margins of at least one inch in each diction- The requretUregaested attachmerds are not part of this page limit' to 'Proposals shall be limited to a maximum of 5eventy4ive {75�, 3-112' X 11' pages [one side only] using a ford size no smeller than 11 pointand margins of al least one inch in each direction. The required+reWa5ted attachments are a part of this page limit.' in RFP 24-0002 Final Hid Doameni V2. 2- Qw-Aons and Answers documeni is hereby incorporated, in full tit, on pages 2-Z of this addendurn All other terms and eondilions remain unchanged. ., ate• t������,e- Alyssa Wilkerson BUYER 11 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ By the signature affixed below, Addendum No. i is hereby incorporated into and made part of the above referenced Request for Proposals - COMPANY NAME: EMr, Inc - SIGNATURE: NOTE Company name and signature must be the same as on the original bid documen9s- Failure to mtum this form with your sealed proposal may oorrstirhrte grounds for rejection of your offer. EMA, INC. CITY OF FORT WORTH RFP NO. 24-0002 65 CURT WO RT 1i n Routing and Transmittal Slip DOCUMENT TITLE: EMA M&C: CPN: TO: Michael Moosavi, Vice President, EMA Rick Lisenbee, Sr. IT Manager Shane Zondor, Assistant Director Jan Hale, Deputy Director Chris Harder, Director Taylor Paris Fernando Costa, ACM Ron Gonzales, Assistant City Secretary Jannette Goodall, City Secretary Allison Tidwell, Administrative Assistant Charmaine Baylor, Sr. IT Business Planner Water Department CSO: Signer Signer Approver Approver Signer Signer Signer Approver Signer Form Filler Acceptor DOC #: APPROVER INITIALS s� J KC EXPLANATION Please sign/approve this contract between the City and EMA, Inc. (Vendor) which will allow the Vendor to provide the City with a needs assessment and assistance in the development of the RFP specifications for the Water Customer Information System (CIS). Phase 1 will have a not to exceed amount of $385,178.00 and has no renewals. If the Vendor and the City both agree to proceed with Phases 2 and 3 of the project, the contract will be amended to add the additional $800,000.00 as was approved by M&C 24-0235, for an amount up to $1,200,000.00. If not, the City will proceed with a new bid for a contractor for the remaining phases. Phase 1 is approximately seven months long, based on the milestones listed by the Vendor. If the City moves forward with Phases 2 and 3, the agreement will expire five years from the date of commencement, with no renewals, or upon completion of the project. If you have questions or concerns, please email me. Charmaine Baylor Senior IT Business Planner Water IT 817.392.6629