HomeMy WebLinkAboutContract 58122-CO4CSC No. 58122-CO4
FoR--�,1*100-_
Project Name University Drive Phase 1
Client Project #(s)1 101588
City of Fort Worth
Change Order Request
I City Sec # 1 58122
Project University Drive Phase 1- Mill & overlay, striping, sidewalks, traffic signals, street lights, medians and landscape along University Drive
Description
Contractor Texas Materials Group Inc., dba Texas Bit Change Order #1 4 1 Datel 5/30/2024
City Project Mgr.1 Bereket Birhane City Inspectorl Stephen Barnard
Dept.
TPW
Water
Contract Time
Totals
(CD)
Original Contract Amount
$3,039,583.96
$366,472.90
$3,406,056.86
365
Extras to Date
$248,651.96
$0.00
$248,651.96
20
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
$3,288,235.92
$366:472.90
$3,654,708.82
385
Amount of Proposed Change Order
$61,483.54
$0.00
$61,483.54
121
Revised Contract Amount
$3,349,719.46
$366,472.90
$3,716,192.36
506
Original Funds Available for Change Orders
$0.00
Remaining Funds Available for this CO
$0.00
$0.00
Additional Funding (if necessary)
$61,483.54
$61,483.54
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 9.11%]
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $4,257,571.08
JUSTIFICATION (REASONS) FOR CHANGE ORDER i
- Installation of stamped colored concrete overlay on a 3 ft median along Old University Dr at University Dr intersection. TPW requested that the narrow center median on Old
University be overlaid with stamped concrete to increase its visibility, improve safety, and aesthetically tie Old University to University Dr.
Application of crack sealant to the concrete base to prevent cracks from reflecting through the asphalt.
Replacement of the original HMAC mix design in the contract (PG64-22 Ty D HMA) with a better mix design (MAC SP-D 70-22XR SAC -A R) that is longer lasting and more
resistant to cracking and rutting.
Removal and replacement of 6 permanent traffic signs knocked down by vehicles.
Replacement of outdated City standard 4" Striping shown in the plans with 6" striping per current City specifications.
Extend contract by 121 days to accommodate blackout periods and (no construction allowed), utility -caused delays and additional work. While the contract does not require
absolute work shutdown on blackout dates but limits lane closures to a single lane, TPW has requested shutdown during all of the dates. Additionally, unanticipated
underground franchise utility conflicts caused a number of delays to the signal and street light work.
Staff and consultant have reviewed pricing and deemed it reasonable.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reporting requirements.
Contractors Com an Name Contractor Name 111FEcritract Signature
Texas Materials Group, Inc. Jamie Greenway I IJun 5, 2024
Inspector/Inspection Su ervisor
Date
Project and Contract Com liance Manager
Date
Jun 5, 2024
Jun 5, 2024
Program Manager
Date
Senior Capital Project Officer
Date
J u n 12, 2024
Jun 12, 2024
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
Patnoia c waticar,K
J u n 13, 2024
A— Z..
J u n 13, 2024
sistant City Attorney
Date
JAssistant City Manager
Date
We„s 1r
Jun 13, 2024
Jun 18, 2024
4ao4oanb M&C Number I M&C Date Approved I l
�o °00 �9 d
Jannette Goodall, City Secretary go., g=�
P�p'F°oo oo
oo4"
da44 bl oho 454ad
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT W RTH
—w. -
City of Fort Worth
Change Order Additions
Project Name I University Drive Phase 1
City Sec # 1
58122
Client Project# 1 101588
1
Contractorl Texas Materials Group Inc., dba Texas Bit
I PMI
Bereket Birhane
Inspector) Stephen Barnard I
Change Order Submittal # ®
Date 1 5/30/2024
AUUI I IONS
I I EM
UlLbURIF' I IUN
UEF' I Uly
Unit
Unit host
I otal
NEVV
Stamped Median uverlay++
IF'W
' UuuuuuuU
LSU
$/,bMbj
$/,b MbJ1
NEW
CamoMastic Cia Sealant
TPW
203.25000006
GAL
$150.26�
$30,539.331
NEW
2' MAC SP-D 70-22XR SAC A-P
TPW
20,176.000OO000
SY
$31.62
$637,965.121
NEW
Remove & Replace I Sign, Post & Anchor I Requires Cormc
TPW
2.O000000U'
EA
$787.5g
$1,575.001
NEW
Remove &Replace Sign & Post Only
TPW
4.O000000U
EA
$472.5g.
$1,890.001
NEW
6' SLID Pvmt Marki g HAS (
TPW
3,650.00000006
LF
$1.8f
$6,606.501
NEW
6' SLID Pvmt Marking HAS )
TPW
200.00000006
LF
$1.8f
$362.001
NEW
6' BRK Pvmt Marking HAS WW
TPW
8,570.000OOOOU
LF
$1.8f
$15,511.701
NEW
6' BRK Pvmt Marking HAS YJ
TPW
1,025.000OOOOU
LF
$1.8f
$1,855.251
1
I
I
1
1
I
I
1
I
I
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
TPW
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$703,879.731
Water
$0.001
Sub Total Additions $703,879.731
Change Order Additions Page 1 of 1
FORTWORTH
City of Fort Worth
T
Change Order Deletions
Project Name I University Drive Phase 1
I City Sec # 1 58122 1
Client Project# 1 101588
1
Contractor Texas Materials Group Inc., dba Texas Bit PMI Bereket Birhane
Inspectorl Stephen Barnard
Change Order Submittal # ®
Date 1 5/30/2024 1
DELETIONS
I I LM ULSUKIP I IUN
ULP 1 u
Unit Unit Uost I otal 1
3CI 2.1JSU2 2" Aspnait PVmt l ype u
IPVV L1J,1/b. UUUUUUU
SY s3u.94 $b24,245.441
3217.0001 4" SLD Pvmt Marking HAS S
TPW 3,650.0000000U
LF $1.35 $4,927.501
3217.0002 4" SLD Pvmt Marking HAS I 1
TPW 200.0000000U
LF $1.35 $270.001
3217.0003 4"BRKPvmt MarkingHASY(%"
TPW 8,570.0000000U
LF $1.35 $11,569.501
3217.0004 4" BRK Pvmt Marking HAS )
TPW 1,025.0000000U
LF $1.35 $1,383.751
I
1
I
1
I
1
I
I
I
I
I
I
I
I
I
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
TFW $642,396.191
Water $0.001
Sub Iotal Deletions $542,396.191
Change Order Deletions Page 3 of 4
M/SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
1 7/7/2023 $97,289.30
2 11 /29/2023 $122,532.96
3 4/24/2024 $28,829.70
Total I $248,651.96
TEXAS Texas Bit TEXAS
A CRH COMPANY A CRH COMPANY
OWNER: City of Fort Worth
Attn: Bereket
200 Texas St
City, State, Zip
DATE:
PROPOSED CHANGE ORDER # 14
ENGINEER:
PROJECT: University Drive
April 5, 2024
High Early Concrete for Crosswalks@ Old University and
DESCRIPTION OF CHANGE AND/OR EXTRA WORK: Village Park
UNIT
ADD: Description
Quantity
Unit PRICE
AMOUNT
New Stamp Median
1
LSU 5.67
7,574.83
Breakdown
Labor
3852.50
Materials
1811.62
Equipment
650.00
Other - Mob
900.00
Sub Quote
7214.12
Profit 5%
360.71
Total
7,574.83
UNIT
DEDUCT: Description
Quantity
Unit PRICE
AMOUNT
Change Order Add
$
7,574.83
Change Order Deduct
Total Change Order Amount =
$
7,574.83
All other items and conditions of our contract with you
remain the same and
this order
is made a part thereof.
Kindly signify your acceptance and approval of this agreement by signing and returning
to us the enclosed copy.
ACCEPTED BY OWNER:
Submitted By:
Texas Materials `Group,
Inc dba: Texas Bit
By:
By:
Date:
Jam' 91eenway
Proj Manager
(214) 543-5705 Cell
Pay Scale
Regular Hourly Rate Overtime Rate (1.5)
1 I 2 I 3 I 4 I 5 1 I 2 1 3 I 4 5
Zamora Weekly Chargeable Report
Summary
Project:101d University Dr.
Labor
Material
Equipment
Other
Grand Total
Task:IStamped Concrete
I
I $1,462.50 I
$0.00 I
I $650.00 I
I $300.00 I
$2,412.50
Labor
18-Apr-24
25-Mar-24
8-Apr-24
15-Apr-24
16-Apr-24
17-Apr-24
18-Apr-24
Monday
Monday
Monday
Monday
Friday
Saturday
Sunday
Total
Total
Name
lki;d
Hrs
I Amount
Hrs
I Amount
Hrs
Amount
Hrs
Amount
Hrs
Amount
Hrs
Amount
Hrs
Amount
Hrs
Amount
Juan R.
5 4.50
$ 337.50
0.00
$
$
$
$
$
$
4.50
Juan G.
3 4.50
$ 157.50
0.00
$
$
$
$
$
$
4.50
Felipe T.
3 4.50
$ 157.50
0.00
$
$
$
$
$
$
4.50
Kevin E.
3 4.50
$ 157.50
0.00
$
$
$
$
$
$
4.50
Jose G.
3 4.50
$ 157.50
0.00
$
$
$
$
$
$
4.50
Efrain G.
3 4.50
$ 157.50
0.00
$
$
$
$
$
$
4.50
$ -
$
$
$
$
$
$
0.00
$
$
$
$
$
$
S
0.00
$
$
$
$
$
$
$
0.00
$
$
$
$
$
$
$
0.00
$
$
$
$
S
$
$
0.00
M4.5$
$
$
$
$
S
$
$
0.00
$
$
$
$
$
$
$
0.00
Lupe Z
5
337.50
0.00
$
$
$
$
$
$
4.50
31.50
$1,462.50
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
31.50
$1,462.50
Materials
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Total
Item
Amount
LA220unt
I Amount
LAmount
Amount
Amount
Amount
I
Amount
0.00
$ -
0.00 $ -
$ -
$
Equipment
Type Equipment Day
Power Washer $350.00
$0.00
Mobilization $300.00
Misc $0.00
0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00
Monday
Monday
Day
0.00
0.00
0.00
Monday
Day
Monday
Day
Friday
Hrs
Saturday
Hrs
Day
Amount
Amount
Amount
Amount
Amount
Amount
1.00
$ 350.00
$
$
$
$
$
0.00
$ -
$
$
$
$
$
$ 300.00
$
$
$
$
$
1.00
$ -
$
$
$
$
$
11.00
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
0.00 $0.00 $0.00
Sunday Total
Hrs Amount Amount
7
J
7
�s�
$ $ $ $ $ $ $
$ $ $ $ $ $ $
$ $ $ $ $ $ $
$ $ $ $ $ $ $
$ $ $ $ $ $ $
3.00 $650.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 $650.00
Other
Monday Monday Monday Monday Friday Saturday Sunday Total
Material Amount Amount Amount Amount Amount Amount Amount Amount
Mobilization. 2.00 $ 300.00 0.00 $ $ $ $
10.00 $ - I 10.00 $ I $ I $ I I I
t.00 $300.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 $300.00
Zamora Weekly Chargeable Deport
Summary
Project:lold University Dr.
Labor
Material
Equipment
Other
Grand Total
Task:IStamped Concrete
I
I 51,950.00
I
51,811.62 I
I $0.00
I $400.00 I
$4,161.62
Prep
Apply Stamp
Labor 18-Apr-24
19-Apr-24
25-Apr-24
26-Apr-24
9-May-24
10-May-24
Tuesday
Wednesday
Tues
Wednesday
Tues
Wednesday
Total
Total
Name
Pay Scale
Hrs
Amount
Hrs
Amount
Hrs
Amount
Hrs
Amount
Hrs
Amount
Hrs
Amount
Hrs
Amount
Hrs
Amount
Juan R. 5 6.00
$ 450.00
0.00
$
0.00
$
0.00
$
$
$
$
6.00
(Juan G. 3 6.00
$ 210.00
0.00
$
0.00
$
0.00
$
$
$
$
6.00
(Felipe T. 3 6.00
$ 210.00
0.00
$
0.00
$
0.00
$
$
$
$
6.00
(Kevin E. 3 6.00
$ 210.00
0.00
$
0.00
$
0.00
$
$
$
$
6.00
(Jose G. 3 6.00
$ 210.00
0.00
$
0.00
$
0.00
$
$
$
$
6.00
(Efrain G. 3 6.00
$ 210.00
0.00
$
0.00
$
0.00
$
$
$
S
6.00
$ -
$
$
$
$
$
$
0.00
S -
S
S
S
S
S
S
0.00
$
$
$
$
$
$
$
0.00
S
S
S
S
S
S
S
0.00
$
$
$
$
$
$
$
0.00
S
S
Is
S
S
S
0.00
$
$
I $
$
$
$
$
0.00
ILupe Z 5 6.00
$ 450.00
0.00
$
0.00
$
0.00
$
$
$
$
6.00
42.00 $1,950.00
0.00
$0.00
0.00
$0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
42.00
$1,950.00
Materials
Tues
I
Total
Item
I Amount
Amount
Amount
Amount
Amount
Amount
Amount
Amount
60LB Intergal Stampable Overlay 1.00 I $ 1,269.35 I
I1GALTRIPLE SEVEN BOND COAT 2.00 I $ 59.98 I
(DARK GRAY RELEASE AGENT 2.00 I $ 180.07 I
IMCT-700 TERRA COTTA 10OZ 30.00 I $ 302.22 I
I Is - I
I I
I I
IS I
I I
I I
I IS I
I I
I I
I IS I
I I
I I
I IS I
I I I
I I I
I I
I I
I I
I I
I I
I I
I I I
35.00 $1,811.62
0.00
$0.00
0.00
I I
$0.00
0.00 $0.00
0.00 $0.00
I I
0.00 $0.00
0.00 $0.00
$1,811.62
Equipment
Hourly
Type Equipment Rate
$0.00
I
I
I
I
I
I
I
I
Tuesday
Hrs
Wed
Tuesday
Hrs
1.00
Hrs
Wed
Hrs
Tues
Hrs
Wed
Hrs
Hrs
Amount
Amount
Amount
Amount
Amount
Amount
1.00
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Total
Amount Amount
Other
Material
Mobilization
$ I $
$ I $
$ I $
$ I $
$ I $
1.00 $0.00 0.00 $0.00
Monday I
Amount I I Amoun
1.00 $ 200.001
$ I $
$ I $
$ I $
$ I $
$ I $
1.00 $0.00 0.00 $0.00
Monday I
I Amount I I Amoun
1.00 $ 200.001
$ $ I $
$ $ I $
$ $ I $
$ $ I $
$ $ I $
0.00 $0.00 0.00 $0.00 0.00 $0.00
Monday I
Amount I Amount I I Amount
$ I
.00 $200.00 0.00 $0.00 1.00 $200.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00
$0.00
Total
Amount
$400.00
Zamora Weekly Chargeable Report
Project:10ld University Dr.
Task:l Replace the V G
Prep & Pour
Labor
17-May-24
Monday
Name
Pay Scale
Hrs
Amount
Juan R.
5 4.00
$ 300.00
Jose G.
3 4.00
$ 140.00
S -
S -
S -
S -
S -
S -
S -
S -
S -
Lupe Z 5
Materials
Item
Equipment
8.00 $440.00
Summary
Labor
Material
Equipment
Other
Grand Total
$440.00 I
$0.00 I
I $0.00 I
I $200.00 I
$640.00
Clean up
18-May-24
19-May-24
20-May-24
21-May-24
22-May-24
23-May-24
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Total Hrs Total
Hrs Amount
Hrs Amount
Hrs Amount
Hrs Amount
Hrs Amount
Hrs Amount
Amount
$ -
$ -
$
$
$
$ -
4.00
$
$
$
$
$
$
4.00
$
$
$
$
$
$
0.00
$
$
$
$
$
$
0.00
$
$
$
$
$
$
0.00
$
$
$
$
$
$
0.00
$
$
$
$
$
$
0.00
$
$
$
$
$
S
0.00
$
$
$
$
$
$
0.00
$
$
$
$
S
$
0.00
$
$
$
$
$
$
0.00
$
$ -
$
$
$
$
0.00
$
$ -
$
$
$
$
0.00
$
$ -
$
Is
$
$
0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
0.00 $0.00
8.00 $440.00
Monday Tuesday Wednesday Thursday Friday Saturday I Sunday Total
Amount Amount Amount Amount Amount Amount Amount I Amount
0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00
Type Equipment
Hourly
Rate
Monday
Hrs
Tuesday
Hrs
Wednesday
Hrs
Thursday
Hrs
Friday
Hrs
Saturday
Hrs
Amount
Amount
Amount
Amount
Amount
Amount
$0.00
$
$
$
$
$
$
-
$
$
$
$
$
S
-
S-
$-
$
$
$
$
$
$
0.00 $0.00 $0.00
Sunday Total
Hrs Amount Amount
Other
Material
Mobilization,
$ I $
$ I $
$ I $
$ I $
$ I $
0.00 $0.00 0.00 $0.00
Monday I Tuesday
Amount I I Amount
1.00 $ 200.00
$ I $
$ I $
$ I $
$ I $
$ I $
0.00 $0.00 0.00 $0.00
Wednesday I Thursday
Amount I I Amount
$ $ I $
$ $ I $
$ $ I $
$ $ I $
$ $ I $
0.00 $0.00 0.00 $0.00 0.00 $0.00
Friday Saturday I Sunday
Amount I Amount I I Amount
.00 $200.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00
$0.00
Total
Amount
$200.00
Zamora Weekly Chargeable Report
Time
Labor
I Material
I Equipment
I Other
Prep
$1,462.50
$0.00
$650.00
$300.00
Apply
$1,950.00
$1,811.62
$0.00
$400.00
Clean up
$440.00
$0.00
$0.00
$200.00
TOTAL
Total
$ 2,412.50
$ 4,161.62
$ 640.00
$ 7,214.1
TEXAS Texas Bit TEXAS
A CRH COMPANY A CRH COMPANY
ADD
New
OWNER: City of Fort Worth
Attn: Bereket
200 Texas St
City, State, Zip
PROPOSED CHANGE ORDER # 13 - Revised
ENGINEER:
PROJECT: University Drive
DATE: May 29, 2024
DESCRIPTION OF CHANGE AND/OR EXTRA WORK: CrackSealing
Description
DEDUCT: Description
UNIT
Quantity Unit PRICE AMOUNT
Camo Mastic Crack Sealant 203.25 GAL 150.26 30539.33
Breakdown
Materials 29085.08
Sub Quote 29085.08
Profit 5% 1,454.25
Total 30,539.33
UNIT
Quantity Unit PRICE AMOUNT
Change Order Add $ 30,539.33
Change Order Deduct
Total Change Order Amount = $ 30,539.33
All other items and conditions of our contract with you remain the same and this order
is made a part thereof.
Kindly signify your acceptance and approval of this agreement by signing and returning
to us the enclosed copy.
ACCEPTED BY OWNER: Submitted By:
Texas Materials Group, Inc dba: Texas Bit
By: By:
Date: Ja ie reenway
P o' ct Manager
(214) 543-5705 Cell
Project Name
Date
Supervisor
Crew Members
5/13/24 - 18.97
5/14/24 - 46.07
5/15/24 - 138.21
Total Gallons Used = 203.25 gal
2024 University Drive Improvements - Fort Worth, Texas
5/13/2024
Josh Thompson
Muffin Baby - Bo Brandon, Jared Thompson
Hours Worked 8:00 pm to 10:00 pm
Work Performed/
Streets Started Southbound Outside Lane
Completed
Material Used 7 Boxes of Camo Mastic - 182 Ibs (26 Ibs per box)
2.71 gallons per box = 18.97 gallons
Milled Road with major transverse cracks about every 12 feet
Quality with occasional longitudinal cracking
Quality Sample Collected: N/A
Safety Discussion Absentees - N/A
Safety Daily Focus - Being aware of hot materials in the work zone and
wearing all required PPE
Additional Notes Muffins crew had to shut down early due to issues with the air
compressor. Will maintenance equipment and restart on 5/14
Project Name
Date
Supervisor
Crew Members
Hours Worked
Work Performed/
Streets
Completed
Material Used
2024 University Drive Improvements - Fort Worth, Texas
5/14/2024
Josh Thompson
Muffin Baby - Bo Brandon, Jared Thompson
7:30 pm to 12:00 am
- Southbound Inside Lanes
- Northbound Outside Lane
17 Boxes of Camo Mastic - 442 Ibs (26 Ibs per box)
2.71 gallons per box = 46.07 gallons
Milled Road with major transverse cracks about every 12 feet
Quality with occasional longitudinal cracking
Quality Sample Collected: 11:35 pm
Safety Discussion Absentees - N/A
Safety Daily Focus - Staying inside the work zones and having good
communication with other contractors working in the work
zone.
Muffin Baby Crew completed all available work for the first half
Additional Notes of the shift and will continue sealing after Texas Materials has
completed milling.
Project Name
Date
Supervisor
Crew Members
Hours Worked
Work Performed/
Streets
Completed
Material Used
2024 University Drive Improvements - Fort Worth, Texas
5/15/2024
Josh Thompson
Muffin Baby - Bo Brandon, Jared Thompson
7:00 pm to 11:30 pm
Completed Southbound Outside Lanes
Completed 3/4 of Northbound Inside Lanes
51 Boxes of Camo Mastic - 1,326 Ibs (26 Ibs per box)
2.71 gallons per box = 138.21 gallons
- Milled Road with major transverse cracks about every 12 feet
with occasional longitudinal cracking
Quality - Curb and gutter edge line on entire Southbound Outside Lane
Quality Sample Collected: N/A
Safety Discussion Absentees - N/A
Safety Daily Focus - Staying aware of other contractors and
equipment near our work area
Muffins crew stopped at midnight due to losing hydraulic
Additional Notes pressure on the truck. This is the final shift of work on the
project. Roughly 85% of the roads was crack sealed prior to
paving.
TEXAS Texas Bit TEXAS
A CRH COMPANY A CRH COMPANY
OWNER: City of Fort Worth
Attn: Bereket
200 Texas St
City, State, Zip
PROPOSED CHANGE ORDER # 15
ENGINEER:
PROJECT: University Drive
DATE: April 24, 2024
DESCRIPTION OF CHANGE AND/OR EXTRA WORK:
ADD: Description
New 2" MAC SP-D 70-22XR SAC A-R
DEDUCT: Description
2" Asphalt Pvmt Type D
Change Order Add
Change Order Deduct
Total Change Order Amount =
HMAC Change products per City Request
UNIT
Quantity Unit PRICE AMOUNT
20176.00 SY 31.62 637,965.12
Total 637,965.12
UNIT
Quantity Unit PRICE AMOUNT
(20,176.00) SY $ 30.94 $ (624,245.44)
Total $
(624,245.44)
$
637,965.12
$
(624,245.44)
$
13,719.68
All other items and conditions of our contract with you remain the same and this order
is made a part thereof.
Kindly signify your acceptance and approval of this agreement by signing and returning
to us the enclosed copy.
ACCEPTED BY OWNER: Submitted B
Texas Materi Is Group, Inc dba: Texas Bit
By: By:
Date: Ja ie reenway t�
P o' ct Manager
(214) 543-5705 Cell
Greenway, Jamie (Texas Materials - North Texas Area)
From: Overton, Stephen <Stephen.Overton@fortworthtexas.gov>
Sent: Thursday, March 28, 2024 8:47 AM
To: Perez, Aaron (Texas Materials - North Texas Area)
Cc: Birhane, Bereket B; Lopez, Raul; Greenway, Jamie (Texas Materials - North Texas Area); Harris, Chris
(Texas Materials - North Texas Area); Morton, David (Texas Materials - North Texas Area); Gregory,
Lewis; Lynn, Tiana (Texas Materials - North Texas Area)
Subject: RE: [EXT] RE: HMAC Submittal - University Drive
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you are expecting
this email and know the contents are safe. If you believe this email may be phishing or malicious, please use the Report Phish
button.
Good Morning Aaron, I've reviewed the HMAC mix design and its approved for paving. Test results and mix looks
good. Mix should be pretty good for the volume of traffic on University.
Stephen Overton, PMP, RSO
Senior Engineering Technician
Geotechnical Services
TPW — Capital Delivery Division
920 Woodward St
Fort Worth, Texas 76107
Phone. (817) 392-7920
Cell. (682) 249-9465
Fax: (817) 392-8441
stevhen.overton(a fortworthtexas.gov
FORT WO RT H'4�
From: Arega, Zelalem <Zelalem.Arega@fortworthtexas.gov>
Sent: Tuesday, March 26, 2024 1:32 PM
To: Perez, Aaron (Texas Materials - North Texas Area) <aaron.perez@texasmaterials.com>
Cc: Birhane, Bereket B <Bereket.Birhane@fortworthtexas.gov>; Lopez, Raul <Raul.LopezRoura@fortworthtexas.gov>;
Greenway, Jamie (Texas Materials - North Texas Area) <jamie.greenway@texasmaterials.com>; Harris, Chris (Texas
Materials - North Texas Area) <chris.harris@texasmaterials.com>; Morton, David (Texas Materials - North Texas Area)
<david. morton@texasmateriaIs. com>; Gregory, Lewis <Lewis.Gregory@fortworthtexas.gov>; Lynn, Tiana (Texas
Materials - North Texas Area) <tiana.lynn@texasmaterials.com>; Overton, Stephen
<Stephen.Overton@fortworthtexas.gov>
Subject: RE: [EXT] RE: HMAC Submittal - University Drive
Aaron,
The data looks good. The rut depth is well below the threshold, and it doesn't show signs of moisture damage. However,
I have moved to a new position in the City and am no longer able to approve mix designs.
I have copied Lewis and Stephen to review and approve the mix design.
Thank you,
Zelalem Arega, Ph.D., P.E., PMP
Engineering Manager
TPW —Capital Delivery Division
Cell: (682) 249-7475
Office: (817) 392-8117
From: Perez, Aaron (Texas Materials - North Texas Area)<aaron.Perez@texasmaterials.com>
Sent: Tuesday, March 26, 2024 10:55 AM
To: Arega, Zelalem <Zelalem.AreizaC@fortworthtexas.Rov>
Cc: Birhane, Bereket B<Bereket.Birhane@fortworthtexas.eov>; Lopez, Raul <Raul.LooezRoura@fortworthtexas.izov>;
Greenway, Jamie (Texas Materials - North Texas Area)<iamie.jzreenwav@texasmaterials.com>; Harris, Chris (Texas
Materials - North Texas Area)<chris.harris(@texasmaterials.com>; Morton, David (Texas Materials - North Texas Area)
<david.morton@)texasmaterials.com>; Lynn, Tiana (Texas Materials - North Texas Area)
<tiana.lvnn@texasmaterials.com>
Subject: RE: [EXT] RE: HMAC Submittal - University Drive
CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open attachments
unless you recognize the sender and know the content is safe.
Dr. Z,
Attached is the HWT you requested. We plan to run another one when we trial batch the mix.
Thanks,
Aaron Perez
Construction Manager
North Texas Area
Texas Materials
A CRH Company
420 Decker Dr. Suite 200
Irving, TX 75062
O: 214-741-3531
C: 817-876-8005
F: 469-565-8091
Aaron. Perez@texasmaterials.com
httq://secure-web.cisco.com/1-MhlsKlvz2rrvvmBmvdzTDkCWbvmsUW6-8WWlk7BX8ErHsGZ7eidWLVQTGZr-71omLP-
zpxxMv 6vvGmd PcifX4rfto8MOiNJt7MSGRiYh n5Vxc6XCwJwn3VleSOmUW1ZTIbAWIldRsXJDCDxHUtCx5dgt10UEOiJHd
gV4zXc D AE4s89uuxzZLY-zXg24JVViAWRZQ EoPxZWUXiNfli7 gUD3CUJC7uewSIU-
C6w9S4iFIQWvRdmS13KONPk6iLoDiMiRdQfQZBzsoT2KC3pvn9UYtSOptUQGTHIZFi08DEtcJhCiASMdOcrLavOOHhlzkpVHNI
r)HvQvIRz7nw/httq%3A%2F%2Fwww.texasmaterials.com
From: Arega, Zelalem <Zelalem.Arena@fortworthtexas.Rov>
Sent: Thursday, March 21, 2024 1:36 PM
To: Perez, Aaron (Texas Materials - North Texas Area)<aaron.gerez@texasmaterials.com>
Cc: Birhane, Bereket B <Bereket.Birhane@fortworthtexas.eov>; Lopez, Raul <Raul.Loi3ezRoura@fortworthtexas.pov>;
Greenway, Jamie (Texas Materials - North Texas Area) <iamie.ereenwav@texasmaterials.com>; Harris, Chris (Texas
Materials - North Texas Area) <chris.harris@texasmaterials.com>; Morton, David (Texas Materials - North Texas Area)
<david.morton@texasmaterials.com>; Lynn, Tiana (Texas Materials - North Texas Area)
<tia na.lvn n @texasmateria Is.com>
Subject: [EXT] RE: HMAC Submittal - University Drive
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you are expecting
this email and know the contents are safe. If you believe this email may be phishing or malicious, please use the Report Phish
button.
Aaron,
Can you please email me the Hamburg Wheel Tracking Test report? The test was conducted on a core sample from the
downtown resurfacing project (CPN 104184), which unfortunately did not pass.
Thank you,
Zelalem Arega, Ph.D., P.E., PMP
Geotechnical Services Manager
TPW —Capital Delivery Division
Office: (817) 392-8930
Cell: (682) 249-7475
Email: Zelalem.Arezanfortworthtexas.aov
FORT WORTHR
From: Perez, Aaron (Texas Materials - North Texas Area)<aaron.Perez@texasmaterials.com>
Sent: Thursday, March 21, 2024 1:06 PM
To: Arega, Zelalem <Zelalem.Areiza@fortworthtexas.Rov>
Cc: Birhane, Bereket B <Bereket.Birhane@fortworthtexas.jzov>; Lopez, Raul <Raul.LooezRoura@fortworthtexas.Rov>;
Greenway, Jamie (Texas Materials - North Texas Area)<iamie.ereenwav@texasmaterials.com>; Harris, Chris (Texas
Materials - North Texas Area)<chris.harris@texasmaterials.com>; Morton, David (Texas Materials - North Texas Area)
<david. morton@texasmateriaIs. com>; Lynn, Tiana (Texas Materials - North Texas Area)
<tiana.lvnn@texasmaterials.com>
Subject: HMAC Submittal - University Drive
CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open attachments
unless you recognize the sender and know the content is safe.
Dr. Z,
Attached is our MAC mix submittal we discussed/observed at the February 91" visit to our design lab.
In short, this is a SAC A SP-D MAC Mix with PG 70-22XR w/23% RAP that we are recommending using. This design is
engineered to resist skidding, cracking, rutting, and UV damage. Our goal was to make a mix that is safer, longer lasting,
retains its color, and environmentally friendly.
Earlier this week you recommended using a PG 70-22 or PG70-28 w/ 15% RAP, and no RAS. If we did go that route, it
would take another 2-3 weeks from today to design and test that mix. Let us know your thoughts.
Thanks,
Aaron Perez
Construction Manager
North Texas Area
Texas Materials
A CRH Company
420 Decker Dr. Suite 200
Irving, TX 75062
O: 214-741-3531
C: 817-876-8005
F: 469-565-8091
Aaron.PerezC@texasmaterials.com
http://secure-
web.cisco.com/1NnfSRlzbswJl4GGYC 5YPukUi)GhwDZEon5XWJcohJQOwmIPi8 SGIfEOzdpoZEKKT9gXszvviELIFT96EG113
Mza23STTAEkFp3V8zVtv1vvJ2rVSDQG pv69-uX4OTnOFC463TOsq hB58PcBv1e-
8kikPXIE5OLozbl6J620MUn8N43xEn2MU1grG6zsza75VwEAOF19dkmgTw7bJDdXvxv7EXf91BvTUBlviev Oc17AK1ci7Eiaumn
OmmSUrWgzga5SRH9fn5EwHxQOOxx9R90Fi XZfzzZQpIQWuD2bQZZtHL12Pu5XvC aozhOr3/http%3A%2F%2Fwww.texas
materials.com
ATTENTION: Ce courriel vient de 1'exterieur de 1'entreprise. Ne cliquez pas sur les liens, et n'ouvrez pas les pieces jointes, a moins
que vous ne connaissiez 1'expediteur du courriel et savez que le contenu est securitaire. Si vous pensez qu'il s'agit d'un courriel
d'hamegonnage ou malveillant, veuillez cliquer sur le bouton Signaler une tentative d'hamegonnage.
ATTENTION: Ce courriel vient de 1'exterieur de 1'entreprise. Ne cliquez pas sur les liens, et n'ouvrez pas les pieces jointes, a moins
que vous ne connaissiez 1'expediteur du courriel et savez que le contenu est securitaire. Si vous pensez qu'il s'agit d'un courriel
d'hamegonnage ou malveillant, veuillez cliquer sur le bouton Signaler une tentative d'hamegonnage.
TEXAS Texas Bit TEXAS
A CRH COMPANY A CRH COMPANY
OWNER: City of Fort Worth
Attn: Bereket
200 Texas St
City, State, Zip
DATE:
PROPOSED CHANGE ORDER # 16 - Revised
ENGINEER:
PROJECT: University Drive
May 30, 2024
DESCRIPTION OF CHANGE AND/OR EXTRA WORK: Additional Signs due to damage
UNIT
ADD: Description Quantity Unit PRICE AMOUNT
New Remove & Replace Sign, Post & Anchor I Requires
Coring 2.00 EA 0 787.5 $4,66 1575
New Remove & Replace Sign & Post Only 4 EA 5. 472.5 $-Vf6-00-W 1890
Breakdown
Materials/Equipment $2,400.00
Labor $900.00
Sub Quote $3,300.00
Profit 5% $165.00
Total $3,465.00
UNIT
DEDUCT: Description Quantity Unit PRICE AMOUNT
Total $ -
Change Order Add $ 3,465.00
Change Order Deduct $ -
Total Change Order Amount = $ 3,465.00
All other items and conditions of our contract with you remain the same and this order
is made a part thereof.
Kindly signify your acceptance and approval of this agreement by signing and returning
to us the enclosed copy.
ACCEPTED BY OWNER: Submitted B
Texas Materia s Group, Inc dba: Texas Bit
By: By: is
Date: Ja ie reenway D
P of t Manager
(2 4) 543-5705 Cell
IP' r
Ae
L� .,sue�A•,�`'l coy MC, _ _'n.. .a - �• _
i Y `
��S ,�' ��' .�' �•. , �� i y ..� , • . r '. `r. _' � � + „� \
kr;, sal. - v ,�' ~�# c ry :_, y 'plc 5 ; + J z,�k�fi i ";�a r'd �= v �:.•. �
Ix
+-". r ��- t� �_�+.K4•'dy CS .�`� 'S t+ �_�� ttic.- �.`r?..r"�i
s _ i+ �,1 `yam} w ,,. t �J - _, ; •. �^ �L
40
���•4 14f�'� �.���'ti` 17 ! � + 'i.t'G � � �� � 4 ti � `` t.'> � v� �� A �' y�;W,
_ .. _ s �i+ `�. ' 1`. � .._ �,�i!' •.� ..ti. R a �.l•n C+ r� i+�.. ; �a.t�`ti:,'-• �'ti'Ls• ;•'^ti
T RNING �1
VEHICLES
® ' 0"t
4p
Y
4sy'
J
�1
'41
N11,
AK —Am
t
IN
I ?, It , �"
qr 'a"��, lam.
A go
FA'°
,.
_ I'a
{
R-
� "r
�. � i
f irlrrt yc. Y w: •
f- = � + - -
T ''..+�,•?`', ,. d . 1' if
-
-
mr
per•
•�
♦.
r
s
----'ate ...........
_
_r
_-
-- _
_ _-
S niversity'.
1 # t C jti ••\ ; it -+�+
"!
O
a.
TEXAS Texas Bit TEXAS
A CRH COMPANY A CRH COMPANY
PROPOSED CHANGE ORDER # 18
OWNER: City of Fort Worth ENGINEER:
Attn: Bereket
200 Texas St PROJECT: University Drive
City, State, Zip
DATE: May 13, 2024
DESCRIPTION OF CHANGE AND/OR EXTRA
WORK: Change 4" Striping to
6"
Striping per new city standards
UNIT
ADD: Description
Quantity Unit
PRICE
AMOUNT
6" SLID Pvmt Marking HAS (W)
3650.00 LF
$
1.81
6,606.50
6" SLD Pvmt Marking HAS (Y)
200.00 LF
$
1.81
362.00
6" BRK Pvmt Marking HAS (W)
8570.00 LF
$
1.81
15,511.70
6" BRK Pvmt Marking HAS (Y)
1025.00 LF
$
1.81
1,855.25
Total
24,335.45
UNIT
DEDUCT: Description
Quantity Unit
PRICE
AMOUNT
4" SLID Pvmt Marking HAS (W)
-3650.00 LF
$
1.35
(4,927.50)
4" SLID Pvmt Marking HAS (Y)
-200.00 LF
$
1.35
(270.00)
4" BRK Pvmt Marking HAS (W)
-8570.00 LF
$
1.35
(11,569.50)
4" BRK Pvmt Marking HAS (Y)
-1025.00 LF
$
1.35
(1,383.75)
Total
(18,150.75)
Change Order Add $ 24,335.45
Change Order Deduct $ (18,150.75)
Total Change Order Amount = $ 6,184.70
All other items and conditions of our contract with you remain the same and this order
is made a part thereof.
Kindly signify your acceptance and approval of this agreement by signing and returning
to us the enclosed copy.
ACCEPTED BY OWNER: Submitted By -
Texas Material Group, Inc.
By: By:
Date: Ja e reenway lJ
Pr Manager
(214) 543-5705 Cell
TEXAS Texas Bit TEXAS
A CRH COMPANY A CRH COMPANY
PROPOSED CHANGE ORDER # 19 -Revised
OWNER: City of Fort Worth ENGINEER:
Attn: Bereket
200 Texas St PROJECT: University Drive
City, State, Zip
DATE: May 29, 2024
DESCRIPTION OF CHANGE AND/OR EXTRA WORK: Contract Days
UNIT
ADD: Description Quantity Unit PRICE AMOUNT
Per signed Contract
The entire length of project must be open to four(4)Lanes, two(2)lanes each direction per the black out
dates.
At Pre -Con January 13, 2023, this changed to all lanes, therefore we would like to have these days
returned to our schedule as it was not possible to work without
a lane Closure.
Spring Break - 3-10 thru 3-19-2023
8
Zoo Run 3-31 thru 4-2-2023
3
May Fest 5-3 thru 5-7-2023
4
Colonial Golf Tournament 5-21 thru 5-27-2023
7
TCU Home Game # 1 - 9-1 thru 9-3-2023
3
TCU Home Game # 2 - 9-8 thru 9-10-2023
3
TCU Home Game # 3 - 9-22 thru 9-24-2023
3
TCU Home Game # 4 - 9-29 thru 10-1-2023
3
TCU Home Game # 5 - 10-13 thru 10-15-2023
3
TCU Home Game # 6 - 11-10 thru 11-12-2023
3
TCU Home Game # 7 - 11-23 thru 11-26-2023
3
Stock Show 1-10 thru 2-4-2024
23
Spring Break - 3-11 thru 3-17-2024
8
Zoo Run - 4-5 thru 4-7-2024
3
Solar Eclipse - 4-7-2024
1
May Fest - 5-1 thru 5-5-2024
5
Colonial Golf Tournament 5-20 thru 5-26-2024
7
90
" CO# 4 - Started on 4/5/2024 to be fully excuted by 6/7/2024.
- Stamp Concrete Work - no approved
10
Mix Design HMAC Change
14
Crackseal
3
Striping change per Spec
4
31
Total Days to add
121
" - As per Change order completing signed excution as of the 7th of June, 2024. If not
signed as of this day, schedule will continue out as of date of execution. Which will
increase the number of days added to schedule.
All other items and conditions of our contract with you remain the same and this order
is made a part thereof.
Kindly signify your acceptance and approval of this agreement by signing and returning
to us the enclosed copy.
ACCEPTED BY OWNER: Submitted By:
Texas eri Is Grou4nc.
By: By:
Date: Jamie een ay
Proje Ma ager
(214 54 5705 Cell
FORT WORTH}
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE:
University Drive Phase 1 Change Order #4
M&C: N/A
CPN: 101588 CSO: 58122
DOC#: N/A
Date:
5/30/2024
To:
Name
Department Initials
Date Out
1.
Ann Estes
TPW - Review 1
Jun 7, 2024
2.
Bereket Birhane
TPW - Signature 636;
Jun 5, 2024
3.
Jamie Greenway
TexasBit - Sign t
Jun 5, 2024
4.
Stephen Barnard
TPW - Signature
Jun 5, 2024
5.
Raul Lopez
TPW - Signature
Jun 12, 2024
6.
Lissette Acevedo
TPW — Signature
Jun 12, 2024
7.
Patricia Wadsack
TPW — Signature
Jun 13, 2024
8.
Lauren Prieur
TPW — Signature ?�
Jun 13, 2024
9.
Doug Black
Legal — Signature - 29
Jun 13, 2024
10.
Jesica McEachern CMO — Signature ,,
Jun 18, 2024
11.
Jannette Goodall
CSO - Signature `Ta
Jun 18, 2024
12. TPW Contracts
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW
Contracts
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ®No NEXT DAY: ❑YES ®No
ROUTING TO CSO: ®YES ❑No
Action Reauired: ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
Return To: Please notify TPWContracts(afortworthtexas.eov for pickup when complete. Call ext.
7233 or ext. 8363 with questions. Thank you!