PARK & RECREATION DEPARTMENT
NOTICE OF PROJECT COMPLETION
-FP1
City Secretary No. 58812
Date Received: 6/13/2024
City Project N!?: C01920
Regarding contract 58812 Lake Worth Trail Phase 1B-Marion Sansom Park for as required by the PARK & RECREATION
DEPARTMENT as approved by City Council on 11/29/2022 through M&C 22-0942 the director of the PARK &
RECREATION DEPARTMENT upon the recommendation of the Assistant Director of the Park & Recreation
Department has accepted the project as complete.
Original Contract Prices:
Amount of Approved Change Orders:
Revised Contract Amount:
Total Cost Work Completed:
Less Deductions:
Liquidated Damages:
Pavement Deficiencies:
Total Deduction Amount:
Total Cost Work Completed:
Less Previous Payments:
Final Payment Due
� a. P�-
Recommended for Acceptance Asst. Director,
PARK & RECREATION DEPARTMENT
Accepted
Director, PARK & RECREATION DEPARTMENT
Asst. City Manager
$ 1,821,821.56
$ 38,135.46 Na 1
$ 1,859,957.02
$1,851,885.16
Days @ $650.00/ Day
$ 1,851,885.16
$ 1,759,290.90
$ 92,594.26
J u n 13, 2024
Date
J u n 13, 2024
Date
Jun 14, 2024
Date
OFFICIAL RECORD
Comments: CITY SECRETARY
FT. WORTH, TX
C-620 Signature Page
Contractor's Application for Payment
To (Owner) City of Fort Worth Invoicing Period (From - To):
P. O. FW080-0000011422 From (Contractor):
Number: Cole Construction Inc
Project: C01920 Contractor's CFW Vendor No.:
0000007792
City Secretary Contract
Number:
Approved Change Orders
Number
1
2
3
4
5
6
7
8
TOTALS
NET CHANGE BY
CHANGE ORDERS
Contractor's Certification
58812
Application For Payment
Change Order Summary
Additions
$103,319.91
$103,319.91
Invoice No. 10-Final
Invoice Date:
Remit to ( If Not Automatic Deposit ):
ContractName:
Naam: Lake Worth Trail Phase 1B - Marion Sansom Park
$38,135.46
1. ORIGINAL CONTRACT PRICE..........................................................
$ $1,821,821.56
Deletions 2. Net change by Change Orders................................................................
$ $38,135.46
$65,184.45 3. Current Contract Price (Line 1 t 2).......................................................
$ $1,859,957.02
4. TOTAL COMPLETED AND STORED TO DATE
(Progress Estimate, Construction Allowance and Change Orders).....
$ $1,851,885.16
5. RETAINAGE:
a. X $1,851,885.16 Work Completed.........
$
b. X Not Used
$
c. Total Retainage (Line 5a + Line 5b)..............................
$
6. AMOUNT ELIGIBLE TO DATE (Line 4 - Line 5c)............................
$ $1,851,885.16
$65,184.45 7. LESS PREVIOUS PAYMENTS (Line 6 from prior Application).......
$ $1,759,290.90
8. AMOUNT DUE THIS APPLICATION .................................................
$ $92,594.26
9. BALANCE TO FINISH, PLUS RETAINAGE
(Column G on Progress Estimate+ CA + COs + Line 5 above).............
$ $8,071.86
The Contractor certifies with the submittal of this document and associated Payment Request Submittal
on the City of Fort Worth Buzzsaw system that to the best of their knowledge: (1) all previous progress
payments received from Owner on account of Work done under the Contract have been applied on
account to discharge Contractor's legitimate obligations incurred in connection with Work covered by
prior Applications for Payment; (2) title of all Work, materials and equipment incorporated in said Work
or otherwise listed in or covered by this Application for Payment will pass to Owner at time of payment
free and clear of all Liens, security interests and encumbrances (except such as are covered by a Bond
acceptable to Owner indemnifying Owner against any such Liens, security interest or encumbrances);
and (3) all Work covered by this Application for Payment is in accordance with the Contract Documents
and is not defective.
Liquidated Damages $650.00 x day
10. CONTRACT TIME:
a, Days Awarded 275
b, Days Added by CO 35
C. Total Days 310
d, Days Charged 208
e, Days Remaining 102
Consent of Surety
Affidavit of Bills Paid
This document has been modified from its original form as an EJCDC document and the user did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
Progress Estimate
city Sr-,
58812
Contract NM'
For(COnhaC1)
Lake Worth Trail Phase 1B - Marion Sansom
Park
APpluwtion Period
B
C
D
Item
Specification
Um[ of
Bid Qnmtity
Unit Price
Bid Value
Estmuated Quantity
Value
Btd Item No
Descnptmn
Section N.
Measure
tistalled
Unit 1: General
1
Construction SfakmSoind Survev
017123
LS
u000OG
$17.960.55
$17,960.5
1.00000000
$17.960.SS
2
Te Prmecl Sign
01 5813
EA
2.00OOO6
$679.51
$1359.02
2.00000000
$1.359.02
3
�orary
Tm Control
34 71 13
Month
9.00OOO6
$3.993.2d
$35,939A6
9.00000000
$35.939.16
4
Tree Protection `s shown in drawmos)
3201 90
LS
1.000OOUJ
$4.88
$4.88
1.00000000
$4.88
5
Tern[� ary watering
33 04 30
LS
100000(f
$9.483.77
M483.77
1.00000000
$9.483.77
6
M._N.n..s Demo
31 00 00
LS
I 000006
M399.97
$9,399.97
1.00000000
$9.399.97
7
I
Clearing and Grubbina
31 0000
LS
I 000006
$60A03.12
$60A03.12
1.00000000
$60.403.12
Unit 2: Erosion Control
8
Stone Sediment Outlet Traps
313700
EA
2.00OOO6
$2.377.10
$4,754.20
2.00000000
$4.754.20
9
12'Diameter Filter Soxx
312500
LF
3180.00000�
$6,4
$19A29.80
3180.00000000
$19.429.80
10
I
Soddino
329213
SF
82744.00000�1
$0.60
$49A46A0
82744.00000000
$49.646.40
11
Unit 3: Trail
Removal Concrete Sidewalk
SF
1000.00OOO6
$7.07
$7,070.00
1000.00000000
$7.070.OQ'(
12
13
Miscellaneous Saw Cu no
Detectable Waminps
024115
TxDOT 529
LS
FA
u000OG
2.0000061
VA16.es
$1,246.77
$1,416.8 f
$2,493.54J
E216.7
1.00000000
2.00000000
$1.416.�Cj
$2.493.5
14
15
5' Thick Concrete Pad (Tmilhead)
Tire Excavation
32 13 13
311000
SF
CY
225.0000061
7200.0000061
$9.85
$26.39
$189,720.00
225.00000000
7193.00000000
$2,216.
$189.535.5
16
17
Trail Embankment
Material Haul Off and Rock Di cast
312400
CY
CY
2354.000ool1'
4846.000oo61
$28.2d
$20.40
$66A76.96
$137,626A0
2354.00000000
4846.00000000
$66.476.96
$137.626.40
18
Concrete Trail 10' Wide flncludino Subomde Preo)
321313
SF
35416000oo61
$9.50
$336A52.00
35416.00000000
$336.452.0
19
Finish Grad in in Sides of Trad
LS
i:0000OG
$67.573.69
$67,573.6
1.00000000
$67.573.65
20
I
Trail Marker Slam.
See Drawings
EA
3.00OOO6
$136.00
$408.00
3.00000000
$408.00
unit 4: Miscellaneous Improvements
21
Metal Rail \Bea. Fencino
323129
LF
goomOOOG
$173.43
$156,087.00
900.00000000
$156,087.00
22
48'RCP
334110
LF
16.000oo61
$209.68
$3.354.88
16.00000000
$3,354,88
23
48'Headwall
334940
EA
2.00OOO6
$2.508.63
$5.017.26
2.00000000
$5,017,26
24
24'RCP
334110
LF
40.000oo61
$132.76
$5.310A0
40.00000000
$5,310.40
25
Yinlet
See Drawings
EA
2.00OOO6
$2.507.69
$5.015.30
2.00000000
$5,015.30
26
24'Headwall
334940
EA
200000G
$1.060.66
$3,721.32
2.00000000
$3,721.32
27
Ry�Ran
See Drawings
BY
288.000oo61
$118.02
$33.989.76
288.00000000
$33.989:76
28
2'x11x5' Cut Limestone Boulders
See Drawings
EA
11.000oo61
$1.273.40
$14.008.2�
11.00000000
$14.008.2
29
30
Plaza [� merit/6" Thick. Sawcut Grid Pattern)
6' BencF (Including Installation\
32 1313
11 67 13
SF
EA
385.00OOO�f
1.00OOO6
$9.85
$2.529.13
$3.830.
$2.529.13
385.00000000
1.00000000
$3.830.75
$2.529.1
31
Ddnku) Fountain flncludino Installation and Sum.)
11 6713
EA
imooOG
$6.512.09
$6.512.09
0.50000000
$3.256.�
32
1'War Line
331210
LF
40.00OOOG
$70.48
$2.819.20
33
Water Main T.
331225
EA
1,000OO61
$1.996.62
$1.996.62
34
35
36
Tmsh ReceDtacle flncludino Installation)
Solar Light
Crosswalk
11 6713
See Drawings
TxDOT 666
EA
EA
EA
1.000006
i0000OG
i 0000OG
$1.617.83
$15.919.O9
$3.136.6d
$1.617.83
$15,919.0f
$3,136.64f
1.00000000
1.00000000
1.00000000
$1.617.8
$15.919.
$3.136.6 f
37
Small S!pna
See Drawings
EA
6.00OOO6
$329.54
$1,977.2
6.00000000
$1.977.2
38
Solit Rail Fence
See Drawings
LF
20.00OOO6
$34.99
$699.00
20.00000000
$699.00
I
Unit 5: Structural Improvements
41
Pedestrian BridgF
SeeDrawings
EA
1.000OO�1
$103.499.27
$103,499.27
1.00000000
$103.499.27
42
43
Br Abutments
Drilled Shafts
033000S
0363295
CY
LF
7.000OO�1
45.000OO6
$2.605.90
$285.79
$18,241.30
$12,860.5J
7.00000000
45.00000000
$18.241.30
$12.860.
44
Set(>mental Bbck Retainlno Wall fmcludina Cao)
See Drawings
SF
8354:000006f
$29.5�
$246,526.5d
8354 0 000000
$246.526.54
1 45
Reffas WallDminaoe
See Drawings
LS
i 0000OG
$88.317.63
$88,317.63
1.00000000
$88.317.63
nmo
Alternate Bids: Unit 1 -Allowance
1
Allowance No 1
NA
LS
$1.000.00
2
Allowance No 2
NA
LS
$2.500.00
3
Allowance No 3
NA
LS
imooOG
$5.000.00
$5,000.00
4
Allowance No 4
NA
LS
$7.500.00
5
Allowance No 5
NA
LS
imooOG
$10.000.00
$10mo.00
6
Allowance No 6
NA
LS
$15.000.00
7
Allowance No 7
NA
LS
$20.000.00
8
Allowance No 8
NA
LS
$25.000.00
9
Allowance No 9
NA
LS
imooOG
$50.000.00
$woo0.00
Thus document has been modified from ns ongmal form w an EJCDC document and the user dud not highlight the
modifications. You are encouraged to read the document carefully and c-oll Legal Counsel poor to ns i-stain.
C-620 Unit Price Progress Estimate
Contractor's Application
Apphcanon Number:
10-Final
APplucatio. D-
E
F
G
Balance m Fimsh
Previously Innnlled Value Value This Period
Materials P.-fly
Completed and (F)
(B
Stored (not in C)
Stored to Date (D+E) B
$17,960.64
$17.960.45 100.0%
$1,359.02
$1.359.02 100,0%
$35,939.16
$35.939.19 100.0%
$4 88
$4.88 100.0%
$9A83.77
$9.483.77 100.0%
$9 99.97
$9.399.97 100.0%
$60.03.12
$60.403.12 100.0%
$4,754.20
$4.754.20 100.0%
$19A29.80
$19.429.80 100.0%
$49,646.40
$49.646.40 100.0%
$7,070.0,
$7.070.00 100.0%
$1,416.
$1.4, 6.�a 100.0%
$2,493.
$2.493.54 100.0%
$2.216. /
$2.216.2? 100.0%
$189,535.55
$189.53545 99.9%
$184.45
$66A76.96
$66.476.94 100.0%
$137,626.40
$137.626.40 100.0%
$336,452.04
$336.452.00 100.0%
$67,573.
$67,573.b�s 100.0%
5408.00
$408.00 100.0%
$156,087.00
$156.087.00 100.0%
$3,354.88
$3.354.BQ 100.0%
$ P17.26
$5.017,1F 100.0%
$eI 10.40
$5.0, 5.30
$5.310.40 100.0%
$5.015.30 100.0%
$3721.32
$3.721.3$ 100.0%
$33 ��9.76
$33,989, F 100.0%
$14.008.2
$14.008A 100.0%
1
$3,830.
13.830. 100,0%
$2,529.1,
$2.529.13 100.0%
$3,256.01
$3.256.64 50.0%
$3.256.05
$2.819.20
$1.996.62
$1,617.8�
$1.617.83 100.0%
$15'919.�
$3136. J
$15.919.64 100.0%
$3.136.a 100,0%
$i,977.2
$t977.z4 100.0%
$699.00
$699.00 100.0%
$103A99.27
$103.499.27 100.0%
$18,241.30
$18241.3Q 100.0%
$12.860.5J
$12,860,SS 100.0%
$246,526.54I
$246.526.54 100.0%
$88,317.63
$88.317.63 100,0%
$5.000.00
$10.000.00
$50.000.00
Progress Estimate
F,,(WnhaC1) Lake Worth Trail Phase Ill - Marion Sansom Park
APplrwtion Penod
1
Item
Md Item No Descnptmn
TOtels
C-620 Unit Price Progress Estimate
GltySxmmry 58812 Contractor's Application
Contract Num-
Apphcanon Number: 10-Final
Applrcehou Date
B C D E F G
Balance m Fimsh
estunated Quantity Materials Presently Total Completed and
Spemfica[ion Umt of Bid Q—fity Urdt Price Bid Value tisWled Value P—iooaly Instaeed VWue Value Thia Period Stored (no[ m C) Stored to Dale (D+ E) F) F)
Section No. Measure B
$1.821.821.56 $1.748.565.25 $1.748.565.25 $1.748.565.25 B6.0% $73.256.32
Th,s document has been modified from rts origmal fmtn as an EJCDC document and the user dW not highlight the
modifications. You are encouraged to read the document —Uly and cons WI Legal Counsel poor W eta execW�on.
C-620 Change Order
Progress Estimate Change Order Number 1 1
ADDITIONS
For (contract): C01920 Lake Worth Trail Phase 113- Marion Sansom Park City Secretary 58812
Contract Num:
Application Period:
A
B
C
D
Item
Addition
EstupatQuantity
Change Order Item
Description
Specification
Measure
CO Quantity to Add
Unit Price
Change Order
Installed
Value
No.
Uni[ of
Section No.
Value
Unit 6 - Road Railing
1
TxDOT Guard Rail
LF
625.00000000
$66.47
$41,543.75
625.00000000
$41,543.75
2
TxDOT Gate
LF
50.00000000
$266.67
$13,333.50
50.00000000
$13,333.50
Unit 7 - Clean Up
1
Sodding
SF
23528.00000000
$0.60
$14,116.80
23528.00000000
$14,116.80
2
Removal Concrete Sidewalk
SF
173.00000000
$7.70
$1,332.10
173.00000000
$1,332.10
3
Trail Embankment
CY
2.00000000
$28.24
$56.48
2.00000000
$56.48
4
Concrete Trail 10' Wide (including subefade prep)
SF
164.00000000
$9.51
$1,558.00
164.00000000
$1,558.00
5
Meal Rail/Beam Fencing
LF
8.00000000
$173.43
$1,387.44
8.00000000
$1,387.44
6
Bridge Abutments
CY
0.40000000
$2,605.90
$1,042.11
0.40000000
$L042.36
7
Drilled Shafts
VF
19.00000000
$285.79
$5,430.01
19.00000000
$5,430.01
8
Segmental Block Retaining Wall (including CAP)
SF
797.00000000
$29.51
$23.519.47
797.00000000
$23,519.47
Contractor's Application
10-Final
E F
Prevrously Value This
Materials Presently Total Completed
%
Installed Value Period
Stored (not in C) and Stored to Date
(F)
(D+E)
B
$41,543.75
$41,543.75
100.0%
$13,333.50
$13,333.50
100.0%
$14,116.80
$14,116.80
100.0%
$1,332.10
$1332.10
100.0%
$56.48
$56.48
100.0%
$1.558.00
$1558.00
100.0%
$1,387.44
$1,387.44
100.0%
$1.042.36
$1,042.36
100.0%
$5,430.01
$5,430.01
100.0%
$23.519.47
$23,519.47
100.0%
Balance to Finish
(B-F)
This document has been modified from its original form as an EJCDC document and the user did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
C-620 Change Order
Totals $103,319.91 $103.319.91 $103,319.91 $103.319.91 100.0%
Progress Estimate Change Order Number I 1 I Contractor's Application
DELETIONS
L k W h T '1 Ph 1B M S P k
For(contract):
a e ort rat ase - anon aneom or
C01920
Application Number:
10-Final
Application Period:
Application Date:
A
B C
D E F
Item
CO Quantity to
Deletion
Change Order Item
Description Specification
Unit of Measure
Delete
Unit Price
Change Order Not Used
Not Used Not Used Not Used Not Used Not Used Not Used Not Used
No.
Section No.
Value
15
Trail Excavation
EA
7.00000000
$26.35
$184.45
3
Allowance No.2
LS
1.00000000
$5`000.00
$5\000.00
5
Allowance No.5
LS
1.00000000
$10000.00
$lo 00.00
9
Allowance No.9
LS
1.00000000
$50,000.00
$50,000.00
This document has been modified from its original forth as an EJCDC document and the user did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
C-620 Change Order
This document has been modified from its original forth as an EJCDC document and the user did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
City of Fort Worth Summary of Charqes
City Secretary Contract Num: I 58812 I Lake Worth Trail Phase 1B - Marion Sansom Park I P. O.: FW080-0000011422 Project Number: C01920
Application Period: Number: Application 10-Final Application Date: 1/0/1900
Funding Identification (FID) Total Completed Amt Remaining Gross Retainage Net
I Original Contract
139301-2060000-00l920-CRETAN $1,748,565.25 $73,256.31 $92,594.26 $92,594.26
10
I0
10
I0
10
I0
10
I0
10
I0
Change Order 1
139301-2060000-00l920-CRETAN $103,319.91 ($65,184.45)
10
I0
10
I0
10
I0
10
I0
10
I0
Change Order 2
139301-2060000-00l 920-CRETAN
10
I0
10
I0
10
I0
10
I0
10
I0
Change Order 3
39301-2060000-00l 920-CRETAN
0
City of Fort Worth Summary of Charqes
City Secretary Contract Num: I 58812 I Lake Worth Trail Phase 1B - Marion Sansom Park I P. O.: FW080-0000011422 Project Number: C01920
Application Period: Number: Application 10-Final Application Date: 1/0/1900
Funding Identification (FID) Total Completed Amt Remaining Gross Retainage Net
10
10
10
10
10
10
10
10
10
Change Order 4
139301-2060000-00l920-C RETAN
10
10
10
10
10
10
10
10
10
10
Change Order 5
139301-2060000-00l920-C RETAN
10
10
10
10
10
10
10
10
10
10
Change Order 6
139301-2060000-00l 920-CRETAN
10
10
10
10
City of Fort Worth Summary of Charqes
City Secretary Contract Num: I 58812 I Lake Worth Trail Phase 1B - Marion Sansom Park I P. O.: FW080-0000011422 Project Number:
Application Application Period: 0 10-Final Application Date:
Number:
Funding Identification (FID)
10
10
10
10
10
10
Change Order 7
139301-2060000-C 0l 92 0-C R E TA N
10
10
10
10
10
10
10
10
10
10
Change Order 8
139301-2060000-C 0l 92 0-C R E TA N
10
10
10
10
10
10
10
10
10
10
Totals
139301-2060000-C 0l 92 0-C R E TA N
10
10
10
10
10
10
10
Total Completed
$1,851,885.16
Amt Remaining
$8,071.86
Gross Retainage
$92,594.26
C01920
1/0/1900
Net
$92,594.26
City of Fort Worth Summary of Charqes
City Secretary Contract Num:
I 58812 I
Lake Worth Trail Phase 1B - Marion Sansom Park
I P. O.:
FW080-0000011422
Project Number:
C01920
Application Period:
Number: Application
10-Final
Application Date: 1/0/1900
Total Completed
Amt Remaining
Retainage Net
Funding Identification (FID)
Gross
10
1 $0.00
$0.00
$0.00
$0.00
10
0.00 1
1 $0.00 1 1
$0.00 1 1
$0.00 1 1
10
' 1
1 $0.00 1 1
$0.00 1 1
$0.00 1 1
I Grand Total
1 $1,851,885.16 1
1 $8,071.86 1 1
$0.00 1 1
$92,594.26 1 1 $92,594.26
Fox_ T�Wo.
Project Name Lake Worth Trail Phase 1 B
Client Project #(s)l C01920
Project Description
Contractor Cole Construction, Inc.
City Project Mgr.1 Carlos M Gonzalez
City of Fort Worth
Change Order Request CSC No. 58812-COl
City Sec # 1 58812 I�
I
Lake Worth Trails Phase 1 B at Marion Sansom Park
Change Order#1 1 1 Date 11/21/2023
City Inspectorl William R. Fauver
Dept.
PARD
Contract Time
Totals
(CD�
Original Contract Amount
$1,821,821.56
$1,821,821.56
75
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
$1,821,821.56
$1,821,821.56
275
IGo to ADD & DEL Tabs to Enter CO Backup
$38,135.46
$38,135.46
35
Revised Contract Amount
$1,859,957.02
$1,859,957.02
310
Original Funds Available for Change Orders
$0.00
Remaining Funds Available for this CO
$0.00
Additional Funding (if necessary) $38,135.46 1 1 1 1 $38,135.46
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 2.09%
MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) 1 $2,277,276.95
JUSTIFICATION (REASONS) FOR CHANGE ORDER
• Due to the proximity of the concrete trail next to Cahoba Dr., the City of Fort Worth requested a quote from the contractor to install 625 Linear Feet of guard rail and two
maintenance gates next to the trail. The contractor provided a quote, and the city found the quote to be fair.
• Per city agreement, all measured field quantities shall be paid (to include overages and shortfalls).
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Name
Contractor Name
Contract Signature
Date
Cole Construction, Inc.
Kenneth Thorne
Nov 21, 2023
Inspector/Inspection Supervisor
Date
Proiect and Contract Compliance Manager
Date
✓ - 471io4
Nov 21, 2023
Nov 21, 2023
Program Manager
Date
Senior Capital Project Officer
Date
Nov 21, 2023
Nov 22, 2023
Assistant Director (Dept)
Date
Director, ContractingDepartment (Dept)
Date
t'
Nov 27, 2023
Nov 28, 2023
Assistant City Attorney
Date
JAssistant City Manager
Date
Nov 28, 2023
Nov 30, 2023
i required)
M&C Number I N\A I M&C Date Approved I N\A
ATTEST:A / G
KC
Jannette Goodall, City Secretary
FORT WORTH
City of Fort Worth
.V.
Change Order Additions
Project Name j Lake Worth Trail Phase 1 B
City Sec # j 58812
Client Project# j C01920
I
Contradorl Cole Construction, Inc.
PMI Cados M Gonzalez
Inspectorl William R. Fauver
Change Order Submittal #
O
Date j 11/21/2023
ADDITIONS
IIEM
UESI;RIP I IUN
UEPI Uty
Unit Unit lost
total
Unit 6 • Road Railing
1
TX Dot Guard Rail
PARD
625.00
LF $66.47
$41,543.75
2
Tx Dot Gate
PARD
50.01J
LF $266.67
$13,333.50
Unit 7 • Clean Up
1
Sodding
PARD 23,528.00
SF $0.6U
2
Removal Concrete Sidewalk
PARD
173.06
SF $7.7U
�4,116.80
1,332.10
3
Trail Embankment
PARD
2.0t,
CY $28.24
$56.48
4
Concrete Trail 10' Wide (Including Subgrade Prep)
PARD
164.06
SF $9.5U
$1,658.00
5
Metal Rail 1 Beam Fencing
PARD
8.0(
LF $173.43
$1,387.44
6
Bridge Abutments
PARD
0.46
CY $2,605.9U
$1,042.36
7
Drilled Shafts
PARD
19.01J
VF $285.79
$5,430.01
8
Segmental Block Retaining Wall (including Cap)
PARD
797.OU
SF $29.51
$23,519.47
PAD $103,319.91
Sub Total Additions $103,319.91
Change Order Additions Page 2 of 4
FORT W RTH
City of Fort worth
".V
Change Order Deletions
Project Name i Lake Worth Trail Phase 1 B
City Sec # i 58812 1
Client Project# i C01920
1
Contractorl Cole Construction, Inc.
PM I Carlos M Gonzalez
Inspectorl William R. Fauver
Change Order Submittal #
Date i 11/21/2023
DELETIONS
11FM
UE5URI1`IIUN
UFFI Uty
Unit Unit Uost dotal
15
Trail Excavation
PARD 7.00
EA $26.35 184.45
3
Allowance No. 2
PARD 1.00000000
LS $51000.0U 4.000.00
5
Allowance No. 5
PARD 1.00000000
LS $10,000.0U $10,000.00
9
Allowance No. 9
PARD 1.00000000
LS $501000.0U $50,000.00
PARD $65,184.45
Sub Total Deletions $66,184.46
Change Order Deletions Page 3 of 4
M/SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
N/A
Total $0.00
Previous Change Orders
co # DATE I AMOUNT
N/A
Total I $0.00 1
Cole Construction Inc.
10315 Alta Vista Rd
Fort Worth, TX 76244
To:
City Of Fort Worth
Address:
200 Texas St
Fort Worth, TX 76102 USA
Project Name: Lake Worth Phase 16
Project Location: 6189 Cahoba Ct E, Fort Worth, TX
Item #
Item Description
01
TX DOT Gate
Includes:
• Wooden Post
• Wooden Block
• Metal Gate
01
TX DOT Guard Rail
Includes:
• Wooden Post
• Wooden Block
• Metal Guard Rail
• Terminal Anchor Sections (Estimated Lead Time Is 6-
10 Weeks)
ACCEPTED:
The above prices, specifications and conditions are satisfactory and
are hereby accepted.
Buyer:
Signature:
Date of Acceptance:
Phone: 817-431-9636
Fax: 817-379-5258
Contact:
Carlos M Gonzalez
Phone:
817-392-5734
Fax:
Bid Number: C01920
Bid Date:
8/4/2022
Estimated Quantity Unit
Unit Price Total Price
50.00 LF
$266.67 $13,333.50
625.00 LF $66.47 $41,543.75
Total Bid Price: $54,877.25
CONFIRMED:
Cole Construction Inc.
Authorized Signature:
Estimator: Jacob McGregor
817-431-9636 x 306 jacob@colecon.com
Page 1 of 1
Cole Construction Inc.
10315 Alta Vista Rd
Fort Worth, TX 76244
To:
City Of Fort Worth
Address:
200 Texas St
Fort Worth, TX 76102 USA
Project Name: Lake Worth Phase 16
Project Location: 6189 Cahoba Ct E, Fort Worth, TX
Item #
Item Description
01
Additional Sodding
02
Removal Concrete Sidewalk
03
Trail Excavation
04
Trail Embankment
05
Concrete Trail 10' Wide (Including Subgrade Prep)
06
Metal Rail \ Beam Fencing
07
Bridge Abutments
08
Bridge Abutment Piers
09
Segmental Block Retaining Wall (Including Cap)
ACCEPTED:
The above prices, specifications and conditions are satisfactory and
are hereby accepted.
Phone: 817-431-9636
Fax: 817-379-5258
Contact:
Carlos M Gonzalez
Phone:
817-392-5734
Fax:
Bid Number:
C01920
Bid Date:
8/4/2022
Estimated Quantity Unit
Unit Price
23,528.00 SF
$0.60
173.00 SF
$7.07
-7.00 CY
$26.35
2.00 CY
$28.24
164.00 SF
$9.50
8.00 LF
$173.43
0.40 CY
$2,605.90
19.00 VF
$285.79
797.00 SF
$29.51
CONFIRMED:
Cole Construction Inc.
Total Bid Price:
Total Price
$14,116.80
$1,332.10
($184.45)
$56.48
$1,558.00
$1,387.44
$1,042.36
$5,430.01
$23,519.47
$48,258.21
Buyer:
Signature: Authorized Signature:
Date of Acceptance: Estimator: Jacob McGregor
817-431-9636 x 306 jacob@colecon.com
Page 1 of 1
(A�SPHA\T P _ . \ \� \� - i ���-65C
TAINING WALL #3 I 6
90 LF of _ \ (SEE STRUCTURAL I ' CO—
"\ — 1\ �� SHEETS FOR DETAILS) I
guard rail - I I
S1
NOTE. J — =665= _
10 CONCRETE TRAIL TO
HAVE CONTRACTION
JOINTS EVERY 10' O.C.
rn AND EXPANSION JOINTS RETAINING WALL #4
30' Gate ��� �o EVERY 40' O.C. (TYP. �o`O/ / , (SEE STRUCTURAL �
/ ���
/ / SHEETS FOR DETAILS
_ Entrance S
\ \ \� `� I \ \ \ , , �\ \ \ \ , � I i I I I // )
��� \ \ I ► I ►►I 1 345LFof
\ \ I I I EXIE
�\ \. \ \ \ � I ► I I I I I I I 1 guard rail
\ \ I I I I ► I I
_673"
FORT WORTH CITY OF
200 TEXAS ST
T WORTH, TX 76102-6311
AVE \66\ `\\ \\\\ �\ ' \\\ \\\ \ \\
S\ \\\\\ \\\\ \\ \ \ \ FORT WORTH CITY OF
RY RETAINING WALL #5 �\��\\\\�\�\\\\\\\\\�\\\\ �� 200TEXASST
\\\\\y / (SEE STRUCTURAL III\I \ �1\\\\\\\\�\\\\\\\\\\\ \ FT WORTH, TX 76102-6311
YP.) �\ /� SHEETS FOR DETAILS) I I I I i i I II I\I111I II\\\ \\\\\\
� �� 67 11111\I l l ll l 111 —NEW HEADWALL, SEE
\ \ \ �\\ \\\1\ \\I��;
STRUCTURAL DETAILS — — — —
\\\\�6�S\\\\\IrII — —672-
N. ��\'.�\ I�Illf((Y a� _ -673— — ��
NOTE: TO
$7- A 0
9 CONCRETE N
106
P,
. \,E CONTp O.C.
705 EERY
C -14 -�14
OE CON
)(SEESHEET
TRAM L
FOR
CAHOBA
DRIVE
(A5PHALT-P,AV(NG)-----
EXISTING 12"
CONCRETE PIPE
RETAINING WALL #7
(SEE STRUCTURAL
ANEW CLASS 3 RPC
SHEETS FOR DETAILS)
48" PIPE. NEW
' WIDE CONCRETE
HEADWALL, TYP. (SEE
SMALL SIGN - TYPE H
AIL (TYP.)(SEE
FORT WORTH CITY OF
STRUCTURAL SHEETS
EET DT 1.02 FOR
200 TEXAS ST
AND DT 1.02 FOR
NOTE:
TAILS)
FT WORTH, TX 76102-6311
DETAILS)
10' CONCRETE TRAIL TO HAVE
S38
CONTRACTION JOINTS EVERY
T34
S39
S36
O.C. AND EXPANSION JOINTS
rl
EVERY 40' O.C. (TYP.)
S33
32
1 .::C18 _' T35
S35
S34N
MATCH WITH EXISTING EDGE OF
ASPHALT ROAD
IN..
� �� ��i ���`��
SMALL SIGN TYPE D
T33 . �S`,
�i C19
T36
TFAADODADY DQr) lFr T ci
FORTWORTH.
M,
TRANSPORTATION AND PUBLIC WORKS
February 5, 2024
Cole Construction
10315 Alta Vista Road
Fort Worth, Texas 76244
RE: Acceptance Letter
Project Name: Lake Worth Trail Phase 1B
Project Type: City Sidewalk Trail
City Project No.: C01920
To Whom It May Concern:
On February 5, 2024 a final inspection was made on the subject project. There were no punch list items
identified at that time. The final inspection indicates that the work meets the City of Fort Worth
specifications and is therefore accepted by the City. The warranty period will start on February 5, 2024,
which is the date of the final inspection and will extend of two (2) years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at Aaron
Ybarra.
Sincerely,
(JWF'
F c�it� a�e� Before &After Pictures
Carlos Gonzalez, Project Manager
Cc: William Favuer, Inspector
Aaron Ybarra, Inspection Supervisor
Donald Watson, Senior Inspector
Scott Penn, Program Manager
Freese and Nichols, Consultant
Cole Construction, Contractor
NA, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 08/20/19
CONSENT OF SURETY
TO FINAL PAYMENT
AIA Doc=ennt G707
Bond No. RCB0043740
TO OWNEL
rNarne surd addresr•)
City of Fort Worth
200 Texas St.
Fort Worth, TX 76102
PROJECT:
( nne and a"-v
Lake Worth Trail Phase 1 B #1920
OWNFR
CONTRACTOR
SURLTY
OTHER
ARCHITECT'S PROJECT NO.:
CONTRACT FOR: Lake Worth Trail Phase 1 B #1920
CONTRACT DATED:
In accordance with the provisican5 of the Comma bemn--en the Owner and the Contractor as indicated above, the
fl nsr�! warn r Gi r d atld+t� of.S�r+-rh J
RLI Insurance Company
9025 N. Lindbergh Drive
Peoria, IL 61615
SURETY,
on bcod of
flu err narrre ant! addrva [(Cmzrracrur)
Cole Construction, Inc.
10315 Alta Vista Road
Fort Worth, TX 76248
CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Sure of
any of irs obligations to
Crnwn nanreanda4WMoror0mver)
City of Fort Worth
200 Texas St.
Fort Worth, TX 76102
as set forth in said Surety's bona.
IN WITNESS WRERROF, the Surety has hereunto set its hand on this date: March 4, 2024
(rrrst+rl hz kvVing (be nwntb fallauwd kt�The munerk dare and rear,)
Attest:
{seat': XY�'—`/
RLI RLI Insurance Company
{Sxrxy})
rSYgrraturir urr/bafzrd r xoentatit+r!
Holly Clevenger, Attorney -in -Fact
Myfrrled rrarr+e awl Hale)
+''r ` g
G707---1994
POWER OF ATTORNEY
RLI Insurance Company
Contractors Bonding and insurance Company
9025 N. Lindbergh Dr_ Peoria, IL 61615
Phone: 800-645-2402 Bond No.RCB0043740
Know Alt Men by These Presents:
That this Power of Attorney is not valid or in effect unless attached to the bond which it authorizes, but may be detached by the
approving officer if desired.
That this Power of Attorney may be effective and given to either or both of RLI Insurance Company and Contractors Bonding and
Insurance Company, required for the applicable bond.
That RLI Insurance Company and/or Contractors Bonding and Insurance Company, each Illinois corporations (as applicable),
each authorized and licensed to do business in all states and the District of Columbia do hereby make, constitute and appoint:
Holly Clevenger in the City of Dallas , State of TX
it's true and lawful Agent and Attorney in Fact, with full power and authority hereby conferred upon himlher to sign, execute,
acknowledge and deliver for and on its behalf as Surety, in general, any and all bonds and undertakings in an amount not to exceed
Seventy Five Million Dollars ($75,000,000) for any single obligation, and specifically for the following described bond.
Principal: Cole Construction, Inc.
Obligee: City of Fort Worth
RLI Insurance Company and Contractors Bonding and Insurance Company, as applicable, have each further certified that the
following is a true and exact copy of a Resolution adopted by the Board of Directors of each such corporation, and now in force,
to -wit:
"All bonds, policies, undertakings, Powers of Attorney or other obligations of the Corporation shall be executed in the
corporate name of the Corporation by the President, Secretary, any Assistant Secretary, Treasurer, or any Vice President,
or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any
Assistant Secretary, or the Treasurer may appoint Attorneys in Fact or Agents who shall have authority to issue bonds,
policies or undertakings in the name of the Corporation. The corporate seal is not necessary for the validity of any bonds,
policies, undertakings, Powers of Attorney or other obligations of the Corporation, The signature of any such officer and
the corporate seal may be printed by facsimile or other electronic image."
IN WITNESS WHEREOF, RLI Insurance Company and/or Contractors Bonding and Insurance Company, as applicable, have
caused these presents to be executed by its respective Sr. Vice President with its corporate seal affixed this 24th day of
Januanr 2024 6�ua"� RLI Insurance Company
,typNCEa `,,4 Contractors Bonding and Insurance Company
CIO
SEAL : _ SEAL:
State of Ohio ''.,`,zii;KolS aueos Eric Raudins Sr. Vice President
SS
County of Cuyahoga CERTIFICATE
On this 24th day of January , 2024 . before me, a Notary
Public, personally appeared Er�'c RgUdia,; , who
being by me duly sworn, acknowledged that he signed the above Power of
Attorney as the aforesaid officer of the RLI Insurance Company and/or
Contractors Bonding and Insurance Company, and acknowledged said
instrument to be the voluntary act and deed f said corporation.
By: /vt
Jill A. Scott Notary Public
JILL A SCOTT
Notary Public
s
State of Ohio
i =r
• __ a
My Comm. Expires
rOy7s,
0
September 22. 2025
I, the undersigned officer of RLI Insurance Company and/or
Contractors Bonding and Insurance Company, do hereby certify
that the attached Power of Attorney is in full force and effect and is
irrevocable; and furthermore, that the Resolution of the Company as
set forth in the Power of Attorney, is now in force. In testimony
whereof, I have hereunto set my hand and the seal of the RLI
Insurance Company and/or Contractors Bonding and Insurance
Company this 4th day of March 2024
RLI Insurance Company
Contractors Bonding; and Insurance CCotnpanq
By:
Jeffrey i�j" IJJ�C,�e,
Corporate Secretary
RL I ® RLIInsurance Company
P.O.P.OBox 3967 Peoria, IL 61612-3967
Phone:309-692-1000 Fax:309-683-1610
TEXAS
IMPORTANT NOTICE
To obtain information or make a complaint:
Texas Policyholder Notice
TEXAS
AVISO IMPORTANTE
Para obtener informacion o para presentar una queja:
You may call RLI Insurance Company's toll free telephone Usted puede llamar al numero de telefono gratuito de RLI
number for information or to p ke a complaint at 800-645-f M2. Insurance Company para obtener informacion o ara presentar
una queja at 800-645-2402.
You may also write to RLI Insurance Company at
9025 N. Lindbergh Drive
Peoria, IL 61615
FAX # 309-683-1610
You may contact the Texas Department of Insurance to obtain
information on companies, coverages, rights or complaints at
1-800-252-3439
You may also write the Texas Department of Insurance:
P.O. Box 149104
Austin, TX 78714-9104
Fax Number: (512) 490-1007
Web: www.tdi.texas.eov
E-mail: ConsumerProtection(a.tdi.texas.eov
Usted tambien puede escribir a RLI Insurance Company:
9025 N. Lindbergh Drive
Peoria, IL 61615
FAX # 309-683-1610
Usted puede comunicarse con el Departamento de Seguros de
Texas para obtener informacion sobre companias, coberturas,
derechos o quejas al 1-800-252-3439
Usted puede escribir al Departamento de Seguros de Texas a:
P.O. Box 149104
Austin, TX 78714-9104
Fax Number: (512) 490-1007
Sitio web: www.tdi.texas.gov
E-mail: ConsumerProtection(a tdi.texas.2ov
PREMIUM OR CLAIM DISPUTES: DISPUTAS POR PRIMAS DE SEGUROS O
Should you have a dispute concerning your premium or about a RECLAMACIONES:
claim, you should contact the agent first. If the dispute is not Si tiene una disputa relacionada con su prima de seguro o con
resolved, you may contact the Texas Department of Insurance. reclamacion, usted debe comunicarse con el agente primero. Si la
disputa no es resuelta, puede comunicarse con el Departamento de
ATTACH THIS NOTICE TO YOUR POLICY: Seguros de Texas.
This notice is for information only and does not become a part or
condition of the attached document.
ADJUNTE ESTE AVISO A SU POLIZA:
Este aviso es solamente para propositos informativos y no se
convierte en parte o en condicion del documento adjunto.
UW 1042-5 (08/15) M4201815
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a notary public in the state and County of aforesaid, on
this day personally appeared Kenneth Thorne, President of Cole Construction, Inc., known to me to be a
credible person, who being by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other organizations furnishing labor and/or
materials have been paid in full;
full;
That the wage scale established by the City Council in the City of Fort Worth has been paid in
That there are no claims pending for personal injury and/or property damages.
On Contract Described as: Lake Worth Trail Improvements Phase 1B
BY Kenneth Thorne, President
Name or Title
i-
Subscribed and sworn before me on this 1 day of thelG�
J
�1r7ir�
Notary Public
Tarrant County, Texas
month, in the year.
hor
EILEEN SANKE
Notary ID #125765901 _
* My Commission Expires
of April 14, 2027
Lake Worth Trails Phase 1B — Marion Sansom Park
Before & After Pictures
Lake Worth Trails 1B — Marion Sansom Park (CD7) — Before 2022
Lake Worth Trails 1B — Marion Sansom Park (CD7) —After 2024
Lake Worth Trails Phase 1B — Marion Sansom Park
Before & After Pictures
Lake Worth Trails 1B — Marion Sansom Park (CD7) — Before 2022
Lake Worth Trails 1B — Marion Sansom Park (CD7) —After 2024
Lake Worth Trails Phase 1B — Marion Sansom Park
Before & After Pictures
t {/
r
y� �Yt Rj�1l
WN
'3 rT_ ti94'}"'� �.:�•. 4'�� c �-: al
��+C.ia-'`�"��`%'`�� V': '� ; �qW/ ,/(j/
JL �J �1ri, ��atisA.� j .� w: } � ,� s��•� '"�+: �•+r �, � C�.k:_-`4�
{
Lake Worth Trails 1B — Marion Sansom Park (CD7) — Before 2022
y
� ry
t�
i
Lake Worth Trails Phase 1B — Marion Sansom Park
Before & After Pictures
Lake Worth Trails 1B — Marion Sansom Park (CD7) —After 2024
r'
Lake Worth Trails 1B — Marion Sansom Park (CD7) — Before 2022
Lake Worth Trails 1B — Marion Sansom Park (CD7) —After 2024