HomeMy WebLinkAboutContract 61573FORT WORTH&
CSC No. 61573
CONTRACT
FOR
THE CONSTRUCTION OF
2024 Sidewalk Improvements Unit Price Construction Contract
Mattie Parker
Mayor
Various City Project Numbers
David Cooke
City Manager
Lauren Prieur
Director, Transportation and Public Works Department
Prepared for
The City of Fort Worth
Transportation and Public Works Department
2023
Kimley-Horn and Associates, Inc.
TPBE Firm Registration No. F-928
801 Cherry Street, Unit 11, Suite 1300
Fort Worth, Texas 76102
817-335-6511
Scott R. Arnold, P.E. (#96782)
OF TF�
° °°°q®®®
.° °
° °°°°.°.° ........
°°.°
°SCOTT.... ARNOLD
d
a 0 96782 o
9�T 12/18/2023
/O ®-,'- ®
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORTWORTH.
City of Fort Worth
Standard Construction Specification
Documents
Adopted September 2011
00 00 00
TABLE OF CONTENTS
Pagel of 5
SECTION 00 00 00
TABLE OF CONTENTS
Division 00 - General Conditions
Last Revised
0005 10
Mayor and Council Communication
07/01/2011
0005 15
Addenda
07/01/2011
0011 13
Invitation to Bidders
02/08/2024
0021 13
Instructions to Bidders
01/17/2024
0035 13
Conflict of Interest Statement
02/24/2020
00 41 00
Bid Form
09/30/2021
00 42 43
Proposal Form Unit Price
01/20/2012
0043 13
Bid Bond
09/11/2017
00 43 37
vv-r✓-ir
Vendor Compliance to State Law Nonresident Bidder
06/27/2011
vvrrazviT
vv-r✓-Ta
0045 13
00 45 26
Pfequalifiec4ieo Sta4eme
n .o,,, alifieatio A ,.plie4
Contractor Compliance with Workers' Compensation Law
mr30r202z
09 it 3 O2 t
07/01/2011
00 45 40
Business Equity Goal
10/27/2021
00 52 43
Agreement
3/08/2024
0061 13
Performance Bond
12/08/2023
0061 14
Payment Bond
12/08/2023
0061 19
Maintenance Bond
12/08/2023
00 61 25
Certificate of Insurance
07/01/2011
00 72 00
General Conditions
03/08/2024
00 73 00
Supplementary Conditions
03/08/2024
Division 01- General Requirements
Last Revised
01 1100
Summary of Work
12/20/2012
01 25 00
Substitution Procedures
07/01/2011
01 31 19
Preconstruction Meeting
08/17/2012
01 31 20
Project Meetings
07/01/2011
01 32 16
Construction Schedule
10/06/2023
01 32 33
Preconstruction Video
07/01/2011
01 33 00
Submittals
12/20/2012
01 35 13
Special Project Procedures
03/11/2022
01 45 23
Testing and Inspection Services
03/09/2020
01 5000
Temporary Facilities and Controls
07/01/2011
01 5526
Street Use Permit and Modifications to Traffic Control
03/22/2021
0157 13
Storm Water Pollution Prevention Plan
07/01/2011
01 58 13
Temporary Project Signage
07/01/2011
01 60 00
Product Requirements
03/09/2020
01 66 00
Product Storage and Handling Requirements
07/01/2011
01 70 00
Mobilization and Remobilization
11/22/2016
01 71 23
Construction Staking and Survey
02/14/2018
01 74 23
Cleaning
07/01/2011
01 77 19
Closeout Requirements
03/22/2021
01 78 23
Operation and Maintenance Data
12/20/2012
01 78 39
Project Record Documents
07/01/2011
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised March 8, 2024
00 00 00
TABLE OF CONTENTS
Page 2 of 5
Technical Specifications which have been modified by the Engineer specifically for this
Project; hard copies are included in the Project's Contract Documents
None
Technical Specifications listed below are included for this Project by reference and can be
viewed/downloaded from the City's website at:
httn:Hfortworthtexas.eov/tnw/contractors/
or
httDs:HaDDs.fortworthtexas.2ov/Proi ectResources/
Division 02 - Existing Conditions Last Revised
0241 13 Selective Site Demolition 03/11/2022
02 41 14 1 rtii:t n effi ,ya / n b r,1 f ffne11 /�1-2
0241 15 Paving Removal 02/02/2016
Division 03 - Concrete
03 30 00 Cast -In -Place Concrete 03/11/2022
03 34 13 Gaiitr-elled row St,.engtL, T a4 fia (rr S n 12/�20,L2012
03 3 4 4 6 Cene,.ote Base r,r to -ia fe f T-Fe ok Roar 12/20,L20z
Division 26 - Electrical
7ti�o Demolition fee Eleetmfieal Systems 12/2z
2605 05 43 U-Rd,.,_., ian Duets andn..,.ew ,,s for- Lleet..:ea Systems 0�/nor 1�11
260550 r,,,,.,.,,,,r:,..,tions rfu ti. Duo,' Ceadait 02/tee
Division 31- Earthwork
31 00 00 Site Clearing 03/22/2021
3123 16 Unclassified Excavation 01/28/2013
31 23 23 Borrow 01/28/2013
31 24 00 Embankments 01/28/2013
31 25 00 Erosion and Sediment Control 04/29/2021
31 37 00 Riprap 12/20/2012
Division 32 - Exterior Improvements
Z7�Qv -T-Amr ar,,, n s,.1,.,1t n.,,,:r,. no,.,,:.. 12/20,9012
27� L' exible Base !''.,,,,-sus 17P)zzravizviz
37 1137 r :,,ui T-Fe..te c 1 08/21 /2n1 c
��I. �,1 '1i a�l� van�-aoz�
32 1216 Asphalt Paving 12/20/2012
32 Q 7-Allpkalt ,:,.. r v c 1 ..tom 12/� ^�z
32 13 �3 ,z
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised March 8, 2024
00 00 00
TABLE OF CONTENTS
Page 3 of 5
32 1320
Concrete Sidewalks, Driveways and Barrier Free Ramps
12/09/2022
32 1373
Concrete Paving Joint Sealants
12/20/2012
32 1 n 1 ti
�-zzrro
7
�,°��" .1L'iltg
12/20,L20 2
zzravraozz
32 1613
Concrete Curb and Gutters and Valley Gutters
12/09/2022
32 1723
Pavement Markings
06/10/2022
27�
7
(`,, , G �Aatw.g,
1 11 1 /04,L2013
3231 13
Chain Fences and Gates
12/20/2012
32 31 26
Wire Fences and Gates
12/20/2012
32 31 29
Wood Fences and Gates
12/20/2012
32 32 13
Cast -in -Place Concrete Retaining Walls
06/05/2018
3291 19
Topsoil Placement and Finishing of Roadway Right-of-ways
03/11/2022
32 92 13
Sodding
05/13/2021
322 92 11
Non N iye coed;„
05/1�T
3' 92 15
Z7�3
Nat�sl'oc%.\'�d Wildflower- Seeding
T fees a- d S1.... bs-
1 n1 /n 3
12/20,L2012
Division 33 - Utilities
Z'2�T Closed Gir-e,,;t Television (CCTV4 lnspo..lim Eanikary-Se ef: 03/1�i
12�i Closed Gir-ettit Television (GGT37) 7,....,..,,,. n'lZ
tl�� ��4�1. �14'�:4 12/0842
22� %'X/xo Nr^[�riff.g of H.Eistiag Sewer- Syste12/20,L2012
33 04 10 Toro, Beading ,,,..d Hleetfieal isel .tie 12/'lzzravizviz
2 A T
33 n1T ir.,..,-.,,.,;,,.ti. Anode r, thedie D«,.teet;,.,-. Syste 12/20,L2n12TpT�z
73-04-30 mT0�12014-
22� Glo..n;«.g and A,.eept.,nee Testing ..FAIIa4e f Mains 02/0�
33 05 i0 U44ity Tfeneh Rx,,,.y tic i, Eqi*-ad. ent, and Baekf;ll nn /n�21
33 05 Q �x�, 4er- 7 r Q/201Q 2
Ts-v�r Tv-uscrzza., �.�7/:alp�� �vrzvzz
33
�-v5-z3 Ffame, mrmrzozz
33 05 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to 03/11/2022
Grade
Z'2�o (`one -ete 7xlate f Vaults 1 2 /'fr�-20, iviz
33 05 20 12/� ^z�z
�--05-zrTtmael Linef Pla4e r2-20r2012-
77--v5-zz 12-20r2012
33 05 -2� 12/2n/2n12
7�--v7-za 7 ,. � r�-avravzz
22�T inst.,11,.�;,.,.. of'!''affi3t, n��� !`....iag of: T-ti .-.,,1 7 1/LPIr �W.e 12/0z
33 05 26 77tilit-y>\aar-kefs/7 ee 4,,f 12/ram2019
33 05 30 Location of Existing Utilities 12/20/2012
33rr05 Belts, ,and Gaskets rLrtvrtvzz
32�no Peetilz !?�. n*a 1 /n�22
33 11 11 r F �• nn/ T
�., �� �� ��a~I�Its
✓� 11 12 U,.1.,.4,..,1 C1,lef de (PVC4 Pfe sefe Pipe nn/nmr 9,L2022
� 11 1., ar 2 3 c: P/uro PiN, Ba f �xr,.. pped, Steel Cylinder- Type 11 /' z
��
7:7--1-1-14 r2-20r20z2
Iry 027T4,2017
✓� 1211 7 , fge Wa4er- „,rote,.,, 12/20,L2012
22� Resilient Sea4ed Gate [7..1.,o 05/0-5
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised March 8, 2024
00 00 00
TABLE OF CONTENTS
Page 4 of 5
33 1230 fer- Petable Water- Syste 12/20,/2012
33 12 0 cF;',01 /n T
33 1250 I�aatc Ea1.:i,T).: SteAieas 12/'fr�-zvrzviz
33 12 600 S„m..lxd off Valve n...,, Ribl., 06/lvvrri,ivi3
33 3i _ wed in P) 11 /�12
33 31 3 Fiber -glass Reinfer-eed Pipe f.,,- C*a- „t-y r..,,;tafy co..,o, 12/1�r�vizvii
33 31 3 (I-IDP.1) Pik., ,12019
333121 Em-dad Sewe 2/20,4012
Pipe
333122 c..�Por E"Ii* liXrrg 11 /�12
7T3r27 r2-204201z
333150 n e. rita-F . Sewer- Se ,iee Gemeet rs an Ser-vice r ; 04 /26/2n1 �
�o ��
1Z�nv Gomnbiryat.a Air- VaPye fee S, .,harry S,...,,,,.>✓,. fee Mains- 12/rL7'zvnviz
33-3-9-10 CG`-,t k. Maze
�v r2-20r201z
33-3-9-60 biftee�or EQ:ItQy" 04/29,9021
✓3 11 11 High Density Polyethylene (I-IDPE) Drc�1Z 12/�14
22��2 rr D,.1lypf,..�...1,.ae Pipe f « S+om .J'ricl i i 06/1 z
32� �4dr-ainage 17/ 1 ')zz2vnviz
33-46 91 wed 90rm DrcYAG 07/nmT01,901i
33 4602 Tfaw . Dpc 1l ; 0�/n�11
33 49 1 Ga&t A. Plaza Manholes affd r,,,., fie B ., 12/�12
33 4920 Gur-b and D2or Inl>s 03 /�22
33 49 40 uo,.,l..,,,lls an xxr,�,....,,lls 07/01 /�n1 1
�B D�n114Q^�
Division 34 - Transportation
3n7 i T"��`1�.. 1..e�' j, T`.... fl;.. C�; 1., 1 1 /�-2i,Livi3
34 41 �3 03/1
34-4Assemblies 12/2n/2n1�2
-�A ��� Il url�ilgiti�� �
34 4120.01 r r 06/1 c/2n1 c
arm �D It ' .�liz.�ras ��
34 4120.02 > ..,,,,way r rrx n,.,.,1..... r 06/1 c/2n1 c
�7.;1°1l.'tYC.G.'r3S vvrr✓rav'a�
34 4120.03 Resi 1 r4i l LED Roadway r , 06/1 c/2n1:
�l.Xl.P.l�:3S vvrr✓rtvz�
34 nl 3n 2/2013 �o z4 u��mu.� .�grrs 11/1
�.
34-41 59 Single-Mede FiY/ar Optie Cable 02/fie
3471 13 Traffic Control 03/22/2021
Appendix
FE-4.91 AvaLllilit.,. ,.f
GG 4.02 914+- sieal Conditions
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised March 8, 2024
00 00 00
TABLE OF CONTENTS
Page 5 of 5
FE-4t'il U
Fly-4.06 13azurdetis Eavi arAnyin 1 Condition at Site
GC-6.06.D Minority and Women Owned Business Enterprise Compliance
GC
+-6. n0�7 7Wage Rates
r
Naftdisar4ptizzation
INei 1Z17aNDIU11110
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised March 8, 2024
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 04/09/24 M&C FILE NUMBER: M&C 24-0274
LOG NAME: 2024 SIDEWALK IMPROVEMENTS UNIT PRICE CONSTRUCTION CONTRACT
SUBJECT
(ALL) Authorize Execution of Unit Price Contracts with Ti-Zack Concrete, LLC in an Amount Not to Exceed $1,500,000.00 and with Capko
Concrete Structures, LLC in an Amount Not to Exceed $1,500,000.00 for Task Order Construction Services for the Installation of Projects Relating
to Sidewalk and Pedestrian Facilities Improvements at Various Locations (2022 Bond Program)
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the execution of a unit price contract with Ti-Zack Concrete, LLC in an amount not to exceed $1,500,000.00 for task order
construction services for the installation of sidewalk and pedestrian facilities improvements on an as needed basis, with up to one
renewal; and
2. Authorize the execution of a unit price contract with Capko Concrete Structures, LLC. in an amount not to exceed $1,500,000.00 for task
order construction services for the installation of sidewalk and pedestrian facilities improvements on an as needed basis, with up to one
renewal.
These contracts will provide for construction services on an as -needed (task order) basis for the construction of capital projects relating to
sidewalk and pedestrian facilities improvements at various locations across the City. The contract amounts are capped at $1,500,000.00. These
contracts may be renewed up to one (1) additional term at the earlier of the expiration of contract funds or contract time under the same terms,
conditions, and unit prices. The project was bid in a low bid format to determine unit prices to be paid when task orders are issued.
Notice of bids was published in the Fort Worth Star -Telegram on November 30, 2023 and December 7, 2023. On December 21, 2023, five
companies submitted the following bids:
CONTRACTOR BID
Ti-Zack Concrete, LLC $145,519.32
Capko Concrete Structures, LLC $166,595.00
EARTC $246,523.00
Urban Infraconstruction $338,371.00
The Fain Group, Inc. $339,999.15
The unit prices were compared to other similar projects and were determined to be fair and competitive. Task orders will be paid at the
established unit prices.
Projects initially identified include: 2022 Bond Year 1 sidewalk projects, 2022 Bond year 2- Glasgow Rd Project (City Project No.104758), 2022
Bond Year 2- Hardy St and Cleckler Ave Project (City Project No. 104759), and other projects as they are identified.
A portion of this contract will be paid from the 2022 Bond Program for the above identified projects. The City's Extendable Commercial Paper
(ECP) (M&C 22-0607; Ordinance 25675-08-2022) provides liquidity to support the appropriation. Available resources will be used to actually
make any interim progress payments until debt is issued. Once debt associated with a project is sold, debt proceeds will reimburse the interim
financing source in accordance with the statement expressing official Intent to Reimburse that was adopted as part of the ordinance canvassing
the bond election (Ordinance 25515-05-2022).
These task order contracts will serve current and future capital projects as -needed, and a funds availability verification will be performed by
Transportation & Public Works Contract Compliance Managers prior to task order assignment.
Ti-Zack Concrete, LLC is in compliance with the City's M/WBE Ordinance by committing to 11 % MBE participation on this project. The City's MBE
goal on this project is 11 %.
Capko Concrete Structures, LLC. is in compliance with the City's M/WBE Ordinance by committing to 11 % MBE participation on this project. The
City's MBE goal on this project is 11%.
a RigmV1110: i77�i/-ImN]:FL«]:1:401a101-IM[*]►>F
The Director of Finance certifies that funds are available in the current capital budgets, as appropriated, in the 2022 Bond Program Fund and
various capital improvement program funds to support the approval of the recommendations and execution of the contracts. Prior to any
expenditure being incurred, the Transportation & Public Works Department has the responsibility to validate the availability of funds.
Submitted for Citv Manaaer's Office bv: Jesica McEachern 5804
Oriainatina Business Unit Head: Lauren Prieur 6035
Additional Information Contact: Monty Hall 8662
Expedited
0005 15- 1
ADDENDA
Page 1 of 3
SECTION 00 05 15
ADDENDA
CITY OF FORT WORTH, TEXAS
ADDENDUM NO. 1
To the Specifications and Contract Documents
For
2024 Sidewalk Improvements Unit Price Construction Contract
Various City Project Numbers
Issued: December 19, 2023
Bid Date: December 21, 2023 at 1:30 P.M. CST
This Addendum forms a part of the Bidding Documents and will be incorporated into Contract
Documents, as applicable. Insofar as the original Contract Documents and Specifications and
Construction Plans are inconsistent, this Addendum governs. Acknowledge receipt of this
addendum by signing and attaching it to the Contract Documents (inside). Note receipt of the
Addendum in the Bid Proposal and on the outer envelope of your bid. FAILURE TO DO SO MAY
SUBJECT BIDDER TO DISQUALIFICATION.
Prospective bidders are herebv notified of the following:
This addendum includes the following:
1. Pre -Bid Meeting and Other Questions
During the pre -bid meeting, the attendees asked the following questions. Official answers
are being provided as part of this addendum:
Q: If the prime contractor is MBE certified, can their participation count towards
the MBE goal?
A: Yes. Certified Business Equity Prime/Offeror Contractors counting their self -
performance towards meeting the contract goal, must be certified within those NAICS
commodity codes with a certifying agency acceptable by the City of Fort Worth. Certified
Business Equity Prime/Offeror counting self -performing services towards the goal, the
service(s) to be performed should be listed first on the Utilization form.
Q: Is there a minimum work order amount?
A: No. In previous on -call contracts, work orders have been $20,000 or more.
Q: How many renewals are included?
A: The contract allows for up to one (1) renewal.
Q: How much is the on -call contract expected to be?
A: The City anticipates the on -call contract amount to be $3,000,000.
Q: Is asphalt work associated with curb and curb ramps subsidiary or paid
separately?
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised July 1, 2011
000515-2
ADDENDA
Page 2 of 3
A: This asphalt work will be paid for under bid item 30, HMAC Transition.
Q: How many railroad projects are anticipated as part of this contract?
A: The City anticipated 6 — 7 railroad related projects to be completed under this on -call
contract.
Q: Is mobilization paid for separately?
A: No, mobilization is subsidiary to the project bid items.
Q: What is the price for the landscape allowances for the Sidewalk Improvement
Unit Price contract?
A: These unit prices will be hard coded in, so they are the same for all bidders. A revised
Proposal Form will be issued as part of this addendum.
2. City Chanaes
a. The following sections have been updated and attached to this addendum. Changes
are summarized below.
i. Table of Contents
1. Listed all City specifications and struck through the ones that are not
applicable to this contract.
ii. 00 11 13 Invitation to Bidders
1. Struck through the language referring to pre -qualification.
iii. 00 41 00 Bid Form
1. Section 5f, struck through reference to pre -qualification.
2. Removed some blank spaces.
iv. 00 45 12 Prequalification Statement
1. Removed this document.
v. 00 52 43 Agreement
1. Increased size of text and bolded text of project name on page 1.
2. Removed line for Form 1295 No.
vi. 01 71 23 Construction Staking and Survey
1. Moved the attachments behind the 01 71 23 documents.
vii. Appendix
1. Listed all City standard appendix section and struck out ones that aren't
applicable to this project.
Acknowledge your receipt of Addendum No. 1 by completing the requested information at the
following locations:
(1) In the space provided in Section 00 41 00, Bid Form
(2) Indicate in upper case letters on the outside of your sealed bid envelope:
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised July 1, 2011
000515-3
ADDENDA
Page 3 of 3
"RECEIVED AND ACKNOWLEDGED ADDENDUM NO. 1"
All other provisions of the plans, specifications and contract documents for the project which are
not expressly amended herein shall remain in full force and effect.
Failure to return a signed copy of the addendum with the proposal shall be grounds for rendering
the bid non -responsive. A signed copy of this addendum shall be placed into the proposal at the
time of bid submittal.
RECEIPT ACKNOWLEDGED:
By: ,� By: I4u-9� A"
Shweta Rao, P.E., PMP
nn-- Senior Professional Engineer
Company: ��( c,� Transportation and Public Works
END OF SECTION
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various Ciq' Project Numbers
Revised July I.2011
FORTWORTH.
City of Fort Worth
Standard Construction Specification
Documents
Adopted September 2011
00 00 00
TABLE OF CONTENTS
Page 1 of 8
SECTION 00 00 00
TABLE OF CONTENTS
Division 00 - General Conditions
Last Revised
0005 10
Mayor and Council Communication
07/01/2011
0005 15
Addenda
07/01/2011
0011 13
Invitation to Bidders
07/19/2021
0021 13
Instructions to Bidders
11/02/2021
0035 13
Conflict of Interest Statement
02/24/2020
00 41 00
Bid Form
09/30/2021
00 42 43
Proposal Form Unit Price
01/20/2012
0043 13
Bid Bond
09/11/2017
00 43 37
vv-r✓-ir
Vendor Compliance to State Law Nonresident Bidder
06/27/2011
vvrrazviT
vv-r✓-Ta
0045 13
00 45 26
U -o,,u l: f:,,atien A ...Beat
Contractor Compliance with Workers' Compensation Law
mr34202z
08 it 3 i202t
07/01/2011
00 45 40
Business Equity Goal
10/27/2021
00 52 43
Agreement
10/06/2023
0061 13
Performance Bond
07/01/2011
0061 14
Payment Bond
07/01/2011
0061 19
Maintenance Bond
07/01/2011
00 61 25
Certificate of Insurance
07/01/2011
00 72 00
General Conditions
08/23/2021
00 73 00
Supplementary Conditions
10/06/2023
Division 01-
General Requirements
Last Revised
01 1100
Summary of Work
12/20/2012
01 25 00
Substitution Procedures
07/01/2011
01 31 19
Preconstruction Meeting
08/17/2012
01 31 20
Project Meetings
07/01/2011
01 32 16
Construction Schedule
10/06/2023
01 32 33
Preconstruction Video
07/01/2011
01 33 00
Submittals
12/20/2012
01 35 13
Special Project Procedures
03/11/2022
01 45 23
Testing and Inspection Services
03/09/2020
01 50 00
Temporary Facilities and Controls
07/01/2011
01 5526
Street Use Permit and Modifications to Traffic Control
03/22/2021
0157 13
Storm Water Pollution Prevention Plan
07/01/2011
0158 13
Temporary Project Signage
07/01/2011
01 60 00
Product Requirements
03/09/2020
01 66 00
Product Storage and Handling Requirements
07/01/2011
01 70 00
Mobilization and Remobilization
11/22/2016
01 71 23
Construction Staking and Survey
02/14/2018
01 74 23
Cleaning
07/01/2011
01 77 19
Closeout Requirements
03/22/2021
01 78 23
Operation and Maintenance Data
12/20/2012
01 78 39
Project Record Documents
07/01/2011
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised October 6, 2023
00 00 00
TABLE OF CONTENTS
Page 2 of 8
Technical Specifications which have been modified by the Engineer specifically for this
Project; hard copies are included in the Project's Contract Documents
Division 02 - Existing Conditions
2 41 13 Seleetive Site Ilemel;tie
2 41 14 Utility D o....,,ya / A 1...-ade,..,..e
Division 03 - Concrete
033000 Cat ICI Ill.se Goner-ete
03 34 13 !'',.,.t,-elle Low Strength >\44ef:i.1 (GI Ar 4
038000 >\aedifie i rs t Existing Gone Ole giuc4wes
Division 26 - Electrical
260533 Raeeways d Jotoo for- Eleetfieal Systems
Division 31 - Earthwork
31 1 o 00 Site Clear-iag
�rrv-vv m�r�ng
312323 Beffe
31�r200 F/�I*--,vn.1--xi--Pts
313600 Gabions
313700 Ripmp
Division 32 - Exterior Improvements
7Z0TTT
A-0 !mot It"I."
Z'72 W 23 Flme.N.z Da,
Gawyint Treated Brio r
Liquid Trem l tail F.,eA1.hzff
3'�66 z4 alt?Zi g
Z 7�v Bfial Unites , Rg
5 r,, 1, Address PaipA n .
�o
Date
Modified
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised October 6, 2023
00 00 00
TABLE OF CONTENTS
Page 3 of 8
3232 13 Cast i Ulaee ram.ne -ete Retaining Walls
329213 Sedding
3293 43 T=fev z-ri 94rubs
Division 33 - Utilities
33 0i 3T Q68ed CiV t TAeViSiOft (rrTV) hiSp eti,ffi
33 03- 10 EIN r Sewer- Syst
22� !'',.,-.-esio.. Gent..,.1 Toss Ctafi ns
Z Z�= A ir.,...-.,..,;,,.f. A ,, ede r4t,, die We z- lli1S E �i3
J
33 04-30 4,a-T*oar J, 7x7atef eo,-.,;..o�
33 nn nn rl,.anki g a fi A , ., taft e Testing of WWeer >, ai ff.
33 04 50 Cleaning of Sewer- Mains
33-05 10 U44it , T o . L > . ., +i�r., Eml;adme,4 andB,,,,k ll
Z'2�z �t� �I��� T ' him T
....�8wer-ing
3305 13.01 > ,.ame, , .r,e,. Gra
de rade Rings r,.mp site
�-oTrr. o-r
33 nc 14 Adjusting Manholes, >
and Othef Stt-devdfes to
Gfade
33 95 17 Genefete r llaf
330520 Aeger- Ber-ing
2Z� T.mnel Liner- Plate
3305-2= Steel r .
✓.,ff�Ib 11ir 3
330523 Hand T-umeling
33-05 24 lnctea1katim-e wrio: Pipe in Casing or Trmyr) Uf e
330530 7 ,,e tie f Edsti,..g U4i ;ties
33 11 05 -Boltz, Nutt, ana Gaskets
33 i i io Diaetilz 1m . P*,a
31-3 11 11 Deetile 7,.e Fittings
�z
✓� 11 13 cGenefete Pfesstife Pipe Ba f 7x7.-.,,..,-.0,7 Steel r.,l;,, de - Type
�v WxrccrvcrPxcO l irlAh ,
3312 11 7 , e Wate f Mete s
2Z� Resilient Seatedr-.-p 17.11.,o
22�= A TI7TT7 A D,.4 be f Sea4e BtWe ffl., V.,1.,,..,
33 1230 Go's' !:r 7!ka Air- Valve A ssembl; iz Roy lV7. li wictef Sy stems
33 1240 Fire Hydrants
33 1250 Wa4ar Ea- Jzi E"tcatioao
Z'2�0 Sf..,..,1.,f Blow off Valve A.,seff.1..1.,
33 3i P F4bac1roo ioinf -ee Pipe f GFwvi , Eamitu-; -s
33 31 15 High Density Polyethylene (HDPE) Pipe fef Sa-aitafy Sewe
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised October 6, 2023
00 00 00
TABLE OF CONTENTS
Page 4 of 8
33 3121
Ape
31112 Sa- y Se or 0* Liaiag
33 3123 �� c Enlxgaffiei}t
Z Z77-41-i1 gi-gi, D4%ri I Pel.,,. hyl,fie (14PPE4 Pipe f Stotm. D1av--.A
3,32 11 12 Dorf -ee-Pel.,ethylem (SRPE) Pira
33 4600 drainage
33-46 01- 84e��d 9t3 I Dfaifts
3�-46-02 %2iiZti: Dpwrld
33-4 20 r,,,.l, and Drop inlets
33 49 40 ,Storm Dpa1aage uo,,,a..,,,lls and Alin...,,!
Division 34 - Transportation
34 41 10 T,-.,ff;e Signals
�
3 AA A�Oi Attaehmeat-A C-entrener- Gabinet
ZAZA A�O2 rn#aehmefA B /''..,-.fellef Spee fiea4 „a
.03 iit�'/.n PPi�.t
3Ate= , TF ff;.. C`;.. fta
11 13 Removing T- ff e Signals
211 11 if Reetan-ulr PEA F&%.-AiY
34 4 16 Pede�na Hybrid Signal
2 Ago Readwy IlluIininat o n s s o,....b4e
3 A A7Z-T1- .01 Aex.-'!.). LED P, Vf : ey ;_l x n;ff.1'Yas
34 .� Lµa�inairrs
34 4120.03 -Resi antial LT'D4?L�- :jxniaaires
34� 4130 Altwninta" 6 gns
3 A�3 T«.,ff;,, Ge fft e
Technical Specifications listed below are included for this Project by reference and can be
viewed/downloaded from the City's website at:
httn:Hfortworthtexas.Lov/tnw/contractors/
or
httDs:Hauns.fortworthtexas.2ov/Proi ectResources/
Division 02 - Existing Conditions
0241 13 Selective Site Demolition
0241 15 Paving Removal
Last Revised
03/ 11 /2022
1 l Piz
02/02/2016
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised October 6, 2023
00 00 00
TABLE OF CONTENTS
Page 5 of 8
Division 03 - Concrete
03 30 00 Cast -In -Place Concrete 03/11/2022
l�Z�o Geiiefete Dace Ma4ef:ial fee rr,.eiiet7 Re13-.:, 11 /�142
038000 >\ ed:fie ieiis to > *istiiig r,...,.f 9t..1l:k-Hfes 121�, ^�z
Division 26 - Electrical
-260500 r,.... fflei Wef4E n siih, f f > leetwiea
n3 /1�z
quo Demolition fo- -Eleet.-iea Systems
' 6 05 33 Raeew ays and Boxes fe T 1o1`ITioa] Sr;4ems
lq/�12
17/'l z
2605 43 U der-gr- t d Dttet&-a-x-zJ Raae s f^f Ele t,.iea Systo ,
0:7/0T
�H-A�-38 Co��I+rurrc� ti,.�s Mi lt: Diiet Gen"it
01/26,L2 �
��
Division 31- Earthwork
31 00 00 Site Clearing
03/22/2021
3123 16 Unclassified Excavation
01/28/2013
31 23 23 Borrow
01/28/2013
31 24 00 Embankments
01/28/2013
31 25 00 Erosion and Sediment Control
31�
04/29/2021
1
dons
31 37 00 Riprap
q/ z
12/20/2012
Division 32 - Exterior Improvements
32 n1 14
�z-vrry
32 n1 29
•ro.,.per-., n-pai.
Tcrnpvrcrry-��0 l.I t ItI. ni�ccparr
r,.,, Paving no..ai
12/2n/2n12
r�rzvrtvrs
12/20,4012
7-Z-v-rz7
17 11 7Z
�rrrza
32 1 1 29
er-ete
r 1.. r
���Ti l' ��s�-cvciisc�
r :,.. e T-fe,t„d Base r,.,,,..,,,.,
r�-avravzz
12/2n/2n12
�z�vrtvzz
12/20,L20 2
Cement Treated Base C
Liquid T- aatkzd Coil FXA/li er
06/10,L2022
08/�15
32 1216
Asphalt Paving
12/20/2012
32 i 73
32 13 13
-Aap alter ,:r,. ry e,.,,i rt.,
Ge n.,.,'
12/20,L2012
06/1nL2022
��
32 1320
ft fete —:
Concrete Sidewalks, Driveways and Barrier Free Ramps
vvrrvrzozz
12/09/2022
32 1373
Joint Sealants
12/20/2012
3-2 14 16
DCo�n��cretePa�vi�ng
&4✓f T.JPll V �,�,-i*g
1 2 /�r20,L20?z
32 16 13
Concrete Curb and Gutters and Valley Gutters
12/09/2022
32 1723
Pavement Markings
1, tiag
06/10/2022
1 1 /nrr nv�oi3
32 i7 5
3231 13
Ct Address Pail
Chain Fences and Gates
12/20/2012
32 31 26
Wire Fences and Gates
12/20/2012
32 31 29
Wood Fences and Gates
12/20/2012
32 32 13
Cast -in -Place Concrete Retaining Walls
06/05/2018
3291 19
Topsoil Placement and Finishing of Roadway Right-of-ways
03/11/2022
3292 13
Sodding
05/13/2021
3292 14
N�. rl�,tr _-
05 /1 � L2021
12 92 if
Wi dfti, wer- coed;,..,,
10/06,L2023
3293 43
Trees 3 9krubG
12/��2
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised October 6, 2023
00 00 00
TABLE OF CONTENTS
Page 6 of 8
Division 33
3 3�no
- Utilities
a ,,,, >\ 4, nn /nmry
3301 31
e f mid d Aiel e Testing ,L2019
Closed Gir-e it Television (CCT37) Insp .;on Furftafy SeweP 03/1�2-2
3`3-A��
Closed r• t Television (CCT37) Insp k. 03 /1 1 /3n23
�e�ec��eet}en�t� ��r �z
223 03 10
33�0
3 3�
33�
Ry i f; Ptrfl�P;t�.g Of L',,;., ifig Q..Wer- SyS♦..13/3r�-20,L2012
T,.iw B,.,,.,1iiig ..-a Eleet+ieal T.,ela4:,..•. 13/7zzrzvnviz
r,.,.,.esio,. C=eatfel Toss Stations 1 3 /3zz2vrzoiz
TR....,-esit,-.-, Anode r.,tl.. die Pfeteeti.,,,. Syste .. 12/lzzrzvnviz
333 0430
33�0
33�0
33�e
3 2�2
To,v.,, e -afy TI atef C'o,-,,;e 07/nmT0W20 i
rl,....-.iog cffid Aeeeiptanee Testi ig of [I 74ef Mains 02/03.
Clo.,..:ng of Pipes 03/1�i
Ufilit-y T,-ene 1✓,iea-f-atiar. Emlve,lmeiA and Baekf;ll 04/02,L2021
Wa4e - Line e T e e 1 2 P)zzrzvnviz
33�3
3305 14
1r..affi r,yef: and Gr-a 1 n;ff,., 09/09,L2022
Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to 03/11/2022
�-4
Grade
Genefete Water- - V..,,1ts- 1 3 /3
r n3 /1�z
3305 7
33�noAugef131
33�T
C;eaefete llafs
/3z
%Hi3i31 13/3n/3�n13
'� Til�,1S Ill�r� z
r 1 31 /3
2
3
33�4
Steel sing Npe z
1 3 /3n/3n1 3
Hand Turrroling ,�
hist.11pAie... of'!'`affi.,. Pipe it Casing of Tunnel Liner- Pl.,t-e 13/02
3 3�o
33 05 30
T Tti 1: y A 4a f-ke fs /T ..e +E) f 1 3 /3rz�-20,L2 iz
Location of Existing Utilities 12/20/2012
�J-�-A�
33
33 11 0
33�=
1+ ,l Gaskets 13/3n/3n13
�@rl, I�TUt�,ni'ia�-�r�acc�a rLrLvrzozz
Deetile T,.e Pipe- 131 /n i
D,.etil. T,.,,r Fitti nn/� ^�T
33 11 12
�2.-3 11 12
gs
Polyvinyl Chloride (PVC) Pressure Pipe 09/09,L2022
Cenc�etePr- Wrapped, Steel r„l;..def Type 13/30,/3012
✓� 11 11
Btffied Stool Pipe a -a Fitt ng- 13/3
i? 12 11
33�no
Large rge Wa4er- Metefs 1 31 /3 z
U,.sili
S,.y.7>xr
33�
iit C4e [mate Valve 05/0�
A �x�-r-. ALA-Ru bea4ea Bi4te .fl„ Valves nn /23,L2019
33 1225
Genneetian *.o E,,,. ;ag W er- N47 :,.� 03 /n 3
�0
3�no
C� 1�/lYYlit;,,,. A;,- �7..1„0 �00(�ii�l,`VI.o� fe f Potable Ala4ef Syst,,,�.� 12/'fr�-20,i012
v n 1 /n
33 1250
33�0
3331 2
�Fi:7fe 14ydfa*ts � T
vi-m � Ecirf*% a sta4ieffs1 2llrt 20,L 012
Sta-,.da-.] Blow off Valve Assembly n6llvvrririvi3
Gtir-ed i Dlaee Pipe 122z
22�3
373 31 is
33�0
(CIPP4
!`_«..
i1✓7ibef:.�1iiass Ref r-ee 1 Pipe f .. ,,:ty Sa ff imzy Q,.,�-_• 12/�-20,Q012
'�3 Dm.-7j, Pely,,t1.,,1,ffe (14PPE) Pi,�.,, F,, SD-I1C,
tWj,�ef 04/23,L2019
nn/n i
r_.-ayit., C`.,.• ita-y Sewer
Polyvinyl C le-ide
33 31 71
(PVC)
C+Pipe �+,,����,.
ga.Aitary—SG"c'v`ef 13/30/3013
7TJTZT
�z
Ripe
334z
33�3
Sa-nita-Fye --y Flits lining 12/20,L2012
1 3 /3
S,.wef Pipe L',ila
S..,..ita
f,, f..,.me
Sanitary Sewer- Sefyiee r iffe 04/36/3013
33 31 70
Coml';ffiation kif V.,We f6 f S ritaf Sewer- Fo -ee Mains 12/20,L2012
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised October 6, 2023
00 00 00
TABLE OF CONTENTS
Page 7 of 8
333930 F4barglwc,�'Neles ,2/� ^�z
33 39 40 xx astewa4e . n eeess C>7a ffi of (WAG) , 2i� ^�z
333960 r ; o s & Sanitafy eonni�24-
LYE D4%Ll'7�' Polyethylene (14PPE) Pipe fef: 01�43 Drain. ,z
31-3 11 13
33 4601 Slet4ed S orm D7d-Y3 n�in�14-
33-46 02 Tfamk Dpc i,m 07/01,L2011
33-49-49 CG\-,t r Ilka:.e ilar. JOT2S ,z
334929 C..,.t, and Drop inlets 03/1�i
3�-49 40 SokGr 11 Dmittnage u,.,.,1..,,.11s and xx iffg .,,,ll., n7in�. 1�11
Division 34 - Transportation
34 41 10.01 Ai7ry.v�g i !, Afellor !.bi a r12/19rL201 5
34 nevi ('`o fft..ellef S,.eei fieatie 02420Q
311 11 11 To.v.....,-afy T-..FF;,. Signals ,WIL200
34 �o • lllurriffyY.4eo12/20,L2012�
34 4120.01 r r 06i1c901
�yr z'1Y`✓.Y>a' . �� � .I:i'l3' �.lal"IPtY.7'73S ovrr�rzoz4
34 .� ����Inc�-,rvs ,L201-5
34 4120.03 r /, c
l�es-iarltia r � ' .�,��irl�r2s n6 ,L201-c
34 41 30 Aluminum Signs 11/12/2013
3471 13 Traffic Control 03/22/2021
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised October 6, 2023
00 00 00
TABLE OF CONTENTS
Appendix
Page 8 of 8
GG-4.01
Avc0c,,N.lity e f
GG 4.02
gki-ja
FE-40.6
H%z,...aous Eiiyi., offi eft l Ge ffd ties . 4 Site
GC-6.06.D
Minority and Women Owned Business Enterprise Compliance
C-6.07
Wage Rates
�G--vv
C]'G
lkzrmlts and T T4;14ie
GG 6.24
1`T sai >K�rcratioa
END OF SECTION
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised October 6, 2023
0011 13
INVITATION TO BIDDERS
Page 1 of 2
SECTION 00 1113
INVITATION TO BIDDERS
RECEIPT OF BIDS
Sealed bids for the construction of 2024 Sidewalk Improvements Unit Price Construction
Contract ("Project") will be received by the City of Fort Worth Purchasing Office until 1:30 P.M.
CST, Thursday, December 21, 2023 as further described below:
City of Fort Worth
Purchasing Division
200 Texas Street
Fort Worth, Texas 76102
Bids will be accepted by: US Mail, Courier, FedEx or hand delivery at the address above;
Bids will be opened publicly and read aloud at 2:00 PM CST in the City Council Chambers.
GENERAL DESCRIPTION OF WORK
The major work will consist of the (approximate) following: sidewalks, curb ramps, driveways,
signing, and pavement markings. The purpose of this invitation to bidders is to set unit prices and
the City's contract budget may be less than the bid amounts, therefore, the City is not obligated to
award a contract for the full bid amount.
DOCUMENT EXAMINATION AND PROCUREMENTS
The Bidding and Contract Documents may be examined or obtained on-line by visiting the City
of Fort Worth's Purchasing Division website at httD://wWW.fortworthtexas.L-ov/Durchasins_/ and
clicking on the link to the advertised project folders on the City's electronic document
management and collaboration system site. The Contract Documents may be downloaded,
viewed, and printed by interested contractors and/or suppliers.
EXPRESSION OF INTEREST
To ensure potential bidders are kept up to date of any new information pertinent to this project, all
interested parties are requested to email Expressions of Interest in this procurement to the City
Project Manager and the Design Engineer. The email should include the company's name,
contact person and that individual's email address and phone number. All Addenda will be
distributed directly to those who have expressed an interest in the procurement and will also be
posted in the City of Fort Worth's purchasing website at http://fortworthtexas.gov/purchasing/
PREBID CONFERENCE — Web Conference
A prebid conference will be held as discussed in Section 00 21 13 - INSTRUCTIONS TO
BIDDERS at the following date, and time via a web conferencing application:
DATE: December 12, 2023
TIME: 9:00 AM, CST
Invitations with links to the web conferencing application will be distributed directly to those
who have submitted an Expression of Interest.
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers
Revised 7/19/2021
0011 13
INVITATION TO BIDDERS
Page 2 of 2
The presentation and any questions and answers provided at the prebid conference will be issued
as an Addendum to the call for bids. Prospective bidders can e-mail questions or comments in
accordance with Section 6 of the Instructions to Bidders referenced above to the project
manager(s) at the e-mail addresses listed below. Emailed questions will suffice as "questions in
writing." If necessary, Addenda will be issued pursuant to the Instructions to Bidders.
CITY'S RIGHT TO ACCEPT OR REJECT BIDS
City reserves the right to waive irregularities and to accept or reject any or all bids.
AWARD
City may award contracts to more than one qualified bidder, lowest to highest, but is not required
to award to any bidders.
RENEWALS
This Contract may be renewed up to one (1) additional term at the earlier of the expiration of
contract funds or contract time under the same terms, conditions, and unit prices.
FUNDING
Any Contract(s) awarded under this INVITATION TO BIDDERS are expected to be funded from
revenues generated from bonds and reserved by the City for the Project.
INQUIRIES
All inquiries relative to this procurement should be addressed to the following:
Attn: Shweta Rao, P.E., PMP, City of Fort Worth
Email: Shweta.Rao(&fortworthtexas.e_ ov
Phone: 817-392-8022
AND/OR
Attn: Scott R. Arnold, P.E., Kimley-Horn and Associates, Inc.
Email: Scott.Arnold(Aimlev_ -horn.com
Phone: 817-335-6511
ADVERTISEMENT DATES
November 30, 2023
December 7, 2023
END OF SECTION
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers
Revised 7/19/2021
00 42 43
BD)PROPOSAL
Pegs I f3
SECTION 00 42 43
PROPOSALFORM
UNIT PRICE BID
PROJECT ITEM INFORMATION
BIDDER'S APPLICATION
BIDDER'S PROPOSAL
BID I I Quantity
Unit of
IT Description Specification Section No. Measure Range/Est. Bid Quantity Unit Price Bid Value
1
0135.0101 Railroad Coordination
01 35 13
LS
1
1 $ -
$ -
2
0135.0102 Railroad Flagmen
01 3513
WD
15
1 $ -
$ -
3
0171.0101 Construction Staking
�0171.0102
01 71 23
LS
1
1 $ -
$ -
4
As -Built Survey
01 71 23
LS
1
1 $ -
S -
BASE BID -UNIT 1 -General
Requirements
$ -
UNIT 2 - Existing Conditions
1-100
1 $ -
$ -
5
0241.0100 Remove Sidewalk
024113
SF
101-500
1 $ -
$ -
501+
1 $ -
$ -
6
0241.0300 Remove ADA Ramp
024113
EA
25
1 $ -
$ -
7
0241.0301 Remove Detectable Warning Surface
0241 13
EA
10
1 $ -
$ -
1-100
1 $ -
$ -
8
0241.0401 Remove Concrete Drive
0241 13
SF
101-500
1 $ -
$ -
501+
1 $ -
$ -
9
0241.0402 Remove Asphalt Drive
024113
SF
100
1 $ -
$ -
1-100
1 $ -
$ -
10
0241.0403 Remove Brick Drive
0241 13
SF
101-400
1 $ -
$ -
401+
1 $ -
$ -
1-50
1 $ -
$ -
11
0241.0500 Remove Fence
0241 13
LF
51-100
1 $ -
$ -
101+
1 $ -
$ -
1-10
1 $ -
$ -
12
0241.0600 Remove Wall <4'
0241 13
LF
11-30
1 $ -
$ -
31+
1 $
$
13
0241.0700 Remove Mailbox
0241 13
EA
10
1 $ -
$ -
14
0241.0701 Remove Multiple User Mailbox
0241 13
EA
10
1 $ -
$ -
15
0241.0702 Relocate Mailbox - Traditional
0241 13
EA
10
1 $ -
$ -
16
0241.0703 Relocate Mailbox - Brick
0241 13
EA
10
1 $ -
$ -
17
0241.0704 Remove and Replace Mailbox - Traditional
0241 13
EA
10
1 $ -
$ -
18
0241.0705 Remove and Replace Mailbox - Brick
0241 13
EA
10
1 $ -
$ -
1-100
1 $ -
$ -
19
0241.1300 Remove Conc Curb&Gutter
0241 15
LF
101-500
1 $ -
$ -
501+
1 $ -
$ -
20
0241.1507 3" Surface Milling
0241 15
SY
100
1 $ -
$ -
BASE BID - UNIT 2 - Existing
Conditions
$ -
UNIT 3 - Earthwork
21
3110.0102 6"-12" Tree Removal
31 1000
EA
10
1 $
�
- $ -
22
3110.0103 12"-18" Tree Removal
31 1000
EA
10
1 $
- $ -
23
3110.0104 18"-24" Tree Removal
31 1000
EA
10
1 $
- $ -
24
3110.0105 24" and Larger Tree Removal
31 1000
EA
10
1 $
- $ -
25
3123.0101 Unclassified Excavation by Plan
31 2316
CY
150
1 $
- $ -
26
3123.0103 Borrow by Plan
31 2323
CY
150
1 $
- $ -
27
3124.0101 Embankment by Plan
31 2400
CY
150
1 $
- $ -
28
3125.0101 SWPPP 21 acre
31 2500
LS
5
1 $
- $ -
29
3137.0101 Concrete Riprap
31 3700
SY
250
1 $
- $ -
BASE BID - UNIT 3 - Earthwork $ -
UNIT 4 - Exterior Improvements
30
3212.0401 HMAC Transition
32 12 16
TN
60
1 $
- $ -
31
3212.0504 7" Asphalt Base Type B
32 12 16
SY
100
1 $
- $ -
1-2500
1 $
- $ -
32
3213.0301 4" Conc Sidewalk
32 13 20
SF
2.1-5000
1 $
- $ -
5001+
1 $
- $ -
33
3213.0302 5" Conc Sidewalk
32 13 20
SF
1000
1 $
- $ -
34
3213.0303 6" Conc Sidewalk
32 13 20
SF
1000
1 $
- $ -
1-2500
1 $
- $ -
35
3213.0311 4" Conc Sidewalk, Adjacent to Curb
32 13 20
SF
2501-5000
1 $
- $ -
5001+
1 $
- $ -
36
3213.0312 5" Conc Sidewalk, Adjacent to Curb
32 13 20
SF
1000
1 $
- $ -
37
3213.0313 6" Conc Sidewalk, Adjacent to Curb
32 13 20
SF
1000
1 $
- $ -
38
3213.0321 Conc Sidewalk, Adjacent to Ret Wall
32 13 20
SF
1000
1 $
- $ -
39
3213.0322 Conc Curb at Back of Sidewalk
32 1320
LF
200
1 $
- $ -
40
3213.0400 5" Concrete Driveway
32 13 20
SF
500
1 $
- $ -
41
3213.0401 6" Concrete Driveway
32 13 20
SF
500
1 $
- $ -
42
3213.0501 Barrier Free Ramp, Type R-1
32 13 20
EA
20
1 $
- $ -
43
3213.0502 Barrier Free Ramp, Type U-1
32 13 20
EA
20
1 $
- $ -
44
3213.0503 Barrier Free Ramp, Type M-1
32 13 20
EA
20
1 $
- $ -
45
3213.0504 Barrier Free Ramp, Type M-2
32 13 20
EA
20
1 $
- $ -
46
3213.0505 Barrier Free Ramp, Type M-3
32 13 20
EA
20
1 $
- $ -
47
3213.0506 Barrier Free Ramp, Type P-1
32 13 20
EA
20
1 $
- $ -
48
3213.0507 Barrier Free Ramp, Type P-2
32 13 20
EA
20
1 $
- $ -
CITY OF FORT WORTH
SrAND(iRD CONSTRUCTION SPPCBIC-ON DOCUM2 2024 Sidewalk Impmvcnunis Uml=ConA t-COnI[8d
Revved 9l3012021 Venous QtyP erect Numlure
00 42 43
Bm PROPOSAL
Pe 2 o0
SECTION 00 42 43
PROPOSALFORM
UNIT PRICE BID
PROJECT ITEM INFORMATION
BID
ITEM Description
NO.
49 3213.0508 Barrier Free Ramp, Type C-1
50 3213.0509 Barrier Free Ramp, Type C-2
51 3213.0510 Barrier Free Ramp, Type C-3
52 3216.0101 6" Cone Curb and Gutter
53 3216.0102 7" Cone Curb and Gutter
54 3216.0102 Cone Laydown Curb
54 3216.0301 7" Conc Valley Gutter, Residential
55 3216.0302 11" Cone Valley Gutter, Arterial/Industrial
56 3217.0501 24" SLID Pvmt Marking HAE (W )
57 3217.0502 Preformed Thermoplastic Contrast Markings - 24" Crosswalk
58 3217.0503 Preformed Thermoplastic Contrast Marking - 24" SLID
59 3217.0504 Preformed Thermoplastic Contrast Markings - 24" Stop Bars
60 3217.4306 Remove 24" Pvmt Marking
61 3231.0111 4' Chain Link, Steel
62 3231.0112 5' Chain Link, Steel
63 3231.0113 6' Chain Link, Steel
64 3231.0131 4' Wrought Iron Fence
65 3231.0132 5' Wrought Iron Fence
66 3231.0133 6' Wrought Iron Fence
67 3231.0141 4' Steel Tube Fence
68 3231.0142 5' Steel Tube Fence
69 3231.0143 6' Steel Tube Fence
70 3231.0301 4' Gate, Steel
71 3231.0302 6' Gate, Steel
72 3231.0303 8' Gate, Steel
73 3231.0304 10' Gate, Steel
74 3231.0305 12' Gate, Steel
75 3231.0306 16' Gate, Steel
76 3231.0307 20' Gate, Steel
77 3231.0411 4' Fences, Wood
78 3231.0412 6' Fences, Wood
79 3231.0413 8' Fences, Wood
80 3232.0100 Cone Rat Wall Adjacent to Sidewalk
81 3291.0100 Topsoil
82 3292.0100 Block Sod Placement
BIDDER'F APPLICATION
BIDDER'S PROPOSAL
Unit of
Quantity
Specification Section No.
Range/Est.
Bid Quantity Unit Price
Bid Value
Measure
Quantity
32 13 20
EA
20
1 $ -
$
32 13 20
EA
2C
1 $ -
$
32 13 20
EA
20
1 $ -
$
1-50C
1 $ -
$
321613
LF
501+
1 $
$
1-50C
1 $ -
$
321613
LF
501+
1 $
$
321613
LF
10C
1 $ -
$
321613
SY
50
1 $ -
$ -
321613
SY
5C
1 $ -
$
32 17 23
LF
50C
1 $ -
$ -
32 1723
LF
50C
1 $ -
$
32 17 23
LF
50C
1 $ -
$
32 17 23
LF
500
1 $ -
$
32 17 23
LF
2000
1 $ -
$
3231 13
LF
200
1 $ -
$
3231 13
LF
20C
1 $ -
$
3231 13
LF
20C
1 $ -
$
3231 13
LF
20C
1 $ -
$
3231 13
LF
200
1 $ -
$
3231 13
LF
20C
1 $ -
$
3231 13
LF
20C
1 $ -
$
3231 13
LF
20C
1 $ -
$
3231 13
LF
20C
1 $ -
$
3231 26
EA
10
1 $ -
$
323126
EA
1C
1 $ -
$
3231 26
EA
10
1 $ -
$ -
323126
EA
1C
1 $ -
$
3231 26
EA
10
1 $ -
$ -
323126
EA
1C
1 $ -
$
3231 26
EA
10
1 $ -
$
3231 29
LF
20C
1 $ -
$
3231 29
LF
20C
1 $ -
$
3231 29
LF
20C
1 $ -
$
32 32 13
SF
20C
1 $ -
$
3291 19
CY
100
1 $ -
$
1-100C
1 $ -
$
32 92 13
SY
1001-2000
1 $ -
$ -
2001+
1 $ -
$
BASE BID -UNIT
4- Exterior Improvements $
5 - Utilities
83
3305.0103 Exploratory Excavation of Existing Utilities
33 05 30
EA
1 50
1 $
$
51+
1 $ -
$
84
3305.0105 Inlet Adjustment
330514
EA
10
1 $ -
$ -
85
3305.0106 Manhole Adjustment, Major
33 05 14
EA
10
1 $ -
$ -
86
3305.0107 Manhole Adjustment, Minor
33 05 14
EA
10
1 $ -
$ -
87
3305.0108 Miscellaneous Structure Adjustment
33 05 14
EA
10
1 $ -
$ -
88
3305.0111 Valve Box Adjustment
33 05 14
EA
10
1 $ -
$ -
89
3305.0114 Manhole Adjustment, Major w/ Cover
33 05 14
EA
10
1 $ -
$ -
BASE BID - UNIT 5 - Utilities
$ -
UNIT 6 -Transportation
90
3441.4002 Furnish/Install Alum Sign Ground Mount TxDOT Std.
3441 30
EA
25
1 $ -
$ -
91
3441.4003 Furnish/Install Alum Sign Ground Mount City Std.
3441 30
EA
25
1 $ -
$ -
92
3441.4004 Furnish/Install Alum Sign Ex. Pole Mount
3441 30
EA
25
1 $ -
$ -
93
3441.4006 Install Alum Sign Ground Mount
3441 30
EA
25
1 $ -
$ -
94
3441.4007 Install Alum Sign Ex Pole Mount
3441 30
EA
25
1 $ -
$ -
95
3441.4108 Remove Sign Panel and Post
3441 30
EA
25
1 $ -
$ -
96
3441.4109 Remove Sign Panel
3441 30
EA
25
1 $ -
$ -
97
3441.4110 Remove and Reinstall Sign Panel and Post
3441 30
EA
25
1 $ -
$ -
98
3471.0001 Traffic Control
3471 13
MO
1C
1 $ -
$ -
99
3471.0002 Portable Message Sign
3471 13
W K
5C_
1 $ -
$ -
BASE
BID - UNIT 6 -Transportation
$ -
UNIT 7 - Nonstandard Items
100
9999.0001 Site Clearing
31 10 00
SY
500
1 $
- $
-
101
9999.0002 1"-2" Water Meter Box Replacement (Cone)
33 12 10
EA
5
1 $
- $
-
102
9999.0003 1"-2" Water Meter Box Replacement (Plastic)
33 12 10
EA
5
1 $
- $
-
103
9999.0004 Irrigation Repair Allowance 1
00 00 00
LS
1
1 $
2,500.00 $
2,500.001
104
9999.0005 Irrigation Repair Allowance 2
00 00 00
LS
1
1 $
5,000.00 $
5,000.00 1
105
9999.0006 Landscaping Repair Allowance 1
00 00 00
LS
1
1 $
2,500.00 $
2,500.001
106
9999.0007 Landscaping Repair Allowance 2
00 00 00
LS
1
1 $
5,000.00 $
5,000.00 1
FFY OF FORT WORTH
STANDARD CONSTRUCTION SFECTICATION DOCUMENTS 2024 Sidewalk Improvements Umt Pn Conatroc Con-
R2nud 9I30R021 Venous Ctty Ptolett Numbers
00 42 43
mOPROPOSAL
Pe 3d3
SECTION 00 42 43
PROPOSALFORM
UNIT PRICE BID
BIDDER'F APPLICATION
PROJECT ITEM INFORMATION
BIDDER'S PROPOSAL
BID
Unit of
Quantity
ITEM
Description
Specification Section No.
Measure
Range/Est.
Bid Quantity
Unit Price Bid Value
NO.
Quantity
107
9999.0008 Detectable Warning Surface
00 00 00
SF
100
1 $
$
108
9999.0009 Relocate Guy Wire
00 00 00
EA
1C
1 $
$
109
9999.0010 Temporary Construction Fence
00 00 00
LF
200
1 $
$
110
9999.0011 Lane Legend RR (Sidewalk)
00 00 00
EA
5
1 $
$
111
9999.0068 Tree Protection
99 99 99
EA
50
1 $
$
BASE BID - UNIT 7 - Non -Standard Items $ 15,000.00
UNIT 8 -
TxDOT Items
112
0450 6048 RAIL (HANDRAIL)(TY B)
TxDOT Spec 450
LF
100
1 $
- $ -
113
0450 6052 RAIL (HANDRAIL)(TY F)
TxDOT Spec 450
LF
10C
1 $
$ -
114
0506 6038 TEMP SEDMT CONT FENCE (INSTALL)
TxDOT Spec 506
LF
20C
1 $
$
115
0506 6039 TEMP SEDMT CONT FENCE (REMOVE)
TxDOT Spec 506
LF
20C
1 $
$
116
0506 6041 BIODEG EROSN CONT LOGS (INSTL) (12")
TxDOT Spec 506
LF
5C
1 $
$
117
0506 6043 BIODEG EROSN CONT LOGS (REMOVE)
TxDOT Spec 506
LF
5C
1 $
$
118
0529 6002 CONC CURB (TY II)
TxDOT Spec 529
LF
100
1 $
$
119
0529 6007 CONC CURB & GUTTER (TY 1)
TxDOT Spec 529
LF
10C
1 $
$
120
0529 6008 CONC CURB & GUTTER (TY II)
TxDOT Spec 529
LF
100
1 $
$
121
0530 6004 DRIVEWAYS (CONIC)
TxDOT Spec 530
SY
50C
1 $
$
122
0530 6005 DRIVEWAYS (ACP)
TxDOT Spec 530
SY
500
1 $
$
123
0531 6001 CONC SIDEWALKS (4")
TxDOT Spec 531
SY
300
1 $
$
124
0531 6003 CONC SIDEWALKS (6")
TxDOT Spec 531
SY
30C
1 $
$
125
0531 6004 CURB RAMPS (TY 1)
TxDOT Spec 531
EA
1C
1 $
$
126
0531 6005 CURB RAMPS (TY 2)
TxDOT Spec 531
EA
1C
1 $
$
127
0531 6006 CURB RAMPS (TY 3)
TxDOT Spec 531
EA
1C
1 $
$
128
0531 6007 CURB RAMPS (TY 4)
TxDOT Spec 531
EA
1C
1 $
$
129
0531 6008 CURB RAMPS (TY 5)
TxDOT Spec 531
EA
10
1 $
$
130
0531 6009 CURB RAMPS (TY 6)
TxDOT Spec 531
EA
1C
1 $
$
131
0531 6010 CURB RAMPS (TY 7)
TxDOT Spec 531
EA
10
1 $
$
132
0531 6011 CURB RAMPS (TY 8)
TxDOT Spec 531
EA
1C
1 $
$
133
0531 6012 CURB RAMPS (TY 9)
TxDOT Spec 531
EA
10
1 $
$
134
0531 6013 CURB RAMPS (TY 10)
TxDOT Spec 531
EA
1C
1 $
$
135
0531 6014 CURB RAMPS (TY 11)
TxDOT Spec 531
EA
1C
1 $
$
136
0531 6015 CURB RAMPS (TY 20)
TxDOT Spec 531
EA
1C
1 $
$
137
0531 6016 CURB RAMPS (TY 21)
TxDOT Spec 531
EA
1C
1 $
$
138
0531 6017 CURB RAMPS (TY 22)
TxDOT Spec 531
EA
1C
1 $
$
139
0531 6032 CONIC SIDEWALKS (SPECIAL) (TYPE A)
TxDOT Spec 531
SY
20C
1 $
- $ -
140
531 6033 CONC SIDEWALKS (SPECIAL) (TYPE B)
TxDOT Spec 531
SY
20C
1 $
$
141
531 6057 CONIC SIDEWALK (SPECIAL)(RETAINING WALL
TxDOT Spec 531
SF
20C
1 $
- $ -
142
0644 6001 IN SM RD SIN SUP&AM TYI OBWG(I)SA(P)
TxDOT Item 644
EA
20
1 $
$
143
0644 6004 IN SM RD SIN SUP&AM TY1 OBWG(1)SA(T)
TxDOT Item 644
EA
2C
1 $
- $ -
144
0644 6007 IN SM RD SN SUP&AM TYIOBWG(1)SA(U)
TxDOT Item 644
EA
20
1 $
$
BASE BID - UNIT 8 -
TxDOT Items $ -
BASE BID SUMMARY
UNIT
TOTAL BASE BID
BASE BID - UNIT 1 - General Requirements
$ -
(BASE BID - UNIT 2 - Existing Conditions
$ -
BASE BID - UNIT 3 - Earthwork
$ -
BASEBID - UNIT 4- Exterior Improvements
$ -
BASE BID - UNIT 5 - Utilities
$ -
IBASEBID- UNIT 6-Transportation
$ -
BASE BID - UNIT 7 - Non -Standard Items
$ 15,000.00
BASE BID - UNIT 8 - TxDOT Items
$ -
ITOTAL BASE BID
$ 15,000.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SFECTICATION DOCUMENTS 2024 S,&e k Improvements Umt Pn Conatroc Con—
Renud9I30R021 Venous Ctty Pto Numbers
00 52 43 - 1
Agreement
Pagel of 6
SECTION 00 52 43
AGREEMENT
THIS AGREEMENT, authorized on , is made by and between the City of Fort
Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager,
("City"), and ,
authorized to do business in Texas, acting by and through its duly authorized representative,
("Contractor"). City and Contractor may jointly be referred to as Parties.
City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows:
Article 1. WORK
Contractor shall complete all Work as specified or indicated in the Contract Documents for the
Project identified herein.
Article 2. PROJECT
The project for which the Work under the Contract Documents may be the whole or only a part is
generally described as follows:
2024 Sidewalk Improvements Unit Price Construction Contract
Various City Project Numbers
Article 3. CONTRACT PRICE
City agrees to pay Contractor for performance of the Work in accordance with the Contract
Documents an amount, in current funds, of Dollars
($ ). Contract price may be adjusted by change orders duly authorized by
the Parties.
Article 4. CONTRACT TIME
4.1 Final Acceptance.
The Work shall be complete for Final Acceptance within the number of days specified in
each Task Order, plus any extension thereof allowed in accordance with Article 12 of the
General Conditions.
4.2 Liquidated Damages
Contractor recognizes that time is of the essence for completion of Milestones, if any, and to
achieve Final Acceptance of the Work and City and the public will suffer from loss of use if
the Work is not completed within the time(s) specified in Paragraph 4.1 above. The
Contractor also recognizes the delays, expense and difficulties involved in proving in a legal
proceeding, the actual loss suffered by the City if the Work is not completed on time.
Accordingly, instead of requiring any such proof, Contractor agrees that as liquidated
damages for delay (but not as a penalty), Contractor shall pay City Five Hundred and 00/100
Dollars ($500.00) for each day that expires after the time specified in Paragraph 4.1 for Final
Acceptance until the City issues the Final Letter of Acceptance.
4.3. Renewals
This Contract may be renewed up to one (1) additional term at the earlier of the expiration of
contract funds or contract time under the same terms, conditions, and unit prices.
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised October 6, 2023
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
00 52 43 - 2
Agreement
Page 2 of 6
Article 5. CONTRACT DOCUMENTS
5.1 CONTENTS:
A.The Contract Documents which comprise the entire agreement between City and
Contractor concerning the Work consist of the following:
1. This Agreement.
2. Attachments to this Agreement:
a. Bid Form
1) Proposal Form
2) Vendor Compliance to State Law Non -Resident Bidder
3) Prequalification Statement
b. Current Prevailing Wage Rate Table
c. Insurance Certification Form (ACORD or equivalent)
d. Payment Bond
e. Performance Bond
f. Maintenance Bond
g. Power of Attorney for the Bonds
h. Worker's Compensation Affidavit
i. MBE and/or SBE Utilization Form
General Conditions.
4. Supplementary Conditions.
5. Specifications specifically made a part of the Contract Documents by attachment or,
if not attached, as incorporated by reference and described in the Table of Contents
of the Project's Contract Documents.
6. Drawings.
7. Addenda.
8. Documentation submitted by Contractor prior to Notice of Award.
9. The following which may be delivered or issued after the Effective Date of the
Agreement and, if issued, become an incorporated part of the Contract Documents:
a. Notice to Proceed.
b. Field Orders.
c. Change Orders.
d. Letter of Final Acceptance.
Article 6. INDEMNIFICATION
6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
expense, the city, its officers, servants and employees, from and against any and all
claims arising out of, or alleged to arise out of, the work and services to be performed
by the contractor, its officers, agents, employees, subcontractors, licenses or invitees
under this contract. This indemnification provision is snecificallv intended to overate
and be effective even if it is alleged or proven that all or some of the damages being
sought were caused, in whole or in part, by anv act, omission or negligence of the citv.
This indemnity provision is intended to include, without limitation, indemnity for costs,
expenses and legal fees incurred by the city in defending against such claims and causes
of actions.
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised October 6, 2023
005243-3
Agreement
Page 3 of 6
6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense,
the city, its officers, servants and employees, from and against any and all loss, damage
or destruction of property of the city, arising out of, or alleged to arise out of, the work
and services to be performed by the contractor, its officers, agents, employees,
subcontractors, licensees or invitees under this contract. This indemnification Drovision
is svecifically intended to overate and be effective even if it is alleged or Droven that all
or some of the damages being sought were caused, in whole or in Dart. by anv act.
omission or negligence of the citv.
Article 7. MISCELLANEOUS
7.1 Terms.
Terms used in this Agreement which are defined in Article 1 of the General Conditions will
have the meanings indicated in the General Conditions.
7.2 Assignment of Contract.
This Agreement, including all of the Contract Documents may not be assigned by the
Contractor without the advanced express written consent of the City.
7.3 Successors and Assigns.
City and Contractor each binds itself, its partners, successors, assigns and legal
representatives to the other party hereto, in respect to all covenants, agreements and
obligations contained in the Contract Documents.
7.4 Severability/Non-Waiver of Claims.
Any provision or part of the Contract Documents held to be unconstitutional, void or
unenforceable by a court of competent jurisdiction shall be deemed stricken, and all
remaining provisions shall continue to be valid and binding upon City and Contractor.
The failure of City or Contractor to insist upon the performance of any term or provision of
this Agreement or to exercise any right granted herein shall not constitute a waiver of City's
or Contractor's respective right to insist upon appropriate performance or to assert any such
right on any future occasion.
7.5 Governing Law and Venue.
This Agreement, including all of the Contract Documents is performable in the State of
Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the
Northern District of Texas, Fort Worth Division.
7.6 Authority to Sign.
Contractor shall attach evidence of authority to sign Agreement if signed by someone other
than the duly authorized signatory of the Contractor.
7.7 Non -appropriation of Funds.
In the event no funds or insufficient funds are appropriated by City in any fiscal period for
any payments due hereunder, City will notify Vendor of such occurrence and this Agreement
shall terminate on the last day of the fiscal period for which appropriations were received
without penalty or expense to City of any kind whatsoever, except as to the portions of the
payments herein agreed upon for which funds have been appropriated.
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised October 6, 2023
00 52 43 - 4
Agreement
Page 4 of 6
7.8 Prohibition On Contracts With Companies Boycotting Israel.
Contractor, unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of
the Texas Government Code, if Contractor has 10 or more full time -employees and the
contract value is $100,000 or more, the City is prohibited from entering into a contract with
a company for goods or services unless the contract contains a written verification from the
company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of
the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to
those terms in Section 808.001 of the Texas Government Code. By signing this contract,
Contractor certifies that Contractor's signature provides written verification to the
City that if Chapter 2271, Texas Government Code applies, Contractor: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract.
7.9 Prohibition on Boycotting Energy Companies.
Contractor acknowledges that in accordance with Chapter 2274 of the Texas Government
Code -(as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2), the City is prohibited from
entering into a contract for goods or services that has a value of $100,000 or more, which
will be paid wholly or partly from public funds of the City, with a company (with 10 or more
full-time employees) unless the contract contains a written verification from the company
that it: (1) does not boycott energy companies; and (2) will not boycott energy companies
during the term of the contract. The terms "boycott energy company" and "company" have
the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as
added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter 2274 of the
Government Code is applicable to this Agreement, by signing this Agreement,
Contractor certifies that Contractor's signature provides written verification to the
City that Contractor: (1) does not boycott energy companies; and (2) will not boycott
energy companies during the term of this Agreement.
7.10 Prohibition on Discrimination Against Firearm and Ammunition Industries.
Contractor acknowledges that except as otherwise provided by Chapter 2274 of the Texas
Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1), the City is
prohibited from entering into a contract for goods or services that has a value of $100,000 or
more which will be paid wholly or partly from public funds of the City, with a company (with
10 or more full-time employees) unless the contract contains a written verification from the
company that it: (1) does not have a practice, policy, guidance, or directive that discriminates
against a firearm entity or firearm trade association; and (2) will not discriminate during the
term of the contract against a firearm entity or firearm trade association. The terms
"discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed
to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th
Leg., R.S., S.B. 19, § 1). To the extent that Chapter 2274 of the Government Code is
applicable to this Agreement, by signing this Agreement, Contractor certifies that
Contractor's signature provides written verification to the City that Contractor: (1)
does not have a practice, policy, guidance, or directive that discriminates against a
firearm entity or firearm trade association; and (2) will not discriminate against a
firearm entity or firearm trade association during the term of this Agreement.
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised October 6, 2023
005243-5
Agreement
Page 5 of 6
7.11 Immigration Nationality Act.
Contractor shall verify the identity and employment eligibility of its employees who perform
work under this Agreement, including completing the Employment Eligibility Verification
Form (I-9). Upon request by City, Contractor shall provide City with copies of all 1-9 forms
and supporting eligibility documentation for each employee who performs work under this
Agreement. Contractor shall adhere to all Federal and State laws as well as establish
appropriate procedures and controls so that no services will be performed by any Contractor
employee who is not legally eligible to perform such services. CONTRACTOR SHALL
INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY
CONTRACTOR, CONTRACTOR'S EMPLOYEES, SUBCONTRACTORS,
AGENTS, OR LICENSEES. City, upon written notice to Contractor, shall have the right
to immediately terminate this Agreement for violations of this provision by Contractor.
7.12 No Third -Party Beneficiaries.
This Agreement gives no rights or benefits to anyone other than the City and the Contractor
and there are no third -party beneficiaries.
7.13 No Cause of Action Against Engineer.
Contractor, its subcontractors and equipment and materials suppliers on the PROJECT or their
sureties, shall maintain no direct action against the Engineer, its officers, employees, and
subcontractors, for any claim arising out of, in connection with, or resulting from the engineering
services performed. Only the City will be the beneficiary of any undertaking by the Engineer.
The presence or duties of the Engineer's personnel at a construction site, whether as on -site
representatives or otherwise, do not make the Engineer or its personnel in any way
responsible for those duties that belong to the City and/or the City's construction contractors
or other entities, and do not relieve the construction contractors or any other entity of their
obligations, duties, and responsibilities, including, but not limited to, all construction
methods, means, techniques, sequences, and procedures necessary for coordinating and
completing all portions of the construction work in accordance with the Contract Documents
and any health or safety precautions required by such construction work. The Engineer and
its personnel have no authority to exercise any control over any construction contractor or
other entity or their employees in connection with their work or any health or safety
precautions.
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised October 6, 2023
005243-6
Agreement
Page 6 of 6
IN WITNESS WHEREOF, City and Contractor have each executed this Agreement to be effective
as of the date subscribed by the City's designated Assistant City Manager ("Effective Date").
Contractor: City of Fort Worth
By: By:
Signature William M. Johnson
Assistant City Manager
(Printed Name)
Date
Title Attest:
Address Jannette Goodall, City Secretary
City/State/Zip (Seal)
M&C:
Date Date:
Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
Shweta Rao, P.E., PMP
Sr. Professional Engineer
Approved as to Form and Legality:
Douglas W. Black
Sr. Assistant City Attorney
APPROVAL RECOMMENDED:
Lauren L. Prieur, Director,
Transportation and Public Works Department
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised October 6, 2023
CITY OF FORT WORTH
Transportation and Public Works
2024 Sidewalk Improvements, Unit Price Contract
City Project No. n/a
ADDENDUM NO. # 1
- END OF SECTION -
2024 Sidewalk Improvements, Unit Price Contract
City Project No. n/a
ADDENDUM NO. # 1
0011 13
INVITATION TO BIDDERS
Pagel of 2
SECTION 00 11 13
INVITATION TO BIDDERS
RECEIPT OF BIDS
Sealed bids for the construction of 2024 Sidewalk Improvements Unit Price Construction
Contract ("Project") will be received by the City of Fort Worth Purchasing Office until 1:30 P.M.
CST, Thursday, December 21, 2023 as further described below:
City of Fort Worth
Purchasing Division
200 Texas Street
Fort Worth, Texas 76102
Bids will be accepted by: US Mail, Courier, FedEx or hand delivery at the address above;
Bids will be opened publicly and read aloud at 2:00 PM CST in the City Council Chambers.
GENERAL DESCRIPTION OF WORK
The major work will consist of the (approximate) following: sidewalks, curb ramps, driveways,
signing, and pavement markings. The purpose of this invitation to bidders is to set unit prices and
the City's contract budget may be less than the bid amounts, therefore, the City is not obligated to
award a contract for the full bid amount.
DOCUMENT EXAMINATION AND PROCUREMENTS
The Bidding and Contract Documents may be examined or obtained on-line by visiting the City
of Fort Worth's Purchasing Division website at httr)://www.fortworthtexas.L'ov/Durchasine_/ and
clicking on the link to the advertised project folders on the City's electronic document
management and collaboration system site. The Contract Documents may be downloaded,
viewed, and printed by interested contractors and/or suppliers.
EXPRESSION OF INTEREST
To ensure potential bidders are kept up to date of any new information pertinent to this project, all
interested parties are requested to email Expressions of Interest in this procurement to the City
Project Manager and the Design Engineer. The email should include the company's name,
contact person and that individual's email address and phone number. All Addenda will be
distributed directly to those who have expressed an interest in the procurement and will also be
posted in the City of Fort Worth's purchasing website at http://fortworthtexas.gov/purchasing/
PREBID CONFERENCE — Web Conference
A prebid conference will be held as discussed in Section 00 21 13 - INSTRUCTIONS TO
BIDDERS at the following date, and time via a web conferencing application:
DATE: December 12, 2023
TIME: 9:00 AM, CST
Invitations with links to the web conferencing application will be distributed directly to those
who have submitted an Expression of Interest.
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers
Revised 7/19/2021
0011 13
INVITATION TO BIDDERS
Page 2 of 2
The presentation and any questions and answers provided at the prebid conference will be issued
as an Addendum to the call for bids. Prospective bidders can e-mail questions or comments in
accordance with Section 6 of the Instructions to Bidders referenced above to the project
manager(s) at the e-mail addresses listed below. Emailed questions will suffice as "questions in
writing." If necessary, Addenda will be issued pursuant to the Instructions to Bidders.
CITY'S RIGHT TO ACCEPT OR REJECT BIDS
City reserves the right to waive irregularities and to accept or reject any or all bids.
AWARD
City may award contracts to more than one qualified bidder, lowest to highest, but is not required
to award to any bidders.
RENEWALS
This Contract may be renewed up to one (1) additional term at the earlier of the expiration of
contract funds or contract time under the same terms, conditions, and unit prices.
FUNDING
Any Contract(s) awarded under this INVITATION TO BIDDERS are expected to be funded from
revenues generated from bonds and reserved by the City for the Project.
INQUIRIES
All inquiries relative to this procurement should be addressed to the following:
Attn:Shw-e& Rw, �E., PN Fanta Kaba, P.E., PTOE Sk.
Email: c, wet RaoQf ,.�...,.Fthtexas e fanta.kaba(a fortworthtexas.sov
Phone: 4I 40" 817-682-3181
AND/OR
Attn: Scott R. Arnold, P.E., Kimley-Horn and Associates, Inc.
Email: Scott.Arnold(Aimlev_ -horn.com
Phone: 817-335-6511
ADVERTISEMENT DATES
November 30, 2023
December 7, 2023
END OF SECTION
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers
Revised 7/19/2021
0021 13
INSTRUCTIONS TO BIDDERS
SECTION 00 2113
INSTRUCTIONS TO BIDDERS
1. Defined Terms
Page 1 of 10
1.1. Capitalized terms used in these INSTRUCTIONS TO BIDDERS are defined in Section
00 72 00 - GENERAL CONDITIONS.
1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the
meanings indicated below which are applicable to both the singular and plural thereof.
1.2.1. Bidder: Any person, firm, partnership, company, association, or corporation acting
directly through a duly authorized representative, submitting a bid for performing
the work contemplated under the Contract Documents.
1.2.2. Nonresident Bidder: Any person, firm, partnership, company, association, or
corporation acting directly through a duly authorized representative, submitting a
bid for performing the work contemplated under the Contract Documents whose
principal place of business is not in the State of Texas.
1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City
(on the basis of City's evaluation as hereinafter provided) makes an award.
2. Copies of Bidding Documents
2.1. Neither City nor Engineer shall assume any responsibility for errors or misinterpretations
resulting from the Bidders use of incomplete sets of Bidding Documents.
2.2. City and Engineer in making copies of Bidding Documents available do so only for the
purpose of obtaining Bids for the Work and do not authorize or confer a license or grant
for any other use.
types rv"ir-ing pfequalifiea4ieii as per- 0 15 1! BIDDr4�6S
J 15 12 NMEQUALIFICATION STATEMP.-IT. Fro
`ion, muot stib .,it the ,t,,,.,,.,.,en4a4io idenfified i cee fi ,,. 00 n c 44
ealendar- days prior- to Bid opening for- r-e iew Lxtd, if qtialified, aeeepta-nee. The
worE types. Suocentfaetorz muct -.�-,Zlow tho aarne tifnelines as Bidders f t..tain r .
pir-.qualifte
-r.—.. �Wrt .
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 2 of 10
UIMMEIT'So/.24FO of -2nn A vTOig-07 20C=QNrru A C=T-O e igaf
0
,;2OC �st met ro;20-D ol1'1UntZ/Cent...,,.+,..oi2nn.o,,ual fiea4;,.nT--PW0,;20R..,dw
.,1i20,ad-0, 2nno,oc%xicLrio/`nriehtineO, 2OPfe,.,,.,,:ficati�,-,,4o/, o
0 o eTTE/.lf
Wa4er- rd E rrt/a\—y
4tr/j:/,bms f:,.....,,,..&e.Eas .,m,., ieet ese.H,.ees/Rese,,.eesPin2oi2n
Oi2OC Est,..,etier,0;2ODeoll'1Unt9/r ft,..,eter-oi2nn.o,,ual fieatien3'a4eA;2Oand,0i2
Oga,it,oi2nSewe.oi2OCeii•1,..ete.oi2nn.o,.,,,,:f:CctiZiO/.2gPr-oer-a.,' SSof2n),.o
opening,ealendar days prior- to Bid ,
I' -I .
3-.2.l.Fmbty:ia6air� 0
the City een4aet as pfe�A&d in R.rcgfaph 6. 1.
1li�Q�l1Mt
bidder- for- a pr-ejeetUi"llt `l:additiena4 infefma4ion as the City, in its sole
g �/aVr11\t !ti wt. ,
to assist the Qty in s7 ,,alw r.
deliver- . quality pr-e, uet and s essfully eemplete pfe4eets-for Vhsz, gaunt bid ..;,�
the Stipulated tiffie fiFaffie. Based upeo the ' c rfabl-f rttad
Qly-Cotxioil. P , may be gr-etmds
notified in wfifing of a one&
3.4. i addition t p o al fiea4ief addit;zinal ra"ir-oments f^,- .,l:f;,.ation may be required
3.5.OMITTED.
4. Examination of Bidding and Contract Documents, Other Related Data, and Site
4.1. Before submitting a Bid, each Bidder:
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 3 of 10
4.1.1. Shall examine and carefully study the Contract Documents and other related data
identified in the Bidding Documents (including "technical data" referred to in
Paragraph 4.2. below). No information given by City or any representative of the
City other than that contained in the Contract Documents and officially
promulgated addenda thereto, shall be binding upon the City.
4.1.2. Should visit the site to become familiar with and satisfy Bidder as to the general,
local and site conditions that may affect cost, progress, performance or furnishing
of the Work.
4.1.3. Shall consider federal, state and local Laws and Regulations that may affect cost,
progress, performance or furnishing of the Work.
4.1.4. OMITTED.
4.1.5. Shall study all: (i) reports of explorations and tests of subsurface conditions at or
contiguous to the Site and all drawings of physical conditions relating to existing
surface or subsurface structures at the Site (except Underground Facilities) that
have been identified in the Contract Documents as containing reliable "technical
data" and (ii) reports and drawings of Hazardous Environmental Conditions, if any,
at the Site that have been identified in the Contract Documents as containing
reliable "technical data."
4.1.6. Is advised that the Contract Documents on file with the City shall constitute all of
the information which the City will furnish. All additional information and data
which the City will supply after promulgation of the formal Contract Documents
shall be issued in the form of written addenda and shall become part of the Contract
Documents just as though such addenda were actually written into the original
Contract Documents. No information given by the City other than that contained in
the Contract Documents and officially promulgated addenda thereto, shall be
binding upon the City.
4.1.7. Should perform independent research, investigations, tests, borings, and such other
means as may be necessary to gain a complete knowledge of the conditions which
will be encountered during the construction of the project. For projects with
restricted access, upon request, City may provide each Bidder access to the site to
conduct such examinations, investigations, explorations, tests and studies as each
Bidder deems necessary for submission of a Bid. Bidder must fill all holes and
clean up and restore the site to its former conditions upon completion of such
explorations, investigations, tests and studies.
4.1.8. Shall determine the difficulties of the Work and all attending circumstances
affecting the cost of doing the Work, time required for its completion, and obtain all
information required to make a proposal. Bidders shall rely exclusively and solely
upon their own estimates, investigation, research, tests, explorations, and other data
which are necessary for full and complete information upon which the proposal is
to be based. It is understood that the submission of a proposal or bid is prima -facie
evidence that the Bidder has made the investigations, examinations and tests herein
required.
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 4 of 10
4.1.9. Shall promptly notify City of all conflicts, errors, ambiguities or discrepancies in or
between the Contract Documents and such other related documents. The Contractor
shall not take advantage of any gross error or omission in the Contract Documents,
and the City shall be permitted to make such corrections or interpretations as may
be deemed necessary for fulfillment of the intent of the Contract Documents.
4.2. Reference is made to Section 00 73 00 — Supplementary Conditions for identification of:
4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to
the site which have been utilized by City in preparation of the Contract Documents.
The logs of Soil Borings, if any, on the plans are for general information only.
Neither the City nor the Engineer guarantee that the data shown is representative of
conditions which actually exist.
4.2.2. those drawings of physical conditions in or relating to existing surface and
subsurface structures (except Underground Facilities) which are at or contiguous to
the site that have been utilized by City in preparation of the Contract Documents.
4.2.3. copies of such reports and drawings will be made available by City to any Bidder
on request. Those reports and drawings may not be part of the Contract
Documents, but the "technical data" contained therein upon which Bidder is entitled
to rely as provided in Paragraph 4.02. of the General Conditions has been identified
and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is
responsible for any interpretation or conclusion drawn from any "technical data" or
any other data, interpretations, opinions or information.
4.2.4. Standard insurance requirements, coverages and limits.
4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder: (i)
that Bidder has complied with every requirement of this Paragraph 4, (ii) that without
exception the Bid is premised upon performing and furnishing the Work required by the
Contract Documents and applying the specific means, methods, techniques, sequences or
procedures of construction (if any) that may be shown or indicated or expressly required
by the Contract Documents, (iii) that Bidder has given City written notice of all
conflicts, errors, ambiguities and discrepancies in the Contract Documents and the
written resolutions thereof by City are acceptable to Bidder, and when said conflicts,
etc., have not been resolved through the interpretations by City as described in
Paragraph 6., and (iv) that the Contract Documents are generally sufficient to indicate
and convey understanding of all terms and conditions for performing and furnishing the
Work.
4.4. The provisions of this Paragraph 4, inclusive, do not apply to Asbestos, Polychlorinated
biphenyls (PCBs), Petroleum, Hazardous Waste or Radioactive Material covered by
Paragraph 4.06. of the General Conditions, unless specifically identified in the Contract
Documents.
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 5 of 10
5. Availability of Lands for Work, Etc.
5.1. The lands upon which the Work is to be performed, rights -of -way and easements for
access thereto and other lands designated for use by Contractor in performing the Work
are identified in the Contract Documents. All additional lands and access thereto
required for temporary construction facilities, construction equipment or storage of
materials and equipment to be incorporated in the Work are to be obtained and paid for
by Contractor. Easements for permanent structures or permanent changes in existing
facilities are to be obtained and paid for by City unless otherwise provided in the
Contract Documents.
5.2.Outstanding right-of-way, easements, and/or permits to be acquired by the City are listed
in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right-
of-way, easements, and/or permits are not obtained, the City reserves the right to cancel
the award of contract at any time before the Bidder begins any construction work on the
project.
5.3. The Bidder shall be prepared to commence construction without all executed right-of-
way, easements, and/or permits, and shall submit a schedule to the City of how
construction will proceed in the other areas of the project that do not require permits
and/or easements.
6. Interpretations and Addenda
6.1. All questions about the meaning or intent of the Bidding Documents are to be directed to
City in writing on or before 2 p.m., the Monday prior to the Bid opening. Questions
received after this day may not be responded to. Interpretations or clarifications
considered necessary by City in response to such questions will be issued by Addenda
delivered to all parties recorded by City as having received the Bidding Documents.
Only questions answered by formal written Addenda will be binding. Oral and other
interpretations or clarifications will be without legal effect.
Address questions to:
City of Fort Worth
200 Texas Street
Fort Worth, TX 76102
Attn: Fanta Kaba, P.E., PTOE, Transportation and Public Works Department
Email: Fanta.Kaba(&,,f6rtworthtexas.2ov
Phone: 817-682-3181
6.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by
City.
6.3. Addenda or clarifications may be posted via the City's electronic document management
and collaboration system at: httDS://aDD-us3.e-
builder.net/da2/Documents/ExDlorer.asDx?PortalID= { c8e646af-aea7-4421-892e-
535916a68d2el.
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 6of10
6.4. A prebid conference may be held at the time and place indicated in the Advertisement or
INVITATION TO BIDDERS. Representatives of City will be present to discuss the
Project. Bidders are encouraged to attend and participate in the conference. City will
transmit to all prospective Bidders of record such Addenda as City considers necessary
in response to questions arising at the conference. Oral statements may not be relied
upon and will not be binding or legally effective.
7. Bid Security
7.1. Each Bid must be accompanied by a Bid Bond made payable to City in an amount of five
(5) percent of Bidder's maximum Bid price, on the form attached or equivalent, issued
by a surety meeting the requirements of Paragraph 5.01 of the General Conditions.
7.2. The Bid Bonds provided by a Bidder will be retained until the conditions of the Notice of
Award have been satisfied. If the Successful Bidder fails to execute and return the
Contract Documents within 14 days after the Notice of Award conveying same, City
may consider Bidder to be in default, rescind the Notice of Award and act on the Bid
Bond. Such action shall be City's exclusive remedy in the event Bidder is deemed to
have defaulted.
8. Contract Times
The number of days within which, or the dates by which, Milestones are to be achieved in
accordance with the General Requirements and the Work is to be completed and ready for
Final Acceptance is set forth in the Agreement or incorporated therein by reference to the
attached Bid Form.
9. Liquidated Damages
Provisions for liquidated damages are set forth in the Agreement.
10. Substitute and "Or -Equal" Items
The Contract, if awarded, will be on the basis of materials and equipment described in the
Bidding Documents without consideration of possible substitute or "or -equal" items.
Whenever it is indicated or specified in the Bidding Documents that a "substitute" or "or -
equal" item of material or equipment may be furnished or used by Contractor if acceptable to
City, application for such acceptance will not be considered by City until after the Effective
Date of the Agreement. The procedure for submission of any such application by Contractor
and consideration by City is set forth in Paragraphs 6.05A., 6.05B. and 6.05C. of the General
Conditions and is supplemented in Section 0125 00 of the General Requirements.
11. Subcontractors, Suppliers and Others
11.1. In accordance with the City's Business Equity Ordinance No.25165-10-2021 the City
has goals for the participation of minority business and/or women business
enterprises in City contracts $100,000 or greater. See Section 00 45 40 for the
M/WBE Project Goals and additional requirements. Failure to comply shall render
the Bidder as non -responsive.
Business Equity Ordinance No.25165-10-2021, as amended (replacing Ordinance
No. 24534-11-2020), codified at:
httns://codelibrarv.amle2al.com/codes/ftworth/latest/ftworth tx/0-0-0-22593
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 7of10
11.2. No Contractor shall be required to employ any Subcontractor, Supplier, other person
or organization against whom Contractor or City has reasonable objection.
12. Bid Form
12.1. The Bid Form is included with the Bidding Documents; additional copies maybe
obtained from the City.
12.2. All blanks on the Bid Form must be completed and the Bid Form signed in ink.
Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A
Bid price shall be indicated for each Bid item, alternative, and unit price item listed
therein. In the case of optional alternatives, the words "No Bid," "No Change," or
"Not Applicable" may be entered. Bidder shall state the prices for which the Bidder
proposes to do the work contemplated or furnish materials required. All entries shall
be legible.
12.3. Bids by corporations shall be executed in the corporate name by the president or a
vice-president or other corporate officer accompanied by evidence of authority to
sign. The corporate seal shall be affixed. The corporate address and state of
incorporation shall be shown below the signature.
12.4. Bids by partnerships shall be executed in the partnership name and signed by a
partner, whose title must appear under the signature accompanied by evidence of
authority to sign. The official address of the partnership shall be shown below the
signature.
12.5. Bids by limited liability companies shall be executed in the name of the firm by a
member and accompanied by evidence of authority to sign. The state of formation of
the firm and the official address of the firm shall be shown.
12.6. Bids by individuals shall show the Bidder's name and official address.
12.7. Bids by joint ventures shall be executed by each joint venture in the manner indicated
on the Bid Form. The official address of the joint venture shall be shown.
12.8. All names shall be typed or printed in ink below the signature.
12.9. The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of
which shall be filled in on the Bid Form.
12.10. Postal and e-mail addresses and telephone number for communications regarding the
Bid shall be shown.
12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of
Texas shall be provided in accordance with Section 00 43 37 — Vendor Compliance
to State Law Non -Resident Bidder.
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 8 of 10
13. Submission of Bids
Bids shall be submitted on the prescribed Bid Form, provided with the Bidding Documents,
at the time and place indicated in the Advertisement or INVITATION TO BIDDERS,
addressed to Purchasing Manager of the City, and shall be enclosed in an opaque sealed
envelope, marked with the City Project Number, Project title, the name and address of
Bidder, and accompanied by the Bid security and other required documents. If the Bid is sent
through the mail or other delivery system, the sealed envelope shall be enclosed in a separate
envelope with the notation "BID ENCLOSED" on the face of it.
14. Withdrawal of Bids
14.1. Bids addressed to the Purchasing Manager and filed with the Purchasing Office may
be withdrawn prior to the time set for bid opening. A request for withdrawal must be
made in writing and delivered to the Purchasing Office to receive a time stamp prior
to the opening of Bids. A timely withdrawn bid will be returned to the Bidder or, if
the request is within one hour of bid opening, will not be read aloud and will
thereafter be returned unopened.
14.2. In the event any Bid for which a withdrawal request has been timely filed has been
inadvertently opened, said Bid and any record thereof will subsequently be marked
"Withdrawn" and will be given no further consideration for the award of contract.
15. Opening of Bids
Bids will be opened and read aloud publicly. An abstract of the amounts of the base Bids and
major alternates (if any) will be made available to Bidders after the opening of Bids.
16. Bids to Remain Subject to Acceptance
All Bids will remain subject to acceptance for a minimum of 90 days or the time period
specified for Notice of Award and execution and delivery of a complete Agreement by
Successful Bidder. City may, at City's sole discretion, release any Bid and nullify the Bid
security prior to that date.
17. Evaluation of Bids and Award of Contract
17.1. City reserves the right to reject any or all Bids, including without limitation the rights
to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids
and to reject the Bid of any Bidder if City believes that it would not be in the best
interest of the Project to make an award to that Bidder. City reserves the right to
waive informalities not involving price, contract time or changes in the Work and
award a contract to such Bidder. Discrepancies between the multiplication of units of
Work and unit prices will be resolved in favor of the unit prices. Discrepancies
between the indicated sum of any column of figures and the correct sum thereof will
be resolved in favor of the correct sum. Discrepancies between words and figures
will be resolved in favor of the words.
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 9of10
17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists
among the Bidders, Bidder is an interested party to any litigation against City,
City or Bidder may have a claim against the other or be engaged in litigation,
Bidder is in arrears on any existing contract or has defaulted on a previous
contract, Bidder has performed a prior contract in an unsatisfactory manner, or
Bidder has uncompleted work which in the judgment of the City will prevent or
hinder the prompt completion of additional work if awarded.
17.2. In addition to Bidder's relevant prequalification requirements, City may consider the
qualifications and experience of Subcontractors, Suppliers, and other persons and
organizations proposed for those portions of the Work where the identity of such
Subcontractors, Suppliers, and other persons and organizations must be submitted as
provided in the Contract Documents or upon the request of the City. City also may
consider the operating costs, maintenance requirements, performance data and
guarantees of major items of materials and equipment proposed for incorporation in
the Work when such data is required to be submitted prior to the Notice of Award.
17.3. City may conduct such investigations as City deems necessary to assist in the
evaluation of any Bid and to establish the responsibility, qualifications, and financial
ability of Bidders, proposed Subcontractors, Suppliers and other persons and
organizations to perform and furnish the Work in accordance with the Contract
Documents to City's satisfaction within the prescribed time.
17.4. Contractor shall perform with his own organization, work of a value not less than
35% of the value embraced on the Contract, unless otherwise approved by the City.
17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and
responsive Bidder whose evaluation by City indicates that the award will be in the
best interests of the City.
17.6. Pursuant to Texas Government Code Chapter 2252.001, the City will not award
contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than
the lowest bid submitted by a responsible Texas Bidder by the same amount that a
Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a
comparable contract in the state in which the nonresident's principal place of
business is located.
17.7. A contract is not awarded until formal City Council authorization. If the Contract is
to be awarded, City will award the Contract within 90 days after the day of the Bid
opening unless extended in writing. No other act of City or others will constitute
acceptance of a Bid. Upon the contract award, a Notice of Award will be issued by
the City.
17.7.1. The contractor is required to fill out and sign the Certificate of Interested
Parties Form 1295 and the form must be submitted to the Project Manager
before the contract will be presented to the City Council. The form can be
obtained at httns://www.ethics.state.tx.us/data/forms/1295/1295.i)df
17.8. Failure or refusal to comply with the requirements may result in rejection of Bid.
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 10 of 10
18. Signing of Agreement
18.1. When City issues a Notice of Award to the Successful Bidder, it will be accompanied
by the required number of unsigned counterparts of the Project Manual. Within 14
days thereafter, Contractor shall sign and deliver the required number of counterparts
of the Project Manual to City with the required Bonds, Certificates of Insurance, and
all other required documentation.
18.2. City shall thereafter deliver one fully signed counterpart to Contractor.
END OF SECTION
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers
Revised/Updated November 2, 2021
00 35 13
CONFLICT OF INTEREST STATEMENT
Capko Concrete Page 1of1
Structures, LLC SECTION 00 35 13
3 x 4206 Azle, TX 76098 CONFLICT OF INTEREST STATEMENT
Each bidder, offeror or respondent to a City of Fort Worth procurement is required to complete a
Conflict of Interest Questionnaire or certify that one is current and on file with the City Secretary's
Office pursuant to state law.
If a member of the Fort Worth City Council, any one or more of the City Manager or Assistant
City Managers, or an agent of the City who exercise discretion in the planning, recommending,
selecting or contracting with a bidder, offeror or respondent is affiliated with your company, then
a Local Government Officer Conflicts Disclosure Statement (CIS) may be required.
You are urged to consult with counsel regarding the applicability of these forms and Local
Government Code Chapter 176 to your company.
The referenced forms may be downloaded from the links provided below.
Form CIQ (Conflict of Interest Questionnaire) (state.tx.us)
httr)s://www.ethics.state.tx.us/data/forms/conflict/CIS.r)df
❑ CIQ Form does not apply
❑ CIQ Form is on file with City Secretary
❑ CIQ Form is being provided to the City Secretary
❑ CIS Form does not apply
❑ CIS Form is on File with City Secretary
❑ CIS Form is being provided to the City Secretary
BIDDER: Capko Concrete Structures LLC
By: John J Capko IV
Signature: e��I�� � � Zs
Title: President / Owner
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 2024 Sidewalk Improvements Unit Price Construction Contract
Revised February 24, 2020 Various City Project Numbers
0041 00
BID FORM
Page 1 of 4
SECTION 00 41 00
BID FORM
TO: The Purchasing Manager
c/o: The Purchasing Division
200 Texas Street
City of Fort Worth, Texas 76102
FOR: 2024 Sidewalk Improvements Unit Price Construction Contract
City Project No.: Various City Project Numbers
Units/Sections: Base Bid
1. Enter Into Agreement
The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form
included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents
for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions
of the Contract Documents.
2. BIDDER Acknowledgements and Certification
2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and
INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond.
2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will
provide a valid insurance certificate meeting all requirements within 14 days of notification of award.
2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed
individual or entity and is not submitted in conformity with any collusive agreement or rules of any group,
association, organization, or corporation.
2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.
2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding.
2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract.
For the purposes of this Paragraph:
a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to
influence the action of a public official in the bidding process.
b. 'fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the
bidding process to the detriment of City (b) to establish Bid prices at artificial non-competitive
levels, or (c) to deprive City of the benefits of free and open competition.
c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or
without the knowledge of City, a purpose of which is to establish Bid prices at artificial, non-
competitive levels.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 2024 Sidewalk Improvements Unit Price Construction Contract
Revised 9/30/2021 Various City Project Numbers
0041 00
BID FORM
Page 2 of 4
d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their
property to influence their participation in the bidding process or affect the execution of the
Contract.
3. Prequalification
The Bidder acknowledges that the following work types must be performed only by prequalified contractors and
subcontractors:
a. None
b.
C.
d.
e.
f. -
g. -
h. -
4. Time of Completion
4.1. The Work will be complete for Final Acceptance within the number of days specified in each
task order when the Contract Time commences to run as provided in Paragraph 2.03 of the General
Conditions.
4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to
complete the Work within the times specified in the Agreement/task order.
5. Attached to this Bid
The following documents are attached to and made a part of this Bid:
a. This Bid Form, Section 00 41 00
b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph
5.01 of the General Conditions.
c. Proposal Form, Section 00 42 43
d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37
e. MWBE Forms (optional at time of bid)
f. Prequalification Statement, Section 00 45 12
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 2024 Sidewalk Improvements Unit Price Construction Contract
Revised 9/30/2021 Various City Project Numbers
0041 00
BID FORM
Page 3 of 4
g. Conflict of Interest Affidavit, Section 00 35 13
*If necessary, CIQ or CIS forms are to be provided directly to City Secretary
h. Any additional documents that may be required by Section 12 of the Instructions to Bidders
6. Total Bid Amount
6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In
the space provided below, please enter the total bid amount for this project. Only this figure will be read
publicly by the City at the bid opening.
6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is
subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective
estimated quantities shown in this proposal and then totaling all of the extended amounts.
6.3.
Total Bid J<-4 J �q 66
#REF!
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised 9/30/2021
2024 Sidewalk Improvements Unit Price Construction Contract
Various City Project Numbers
0041 00
BID FORM
Page 4 of 4
7. Bid Submittal
This Bid is submitted on December 21 2023
Respectfully submitted,
By:V�,
(S' ignature)
John J Capko IV
(Printed Name)
Title: President / Owner
Company: Capko Concrete Structures LLC
Address: P.O. Box 426
Azle
Texas 76098
State of Incorporation: Texas
Email: john@capkoconcretestructures.com
Phone: 682-247-1035
END OF SECTION
by the entity named below.
Receipt is acknowledged of the
following Addenda:
lAddendum No. 1: V
JAddendum No. 2:
JAddendum No. 3: N/A
lAddendum No. 4:
Corporate Seal:
Initial
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised 9/30/2021
2024 Sidewalk Improvements Unit Price Construction Contract
Various City Project Numbers
00 42 43
BD)PROPOSAL
Pegs I f3
SECTION 00 42 43
PROPOSALFORM
UNIT PRICE BID
PROJECT ITEM INFORMATION
BIDDER'S APPLICATION
BIDDER'S PROPOSAL
BID I I Quantity
Unit of
IT Description Specification Section No. Measure Range/Est. Bid Quantity Unit Price Bid Value
1
0135.0101 Railroad Coordination
01 35 13
LS
1
1 $
1,000.00 $
1,000.001
2
0135.0102 Railroad Flagmen
01 3513
WD
15
1 $
1,000.00 $
1,000.001
3
0171.0101 Construction Staking
�0171.0102
01 71 23
LS
1
1 $
1,000.00 $
1,000.001
4
As -Built Survey
01 71 23
LS
1
1 $
1,000.00 $
1,000.001
BASE BID - UNIT 1 - General Requirements $
4,000.00
NOEL
UNIT 2 - Existing Conditions
1-100
1 $
10.00
5
0241.0100 Remove Sidewalk
024113
SF
101-500
1 $
10.00 $
10.00
501+
1 $
10.00 $
10.00
6
0241.0300 Remove ADA Ramp
024113
EA
25
1 $
1,000.00 $
1,000.00
7
0241.0301 Remove Detectable Warning Surface
0241 13
EA
10
1 $
250.00 $
250.00
1-100
1 $
10.00 $
10.00
8
0241.0401 Remove Concrete Drive
0241 13
SF
101-500
1 $
10.00 $
10.00
501+
1 $
5.00 $
5.001
9
0241.0402 Remove Asphalt Drive
024113
SF
100
1 $
10.00 $
10.00
1-100
1 $
10.00 $
10.00
10
0241.0403 Remove Brick Drive
0241 13
SF
101-400
1 $
10.00 $
10.00
401+
1 $
5.00 $
5.001
1-50
1 $
10.00 $
10.00
11
0241.0500 Remove Fence
0241 13
LF
51-100
1 $
10.00 $
10.00
101+
1 $
10.00 $
10.001
1-10
1 $
50.00 $
50.00
12
0241.0600 Remove Wall <4'
0241 13
LF
11-30
1 $
40.00 $
40.00
31+
1 $
30.00 $
30.00
13
0241.0700 Remove Mailbox
0241 13
EA
10
1 $
100.00 $
100.00
14
0241.0701 Remove Multiple User Mailbox
0241 13
EA
10
1 $
120.00 $
120.00
15
0241.0702 Relocate Mailbox - Traditional
0241 13
EA
10
1 $
200.00 $
200.00
16
0241.0703 Relocate Mailbox - Brick
0241 13
EA
10
1 $
500.00 $
500.00
17
0241.0704 Remove and Replace Mailbox - Traditional
0241 13
EA
10
1 $
300.00 $
300.00
18
0241.0705 Remove and Replace Mailbox - Brick
0241 13
EA
10
1 $
1,000.00 $
1,000.00
1-100
1 $
15.00 $
15.00
19
0241.1300 Remove Conc Curb&Gutter
0241 15
LF
101-500
1 $
10.00 $
10.00
501+
1 $
5.00 $
5.00
20
0241.1507 3" Surface Milling
0241 15
SY
100
1 $
40.00 $
40.00
BASE BID - UNIT 2 - Existing
Conditions $
3,780.00
UNIT 3 - Earthwork
21
3110.0102 6"-12" Tree Removal
311000
EA
10
1 $
1,100.00 $
1,100.00
22
3110.0103 12"-18" Tree Removal
31 1000
EA
10
1 $
1,750.00 $
1,750.00
23
3110.0104 18"-24" Tree Removal
31 1000
EA
10
1 $
2,200.00 $
2,200.00
24
3110.0105 24" and Larger Tree Removal
31 1000
EA
10
1 $
3,000.00 $
3,000.00
25
3123.0101 Unclassified Excavation by Plan
31 2316
CY
150
1 $
50.00 $
50.00
26
3123.0103 Borrow by Plan
31 2323
CY
150
1 $
50.00 $
50.00
27
3124.0101 Embankment by Plan
31 2400
CY
150
1 $
50.00 $
50.00
28
3125.0101 SWPPP 21 acre
31 2500
LS
5
1 $
2,500.00 $
2,500.00
29
3137.0101 Concrete Riprap
31 3700
SY
250
1 $
150.00 $
150.00
BASE BID - UNIT 3 - Earthwork $ 10,850.00
UNIT 4 - Exterior Improvements
30
3212.0401 HMAC Transition
32 12 16
TN
60
1 $
400.00 $
400.00
31
3212.0504 7" Asphalt Base Type B
32 12 16
SY
100
1 $
160.00 $
160.00
1-2500
1 $
20.00 $
20.00
32
3213.0301 4" Conc Sidewalk
32 13 20
SF
2.1-5000
1 $
19.00 $
19.00
5001+
1 $
18.00 $
18.001
33
3213.0302 5" Conc Sidewalk
32 13 20
SF
1000
1 $
20.00 $
20.00
34
3213.0303 6" Conc Sidewalk
32 13 20
SF
1000
1 $
22.00 $
22.00
1-2500
1 $
20.00 $
20.00
35
3213.0311 4" Conc Sidewalk, Adjacent to Curb
32 13 20
SF
2501-5000
1 $
19.00 $
19.00
5001+
1 $
18.00 $
18.001
36
3213.0312 5" Conc Sidewalk, Adjacent to Curb
32 13 20
SF
1000
1 $
20.00 $
20.00
37
3213.0313 6" Conc Sidewalk, Adjacent to Curb
32 13 20
SF
1000
1 $
22.00 $
22.00
38
3213.0321 Conc Sidewalk, Adjacent to Ret Wall
32 13 20
SF
1000
1 $
22.00 $
22.00
39
3213.0322 Conc Curb at Back of Sidewalk
32 13 20
LF
200
1 $
30.00 $
30.00
40
3213.0400 5" Concrete Driveway
32 13 20
SF
500
1 $
20.00 $
20.00
41
3213.0401 6" Concrete Driveway
32 13 20
SF
500
1 $
21.00 $
21.00
42
3213.0501 Barrier Free Ramp, Type R-1
32 13 20
EA
20
1 $
5,000.00 $
5,000.00
43
3213.0502 Barrier Free Ramp, Type U-1
32 13 20
EA
20
1 $
3,000.00 $
3,000.00
44
3213.0503 Barrier Free Ramp, Type M-1
32 13 20
EA
20
1 $
3,000.00 $
3,000.00
45
3213.0504 Barrier Free Ramp, Type M-2
32 13 20
EA
20
1 $
3,000.00 $
3,000.00
46
3213.0505 Barrier Free Ramp, Type M-3
32 13 20
EA
20
1 $
3,000.00 $
3,000.00
47
3213.0506 Barrier Free Ramp, Type P-1
32 13 20
EA
20
1 $
3,000.00 $
3,000.00
48
3213.0507 Barrier Free Ramp, Type P-2
32 13 20
EA
20
1 $
3,000.00 $
3,000.00
CITY OF FORT WORTH
SrAND(iRD CONSTRUCTION SPPCBIC-ON DOCUM2 2024 Sidewalk Impmvcnunis Uml=ConA t-COnI[8d
Revved 9l3012021 Venous QtyP erect Numlure
00 42 43
Bm PROPOSAL
P_ 2 of3
SECTION 00 42 43
PROPOSALFORM
UNIT PRICE BID
BIDDER'S APPLICATION
PROJECT ITEM INFORMATION
BIDDER'S PROPOSAL
BID
Unit of
Quantity
ITEM
Description
Specification Section No.
Measure
RangeltEst.
Bid Quantity Unit Price
Bid Value
NO.
Quantity
49
3213.0508 Barrier Free Ramp, Type C-1
32 13 20
EA
20
1 $
5,000.00 $
5,000.00
50
3213.0509 Barrier Free Ramp, Type C-2
32 13 20
EA
20
1 $
4,000.00 $
4,000.00
51
3213.0510 Barrier Free Ramp, Type C-3
32 13 20
EA
20
1 $
3,000.00 $
3,000.00
1-500
1 $
60.00 $
60.00
52
3216.0101 6" Conc Curb and Gutter
32 16 13
LF
501+
1 $
50.00 $
50.00
1-500
1 $
62.00 $
62.00
53
3216.0102 7" Conc Curb and Gutter
32 16 13
LF
501+
1 $
52.00 $
52.00
54
3216.0102 Conc Laydown Curb
32 16 13
LF
100
1 $
70.00 $
70.00
54
3216.0301 7" Conc Valley Gutter, Residential
32 16 13
SY
50
1 $
200.00 $
200.00
55
3216.0302 11" Conc Valley Gutter, Arterial/Industrial
32 16 13
SY
50
1 $
225.00 $
225.00
56
3217.0501 24" SLID Pvmt Marking HAE (W)
32 17 23
LF
500
1 $
20.00 $
20.00
57
3217.0502 Preformed Thermoplastic Contrast Markings - 24" Crosswalk
32 1723
LF
500
1 $
20.00 $
20.00
58
3217.0503 Preformed Thermoplastic Contrast Marking - 24" SLID
32 17 23
LF
500
1 $
20.00 $
20.00
59
3217.0504 Preformed Thermoplastic Contrast Markings - 24" Stop Bars
32 1723
LF
500
1 $
20.00 $
20.00
60
3217.4306 Remove 24" Pvmt Marking
32 17 23
LF
2000
1 $
5.00 $
5.00
61
3231.0111 4' Chain Link, Steel
3231 13
LF
200
1 $
55.00 $
55.00
62
3231.0112 5' Chain Link, Steel
3231 13
LF
200
1 $
60.00 $
60.00
63
3231.0113 6' Chain Link, Steel
3231 13
LF
200
1 $
65.00 $
65.00
64
3231.0131 4' Wrought Iron Fence
3231 13
LF
200
1 $
80.00 $
80.00
65
3231.0132 5' Wrought Iron Fence
3231 13
LF
200
1 $
90.00 $
90.00
66
3231.0133 6' Wrought Iron Fence
3231 13
LF
200
1 $
100.00 $
100.00
67
3231.0141 4' Steel Tube Fence
3231 13
LF
200
1 $
100.00 $
100.00
68
3231.0142 5' Steel Tube Fence
3231 13
LF
200
1 $
120.00 $
120.00
69
3231.0143 6' Steel Tube Fence
3231 13
LF
200
1 $
140.00 $
140.00
70
3231.0301 4' Gate, Steel
3231 26
EA
10
1 $
500.00 $
500.00
71
3231.0302 6' Gate, Steel
3231 26
EA
10
1 $
800.00 $
800.00
72
3231.0303 8' Gate, Steel
3231 26
EA
10
1 $
1,000.00 $
1,000.00
73
3231.0304 10' Gate, Steel
3231 26
EA
10
1 $
1,200.00 $
1,200.00
74
3231.0305 12' Gate, Steel
3231 26
EA
10
1 $
1,500.00 $
1,500.00
75
3231.0306 16' Gate, Steel
3231 26
EA
10
1 $
2,000.00 $
2,000.00
76
3231.0307 20' Gate, Steel
3231 26
EA
10
1 $
3,000.00 $
3,000.00
77
3231.0411 4' Fences, Wood
3231 29
LF
200
1 $
100.00 $
100.00
78
3231.0412 6' Fences, Wood
3231 29
LF
200
1 $
110.00 $
110.00
79
3231.0413 8' Fences, Wood
3231 29
LF
200
1 $
120.00 $
120.00
80
3232.0100 Conc Rat Wall Adjacent to Sidewalk
32 32 13
SF
200
1 $
100.00 $
100.00
81
3291.0100 Topsoil
329119
CY
100
1 $
50.00 $
50.00
1-1000
1 $
3,020.00 $
3,020.00
82
3292.0100 Block Sod Placement
32 92 13
SY
101,2000
1 $
17.00 $
17.00
2001+
1 $
15.00 $
15.00
BASE BID - UNIT 4- Exterior Improvements
$
50,997.00
UNIT 5 - Utilities
1-50
1 $
200.00 $
200.00
83
3305.0103 Exploratory Excavation of Existing Utilities
330530
EA
51+
1 $
200.00 $
200.00
84
3305.0105 Inlet Adjustment
330514
EA
10
1 $
5,000.00 $
5,000.00
85
3305.0106 Manhole Adjustment, Major
330514
EA
10
1 $
2,500.00 $
2,500.00
86
3305.0107 Manhole Adjustment, Minor
330514
EA
10
1 $
1,000.00 $
1,000.00
87
3305.0108 Miscellaneous Structure Adjustment
330514
EA
10
1 $
1,000.00 $
1,000.00
88
3305.0111 Valve Box Adjustment
33 05 14
EA
10
1 $
250.00 $
250.00
89
3305.0114 Manhole Adjustment, Major w/Cover
330514
EA
10
1 $
3,000.00 $
3,000.00
BASE BID- JNIT
5-Utilities $
13,150.00
UNIT 6 -Transportation
90
3441.4002 Furnish/Install Alum Sign Ground Mount TxDOT Std.
3441 30
EA
25
1 $
1,000.00 $
1,000.00
91
3441.4003 Furnish/install Alum Sign Ground Mount City Std.
3441 30
EA
25
1 $
1,000.00 $
1,000.00
92
3441.4004 Furnish/install Alum Sign Ex. Pole Mount
3441 30
EA
25
1 $
500.00 $
500.00
93
3441.4006 Install Alum Sign Ground Mount
3441 30
EA
25
1 $
750.00 $
750.00
94
3441.4007 Install Alum Sign Ex Pole Mount
3441 30
EA
25
1 $
500.00 $
500.00
95
3441.4108 Remove Sign Panel and Post
3441 30
EA
25
1 $
200.00 $
200.00
96
3441.4109 Remove Sign Panel
3441 30
EA
25
1 $
100.00 $
100.00
97
3441.4110 Remove and Reinstall Sign Panel and Post
3441 30
EA
25
1 $
800.00 $
800.00
98
3471.0001 Traffic Control
347113
MO
10
1 $
3,000.00 $
3,000.00
99
3471.0002 Portable Message Sign
3471 13
WK
50
1 $
600.00 $
600.00
BASE BID -UNIT 6 -Transportation $ 8,450.00
UNIT 7 - No -Standard Items
100
9999.0001 Site Clearing
31 1000
SY
500
1 $
1,000.00 $
1,000.00
101
9999.0002 1"-2" Water Meter Box Replacement (Conc)
33 12 10
EA
5
1 $
500.00 $
500.00
102
9999.0003 1%2" Water Meter Box Replacement (Plastic)
33 12 10
EA
5
1 $
400.00 $
400.00
103
9999.0004 Irrigation Repair Allowance 1
000000
LS
1
1 $
2,500.00 $
2,500.00
104
9999.0005 Irrigation Repair Allowance 2
000000
LS
1
1 $
5,000.00 $
5,000.00
105
9999.0006 Landscaping Repair Allowance 1
00 00 00
LS
1
1 $
2,500.00 $
2,500.00
106
9999.0007 Landscaping Repair Allowance 2
000000
LS
1
1 $
5,000.00 $
5,000.00
CnY OP FORT WORTH
STANDARD COn-CTrON SPBCTIC-ON DOCUMB 2024 Sidewalk Impmvcnunrs C =ConA t-COnI[8d
Revved 9l3012021 Venous QtyP erect Numlure
00 42 43
Bm PROPOSAL
Pegs 3 of3
SECTION 00 42 43
PROPOSALFORM
UNIT PRICE BID
PROJECT ITEM INFORMATION
BID
ITEM Description
NO.
107 9999.0008 Detectable Warning Surface
108 9999.0009 Relocate Guy Wire
109 9999.0010 Temporary Construction Fence
110 9999.0011 Lane Legend RR (Sidewalk)
111 9999.0068 Tree Protection
BIDDER'S APPLICATION
BIDDER'S PROPOSAL
Unit of
Quantity
Specification Section No.
Measure
Range/Est.
Bid Quantity
Unit Price
Bid Value
Quantity
00 00 00
SF
100
1 $
30.00 $
30.00
000000
EA
10
1 $
2,000.00 $
2,000.00
00 00 00
LF
200
1 $
25.00 $
25.00
00 00 00
EA
5
1 $
500.00 $
500.00
99 99 99
FA
50
1 $
50.00 $
50.001
BASE BID - UNIT 7 - Non -Standard Items $
19,505.00 1
UNIT 8 - TxDOT Items
112
0450 6048 RAIL (HANDRAIL)(TY B)
TxDOT Spec 450
LF
100
1 $
150.00 $
150.00
113
0450 6052 RAIL (HANDRAIL)(TY F)
TxDOT Spec 450
LF
100
1 $
350.00 $
350.00
114
0506 6038 TEMP SEDMT CONT FENCE (INSTALL)
TxDOT Spec 506
LF
200
1 $
5.00 $
5.00
115
0506 6039 TEMP SEDMT CONT FENCE (REMOVE)
TxDOT Spec 506
LF
200
1 $
1.00 $
1.00
116
0506 6041 BIODEG EROSN CONT LOGS (INSTL) (12")
TxDOT Spec 506
LF
50
1 $
10.00 $
10.001
117
0506 6043 BIODEG EROSN CONT LOGS (REMOVE)
TxDOT Spec 506
LF
50
1 $
2.00 $
2.00 I
118
0529 6002 CONC CURB (TY 11)
TxDOT Spec 529
LF
100
1 $
10.00 $
10.001
119
0529 6007 CONC CURB & GUTTER (TY 1)
TxDOT Spec 529
LF
100
1 $
80.00 $
80.001
120
0529 6008 CONC CURB & GUTTER (TY 11)
TxDOT Spec 529
LF
100
1 $
100.00 $
100.00
121
0530 6004 DRIVEWAYS (CONC)
TxDOT Spec 530
SY
500
1 $
200.00 $
200.00
122
0530 6005 DRIVEWAYS (ACP)
TxDOT Spec 530
SY
500
1 $
180.00 $
180.001
123
0531 6001 CONC SIDEWALKS (4")
TxDOT Spec 531
SY
300
1 $
200.00 $
200.00
124
0531 6003 CONC SIDEWALKS (6")
TxDOT Spec 531
SY
300
1 $
3,000.00 $
3,000.00
125
0531 6004 CURB RAMPS (TY 1)
TxDOT Spec 531
FA
10
1 $
3,000.00 $
3,000.00
126
0531 6005 CURB RAMPS (TY 2)
TxDOT Spec 531
EA
10
1 $
3,000.00 $
3,000.00
127
0531 6006 CURB RAMPS (TY 3)
TxDOT Spec 531
FA
10
1 $
3,000.00 $
3,000.00
128
0531 6007 CURB RAMPS (TY 4)
TxDOT Spec 531
EA
10
1 $
3,000.00 $
3,000.00
129
0531 6008 CURB RAMPS (TY 5)
TxDOT Spec 531
FA
10
1 $
3,000.00 $
3,000.00
130
0531 6009 CURB RAMPS (TY 6)
TxDOT Spec 531
EA
10
1 $
3,000.00 $
3,000.00
131
0531 6010 CURB RAMPS (TY 7)
TxDOT Spec 531
FA
10
1 $
3,000.00 $
3,000.00
132
0531 6011 CURB RAMPS (TY 8)
TxDOT Spec 531
EA
10
1 $
3,000.00 $
3,000.00
133
0531 6012 CURB RAMPS (TY 9)
TxDOT Spec 531
FA
10
1 $
3,000.00 $
3,000.00
134
0531 6013 CURB RAMPS (TY 10)
TxDOT Spec 531
EA
10
1 $
3,000.00 $
3,000.00
135
0531 6014 CURB RAMPS (TY 11)
TxDOT Spec 531
FA
10
1 $
3,000.00 $
3,000.00
136
0531 6015 CURB RAMPS (TY 20)
TxDOT Spec 531
EA
10
1 $
4,000.00 $
4,000.00
137
0531 6016 CURB RAMPS (TY 21)
TxDOT Spec 531
FA
10
1 $
4,000.00 $
4,000.00
138
0531 6017 CURB RAMPS (TY 22)
TxDOT Spec 531
EA
10
1 $
7,000.00 $
7,000.00
139
0531 6032 CONC SIDEWALKS (SPECIAL) (TYPE A)
TxDOT Spec 531
SY
200
1 $
225.00 $
225.00
140
531 6033 CONC SIDEWALKS (SPECIAL) (TYPE B)
TxDOT Spec 531
SY
200
1 $
250.00 $
250.00
141
531 6057 CONC SIDEWALK (SPECIAL)(RETAINING WALL
TxDOT Spec 531
SF
200
1 $
100.00 $
100.00
142
0644 6001 IN SM RD SIN SUPBAM TY10BWG(1)SA(P)
TxDOT Item 644
EA
20
1 $
1,000.00 $
1,000.00
143
0644 6004 IN SM RD SIN SUP&AM TYIOBWG(1)SA(T)
TxDOT Item 644
EA
20
1 $
1,000.00 $
1,000.00
144
0644 6007 IN SM RD SIN SUPBAM TY10BWG(1)SA(U)
TxDOT Item 644
EA
20
1 $
1,000.00 $
1,000.00
BASE BID
- UNIT o - TxDOT Items $
55,863.00
BASE BID SUMMARY
I
UNIT
TOTAL BASE BID I
IBASE BID - UNIT 1 - General Requirements
$ 4,000.001
IBASE BID - UNIT 2 - Existing Conditions
$ 3,780.00 I
IBASE BID - UNIT 3 - Earthwork
$ 10,850.00 I
IBASE BID - UNIT 4 - Exterior Improvements
$ 50,997.00 I
IBASE BID - UNIT 5-Utilities
$ 13,150.00
IBASE BID - UNIT 6 - Transportation
$ 8,450.001
IBASE BID - UNIT 7 - Non -Standard Items
$ 19,505.00 I
IBASE BID - UNIT S - TxDOT Items
$ 55,863.001
ITOTAL BASE BID I $ 166,595.00 I
CITY OF FORT WORTH
STANOARU COn-CrrON SPBCBIC-ON UOCUMBNTS 2024 SO-1k Impmvc-Pn ConAry .Cm,Iwd
Revved 9l3012021 Venous CnyP erect Numlure
SECTION 00 43 13
BID BOND
KNOW ALL BY THESE PRESENTS:
00 43 13
BID BOND
Page 1 of 2
That we, Capko Concrete Structures LLC , known as
"Bidder" herein and Frankenmuth Insurance Comoanv a corporate surety duly
authorized to do business in the State of Texas, known as "Surety" herein, are held and firmly bound unto the City
of Fort Worth, a municipal corporation created pursuant to the laws of Texas, known as "City" herein, in the penal sum
of five percent (5%) of Bidder's maximum bid price, in lawful money of the United States, to be paid in Fort Worth,
Tarrant County, Texas for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors,
administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has submitted a bid or proposal to perform Work for the following project
designated as 2024 Sidewalk Improvements Unit Price Construction Contract
NOW, THEREFORE, the condition of this obligation is such that if the City shall award
the Contract for the foregoing project to the Principal, and the Principal shall satisfy all requirements and conditions
required for the execution of the Contract and shall enter into the Contract in writing with the City in accordance with the
terms of such same, then this obligation shall be and become null and void. If, however, the Principal fails to execute
such Contract in accordance with the terms of same or fails to satisfy all requirements and conditions required for the
execution of the Contract, this bond shall become the property of the City, without recourse of the Principal and/or
Surety, not to exceed the penalty hereof, and shall be used to compensate City for the difference between Principal's
total bid amount and the next selected bidder's total bid amount.
PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County,
Texas or the United States District Court for the Northern District of Texas, Fort Worth Division.
IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrument by
duly authorized agents and officers on this the 21st day of December 2023.
ATTEST
IA
Witness as to Principal I
PRINCIPAL:
Capko Concrete Structures LLC
BY: g,
ignature r/
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised 9/30/2021
2024 Sidewalk Improvements Unit Price Construction Contract
Various City Project Numbers
Witness as to Surety Melissa Pitts, Bond Secretary
Attach Power of Attorney (Surety) for Attorney -in -Fact
Address: P.O. Box 426
Azle. TX 76098
SURETY:
Frankenmuth Insurance CorrLnar`v
BY:
Si e
Jordan Pitts, Attorney -In -Fact
Name and Title
Address: 1 Mutual Ave
Frankenmuth, MI 48787
Telephone Number: 469-661-0314
0043 13
BID BOND
Page 2 of 2
*Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by laws
showing that this person has authority to sign such obligation. If Surety's physical address is different from its
mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is
awarded.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 2024 Sidewalk Improvements Unit Price Construction Contract
Revised 9/30/2021 Various City Project Numbers
FRANKENMUTH INSURANCE COMPANY
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS, that Frankenmuth Insurance Company (the "Company"), a corporation duly organized
and existing under the laws of the State of Michigan, having its principal office at 1 Mutual Avenue, Frankenmuth, Michigan 48787,
does hereby nominate, constitute and appoint:
Jordan Pitts, Lloyd Ray Pitts Jr., William D. Birdsong
Their true and lawful attorneys) -in -fact, each in their separate capacity if more than one is named above, to make, execute, seal,
acknowledge and deliver any and all bonds, contracts and undertakings of suretyship, with the exception of Financial Guaranty
Insurance, provided, however, that the penal sum of any one such instrument shall not exceed the sum of:
Fifty Million and 00/100 Dollars ($50,000,000)
This Power of Attorney is granted pursuant to the following Resolution duly adopted at a meeting of the Board of Directors of
Frankenmuth Insurance Company:
"RESOLVED, that the President, Senior Vice President or Vice President and each of them under their respective
designations, hereby is authorized to execute powers of attorney, and such authority can be executed by use of facsimile
signature, which may be attested or acknowledged by any officer of the Company, qualifying the attorney(s) named in the
given power of attorney, to execute on behalf of, and acknowledge as the act and deed of Frankenmuth Insurance Company
on all bonds, contracts and undertakings of suretyship, and to affix the corporate seal thereto."
IN WITNESS WHEREOF, the Company has caused these presents to be signed and attested by its appropriate officers and its corporate
seal hereuttt6' Xed this 15t_h day of December, 2022.
Frankenmuth Insurance Company
�7�� Z_
Frederick A. Edmond, Jr.,
President and Chief Executive Officer
q)
W ) ss:
Sworn to before me, a Notary Public in the State of Michigan, by Frederick A, Edmond, Jr., to me personally known to be the individual
and officer described in, and who executed the preceding instrument, deposed and said the Corporate Seal and his signatttVe�p�
were affixed and subscribed to said instrument by the authority of the Company.
IN TESTIMONY WHEREOF, I have set my hand, and affixed my Official Seal this .15th day of December, 202 ,FdO
/+ X (Seal) = x�.
Susan L. Fresorger, Notary Pu tic A.
Saginaw County, State of Michigan
My Commission Expires: April 3, 2028
QS►
I, the undersigned, Executive Vice President of Frankenmuth Insurance Company, do hereby certify that the foregoing is a true, correct
and complete copy of the original Power of Attorney; that said Power of Attorney has not been revoked or rescinded and is in full force
and effect as of this date.
IN WITNESS WHEREOF, I have set my hand and affixed the Seal of the Company, this 21st day of December; 2023.
Andrew H. Knudsen, Executive Vice President,
Chief Operating Officer and Secretary
ALL CORRESPONDENCE RELATED TO BOND VALIDATION AND/OR A CLAIM SHOULD BE DIRECTED TO
VP SURETY, 701 U.S. ROUTE ONE, SUITE 1, YARMOUTH, ME 04096
00 43 37
VENDOR COMPLIANCE TO STATE LAW
Page 1 of 1
SECTION 00 43 37
VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER
Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This
law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state
contractors whose corporate offices or principal place of business are outside the State of Texas) bid projects
for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas
resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident
bidder in order to obtain a comparable contract in the State which the nonresident's principal place of business
is located.
The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet
specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident
bidders must check the box in Section B.
A. Nonresident bidders in the State of , our principal place of business,
are required to be percent lower than resident bidders by State Law. A copy of the
statute is attached.
Nonresident bidders in the State of our principal place of business,
are not required to underbid resident bidders.
B. The principal place of business of our company or our parent company or majority owner is
in the State of Texas.0
BIDDER:
Capko Concrete Streuctures LLC
END OF SECTION
By: John J Capko IV
—Voo'i�A Signature
Title: President / Owner
Date: 12/21 /2023
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised 9/30/2021
2024 Sidewalk Improvements Unit Price Construction Contract
Various City Project Numbers
00 45 26 - 1
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Page 1 of I
1 SECTION 00 45 26
2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
3 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it
4 provides worker's compensation insurance coverage for all of its employees employed on City
5 Project No. Various. Contractor further certifies that, pursuant to Texas Labor Code, Section
6 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with
7 worker's compensation coverage.
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
CONTRACTOR:
Nit I
SoA ny WAU
fO mk%
Address
IWO
City/State4ip
THE STATE OF TEXAS
COUNTY OF TARRANT
By: -Sox,) -57,
(Please Pr1 t)
Signature: ,
0
Title: UU-411
(Please P int)
BEFORE ME, the undersigned authority, on this day personally appeared
�PK I �l� , known to me to be the person whose name is
subscribed to the fore oI g Instrument and c nowledged to me that he/she executed the same as
the act and deed of s f / for the purposes and
consideration therein expressed and in the capacity therein stated.
GIVEN NDER MY HAND AND SEAL OF OFFICE this l '' ` day of
20_t%
'Audg, cum
Notary Pub c in and for the Siaie of Texas
END OF SECTION
ShCapko
My Commission Expires
* 8/30/2026
Notary ID131705485
r
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised July I, 2011
00 45 40 - 1
Business Equity Goal
Page 1 of 2
1 SECTION 00 45 40
2 Business Equity Goal
3 APPLICATION OF POLICY
4 If the total dollar value of the contract is $100,000 or more, then a Business Equity goal is applicable.
5 A Business Equity Firm refers to certified Minority-, and/or Women-, owned Business Enterprises
6 (M/WBEs).
7
8 POLICY STATEMENT
9 It is the policy of the City of Fort Worth to ensure the full and equitable participation of Business Equity
10 Firms when applicable, in the procurement of all goods and services. All requirements and regulations
11 stated in the City's Business Equity Ordinance No.25165-10-2021, (replacing Ordinance No. 24534-11-
12 2020 (codified at: htt_r)s:Hcodelibrarv.amle2_al.com/codes/ftworth/latest/ftworth_tx/0-0-0-22593) apply to
13 this bid.
14
15 BUSINESS EOUITY PROJECT GOAL
16 The City's Business Equity goal on this project is 11% of the total bid value of the contract (Base bid
17 applies to Parks and Community Services).
18
19 METHODS TO COMPLY WITH THE GOAL
20 On City contracts where a Business Equity Goal is applied, offerors are required to comply with the City's
21 Business Equity Ordinance by meeting or exceeding the above stated goal or otherwise comply with the
22 ordinance through one of the following methods: 1. Commercially useful services performed by a
23 Business Equity prime contractor, 2. Business Equity subcontracting participation, 3. Combination
24 of Business Equity prime services and Business Equity subcontracting participation, 4. Business
25 Equity Joint Venture/Mentor-Protege participation, 5. Good Faith Effort documentation, or 6.
26 Prime contractor Waiver documentation.
27
28 SUBMITTAL OF REOUIRED DOCUMENTATION
29 Applicable documents (listed below) must be received by the Purchasing Division, OR the offeror shall
30 EMAIL the Business Equity documentation to the assigned City of Fort Worth Project Manager or
31 Department Designee. Documents are to be received no later than 2:00 p.m., on the third City
32 business day after the bid opening date, exclusive of the bid opening date.
33
34 The Offeror must submit one or more of the following documents:
35 1. Utilization Form and Letter(s) of Intent, if the goal is met or exceeded;
36 2. Good Faith Effort Form and Utilization Form, including supporting documentation, if
37 participation is less than stated goal, or no Business Equity participation is accomplished;
38 3. Prime Contractor Waiver Form, including supporting documentation, if the Offeror will perform
39 all subcontracting/supplier opportunities; or
40 4. Joint Venture/Mentor-Protege Form, if goal is met or exceeded with a Joint Venture or Mentor-
41 Protege participation.
42
43 These forms can be found at:
44 Business Equity Utilization Form and Letter of Intent
45 httDs://anus.fortworthtexas.aov/Pro_ iectResources/ResourcesP/60 - MWBE/Business Ea_uity_ Utilization
46 Form DVIN 2022 220324.Ddf
47
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised October 27, 2021
004540-2
Business Equity Goal
Page 2 of 2
1 Letter of Intent
2 httDs://aDDs.fortworthtexas.eov/ProiectResources/ResourcesP/60 - MWBE/Letter of Intent DVIN
3 2021.Ddf
4
5 Business Equity Good Faith Effort Form
6 httDs://aDDs.fortworthtexas.2ov/ProiectResources/ResourcesP/60 - MWBE/Good Faith Effort
7 Form DVIN2022.Ddf
8
9 Business Equity Prime Contractor Waiver Form
10 httns://aDDs.fortworthtexas.eov/ProiectResources/ResourcesP/60 - MWBE/MWBE Prime Contractor
11 Waiver-220313.Ddf
12
13 Business Equity Joint Venture Form
14 httt)s://aDDs.fortworthtexas.eov/ProiectResources/ResourcesP/60 - MWBE/MWBE Joint
15 Venture 220225.Ddf
16
17
18 FAILURE TO ACHIEVE THE GOAL OR OTHERWISE COMPLY WITH THE ORDINANCE
19 WILL RESULT IN THE BIDDER/OFFEROR BEING DECLARED NON -RESPONSIVE AND
20 THE BID REJECTED.
21
22
23 FAILURE TO SUBMIT THE REOUIRED BUSINESS EOUTY DOCUMENTATION OR
24 OTHERWISE COMPLY WITH THE ORDINANCE WILL RESULT IN THE BID BEING
25 DECLARED NON -RESPONSIVE. THE BID REJECTED AND MAY SUBJECT THE
26 BIDDER/OFFEROR TO SANCTIONS AS DESCRIBED IN SEC. 20-373 OF THE ORDINANCE.
27
28 For Questions, Please Contact The Business Equity Division of the Department of Diversity and
29 Inclusion at (817) 392-2674.
30
31 END OF SECTION
32
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised October 27, 2021
00 52 43 - 1
Agreement
Pagel of 6
SECTION 00 52 43
AGREEMENT
THIS AGREEMENT, authorized on April 9, 2024, is made by and between the City of Fort
Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager,
("City"), and Capko Concrete Structures LLC, authorized to do business in Texas, acting by and
through its duly authorized representative, ("Contractor"). City and Contractor may jointly be
referred to as Parties.
City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows:
Article 1. WORK
Contractor shall complete all Work as specified or indicated in the Contract Documents for the
Project identified herein.
Article 2. PROJECT
The project for which the Work under the Contract Documents may be the whole or only a part is
generally described as follows:
2024 Sidewalk Improvements Unit Price Construction Contract
Various City Project Numbers
Article 3. CONTRACT PRICE
City agrees to pay Contractor for performance of the Work in accordance with the Contract
Documents an amount, in current funds, of One Million Five Hundred Thousand and 00/100
Dollars ($1,500,000.00). Contract price may be adjusted by change orders duly authorized by the
Parties.
Article 4. CONTRACT TIME
4.1 Final Acceptance.
The Work shall be complete for Final Acceptance within the number of days specified in
each Task Order, plus any extension thereof allowed in accordance with Article 12 of the
General Conditions.
4.2 Liquidated Damages
Contractor recognizes that time is of the essence for completion of Milestones, if any, and
to achieve Final Acceptance of the Work and City and the public will suffer from loss of
use if the Work is not completed within the time(s) specified in Paragraph 4.1 above. The
Contractor also recognizes the delays, expense and difficulties involved in proving in a
legal proceeding, the actual loss suffered by the City if the Work is not completed on time.
Accordingly, instead of requiring any such proof, Contractor agrees that as liquidated
damages for delay (but not as a penalty), Contractor shall pay City Five Hundred and
00/100 Dollars ($500.00) for each day that expires after the time specified in Paragraph 4.1
for Final Acceptance until the City issues the Final Letter of Acceptance.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised March 3, 2024
00 52 43 - 2
Agreement
Page 2 of 6
Article 5. CONTRACT DOCUMENTS
5.1 CONTENTS:
A.The Contract Documents which comprise the entire agreement between City and
Contractor concerning the Work consist of the following:
1. This Agreement.
2. Attachments to this Agreement:
a. Bid Form
1) Proposal Form
2) Vendor Compliance to State Law Non -Resident Bidder
b. Current Prevailing Wage Rate Table
c. Insurance Certification Form (ACORD or equivalent)
d. Payment Bond
e. Performance Bond
f. Maintenance Bond
g. Power of Attorney for the Bonds
h. Worker's Compensation Affidavit
i. MBE and/or SBE Utilization Form
3. General Conditions.
4. Supplementary Conditions.
5. Specifications specifically made a part of the Contract Documents by attachment or,
if not attached, as incorporated by reference and described in the Table of Contents
of the Project's Contract Documents.
6. Drawings.
7. Addenda.
8. Documentation submitted by Contractor prior to Notice of Award.
9. The following which may be delivered or issued after the Effective Date of the
Agreement and, if issued, become an incorporated part of the Contract Documents:
a. Notice to Proceed.
b. Field Orders.
c. Change Orders.
d. Letter of Final Acceptance.
Article 6. INDEMNIFICATION
6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
expense, the city, its officers, servants and employees, from and against any and all
claims arising out of, or alleged to arise out of, the work and services to be performed
by the contractor, its officers, agents, employees, subcontractors, licenses or invitees
under this contract. This indemnification provision is suecifically intended to overate
and be effective even if it is alleged or Droven that all or some of the damages being
sought were caused. in whole or in Dart. by anv act. omission or negligence of the citv.
This indemnity provision is intended to include, without limitation, indemnity for costs,
expenses and legal fees incurred by the city in defending against such claims and causes
of actions.
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised March 3, 2024
005243-3
Agreement
Page 3 of 6
6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense,
the city, its officers, servants and employees, from and against any and all loss, damage
or destruction of property of the city, arising out of, or alleged to arise out of, the work
and services to be performed by the contractor, its officers, agents, employees,
subcontractors, licensees or invitees under this contract. This indemnification provision
is specifically intended to operate and be effective even if it is alleged or proven that all
or some of the damages being sought were caused, in whole or in Dart, by anv act.
omission or negligence of the citv.
Article 7. MISCELLANEOUS
7.1 Terms.
Terms used in this Agreement which are defined in Article 1 of the General Conditions will
have the meanings indicated in the General Conditions.
7.2 Assignment of Contract.
This Agreement, including all of the Contract Documents may not be assigned by the
Contractor without the advanced express written consent of the City.
7.3 Successors and Assigns.
City and Contractor each binds itself, its partners, successors, assigns and legal
representatives to the other party hereto, in respect to all covenants, agreements and
obligations contained in the Contract Documents.
7.4 Severability/Non-Waiver of Claims.
Any provision or part of the Contract Documents held to be unconstitutional, void or
unenforceable by a court of competent jurisdiction shall be deemed stricken, and all
remaining provisions shall continue to be valid and binding upon City and Contractor.
The failure of City or Contractor to insist upon the performance of any term or provision of
this Agreement or to exercise any right granted herein shall not constitute a waiver of City's
or Contractor's respective right to insist upon appropriate performance or to assert any such
right on any future occasion.
7.5 Governing Law and Venue.
This Agreement, including all of the Contract Documents is performable in the State of
Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the
Northern District of Texas, Fort Worth Division.
7.6 Authority to Sign.
Contractor shall attach evidence of authority to sign Agreement if signed by someone other
than the duly authorized signatory of the Contractor.
7.7 Non -appropriation of Funds.
In the event no funds or insufficient funds are appropriated by City in any fiscal period for
any payments due hereunder, City will notify Vendor of such occurrence and this Agreement
shall terminate on the last day of the fiscal period for which appropriations were received
without penalty or expense to City of any kind whatsoever, except as to the portions of the
payments herein agreed upon for which funds have been appropriated.
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised March 3, 2024
00 52 43 - 4
Agreement
Page 4 of 6
7.8 Prohibition On Contracts With Companies Boycotting Israel.
Contractor, unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of
the Texas Government Code, if Contractor has 10 or more full time -employees and the
contract value is $100,000 or more, the City is prohibited from entering into a contract with
a company for goods or services unless the contract contains a written verification from the
company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of
the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to
those terms in Section 808.001 of the Texas Government Code. By signing this contract,
Contractor certifies that Contractor's signature provides written verification to the
City that if Chapter 2271, Texas Government Code applies, Contractor: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract.
7.9 Prohibition on Boycotting Energy Companies.
Contractor acknowledges that in accordance with Chapter 2276 of the Texas Government
Code, the City is prohibited from entering into a contract for goods or services that has a
value of $100,000 or more, which will be paid wholly or partly from public funds of the City,
with a company (with 10 or more full-time employees) unless the contract contains a written
verification from the company that it: (1) does not boycott energy companies; and (2) will
not boycott energy companies during the term of the contract. The terms "boycott energy
company" and "company" have the meaning ascribed to those terms by Chapter 2276 of the
Texas Government Code. To the extent that Chapter 2276 of the Government Code is
applicable to this Agreement, by signing this Agreement, Contractor certifies that
Contractor's signature provides written verification to the City that Contractor: (1)
does not boycott energy companies; and (2) will not boycott energy companies during
the term of this Agreement.
7.10 Prohibition on Discrimination Against Firearm and Ammunition Industries.
Contractor acknowledges that except as otherwise provided by Chapter 2274 of the Texas
Government Code, the City is prohibited from entering into a contract for goods or services
that has a value of $100,000 or more which will be paid wholly or partly from public funds
of the City, with a company (with 10 or more full-time employees) unless the contract
contains a written verification from the company that it: (1) does not have a practice, policy,
guidance, or directive that discriminates against a firearm entity or firearm trade association;
and (2) will not discriminate during the term of the contract against a firearm entity or firearm
trade association. The terms "discriminate," "firearm entity" and "firearm trade association"
have the meaning ascribed to those terms by Chapter 2274 of the Texas Government
Code. To the extent that Chapter 2274 of the Government Code is applicable to this
Agreement, by signing this Agreement, Contractor certifies that Contractor's signature
provides written verification to the City that Contractor: (1) does not have a practice,
policy, guidance, or directive that discriminates against a firearm entity or firearm
trade association; and (2) will not discriminate against a firearm entity or firearm trade
association during the term of this Agreement.
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised March 3, 2024
005243-5
Agreement
Page 5 of 6
7.11 Immigration Nationality Act.
Contractor shall verify the identity and employment eligibility of its employees who perform
work under this Agreement, including completing the Employment Eligibility Verification
Form (I-9). Upon request by City, Contractor shall provide City with copies of all 1-9 forms
and supporting eligibility documentation for each employee who performs work under this
Agreement. Contractor shall adhere to all Federal and State laws as well as establish
appropriate procedures and controls so that no services will be performed by any Contractor
employee who is not legally eligible to perform such services. CONTRACTOR SHALL
INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY
CONTRACTOR, CONTRACTOR'S EMPLOYEES, SUBCONTRACTORS,
AGENTS, OR LICENSEES. City, upon written notice to Contractor, shall have the right
to immediately terminate this Agreement for violations of this provision by Contractor.
7.12 No Third -Party Beneficiaries.
This Agreement gives no rights or benefits to anyone other than the City and the Contractor
and there are no third -party beneficiaries.
7.13 No Cause of Action Against Engineer.
Contractor, its subcontractors and equipment and materials suppliers on the PROJECT or their
sureties, shall maintain no direct action against the Engineer, its officers, employees, and
subcontractors, for any claim arising out of, in connection with, or resulting from the engineering
services performed. Only the City will be the beneficiary of any undertaking by the Engineer.
The presence or duties of the Engineer's personnel at a construction site, whether as on -site
representatives or otherwise, do not make the Engineer or its personnel in any way
responsible for those duties that belong to the City and/or the City's construction contractors
or other entities, and do not relieve the construction contractors or any other entity of their
obligations, duties, and responsibilities, including, but not limited to, all construction
methods, means, techniques, sequences, and procedures necessary for coordinating and
completing all portions of the construction work in accordance with the Contract Documents
and any health or safety precautions required by such construction work. The Engineer and
its personnel have no authority to exercise any control over any construction contractor or
other entity or their employees in connection with their work or any health or safety
precautions.
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised March 3, 2024
005243-6
Agreement
Page 6 of 6
IN WITNESS WHEREOF, City and Contractor have each executed this Agreement to be effective
as of the date subscribed by the City's designated Assistant City Manager ("Effective Date").
Contractor:
By. , 7-ohn Y C gok0 / V
John J Capko IV (May 3t, 202413:36 CDT)
Signature
John J Capko IV
(Printed Name)
President / Owner
Title
P.O. Box 426
Address
Azle, TX 76098
City/State/Zip
May 31, 2024
Date
City of Fort Worth
By:
Jesica McEachern
Assistant City Manager
Jun 18, 2024
Date
FORT°�oaa
p°0000
Attest:
Pao � _;
4S6bd
Jannette Goodall, City Secretary
(Seal)
M&C: 24-0274
Date: April 9, 2024
Approved as to Form and Legality:
Qow—
Douglas Black (Jun 12, 202410:22 CDT)
Douglas W. Black
Sr. Assistant City Attorney
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers
Revised March 3, 2024
0061 13- 1
PERFORMANCE BONE
Page I cf2
Bond N um1�er, SLJR2006604
[ SECTION 1W 61 13
2 PERFORMANCE BOND
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENT :
6 COUNTY OF TA]RRANT §
7 That we, Capkn Concrete SfTudures I.I.C, knowtl a_S "Principal" herein and
8 l=rankmmwh lnsurance Camoany a eorpgraK surely duly auflioriaed to do business in the State of
4 Texas, €cmmn as "Surely- herein (whether one or more), are held and Firmly bound unto die City
10 of Fort Worth, a municipal corporation emated pursuant to the laws of Texas, knowll aS "City"
I ] herein. in the penal sum of, One Million Five hundred Thousand and 00/100 Do[lars
12 ($1,500,0N.04 lawful money Of the United States, to be paid in Rai Worth, Tarrant Courtly,
t3 Texaas for the payment of which sum well and truly to be made, we bind oursetves, our heirs.
14 cxecmtors, adininistmtors, successors and assigns, jointly and sr3verally, firmly by these presents.
15 WH EREAS, the Principal has enlemd !Tiro a certain written contract w€th the City awarded
Ib the 99i day of April, 2024, which Contract is hereby referred to and ma& a part hereof for all
17 purposes n if fully suet forth herein, to furnish all inaterials, equipnient labor and other accessotie_s
[8 defined by law. in the prosecution of the Work, including any Change Orders, as provided fur in
19 said Contract dcsigrlated as 2024 Sidewalk Improvements Unit Price Construction Contrace,
20 Vsiriaaa City Project Number,-
21 NOW, THEREFORE, the condition of this obJiga ien i.s such that if the said Principal
22 shall faithi`ully perfbrin it ob]igalions urderthe Contract and shal€ in ail respects duly and faithfully
23 perform the Work, including Change Orders, render the Contract. according to the plans,
24 specifications, and contract documents therein reFormd to, and as well during any per€od of
25 extexrgion of the Contract that may be &rallied on die part of the City, then this obligation shall be
26 and become null and void, otherwise to rein ain in fuI I force and effect.
27 PROVIDED FURTH FK, [hrtt if any legal action he fileel on this Bond, venue shalt lie in
28 Tarrant County. Texas or the United States District Court for the Northern District of Tom, Fort
29 Worth Division.
3Q 'Chia bond is inade and executed in eomp€iance with the provisl0rts 01 Chapter 2253 of the
31 Texas Ciovernment Code, as amended, and all liabilities on 1k % bond shall be delerrrlined in
32 accordance with the provisions of said statue.
CITY OF r-owr wyicni 2424 Sidewalk 1rnfrowcnrt!y5 Uriil Prxe Caiulrucliw ionliact
STANDAIW CONSTRUCTION SPECI FICA710N E10CUMENTS. Various Citk Project Nuinbm
RevLwd Dece"her 8, 2023
4
5
6
7
8
9
1€1
11
i�
1
14
15
lb
17
13
19
20
21
22
23
24
25
26
27
28
29
39
31
32
33
34
35
36
37
38
39
40
006113-2
PER RIHi41?.EV{ V }Ef7HIJ
Page 2 a€'L
IN WITNESS WHER EOF, the PrincipaI and the Surety have SIGNED and SEALED tYEks
WS1rument icy duly authorized agents and afl'rcers on this the _ slay UF,�
— - , 2024.
ATTES'r,
— 41 ! OtL--�
pr-IRCtpalj Smrc�[xry —
Wi -ss as rn rijifval
T 0, ,;, ' Y 1, 6et
Witnew as to Surety
Pi21UC IPAI.
C 2Pka C'OMCre 5teucEures LLC:
BY: S toe _
1�amt�El T;�l{•
Address; F.O. Bux 426
Azle. TX 76M
SURETY;
Rankenmuth Insurance Comoanv
BY: ix��
tore
Iordm Nts, AU4)LT c-y-lA-Fact
Narne and TWe
Addre ; oneNtutualAve
Frankenmtith, MT 48787.
Telephone hlumba. 469-661-0314 --
Enull Address_ itts lttslbUdsanir,com
*Nate. if signed by an officer Df the Surety Company, there must be on file a certified extract
frnrn the by-laws showing that this person has authority to sign such obligation, if
Surety's physical address is different from its inailhig address, both must be provided -
The date of the bond shall not be prior to the dare the Caniract is awardnd-
CITY OP E?{)ff Y w{.iit rH 20N SWL-walk € npruvemenls UnN Pr[tc G Eisl=duft 4:onlract
STe%NDARD XNSTRUCTION SPECOCATION MCUMIiiNTS Various Oly PrgRlcl NurnLVF9
Revised December R. 2121
UOSI14-I
PAYMFNI- BOND
Page k of 2
i SECTION 00 6114 ldond Number. SUR2006604
PAYMENT BOND
3
4 THE STATE OF TEXAS §
5 KNOW ALL BY THESE PRESENTS:
C COLT TM OF TARRANT
7 That we, Capka Cowrett� Structures LLC, known as "Principal" herein, and
8 r"nker""th fnsuranre C!TPan3- , a COTPOlatV surety, duly authorized to do business in the Slate
9 of Texas, €crown as "Surety" herein (wheiher one or more), are held and firmly bound Ltnto the City
if) of Fort Worth, a rrknnicipgI wrporation created pursuant to the laws of the Slate of Tuxats, known
It as "City" herein, in the Knal sum of Ofle Million rive 1-lundred Thousand and MAW Dollars
12 ($1,500,000,00), lawful money of the United States, to be paid in Fort Worth, Tarrant County,
13 Texas. for the payn- wnt of which sum nail and truly be made. we bind ourselves. out heirs,
14 executors, administrators, successors and assigns, jolntly and severally. firmly by these presents;
15 WHEREAS, Principal has entered into a rWirl vattten Contract with City, awarded the
16 91 day of April, 2024, which Contract fs hereby referred to and made a tram hereof For al I purposes
17 as if fu Ily set roan heiAn, to furnish all materials. equipment, labor and odw accessories as defined
18 by law, in tine prosecurion of the mark as provided for in said Contract and designated as 2024
€9 Sidewalk Improvements Unit Price Construction Contract. Variow City Pn*ct Nun&ers.
20 NOW, THEREFORE. THE CONDITION OF THIS OBLIGATION is such that if
2€ Principal shall pay all monies owing to any (and all) payment band beneficiary (as defined In
22 Chapter U53 of the TeyAi Gnvcrnment Cade. as amt-nded) irk the prosecution of the Work under
23 the Contract, then this obligatton shall be and become milt avid void, otherwise to remain in full
4 Force and effect_
5 This bond is made and exectsLe,d iri camp Iiance with the provisions of Chapter 22-13 of the
26 Texas Guvernment Code, as atnended. and all liabilities on this bond shall be determined to
27 accordance with the provisions of said statute_
28
CITY OF FORT WORTH -2024 Sldexaik lmpcovrmenls t my race 0mgirmthmi 0)til rwr
STANDARD CONStRLA-rt17N 5Pi;CTFICATION D00-- MEKTS Varkus City C'm[eu Nuftdels
Revised DbmTaer 8, ?04a
0061 t4-2
MYMTt NT BOND
PIV aofz
I IN WfTN ESS WHEREOF. the Prinelpai attd Surety have each Sf IVED and SEALED
2 this irstrtimem by duly autttor12ad agents and of'iicees on this the 2,041, day of
3
4 f
ID
12
XFTEST.
{Printip�lj ecrctaey
Pess as to Frinci�i69L
PRINCIPAL-
Capkt} 0mcme Structures LL
S gna�urc
Marne and Title
Address: P.O- Bnx 426
Azle. TX 76098
SIJRETY;
Frankemnuth irL3Urance Cpmpany
iT l'i?ST: "Y'
Sid
tardan Fitts. A#tomay-In-Pact
(Surety) Secretary Me]issa Pitts ~— Name and Title
Address: One Mutual Ave
Frankenmuth, MI 48787
Witness as to Suety
Telepbone Number: 40-661•0314
Email Address_ _jpitts@pittsbirdsanp-corn
Note' IfMgnod by an officer of the Surety, there must be on file acertified extract From tite bylaws
01DWIng that this person has autherlty to sign such obligatiorl. If Surety's physical address is
ditterent from Its inatling addrew, both must he provided.
The date of the bond shall not be prior to the date the Contract Is awarded.
END OIL SECTION
CVT'Y OF FOR7 wClxn [ 2024 Sidewalk IffWmvemm Unit PrLce CokiMnceunn Conufiu
S1`ANDAR13 CONSTRUCTION SYLCt$i1C=A'1f0N VOCUtoTEN s5 V*TirW¢Clly i'MJC i Nw®tirrs
Rcvised Ncemler R. Z023
FRANKENMUTH JINSURANC9 COMPANY
POWER OF ATTOMMY
KNOW ALL MEN BV THESE PRESENTS, chat Fran ken mu[h Insurance Company (Ihe `�-,ampany`). a corporation duly organised
and existing under Ilse laws of the Stan of Michigan, having us principal office al I Mlutu31 Avenue, Frankenmuih, Michigan 487V,
does hereby nominate. constitute Rrad Appaint'
Jordan Pi#ts, Lloyd Ray Pits Jr., William D- Birdsong
Their true and Iawral aitorney(s)-in-fact. each in ilieir sepafaie capactly ir- inore than one is nained alcove, to make, execute, seal,
acknowledge artd de{ivcr any and all bonds, contracts and undertakings of suretyshilr, with Ihe excerAian of Financial Guaranty
Insurance, pro-vided, however, than Ihe pepat 541m of any ate suclti irtStFUPItUl %'.halI nOE eXC4:Vd the sum UF'.
Fifty Million and 001100 Dollars ($54,000,000)
This Power of Atiorncy is granted pursuarEl lu [he folaowing Resolution duly adopted at a mtoi rig of rh a Bawd of Directors of
Frankeninuth Insurance Company_
"RESOLVED, [ha( the President, Seer lof Vice President or Vice President and each of [heart under their respectiwc
designations. hereby i5 authorized to exec We powers of artorncy, and such authority can be executed by ttse of facsitnRe
signature, which may he attested 4r acknowledged by arty offiecr of the Company, quaiifying [he attornep(s) named in [he
given power 0Cattorney, to execute on behalf of, and acktrawIedge as the act and deed of Fvarikcnmuth Insafancc Company
on all bonds, coatracis and undertakirigs of suretyship, and to aflGx the corporate sfal Thereto-"
[N WITNESS WHEREOF, the Company has coused chest! pre Penis to be signed and a[tested by its appropriate officers and its corporate
scot hetieertttp' this ]Slh day DfDU=
1
Frank-enmuth rrmurance Company
l;redericlC A- Edn�ar�d, Jr.,
,= president and Chief Execwiwe OfFFcer
5 ' T�.dr1J� 1 �
O y OFMK A W
Sworn to before roe. a Notary Pub1w kn the State of Michigan, by Frederick A- Umond, Jr.. 10 me personally known to be Ihe indiuiduat
and officer dieseribcd in, and who executed the precedil1g irrslrumew, deposed and said the C'orporam Seal and his sigfiawu y6
were affixed and sijbscr,hed to said instrumcrn[ by The authnrity of the Company. �11%!, .e
IN TEST]i4IONY WHERE0F'r I havt<sm my hand. and affixed my OffEcia[ Seal this 13th day of December, 2t
ed
ctr
Susan T.. Ftesorger, lolary PAR
Saginaw County. Sato of Michigan
My Commission ExpLres: April 3. 2028
IF
1. the urrdetsigned, Exceulive Vice Fresidcot of Franke nmuth Insurance Company- do hereby certify that Ihe foregoing is a Irue. corfrco
and compleiecopy of rhr original Power of Attorney; chat said Power of Attorney has not been revoked or reWnded and is in full rbree
and eflect as of [his date.
IN WITNESS WHEREOF, 111dvtt set m} hand aad affixed Ihe Seal of"Carn , ibis LJ��Oilnday a4
Andrew H. Knudsen, Execuliwe Vice President.
Chtrf Operortng Officer and Secretary
ALL C0Rli✓riSP0.V1)F.VCF, RELtTED TO HOND VALIDATION ANWOR A CLAIM SHOULD AEDIRECTED TO
VP SURErV, 701 U.S. ROUTE ONF., SUITE r, YA RMOUTH, ME 440 ri
IMPORTANT NOTICE TO ALL TEXAS POLICYHOLDERS
IMPORTANT NOTICE AVISO IMPORTANTE
To obtain info rmalian or make a complaint
You may call Frsnkenmuth Mutual Inaur-ance
Company toll -free telephone number for
information or to make a camplairrt at:
1-704-421-7002
You may also write to Frankenmuth Mutual
Insurance Company at'
FrankenmUth Mutual Insurance Company
One Mutual Avenue
Frankenmuth. MI 48787
You may contact the Texas Department of
Insurance to obtain Information on companies,
coverages_ rights or complaints at:
1-800-252-3439
You may write the Texas Department of
Insurance:
P.O.Sm 149091
Austin, TX 78714-9091
Fax. (512) 00-1007
Web: htlp-lAwm.tdj.texas.gov
E-mail: ConsumarProtection tdi texas.gov
PREMIUM OR CLAIM DISPUTES -
Should you have a dlspWe concerning your
premium or about a claim you should contact
the Frankenmuth Mutual Insurance Company
first. tf the dispute is not resalved, you may
contact the Texas Department of Insurance.
ATTACH THIS NOTICE TO YOUR POLICY.
This notice is for information only and does not
become a part or condition of the attached
document.
Para obtener information o para someter una
queja:
Usted puede liamar al numero de telefono gratis
de Frankenmuth Mukual Insurance Company
Para mformacion o Para sornster urea queja at:
1-7 04-42 t -7002
Usted tarnbien puede escribir a Frarnkenrnuth
Mutual Insurance Company:
Frankenmuth Mutual Insurance Cornpany
One Mutual Avenue
FrankernmUth, MI 48787
Puede camunicarse corn el Departamento de
Seguros de Texas pars obtener Inform ion
acerca de companias, coberturas, derechos o
quejas all:
1-800-262-3439
Puede escribir al Cepartomento de Seguros de
Texas:
P.O. Box i49091
Austin, TX 78714-3991
Fax: (512) 490-1007
Web' http'/AVWw.tdi.texae,g0V
E-mail, ConsurnerProtection@tdi_texas.gov
OJSPUTAS SORRE PRIMAS O RECLAMOS: Si
tune una disputa cancermenre a su prima o a
un recWmo, debe comunicarse can el
Frankenmuth Mutual Jnsurance Company
prxmero, Si no se resuelve la d sputa, puede
urrtoris comunicarse con el departarnento
(TDI).
UNA ESTE AVISO A SU POLIZA Este aviso es
solo para propos4o de informac"ron y no se
Lonvierte an parte o condicion del documento
sdjt,nto
00 MLOG42 44 04 16 Page 1 of 1
oust t9 - t
MALNT ENANCE E CWL3
Page t OH
1 SECTION 00 6119 [land Number: SUR2006644
2 MAINTENANCE BOND
3
4 THE STATE OF TEXAS
5 KN OW ALLBYTflESFFRESENTS:
6 COUNTY OF TARRANT �
7
8 That we Capko Concrete Struclum LLC, known as "Principal' herein and
'� Fratakerarnutil Insurance c' r,n. uany, a enrpaEuY surety duly authorl , to d bush s €n the Sate Of
10 Texas. known as 'Surety" herein (whether one or more) . are held and ftnnly baLmd unto the City
11 of Fort Worth. a municipal corporation created pursuant tti the taws of the State of Texas. ktrnwn
12 ;�s 'City' herein, in the sure of 0ae Million Five Hundred Thousand and Owfou Dollars
13 ($1,500,000.00), lawful money of the United States, to be paid in Fort 41+arth, 'Tarrant County.
14 Texas. For payment of which sum well and truly be made unto the City and its successors, we bind
15 ourselves, our heirs, execvt,ors, admintstrators, successors and assigns, Jointly and severally, firmly
16 by these presents,
17
18 WHEREAS, die Principal has mwred into a certain written contract with the City awarded
19 the 91" day of April, 2024, which Contract is hereby referred to and a made part hereof for all
20 purposes as If Fully set forth herein, cc) furnish all materials, equipment labor and other accessories
21 as dettned by law, in the pruwcuficn of the Work, including any Work resulting fmrn a duly
22 authorized Change Order (collectively herein, the "Work') as provided for in said contract and
23 de:ngnated m 2G24 Sidewalk Improvements Emit Price Construction Contract, Various City Project
24 Numbers; and
25
26 iERIEA _ Principal bloods itself to use such materials and to so construct the Work in
27 accordance with the plans. Sp"iflcaHum and Contract Documents that the Work is and will remain
28 frr--e frnm defects in materials or war kntanship for and during the period of two 12) years after the
29 date of EInal Acceptance of the Work by the City ("Mziintenance Period"); and
30
31 WHEREAS, Principal binds Itself to repair or recoToruct the Work in whvlt: car I part uPIn
32 receiving notice from the City of the need therefor at any Hme wlIhin rhrs alntem-ance Period,
33
CfTY OF FORT WORM 2n& Skkw&k tiuWK& v m1s Uptr price Conimmma C omirwe
STANDARD C )NS7RUCT[0A SPEC3FICATION EK)C VMEVN Various Clay "a Numbm
RvAKL� Ox'MIriber 2, 20n
MAINTENANCE BOND
PaRC 2 nr 3
1 NOW THEREFORE, the c ondhion of this obligation is such that if Principal steal l remedy
2 any defective Work, for which ttmciy notice was provided by City, to a to
3 dos City, then this obligation shall become null and void; otherwise to remain In full Force and
d effect,
5
6
18
19
PROVIDED, HOWEVER, if Principal shall fatl so to repair or reconstruct any timely
noticed deflective Work, it is agreed that the City inay cause any and all such defective Woil to be
repalmd andfor reconstructed with all assncidted costs thereof being borne by the Principal and the
Surety tinder this Maintenance honct; and
PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall Ile in
Tafrant Cow Lty, Texas or the United States DistriL:t i ciurt for the Northern District of Text, Fort
Worth Dig U)n; Arid
PROVIDED FURTHER, that this abligation shall he continuous in nature and successive
receverles may he had hcTr:on For successive breaches_
GtrY OF FORT WGRI 4 EU2A Sidewalk hgprovem ft Unit Price ivimunecibm Comma
S 'ekNJ)ARD CONSTRUCTION S?M- PiCrMON DU,'UN14N 25 V40UMCity PFd*CA NCIMkWra
Revw d x mimkw & M23
oast 19.3
MAlMENANC . HUmD
Fzgv s 13F3
1 IN WITNESS WHEREOF, the Principal and the Surety have earls S I N ED and S EALED this
2 Instrument by duly authorized a8ents �tntf (Oficers on this the ')%OA43 day of
3 , 2024-
5
B
7
8
10
11
12
13
14
t5
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
4
PRINCIPAL
Capka Concrete Structures LLC
BY
Or SlgnetM�r'
ATTF5T-
1)(.'ad -
[Prtnetpai) Secretary N,3mn anA Tula
Address: P-0. Box 42�
Axle, TX 7$098
1 ss as Principal
SURETY:
Frankenmu#h Insurance Com arry
€ Y.
tore
Jordan Pitts, Attorney-ln.Fact
ATTEST: k Name and Titie
f
Address; 0ae Mutual Ave
(SuretYr)' Secretary McIissa Pitts Frankenmuth, MI 48787
Witness as to surety Tclephaac Number-. 469-661-0314
HmaiI Addre��: _jpitts,@pittsNvLWngrco,n
*Note: If signed by ar+ officer of the Surety Company, there must be on ftle a certified extract
from the by-laws showing that thin person has authulty to signs such obligation- if
Sstreiy'5 physical address is diFF!rent from Its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
city t7F rORT WORTH 2024 SldewEA imprQWMff $ Un94 Pricr. Canatnrctkan Caf&aal
SThNVARD COKSTRUC'IIG SPEOFTCAT1Odti DOCUMr-MrS vadmw City E4"t N(unheo
REv6ed oeKember 2. 2023
FRANKEhfMUTH INS URhN CC COM PA NY
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS, that Frankenmuth Insurance Company (khe "Company") a cerpordttion duly organized
and existing unifer the laws of the Slate of Michigan, hawing iis Principal -office at J Mutuai Avenue, Fraaketimuth, Michigan 48797,
discs hereby nominate, eonsthutr and appoine
Jol-dan Pitts, Lloyd Flay Pitts Jr_, William D. Birdsong
Their irua and Ia.wful ta[torncy(s)-in-fact, t�Ach i,i Ilie ir separale capacity if more than oaa is named above, [o make, execute, seal.
acknowledge and deliver any and all bonds, comrarrs and undertakings of suretyship. wish the exception of Financial Guaranty
Insarranee-, provided, however, ilkat iha penal suer of any one sucli insirunfcnt shall not exceed the sum of.
Fifty M1111un and ON100 Dollars 0,000)
This power of Aitorncy is granted pursuant to the Fallowing Rcs4lution duly "op[astl at a mea:ting of the BOa2rd Of DiFeCtrtra of
Franice'nmuO Insurance Company:
.-RESOLVED, chat ihC PTCSidenl. SeRkdf VICC President or Vice Prasidem and each of them under their respeclive
designations, hereby is aulhafizrd to axeCule puwers of attorney, and such authority cxn be execu led by use of facsimile
signature, which may hx aitested ar acknewiedg-d by any 0 115arr of the Company, quaitfyirig the attorney(s) named in the
given power of attorney, to execute on behalf of. and acknow[edge as the A0 acted deed of FrankenmLIM Insurancr< Company
nn all bonds, C4atracIS and underlakings Of s[xre[yship. and to affix [he cnfporave seal thereto."
tN 4k ITNE5S WH ERFAF, the Com pa n y h as caa Seri Ihcse press rt[s t-o b-c sigricd and atlesied by i [s ap fJ r0l3riALG a f free" anti its cmrporate
seal hepatrtltii)Wod.this 151h flay of c ber, 2022.
Frankenmutb fesurarice Cornpiny
40 Frederick A. Edmofld, In.
5 TF.
1 .= Presidew and Chief Execkitive Officer
Co Y OF ' } SKI
...,. .
SWOrn to before mu. aldtxafy J'UNX In the State of Michigan. by Frederick A. Edmond. Jr., to me personallyknown to be the individuai
and officer descrihed in, and who execa led ibc preceding in pmritem, deposed and said the Corporate Scal and his 5iguulu�rs
were affixed and subscfsbed io said instrument by the authority of the Ivompany, ,w*19
IN TESTIMONY WHEREOF. t have sct my hand, and affixed my Official Seal This 151h day of Decernbe% 202`�
t ti1
(Seal) _ X y
usatl L. F7csorger, Xalary Pit I, i
Saginaw County, State of Michigan
My Commission Expires_ April 1, 2G28 ,p �
I, the undersigned. 8xecuTive: Vice President of Friiokcnrnuth lnfur4acc Cornpany, do hereby csrtify rttat the foregoing is a true, oukreci
and complete Copy of the urigmal Fewer of Alturney; that said Puwarr of Attorney has not bl�n rcvuked or rescinded and as in fu11 force
and errant as of this date_
IN WITNESS WHEREOF, I have sit rrty hand and affixed the Seul k of [he Company, this � day of pl GO'A
Andrew H_ Knudsen, Excuwtivc Vice Presideni,
Chicf {operating Officer and 5ecaxtary
ALL CORRESPONDENCE PONDENCE REIA TED TO 80ND VALIDA TION ANDIOR A C'LA bV SHOULD BE DIRECTED TO
VP S')RErY, 101 U-S, ROUTE ONE, SLATE 1, YAR,x{OVTH, AM W096
IMPORTANT NOTICE TO ALL TEXAS POLICYHOLDERS
IMPORTANT NOTICE AVISO IMPORTANTE
To obtain information or make a complaint.
You msy call Frankenmuth WWI Insurance
Company toll -Frew telephone rs; mlaw for
information or to rn2�e a complaint at'
1-7 D4-421-7002
You may also write to Frankenmuth MutuaI
Insurance C ompany at.
Frankenmuth Mutuaf Insurance Company
One Mutual Avenue
Frankenmuth, MI 48787
`fokr may conlact the Texas f "rtment of
Insurance to obtain information on companies.
coverages, rights or compJaints at:
1-800-252 439
You may write the Texas Department of
Insurance:
P.O. Box 149091
Austin, TX 78714-9091
Fax: (512) 4' -1007
Web: http:1Ay wa_tdi,texas,gov
E-mail; Cons umerFrote ction tdi.texas gov
PREMIUM OR CLAIM DISPUTES:
Should you have a dispute concerning your
prernium or about a claim you should contart
the Frankenmuth Mutual Insurance Company
first. If the dispute is not resolved, you may
oantact the Texas Department of Insurance.
ATTACH THIS NOTICE TO YOUR POLICY:
This notice is for information only and does not
become a part or condition of the attached
document.
Para obtefier Mnformacion o para spmcter una
quefa:
Usted puede ilamar al numero de telefono gratis
de Frankenmuth WNW Insurance Company
para i€ forrmacion o psra someter una queja al;
1-704-421-7002
Usted tambi& puede escribir s Frankenmuth
Mutual Insurance Company'.
Frankenmutti Mutual Insurance Company
One Mutual Avenue
Frankenmuth, MI 48787
Puede 0ofnUnkars8 can al Departarnento de
Seguros de Texas para i3blener information
acerca de companias, coberturas, derechos a
quetas al'.
1-800-252-3439
Puede r:scF.Nr al Departamento de Seguros de
Texas,
P.O. Box 149091
Ausftnr TX 7B714-9091
Fax. (512) 490-1007
Web: ht1p'1Akww1di,texas,gov
E-mail. ConsurnerProtection@tdi texas,gov
DISPUTAS SOBRE PRIMA$ O RECLAMOS 5i
tiene una disputa concerniente a su prima o a
ups reclamo, debe comuNcarse can e:
Frankenmuth Mutual Insurance Company
primero. Si no se resuelve Ia disputa, Puede
entonces cumunicarse con el departamento
(TDI).
UNA ESTE AVISO A SU POLIZA: Este aviso es
solo para proposito de information y no se
convierte en parte o condition del documento
adjunto.
00 MLC042 44 04 16 Page 1 of I
FORT WORTH,..,
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE:2024 Sidewalk Improvements. Unit Price [CAPK01
M&C: 24-0274 CPN:
Date: 06/06/24
To:
Name
1.
Donnette Murphy
2.
Patricia Wadsack
3.
Lauren Prieur
4.
Priscilla Ramirez
5.
Doug Black
6.
Jesica McEachern
7
Ronald Gonzales
8
Janette Goodall
9
Allison Tidwell
10.
TPW Contracts
N/A CSO: 61573 DOCM
Department
Initials
Date Out
Risk -Approver
1.1 ""
06/10/24
TPW-Approver
pL
06/11/24
TPW-Signer
06/11 /24
Legal -Approver-
06/11 /24
Legal -Signer
1
36/12/24
ACM -Signer
36/18/24
CSCO-Approver
PgTf
)6/18/24
CSCO-Signer
06/18/24
CSCO-Form Filler-
06/18/24
TPW
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW
Contracts
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: []YES []No NEXT DAY: []YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Re aired:, ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File Link to the General Conditions & Technical Specs
Return To: Please notify TPWContracts a@fortworthtexas. oovv for pickup when complete. Call eat.
7233 or ext. 8363 with questions. Thank you!
FORTWORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: 2024 Sidewalk Improvements. Unit Price [Caakol
M&C: 24-0274 CPN: n/a
Date: 05/29/24
To: Name
1. John Capko IV/Capko Conc.
2. Proj. Mgr.: Fanta Kaba
3. Michelle Hadley -McGhee
4.
5.
6.
7
8
9
10.
CSO:
Department Initials
Vendor -Signer rsc
TPW-Signer F K
TPW-Review
DOC#:
Date Out
05/31/24
06/03/24
06/06/24
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW
Contracts
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: Please notify TPWCoirtracts(i�fortworthtexas.gov for pickup when complete. Call ext.
7233 or ext. 8363 with questions. Thank you!
0 Bond Verification
From:
Jordan Pitts
To:
svc. Aailoft
Cc:
TPW Contracts
Subject:
Re: PLEASE REPLY - BOND VERIFICATION REQUEST (2024 Sidewalk Improvements) ID:[fi7y3k/4958/1022]
Date:
Tuesday, June 4, 2024 5:11:34 PM
CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open attachments unless you recognize
the sender and know the content is safe.
Confirmed
Sent from my iPhone
On Jun 4, 2024, at 3:35 PM, agiloftsvc@fortworthtexas.gov wrote:
06/04/2024
Good afternoon Jordan.
The City of Fort Worth is in receipt of the following referenced bond(s) — BOND #SUR2006604, in the amount of
$1,500,000.00 (One Million Five Hundred Thousand and 00/100 Dollars), from Capko Concrete Structures
LLC, for City Project (2024 Sidewalk Improvements, Unit Price Contract).
Please provide confirmation that both the bond(s) and dollar amount(s) are valid. Your prompt attention to this matter
is greatly appreciated!
If there are additional questions or concerns, please do not hesitate to contact me at, michelle.hadlev-
mcaheeafortworthtexas.00v, or by phone, 817-392-7233.
Should this request have reached you in error, or needs to be directed elsewhere, please be so kind to provide the
name of the contact, with both an email address & phone number of the person or department being referenced. It is
appreciated.
,&okuiS/6twatd & pggpeeciative,
Michelle Hadley -McGhee
Contract Compliance Specialist
City of Fort Worth
Transportation & Public Works (TPW)
200 Texas Street, Fort Worth, TX 76102
Direct: 817-392-7233
Michelle. Had lev-McGhee(@fortworthtexas.gov