HomeMy WebLinkAboutContract 61573FORT WORTH& CSC No. 61573 CONTRACT FOR THE CONSTRUCTION OF 2024 Sidewalk Improvements Unit Price Construction Contract Mattie Parker Mayor Various City Project Numbers David Cooke City Manager Lauren Prieur Director, Transportation and Public Works Department Prepared for The City of Fort Worth Transportation and Public Works Department 2023 Kimley-Horn and Associates, Inc. TPBE Firm Registration No. F-928 801 Cherry Street, Unit 11, Suite 1300 Fort Worth, Texas 76102 817-335-6511 Scott R. Arnold, P.E. (#96782) OF TF� ° °°°q®®® .° ° ° °°°°.°.° ........ °°.° °SCOTT.... ARNOLD d a 0 96782 o 9�T 12/18/2023 /O ®-,'- ® OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORTWORTH. City of Fort Worth Standard Construction Specification Documents Adopted September 2011 00 00 00 TABLE OF CONTENTS Pagel of 5 SECTION 00 00 00 TABLE OF CONTENTS Division 00 - General Conditions Last Revised 0005 10 Mayor and Council Communication 07/01/2011 0005 15 Addenda 07/01/2011 0011 13 Invitation to Bidders 02/08/2024 0021 13 Instructions to Bidders 01/17/2024 0035 13 Conflict of Interest Statement 02/24/2020 00 41 00 Bid Form 09/30/2021 00 42 43 Proposal Form Unit Price 01/20/2012 0043 13 Bid Bond 09/11/2017 00 43 37 vv-r✓-ir Vendor Compliance to State Law Nonresident Bidder 06/27/2011 vvrrazviT vv-r✓-Ta 0045 13 00 45 26 Pfequalifiec4ieo Sta4eme n .o,,, alifieatio A ,.plie4 Contractor Compliance with Workers' Compensation Law mr30r202z 09 it 3 O2 t 07/01/2011 00 45 40 Business Equity Goal 10/27/2021 00 52 43 Agreement 3/08/2024 0061 13 Performance Bond 12/08/2023 0061 14 Payment Bond 12/08/2023 0061 19 Maintenance Bond 12/08/2023 00 61 25 Certificate of Insurance 07/01/2011 00 72 00 General Conditions 03/08/2024 00 73 00 Supplementary Conditions 03/08/2024 Division 01- General Requirements Last Revised 01 1100 Summary of Work 12/20/2012 01 25 00 Substitution Procedures 07/01/2011 01 31 19 Preconstruction Meeting 08/17/2012 01 31 20 Project Meetings 07/01/2011 01 32 16 Construction Schedule 10/06/2023 01 32 33 Preconstruction Video 07/01/2011 01 33 00 Submittals 12/20/2012 01 35 13 Special Project Procedures 03/11/2022 01 45 23 Testing and Inspection Services 03/09/2020 01 5000 Temporary Facilities and Controls 07/01/2011 01 5526 Street Use Permit and Modifications to Traffic Control 03/22/2021 0157 13 Storm Water Pollution Prevention Plan 07/01/2011 01 58 13 Temporary Project Signage 07/01/2011 01 60 00 Product Requirements 03/09/2020 01 66 00 Product Storage and Handling Requirements 07/01/2011 01 70 00 Mobilization and Remobilization 11/22/2016 01 71 23 Construction Staking and Survey 02/14/2018 01 74 23 Cleaning 07/01/2011 01 77 19 Closeout Requirements 03/22/2021 01 78 23 Operation and Maintenance Data 12/20/2012 01 78 39 Project Record Documents 07/01/2011 CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised March 8, 2024 00 00 00 TABLE OF CONTENTS Page 2 of 5 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents None Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: httn:Hfortworthtexas.eov/tnw/contractors/ or httDs:HaDDs.fortworthtexas.2ov/Proi ectResources/ Division 02 - Existing Conditions Last Revised 0241 13 Selective Site Demolition 03/11/2022 02 41 14 1 rtii:t n effi ,ya / n b r,1 f ffne11 /�1-2 0241 15 Paving Removal 02/02/2016 Division 03 - Concrete 03 30 00 Cast -In -Place Concrete 03/11/2022 03 34 13 Gaiitr-elled row St,.engtL, T a4 fia (rr S n 12/�20,L2012 03 3 4 4 6 Cene,.ote Base r,r to -ia fe f T-Fe ok Roar 12/20,L20z Division 26 - Electrical 7ti�o Demolition fee Eleetmfieal Systems 12/2z 2605 05 43 U-Rd,.,_., ian Duets andn..,.ew ,,s for- Lleet..:ea Systems 0�/nor 1�11 260550 r,,,,.,.,,,,r:,..,tions rfu ti. Duo,' Ceadait 02/tee Division 31- Earthwork 31 00 00 Site Clearing 03/22/2021 3123 16 Unclassified Excavation 01/28/2013 31 23 23 Borrow 01/28/2013 31 24 00 Embankments 01/28/2013 31 25 00 Erosion and Sediment Control 04/29/2021 31 37 00 Riprap 12/20/2012 Division 32 - Exterior Improvements Z7�Qv -T-Amr ar,,, n s,.1,.,1t n.,,,:r,. no,.,,:.. 12/20,9012 27� L' exible Base !''.,,,,-sus 17P)zzravizviz 37 1137 r :,,ui T-Fe..te c 1 08/21 /2n1 c ��I. �,1 '1i a�l� van�-aoz� 32 1216 Asphalt Paving 12/20/2012 32 Q 7-Allpkalt ,:,.. r v c 1 ..tom 12/� ^�z 32 13 �3 ,z CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised March 8, 2024 00 00 00 TABLE OF CONTENTS Page 3 of 5 32 1320 Concrete Sidewalks, Driveways and Barrier Free Ramps 12/09/2022 32 1373 Concrete Paving Joint Sealants 12/20/2012 32 1 n 1 ti �-zzrro 7 �,°��" .1L'iltg 12/20,L20 2 zzravraozz 32 1613 Concrete Curb and Gutters and Valley Gutters 12/09/2022 32 1723 Pavement Markings 06/10/2022 27� 7 (`,, , G �Aatw.g, 1 11 1 /04,L2013 3231 13 Chain Fences and Gates 12/20/2012 32 31 26 Wire Fences and Gates 12/20/2012 32 31 29 Wood Fences and Gates 12/20/2012 32 32 13 Cast -in -Place Concrete Retaining Walls 06/05/2018 3291 19 Topsoil Placement and Finishing of Roadway Right-of-ways 03/11/2022 32 92 13 Sodding 05/13/2021 322 92 11 Non N iye coed;„ 05/1�T 3' 92 15 Z7�3 Nat�sl'oc%.\'�d Wildflower- Seeding T fees a- d S1.... bs- 1 n1 /n 3 12/20,L2012 Division 33 - Utilities Z'2�T Closed Gir-e,,;t Television (CCTV4 lnspo..lim Eanikary-Se ef: 03/1�i 12�i Closed Gir-ettit Television (GGT37) 7,....,..,,,. n'lZ tl�� ��4�1. �14'�:4 12/0842 22� %'X/xo Nr^[�riff.g of H.Eistiag Sewer- Syste12/20,L2012 33 04 10 Toro, Beading ,,,..d Hleetfieal isel .tie 12/'lzzravizviz 2 A T 33 n1T ir.,..,-.,,.,;,,.ti. Anode r, thedie D«,.teet;,.,-. Syste 12/20,L2n12TpT�z 73-04-30 mT0�12014- 22� Glo..n;«.g and A,.eept.,nee Testing ..FAIIa4e f Mains 02/0� 33 05 i0 U44ity Tfeneh Rx,,,.y tic i, Eqi*-ad. ent, and Baekf;ll nn /n�21 33 05 Q �x�, 4er- 7 r Q/201Q 2 Ts-v�r Tv-uscrzza., �.�7/:alp�� �vrzvzz 33 �-v5-z3 Ffame, mrmrzozz 33 05 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to 03/11/2022 Grade Z'2�o (`one -ete 7xlate f Vaults 1 2 /'fr�-20, iviz 33 05 20 12/� ^z�z �--05-zrTtmael Linef Pla4e r2-20r2012- 77--v5-zz 12-20r2012 33 05 -2� 12/2n/2n12 7�--v7-za 7 ,. � r�-avravzz 22�T inst.,11,.�;,.,.. of'!''affi3t, n��� !`....iag of: T-ti .-.,,1 7 1/LPIr �W.e 12/0z 33 05 26 77tilit-y>\aar-kefs/7 ee 4,,f 12/ram2019 33 05 30 Location of Existing Utilities 12/20/2012 33rr05 Belts, ,and Gaskets rLrtvrtvzz 32�no Peetilz !?�. n*a 1 /n�22 33 11 11 r F �• nn/ T �., �� �� ��a~I�Its ✓� 11 12 U,.1.,.4,..,1 C1,lef de (PVC4 Pfe sefe Pipe nn/nmr 9,L2022 � 11 1., ar 2 3 c: P/uro PiN, Ba f �xr,.. pped, Steel Cylinder- Type 11 /' z �� 7:7--1-1-14 r2-20r20z2 Iry 027T4,2017 ✓� 1211 7 , fge Wa4er- „,rote,.,, 12/20,L2012 22� Resilient Sea4ed Gate [7..1.,o 05/0-5 CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised March 8, 2024 00 00 00 TABLE OF CONTENTS Page 4 of 5 33 1230 fer- Petable Water- Syste 12/20,/2012 33 12 0 cF;',01 /n T 33 1250 I�aatc Ea1.:i,T).: SteAieas 12/'fr�-zvrzviz 33 12 600 S„m..lxd off Valve n...,, Ribl., 06/lvvrri,ivi3 33 3i _ wed in P) 11 /�12 33 31 3 Fiber -glass Reinfer-eed Pipe f.,,- C*a- „t-y r..,,;tafy co..,o, 12/1�r�vizvii 33 31 3 (I-IDP.1) Pik., ,12019 333121 Em-dad Sewe 2/20,4012 Pipe 333122 c..�Por E"Ii* liXrrg 11 /�12 7T3r27 r2-204201z 333150 n e. rita-F . Sewer- Se ,iee Gemeet rs an Ser-vice r ; 04 /26/2n1 � �o �� 1Z�nv Gomnbiryat.a Air- VaPye fee S, .,harry S,...,,,,.>✓,. fee Mains- 12/rL7'zvnviz 33-3-9-10 CG`-,t k. Maze �v r2-20r201z 33-3-9-60 biftee�or EQ:ItQy" 04/29,9021 ✓3 11 11 High Density Polyethylene (I-IDPE) Drc�1Z 12/�14 22��2 rr D,.1lypf,..�...1,.ae Pipe f « S+om .J'ricl i i 06/1 z 32� �4dr-ainage 17/ 1 ')zz2vnviz 33-46 91 wed 90rm DrcYAG 07/nmT01,901i 33 4602 Tfaw . Dpc 1l ; 0�/n�11 33 49 1 Ga&t A. Plaza Manholes affd r,,,., fie B ., 12/�12 33 4920 Gur-b and D2or Inl>s 03 /�22 33 49 40 uo,.,l..,,,lls an xxr,�,....,,lls 07/01 /�n1 1 �B D�n114Q^� Division 34 - Transportation 3n7 i T"��`1�.. 1..e�' j, T`.... fl;.. C�; 1., 1 1 /�-2i,Livi3 34 41 �3 03/1 34-4Assemblies 12/2n/2n1�2 -�A ��� Il url�ilgiti�� � 34 4120.01 r r 06/1 c/2n1 c arm �D It ' .�liz.�ras �� 34 4120.02 > ..,,,,way r rrx n,.,.,1..... r 06/1 c/2n1 c �7.;1°1l.'tYC.G.'r3S vvrr✓rav'a� 34 4120.03 Resi 1 r4i l LED Roadway r , 06/1 c/2n1: �l.Xl.P.l�:3S vvrr✓rtvz� 34 nl 3n 2/2013 �o z4 u��mu.� .�grrs 11/1 �. 34-41 59 Single-Mede FiY/ar Optie Cable 02/fie 3471 13 Traffic Control 03/22/2021 Appendix FE-4.91 AvaLllilit.,. ,.f GG 4.02 914+- sieal Conditions CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised March 8, 2024 00 00 00 TABLE OF CONTENTS Page 5 of 5 FE-4t'il U Fly-4.06 13azurdetis Eavi arAnyin 1 Condition at Site GC-6.06.D Minority and Women Owned Business Enterprise Compliance GC +-6. n0�7 7Wage Rates r Naftdisar4ptizzation INei 1Z17aNDIU11110 CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised March 8, 2024 City of Fort Worth, Texas Mayor and Council Communication DATE: 04/09/24 M&C FILE NUMBER: M&C 24-0274 LOG NAME: 2024 SIDEWALK IMPROVEMENTS UNIT PRICE CONSTRUCTION CONTRACT SUBJECT (ALL) Authorize Execution of Unit Price Contracts with Ti-Zack Concrete, LLC in an Amount Not to Exceed $1,500,000.00 and with Capko Concrete Structures, LLC in an Amount Not to Exceed $1,500,000.00 for Task Order Construction Services for the Installation of Projects Relating to Sidewalk and Pedestrian Facilities Improvements at Various Locations (2022 Bond Program) RECOMMENDATION: It is recommended that the City Council: 1. Authorize the execution of a unit price contract with Ti-Zack Concrete, LLC in an amount not to exceed $1,500,000.00 for task order construction services for the installation of sidewalk and pedestrian facilities improvements on an as needed basis, with up to one renewal; and 2. Authorize the execution of a unit price contract with Capko Concrete Structures, LLC. in an amount not to exceed $1,500,000.00 for task order construction services for the installation of sidewalk and pedestrian facilities improvements on an as needed basis, with up to one renewal. These contracts will provide for construction services on an as -needed (task order) basis for the construction of capital projects relating to sidewalk and pedestrian facilities improvements at various locations across the City. The contract amounts are capped at $1,500,000.00. These contracts may be renewed up to one (1) additional term at the earlier of the expiration of contract funds or contract time under the same terms, conditions, and unit prices. The project was bid in a low bid format to determine unit prices to be paid when task orders are issued. Notice of bids was published in the Fort Worth Star -Telegram on November 30, 2023 and December 7, 2023. On December 21, 2023, five companies submitted the following bids: CONTRACTOR BID Ti-Zack Concrete, LLC $145,519.32 Capko Concrete Structures, LLC $166,595.00 EARTC $246,523.00 Urban Infraconstruction $338,371.00 The Fain Group, Inc. $339,999.15 The unit prices were compared to other similar projects and were determined to be fair and competitive. Task orders will be paid at the established unit prices. Projects initially identified include: 2022 Bond Year 1 sidewalk projects, 2022 Bond year 2- Glasgow Rd Project (City Project No.104758), 2022 Bond Year 2- Hardy St and Cleckler Ave Project (City Project No. 104759), and other projects as they are identified. A portion of this contract will be paid from the 2022 Bond Program for the above identified projects. The City's Extendable Commercial Paper (ECP) (M&C 22-0607; Ordinance 25675-08-2022) provides liquidity to support the appropriation. Available resources will be used to actually make any interim progress payments until debt is issued. Once debt associated with a project is sold, debt proceeds will reimburse the interim financing source in accordance with the statement expressing official Intent to Reimburse that was adopted as part of the ordinance canvassing the bond election (Ordinance 25515-05-2022). These task order contracts will serve current and future capital projects as -needed, and a funds availability verification will be performed by Transportation & Public Works Contract Compliance Managers prior to task order assignment. Ti-Zack Concrete, LLC is in compliance with the City's M/WBE Ordinance by committing to 11 % MBE participation on this project. The City's MBE goal on this project is 11 %. Capko Concrete Structures, LLC. is in compliance with the City's M/WBE Ordinance by committing to 11 % MBE participation on this project. The City's MBE goal on this project is 11%. a RigmV1110: i77�i/-ImN]:FL«]:1:401a101-IM[*]►>F The Director of Finance certifies that funds are available in the current capital budgets, as appropriated, in the 2022 Bond Program Fund and various capital improvement program funds to support the approval of the recommendations and execution of the contracts. Prior to any expenditure being incurred, the Transportation & Public Works Department has the responsibility to validate the availability of funds. Submitted for Citv Manaaer's Office bv: Jesica McEachern 5804 Oriainatina Business Unit Head: Lauren Prieur 6035 Additional Information Contact: Monty Hall 8662 Expedited 0005 15- 1 ADDENDA Page 1 of 3 SECTION 00 05 15 ADDENDA CITY OF FORT WORTH, TEXAS ADDENDUM NO. 1 To the Specifications and Contract Documents For 2024 Sidewalk Improvements Unit Price Construction Contract Various City Project Numbers Issued: December 19, 2023 Bid Date: December 21, 2023 at 1:30 P.M. CST This Addendum forms a part of the Bidding Documents and will be incorporated into Contract Documents, as applicable. Insofar as the original Contract Documents and Specifications and Construction Plans are inconsistent, this Addendum governs. Acknowledge receipt of this addendum by signing and attaching it to the Contract Documents (inside). Note receipt of the Addendum in the Bid Proposal and on the outer envelope of your bid. FAILURE TO DO SO MAY SUBJECT BIDDER TO DISQUALIFICATION. Prospective bidders are herebv notified of the following: This addendum includes the following: 1. Pre -Bid Meeting and Other Questions During the pre -bid meeting, the attendees asked the following questions. Official answers are being provided as part of this addendum: Q: If the prime contractor is MBE certified, can their participation count towards the MBE goal? A: Yes. Certified Business Equity Prime/Offeror Contractors counting their self - performance towards meeting the contract goal, must be certified within those NAICS commodity codes with a certifying agency acceptable by the City of Fort Worth. Certified Business Equity Prime/Offeror counting self -performing services towards the goal, the service(s) to be performed should be listed first on the Utilization form. Q: Is there a minimum work order amount? A: No. In previous on -call contracts, work orders have been $20,000 or more. Q: How many renewals are included? A: The contract allows for up to one (1) renewal. Q: How much is the on -call contract expected to be? A: The City anticipates the on -call contract amount to be $3,000,000. Q: Is asphalt work associated with curb and curb ramps subsidiary or paid separately? CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised July 1, 2011 000515-2 ADDENDA Page 2 of 3 A: This asphalt work will be paid for under bid item 30, HMAC Transition. Q: How many railroad projects are anticipated as part of this contract? A: The City anticipated 6 — 7 railroad related projects to be completed under this on -call contract. Q: Is mobilization paid for separately? A: No, mobilization is subsidiary to the project bid items. Q: What is the price for the landscape allowances for the Sidewalk Improvement Unit Price contract? A: These unit prices will be hard coded in, so they are the same for all bidders. A revised Proposal Form will be issued as part of this addendum. 2. City Chanaes a. The following sections have been updated and attached to this addendum. Changes are summarized below. i. Table of Contents 1. Listed all City specifications and struck through the ones that are not applicable to this contract. ii. 00 11 13 Invitation to Bidders 1. Struck through the language referring to pre -qualification. iii. 00 41 00 Bid Form 1. Section 5f, struck through reference to pre -qualification. 2. Removed some blank spaces. iv. 00 45 12 Prequalification Statement 1. Removed this document. v. 00 52 43 Agreement 1. Increased size of text and bolded text of project name on page 1. 2. Removed line for Form 1295 No. vi. 01 71 23 Construction Staking and Survey 1. Moved the attachments behind the 01 71 23 documents. vii. Appendix 1. Listed all City standard appendix section and struck out ones that aren't applicable to this project. Acknowledge your receipt of Addendum No. 1 by completing the requested information at the following locations: (1) In the space provided in Section 00 41 00, Bid Form (2) Indicate in upper case letters on the outside of your sealed bid envelope: CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised July 1, 2011 000515-3 ADDENDA Page 3 of 3 "RECEIVED AND ACKNOWLEDGED ADDENDUM NO. 1" All other provisions of the plans, specifications and contract documents for the project which are not expressly amended herein shall remain in full force and effect. Failure to return a signed copy of the addendum with the proposal shall be grounds for rendering the bid non -responsive. A signed copy of this addendum shall be placed into the proposal at the time of bid submittal. RECEIPT ACKNOWLEDGED: By: ,� By: I4u-9� A" Shweta Rao, P.E., PMP nn-- Senior Professional Engineer Company: ��( c,� Transportation and Public Works END OF SECTION CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various Ciq' Project Numbers Revised July I.2011 FORTWORTH. City of Fort Worth Standard Construction Specification Documents Adopted September 2011 00 00 00 TABLE OF CONTENTS Page 1 of 8 SECTION 00 00 00 TABLE OF CONTENTS Division 00 - General Conditions Last Revised 0005 10 Mayor and Council Communication 07/01/2011 0005 15 Addenda 07/01/2011 0011 13 Invitation to Bidders 07/19/2021 0021 13 Instructions to Bidders 11/02/2021 0035 13 Conflict of Interest Statement 02/24/2020 00 41 00 Bid Form 09/30/2021 00 42 43 Proposal Form Unit Price 01/20/2012 0043 13 Bid Bond 09/11/2017 00 43 37 vv-r✓-ir Vendor Compliance to State Law Nonresident Bidder 06/27/2011 vvrrazviT vv-r✓-Ta 0045 13 00 45 26 U -o,,u l: f:,,atien A ...Beat Contractor Compliance with Workers' Compensation Law mr34202z 08 it 3 i202t 07/01/2011 00 45 40 Business Equity Goal 10/27/2021 00 52 43 Agreement 10/06/2023 0061 13 Performance Bond 07/01/2011 0061 14 Payment Bond 07/01/2011 0061 19 Maintenance Bond 07/01/2011 00 61 25 Certificate of Insurance 07/01/2011 00 72 00 General Conditions 08/23/2021 00 73 00 Supplementary Conditions 10/06/2023 Division 01- General Requirements Last Revised 01 1100 Summary of Work 12/20/2012 01 25 00 Substitution Procedures 07/01/2011 01 31 19 Preconstruction Meeting 08/17/2012 01 31 20 Project Meetings 07/01/2011 01 32 16 Construction Schedule 10/06/2023 01 32 33 Preconstruction Video 07/01/2011 01 33 00 Submittals 12/20/2012 01 35 13 Special Project Procedures 03/11/2022 01 45 23 Testing and Inspection Services 03/09/2020 01 50 00 Temporary Facilities and Controls 07/01/2011 01 5526 Street Use Permit and Modifications to Traffic Control 03/22/2021 0157 13 Storm Water Pollution Prevention Plan 07/01/2011 0158 13 Temporary Project Signage 07/01/2011 01 60 00 Product Requirements 03/09/2020 01 66 00 Product Storage and Handling Requirements 07/01/2011 01 70 00 Mobilization and Remobilization 11/22/2016 01 71 23 Construction Staking and Survey 02/14/2018 01 74 23 Cleaning 07/01/2011 01 77 19 Closeout Requirements 03/22/2021 01 78 23 Operation and Maintenance Data 12/20/2012 01 78 39 Project Record Documents 07/01/2011 CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised October 6, 2023 00 00 00 TABLE OF CONTENTS Page 2 of 8 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents Division 02 - Existing Conditions 2 41 13 Seleetive Site Ilemel;tie 2 41 14 Utility D o....,,ya / A 1...-ade,..,..e Division 03 - Concrete 033000 Cat ICI Ill.se Goner-ete 03 34 13 !'',.,.t,-elle Low Strength >\44ef:i.1 (GI Ar 4 038000 >\aedifie i rs t Existing Gone Ole giuc4wes Division 26 - Electrical 260533 Raeeways d Jotoo for- Eleetfieal Systems Division 31 - Earthwork 31 1 o 00 Site Clear-iag �rrv-vv m�r�ng 312323 Beffe 31�r200 F/�I*--,vn.1--xi--Pts 313600 Gabions 313700 Ripmp Division 32 - Exterior Improvements 7Z0TTT A-0 !mot It"I." Z'72 W 23 Flme.N.z Da, Gawyint Treated Brio r Liquid Trem l tail F.,eA1.hzff 3'�66 z4 alt?Zi g Z 7�v Bfial Unites , Rg 5 r,, 1, Address PaipA n . �o Date Modified CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised October 6, 2023 00 00 00 TABLE OF CONTENTS Page 3 of 8 3232 13 Cast i Ulaee ram.ne -ete Retaining Walls 329213 Sedding 3293 43 T=fev z-ri 94rubs Division 33 - Utilities 33 0i 3T Q68ed CiV t TAeViSiOft (rrTV) hiSp eti,ffi 33 03- 10 EIN r Sewer- Syst 22� !'',.,-.-esio.. Gent..,.1 Toss Ctafi ns Z Z�= A ir.,...-.,..,;,,.f. A ,, ede r4t,, die We z- lli1S E �i3 J 33 04-30 4,a-T*oar J, 7x7atef eo,-.,;..o� 33 nn nn rl,.anki g a fi A , ., taft e Testing of WWeer >, ai ff. 33 04 50 Cleaning of Sewer- Mains 33-05 10 U44it , T o . L > . ., +i�r., Eml;adme,4 andB,,,,k ll Z'2�z �t� �I��� T ' him T ....�8wer-ing 3305 13.01 > ,.ame, , .r,e,. Gra de rade Rings r,.mp site �-oTrr. o-r 33 nc 14 Adjusting Manholes, > and Othef Stt-devdfes to Gfade 33 95 17 Genefete r llaf 330520 Aeger- Ber-ing 2Z� T.mnel Liner- Plate 3305-2= Steel r . ✓.,ff�Ib 11ir 3 330523 Hand T-umeling 33-05 24 lnctea1katim-e wrio: Pipe in Casing or Trmyr) Uf e 330530 7 ,,e tie f Edsti,..g U4i ;ties 33 11 05 -Boltz, Nutt, ana Gaskets 33 i i io Diaetilz 1m . P*,a 31-3 11 11 Deetile 7,.e Fittings �z ✓� 11 13 cGenefete Pfesstife Pipe Ba f 7x7.-.,,..,-.0,7 Steel r.,l;,, de - Type �v WxrccrvcrPxcO l irlAh , 3312 11 7 , e Wate f Mete s 2Z� Resilient Seatedr-.-p 17.11.,o 22�= A TI7TT7 A D,.4 be f Sea4e BtWe ffl., V.,1.,,.., 33 1230 Go's' !:r 7!ka Air- Valve A ssembl; iz Roy lV7. li wictef Sy stems 33 1240 Fire Hydrants 33 1250 Wa4ar Ea- Jzi E"tcatioao Z'2�0 Sf..,..,1.,f Blow off Valve A.,seff.1..1., 33 3i P F4bac1roo ioinf -ee Pipe f GFwvi , Eamitu-; -s 33 31 15 High Density Polyethylene (HDPE) Pipe fef Sa-aitafy Sewe CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised October 6, 2023 00 00 00 TABLE OF CONTENTS Page 4 of 8 33 3121 Ape 31112 Sa- y Se or 0* Liaiag 33 3123 �� c Enlxgaffiei}t Z Z77-41-i1 gi-gi, D4%ri I Pel.,,. hyl,fie (14PPE4 Pipe f Stotm. D1av--.A 3,32 11 12 Dorf -ee-Pel.,ethylem (SRPE) Pira 33 4600 drainage 33-46 01- 84e��d 9t3 I Dfaifts 3�-46-02 %2iiZti: Dpwrld 33-4 20 r,,,.l, and Drop inlets 33 49 40 ,Storm Dpa1aage uo,,,a..,,,lls and Alin...,,! Division 34 - Transportation 34 41 10 T,-.,ff;e Signals � 3 AA A�Oi Attaehmeat-A C-entrener- Gabinet ZAZA A�O2 rn#aehmefA B /''..,-.fellef Spee fiea4 „a .03 iit�'/.n PPi�.t 3Ate= , TF ff;.. C`;.. fta 11 13 Removing T- ff e Signals 211 11 if Reetan-ulr PEA F&%.-AiY 34 4 16 Pede�na Hybrid Signal 2 Ago Readwy IlluIininat o n s s o,....b4e 3 A A7Z-T1- .01 Aex.-'!.). LED P, Vf : ey ;_l x n;ff.1'Yas 34 .� Lµa�inairrs 34 4120.03 -Resi antial LT'D4?L�- :jxniaaires 34� 4130 Altwninta" 6 gns 3 A�3 T«.,ff;,, Ge fft e Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: httn:Hfortworthtexas.Lov/tnw/contractors/ or httDs:Hauns.fortworthtexas.2ov/Proi ectResources/ Division 02 - Existing Conditions 0241 13 Selective Site Demolition 0241 15 Paving Removal Last Revised 03/ 11 /2022 1 l Piz 02/02/2016 CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised October 6, 2023 00 00 00 TABLE OF CONTENTS Page 5 of 8 Division 03 - Concrete 03 30 00 Cast -In -Place Concrete 03/11/2022 l�Z�o Geiiefete Dace Ma4ef:ial fee rr,.eiiet7 Re13-.:, 11 /�142 038000 >\ ed:fie ieiis to > *istiiig r,...,.f 9t..1l:k-Hfes 121�, ^�z Division 26 - Electrical -260500 r,.... fflei Wef4E n siih, f f > leetwiea n3 /1�z quo Demolition fo- -Eleet.-iea Systems ' 6 05 33 Raeew ays and Boxes fe T 1o1`ITioa] Sr;4ems lq/�12 17/'l z 2605 43 U der-gr- t d Dttet&-a-x-zJ Raae s f^f Ele t,.iea Systo , 0:7/0T �H-A�-38 Co��I+rurrc� ti,.�s Mi lt: Diiet Gen"it 01/26,L2 � �� Division 31- Earthwork 31 00 00 Site Clearing 03/22/2021 3123 16 Unclassified Excavation 01/28/2013 31 23 23 Borrow 01/28/2013 31 24 00 Embankments 01/28/2013 31 25 00 Erosion and Sediment Control 31� 04/29/2021 1 dons 31 37 00 Riprap q/ z 12/20/2012 Division 32 - Exterior Improvements 32 n1 14 �z-vrry 32 n1 29 •ro.,.per-., n-pai. Tcrnpvrcrry-��0 l.I t ItI. ni�ccparr r,.,, Paving no..ai 12/2n/2n12 r�rzvrtvrs 12/20,4012 7-Z-v-rz7 17 11 7Z �rrrza 32 1 1 29 er-ete r 1.. r ���Ti l' ��s�-cvciisc� r :,.. e T-fe,t„d Base r,.,,,..,,,., r�-avravzz 12/2n/2n12 �z�vrtvzz 12/20,L20 2 Cement Treated Base C Liquid T- aatkzd Coil FXA/li er 06/10,L2022 08/�15 32 1216 Asphalt Paving 12/20/2012 32 i 73 32 13 13 -Aap alter ,:r,. ry e,.,,i rt., Ge n.,.,' 12/20,L2012 06/1nL2022 �� 32 1320 ft fete —: Concrete Sidewalks, Driveways and Barrier Free Ramps vvrrvrzozz 12/09/2022 32 1373 Joint Sealants 12/20/2012 3-2 14 16 DCo�n��cretePa�vi�ng &4✓f T.JPll V �,�,-i*g 1 2 /�r20,L20?z 32 16 13 Concrete Curb and Gutters and Valley Gutters 12/09/2022 32 1723 Pavement Markings 1, tiag 06/10/2022 1 1 /nrr nv�oi3 32 i7 5 3231 13 Ct Address Pail Chain Fences and Gates 12/20/2012 32 31 26 Wire Fences and Gates 12/20/2012 32 31 29 Wood Fences and Gates 12/20/2012 32 32 13 Cast -in -Place Concrete Retaining Walls 06/05/2018 3291 19 Topsoil Placement and Finishing of Roadway Right-of-ways 03/11/2022 3292 13 Sodding 05/13/2021 3292 14 N�. rl�,tr _- 05 /1 � L2021 12 92 if Wi dfti, wer- coed;,..,, 10/06,L2023 3293 43 Trees 3 9krubG 12/��2 CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised October 6, 2023 00 00 00 TABLE OF CONTENTS Page 6 of 8 Division 33 3 3�no - Utilities a ,,,, >\ 4, nn /nmry 3301 31 e f mid d Aiel e Testing ,L2019 Closed Gir-e it Television (CCT37) Insp .;on Furftafy SeweP 03/1�2-2 3`3-A�� Closed r• t Television (CCT37) Insp k. 03 /1 1 /3n23 �e�ec��eet}en�t� ��r �z 223 03 10 33�0 3 3� 33� Ry i f; Ptrfl�P;t�.g Of L',,;., ifig Q..Wer- SyS♦..13/3r�-20,L2012 T,.iw B,.,,.,1iiig ..-a Eleet+ieal T.,ela4:,..•. 13/7zzrzvnviz r,.,.,.esio,. C=eatfel Toss Stations 1 3 /3zz2vrzoiz TR....,-esit,-.-, Anode r.,tl.. die Pfeteeti.,,,. Syste .. 12/lzzrzvnviz 333 0430 33�0 33�0 33�e 3 2�2 To,v.,, e -afy TI atef C'o,-,,;e 07/nmT0W20 i rl,....-.iog cffid Aeeeiptanee Testi ig of [I 74ef Mains 02/03. Clo.,..:ng of Pipes 03/1�i Ufilit-y T,-ene 1✓,iea-f-atiar. Emlve,lmeiA and Baekf;ll 04/02,L2021 Wa4e - Line e T e e 1 2 P)zzrzvnviz 33�3 3305 14 1r..affi r,yef: and Gr-a 1 n;ff,., 09/09,L2022 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to 03/11/2022 �-4 Grade Genefete Water- - V..,,1ts- 1 3 /3 r n3 /1�z 3305 7 33�noAugef131 33�T C;eaefete llafs /3z %Hi3i31 13/3n/3�n13 '� Til�,1S Ill�r� z r 1 31 /3 2 3 33�4 Steel sing Npe z 1 3 /3n/3n1 3 Hand Turrroling ,� hist.11pAie... of'!'`affi.,. Pipe it Casing of Tunnel Liner- Pl.,t-e 13/02 3 3�o 33 05 30 T Tti 1: y A 4a f-ke fs /T ..e +E) f 1 3 /3rz�-20,L2 iz Location of Existing Utilities 12/20/2012 �J-�-A� 33 33 11 0 33�= 1+ ,l Gaskets 13/3n/3n13 �@rl, I�TUt�,ni'ia�-�r�acc�a rLrLvrzozz Deetile T,.e Pipe- 131 /n i D,.etil. T,.,,r Fitti nn/� ^�T 33 11 12 �2.-3 11 12 gs Polyvinyl Chloride (PVC) Pressure Pipe 09/09,L2022 Cenc�etePr- Wrapped, Steel r„l;..def Type 13/30,/3012 ✓� 11 11 Btffied Stool Pipe a -a Fitt ng- 13/3 i? 12 11 33�no Large rge Wa4er- Metefs 1 31 /3 z U,.sili S,.y.7>xr 33� iit C4e [mate Valve 05/0� A �x�-r-. ALA-Ru bea4ea Bi4te .fl„ Valves nn /23,L2019 33 1225 Genneetian *.o E,,,. ;ag W er- N47 :,.� 03 /n 3 �0 3�no C� 1�/lYYlit;,,,. A;,- �7..1„0 �00(�ii�l,`VI.o� fe f Potable Ala4ef Syst,,,�.� 12/'fr�-20,i012 v n 1 /n 33 1250 33�0 3331 2 �Fi:7fe 14ydfa*ts � T vi-m � Ecirf*% a sta4ieffs1 2llrt 20,L 012 Sta-,.da-.] Blow off Valve Assembly n6llvvrririvi3 Gtir-ed i Dlaee Pipe 122z 22�3 373 31 is 33�0 (CIPP4 !`_«.. i1✓7ibef:.�1iiass Ref r-ee 1 Pipe f .. ,,:ty Sa ff imzy Q,.,�-_• 12/�-20,Q012 '�3 Dm.-7j, Pely,,t1.,,1,ffe (14PPE) Pi,�.,, F,, SD-I1C, tWj,�ef 04/23,L2019 nn/n i r_.-ayit., C`.,.• ita-y Sewer Polyvinyl C le-ide 33 31 71 (PVC) C+Pipe �+,,����,. ga.Aitary—SG"c'v`ef 13/30/3013 7TJTZT �z Ripe 334z 33�3 Sa-nita-Fye --y Flits lining 12/20,L2012 1 3 /3 S,.wef Pipe L',ila S..,..ita f,, f..,.me Sanitary Sewer- Sefyiee r iffe 04/36/3013 33 31 70 Coml';ffiation kif V.,We f6 f S ritaf Sewer- Fo -ee Mains 12/20,L2012 CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised October 6, 2023 00 00 00 TABLE OF CONTENTS Page 7 of 8 333930 F4barglwc,�'Neles ,2/� ^�z 33 39 40 xx astewa4e . n eeess C>7a ffi of (WAG) , 2i� ^�z 333960 r ; o s & Sanitafy eonni�24- LYE D4%Ll'7�' Polyethylene (14PPE) Pipe fef: 01�43 Drain. ,z 31-3 11 13 33 4601 Slet4ed S orm D7d-Y3 n�in�14- 33-46 02 Tfamk Dpc i,m 07/01,L2011 33-49-49 CG\-,t r Ilka:.e ilar. JOT2S ,z 334929 C..,.t, and Drop inlets 03/1�i 3�-49 40 SokGr 11 Dmittnage u,.,.,1..,,.11s and xx iffg .,,,ll., n7in�. 1�11 Division 34 - Transportation 34 41 10.01 Ai7ry.v�g i !, Afellor !.bi a r12/19rL201 5 34 nevi ('`o fft..ellef S,.eei fieatie 02420Q 311 11 11 To.v.....,-afy T-..FF;,. Signals ,WIL200 34 �o • lllurriffyY.4eo12/20,L2012� 34 4120.01 r r 06i1c901 �yr z'1Y`✓.Y>a' . �� � .I:i'l3' �.lal"IPtY.7'73S ovrr�rzoz4 34 .� ����Inc�-,rvs ,L201-5 34 4120.03 r /, c l�es-iarltia r � ' .�,��irl�r2s n6 ,L201-c 34 41 30 Aluminum Signs 11/12/2013 3471 13 Traffic Control 03/22/2021 CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised October 6, 2023 00 00 00 TABLE OF CONTENTS Appendix Page 8 of 8 GG-4.01 Avc0c,,N.lity e f GG 4.02 gki-ja FE-40.6 H%z,...aous Eiiyi., offi eft l Ge ffd ties . 4 Site GC-6.06.D Minority and Women Owned Business Enterprise Compliance C-6.07 Wage Rates �G--vv C]'G lkzrmlts and T T4;14ie GG 6.24 1`T sai >K�rcratioa END OF SECTION CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised October 6, 2023 0011 13 INVITATION TO BIDDERS Page 1 of 2 SECTION 00 1113 INVITATION TO BIDDERS RECEIPT OF BIDS Sealed bids for the construction of 2024 Sidewalk Improvements Unit Price Construction Contract ("Project") will be received by the City of Fort Worth Purchasing Office until 1:30 P.M. CST, Thursday, December 21, 2023 as further described below: City of Fort Worth Purchasing Division 200 Texas Street Fort Worth, Texas 76102 Bids will be accepted by: US Mail, Courier, FedEx or hand delivery at the address above; Bids will be opened publicly and read aloud at 2:00 PM CST in the City Council Chambers. GENERAL DESCRIPTION OF WORK The major work will consist of the (approximate) following: sidewalks, curb ramps, driveways, signing, and pavement markings. The purpose of this invitation to bidders is to set unit prices and the City's contract budget may be less than the bid amounts, therefore, the City is not obligated to award a contract for the full bid amount. DOCUMENT EXAMINATION AND PROCUREMENTS The Bidding and Contract Documents may be examined or obtained on-line by visiting the City of Fort Worth's Purchasing Division website at httD://wWW.fortworthtexas.L-ov/Durchasins_/ and clicking on the link to the advertised project folders on the City's electronic document management and collaboration system site. The Contract Documents may be downloaded, viewed, and printed by interested contractors and/or suppliers. EXPRESSION OF INTEREST To ensure potential bidders are kept up to date of any new information pertinent to this project, all interested parties are requested to email Expressions of Interest in this procurement to the City Project Manager and the Design Engineer. The email should include the company's name, contact person and that individual's email address and phone number. All Addenda will be distributed directly to those who have expressed an interest in the procurement and will also be posted in the City of Fort Worth's purchasing website at http://fortworthtexas.gov/purchasing/ PREBID CONFERENCE — Web Conference A prebid conference will be held as discussed in Section 00 21 13 - INSTRUCTIONS TO BIDDERS at the following date, and time via a web conferencing application: DATE: December 12, 2023 TIME: 9:00 AM, CST Invitations with links to the web conferencing application will be distributed directly to those who have submitted an Expression of Interest. CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers Revised 7/19/2021 0011 13 INVITATION TO BIDDERS Page 2 of 2 The presentation and any questions and answers provided at the prebid conference will be issued as an Addendum to the call for bids. Prospective bidders can e-mail questions or comments in accordance with Section 6 of the Instructions to Bidders referenced above to the project manager(s) at the e-mail addresses listed below. Emailed questions will suffice as "questions in writing." If necessary, Addenda will be issued pursuant to the Instructions to Bidders. CITY'S RIGHT TO ACCEPT OR REJECT BIDS City reserves the right to waive irregularities and to accept or reject any or all bids. AWARD City may award contracts to more than one qualified bidder, lowest to highest, but is not required to award to any bidders. RENEWALS This Contract may be renewed up to one (1) additional term at the earlier of the expiration of contract funds or contract time under the same terms, conditions, and unit prices. FUNDING Any Contract(s) awarded under this INVITATION TO BIDDERS are expected to be funded from revenues generated from bonds and reserved by the City for the Project. INQUIRIES All inquiries relative to this procurement should be addressed to the following: Attn: Shweta Rao, P.E., PMP, City of Fort Worth Email: Shweta.Rao(&fortworthtexas.e_ ov Phone: 817-392-8022 AND/OR Attn: Scott R. Arnold, P.E., Kimley-Horn and Associates, Inc. Email: Scott.Arnold(Aimlev_ -horn.com Phone: 817-335-6511 ADVERTISEMENT DATES November 30, 2023 December 7, 2023 END OF SECTION CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers Revised 7/19/2021 00 42 43 BD)PROPOSAL Pegs I f3 SECTION 00 42 43 PROPOSALFORM UNIT PRICE BID PROJECT ITEM INFORMATION BIDDER'S APPLICATION BIDDER'S PROPOSAL BID I I Quantity Unit of IT Description Specification Section No. Measure Range/Est. Bid Quantity Unit Price Bid Value 1 0135.0101 Railroad Coordination 01 35 13 LS 1 1 $ - $ - 2 0135.0102 Railroad Flagmen 01 3513 WD 15 1 $ - $ - 3 0171.0101 Construction Staking �0171.0102 01 71 23 LS 1 1 $ - $ - 4 As -Built Survey 01 71 23 LS 1 1 $ - S - BASE BID -UNIT 1 -General Requirements $ - UNIT 2 - Existing Conditions 1-100 1 $ - $ - 5 0241.0100 Remove Sidewalk 024113 SF 101-500 1 $ - $ - 501+ 1 $ - $ - 6 0241.0300 Remove ADA Ramp 024113 EA 25 1 $ - $ - 7 0241.0301 Remove Detectable Warning Surface 0241 13 EA 10 1 $ - $ - 1-100 1 $ - $ - 8 0241.0401 Remove Concrete Drive 0241 13 SF 101-500 1 $ - $ - 501+ 1 $ - $ - 9 0241.0402 Remove Asphalt Drive 024113 SF 100 1 $ - $ - 1-100 1 $ - $ - 10 0241.0403 Remove Brick Drive 0241 13 SF 101-400 1 $ - $ - 401+ 1 $ - $ - 1-50 1 $ - $ - 11 0241.0500 Remove Fence 0241 13 LF 51-100 1 $ - $ - 101+ 1 $ - $ - 1-10 1 $ - $ - 12 0241.0600 Remove Wall <4' 0241 13 LF 11-30 1 $ - $ - 31+ 1 $ $ 13 0241.0700 Remove Mailbox 0241 13 EA 10 1 $ - $ - 14 0241.0701 Remove Multiple User Mailbox 0241 13 EA 10 1 $ - $ - 15 0241.0702 Relocate Mailbox - Traditional 0241 13 EA 10 1 $ - $ - 16 0241.0703 Relocate Mailbox - Brick 0241 13 EA 10 1 $ - $ - 17 0241.0704 Remove and Replace Mailbox - Traditional 0241 13 EA 10 1 $ - $ - 18 0241.0705 Remove and Replace Mailbox - Brick 0241 13 EA 10 1 $ - $ - 1-100 1 $ - $ - 19 0241.1300 Remove Conc Curb&Gutter 0241 15 LF 101-500 1 $ - $ - 501+ 1 $ - $ - 20 0241.1507 3" Surface Milling 0241 15 SY 100 1 $ - $ - BASE BID - UNIT 2 - Existing Conditions $ - UNIT 3 - Earthwork 21 3110.0102 6"-12" Tree Removal 31 1000 EA 10 1 $ � - $ - 22 3110.0103 12"-18" Tree Removal 31 1000 EA 10 1 $ - $ - 23 3110.0104 18"-24" Tree Removal 31 1000 EA 10 1 $ - $ - 24 3110.0105 24" and Larger Tree Removal 31 1000 EA 10 1 $ - $ - 25 3123.0101 Unclassified Excavation by Plan 31 2316 CY 150 1 $ - $ - 26 3123.0103 Borrow by Plan 31 2323 CY 150 1 $ - $ - 27 3124.0101 Embankment by Plan 31 2400 CY 150 1 $ - $ - 28 3125.0101 SWPPP 21 acre 31 2500 LS 5 1 $ - $ - 29 3137.0101 Concrete Riprap 31 3700 SY 250 1 $ - $ - BASE BID - UNIT 3 - Earthwork $ - UNIT 4 - Exterior Improvements 30 3212.0401 HMAC Transition 32 12 16 TN 60 1 $ - $ - 31 3212.0504 7" Asphalt Base Type B 32 12 16 SY 100 1 $ - $ - 1-2500 1 $ - $ - 32 3213.0301 4" Conc Sidewalk 32 13 20 SF 2.1-5000 1 $ - $ - 5001+ 1 $ - $ - 33 3213.0302 5" Conc Sidewalk 32 13 20 SF 1000 1 $ - $ - 34 3213.0303 6" Conc Sidewalk 32 13 20 SF 1000 1 $ - $ - 1-2500 1 $ - $ - 35 3213.0311 4" Conc Sidewalk, Adjacent to Curb 32 13 20 SF 2501-5000 1 $ - $ - 5001+ 1 $ - $ - 36 3213.0312 5" Conc Sidewalk, Adjacent to Curb 32 13 20 SF 1000 1 $ - $ - 37 3213.0313 6" Conc Sidewalk, Adjacent to Curb 32 13 20 SF 1000 1 $ - $ - 38 3213.0321 Conc Sidewalk, Adjacent to Ret Wall 32 13 20 SF 1000 1 $ - $ - 39 3213.0322 Conc Curb at Back of Sidewalk 32 1320 LF 200 1 $ - $ - 40 3213.0400 5" Concrete Driveway 32 13 20 SF 500 1 $ - $ - 41 3213.0401 6" Concrete Driveway 32 13 20 SF 500 1 $ - $ - 42 3213.0501 Barrier Free Ramp, Type R-1 32 13 20 EA 20 1 $ - $ - 43 3213.0502 Barrier Free Ramp, Type U-1 32 13 20 EA 20 1 $ - $ - 44 3213.0503 Barrier Free Ramp, Type M-1 32 13 20 EA 20 1 $ - $ - 45 3213.0504 Barrier Free Ramp, Type M-2 32 13 20 EA 20 1 $ - $ - 46 3213.0505 Barrier Free Ramp, Type M-3 32 13 20 EA 20 1 $ - $ - 47 3213.0506 Barrier Free Ramp, Type P-1 32 13 20 EA 20 1 $ - $ - 48 3213.0507 Barrier Free Ramp, Type P-2 32 13 20 EA 20 1 $ - $ - CITY OF FORT WORTH SrAND(iRD CONSTRUCTION SPPCBIC-ON DOCUM2 2024 Sidewalk Impmvcnunis Uml=ConA t-COnI[8d Revved 9l3012021 Venous QtyP erect Numlure 00 42 43 Bm PROPOSAL Pe 2 o0 SECTION 00 42 43 PROPOSALFORM UNIT PRICE BID PROJECT ITEM INFORMATION BID ITEM Description NO. 49 3213.0508 Barrier Free Ramp, Type C-1 50 3213.0509 Barrier Free Ramp, Type C-2 51 3213.0510 Barrier Free Ramp, Type C-3 52 3216.0101 6" Cone Curb and Gutter 53 3216.0102 7" Cone Curb and Gutter 54 3216.0102 Cone Laydown Curb 54 3216.0301 7" Conc Valley Gutter, Residential 55 3216.0302 11" Cone Valley Gutter, Arterial/Industrial 56 3217.0501 24" SLID Pvmt Marking HAE (W ) 57 3217.0502 Preformed Thermoplastic Contrast Markings - 24" Crosswalk 58 3217.0503 Preformed Thermoplastic Contrast Marking - 24" SLID 59 3217.0504 Preformed Thermoplastic Contrast Markings - 24" Stop Bars 60 3217.4306 Remove 24" Pvmt Marking 61 3231.0111 4' Chain Link, Steel 62 3231.0112 5' Chain Link, Steel 63 3231.0113 6' Chain Link, Steel 64 3231.0131 4' Wrought Iron Fence 65 3231.0132 5' Wrought Iron Fence 66 3231.0133 6' Wrought Iron Fence 67 3231.0141 4' Steel Tube Fence 68 3231.0142 5' Steel Tube Fence 69 3231.0143 6' Steel Tube Fence 70 3231.0301 4' Gate, Steel 71 3231.0302 6' Gate, Steel 72 3231.0303 8' Gate, Steel 73 3231.0304 10' Gate, Steel 74 3231.0305 12' Gate, Steel 75 3231.0306 16' Gate, Steel 76 3231.0307 20' Gate, Steel 77 3231.0411 4' Fences, Wood 78 3231.0412 6' Fences, Wood 79 3231.0413 8' Fences, Wood 80 3232.0100 Cone Rat Wall Adjacent to Sidewalk 81 3291.0100 Topsoil 82 3292.0100 Block Sod Placement BIDDER'F APPLICATION BIDDER'S PROPOSAL Unit of Quantity Specification Section No. Range/Est. Bid Quantity Unit Price Bid Value Measure Quantity 32 13 20 EA 20 1 $ - $ 32 13 20 EA 2C 1 $ - $ 32 13 20 EA 20 1 $ - $ 1-50C 1 $ - $ 321613 LF 501+ 1 $ $ 1-50C 1 $ - $ 321613 LF 501+ 1 $ $ 321613 LF 10C 1 $ - $ 321613 SY 50 1 $ - $ - 321613 SY 5C 1 $ - $ 32 17 23 LF 50C 1 $ - $ - 32 1723 LF 50C 1 $ - $ 32 17 23 LF 50C 1 $ - $ 32 17 23 LF 500 1 $ - $ 32 17 23 LF 2000 1 $ - $ 3231 13 LF 200 1 $ - $ 3231 13 LF 20C 1 $ - $ 3231 13 LF 20C 1 $ - $ 3231 13 LF 20C 1 $ - $ 3231 13 LF 200 1 $ - $ 3231 13 LF 20C 1 $ - $ 3231 13 LF 20C 1 $ - $ 3231 13 LF 20C 1 $ - $ 3231 13 LF 20C 1 $ - $ 3231 26 EA 10 1 $ - $ 323126 EA 1C 1 $ - $ 3231 26 EA 10 1 $ - $ - 323126 EA 1C 1 $ - $ 3231 26 EA 10 1 $ - $ - 323126 EA 1C 1 $ - $ 3231 26 EA 10 1 $ - $ 3231 29 LF 20C 1 $ - $ 3231 29 LF 20C 1 $ - $ 3231 29 LF 20C 1 $ - $ 32 32 13 SF 20C 1 $ - $ 3291 19 CY 100 1 $ - $ 1-100C 1 $ - $ 32 92 13 SY 1001-2000 1 $ - $ - 2001+ 1 $ - $ BASE BID -UNIT 4- Exterior Improvements $ 5 - Utilities 83 3305.0103 Exploratory Excavation of Existing Utilities 33 05 30 EA 1 50 1 $ $ 51+ 1 $ - $ 84 3305.0105 Inlet Adjustment 330514 EA 10 1 $ - $ - 85 3305.0106 Manhole Adjustment, Major 33 05 14 EA 10 1 $ - $ - 86 3305.0107 Manhole Adjustment, Minor 33 05 14 EA 10 1 $ - $ - 87 3305.0108 Miscellaneous Structure Adjustment 33 05 14 EA 10 1 $ - $ - 88 3305.0111 Valve Box Adjustment 33 05 14 EA 10 1 $ - $ - 89 3305.0114 Manhole Adjustment, Major w/ Cover 33 05 14 EA 10 1 $ - $ - BASE BID - UNIT 5 - Utilities $ - UNIT 6 -Transportation 90 3441.4002 Furnish/Install Alum Sign Ground Mount TxDOT Std. 3441 30 EA 25 1 $ - $ - 91 3441.4003 Furnish/Install Alum Sign Ground Mount City Std. 3441 30 EA 25 1 $ - $ - 92 3441.4004 Furnish/Install Alum Sign Ex. Pole Mount 3441 30 EA 25 1 $ - $ - 93 3441.4006 Install Alum Sign Ground Mount 3441 30 EA 25 1 $ - $ - 94 3441.4007 Install Alum Sign Ex Pole Mount 3441 30 EA 25 1 $ - $ - 95 3441.4108 Remove Sign Panel and Post 3441 30 EA 25 1 $ - $ - 96 3441.4109 Remove Sign Panel 3441 30 EA 25 1 $ - $ - 97 3441.4110 Remove and Reinstall Sign Panel and Post 3441 30 EA 25 1 $ - $ - 98 3471.0001 Traffic Control 3471 13 MO 1C 1 $ - $ - 99 3471.0002 Portable Message Sign 3471 13 W K 5C_ 1 $ - $ - BASE BID - UNIT 6 -Transportation $ - UNIT 7 - Nonstandard Items 100 9999.0001 Site Clearing 31 10 00 SY 500 1 $ - $ - 101 9999.0002 1"-2" Water Meter Box Replacement (Cone) 33 12 10 EA 5 1 $ - $ - 102 9999.0003 1"-2" Water Meter Box Replacement (Plastic) 33 12 10 EA 5 1 $ - $ - 103 9999.0004 Irrigation Repair Allowance 1 00 00 00 LS 1 1 $ 2,500.00 $ 2,500.001 104 9999.0005 Irrigation Repair Allowance 2 00 00 00 LS 1 1 $ 5,000.00 $ 5,000.00 1 105 9999.0006 Landscaping Repair Allowance 1 00 00 00 LS 1 1 $ 2,500.00 $ 2,500.001 106 9999.0007 Landscaping Repair Allowance 2 00 00 00 LS 1 1 $ 5,000.00 $ 5,000.00 1 FFY OF FORT WORTH STANDARD CONSTRUCTION SFECTICATION DOCUMENTS 2024 Sidewalk Improvements Umt Pn Conatroc Con- R2nud 9I30R021 Venous Ctty Ptolett Numbers 00 42 43 mOPROPOSAL Pe 3d3 SECTION 00 42 43 PROPOSALFORM UNIT PRICE BID BIDDER'F APPLICATION PROJECT ITEM INFORMATION BIDDER'S PROPOSAL BID Unit of Quantity ITEM Description Specification Section No. Measure Range/Est. Bid Quantity Unit Price Bid Value NO. Quantity 107 9999.0008 Detectable Warning Surface 00 00 00 SF 100 1 $ $ 108 9999.0009 Relocate Guy Wire 00 00 00 EA 1C 1 $ $ 109 9999.0010 Temporary Construction Fence 00 00 00 LF 200 1 $ $ 110 9999.0011 Lane Legend RR (Sidewalk) 00 00 00 EA 5 1 $ $ 111 9999.0068 Tree Protection 99 99 99 EA 50 1 $ $ BASE BID - UNIT 7 - Non -Standard Items $ 15,000.00 UNIT 8 - TxDOT Items 112 0450 6048 RAIL (HANDRAIL)(TY B) TxDOT Spec 450 LF 100 1 $ - $ - 113 0450 6052 RAIL (HANDRAIL)(TY F) TxDOT Spec 450 LF 10C 1 $ $ - 114 0506 6038 TEMP SEDMT CONT FENCE (INSTALL) TxDOT Spec 506 LF 20C 1 $ $ 115 0506 6039 TEMP SEDMT CONT FENCE (REMOVE) TxDOT Spec 506 LF 20C 1 $ $ 116 0506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") TxDOT Spec 506 LF 5C 1 $ $ 117 0506 6043 BIODEG EROSN CONT LOGS (REMOVE) TxDOT Spec 506 LF 5C 1 $ $ 118 0529 6002 CONC CURB (TY II) TxDOT Spec 529 LF 100 1 $ $ 119 0529 6007 CONC CURB & GUTTER (TY 1) TxDOT Spec 529 LF 10C 1 $ $ 120 0529 6008 CONC CURB & GUTTER (TY II) TxDOT Spec 529 LF 100 1 $ $ 121 0530 6004 DRIVEWAYS (CONIC) TxDOT Spec 530 SY 50C 1 $ $ 122 0530 6005 DRIVEWAYS (ACP) TxDOT Spec 530 SY 500 1 $ $ 123 0531 6001 CONC SIDEWALKS (4") TxDOT Spec 531 SY 300 1 $ $ 124 0531 6003 CONC SIDEWALKS (6") TxDOT Spec 531 SY 30C 1 $ $ 125 0531 6004 CURB RAMPS (TY 1) TxDOT Spec 531 EA 1C 1 $ $ 126 0531 6005 CURB RAMPS (TY 2) TxDOT Spec 531 EA 1C 1 $ $ 127 0531 6006 CURB RAMPS (TY 3) TxDOT Spec 531 EA 1C 1 $ $ 128 0531 6007 CURB RAMPS (TY 4) TxDOT Spec 531 EA 1C 1 $ $ 129 0531 6008 CURB RAMPS (TY 5) TxDOT Spec 531 EA 10 1 $ $ 130 0531 6009 CURB RAMPS (TY 6) TxDOT Spec 531 EA 1C 1 $ $ 131 0531 6010 CURB RAMPS (TY 7) TxDOT Spec 531 EA 10 1 $ $ 132 0531 6011 CURB RAMPS (TY 8) TxDOT Spec 531 EA 1C 1 $ $ 133 0531 6012 CURB RAMPS (TY 9) TxDOT Spec 531 EA 10 1 $ $ 134 0531 6013 CURB RAMPS (TY 10) TxDOT Spec 531 EA 1C 1 $ $ 135 0531 6014 CURB RAMPS (TY 11) TxDOT Spec 531 EA 1C 1 $ $ 136 0531 6015 CURB RAMPS (TY 20) TxDOT Spec 531 EA 1C 1 $ $ 137 0531 6016 CURB RAMPS (TY 21) TxDOT Spec 531 EA 1C 1 $ $ 138 0531 6017 CURB RAMPS (TY 22) TxDOT Spec 531 EA 1C 1 $ $ 139 0531 6032 CONIC SIDEWALKS (SPECIAL) (TYPE A) TxDOT Spec 531 SY 20C 1 $ - $ - 140 531 6033 CONC SIDEWALKS (SPECIAL) (TYPE B) TxDOT Spec 531 SY 20C 1 $ $ 141 531 6057 CONIC SIDEWALK (SPECIAL)(RETAINING WALL TxDOT Spec 531 SF 20C 1 $ - $ - 142 0644 6001 IN SM RD SIN SUP&AM TYI OBWG(I)SA(P) TxDOT Item 644 EA 20 1 $ $ 143 0644 6004 IN SM RD SIN SUP&AM TY1 OBWG(1)SA(T) TxDOT Item 644 EA 2C 1 $ - $ - 144 0644 6007 IN SM RD SN SUP&AM TYIOBWG(1)SA(U) TxDOT Item 644 EA 20 1 $ $ BASE BID - UNIT 8 - TxDOT Items $ - BASE BID SUMMARY UNIT TOTAL BASE BID BASE BID - UNIT 1 - General Requirements $ - (BASE BID - UNIT 2 - Existing Conditions $ - BASE BID - UNIT 3 - Earthwork $ - BASEBID - UNIT 4- Exterior Improvements $ - BASE BID - UNIT 5 - Utilities $ - IBASEBID- UNIT 6-Transportation $ - BASE BID - UNIT 7 - Non -Standard Items $ 15,000.00 BASE BID - UNIT 8 - TxDOT Items $ - ITOTAL BASE BID $ 15,000.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SFECTICATION DOCUMENTS 2024 S,&e k Improvements Umt Pn Conatroc Con— Renud9I30R021 Venous Ctty Pto Numbers 00 52 43 - 1 Agreement Pagel of 6 SECTION 00 52 43 AGREEMENT THIS AGREEMENT, authorized on , is made by and between the City of Fort Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager, ("City"), and , authorized to do business in Texas, acting by and through its duly authorized representative, ("Contractor"). City and Contractor may jointly be referred to as Parties. City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK Contractor shall complete all Work as specified or indicated in the Contract Documents for the Project identified herein. Article 2. PROJECT The project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: 2024 Sidewalk Improvements Unit Price Construction Contract Various City Project Numbers Article 3. CONTRACT PRICE City agrees to pay Contractor for performance of the Work in accordance with the Contract Documents an amount, in current funds, of Dollars ($ ). Contract price may be adjusted by change orders duly authorized by the Parties. Article 4. CONTRACT TIME 4.1 Final Acceptance. The Work shall be complete for Final Acceptance within the number of days specified in each Task Order, plus any extension thereof allowed in accordance with Article 12 of the General Conditions. 4.2 Liquidated Damages Contractor recognizes that time is of the essence for completion of Milestones, if any, and to achieve Final Acceptance of the Work and City and the public will suffer from loss of use if the Work is not completed within the time(s) specified in Paragraph 4.1 above. The Contractor also recognizes the delays, expense and difficulties involved in proving in a legal proceeding, the actual loss suffered by the City if the Work is not completed on time. Accordingly, instead of requiring any such proof, Contractor agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay City Five Hundred and 00/100 Dollars ($500.00) for each day that expires after the time specified in Paragraph 4.1 for Final Acceptance until the City issues the Final Letter of Acceptance. 4.3. Renewals This Contract may be renewed up to one (1) additional term at the earlier of the expiration of contract funds or contract time under the same terms, conditions, and unit prices. CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised October 6, 2023 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 00 52 43 - 2 Agreement Page 2 of 6 Article 5. CONTRACT DOCUMENTS 5.1 CONTENTS: A.The Contract Documents which comprise the entire agreement between City and Contractor concerning the Work consist of the following: 1. This Agreement. 2. Attachments to this Agreement: a. Bid Form 1) Proposal Form 2) Vendor Compliance to State Law Non -Resident Bidder 3) Prequalification Statement b. Current Prevailing Wage Rate Table c. Insurance Certification Form (ACORD or equivalent) d. Payment Bond e. Performance Bond f. Maintenance Bond g. Power of Attorney for the Bonds h. Worker's Compensation Affidavit i. MBE and/or SBE Utilization Form General Conditions. 4. Supplementary Conditions. 5. Specifications specifically made a part of the Contract Documents by attachment or, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents. 6. Drawings. 7. Addenda. 8. Documentation submitted by Contractor prior to Notice of Award. 9. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. Article 6. INDEMNIFICATION 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the city, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under this contract. This indemnification provision is snecificallv intended to overate and be effective even if it is alleged or proven that all or some of the damages being sought were caused, in whole or in part, by anv act, omission or negligence of the citv. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the city in defending against such claims and causes of actions. CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised October 6, 2023 005243-3 Agreement Page 3 of 6 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the city, arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licensees or invitees under this contract. This indemnification Drovision is svecifically intended to overate and be effective even if it is alleged or Droven that all or some of the damages being sought were caused, in whole or in Dart. by anv act. omission or negligence of the citv. Article 7. MISCELLANEOUS 7.1 Terms. Terms used in this Agreement which are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions. 7.2 Assignment of Contract. This Agreement, including all of the Contract Documents may not be assigned by the Contractor without the advanced express written consent of the City. 7.3 Successors and Assigns. City and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, in respect to all covenants, agreements and obligations contained in the Contract Documents. 7.4 Severability/Non-Waiver of Claims. Any provision or part of the Contract Documents held to be unconstitutional, void or unenforceable by a court of competent jurisdiction shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon City and Contractor. The failure of City or Contractor to insist upon the performance of any term or provision of this Agreement or to exercise any right granted herein shall not constitute a waiver of City's or Contractor's respective right to insist upon appropriate performance or to assert any such right on any future occasion. 7.5 Governing Law and Venue. This Agreement, including all of the Contract Documents is performable in the State of Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the Northern District of Texas, Fort Worth Division. 7.6 Authority to Sign. Contractor shall attach evidence of authority to sign Agreement if signed by someone other than the duly authorized signatory of the Contractor. 7.7 Non -appropriation of Funds. In the event no funds or insufficient funds are appropriated by City in any fiscal period for any payments due hereunder, City will notify Vendor of such occurrence and this Agreement shall terminate on the last day of the fiscal period for which appropriations were received without penalty or expense to City of any kind whatsoever, except as to the portions of the payments herein agreed upon for which funds have been appropriated. CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised October 6, 2023 00 52 43 - 4 Agreement Page 4 of 6 7.8 Prohibition On Contracts With Companies Boycotting Israel. Contractor, unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of the Texas Government Code, if Contractor has 10 or more full time -employees and the contract value is $100,000 or more, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Contractor certifies that Contractor's signature provides written verification to the City that if Chapter 2271, Texas Government Code applies, Contractor: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. 7.9 Prohibition on Boycotting Energy Companies. Contractor acknowledges that in accordance with Chapter 2274 of the Texas Government Code -(as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2), the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more, which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Contractor certifies that Contractor's signature provides written verification to the City that Contractor: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. 7.10 Prohibition on Discrimination Against Firearm and Ammunition Industries. Contractor acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1), the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Contractor certifies that Contractor's signature provides written verification to the City that Contractor: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised October 6, 2023 005243-5 Agreement Page 5 of 6 7.11 Immigration Nationality Act. Contractor shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Contractor shall provide City with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Contractor shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Contractor employee who is not legally eligible to perform such services. CONTRACTOR SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY CONTRACTOR, CONTRACTOR'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Contractor, shall have the right to immediately terminate this Agreement for violations of this provision by Contractor. 7.12 No Third -Party Beneficiaries. This Agreement gives no rights or benefits to anyone other than the City and the Contractor and there are no third -party beneficiaries. 7.13 No Cause of Action Against Engineer. Contractor, its subcontractors and equipment and materials suppliers on the PROJECT or their sureties, shall maintain no direct action against the Engineer, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the City will be the beneficiary of any undertaking by the Engineer. The presence or duties of the Engineer's personnel at a construction site, whether as on -site representatives or otherwise, do not make the Engineer or its personnel in any way responsible for those duties that belong to the City and/or the City's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The Engineer and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised October 6, 2023 005243-6 Agreement Page 6 of 6 IN WITNESS WHEREOF, City and Contractor have each executed this Agreement to be effective as of the date subscribed by the City's designated Assistant City Manager ("Effective Date"). Contractor: City of Fort Worth By: By: Signature William M. Johnson Assistant City Manager (Printed Name) Date Title Attest: Address Jannette Goodall, City Secretary City/State/Zip (Seal) M&C: Date Date: Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Shweta Rao, P.E., PMP Sr. Professional Engineer Approved as to Form and Legality: Douglas W. Black Sr. Assistant City Attorney APPROVAL RECOMMENDED: Lauren L. Prieur, Director, Transportation and Public Works Department CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised October 6, 2023 CITY OF FORT WORTH Transportation and Public Works 2024 Sidewalk Improvements, Unit Price Contract City Project No. n/a ADDENDUM NO. # 1 - END OF SECTION - 2024 Sidewalk Improvements, Unit Price Contract City Project No. n/a ADDENDUM NO. # 1 0011 13 INVITATION TO BIDDERS Pagel of 2 SECTION 00 11 13 INVITATION TO BIDDERS RECEIPT OF BIDS Sealed bids for the construction of 2024 Sidewalk Improvements Unit Price Construction Contract ("Project") will be received by the City of Fort Worth Purchasing Office until 1:30 P.M. CST, Thursday, December 21, 2023 as further described below: City of Fort Worth Purchasing Division 200 Texas Street Fort Worth, Texas 76102 Bids will be accepted by: US Mail, Courier, FedEx or hand delivery at the address above; Bids will be opened publicly and read aloud at 2:00 PM CST in the City Council Chambers. GENERAL DESCRIPTION OF WORK The major work will consist of the (approximate) following: sidewalks, curb ramps, driveways, signing, and pavement markings. The purpose of this invitation to bidders is to set unit prices and the City's contract budget may be less than the bid amounts, therefore, the City is not obligated to award a contract for the full bid amount. DOCUMENT EXAMINATION AND PROCUREMENTS The Bidding and Contract Documents may be examined or obtained on-line by visiting the City of Fort Worth's Purchasing Division website at httr)://www.fortworthtexas.L'ov/Durchasine_/ and clicking on the link to the advertised project folders on the City's electronic document management and collaboration system site. The Contract Documents may be downloaded, viewed, and printed by interested contractors and/or suppliers. EXPRESSION OF INTEREST To ensure potential bidders are kept up to date of any new information pertinent to this project, all interested parties are requested to email Expressions of Interest in this procurement to the City Project Manager and the Design Engineer. The email should include the company's name, contact person and that individual's email address and phone number. All Addenda will be distributed directly to those who have expressed an interest in the procurement and will also be posted in the City of Fort Worth's purchasing website at http://fortworthtexas.gov/purchasing/ PREBID CONFERENCE — Web Conference A prebid conference will be held as discussed in Section 00 21 13 - INSTRUCTIONS TO BIDDERS at the following date, and time via a web conferencing application: DATE: December 12, 2023 TIME: 9:00 AM, CST Invitations with links to the web conferencing application will be distributed directly to those who have submitted an Expression of Interest. CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers Revised 7/19/2021 0011 13 INVITATION TO BIDDERS Page 2 of 2 The presentation and any questions and answers provided at the prebid conference will be issued as an Addendum to the call for bids. Prospective bidders can e-mail questions or comments in accordance with Section 6 of the Instructions to Bidders referenced above to the project manager(s) at the e-mail addresses listed below. Emailed questions will suffice as "questions in writing." If necessary, Addenda will be issued pursuant to the Instructions to Bidders. CITY'S RIGHT TO ACCEPT OR REJECT BIDS City reserves the right to waive irregularities and to accept or reject any or all bids. AWARD City may award contracts to more than one qualified bidder, lowest to highest, but is not required to award to any bidders. RENEWALS This Contract may be renewed up to one (1) additional term at the earlier of the expiration of contract funds or contract time under the same terms, conditions, and unit prices. FUNDING Any Contract(s) awarded under this INVITATION TO BIDDERS are expected to be funded from revenues generated from bonds and reserved by the City for the Project. INQUIRIES All inquiries relative to this procurement should be addressed to the following: Attn:Shw-e& Rw, �E., PN Fanta Kaba, P.E., PTOE Sk. Email: c, wet RaoQf ,.�...,.Fthtexas e fanta.kaba(a fortworthtexas.sov Phone: 4I 40" 817-682-3181 AND/OR Attn: Scott R. Arnold, P.E., Kimley-Horn and Associates, Inc. Email: Scott.Arnold(Aimlev_ -horn.com Phone: 817-335-6511 ADVERTISEMENT DATES November 30, 2023 December 7, 2023 END OF SECTION CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers Revised 7/19/2021 0021 13 INSTRUCTIONS TO BIDDERS SECTION 00 2113 INSTRUCTIONS TO BIDDERS 1. Defined Terms Page 1 of 10 1.1. Capitalized terms used in these INSTRUCTIONS TO BIDDERS are defined in Section 00 72 00 - GENERAL CONDITIONS. 1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the meanings indicated below which are applicable to both the singular and plural thereof. 1.2.1. Bidder: Any person, firm, partnership, company, association, or corporation acting directly through a duly authorized representative, submitting a bid for performing the work contemplated under the Contract Documents. 1.2.2. Nonresident Bidder: Any person, firm, partnership, company, association, or corporation acting directly through a duly authorized representative, submitting a bid for performing the work contemplated under the Contract Documents whose principal place of business is not in the State of Texas. 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City (on the basis of City's evaluation as hereinafter provided) makes an award. 2. Copies of Bidding Documents 2.1. Neither City nor Engineer shall assume any responsibility for errors or misinterpretations resulting from the Bidders use of incomplete sets of Bidding Documents. 2.2. City and Engineer in making copies of Bidding Documents available do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license or grant for any other use. types rv"ir-ing pfequalifiea4ieii as per- 0 15 1! BIDDr4�6S J 15 12 NMEQUALIFICATION STATEMP.-IT. Fro `ion, muot stib .,it the ,t,,,.,,.,.,en4a4io idenfified i cee fi ,,. 00 n c 44 ealendar- days prior- to Bid opening for- r-e iew Lxtd, if qtialified, aeeepta-nee. The worE types. Suocentfaetorz muct -.�-,Zlow tho aarne tifnelines as Bidders f t..tain r . pir-.qualifte -r.—.. �Wrt . CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 2 of 10 UIMMEIT'So/.24FO of -2nn A vTOig-07 20C=QNrru A C=T-O e igaf 0 ,;2OC �st met ro;20-D ol1'1UntZ/Cent...,,.+,..oi2nn.o,,ual fiea4;,.nT--PW0,;20R..,dw .,1i20,ad-0, 2nno,oc%xicLrio/`nriehtineO, 2OPfe,.,,.,,:ficati�,-,,4o/, o 0 o eTTE/.lf Wa4er- rd E rrt/a\—y 4tr/j:/,bms f:,.....,,,..&e.Eas .,m,., ieet ese.H,.ees/Rese,,.eesPin2oi2n Oi2OC Est,..,etier,0;2ODeoll'1Unt9/r ft,..,eter-oi2nn.o,,ual fieatien3'a4eA;2Oand,0i2 Oga,it,oi2nSewe.oi2OCeii•1,..ete.oi2nn.o,.,,,,:f:CctiZiO/.2gPr-oer-a.,' SSof2n),.o opening,ealendar days prior- to Bid , I' -I . 3-.2.l.Fmbty:ia6air� 0 the City een4aet as pfe�A&d in R.rcgfaph 6. 1. 1li�Q�l1Mt bidder- for- a pr-ejeetUi"llt `l:additiena4 infefma4ion as the City, in its sole g �/aVr11\t !ti wt. , to assist the Qty in s7 ,,alw r. deliver- . quality pr-e, uet and s essfully eemplete pfe4eets-for Vhsz, gaunt bid ..;,� the Stipulated tiffie fiFaffie. Based upeo the ' c rfabl-f rttad Qly-Cotxioil. P , may be gr-etmds notified in wfifing of a one& 3.4. i addition t p o al fiea4ief addit;zinal ra"ir-oments f^,- .,l:f;,.ation may be required 3.5.OMITTED. 4. Examination of Bidding and Contract Documents, Other Related Data, and Site 4.1. Before submitting a Bid, each Bidder: CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 3 of 10 4.1.1. Shall examine and carefully study the Contract Documents and other related data identified in the Bidding Documents (including "technical data" referred to in Paragraph 4.2. below). No information given by City or any representative of the City other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the City. 4.1.2. Should visit the site to become familiar with and satisfy Bidder as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the Work. 4.1.3. Shall consider federal, state and local Laws and Regulations that may affect cost, progress, performance or furnishing of the Work. 4.1.4. OMITTED. 4.1.5. Shall study all: (i) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities) that have been identified in the Contract Documents as containing reliable "technical data" and (ii) reports and drawings of Hazardous Environmental Conditions, if any, at the Site that have been identified in the Contract Documents as containing reliable "technical data." 4.1.6. Is advised that the Contract Documents on file with the City shall constitute all of the information which the City will furnish. All additional information and data which the City will supply after promulgation of the formal Contract Documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents. No information given by the City other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the City. 4.1.7. Should perform independent research, investigations, tests, borings, and such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during the construction of the project. For projects with restricted access, upon request, City may provide each Bidder access to the site to conduct such examinations, investigations, explorations, tests and studies as each Bidder deems necessary for submission of a Bid. Bidder must fill all holes and clean up and restore the site to its former conditions upon completion of such explorations, investigations, tests and studies. 4.1.8. Shall determine the difficulties of the Work and all attending circumstances affecting the cost of doing the Work, time required for its completion, and obtain all information required to make a proposal. Bidders shall rely exclusively and solely upon their own estimates, investigation, research, tests, explorations, and other data which are necessary for full and complete information upon which the proposal is to be based. It is understood that the submission of a proposal or bid is prima -facie evidence that the Bidder has made the investigations, examinations and tests herein required. CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 4 of 10 4.1.9. Shall promptly notify City of all conflicts, errors, ambiguities or discrepancies in or between the Contract Documents and such other related documents. The Contractor shall not take advantage of any gross error or omission in the Contract Documents, and the City shall be permitted to make such corrections or interpretations as may be deemed necessary for fulfillment of the intent of the Contract Documents. 4.2. Reference is made to Section 00 73 00 — Supplementary Conditions for identification of: 4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to the site which have been utilized by City in preparation of the Contract Documents. The logs of Soil Borings, if any, on the plans are for general information only. Neither the City nor the Engineer guarantee that the data shown is representative of conditions which actually exist. 4.2.2. those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site that have been utilized by City in preparation of the Contract Documents. 4.2.3. copies of such reports and drawings will be made available by City to any Bidder on request. Those reports and drawings may not be part of the Contract Documents, but the "technical data" contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.02. of the General Conditions has been identified and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion drawn from any "technical data" or any other data, interpretations, opinions or information. 4.2.4. Standard insurance requirements, coverages and limits. 4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder: (i) that Bidder has complied with every requirement of this Paragraph 4, (ii) that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and applying the specific means, methods, techniques, sequences or procedures of construction (if any) that may be shown or indicated or expressly required by the Contract Documents, (iii) that Bidder has given City written notice of all conflicts, errors, ambiguities and discrepancies in the Contract Documents and the written resolutions thereof by City are acceptable to Bidder, and when said conflicts, etc., have not been resolved through the interpretations by City as described in Paragraph 6., and (iv) that the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work. 4.4. The provisions of this Paragraph 4, inclusive, do not apply to Asbestos, Polychlorinated biphenyls (PCBs), Petroleum, Hazardous Waste or Radioactive Material covered by Paragraph 4.06. of the General Conditions, unless specifically identified in the Contract Documents. CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 5 of 10 5. Availability of Lands for Work, Etc. 5.1. The lands upon which the Work is to be performed, rights -of -way and easements for access thereto and other lands designated for use by Contractor in performing the Work are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by City unless otherwise provided in the Contract Documents. 5.2.Outstanding right-of-way, easements, and/or permits to be acquired by the City are listed in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right- of-way, easements, and/or permits are not obtained, the City reserves the right to cancel the award of contract at any time before the Bidder begins any construction work on the project. 5.3. The Bidder shall be prepared to commence construction without all executed right-of- way, easements, and/or permits, and shall submit a schedule to the City of how construction will proceed in the other areas of the project that do not require permits and/or easements. 6. Interpretations and Addenda 6.1. All questions about the meaning or intent of the Bidding Documents are to be directed to City in writing on or before 2 p.m., the Monday prior to the Bid opening. Questions received after this day may not be responded to. Interpretations or clarifications considered necessary by City in response to such questions will be issued by Addenda delivered to all parties recorded by City as having received the Bidding Documents. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Address questions to: City of Fort Worth 200 Texas Street Fort Worth, TX 76102 Attn: Fanta Kaba, P.E., PTOE, Transportation and Public Works Department Email: Fanta.Kaba(&,,f6rtworthtexas.2ov Phone: 817-682-3181 6.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by City. 6.3. Addenda or clarifications may be posted via the City's electronic document management and collaboration system at: httDS://aDD-us3.e- builder.net/da2/Documents/ExDlorer.asDx?PortalID= { c8e646af-aea7-4421-892e- 535916a68d2el. CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 6of10 6.4. A prebid conference may be held at the time and place indicated in the Advertisement or INVITATION TO BIDDERS. Representatives of City will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. City will transmit to all prospective Bidders of record such Addenda as City considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. 7. Bid Security 7.1. Each Bid must be accompanied by a Bid Bond made payable to City in an amount of five (5) percent of Bidder's maximum Bid price, on the form attached or equivalent, issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. 7.2. The Bid Bonds provided by a Bidder will be retained until the conditions of the Notice of Award have been satisfied. If the Successful Bidder fails to execute and return the Contract Documents within 14 days after the Notice of Award conveying same, City may consider Bidder to be in default, rescind the Notice of Award and act on the Bid Bond. Such action shall be City's exclusive remedy in the event Bidder is deemed to have defaulted. 8. Contract Times The number of days within which, or the dates by which, Milestones are to be achieved in accordance with the General Requirements and the Work is to be completed and ready for Final Acceptance is set forth in the Agreement or incorporated therein by reference to the attached Bid Form. 9. Liquidated Damages Provisions for liquidated damages are set forth in the Agreement. 10. Substitute and "Or -Equal" Items The Contract, if awarded, will be on the basis of materials and equipment described in the Bidding Documents without consideration of possible substitute or "or -equal" items. Whenever it is indicated or specified in the Bidding Documents that a "substitute" or "or - equal" item of material or equipment may be furnished or used by Contractor if acceptable to City, application for such acceptance will not be considered by City until after the Effective Date of the Agreement. The procedure for submission of any such application by Contractor and consideration by City is set forth in Paragraphs 6.05A., 6.05B. and 6.05C. of the General Conditions and is supplemented in Section 0125 00 of the General Requirements. 11. Subcontractors, Suppliers and Others 11.1. In accordance with the City's Business Equity Ordinance No.25165-10-2021 the City has goals for the participation of minority business and/or women business enterprises in City contracts $100,000 or greater. See Section 00 45 40 for the M/WBE Project Goals and additional requirements. Failure to comply shall render the Bidder as non -responsive. Business Equity Ordinance No.25165-10-2021, as amended (replacing Ordinance No. 24534-11-2020), codified at: httns://codelibrarv.amle2al.com/codes/ftworth/latest/ftworth tx/0-0-0-22593 CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 7of10 11.2. No Contractor shall be required to employ any Subcontractor, Supplier, other person or organization against whom Contractor or City has reasonable objection. 12. Bid Form 12.1. The Bid Form is included with the Bidding Documents; additional copies maybe obtained from the City. 12.2. All blanks on the Bid Form must be completed and the Bid Form signed in ink. Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each Bid item, alternative, and unit price item listed therein. In the case of optional alternatives, the words "No Bid," "No Change," or "Not Applicable" may be entered. Bidder shall state the prices for which the Bidder proposes to do the work contemplated or furnish materials required. All entries shall be legible. 12.3. Bids by corporations shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed. The corporate address and state of incorporation shall be shown below the signature. 12.4. Bids by partnerships shall be executed in the partnership name and signed by a partner, whose title must appear under the signature accompanied by evidence of authority to sign. The official address of the partnership shall be shown below the signature. 12.5. Bids by limited liability companies shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown. 12.6. Bids by individuals shall show the Bidder's name and official address. 12.7. Bids by joint ventures shall be executed by each joint venture in the manner indicated on the Bid Form. The official address of the joint venture shall be shown. 12.8. All names shall be typed or printed in ink below the signature. 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form. 12.10. Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown. 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of Texas shall be provided in accordance with Section 00 43 37 — Vendor Compliance to State Law Non -Resident Bidder. CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 8 of 10 13. Submission of Bids Bids shall be submitted on the prescribed Bid Form, provided with the Bidding Documents, at the time and place indicated in the Advertisement or INVITATION TO BIDDERS, addressed to Purchasing Manager of the City, and shall be enclosed in an opaque sealed envelope, marked with the City Project Number, Project title, the name and address of Bidder, and accompanied by the Bid security and other required documents. If the Bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation "BID ENCLOSED" on the face of it. 14. Withdrawal of Bids 14.1. Bids addressed to the Purchasing Manager and filed with the Purchasing Office may be withdrawn prior to the time set for bid opening. A request for withdrawal must be made in writing and delivered to the Purchasing Office to receive a time stamp prior to the opening of Bids. A timely withdrawn bid will be returned to the Bidder or, if the request is within one hour of bid opening, will not be read aloud and will thereafter be returned unopened. 14.2. In the event any Bid for which a withdrawal request has been timely filed has been inadvertently opened, said Bid and any record thereof will subsequently be marked "Withdrawn" and will be given no further consideration for the award of contract. 15. Opening of Bids Bids will be opened and read aloud publicly. An abstract of the amounts of the base Bids and major alternates (if any) will be made available to Bidders after the opening of Bids. 16. Bids to Remain Subject to Acceptance All Bids will remain subject to acceptance for a minimum of 90 days or the time period specified for Notice of Award and execution and delivery of a complete Agreement by Successful Bidder. City may, at City's sole discretion, release any Bid and nullify the Bid security prior to that date. 17. Evaluation of Bids and Award of Contract 17.1. City reserves the right to reject any or all Bids, including without limitation the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if City believes that it would not be in the best interest of the Project to make an award to that Bidder. City reserves the right to waive informalities not involving price, contract time or changes in the Work and award a contract to such Bidder. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words. CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 9of10 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists among the Bidders, Bidder is an interested party to any litigation against City, City or Bidder may have a claim against the other or be engaged in litigation, Bidder is in arrears on any existing contract or has defaulted on a previous contract, Bidder has performed a prior contract in an unsatisfactory manner, or Bidder has uncompleted work which in the judgment of the City will prevent or hinder the prompt completion of additional work if awarded. 17.2. In addition to Bidder's relevant prequalification requirements, City may consider the qualifications and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work where the identity of such Subcontractors, Suppliers, and other persons and organizations must be submitted as provided in the Contract Documents or upon the request of the City. City also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award. 17.3. City may conduct such investigations as City deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to City's satisfaction within the prescribed time. 17.4. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract, unless otherwise approved by the City. 17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and responsive Bidder whose evaluation by City indicates that the award will be in the best interests of the City. 17.6. Pursuant to Texas Government Code Chapter 2252.001, the City will not award contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than the lowest bid submitted by a responsible Texas Bidder by the same amount that a Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located. 17.7. A contract is not awarded until formal City Council authorization. If the Contract is to be awarded, City will award the Contract within 90 days after the day of the Bid opening unless extended in writing. No other act of City or others will constitute acceptance of a Bid. Upon the contract award, a Notice of Award will be issued by the City. 17.7.1. The contractor is required to fill out and sign the Certificate of Interested Parties Form 1295 and the form must be submitted to the Project Manager before the contract will be presented to the City Council. The form can be obtained at httns://www.ethics.state.tx.us/data/forms/1295/1295.i)df 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid. CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 10 of 10 18. Signing of Agreement 18.1. When City issues a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Project Manual. Within 14 days thereafter, Contractor shall sign and deliver the required number of counterparts of the Project Manual to City with the required Bonds, Certificates of Insurance, and all other required documentation. 18.2. City shall thereafter deliver one fully signed counterpart to Contractor. END OF SECTION CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Various City Project Numbers Revised/Updated November 2, 2021 00 35 13 CONFLICT OF INTEREST STATEMENT Capko Concrete Page 1of1 Structures, LLC SECTION 00 35 13 3 x 4206 Azle, TX 76098 CONFLICT OF INTEREST STATEMENT Each bidder, offeror or respondent to a City of Fort Worth procurement is required to complete a Conflict of Interest Questionnaire or certify that one is current and on file with the City Secretary's Office pursuant to state law. If a member of the Fort Worth City Council, any one or more of the City Manager or Assistant City Managers, or an agent of the City who exercise discretion in the planning, recommending, selecting or contracting with a bidder, offeror or respondent is affiliated with your company, then a Local Government Officer Conflicts Disclosure Statement (CIS) may be required. You are urged to consult with counsel regarding the applicability of these forms and Local Government Code Chapter 176 to your company. The referenced forms may be downloaded from the links provided below. Form CIQ (Conflict of Interest Questionnaire) (state.tx.us) httr)s://www.ethics.state.tx.us/data/forms/conflict/CIS.r)df ❑ CIQ Form does not apply ❑ CIQ Form is on file with City Secretary ❑ CIQ Form is being provided to the City Secretary ❑ CIS Form does not apply ❑ CIS Form is on File with City Secretary ❑ CIS Form is being provided to the City Secretary BIDDER: Capko Concrete Structures LLC By: John J Capko IV Signature: e��I�� � � Zs Title: President / Owner END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 2024 Sidewalk Improvements Unit Price Construction Contract Revised February 24, 2020 Various City Project Numbers 0041 00 BID FORM Page 1 of 4 SECTION 00 41 00 BID FORM TO: The Purchasing Manager c/o: The Purchasing Division 200 Texas Street City of Fort Worth, Texas 76102 FOR: 2024 Sidewalk Improvements Unit Price Construction Contract City Project No.: Various City Project Numbers Units/Sections: Base Bid 1. Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. 'fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of City (b) to establish Bid prices at artificial non-competitive levels, or (c) to deprive City of the benefits of free and open competition. c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of City, a purpose of which is to establish Bid prices at artificial, non- competitive levels. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 2024 Sidewalk Improvements Unit Price Construction Contract Revised 9/30/2021 Various City Project Numbers 0041 00 BID FORM Page 2 of 4 d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. 3. Prequalification The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors: a. None b. C. d. e. f. - g. - h. - 4. Time of Completion 4.1. The Work will be complete for Final Acceptance within the number of days specified in each task order when the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified in the Agreement/task order. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form, Section 00 41 00 b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. c. Proposal Form, Section 00 42 43 d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37 e. MWBE Forms (optional at time of bid) f. Prequalification Statement, Section 00 45 12 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 2024 Sidewalk Improvements Unit Price Construction Contract Revised 9/30/2021 Various City Project Numbers 0041 00 BID FORM Page 3 of 4 g. Conflict of Interest Affidavit, Section 00 35 13 *If necessary, CIQ or CIS forms are to be provided directly to City Secretary h. Any additional documents that may be required by Section 12 of the Instructions to Bidders 6. Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project. Only this figure will be read publicly by the City at the bid opening. 6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts. 6.3. Total Bid J<-4 J �q 66 #REF! CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 2024 Sidewalk Improvements Unit Price Construction Contract Various City Project Numbers 0041 00 BID FORM Page 4 of 4 7. Bid Submittal This Bid is submitted on December 21 2023 Respectfully submitted, By:V�, (S' ignature) John J Capko IV (Printed Name) Title: President / Owner Company: Capko Concrete Structures LLC Address: P.O. Box 426 Azle Texas 76098 State of Incorporation: Texas Email: john@capkoconcretestructures.com Phone: 682-247-1035 END OF SECTION by the entity named below. Receipt is acknowledged of the following Addenda: lAddendum No. 1: V JAddendum No. 2: JAddendum No. 3: N/A lAddendum No. 4: Corporate Seal: Initial CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 2024 Sidewalk Improvements Unit Price Construction Contract Various City Project Numbers 00 42 43 BD)PROPOSAL Pegs I f3 SECTION 00 42 43 PROPOSALFORM UNIT PRICE BID PROJECT ITEM INFORMATION BIDDER'S APPLICATION BIDDER'S PROPOSAL BID I I Quantity Unit of IT Description Specification Section No. Measure Range/Est. Bid Quantity Unit Price Bid Value 1 0135.0101 Railroad Coordination 01 35 13 LS 1 1 $ 1,000.00 $ 1,000.001 2 0135.0102 Railroad Flagmen 01 3513 WD 15 1 $ 1,000.00 $ 1,000.001 3 0171.0101 Construction Staking �0171.0102 01 71 23 LS 1 1 $ 1,000.00 $ 1,000.001 4 As -Built Survey 01 71 23 LS 1 1 $ 1,000.00 $ 1,000.001 BASE BID - UNIT 1 - General Requirements $ 4,000.00 NOEL UNIT 2 - Existing Conditions 1-100 1 $ 10.00 5 0241.0100 Remove Sidewalk 024113 SF 101-500 1 $ 10.00 $ 10.00 501+ 1 $ 10.00 $ 10.00 6 0241.0300 Remove ADA Ramp 024113 EA 25 1 $ 1,000.00 $ 1,000.00 7 0241.0301 Remove Detectable Warning Surface 0241 13 EA 10 1 $ 250.00 $ 250.00 1-100 1 $ 10.00 $ 10.00 8 0241.0401 Remove Concrete Drive 0241 13 SF 101-500 1 $ 10.00 $ 10.00 501+ 1 $ 5.00 $ 5.001 9 0241.0402 Remove Asphalt Drive 024113 SF 100 1 $ 10.00 $ 10.00 1-100 1 $ 10.00 $ 10.00 10 0241.0403 Remove Brick Drive 0241 13 SF 101-400 1 $ 10.00 $ 10.00 401+ 1 $ 5.00 $ 5.001 1-50 1 $ 10.00 $ 10.00 11 0241.0500 Remove Fence 0241 13 LF 51-100 1 $ 10.00 $ 10.00 101+ 1 $ 10.00 $ 10.001 1-10 1 $ 50.00 $ 50.00 12 0241.0600 Remove Wall <4' 0241 13 LF 11-30 1 $ 40.00 $ 40.00 31+ 1 $ 30.00 $ 30.00 13 0241.0700 Remove Mailbox 0241 13 EA 10 1 $ 100.00 $ 100.00 14 0241.0701 Remove Multiple User Mailbox 0241 13 EA 10 1 $ 120.00 $ 120.00 15 0241.0702 Relocate Mailbox - Traditional 0241 13 EA 10 1 $ 200.00 $ 200.00 16 0241.0703 Relocate Mailbox - Brick 0241 13 EA 10 1 $ 500.00 $ 500.00 17 0241.0704 Remove and Replace Mailbox - Traditional 0241 13 EA 10 1 $ 300.00 $ 300.00 18 0241.0705 Remove and Replace Mailbox - Brick 0241 13 EA 10 1 $ 1,000.00 $ 1,000.00 1-100 1 $ 15.00 $ 15.00 19 0241.1300 Remove Conc Curb&Gutter 0241 15 LF 101-500 1 $ 10.00 $ 10.00 501+ 1 $ 5.00 $ 5.00 20 0241.1507 3" Surface Milling 0241 15 SY 100 1 $ 40.00 $ 40.00 BASE BID - UNIT 2 - Existing Conditions $ 3,780.00 UNIT 3 - Earthwork 21 3110.0102 6"-12" Tree Removal 311000 EA 10 1 $ 1,100.00 $ 1,100.00 22 3110.0103 12"-18" Tree Removal 31 1000 EA 10 1 $ 1,750.00 $ 1,750.00 23 3110.0104 18"-24" Tree Removal 31 1000 EA 10 1 $ 2,200.00 $ 2,200.00 24 3110.0105 24" and Larger Tree Removal 31 1000 EA 10 1 $ 3,000.00 $ 3,000.00 25 3123.0101 Unclassified Excavation by Plan 31 2316 CY 150 1 $ 50.00 $ 50.00 26 3123.0103 Borrow by Plan 31 2323 CY 150 1 $ 50.00 $ 50.00 27 3124.0101 Embankment by Plan 31 2400 CY 150 1 $ 50.00 $ 50.00 28 3125.0101 SWPPP 21 acre 31 2500 LS 5 1 $ 2,500.00 $ 2,500.00 29 3137.0101 Concrete Riprap 31 3700 SY 250 1 $ 150.00 $ 150.00 BASE BID - UNIT 3 - Earthwork $ 10,850.00 UNIT 4 - Exterior Improvements 30 3212.0401 HMAC Transition 32 12 16 TN 60 1 $ 400.00 $ 400.00 31 3212.0504 7" Asphalt Base Type B 32 12 16 SY 100 1 $ 160.00 $ 160.00 1-2500 1 $ 20.00 $ 20.00 32 3213.0301 4" Conc Sidewalk 32 13 20 SF 2.1-5000 1 $ 19.00 $ 19.00 5001+ 1 $ 18.00 $ 18.001 33 3213.0302 5" Conc Sidewalk 32 13 20 SF 1000 1 $ 20.00 $ 20.00 34 3213.0303 6" Conc Sidewalk 32 13 20 SF 1000 1 $ 22.00 $ 22.00 1-2500 1 $ 20.00 $ 20.00 35 3213.0311 4" Conc Sidewalk, Adjacent to Curb 32 13 20 SF 2501-5000 1 $ 19.00 $ 19.00 5001+ 1 $ 18.00 $ 18.001 36 3213.0312 5" Conc Sidewalk, Adjacent to Curb 32 13 20 SF 1000 1 $ 20.00 $ 20.00 37 3213.0313 6" Conc Sidewalk, Adjacent to Curb 32 13 20 SF 1000 1 $ 22.00 $ 22.00 38 3213.0321 Conc Sidewalk, Adjacent to Ret Wall 32 13 20 SF 1000 1 $ 22.00 $ 22.00 39 3213.0322 Conc Curb at Back of Sidewalk 32 13 20 LF 200 1 $ 30.00 $ 30.00 40 3213.0400 5" Concrete Driveway 32 13 20 SF 500 1 $ 20.00 $ 20.00 41 3213.0401 6" Concrete Driveway 32 13 20 SF 500 1 $ 21.00 $ 21.00 42 3213.0501 Barrier Free Ramp, Type R-1 32 13 20 EA 20 1 $ 5,000.00 $ 5,000.00 43 3213.0502 Barrier Free Ramp, Type U-1 32 13 20 EA 20 1 $ 3,000.00 $ 3,000.00 44 3213.0503 Barrier Free Ramp, Type M-1 32 13 20 EA 20 1 $ 3,000.00 $ 3,000.00 45 3213.0504 Barrier Free Ramp, Type M-2 32 13 20 EA 20 1 $ 3,000.00 $ 3,000.00 46 3213.0505 Barrier Free Ramp, Type M-3 32 13 20 EA 20 1 $ 3,000.00 $ 3,000.00 47 3213.0506 Barrier Free Ramp, Type P-1 32 13 20 EA 20 1 $ 3,000.00 $ 3,000.00 48 3213.0507 Barrier Free Ramp, Type P-2 32 13 20 EA 20 1 $ 3,000.00 $ 3,000.00 CITY OF FORT WORTH SrAND(iRD CONSTRUCTION SPPCBIC-ON DOCUM2 2024 Sidewalk Impmvcnunis Uml=ConA t-COnI[8d Revved 9l3012021 Venous QtyP erect Numlure 00 42 43 Bm PROPOSAL P_ 2 of3 SECTION 00 42 43 PROPOSALFORM UNIT PRICE BID BIDDER'S APPLICATION PROJECT ITEM INFORMATION BIDDER'S PROPOSAL BID Unit of Quantity ITEM Description Specification Section No. Measure RangeltEst. Bid Quantity Unit Price Bid Value NO. Quantity 49 3213.0508 Barrier Free Ramp, Type C-1 32 13 20 EA 20 1 $ 5,000.00 $ 5,000.00 50 3213.0509 Barrier Free Ramp, Type C-2 32 13 20 EA 20 1 $ 4,000.00 $ 4,000.00 51 3213.0510 Barrier Free Ramp, Type C-3 32 13 20 EA 20 1 $ 3,000.00 $ 3,000.00 1-500 1 $ 60.00 $ 60.00 52 3216.0101 6" Conc Curb and Gutter 32 16 13 LF 501+ 1 $ 50.00 $ 50.00 1-500 1 $ 62.00 $ 62.00 53 3216.0102 7" Conc Curb and Gutter 32 16 13 LF 501+ 1 $ 52.00 $ 52.00 54 3216.0102 Conc Laydown Curb 32 16 13 LF 100 1 $ 70.00 $ 70.00 54 3216.0301 7" Conc Valley Gutter, Residential 32 16 13 SY 50 1 $ 200.00 $ 200.00 55 3216.0302 11" Conc Valley Gutter, Arterial/Industrial 32 16 13 SY 50 1 $ 225.00 $ 225.00 56 3217.0501 24" SLID Pvmt Marking HAE (W) 32 17 23 LF 500 1 $ 20.00 $ 20.00 57 3217.0502 Preformed Thermoplastic Contrast Markings - 24" Crosswalk 32 1723 LF 500 1 $ 20.00 $ 20.00 58 3217.0503 Preformed Thermoplastic Contrast Marking - 24" SLID 32 17 23 LF 500 1 $ 20.00 $ 20.00 59 3217.0504 Preformed Thermoplastic Contrast Markings - 24" Stop Bars 32 1723 LF 500 1 $ 20.00 $ 20.00 60 3217.4306 Remove 24" Pvmt Marking 32 17 23 LF 2000 1 $ 5.00 $ 5.00 61 3231.0111 4' Chain Link, Steel 3231 13 LF 200 1 $ 55.00 $ 55.00 62 3231.0112 5' Chain Link, Steel 3231 13 LF 200 1 $ 60.00 $ 60.00 63 3231.0113 6' Chain Link, Steel 3231 13 LF 200 1 $ 65.00 $ 65.00 64 3231.0131 4' Wrought Iron Fence 3231 13 LF 200 1 $ 80.00 $ 80.00 65 3231.0132 5' Wrought Iron Fence 3231 13 LF 200 1 $ 90.00 $ 90.00 66 3231.0133 6' Wrought Iron Fence 3231 13 LF 200 1 $ 100.00 $ 100.00 67 3231.0141 4' Steel Tube Fence 3231 13 LF 200 1 $ 100.00 $ 100.00 68 3231.0142 5' Steel Tube Fence 3231 13 LF 200 1 $ 120.00 $ 120.00 69 3231.0143 6' Steel Tube Fence 3231 13 LF 200 1 $ 140.00 $ 140.00 70 3231.0301 4' Gate, Steel 3231 26 EA 10 1 $ 500.00 $ 500.00 71 3231.0302 6' Gate, Steel 3231 26 EA 10 1 $ 800.00 $ 800.00 72 3231.0303 8' Gate, Steel 3231 26 EA 10 1 $ 1,000.00 $ 1,000.00 73 3231.0304 10' Gate, Steel 3231 26 EA 10 1 $ 1,200.00 $ 1,200.00 74 3231.0305 12' Gate, Steel 3231 26 EA 10 1 $ 1,500.00 $ 1,500.00 75 3231.0306 16' Gate, Steel 3231 26 EA 10 1 $ 2,000.00 $ 2,000.00 76 3231.0307 20' Gate, Steel 3231 26 EA 10 1 $ 3,000.00 $ 3,000.00 77 3231.0411 4' Fences, Wood 3231 29 LF 200 1 $ 100.00 $ 100.00 78 3231.0412 6' Fences, Wood 3231 29 LF 200 1 $ 110.00 $ 110.00 79 3231.0413 8' Fences, Wood 3231 29 LF 200 1 $ 120.00 $ 120.00 80 3232.0100 Conc Rat Wall Adjacent to Sidewalk 32 32 13 SF 200 1 $ 100.00 $ 100.00 81 3291.0100 Topsoil 329119 CY 100 1 $ 50.00 $ 50.00 1-1000 1 $ 3,020.00 $ 3,020.00 82 3292.0100 Block Sod Placement 32 92 13 SY 101,2000 1 $ 17.00 $ 17.00 2001+ 1 $ 15.00 $ 15.00 BASE BID - UNIT 4- Exterior Improvements $ 50,997.00 UNIT 5 - Utilities 1-50 1 $ 200.00 $ 200.00 83 3305.0103 Exploratory Excavation of Existing Utilities 330530 EA 51+ 1 $ 200.00 $ 200.00 84 3305.0105 Inlet Adjustment 330514 EA 10 1 $ 5,000.00 $ 5,000.00 85 3305.0106 Manhole Adjustment, Major 330514 EA 10 1 $ 2,500.00 $ 2,500.00 86 3305.0107 Manhole Adjustment, Minor 330514 EA 10 1 $ 1,000.00 $ 1,000.00 87 3305.0108 Miscellaneous Structure Adjustment 330514 EA 10 1 $ 1,000.00 $ 1,000.00 88 3305.0111 Valve Box Adjustment 33 05 14 EA 10 1 $ 250.00 $ 250.00 89 3305.0114 Manhole Adjustment, Major w/Cover 330514 EA 10 1 $ 3,000.00 $ 3,000.00 BASE BID- JNIT 5-Utilities $ 13,150.00 UNIT 6 -Transportation 90 3441.4002 Furnish/Install Alum Sign Ground Mount TxDOT Std. 3441 30 EA 25 1 $ 1,000.00 $ 1,000.00 91 3441.4003 Furnish/install Alum Sign Ground Mount City Std. 3441 30 EA 25 1 $ 1,000.00 $ 1,000.00 92 3441.4004 Furnish/install Alum Sign Ex. Pole Mount 3441 30 EA 25 1 $ 500.00 $ 500.00 93 3441.4006 Install Alum Sign Ground Mount 3441 30 EA 25 1 $ 750.00 $ 750.00 94 3441.4007 Install Alum Sign Ex Pole Mount 3441 30 EA 25 1 $ 500.00 $ 500.00 95 3441.4108 Remove Sign Panel and Post 3441 30 EA 25 1 $ 200.00 $ 200.00 96 3441.4109 Remove Sign Panel 3441 30 EA 25 1 $ 100.00 $ 100.00 97 3441.4110 Remove and Reinstall Sign Panel and Post 3441 30 EA 25 1 $ 800.00 $ 800.00 98 3471.0001 Traffic Control 347113 MO 10 1 $ 3,000.00 $ 3,000.00 99 3471.0002 Portable Message Sign 3471 13 WK 50 1 $ 600.00 $ 600.00 BASE BID -UNIT 6 -Transportation $ 8,450.00 UNIT 7 - No -Standard Items 100 9999.0001 Site Clearing 31 1000 SY 500 1 $ 1,000.00 $ 1,000.00 101 9999.0002 1"-2" Water Meter Box Replacement (Conc) 33 12 10 EA 5 1 $ 500.00 $ 500.00 102 9999.0003 1%2" Water Meter Box Replacement (Plastic) 33 12 10 EA 5 1 $ 400.00 $ 400.00 103 9999.0004 Irrigation Repair Allowance 1 000000 LS 1 1 $ 2,500.00 $ 2,500.00 104 9999.0005 Irrigation Repair Allowance 2 000000 LS 1 1 $ 5,000.00 $ 5,000.00 105 9999.0006 Landscaping Repair Allowance 1 00 00 00 LS 1 1 $ 2,500.00 $ 2,500.00 106 9999.0007 Landscaping Repair Allowance 2 000000 LS 1 1 $ 5,000.00 $ 5,000.00 CnY OP FORT WORTH STANDARD COn-CTrON SPBCTIC-ON DOCUMB 2024 Sidewalk Impmvcnunrs C =ConA t-COnI[8d Revved 9l3012021 Venous QtyP erect Numlure 00 42 43 Bm PROPOSAL Pegs 3 of3 SECTION 00 42 43 PROPOSALFORM UNIT PRICE BID PROJECT ITEM INFORMATION BID ITEM Description NO. 107 9999.0008 Detectable Warning Surface 108 9999.0009 Relocate Guy Wire 109 9999.0010 Temporary Construction Fence 110 9999.0011 Lane Legend RR (Sidewalk) 111 9999.0068 Tree Protection BIDDER'S APPLICATION BIDDER'S PROPOSAL Unit of Quantity Specification Section No. Measure Range/Est. Bid Quantity Unit Price Bid Value Quantity 00 00 00 SF 100 1 $ 30.00 $ 30.00 000000 EA 10 1 $ 2,000.00 $ 2,000.00 00 00 00 LF 200 1 $ 25.00 $ 25.00 00 00 00 EA 5 1 $ 500.00 $ 500.00 99 99 99 FA 50 1 $ 50.00 $ 50.001 BASE BID - UNIT 7 - Non -Standard Items $ 19,505.00 1 UNIT 8 - TxDOT Items 112 0450 6048 RAIL (HANDRAIL)(TY B) TxDOT Spec 450 LF 100 1 $ 150.00 $ 150.00 113 0450 6052 RAIL (HANDRAIL)(TY F) TxDOT Spec 450 LF 100 1 $ 350.00 $ 350.00 114 0506 6038 TEMP SEDMT CONT FENCE (INSTALL) TxDOT Spec 506 LF 200 1 $ 5.00 $ 5.00 115 0506 6039 TEMP SEDMT CONT FENCE (REMOVE) TxDOT Spec 506 LF 200 1 $ 1.00 $ 1.00 116 0506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") TxDOT Spec 506 LF 50 1 $ 10.00 $ 10.001 117 0506 6043 BIODEG EROSN CONT LOGS (REMOVE) TxDOT Spec 506 LF 50 1 $ 2.00 $ 2.00 I 118 0529 6002 CONC CURB (TY 11) TxDOT Spec 529 LF 100 1 $ 10.00 $ 10.001 119 0529 6007 CONC CURB & GUTTER (TY 1) TxDOT Spec 529 LF 100 1 $ 80.00 $ 80.001 120 0529 6008 CONC CURB & GUTTER (TY 11) TxDOT Spec 529 LF 100 1 $ 100.00 $ 100.00 121 0530 6004 DRIVEWAYS (CONC) TxDOT Spec 530 SY 500 1 $ 200.00 $ 200.00 122 0530 6005 DRIVEWAYS (ACP) TxDOT Spec 530 SY 500 1 $ 180.00 $ 180.001 123 0531 6001 CONC SIDEWALKS (4") TxDOT Spec 531 SY 300 1 $ 200.00 $ 200.00 124 0531 6003 CONC SIDEWALKS (6") TxDOT Spec 531 SY 300 1 $ 3,000.00 $ 3,000.00 125 0531 6004 CURB RAMPS (TY 1) TxDOT Spec 531 FA 10 1 $ 3,000.00 $ 3,000.00 126 0531 6005 CURB RAMPS (TY 2) TxDOT Spec 531 EA 10 1 $ 3,000.00 $ 3,000.00 127 0531 6006 CURB RAMPS (TY 3) TxDOT Spec 531 FA 10 1 $ 3,000.00 $ 3,000.00 128 0531 6007 CURB RAMPS (TY 4) TxDOT Spec 531 EA 10 1 $ 3,000.00 $ 3,000.00 129 0531 6008 CURB RAMPS (TY 5) TxDOT Spec 531 FA 10 1 $ 3,000.00 $ 3,000.00 130 0531 6009 CURB RAMPS (TY 6) TxDOT Spec 531 EA 10 1 $ 3,000.00 $ 3,000.00 131 0531 6010 CURB RAMPS (TY 7) TxDOT Spec 531 FA 10 1 $ 3,000.00 $ 3,000.00 132 0531 6011 CURB RAMPS (TY 8) TxDOT Spec 531 EA 10 1 $ 3,000.00 $ 3,000.00 133 0531 6012 CURB RAMPS (TY 9) TxDOT Spec 531 FA 10 1 $ 3,000.00 $ 3,000.00 134 0531 6013 CURB RAMPS (TY 10) TxDOT Spec 531 EA 10 1 $ 3,000.00 $ 3,000.00 135 0531 6014 CURB RAMPS (TY 11) TxDOT Spec 531 FA 10 1 $ 3,000.00 $ 3,000.00 136 0531 6015 CURB RAMPS (TY 20) TxDOT Spec 531 EA 10 1 $ 4,000.00 $ 4,000.00 137 0531 6016 CURB RAMPS (TY 21) TxDOT Spec 531 FA 10 1 $ 4,000.00 $ 4,000.00 138 0531 6017 CURB RAMPS (TY 22) TxDOT Spec 531 EA 10 1 $ 7,000.00 $ 7,000.00 139 0531 6032 CONC SIDEWALKS (SPECIAL) (TYPE A) TxDOT Spec 531 SY 200 1 $ 225.00 $ 225.00 140 531 6033 CONC SIDEWALKS (SPECIAL) (TYPE B) TxDOT Spec 531 SY 200 1 $ 250.00 $ 250.00 141 531 6057 CONC SIDEWALK (SPECIAL)(RETAINING WALL TxDOT Spec 531 SF 200 1 $ 100.00 $ 100.00 142 0644 6001 IN SM RD SIN SUPBAM TY10BWG(1)SA(P) TxDOT Item 644 EA 20 1 $ 1,000.00 $ 1,000.00 143 0644 6004 IN SM RD SIN SUP&AM TYIOBWG(1)SA(T) TxDOT Item 644 EA 20 1 $ 1,000.00 $ 1,000.00 144 0644 6007 IN SM RD SIN SUPBAM TY10BWG(1)SA(U) TxDOT Item 644 EA 20 1 $ 1,000.00 $ 1,000.00 BASE BID - UNIT o - TxDOT Items $ 55,863.00 BASE BID SUMMARY I UNIT TOTAL BASE BID I IBASE BID - UNIT 1 - General Requirements $ 4,000.001 IBASE BID - UNIT 2 - Existing Conditions $ 3,780.00 I IBASE BID - UNIT 3 - Earthwork $ 10,850.00 I IBASE BID - UNIT 4 - Exterior Improvements $ 50,997.00 I IBASE BID - UNIT 5-Utilities $ 13,150.00 IBASE BID - UNIT 6 - Transportation $ 8,450.001 IBASE BID - UNIT 7 - Non -Standard Items $ 19,505.00 I IBASE BID - UNIT S - TxDOT Items $ 55,863.001 ITOTAL BASE BID I $ 166,595.00 I CITY OF FORT WORTH STANOARU COn-CrrON SPBCBIC-ON UOCUMBNTS 2024 SO-1k Impmvc­-Pn ConAry .Cm,Iwd Revved 9l3012021 Venous CnyP erect Numlure SECTION 00 43 13 BID BOND KNOW ALL BY THESE PRESENTS: 00 43 13 BID BOND Page 1 of 2 That we, Capko Concrete Structures LLC , known as "Bidder" herein and Frankenmuth Insurance Comoanv a corporate surety duly authorized to do business in the State of Texas, known as "Surety" herein, are held and firmly bound unto the City of Fort Worth, a municipal corporation created pursuant to the laws of Texas, known as "City" herein, in the penal sum of five percent (5%) of Bidder's maximum bid price, in lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid or proposal to perform Work for the following project designated as 2024 Sidewalk Improvements Unit Price Construction Contract NOW, THEREFORE, the condition of this obligation is such that if the City shall award the Contract for the foregoing project to the Principal, and the Principal shall satisfy all requirements and conditions required for the execution of the Contract and shall enter into the Contract in writing with the City in accordance with the terms of such same, then this obligation shall be and become null and void. If, however, the Principal fails to execute such Contract in accordance with the terms of same or fails to satisfy all requirements and conditions required for the execution of the Contract, this bond shall become the property of the City, without recourse of the Principal and/or Surety, not to exceed the penalty hereof, and shall be used to compensate City for the difference between Principal's total bid amount and the next selected bidder's total bid amount. PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrument by duly authorized agents and officers on this the 21st day of December 2023. ATTEST IA Witness as to Principal I PRINCIPAL: Capko Concrete Structures LLC BY: g, ignature r/ CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 2024 Sidewalk Improvements Unit Price Construction Contract Various City Project Numbers Witness as to Surety Melissa Pitts, Bond Secretary Attach Power of Attorney (Surety) for Attorney -in -Fact Address: P.O. Box 426 Azle. TX 76098 SURETY: Frankenmuth Insurance CorrLnar`v BY: Si e Jordan Pitts, Attorney -In -Fact Name and Title Address: 1 Mutual Ave Frankenmuth, MI 48787 Telephone Number: 469-661-0314 0043 13 BID BOND Page 2 of 2 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 2024 Sidewalk Improvements Unit Price Construction Contract Revised 9/30/2021 Various City Project Numbers FRANKENMUTH INSURANCE COMPANY POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS, that Frankenmuth Insurance Company (the "Company"), a corporation duly organized and existing under the laws of the State of Michigan, having its principal office at 1 Mutual Avenue, Frankenmuth, Michigan 48787, does hereby nominate, constitute and appoint: Jordan Pitts, Lloyd Ray Pitts Jr., William D. Birdsong Their true and lawful attorneys) -in -fact, each in their separate capacity if more than one is named above, to make, execute, seal, acknowledge and deliver any and all bonds, contracts and undertakings of suretyship, with the exception of Financial Guaranty Insurance, provided, however, that the penal sum of any one such instrument shall not exceed the sum of: Fifty Million and 00/100 Dollars ($50,000,000) This Power of Attorney is granted pursuant to the following Resolution duly adopted at a meeting of the Board of Directors of Frankenmuth Insurance Company: "RESOLVED, that the President, Senior Vice President or Vice President and each of them under their respective designations, hereby is authorized to execute powers of attorney, and such authority can be executed by use of facsimile signature, which may be attested or acknowledged by any officer of the Company, qualifying the attorney(s) named in the given power of attorney, to execute on behalf of, and acknowledge as the act and deed of Frankenmuth Insurance Company on all bonds, contracts and undertakings of suretyship, and to affix the corporate seal thereto." IN WITNESS WHEREOF, the Company has caused these presents to be signed and attested by its appropriate officers and its corporate seal hereuttt6' Xed this 15t_h day of December, 2022. Frankenmuth Insurance Company �7�� Z_ Frederick A. Edmond, Jr., President and Chief Executive Officer q) W ) ss: Sworn to before me, a Notary Public in the State of Michigan, by Frederick A, Edmond, Jr., to me personally known to be the individual and officer described in, and who executed the preceding instrument, deposed and said the Corporate Seal and his signatttVe�p� were affixed and subscribed to said instrument by the authority of the Company. IN TESTIMONY WHEREOF, I have set my hand, and affixed my Official Seal this .15th day of December, 202 ,FdO /+ X (Seal) = x�. Susan L. Fresorger, Notary Pu tic A. Saginaw County, State of Michigan My Commission Expires: April 3, 2028 QS► I, the undersigned, Executive Vice President of Frankenmuth Insurance Company, do hereby certify that the foregoing is a true, correct and complete copy of the original Power of Attorney; that said Power of Attorney has not been revoked or rescinded and is in full force and effect as of this date. IN WITNESS WHEREOF, I have set my hand and affixed the Seal of the Company, this 21st day of December; 2023. Andrew H. Knudsen, Executive Vice President, Chief Operating Officer and Secretary ALL CORRESPONDENCE RELATED TO BOND VALIDATION AND/OR A CLAIM SHOULD BE DIRECTED TO VP SURETY, 701 U.S. ROUTE ONE, SUITE 1, YARMOUTH, ME 04096 00 43 37 VENDOR COMPLIANCE TO STATE LAW Page 1 of 1 SECTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors whose corporate offices or principal place of business are outside the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresident's principal place of business is located. The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by State Law. A copy of the statute is attached. Nonresident bidders in the State of our principal place of business, are not required to underbid resident bidders. B. The principal place of business of our company or our parent company or majority owner is in the State of Texas.0 BIDDER: Capko Concrete Streuctures LLC END OF SECTION By: John J Capko IV —Voo'i�A Signature Title: President / Owner Date: 12/21 /2023 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 2024 Sidewalk Improvements Unit Price Construction Contract Various City Project Numbers 00 45 26 - 1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of I 1 SECTION 00 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it 4 provides worker's compensation insurance coverage for all of its employees employed on City 5 Project No. Various. Contractor further certifies that, pursuant to Texas Labor Code, Section 6 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with 7 worker's compensation coverage. 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 CONTRACTOR: Nit I SoA ny WAU fO mk% Address IWO City/State4ip THE STATE OF TEXAS COUNTY OF TARRANT By: -Sox,) -57, (Please Pr1 t) Signature: , 0 Title: UU-411 (Please P int) BEFORE ME, the undersigned authority, on this day personally appeared �PK I �l� , known to me to be the person whose name is subscribed to the fore oI g Instrument and c nowledged to me that he/she executed the same as the act and deed of s f / for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN NDER MY HAND AND SEAL OF OFFICE this l '' ` day of 20_t% 'Audg, cum Notary Pub c in and for the Siaie of Texas END OF SECTION ShCapko My Commission Expires * 8/30/2026 Notary ID131705485 r CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised July I, 2011 00 45 40 - 1 Business Equity Goal Page 1 of 2 1 SECTION 00 45 40 2 Business Equity Goal 3 APPLICATION OF POLICY 4 If the total dollar value of the contract is $100,000 or more, then a Business Equity goal is applicable. 5 A Business Equity Firm refers to certified Minority-, and/or Women-, owned Business Enterprises 6 (M/WBEs). 7 8 POLICY STATEMENT 9 It is the policy of the City of Fort Worth to ensure the full and equitable participation of Business Equity 10 Firms when applicable, in the procurement of all goods and services. All requirements and regulations 11 stated in the City's Business Equity Ordinance No.25165-10-2021, (replacing Ordinance No. 24534-11- 12 2020 (codified at: htt_r)s:Hcodelibrarv.amle2_al.com/codes/ftworth/latest/ftworth_tx/0-0-0-22593) apply to 13 this bid. 14 15 BUSINESS EOUITY PROJECT GOAL 16 The City's Business Equity goal on this project is 11% of the total bid value of the contract (Base bid 17 applies to Parks and Community Services). 18 19 METHODS TO COMPLY WITH THE GOAL 20 On City contracts where a Business Equity Goal is applied, offerors are required to comply with the City's 21 Business Equity Ordinance by meeting or exceeding the above stated goal or otherwise comply with the 22 ordinance through one of the following methods: 1. Commercially useful services performed by a 23 Business Equity prime contractor, 2. Business Equity subcontracting participation, 3. Combination 24 of Business Equity prime services and Business Equity subcontracting participation, 4. Business 25 Equity Joint Venture/Mentor-Protege participation, 5. Good Faith Effort documentation, or 6. 26 Prime contractor Waiver documentation. 27 28 SUBMITTAL OF REOUIRED DOCUMENTATION 29 Applicable documents (listed below) must be received by the Purchasing Division, OR the offeror shall 30 EMAIL the Business Equity documentation to the assigned City of Fort Worth Project Manager or 31 Department Designee. Documents are to be received no later than 2:00 p.m., on the third City 32 business day after the bid opening date, exclusive of the bid opening date. 33 34 The Offeror must submit one or more of the following documents: 35 1. Utilization Form and Letter(s) of Intent, if the goal is met or exceeded; 36 2. Good Faith Effort Form and Utilization Form, including supporting documentation, if 37 participation is less than stated goal, or no Business Equity participation is accomplished; 38 3. Prime Contractor Waiver Form, including supporting documentation, if the Offeror will perform 39 all subcontracting/supplier opportunities; or 40 4. Joint Venture/Mentor-Protege Form, if goal is met or exceeded with a Joint Venture or Mentor- 41 Protege participation. 42 43 These forms can be found at: 44 Business Equity Utilization Form and Letter of Intent 45 httDs://anus.fortworthtexas.aov/Pro_ iectResources/ResourcesP/60 - MWBE/Business Ea_uity_ Utilization 46 Form DVIN 2022 220324.Ddf 47 CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised October 27, 2021 004540-2 Business Equity Goal Page 2 of 2 1 Letter of Intent 2 httDs://aDDs.fortworthtexas.eov/ProiectResources/ResourcesP/60 - MWBE/Letter of Intent DVIN 3 2021.Ddf 4 5 Business Equity Good Faith Effort Form 6 httDs://aDDs.fortworthtexas.2ov/ProiectResources/ResourcesP/60 - MWBE/Good Faith Effort 7 Form DVIN2022.Ddf 8 9 Business Equity Prime Contractor Waiver Form 10 httns://aDDs.fortworthtexas.eov/ProiectResources/ResourcesP/60 - MWBE/MWBE Prime Contractor 11 Waiver-220313.Ddf 12 13 Business Equity Joint Venture Form 14 httt)s://aDDs.fortworthtexas.eov/ProiectResources/ResourcesP/60 - MWBE/MWBE Joint 15 Venture 220225.Ddf 16 17 18 FAILURE TO ACHIEVE THE GOAL OR OTHERWISE COMPLY WITH THE ORDINANCE 19 WILL RESULT IN THE BIDDER/OFFEROR BEING DECLARED NON -RESPONSIVE AND 20 THE BID REJECTED. 21 22 23 FAILURE TO SUBMIT THE REOUIRED BUSINESS EOUTY DOCUMENTATION OR 24 OTHERWISE COMPLY WITH THE ORDINANCE WILL RESULT IN THE BID BEING 25 DECLARED NON -RESPONSIVE. THE BID REJECTED AND MAY SUBJECT THE 26 BIDDER/OFFEROR TO SANCTIONS AS DESCRIBED IN SEC. 20-373 OF THE ORDINANCE. 27 28 For Questions, Please Contact The Business Equity Division of the Department of Diversity and 29 Inclusion at (817) 392-2674. 30 31 END OF SECTION 32 CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised October 27, 2021 00 52 43 - 1 Agreement Pagel of 6 SECTION 00 52 43 AGREEMENT THIS AGREEMENT, authorized on April 9, 2024, is made by and between the City of Fort Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager, ("City"), and Capko Concrete Structures LLC, authorized to do business in Texas, acting by and through its duly authorized representative, ("Contractor"). City and Contractor may jointly be referred to as Parties. City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK Contractor shall complete all Work as specified or indicated in the Contract Documents for the Project identified herein. Article 2. PROJECT The project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: 2024 Sidewalk Improvements Unit Price Construction Contract Various City Project Numbers Article 3. CONTRACT PRICE City agrees to pay Contractor for performance of the Work in accordance with the Contract Documents an amount, in current funds, of One Million Five Hundred Thousand and 00/100 Dollars ($1,500,000.00). Contract price may be adjusted by change orders duly authorized by the Parties. Article 4. CONTRACT TIME 4.1 Final Acceptance. The Work shall be complete for Final Acceptance within the number of days specified in each Task Order, plus any extension thereof allowed in accordance with Article 12 of the General Conditions. 4.2 Liquidated Damages Contractor recognizes that time is of the essence for completion of Milestones, if any, and to achieve Final Acceptance of the Work and City and the public will suffer from loss of use if the Work is not completed within the time(s) specified in Paragraph 4.1 above. The Contractor also recognizes the delays, expense and difficulties involved in proving in a legal proceeding, the actual loss suffered by the City if the Work is not completed on time. Accordingly, instead of requiring any such proof, Contractor agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay City Five Hundred and 00/100 Dollars ($500.00) for each day that expires after the time specified in Paragraph 4.1 for Final Acceptance until the City issues the Final Letter of Acceptance. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised March 3, 2024 00 52 43 - 2 Agreement Page 2 of 6 Article 5. CONTRACT DOCUMENTS 5.1 CONTENTS: A.The Contract Documents which comprise the entire agreement between City and Contractor concerning the Work consist of the following: 1. This Agreement. 2. Attachments to this Agreement: a. Bid Form 1) Proposal Form 2) Vendor Compliance to State Law Non -Resident Bidder b. Current Prevailing Wage Rate Table c. Insurance Certification Form (ACORD or equivalent) d. Payment Bond e. Performance Bond f. Maintenance Bond g. Power of Attorney for the Bonds h. Worker's Compensation Affidavit i. MBE and/or SBE Utilization Form 3. General Conditions. 4. Supplementary Conditions. 5. Specifications specifically made a part of the Contract Documents by attachment or, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents. 6. Drawings. 7. Addenda. 8. Documentation submitted by Contractor prior to Notice of Award. 9. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. Article 6. INDEMNIFICATION 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the city, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under this contract. This indemnification provision is suecifically intended to overate and be effective even if it is alleged or Droven that all or some of the damages being sought were caused. in whole or in Dart. by anv act. omission or negligence of the citv. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the city in defending against such claims and causes of actions. CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised March 3, 2024 005243-3 Agreement Page 3 of 6 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the city, arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licensees or invitees under this contract. This indemnification provision is specifically intended to operate and be effective even if it is alleged or proven that all or some of the damages being sought were caused, in whole or in Dart, by anv act. omission or negligence of the citv. Article 7. MISCELLANEOUS 7.1 Terms. Terms used in this Agreement which are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions. 7.2 Assignment of Contract. This Agreement, including all of the Contract Documents may not be assigned by the Contractor without the advanced express written consent of the City. 7.3 Successors and Assigns. City and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, in respect to all covenants, agreements and obligations contained in the Contract Documents. 7.4 Severability/Non-Waiver of Claims. Any provision or part of the Contract Documents held to be unconstitutional, void or unenforceable by a court of competent jurisdiction shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon City and Contractor. The failure of City or Contractor to insist upon the performance of any term or provision of this Agreement or to exercise any right granted herein shall not constitute a waiver of City's or Contractor's respective right to insist upon appropriate performance or to assert any such right on any future occasion. 7.5 Governing Law and Venue. This Agreement, including all of the Contract Documents is performable in the State of Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the Northern District of Texas, Fort Worth Division. 7.6 Authority to Sign. Contractor shall attach evidence of authority to sign Agreement if signed by someone other than the duly authorized signatory of the Contractor. 7.7 Non -appropriation of Funds. In the event no funds or insufficient funds are appropriated by City in any fiscal period for any payments due hereunder, City will notify Vendor of such occurrence and this Agreement shall terminate on the last day of the fiscal period for which appropriations were received without penalty or expense to City of any kind whatsoever, except as to the portions of the payments herein agreed upon for which funds have been appropriated. CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised March 3, 2024 00 52 43 - 4 Agreement Page 4 of 6 7.8 Prohibition On Contracts With Companies Boycotting Israel. Contractor, unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of the Texas Government Code, if Contractor has 10 or more full time -employees and the contract value is $100,000 or more, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Contractor certifies that Contractor's signature provides written verification to the City that if Chapter 2271, Texas Government Code applies, Contractor: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. 7.9 Prohibition on Boycotting Energy Companies. Contractor acknowledges that in accordance with Chapter 2276 of the Texas Government Code, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more, which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meaning ascribed to those terms by Chapter 2276 of the Texas Government Code. To the extent that Chapter 2276 of the Government Code is applicable to this Agreement, by signing this Agreement, Contractor certifies that Contractor's signature provides written verification to the City that Contractor: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. 7.10 Prohibition on Discrimination Against Firearm and Ammunition Industries. Contractor acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Contractor certifies that Contractor's signature provides written verification to the City that Contractor: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised March 3, 2024 005243-5 Agreement Page 5 of 6 7.11 Immigration Nationality Act. Contractor shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Contractor shall provide City with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Contractor shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Contractor employee who is not legally eligible to perform such services. CONTRACTOR SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY CONTRACTOR, CONTRACTOR'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Contractor, shall have the right to immediately terminate this Agreement for violations of this provision by Contractor. 7.12 No Third -Party Beneficiaries. This Agreement gives no rights or benefits to anyone other than the City and the Contractor and there are no third -party beneficiaries. 7.13 No Cause of Action Against Engineer. Contractor, its subcontractors and equipment and materials suppliers on the PROJECT or their sureties, shall maintain no direct action against the Engineer, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the City will be the beneficiary of any undertaking by the Engineer. The presence or duties of the Engineer's personnel at a construction site, whether as on -site representatives or otherwise, do not make the Engineer or its personnel in any way responsible for those duties that belong to the City and/or the City's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The Engineer and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised March 3, 2024 005243-6 Agreement Page 6 of 6 IN WITNESS WHEREOF, City and Contractor have each executed this Agreement to be effective as of the date subscribed by the City's designated Assistant City Manager ("Effective Date"). Contractor: By. , 7-ohn Y C gok0 / V John J Capko IV (May 3t, 202413:36 CDT) Signature John J Capko IV (Printed Name) President / Owner Title P.O. Box 426 Address Azle, TX 76098 City/State/Zip May 31, 2024 Date City of Fort Worth By: Jesica McEachern Assistant City Manager Jun 18, 2024 Date FORT°�oaa p°0000 Attest: Pao � _; 4S6bd Jannette Goodall, City Secretary (Seal) M&C: 24-0274 Date: April 9, 2024 Approved as to Form and Legality: Qow— Douglas Black (Jun 12, 202410:22 CDT) Douglas W. Black Sr. Assistant City Attorney OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX CITY OF FORT WORTH 2O24 Sidewalk Improvements Unit Price Construction Contract STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Various City Project Numbers Revised March 3, 2024 0061 13- 1 PERFORMANCE BONE Page I cf2 Bond N um1�er, SLJR2006604 [ SECTION 1W 61 13 2 PERFORMANCE BOND 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENT : 6 COUNTY OF TA]RRANT § 7 That we, Capkn Concrete SfTudures I.I.C, knowtl a_S "Principal" herein and 8 l=rankmmwh lnsurance Camoany a eorpgraK surely duly auflioriaed to do business in the State of 4 Texas, €cmmn as "Surely- herein (whether one or more), are held and Firmly bound unto die City 10 of Fort Worth, a municipal corporation emated pursuant to the laws of Texas, knowll aS "City" I ] herein. in the penal sum of, One Million Five hundred Thousand and 00/100 Do[lars 12 ($1,500,0N.04 lawful money Of the United States, to be paid in Rai Worth, Tarrant Courtly, t3 Texaas for the payment of which sum well and truly to be made, we bind oursetves, our heirs. 14 cxecmtors, adininistmtors, successors and assigns, jointly and sr3verally, firmly by these presents. 15 WH EREAS, the Principal has enlemd !Tiro a certain written contract w€th the City awarded Ib the 99i day of April, 2024, which Contract is hereby referred to and ma& a part hereof for all 17 purposes n if fully suet forth herein, to furnish all inaterials, equipnient labor and other accessotie_s [8 defined by law. in the prosecution of the Work, including any Change Orders, as provided fur in 19 said Contract dcsigrlated as 2024 Sidewalk Improvements Unit Price Construction Contrace, 20 Vsiriaaa City Project Number,- 21 NOW, THEREFORE, the condition of this obJiga ien i.s such that if the said Principal 22 shall faithi`ully perfbrin it ob]igalions urderthe Contract and shal€ in ail respects duly and faithfully 23 perform the Work, including Change Orders, render the Contract. according to the plans, 24 specifications, and contract documents therein reFormd to, and as well during any per€od of 25 extexrgion of the Contract that may be &rallied on die part of the City, then this obligation shall be 26 and become null and void, otherwise to rein ain in fuI I force and effect. 27 PROVIDED FURTH FK, [hrtt if any legal action he fileel on this Bond, venue shalt lie in 28 Tarrant County. Texas or the United States District Court for the Northern District of Tom, Fort 29 Worth Division. 3Q 'Chia bond is inade and executed in eomp€iance with the provisl0rts 01 Chapter 2253 of the 31 Texas Ciovernment Code, as amended, and all liabilities on 1k % bond shall be delerrrlined in 32 accordance with the provisions of said statue. CITY OF r-owr wyicni 2424 Sidewalk 1rnfrowcnrt!y5 Uriil Prxe Caiulrucliw ionliact STANDAIW CONSTRUCTION SPECI FICA710N E10CUMENTS. Various Citk Project Nuinbm RevLwd Dece"her 8, 2023 4 5 6 7 8 9 1€1 11 i� 1 14 15 lb 17 13 19 20 21 22 23 24 25 26 27 28 29 39 31 32 33 34 35 36 37 38 39 40 006113-2 PER RIHi41?.EV{ V }Ef7HIJ Page 2 a€'L IN WITNESS WHER EOF, the PrincipaI and the Surety have SIGNED and SEALED tYEks WS1rument icy duly authorized agents and afl'rcers on this the _ slay UF,� — - , 2024. ATTES'r, — 41 ! OtL--� pr-IRCtpalj Smrc�[xry — Wi -ss as rn rijifval T 0, ,;, ' Y 1, 6et Witnew as to Surety Pi21UC IPAI. C 2Pka C'OMCre 5teucEures LLC: BY: S toe _ 1�amt�El T;�l{• Address; F.O. Bux 426 Azle. TX 76M SURETY; Rankenmuth Insurance Comoanv BY: ix�� tore Iordm Nts, AU4)LT c-y-lA-Fact Narne and TWe Addre ; oneNtutualAve Frankenmtith, MT 48787. Telephone hlumba. 469-661-0314 -- Enull Address_ itts lttslbUdsanir,com *Nate. if signed by an officer Df the Surety Company, there must be on file a certified extract frnrn the by-laws showing that this person has authority to sign such obligation, if Surety's physical address is different from its inailhig address, both must be provided - The date of the bond shall not be prior to the dare the Caniract is awardnd- CITY OP E?{)ff Y w{.iit rH 20N SWL-walk € npruvemenls UnN Pr[tc G Eisl=duft 4:onlract STe%NDARD XNSTRUCTION SPECOCATION MCUMIiiNTS Various Oly PrgRlcl NurnLVF9 Revised December R. 2121 UOSI14-I PAYMFNI- BOND Page k of 2 i SECTION 00 6114 ldond Number. SUR2006604 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 KNOW ALL BY THESE PRESENTS: C COLT TM OF TARRANT 7 That we, Capka Cowrett� Structures LLC, known as "Principal" herein, and 8 r"nker""th fnsuranre C!TPan3- , a COTPOlatV surety, duly authorized to do business in the Slate 9 of Texas, €crown as "Surety" herein (wheiher one or more), are held and firmly bound Ltnto the City if) of Fort Worth, a rrknnicipgI wrporation created pursuant to the laws of the Slate of Tuxats, known It as "City" herein, in the Knal sum of Ofle Million rive 1-lundred Thousand and MAW Dollars 12 ($1,500,000,00), lawful money of the United States, to be paid in Fort Worth, Tarrant County, 13 Texas. for the payn- wnt of which sum nail and truly be made. we bind ourselves. out heirs, 14 executors, administrators, successors and assigns, jolntly and severally. firmly by these presents; 15 WHEREAS, Principal has entered into a rWirl vattten Contract with City, awarded the 16 91 day of April, 2024, which Contract fs hereby referred to and made a tram hereof For al I purposes 17 as if fu Ily set roan heiAn, to furnish all materials. equipment, labor and odw accessories as defined 18 by law, in tine prosecurion of the mark as provided for in said Contract and designated as 2024 €9 Sidewalk Improvements Unit Price Construction Contract. Variow City Pn*ct Nun&ers. 20 NOW, THEREFORE. THE CONDITION OF THIS OBLIGATION is such that if 2€ Principal shall pay all monies owing to any (and all) payment band beneficiary (as defined In 22 Chapter U53 of the TeyAi Gnvcrnment Cade. as amt-nded) irk the prosecution of the Work under 23 the Contract, then this obligatton shall be and become milt avid void, otherwise to remain in full 4 Force and effect_ 5 This bond is made and exectsLe,d iri camp Iiance with the provisions of Chapter 22-13 of the 26 Texas Guvernment Code, as atnended. and all liabilities on this bond shall be determined to 27 accordance with the provisions of said statute_ 28 CITY OF FORT WORTH -2024 Sldexaik lmpcovrmenls t my race 0mgirmthmi 0)til rwr STANDARD CONStRLA-rt17N 5Pi;CTFICATION D00-- MEKTS Varkus City C'm[eu Nuftdels Revised DbmTaer 8, ?04a 0061 t4-2 MYMTt NT BOND PIV aofz I IN WfTN ESS WHEREOF. the Prinelpai attd Surety have each Sf IVED and SEALED 2 this irstrtimem by duly autttor12ad agents and of'iicees on this the 2,041, day of 3 4 f ID 12 XFTEST. {Printip�lj ecrctaey Pess as to Frinci�i69L PRINCIPAL- Capkt} 0mcme Structures LL S gna�urc Marne and Title Address: P.O- Bnx 426 Azle. TX 76098 SIJRETY; Frankemnuth irL3Urance Cpmpany iT l'i?ST: "Y' Sid tardan Fitts. A#tomay-In-Pact (Surety) Secretary Me]issa Pitts ~— Name and Title Address: One Mutual Ave Frankenmuth, MI 48787 Witness as to Suety Telepbone Number: 40-661•0314 Email Address_ _jpitts@pittsbirdsanp-corn Note' IfMgnod by an officer of the Surety, there must be on file acertified extract From tite bylaws 01DWIng that this person has autherlty to sign such obligatiorl. If Surety's physical address is ditterent from Its inatling addrew, both must he provided. The date of the bond shall not be prior to the date the Contract Is awarded. END OIL SECTION CVT'Y OF FOR7 wClxn [ 2024 Sidewalk IffWmvemm Unit PrLce CokiMnceunn Conufiu S1`ANDAR13 CONSTRUCTION SYLCt$i1C=A'1f0N VOCUtoTEN s5 V*TirW¢Clly i'MJC i Nw®tirrs Rcvised Ncemler R. Z023 FRANKENMUTH JINSURANC9 COMPANY POWER OF ATTOMMY KNOW ALL MEN BV THESE PRESENTS, chat Fran ken mu[h Insurance Company (Ihe `�-,ampany`). a corporation duly organised and existing under Ilse laws of the Stan of Michigan, having us principal office al I Mlutu31 Avenue, Frankenmuih, Michigan 487V, does hereby nominate. constitute Rrad Appaint' Jordan Pi#ts, Lloyd Ray Pits Jr., William D- Birdsong Their true and Iawral aitorney(s)-in-fact. each in ilieir sepafaie capactly ir- inore than one is nained alcove, to make, execute, seal, acknowledge artd de{ivcr any and all bonds, contracts and undertakings of suretyshilr, with Ihe excerAian of Financial Guaranty Insurance, pro-vided, however, than Ihe pepat 541m of any ate suclti irtStFUPItUl %'.halI nOE eXC4:Vd the sum UF'. Fifty Million and 001100 Dollars ($54,000,000) This Power of Atiorncy is granted pursuarEl lu [he folaowing Resolution duly adopted at a mtoi rig of rh a Bawd of Directors of Frankeninuth Insurance Company_ "RESOLVED, [ha( the President, Seer lof Vice President or Vice President and each of [heart under their respectiwc designations. hereby i5 authorized to exec We powers of artorncy, and such authority can be executed by ttse of facsitnRe signature, which may he attested 4r acknowledged by arty offiecr of the Company, quaiifying [he attornep(s) named in [he given power 0Cattorney, to execute on behalf of, and acktrawIedge as the act and deed of Fvarikcnmuth Insafancc Company on all bonds, coatracis and undertakirigs of suretyship, and to aflGx the corporate sfal Thereto-" [N WITNESS WHEREOF, the Company has coused chest! pre Penis to be signed and a[tested by its appropriate officers and its corporate scot hetieertttp' this ]Slh day DfDU= 1 Frank-enmuth rrmurance Company l;redericlC A- Edn�ar�d, Jr., ,= president and Chief Execwiwe OfFFcer 5 ' T�.dr1J� 1 � O y OFMK A W Sworn to before roe. a Notary Pub1w kn the State of Michigan, by Frederick A- Umond, Jr.. 10 me personally known to be Ihe indiuiduat and officer dieseribcd in, and who executed the precedil1g irrslrumew, deposed and said the C'orporam Seal and his sigfiawu y6 were affixed and sijbscr,hed to said instrumcrn[ by The authnrity of the Company. �11%!, .e IN TEST]i4IONY WHERE0F'r I havt<sm my hand. and affixed my OffEcia[ Seal this 13th day of December, 2t ed ctr Susan T.. Ftesorger, lolary PAR Saginaw County. Sato of Michigan My Commission ExpLres: April 3. 2028 IF 1. the urrdetsigned, Exceulive Vice Fresidcot of Franke nmuth Insurance Company- do hereby certify that Ihe foregoing is a Irue. corfrco and compleiecopy of rhr original Power of Attorney; chat said Power of Attorney has not been revoked or reWnded and is in full rbree and eflect as of [his date. IN WITNESS WHEREOF, 111dvtt set m} hand aad affixed Ihe Seal of"Carn , ibis LJ��Oilnday a4 Andrew H. Knudsen, Execuliwe Vice President. Chtrf Operortng Officer and Secretary ALL C0Rli✓riSP0.V1)F.VCF, RELtTED TO HOND VALIDATION ANWOR A CLAIM SHOULD AEDIRECTED TO VP SURErV, 701 U.S. ROUTE ONF., SUITE r, YA RMOUTH, ME 440 ri IMPORTANT NOTICE TO ALL TEXAS POLICYHOLDERS IMPORTANT NOTICE AVISO IMPORTANTE To obtain info rmalian or make a complaint You may call Frsnkenmuth Mutual Inaur-ance Company toll -free telephone number for information or to make a camplairrt at: 1-704-421-7002 You may also write to Frankenmuth Mutual Insurance Company at' FrankenmUth Mutual Insurance Company One Mutual Avenue Frankenmuth. MI 48787 You may contact the Texas Department of Insurance to obtain Information on companies, coverages_ rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P.O.Sm 149091 Austin, TX 78714-9091 Fax. (512) 00-1007 Web: htlp-lAwm.tdj.texas.gov E-mail: ConsumarProtection tdi texas.gov PREMIUM OR CLAIM DISPUTES - Should you have a dlspWe concerning your premium or about a claim you should contact the Frankenmuth Mutual Insurance Company first. tf the dispute is not resalved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY. This notice is for information only and does not become a part or condition of the attached document. Para obtener information o para someter una queja: Usted puede liamar al numero de telefono gratis de Frankenmuth Mukual Insurance Company Para mformacion o Para sornster urea queja at: 1-7 04-42 t -7002 Usted tarnbien puede escribir a Frarnkenrnuth Mutual Insurance Company: Frankenmuth Mutual Insurance Cornpany One Mutual Avenue FrankernmUth, MI 48787 Puede camunicarse corn el Departamento de Seguros de Texas pars obtener Inform ion acerca de companias, coberturas, derechos o quejas all: 1-800-262-3439 Puede escribir al Cepartomento de Seguros de Texas: P.O. Box i49091 Austin, TX 78714-3991 Fax: (512) 490-1007 Web' http'/AVWw.tdi.texae,g0V E-mail, ConsurnerProtection@tdi_texas.gov OJSPUTAS SORRE PRIMAS O RECLAMOS: Si tune una disputa cancermenre a su prima o a un recWmo, debe comunicarse can el Frankenmuth Mutual Jnsurance Company prxmero, Si no se resuelve la d sputa, puede urrtoris comunicarse con el departarnento (TDI). UNA ESTE AVISO A SU POLIZA Este aviso es solo para propos4o de informac"ron y no se Lonvierte an parte o condicion del documento sdjt,nto 00 MLOG42 44 04 16 Page 1 of 1 oust t9 - t MALNT ENANCE E CWL3 Page t OH 1 SECTION 00 6119 [land Number: SUR2006644 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS 5 KN OW ALLBYTflESFFRESENTS: 6 COUNTY OF TARRANT � 7 8 That we Capko Concrete Struclum LLC, known as "Principal' herein and '� Fratakerarnutil Insurance c' r,n. uany, a enrpaEuY surety duly authorl , to d bush s €n the Sate Of 10 Texas. known as 'Surety" herein (whether one or more) . are held and ftnnly baLmd unto the City 11 of Fort Worth. a municipal corporation created pursuant tti the taws of the State of Texas. ktrnwn 12 ;�s 'City' herein, in the sure of 0ae Million Five Hundred Thousand and Owfou Dollars 13 ($1,500,000.00), lawful money of the United States, to be paid in Fort 41+arth, 'Tarrant County. 14 Texas. For payment of which sum well and truly be made unto the City and its successors, we bind 15 ourselves, our heirs, execvt,ors, admintstrators, successors and assigns, Jointly and severally, firmly 16 by these presents, 17 18 WHEREAS, die Principal has mwred into a certain written contract with the City awarded 19 the 91" day of April, 2024, which Contract is hereby referred to and a made part hereof for all 20 purposes as If Fully set forth herein, cc) furnish all materials, equipment labor and other accessories 21 as dettned by law, in the pruwcuficn of the Work, including any Work resulting fmrn a duly 22 authorized Change Order (collectively herein, the "Work') as provided for in said contract and 23 de:ngnated m 2G24 Sidewalk Improvements Emit Price Construction Contract, Various City Project 24 Numbers; and 25 26 iERIEA _ Principal bloods itself to use such materials and to so construct the Work in 27 accordance with the plans. Sp"iflcaHum and Contract Documents that the Work is and will remain 28 frr--e frnm defects in materials or war kntanship for and during the period of two 12) years after the 29 date of EInal Acceptance of the Work by the City ("Mziintenance Period"); and 30 31 WHEREAS, Principal binds Itself to repair or recoToruct the Work in whvlt: car I part uPIn 32 receiving notice from the City of the need therefor at any Hme wlIhin rhrs alntem-ance Period, 33 CfTY OF FORT WORM 2n& Skkw&k tiuWK& v m1s Uptr price Conimmma C omirwe STANDARD C )NS7RUCT[0A SPEC3FICATION EK)C VMEVN Various Clay "a Numbm RvAKL� Ox'MIriber 2, 20n MAINTENANCE BOND PaRC 2 nr 3 1 NOW THEREFORE, the c ondhion of this obligation is such that if Principal steal l remedy 2 any defective Work, for which ttmciy notice was provided by City, to a to 3 dos City, then this obligation shall become null and void; otherwise to remain In full Force and d effect, 5 6 18 19 PROVIDED, HOWEVER, if Principal shall fatl so to repair or reconstruct any timely noticed deflective Work, it is agreed that the City inay cause any and all such defective Woil to be repalmd andfor reconstructed with all assncidted costs thereof being borne by the Principal and the Surety tinder this Maintenance honct; and PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall Ile in Tafrant Cow Lty, Texas or the United States DistriL:t i ciurt for the Northern District of Text, Fort Worth Dig U)n; Arid PROVIDED FURTHER, that this abligation shall he continuous in nature and successive receverles may he had hcTr:on For successive breaches_ GtrY OF FORT WGRI 4 EU2A Sidewalk hgprovem ft Unit Price ivimunecibm Comma S 'ekNJ)ARD CONSTRUCTION S?M- PiCrMON DU,'UN14N 25 V40UMCity PFd*CA NCIMkWra Revw d x mimkw & M23 oast 19.3 MAlMENANC . HUmD Fzgv s 13F3 1 IN WITNESS WHEREOF, the Principal and the Surety have earls S I N ED and S EALED this 2 Instrument by duly authorized a8ents �tntf (Oficers on this the ')%OA43 day of 3 , 2024- 5 B 7 8 10 11 12 13 14 t5 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 4 PRINCIPAL Capka Concrete Structures LLC BY Or SlgnetM�r' ATTF5T- 1)(.'ad - [Prtnetpai) Secretary N,3mn anA Tula Address: P-0. Box 42� Axle, TX 7$098 1 ss as Principal SURETY: Frankenmu#h Insurance Com arry € Y. tore Jordan Pitts, Attorney-ln.Fact ATTEST: k Name and Titie f Address; 0ae Mutual Ave (SuretYr)' Secretary McIissa Pitts Frankenmuth, MI 48787 Witness as to surety Tclephaac Number-. 469-661-0314 HmaiI Addre��: _jpitts,@pittsNvLWngrco,n *Note: If signed by ar+ officer of the Surety Company, there must be on ftle a certified extract from the by-laws showing that thin person has authulty to signs such obligation- if Sstreiy'5 physical address is diFF!rent from Its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. city t7F rORT WORTH 2024 SldewEA imprQWMff $ Un94 Pricr. Canatnrctkan Caf&aal SThNVARD COKSTRUC'IIG SPEOFTCAT1Odti DOCUMr-MrS vadmw City E4"t N(unheo REv6ed oeKember 2. 2023 FRANKEhfMUTH INS URhN CC COM PA NY POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS, that Frankenmuth Insurance Company (khe "Company") a cerpordttion duly organized and existing unifer the laws of the Slate of Michigan, hawing iis Principal -office at J Mutuai Avenue, Fraaketimuth, Michigan 48797, discs hereby nominate, eonsthutr and appoine Jol-dan Pitts, Lloyd Flay Pitts Jr_, William D. Birdsong Their irua and Ia.wful ta[torncy(s)-in-fact, t�Ach i,i Ilie ir separale capacity if more than oaa is named above, [o make, execute, seal. acknowledge and deliver any and all bonds, comrarrs and undertakings of suretyship. wish the exception of Financial Guaranty Insarranee-, provided, however, ilkat iha penal suer of any one sucli insirunfcnt shall not exceed the sum of. Fifty M1111un and ON100 Dollars 0,000) This power of Aitorncy is granted pursuant to the Fallowing Rcs4lution duly "op[astl at a mea:ting of the BOa2rd Of DiFeCtrtra of Franice'nmuO Insurance Company: .-RESOLVED, chat ihC PTCSidenl. SeRkdf VICC President or Vice Prasidem and each of them under their respeclive designations, hereby is aulhafizrd to axeCule puwers of attorney, and such authority cxn be execu led by use of facsimile signature, which may hx aitested ar acknewiedg-d by any 0 115arr of the Company, quaitfyirig the attorney(s) named in the given power of attorney, to execute on behalf of. and acknow[edge as the A0 acted deed of FrankenmLIM Insurancr< Company nn all bonds, C4atracIS and underlakings Of s[xre[yship. and to affix [he cnfporave seal thereto." tN 4k ITNE5S WH ERFAF, the Com pa n y h as caa Seri Ihcse press rt[s t-o b-c sigricd and atlesied by i [s ap fJ r0l3riALG a f free" anti its cmrporate seal hepatrtltii)Wod.this 151h flay of c ber, 2022. Frankenmutb fesurarice Cornpiny 40 Frederick A. Edmofld, In. 5 TF. 1 .= Presidew and Chief Execkitive Officer Co Y OF ' } SKI ...,. . SWOrn to before mu. aldtxafy J'UNX In the State of Michigan. by Frederick A. Edmond. Jr., to me personallyknown to be the individuai and officer descrihed in, and who execa led ibc preceding in pmritem, deposed and said the Corporate Scal and his 5iguulu�rs were affixed and subscfsbed io said instrument by the authority of the Ivompany, ,w*19 IN TESTIMONY WHEREOF. t have sct my hand, and affixed my Official Seal This 151h day of Decernbe% 202`� t ti1 (Seal) _ X y usatl L. F7csorger, Xalary Pit I, i Saginaw County, State of Michigan My Commission Expires_ April 1, 2G28 ,p � I, the undersigned. 8xecuTive: Vice President of Friiokcnrnuth lnfur4acc Cornpany, do hereby csrtify rttat the foregoing is a true, oukreci and complete Copy of the urigmal Fewer of Alturney; that said Puwarr of Attorney has not bl�n rcvuked or rescinded and as in fu11 force and errant as of this date_ IN WITNESS WHEREOF, I have sit rrty hand and affixed the Seul k of [he Company, this � day of pl GO'A Andrew H_ Knudsen, Excuwtivc Vice Presideni, Chicf {operating Officer and 5ecaxtary ALL CORRESPONDENCE PONDENCE REIA TED TO 80ND VALIDA TION ANDIOR A C'LA bV SHOULD BE DIRECTED TO VP S')RErY, 101 U-S, ROUTE ONE, SLATE 1, YAR,x{OVTH, AM W096 IMPORTANT NOTICE TO ALL TEXAS POLICYHOLDERS IMPORTANT NOTICE AVISO IMPORTANTE To obtain information or make a complaint. You msy call Frankenmuth WWI Insurance Company toll -Frew telephone rs; mlaw for information or to rn2�e a complaint at' 1-7 D4-421-7002 You may also write to Frankenmuth MutuaI Insurance C ompany at. Frankenmuth Mutuaf Insurance Company One Mutual Avenue Frankenmuth, MI 48787 `fokr may conlact the Texas f "rtment of Insurance to obtain information on companies. coverages, rights or compJaints at: 1-800-252 439 You may write the Texas Department of Insurance: P.O. Box 149091 Austin, TX 78714-9091 Fax: (512) 4' -1007 Web: http:1Ay wa_tdi,texas,gov E-mail; Cons umerFrote ction tdi.texas gov PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your prernium or about a claim you should contart the Frankenmuth Mutual Insurance Company first. If the dispute is not resolved, you may oantact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. Para obtefier Mnformacion o para spmcter una quefa: Usted puede ilamar al numero de telefono gratis de Frankenmuth WNW Insurance Company para i€ forrmacion o psra someter una queja al; 1-704-421-7002 Usted tambi& puede escribir s Frankenmuth Mutual Insurance Company'. Frankenmutti Mutual Insurance Company One Mutual Avenue Frankenmuth, MI 48787 Puede 0ofnUnkars8 can al Departarnento de Seguros de Texas para i3blener information acerca de companias, coberturas, derechos a quetas al'. 1-800-252-3439 Puede r:scF.Nr al Departamento de Seguros de Texas, P.O. Box 149091 Ausftnr TX 7B714-9091 Fax. (512) 490-1007 Web: ht1p'1Akww1di,texas,gov E-mail. ConsurnerProtection@tdi texas,gov DISPUTAS SOBRE PRIMA$ O RECLAMOS 5i tiene una disputa concerniente a su prima o a ups reclamo, debe comuNcarse can e: Frankenmuth Mutual Insurance Company primero. Si no se resuelve Ia disputa, Puede entonces cumunicarse con el departamento (TDI). UNA ESTE AVISO A SU POLIZA: Este aviso es solo para proposito de information y no se convierte en parte o condition del documento adjunto. 00 MLC042 44 04 16 Page 1 of I FORT WORTH,.., Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE:2024 Sidewalk Improvements. Unit Price [CAPK01 M&C: 24-0274 CPN: Date: 06/06/24 To: Name 1. Donnette Murphy 2. Patricia Wadsack 3. Lauren Prieur 4. Priscilla Ramirez 5. Doug Black 6. Jesica McEachern 7 Ronald Gonzales 8 Janette Goodall 9 Allison Tidwell 10. TPW Contracts N/A CSO: 61573 DOCM Department Initials Date Out Risk -Approver 1.1 "" 06/10/24 TPW-Approver pL 06/11/24 TPW-Signer 06/11 /24 Legal -Approver- 06/11 /24 Legal -Signer 1 36/12/24 ACM -Signer 36/18/24 CSCO-Approver PgTf )6/18/24 CSCO-Signer 06/18/24 CSCO-Form Filler- 06/18/24 TPW CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: ❑YES ®No SAME DAY: []YES []No NEXT DAY: []YES ❑No ROUTING TO CSO: ®YES ❑No Action Re aired:, ❑ Attach Signature, Initial and Notary Tabs ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File Link to the General Conditions & Technical Specs Return To: Please notify TPWContracts a@fortworthtexas. oovv for pickup when complete. Call eat. 7233 or ext. 8363 with questions. Thank you! FORTWORTH. Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: 2024 Sidewalk Improvements. Unit Price [Caakol M&C: 24-0274 CPN: n/a Date: 05/29/24 To: Name 1. John Capko IV/Capko Conc. 2. Proj. Mgr.: Fanta Kaba 3. Michelle Hadley -McGhee 4. 5. 6. 7 8 9 10. CSO: Department Initials Vendor -Signer rsc TPW-Signer F K TPW-Review DOC#: Date Out 05/31/24 06/03/24 06/06/24 CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: ❑YES ®No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No ROUTING TO CSO: ®YES ❑No Action Required: ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return To: Please notify TPWCoirtracts(i�fortworthtexas.gov for pickup when complete. Call ext. 7233 or ext. 8363 with questions. Thank you! 0 Bond Verification From: Jordan Pitts To: svc. Aailoft Cc: TPW Contracts Subject: Re: PLEASE REPLY - BOND VERIFICATION REQUEST (2024 Sidewalk Improvements) ID:[fi7y3k/4958/1022] Date: Tuesday, June 4, 2024 5:11:34 PM CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open attachments unless you recognize the sender and know the content is safe. Confirmed Sent from my iPhone On Jun 4, 2024, at 3:35 PM, agiloftsvc@fortworthtexas.gov wrote: 06/04/2024 Good afternoon Jordan. The City of Fort Worth is in receipt of the following referenced bond(s) — BOND #SUR2006604, in the amount of $1,500,000.00 (One Million Five Hundred Thousand and 00/100 Dollars), from Capko Concrete Structures LLC, for City Project (2024 Sidewalk Improvements, Unit Price Contract). Please provide confirmation that both the bond(s) and dollar amount(s) are valid. Your prompt attention to this matter is greatly appreciated! If there are additional questions or concerns, please do not hesitate to contact me at, michelle.hadlev- mcaheeafortworthtexas.00v, or by phone, 817-392-7233. Should this request have reached you in error, or needs to be directed elsewhere, please be so kind to provide the name of the contact, with both an email address & phone number of the person or department being referenced. It is appreciated. ,&okuiS/6twatd & pggpeeciative, Michelle Hadley -McGhee Contract Compliance Specialist City of Fort Worth Transportation & Public Works (TPW) 200 Texas Street, Fort Worth, TX 76102 Direct: 817-392-7233 Michelle. Had lev-McGhee(@fortworthtexas.gov