Loading...
HomeMy WebLinkAboutIR 7178 INFORMAL REPORT TO CITY COLIWIL -MEMBERS No. 7178 5op" To the Mayor and Members of the City Council March 10 , 1987 Subject: PROPOSED CHANGES TO PURCHASING POLICY The amendment of the City Charter approved in November, 1983 changed the requirements for competitive bidding on City contracts and approval of contracts by the City Council. This change requires the City Council, by ordinance, to establish rules by which a contract may be signed by, the City Manager without Council approval. Subsequent to the Charter amendment, on M&C G-5872 (1/3/84), the Council chose to reflect the then existing state law and authorized the City Manager to sign any contract not exceeding $5,000 without Council approval when let to the lowest responsive bidder, quality considered. In the last session of the Legislature the limit allowed by state law was increased from $5,000 to $10,000. Approval to increase the authorization given to the City Manager to the $10,000 level has been delayed until the recommendations of two different reviews of the City's purchasing policies and procedures could be more fully analyzed. During 1986, both a review by an outside purchasing consultant and an internal audit were conducted with the objective of improving the efficiency and effectiveness of the City's purchasing function. The findings of the review and the audit have been evaluated and monitored by the City's new Purchasing Manager. Additionally, the audit findings and the Purchasing Manager's response to those findings have been discussed with the City Council Audit Committee.- Among other findings, these two reviews agreed that large dollar amounts are being spent to control relatively small expenditures resulting in an on-going backlog in the purchasing process and a hindrance to departments` accomplishing their assigned duties. i,educing, by ordinance, the dollar level for contracts which must go before the City Council along with two other basic changes to the City's purchasing policy should have a positive impact on purchasing process. These changes are to increase the level at which written bids are required from $2,500 to $5,000 and to increase the level of purchasing aul'-hority delegated to departments from $50 to $250 as outlined on the attachment to this informal report. It is the staff's position that these enchancements coupled with an on-going internal audit program can be made to the purchasing process without lessening the City's internal control standards. In addition to the input previously received from the Audit Committee, the staff welcomes comments from the rest of the Council prior to these recommendations .being placed before the Council for action on the agenda for 3/17/87. 6kuglas HarmanV i" City Manager ISSUED BY T E CITY MANAGER FORT WORTH, TEXAS PROPOSED POLICY CHANGES PURCHASING DIVISION CURRENT PROCEDURES • <$50.00 - CONTROL NUMBER ISSUED • >$50.00 & <$2.5 - VERBAL BIDS • >2.5K - WRITTEN BIDS • >$5K - WRITTEN BIDS ADV. ,M&C EFFECTS OF CURRENT PROCEDURES WRITTEN BIDS : 1000 WRITTEN BIDS PROCESSED ANNUALLY 4 MANHOURS USED PER EACH WRITTEN BID (1000 BIDS`f 4 HRS/BID) / 1500 HRS AVAILABLE = 3 BUYERS VERBAL BIDS : 13,324 VERBAL BIDS PROCESSED ANNUALLY 3/4 MANHOURS USED PER EACH VERBAL BID A*j (13,324 ^.75 HRS) / 1500 HRS AVAIABLE = 7 BUYERS 10 BUYERS NEEDED TO PROCESS 8 BUYERS CURRENTLY ON STAFF PROPOSED ?PROCEDURES • <$250.00 - LOCAL PURCHASE ORDER • >$250.00 & <$5K - VERBAL BIDS • 5K & <10K - WRITTEN BIDS, ADV. IF NECESSARY • $10K & ABOVE - WRITTEN, ADV. , M&C EFFECTS OF PROPOSED PROCEDURES 750 WRITTEN BIDS REQUIRING COUNCIL APPROVAL (750 * 4 HRS/BID) /1500 HRS AVAILABLE = 2 BUYERS 11,500 VERBAL BIDS PROCESSED ANNUALLY ARE OVER $250.00 (11,500 '^ .75 HRS/BID) /1500 HRS AVAIL = 6 BUYERS „% EFFECTS OF "STATUS QUO" 830 REQUISITIONS CURRENTLY SHOW NO ACTIVITY SOME OF THESE DATE BACK TO NOVEMBER. AVERAGE DAYS TO PROCESS A WRITTEN BID FROM RECEIPT OF REQUISTION - P.O. PRINT = 68.4 DAYS, OUR GOAL IS 40 DAYS. AVERAGE DAYS TO PROCESS A VERBAL BID FROM RECEIPT OF REQUISITION - P.O. PRINT = 18 DAYS, OUR GOAL IS 10 DAYS.